Loading...
HomeMy WebLinkAboutClearwater Costworksheet3_10-7-09 Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source Wind The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 13.2 mph or 6.0 m/s Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) windspeed 2. Exis ting Energy Generat ion and Usage Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 a) B asic configura tion (if system is part of the Railbelt# The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department , Matanuska Electric Association and Anchorage Municipal Light and Power. # grid, leave this section Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 3 10-7-09 blank) Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 4 10-7-09 i. Num ber of generator s/boilers/o ther ii. Rate d capacity of generator s/boilers/o ther iii. Gene rator/boile rs/other type iv. Age of generator s/boilers/o ther v. Effici ency of generator s/boilers/o ther Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 5 10-7-09 b) Annu al O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annu al O&M cost for labor ii. Annu al O&M cost for non-labor Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 6 10-7-09 c) Annu al electricity productio n and fuel usage (fill in as applicabl e) (if system is part of the Railbelt grid, leave this section blank) i. Electr icity [kWh] ii. Fuel usage Diesel [gal] Other iii. Peak Load Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 7 10-7-09 iv. Aver age Load v. Mini mum Load vi. Effici ency vii. Futur e trends d) Annu al heating fuel usage (fill in as applicabl e) i. Diese l [gal or MMBtu] ii. Electr icity [kWh] iii. Prop ane [gal or MMBtu] Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 8 10-7-09 iv. Coal [tons or MMBtu] v. Woo d [cords, green tons, dry tons] vi. Other 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] 1800 kWh b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] 4,730,400 kWh ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 9 10-7-09 iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost $4,500,000 a) Total capital cost of new system $4,400,000 b) Development cost $100,000 c) Annual O&M cost of new system $0.02 per kWh = 94,608 d) Annual fuel cost 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 3,189,120 gallons over 20 years ii. Heat iii. Transportation b) Price of displaced fuel Avoided costs $0.0918 per kWh or $8,685,014 over 20 years Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet RFA AEA10-015 Application Cost Worksheet Page 10 10-7-09 c) Other economic benefits Landowner royalties paid over 20 years $681,177 Transmission line loss savings at 3% loss $0.09 per kWh= $255,441 d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale Avoided Cost or Cost-Based 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Payback