Loading...
HomeMy WebLinkAboutAngoon Heat Recovery Costworksheet Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Estimated 26,000 gallons of diesel fuel annually Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 3 diesel engines with attached electric generators ii. Rated capacity of generators/boilers/other Approximate 1,500 kw iii. Generator/boilers/other type Diesel iv. Age of generators/boilers/other 1989, 1998, 2006 v. Efficiency of generators/boilers/other 13 -14 kwh/gallon of diesel b) Annual O&M cost i. Annual O&M cost for labor $100,000 ii. Annual O&M cost for non-labor $150,000 c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] 1,907,000 kwh ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] 145,000 gallons Other iii. Peak Load 400kw iv. Average Load 250kw v. Minimum Load 200kw vi. Efficiency 13 kwh/gallon vii. Future trends Not to reduce effiency d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] Unknown ii. Electricity [kWh] Unknown iii. Propane [gal or MMBtu] Unknown iv. Coal [tons or MMBtu] None v. Wood [cords, green tons, dry tons] None vi. Other Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 2 3. Proposed System Design a) Installed capacity 435 kw (CAT 3456 genset) b) Annual renewable electricity generation i. Diesel [gal or MMBtu] 26,000 gallons of heating fuel displaced ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $617,934 b) Development cost $0 c) Annual O&M cost of new system $0 d) Annual fuel cost $0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 0 ii. Heat 26,000 gallons iii. Transportation 0 b) Price of displaced fuel Expected average of $4.00 per gallon c) Other economic benefits Partnership between IPEC and the City of Angoon d) Amount of Alaska public benefits Help sustain a community 6. Power Purchase/Sales Price a) Price for power purchase/sale Unknown 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Unknown Payback Simple Project Payback= 5.25 years