Loading...
HomeMy WebLinkAboutREFG Round III BudgetRenewable Energy Fund Grant Round III Grant Budget Form 10-7-09 Milestone or Task Anticipated Completion Date $4,000,000 RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: TOTALS Phase I Program Plan: 0. Drill Well Naknek-G #1 0.1 Finalize contracts and procurement for equipment, materials and services 07/30/09 $3,429,160 $2,694,340 NEA $6,123,500 0.2 Prepare drilling pad and access road 07/30/09 $518,448 $407,352 NEA $925,800 0.3 Mobilize drilling equipment to the well site and rig up 07/30/09 $952,000 $748,000 NEA $1,700,000 0.4 Regulatory permitting and compliance 07/30/09 $560,000 $440,000 NEA 1,000,000 0.5 Drill to Total Depth (TD), Well Completion, Testing and Evaluation 11/30/09 $1,604,400 $1,260,600 NEA $2,865,000 0.6 Project Management and Reporting 11/30/09 $420,000 $330,000 NEA $750,000 1. Deploy temporary surface-based seismic array to collect baseline seismic data, calibrate velocity model and prepare for later stimulation 08/31/09 $110,940 DOE $110,940 2. Mobilize downhole geophysical logging equipment and crew 10/01/09 $1,251,140 DOE $1,251,140 3. Electric logging 3,000 – 8,000 feet (sonic-gamma-density) equipment, crew and data processing 10/16/09 $29,270 DOE $29,270 4. Mobilize Pressure-Temperature-Spinner (PTS) logging, equipment, and crew 10/16/09 $166,940 DOE $166,940 5. Electric logging 8,000 – 10,000 feet (sonic-gamma-density) crew and data processing 10/16/09 $15,770 DOE $15,770 6. Core and mini-frac (extended leak-off test) at 10,000 feet 10/26/09 $82,700 DOE $82,700 7. Electric logging 10,000-14,000 feet (sonic-gamma-density with Stoneley wave and cross-dipole; FMI with gamma for correlation) crew and data processing 11/14/09 $51,079 DOE $51,079 8. Core collection at TD (14,000 feet) 11/16/09 $150,000 DOE $150,000 9. Pre-stimulation injection test using rig pumps, with TPS logging and reactive tracer injection (air-lift/flow-back at end to recover tracer) 11/20/09 $86,397 DOE $86,397 10. Heat-up temperature profiles over 6-8 weeks enabling stabilized temperature and pressure (water rest level) data to be obtained 01/31/10 $40,440 DOE $40,440 11. Petrological / mineralogical analyses of cuttings and mechanical testing of core from 10,000-14,000 feet 01/31/10 $86,510 DOE $86,510 12. Mechanical testing of cores from 10,000-14,000 feet 01/31/11 $61,510 DOE $61,510 13. High-temperature reactor experiments on cuttings from potential stimulation intervals to identify best agents for chemical stimulation 01/31/10 $23,540 DOE $23,540 14. Analysis of all logs (TPS, FMI, sonic), rock strength and mini -frac data to develop stress model 01/31/10 $124,824 DOE $124,824 15. Design of seismic monitoring system and permitting of 6 core holes for shallow downhole deployment of seismometers 02/28/10 $78,699 DOE $78,699 Renewable Energy Fund Grant Round III Grant Budget Form 10-7-09 16. FULL TEAM MEETING: Data based conceptual modeling of resource 02/28/10 $81,397 DOE $81,397 17. Progress Report: Favorability of well Naknek-G #1 for stimulation 03/15/10 $19,849 DOE $19,849 18. Seismic monitoring system set-up (drill 6 shallow holes, install equipment, calibrate system and velocity model, deploy 3 accelerometers for ground movement monitoring) 05/15/10 $585,699 DOE $585,699 19. Pre-stimulation of well Naknek-G #1 with thermally reactive tracer injection and modeling to estimate fracture surface area 06/30/10 $465,246 DOE $465,246 20. FULL TEAM MEETING: Data integration and stimulation planning 07/31/10 $63,699 DOE $63,699 21. Phase I Reporting 07/31/10 $102,096 DOE $102,096 22. Go/No-Go Decision Point:: 1) Favorability of Naknek-G #1 for stimulation; 2) selection of site and depth for Naknek-G #2 (based on stress orientation and pre-stimulation results) 08/15/10 $43,699 DOE $43,699 Phase I travel expenses $50,000 DOE $50,000 Phase II Program Plan: 1. Permitting and procurement for full stimulation 10/15/10 $55,699 DOE $55,699 2. Chemical and/or hydraulic stimulation of well Naknek -G #1, seismic monitoring; post-stimulation injection test with detailed TPS logging in Naknek-G #1 and continued seismic monitoring 11/30/10 $1,252,794 DOE $1,252,794 3. Integrated evaluation of stimulation results and finalization of site and depth for Naknek-G #1 01/31/11 $87,548 DOE $87,548 4. Progress Report and Go/No-Go Decision: Suitability of stimulated reservoir to support drilling of second well 03/31/11 $58,699 DOE $58,699 5. Well design 03//31/11 $23,699 DOE $23,699 6. Permitting and procurement 03/31/11 $44,849 DOE $44,849 7. Road, well pad and water supply to site of Naknek -G #2 10/15/10 $244,000 DOE $244,000 8. Drill well Naknek-G #2 following same EGS program (during and after drilling) as in well Naknek-G #1. Downhole pressures monitored in well Naknek-G #1 while drilling well Naknek-G #2 06/30/11 8.1 Finalize contracts and procurement for equipment, materials and services 06/30/11 $3,779,160 $2,969,340 $1,889,580 DOE $1,079,760 NEA $6,748,500 8.2 Mobilize drilling equipment to the well site and rig up 06/30/11 $952,000 $748,000 $476,000 DOE $272,000 NEA $1,700,000 8.3 Regulatory permitting and compliance 06/30/11 $728,000 $572,000 $364,000 DOE $208,000 NEA $1,300,000 8.4 Drill to Total Depth (TD), Well Completion, Testing and Evaluation 06/30/11 $1,636,832 $1,544,765 $890,847 DOE $3,181,597 Renewable Energy Fund Grant Round III Grant Budget Form 10-7-09 $653,918 NEA 8.5 Project Management and Reporting 07/30/11 $420,000 $330,000 $210,000 DOE $120,000 NEA $750,000 9. Heat-up temperature profiles over 6-8 weeks enabling stabilized temperature and pressure (water rest level) data to be obtained 08/31/11 $201,440 DOE $201,440 10. Geologic analysis of cuttings and core samples from well Naknek -G #2; mechanical testing of core samples; analysis of well logs; evaluation of seismic data 08/31/11 $255,246 DOE $255,246 11. FULL TEAM MEETING: Data integration and stimulation planning 08/31/11 $63,699 DOE $63,699 12. Progress Report and Go/No-Go Decision: Suitability of well Naknek-G #2 for stimulation 09/15/11 $19,849 DOE $19,849 13. Chemical and/or hydraulic stimulation of well Naknek -G #2; seismic monitoring, hydraulic monitoring in well Naknek -G #1; post-stimulation injection test with detailed TPS logging in well Naknek-G #2, continued seismic and hydraulic monitoring 10/31/11 $1,252,794 DOE $1,252,794 14. Integrated evaluation of stimulation results and design of circulation test program 11/30/11 $81,397 DOE $81,397 15. Progress Report and Go/No-Go Decision: Suitability of circulation test plan 12/15/11 $5,000 DOE $5,000 16. Permitting and procurement for circulation testing 02/28/12 $53,389 DOE $53,389 17. Circulation testing including tracer testing and fluid sampling 05/31/12 $650,096 DOE $650,096 18. Analysis of testing results and modeling of future system behavior 07/31/12 $105,794 DOE $105,794 19. Phase II Reporting 08/31/12 $117,096 DOE $117,096 20. Go/No-Go Decision: Suitability of enhanced reservoir for geothermal power production 08/31/12 $67,548 DOE $67,548 Phase II travel expenses $50,000 DOE $50,000 TOTALS $15,000,000 $20,506,477 $35,506,477 Budget Categories: Direct Labor & Benefits $1,233,043 $517,878 $715,165 $ Travel & Per Diem $100,000 $42,000 $58,000 $ Equipment $3,250,000 $1,365,000 $1,885,000 $ Materials & Supplies $7,757,000 $3,345,220 $4,411,780 $ Contractual Services $19,940,634 $8,375,066 $11,565,568 $ Renewable Energy Fund Grant Round III Grant Budget Form 10-7-09 Construction Services $925,800 $388,836 $536,964 $ Other $2,300,000 $966,000 $1,334,000 $ TOTALS 35,506,477 15,000,000 $20,506,477 $35,506,477 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed. Renewable Energy Fund Grant Round III Grant Budget Form 10-7-09 Project Milestones that should be addressed in Budget Proposal Reconnaissance Feasibility Design and Permitting Construction 1. Project scoping and contractor solicitation. 2. Resource identification and analysis 3. Land use, permitting, and environmental analysis 5. Preliminary design analysis and cost 4. Cost of energy and market analysis 5. Simple economic analysis 6. Final report and recommendations 1. Project scoping and contractor solicitation. 2. Detailed energy resource analysis 3. Identification of land and regulatory issues, 4. Permitting and environmental analysis 5. Detailed analysis of existing and future energy costs and markets 6. Assessment of alternatives 7. Conceptual design analysis and cost estimate 8. Detailed economic and financial analysis 9, Conceptual business and operations plans 10. Final report and recommendations 1. Project scoping and contractor solicitation for planning and design 2. Permit applications (as needed) 3. Final environmental assessment and mitigation plans (as needed) 4. Resolution of land use, right of way issues 5. Permit approvals 6. Final system design 7. Engineers cost estimate 8. Updated economic and financial analysis 9. Negotiated power sales agreements with approved rates 10. Final business and operational plan 1. Confirmation that all design and feasibility requirements are complete. 2. Completion of bid documents 3. Contractor/vendor selection and award 4. Construction Phases – Each project will have unique construction phases, limitations, and schedule constraints which should be identified by the grantee 5. Integration and testing 6. Decommissioning old systems 7. Final Acceptance, Commissioning and Start-up 8. Operations Reporting