Loading...
HomeMy WebLinkAboutWrangell LED Street Lights App Renewable Energy Fund Round 3 Grant Application AEA 10-015 Application Page 1 of 11 10/7/2009 Application Forms and Instructions The following forms and instructions are provided to assist you in preparing your application for a Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA) and the forms are available online at: http://www.akenergyauthority.org/RE_Fund-III.html Grant Application Form GrantApp3.doc Application form in MS Word that includes an outline of information required to submit a complete application. Applicants should use the form to assure all information is provided and attach additional information as required. Application Cost Worksheet Costworksheet3 .doc Summary of Cost information that should be addressed by applicants in preparing their application. Grant Budget Form GrantBudget3.d oc A detailed grant budget that includes a breakdown of costs by milestone and a summary of funds available and requested to complete the work for which funds are being requested. Grant Budget Form Instructions GrantBudgetInst ructions3.pdf Instructions for completing the above grant budget form. • If you are applying for grants for more than one project, provide separate application forms for each project. • Multiple phases for the same project may be submitted as one application. • If you are applying for grant funding for more than one phase of a project, provide milestones and grant budget for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. • If you have additional information or reports you would like the Authority to consider in reviewing your application, either provide an electronic version of the document with your submission or reference a web link where it can be downloaded or reviewed. REMINDER: • Alaska Energy Authority is subject to the Public Records Act AS 40.25, and materials submitted to the Authority may be subject to disclosure requirements under the act if no statutory exemptions apply. • All applications received will be posted on the Authority web site after final recommendations are made to the legislature. • In accordance with 3 AAC 107.630 (b) Applicants may request trade secrets or proprietary company data be kept confidential subject to review and approval by the Authority. If you want information is to be kept confidential the applicant must: o Request the information be kept confidential. o Clearly identify the information that is the trade secret or proprietary in their application. o Receive concurrence from the Authority that the information will be kept confidential. If the Authority determines it is not confidential it will be treated as a public record in accordance with AS 40.25 or returned to the applicant upon request. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 2 of 11 10/7/2009 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) City and Borough of Wrangell Type of Entity: Local Municipal Government Mailing Address City & Borough of Wrangell P.O. Box 531 Wrangell, Alaska 99929 Physical Address City and Borough of Wrangell 205 Brueger Street Wrangell, Alaska 99929 Telephone (907) 874-2381 Fax (907) 874-8952 Email tdrooney@wrangell.com 1.1 APPLICANT POINT OF CONTACT Name Steven Henson Title Electrical Superintendent Mailing Address Wrangell Municipal Light & Power P.O. Box 531 Wrangell, Alaska 99929 Telephone (907) 874-3602 Fax (907) 874-3614 Email linedept@gci.net 1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer in accordance with 3 AAC 107.695 (a) (1), or X A local government, or A governmental entity (which includes tribal councils and housing authorities); Yes 1.2.2. Attached to this application is formal approval and endorsement for its project by its board of directors, executive management, or other governing authority. If the applicant is a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Indicate Yes or No in the box ) Yes 1.2.3. As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes 1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exceptions should be clearly noted and submitted with the application.) Yes 1.2.5 We intend to own and operate any project that may be constructed with grant funds for the benefit of the general public. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 3 of 11 10/7/2009 SECTION 2 – PROJECT SUMMARY This is intended to be no more than a 1-2 page overview of your project. 2.1 Project Title – (Provide a 4 to 5 word title for your project) Wrangell Street Light Conversion 2.2 Project Location – Include the physical location of your project and name(s) of the community or communities that will benefit from your project. Public streets, trailer parks, harbors, some residential driveways and various parking areas in the Wrangell community 2.3 PROJECT TYPE Put X in boxes as appropriate 2.3.1 Renewable Resource Type Wind Biomass or Biofuels Hydro, including run of river Transmission of Renewable Energy Geothermal, including Heat Pumps Small Natural Gas Heat Recovery from existing sources Hydrokinetic Solar Storage of Renewable X Other (Describe) Lower energy consumption 2.3.2 Proposed Grant Funded Phase(s) for this Request (Check all that apply) Reconnaissance Design and Permitting Feasibility X Construction and Commissioning Conceptual Design 2.4 PROJECT DESCRIPTION Provide a brief one paragraph description of your proposed project. Purchase and installation of new Low-Emitting Diode (LED) street lighting fixtures, replacing existing High Pressure Sodium (HPS), Low Pressure Sodium (LPS) and Mercury Vapor (MV) fixtures. 2.5 PROJECT BENEFIT Briefly discuss the financial and public benefits that will result from this project, (such as reduced fuel costs, lower energy costs, etc.)  LED fixtures are cost and energy efficient. LED instillation will lower energy consumption, approximately 268,000 kilowatts per year. At 11.6 cents per kwh total savings are an estimated $31,000.00 per year. This savings will benefit the City Public Works, Wrangell Harbor Department, the State of Alaska, Trailer Court Owners, and a few Residential requested units. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 4 of 11 10/7/2009 LED lights also produce a cleaner/whiter light increasing visibility and safety. 2.6 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. The estimated cost of the LED fixtures with shipping to Wrangell is $347,950.00. Wrangell Municipal Light & Power will install the fixtures, estimated cost with labor and truck time is $68,442.00. Wrangell Cooperative has secured a grant, thru the Department of Energy, to install new LED lighting in a Tlingit & Haida tribally owned subdivision in Wrangell with excess funds requested to assist in the fixture cost. They are contributing approximately $34,160.00 towards purchasing lowering our grant request to $313,790.00 2.7 COST AND BENEFIT SUMARY Include a summary of grant request and your project’s total costs and benefits below. Grant Costs (Summary of funds requested) 2.7.1 Grant Funds Requested in this application. $313,790.00 2.7.2 Other Funds to be provided (Project match) $102,602.00 2.7.3 Total Grant Costs (sum of 2.7.1 and 2.7.2) $416,392.00 Project Costs & Benefits (Summary of total project costs including work to date and future cost estimates to get to a fully operational project) 2.7.4 Total Project Cost (Summary from Cost Worksheet including estimates through construction) $416,392.00 2.7.5 Estimated Direct Financial Benefit (Savings) $31,113.17 (annually) 2.7.6 Other Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application (Section 5.) $ 1,312.20 (annually) SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include a resume and references for the manager(s). If the applicant does not have a project manager indicate how you intend to solicit project management support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Steven Henson, Electrical Superintendent Wrangell Municipal Light & Power Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 5 of 11 10/7/2009 3.2 Project Schedule Include a schedule for the proposed work that will be funded by this grant. (You may include a chart or table attachment with a summary of dates below.) The proposed schedule for this phase is as follows Description Schedule Phase 1- RFP 30 days after award of grant Phase 2- Purchase/Ship 8-12 Weeks after receiving grant money Phase 3-Instillation 2 years after receiving fixtures* *Instillation is spread over a 2 year period to slowly integrate the new style light. This schedule will also help avoid numerous replacements when the lifespan of the light unit expires. 3.3 Project Milestones Define key tasks and decision points in your project and a schedule for achieving them. The Milestones must also be included on your budget worksheet to demonstrate how you propose to manage the project cash flow. (See Section 2 of the RFA or the Budget Form.) Key project milestones for this project include the following: Date Project Milestone 1 Month after Award Request for Proposal Bid 2-3 Months after RFP Bid Award Purchase/Shipping 2 years after purchase Instillation replacement of existing fixtures This project will start when the grant is approved and will be completed approximately two years and 3 months later. 3.4 Project Resources Describe the personnel, contractors, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe any existing contracts and the selection process you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. City and Borough of Wrangell charter dictates that all large purchases must go through a formal request for proposal or bid process for award. For this project we anticipate issuing an RFP for the purchase of 422 each LED lighting fixtures. After award of RFP, Wrangell Municipal Light & Power will purchase the light fixtures and have them delivered to Wrangell. Over the next two year period, Wrangell Municipal Light & Power employees (one Lineman and one Ground Man) will replace the existing light fixtures with the new LED fixtures. Instillation will also require use of a company bucket truck. Wrangell Cooperative Association on behalf of Tlingit & Haida has secured a grant from the Department of Energy to install 8 new street poles and LED fixtures in a tribal owned subdivision. In securing the grant they acquired additional funds to help the City and Borough of Wrangell purchase additional LED fixtures. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 6 of 11 10/7/2009 3.5 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status. Throughout the life of the project, the Project Manager will provide written and monthly updates to AEA which will include at a minimum: - Expenditures to date; - Percent complete; and - Narrative on progress including any scheduled changes. In addition to the monthly progress reports, communications on project status will also be provided verbally with the AEA Project Manager on an informal basis through emails and phone conversations. 3.6 Project Risk Discuss potential problems and how you would address them. Only foreseeable problem would be availability and delivery time to Wrangell this would only delay the completion date. SECTION 4 – PROJECT DESCRIPTION AND TASKS • Tell us what the project is and how you will meet the requirements outlined in Section 2 of the RFA. • The level of information will vary according to phase(s) of the project you propose to undertake with grant funds. • If you are applying for grant funding for more than one phase of a project provide a plan and grant budget form for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be available for the market to be served by your project. The current street lights use an estimated 410,145 kwh annually for street lighting. The new LED lights will use an estimated 142,028 kwh per year lowering consumption by over 268,000 kwh per year. At 11.6 cents per kwh this is an estimated savings of $31,113.17 annually. See Attachment D 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include information about the number, size, age, efficiency, and type of generation. Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 7 of 11 10/7/2009 Currently Wrangell has 422 street lighting fixtures: - 39 each 400 watt High Pressure Sodium fixtures - 6 each 400 watt Mercury Vapor fixtures - 47 each 250 watt High Pressure Sodium fixtures - 203 each 150 watt High Pressure Sodium fixtures - 127 each 175 watt Mercury Vapor fixtures Then 133 Mercury Vapor fixtures are now obsolete and have to be replaced regardless of the grant. The other units are not cost effective to keep replacing. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. Currently Wrangell uses hydropower supplied from the Tyee Lake Hydroelectric Facility. Total consumption in Wrangell has increased over 30% in the past two years. Lower consumption for street lighting will allow for further economic growth. 4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. Then street light fixtures currently installed use approximately 410,145 kilowatts per year. This cost is paid by the City (Public Works and Harbor Departments), the State of Alaska, Trailer Court owners, and Residents (who requested additional lighting). The proposed LED lights will use approximately 142,018 kilowatts per year. Lower usage will save an estimated $31,113.17 per year. 4.3 Proposed System Include information necessary to describe the system you are intending to develop and address potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system: • A description of renewable energy technology specific to project location • Optimum installed capacity • Anticipated capacity factor • Anticipated annual generation • Anticipated barriers • Basic integration concept • Delivery methods No new system is being proposed Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 8 of 11 10/7/2009 4.3.2 Land Ownership Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. All fixtures are on poles owned and maintained by the City and Borough of Wrangell 4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. • List of applicable permits • Anticipated permitting timeline • Identify and discussion of potential barriers No permits will be necessary for this project 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed: • Threatened or Endangered species • Habitat issues • Wetlands and other protected areas • Archaeological and historical resources • Land development constraints • Telecommunications interference • Aviation considerations • Visual, aesthetics impacts • Identify and discuss other potential barriers Installing LED lighting units will have positive visual and aesthetic impacts, increasing visibility and unifying fixture types and light output. 4.4 Proposed New System Costs and Projected Revenues (Total Estimated Costs and Projected Revenues) The level of cost information provided will vary according to the phase of funding requested and any previous work the applicant may have done on the project. Applicants must reference the source of their cost data. For example: Applicants Records or Analysis, Industry Standards, Consultant or Manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed project cost information based on your current knowledge and understanding of the project. Cost information should include the following: • Total anticipated project cost, and cost for this phase • Requested grant funding • Applicant matching funds – loans, capital contributions, in-kind • Identification of other funding sources • Projected capital cost of proposed renewable energy system • Projected development cost of proposed renewable energy system Total cost is estimated at $416,392.00; $313,790.00 grant funding, $68,442.00 in kind contribution, $34,160.00 Wrangell Cooperative/Tlingit & Haida Department of Energy grant Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 9 of 11 10/7/2009 4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. (Note: Operational costs are not eligible for grant funds however grantees are required to meet ongoing reporting requirements for the purpose of reporting impacts of projects on the communities they serve.) Light fixtures are already in use costing an estimated $47,587.26 per year. Annual cost will be approximately $16,474.09 after the project is completed 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following: • Identification of potential power buyer(s)/customer(s) • Potential power purchase/sales price - at a minimum indicate a price range • Proposed rate of return from grant-funded project Not applicable 4.4.4 Project Cost Worksheet Complete the cost worksheet form which provides summary information that will be considered in evaluating the project. See Attachment B SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. The benefits information should include the following: • Potential annual fuel displacement (gal and $) over the lifetime of the evaluated renewable energy project • Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or cost based rate) • Potential additional annual incentives (i.e. tax credits) • Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) • Discuss the non-economic public benefits to Alaskans over the lifetime of the project Wrangell operates on diesel generation for 2-3 weeks in the early summer for Tyee’s annual shut down for maintenance. The generators used 46,303 gallons of diesel producing 566,980 KWH over an 11 day period. Converting to LED street lighting will save an estimated 358 gallons of diesel costing $811.60. Additionally Wrangell charges a surcharge on the entire months usage while on diesel generators. In 2009 the usage for street lights was 18,186 KWH for the month of June. The estimated LED KWH consumption for the same month is 6267 KWH. The surcharge amount for 2009 was $0.042 providing an additional savings of $500.60. The total saving for the annual shut down will be $1312.20. See Attachment E Renewable Energy Fund Grant Application Round 3 AEA10-015 Grant Application Page 10 of 11 10/7/2009 SECTION 6– SUSTAINABILITY Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum: • Proposed business structure(s) and concepts that may be considered. • How you propose to finance the maintenance and operations for the life of the project • Identification of operational issues that could arise. • A description of operational costs including on-going support for any back-up or existing systems that may be require to continue operation • Commitment to reporting the savings and benefits Not applicable SECTION 7 – READINESS & COMPLIANCE WITH OTHER GRANTS Discuss what you have done to prepare for this award and how quickly you intend to proceed with work once your grant is approved. Tell us what you may have already accomplished on the project to date and identify other grants that may have been previously awarded for this project and the degree you have been able to meet the requirements of previous grants. Wrangell Municipal Light & Power requested quotes for the lighting in early 2009 at the request of Tlingit & Haida. Wrangell Cooperative applied for a Department of Energy grant to install 8 new lighting poles with fixtures in a local tribally owned subdivision and ask for additional funding to assist the City and Borough of Wrangell in purchasing units to upgrading existing street lights with the more energy efficient LED’s. During this process Wrangell Municipal Light & Power prepared a cost analysis regarding the existing units vs. new LED units (Attachment E). Wrangell Cooperative/Tlingit & Haida have secured their grant with the Department of Energy with additional funds ($34,160.00) for the City to use towards purchasing new LED units. If this project grant is approved the City and Borough of Wrangell intends to start the RFP process immediately. SECTION 8– LOCAL SUPORT Discuss what local support or possible opposition there may be regarding your project. Include letters of support from the community that would benefit from this project. See Attachment A SECTION 9 – GRANT BUDGET Tell us how much you want in grant funds Include any investments to date and funding sources, how much is being requested in grant funds, and additional investments you will make as an applicant. Include an estimate of budget costs by milestones using the form – GrantBudget3.doc See Attachment C – Grant Budget Worksheet I Renewable Energy Fund ALASKA : ENERGY AUTHORITY Grant Application Round 3 SECTION 9 -ADDITIONAL DOCUMENTATION AND CERTIFICATION SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION: A. Resumes of Applicant's Project Manager, key staff, partners, consultants, and suppliers per application form Section 3.1 and 3.4. B. Cost Worksheet per application form Section 4.4.4. C. Grant Budget Form per application form Section 9. D. Letters demonstrating locall support per application form Section 8. E. An electronic version of the entire application on CD per RFA Section 1.6. F. Governing Body Resolution or other formal action taken by the applicant's governing body or management per RFA Section 1.4 that: Commits the organization to provide the matching resources for project at the match amounts indicated in the application. Authorizes the individual who signs the application has the authority to commit the organization to the obligations under the grant. Provides as p6int of contact to represent the applicant for purposes of this application. Certifies the applicant is in compliance with applicable federal. state, and local, laws including existing credit and federal tax obligations. F. CERTIFICATION The undersigned certifies that this application for a renewable energy grant is truthful and correct, and that the applicant is in compliance with, and will continue to comply with, all federal and state laws including existing credit and federal tax obligations. Print Name Jeff Jabusch Signature(~~/J~ I f //~ Title V Acting Borough Manager Date 1/-S-.CJ9 AEA 10-015 Grant Application Page 11 of 11 10/7/2009 Attachment B    Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet Page 1 10-7-09 Please note that some fields might not be applicable for all technologies or all project phases. The level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation and Usage a) Basic configuration (if system is part of the Railbelt 1 grid, leave this section blank) i. Number of generators/boilers/other ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric  Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power.    Attachment B    Renewable Energy Fund Round 3 Project Cost/Benefit Worksheet   RFA AEA10-015 Application Cost Worksheet Page 2 10-7-09 3. Proposed System Design Capacity and Fuel Usage (Include any projections for continued use of non-renewable fuels) a) Proposed renewable capacity (Wind, Hydro, Biomass, other) [kWh or MMBtu/hr] b) Proposed Annual electricity or heat production (fill in as applicable) i. Electricity [kWh] ii. Heat [MMBtu] c) Proposed Annual fuel Usage (fill in as applicable) i. Propane [gal or MMBtu] ii. Coal [tons or MMBtu] iii. Wood [cords, green tons, dry tons] iv. Other 4. Project Cost a) Total capital cost of new system $416,392.00 b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 358 gallons of diesel during Tyee annual maintenance ii. Heat iii. Transportation b) Price of displaced fuel $812.00 (based on 2009 price of diesel) c) Other economic benefits $31,613 (annual based on estimated new kwh usage) d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Savings of over 268,000 kilowatts and over $31,113.00 annually Payback Renewable Energy Fund Grant Round III Grant Budget Form 10-7-09 Milestone or Task Anticipated Completion Date RE- Fund Grant Funds Grantee Matching Funds Source of Matching Funds: Cash/In-kind/Federal Grants/Other State Grants/Other TOTALS 1. Confirmation that all design and feasibility requirements are complete. $ $ $ 2. Completion of bid documents $ $ $ 3. Contractor/vendor selection and award I month after Grant approval $ $ $ 4. Construction Phases – Start 2-3 months after vender selection complete in 2 years $313,790.00 $68442.00 $34,160.00 Wrangell In-Kind Other Government Grant $416,392.00 5. Integration and testing $ $ $ 6. Decommissioning old systems $ $ $ 7. Final Acceptance, Commissioning and Start-up $ $ $ 8. Operations Reporting $ $ $ $ $ $ TOTALS $313,790.00 $102,602.00 $416,392.00 Budget Categories: Direct Labor & Benefits $ $32,402.00 Wrangell In-Kind $32,402.00 Travel & Per Diem $ $ $ Equipment $ $36,040.00 Wrangell In-Kind $36,040.00 Materials & Supplies $313,790.00 $34,160.00 Other Government Grant $347,950.00 Contractual Services $ $ $ Construction Services $ $ $ TOTALS $313,790.00 $102,602.00 $416,392.00 Applications should include a separate worksheet for each project phase (Reconnaissance, Feasibility, Design and Permitting, and Construction)- Add additional pages as needed Attachment D Wrangell Light Power  In‐Kind Worksheet Cost per hour Cost Per Day Lineman 55.148 $441.18 Ground man 21.272 $170.18 Truck 85 $680.00 Estimated to install 8 fixtures per day 422 8 53 Estimated Cost per day for Labor 53 $611.36 $32,402.08 Estimated Cost for equipment 53 $680.00 $36,040.00 Labor $32,402.08 Equipment $36,040.00 Total $68,442.08 Attachment ECity and Borough of WrangellStreet Light Analysis11,093.20 311,481.58 Total$65,250.0045$           400 watt  over 10 years.$347,950.00$65,250.00$51,700.00$231,000.00LED Street LightsEachLED Watt Per HourWatt perhr ave day (13 rage) Watt per yeaeachr KWH pereach year Cost eper yach earKWH for all per yearCost for all per year400 watt replacement451531989725985726$        84.22 32670 $3,789.72250 watt replacement471041352493480494$        57.30 23218 $2,693.29150/175 watt replacement33055715260975261$        30.28 86130 $9,991.08Total42231240561480440148117$      1.80 142018 $16,474.09WrangellCurrent InventoryCurrent LiSize ght KWfoH year r oneCost each per yearKWH for all per yearCost for all per Light SyearizeCity CosYeat Per rLED Cost Per YearEstimated Saving Per Year39400 hps 1810 $     1,810.12 70590 $8,188.4            400 W4att 9,39$   2.52 3,789.72$       5,602.80$      6400 mv 1730 $     1,730.12 10380 $1,204.0            250 W8att 6,52$   0.59 2,693.29$       3,827.30$      47250 hps 1196 $     1,196.12 56212 $6,520.5            150/175 9Watt 31,67$ 4.15 9,991.08$       21,683.07$    203150 hps874 $874.12        177422 $20,580.9          Tota5l 47,58$7.26 16,474.09$    31,113.17$    127175mv753 $753.12        95631 $         422Total6363 $     6,363.58 410235 $       LED Street LightsEach Per Unit400 watt replacementreplacement45$1,450.00           1,450.00250 watt replacement47 $1,100.00           150/175 watt replacement330 $700.00               Cost is based on currently  $0.116 per kilowatt hourAll bulbs are estimated to run for approximately 50,000 hours.  Averaging 13 hours a day each will last a little*Estimates subject to change depending on quantity ordered and when order placed  Attachment F City and Borough of Wrangell Street Light Analysis Total $763 $263 $500 Watt Size June KWH Usage Surcharge Total 400 3210 0.042$              134.82$             250 2538 0.042$              106.60$             150/175 12438 0.042$              522.40$             Total 18186 0.042$              763.81$             Light Size Current KWH per  year LED KWH Per  Year %  400 Watt 80970 32670 40.348% 250 Watt 56212 23218 41.304% 150/175 Watt 273053 86130 31.543% Total 410235 142018 34.619% Watt Size June KWH Usage % June LED KWH Surcharge Total 400 3210 40.348%1295 0.042$      $54.40 250 2538 41.304%1048 0.042$      $44.03 150/175 12438 31.543%3923 0.042$      $164.78 Total 18186 34.619%6267 0.042$      $263.21 Watt Size Current Surcharge LED Surcharge Savings 400 $134.82 $54.40 $80.42 250 $106.60 $44.03 $62.57 150/175 $522.40 $164.78 $357.61 Total $763.81.81 $263.21.21 $500.60.60 Watt Size June KWH Usage June LED KWH Savings 400 3210 1295 1915 250 2538 1048 1490 150/175 12438 3923 8515 Total 18186 6267 11919 June per day 606 208 398 Days on Gen 11 11 11 KWH on Gen 6666 2288 4378 Total KWH produced while on generated power 566980 Percent of KWH 0.77% Cost of fuel while on generated power $105,107.81 Gallons of Fuel Used 46303 Gallons of Fuel Savings 358 Additional fuel savings $811.60 Surchage Savings $500.60 Total saving for June $1,312.20