HomeMy WebLinkAboutGolden Valley Electric Waste Heat and Healy Final AppRenewable Energy Fund Round 3~ALASKA ,_,ENERGY AUTHOR1TY Grant Application
Application Forms and Instructions
The following forms and instructions are provided to assist you in preparing your application for a
Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA) and the forms
are available online at: http://www.akeneravauthority.org/REFund-lII.html
I Grant Application I GrantApp3.doc I Application form in MS Word that includes an outline of information
Form required to submit a complete application. Applicants should use the
I form to assure all information is provided and attach additional
I l information as required.
Application Cost I Costworksheet3.d
Summary of Cost information that should be addressed by applicants
Worksheet ' oc in preparinQ.. their aQQiication.
Grant Budget Form
GrantBudget3.doc A detailed grant budget that includes a breakdown of costs by
milestone and a summary of funds available and requested to
com(:liete the work for which funds are being ~uested.
Grant Budget Form GrantBudgetinstr Instructions for completing the above grant budget form.
Instructions • uctions3.pdf
• If you are applying for grants for more than one project, provide separate application forms for
each project.
• Multiple phases for the same project may be submitted as one application.
• If you are applying for grant funding for more than one phase of a project, provide milestones
and grant budget for completion of each phase.
• If some work has already been completed on your project and you are requesting funding for an
advanced phase, submit information sufficient to demonstrate that the preceding phases are
satisfied and funding for an advanced phase is warranted.
• If you have additional information or reports you would like the Authority to consider in reviewing
your application, either provide an electronic version of the document with your submission or
reference a web link where it can be downloaded or reviewed.
REMINDER:
• Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials submitted to
the Authority may be subject to disclosure requirements under the act if no statutory exemptions
apply.
• All applications received will be posted on the Authority web site after final recommendations are
made to the legislature.
• In accordance with 3 MC 107.630 (b) Applicants may request trade secrets or proprietary
company data be kept confidential subject to review and approval by the Authority. If you want
information is to be kept confidential the applicant must:
o Request the information be kept confidential.
o Clearly identify the information that is the trade secret or proprietary in their application.
o Receive concurrence from the Authority that the information will be kept confidential. If
the Authority determines it is not confidential it will be treated as a public record in
accordance with AS 40.25 or returned to the applicant upon request.
AEA 10-015 Application Page 1 of 20 10/7/2009
i
Renewable Energy Fund
Grant Application Round 3
SECTION 1 -APPLICANT INFORMATION
. Name (Name of utility, IPP, or government entity submitting proposal)
Golden Valley Electric Association
Type of Entity:
An electric cooperative operating in Interior Alaska
Physical Address Mailing Address
P. O. Box 71249 758 Illinois Street
Fairbanks, AK 99707 Fairbanks, AK 99701
EmailTelephone Fax
kklamal@gvea.com451·5645 (907) 451·5657
1.1 APPLICANT POINT OF CONTACT
Name Title
Kate Lamal Vice President of Power Supply
Dave Hoffman Healy Plant Manager
Mailing Address
P. O. Box 71249
Fairbanks, AK 99707
Telephone Fax Email
907-451· 907-458-6388 kklamal@gvea.com
5645 dhoffman@gvea.com
11.2 APPLICANT MINIMUM REQUIREMENTS
i Please check as appropriate. Ifyou do not to meet the minimum applicant requirements, your
. application will be rejected
, 1.2.1 As an Applicant, we are: (put an X in the appropriate box)
XX An electric utility holding a certificate of public convenience and necessi ty under AS
42.05, orI
An independent power producer in accordance with 3 Me 107.695 (a) (1). or
A local government, or
A governmental entity (which includes tribal councils and housing authorities);
i
l§ 1.2.2. Attached to this application is formal approval and endorsement for its project by
its board of directors, executive management, or other governing authority. If
the applicant is a collaborative grouping, a formal approval from each
participant's governing authority is necessary. (Indicate Yes or No in the box )
l§ 1.2.3. As an applicant, we have administrative and financial management systems and
follow procurement standards that comply with the standards set forth in the
grant agreement.
l§ 1.2.4. If awarded the grant, we can comply with all terms and conditions of the
attached grant form. (Any exceptions should be clearly noted and submitted with
the application.)
l§ 1.2.5 We intend to own and operate any project that may be constructed with grant
funds for the benefit of the general public.
AEAlO-0l5 Grant Application Page 2 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
SECTION 2 -PROJECT SUMMARY
This is intended to be no more than a 1-2 page overview of your project.
2.1 Project Title -(Provide a 4 to 5 word title for your project)
Type in your answer here and follow same format for rest ofthe application.
A Feasibility and Planning Project to Recapture aud Utilize Waste Heat from the Healy Clean
Coal Project
2.2 Project Location
Include the physical location of your project and name(s) of the community or communities that will
benefit from your project.
Answer here.
Healy, Alaska
2.3 PROJECT TYPE
Put X in boxes as appropriate
2.3.1 Renewable Resource Type
Wind Biomass or Bio-fuels
Hydro, includi ng run of river Transmission of Renewable Energy
Geothermal, including Heat Pumps Small Natural Gas
XX Heat Recovery from existi ng sources Hydrokinetic
Solar Storage of Renewable
Other (Describe)
2.3.2 Proposed Grant Funded Phase{s) for this Request (Check all that apply)
XX Reconnaissance ~n and Permitting
Ixx Feasibility truction and Commissioning
XX Conceptual Design
2.4 PROJECT DESCRIPTION
Provide a brief one paragraph description of your proposed project.
Golden Valley Electric Association (GVEA) proposes to conduct the preliminary feasibility study,
feasibility analysis, and resource assessment to determine the necessary conceptual des ign and
construction to build and operate a community greenhouse located in Healy, Alaska, and to
determine the optimal business structure for the operation. The greenhouse will utilize waste
heat from the Healy Clean Coal Plant as its main energy source, and will create a working
partnership between several public and private entities in the Healy community to demonstrate
teach and encourage resource recycling, alternative energy, and local food production
AEAI0-0IS Grant Application Page 3 of 20 10/7/2009
Renewable Energy Fund
IJ&SALASKAiiiiI:J ENERGY AUTHORITY Grant Application Round 3
12.5 PROJECT BENEFIT
. Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel
costs, lower energy costs, etc.)
The Healy Clean Coal Project CHCCP) will be brought on line during the first half of 2011. The
project will explore the opportunity of using warm water (normally discharged directly into the
Nenana River) to heat a greenhouse year-round which will provide vegetable production to
benefit the Healy comm unity. Technically, there is plenty of water that can be used for the
project, but the economics of the project are unknown. The proposed grant will be used to
gather the data needed to determine if there is a business case for a successful and sustainable
community greenhouse project.
The Denali Borough, the Denali Borough School District and Golden Valley Electric Association,
Inc. will be primary partners in the feasibility study and business plan development. We
understand that there are several business configurations that will need to be evaluated to find
the best fit for the community and the local residents. The Borough is interested in the project
as it has the potential to create jobs and provide locally grown produce for a community with
no large grocery store and no ready source of fresh produce, and a potential source of local
produce for public programs and tourism businesses in the area. The school district is
interested in the project as it will be used as a place to teach chi Idren how to grow their own
food, and can provide internships and other job opportunities. GVEA is interested is finding
beneficial uses of the waste heat as well as supporting the community. The Alaskan public will
benefit by the demonstration of this waste heat recovery concept and look for other low-grade
waste heat to utilize in similar space heating applications. Reducing fuel burned for the
greenhouse will result in lower NOx, CO, and C02 emissions from the gas turbine.
2.6 PROJECT BUDGET OVERVIEW
Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source
of other contributions to the project.
Total Grant Request: $ 95,190
Total Match From Project Partners: $ 72.200
TOTAL DIRECT PROJECT COST: $167,390
12.7 COST AND BENEFIT SUMMARY
i Include a summary of grant request and your project's total costs and benefits below.
Grant Costs
(Summary of funds requested)
2.7.1 Grant Funds Requested in this application. $ 95,190
2.7.2 Other Funds to be provided (Project match) $ 72,200 (GVEA match)
2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2) $167,390
AEA10-015 Grant Application Page 4 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
I Project Costs & Benefits
(Summary of total project costs including work to date and future cost estimates to get to a fully
operational project)
2.7.4 Total Project Cost (Summary from Cost Worksheet
including estimates through construction)
$167,390
2.7.5 Estimated Direct Financial Benefit (Savings) $ 24,000 (for fuel savings in
heating the greenhouse)
2.7.6 Other Public Benefit (If you can calculate the benefit in
terms of dollars please provide that number here and
explain how you calculated that number in your application
(Section 5.)
$ 0
SECTION 3 -PROJECT MANAGEMENT PLAN
Describe who will be responsible for managing the project and provide a plan for successfully
completing the project within the scope, schedule and budget proposed in the application.
3.1 Project Manager
Tell us who will be managing the project for the Grantee and include a resume and references
for the manager(s). If the applicant does not have a project manager indicate how you intend
to solicit project management support. If the applicant expects project management assistance
from AEA or another government entity, state that in this section.
Mr. Dave Hoffman, GVEA Healy Plant Manager, will be the Project Manager. Please see his
resume' in Appendix A.
3.2 Project Schedule
Include a schedule for the proposed work that will be funded by this grant. (You may include a
chart or table attachment with a summary of dates below.)
Project Schedule:
1. Project Scoping (ongoing from 07/10 to 06/11)
2. Selection of the contractor for feasibility study and planning (by07/10)
3. Identify land and land use permitting and regulatory issues (by 08/10)
4. Create Conceptual Business and Operational plans (by 12/10)
5. Determination of costs for implementation plan (by 01/11)
6. Create Implementation and Sustain ability Funding Plan (by 02/11)
7. Receipt of study and decisions on scope of project/approval by project partners (by 04/11)
8. Final Report and Recommendations delivered to key stakeholders and AEA (by 06/11)
9. Draft and Submit Grant Applications for implementation phase (by 06/11)
AEA1O-015 Grant Application Page 5 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
3.3 Project Milestones
Define key tasks and decision points in your project and a schedule for achieving them. The
Milestones must also be included on your budget worksheet to demonstrate how you propose
to manage the project cash flow. (See Section 2 of the RFA or the Budget Form.)
Project Milestones:
Feasibility Analysis, Resource Assessment, and Conceptual Design
A detailed evaluation of technical, economic1 financial, and operational considerations will
be made to narrow the focus as well as the final design for construction purp oses.
A feasibility study will be completed in whole or in large part by an independent third
party to ensure that the greatest objectivity is given to the analysis. Golden Valley Electric
Association l the Denali Boroughl and the De nali Borough School District are prepared to
work with their Project Steering Com mittee and a planning consultant to involve a variety
of expertise in the feasibility analysis and compile information for an objective financial
review. The feasibility study and planning activity will include the following elements:
• Statement of purpose and overriding goals for pursuit of a community greenhouse.
• Discussion of the history, current status and future prOjection for community
greenhouse support and use through the Denali Borough.
• Review of various development alternatives, design and construction types as well as
technology and equipment needs.
• Review of proposed system to utilize GVEA waste heat produced from hot water
released from the Healy Power Plant. Identification and analysiS of collection system
alternatives, assessment of project site, completion of annual energy production
profilel conceptual system designl conceptual integration deSign, and identification of
any technical barriers. This will include site control and lease length determinations.
• Appraisal and discussion of most likely ownership and development partners as well as
management/staffing organizational needs and considerations.
• Analysis of operations based on a review of other similar facilities and determination of
potential community involvementl support and benefits.
• Review of legal requirem entsl regulatory considerations and permits necessary for a
community greenhouse operation.
• Assessment and overview of environmental considerations necessary for development
of the community greenhouse and a plan for addressing these considerations.
• Development of comprehensive financial pro formas. Including pro formas with
projected revenues and expenses.
• A projection of start~up costs (including design and construction) to begin
operations.
• A realistiC cash flow projection that assumes differing client use levels as well as
all potential sources of income based on scenarios resulting in operations and
maintenance costs.
• A detailed financial operations plan that outlines proposed operating expenses
such as: facility operations and maintenancel lease fees, staffing requirementsl
insurancel utilitiesl taxes I financing and contingency costs .
• A review of potential sources of funding and financing options.
AEA10~015 Grant Application Page 6 of 20 10/7/2009
Renewable Energy Fund~ALASKA , iiii::J ENERGY AUTHORITY Grant Application Round 3
Incorporation offeasibility findinas into a business plan:
Based on the feasibility phase outcomes, a draft business plan will be completed by the
owners/operators of the proposed operation. This will ensure a greater level of onsite
decision making and understanding of the business operations. The planning consultant
will work closely with the owners/operators in the writing of the business plan. The
business plan will build from initial feasibility analysis findings, and will address, at a
minimum, the following additional elements:
• A description of the business model determined most feasible based on feasibility
study outcomes, public input and strategic decisions.
• A discussion of the organization that will pursue development including mission, vision,
and leadership.
• A discussion of business ownership, staffing and management. An organizational
chart, job descriptions, employee availability and anticipated salary ranges.
• A review of potential facility development partners, anchor tenants, and future
infrastructure development needs.
• A marketing analysis describing the most likely target rna rkets to be pursued and
strategies for pursuit of those markets.
• An analysis reviewing the overall economiC benefits to the Denali Borough and other
regional commu nities.
• Financial performance including revenue and expense assumptions and projections for
start-up and operations of initial years.
• A full and comprehe nsive business execution plan to outline timeframes for
development.
The business plan will include the following chapters and/or sections:
• Executive Summary
• Statement of Purpose
• Description of Business
• Location
• Description of Products/Services
• Market Research
• Competitive Overview
o Pricing Comparisons
• Marketing Plan
• Ownership (Operational Model)/Management
• Staffing Plan -(Training, Job Descriptions, Needs)
• Business Implementation Plan -Start-up timing of events
o Pricing Decisions
o Accounting/Bookkeeping/Taxes
o Insurance
o Legal form of ownership
o Technology and communication considerations
• Business Exit Strategy/Succession Plan
• Financial Statements
o Forecasting funding needs
• Sources of Funding -Grants and Loans
o Discussion of potential finanCing strategies
o Create Funding Plan
• Appendix -Resumes and Standard Docum ents
AEAlO-015 Grant Application Page 7of20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
3.4 Project Resources
Describe the personnel, contractors, equipment, and services you will use to accomplish the
project. Include any partnerships or commitme nts with other entities you have or anticipate will
be needed to complete your project. Describe any existing contracts and the selection process
you may use for major equipment purchases or contracts. Include brief resumes and references
for known, key personnel, contractors, and suppliers as an attachment to your application.
Personnel will include the Project Manager, Project Sponsor, Planning Consultant, GVEA
Engineering staff, and GVEA Marketing Department staff. Please see attached resume's in
Appendix A.
Project Partners will include GVEA, the Denali Borough, and the Denali Borough School District.
Other potential partners may include Lausen's Dependable Disposal, a Healy-based garbage
hauling and pumping service, and the Alaska Cooperative Extension Service's Energy Specialist.
Other key stakeholders either involved or benefiting from this project will include the adult
citizens and school-age students of Healy, Alaska, and transient visitors to Healy who are part
of a tour group or traveling through independently during the tourist season (May
September).
3.5 Project Communications
Discuss how you plan to monitor the project and keep the Authority informed of the status.
The GVEA Project Manager will be funded at .50FTE for work on this proposed project over the
12 months of the project. Reports to AEA will be submitted quarterly that contain project
status, schedule updates, and expenditures.
3.6 Project Risk
Discuss potential problems and how you would address them.
The waste heat supply is not available when the Healy Power Plant is off-line. While it is
expected that the HCCP would be online continually, a back-up source of temporary heat will be
built into the greenhouse project.
In addition to heat, the greenhouse will require electricity for cooling in the summer (through
the use of fans), and to power grow lights in the shoulder seasons and (if determined) the
winter. Availability of excess electricity from GVEA will be researched, and the project's
implementation/sustainability budget will factor in any costs not donated.
As a member-owned cooperative, the best business model to apply to this project will need to
be determined. The feasibility study will research business models for the project, including a
community cooperative with working members receiving a percentage share of produce; retail
to the community and/or local businesses; and harvest donation to local public programs who
utilize fresh, frozen, or canned produce.
Since produce often ripens all at once in a short period of time, there is the possibility that all of
the harvested produce may not be able to be immediately consumed in its fresh state. The
project will include planning for a public canning and freezing workshop to preserve excess
produce from the project. A Cooperative Extension Service Home Economist will be used to
teach this workshop to local volunteers in the high school's home economics room, and the
need for freezers to store prod uce will be addressed in the business plan.
AEAI0-015 Grant Application Page 8 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
SECTION 4 -PROJECT DESCRIPTION AND TASKS
• Tell us what the project is and how you will meet the requirements outlined in Section 2 of
theRFA.
• The level of information will vary according to phase(s) of the project you
propose to undertJllke with grant funds.
• Ifyou are applying for grant funding for more than one phase ofa project provide
a plan andgrant budget form for completion ofeach phase.
• If some work has a/ready been completed on your project and you are requesting funding for
an advanced phase, submit information sufficient to demonstrate that the preceding phases
are satisfied and funding for an adva nced phase is warranted.
4.1 Proposed Energy Resource
Describe the potential extent/amount of the energy resource that is available.
Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project.
The Healy Power Plant typically burns 8200 -8500 MMBTU of coal per day to generate 610
625 MWH of electricity. Of the total input, approximately 25% is converted to electrici ty. The
remainder (75&, or 6200 MMBTU per day) is either lost or intentionally rejected as waste heat in
the process.
The Healy Power Plant currently pumps wate r out of the Nenana River, through the plant's
condenser for cooling, and directly back into the river. Typical summer operating parameters are
two circulating pumps in operation with a total circulating water flow of 14,000 gpm and 32°F
temperature rise. Because of colder water, winter conditions include one Circulating pump in
operation with a 10,000 gpm flow and 42°F temperature rise. The heat rejection back to the
Nenana River is upwards of 60% of the coal burned.
This proposed feasibility and planning project will determine the viability and best methods to
use for a heat recovery system that can provide the necessary year-round heat and growing
conditions for a community greenhouse in Healy. The project will be built on the banks of the
Nenana River just north of the existing Heal y Power Plant river intake location and will discharge
on land that is owned by GVEA and is part of the Healy Power Plant site. The feasibility study
will also determine the best business model for providing the fresh, frozen or canned produce
from the greenhouse to the Healy community.
4.2 Existing Energy System
4.2.1 Basic configuration of Existing Energy System
Briefly discuss the basic configuration of the existing energy system. Include information about
the number, size, age, effiCiency, and type of generation.
In 1989, the U.S. Department of Energy's Clean Coal Technology Program selected Healy as a
demonstration plant to use experimental technology to burn waste coal. The Healy Clean Coal
Power Plant began burning coal in 1998 and generated power intermittently through 1999 in its
testing phase. The plant was shut down in 2000. Talks between AIDEA and GVEA to resolve
disputes were unsuccessful. In 2005, AIDEA filed a lawsuit against GVEA. Subsequent mediation
did not result in resolution, but the entities a greed to terms for a sale, which when complete
(estimated by January 2010), will end all litigation on the project and clear the remaining
AEA10-015 Grant Application Page 10 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
obstacles to allow the restart of power generation from Coal Power Plant.
Golden Valley Electric Association intends to run the Healy Clean Coal Power Plant (HCCP) with
the existing "Clean Coal Technology" under existing environm ental permits. The goal of the
1990's Clean Coal Technology program was to find a way to burn this vast resource more cleanly
and help achieve national energy independence. GVEA is currently approaching this goal, as the
permitted em ission levels for both power plants is lower than the original permit for just the
existing Healy Power Plant alone.
GVEA has a proven track record of owning and operating a coal plant. Getting HCCP up and
running strengthens the local economy by using local coal resources. When operational, the
plant will provide 50 megawatts of competitively-priced power to the Railbelt region of Alaska.
HCCP will provide jobs, help and diversify GVEA's fuel resources, which in turn helps stabilize the
cost of power to members while providing for the future power generation needs of Interior
Alaskans.
AIDEA constructed and owns HCCP. The project was partially funded by the U.S. Department of
Energy's (DOE) Clean Coal Technology Program in their efforts to research and develop clean
burning coal technology. Usibelli Coal Mine partnered in the project as the coal supplier.
GVEA originally participated as the future operator and power purchaser, but in January 2009
agreed to purchase the plant from AIDEA in addition to operating the plant. The purchase of
HCCP will be complete and the plant will be owned by GVEA prior to the start of the greenhouse
feasibility study.
4.2.2 Existing Energy Resources Used
Briefly discuss your understanding of th e existing energy resources. Include a brief discussion of
any impact the project may have on existing energy infrastructure and resources.
GVEA uses an economic dispatch model for supplying power to customers. Electric power
conserved internally (to the HCCP project )by GVEA effectively eliminates the cost of fuel
required to generate the 410 kw of the highest cost power, depending on the power generation
units in service at the time.
4.2.3 Existing Energy Market
Discuss existing energy use and its market. Discuss impacts your project may have on energy
customers.
As a member-owned cooperative, reducing fuel consumption in GVEA's power plants directly
reduces GVEA customer charges.
The direct im pact this project will have on GVEA customers in Healy will be qualitative with t he
potential of new jobs at a community greenhouse, fresh vegetables year-round for Healy citizens
to partake in, and educational opportunities and projects for the Denali Borough School District
to undertake involving the greenhouse environment and agriculture/horticulture during the
school year.
AEAI0-015 Grant Application Page 11 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
4.3 Proposed System
Include information necessary to describe the system you are intending to develop and address
potential system design, land ownership, permits, and environmental issues.
4.3.1 System Design
Provide the following information for the proposed renewable energy system:
• A description of renewable energy technology specific to project location
• Optimum installed capacity
• Anticipated capacity factor
• Anticipated annual generation
• Anticipated barriers
• Basic integration concept
• Delive methods
The system to be developed will be determined during the course of this feasibility and planning
phase of the project. Potential system design, permitting and environmental issues will all be
identified during this process as well. GVEA will own the source of waste heat, the greenhouse
and any surrounding land used for agricultural purposes.
4.3.2 Land Ownership
Identify potential land ownership issues, including whether site owners have agreed to the
project or how you intend to approach land ownership and access issues.
GVEA is the legal owner of the land under and surrounding the Healy Power Plant site. They will
grant access to all project partners involved in the gree nhouse project.
4.3.3 Permits
Provide the following information as it may relate to permitting and how you intend to add ress
. outstanding perm it issues.
• List of applicable permits
• Anticipated permitting timeline
• Identi and discussion of tential barriers
As this is a feasibility and planning project, permitting requirements will be researched and
determined during the course of the project.
4.3.4 Environmental
Address whether the following environmental and land use issues apply, and if so how they will
be addressed:
• Threatened or Endangered species
• Habitat issues
• Wetlands and other protected areas
• Archaeological and historical resources
• land development constraints
• Telecommunications interfer ence
• Aviation considerations
• Visual, aesthetics impacts
• Identi and discuss other tential barriers
AEA10-015 Grant Application Page 12 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
This project will be located in a heavy industrial complex. Environmental issues will be identified
along with the appropriate course of action to address them during the course of the feasibility
and planning phase. It is anticipated, and will be confirmed or denied in the feasibility study,
that lowering the temperature of the water returned to the river will mitigate any negative
environmental impacts present in the absence of the greenhouse project. Since this project
would convert part of the existing waste heat system stream into electricity and rerouted heat,
its largest environmental impact would be a reduction of the temperature of the thermal plume
into the Nenana River.
4.4 Proposed New System Costs and Projected Revenues
(Total Estimated Costs and Projected Revenues)
The level of cost information provided will vary according to the phase of funding requested and
any previous work the applicant may have done on the project. Applicants must reference the
source of their cost data. For example: Applicants Records or Analysis, Industry Standards,
Consultant or Manufacturer's estimates.
4.4.1 Project Development Cost
Provide detailed project cost information based on your current knowledge and understanding of
the project. Cost information should include the following:
• Total antiCipated project cost, and cost for this phase
• Requested grant funding
• Applicant matching funds -loans, capital contributions, in-kind
• Identification of other funding sources
• Projected capital cost of proposed renewable energy system
• Projected development cost of proposed renewable energy system
Project Development Cost:
GVEA Project Manager $78,000 in g rant funds
Tasking for the project will be performed by GVEA's project staff. The Healy Plan Manager, Mr.
Dave Hoffman will be the overall manager of this project and will have the day-to-day oversight
and responsibility for fulfilling the goals and objectives of this project. $75 per hour x 1040
hours. Hourly rate includes a benefit rate of 25%.
A & E conceptual design $0 in grant funds $ 6,000 match from GVEA
GVEA will provide the A & E conceptual design work relevant to the project and provide it to
project partners. This is an in-kind donation of staff time and wages totali ng $50 per hour x 120
hours x 1 engineer. This design work is a match from GVEA.
GVEA Staff Oversight $0 in grant funds $65,000 match from GVEA
The Project Sponsor, Ms. Kate Lamal, GVEA Vice President of Power Supply, will directly develop
and manage the overall im plementation of the project by GVEA staff. The hourly rate is@ $125
per hour X 520 hours and includes a benefit rate of 25%.
Planning Consultant $12,500 in grant funds
A planning consultant will be contracted to coordinate monthly planning meetings with the
project partners to draft a viable feasibility study and project plan. @$125 per hour x 100
hours.
AEA10-015 Grant Application Page 13 of 20 10/7/2009
Renewable Energy Fund~ALASKA , _)ENERGY A\JTtIORlTY Grant Application Round 3
Travel $ 1,290 in grant funds
Three face-to-face meetings are planned for GVEA project staff to consult with other project
partners located in Healy, and to meet with community members for the purpose of participating
in the partner planning sessions and to provide project updates. Each day trip and will include 2
GVEA staff members. Amount is based on round trip mileage from Fairbanks to Healy via
automobile ($0.45 per mile X 200 miles round trip x 2 persons x 3 trips) and GVEA's standard
per diem rate ($125 per day x 2 people x 3 days).
Audio-conferences $ 900 in grant funds
The project partners will hold 9 audio-conference meetings during this project. The cost per
audio-conference is $ 50 per hour x 9 meetings x 2 hours per meeting.
Information distribution $0 in grant funds $ 1,200 match from GVEA
GVEA marketing staff will develop presentation pieces utilizing print media and multi-media
presentations (PowerPoint) to update the project partners and key stakeholders in the Healy
community on the progress and results of the feasibility and planning project. The hourly rate is
$30 per hour X 40 hours and includes a benefit rate of 25%.
Printing $ 2,500 in grant funds
Cost of printing and/or duplicating the final report and findings of the feasibility study and
project implementation plan for distribution to project partners, key stakeholders in the Healy
community, and AEA. 50 pages x $.10/page x 500 copies,
TOTAL GRANT REQUEST: $95,190
TOTAL HATCHFROHPROJECTPARTNERs: $72200
TOTAL DIRECT PROJECT COST: $167,390.
4.4.2 Project Operating and Maintena nee Costs
Include anticipated O&M costs for new facilities constructed and how these would be funded by
the applicant. .
(Note: Operational costs are not eligible for grant funds however grantees are required to meet
• ongoing reporting requirements for the purpose of reporting impacts of projects on the
. communities the serve.
Project operating and maintenance costs will be determined during the feasibility and planning
phase.
4.4.3 Power Purchase/Sale
The power purchase/sale information should include the following:
• Identification of potential power buyer(s)/customer(s)
• Potential power purchase/sales price -at a minimum indicate a price range
• Pro sed rate of return from rant-funded ro'ect
GVEA intends this to be a community service project which will benefit the residents of Healy.
AEA10-015 Grant Application Page 14 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
· 4.4.4 Project Cost Worksheet
· Complete the cost worksheet form which provides summary information that will be considered
· in evaluating the proje ct.
Please see the attached AEA Cost Worksheet, Attachment B.
SECTION 5-PROJECT BENEFIT
Explain the economic and public benefits of your project. Include direct cost savings,
and how the people ofAlaska will benefit from the project.
The benefrt:s information should include the following:
• Potential annual fuel displacement (gal and $) over the lifetime of the evaluated
renewable energy project
• Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price,
RCA tariff, or cost based rate)
• Potential additional annual incentives (i.e. tax credits)
• Potential additional ann ual revenue streams (i.e. green tag sales or other renewable
energy subsidies or programs that might be available)
• Discuss the non-econom ic public benefits to Alaskans over the lifetime of the project
GVEA requests financial assistance from AEA to perform a comprehensive feasibility and
planning project to determine the viability of installing a waste heat recovery system at the
Healy Clean Coal Project. In 2005, the GVEA Board of Directors adopted a Green Power Pledge
to supply 20% of the peak power load from renewable energy sources by 2014. This energy
conservation project will help GVEA to meet the Green Power Pledge, and will directly benefit
the residents located near the HCCP.
The Alaskan public will benefit by the demonstration of this waste heat recovery project and look
for other low grade waste heat to utilize in similar heating applications. Reducing fuel
consumption will result in lower NOx, CO, and C02 emissions from the gas turbine into Alaska's
air. Reducing electricity rates by conservation helps sustain all GVEA customers including local
businesses and reSidents by lowering rates, and it provides a replicable conservation model for
the community.
The potential annual fuel displacement, anticipated annual revenue, potential annual incentives,
and potential annual revenue streams will be determined through the course of this feasibility
and planning phase of the project.
AEA10-015 Grant Application Page 15 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
SECTION 6-SUSTAINABILITY
Discuss your plan for operating the completed project so that it will be sustainable.
Include at a minimum:
• Proposed business structure(s) and concepts that may be considered.
• How you propose to finance the maintenance and operations for the life of the project
• Identification of operational issues that could arise.
• A description of operational costs including on-going support for any back-up or existing
systems that may be require to continue operation
• Commitment to reporting the savings and benefits
A viable sustainability component will be discussed and determined during the course of this
feasibility and planning phase of the project. Proposed business structure(s) and concepts will be
considered a nd the most sustainable model will be chosen. A long-term maintenance and
operations component will be included as part of the plan, and any operational issues that may
arise during the life of the project will be identified. Operational costs for this community
greenhouse project will be identified and will include support for backup and existing systems
that are required to sustain operation. The overall savings and benefits of this project will be
reported to stake holders on a regular basis.
SECTION 7 -READINESS & COMPLIANCE WITH OTHER GRANTS
Discuss what you have done to prepare for this award and how quickly you intend to proceed
with work once your grant is approved.
Tell us what you may have already accomplished on the project to date and identify other grants
. that may have been previously awarded for this project and the degree you have been able to
I meet the requirements of previous grants.
GVEA and its partners, the Denali Borough and the Denali Borough School District, are ready and
willing to proceed with this feasibility and planning project immediately once grant approval is
received.
The partners have met several times to discuss their commitment to seeing this project through
and each has committed to that end. No other grants have been requested or awarded for this
feasibility and planning project.
GVEA has been able and willing to meet the requirements of all previously received grants.
AEA10-015 Grant Application Page 16 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
SECTION 8-LOCAL SUPPORT
Discuss what local support or possible opposition there may be regarding your project. Include
letters of support from the community that would benefit from this project.
Letters of support are attached in Appendix D from the following:
• Denali Borough Mayor
• Denali Borough School District Superintendent
• Lausen's Dependable Disposal
Resolutions are attached in Appendix F from the following:
• Golden Valley Electric Association Board of Directors
• Denali Borough Assembly
AEAlO-015 Grant Application Page 17 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
SECTION 9 -GRANT BUDGET
Tell us how much you want in grant funds Include any investments to date and funding sources,
how much is being requested in grant funds, and additional investments you will make as an
applicant.
Include an estimate of budget costs by milestones using the form -GrantBudget3.doc
Provide a narrative summary regarding funding sources and your financial commitment to the
project.
Project Budget Narrative:
GVEA Project Manager $78,000 in grant funds
Tasking for the project will be performed by GVEA's project staff. The Healy Plan Manager, Mr.
Dave Hoffman will be the overall manager of this project and will have the day-to-day oversight
and responsibility for fulfilling the goals and objectives of this project. $75 per hour x 1040
hours. Hourly rate includes a benefit rate of 25%.
A & E conceptual design $0 in grant funds $ 6,000 match from GVEA
GVEA will provide the A &E conceptual design work relevant to the project and provide it to all
project partners. This is an in-kind donation 0 f staff time and wages totaling $50 per hour x
120 hours x 1 engineer. This design work is a match from GVEA.
GVEA Staff Oversight $0 in grant funds $65,000 match from GVEA
The Project Sponsor, Ms. Kate Lamal, GVEA Vice President of Power Supply, will directly
develop and manage the overall implementation of the project by GVEA staff. The hourly rate
is@ $125 per hour X 520 hours and includes a benefit rate of 25%.
Planning Consultant $12,500 in grant funds
A planning consultant will be contracted with in order to coordinate monthly planning meetings
with the project partners for the purpose of drafting a viable feasibility study and project pi an.
@$125 per hour x 100 hours.
Travel $ 1.290 in grant funds
Three face-to-face meetings are planned for GVEA project staff to consult with other project
partners located in Healy and other concerned community members for the purpose of
participating in the partner planning sessions and to provide project updates. Each trip will be 1
day and will include 2 GVEA staff members. Amount is based on round trip mileage from
Fairbanks to Healy via automobile ($0.45 per mile X 200 miles round trip x 2 persons x 3 trips)
and GVEA's standard per diem rate ($125 per day x 2 people x 3 days).
Audio-conferences $ 900 in grant funds
The project partners will hold 9 audio-conference meetings during the planning phase of this
project. The cost per audio-conference is $ 50 per hour x 9 meetings x 2 hours per meeting.
Information distribution $0 in grant funds $1.200 match from GVEA
GVEA marketing staff will develop presentation pieces utilizing print media and multi-media
presentations (PowerPoint) to update the project partners and key stakeholders in the Healy
community on the progress and results of the feasibility and planning project. The hourly rate is
$30 per hour X 40 hours and includes a benefit rate of 25%.
AEA10-015 Grant Application Page 18 of 20 10/7/2009
Renewable Energy Fund~ALASKA , _ ENERGY AUTHORITY Grant Application Round 3
Printing $ 2,500 in grant funds
Cost of printing and/or duplicating the final report and findin gs of the feasibility study and
project implementation plan for distribution to project partners, key stakeholders in the Healy
community, and AEA. 50 pages x $.10/page x 500 copies.
TOTAL GRANT REQUEST: $95,1.90
TOTAL MATCH fRJJMPROJECT PARTNERS: V2,200
TOTAL DIRECT PROJECT COST: $1.67,390
AEA1O-015 Grant Application Page 19 of 20 10/7/2009
Renewable Energy Fund
Grant Application Round 3
SECTION 9 -ADDITIONAL DOCUMENTATION AND CERTIFICATION
SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION:
A. Resumes of Applicant's Project Manager, key staff, partners, consultants, and
suppliers per application form Section 3.1 and 3.4.
B. Cost Worksheet per application form Section 4.4.4.
C. Grant Budget Form per application form Section 9.
D. Letters demonstrating local support per application form Section 8.
E. An electronic version of the entire application on CD per RFA Section 1.6.
F. Governing Body Resolution or other formal action taken by the applicant's
governing body or management per RFA Section 1.4 that:
Commits the organization to provide the matching resources for project at the
match amounts indicated in the application.
Authorizes the individual who signs the application has the authority to
commit the organization to the obligations under the grant.
Provides as point of contact to represent the applicant for purposes of this
application.
Certifies the applicant is in compliance with applicable federal, state, and local,
laws including existing credit and federal tax obligations.
F. CERTIFICATION
The undersigned certifies that this application for a renewable energy grant is truthful·
and correct, and that the applicant is in compliance with, and will continue to comply
with, all federal and state laws including existing credit and federal tax obligations.
\ ,. DO,· b~
, Print Name
Signature
Title
Date
AEA10-015 Grant Application Page 20 of 20 10/7/2009
Renewable Energy Fund Round 3
Project Cost/Benefit Worksheet
Please note that some fields might not be applicable for all technologies or all project
phases. The level of information detail varies according to phase requirements.
!1. Renewable Energy Source
The Applicant should demonstrate that the renewable energy resour ce is available on a
sustainable basis.
Annual average resource availability. Waste heat from Healy Power Plant available year
round.
Unit depends on project type (e.g. windspeed, hydropower output, biom asss fuel)
2. Existing Energy Generation and Usage
a) Basic configuration (if system is part of the Railbelt1 grid. leave this section blank)
i. Number of generators/boilers/other
ii. Rated capacity of generators/boilers/other
iii. Generator/boilers/other type
iv. Age of generators/boilers/other
v. Efficiency of generators/boilers/other
b) Annual O&M cost (if system is part of the Railbelt grid. leave this section blank)
i. Annual O&M cost for labor
ii. Annual o&M cost for non-labor
c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the
Railbelt grid. leave this section blank)
i. Electricity [kWh]
ii. Fuel usage
Diesel [gal]
Other
iii. Peak Load
iv. Average Load
v. Minimum Load
vi. Efficiency
vii. Future trends
d) Annual heating fuel usage (fill in as applicable)
i. Diesel [gal or MMBtu]
ii. Electricity [kWh]
iii. Propane [gal or MMBtu]
iv. Coal [tons or MMBtu]
v. Wood [cords, green tons, dry tons]
vi. Other
1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric
ASSOciation, the City of Seward Electric Department, Matanuska Electric Association and Anchorage MunicipalUght and Power.
RFA AEA 10-015 Application Cost WOrksheet Page 1 10-7-09
---------------------------------------------------
---------------------------------------------------
-----------------------------------------
----------------------------------------
-----------------------------------------
Renewable Energy Fund Round 3
Project Cost/Benefit Worksheet
3. Proposed System Design Capacity and Fuel Usage
(Include any projections for continued use of non-renewable fuels)
a) Proposed renewable capacity Renewable capacity of the waste heat from the Healy
(Wind, Hydro, Biomass, other) Power Plant will be determined during the feasibility study
[kWh or MMBtulhr] and planning phase.
b) Proposed Annual electricity or heat production (f ill in as applicable)
i. Electricity [kWh] See 3.a.
ii. Heat [MMBtu] See 3.a.
c) Proposed Annual fuel Usage (fill in as applicable)
i. Propane [gal or MMBtu]
ii. Coal [tons or MMBtu]
iii. Wood [cords, green tons, dry tons]
iv. Other See 3.a.
[4, Project Cost
a) Total capital cost of new system Cost projections will be determined during the feasibility
study and planning phase.
b) Development cost See4.a.
c) Annual O&M cost of new system See4.a.
d) Annual fuel cost See4.a.
[5, Project Benefits
a) Amount of fuel displaced for
I. Electricity Will be determined during the feasibility study and planning phase.
ii. Heat See 5.a.L
iii. Transportation See 5.a.L
b) Price of displaced fuel See 5.a.L
c) Other economic benefits See 5.a.i.
d) Amount of Alaska public benefits See S.a.L
16. Power Purchase/Sales Price
a) Price for power purchase/sale Price will be determined during feasibility study and planning
phase.
17. Project Analysis
a) Basic Economic Analysis
Project benefit/cost ratio Will be determined during feasibility study and planning phase.
Payback Will be determined during feasibility study and planning phase.
RFA AEA1 0-01 S Application Cost Worksheet Page 2 10-7-09
GVEA's Renewable Energy Fund Grant Request, Round III Grant Budget Form 10-7-09
2. Selection of Planning Contractor
3. Identify Land and Land Use Issues
4. Create Business and Operational Plans
5. Determine costs for Implementation Plan I 1/2011
6. Create Implementation and Sustainable I 212011
Fundina Plan
7. Approval of Project Scope by Project I 4/2011
Partners
8. Final Report and Recommendations I 6/2011
nro",onfoorl to Kev Stakeholders
9. Draft and Submit Grant Applications for I 6/2011
'rnnl"'rnonbfoi....n Phase
TOTALS
Budget Categories:
Direct Labor & Benefits
Travel & Per Diem
Equipment
Materials & Supplies (and PrintinglDuplication)
Contractual Services
Construction Services
Other (Communication via audio-conferences)
TOTALS
Cash
Cash
Cash
$7,724 $11,417 Cash
$19,311 $13,542 Cash $32,853
$3,862 $2,708 Cash $6,570
$10,224 $6,617 Cash $16,840
$7,725 $5,417 I Cash I $13,141
Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)
Add additional pages as needed
GVEA's Renewable Energy Fund Grant Request, Round III Grant Budget Form 10·7-09
Project Milestones that should be addressed in Budget Proposal
-~
Reconnaissance Feasibility Design and Permitting Construction
1. Project scoping and
contractor solicitation.
2. Resource identification and
analysis
3. Land use, permitting, and
environmental analysis
5. Preliminary design analysis
and cost
4. Cost of energy and market
analYSis
5. Simple economic analysis
6. Final report and
recommendations
1. Project scoping and contractor
solicitation.
2. Detailed energy resource
analysis
3. Identification of land and
regulatory issues.
4. Permitting and environmental
analysis
5. Detailed analysis of existing
and future energy costs and
markets
6. Assessment of alternatives
7. Conceptual design analysis
and cost estimate
8. Detailed economic and
financial analysiS
1. Project scoping and contractor
solicitation for planning and
design
2. Permit applications (as
needed)
3. Final environmental
assessment and mitigation
plans (as needed)
4. Resolution of land use. right of
way issues
5. Permit approvals
6. Final system design
7. Engineers cost estimate
8. Updated economic and
financial analysis
9. Negotiated power sales
1. Confirmation that all design
and feasibility requirements
are complete.
2. Completion of bid documents
3. Contractor/vendor selection
and award
4. Construction Phases-
Each project will have unique
construction phases, limitations,
and schedule constraints which
should be identified by the
grantee
5. Integration and testing
6. Decommissioning old
systems
7. Final Acceptance.
Commissioning and Start-up
9, Conceptual business and
operations plans
agreements with approved
rates 8. Operations Reporting
10. Final report and
recommendations
10. Final business and operational
plan
11/06/2009 14:41 987563099& DENAL I PEAl< PAGE 02/02
_................... Borou " School District
P.O. Box 280. HeaJy. Alaska 99743 • (907) 683-2278 • FAX (907) 683-2514
November 6, 2009
Dear Alaska Energy Authority,
As the superintendent of the Denali Borough School District, I am pleased to e"press the fulJ support
of GVEA's propouJ to the Alaska Energy Autbority to conduct a feasibility and planning study for a
communlty ,greenhouse powered and heated by wute heat. Tbe overall objective of this proposal is to
conduct preliminary engineering and create 8 business plan to build and operate this greenhouse to be
located iA Healy t Alaska. usiu8 waste beat from the Healy aun Coal. Plant as its cDergy source.
The Healy aean Coal Project (BCCP) is being brought 9n line sometime the first half of 2011. Tb;s
project will explore the opportunity of using wann water that .is typically discharged into the Nenana
River to heat a greenhouse that will be used to produce vegetables for the Healy community.
Technically, there is plenty of water that can be used for tbe project, but the economjcs of the project
are unknown. This grant wili be used to put toðer the necessary information 10 determine if there is
a business case for a successful and sustainabJe project.
The Denali Borough. the Denali ~hool District and Golden Valley Electric Association Inc., will be
participants in the business plan deveJopment. The school msttiet is excited by the potential tht.s
project haa to teach children how to grow tbeir own food. provide internship and other job
opportunities. We will use it for scieuce experiments ou. a grander scale than cl8S8fOOm window
boxes. Many people in the eonununity have home lardens. which succeed or fail depending on the
weather. t'llIpeciaJly in the spring. This will allow students to experience success despite late frosts.
Students in the district have been involved in a building trades program. with Denali National Park. as a
partner. One project bas been building traditional greenhouses. Taking part ;n the building of the
facility at some point. or even studying the construction of a greenhouse utilizing waste heat would be
a valuable e.xperieu.ce for our students.
The Denali Borougb School District wholeheartedly endorses this project for the benefit of our
students and community members in the borouah.
since~~~,y~.
J /. .'
..y" '.. '
Kim Langton
Superintendent
907 883 1340 11J0812008 12: 23 1088 P.001J001From: DENAlI BOROUGH
DENALI BOROUGH
P. O. Bole 480 • Healy. Al8ska 89743
Phone (907) 683·1330 • Fax (907) 883-1340
dbgovtOmtaonHne.net
www.denallborough.govoffice.com
November 5, 2009
To: Alaska F.nergy Authority
Re: Renewable Energy Fund
I am writing to support the request for funding proposed by Golden Valley
Electric Association (GVEA) to evaluate a Healy community greenhouse using waste
heat ftom the Healy Clean Coal Plant.
The Denali Borough Administration will work closely with GVEA to provide
assistance to complete the evaluation.
I believe that there is potential for this concept to provide a tremendous
opportunity for the local community and school district. The benefits would include
educational opportunities that have not been explored in our area before.
Utili" energy 1bat otberwiae would be wasted is equal to and connected to
reduciDg energy consumption. Added to this i~ the retearch potential, reduction in
transportation and storage faciliti~ and workforce development.
Thank you for your coDSideration.
<r:R)tJ/;V~
David M TaleriCo, Mayor
Denali Borough
-~-----~4U:;eh $ -~.--~--.------,1 P~!~wlt:tb~ Pt~!O;;Ae II1C,
.rn~ et'C~;;f: e9'r~r;r;'~
! 'PO, BQl' 3G5 • :Uq 11tr/:s :;Ht~~l •:/-Idetfj.•, f1let.-;Kt'i qt:(743
'Pf.$r(Q07) Glf3-3333
November 6, 2009
Alaska Energy Authority
813 W Northern Ughts Boulevard
Anchorage, Alaska 99503
To whom it may concern:
As owner/operators of Lausen's Dependable Disposal here in
Healy, Alaska, we would like to thank Golden Valley Electric for stepping
up and being a leader in the recycling for energy process. Lausen's has
been in the process of looking into turning waste into a burnable pellet
and would really look forward to working with them on their green house
project. Vickie has been working through the Denali School District on
recycling and composting. Anything we can do to help with this project
let us know.
Respectfully,
Leroy and Vickie Lausen
RESOLUTION NO. 111-09
A RESOLUTION OF THE BOARD OF DIRECTORS
SUPPORTING THE REQUEST FOR STATE FUNDING TO EVALUATE A HEALY
COMMUNITY GREENHOUSE USING HEALY CLEAN COAL WASTE HEAT
THROUGH THE ALASKA ENERGY AUTHORITY (AEA) RENEWABLE ENERGY FUND
WHEREAS, Golden Valley Electric Association (GVEA), through its subsidiary company Tri
Valley Electric Cooperative, Inc., is acquiring the Healy Clean Coal Plant (HCCP), a 50MW
coal fired power plant, located immediately adjacent to GVEA's 25MW Unit #1 coal fired
power plant, both located on the banks of the Nenana River in Healy, Alaska; and
WHEREAS, water from the Nenena River is used in a once through cooling system in which
the river water is used to condense steam as part of the Healy #1 and HCCP generating
process, after which warm water is returned to the river in accordance with Federal and State
discharge permits; and
WHEREAS, GVEA believes there may be an additional use of the warm water to heat a
greenhouse located near the Healy generating units before the water is returned to the river;
and
WHEREAS, the Board of Directors in interested in exploring the feasibility of such an
endeavor in partnership with the Denali Borough and the Denali Borough School District; and
WHEREAS, the GVEA Board of Directors authorizes the application to AEA for project
funding and authorizes and name GVEA Vice President Kathryn Lamal as the project
manager and point of contact to represent the applicant for purposes of this application; and
WHEREAS, Brian Newton, President & CEO, shall be authorized to execute all agreements
on behalf of the Association.
NOW, THEREFORE, BE IT RESOLVED, that the Board of Directors of Golden Valley
Electric Association hereby endorses GVEA's request for funding through the State of
Alaska's Renewable Energy Fund for purposes of evaluating a Healy community greenhouse
using Healy #1 and HCCP warm water in partrnership with the Denali Bourough and the
Denail Borough School District, and affirms that GVEA is in compliance with all federal, state,
and local laws, including existing credit and federal tax obligations.
CERTIFICATION
I, John Sloan, do hereby certify that I am the Secretary of Golden Valley Electric Association, Inc., an electric
not-for-profit cooperative membership corporation organized and existing under the laws of the State of Alaska;
that the foregoing is a complete and correct copy of a resolution adopted at a regular meeting of the Board of
Directors of this corporation, duly and properly called and held on the 10th day of November, 2009; that a
quorum was present at the meeting; that the resolution is set forth in the minutes of the meeting and has not
been rescinded or modified.
IN WITNESS WHEREOF. I have hereunto subscribed my name and affixed the seal of the corporation this 10th
day of November. 2009.
(SEAL)
John Sloan, Secretary
DRAFT
DENALI BOROUGH, ALASKA
RESOLUTION NO. __
A RESOLUTION OF THE DENALI BOROUGH ASSEMBLY SUPPORTING THE
REQUEST FOR STATE FUNDING FOR GOLDEN VALLEY ELECTRIC
ASSOCIATION, THE DENALI BOROUGH, AND THE DENALI BOROUGH
SCHOOL DISTRICT FOR A FEASIBILITY STUDY FOR A GREENHOUSE
THROUGH THE ALASKA ENERGY AUTHORITY RENEWABLE ENERGY FUND
WHEREAS, the Denali Borough Assembly supports the use of excess energy to develop
and maintain projects and services that will benefit the residents and businesses within
the Denali Borough and beyond; and
WHEREAS, the Denali Borough Assembly is aware that Golden Valley Electric
Association has received renewable energy grants in the past and has successfully
completed projects within the allotted time and budget: and,
WHEREAS, support of this study may increases educational opportunities for local
students and adults and will also extend well past the Denali Borough boundaries to
stimulate productive goods and services as well as research for future sustainable
facilities within Alaska; and
WHEREAS, the benefits of a successful greenhouse project will also positively impact
the delivery of goods and resolve some transportation issues while creating jobs.
THEREFORE BE IT RESOLVED, that the Denali Borough Assembly hereby endorses
and supports the request for funding through the State of Alaska's Renewable Energy
Fund for purposes of a feasibility study for a greenhouse near the Golden Valley Power
Plants in Healy, Alaska for the purposes of designing and building a greenhouse which
will utilize excess energy from the power facilities.