Loading...
HomeMy WebLinkAboutFY11_Costworksheet3_10-7-09_Tenakee Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source: Indian River Hydroelectric Project The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Estimated annual average resource availability. 916,600 kWh/year for average water year Unit depends on project type (e.g. windspeed, hydropower output, biomass fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt 1 grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 88, 88, 66 kW (peak) iii. Generator/boilers/other type Diesel generators iv. Age of generators/boilers/other All are 2 years old v. Efficiency of generators/boilers/other combined efficiency is 13 kWh/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $20,000 (estimated) ii. Annual O&M cost for non- labor $5,000 (estimated) c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 430,000 kWh ii. Fuel usage Diesel [gal] 32,500 gal Other none 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 iii. Peak Load 120 kW iv. Average Load 50 kW v. Minimum Load 19 kW vi. Efficiency 12.97 kwh/gal (PCE data from 2007-2009) vii. Future trends Future load growth without hydro is flat. With hydro, will likely increase. d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 60,000 gal (estimate) ii. Electricity [kWh] Unknown (any usage is included in c.i) iii. Propane [gal or MMBtu] zero iv. Coal [tons or MMBtu] zero v. Wood [cords, green tons, dry tons] 24 cords/year (estimate) vi. Other zero 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 120 kW installed capacity – run of river hydro 87% capacity factor b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 916,600 kWh/year ii.Heat [MMBtu] - c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] 0 ii. Coal [tons or MMBtu] 0 iii. Wood [cords, green tons, dry tons] 0 iv. Other 0 4. Project Cost a) Total capital cost of new system $2,711,000 Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 3 10-7-09 b) Development cost $ 329,000 (includes $100,000 already committed) c) Annual O&M cost of new system $ 22,200 d) Annual fuel cost Zero 5. Project Benefits a) Amount of fuel displaced for i. Electricity 31,400 gallons ii. Heat 13,000 gallons iii. Transportation N/A b) Price of displaced fuel $ 5.81 / gal (2011 projection) c) Other economic benefits Embedded in fuel cost. d) Amount of Alaska public benefits $0 in quantifiable economic terms 6. Power Purchase/Sales Price a) Price for power purchase/sale Estimated utility rate to customers is $0.20 to .30/kWh. This includes revenue requirements for all utility costs. 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio With 50 year life, $5,600,000 / 2,355,500 = 2.38 Payback $2,590,000 / 252,200 = 10.3 years