Loading...
HomeMy WebLinkAboutNWABSchool_Milestone Table(1)Milestone table for the NWAB School Alternate Energy Solar Awareness Project The NWAB is proposing to complete installation of Tracking Solar arrays at each of 11 High-schools in the Region. School maintenance personal and students will be utilized for the installation in collaboration with local utility personal. AEA must receive and approve evidence that each milestone has been reached prior to approving reimbursement or releasing funding for the corresponding tasks. The milestones and corresponding tasks are outlined in the table below. Project timeline based on the acceptance of an official grant agreement between NWAB and the State of Alaska. Required Milestone Reimbursable Tasks Timeline 1. Reconnaissance Done Sep-Oct 2009 2. Feasibility Study Done September October 2009 3. Conceptual Design Done October 2009 4. Ordering of Equipment and materials 4.1 Put out bid on Equipment 4.2 Select vendor 4.3 Order Equipment 4.4 Distribute Equipment to Schools July 2010 5. Construction 5.1 Mobilization 5.2 Site access and foundation installation 5.3 Creation of pedestals foundation 5.4 Assembly of arrays July 2010 6. Integration of arrays onto the grid 6.1 Connection by utility personal July 2010 7. Commissioning 7.1 Commissioning Aug 2010 8. Operations Report 8.1 Operation Report 30 Aug 2010-30 Aug 2011