HomeMy WebLinkAboutGalena Renewable Energy Project App
Renewable Energy Fund Round 3
Grant Application
AEA 10-015 Application Page 1 of 20 10/7/2009
Application Forms and Instructions
The following forms and instructions are provided to assist you in preparing your application for
a Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA)
and the forms are available online at: http://www.akenergyauthority.org/RE_Fund-III.html
Grant Application
Form
GrantApp3.doc Application form in MS Word that includes an outline of
information required to submit a complete application.
Applicants should use the form to assure all information is
provided and attach additional information as required.
Application Cost
Worksheet
Costworksheet3
.doc
Summary of Cost information that should be addressed by
applicants in preparing their application.
Grant Budget
Form
GrantBudget3.d
oc
A detailed grant budget that includes a breakdown of costs by
milestone and a summary of funds available and requested to
complete the work for which funds are being requested.
Grant Budget
Form Instructions
GrantBudgetInst
ructions3.pdf
Instructions for completing the above grant budget form.
If you are applying for grants for more than one project, provide separate application
forms for each project.
Multiple phases for the same project may be submitted as one application.
If you are applying for grant funding for more than one phase of a project, provide
milestones and grant budget for completion of each phase.
If some work has already been completed on your project and you are requesting
funding for an advanced phase, submit information sufficient to demonstrate that the
preceding phases are satisfied and funding for an advanced phase is warranted.
If you have additional information or reports you would like the Authority to consider in
reviewing your application, either provide an electronic version of the document with
your submission or reference a web link where it can be downloaded or reviewed.
REMINDER:
Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials
submitted to the Authority may be subject to disclosure requirements under the act if no
statutory exemptions apply.
All applications received will be posted on the Authority web site after final
recommendations are made to the legislature.
In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or
proprietary company data be kept confidential subject to review and approval by the
Authority. If you want information is to be kept confidential the applicant must:
o Request the information be kept confidential.
o Clearly identify the information that is the trade secret or proprietary in their
application.
o Receive concurrence from the Authority that the information will be kept
confidential. If the Authority determines it is not confidential it will be treated as a
public record in accordance with AS 40.25 or returned to the applicant upon
request.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 2 of 20 10/7/2009
SECTION 1 – APPLICANT INFORMATION
Name (Name of utility, IPP, or government entity submitting proposal)
Louden Tribal Council
Type of Entity:
Tribal Government
Mailing Address
PO Box 244, Galena, Alaska 99741
Physical Address
100 Campion Road, Galena, Alaska 99741
Telephone
9076561711
Fax
9076561716
Email
Phil.koontz@gmail.com
1.1 APPLICANT POINT OF CONTACT
Name
Phil Koontz
Title
Environmental Engineer
Mailing Address
PO Box 288
Galena, Alaska 99741
Telephone
907 656 2328
Fax
9076561716
Email
Phil.koontz@gmail.com
1.2 APPLICANT MINIMUM REQUIREMENTS
Please check as appropriate. If you do not to meet the minimum applicant requirements, your
application will be rejected.
1.2.1 As an Applicant, we are: (put an X in the appropriate box)
An electric utility holding a certificate of public convenience and necessity under AS
42.05, or
An independent power producer in accordance with 3 AAC 107.695 (a) (1), or
A local government, or
XX A governmental entity (which includes tribal councils and housing authorities);
Yes
1.2.2. Attached to this application is formal approval and endorsement for its project by
its board of directors, executive management, or other governing authority. If the
applicant is a collaborative grouping, a formal approval from each participant’s
governing authority is necessary. (Indicate Yes or No in the box )
Yes
1.2.3. As an applicant, we have administrative and financial management systems and
follow procurement standards that comply with the standards set forth in the grant
agreement.
Yes
1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached
grant form. (Any exceptions should be clearly noted and submitted with the
application.)
No*
See
note
1.2.5 We intend to own and operate any project that may be constructed with grant
funds for the benefit of the general public.
* Louden Tribal Council will turn the completed project over to the City of Galena to own
and operate for the public benefit.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 3 of 20 10/7/2009
SECTION 2 – PROJECT SUMMARY
This is intended to be no more than a 1-2 page overview of your project.
2.1 Project Title – (Provide a 4 to 5 word title for your project)
Type in your answer here and follow same format for rest of the application.
Galena Renewable Energy Project
2.2 Project Location –
Include the physical location of your project and name(s) of the community or communities that will
benefit from your project.
Answer here.
Galena, Alaska and the former Galena Air Force Base. The wood chip storage, the boiler,
and generator will be located close to the existing boiler plant at the former Air Base, and
will be directly connected to the City electrical distribution system and the existing utilidor
that serves the former Air Force buildings that are presently used by the Galena Interior
Learning Academy boarding school.
2.3 PROJECT TYPE
Put X in boxes as appropriate
2.3.1 Renewable Resource Type
Wind XX Biomass or Biofuels
Hydro, including run of river Transmission of Renewable Energy
Geothermal, including Heat Pumps Small Natural Gas
Heat Recovery from existing sources Hydrokinetic
Solar Storage of Renewable
Other (Describe)
2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply)
Reconnaissance Design and Permitting
Feasibility XX Construction and Commissioning
Conceptual Design
2.4 PROJECT DESCRIPTION
Provide a brief one paragraph description of your proposed project.
Louden Tribal Council is taking the lead in this application to purchase, install, and commission
a new steam powered Combined Heat and Power (CHP) facility that will eventually be owned
and operated by the City of Galena as an Independent Power Producer. The new project will
include assessment and management of the local biomass resources, formation of a partnership
with the biomass owner (Gana-a’Yoo Native Regional Corporation), purchasing and installation
of the harvesting equipment, boiler, steam powered generator, and heat recovery systems
including Organic Rankine Cycle generators, and providing steam heat for the existing utilidor
and buildings occupied by the Galena City School District. We hope and anticipate that the
project will eventually be expanded to provide wood pellets for home heating fuel to villages in
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 4 of 20 10/7/2009
the local region, and to radically reduce the cost of electric power through interties to other
villages.
2.5 PROJECT BENEFIT
Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel
costs, lower energy costs, etc.)
One of the principal benefits will be local employment for about 8 to 12 persons directly
employed, and about 40 to 50 additional local jobs, mostly at the Galena Interior Learning
Academy. Other benefits will include reduced electrical costs (roughly $0.30 per kWh instead of
the present $0.56 per kWH) and radically reduced heating costs for the GILA school buildings.
In addition, the reduction of diesel fuel use locally will reduce the net carbon footprint, greatly
reduced shipping of fuel on the Yukon River, and improvement of the biomass resource through
management of fire hazards, increased wildlife browse, and increased diversity.
In addition to the economic enhancement of providing local jobs and reduced living costs, there
will be a direct financial benefit to the shareholders of the Gana-a’Yoo Native Regional
Corporation due to the annual royalties that are anticipated as part of a land use agreement.
2.6 PROJECT BUDGET OVERVIEW
Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source
of other contributions to the project.
The entire project will cost about $11.2 million in new funding. The existing facilities that will
be dedicated to the project by the City and the City School district including the power
distribution system, the utilidor, and the real estate are valued at something over $30 million.
We (e.g. Louden Tribal Council, the project manager, and the community partners) plan to
obtain grant funding to pay for most or all of the new equipment, supplies, and operating costs,
so we are hoping that the $4 million limit for this grant application can be matched with other
funding, which we are actively seeking, although none of our various grant applications have
been approved as yet.
The fundamental economics of the project appear to be sound, and it turn out that loans or other
investment funds can be developed, particularly if a significant part of the total cost can be
funded by one or more grants.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 5 of 20 10/7/2009
2.7 COST AND BENEFIT SUMARY
Include a summary of grant request and your project’s total costs and benefits below.
Grant Costs
(Summary of funds requested)
2.7.1 Grant Funds Requested in this application. $4,000,000
2.7.2 Other Funds to be provided (Project match) $7,187,738
2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2) $11,187,738
Project Costs & Benefits
(Summary of total project costs including work to date and future cost estimates to get to a fully
operational project)
2.7.4 Total Project Cost (Summary from Cost Worksheet
including estimates through construction)
$11,187,738
2.7.5 Estimated Direct Financial Benefit (Savings) $63,000,000*
2.7.6 Other Public Benefit (If you can calculate the benefit in
terms of dollars please provide that number here and
explain how you calculated that number in your application
(Section 5.)
$ 186,000,000*
*notes—
2.7.5 Estimated Direct Financial Benefit (Savings)—
This figure is estimated based on elimination of about 700,000 gallons of fuel consumption per
year for the combined existing heating system and electrical generation systems, with diesel
fuel cost estimated at $3 per gallon for 30 years. Realistically, this is the avoided cost, which
will be offset by the actual costs, which are roughly half of the total amount.
2.7.6 Other Public Benefit—
Local jobs are the principal other public benefit. Approximately 12 new jobs are expected for
the new renewable energy system, plus about 50 new jobs at the GILA boarding school as it
doubles enrollment over the next few years. Jobs are estimated at $100,000 total economic
benefit per job per year, and, again, the benefits are extended for 30 years.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 6 of 20 10/7/2009
SECTION 3 – PROJECT MANAGEMENT PLAN
Describe who will be responsible for managing the project and provide a plan for successfully
completing the project within the scope, schedule and budget proposed in the application.
3.1 Project Manager
Tell us who will be managing the project for the Grantee and include a resume and references
for the manager(s). If the applicant does not have a project manager indicate how you intend to
solicit project management support. If the applicant expects project management assistance
from AEA or another government entity, state that in this section.
Type in your answer here and follow same format for rest of the application.
Three people have taken the lead for this project.
Lewis T (Tom) Johnson will be the project director. His resume summary is attached. He
performed the equipment scoping, sizing, and selection, and worked up the projected costs to
design, install, start up, and operate the proposed system. His background includes long
familiarity with the local economy, the utility systems, and with steam power and business
development. He has decades of experience with utility and business management and is deeply
familiar with local issues.
March Runner is the Louden Tribal Council Administrator and director of the Environmental
Department. She has extensive experience with financial and grant management, and will
perform those functions for the project. She recently managed funding for construction of the
$5.6 million Yukon Koyukuk Assisted Living Center.
Phil Koontz will assist both Ms. Runner and Mr. Johnson as a technical assistant. He has
degrees in civil engineering, chemical engineering, and law, and is a Professional Engineer
registered to practice in Alaska.
All of these persons are essentially self selected representatives of the local community, and have
agreed to pursue grant funding of the project for the general benefit of the community.
Resumes are attached.
3.2 Project Schedule
Include a schedule for the proposed work that will be funded by this grant. (You may include a
chart or table attachment with a summary of dates below.)
A Work Breakdown Structure (WBS--Excel Spreadsheet) is attached. The first sheet shows the
proposes schedule, which extends from today through closure of the grant project in December
of 2012. The schedule obviously will slip to accommodate the grant approval schedule, but we
hope to start bidding equipment and selecting an engineering firm almost immediately and to
have the project running by the fall of 2011. The first year of operation is included in the
schedule to accommodate the shakedown of the project and any delays that may be encountered.
3.3 Project Milestones
Define key tasks and decision points in your project and a schedule for achieving them. The
Milestones must also be included on your budget worksheet to demonstrate how you propose to
manage the project cash flow. (See Section 2 of the RFA or the Budget Form.)
The attached WBS spreadsheet depicts the project progress as a Gantt chart of activities, and as
quarterly accomplishments. The principal milestones are as follows—
December, 2009 (approximately) Grant approval, begin bids for equipment and a
design/construction engineering firm. An agreement with the biomass resource owner for
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 7 of 20 10/7/2009
harvesting tree chips should be in place by about the end of 2009.
Spring, 2010, hire the engineering firm, order the tree harvesting equipment.
Summer (barge season) 2010, delivery of the tree harvesting equipment, including a feller
buncher, chipper, and forwarders.
Fall and winter 2010-2011—initial tree chip harvest.
Spring 2011—delivery of the heavy equipment for the boiler, generator, and buildings.
Fall and winter, 2011 and 2012—construction and startup.
December 2012—close out project, turn the finished, operating steam plant and generator
facility over to the City of Galena.
3.4 Project Resources
Describe the personnel, contractors, equipment, and services you will use to accomplish the
project. Include any partnerships or commitments with other entities you have or anticipate will
be needed to complete your project. Describe any existing contracts and the selection process
you may use for major equipment purchases or contracts. Include brief resumes and references
for known, key personnel, contractors, and suppliers as an attachment to your application.
Biomass resources agreement—A contract for use of the local biomass resources is essential to
the project, and an agreement with the biomass resource owner is under discussion with the goal
of having it in place before any significant grant funding is committed.
Personnel—Local heavy equipment operators are readily available for the tree harvesting
operations, which is planned to be seasonal during the early and late winter seasons. The
boarding school presently employs about 50 persons for direct support of the school operations,
including dorm and teaching staff, dining hall, maintenance, administration, and support. The
school staff is expected to roughly double during the next few years, so the local employment
should increase by 50 people at the school plus direct operation of the harvesting and
boiler/generator operations. Many of the school staff will presumably be hired from outside
Galena.
Equipment—All of the proposed equipment is available within the time frames that are
projected.
Engineering—An Alaskan Engineering firm will be hired based on qualifications, prior
experience, and financial responsibility determinations. The engineering firm will perform the
design/build and construction management phases of the project.
3.5 Project Communications
Discuss how you plan to monitor the project and keep the Authority informed of the status.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 8 of 20 10/7/2009
The attached Work Breakdown Summary lists decision points, reports, estimated expenditures
and schedules. The financial manager (March Runner) will be in charge of reporting, financial
management, and oversight, with the assistance of the project director and the technical assistant.
3.6 Project Risk
Discuss potential problems and how you would address them.
No significant risks are anticipated with the technical portions of the project. That is, the
equipment, construction, and operating costs appear to be well known and not subject to serious
upsets. Tree harvesting equipment, the chipper, the forwarders, material handling equipment,
steam generation, and power and heat distribution are all well known technologies that are in
daily use in the local area.
The biomass resource availability is the principal risk, in that the project cannot proceed without
a firm, long term, and economically viable agreement for use of the trees located on several
thousand acres of nearby tribal lands. Management of the risk of obtaining the resource
development agreement will be by a simple decision at the beginning of the project—if the
resources are not available, the project cannot proceed.
Responsible long term management of the resource will be a continuing task, but is not viewed
as a major risk element.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 9 of 20 10/7/2009
SECTION 4 – PROJECT DESCRIPTION AND TASKS
Tell us what the project is and how you will meet the requirements outlined in Section 2 of
the RFA.
The level of information will vary according to phase(s) of the project you propose to
undertake with grant funds.
If you are applying for grant funding for more than one phase of a project provide a
plan and grant budget form for completion of each phase.
If some work has already been completed on your project and you are requesting funding for
an advanced phase, submit information sufficient to demonstrate that the preceding phases
are satisfied and funding for an advanced phase is warranted.
4.1 Proposed Energy Resource
Describe the potential extent/amount of the energy resource that is available.
Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project.
The proposed energy resource is the fast growing low value scrub trees that grow in the wetlands
surrounding Galena. The extent of the resource is much larger than the projected use. Our early
estimated indicate that approximately 400 acres per year (plus or minus 20 percent or so) will be
required to produce all of the tree chips that are required. Over the 30 year projected economic
life of the project, approximately 12,000 acres might be affected. Some or most of the harvested
biomass will be re-established during that time, although the exact speed and extent of the
regrowth has not been determined exactly.
The tribal lands affected also support some larger trees, principally spruce and birch that
occasionally grow to substantial sizes. Some of those more desirable trees will be harvested, but
the preference in selecting harvest areas will be for fast growing smaller trees such as willows and
their relatives. One example of a harvest plan that was presented at a recent meeting with the
Gana-a-‘Yoo natural resource committee would be to harvest a portion of one 640 acre section
each year, working gradually around Galena over a period of 30 years. That sort of harvesting
would keep the hauling distance for the tree chips to a maximum of ten or fifteen miles during the
life of the project, and would allow for a range of regrowth, open areas, and older trees within any
particular region. Initially, the preferred harvest areas would be on the north side of the Yukon
River, where building roads and timing of the harvest season would be easier, but eventually, the
harvesting is expected to expand to the south side of the river, and a winter road across the Yukon
will be required.
4.2 Existing Energy System
4.2.1 Basic configuration of Existing Energy System
Briefly discuss the basic configuration of the existing energy system. Include information about
the number, size, age, efficiency, and type of generation.
The existing energy system consists of three parts—
The Galena Electric Utility operates six diesel generators. The generators are rated for base loads
of about 450 kW to 1050 kW each, and generally two of them are in operation at any given time.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 10 of 20 10/7/2009
When they Air Force base was in operation, they burned about a million gallons of diesel per
year, and provided waste heat via a utilidor to the City complex of uptown Galena, which
includes the City School, the Clinic (now operated by TCC), the City Hall, the water plant, and
the City swimming pool and shower house. Since 2005, the Air Force has deactivated the base
and the load has declined to the point that the power house uses about 700,000 gallons per year
and the waste heat is not sufficient for the heating loads on the system. As a result, the City
complex utilidor has become inadequate, so the city buildings need to operate boilers for heat
during cold weather. The generators are a combination of old and new units, and their efficiency
depends largely on how much waste heat they can provide to the uptown Galena utilidor
complex. Their peak efficiency is estimated at perhaps 70% overall thermal efficiency, which
declines to as low as 30 or 40% during the summer months. The Denali Commission funded one
high efficiency 1050 kW diesel generator for the Galena Electric Utility in 2003. It is overdue for
a major overhaul, and the other generators are all older and less efficient. One of the six
generators is presently out of service due to a major breakdown.
As a result of the decline in available heat from the power house, the City complex now
represents a second heat load, with an annual fuel requirement of about 150,000 gallons.
The GILA boarding school complex at the former Air Force base uses heat from a utilidor and
boiler system that also supports the sewer and water plants. The heating and utilidor system uses
about 300,000 gallons of diesel fuel per year during the 10 month heating season, and cannot be
shut down without resulting in a destructive freeze up of the water and sewer systems. The three
existing boilers that supply heat for the utilidor are estimated at about 80% overall efficiency, and
have been in operation for about 30 years.
4.2.2 Existing Energy Resources Used
Briefly discuss your understanding of the existing energy resources. Include a brief discussion of
any impact the project may have on existing energy infrastructure and resources.
Diesel. The City uses something over a million gallons per year of diesel fuel that is delivered by
barge on the Yukon River. The proposed project will displace the existing diesel generator plant,
which will be kept as a backup system. Some diesel fuel will be required for the tree harvesting,
chipping, and hauling operations, but the estimated fuel consumption is much lower than at
present, perhaps 200,000 gallons per year. The existing boiler plant at the former AFB will also
be mothballed, for use in an emergency, but it will be easy to heat because it will be immediately
adjacent to the new boiler generator plant. The school buildings and business plan would benefit
immensely, and there is almost no drawback, unless the biomass harvesting itself should turn out
to be a problem. We hope and assume that careful planning and responsible management will
enable the tree harvesting portion of the project to benefit the forest and wildlife diversity and
sustainability.
The net results should be greatly reduced use and transport of diesel fuel, greatly improved local
economics and employment, more responsible environmental resource management, and a
reduced carbon footprint for the local area. In addition, we hope that the tree chips will provide a
feedstock for a wood pellet mill, with an almost negligible increase in the harvesting requirements
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 11 of 20 10/7/2009
(300 tons per year is the estimated capacity of the pellet mill, compared with 17,000 tons per year
for the entire project). Locally produced pellets would allow the local villages to begin to convert
to pellet stoves, which are more efficient to operate and use wood fuel in a much more convenient
form than typical home wood stoves.
It’s hard to find a down side. A few jobs will be moved from the diesel generator plant and from
the boiler plant to the steam fired system. Some barges won’t be required to haul fuel to Galena.
On the other hand, the future of the boarding school would be much more secure, more jobs will
be available there and elsewhere, and the cost of living should be significantly reduced.
4.2.3 Existing Energy Market
Discuss existing energy use and its market. Discuss impacts your project may have on energy
customers.
The main difference will be the substitution of local resources for imported fuel. The price of
electricity is expected to be reduced from about $0.56/kWh to $0.30 or less, and the cost of heat
for the GILA school buildings should be reduced proportionately. We hope that an intertie will
eventually extend some of the electrical cost benefits to nearby villages (probably Ruby,
Koyukuk, Nulato, and perhaps Kaltag), and that the pellet mill will permit people to use locally
produced fuel for pellet stoves instead of oil fired heaters such as Monitors or Laser stoves.
4.3 Proposed System
Include information necessary to describe the system you are intending to develop and address
potential system design, land ownership, permits, and environmental issues.
4.3.1 System Design
Provide the following information for the proposed renewable energy system:
A description of renewable energy technology specific to project location
Optimum installed capacity
Anticipated capacity factor
Anticipated annual generation
Anticipated barriers
Basic integration concept
Delivery methods
Renewable energy technology specific to project location—
Galena is located on the north bank of the Yukon River about 300 air miles west of Fairbanks.
Like most of interior Alaska, some renewable energy technologies (e.g. wind energy and direct
solar) are considered inadequate), and several non-renewable technologies including nuclear
power, coal and coal gas have been considered and dismissed as unsuitable.
The renewable technologies with the most promise appear to be in-stream hydro turbines in the
Yukon River and biomass. Both are under consideration, although implementation of in-stream
hydro technology appears to be several years away at best, and it cannot provide significant
amounts of heat for buildings or for the utilidors. Biomass development in the form of harvesting
trees is therefore the preferred technology for development.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 12 of 20 10/7/2009
Optimum installed capacity—
The electric power generation capacity of the system was selected so that it can take over
essentially all of the electric load from the existing diesel generator plant, which presently
operates at or below one megawatt, roughly 1500 horsepower. The electrical load is expected to
be generally around 800 kW, or 80% of the capacity of the proposed project, and to decline
slightly as the local power customers improve the efficiency of their buildings and activities. If
the electrical peak loads exceed the capacity of the new generator, the existing diesel power plant
can provide for standby and peak loads.
The other capacity issues (eg waste heat for building heating and utilidor maintenance in the
winter) are adequately provided for with a one megawatt generator capacity. Waste heat in the
summer will be recovered by the proposed ORC low temperature turbines and for use to maintain
greenhouses. Harvesting and chipping capacity is expected to be adequate to provide the annual
fuel supply during a harvest season of about 60 to 90 days, but the season can be adjusted if
necessary to provide additional wood chips for a pellet mill, or for a boiler to heat the utilidor
system in uptown Galena that serves the City complex, the clinic, and the water plant. The
additional fuel required for these purposes is not a major contribution to the overall capacity of
the system, and does not affect the sizing considerations for the equipment.
As the power and heating systems mature in the future, the community expects and plans to
increase our electrical and heating efficiency to more than offset the potential growth of the City
and the school, and we hope to be able to provide relative cheap excess power to other local
villages through electrical interties.
Anticipated Capacity Factor—
The electrical generator is expected to operate at approximately 80% of full load on an annual
basis, although this design factor may be refined during the engineering design phase of the
project. The harvesting and chipping capacity are based on seasonal use during early and late
winter when ice roads can be used, but extreme cold weather will not cause undue stress on the
equipment, and is estimated at about 60 to 90 days per year. The season can be adjusted to suit
the operational needs of the project, and the two key pieces of harvest equipment, the feller
buncher and the chipper are sized to allow some expansion of the harvesting capacity if necessary
by adding additional transportation capacity in the form of forwarders. Three forwarders are
proposed.
Anticipated Annual Generation—
At the projected 800 kW average load, the annual electrical generation would be approximately 7
million kWh per year. Steam for the utilidor is estimated at approximately the equivalent of
300,000 gallons of fuel oil per year or 30,000 Mbtu per year.
Anticipated Barriers—
The principal issue to be overcome is to reach an agreement for use of the biomass resource,
which is regarded as a decision point rather than a barrier. Scheduling for the project was
originally to begin this fall, and is likely to slip at least one year, depending on availability of
funds, which in turn will affect the delivery and construction plans.
Basic Integration Concept—
The new electrical power and steam generation facilities can be connected directly to existing
utilities, and the proposed location for the boiler/generator plant is close and convenient for the
connections. The real estate that will be used for the new facility and for chip storage and
handling already belongs to the City of Galena, which has agreed to dedicate their resources to
the project.
Taking a wider view, the regional land use has historically been compatible with wilderness
ecology—that is, the Native Regional Corporation has allowed the use of their land for
subsistence harvesting of furs, hunting and fishing, and for casual harvesting of firewood and
sawlogs. Prior to transfer of the property to Gana-a’Yoo, some of the property was logged for
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 13 of 20 10/7/2009
lumber and for fuel for the gold rush era steam boats, so much of the land on the north shore of
the Yukon is second growth timber. Increasing the harvesting of biomass enough to account for
the demands of this project will require some adjustment in the local land management
philosophy, but it should not compete strongly with the existing uses, and there will be some
offsetting benefits including improved public access to the land, improved fire control, and
possibly increased biological diversity.
Regarding other villages in the region, the principal effects should be economic shifts, including
some change in the local job market which may cause people to move to Galena from the other
villages, and some additional income and reduced costs for living in the local area.
Delivery methods—
Electrical power and steam heat deliveries will not be changed by this proposed project.
Eventually, electrical interties with local villages and some local commerce in wood pellets for
home heating may result in improved local commerce. Barge traffic may be reduced slightly on
the Yukon due to the reduced local demand for diesel fuel, but the fuel deliveries are typically
accomplished by about 3 to 6 barge deliveries per year, so the change will not be very substantial
in terms of river traffic.
4.3.2 Land Ownership
Identify potential land ownership issues, including whether site owners have agreed to the
project or how you intend to approach land ownership and access issues.
The property that will be used for the fixed assets associated with the project is already owned by
the City, and the City Council has indicated that it will dedicate whatever resources are required
for installation of the proposed facilities.
Gana-a’Yoo Native Regional Corporation has been approached for an agreement on the use of the
biomass resource, which should be resolved in the next few months.
4.3.3 Permits
Provide the following information as it may relate to permitting and how you intend to address
outstanding permit issues.
List of applicable permits
Anticipated permitting timeline
Identify and discussion of potential barriers
Permitting issues for a small facility like this are routine and will be turned over to a qualified
engineering firm. They are expected to include air and particulate emissions, use of property
adjacent to a state owned airport, land use issues associated with the known contamination of
ground water during the Air Force occupation of the property, and operation of a public electric
utility (Independent Power Producer). The timeline for permitting should be easily
accommodated during the projected three year duration of the project.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 14 of 20 10/7/2009
4.3.4 Environmental
Address whether the following environmental and land use issues apply, and if so how they will
be addressed:
Threatened or Endangered species
Habitat issues
Wetlands and other protected areas
Archaeological and historical resources
Land development constraints
Telecommunications interference
Aviation considerations
Visual, aesthetics impacts
Identify and discuss other potential barriers
The net effect of the project on the environment is expected to be very positive in terms of
reduced use of fossil fuels, diesel and petroleum emissions, fuel transport on the river, and carbon
dioxide generation. Many of these specific issues, particularly threatened or endangered species,
habitat issues, wetlands and other protected areas, and archaeological and historical resources will
need detailed examination during the engineering phase of the project.
Land development constraints, telecommunications interference, and aviation considerations do
not appear to be significant issues, but will be addressed if needed. Visual and aesthetics impacts
should be minor because the property affected is relatively remote, and will be mitigated as far as
possible by responsible management of the harvesting plan.
No other barriers have been identified.
4.4 Proposed New System Costs and Projected Revenues
(Total Estimated Costs and Projected Revenues)
The level of cost information provided will vary according to the phase of funding requested and
any previous work the applicant may have done on the project. Applicants must reference the
source of their cost data. For example: Applicants Records or Analysis, Industry Standards,
Consultant or Manufacturer’s estimates.
4.4.1 Project Development Cost
Provide detailed project cost information based on your current knowledge and understanding of
the project. Cost information should include the following:
Total anticipated project cost, and cost for this phase
Requested grant funding
Applicant matching funds – loans, capital contributions, in-kind
Identification of other funding sources
Projected capital cost of proposed renewable energy system
Projected development cost of proposed renewable energy system
Total anticipated project cost, and cost for this phase—
The total cost is $11,187,738. Cost for this phase is the same. Follow-on projects are anticipated
but no grant applications are planned at this time.
Requested grant funding—
Grant funding under this application is for $4 million, the limit of the grant offering.
Applicant matching funds—
The remainder of the project cost beyond the $4 million grant request is $7,187,738. No source
has been identified to date, but some or all of that total may be matching funds, depending on the
source.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 15 of 20 10/7/2009
Projected capital cost of proposed renewable energy system—
The budget includes $2,543,682 for operation of the project during the first year. The remainder
of the project cost, totaling $8,644,056 represents the capital cost, which includes legal, and
engineering costs that are considered essential to the project construction and implementation.
Projected development cost of proposed renewable energy system—
The operating expenses for the first year in the amount of $2,543,682 are necessary for the system
to begin operation, because the fuel harvesting is performed annually.
4.4.2 Project Operating and Maintenance Costs
Include anticipated O&M costs for new facilities constructed and how these would be funded by
the applicant.
(Note: Operational costs are not eligible for grant funds however grantees are required to meet
ongoing reporting requirements for the purpose of reporting impacts of projects on the
communities they serve.)
Capital Cost (annualized depreciation) $ 864,000.00
Biomass Fuel cost $ 780,628.00
O & M $ 899,040.00
Annual operating cost $ 2,543,682.00
Projected user charges
Electrical sales: hourly average load 800kw x 24hr/day x 30days x .30cents/kw =
$ 172,800.00 monthly
Steam sales: 2,500Mbtu / month x $20/ Mbtu = $50,000.00 monthly
Total revenue stream = $222,800.00 monthly or $2,673,600 per year.
4.4.3 Power Purchase/Sale
The power purchase/sale information should include the following:
Identification of potential power buyer(s)/customer(s)
Potential power purchase/sales price - at a minimum indicate a price range
Proposed rate of return from grant-funded project
Customers—assume no change from the present day power consumption of approximately 800
kW, combined public, private and business use.
Approximate power sale price--$0.20 to $0.30/kWH. The lower end of the range assumes that no
cost recovery is required for the cost of the project. At the higher range, the project could be
funded by loans or private ownership.
Proposed rate of return from grant funded project—at the higher rate of power charges (e.g.
$0.30/kWH, the return on investment is estimated at 9.5%.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 16 of 20 10/7/2009
4.4.4 Project Cost Worksheet
Complete the cost worksheet form which provides summary information that will be considered
in evaluating the project.
Download the form, complete it, and submit it as an attachment. Document any conditions or
sources your numbers are based on here.
Attached
SECTION 5– PROJECT BENEFIT
Explain the economic and public benefits of your project. Include direct cost savings,
and how the people of Alaska will benefit from the project.
The benefits information should include the following:
Potential annual fuel displacement (gal and $) over the lifetime of the evaluated
renewable energy project
Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price,
RCA tariff, or cost based rate)
Potential additional annual incentives (i.e. tax credits)
Potential additional annual revenue streams (i.e. green tag sales or other renewable
energy subsidies or programs that might be available)
Discuss the non-economic public benefits to Alaskans over the lifetime of the project
Annual fuel displacement—
Approximately 1,000,000 gallons of imported diesel fuel would be replaced by renewable energy,
which would be harvested be consuming only about 46,000 gallons of diesel per year. The
estimated fuel displacement in dollars is
$3,000,000 per year for fuel presently, estimating the cost of delivered fuel at $3 during the life of
the project, compared with—
$ 780,628.00 annual cost of renewable fuel, including salaries, fuel and maintenance costs for the
harvesting equipment.
Anticipated annual revenue would be selected to balance the costs on an annual basis. The
estimate for revenues including electrical power charges and steam heat sales is $2,673,600 per
year.
No tax credits have been identified.
Potential additional annual revenue streams include—
Wood chip pellet sales to provide feed stock for a wood pellet mill.
Electrical sales to other villages via interties.
Greenhouse operations.
Sales of sawlogs, firewood, or other timber that is too big or otherwise unsuitable for chipping.
Non-economic benefits—
Reduced particulate emission, sulfur oxides, and other air quality issues associated with diesel
fuel,
Improved access to local wilderness areas, reduced wildfire hazards, and improved wildlife
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 17 of 20 10/7/2009
habitat.
Increased economic stability and improved job outlook for the region.
SECTION 6– SUSTAINABILITY
Discuss your plan for operating the completed project so that it will be sustainable.
Include at a minimum:
Proposed business structure(s) and concepts that may be considered.
How you propose to finance the maintenance and operations for the life of the project
Identification of operational issues that could arise.
A description of operational costs including on-going support for any back-up or existing
systems that may be require to continue operation
Commitment to reporting the savings and benefits
Proposed business structure—
Although Louden Tribal Council has the lead in developing this grant application, the City of
Galena will be the intended owner and operator of the utility, and will operate the project as it
does now. The boarding school and other tenants of the buildings at the former Air Force base
will pay for heat that is delivered via the utilidor at a rate that reimburses the reasonable operating
costs, and electrical power rates will be adjusted to a similar standard.
Financing maintenance and operations, operational issues, and costs, and maintenance of the
existing generators and boiler plant will be the task of the City of Galena, which presently operates
those utilities and systems.
Reporting of grant elements will be the task of the Louden Tribal Council, and will be managed by
the Tribal Administrator.
SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS
Discuss what you have done to prepare for this award and how quickly you intend to proceed
with work once your grant is approved.
Tell us what you may have already accomplished on the project to date and identify other grants
that may have been previously awarded for this project and the degree you have been able to
meet the requirements of previous grants.
The Work Breakdown Structure that is attached as an Excel spreadsheet has a proposed schedule
that began this fall with a projected grant approval and continues through completion in
December 2012. That schedule and some of the funding assumptions will need to be revised to
reflect reality, but it shows the general plan with decision points, critical time lines (eg barge
delivery seasons), and dates that can be shifted if necessary. Other grant applications are in
process, but no other funding source has been identified to date, although Louden Tribal Council
has been selected for a formula based Energy Efficiency Community Development Block Grant
from the Department of Energy in the amount of $49,300, and has elected to direct the grant
proceeds toward furthering this project, particularly in terms of developing accurate and
defensible land management plans for harvesting the biomass resource.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 18 of 20 10/7/2009
SECTION 8– LOCAL SUPORT
Discuss what local support or possible opposition there may be regarding your project. Include
letters of support from the community that would benefit from this project.
Local support is very high, and both the City of Galena and Louden Tribal Council have excellent
records of following through on grant projects. Letters of support are attached from Tom
Corrigan, the City Manager for Galena, and from Jim Smith, the Superintendant of the Galena
City School District.
SECTION 9 – GRANT BUDGET
Tell us how much you want in grant funds Include any investments to date and funding sources,
how much is being requested in grant funds, and additional investments you will make as an
applicant.
Include an estimate of budget costs by milestones using the form – GrantBudget3.doc
Provide a narrative summary regarding funding sources and your financial commitment to the
project.
Louden Tribal Council is still seeking funding for this project, and if this grant application is
approved, approximately $7.2 million in matching funds will be required to complete the
implementation. We have not yet identified the source of the additional funds, but will continue
to pursue them.
GrantBudget3.doc is attached.
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 19 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
AEA10-015 Grant Application Page 20 of 20 10/7/2009
SECTION 9 – ADDITIONAL DOCUMENTATION AND CERTIFICATION
SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION:
A. Resumes of Applicant’s Project Manager, key staff, partners, consultants, and
suppliers per application form Section 3.1 and 3.4.
B. Cost Worksheet per application form Section 4.4.4.
C. Grant Budget Form per application form Section 9.
D. Letters demonstrating local support per application form Section 8.
E. An electronic version of the entire application on CD per RFA Section 1.6.
F. Governing Body Resolution or other formal action taken by the applicant’s
governing body or management per RFA Section 1.4 that:
- Commits the organization to provide the matching resources for project at the
match amounts indicated in the application.
- Authorizes the individual who signs the application has the authority to
commit the organization to the obligations under the grant.
- Provides as point of contact to represent the applicant for purposes of this
application.
- Certifies the applicant is in compliance with applicable federal, state, and local,
laws including existing credit and federal tax obligations.
F. CERTIFICATION
The undersigned certifies that this application for a renewable energy grant is truthful
and correct, and that the applicant is in compliance with, and will continue to comply
with, all federal and state laws including existing credit and federal tax obligations.
Print Name
Signature
Title
Date