Loading...
HomeMy WebLinkAboutCostworksheet3_10-7-091(final) Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 12MWh Grant Lake (+3MWh Lake Elva) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 7 diesel generators ii. Rated capacity of generators/boilers/other 455ekW, 5@ 1050ekW, 1135ekW iii. Generator/boilers/other type iv. Age of generators/boilers/other 2009, 2@2006, 2@2008, 2000, 1988 v. Efficiency of generators/boilers/other 14.16 kWh/gal b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $ 575,000.00 plant ii. Annual O&M cost for non-labor $ 363,891.00 depreciation c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 16,894,317 kWh - 2008 ii. Fuel usage Diesel [gal] 1,250,000 gal Other iii. Peak Load 3.6MW iv. Average Load 2MW v. Minimum Load 1.6MW vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 2.7MW hydro b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 12MWh (+3 MWh Lake Elva) ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system $ 49,500,000.00 b) Development cost c) Annual O&M cost of new system $1,800,000.00 plt & dep d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 850,000 gal (@50%) ii. Heat iii. Transportation b) Price of displaced fuel $ 2,524,500.00 (@ recent 3 yr avg of $2.97/gal) c) Other economic benefits ($ 5,049,000.00 @ 30 yr avg diesel price of 5.94/gal) d) Amount of Alaska public benefits (est. 30 yr fuel savings = >$150,000,000.00 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 1.3:1 Payback 20 years