HomeMy WebLinkAboutCost WorksheetsNorthwest Arctic Borough Wind-Diesel Project for Buckland, Deering, and Noorvik Renewable Energy Fund Grant October 8th 2008 Page 37 of 58 Application Cost Worksheet-BUCKLAND 1. Renewable Energy Source- BUCKLAND The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wind Speed: 6.8 m/s documented (class 5 predicted) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation- BUCKLAND a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 455 kW, 455 kW, 175 kW iii. Generator/boilers/other type Caterpillar Gen-Sets iv. Age of generators/boilers/other 2007 v. Efficiency of generators/boilers/other 13.8 kWh/gallon b) Annual O&M cost i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] 1,423,267 kWh per year ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] 118,708 gallons per year Other iii. Peak Load 396 kW iv. Average Load 251 kW v. Minimum Load 106 kW vi. Efficiency 13.8 kWh/gallon vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] n/a ii. Electricity [kWh] n/a iii. Propane [gal or MMBtu] n/a iv. Coal [tons or MMBtu] n/a v. Wood [cords, green tons, dry tons] n/a 3. Proposed System Design-BUCKLAND a) Installed capacity 300 kW Northwest Arctic Borough Wind-Diesel Project for Buckland, Deering, and Noorvik Renewable Energy Fund Grant October 8th 2008 Page 38 of 58 b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] 682,000 kWh/yr iii. Propane [gal or MMBtu] 4. Project Cost- BUCKLAND a) Total capital cost of new system $5,279,369 b) Development cost $0 c) Annual O&M cost of new system $22,000 d) Annual fuel cost n/a 5. Project Benefits- BUCKLAND a) Amount of fuel displaced for i. Electricity 54,560 gallons ii. Heat iii. Transportation b) Price of displaced fuel At $4.79 this is $261,342/year. c) Other economic benefits 6. Power Purchase/Sales Price- BUCKLAND a) Price for power purchase/sale n/a 7. Project Analysis- BUCKLAND a) Basic Economic Analysis Project benefit/cost ratio 1.27 Payback 13.6 years Northwest Arctic Borough Wind-Diesel Project for Buckland, Deering, and Noorvik Renewable Energy Fund Grant October 8th 2008 Page 39 of 58 Application Cost Worksheet-DEERING 1. Renewable Energy Source- DEERING The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wind Resource-7.2 m/s Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation- DEERING a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 4 ii. Rated capacity of generators/boilers/other 170 kW, 170 kW, 125 kW, 100 kW iii. Generator/boilers/other type 2 Cummins and 2 John Deere iv. Age of generators/boilers/other 2002-2003 v. Efficiency of generators/boilers/other Approx 13.5 kWh/gallon b) Annual O&M cost i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] 709,559 kWh per year ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] 62,878 gallons per year Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency 13.5 kW/gallon vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] n/a ii. Electricity [kWh] n/a iii. Propane [gal or MMBtu] n/a iv. Coal [tons or MMBtu] n/a v. Wood [cords, green tons, dry tons] n/a 3. Proposed System Design- DEERING a) Installed capacity 200 kW Northwest Arctic Borough Wind-Diesel Project for Buckland, Deering, and Noorvik Renewable Energy Fund Grant October 8th 2008 Page 40 of 58 b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] 510,000 kWh/year iii. Propane [gal or MMBtu] 4. Project Cost- DEERING a) Total capital cost of new system $2,690,191 b) Development cost $0 c) Annual O&M cost of new system $22,000 d) Annual fuel cost n/a 5. Project Benefits- DEERING a) Amount of fuel displaced for i. Electricity 40,800 ii. Heat iii. Transportation b) Price of displaced fuel At $4.80 this is $195,840 /year. c) Other economic benefits 6. Power Purchase/Sales Price- DEERING a) Price for power purchase/sale n/a 7. Project Analysis- DEERING a) Basic Economic Analysis Project benefit/cost ratio 1.72 Payback 11.6 years Northwest Arctic Borough Wind-Diesel Project for Buckland, Deering, and Noorvik Renewable Energy Fund Grant October 8th 2008 Page 41 of 58 Application Cost Worksheet-NOORVIK 1. Renewable Energy Source- NOORVIK The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Wind Resource 5.8 m/s Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation- NOORVIK a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 314 kW, 499 kW, 756 kW iii. Generator/boilers/other type Detroit Diesel, Cummins, MTU iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other 13.02kWh/gallon b) Annual O&M cost i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] 1,991,566 kWh per year ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] 149,669 gallons per year Other iii. Peak Load 454 kW iv. Average Load 229 kW v. Minimum Load 110 kW vi. Efficiency 13.02 kW/gallon vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] n/a ii. Electricity [kWh] n/a iii. Propane [gal or MMBtu] n/a iv. Coal [tons or MMBtu] n/a v. Wood [cords, green tons, dry tons] n/a 3. Proposed System Design- NOORVIK Northwest Arctic Borough Wind-Diesel Project for Buckland, Deering, and Noorvik Renewable Energy Fund Grant October 8th 2008 Page 42 of 58 a) Installed capacity 300 kW b) Annual renewable electricity generation i. Diesel [gal or MMBtu] 473,000 ii. Electricity [kWh] iii. Propane [gal or MMBtu] 4. Project Cost- NOORVIK a) Total capital cost of new system $1,991,941 b) Development cost $0 c) Annual O&M cost of new system $22,000 d) Annual fuel cost n/a 5. Project Benefits- NOORVIK a) Amount of fuel displaced for i. Electricity 37,840 gallons ii. Heat iii. Transportation b) Price of displaced fuel At $5.10 / gallon this is $192,984 /year. c) Other economic benefits 6. Power Purchase/Sales Price- NOORVIK a) Price for power purchase/sale n/a 7. Project Analysis- NOORVIK a) Basic Economic Analysis Project benefit/cost ratio 1.68 Payback 11.8 years