Loading...
HomeMy WebLinkAboutAEA Grant Costworksheet Renewable Energy Fund   Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source – Waste Heat Recovery from NPEP Cooling Water The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. NPEP Availability - 98% Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation – GVEA NPEP Combined Cycle Plant a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] 1,920,000 kWh (500 kwh – 160 heating days) iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other   AEA 09-004 GVEA Waste Heat App Cost Worksheet Page 1  Renewable Energy Fund   3. Proposed System Design a) Installed capacity None – Waste Heat Recovery b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $1,050,000 b) Development cost Included in capital cost c) Annual O&M cost of new system O&M cost of new system to be combined with existing plant O&M costs, expected to be minimal d) Annual fuel cost $ 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat 92,000 gallons of naphtha (410 kwh – 150 available days/yr) iii. Transportation b) Price of displaced fuel $252,000/yr - $7,000,000 for life of project c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio $7,000,000/$1,050,000 = 6.667 Payback Five years at 6% interest and 2008 average fuel cost   AEA 09-004 GVEA Waste Heat App Cost Worksheet Page 2