Loading...
HomeMy WebLinkAboutCity_Kotzebue_Costworksheet ver 2 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 1820 tons of Municipal Solid Waste (7 tons each work day) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) Waste-to Energy Facility 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other Local electric utility ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor Local electric utility ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] n/a ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) 96,000 gallons 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 i. Diesel [gal or MMBtu] 96,000 gallons ii. Electricity [kWh] 630,000 KwH iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 3. Proposed System Design a) Installed capacity Up to 200Kwh b) Annual renewable electricity generation i. Diesel [gal or MMBtu] To be evaluated by reconnaissance study ii. Electricity [kWh] To be evaluated by reconnaissance study iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $20,000 this phase b) Development cost To Be Determined by Reconnaissance Study c) Annual O&M cost of new system To Be Determined by Reconnaissance Study d) Annual fuel cost $420,000 5. Project Benefits a) Amount of fuel displaced for i. Electricity 350,000 KwH—to be evaluated by reconnaissance study ii. Heat 25,000 gallons--to be evaluated by reconnaissance study iii. Transportation n/a b) Price of displaced fuel $5.81 gallon c) Other economic benefits $60,000 annual landfill cover saving and annual replacement cost for used landfill d) Amount of Alaska public benefits Cleaner landfill area will less than 10% of waste stream going into the fill. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 6. Power Purchase/Sales Price a) Price for power purchase/sale n/a at this time. 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 75:1 Payback < than 5 years---estimated. Reconnaissance study will validate.