Loading...
HomeMy WebLinkAboutEXHIBIT DIDTask Name1CBM Prototype - Kircher Well2Phase 1 - Reconnaissance3Phase 2- Feasibilty Analysis, Resource Assessmen4Phase 3 - Final Design and Permiting5Phase 4 - Construction, Commissioning, Operation64.1 Site Preparation74.2 Coring and Testing84.3 Drilling and Completion94.4 Issue Final Report to AEA1011CHP CBM Prototype - Colony H.S.12Phase 1 - Reconnaissance131.1 CHP Power Plant141.2 Gas Line From CBM Well151.3 Heat Line Tie-Ins to CHS & CMS16Phase 2- Feasibilty Analysis, Resource Assessmen172.1 CHP Power Plant182.2 Gas Line From CBM Well192.3 Heat Line Tie-Ins to CHS & CMS20Phase 3 - Final Design and Permiting213.1 CHP Power Plant223.2 Gas Line From CBM Well233.3 Heat Line Tie-Ins to CHS & CMS243.4 Design Approval253.5 Procure Equipment26Phase 4 - Construction, Commissioning, Operation274.1 CHP Power Plant284.2 Gas Line From CBM Well294.3 Heat Line Tie-Ins to CHS & CMS304.4 Startup, Shakedown, Operations3132CBM VILLAGE ASSESSMENT33Phase 1 - Reconnaissance341.1 Organize Steering Committee351.2 Approval of Regional/Village Corp361.2 Community Awareness & Education37Phase 2- Feasibilty Analysis, Resource Asses382.1 Permits392.2 Geologic Survey402.3 Drill and Test412.4 Seismic Analysis422.5 Issue Final Report8/258/258/258/256/158/254/1512/91/257/208/108/319/2110/1211/211/2312/141/41/252/153/83/294/195/105/316/217/128/28/239/1310/410/2511/1512/612/271/172/7SeptemberNovemberJanuaryMarchMayJulySeptemberNovemberJanuaryTaskSplitProgressMilestoneSummaryProject SummaryExternal TasksExternal MilestoneDeadlineExhibit D: Project Schedule and MilestonesPage 1Project: CBM_CHP ProjectDate: Tue 10/7/08