HomeMy WebLinkAboutPhoenix Prior Work ExperiencePhoenix Industrial, Inc. Prior Work Experience Mt. Hood Solutions Plant Relocation The project involved relocation of process manufacturing equipment for a chemical processing plant. The scope included civil, structural, mechanical, piping and electrical modifications of the new facility, and close coordination with the owner to minimize process downtime. Tom Mulflur 503-227-3505 $2,700,000 7/08 – 11/08 Schnitzer Steel Metal Screening Project The project entailed installing 18 new conveyors and mechanica l screen for a scrap metal facility. The project was design build, and executed in a two month period of time, including all civil, structural steel, equipment, piping and electrical. Darrell Ford 503-286-6911 $1,300,000 8/08 – 10/08 Hecla Mining Process System Upgrade The project involved an expansion of processing capabilities for a silver mine. The scope included civil, steel erection, mechanical, pipe and electrical for the new ore refining area. Dale Dean 208-769-4197 7/08 – 11/08 $2,500,000 Jorgensen Forge Tacchi and Bar Peeler Foundations The project included installation of foundations for installation of two vibration sensitive pieces of equipment. The scope included demolition, sheet piling, excavation, formwork, rebar, embeds and concrete. Pat Collins 206-357-1068 $900,000 2/08 – 8/08 T-5 Hallbuck Marine Soda Ash Expansion The project consisted of supply and installation of 2,000 LF of belt conveyor for an existing soda ash storage facility, along with take-up towers. Rachael Brake 360-213-0474 $1,700,000 8/07 – 11/07 Aurora Energy Baghouse Installation The project consisted of mechanical installation of a 350,000 ACFM baghouse for an existing coal fired power plant. Randy Hobbs 907-278-7283 $450,000 7/06 – 8/06 Ashgrove Cement Electrical Service Building Relocate 2000 amp electrical service, 4.2kv primary feeder, 1500kva transformer, service switchgear, MCC and power panels Mike Begley 206-623-5596 $600,000 7/07 – 10/07 Oregon Steel Mills Warehouse Storage Building Construction of a 45’ x 100’ pre-engineered metal building, including foundation, structure, electrical, HVAC and fire protection Phillip Angelechio 503-978-6062 $350,000 9/07 – 12/07 Hecla Mining Company Plant Expansion Installation of foundations, steel, equipment, piping a nd electrical for silver mine expansion Dale Dean 208-769-4197 $5,000,000 6/07 – 12/07 Cascade Steel Rolling Mills Billet Yard Craneway Installation of piling, foundations, electrical and 1,300 tons of steel for new overhead crane system Arden Tarum 503-434-3216 $9,000,000 11/06 – 5/07 Oregon Steel Mills Coating Mill Installation of concrete slabs and equipment for new Spiral Tube Coating Facility Phillip Angelechio 503-978-6062 $4,000,000 9/06 – 3/07 RR Donnelly Printing Press Electrical Service Installation of 4000 amp electrical service for new printing press, including new 12kv primary feeder, 3000kva transformer, and 480 volt secondary service conductors Frank Womack 503-251-3608 $550,000 6/06 – 8/06 Oregon Steel Mills Spiral Tube Mill Installation of concrete foundations, equipment and piping for new Spiral Tube Facility Phillip Angelechio 503-978-6062 $7,000,000 11/05 – 3/07 Oregon Steel Mills Roll Grinding Machine Installation of foundations, steel, equipment and piping for new Roll Grinding Ma chine Bob Appleby 503-286-9651 ext. 2252 $1,750,000 6/05 – 12/05 Hawaiian Commercial & Sugar Company Product Storage Warehouse Installation of concrete foundation and building for a 35,000 SF warehouse Robert Hirozawa 808-877-6911 $900,000 4/05 - 9/05 Hecla Mining Company Plant Expansion Installation of foundations, steel, equipment, piping and electrical for silver mine expansion Dale Dean 208-769-4197 $1,700,000 9/05 – 11/05 BOC Plant Maintenance Ongoing maintenance for gas production plants, including mechanical and process piping work. Doug Sponseller 503-681-8833 $250,000 6/03 – Present General Energy Services Power Plant Shutdown Fabrication and installation of power piping spools for gas-fired cogen shutdown Terry Toland 360-992-3065 $100,000 4/05 – 5/05 Nalco Chemical Process Piping Projects Fabrication and installation of small and large bore, carbon and stainless steel pipe for a chemical production plant. Brett Misener 360-694-9587 $150,000 7/05 – 9/05 West Linn Paper Process Piping Projects Fabrication and installation of large bore stainless steel piping for paper mill. Bob Hart 503-557-6525 $125,000 6/05 – 9/05 Boise Paper Process Piping Fabrication and installation of 3” stainless steel piping. Dave Tobin 509-546-3415 $100,000 4/05 – 5/05 Owens Corning Plant Maintenance Completed a variety of civil, structural, mechanical and piping projects for an asphalt shingle plant. Mike Engh 503-273-1450 $15,000 (Average contract size) 6/02 - present Port of Tacoma Control Tower Stairway Fabrication and installation of new galvanized access stairway for control tower at the Port of Tacoma. Poli Luis, Jr. 253-428-8638 $75,000 4/03 – 5/03 HC&S Sugar Power Plant Outages Provide boilermaker and millwright services for power plant outages on an annual basis. Steve Onaga 808-877-6911 $500,000 (Average Contract) 1/03, 1/04, 1/05, 1/06, 1/07 Columbia River Carbonates Micronatex Addition Installation of structural steel, mechanical equipment and piping for calcium chlorate plant. Don Connell 360-225-4152 $400,000 3/03 – 6/03 Ashgrove Cement Ventilation Project Demolition of existing dust collection system and installation of new pipe, baghouse and rotating equipment. Gary Wright 503-247-5424 $400,000 10/02 – 12/02 Owens Corning Miscellaneous Maintenance Projects Completed a variety of civil, structural, mechanical and piping projects for an asphalt plant. Tony Katzenberger 503-273-1467 $15,000 (Average contract size) 6/02 - present