HomeMy WebLinkAboutAttachment D Project Schedule ChigniksAttachment D Project ScheduleLake and Peninsula Borough Energy PlanAEA Renewable Grant Application Project Descriptionsdraft:q's to:CHIGNIK HYDRO/WIND/INTERTIE FEASIBILITY ANALYSISDescription:Schedule:NOTES:Hydro recon studies have been previously performed1Q 092Q 093Q 094Q 09Indian Creek into Chignik Bay emerged as most attractive prospectArmy Corps of Engineers prepared a draft Feasibility Study & EIS, July 1984ACOE draft feasibility study & EIS plusThis feasibility analysis would update the prior hydro study, incorporating:recent wind resource assessment on1More recent stream flow dataX===============================Xnearby ridges enables quick verification of2Conceptual design of alternative hydro project capacities in light ofX===============================Xbaseline information and significantlynew local needs for fish processing, ice, packaging process, and:reduces time and resources needed to3Potential system integration with nearby Class 6 wind resources X===============================Xupdate local data and integrate hydro, wind4Potential interties between Chignik Bay, Chignik Lagoon & Chignik LakeX===============================Xand interties resources plans, update costtaking into account approved, but not yet construction, pioneer roadestimate, and prepare bid documents forproject to link Chignik Lagoon and Chignik Lakean EPC contract for wind, intertie andhydro projectsWind Resource Assessment has been previously performedInitial Mud Bay Hill Site found Class 6 wind resource, but it was just outside turbulence specThis feasibility analysis would:1Expand the wind resource assessment to the most promising alternative sites, X===============================XLumber Bay Ridge and High Ridge sites between Chignik Bay & Chignik Lagoonin light ofaPotential system integration with Indian Creek hydro resourcebPotential interties between Chignik Bay, Chignik Lagoon & Chignik Lake2Develop conceptual engineering designs for wind resource (HOMER modeling)X==============Xand potential integration with hydro, interties, and dump load opportunitiesThe hydro/wind/intertie feasibility analysis would also:1Develop interties alternatives and optimize hydro/wind/intertie configurationX===============X2Develop permitting plan & apply for permitsX===============================X3Assess site control requirements for the proposed sitesX===============Xand get permission from land owners for on site feasibility activities4Conduct a site specific assessment of environmental resources that may beX===============================Xsignificantly affected by updating draft hydro EIS and conducting EAfor wind and intertie facilities5Obtain final land use authorizationsX==============X6Draft EPC (Engineering Procurement & Construction) Contracts for:X======XWind Resource DevelopmentIntertiesHydro Resource Development8Update total project cost estimatesX=======================XConcurrent Activities (Lake & Peninsula Borough)1Stakeholder MeetingsX===============================X2Develop regional utility coop (adopt "I-N-N Model" to local needs)X===============================X3Socio-Economic Impact AnalysisX===============X4Update Project Finance PlanX==============XNext PhasesBidEng/ Procure Construct CommissionWind EPC Contract Bid1Q 10201020112011Intertie EPC Contract Bid1Q 10201020112011Hydro EPC Bid Contract1Q 1020102011-201220138-Oct-08mafa@alaska.netlp_energyplan_aearenewgrant_overview1CHIGNIK10/8/2008