Loading...
HomeMy WebLinkAboutILIAMN~2 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet – Lake & Pen Regional Wind Recon/Feasibility Study –Iliamna-Newhalen-Nondalton Wind Study Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wind Power Class 6 Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 920 kw Tazimina Hydro + Peaking Diesels ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] Hydro – 2,873,000 kWh/year (FY07) Diesel – 528,000 kWh/year (FY07) ii. Fuel usage Diesel [gal] 42,700 gallons Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency Peaking diesels = 0.0807 gallons per kWh vii. Future trends Peaking diesels = 0.0732 gallons per kWh d) Annual heating fuel usage (fill in as applicable) 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 3. Proposed System Design a) Installed capacity 2 X 65kW = 130 kW b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] 325,000 kWhs/year iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $1,040,000 b) Development cost $38,000 per community as part of region wide initiative c) Annual O&M cost of new system $22,100 d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity 23,792 gallons ii. Heat Dump load heating potential to be developed in recon/feasibility study iii. Transportation b) Price of displaced fuel Long run price of diesel fuel (primarily delivered by air) in Iliamna, Newhalen, and Nondalton is estimated at $5.60 a gallon c) Other economic benefits d) Amount of Alaska public benefits Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 6. Power Purchase/Sales Price a) Price for power purchase/sale na 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 1.4 Payback 9 years PLEASE SEE ATTACHED SPREADSHEETS FROM THE LAKE & PENINSULA BOROUGH ENERGY PLAN SCREENING STUDY FOR ADDITIONAL DETAIL ON THE ECONOMIC ANALYSIS OF WIND OPPORTUNITIES IN Iliamna, Newhalen, and Nondalton