Loading...
HomeMy WebLinkAboutCost Worksheet Renewable Energy Fund   RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 of 3 C:\Documents and Settings\bgross.PROJECT_MANAGER\My Documents\My Docs\Docs Active\() ALASKA GREEN ENERGY, LLC\(ii) PROJECTS\(i) CHIGNIK LAKE\(i) ELECTRONIC GRANT\Original Format\(iii) COST WORKSHEET\CL Costworksheet 3 village.docx 10-Nov-200 Application Cost Worksheet – Chignik Lake CBM Assessment & Feasibility Study Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 16,500 + MCF/Day Coal Bed Methane Gas Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation – Chignik, Chignik Lagoon & Chignik Lake a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 Primary ii. Rated capacity of generators/boilers/other 525KW, 300KW, 80KW iii. Generator/boilers/other type iv. Age of generators/boilers/other 5+ years v. Efficiency of generators/boilers/other 30% b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $ 200,000 est. ii. Annual O&M cost for non-labor $150,000 est. c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 782,000 KWh ii. Fuel usage Diesel [gal] 180,000 gal Other iii. Peak Load 850 KWh 700 KWh v. Minimum Load 500 KWh vi. Efficiency 30% vii. Future trends Rising cost of fuel (avg cost $6.50 / gal) d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Additional residential heat not determined.                                                              1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden  Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage  Municipal Light and Power.   Renewable Energy Fund   RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 of 3 C:\Documents and Settings\bgross.PROJECT_MANAGER\My Documents\My Docs\Docs Active\() ALASKA GREEN ENERGY, LLC\(ii) PROJECTS\(i) CHIGNIK LAKE\(i) ELECTRONIC GRANT\Original Format\(iii) COST WORKSHEET\CL Costworksheet 3 village.docx 10-Nov-200 ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other   3. Proposed System Design a) Installed capacity 905+ KWH plus Waste heat from CHP b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other Coal Bed Methane Gas in excess of 2 Mill KWH 4. Project Cost a) Total capital cost of new system $ 1,995,617 Assessment, Feasibility, Core Sample b) Development cost $ N/A c) Annual O&M cost of new system $ N/A d) Annual fuel cost $ N/A 5. Project Benefits a) Amount of fuel displaced for i. Electricity 180,000 gal/yr ii. Heat N/A iii. Transportation b) Price of displaced fuel $720,000 / yr c) Other economic benefits d) Amount of Alaska public benefits  Renewable Energy Fund   RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 of 3 C:\Documents and Settings\bgross.PROJECT_MANAGER\My Documents\My Docs\Docs Active\() ALASKA GREEN ENERGY, LLC\(ii) PROJECTS\(i) CHIGNIK LAKE\(i) ELECTRONIC GRANT\Original Format\(iii) COST WORKSHEET\CL Costworksheet 3 village.docx 10-Nov-200 6. Power Purchase/Sales Price a) Price for power purchase/sale Estimated reduction of consumer Electricity price from $ 0.75 / KWH to $ 0.25 / KWH 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Payback Estimated reduction of consumer Electricity price from $ 0.75 / KWH to $ 0.25 / KWH