HomeMy WebLinkAboutCostworksheet ver 2 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 1,700,000 kWh December to April 87.4 cfs, June to October 74.8cfs Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 3 generators ii. Rated capacity of generators/boilers/other 2-98kWh and 1-66kWh iii. Generator/boilers/other type Diesel generators iv. Age of generators/boilers/other 2 years v. Efficiency of generators/boilers/other 13 kW per gallon b) Annual O&M cost i. Annual O&M cost for labor $20,000 ii. Annual O&M cost for non-labor $6000 (lubrication) $5000 (overhaul and replacement) c) Annual electricity production and fuel usage i. Electricity [kWh] 345,000 kWh ii. Fuel usage Diesel [gal] 33,000 Other 250 (lube oils) iii. Peak Load 75kW iv. Average Load 44kW v. Minimum Load 32kW vi. Efficiency 13 kW/gallon vii. Future trends stable d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 20,000 gallons ii. Electricity [kWh] 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] 20 vi. Other 3. Proposed System Design a) Installed capacity 270kW b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] 1,700,000 kWh iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $1,800,000 b) Development cost $700,000 c) Annual O&M cost of new system $20,000 d) Annual fuel cost 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 33,000 gallons ii. Heat 20,000 gallons iii. Transportation Potential b) Price of displaced fuel Currently $5.00/gallon c) Other economic benefits Reduction in costs for lubrication, maintenance, overhaul and replacement of diesel generators d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale Estimates $0.15-0.20 kWh Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 1.7:1 Payback 12 years