Loading...
HomeMy WebLinkAboutATTACHMENT B, Costworksheet ver 2 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Near 99.5% Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other NA ii. Rated capacity of generators/boilers/other NA iii. Generator/boilers/other type NA iv. Age of generators/boilers/other NA v. Efficiency of generators/boilers/other NA b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor NA ii. Annual O&M cost for non- labor NA c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] NA ii. Fuel usage Diesel NA 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 [gal] Other NA iii. Peak Load NA iv. Average Load NA v. Minimum Load NA vi. Efficiency NA vii. Future trends NA d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] NA ii. Electricity [kWh] NA iii. Propane [gal or MMBtu] NA iv. Coal [tons or MMBtu] NA v. Wood [cords, green tons, dry tons] NA vi. Other NA 3. Proposed System Design a) Installed capacity 1,200 kW b) Annual renewable electricity generation i. Diesel [gal or MMBtu] - ii. Electricity [kWh] 6,000,000 kWh iii. Propane [gal or MMBtu] - iv. Coal [tons or MMBtu] - v. Wood [cords, green tons, dry tons] - vi. Other - 4. Project Cost a) Total capital cost of new system $3,087,000 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 b) Development cost $3,087,000 c) Annual O&M cost of new system $35,600 d) Annual fuel cost 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 58.8 MMCF/yr, value Present worth $8,067,000 ii. Heat - iii. Transportation - b) Price of displaced fuel $411,600/yr c) Other economic benefits - d) Amount of Alaska public benefits $4,062,000 6. Power Purchase/Sales Price a) Price for power purchase/sale $0.05/kWh 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 3.92 Payback < 30 years