Loading...
HomeMy WebLinkAboutAIN Coalbed Methane Costworksheet ver 2 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 5 total ii. Rated capacity of generators/boilers/other Two Caterpillar 3512 engines with 910 kW factory settings rated output. Three Caterpillar 3508 engines with 430 kW factory settings rated output. iii. Generator/boilers/other type Diesel generators iv. Age of generators/boilers/other Two 3512 engines about 9 years, three 3508 about 21 years v. Efficiency of generators/boilers/other Estimated at 80% b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $618,664 ii. Annual O&M cost for non-labor $1,556,224 c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] ii. Fuel usage Diesel [gal] 343,121 Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 3. Proposed System Design a) Installed capacity N/A this is feasibility study b) Annual renewable electricity generation i. Diesel [gal or MMBtu] 343,121 ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system Estimated at $30 million b) Development cost To be determined next phase c) Annual O&M cost of new system To be determined in later phase d) Annual fuel cost $4.43 a gallon 5. Project Benefits a) Amount of fuel displaced for i. Electricity 343,121 gallons ii. Heat iii. Transportation b) Price of displaced fuel $4.43 c) Other economic benefits Reduced environmental hazards d) Amount of Alaska public benefits 6. Power Purchase/Sales Price Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 a) Price for power purchase/sale To be determined in next phase 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio To be determined next phase Payback