Loading...
HomeMy WebLinkAbout109 GVEA Eva Creek Revised Scope1k rx�\1111 II/v/ p,�, GVE Golden Valley Electric Association PO Box 71249, Fairbanks, AK 99707-1249 • (907) 452-1151 • www.gvea.com Your Touchstone Energy' Cooperative ? 't EVA CREEK WIND GENERATION PROJECT Revised Scope -of -Work, Project Development Schedule and Budget for $2,000,000 Renewable Energy Fund Grant Project Schedule — 2009 / 2010 April — August 2009: (Meteorological data collection) • Finalize new met tower locations and configuration • Upgrade and recalibrate existing Eva Creek met towers • Install new met towers per meteorologist recommendation $940,000.00 April — June 2009: (Transportation Limitations and Logistics) • Determine land requirements for access and adequacy of existing railroad sidings • Design larger off-loading facilities at siding $100,000.00 April — December 2009 (Electrical Interconnect and Integration) • Economic Integration • System relaying • Communication system design $200,000.00 April 2009 — June 2010: (Initiate Infrastructure Permitting) • Avian Issues, Studies and Impact Assessments • Cultural resource assessment • Biological resource assessment $760,000.00