HomeMy WebLinkAboutCostworksheet ver 2[1] Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wood chip biomass fuel 2000 to 3000 tons/year available by barge from Craig and/or Prince of Wales Island and eventually from local thinning. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other One diesel generator ii. Rated capacity of generators/boilers/other 400 kW h iii. Generator/boilers/other type iv. Age of generators/boilers/other Not known v. Efficiency of generators/boilers/other Not known b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $24,000/year for heat boilers and generator ii. Annual O&M cost for non-labor ~$300,000/year for heat boilers and generator c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] 38,400 kWh/year ii. Fuel usage Diesel [gal] Unknown Other Federal licensing requires that the emergency generator be run 8 hrs/month iii. Peak Load Unknown iv. Average Load Unknown v. Minimum Load Unknown vi. Efficiency Unknown vii. Future trends Unlikely to change d) Annual heating fuel usage (fill in as applicable) 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 i. Diesel [gal or MMBtu] 68,000 gal/year for both heat and energy ii. Electricity [kWh] 240,000 kWh/year iii. Propane [gal or MMBtu] 0 iv. Coal [tons or MMBtu] 0 v. Wood [cords, green tons, dry tons] 0 vi. Other o 3. Proposed System Design a) Installed capacity Primarily for heat generation at 2.5 million Btu with 200 kWh generator b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] 1.5 million kWh/year iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] Between 2.5 and 5.5 green tons/day vi. Other 4. Project Cost a) Total capital cost of new system Feasibility study needed. b) Development cost $30,000 c) Annual O&M cost of new system Feasibility study needed. d) Annual fuel cost Feasibility study needed. 5. Project Benefits a) Amount of fuel displaced for i. Electricity Unknown ii. Heat Heat and steam generation: 47,600 gallons/year of diesel fuel. This is based on a 70% reduction in fuel use for the hospital.) iii. Transportation 0 b) Price of displaced fuel $209,440 at today’s city rate of $4.40/gal. c) Other economic benefits Purchase of fuel from local sources replacing imported fuel. Demonstration of renewable energy as a “green attraction”. Provides a market for local thinning and chipping work. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 d) Amount of Alaska public benefits $209,440 savings from fuel cost can be redirected into patient services at the hospital. 6. Power Purchase/Sales Price a) Price for power purchase/sale 7 ½ cents per kWh 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Feasibility study needed Payback Projected at less than 10 years.