Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Figure 2_ProjectLayout_sm
!! !!!!!!!!!!!!!!!!!!!!!!!!!!!!!!!6 O 0 200 400100 Feet ¯Chenega Bay Hydroelectric ProjectReconnaissance Report Proposed Project Layout Figure 2 MAP NOTES:1. Base aerial image from Aerometric, Inc. taken June 28, 2005.6 Falls (fish barrier)Anderson Creek !Proposed pipeline (above ground) !Proposed pipeline (below ground)Proposed intake access road Proposed Tailrace Proposed Intake Site (existing ANTHC intake) ProposedPowerhouse LEGEND ProposedPipeline Route Proposed IntakeAccess Road Barrier Falls 2(fish barrier) Anderson Creek