Loading...
HomeMy WebLinkAboutApplication Cost Worksheet
Renewable Energy Fund 
 RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 682,428,000,000 BTUs of sustainably harvested urban biomass Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 




























































 1
The
Railbelt
grid
connects
all
customers
of
Chugach
Electric
Association,
Homer
Electric
Association,
Golden
 Valley
Electric
Association,
the
City
of
Seward
Electric
Department,
Matanuska
Electric
Association
and
Anchorage
 Municipal
Light
and
Power.
 
Renewable Energy Fund 
 RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 14,203,000,000 BTUs of natural gas 
 3. Proposed System Design a) Installed capacity 175kwh boiler or 600,000 BTU/hr b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] 444 dry tons vi. Other 4. Project Cost a) Total capital cost of new system   b) Development cost   c) Annual O&M cost of new system   JODMVEFTGVFMDPTU d) Annual fuel cost   5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat 5.1 Billion BTU’s of natural gas or 51,000 Therms of natural gas iii. Transportation b) Price of displaced fuel   FTUJNBUFEQSJDFT c) Other economic benefits TFFBQQMJDBUJPO d) Amount of Alaska public benefits TFFBQQMJDBUJPO 6. Power Purchase/Sales Price 
Renewable Energy Fund 
 RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 a) Price for power purchase/sale QFSUPOPGXPPEEFMJWFSFE 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio .827 Payback 18.3% or $9093.26