Loading...
HomeMy WebLinkAboutCostworksheet3_10-7-09  Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 374 MWh/yr Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt 1 grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 2 @65 KW 1@45 KW iii. Generator/boilers/other type iv. Age of generators/boilers/other <1 yr v. Efficiency of generators/boilers/other unknown b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $10,055 ii. Annual O&M cost for non-labor $13,000 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 14 kWh/per gal ii. Fuel usage Diesel [gal] 33,600 gal Other iii. Peak Load 57 KW iv. Average Load 48 KW v. Minimum Load 34 KW vi. Efficiency Unknown vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] N/A ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.      Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 90 kW b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 374 mWh/yr ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system $660,000 b) Development cost $290,500 c) Annual O&M cost of new system $10,000 d) Annual fuel cost 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 26,700 gallons/yr ii. Heat iii. Transportation b) Price of displaced fuel $133,500/year c) Other economic benefits $0.21 kWh versus $0.48 kWh presently d) Amount of Alaska public benefits $0.27 kWh 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 2:1 (value of displaced fuel vs debt repayment) Payback