Loading...
HomeMy WebLinkAboutApplication Cost Worksheet/� ALASKA Renewable Energy Fund t) ENERGY AUTHORITY Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wind turbines average use will be 8,000 kw/yr Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt' grid, leave this section blank) i. Number of generators/boilers/other One AVEC Generator ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) L Annual O&M cost for labor None really expected, Tribe and City will provide funds for any expenses, if any. ii. Annual O&M cost for non -labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] The Tribe used 26,055 kw, while the City used 351,042 kw — annually ii. Fuel usage Diesel [gal] Tribe used 3,800 gallons of HF-1 last year. Other iii. Peak Load 2,531 for tribe, 37,326 for city iv. Average Load 2,171 for tribe, 29,254 for city v. Minimum Load 1,764 for tribe, 17,510 for city vi. Efficiency vii. Future trends d)Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 3,800 gallons for tribe The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. RFA AEA 09-004 Application Cost Worksheet revised 9126108 Page 1 /Z�ALASKA Renewable Energy Fund �'. ENERGY AUTHORITY ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other a) Installed capacity b)Annual renewable electricity generation is Diesel [gal or MMBtu] ii. Electricity [kWh] iii:' Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] A. Other a) Total capital cost of new system b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat «iii. Transportation b) Price of displaced fuel c) ' Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale RFA AEA 09-004 Application Cost Worksheet revised 9126108 Page 2 LALASKA Renewable Energy Fund , ENERGY AUTHORITY 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio _ Payback RFA AEA 09-004 Application Cost Worksheet revised 9126108 Page 3