Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Attachment 2.3 Project Cost And Benefit Summary
Attachment 2.3 Project Cost And Benefit SummaryAttachment 2.5 Project Cost And Benefit SummaryESTIMATED PROJECT COST SUMMARY20% 10% 30% 20%Subtotal CM Fee Subtotal Esc. To Bid Subtotal Remote Factor Subtotal Contingency SubtotalBiomass Boiler System $420,000 $84,000 $504,000 $50,400 $554,400 $166,320 $720,720 $144,144 $864,864Biomass Boiler Building $450,000 $90,000 $540,000 $54,000 $594,000 $178,200 $772,200 $154,440 $926,640Boiler Building Mechanical Costs $210,648 $42,130 $252,777 $25,278 $278,055 $83,416 $361,471 $72,294 $433,765Mechanical Integration Costs $50,381 $10,076 $60,457 $6,046 $66,502 $19,951 $86,453 $17,291 $103,744Soft Costs (Design, Testing, Permits, Etc)$189,296 $37,859 $227,155Totals - Design & Construction $1,131,028 $226,206 $1,357,234 $135,723 $1,492,957 $447,887 $2,130,140 $426,028 $2,556,168Chip Vans 4 vans $40,000 each $160,000 $32,000 $192,000Project Manager$100,000Part Time IT Technician$20,000ESTIMATED TOTAL PROJECT COST$2,868,168