Loading...
HomeMy WebLinkAbout2 E WCE Electrical Design ONELINE DIAGRAMUtility transmission Connection Point Existing 25 KV Utility Overhead Line 52 SEL-351 R Relay Settings:67,50 , 67G,59/27,81 50 -InstantaneousOvercurrent 50G -Instantaneous Residual Ground Overcurrent 51 -Time Overcurrent 51P -Phase Time Overcurrent 51N -Neutral Time Overcurrent 67 -Directional Overcurrent 67G -Residual Ground Directional Overcurrent 59/27 -Over/Under Voltage 81 -Over/Under Frequency Directional Elements Reclosing Manyother functionsavailable. New four pole overhead line arrangement for mounting of electrical protection equipment and metering,and to transition from new overhead transmission line to project underground collection system SA To Sheet 2,JB6 Include PT’s,CT’sand metering cabinet for utilityto install their own metering. Utility maywant a different relayhere. Metering Equipment Nome Electric Owned and Maintained Metering,Relaying and Communication Equipment At Interconnection Station Electric cabinet(s)will also include a small station service xfmr,small batteries backup &charger system, and communicationsinterfaced to utilitySCADA and project remote monitoring systems. 25kV -200A 200/5 MR Set 50/5 200/5 MR Set 50/5 200/5 MR Set 50/5 Nome Wind Project Electrical One-Line Sheet 1 of 2 DWG NO.WCE-NOME-E1 DATE AUGUST 2008 Western Community Energy Nome,Alaska Scale None REUSE OF DOCUMENTS THIS DOCUMENT,AND THE IDEAS ANDDESIGNS INCORPORATED HEREIN,AS AN INSTRUMENT OF PROFESSIONAL SERVICE ,IS THE PROPERTY OF K&R ENERGY CONSULTING LLC,AND IS NOT TO BE USED,IN WHOLE OR IN PART,FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF K&R ENERGY CONSULTING LLC. K&R ENERGY CONSULTING,LLC NOTES: 1.This is a preliminary,performance-design drawing.It isnot intended to be a construction or final design drawing. 2.Transformer impedancesshown are typical.Actual impedances will not be known until transformersare purchased and manufacturer’s data is made available. 3.Underground conductor sizes based on soil/fill assumptions and project requirements (i.e.loss minimization,utility standards, etc.).Soil tests and other project steps are required for final cable type,sizing,and design decisions.PRELIMINARYspare Overhead line visible disconnect switch Overhead vacuum fault interrupter/recloser, G&W Electric part #VIP388ER-12S 27kV 125kV BIL At last overhead line pole, #1/0 AWG riser from overhead line to padmount junction box JB1,EPR,25 KV Al,approx.50 feet. #1/0 AWG,Aluminum,EPR HDPE (MV- 105,shielded,133%insulation level,1/3 Cu concentricneutral),25 kV Al, underground installation in 4"Schedule 40 conduit,Typical for all 25kV cable for this project.Approx.750 feet from JB5 to JB6 on top of hill. Coordinate settings with wind turbine control panel protective settings. Padmount junction boxJB1, at Highway at bottom of hill Padmount junction box JB2 Padmount junction box JB3 Padmount junction boxJB4 Padmount junction boxJB5 940 feet 1070 feet 1010 feet 885 feet 750 feet 25kV cable run heads uphill to wind farm from here Nome Wind Project Electrical One-Line Sheet 2 of 2 DWG NO.WCE-NOME-E1 To Sheet 1,JB’s 5-1 and overhead line disconnect, protection and metering arrangement 10A Transformer #T5,loop feed, 200 Amp loadbreakelbows Typical, (fused at 10 Amps), 24.9KV -480V Wye -Wye Ground 300 kVA %Z =4.0 Dead-front Transformer #T2, 24.9KV -480V Wye -Wye Ground 150 kVA %Z =4.0 (Typical of all the wind turbine transformersin this project) X/R =3.07,Typical 5A SA Direct bury cable in 4"conduit,buried 24"cover in estimated rho 170 backfill soil or other material.Include a #4 bare Cu ground cable in entire length of system,Typical. 1-#1/0 AWG (Al)per phase,type 3 high density URD,underground,ducted PE 33, Al,90 deg.C temperature rating,and 1 -#2 AWG Al neutral conductors (bundled cable)per WTG connection and grounding to the control panel and building ground,3" Schedule 40 conduit,Typical. DATE AUGUST 2008 Western Community Energy Nome,Alaska Scale None REUSE OF DOCUMENTS THIS DOCUMENT,AND THE IDEAS ANDDESIGNS INCORPORATED HEREIN,AS AN INSTRUMENT OF PROFESSIONAL SERVICE ,IS THE PROPERTY OF K&R ENERGY CONSULTING LLC,AND IS NOT TO BE USED,IN WHOLE OR IN PART,FOR ANY OTHER PROJECT WITHOUT THE WRITTEN AUTHORIZATION OF K&R ENERGY CONSULTING LLC. K&R ENERGY CONSULTING,LLC PRELIMINARY#1/0 AWG Al Cable Parameters,Typical: Positive Sequence: R =0.21 Ohms/1000 feet Xl =0.045 Ohms/1000 feet Zero Sequence: R =0.3339 Ohms/1000 feet Xl =0.1145 Ohms/1000 feet Xc =0.0429 Mohms-1000 feet For #1/0 AWG cable runs,use shown cable lengths to calculate those impedances based upon Typical valuesshown above. 0.95 power factor,absorbing VARs,Typical. 1-#4 AWG Cu per phase and neutral. Control Panel #4 WTG 5-4 50 KW G 430 feet 25 feet Control Building #1/0 AWG Al Cable Parameters,Typical: Positive Sequence: R =0.21 Ohms/1000 feet Xl =0.045 Ohms/1000 feet Zero Sequence: R =0.3339 Ohms/1000 feet Xl =0.1145 Ohms/1000 feet Xc =0.0429 Mohms-1000 feet For #1/0 AWG cable runs,use shown cable lengthsto calculate those impedances based upon Typical values shown above. Control Panel #3 WTG 5-3 50 KW G 253 feet Control Panel #2 WTG 5-2 50 KW G 20 feet Control Panel #1 WTG 5-1 50 KW G 252 feet 480V Distribution Panel,400A Main,125A WT FeederBkrs. Cutler-Hammer Dist Equip CircuitBreaker FD3125 125A 3P CKT BRKR Series C F-FrameMold Case Circ BreakerTypeFD Cable In/ CableOut 3 Pole 10A Control Panel #4 G 270 feet 25 feet Control Building Control Panel #3 WTG 4-3 50 KW G 20 feet Control Panel #2 WTG 4-2 50 KW G 341 feet Control Panel #1 WTG 4-1 50 KW G 486 feet Transformer #T4, 24.9KV -480V Wye -Wye Ground 300 kVA %Z =4.0 WTG 4-4 50 KW 10A Control Panel #4 G 352 feet 25 feet Control Building Control Panel #3 WTG 3-3 50 KW G 20 feet Control Panel #2 WTG 3-2 50 KW G 360 feet Control Panel #1 G 442 feet Transformer #T3, 24.9KV -480V Wye -Wye Ground 300 kVA %Z =4.0 WTG 3-1 50 KW WTG 3-4 50 KW 10A SA Control Panel #4 G 338 feet 25 feet Control Building Control Panel #3 WTG 1-3 50 KW G 20 feet Control Panel #2 WTG 1-2 50 KW G 395 feet Control Panel #1 G 599 feet Transformer #T1, 24.9KV -480V Wye -Wye Ground 300 kVA %Z =4.0 WTG 1-1 50 KW WTG 1-4 50 KW Control Panel #2 G 416 feet 25 feet Control Building Control Panel #1 G 20 feet WTG 2-1 50 KW WTG 2-2 50 KW #1/0 Al 468.5 feet 857.5 feet JB9 3way junction box 285.5 feet 955.6 feet 1001.7 feet JB8 3way junction box JB7 3way junction box 1007.4 feet 471 feet JB6 3way junction box 468.1 feet 1-500 kcmil Cu per phase plus neutral,EPR/ Hypalon jacket,600V cable,installed in 4"Rigid Conduit,Typical. 480V Distribution Panel,400A Main,125A WT Feeder Bkrs. 480V Distribution Panel,400 A Main,125A WT Feeder Bkrs. 480V Distribution Panel,400A Main,125A WT FeederBkrs. 480V Distribution Panel,400A Main,125A WT Feeder Bkrs. #1/0 Al#1/0 Al #1/0 Al 50 KW nominal,66 KW peak,Typical. #1/0 AWG,Aluminum,EPR HDPE (MV- 105,shielded,133%insulation level,1/3 Cu concentric neutral),25 kV Al, underground installation in Schedule 40 conduit,Typical for all 25kV cable for thisproject.Approx.750 feet from JB5 to JB6. NOTES: 1.This is a preliminary,performance-design drawing.It isnot intended to be a construction or final design drawing. 2.Transformer impedancesshown are typical.Actual impedanceswill not be known until transformersare purchased and manufacturer’s data is made available. 3.Underground conductor sizes based on soil/fill assumptions and project requirements (i.e.loss minimization,utility standards, etc.).Soil tests and other project steps are required for final cable type,sizing,and design decisions.