Loading...
HomeMy WebLinkAboutCostworksheetMKI-Final Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 100% for transmission line Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 4 ii. Rated capacity of generators/boilers/other 23,000 kW iii. Generator/boilers/other type Diesel generators iv. Age of generators/boilers/other Varies – 1970 through 1998 v. Efficiency of generators/boilers/other Approximately 14.5 kWh per gallon of diesel fuel b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $30,000 ii. Annual O&M cost for non-labor $30,000 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 164,800,000 (2007 actual for KPU) ii. Fuel usage Diesel [gal] 180,000 (estimated for 2007 for KPU diesel generation) Other iii. Peak Load NA iv. Average Load 18,800 kW (2007 actual for KPU) v. Minimum Load NA vi. Efficiency NA vii. Future trends Significant increases with local conversions to electric space heat d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Unknown ii. Electricity [kWh] Unknown iii. Propane [gal or MMBtu] Unknown iv. Coal [tons or MMBtu] Unknown v. Wood [cords, green tons, dry tons] Unknown vi. Other Unknown 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] None for transmission line b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] None for transmission line ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] None ii. Coal [tons or MMBtu] None iii. Wood [cords, green tons, dry tons] None iv. Other None 4. Project Cost a) Total capital cost of new system $7,652,000 b) Development cost $7,652,000 c) Annual O&M cost of new system $60,000 d) Annual fuel cost None 5. Project Benefits a) Amount of fuel displaced for i. Electricity 600,000 gallons per year ii. Heat iii. Transportation b) Price of displaced fuel $1,510,000 at current fuel prices c) Other economic benefits $130,000 per year (incremental diesel O&M savings) d) Amount of Alaska public benefits $1,640,000 per year 6. Power Purchase/Sales Price a) Price for power purchase/sale Assumed 8.5 cents/kWh (price to be negotiated later) 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 2.0 Payback 8.5 years