HomeMy WebLinkAboutAPA75~.... PRELIMINARY ENVIRONMENTAL ASSESSMENT /OF HYDROELECTRIC DEVELOPMENT /ON THE SUSITNA RIVERlJ Prepared for the United States Fish and Wildlife Service by the Alaska Department of Fish and Game 333 Raspberry Road Anchorage,Alaska 1978 Il;)..$ YlO/7!) Section I TABLE OF CONTENTS Fisheries and Habitat Investigations of the Susitna River Page Summary • Backgrmmd Description of Area • Procedures Findings and Discussion • Conclusion Recommendations Acknowledgements Literature Cited 1-7 1-9 1-10 1-11 1-17 1-47 1-48 I-50 I-51 Section II \ Moose MOvements and Habitat Use Along the Upper Susitna River Summary • Background Description of Area • Procedures Findings Discussion Conclusion Recommendations Acknowledgements Literature Cited 11-3 11-4 11-7 11-8 11-11 11-26 11-31 II-34 11-34 11-36 Fisheries and Habitat Investigations of the Susitna River--A Preliminary Study of Potential Impacts of the Devils Canyon andWatana Hydroelectric Projects by James C.Riis and Nancy V.Friese Alaska Department of Fish and Game Divisions of Sport and Commercial Fish March 1978 I-I r-..TABLE OF CONTENTS List of Figures • List of Tables List of Appendix Tables . Summary Background Description of Area Procedures Fisheries •• Adults . Juvenile salmon migration Juvenile studies • . Water Quantity Water Quality . . Findings and Discussion • Fisheries . Adults Juvenile salmon migration Juvenile studies • • . . . • Aquatic insects and juvenile salmon gut contents Impoundment area fisheries investigations Water Quantity Water Quality Conclusion Reconnnendations Acknowledgements Literature Cited 1-2 Page 4 5 6 7 9 10 11 13 13 13 14 16 17 17 17 17 23 28 30 37 40 43 47 48 50 51 Appendix I •• Appendix II Appendix III • TABLE OF CONTENTS (cont.) 1-3 .,. . .53 73 • • • • •96 Figure 1 2 3 4 LIST OF FIGURES The Susitna River drainage,Devils Canyon Project,1977 ... Upper Susitna River study area,Devils Canyon Project,1977 . Locations of adult salmon tag recoveries occuring downstream of the Susitna River fishwheel sites,Devils Canyon Project, 1977 (RS-sockeye salmon;PS-pink salmon;CS-chum salmon; SS-coho salmon;KS-chinook salmon).•••..••••• Susitna River discharge at Gold Creek,Devils Canyon Project, 1977 ... . ...... ....... . 1-4 12 15 22 41 LIST OF TABLES Table 1 Relative magnitude of pink,chum,and sockeye salmon moving past the fishwheel sites as determined by Peterson population estimates,Devils Canyon Project,1974,1975,and 1977.~/...18 2 Peak chum,pink,and sockeye salmon ground escapement survey counts within the upper Susitna River,Devils Canyon Project, 1977 ... . . . . ..... .. .. .. ........ .. ... . ... .... ........20 3 Peak chinook salmon counts within the Susitna River drainage, 1977 • • . . . . . • . • . . • . . • . • . . . . .21 4 Rabideux Creek salmon fry trapping,Devils Canyon Project, 1977 • •. . . . • • • . . • • . . .24 5 Montana Creek salmon fry trapping,Devils Canyon Project,1977 26 6 Willow Creek Project,1977 chinook salmon fry trapping,Devils Canyon 27 7 8 9 10 11 Mean percent composition of gut contents per fish of chinook, sockeye,and coho salmon juveniles in sloughs and clearwater tributaries of the Susitna River,Devils Canyon~roject,1977.32 Limnological data from selected tributaries to the Susitna River,Devils Canyon Project,1977 • • . .••.•..38 Susitna River impoundment area lake surveys,Devils Canyon Project,1977 .•• . • . . • . • . • . . • . • • . . .39 Water flows of Montana,Rabideux,and Willow cr~eks from May through November,Devils Canyon Project,1977.!/. . . .44 Thermograph set in Susitna River downstream of Parks Highway bridge,daily maximum and minimum water temperature,Devils Canyon Project,1978 • . . . . . • . . . . • • • . . . . . • .45 1-5 LIST OF APPENDIX TABLES Appendix I Table 1 Percent age composition of chinook,sockeye,coho,and chum salmon escapement samples,Devils Canyon Project,1974,1975, and 1977 • .• . . . . . . . . . . . . . . . . .-54 2 Age,length,and sex characteristics of chum,chinook,sockeye, and coho salmon escapement samples,Devils Canyon Project, 1974,1975,and 1977 . . . .•.. .55 3 Analyses of age,length,weight,and condition factors of juvenile sockeye salmon samples from Susitna River sloughs and clearwater tributaries,Devils Canyon Project,1977 56-57 4 Analyses of age,length,weight,and condition factors of juvenile coho salmon samples from Susitna River sloughs and clearwater tributaries,Devils Canyon Project,1977 58-59 5 Analyses of age,length,weight,and condition factors of juvenile chinook salmon samples from Susitna River sloughs and clearwater tributaries,Devils Canyon Project,1977 60-64 6 Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall,Devils Canyon Proj ect,1977 . . • . . . . . • . . . . . .... .<• • •••65-72 Appendix II 1 Susitna River discharge at Gold Creek (USGS provisional data)1977 • • . .. . . . . . . . . . . . . . •74 2 Water quality data and juvenile salmon surveys in sloughs and clearwater tributaries of the Susitna River between the Chulitna River and Portage Creek,Devils Canyon Project,1977.75-81 3 Thermograph set in Rabideux Creek,upper sub-area;daily maximum and minimum water tempe=ature,Devils Canyon Project, 1977 . . . . . . . . . . . . . . . . . . . . . . . . . .82 4 Thermograph set in Montana Creek,upper sub-area;daily maximum and minimum water temperature,Devils Canyon Project, 1977 . . . • . . . . . • . . . . . . . . . . . . . . . . ...83 5 Water chemistry data,Rabideux Creek,Devils Canyon Project, 1977 . . . . . . . . . . . . . . . . . . . . ...84 6 Water chemistry data,Montana Creek,Devils Canyon Project, 1977 . . . . . . . • . . . . . . . . . . . . . . . . . . .85 7 United States Department of Interior,Geological Survey 86-95 T-fi SUMMARY Biological and water quality and quantity investigations were conducted from May 1,1977 through March 7,1978 to obtain baseline data on indigenous fish populations and the existing aquatic habitat of the Susitna River drainage.These investigations conclude a four year· series of environmental baseline inventories.They were designed to generate sufficient biological information to enable the Alaska Department of Fish and Game (ADF&G)to prepare a comprehensive biological study plan in the event a final environmental impact study is initiated to determine the feasibility of constructing the proposed Watana and Devils Canyon hydroelectric dams on the Susitna River. The relative abundance,distribution and migrational timing of adult salmon (Oncorhynchus sp.)were determined within the Susitna River drainage through tag and recovery programs during 1977.The salmon escapement from June 29 through August 14 was estimated to be approximately 237,000 sockeye (0.nerka),50,000 coho (0.kisutch),and 105,000 chum salmon (0.keta)(Friese,in prep.).An escapement estimate in excess of 100,000 fish was determined for chinook salmon (0.tshawytscha) through aerial surveys (Kub~k,1977;Watsjold,1977).Population estimates of pink salmon utilizing the drainage in the area of the Susitna and Chulitna river confluence were determined as a part of this study. Documentation of the outmigration of salmon fry from tributary rearing areas into the mainstem Susitna River was accomplished by intensive investigation of two clearwater tributaries~The objective of these studies was to determine utilization of the mainstem river for rearing during winter months.A total of 25,176 chinook salmon fry were marked 1-7 in Montana Creek between July 19 and August 4.A gradual downstream i~fI,l~'l movement of fry was noted from the latter part of August to February.A drastic reduction in population density was found in February and was attributed to low flows which prevailed at the time.Chinook fry were documented overwintering in the Susitna River.No distinct movement of fry was observed in Rabideux Creek. The relative abundance,distribution,age,length,and weight characteristics,and feeding habits of juvenile salmonids were monitored in sloughs and tributaries of the Susitna River from Portage Creek downstream to the Chulitna River confluence from July 1 through October 5,1977.The predominant rearing species were chinook and coho salmon. Water quality and quantity determinations were made in conjunction with all juvenile salmon surveys. The Susitna River was floated from its intersection with the Denali Highway to Devils Canyon during the first two weeks of July to inventory fish species present and survey the aquatic habitat in the areas to be inundated.Arctic grayling (Thymallus arcticus)were abundant in all of the clearwater tributaries within the proposed impoundment area.The headwaters of these tributaries and upland lakes were also surveyed by separate crews.It is apparent that the Watana reservoir,which is projected to have substantial seasonal fluctuations, will alter the fisheries habitat. Measurements of hydrological and limnological parameters associated with the Susitna River and selected tributaries and sloughs were obtained between the Denali Highway and Montana Creek.A cooperative agreement between the United States Geological Survey (USGS)and the ADF&G was initiated to determine discharge,sediment loads,and standard water 1-8 quality analysis of the mainstem Susitna River.This data,along with the water quality and quantity data collected in conjunction with the fisheries studies,will be extremely valuable for future comparisons. Long term ecological changes to the drainage may be significant due to dam construction.The level and flow patterns of the Susitna River will be altered and will affect the fisheries resources.Extensive research is necessary both upstream and downstream of the proposed dams to adequately assess the potential effects of these impacts on fisheries resources. The effects of impoundments and construction activities which alter natural flow regimes,water chemistry,mass transport of materials,and quantity of wetted habitat areas are of primary concern.These changes may disrupt the trophic structure and habitat composition and reduce or eliminate terrestrial and aquatic populations.These populations and vegetation in and around the free-flowing rivers have evolved to their current levels due to natural flow variations.Some species may be present only because this particular hydrologic regime exists. BACKGROUND Background knowledge of the Susitna River basin is limited.The proposed hydroelectric development necessitates gaining a thorough knowledg~of its natural char~cteristics and populations prior to final ./ dam design approval and construction authorization to enable protection of the aquatic and terrestrial populations from unnecessary losses. The Susitna River basin has long been recognized as an area of high recreational and aesthetic appeal.It is also important habitat to a wide variety of fish species,both resident and anadromous.Five species of Pacific salmon (chinook,coho,chum,pink,and sockeye)utilize the T n Susitna River drainage for spawning and rearing.The majority of the chinook,coho,chum,and pink salmon production in the Cook Inlet area occurs within this drainage.Grayling,rainbow trout (Salmo gairdneri), Dolly Varden (Sa1velinus ma1ma),burbot (Lota lota),lake trout (Sa1velinus namaycush),whitefish (Coregonus sp.),and scu1pins (Cottus sp.)are some of the more common and important resident fish species. Baseline environmental fisheries studies have been conducted by ADF&G intermittently since 1974.The projects were financed with federal funding averaging $29,000 per year for the first three years.An allocation of $100,000 was received for this study.The National Marine Fisheries Service (NMFS)and U.S.Fish and Wildlife Service (USFWS) contracted ADF&G to conduct a one-year assessment of salmon populations utilizing the Susitna River in the vicinity of the proposed Devils Canyon dam site during 1974.The objectives of these studies were to determine the adult salmon distribution,relative abundance and migrational timing and to determine juvenile rearing areas (Barrett,1974).Additional funding was received in 1975,1976,and 1977 from USFWS to continue and expand these studies and to monitor the physical and chemical parameters associated with the mainstem Susitna (USFWS,1976 and Riis,1977).Additional baseline studies will not be initiated during 1978 due to lack of funding. The proposed hydroelectric project is discussed in Barrett (1974), Friese (1975),USFWS (1976),and Riis (1977).The purpose of this data report is to present the findings of the studies conducted from May 1977 through March 1978 and to make recommendations for future investigations and a final environmental impact statement. DESCRIPTION OF AREA The Susitna River is approximately 275 miles long from its source in the Alaska Mountain Range to its point of discharge into Cook Inlet I-10 (Figure 1).The major tributaries of the Susitna originate in glaciers and carry a heavy load of glacial silt during ice free months.There are also many smaller tributaries which are perennially silt free.The study area included the majority of the Susitna River between the Denali Highway and Cook Inlet.The entire drainage from Devils Canyon downstream was monitored for chinook salmon escapement.Studies of other anadromous species were more restricted to the mainstem Susitna and adjacent areas between Devils Canyon and Susitna Station. Two clearwater tributaries,Rabideux and Montana creeks,were selected for intensive juvenile salmon studies.These streams are located downstream of the proposed dam site near the Parks Highway Bridge.A total of 26 clearwater sloughs and eight tributaries were surveyed between the Chulitna River confluence and Devils Canyon area. These areas are described in USFWS (1976).Surveys of the Talkeetna River were conducted,but results are not included within this report. Resident fish were inventoried in the impoundment area upstream of Devils Canyon. Water quality and quantity sampling stations were monitored in the Susitna River and tributaries.Twenty-six of these sites were clearwater sloughs adjunct to the Susitna River.Three sites were in the mainstem Susitna River and the ten remaining locations were clearwater creeks and - rivers flowing into the Susitna River.Site selection was based on proximity to the Devils Canyon dam area and previous Susitna River studies document,ing fish usage (Barrett,1974;USFWS,1976). PROCEDURES A field camp was established at Gold Creek for studies downstream of Devils Canyon due to its central location to the sample sites and the 1-11 •Palmer 40 km I Figure 1.The Susitna River drainage,Devils Canyon Project,1977. 1-12 N logistical advantages offered by the Alaska Railroad.Travel on the Susitna River to the s~tes was accomplished by riverboats equipped with jet outboard motors.Access to sloughs and tributaries downstream from Gold Creek was accomplished with a Zodiac raft.A field camp was also established along the Susitna River five miles upstream from Talkeetna to install and operate fishwhee1s.Fishwheels were deployed commencing July 5 and were operated through August 27.Methods of operation are discussed by Friese (1975).A field station was located in the vicinity of Talkeetna to conduct Rabideux and Montana creek studies.Avon rubber rafts supported with helicopter and fixed wing aircraft were used for the impoundment area studies. FISHERIES Adults Adult salmon escapement was generally determined by tag and recovery population estimates utilizing fishwhee1s and ground escapement surveys. Methods are discussed in Friese (1975).The Peterson population estimate used to determine salmon abundance is presented in Table 1.Chinook salmon counts were conducted with a Be11-47 helicopter and fixed wing aircraft.Variable mesh gi1lnets were used to determine species composition in the impoundment area lakes.Electroshockers and angling were also employed to collect adult fish for this study.Sloughs and tributaries in the upper study area were surveyed on the ground according to methods described in Friese (1975). Juvenile salmon migration Intensive fry trapping was undertaken in Rabideux Creek on June 16. The creek was sectioned into three study areas:upper,middle,and lower.Coho salmon yearlings were anesthetized with MS-222 and fin 1-13 clipped from June 16 through August 31.The following fin clip codes were used:upper caudal lobe for upper sub-area,one-half dorsal for mid sub-area,and lower caudal lobe for lower sub-area.After marking, the salmon were allowed to recover and were released at the location of capture.Recovery of these marked coho salmon was continued until mid- November when extreme cold weather and icing conditions prevented further intensive work. Montana Creek was also sectioned into three study sub-areas: upper,middle,and lower.The upper area was approximately eight stream miles above its mouth,the middle about three stream miles,and the lower was from the Parks Highway downstream to its junction with the Susitna River.The upper and middle sections were seined from July 19 through August 4.All chinook salmon fry captured were marked with an upper caudal fin clip for the upper area and a lower caudal fin clip for the middle area.Minnow traps baited with salmon roe were utilized from the latter part of August until the end of February to monitor fry movements and population densities throughout the system. Juvenile studies Twenty-eight clearwater sloughs and nine tributary streams have previously been identified as observed or potential rearing sites for juvenile salmon in the upper Susitna River between Talkeetna and Devils Canyon (Figure 2)(Barrett,1974;Friese,1975).Juvenile salmon were collected from these locations during two different sampling periods during this study.Each slough and tributary were also surveyed biweekly for relative abundance of rearing fish and water quality data ..Methods are discussed in Friese (1975).Fry samples for analysis of physical characteristics and feeding habits were collected with dip net,minnow traps,or seine and preserved in a 10 percent formalin solution (Brown,1971). 1-14 Portage Cr. N Cr. Talkeetna R. Cr. Indien R. ~.8A n0.88 nO.A no.Se~no.8D Clear Cr. Fourth of JUly Cr. i Talkeetna o.c--'"5 ;,C (,) Figure 2.Upper Susitna River study area,Devils Canyon Project,1977. 1-15 Summer samples were netted Dy minnow seine between July 11 and August 5.Juvenile salmon were collected by a combination of minnow seine and minnow traps from September 20 to 24.Fork lengths and scale smears were taken in the field for each individual fish.Specimens, together with incidental catches of other resident fish species,were preserved in 10 percent formalin.Species identification,verified by pyloric caecae counts,and weight determinations were made in the Anchorage laboratory.The gut was dissected from each fish and contents from both hind-and foregut removed.All gut contents from one sampling location were pooled by species for each sampling day to facilitate investigation. Individual stomachs were not examined separately.Insects were identified to order and larval and pupal forms of Diptera to family.Other organisms present were identified to the most convenient taxon,usually order. The major keys used were Pennack (1953),Usinger (1968),Ward and Whipple (1959),and Jacques (1947).Volume percentages were estimated according to four gross categories:Crustacea,immature Insecta,adult Insecta, and other organisms.These estimates reflect the interpretations of the investigator,but it is felt that they gave a close approximation of actual volumes. I-16 Water flows in Rabideux Creek were measured by recording the height of the water passing through culverts at the Parks Highway,approximately one-half mile above its confluence with the Susitna River.Recordings were converted into cubic feet per second.The River Forecast Center of the National Weather Service monitored water stage and computed flow in Montana and Willow Creeks. WATER QUALITY Dissolved oxygen,temperature,pH,and specific conductance were measured biweekly and on a random basis in clearwater sloughs and tributaries with a Yellow Springs Instrument Model 57 oxygen and temperature meter,Cole Parmer Digi sense pH meter,and Labline Lectro mho meter, respectively.Alkalinity and hardness were determined with a Hach chemical kit (model DR-EL/2 and model AL36B)using methods outlined by the manufacturers. Temperature data was continually recorded with Ryan thermographs, MOdel D-30,at one site on the Susitna River and at three sites in both Rabideux and Montana creeks.Analysis of water samples from the mainstem Susitna were ana~yzed by the USGS laboratory. Benthic invertebrates were collected with artificial substrates (McCoy,1974)and Surber samplers for future analysis. FINDINGS AND DISCUSSION FISHERIES Adults Adult salmon abundance above the Chulitna River confluence was determined by tag and subsequent recovery programs during 1974, 1975, and 1977 (Table 1).The relative magnitude of pink salmon moving past 1-17 Table 1.Relative magnitude of pink,chum,.and sockeye salmon moving past the fishW'hee1 sites as determined by Peterson population es1imates,Devils Canyon Project, 1974,1975,and 1977.~. 1974 Pink Species Chum Sockeye M R C N Confidence Interval 1975 M R C N Confidence Interval 160 568 39 23 74 13 755 3,164 336 5,040 23,970 939 3,836-8,359 20,081-30,746 709-1,764 943 674 370 46 8 22 291 139 103 6,129 10,549 1,760 4,977-11,895 7,122-35,293 1,355-2,865 19772:/ M R C N Confidence Interval 429 64 6,644 43,857 36,375-57,439 46 3 2,332 31 1 661 11 Calculated by the following formulas: N M (C+1) R+1 95%confidence interval around N Ric Ric +t R (1~) C C (N-C) C N l/Population estimates were not determined for chum and sockeye salmon since number of tag recoveries were too low to place confidence limits on estimates. 1-18 the fishwheel sites above Talkeetna during 1977 was approximately 44,000 fish.Tag recoveries of other salmon species were too low to determine abundance.Abundance of all salmon species within sloughs and tributaries, with the exception of chinook salmon,was determined by ground escapement surveys.Peak survey counts by species from Portage Creek downstream to the Chulitna River confluence was 1,330 chum,3,429 pink,and 301 sockeye salmon (Table 2).These estimates are considered minimum escapements, since counts were only conducted within index areas (USFWS,1976). Migrational timing of coho salmon was too late to determine peak abundance. The chinook salmon escapement within the drainage was about 100,000 fish (Table 3).The 1977 escapement appears to have a high reproduction potential (Kubik,1977 and Watsjold,1977).Historic escapement and harvest data indicate a minimum escapement level of at least 60,000 chinook salmon would be required yearly to restore stocks to historic levels. Numerous tag recoveries downstream of the tagging project were obtained from the sport fish harvest during 1977 (Figure 3).This "drop-out"phenomenon was also observed during 1974 and 1975.The total magnitude of tagged fish moving downstream was not determined since reporting of tag recoveries was on a voluntary basis.This should, however,be thoroughly evaluated during future studies.If the Chulitna, Susitna,and Talkeetna river confluence area serves as a milling area for fish destined to spawning areas downstream,the project impact area would be greatly expanded and numbers of fish affected increased significantly. Age,length,and sex composition characteristics were determined from fishwheel catch samples for all species except pink salmon;Results are presented in Appendix I,Tables 1 and 2.Data is comparable with 1-19 Table Z.Peak chum,pink and sockeye salmon ground escapement survey counts within the upper Susitna River,Devils Canyon Project,1977. CHUM SALMON Density Area Date Live Dead Total Slough 8A 9/22/77 34 17 51 Slough 9 8/19/77 34 2 36 Slough 10 9/9/77 0 2 2 Slough 11 9/22/77 79 37 116 Slough 16 8/28/77 0 4 4 Slough 20 8/16/77 27 1 28 Slough 21 9/20/77 187 117 304 Lane Creek 8/19/77 0 2 2 Fourth of July Creek 8/11/77 11 0 11 Indian River 8/18/77 514 262 776 TOTAL 886 444 1,330 PINK SALMON Density Area Date Live Dead Total Slough 16 8/28/77 0 13 13 Lane Creek 8/11/77 1,190 3 1,193 Fourth of July Creek 8/11/77 611 1 612 Indian River 8/18/77 1,031 580 1,611 TOTAL 2,832 597 3,429 SOCKEYE SALMON Density Area Date Live Dead Total Slough 8A 9/9/77 64 6 70 Slough 8B 9/9/77 2 0 2 Slough 9 9/9/77 6 0 6 Slough 11 9/8/77 181 33 214 Slough 19 9/7/77 7 1 8 Indian River 8/18/77 1 0 1 TOTAL 261 40 301 1-20 Table 3.Peak chinook salmon counts within the Susitna River drainage,1977. Streams (West Side)Count Streams (East Side)Count Deshka River 39,642 Wi 11 ow -Creek 1,065 Alexander Creek 13,385 Montana Creek 1,443 Ta1achu1itna River 1,856 Moose Creek 153 Lake Creek 7,391 Prairie Creek 5,790 Martin Creek 1,060 Chunilna Creek 769 Cache Creek 100 Kashwitna River (North Fork)336 Bear Creek 298 Little Willow Creek 598 Red Creek 1 ,511 Sheep Creek 630 Peters Creek 3,042 Indian River 393 Donkey Creek 159 Portage Creek 374 Fish Creek (Quits)131 Chulitna River (East Fork)168 Fish Creek (Kroto S.)132 Chulitna River (Middle Fork)1,782 Unnamed-Kichatna River 120 Chulitna River (Mainstem)229 Clearwater Creek 47 Goose Creek 133 Quartz Creek 8 Honolulu Creek 36 Canyon Creek 135 Byers Creek 69 Dickason Creek 4 Troublesome Creek 95 Unnamed-Hayes River 2 Bunco Creek 136 Rabideux Creek 99 Total Count 14,199 Total Count 69,122 Estimated Total Count 17,028 Estimated Total Count 93,411 Total Count 83,321 Estimated Total Count 109,439 1-21 ,.-. Tokosifna. Rive r Swan lake (R5) Chulitna River Trapp er Slo~gh (55) Rabi deux (SS) 8 kilometer s (C5) N Susitna River Chunilna (Clear)Cr. (C5,P5,S5) Ta I ke.e t n a Ri v e r (55) (PS,SS) (55) Cr.(CS,K5,P5,55) She~p Cr.(P5) Figure 3.Locations of adult salmon tag recoveries occurring downstream of the Susitna River fishwheel sites,Devils Canyon Project,1977 (RS-sockeye salmon;PS-pink salmon;CS-chum salmon;SS-coho salmon; KS-chinook salmon). 1-22 escapement aamples obtained from other areas within the drainage (Friese, in prep.).Carcass data collected in the Deshka River and Alexander Creek revealed a high percentage of five-and six-year-old chinook salmon females (Kubik,1977). Juvenile salmon migration Intensive studies of juvenile chinook and coho salmon were conducted in Rabideux and Montana creeks to define the life histories of these species as related to the variable conditions of the drainage.The authors believe that the overwintering period during the first year of life is probably the most critical time for survival of these two species. Rabideux and Montana creeks were selected for this study due to: accessibility,their opposite physical characteristics,and the difference in the ratio of rearing species.Willow Creek and Indian River were also sampled periodically for comparative purposes. Rabideux Creek was selected to obtain representative data on coho salmon fry densities and yearling movements.A total of 1,041 yearling cohos were marked.Of these,274 were marked in the upper sub-area,753 in the middle sub-area,and 14 in the lower sub~area.Catches of rearing coho and chinook salmon captures and recaptures are presented in Table 4. A total of 159 marked fish were recaptured in the original area of marking and 32 in dispersed areas.An increase in catch per hour of coho salmon fry occurred following August 1 because increased growth made them more susceptible to capture in the 1/4"mesh minnow traps.Fourteen marked yearlings moved downstream,five upstream,and thirteen migrated to small lateral tributaries.No distinct pattern was exhibited,which could be attributed to the fact that environmental conditions are more stable throughout the year in this tributary during this particular year. 1-23 Other species inhabiting the system were chinook salmon.round whitefish (Prosopium cy1indraceum).10ngnose sucker (Catostomus catostomus). arctic grayling,pink salmon.Dolly Varden.rainbow trout.threespine stickleback (Gasterosteus acu1eatus).burbot.slimy sculpin (Cottus cognatus).and the western brook lamprey (Lampetra p1aneri). Montana Creek was selected to obtain data on juvenile chinook salmon abundance and migration.A total of 25.176 fry were marked from July 19 through August 14.The distribution of marking was 16.039 in the upper area and 9.137 in the middle area.Species composition of other fish was similar to Rabideux Creek.Table 5 illustrates the findings of trapping in biweekly periods until the first of December. After this time,trapping was conducted one to three days per month. The chinook salmon catch per hour indicated a gradual population density decline until February when a drastic reduction was recorded (Table 5).The gradual reduction is attributed to fry slowly moving downstream to the Susitna River throughout the season.This is also evidenced by marked fry being recovered below their area of release while no evidence of upstream recoveries was recorded. Willow Creek was also sampled with ~innow traps periodically between August 23 and March 2.This data clearly shows a decline in population density between December and February (Table 6). The drastic reduction in population density found in February is attributed to the extremely low water conditions encountered at that time.The reduced flow was believed to have eliminated required rearing habitat and forced the juvenile salmonids into the mainstem Susitna River.Traps were set in the Susitna River and one of its sloughs to test this theory.Chinook salmon fry were recovered from the Susitna 1-25 )-".J Table 5.Montana Creek salmon fry trapping,DevilsCanyon Project,1977. Chinook Chinook Chinook Total Fry Fry Fry Coho Coho Number Trap Chinook Chinook Date Unmarked Upper Mark Lower Mark Fry Yearling Traps Hours Per Trap Per Hour UPPER SECTION 8/16-8/31 178 56 ------13 312 18.0 .75 9/1-9/15 336 6 --I 5 5 115 68.4 2.97 .9/16-9/30 461 2 --11 --14 294 33.1 1.57 10/1-10/15 4188 7 ----14 110 2540 38.1 1.65 10/16-10/31 2987 16 --6 5 74 1560 40.6 1,.93 11/1-11/15 1467 3 --2 8 37 888 39.7 1.66 11/16-11/30 410 1 ----2 17 402 24.2 1.02 12/22 136 ----2 --5 128 27.2 1.06 1/27 185 ----4 --5 126 37.0 1.47 2/23-24 126 --.--I --22 440 5.7 0.29 H MIDDLE SECT IONI N 0-8/16-8/31 1206 6 13 ----15 360 81.7 3.40 9/1-9/15 1445 6 8 19 1 17 3~8 85.8 4.45 9/16-9/30 10/1-10/15 1982 4 4 --10 39 936 51.0 2.1.3 10/16-10/31 3218 5 10 24 13 65 1490 49.7 2.17 11/1-11/15 1601 3 5 22 3 52 1208 30.9 1.33 11/16-11/30 507 3 1 3 3 17 390 30.1 1.31 12/22 187 ------3 5 120 37.4 1.56 1/27 40 ----I --7 130 5.7 0.31 2/23-24 32 ------I 20 406 1.6 0.08 LOWER SECTION 8/16-8/31 1627 6 9 -- -- 24 576 68.4 2.85 9/1-9/15 2077 --2 56 --30 142 69.3 14.64 9/16-9/30 891 1 3 7 39 28 423 32.0 2.12 10/1-10/15 5002 4 1 100 162 141 3292 35.5 1.52 10/16-10/31 2221 6 1 75 21 54 1236 41.3 1.80 11/1-11/15 647 1 --3 --40 936 16.2 0.69 11/16-11/30 456 ----I 3 10 228 45.6 2.00 12/21-23 174 1 ----4 12 288 14.6 0.61 1/27 116 ----3 --5 108 23.2 1.07 2/23-24 108 ------I 18 372 6.0 0.29 H I N " ) Table 6.Willow Creek chinook salmon fry trapping,Devils Canyon Project,1977. 1977 Catch/Trap Hour 1978Index Area 8/23 10/26 12/1 1/18 3/2 III 2.8 2.6 1.3 1.5 1.29 112 3.8 3.2 3.3 1.3 0.28 113 4.2 4.1 4.8 1.3 0.67 ,~River at a rate of 0.45 per hour.In the slough they were recovered at a rate of 0.12 per hour.These catch rates document that chinook salmon juveniles utilize the mainstem river for rearing during the winter period. Juvenile studies Juvenile salmonids were present in all sloughs and clearwater tributaries identified within this study,with the exception of Lane Creek.The absence of juveniles in the latter location does not preclude their presence,since survey conditions of this creek were generally poor for juveniles.Pink salmon were the only species observed spawning within this creek and emergent fry would not be expected to be present when surveys were conducted,since this species migrate toward sea after their emergence from the gravel in late May and early June. The major species utilizing these areas for rearing during summer months were chinook and coho salmon,although sockeye salmon were also collected.Misidentification of salmon fry samples collected in previous studies,particularly between chinook and coho salmon,was noted during 1977.Samples from previous years were reexamined and correct identification was made.Data indicates chinook salmon were the most abundant rearing species collected during 1974 through 1976. Estimated fry abundance varied throughout the season.Lowest numbers occurred during late September surveys.This data is concurrent with studies conducted in Willow\.and Montana creeks (see p.25)• Attempts were not generally made to establish migration from the upper sloughs and tributaries to the mainstem river.A limited experiment was,however,conducted in Indian River to determine if migrations observed in MOntana and Willow creeks also occurred.A total of 579 1-28 chinook salmon fry were trapped during a two hour period on August 18. Large numbers of chinook salmon fry were also observed near the confluence area during late August and September.On August 31 the first chinook salmon fry was trapped in the mainstem Susitna River immediately downstream of Indian River.Logistical problems prevented follow-up studies until March 7.Ten traps were fished on this date for 24 hours in areas where high densities of fry had been observed during the summer.Only four chinook salmon were captured.Data is 1imited~but it does corroborate findings in Montana Creek.Montana Creek and Indian River have comparable gradients~velocities~pool to riffle ratios~and are representative of most of the clearwater tributaries to the Susitna River.It would be reasonable to speculate that life history information of salmon fry from one of these tributaries would be representative of the other. In addition to the apparent intrasystem migration of juvenile chinook salmon from the lateral tributaries to the Susitna River in the fall~it appears some young-of-the-year chinooks move out of the parent stream in the spring.The majority of the salmon fry observed in sloughs during 1977 were chinook salmon.Adult chinook salmon were not observed spawning in these sloughs during 1976.Observations~therefore~ indicate the fry dropped out of spawning areas sometime in the spring into the Susitna River and then moved into the sloughs to rear for the summer. Definition of the intrasystem migrations for the various life history phases of each species will be important considerations in assessing the potential impacts of this project.It can be assumed that individuals of a species will tend to select areas within a drainage that have the most favorable combinations of hydraulic conditions which 1-29 support life history requirements.They will also utilize less favorable conditions,with the probability-of-use decreasing with diminishing favorability of one or several hydraulic conditions (Bovee,1978). Observations demonstrate that individuals elected to leave an area before conditions became lethal.The movement of rearing salmon fry out of the sloughs in the fall has been documented and is an example of areas where conditions could become lethal. Data indicates that in early summer salmon rearing conditions are poor in the mainstem Susitna River because of high discharge and sediment loads.The clearwater sloughs and tributary areas are utilized by fry at this time.As the season progresses,discharge and sediment loads of the mainstem Susitna begin to decrease.By fall and winter,the silt load appears to be low enough to transform the mainstem Susitna River into suitable fry rearing habitat to replace slough areas,which are dewatered when mainstem discharge and stage decreases,and tributaries that often freeze in the winter. Samples for age,length and weight analysis were obtained from each slough during late July and early August and late September.Analysis , will not be discussed,but is presented in Appendix I Tables 3,4,and 5. Aquatic insects and juvenile salmon gut contents Knowledge of the aquatic insect fauna and its ecology is necessary to assess the potential impacts of the Devils Canyon and Watana dams upon the salmon population downstream.Alterations of currently existing populations would probably have a corrollary effect upon rearing fish. Gut contents of juvenile salmon from sloughs and tributaries between Portage Creek and the Chulitna and Susitna River confluence were 1-30 examined to determine feeding habits of rearing fish during 1977. Studies were considered minimal and further investigations will be required. Immature members of the Orders Diptera,Plecoptera,Ephemeroptera, Trichoptera,Coleoptera,Hemiptera,and adult forms of Hemiptera and Coleoptera were found in the summer and fall diets of juvenile salmon (Appendix I Table 6).Adult terrestrial insects were estimated to be the largest percentage of the gut contents by volume.Although most of these adult forms were terrestrial,the majority of their life histories were spent in the aquatic environment. Percent composition of gut contents varied between species of fish examined (Table 7).Feeding habits·of chinook and coho salmon were, however,similar during the summer sampling period.Adult Insecta were of primary importance for the latter two species during summer.Sockeye salmon fry fed primarily on Diptera larvae during summer months.Cladocera (Bosminidae)were also found to be important food organisms for sockeye salmon in three sloughs (Appendix I Table 6). Adult Insecta remained the major food items identified in the fall stomach content samples.Adult Diptera and Hymenoptera comprised approximately 80 percent of the food items in sockeye salmon during the fall as compared to about 18 percent during summer.The importance of immature Insecta and Crustacea apparently decreased appreciably.Change in percent, composition of food items per fish was not significant for chinook and coho salmon fry. Aquatic insects probably play a more important role in the juvenile salmon diet during winter months than in the summer and fall.Many groups of insects (P1ecoptera,Ephemeroptera,Trichoptera,and Diptera) 1-31 Table 7.Mean percent composition of gut contents per fish of chinook,sockeye.and coho salmon juveniles in sloughs and clearwater tributaries of the Susitna River,Devils Canyon Project,1977. H I W N Mean Percent Per Fish Immature Adult Species Sample Size Crustacea Insecta Insecta Other Summer Fall Summer Fall Summer Fall Summer Fall Summer Fall Chinook 219 158 4 trace 24 26 71 62 1 12 Sockeye 35 18 27 2 54 17 18 80 1 1 Coho 17 45 9 trace 17 9 68 69 6 22 are very active during the winter even at water temperatures of Oo:C (Hynes,1970)~Conversely,during these cold months terrestrial insects are nonexistent and plankton is either greatly reduced or nil.This would suggest that aquatic insects would probably be a greater proportion of the juvenile salmon diets than in the summer.Additional studies are required to analyze this. Research and literature in the area of environmental factors affecting aquatic insects is sparse and often times conflicting.There is,apparently,a high degree of variability as to substrate type preference,temperature requirements,and general modes of existence even within the Order level.Evaluating species diversity would probably be the most useful means of monitoring on-going environmental changes in the invertebrate fauna of the river (McCoy,1974).It would not,however, provide a means to predict whether or how a change will occur.Environmental factors which would probably result in the greatest alterations in the aquatic fauna include:water temperature,flow,substrate types,water clarity,and chemical water quality. Research in the area of water temperature effects on aquatic fauna are conflicting,but apparently the "environmental clues"for the hatching of eggs,the change from a larval to pupal state,etc.,are a combination of threshho1d temperatures and changing day length (Hynes, 1970).Disruptions in the seasonal pattern of temperature are attributed to have caused extensive alterations in the aquatic insect fauna of the Saskatchewan River (Lehmkuhl,1972).Hypolimnial water discharge from a dam in the river reduced both diversity and absolute numbers of insects downstream.River temperatures became higher in winter and lower in summer,differing from the norm in such a way that Ephemeroptera eggs 1-33 failed to.develop into nymphs.Similar temperature effects were thought to have adversely affected other aquatic insect groups at this site, even at a distance of 70 miles downstream.Alteration of natural flow could affect both the respiration of organisms and substrate types. Most arthropods in still water self-ventilate their gills or respiratory structures.Many immature aquatic insects have lost this function and rely on running water or current to artificially "fan"their gills.A decrease in flow could therefore have an adverse effect upon respiration. The nature of the flow is intimately related to substrate type.A fast current area will generally be clean swept and have a rocky or gravel substrate.The sediment load will drop in slow moving waters and the bottom will become increasingly silty.Each different substrate type supports a completely different benthic fauna.All these current related factors can perhaps best be summarized by Hynes'observation that areas subjected to wide fluctuations in current "are often without much fauna." Neither those organisms adapted to a slow moving area nor those to one of swift water can thrive. Numerous investigators have established the importance of substrate types upon the nature of the benthic fauna.Each species of aquatic insect seems adapted to a certain substrate type or at least greatly prefers one type to another.Obviously,changes in substrate type will result in altered benthic fauna.This was evidenced when a small beaver dam across a stream in Ontario altered the upstream bottom habitat from swift flowing and stoney to slow moving and silty stones.The total number of aquatic insects were reduced,"especially of Ephemeroptera, Plecoptera,and Trichoptera,"while the proportion of Diptera Chironomid larvae was increased (Hynes,1970).There can be great variations in 1-34 substrate preference within each order or even family.Some trends are, however,discernable.In general,rocky or stoney substrates with a swift flow of water will contain both a greater species diversity and a higher biomass than silty substrates with slower moving water.These riffle areas are the most productive regions in running water. The possible introduction of turbid glacial water by the proposed dam into the clear winter water of the upper Susitna seems to indicate substrate type would be altered to one of increasing silt.This would probably change the aquatic insect fauna and quite possibly reduce its abundance. Chemical water quality influences upon aquatic insects would be minimal in comparison to the above factors.Lehmkuhl (1972)and Spence and Hynes (1971)discovered no appreciable differences in chemical water quality upstream and downstream from dam impoundments and thus concluded there were no effects from these factors upon benthic invertebrates. The importance of drift to the relationship between aquatic insects and the diet of juvenile salmon is another factor to consider.Many benthic invertebrates,displaced by crowded conditions and as a means of finding more favorable substrate habitats,leave the substrate and are carried downstream by the water's flow.These are cumulatively called "drift".Investigators have repeatedly found that most of the food items of salmonid fish in flowing water situations consist of drift. Hynes (1970)reports that brown trout feed mostly on drifting organisms. Becker's (1973)food habits study of juvenile chinook salmon on the Columbia River concluded prey items were either drift organisms or adult insects floating on the water's surface.Loftus and Lenon (1977)also believed drift to be an important food source to chinook and chum smelt 1-35 on the Salcha River in interior Alaska.A comparison between the gut contents of a limited number of longnase suckers (bottom feeders) collected in our study with that of the juvenile salmon reveals that drift aquatic insects together with floating adult insects were apparently the major food items.The numbers and kinds of organisms in the drift appear to differ substantially when compared to fauna collected strictly on the bottom.As might be expected,heavier organisms such as Trichoptera larvae and their cases,snails,etc.,are relatively rare in drift, while Ephemeroptera,Diptera Chironomid larvae,and P1ecoptera form a \ higher percentage than they do On the substrate.Various environmental factors can alter the amount of drift.Investigators have reported varying drift because of ice scouring,water temperature,and daylight changes (Hynes,1970).The role of drift organisms in both the food , habits of rearing salmonid fishes and in the overall ecology of aquatic insects is thus probably of some importance in the Susitna River and should be investigated further. If a hypolimnia1 discharge hydroelectric dam is constructed at Devils Canyon,it appears almost certain the downstream benthic fauna will be altered.This will most probably occur because of:1)changed water temperatures resulting from the hypolimnia1 discharge which may disrupt the life cycles of certain species;2)substrate types altered by increased winter turbidity of downstream river water,which will in turn alter the aquatic insects living on the substrate,and 3)discharge flow variations because of varying power demands,which will create areas of the river bottom to which neither swift current associated species nor slow current forms are perfectly adapted for.Which species or group of insects will be most affected,whether they will be major 1-36 food items of rearing juvenile salmon or whether the salmon will switch their food preference to the newly abundant forms,and whether the biomass of benthic fauna will decrease,will probably be difficult,if not impossible,to predict.We can only hope to broadly outline what changes may occur. Impoundment area fisheries investigations Alterations will definitely occur to the fish habitat in the areas to be inundated.The fisheries investigations in the impoundment area during the first two weeks of July revealed that Arctic grayling were abundant in all of the major clearwater tributaries (Table 8).Extreme lake level fluctuations of the Watana reservoir will destroy habitat and affect the high quality fishery which presently exists. No anadromous species were captured upstream of Devils Canyon during the first two weeks of July.More extensive sampling,however, is necessary throughout the summer to determine if Devils Canyon is a velocity barrier to salmon during different natural flow regimes over a three to five year period. Lakes in the impoundment area which could be impacted by construction of road or transmission corridors and increased access were also surveyed for species composition (Table 9).Fifteen of the eighteen lakes sampled supported desirable game fish populations. Construction of the Devils Canyon dam would inundate 7,550 acres and have a surface elevation of 1,450 feet and extend for 28 miles upstream (U.S.Army Corps of Engineers,1977).Construction of the Watana dam would result in inundation of 43,000 acres with a surface elevation of 2,200 feet extending for 54 miles upstream along the Susitna River.For downstream discharge to remain relatively constant,at least 1-37 r~Table 8.Limnological data from selected tributaries to the Susitna River, Devils Canyon Project,1977 . Est.Estimated Flow Velocity Percent Bottom Conduc-Fish Stream (cfs)(fps)Pools TyPe Temp.pH tivity Observed* Oshetna 600 3 15 Rubble 13 8 75 GR Boulder Goose 100 2 40 Rubble 15 GR Boulder Jay 75 2 40 Gravel 8 8.4 160 GR,SK,WF, Boulder SC Kosina 100 2 30 Gravel 14 8 65 GR Boulder Watana 300 1.5 20 Gravel 12 7.8 110 GR Rubble Deadman 900 3 10 Boulder 14 GR Tsusena 600 2 10 Gravel 6 7.8 50 GR Boulder Fog 200 1.5 30 Sand 9 7.9 75 GR *GR -Grayling SK -Suckers SC -Sculpin WF-Whitefish 1-38 Table 9 • Susitna River impoundment area lake surveys,Devils Canyon Project,1977. Surface Surface Maximum Fish Species Lake Location Elevation Acres Depth (Ft)Present* Clarence ·T30N,R9E,S19,20 2,900 299 35 LT,GR,WF Fog 1 T31N,RSE,S9 2,230 147 72 DV,SC 2 T31N,R5E,S8 2,230 237 50 DV,SC 3 T31N,R5E,S15 2,110 339 81 DV,SC 4 T31N,RSE,S13 2,300 358 9 DV,SC 5 T31N,R6E,S7 2,300 269 6 George T6N,R7W,S20,29 2,400 80 18 GR,LNS Louise T32N,R6E,S7 2,362 155 155 LT,BB,WF,GR Connor T6N,R7W,S28 2,450 18 13 GR Tsusena Butte T33N,R5E,S21 2,493 190 110 GR,LT,WF Pistol T32N,R6E,S7 2,350 205 Big T32S,R3,4W,S25,3,070 1,080 80 LT,WF ·18,19,30 Deadman T22S,R4W,S13,14 3,064 380 70 LT,GR,WF Watana T30N,R7W,S36 3,000 300 30 LT,WF,GR Square T30N,R3E,S35 1,935 230 34 Little Moose Horn T30N,R3E,S36 1,850 120 33 GR,LT,LNS Stephan T30N,R3E,S2,10,16 1,862 840 95 LT,RT,RS SS,GR,WF,LNS *Species:GR -Grayling RT -Rainbow Trout DV -Dolly Varden LT -Lake Trout WF -White Fish SC -Sculpin S8 -Coho Salmon BB -Burbon 1-39 RS -Sockeye Salmon LNS -Long Nosed Sucker one of these reservoirs will have to fluctuate considerably.The Watana reservoir is projected to have the most extreme fluctuations.The majority of the clearwater tributaries to be inundated are found within this section of river and,of the two impoundments,greater impacts will probably occur here since loss of portions of these tributaries is inevitable if the two dams are built.If salmon utilize the area above the Devils Canyon dam site,however,both the Devils Canyon and Watana dams and impoundments could adversely impact migration.Reservoir fluctuations could have a variety of effects on the tributaries.The mouths of these tributaries and stretches of water upstream provide some of the most productive fishery habitat in this area.Some tributaries have steep gradients upstream of the mouth area which act as migration barriers and do not appear to support fish species. In tributaries where the full pool would extend up to the base of steep tributary gradients or waterfalls,critical lotic habitat would be lost.Periods of lowered pool levels could have a suction effect and result in the erosion and formation of channels with steep gradients which may block intersystem fish migrations and eliminate suitable fishery habitat.Preliminary data on fish species present demonstrates that additional information is required to evaluate the full effects of inundation and regulation in these areas. WATER QUANTITY Between May 17 and June 14,1977 the unregulated flow of the Susitna River increased from 13,600 cubic feet per second (cfs)to a peak discharge of 52,600 cfs (Figure 4;Appendix II,Table 1).By July 20,the flow decreased to 22,400 cfs and fluctuated around 20,000 cfs until August 25.On September 6 the flow dropped to 9,520 cfs and then increased to 1-40 50,000 45,000 .49,000 ,...., to 4-l 35,000c.J '-" ill Oil ~ C'j,...-() to 30,000'r-I '4 >..-; -rl co 0 t:: Q Q 25,000.....""' 20,000 15,000 la,000 9,000 8,000 Hay June July Date August September ( Figure 4.Susitna River discharge at Gold Creek,Devils Canyon Project,1977. 16,900 cfs one week later.The flow decreased to 9,840 cfs on September 27 which again was followed by increased flow until the last reading of 12,500 cfs was made.on September 30. Fluctuations in flow during August and September were attributed to heavy rain.Stage fluctuations within the majority of clearwater sloughs of the Susitna River,related directly to mainstem discharge variations (Appendix II,Table 2).Downstream flow is projected to be maintained at a constant rate of approximately 7,000 to 8,000 cfs at Gold Creek after completion of the dams.Slough surveys were terminated near the end of September when the flow was approximately 15,000 cfs. It was not possible to observe the sloughs during this study when the mainstem flow was 8,000 cfs due to freezing conditions.Observations during the 1976 study,however,concluded that 75 percent of the rearing sloughs studied were undesirable habitat when the flow in the mainstem was 7,000 cfs (Riis,1977). Habitat requirements for passage,spawning,egg incubation,fry, juvenile,and adult phases of the salmon species studied are quite specific.The USFWS Cooperative Instream Flow Service Group has developed criteria which demonstrate the narrow tolerances of certain sa1monid species to hydraulic parameters of velocity,depth,substrate and temperature (Bovee,1978).The seasonally wide fluctuations of water velocity,depth,temperature,substrate,and sediment of the mainstem Susitna,its sloughs and tributaries determine to some extent the \ intrasystem migrations of fish seeking more desirable environments. Thus,any alterations to the existing aquatic ecosystem which restrict or reduce the availability of required habitat,will also reduce fish \ production. 1-42 Low flows were encountered in Rabideux Creek from mid-June through the end of August (Table 10).The lowest flow recorded was 24.3 cfs on August 23.The highest flow was 440.7 cfs on September 29 and was apparently due to the heavy rains encountered at that time. WATER QUALITY Ryan thermo graphs were installed in the upper sub-areas of Rabideux and Montana creeks.Water temperatures in Rabideux Creek ranged up to five degrees celsius (OC)higher than Montana Creek during corresponding time periods.The high recorded in Rabideux Creek was l8.8°C on both July 11 and 12;the low of 107°C occurred on October 22 and 23 at which time the thermograph was removed (Appendix II,Table 3).In Montana Creek,a high of l5.D oc was recorded on July 28 and the low of D.DoC was , recorded from November 3 through 6 at which time recording was terminated (Appendix II,Table 4). A thermograph was also installed in the Susitna River at the Parks Highway bridge.When installed on June 27 the temperature was lD.SoC and the highest water temperature of 14°C was reached on July 12 followed by temperatures fluctuating between l3.SoC and 10°C when a steady decline began on August 25 and continued to the lowest reading of 2°C on October 2 (Table 11). Temperatures at all other sampling sites were measured with a combined dissolved oxygen and temperature meter and/or a pocket thermometer.Data is presented in Appendix II,Table 2. Water chemistry of Rabideux and Montana creeks was measured throughout the season.Determinations of dissolved oxygen,pH,hardness,and total alkalinity are presented in Appendix II,Tables 5 and 6. In Rabideux Creek,dissolved oxygen ranged from a low of 6 ppm in the upper sub-area to a high of 11 ppm recorded in all areas ..Hydrogen 1-43 Table 10.Water flows of Montana,Rabideux,and Willow cr~eks from Hay • through November,Devils Canyon Project,1977.~1 MONTANA CREEK r-"Date Flow (cis) 5/1 935 5/21 2,000 6/5 4,800 6/20 1,764 7/1 935 7/21 935 8/6 233 8/22 153 9/1 103 9/29 1,349 10/15 .394 11/9 490 RABIDEUX CREEK ;- Date Flow (cfs) 4/13 325.4 5/25 128.7 6/7 116.7 6/17 50.2 6/30 33.2 7/13 36.7 7/26 31.4 8/23 24.3 8/31 29.2 9/21 242.9 9/29 440.7 IHLLOW CREEK ... \ Date 5/1 5/30 6/15 6/29 7/15 7/30 8/15 8/30 9/16 9/29 10/15 10/30 11/8 Flow (cfs) 443 1,590 3,320 1,900 951 525 409 1'22 1,590 2,070 525 348 676 Montana and Willow creeks data is provisional and was obtained from the National Weather Service. 1-L,4 Table 11.Thermograph set in Susitna River downstream of Parks Highway Bridge,daily maximum and minimum water temperature,Devils Canyon Project,1978. Temp.°c Temp.0c Temp.°c Date Min.Max.Date Min.:M"..ax.Date 'Min.Max. 6/27 10.5 10.5 7/30 12.5 12.5 9/12 7.5 8.0 6/28 10.5 10.5 7/31 11.0 12.5 9/13 7.5 7.5 6/29 10 10.5 8/1 10.0 10.5 9/14 7.5 7.5 6/30 10 10 8/2 10.0 10.0 9/15 6.0 7.5 7/1 10.5 10.5 8/3 10.0 11.0 9/16 6.0 6.5 7/2 10.5 10.5 8/4 11.0 11.0 9/17 6.5 6.5 7/3 10 10.5 8/5 11.0 11.0 9/18 6.5 6.5 7/4 9.5 10 8/6 10.5 11.0 9/19 6.0 6.5 7/5 9.5 10 8/7 11.0 11.0 9/20 5.5 6.5 7/6 10 11 8/8 10.0 10.5 9/21 5.5 5.5 7/7 12 12.5 8/9 10.0 11.5 9/22 5.5 6.0 7/8 12 13 8/10 .11.0 11.5 9/23 5.5 6.0 7/9 12 13 8/11 10.5 11.0 9/24 5.0 5.5 7/10 12.5 13.5 8/12 10.5 11.0 9/25 4.5 5.0 7/11 13 13.5 8/13 10.5 11.0 9/26 4.5 5.0 7/12 13.5 14 8/14 10.5 11.0 9/27 5.0 5.0 7/13 13 13.5 8/15 10.5 11.0 9/28 5.0 5.0 7/14 11 13 8/16 11.0 11.0 9/29 4.5 5.0 7/15 10.5 11 8/17 11.0 11.0 9/30 3.0 4.5 7/16 10.5 11.5 8/18 10.0 10.5 10/1 2.5 3.0 7/17 11.3 12 8/19 10.5 12.0 10/2 2.0 2.5 7/18 12 12 8/20 11.0 12.0 10/3 2.0 2.0 7/19 11.5 11.5 8/21 10.5 12.0 10/4 2.0 3.0 7/20 11.5 11.5 8/22 11.0 11.5 10/5 2.5 3.0 7/21 11 11 8/23 11.0 12.0 10/6 2.0 2.5 7/22 11 11.5 8/24 10.5 11.5 10/7 2.5 2.5 7/23 11 11.5 8/25 9.5 10.5 10/8 2.5 3.0 7/24 11 11.5 8/26 9.0 10/9 3.0 3.5 7/25 11.5 11.5 10110 3.5 3.5 7/26 11.5 11.5 10/11 3.5 4.0 7/27 10.5 12.0 9/9 8.0 10/12 3.5 7/28 11.0 12.5 9/10 7.5 8.0 7/29 12.0 13.0 9/11 7.5 8.0 1-45 ion (pH)concentrations were found to be relatively stable ranging from a low of 6.5 to a high of 7.7.Both hardness and total alkalinity were found to range between 17 mg/1to 68 mg/1.The higher readings occurred during the warmer summer months. Montana Creek exhibited less fluctuation in chemical water character- istics than Rabideux Creek.The d~ssolved oxygen ranged from 9 to 12 ppm~pH from 6.8 to 7.7,and hardness and total alkalinity from 17 to 34 mg/L Water samples were collected jointly by ADF&G and USGS from three sites on the Susitna and the USGS laboratory carried out the complete standard chemical analysis.This data is presented in Appendix II, Table 7 and considerably expands the daLa base which will be used for future comparisons. Field determinations of dissolved oxygen,pH,hardness,total alkalinity and specific conductance were collected in clearwater sloughs and tributaries and are tabulated in Appendix II,Table 2.Thefindings were within acceptable limits for fish life and were in the range of expected.resu1ts for natural waters in southcentra1 Alaska. CONCLUSION Baseline inventory studies,to date,emphasize the need to initiate a comprehensive study to properly assess the potential environmental impacts to the aquatic ecosystem of the Susitna drainage by the proposed Watana and Devils Canyon hydroelectric project prior to final design approval and construction authorization. The Susitna River is a product of its tributaries.All aquatic habitat and populations (within the power transmission corridor site, construction road routes,and above and below the proposed dam sites) which would be directly or indirectly affected during construction and after completion of the project must be carefully evaluated.It is imperative to thoroughly investigate the interrelationships between the aquatic biology and the water quantity and quality of the existing free flowing Susitna River system.Recreational,social,economic,and aesthetic considerations should also be included. With this information the Alaska Department of Fish and Game will be able to provide the input for preventing unnecessary losses of the fisheries and related resources held in high esteem by the people of Alaska and the Nation as a whole. 1-47 RECOMMENDATIONS Continued collection of biological data and completion of resource assessment in the area affected by the proposed hydroelectric project ts essential to understanding the potential impacts of the proposed action.Appendix III is a summary of ADF&G's reconnnendations for essential aquatic studies. Direct studies of aquatic and terrestrial species can delineate a population and indicate their distribution throughout the year and define why species are there to a certain ~xtent.Seasonal life history studies must be accompanied by habitat studies if we are to determine the full.significance of habitat alteration to the population. The studies identified for the pre-authorization environmental assessment are necessary to predict the impacts of hydroelectric develop- ment on the ecosystem.The objectives of the biological investigations are based upon the assumption that the Devils Canyon and Watana two dam plan will be selected.It must be realized that as the plan evolves and new information becomes available,the program must be flexible enough. to permit adjustment in study direction.If other basin development schemes are proposed,study time and costs will have to be reevaluated. Capital requirements for each year were based upon FY-78 dollars.Inflation will therefore necessitate annual supplemental allocations which represent revised cost estimates.The proposals are closely integrated and demonstrate the need for continuity.The design,timing,manpower requirements,and funding levels of the individual projects have been coordinated. A team of resource specialists representing various scientific disciplines will be required to carry out field investigations in habitat I-48 assessment.Adequate time will be required to organize study personnel and procure equipment prior to the first field season.An untimely delay could prevent the initiation of the field studies one year. 1-49 ACKNOHLEDGEMENTS Several biologists with the Alaska Department of Fish and Game gave freely of their time and expertise to assist us during this study.We would like to express our thanks to Paul Janke,Larry Engel, Roger Wadman,Stan Kubik,Larry Heckart,Fred Williams,Mike Mills, Dave Watsjold and Bob Chlupach. The temporary biologists who worked on this project deserve credit for long hours spent collecting and analyzing data:Christopher Estes, Jeff Hock,Terry Bradley,Pete Probasco,Kevin Delaney,Ward Knous, Steven Sykes,Doug Bue,Dave Clausen and Dave Go1we11.LabQrato~y .analysis and literature research on aquatic insect samples were"CQnduc.ted by Dave Clausen.Special appreciation is extended to Christopher Estes for his participa~ion in the preparation of this document. Funding for this study was provided by the U.S.Fish and Wildlife Service.Individuals from the USFWS also assisted with the Chinook fry marking operation in Montana Creek. The USGS cooperated in every way possible in collecting and analyzing water samples. Appreciation is also extended to those individuals not mentioned here who assisted with this project. I-50 LITERATURE CITED Alaska District U.S.Army Corps of Engineers.1977.Plan of Study for Susitna hydropower feasibility analysis.Prepared under contract agreement for the state_of Alaska.September.297 pp. Barrett,B.M.1974.An assessment study of the anadromous fish population in the upper Susitna River watershed between Devils Canyon and the Chulitna River.Cook Inlet Data Report No.74-2.Alaska Department of Fish and Game.Division of Commercial Fisheries.56 pp. Becker,C.D.1973.Food and growth parameters of juvenile chinook salmon,Oncorhynchus tshaFYtscha,in central Columbia River. Fishery Bulletin.Vol.71.No~2.387-400 pp. Bovee,K.D.1978.Probabi1ity-of-use criteria for the family Sa1monidae FWS/OBS -78/07 Cooperative Instream Flow Service Group.Fort Collins,Colorado. ___'and T.Cochnauer.1977.Development and evaluation of weighted criteria probabi1ity-of-use curves for instream flow assessment: Fisheries FWS/OBS -77/63 Cooperative Instream Flow Service Group. Fort Collins,Colorado.39 pp. Brown,C.J.D. Montana. 1971.Fishes of Montana Big S~y Books. 207 pp. Bozeman, Friese,N.V.1975.Preauthorization assessment of anadromous fish populations of the upper Susitna River watershed in the vicinity of the proposed Devils Canyon hydroelectric project.Cook Inlet Data Report No 75-2.Alaska Department of Fish and Game.Division of Commercial Fisheries.121 pp. Friese,N.V.(in prep).Susitna River salmon escapement studies,1977. Cook Inlet Data Report Series.Alaska Department of Fish and Game. Division of Commercial Fisheries. Hynes,H.B.N.1970.The ecology of running water.Univ.of Toronto Press,Toronto. Jaques,H.C.1947.How to know the insects.Second Edition.WID. C.Brown Co.Dubuque,Iowa.205 pp. Kubik,S.W.and R.Wadman.1977.Inventory and cataloging of sport fish waters of the lower Susitna River and central Cook Inlet drainages.Annual Report of Progress,1976-1977.Project F-9-9, Vol.18,No.G-I-H.28 pp. Lehmkuhl,D.M.1972.Change in thermal regime as a cause of reduction of benthic fauna downstream of a reservoir.J.Fish.Res.Bd. Canada.Vol.29,No.9.1329-1332 pp. Loftus,W.F.and H.L.Lenon.1977.Food habits of the salmon smolts, Oncorhynchus tshawytscha and o.keta,from the Salcha River,Alaska. Trans.Am.Fish.Soc.Vol.106,No.3.235-240 pp. I-51 McCoy,G.1974. the Chena and Flood Control Survey,Water LITERATURE CITED (cant.) Preconstruction assessment of biological quality of Little Chena rivers in the vicinity of Chena Lakes Project near Fairbanks,Alaska.U.S.Geological Resources Investigations 29-74.84 pp. Pennak,R.W.1953.Freshwater invertebrates of the United States. The Ronald Press Co.New York. Riis,J.C.1977.Pre-authorization assessment of the proposed Susitna River hydroelectric projects:preliminary investigations of water quality and aquatic species composition.Alaska Department of Fish and Game.Division of Sport Fish.91 pp. Spence,J.A.and H.B.N.Hynes.1971a. and downstream of an impoundment. 28,No.1.35-43 pp. Differences in benthos upstream J.Fish.Res.Bd.Canada.Vol. 1971b.Differences in fish populations upstream and downstream of a mainstem impoundment.J.Fish.Res.Bd.Canada.Vol.28,No. 1.45-46 pp. U.S.Fish and Wildlife Service.1976.Southcentral railbe1t area - Susitna River basin.Fish and wildlife studies related to the Corps of Engineers Devils Canyon -Watana Reservoir hydroelectric project.Studies conducted by the Alaska Dept.of Fish and Game under contract agreement with the u.S.Fish and Widlife Service. February.185 pp and appendices. Usinger,R.L.1968.Aquatic insects of California.Univ.of Calif. Press.Berkeley. Ward,H.B.and G.C.Whipple.1959.Freshwater Biology.Second Edition.John Wiley and Sons,Inc.New York. Watsjold,D.A.1977.Inventory,cataloging,and population sampling of the sport fish and sport fish waters in upper Cook Inlet. Annual Report of Progress,1976-1977.Project F-9-9,Vol.18,No. G-I-D.48 pp. I-52 APPENDIX I Tables in the following appendix include data on adult and juvenile salmonids and stomach content analysis. I-53 Appendix I Table 1 •Percent age composition of chinook,sockeye,coho,and chum salmon escapement samples.Devils Canyon Project.1974.1975.and 1977. Year of Sample Return Age Class Brood Year Size CHINOOK: 1977 1.1 1.2 1.3 1.4 1.5 1970 1971 1972 1973 1974 Percent 9.5 9.5 52.4 28.6 0.0 0.0 28.6 52.4 9.5 9.5 100.0 Number 2 2 11 6 a 0 6 11 2 2 21 1975 1.1 1.2 1.3 1.4 1.5 1968 1969 1970 1971 1972 Percent 9.3 4.6 34.9 44.2 7.0 7.0 44.2 34.9 4.6 9.3 100.0 Number 4 2 15 19 3 3 19 15 2 4 43 -------------------------------------------------------------------- SOCKEYE: 1977 1.1 1.2 1.3 2.1 2.2 1972 1973 1974 Percent 3.3 16.7 76.7 3.3 0.0 76.7 20.0 3.3 100.0 Number 1 5 23 1 0 23 6 1 30 1975 1.1 1.2 1.3 2.1 2.2 1970 1971 1972 Percent 6.3 41.8 37.9 0.0 14.0 51.9 41.8 6.3 100.0 Number 5 33 30 0 11 41 30 5 79 1974 1.1 1.2 1.3 2.1 2.2 1969 1970 1971 Percent 27.9 46.5 4.7 11.6 9.3 14.0 58.1 27.9 100.0 Number 12 20 2 5 4 6 25 12 43 -------------------------------------------------------------------------------------- COHO: 1977 1.1 1.2 2.0 2.1 1973 1974 Percent 14.3 0.0 0.0 85.7 85.7 14.3 100.0 Number 1 0 0 6 6 1 7 1975 1.1 1.2 2.0 2.1 1971 1972 Percent 11.8 5.9 0.0 82.3 88.2 11.8 100.0 Number 2 1 0 14 15 2 17 1974 1.1 1.2 2.0 2.1 ·1970 1971 Percent 15.9 0.0 0.9 83.2 84.1 15.9 100.0 Number 18 0 1 94 95 18 113 ~: 1977 0.2 0.3 0.4 1972 1973 1974 Percent 4.8 88.1 7.1 7.1 88.1 4.8 100.0 Number 2 37 3 2 37 2 42 1975 0.2 0.3 0.4 1970 1971 1972 Percent 16.4 82.0 1.6 1.6 82.0 16.4 100.0 Number 21 105 2 2 105 21 128 1974 0.2 0.3 0.4 1969 1970 1971 Percent 48.1 33.4 18.5 18.5 33.4 48.1 100.0 Number 229 159 88 88 159 229 476 I-54 Appendix I Table 2 Age.length.and sex characteristics or cnum.chinook.sockeye.and coho salmon escapement,samples.Devils Canyon Project.1974.1975.and 1977. Year of Age Mean Standard Range of Number Number Return Class Length <mm)Deviation (s.)Lengths Males Females n CHUM: 1974 0.2 545.0 32.05 410-650 155 74 229 0.3 614.8 33.61 510-695 88 71 159 0.4 627.6 30.71 520-695 47 41 88 1975 0.2 552.7 13.58 530-578 11 10 21 0.3 587.6 20.62 532-628 55 50 105 0.4 620.5 2.50 618-623 0 2 2 1977 0.2 568.5 3.50 565-572 0 2 2 0.3 618.3 29.05 545-667 28 9 37 0.4 656.7 9.43 650-670 2 1 3 --------.----------------------------------------.----------------------------------------------- CHINOOK: 1975 1.1 389.3 31.69 341-421 4 0 4 1.2 483.5 6.50 477-490 1 1 2 1.3 710.6 84.25 569-812 12 3 15 1.4 856.2 62.63 778-990 7 12 19 1.5 937.0 45.08 897-1000 0 3 3 1977 1.1 371.5 28.50 343-400 2 0 2 1.2 580.0 5.00 575-580 2 0 2 1.3 816.3 59.10 725-920 8 3 11 1.4 994.8 52.02 950-1103 4 2 6 ---------------------------.--------.---------------------------------------------~----------- SOCKEYE: 1974 1.1 395.5 69.14 315-485 12 0 12 1.2 527.8 48.99 417-595 10 10 20 1.3 572.5 12.50 560-585 0 2 2 2.1 376.6 56.94 318-485 5 0 5 2.2 536.3 20.12 515';'565 3 1 4 1975 1.1 352.4 37.15 313-423 5 0 5 1.2 471.8 42.36 398-548 15 18 33 1.3 576.1 26.65 514-638 12 18 30 2.1 0 0 0 2.2 532.3 39.54 460-576 4 7 11 1977 1.,1 347.0 347 1 0 1 1.2 451.8 27.09 433-505 4 1 5 1.3 596.4 30.24 509-639 11 12 23 2.1 371.0 371 1 0 1 2.2 0 0 0 -------------------------------------------------------- £Q!!Q: 1974 1.1 487.9 42.92 410-575 11 7 18 2.0 375.0 375 1 0 1 2.1 527.7 48.00 376-605 49 45 94 1975 1.1 495.5 4.50 491-500 1 1 2 1.2 540.0 540 1 0 1 2.1 531.1 38.53 454-608 5 9 14 1977 1.1 337.0 337 1 0 1 2.1 473.0 54.54 400-549 5 1 6 I-55 ')) Appendix I Table .1.Analyses of age,length,weight and cOlldition factors of juvenile sockeye salmon samples from SlIsitns River sloughs and clearwater tributaries.Devils Canyon Project.1977.(continued) ') H I V1 -.J Length (mm)Weight (g)Condition Factor Age Standard Standard Staodard Percent!1 Location Class Date Mean Deviation Range .Iean Deviation Range Mean Deviation Range Composition n Slough 19 0.0 7/26 32.4 7.9 25-51 0.4 0.5 0.1-1.9 0.803 0.335 0.370-1.432 100 12 0.0 8/2 53.5 1.5 52-55 1.5 0.1 1.4-1.7 1.009 0.013 0.996-1.022 100 2 - 0.0 9/21 50.0 --1.5 --1.200 --100 1 11 Percent composition of each age class within sampling period. \J Appendix I Table 4.Analyses of age,length,weight and condition factors of juvenile coho salmon samples from Susitna River sloughs and clearwater tributaries,Devils Canyon Project,1977. Length (nun)Weight (g)Condition Factor Age Standard Standard Standard Percent!.! Location __Jaass Date Mean Deviation Range Mean Deviation Range Mean Deviation Range Composition n Slough 1 0.0 9/24 54.6 3.9 49-61 2.0 0.5 1.3-2.9 1.199 0.08/1 1.022-1.315 93 13 1.0 9/24 80.0 --6.0 --1.172 --7 1 - Slough 4 0.0 9/24 62.7 3.3 59-67 2.9 0.4 2.5-3.6 1.196 0.017 1.175-1.217 23 3 1.0 9/24 75.4 8.3 68-99 5.9 3.3 3.7-15.6 1.268 0.126 1.152-1.628 17 10 - Slough 5 0.0 9/23 17.0 --6.2 --1.358 --25 1 H 1.0 9/23 105.3 8.9 93-114 14.9 3.0 10.7-17 .5 1.267 0.104 1.120-1.351 75 3 I Ln 00 7/27 57.0Slough60.0 --1.9 --1.026 --100 1 Slough 6A 0.0 7/27 49.5 1.5 48-51 1.5 0.0 1.5 1.243 0.'113 1.113-1.356 100 2 Slough 0.0 9/23 63.0 - - 3.0 --1.216 --100 1 or SA Slough BC 0.0 9/23 47.0 --1.2 --1.156 --100 1 Slough 10 0.0 7/27 57.0 --2.1 --1.134 --100 1 ) Appendix I Table 4.Analyses of age,length,weight and condition factors of juvenile coho salmon samples from SusHna River sloughs and clearwater tributaries,Devils Canyon Project,1977.(continued) l.ength (mm)Weight (g)Condition Factor Age Standard Standard Standard Percentll Location Class Date Mean Deviation Range__Mean Deviation Range Mean Deviati()fi Range'C.:I!Upositlon n Slough 13 0.0 9/22 59.0 --2.2 --1.071 --100 1 Slough 16 0.0 9/21 63.0 2.0 61-65 3.2 .....0.3 2.9-3.5 1.276 0.002 1.274-1.278 100 2 Slough 19 0.0 9/21 71.0 2.0 69~73 4.7 0.7 4.0-5.3 1.290 0.072 1.218-1.362 100 2 Slough 21 0.0 9/20 56.0 --1.5 --0.854 --100 1 ---~~-- Chase 0.0 8/6 43.0 2.0 41-45 0.9 0.1 0.8-1.1 1.184 0.023 1.161-1.207 100 2 Creek H 8/5IWhiskers0.0 43.0 5.0 38-48 0.9 0.3 0.6-1.2 1.089 0.004 1.085-1.093 100 2 Ln CreekI,Q 0.0 9/24 50.7 4.3 46-57 1.7 0.4 1.1-2.2 1.243 0.837 1.130-1.356 100 6 11 Percent composition of each age class within sampling period. 'It 'I ~ Appendix I Table 5.Analyses of age,length,weight and condition factors of juvenile chInook salmon samples from Susitna River sloughs and clearwater tributaries,Devils Canyon Project,1977.(continued) Length (lUlU)Weight (g)Condition Factor Age Standard Standard Standard Percent!/ Location Class Date Mean Deviation Range Mean Deviation Range Mean Deviation Range Composition n Slough 11 0.0 9/21 60.3 3.5 54-69 2.5 0.5 1.3-4.0 1.166 0.104 0.972-1.366 100 40 Slough 13 0.0 9/22 56.0 3.5 53-62 2.1 0.5 1.9-3.0 1.221 0.052 1.142-1.276 100 4 Slough 14 0.0 9/22 60.7 4.1 54-68 2.8 0.5 2.0-3.8 1.233 0.0110 1.165-1.296 90 9 1.0 9/22 74.0 --5.1 --1.259 --10 1 Slough 15 0.0 7/26 48.5 2.1 45-52 1.2 0.1 1.0-1.6 1.048 0.080 0.924-1.175 100 10 H 0.0 9/21 60.8 6.3 48-74 2.9 0.9 1.8-4.8 1.260 0.137 0.926-1.628 100 19I 0'1 N Slough 16 0.0 7/26 51,7 3.l 46-58 1.5 0.3 1.0-2.3 1.092 0.080 0.962-1.242 100 20 0.0 9/21 54.8 4.4 47-63 2.1 0.5 1.4-2.8 1,268 0.102 1.075-1.461 93 13 1.0 9/21 73.0 --4.6 --1.182 --7 1 - Slough 17 0.0 7/11 47.9 1.0 46-50 1.3 0.1 1.2-1.4 1.208 0.069 1.085-1.266 100 10 0.0 7/26 46.1 2.6 40-50 ·0.9 0.1 0.7-1.1 0.916 0.239 0.719-1.563 100 9 ) Appendix I Table 5.Analyses of age.length.weight and condition factors of juvenile ch:l.nook salmon smnp1es from SU61tna River sloughs and clearwater tributaries.Devils Canyon Project.1977.(continued) Length (mm)Weight (g)Condition Factor Age Standard Standard Standard Percent!/ Location Class Date Mean Deviation Range Mean Deviation Range Mean Deviation Range Composition n Slough 18 0.0 7/26 50.0 3.5 46-52 1.3 0.3 1.0-2.2 1.079 0.065 0.963-1.175 100 10 0.0 9/21 61.7 4.5 58-69 3.1 1.0 2.3-4.6 1.286 0.126 1.179-1.463 100 3 - Slough 19 0.0 8/2 60.5 3.5 57-64 2.1 0.2 1.9-2.4 0.970 0.055 0.915-1.026 100 2 0.0 9/21 60.3 3.7 52-65 2.7 0.4 1.7-3.2 1.206 0.084 1.111-1.412 100 8 - Slough 20 0.0 7/25 54.2 4.4 46-64 1.7 0.5 0.8-2.8 1.048 0.128 0.822-1.207 100 20 H 0.0 9/20 60.7 3.9 51-68 2.7 0.5 1.5-3.2 1.211 0.063 1.080-1.343 100 19 I.0' W 7/13 45.0 .43-47Slough210.0 1.6 1.2 0.2 1.0-1.5 1.340 0.078 1.258-1."45 100 3 0.0 9/20 58.9 2.5 57-63 2.3 0.3 1.9-3.0 1.139 0.075 1.019-1.296 100 14 Chase 0.0 8/6 48.7 4.1 42-54 1.3 0.3 0.8-2.2 1.171,0.069 1.080-1.266 100 6 Creek Fourth of 0.0 8/3 49.7 4.3 40-57 1.3 0.3 0.7-1.8 1.009 0.076 0.873-1.138 100 13 July Creek 0.0 9/22 63.0 3.0 59-68 3.2 0.3 2.9-3.6 1.297 0.061 1.240-1.412 100 6 H I '".f::'- Appendix I Table 5.Analyses of age,length,weight and condition factors of juvenile chinook salmon samples from Susltna River sloughs and· clearwater tributaries,Devlls Canyon Project,1977.(continued) Length ~mm)Weight (g)GondHion Factor Age Standard Standard Standard Percent.!} Location Class Date Mean Deviation Range Mean Deviation Range Mean DeviatioJL Range _fo~sltion n McKenzie 0.0 7/27 47.6 4.8 39-59 1.1 0.4 0.7-2.1 1.012 0.085 0.822-1.142 100 24 Creek Whiskers 0.0 8/5 45.0 4.0 41-49 1.1 0.3 0.8-1.4 1.175 0.014 1.161-1.190 100 2 Creek 0.0 9/24 53.0 3.7 49-59 1.9 0.3 1.5-2 •.5 1.246 0.033 1.209-1.282 100 4 11 Percent composition of each age class within sampling period. -J Appendix I Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall,Devils Canyon Project,1977. )) Appendix I Table 6.Stomach content analysis of juvenile chinook.coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall.Devils Canyon Project,1977, (continued). Appendix I Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall,Devils Canyon Project,1977, (continued). Estimated Percent of Combined Gut Contents Location Date Number Immature Adult Predominate Organisms Specimens Crustacea Insecta Insecta Other Susitna 7/13 3 0 10 90 0 Adult Diptera #21 Whiskers 8/5 2 10 <5 >85 0 Adult Di ptera Creek Chase 8/6 11 1 4 95 0 Adult Homoptera and Hymenoptera Creek H I ~McKenzie 7/27 21 0 40 60 0 Adult Diptera;Diptera Chironomid Creek larvae and pupae Fourth of 8/3 13 0 40 60 0 Adult Diptera;adult Chironomid July Creek larvae and pupae. Chinook-Fall Susitna 9/24 6 0 20 80 0 Adult Hemiptera and unidentified #3 adult Insecta;Diptera Chironomid larvae Susitna 9/24 1 0 10 >85 <5 Unidentified adult insect fragments #4 Slough 9/23 2 0 5 35 60 Oligochaeta (1);Unidentified adult #A insect fragments Susitna 9/23 10 0 >45 50 <5 Adult Diptera and Hymenoptera;Diptera #8 Chironomid pupae and larvae;Trichoptera pupae;Diptera Tepulidae larvae 'il Appendix I Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall,Devils Canyon Project,1977, (continued). Estimated Percent of Combined Gut Contents Location Date Number Immature Adult Predominate Organisms Specimens Crustacea Insecta Insecta Other Susitna 9/23 3 0 10 90 0 Adult Diptera,Hymenoptera and Lepidoptera lIaB Susitna 9/23 6 0 30 40 30 Adult Homoptera and unidentified adult IISC insect fragment;Oligochaeta (?);Diptera Chironomid larvae and pupae Susitna 9/23 1 0 30 70 0 Adult insect fragments;Diptera Chironomid H lIaD larvaeI 0'1 0:> Susitna 9/22 10 0 <5 >95 0 Adult Diptera,Hymenoptera,Homoptera and 119 Lepidoptera Susitna 9/21 20 0 70 20 10 Trichoptera and Diptera Chironomid pupae; 1111 adult Hemiptera and unidentified adult fragments Susitna 9/22 4 0 30 70 0 Adult Diptera and unidentified adult 1113 fragments;Diptera Chironomid larvae and pupae Susitna 9/22 10 0 9 90 1 Adult Diptera,Hymenoptera,Plecoptera 1114 Susitna 9/21 19 0 10 30 60 Oligochaeta (?);Adult Diptera and 1115 Hemiptera Susitna 9/21 14 0 10 85 5 Adult Diptera and Hemiptera 1116 Susitna 9/21 8 1 14 85 0 Diptera Chironomid pupae 1119 ) Appendix I Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall,Devils Canyon Project,1977, (continued). Estimated Percent of Combined Gut Contents Location Date Number Immature Adult Predominate Organisms Specimens Crustacea Insecta Insecta Other Sus:f.tna 9/20 19 a 30 65 5 Adult Hemiptera Diptera and H~nenoptera /120 fragments;Diptera Ch:f.ronomid larvae Sus:f.tna 9/20 14 0 <5 >95 0 Adult Diptera 1121 Whiskers 9/24 4 0 >95 <5 0 Trichoptera pupae Creek H I 0\Fourth of 9/22 7 0 15 75 10 Adult Diptera,Hemoptera,and Hymenoptera~ July Creek Coho-Summer Susitna 8/5 5 10 10 80 0 Adult Lepidoptera and unidentified 111 adult insect fragments Susitna 7/27 1 70 0 30 0 Calanoid Copepoda;Adult insect 116 fragments Susitna 7/27 2 0 80 20 0 Diptera Chironomid larvae,unidentified 116A adult insect fragments Susitna 7/27 2 0 20 80 0 Unidentified adult insect fragments; 1110 D:f.ptera Chironomid pupae Whiskers 8/5 2 10 10 80 0 Adult Coleoptera fragments Creek Chase 8/6 2 <5 0 >45 50 Sand grains;adult Hymenoptera and Creek Diptera ') ifJ f Appendix I Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Suettna River during summer and fall,Devils Canyon Project,1977, (continued). Estimated Percent of Combined Gut Contents Location Date Number Immature Adult Predominate Organisms Specimens Crustacea Insecta Insecta Other McKenzie 7/27 3 0 10 90 0 Adult Diptera Creek •Coho-Fall Susitna 9/24 14 <1 1 >98 0 Adult Hemiptera,Homoptera,Coleoptera, 111 Lepidoptera and fragments H I ~Susitna 9/24 13 0 <5 >35 60 3 salmonid juveniles;adult Coleoptera, 114 Hemiptera,Homoptera,Hymenoptera,Dipteraf Susitna 9/23 4 0 1 89 10 .Adult Diptera,Coleoptera,Hemiptera, 115 and Homoptera Slough 9/23 1 0 70 30 0 Diptera Chironomid larvae;Ephemeroptera IIA Plecoptera nymphs;adult Diptera Susitna 9/23 1 0 40 60 0 Unidentified adult Insecta;Diptera 118C Chironomid larvae Susitna 9/22 1 <1 10 >84 5 Adul,t Diptera and Homoptera 1113 Susitna 9/21 2 0 20 0 80 Algae;Diptera Chironomid larvae 1/16 Susitna 9/21 2 0 20 80 0 Adult Coleoptera and Diptera;Diptera 1119 Chironomid pupae Susitna 9/20 1 0 10 90 0 Adult Diptera 1121 ) Appendix l'Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and clearwater tributaries of the Susitna River during summer and fall,Devils Canyon Project,1977, (continued). Estimated Percent of Combined Gut Contents Location Date Number Immature Adult Predominate Organisms Specimens Crustacea Insecta Insecta Other Whiskers 9/24 6 0 20 80 0 Adult Homoptera,Coleoptera,Hemiptera, Creek Hymenoptera;Trechoptera pupae -' Sockeye-Sunnl\er Susitna 8/5 2 50 20 20 10 Calanoid and Cyclopoid Copepoda;Diptera /11 adults and Chironomid larvae H I -...J Susitna 7/27 1 90 10 0 0 Cladocera BosminidaeI--' 115 Susitna 7/27 3 50 50 0 0 Ostracoda;Diptera Chironomid larvae 1/6 Susitna 7/27 4 0 10 90 0 Adult Diptera,Homoptera,Hymenoptera 118 Susitna 7/29 10 0 90 10 0 Diptera Chironomid larvae /112 Susitna 7/26 1 20 80 0 0 Diptera Chironomid larvae 1/17 Susitna 7/14 3 20 40 40 0 Adult Diptera;Diptera Chironomid larvae; 1/19 Cladocera Bosmididae Susitna 7/26 11 50 50 0 0 Cladocera Bosminidae;Diptera Chironomid 1119 larvae ) Appendix I Table 6.Stomach content analysis of juvenile chinook,coho,and sockeye salmon collected in sloughs and ~learwater tributaries of the Susitna River during summer and fall,Devils Canyon Project,1977, (continued). Estimated Percent of Combined Gut Contents Location Date Number Immature Adult Predominate Organisms Specimens Crustacea Insecta Insecta Other Sockeye-Fall Su~itna 9/24 1 5 10 85 0 Unidentified adult insect fragments; 113 Diptera Chironomid larvae Susitna 9/23 2 1 9 90 0 Adult Diptera fl8 Susitna 9/23 12 <1 3 >95 <1 Adult Hymenoptera,Diptera,and fl8B Lepidoptera H I......Susitna 9/21 2 5 95 0 0 Diptera Chironomid pupae and larvaeN fIll Susitna 9/21 1 10 50 40 0 Diptera Chironomid larvae;unidentified 1119 adult insect fragments APPENDIX II Tables in the following appendix include data on water quality and quantity within the mainstem Susitna River and its clearwater sloughs and tributaries collected by ADF&G and USGS water quality data collected at established gaging stations. 1-73 Appendix II Table 1.Susitna River d~scharge at Gold Creek (USGS provisional data)1977. May June July August September Gauge Gauge Gauge Gauge Gauge Day Height__D:i,scE_arge _HeighL__Rischarge Height Discharge Height Discharge Height Discharge 1 11.49 30,900 35,000 10.60 24,200 8.00 10,600 2 12.19 36,700 32,000 10.89 26,200 8.03 10,700 3 12.44 39,000 32,000 10.49 23,400 8.02 10,700 4 12.52 39,700 30,000 10.17 21,500 7.97 10,500 5 12.34 38,100 30,000 10.20 21,700 7.81 9,840 6 11.77 33,200 28,000 10.f19 23,400 7.72 9,520 7 11.54 31,300 27,000 10.48 23,400 7.82 9,880 8 11.56 31,500 27 ,000 10.12 21,200 8.20 11,400 9 11.61 31,900 27,000 9.80 19,300 8.48 12,500 10 11.93 34,400 28,000 9.90 19,900 8.05 10,800 11 12.39 -38,500 28,000 9.98 20,400 8.81 14,000 H 12 13.02 44,200 30,000 10.12 21,200 9.34 16,700 I '-I 13 13.67 51,400 30,000 9.74 18,900 9.38 16,900 .j::'- 14 13.78 52,600 32,000 9.58 18,000 9.37 16,800 15 13.78 5i,600 32,000 9.94 20,100 9.01 15,000 16 13.58 50,400 30,000 10.01 20,600 9.13 15,600 17 8.72 13,600 13.07 44,800 28,000 9.78 19,200 8.90 14,500 18 9.06 15,300 12.82 42,400 26,000 9.69 18,600 8.87 14,400 19 10.37 22,700 12.67 41,000 24,000 9.66 18,500 8.59 13,000 20 10.92 26,400 12.22 37,000 10.31 22,400 9.67 18,500 8.41 12,200 21 10.19 21,600 11.93 34,400 10.28 22,200 9.76 19,100 8.84 14,200 22 9.56 17,900 11.75 33,000 10.22 21,800 9.93 20,100 8.93 14,600 23 9.33 16,600 33,000 10.41 23,000 10.18 21,600 8.95 14,800 24 9.38 16,900 34,000 10.39 22,800 10.16 21,500 8.60 13,000 25 9.36 16,800 36,000 10.14 21,300 .9.72 18,800 8.21 11,400 26 9.61 18,200 38,000 10.00 20,500 9.19 16,000 7.95 10,400 27 10.22 21,800 40,000 9.84 19,500 8.88 14,400 7.81 9,840 28 10.54 23,800 42,000 9.87 19,700 8.68 13,400 8.10 11,000 29 11.18 28,400 40,000 9.90 19,900 8.41 12,200 8.31 11,800 30 11.76 33,100 38,000 9.85 19,600 8.09 .11,000 8.48 12,500 31 11.34 29,700 10.11 21,200 7.85 10,000 ·Append.:i.x II Table 2.Water qual~ty data and juvenile salmon surveys in sloughs and clearwater tributaries of the Susitua River between the Chu~itua River and Portage Creek.Devils Canyon Project.1977. Specific Gage Number of Data Time Weather Water Temperature ·C D.O.pH Conductance Height Fry ConcU,tioDS Conditions Air Water (PPM)(uMHOS/CM)(M)Observed Slaugh.n (26N O.sw llDAD) 7/18 1250 Swmy SUty 22.0 15 .•0 8.1 5.9 .90 7/'30 1425 S=y SUty 22.0 11.0 8.4 100 .38 8/5 1340 5=y Silty 23 •.5 13.0 9.7 6.5 100 .76 8/12 15'35 Cloudy SUty 16.0 U.S 8.4 &.6 290 .7&190 8/22 1620 Cloudy SUty 17 .5 14.0 8.9 100 .70 150 9/24 1.530 S=y Clear 16.0 6.0 9.4 &.0 125 .31 14 Slc:IUgh #2 (26N OSW 02CDD) 7/18 1330 S=y 22.0 11.5 8.7 6.2 .26 500 7/30 14.50 S=y 21.0 10.0 8.6 150 .16 4 8/5 1440 Su=y 20.0 9.0 8.4 6.5 190 .17 100 B/12 1615 S=y 18.5 10.0 6.7 7.1 130 .18 60 B/22 1520 Cloudy 18.0 10.0 8.0 130 .16 125 9/10 1130 Rain 10.0 8.0 10.1 6.0 102 Slough #3 (27N OSW 35Cca) 7/17 1800 5=y SUty 26.5 19.5 8.3 5.9 7/30 1600 Su:my Clear 19.0 13.5 7.1 125 2 8/5 1745 S=y Clear 19.5 11.0 7.0 5.6 100 100 8/12 1800 Su:my Clear 20.5 10.0 5.4 6.2 110 465 8/22 1800 S=y Clear 17.0 13.0 5.6 100 300 9/10 1100 Rain SUty 10.2 6.8 6.6 5.5 72. 9/24 1245 S=y Clear 10.0 5.3 8.2 5.5 B5 350 Slough #4 (27N OSW 25CCC) 7/17 1725 S=y Clear 22.0 17 .0 7.5 6.5 .88 1,000+ 8/14 1800 Rain Clear 17.5 15.0 9.1 6.0 100 .82 500 9/10 0900 Rain SUty 9.0 10.1 11.1 6.0 78 .61 9/24 1120 Sunny Clear 7.0 6.2 10.9 5.0 85 .82 52 Slough.#5 (27N OSW 01CCA) 7/16 1050 Silty 23.0 17.0 4.3 7.3 .58 7/27 1800 S=y Rusty 22.0 18.5 5.4 6.3 120 5 8/6 1200 Rain 16.0 15.0 7.2 6.0 105 .26 10 8/13 0845 Rain 14.0 1.3 .5 2.7 6.0 180 .13 8/21 1330 Rain 21.0 14.0 1.2 240 .il 8/29 1730 Partly 17.0 15.0 7.6 6.5 100 7 Sunny 9/9 1915 Overcast Algae 11.0 12.5 10.8 6.0 88 90 9/23 1720 Over~st il.O 9.9 11.0 5.0 68 4 Slough #6 (27N OSW OUAD) 7/16 1ll.5 23.5 14.0 9.2 7.0 .85 7/27 1715 S=y Rusty 24.0 22.0 6.2 6.7 100 .36 100 8/6 1230 Rain Rusty 19.5 14.0 5.6 5.0 100 .57 5 8/13 0800 Rain Rusty 13.5 12.0 4.8 6.0 110 .42 12 8/21 1315 Rain Rusty 21.0 16.0 7.2 100 .39 42 8/29 1700 Partly Rusty &18.5 17.2 9.8 &.0 130 .33 5=y Algae 9/9 1850 Overcast Rusty &11.0 12.5 10.8 6.0 88 Algae 9/23 1650 Overcast 11.0 8.3 10.4 6.0 38 .36 1-75 1'""'"', Appendix II Table 2.Water quality da~and juvenile salmon surveys in sloughs and clearwater tributaries of the Susitna River berween the Chulitna River and Portage Creek,Devils Canyon Project,1977 (contL~ued). Specific Gage Number of Date Tillie Weather Water Temperature ·C D.O.pH Conductance neight Fry Conditions Conditions Air Water (PPM).(uMHOS /CM)(M)Observed Slough ~7 (28N OSW 12DCA) 7/13 1530 Sunny Clear 20.0 14.0 8.4 8.1 8/4 1500 Sunny Clear 16.0 12.0 11.2 100 8/11 2025 S=y Clear 16.0 17.0 9.4 6.0 130 12 8/19 1930 Sunny Clear 17.5 16.0 8.1 100 10 8/29 1530 Part:1y Clear 18.0 17.0 11.0 6.0 90 30 S=y 9/9 1815 Overcast Clear 11.0 14.5 10.0 5.0 100 80 9/23 1550 Overcast Clear 11.0 9.0 12.2 5.0 100 Slough #8 (28N 04W 07BCB and OnCC) 7/13 1500 Sunny Clear 18.0 12.0 9.2 7.8 .36 3,500 7/27 1510 Sunny Clear 23.0 13.5 9.1 7.3 70 .26 8/4 1435 Rain 16.0 9.5 9.2 65 8/11 1915 Sunny Clear 16.0 9.0 10.4 6.2 90 .26 670 8/19 1850 Sunny Clear 18.0 11.0 9.2 102 .25 400 8/29 1500 S=y Clear 18.5 11.5 10.3 6.0 70 .24 9/9 1800 Ovarcast 12.5 8.8 10.7 100 .21 1,200 9/23 1500 Overcast 12.0 7.8 9.8 5.0 100 .20 35 Slough U8A (30N 03101 20C,29BBB and 30A) 7/12 1730 Sunny Clear 23.0 17.0 10.1 7.6 8/3 1730 Fair SUty 19.0 16.0 8.4 6.8 140 1,500 8/11 1400 Sunny Clear 17.5 17.0 7.1 6.5 175 8/19 ·1400 Sunny Clear 17.0 14.0 8.0 45 2,000 8/29 0825 Pardy Clear 5.0 10.0 10.3 5.8 118 90 C1ou4y 9/9 1350 Pardy Clear 12.5 12.5 10.1 6.0 145 135 C1audy 9/22 1700 Overcast 9.0 7.1 10.3 5.6 75 Slough ~8B (29N 04101 02CBA) 7/13 1105 Sunny SUty 17.0 11.0 8.1 7.9 1,000 8/4 1000 Sunny SUty 14.0 8.5 9.2 6.5 100 8/11 1515 Sunny Clear 19.5 13.0 8.4 6.7 170 560 8/19 1510 Sunny Clear 17.0 12.0 7.7 200 650 8/29 0930 Pardy Clear 10.0 7.2 11.2 5.8 110 350 Cloudy 9/9 1510 Partly Clear 14.0 9.9 8.8 6.0 135 C1ou4y 9/23 1100 Sunny Clear 6.5 5.0 10.8 5.6 68 25 Slough U8C (29N 04101 02eCC) 7/13 1140 Sunny Clear 21.5 9.5 7.2 7.8 500 8/4 1100 Sunny Clear 16.0 7.5 7.5 6.0 80 30 8/11 1625 Sunny Clear 16.5 11.0 7.2 6.9 70 34 8/19 1540 Sunny Clear 16.0 11.0 6.8 130 850 8/29 1020 Partiy Clear 11.0 6.9 9.0 5.5 60 Clou4Y 9/9 1540 Par!:ly Clear 14.0 8.8 7.5 5.5 60 Cloudy 9/23 1130 S=y Clear 10.0 7.0 10.8 5.6 45 7 Slough H8D (29N 0401 113M) 7/13 1200 Sunny Clear 23.0 11.0 11.0 7.2 8/4 1130 Sunny Clear 17.0 8.0 9.2 5.0 50 4 8/11 1640 Sunny Clear 18.0 14.0 8.0 6.9 90 8/19 1600 Sunny Clear 15.0 13.0 8.6 130 40 8/29 1045 Partly Clear 13.2 8.0 10.8 5.8 58 50 C1ou4y 9/9 1600 Pardy Clear 13.0 9.9 9.8 5.5 72 750 C1ou4y 9/23 1210 Sunny Clear 12.2 6.5 10.3 5.6 55 1 T_7~ ApPen4iJ1:II Table 2.Wa1:er quali1:y da1:a and juvenile salmon surveys in sloughs and c.learva1:er tribu1:aries of the Susitna River between the Chulitna River and Portage Creek,Devils Canyon Projec.1:,1977 (c.on1:inued). Spedfic.Gage Number of Date TilDa Weather Water Temperature ·C D.O.pH Ccnduc.tanc.e Height Fry Conditions Ccnditio:i!S Air Water (PPM)(uMHOS/CM)(M)Observed Slough A (3ON 0'""25D511) 7/13 1020 Swmy Clear 17 .5 9.0 9.9 7.7 8/3 1830 Sumly Clear 24.0 12.0 7.0 6.3 UO 20 8/ll 1415 Sunny Clear 15.5 14.0 7.1 6.9 110 27 8/19 1415 Swmy Clear 20.0 13.0 7.1 200 85 8/29 0900 Par1:ly Clear U.O 9.8 U.3 5.0 UO C1QucIy 9/9 1400 Partly Clear 12.2 9.9 12.4 85 Cloudy 9/23 1010 Sumly Clear 5.2 6.0 9.8 5.6 58 3 Slough #9 (3ON 03W 16BD) 7/12 1600 Clear Silty 20,0 15.5 9.6 8.0 .39 7/27 0850 Cloudy Clear 15.0 8.0 8.9 6.7 190 .38 40 8/3 1630 Clear Silty 17.0 13.0 8.8 7.0 US .39 8/U 1200 Clear Clear 17.0 U.O 7.7 6.8 175 .38 140 8/19 USO Clear Clear 17.0 10.0 8.0 210 .38 700 8/29 1015 Rain Clear 15.0 12.0 7.0 5.4 .38 600 9/9 1230 Overcast Clear li.O 8.0 9.9 6.0 135 .36 2S0 9/22 1500 Clear Clear 10.5 7.8 10.8 5.6 100 .43 78 Slough 1110 (3lN 03W 36MB) 7/8 IllS Clear Clear 22.0 7.0 11.0 6.8 .68 7/12 1445 Clear Clear 22.0 U.S 9.1 7.8 .81 7/27 0850 Partly Clear 19.0 7.0 9.7 6.5 150 .71 1,000 Cloudy 8/3 1135 Clear Clear 16.0 7.5 9.4 6.5 100 .88 1,000 8/19 0900 Claar Clear 12.0 6.0 8.5 6.0 140 .65 1.200 8/26 1415 Rain Clear 13.0 4.0 7.0 6.4 .52 2,500 9/9 1015 Overcall!:Clear 9.0 5.1 9.6 6.0 145 .30 250 Slough #11 (3111 02W 30AAB,2011.20C) 7/1 1500 Claar Clear 23.0 10.0 1.38 7/12 1350 Clear Clear 23.0 U.O 10.6 7.8 1.24 3,000 7/27 1745 Partly Clear 27.0 12.0 11.0 7.9 <1.00 8,000 ClOUdy 8/2 2010 Clear Silty 14.0 9.0 9.2 7.5 <1.00 8/3 1710 Mouly Silty 28.0 12.0 11.0 7.3 180 <1.00 8,000 Sunny 8/10 1600 Parely Silty 16.5 11.0 10.0 7.0 155 <1.00 8,000 Cloudy 8/17 1530 Claar Silty 16.0 9.0 11.0 150 1.08 8,000 8/28 1820 Clear Clear 13.0 8.5 9.8 5.0 170 :92 10,000 9/8 1900 Clear Clear 10.5 5.2 10.8 5.5 190 .89 2,000 9/22 1215 Clear Clear 8.5 6.2 U.S 5.6 105 1.00 87 Slough H12 (31.~07W 19DCD) 7/1 1400 Most.ly Silty 22.0 11.0 Cloudy 7/12 1330 Clear Silty 23.0 9.1 8.2 .95 7/27 1545 Partly Silty 20.0 9.0 8.0 7.6 150 .85 30 Cloudy 8/2 1945 Clear Silty 14.0 9.5 9.2 6.8 200 <1.00 8/3 1540 Mostly Clear 20.0 11.0 9.0 7.5 200 .94 175 Sunny 8/10 1540 Clear Silty 17.5 13.0 8.9 7.4 170 .85 10 8/17 1600 Rain Silty 15.0 10.0 10.0 175 .80 8/23 10 8/28 1750 Clear 15.0 10.0 10.0 6.0 "158 10 9/8 1830 Rain Silty 10.0 9.1 11.1 6.0 160 .51 9 9/22 1200 Clear Clear 7.0 6.0 11.0 6.5 175 .64 a 1-77 Appendu II Table 2.Water quaJ.1ty data and juvenile salmon surveys in slouglu;and clearwacer cr:i.butaries or the Susitna River between che Chulitna River and Portage Creek,De~s Canyon Project,1977 (continued). Specific Gage Number of Date Tjm.e Weather Water Temperature 'C D.O.pH Conduccance Height Fry Conditions Condicions Air Water (PPM)(uMHOS/O:l)(M)Observed Slough #13 (3lN 02W 19DAB) 7/1 1340 Mostly Clear 24.0 7.0 Cloudy I 7/lZ 1310 Clear Clear 26.0 11.1 7.7 .26 7/28 1210 Clear Clear 25.0 7.0 10.0 7.4 ISO .25 15 8/2 1900 Clear Clear lS.O 7.5 9.6 6.5 185 .27 400 8/3 1800 Partly Clear 25.0 7.0 9.0 7.5 180 .26 75 Cloudy 8/10 1500 Clear Clear 20.0 9.0 8.8 6.9 205 .25 310 8/17 1630 Clear Clear 15.0 7.0 11.0 170 .25 400 8/28 InS Clear Clear 15.0 7.0 9.5 6.0 160 .25 400 9/8 1aOO Clear Clear 10.0 7.0 11.7 6.0 130 .29 120 9/22 1130 Clear Clear 8.5 5.0 11.4 6.0 105 .25 5 Slough 414 (3lN O~19AAA) 7/1 1300 Mostly Clear 26.0 15.0 .5a ClouAy 7/12 1240 Clear Clear 26.0 7.1 7.4 .43 7/2a 1305 Clear Clear 26.0 15.0 9.0.6.9 as .35 7/29 0950 Clear Clear 500 8/2 laOO Clear Clear 1S.0 U.S 7.1 6.3 as 2,000 8/3 1900 Partly Clear lS.0 11.0 6.8 6.0 ao .42 ClouAY a/10 1435 Clear Clear 18.0 15.0 7.a 6.0 95 .35 100 8/19 0830 Clear aear 12.0 10.5 7.3 6.0 78 .28 120 8/26 1530 Rain 10.0 14.0 6.5 .23 500 a/2a 1645 Clear Clear 13.0 12.0 8.0 6.5 85 .65 100 9/8 1720 Overcast Cloudy 12.0 8.9 10.8 8.5 60 1.15 20 9/22 1030 Clear Clear 7.5 6.5 10.3 5.6 34 .50 10 Slough illS (3lN 02W 17CAC) 7/1 1235 Mostly Clear 25.0 15.0 .88 Cloudy 7/12 1215 Clear Silty 22.5 14.0 8.3 8.4 .66 7/26 1745 Cloudy Silty 18.5 13.5 7.3 6.7 70 .53 1,500 8/2 1400 Mosdy SUty 17.0 12.5 7.8 6.4 105 .93 2,000 Cloudy 8/10 1145 Cloudy Silty 22.5 12.5 7.2 6.4 105 .55 8/16 2000 Clear Silty 16.5 14.0 6.8 6.0 78 .53 1,000 8/28 1515 Clear Clear 16.0 8.8 8.8 6.0 58 .80 155 9/a 1410 Overcast Clear 7.0 10.6 11.2 5.5 30 20 9/21 1630 Rain Clear 7.5 6.5 10.8 5.6 la .29 19 1015 Clear Clear ..09 50 (Ice Cover) Slough #16 (3lN O~17AAC) 7/1 1210 Partly Clear 21.5 9.0 .68 Cloudy 7/11 1600 Clear Clear 9.0 7.2 .26 7/26 1710 Mostly Clear 17.5 12.5 9.5 6.7 50 .17 9,000 Cloudy 8/2 1248 ClouAy Silty 16.5 11.5 10.4 7.6 95 .72 8/3 1200 Parcly Silty 21.0 11.5 .48 99 Cloudy 8/10 llOO Cloudy Clear 21.0 ll.O 10.8 6.6 80 .18 600 a/16 1925 Clear Clear 16.0 11.5 8.7 6.0 75 .17 8/23 1500 Clear Clear 17 .0 10.0 9.5 6.0 75 9/8 1340 Overcast Clear 10.5 7.2-11.6 6.0 50 .08 300 9/2~1500 Rain Clear 8.0 5.5 10.2-5.6 10 18 10/5 Clear Clear .13 150 (Ice Cover) 1-78 Appendix II Table 2.Water qual.1ty data and juvenile salmon surveys in sloughs and clearwater tributaries of the Susitna River between the Chulitna River and Portage Creek.Dev~s Canyon Project.1977 (continued). Specific Gage Number of Date Tillie Weather Wa.ter Temperature ·c D.O.pH Conductance !ieiglll:"Fry Conditions Conditions Air Water (PPM)(uMHOS/CM)(M)Observed Slaugh-U17 (3lN O~09DBD) 6/14 0030 Clear Silty 1.03 6/30 2345 Clear S~ty 9.0 6.0 9.0 6.9 140 .84 7/7 1740 MoeUy Silty 19.0 10.0 .71 Sunny 7/11 1710 Claar SUty 10.8 7.5 .94 50 7/26 1315 CJ.ear Clea.r 20.0 8.5 9.8 6.8 90 .84 900 8/2 1145 CJ.ear SUty 17 .0 8.0 10.2 6.2 85 1.12 1 8/10 1000 Cloudy Clear 20.0 7.0 8.4 6.0 95 .83 230 8/16 1830 Clear Clear 16.0 9.5 9.9 6.3 100 .82 3 8/28 1100 Clear Clear 17.0 6.5 8.5 5.5 58 .75 15 9/8 1200 R.a;I.n Clear 8.0 4.5 10.'8 6.5 50 .17 10 9/21 1400 bill Clear 7.5 4.5 10.8 5.9 70 .37 1015 Clur Clear .12 6 (lee Cover) Slough 1il.8 (3ll'l o~10CBC) 7/7 1725 Mostly Clear 19.0 15.0 9.7 7.2 .51 Sunny 7/11 1720 Clear Clear 20.0 13.5 9.1 7.5 .65 7/26 1245 Claar Clear 25.0 12.0 7.8 7.3 140 .63 1.000 8/2 1125 Clear Clear 15.0 8.5 8.2 6.7 145 .98 125 8/10 0945 Cloudy Clear 20.5 9.0 7.0 6.4 115 .63 60 8/16 1835 Clear Clear 15.0 12.0 8.4 125 .60 100 8/28 1015 Clear Clear 13.0 7.0 5.4 5.5 80 9/8 1230 1la1n Clear 9.5 8.2 9.7 5.5 88 .48 12 9/21 1330 Rain Clear 7.5 6.0 10.4 6.0 100 .52 3 1015 Clear Clear .47 50 (lee Cover) SlOtlgh 1119 (3lN 02w 10DBD) 6/30 2235 Meetly Clear 10.0 7.2 125 .74 Sumly 7/7 1700 Clear 20.0 12.0 .43 7/11 1745 Claar Clear 15.0 18.5 11.4 6.7 .54 7/26 1210 Mostly Clear 20.0 8.5 9.5 7.7 150 .54 2.000 Cloudy 8/2 1000 Partly Clear 11.5 7.5 10.8 6.6 130 .78 2.000 Swmy 8/10 0845 Cloudy Clear 17.0 9.0 8.6 6.4 140 .53 200 8/16 1750 Cloudy Clear 18.5 10.0 8.3 6.8 130 .53 800 8/27 2010 Cloudy Clear 12.0 8.5 9.0 6.9 100 .19 100 9/7 1935 Rain Clear 9.0 7.0 8.9 6.5 100 .17 9/21 UOO 1la1n Clear 6.5 5.0 10.8 5.5 100 .17 11 1015 Claar Clear .11 500 (Ice Cover) Slaugh #20 (3lN OZW llBBD) 6/30 2130 Mostly SUty 14.0 9.0 10.0 7.8 70 .33 S=y 7/7 1630 Silty 24.0 12.0 .39 7/ll 1817 Clear Clear 19.0 12.0 10.4 7.5 .37 7/25 2045 MosUy SUty 13.0 10.0 10.0 7.9 75 .34 56 Cloudy 8/1 1855 Mostly SUty 15.5 11.5 10.4 7.0 125 .56 Sunny 7008/9 1945 Cloudy Clear 16.5 12.5 9.6 6.7 140 .31 8/16 1725 -Partly Silty 18.0 13.0 9.6 7.2 180 700 Cloudy 8/27 1945 Mostly SUty 12.5 11.5 10.3 6.0 90 1.000 Sunny 9/7 1910 R.a..in Clear 9.5 7.2 9.8 6.0 60 .38 9/20 1910 Rain Clear 6.0 5.1 12.2 60 .77 19 1015 Clear Clear .44 (lee Cover) 1-79 Appendix II Table 2.Water qu.aJ.ity data and juvenile saJ.mgn surveys in sloughs and clearwater tributaries of the Susitna River berween the Chulitna River and Portage Creek,Devils Canyon Project,1977 (continued). Specific Gage Number of Date T:!.me Weather Water TE!lIIperature ·C D.O.pH Conductance Height Fry Conditions Conditions Air Water (PPM)(uMHoS/CM)(M)Observed SloulZh H21 (32N 02W 36CCC) 6/30 1940 Mostly Silty 19.5 7.0 8.0 7.9 175 .52 SumLy 7/7 1530 Silty 14.0 24.0 .25 t/ll 2010 Clear Clear 21.5 8.0 10.2 7.9 .30 7/25 1945 Clear Clear 19.5 8.0 8.9 8.0 180 .28 .a/l 1710 Mostly SUty 17.0 10.0 9.6 6.8 200 .43 33 Cloudy 8/9 1800 Mostly SUty 9.0 9.9 7.6 245 .26 385 Cloudy 8/16 1635 Clear Silty 18.0 12.0 8.5 7.7 210 .29 600 8/27 1820 Partly Clear 17.0 7.5 10.2 6.7 170 180 1730 Cloudy 9/7 Rain Clear U.S 7.5 10.4 6.0 135 9/20 1800 Rain Clear 7.0 3.9 11.6 5.6 145 15 10/5 Clear Clear .01 350 (Ice Cover) Whisker's Creek (26N OSW 03AAC) Downstream Gage 7/17 1820 SUty 22.0 15.5 9.0 6.2 7/30 1530 Clear 21.5 17 .0 8.9 95 .44 8/5 1525 SUty 17.0 13.0 10.8 6.0 100 .53 8/12 1655 Silty 17.0 14.0 9.8 1.0 80 .52 8/22 1700 Silty 11.5 16.0 9.0 70 .48 200 9/10 1000 Rain Clear 9.5 9.1 10.8 5.5 3D .13 9/24 .25 UEstream Gage 7/17 1825 Clear 25.0 15.5 9.3 5.3 7/30 1,540 Clear 20.0 16.0 10.8 60 .76 1,000 S/5 1535 Clear 17.5 14.,5 9.5 5.6 90 .78 8/12 1700 Clear 19.5 14.0 9.5 6.3 60 .78 500 8/22 1715 Clear 17.0 15.5 9.9 35 .76 200 9/10 Rain Clear .78 9/24 1320 Clear 8.0 7.0 U.2 5.5 38 .69 10 McKenzie Creek (29N 04101 3ZABA) 7/13 1350 Su::ny Clear 21.0 11.0 11.2 8.0 30,000 7/27 1405 Su::ny Clear 20.5 10.5 10.8 7.7 105 12,500 8/4 1310 Sunny Clear 16.0 8.5 11.8 6.9 100 2,000 8/11 1800 S=y Clear 17.0 11.0 9.8 5.9 125 1,800 8/19 1800 S=y Clear 16.0 10.0 10.3 105 1,300 8/29 1200 Overcast Clear 12.0 8.5 13.8 5.2 130 3,500 9/9 1650 Overcast Clear 13.5 9.9 10.8 5.5 78 2,500 9/23 1340 OVercast Clear 12.5 7.3 10.8 5.6 70 20 Chase Creek (27N OSW 12liCC) 7/16 U30 SUllnY Clear ·23.0 16.0 12.8 7.0 8/6 1330 Su::ny Clear 21.0 17.0 9.6 6.0 60 10,000 8/13 0905 S=y Clear 15.0 13.0 8.6 6.0 78 5,000 8/21 1400 Sunny Clear 21.0 IB.O 8.1 50 5,000 B/29 1800 Overcast Clear 19.0 14.5 8.9 6.5 48 9/9 1935 Overcast Clesr 11.6 U.2 10.8 5.5 45 9/23 1800 OVercast Clear 10.5 11.2 7.5 5.0 52/- 1-80 " ~ Appendix II Table 2.Water quality data and juvenile salmon surveys in slougbs and clearwater tributaries of the Susitna River between the Chuli~a River and Portage Creek,Devils Canyon Project,1977 (continued). Specific Gage Number of Date T1me Weather Water Temperature ·C D.O.pH Conduc:tanee Height Fry Condi.tions •Conditions ALr II'ater (PPM)(uMHOS/CM)(M)Observed Lane Creek (28N OSW lZOAA) 7/13 -1450 Sunny Clear 18.0 11.0 9.6 7.7 7/27 1535 S=y Clear 24.5 12.0 10.9 8.0 60 8/4 1420 SUllDY Clear 17.0 11.0 10.4 5.4 60 8/11 2000 S=y Clear 17.0 11.0 10.0 6.2 90 8/19 1900 SWUlY Clear 18.0 12.0 9.0 90 8/29 1430 Overcast Clear 24.0 10.5 10.7 6.0 62 9/9 1730 Ovsrcsst Clear 13.0 9.0 11.4 99 9/23 1520 Overcast Clear 14.0 6.2 10.6 5.0 75 Fourth of July Creek (30N 0310 03DAC) 7/29 1140 Clear Clear 23.0 15.0 9.0 7.3 30 8/3 1300 Claar Clear 22.0 16.0 9.0 7.4 125 5,000 8/11 0945 Clear Clear 14.0 13.0 9.5 7.1 50 8/19 1030 Clear Clear 15.5 14.0 9.2 45 8/26 1230 Rain Clear 12.0 12.0 6.6 8.0 18 8/28 2010 Partly Clear 12.5 11.0 9.8 5.5 24 Cloudy 9/9 1120 Cloudy Turbid 10.0 9.1 11.6 5.5 46 9/22 1330 Clear Turbid 9.0 7.0 11.7 5.6 31 7 Gold Creek (31N 02'~20BAD) 6/14 2100 RaiJ:l Turbid 11.0 4.0 12.0 7.8 60 7/21.1200 Pardy Clear 23.0 10.0 10.0 7.8 160 Cloudy 8/17 1400 RaiJ:l Clear 16.5 ll.O 12.0 200 9/22 1030 Clear Clear 28 Indian River (3lN 0211'09CDA) 7/29 1140 Claar Clear 20.0 12.0 11.0 7.1 SO 8/18 1530 Partly Clear 17.0 12.0 ll.O 7.5 40 581 Cloudy 8/28 1430 Partly Clear 17.0 12.0 11.2 6.0 43 Cloudy 9/8 1300 Cloudy Clear 10.0 7.8 10.0 5.9 40 Portage Creek (32..'i OlW 26CDB) 7/7 1200 Clear Clear 27.0 10.0 14.0 7.5 7/28 1645 Clear Clear 23.0 13.0 10.0 7.8 80 8/25 1200 Clear 11.0 6 1-81 "'\ Appel )n Table 3.Thermograph set in Rabideux Creek,tipper sub-area;daily maximun and minimum water temperattire, Devils Canyon Project,1977. 0 0 0 0 0Temp.C Temp.C Temp.C Temp.C Temp.C Date Max.Min.Date Max.Min.Date Max.Min.Date Max.Min.Date Max.Min. 5/25 8.2 -8.2 6/27 14.7 14.3 7/30 16.0 15.6 9/1 11.0 10.9 10/5 4.0 3.0 26 10.0,8.2 28 14.3 14.2 31 15.6 15.3 2 10.9 10.9 6 3.9 3.5 27 10.0 9.8 29 15.5 14.2 8/1 15.2 14.8 3'10.8 10.7 7 4.0 3.5 28 11.7 10.0 30 15.2 14.1 2 14.8 14.7 4 10.7 10.0 8 4.0 3.9 29 10.8 9.2 7/1 15.6 14.1 3 16.0 14.8 5 10.0 10.0 9 4.1 4.0 30 10.1 9.2 2 14.8 13.7 4 15.8 15.4 6 10.0 10.0 10 4.5 4.1 31 11.7 10.1 3 14.4 13.0 5 15.4 14.6 7 10.0 10.0 11 5.5 4.5 6/1 12.6 11.3 4 13.1 13.0 6 15.3 14.6 8 10.0 10.0 12 5.7 5.5 2 14.1 12.6 5 13.2 13.0 7 15.2 15.0 '9 10.0 10.0 13 5.7 3.7 3 14.8 13.0 6 13.9 13.0 &15.1 14.9 10 10.0 10.0 14 4.0 3.9 4 13.3 10.8 7 15.3 13.2 9 16.0 15.1 11 10.0 10.0 15 4.0 3.9 5 10.8 10.4 8 16.3 13.2 10 15.9 15.0 12 10.0 10.0 16 4.0 3.9 6 10.7 10.4 9 17.2 14.2 11 15.0 14.0 13 9.9 9.9 17 4.0 3.8 H 7 11.0 10.8 10 17.9 14.5 12 14.0 13.7 14 9.9 9.9 18 3.8 3.2I CP 8 12.3 10.0 11 18.8 15.1 13 14.8 13.8 15 9.9 8.8 19 3.2 2.5N 9 12.8 12.3 12 18.8 15.0 14 14.7 14.7 16 8.8 8.3 20 2.5 2.2 10 13.6 12.8 13 16.0 15.0 15 14.7 14.7 17 8.3 8.3 21 2.2 1.8 11 13.6 '13.6 14 15.5 15.0 16 14.7 14.7 18 8.3 8.3 22 1.8 1.7 12 13.6 13.6 15 15.0 14.0 17 14.7 14.5 19 8.3 8.3 23 1.8 1.7 13 13.6 13.6 16 17.0 14.0 18 14.5 14.4 20 8.3 7.7 14 14.4 13.6 17 16.8 14.0 19 14.6 14.4 21 7.7 7.7 15 14.7 14.5 18 16.5 14.0 20 15.5 14.4 22 7.7 7.5 16 14.8 1l1.8 19 15.8 13.9 21 15.5 14.3 23 7.5 7.2 17 14.8 14.5 20 14.8 13.9 22 15.5 14.5 24 7.2 6.7 18 14.5 13.3 21 14.9 14.7 23 14.8 13.5 25 N/A N/A 19 13.3 13.2 22 15.2 13.7 24 14.0 13.9 26 N/A N/A 20 ,14.2 13.5 23 15.3 13.0 25 13.9 13.7 27 7.5 7.5 21 14.2 14.0 24 16.0 13.0 26 13.7 13.0 28 7.5 7.2 22 14.0 13.6 25 15.3 14.4 27 13.0 12.4 29 7.2 6.8 23 13.3 13.0 26 15.3 14.4 28 12.4 11.5 30 6.8 \'5.5 24 14.4 13.0 27 I 15.3 14.3 29 11.3 11.3 10/1 5.5 3.0 25 13.9 13.8 28 .16.4 14.3 30 11.3 11.0 2 3.0 2.4 26 14.9 13.8 29 16.0 15.6 31 11.0 11.0 3 2.5 2.4 4 3.0 2.5 Appendix II Table 4.Thermograph set in Montana Creek,upper sub-area;daily maximum and minimum w-ater tllmperature, Devils Canyon Project,1977. Temp.0c Temp.oC Temp.°c Temp.0c Temp.oc Date Max.Min.Date Max.Min.Date Max.Min.Date Max.Min..Date Max.Min.' 5/25 3.0 2.8 6/27 10.1 9.5 8/17 13.2 12.5 9/19 6.0 5.5 11/1 0.2 0.1 26 5.1 3.2 28 10.1 9.3 18 13.2 12.0 20 5.8 5.5 2 0.1 0.1 27 5.2 2.9 29 10.5 10.0 19 13.8 12.3 21 6.5 5.6 3 0.1 0.0 28 6.5 4.7 30 10.3 10.1 20 13.7 12.6 22 6.8 5.0 4 0.0 0.0 29 3.9 3.0 7/1 11.1 9.8 21 13.6 12.6 23 5.6 4.7 5 0.0 0.0 30 4.9 3.0 2 11.1 10.5 22 13.3 12.7 9/24-10/24 N/A N/A 6 0.0 0.0 31 5.8 4.0 3 10.5 10.0'23 13.7 13.0 10/5 3.4 3.0 6/1 5.3 4.0 4 10.5 10.1 24 13.2 12.7 6 3.5 3.3 2 5.8 4.0 5 10.0 10.0 25 12.7 11.3 7 4.0 3.6 3 6.9 4.0 7/24 N/A N/A 26 ·11.6 11.0 8 4.1 4.0 4 4.5 4.1 25 14.0 12.3 27 12.0 10.5 9 4.4 4.2 5 4.7 4.1 26 14.0 11.7 28 11.0 9.8 10 4.5 4.5 6 5.1 4.5 27 14.8 12.7 29 10.6 9.9 11 4.5 3.2 7 5.5 5.0 28 15.0 13.7 30 10.6 9.8 12 3.8 3.2 ~8 7.0 5.1 29 13.8 12.7 31 10.2 9.8 13 3.9 3.4J 9 6.5 6.1 30 13.8 11.0 9/1 10.2 9.2 14 3.4 3.0 10 7.8 6.1 31 12.8 11.3 2 10.2 9.8 15 3.0 2.3 11 7.8 7.2 8/1 13.7 11.0 3 11.9 9.6 16 2.3 1.1 12 7.0 6.7 2 14.0 12.8 4 10.1 9.4 17 1.1 0.8 13 7.6 6.4 3 12.8 12.1 5 10.0 9.8 18 0.8 0.7 14 8.3 7.2 4 12.2 11.1 6 9.8 8.4 19 0.8 0.8 15 8.0 7.7 5 12.2 11.8 7 8.4 8.4 20 0.9 0.2 16 7.7 7.5 6 11.0 10.5 8 8.7 8.4 21 0.5 0.1 17 8.0 7.7 7 12.8 10.8 9 9.0 8.8 22 0.8 0.5 18 7.8 7.0 8 13.2 12.5 10 8.9 8.9 23 0.6 0.5 19 8.7 6.9 9 12.8 11.7 11 9.0 8.6 24 0.6 0.4 20 9.8 3.3 10 12.5 11.5 12 8.6 7.7 25 0.6 0.5 21 9.0 9.0 11 13.0 11.8 13 7.7 7.7 26 0.8 0.5 22 9.0 8.8 12 13.5 12.7 14 7.9 7.5 27 0.9 0.7 23 9.0 8.5 13 13.0 12.3 15 7.5 6.6 28 0.8 0.8 24 .10.9 8.7 14 12.7 12.2 16 7.2 6.3 29 0.9 0.8 25 10.7 9.5 15 ).2.9 12.0 17 6.8 6.3 30 0.9 0.5 26 11.0 9.5 16 13.7 12.1 18 6.8 5.7 31 0.5 0.3 Appendix II Table 5. Water chemistry data~Rabideux Creek,Devils Canyon Project,1977 . D.O.Hardness Alkalinity Date (mg/1).E!!.(mg/1)(mg/1) Upper Sub Area 5/25 11 6.6 17 17 6/7 12 7.3 34 17 6/16 8 7.0 34 34 6/30 7 7.3 51 51 7/13 6 6.5 51 51 7/26 8 7.0 51 51 8/8 7 7.0 51 51 8/23 6 6.8 51 51 9/15 8 6.8 34 17 9/27 10 6.8 34 17 10/12 9 6.8 34 17 10/27 11 7.2 34 17 Middle Sub Area 5/25 11 7.0 34 34 6/7 11 7.3 34 17 6/16 9 7.3 51 51 6/30 9 7.3 51 51 7/13 9 7.7 51 51 7/26 8 7.5 68 51 8/8 8 7.3 68 68 8/23 8 7.3 68 68 9/15 9 7.3 34 34 9/28 10 7.3 34 17 10/12 10 7.2 51 34 10/27 10 7.2 5i'51 Lower Sub Area 5/25 11 7.2 17 17 6/8 10 7.5 34 34 6/30 9 7.3 51 51 .7/13 10 7.7 51 68 7/26 9 7.7 51 68 8/8 10 7.3 68 68 8/23 9 7.3 68 68 9/15 9 7.3 34 34 9/29 9 7.3 34 34 10/12 11 7.2 34 34 10/27 11 7.2 34 34 1-84 Appendix II Table 6. Water chemistry data,Montana Creek~Devils Canyon Project~1977. /",.., A1~a1inityD.O.Hardness Date (mg/1).P.!!(mg /1)(mg/1) Upper Sub Area 6/7 11 7.3 34 17 6/29 9 7.7 34 34 7/13 9 7.7 34 34 7/26 9 7.3 34 17 8/10 9 7.3 34 34 8/22 9 7.3 34 .34 9/13 10 7.3 34 34 9/28 10 7.3 17 17 10/11 10 7.3 34 34 10/26 13 7.3 34 34 Middle Sub Area 6/7 12 7.3 34 17 6/29 9 7.3 34 34 7/13 8 6.8 34 34 8/10 9 7.3 34 34 8/22 9 7.3 34 34 9/13 10 7.3 34 34 10/11 9 7.3 34 34 10/28 10 7.4 34 34 11/11 10 7.3 34 34 Lower Sub .Area 6/7 11 7.3 34 17 6/29 10 7.3 34 34 7/13 9 7.7 34 34 7/26 9 7.3 34 17 8/10 9 7.3 34 34 8/22 9 7.3 34 34 9/2 ( 9 7.6 34 34 9/13 10 7.3 34 34 9/30 10 7.3 34 17 10/11 10 7.3 34 34 10/28 10 7.4 34 34 1-85 DIS-DIS~SU5~. DIS-SOLVED SOLVED DIS-015..SED.H SOLVED TOTAL •TOTAL TOTAL SOLIDS soliDS SOLVED .SOLVED fALLI 00 HAN-MOLYO-TOTAL TOTAL TOTAL ALUH-SElf-(RES1-ISU"or SOLIDS SOLIDS OIA".0'GANESE DENmt NICKEL SILVE~ZINC .INUH NIU"DUE AT CONSTI-(TONS noNs i fiNER CHN.CHO.'Nit eAG'(IN.(AU (SEt 180 q TUENTS'PEIl PER TI-IAN CUG/l''VO/U CUO/l.WO/U CU6/L.WG/L.eUG/U CHO/L,(HO/l'DAY'Ac-rn .002 HI~e01056 •.'01062'tOl061'iOI071~UI092,lolios.t011411'n0300,nOlOI,4103021 (10303,(10J37t 20 1 too <10 liD 9500 1 SO 51 6150 .07 l Appendix !r Table 7. UNITED STATES DEPARTMENT OF INTERIOR -GEOLOGICAL SURVEY 624941149221500 ~SUSITNA R AD PORTAGE C H"GOLD CREEK AK PROCESS DATE 02/10/'" DISTRICT CODE 02 WATER QUALITY DATA.WATER YEAR OCTOUER 1916 TO SEPTEMBER 1977 SPE- CIFIC I NSTAN-COLOR .CON-4Lt<A- TANEOUg (PLAT~DUCT-OIS-CARBON UNITY BICAR-Cl\R- TEHPER-015-INUH-ANCE SOLVED p,~DIOX IOE AS DONATE BONATE :rIHE TYPE ATURE CHARGE COBALT IHIC"O-OXYGEN I(02)CACOJ IHCOJ'le031 DATE tOEO.C'(efS)UNITS'tlHOS)It·1G1L ,.WNITSI (MG/l)IHG/l'IMG/L'mOIl) 100010)(00061)100000)100095'100300'(00400'100405'(00410)100440'co.0445' JUN J114.u 1130 2 O.ClESOOOO 55 80 12.8 1.2 3.7 30 0 015-OIS-DIS-015-DIs-SOLVED SOLVED SOLVED NON-DIS-SOLVED SODIUM SOLVED DIS- H NITRITE ORmo ORTHO.CAR-SOLVED HAG-015-AO-PO-SOLVEDIPLUSPHOS-PHOS-HARO-BONATE CAL-HE-SOLVED SORP-TAS-CtlLO-00 NITRATE PtlATE PHORUS NESS HARD-CruM SlUM SODIUM TlON PERCENT SlUM RIOE"IN)Ipolft (P)(e",,MGt NESS fCA'(HGt (NA,RATIO SODIUM IKt leLlIHQ/U tHO/L)'HO/L'(Hall)'HG/U HIG/lt (HG/U (HG/lt IHG/U IHG/l,10063U (00660)«006111 (00900)(00902)100915'100925'(00930,(00931)(00932,(00935t (00940t .06 .06 .02 36 5 12 1.4 Z.6 .2 13 1.2 4.9 015- DIS-SOLVED OIS-TOTAL TOTAL Ols-TOTALSOLVEDFlUO-SOLVED TOTAL ToTAL CAO-CBRO-JOTAL TOTAL SOLVED TOTAL "ft"'-SUf.;HTE RJOE SILICA ARSENIC BARIUM HlUff HIUM COPPER IRON IRO~.LEAD GANESE1$04)In 'SIOlt (AS)lOA)(tOt (CRt (CU,frE)erE'(POt IHmIt-lOll)tMG/U tHG/LI tUO/L'WG/l),IUO/l)WG/l)IUG/l)WG/l)WG/U IUO/LI (UO/LJf00945'100950'100955'101002.(01001)'01021'101034)101042)(010',5'(01046'10IOSn 101055' 5.0 .0 5.2 .h 100 <lo 30 200 15000 110 1200 280 ·Appendix II Table 7. lJtI6UEU STAT~tJ(Pl\~TMeNr QrT/"t£INTEH!O~ GEO~OGIC~~Su~vEr Cf.Nr~AI.l..A~OHQ.TOAY.DfNvEl:1.CO~ORAOO 'f'" w~TEH ~AI.ITY ANAI.Y~IS us'10 It 29106"~ECOHO •427qa SAMPLE LOC~i!ON:SUSITNA R AS PORTAGE C N~GOLD CREEK AK STATION 10:<;24941149221500 !-Ai .l..uNG.SEQ.:~249~l 1~q221S ao OA~OF COL~eCTION:6£GIN--771005 ENu--TI~E--1300 STkTE CODE:02 COUNTY ClJCE:170 PRO.JECT IOENnnCA.TlO"l:470200~SO D.HA TYPE:2 SOUR<:&;:SlJHFAC~wATER GC;OI.OGIC.UNIT: COMMENTS: FIE~VA~UE UseD FOA BICARB ~CARSONATE. AIR TEl'IP tOEG Cl ALK.TOi (AS CACOJl At.U~INUH iOTA~ ARSDfIC iOTAI.. eA~IUM TOTAl- BICARBONATe: CADMIUM TOTAl.. C~CIU'"OIS5 CARBONATE Ofl..ORIDc 0155 CiROMIUM TOTAl- cat..OR CcP!=e:;;.TOTAL F'LUOiotIDE DISS H~RONESS NaNCA~e HtoROhESS TOTAl. IRON OISSO~VEO IRON TOUL LEAD TOrAL MAGNEsru:-t 01SS MANGANESE DISSOLVED MANGANESe:TOTAL MERCURY TOTAL MG/L UG/l- uG/I- UG/t- MG/L UG/!.< "lG/t.. "'IG/l- MG/!. UG/t- uli/\... 1'113 It.. .MG/L "'GIL UG/l. UG/L· UG/L < MG/!. UG/l. UG/L UG/L a.o 4.S '-10 1 200 55 10 20 o 17 10 o 20 0.1 17 a2 40 7:30 100 3.0 o '"'0 0.0 MOLYSUENUM TaTA~ NICKEl..TOTA\.... N02.NOJ AS N ~ISS OXYGEN tJlSSa~v~ Pl1FIEl.C FHOS ORTHa OIS AS P PHOSF~Ar~015 ORiHO POTASSIUM or S5. ~ES I Due:0 IS CALC SUM RES IOue:0 I5 TONI'A.rT RESIDuE 015 TON/CAY ~eSIOU~~IS laGe .SAR SC:L£,I\f!UM TOTAl. SILICA uISSOLvED SILv€Ft TOiAt. SOO!UH uIS5 sao I U:oI ?-::jo(C~.N r SP.CONDUCT~~C~FLO SP.CONOUCTANCE:I.A8 STREAMFLOw (CFS)-!NST SUl.rATE Or55 ~AT~q TEM~{OEG CJ ZINC TOTAL llGL.L UG/t..« MG/L. MG/L ~/L MG/L ~G/l­ "'G/L MG/t.. uG/\... "!(V'- UG/!-< MG/l- UG/L 4 sa 0.Q7 13.9 1.2 0.00 0.00 1.6 98 0 ..12 1530 87 _0,,4- aa.7 10 7.1 19 165 170 6'500 1:3 2.0 20 AI-f!ONS C,ilLCIUM O!SS MAGNESIUM 'OISS POUSS1UM iJ!SS SODIUM 0155 (MG/!-' 2U 3.~ 1.6 7.1 TOTAL (MEa/I.) O.9~d 8!CAP.~vNATE 0.247 C),R90NATE. O.O~l C~1.0RrOE QIS5 0.309 FLUO~IUE.orss SULF'ATE aI55 N02"N03 ,.5 N 0 1.$.,5 (MG/!.l 55 o 17 0.1 IJ 0.07 TOT~L (M€O/T.- 0.90 0.00 -0 ....8 0.00 0.27 0.00 l.~ 1-88 ) Appendix II Table,7. UNlTED STATES DEPARTMENT or INTERIOR -GEOLOGICAL.SURVEY 15292000 -SUSITNA RIVER AT GOLD C AK WATER QUALITY DATA,WATER YEAR OCTOOER 191~TO SEPTEMBER 1911 PIlOCESS DATE 'll DISTRICT CODE 02 DATE SPE- CIfiC INSTAN:--COLOR CON-ALKA- AIR sunfACE TANEOUS IPLAT-OUCT-015"CARRON UNITY TEMPER-TEMPER.,.AJ~EA DIS"INU"'-ANCE SOLVED PH DIOXIDE AS 1'lHE TYPE ATURE ATunE (SaUAnE CHARGE COOALT IHleno-OXYGEN (:C02.CAC03 10EG C)iDEO C.HILESJ Icrs.UNITS)MHOS'(HG/LI «UNITS)(:HG/L'tHO/L' 100010.coo020a 100049'.100061)100080'100095'100300.(oo/too.IM40St 100410 •. H I 00 1..0 ocr •01 ••• HAY 10 ••• '18 ••• JUN )4 ••• JUL \.20 ... .AUG ,to ••• I/tOO 2 J.5 -,.6160 5330 ~-----. 18JO a 1.0 -of'6160 J7JO ------1000 2 ----6160 14200 i630 2 0,0 11.'6160 52000 45 102 12.2 6.8 l·l 1130 2 l/t.o -or 6160 21000 1430 2 12.0 --616tJ 20000 25 163 II.t·1.9 1.1 sus.SUS ..sus.sus'.sus.[LEV.sus-SED.SED.SED.SED.SED •.or LAND PEt'IOEDfALLfALLfAllfALLfAllSURfACE.sus-SEDI-D1AH.DlAH.DIAH.OIAM.01 A14.TOTAL DATUH PENDED HENT'4 fiNER inNER •fJt-lER 15 fiNER t fiNER ~ERC"RY (fT •SEDI-015-TIiAN TftAN "'AN THAN.THAN CHG'ABOVE HENT CHARG~DATE .062 MH .125 HH .~50 MH .500 HH 1.00 HH WG/l.HSU IHGIL.IT/DAY).410342.ClOJ4J,(10344.t10J4S)C10346.111900)1120001 180154'180.55.' OCT 01 •••------------611 10 144HAY 10 ••• _..----------\611 120 121010•••---------_.--617 UIO'42600JUN I'....'.0 62 04 91 100 .2 611 915 128000JUL 28 •••--,----------611 394 22300AUG 10 •••----------.J 611 656 35400 23 45 Appendix II Table 7. UNITED STATES OEPARTHENT Of INTERIOR -GEOlOGICA~SURVEY PROCESS O"E 0 15292000 -SUSITNA RIVER AT GOLD C AK DISTRICT CODE t2 WATER QUALITY DATA,WATER YEAn OCTODER 1916 TO SEPTEMBER 1911 015-DIS-OIS-DIS" SOLVED SOLVED SOLVED 1II0N-015-SOLVEO SODlUt4 NITRITE ORTHO OI1Hto.CAR-SOLVED HAG-OIS-AO-' BleAR-CAR-PLUS PHOS-PHOS-UARO-BoNATE CAL-NE-SOLVED SORP- bONATE BONATE NITRATE PHATE PI-lOR US NESS HARO-elUH SlUM SODIUM TlON PERCENT eHC03)(COJ)(N)ep04)ep)eCA,HG)NESS ICA)CHO)eNAI .RATIO SODIUM DATE eMOIl)tHO/LJ (HG/U CHO/U (MOIL)eMOIU eMGll1 eHGILt eHO/l),MG/LI eOO /140'(004451 (0063"1006601 (00611)C009001 (009021 100915)e00925)(009301 (00931'CQ0932J OCT oi ••• HAY )0 ... 10 ••• JUN 14 •••28 0 .06 .06 .02 .36 lJ 12 1.4 2.4 .2 ,12 H JuLI o.D 28 ... 0 Auo ·10 ...55 0 .06 .02 15 30 ZJ 4.J 3.6 .2 9 DIS- SOLVED 015-OIS-rOTAL TOTAL OIS-po-SOLVED .DIS-SOLVED DIS- SOLVED TOTAL TOTAL CAD-CHRO-TOTAL TOTAL SOLVED TAS-CHLO-SOLVED nuo-·IRON IRON RIOE ,!iULFATE RlDE SILICA ARSENIC BARIUM HIUM HIU'"COPPER$IUM (5102)(ASI COAt ceDI (CRI ecut efEl eFEI .eK J celt esOitt en (UG/L)WG/L)WG/L)CUG/L) tMG/Lt eHOIl)tHG/LI (HG/LI wa/u WG/U COO/UOATEeHOllteol021t (01034t co 1042 t eOl045t co 1046) (009351 fo0940t 100945t e00950)C009551 .010021 (010011 OCT --------01 •••--.;.- ttAY 10.;.-------~ IA ••• JUN .<10 30 50 20~00 100 14 ...1.1 is '..1 ..5.2 5 0 JUl ---------------_. 211 ••• AUG 14 .1 4.'1 iz 1)00 <10 40 50 18000 10 •••4.1t 5.4 Appendix II Table 7. UNITED STATES DEPARTMENT Of INlERIOR -GEOLOGICAL SUnVEY PROCESS OAT£.U: 1529aOOO -SUSlTNA RIVER AT GOLD C AK DISTRICT CODE 02 WATER QUALITY DATA,WATER YEAR OCTOBER 1916 TO SEPTEHBER 1911 SUS. SUS.SUS.SUS.SU5.SUS.SUS.SUS.SUS. SUS. sus. DIS-SED.SED.SED.SED.SEO.SED.SED.SED.SEO.SED.SED. SOLVED SiEVE SiEVE SIEVE SIEVE SIEVE SiEVE FALL FALL FALL FALL FALL SOLIDS DIAH.DIAH.OIAH.OIAH.DIAH.OIAf.l.OIAH.DIAH.DIMh DIM,.01"'1. CliONS ,FINER ,fiNER 'Ii fiNER ~FINER ti fiNER "FINER .,;fiNER '.t riNER ~fiNER "FINER ,rINER PER THAN HI AN THAN THAN TI-tAN THAN THAN TIiAN tJ~AN THAN TllAN DATE AO-fT'.062 t-tH .125 UH ,250 HH .500 HH 1.00 HH 2.00 HH .002 HH .004 HH .008 Ht-t .016 HH .Oll HM 110303'nOJl.,nOJ3z,110l33'CI03341 n03351 (70]]6»1103311 (10]381 C70JJ9'170340.(103411 OCT 01 ... HAY 10 •••--44 64 81 99 100 -----, 18 •••--63 16 90 99 100 --1 9 11 21 4/, JON 14 ....09 ------------2 It 6 11 b JUL H 28 •••--10 00 92 99 IOn --14 19 29 44 54 I AUG \0 10 ....10 6S 1 1,86 95 98 99 13 19 21 39 S2..... OIS-015- DIs-SOLVED SOLVED OIS- TOTAL SOLVED TOTAL TOTAL TOTAL SOLIDS SOLIOS SOLVED '(OTAL ~'AN-HAN-HOLYO ...TOTAL TOTAL TOTAL ALUH-SElE ..IRESI-ISlIf1 OF SOLIDS lEAD GANESE OANESE DENU'"NICKEL SiLVER liNe INUM NIUI"DUE At CONSTI-nONS' IPo)IHNI IMN)CHOI CNIt CAO)iZN)CALI ISE)100 c.lUEHTS'PER OATt::CUO/Lt CUG/U CUGll)CUO/U CUGILI WO/U fUO/L.CUG/L)CUOILi IHGll'CHG/L'DAY. COI05U COI0551 '01056)(01062)to1061)fOI011.fOI092,COll05'eOII"1'(10300)Ci030lt 110302.,. OCT 01 ••• "'AY 10 ...---~...-..... to ...-------..----------------I.JUN 14 ....100 310 40 I 50 <10 80 14000 0 63 56 ROSO JUL 28 .... AUG 10 •••<100 320 ,180 8 <50 <10 00 IJOOO 1 16 130 4100 Appendix II Table 7. UNITED STATES DEPARTMENT OF ~e INTERIOR G£OLOGICA~SU~VEY C~NTRAL LA80RATORY.OENvER,COLOR~OQ w~TER OU~LITY ANALYSIS L~8 10 •291068 REeOHO •42795 SAMPLE LOCATION:SUSITNA RIvER AT GO~O C AK STATION 10:1:5292000 UT".!.ONG.SEQ.:0,21'.0604 149412B 00 OATE Or CQL~ECTION:~EGIN--77100~ENO__TIME--1600 SlATE.CODE:02 COUNTY CODE:'170 F'RQ.JECT IOENTIF'lCATlON:41a2~OJSO OATA TlPE:2 SOURCE:'SU~FACE ~ATER GEOLOGIC UNIT: -CO!'lMENTS: F'IELO VALUE USED F'OR SICARS ,CARSONAT~. AIR TE!'IP COEG C) ALK.TOT (AS CAC03) ALUMINUM TOTAl.. ARSENIC .TOTAL 6ARIUM TOTA~ BICARBONATE CADMIUM TaTA~ CALCIUM DI5S CAR80NATE CHLORIDE 0155 04ROMIUM TOTA.~ COL-OR COPPEH TOTAL FLUORIDE 01S5 HARDNEss NONC':'Rtf HARDNESS TOUL I~ON DISSOLveo IRON TOTAL. LE,o.O TOTAL. IoIAG~ESIUM 015S H~NGANESE DISSULVED M,ANGANESE TOTAL "lERCURY TOT4.l. MG/l.. UG/l.. UG/L UG/l.. "IG/L UG/l..< MG/L MG/1... "'cut.. UG/L .UG/l.. MG/L "'G/L MG/L UG/l.. UG/L UG/L < I"IG/l.. UG/l. UG/l.. UG/L 9 •.0- 37 SOD 1 200 45 10 18. o 11 0' '12 SO· 0.1 20 57 40 sse 100 3.0 o 20 0.2 1<'OL.'f8DENUht TO TA'-- NICKa TOTA~ N02+NOJ AS N 01SS OXYGEN OISSOLV(O PH F'IELO PMOS ORTHO 01S AS F> PWOSPHATE DIS ORTHO POTASSIUM 01SS ~ESIOuE DIS CAt.C SUM RESIDuE DIS TON/A~T HESIOuE'DIS TON/OAY RESIDUE DIS l~OC SAR _ SEL.ENIUM'TOTAt. SILICA OISSOLVeO SILVER TOTA~ SPOIU!"I 01S5 S.001UH,PE~CENT 5P~'CONOUCTANCE FLO S?CON~uCTANCE LAB SiREAMFLC~(CFS}-INSi SULFATE otss w~TE~TEMP (UEG C] ZINC TOTAt. UGA UG/L < Jo4G/1... MG/t.. MG/L '~G/L MG/l. MG/L /'4G/L UG/L MG/L UG/L < ;.4G/\. MG/L UG/l.. 7 SO 0.11 12.6 7.4- 0.00 0.00 1.4 as 0.10 1740 76 0.4- o 8.6 10 6.5 19 150 154- .~500 14 3.5 30 CA nONS ANIONS CAt.CIUH 0155 MAGNESIUM 0155 POTASSIUM OI5S SOOIUM 0155 (~G/l..) Ie 3.0 1.4 6.5 TOt>\l. CMF-Co/L) O.ij~9 BICARdONATE 0.2..7 CA~80NATE 0.030 C"t.O~ICE 015S O.2S~FLUORIO~0155 SUI.FATE orss NOZ ...~~03 AS /II a 1.404 (MG/l.l 45- o 11 0.1 14 0.11 TOTAL (MEO/L 0.73. 0.00' 0•.31 0.00 Q.2q 0.00 1.35 P~RCENT OIFFE~ENCE =J.9~ 1-92 ') Appendix II Table 7. UNITED STATES OE~ARTHENT or INTE~IOR -GEOLOGICAL SURVEY 15292100 -SUslTNA R AT SUNSHINE AK WATER QUALITY DATA.WATER YEAR OCTOBER 1916 TO SEPTEMBER 1971 PROCESS DATE e~~1 DISTRICT cnOE 02 DATE sus. SED. stEVE DiAH. i fINER THAN .125 MH 1103JZ) SUS. SED. StEVE' DtAH. ,ftNER THAN .250 t-t,.. (103J3. SUS. SED. stEVE OlAf•• ,FJNER THAN .500 "H 1103J/•• sus. 5£0. SiEVE OUH. S fiNER "HAN 1.00 HH 110335. sus. SED. fAll OII\H. I FtNEtl THAN .oo~H" (103J1I sus. SED. fALL OIAH. ~FINER TUAN .004 HH 1703301 sus. SED. fALL OIA". inNER THAN .000 HH (10339' sus. SED. fALL OIAM. ,fiNER JUAN .016 HH (10340) sus. SEO. FALL DIAH. ,nNER' THAN .0J"1 MH (70H" TOTAL MERCURY IHG) .tuO/L' (11900' sus- PENDED SEOI- HENT (HG/L) (8015 /.' JUN IS,•• AUa 10 •••.1 900 .2 1630 H I \0 .p- DAtE DIS- SOLVED HAN- GANESE IMN. WO/l' (010561 64 83 TOTAL MOLYO- DENUM (HOI wa/U (01062' 84 92 TOTAL NICKEL (NU WOIU (01061' 91 99 TOTAL SILVER UG, 'UG/LI (01071) 100 100 tOTAL ZINC IlNt WO/L) (010921 1 16 TOTAL ALUM- INUM (·AL' IUO,/Lt '01105' q ~B TOTAL SElE- NIUM ISEt WG/L) (011411 15 40 DIS- SOLVED SOLIDS IRESI- DUE AT 180 CI IHG/I~) (70300' 22 51 DIS- soLVED souos ISUM Of CONSTI- TUENTS) (HG/U 110301) 33 64 DIS- SOLVED soLI os (JOW; PER .04Y) (103021 DIS- SOLVED SOLIDS nOt-4s P[R AC-fTl ("0303) SliS. SED • .SIEVE OIA"'. ."flNEq TIIAH .062 tiM nOJJI ). JUN 15 ... AUG 10 .., 20 1 o 100 <50 <10 dO 150 &20 22000 15000 ) o 56 51 17400 '102 .08 .09 46 16 DAT~ JUN 15 .... AUG 10 ••, DIS- SOLVED SULfATE '504) 'MG/Lt (00945» 5.1 11 tH S..;• SOLVED flUO- RIDE If) CHO/LI '00950) .1 • I DIS- SOLVED SiLICA (S1021 ('m/Ll 100955. ,4.9 '..0 TOTAL ARSENIC US) WG/U 101002' 25 2 1, TOTAL BARlu,.. IBAI WO/L) 101001) 200 soo TOTAL «:1\0- HIUM (CO) IUG/l) 101021) <10 <10 TOTAL CltRO- MfUH IC~) WO/Lt 101034) 60 40 TOTAL COPPER (Cut tuG/l) (01042) 200 40 TOTAL IRON (fE) IUGIL. '01045' 31000 2,.000 DIS- SOLVED IRON -I (fE) IUG/l) 10IQ4(,) IRO TOTAL LEAD IPDI IUG/L, 1010Slt 300 <100 .TOTAL HI\t-4- GI\NESE IMN. (U6/Lt 1010551 790 540 Appendix II Table 7. u~tT£D ST~ras OE~ARTMENr OF THe INT~~IO~ G£O~aGICAL SU~vEr CE:NT~Al..l.AAOSolATORy,lJfNVe:~.CO~Ojoo!AOO WATER QUA~IiY ANALYSIS l.AB 10 •2~lQ70 ~ECOHO #~<SGl SAl'tPl.~I.CCA nON:SUSlTNA R ~r SUNSHIN.e:AI( 'STATION 10:lS2927dO I.AT.l.ONG.S£~.:"ZlOJ=lSill01S 00 DATE OF CO~.e:CT!ON:aEGIN--77100~~~o--i!M.e:--~915 STATE COUE:02 COUNTY CODE:170 PRO..JECT rOENTIFICATlON:Z.70200350 OAT4 TYPE:2 SQ~ct:SUqFAC!WATER GEOLOblC UNIT: CQMMENTS: FIELO VALUE USEll FOR etcARo ~CARBONATE. A 1R TEMP (OE03 CJ 4~K.TQT (AS CAC03) ·ALUMINUM TOTAL ARSENIC rnnL BAR!UM iOTAL 8ICAP.SONATE CJ.OMtulof iOTA~ c.4LCIUM 0IS$· .CAR80NATE C1otLCRIOE 0155 'Cl-tAOM 1UM rOT Al. COl-OR :COPPER TOTA~ :~uort10E OI5S ,,...ARCNESS NONCARd HARDNESS TOTAL IRON OISSOLI/€O IAON TOTAl. !..EAD rOUL ;.tAGNESIUM DISS ~ANGANe:5E CISSOLVED rANGl1NESE rOTAI. ,~E;:'CUA.,.'TO r AI. l'IG.lL UG/L UG/t. UG/t. "1G/L UG.I\.< MG/t. ~.IL MG.lL WG.I\. UG/t. MG/L ~lG/L "'Ii/\.. UG.I\. UG.I\. UG/L < ~/t. UG/L UG/L UG/1. 6.8 43 2200 3 ZOO 52 10 .17 u ~.a 10 B 20 0.1 12 55 00 3700 100 3.0 o loa 0.0 MO~YAOENUM TO TAt.NIcxa TOTAl....- N02.N03 AS N 01S5 OXYG~~DISSOl.VEO Plot F'I E3..u 'PHOS ORTHO OIS AS ? P~OSP~AT~DIS ORTHO. ~HssrUM DI5S ~ES10uE DIS·CALC su~ ~ESI~u£DIS rON/4FT ~ESIOUE 015 rON/DAY RESIOUE U15 l~OC SA,q SEl-EN1UM rOTAI. SILICA DISSOl.vED SILvE:R TOTAt. SODIUM 0155 saOlulof PE>oICENT SP.CONDUCTANC~FLO SP.CONOUCT~NC~L~8 ST~EAMFLOw(~S)-rNST SU~FArE urss ~ATER T~~~(OEG C) ZINC TOhl. UG/L UG/lo < MG/I.. 104GIL MG/t. ~/t. MG/L ~G/L Io4G.lL UG/t. .'1G/L UG/L < MG/\.. "'G/L UG/t. ~ 50 0.23 12.8 7.4 0.00 0.00 1.2 78 O.Q9 408aO &6 0.3 o 7.4 10 4.4 15 135 133 27400 12 4.0 30 CATIONS ANIONS ~:'~C!U~015S :'!AGNESIUM 01S5 ~OHSSIUH 01SS SODIUM 0lS5 (Mu/I.) 17 3.0 1.2 4.4 (l04EQ/L) 0.849 aICAR50~ATE 0.247 CAP901llATE 0.031 C~1.0~!U~orS5 0.192 rLUO~10E 01SS SULFATE DISS ~'llJ2 ·NOJ ....S ,,.0 (MG/l.> S2 o ~.O 0.1 12 1,).23' rlo4EC/1., O.S:U 0.000 0.170 0.006 0.250 Q .1317 TOHI. PERCENT OIFF'E~E,'<jCE:0.':/2 1-95 TOT"L -~ APPENDIX III The following appendix is a synopsis of ADF&G's recommended plan of study for the aquatic environment.Yearly objectives and cost estimates are included. 1-96 AQUATIC BIOLOGY STUDIES In troduction The p~oposed Susitna River hydroelectric project wil~have various impacts on both the indigenous organisms and the natura~conditions within the aquat~c environment.The fish populations are the most obvious aspects of the aquatic community where impacts will be evident due to their economic and recreational importance to the people of Alaska and the nation. However,studies cannot be limited to the fishery resource alone due to the complex interrelationships between all biological components of,and within,the aquatic community and the associated habitat.The majority of the impacts on fish species will likely ~esult from changes in the natural regimes of the river rather than direct impacts on the fish in the vicinity. Primary areas of concern are reduction of stream flow,increased turbidity levels during winter months,and thennal and chemical pollution.Alterations of the habitat may adversely affect the existing fish populations and render portions of the drainage either nonproductive or unavailable in future years. Baseline fisheries inventories wer~conducted by the Alaska Department of Fish and Game in the upper Susitna River during the 1974-1977 field seasons.The Susitna Basin is the .major coho,pink,chum,and chinook salmon production area within the Cook Inlet area.Although total escape- ment estimates have not been derived for this system,it is probably the second or third largest sockeye salmon production area within Cook Inlet. Grayling,rainbow trout,Dolly Varden,lake trout,whitefish,and burbot are among the important resident fish species present. The interrelationships within the biological communities and between their habitats must be clearly defined to protect the aquatic ecosystem fr~losses incurred by hydroelectric development.The effects on the anadromous and resident fish populations are of primary concern to the Alaska Department of Fish and Game fisheries divisions.Aquatic studies wi~,therefore,concentrate on the seasonal life histories and critical habitat requirements of fish species present.' Seasonal fluctuations in the physiochemical composition of the aquatic habitat are apparently the major factors influencing distribution of fish within the upper drainage.Any alterations resulting from hydroelectric project activities which restrict or reduce quality or quantity of required habitat will also reduce fish populations and associated members of the aquatic commtmity. Each aquatic community is dependent upon various river mechanics to provide the necessary habitat for its existence.Depth,width,and velocity of the stream flow determine the quality and quantity of habitat available' to aquatic organisms.High water discharge associated with spring and summer r~off results in important physical habitat alterations.Unregulated flowing waters dilute and transport natural and man-generated pollutants. A flushing or scouring action occurs during periods of high 'flows and removes deposited sediments and fines,resulting in an annual cleansing of the river botto~This is an important factor in rivers like the Susitna 1-97 which transport large amounts of glacial silt~Deposition of sediment without the annual scouring could change the overall productivity of the river,.eventually suffocating some of the aquatic organisms. Individual study'proposals are designed to provide the necessary background information to enable proper evaluation of impacts.Six general .objectives have been outlined: 1) 2) 3} 4) 5) 6) Determine the relative abundance and distribution of anadromous fish populations within the drainage. Determine the distribution and abundance of selected resident fish populat~ons. Determine the seasonal habitat requirements of anadromous and resident fish species during each stage of their life histories. DeteI:ll1ine the economic,recreational,social,and aesthetic values of the existing resident and anadromous fish stocks and habitat. Determine the impact the Devils Canyon project will have on the aquatic ecosystems and any required mitigation prior to con- struction approval. Determine a long term plan of study,if the project is authorized, to monitor the impacts during and after project completion. Fisheries and physiochemical sampling techniques and equipment for large rivers similar to the Susitna are in the early stages of development. Research and development must accompany the study to modify equipment and techniques to the habitat conditions of the specific environment to be evaluated. The large drainage areas encompassed by the project are divided and categorized by location and activity.The three major study areas are: 1)The Susitna River basin between Denali Highway and Cook Inlet .'- 2)The proposed transmission line corridor and construction rQad 'drainage areas. 3)The Cook Inlet estuarine area. All proposed studies are interrelated and have been coordinated to produce specific results.The elimination of any segment of a project will require revision of study plans.Investigations have been arbitrarily divided into anadromous and resident species studies.To insure pre~se and adequate aquatic data are collected each study is limited to a specific geographic area.A sufficient number of personnel must therefore be distributed throughout the study areas.to insure a cross-sec.tion of habitat conditions are examined and movements of fish populations are monitored. 1-98 Title:Impact of the Proposed Devils Canyon-Watana Hydropower Projects On Anadramous Fish Po~ulations Within the Susitna Riyer Drainage. Obj ectives:Determine the abundance and distributi'On of anadromous fish populations. Determine the seasonal freshwater habitat requirements of adult and juvenile salmon,including spawning,incubation,rearing,and migration. Background:The salmon stocks of the Susitna River drainage are major contributors to the Cook Inlet area fishery._Determining total escapement into this system is greatly complicated by the glacial conditions of the major streams and the enormity of the area.Management of the northern Cook Inlet salmon stocks has been difficult due to the mixed stock commercial fishery in Cook Inlet and the lack of adequate tools to provide accurate in season escape~nt estimates for the drainage • .The major hydroelectric proj ect impacts on the anadromous fish species are expected to be due to changes in habitat.Alteration of the normal flow regimes and the physical and chemical water characteristics will probably be the most critical impacts.It is difficult at this time to determine the distance downstream from the proposed dams that changes w~ll occur. Studies conducted by Townsend (1975)in the Peace River demonstrate that effects were observed 730 miles downstream from the Bennett.Dam. The Alaska Department of Fish and Game has conducted fisheries investiga- tions in the area of proposed dam construction downstream since 1974. Emphasis has been on the inventory of adult and juvenile salmon stocks and habitat assessment.Current research investigations have concentrated on determining total escapement of salmon species into the Susitna drainage and intrasystem migrations of fry.Successful tag and recovery projects were operated in the lower river during 1975 and 1977 and the feasibility of sonar operation was tested in the mainstem Susitna River approximately 25 miles upstream from Cook Inlet during 1976. Only through complete stock assessment will it be possible to determine what portion of the Susitna River anadromous fish runs will be affected by the project and determine the level of mitigative measures which will ultimately be required.It is essential to know what portion the affected stocks contribute to the total Susitna River salmon escapement in orde~to determine potential losses of fish populations and numbers.Economic values and relative importance can be determined after establishing this. Pink,chum,and chinook salmon are the dominant species utilizing the upper reaches of the drainage although sockeye and coho salmon are also observed. Adults Population estimates 'of salmon species utilizing the Susitna River above the Chulitna River confluence were estimated during the 1974, 1975,and ,~1977 field seasons based on tagging and subsequent recovery of fish.These studies indicate a portion of the salmon tagged are not destined to spawn above the tagging site,but rather below it.The importance and extent 1-99 of this milling behavior in the upper river areas requires definition. The alterations in flow and water quality in the mainstem river after project completion could significantly affect this behavior and consequently spawning success.Behavior modifications and disorientation of fish due to tagging and handling may have been a contributing factor. Observations of spawning areas between the Chulitna and Susitna river confluence upstream to Portage Creek during fall surveys indicate that a reduction in flow to proposed post-construction levels would prevent access to many impoJ::tant spawning areas. The degree of impact of reduced flows will be dependent on the total area affected.The distance affected downstream would depend partially on the contribution of the natural Susitna River flow regimes to that of each major tributary and the drainage as a whole. Studies conducted during the late 1950's indicate that Cook Inlet salmon stocks are unable to ascend the Susitna River beyond Devils Canyon,the latter being a natural water velocity barrier td migration (U.S.Department of the Interior,1957).Reports from local residents of salmon observations above Devils Canyon indicate that this should be investigated further. Juveniles Previous studies have defined important clearwater streams and spring fed sloughs within the Susitna River drainage which support juvenile anadromous fish species.Investigations have,however,concentrated primarily on . summer rearing areas.Surleys indicate these populations are not static, but vary in abundance and distribution.Studies conducted during the winter of 1974-1975 revealed that juvenile anadromous species also utilize the mainstem Susitna River. Data collected since 1974 prOVide only baseline information.Generaliza- tions may be made,but sufficient information is not available to determine specific impacts of dam construction and operation on incubating and rearing anadromous species. Adults Procedures:Emphasis should be on determining total salmon escapement into the drainage,stock separation,and habitat evaluation.Types of sampling gear which can be utilized in the upper area of the river and catchability of adult salmon migrating upstream greatly affect the success of a tag and recovery program.Recent developments and improvements in sonar salmon counters are a viable option.A sonar counting system suitable for operation in the upper Susitna River would have to be designed and tested.Installation of weirs or counting towers to determine escapements would be feasible on most clearwater tributaries. 1-100 Commercial Fisheries Division will operate side-scanning sonar salmon counters in the lower Susitna River during 1978 as part of their ongoing studies.A salmon tag and recovery program to provide an alternate escapement estimate could be funded through Devils Canyon studies to· provide additional data and supplement sonar escapement information.The duration of this project-is dependent on correlation of population esti- mates and sonar counts.Data obtained from these studies would be correlated with population estimates in the upper Susitna River.Through thesa studies the importance of the Susitna River salmon stocks to the .Cook.Inlet area as a whole could be detennined. Evaluation cif milling behavior of adult salmon in the'upper Susitna River will require new sampling techniques.Obtaining escapement samples and marking them.to detenn:f.ne migrational characteristics without causing some modification of normal behavior is difficult.Internal sonic transmitters may be utilized to evaluate this.The effectiveness of this type of tag in heavily silt laden waters 'would have to be tested.Recently developed stock separation techniques based on salmon scale ¢haracteristics may eventually enable researchers to assign unknown stocks to specific areas. This technique is still in the developmental research stage t but preliminary data indicate that samples obtained from Cook Inlet can be assigned to one of the three major salmon producing systems with ±14 percent confi- dence.A large data base of scale characteristics from tributary systems would have to be established before analysis could be made. Surveys and escapement sampling should be conducted in the proposed impowdment areas between the Denali Highway and Devils Canyon during periods of peak adult salmon abundance.Initial observations would be conducted by aerial surveys to document the presence or absence of adult salmon.Surveys would be done in conjunction with resident fish investi- gations.Data obtained would be utilized to determine necessary mitigation measures. Water quality,quantity,and biological studies to predict the effects on spawning and migration habitat are described in the habitat study section. Juveniles Year-round studies are required to determine complete juvenile salmon. distribution and habitat utilization data. Surveys of all rearing areas defined in previous studies should be con- tinued.The distribution,species composition,and growth characteristics of juvenile salmonids should be monitored.Additional sampling equipment should be employed to assure representative samples are being collected. These include seines t minnow traps,small fyke traps,and dip nets.Fore- gut sample analysis should be continued and related to invertebrate studies. Winter sampling should be initiated on selected sloughs and clearwater tributaries that support significant populations of rearing.fish during the summer and are also accessible during the winter months.'.Physio- chemical parameters of the aquatic habitat will be monitored during each survey. 1-101 The timing of migration of juvenile fish from sioughs and tributaries to the mainstem river and the extent of mainstem utilization should be docu- mented.Factors which trigger the outmigration will be determined through habitat monitoring.These will include water temperature,ice cover, relative water levels,dissolved oxygen,pH,and conductivity.Fish samples will.be collected primarily by traps.Coded wire tags and/or pigment dye marking may be effective methods of determining intrasystem migrations after initial documentation of this phenomenon. The quantity and quality of water within the mainstem Susitna River will be monitored year round.Data will be obtained from U.S.G.S.gauging stations and at additional sites by field crews monitoring fry distribution. (See Habitat Section). Schedule:Following is a preliminary schedule of anadromous fish project activities.The initiation of some segments of the studies will be dependent on testing of sampling equipment and delivery time required for more complex equipment,i.e.,sonar counters. The·fiscal years (FY)outlined encompass the period of July 1 through June 30. FY ·79 .FY 80 Determine total salmon escapement estimate for the Susitna River drainage. Determine total escapement in selected streams in the upper drainage. Monitor abundanc~,distribution,characteristics,and habitat requirements of adult and juvenile salmonids. Monitor physical,chemical and hydrological parameters of the mains·tem Susitna River,sloughs,and clearwater tributaries. Evaluate the feasibility of operation of various types of sampling gear for use in the upper river areas. Begin building data base for stock separation studies • Continue salmon escapement estimates. Continue fry and habitat studies. Evaluate milling behavior of adult salmon. Continue water quantity and quality monitoring. Continue impoundment surveys,if salmon are observed during FY 79. Continue stock separation studies and begin detailed analysis. 1-102 FY 81 IT 82 F"i 83 Continue all FY 80 studies and revise programs as necessary. Continue ongoing field projects (FY 81)and begin final analysis of projects. Continue field monitoring and prepare final report. FY 79 FY 80 FY 81 FY 82 IT 83 $909,800 $S9Z~700 $S9Z~700 $S92~700 $592,700 Literature Cited: Townsend,'G.H.1975.Impact of the Bennett Dam on the Peac.e-Athabasca Delta.J:Fish.Res.Board Can.Vol.32 (1).pp.171-176. U.S.Dept.of the Interior.1957.(Unpublished).Progress Report 1956 field investigation Devils Canyon Dam Site,Susitna River Basin. 15 pp. Title:Impact of the.Susitna aydrcelect~c.Froject on Resident Fish Species Obi ectives:Dete:cnine spades present and disttibut~on. Deter.mine seasonal abundance of selected populations. Dete:r:m:ine seasoncll habitat requirements necessary to s'USta:in the spedes present. Background:The Alaska Department of Fish.and Game has conducted limited fisheries iIIV'estigations in the Susitna River and its tributaries.,both upstream at1d downstteam of the p-roposed dam.sites and in lakes near the :t:mpcnmdment uea.The gene:raJ.d:i.st:r:1buti.on of resident species was 1llonito1:'ed and.basic seasonal lile histo-ry and habi.tat obse'rVations were conducted durlng portions of the SP1:'ing,summe1:',fall,and winte1:'seasons.Some resident spec:i.es 1l1ake tUajor m.grations from.lake and t1:'ibutary systems into the 1I1ainstem Susitna for purposes of ovennntering.The impo1:'tance of this intrasystemmigraticn and the role of the mainste:m Susitna Ri'Ver is not understood at this time.Surveys conducted be~een 1974 and 1977 document that a high quality sport fishery is provided by the Susitna River,its ttibutaxies,and nearby lakes. P-rocedu1:'e:Seasonal life history,distribution,population abundance,and habitat requ:i.rement investigat:i.ons of sele.cted resident fish species will. be continued and expanded.These studies will be closely coordinated ~th the anadrc:mcus fisn s~udies.Special attention will be given to those areas important to resident fish which may not coincide with anadromous fish habitat.!he study area for resident fish investigations may be considerably greater,extending along the Susitna Riyer from the mouth of the Tyotle River to Cook Inlet,including tributaries bisected by transmission and road corridors. Of particular illIpoxtance in this study will be the determination of winter distribution,mgrational and habitat requirements within axeas subj ect to proj ect impact.Stuclies will be made of the tributaries where resident fish predominately spawn and reside during the summer months,and the mainstem Susit'Ila River where many of these same fish may winter.Emphasis will also be gi'Vet1 to streams impacted by inundation.Human utilization of resident species wi~l also be determined. This study will be conducted in two parts,with results of the first two years of extort being compiled and analyzed for use in related studies and as a basis £01"deter.mining areas where efforts should be concentrated during the remaining years of the study. Due to dtificulty in capturing fish from the Susitna River through the winter ice cover,high velocities and tuxbid water conditions in the summer, considerable equipment and sampling technique adaptations will be necessary. Boom and backpack electroIishing,side scanning sonar,sonar,angling, radio tags,anchor tags,coded woire tags,fyke nets,seines,gill nets, fixed traps,fish wheels,weirs,and ground surveys will be among the techniques to be employed. 1-104 '!hose elements of the physiochemical and trophic makeup of the e:dsting natural ba.bi.tat which will be analyzed are discussed under the Habitat Studies Section. Schedule: FY 79 FY 80 .FY 81. FY 82 FY 83 Organi.ze Susic:r.a River Basin study team and coordinate work schedule with other study teams where necess~. Establish base camps and'begin fisheries iIIVentorj",seasonal life history~and associated habitat investigations. Continue field activities and relocate various personnel as dictated by·data which are generated.Areas of investigation include impoundment,transmission and road corridors,and . downstteam of DeviJ.s Canyon to Cook Inlet • Continuefie1d actiYities and relocate various personnel as dictated by data which are generated. Continue field ac:tivities and relocate various personnel as dictated by data which ara generated. Initiate report writj.ng process. Continue field activities and relocate various personnel as dictated by data which are generated,and integrate and s~rize all data collected into final report. Cost: IT 79 $462,900 IT 80 $416,600 FY 81 $416,600 FY 82 $416,600 FY 83 $416,600 1-105 Title:Investigations of the Cook Inlet Estuarine Area and Potential Effects of Hydroelect;ic Development. Obj ectives:Identliy the fisheries 'resources of the lower Susitna River and the Cook Inlet es tu.uy. Deter.mine the existing water quality and biological p'roductivity of the lower Susitna River and the:Cook Inlet es~ary. Determine the contributiou and importance of the Susitna River to the Cook Inlet.estuary. Background:Cook I:c.lat is appro.:c:iJnately 170 miles long and 60 miles wi.de at its 1210uth~with a total volume of J..7 x 1013 feet 3 •It can be divided into two natural regions-~a northern and southern portion,by a natural topographic featuZ'e,the East and West Forelands.The Susitna.River and the major streams and rivers ~terlng Knik AD1 represent-about 70-80 percent 0'£the total freshwater entering the Inlet (Rosenberg,1967). Estuaries generally have exceptional usefulness in support of fisheries as rearing areas.It is generally a high.food production area for pri:mary consumers suc.l].as c:lams and other filter feeding organisms and the secondary and tertiary level consumers,including finfish and shellfish species. Migratory fishes such as salmen must pass through the estuarine area to reach their spawning grounds. The estuary is,in many ways,the mest complicated and -variable of the aquatic ecosystems.Current and~salinity shape the life of the estuary where the envirotmleut is neither fresh nor salt water.Estuarine currents result from the interaction of one-d:irection flow which varies with seasonal ru~off,oscillating tides and the winds.The unique assemblages of organisms utilizing the estuarine habitat have evolved to survive these rigorous conditions. Oceanograpbic data from the Cook Inlet estuarine area is limited~The extent to which juvenile and adult salmon species utilize this estuar:i.ne area is UIlkncwn.If natural-flow regimes and water quality are altered by the hydroelectric project,adverse effects would possibly be observed within the Inlet.Baseline studies to detenrine existing physiochemical habitat conditions and biological productivity should be conducted. Parameters which need to be evaluated include:temperatuTe,salinity,pH, nutrients,sediJnentation processes,water stage and velocity,and biological activities. Investigations of estuarine areas are more difficult than for river systems and will 'require elaborate equipment and use of large vessels. Procedures:Baseline aquatic biology,and habitat studies and a thorough investigation of existing data available on the Cook Inlet area will be conducted p~ior to initiation of any camp~ehensive field investigations. This environmental data will provide an adequate data base for determining the direction and level of future field studies necessary to project the effects of the hydroelectric project on the estuarine ecosystem. Schedule: FY 72. IT 80 FY ]9 FY 80-8..3 CQnduct field ~eseazc~and analyze ~e data collected. RevieW'and evaluate e:xis'ting etIVi.~on::mental data of the Cook.Inlet a~ea. Develop ,cOlDpreheusi-ve.study plan. Actin.ties will dep end on n 79 f1Ii<tings.Oagoing J!lOE1itoring and p-revi.ous studies may p~O"rlde suf:fic:ient data..If nat,.addit:iona~field investj.gations will have to be ilUt1ated. $75,000 Open.Will depend ou FY 79 ~esults.Overall allocation JIJay have to be aJIlended. ..~ Lite~ature Cited: Rosenberg,D.H.,S..C.Burrell,K.V.Matarajan,and D.W.Hook,1967. Oceanograph.y of Cock Inlet with special reference to the effluent from.the Collier Ca.rbon and Chemical Plant.Institute of Marine Science,UniV'ersi.ty of Alaska.Report No.R67-5..80 pp •. 1-107 Title:SusitIla River BasiIl Habitat Investigations ObjectiveS:Identify seasoIlal habitat characteristics associated with the SusitIla.River Basin aDadromous and resident fisheries. De£inethe complex.interrelationships between the various components of the habitat. Dete:minewhiCh habitat components are c:,itical to the sustenance of the-existing fisheries,and wny •. Background:Maintenance o£anadl:CDJus and resident fish pOpulations within the Susi:tna River Basin will requ:ire a thorough u:n.derstandiIlg of their life sustaining habitat.Impacts.by the hydroelectric project which alter or reduce the quantity or quality·of the critical.spawning,incubation,rearing, and migration habitat o£these species will reduce or eliminate their populations.Major changes may'taka place in the biotic commnnity nth only a subtle change in the habitat. Baseline physiochemical and b~ological aquatic habitat data were collected between 1974 and 1977 by the Alaska DepartJI1ent of Fish and Game at selected sites within the-Susitna River drainage.The United States Geological Survey and other agencies have also monitored physiochemical parameters of the drainage. Literature on the physiochemical and biological composition of aquatic habitat in lotic and lentic environments and its relationships to aquatic conmnmities is also available. Procedure:Personnel conducting seasonal fisheries life history investi- gatio~within the Susitna River Basin will concurrently collect the maj ority of the associated physiochemical field habitat data.In situ water velocity, Width,depth,gradient,temperature,conductivity,pH and dissolved oxygen measurements will be collected with sophisticated electronic and mechanical instrumentation.Watar samples will also be collected for laboratory analyses of basic metals,dissolved solids,total suspended solids,alkalinity,. hardness,pH,conductivity,and total recoverable solids.Additional in- vestigations by fisheries personnel will include water surface and sedi- mentation profiles.The U.S.G.S.will be contracted to install stream gauging stations at sele~ted sites. Biological habitat investigations will include primary productivity,benthos species composition and diversity,fOTage fish,pathological,and bioassay studies.Benthos,forage fish and fish pathology investigations will be integrated with fisheries li.fe history studies.The remaining three will be conducted as individual studies. To define the complex interrelationships of the dynamic habitat conditions of the Susitna River Basin it ~be necessary to collect data over an extended period of time.Because of the precise measurements required, eqUipment for this investigatio?will be costly. 1-108 Schedule: FY 79 n 80 IT 81. FY82 n°83 Organize field staff ana procure equipment.Establ1sh fiel.d camps,install equ:t.pment,and i~t:tate field and office research. CantiDue field and office research. Coutimle field and..o.f£ice resea-rch. Coutinue £ield and office research. .Cont:tnue field and office s'tUdies,analyze data,and write report • .£E!5.:Personnel and their associated expenses are included in the fishe-r"ies investigations. FY 79 FY 80 ]'I'81 F!'82 IT 83 $191,000 $149,000 $149,000 $149,000 $149,000 1-109 ---------------- Title:Transmission Corti.dors,Access Road Corridor,and Construction Pad Sites-Fisheries Investigations Objectives:.Identify all fishery resources within the four proposed trans- mission cor1:idors,the access road c01:':ridor,and the construction pad sites. Ident1.fy species present in these waters and determine ~easonal presence. Identi.fy the habitat associated with these species. Backg;oUJ:1d:Four ttansmission corti.dorroutes,one access road·conidor, gravel and fill sites,and.numerous bulllting site pads are under considera- tion.The corn.dors wU~provide human access to previ.ously i.naccessible areas.!his access will concentrate sportsman.efforts in certain areas which may result in adverse iIllpacts to aquatic life.Uncontrolled removal. of grave.l and fill for construction activities will.also adversely affect the aquatic habitat.No hydroelectric related fishery investigations of these areas have been conducted.-Other so~ces·of fisheries data in these dra.iJ::1a.ges ue insufficient.• Procedures:Fishery resources,thrlr seasonal presence and associated habitat wtiJ.be identified ildthin these areas.Ground surveys,fish trapping,fish marking,benthic:species collection and physiochemical water quality measurement techniques will be conducted.Backpack electro- fishing~nets,traps,anchor and radio tags,electrophoresis instrumentation, weirs,benthic samplers,sophisticated water quality measurement devices, water quantity measurement equipment,and survey equipment are among the equipment which will b.e.ut.:Ui::ed. Schedule: FY 79 Organize corridor and building site study teams,procure equipment,and coordinate schedules with other study teams where necessary. Establish base camps and initiate fisheries resource identification,species identification,and seasonal presence and habitat investigations. FY 80 Continue field activi.ties. FY 81 Continue field activities and relocate various personnel as dictated by data and overall study findings. FY 82 Continue field activities and relocate various personnel as dictated by data and overall study findings. \ FY 83 Conduct concentrated studies if necessary and integrate and s~ize all data collected. I-lln .f.2!E..: FY 79 $13Q,5QQ n 80 $125 ,5"00 FY 8~$125,500 J!Y 82 $125~500 IT 83.$125,500 T _111 Title~Existing Economi.c,Recreat:lonal,Social and Aesthetic Evaluat:lons of the Susitna Ri"Ver .. Object:lves:Determne.the econemic "Values of the aquatic and terrestr:laL ecosystems. Deten1ine the'recreational..values of the aquat:lc and terrestrial ecosystems. Dete:r::m:ine the social.values of the aquatic and terrestrial ecosystems. Deter:mine the aesthetic values of the aquatic.and terrestria,J.el::osystems .. Background:Economic,recreational,social,and aesthetic.values of the project drainages must be determined in order to project whether the project.will enhance or diJilinish these values.The close pro:x::imity of 1I1UUic:ipalities containing half the human population of Alaska.elIlPhasizes the.need to assess these values.The Susitna drainage is highly used and important to the sport and commercial fisherman,the recreational enthusiast, industry,and mun:i.cipaJ.j.ties.The popularl.ty of Denali State Park and nearby Mt.McKinley National Park further attests to the high social, reaeat:loual,and aesthetic qual.ities of the area.Specific data on these subjects in the hydroelectric project area watersheds are incomplete or lack.ing. Procedure:The four objectives will be accomplished through statistical surveys and analyses.Some of the methods employed will be literat:ure 'searches,mail surveys,creel surveys,personal interviews,and fish tag return data. Schedule: FY 79 IT aa FY al FY 82 FY 8.3 Costs: IT 79 FY 80 IT 81 FY 82 FY 83 Organize personnel,procure equipment,and begin literature searches,and develop survey approaches. Continue literature searches,analyze data,and begin surveys. Continue literature searches,analyze data,and continue surveys. Continue literature searches,analyze data,and continue surveys. Continue data collection and analyses and write report. $200,000 $200,000 $100,000 $100,000 $100,000 T _11? T:ttle:Predict Project Impacts ODject:l-ves:Determine the direct~indUect,and :magnitude.of ef.fects the Devils Canyon/~tana p-rej ect w:Ul.fulve on the Sus:.ttna Ri'Ver Rasin fishe%'ies and oeher drainages prior to coust'rUct:ten approval. Background:Susitna River Basin 11IVestigations to date have not gene%'ated suf£ic:ient data to predict.the iJDpacts of this project on the aquatic eco- system...Scientific literature is available on the ecological effects of hydroelectric dams which.ha:ve been constructed in othe1'areas. Procedure:This study culminates ~previously outlined studies.An evaluation of data obtained fram the proposed fisheries related biological, l1abitat,socia-economic,and recreational studies will be combined with other'engineering a:c.d design studies.A predicti'Ve medel of the aquatic ecosystem with and without the hydroelectric project will be constr~cted. Concerns ~not be limited to f~sheries;secondary effects and haw humans w:ilJ.be af.fected will also be addressed.In£ormation required in this analysis incl.udes seasonal life history habitat requirements of the existi.:c.g aquatic camtmmity,a thorough understanding of the interrelationships between physical,.chemical,and biological components of the habitat,and recreational and socio-eccnOIDic values.Proj ect engineering and design II10dels will also be required~espec.ially those concerned with sed:i:mentation,tempe%'ature, dissolved gasses,discharge"and other related physiochemical characteristics. Literature searches and various proj ect data wil~be continually analyzed to insure all sources of pertinent data are included. Schedule: IT 79 Literature research. FY 80 Literature research,analyze data. n 81 Literature research,analyze.data. n 82 Literature research,analyze data- FY 83 Literature research,analyze data,predict impacts. ~:\ FY 79 $5,000 IT 80 $5,000 FY 81 $20,000 FY 82 $60,000 F'Y 83 $60,000 1-113 Title:M::ttigat~:ve Measures fo:r:Lost Aquat;i.c Habitat OojectiiTe:To identi£y and evaluate tf1e DevUs CanyonlWatana Dam p-roj ect fisheries mitigation requtrements and implementation costs pr1o~to construction app~oval. 3 a c:.kground:Ctitical habitat for "Various life history stages of aquati.c species couJ.d ee e 1 ;:minated or redw:ed in quality and quantity by the Susitna hydropower project.For e:xa:mple lt regulation will result in decreased flows downstream of the dams during the S'1.mlli1er months which could eliminate critical rearing a~eas for sal:mouid fry.The proposed aquatic and related habitat studies should.quanti.fy the losses and resulting impact on the fisheries.This activ:ity is designed t.d p~av1dei:c.formation to assess the feasibi1:tty of mitigation and to incU.cate"long t.enu studies wh:lch would direct actual mitigation warts.Evaluation of these studieS will go beyond phase I i.f t.he proj ect is deemed feasible. Procedure:Analyze all project data collected wh:lch relate to the fisheries and aquatic habit2.t of the Susit11a River Basin and other impacted drainages •. Conduct speciaJ..studies where necessary and analyze.Conduct literature 1;'esearch to obtain aquatic impact data relating to e:dsting and proposed nydroelectric proj ects. Conduct preli:m;1Jary site surveys which include reconnaissance and topographic analysis.De"tailed site surveys arid analysis will begin in the last t"'N'O years of this study. Sched1,1le: FY 79 n 80 FY 81 FY 82 FY 83 Preliminary site surveys. Reconnaissance and to~ographic analysis Conduct literat'ltte research and review. Continue preliminary site surveys. Analyze data and identify potential areas for mitigation. Continue literature search and review. Report on findings. Detailed site surleys • .Analyze surveys. Continue literature search and review. COl1tiInle literature "search and review. Continue detailed.site surveys and literature search and review. Report on findings. Cost: FY 79 $26,000 FY 80 $10,000 IT 81*$60,000 FY 82 $50,000 FY 83 $6Q,000 ..Asswz:es $10,000 per site survey. I-llS Title:Plan of Study During and After Completion Otijective:Develop a plan of study to monitor th.e effects of the project to the aquatic ecosystems during and after completion. Procedure:This ongoing activity w:tl~oe dependent on the feasibility results.'I1i.e data generated from all.of the pTe-authorization studies rill provide the ground work for this plan.FlexLbility must be built into this .plan until the results of the biological and detailed fea.sibility studies aTe a:vailable. Schedule:Complete p~within an additional 14 months after completion of the detailed feasibility studies. ~:$SO~OOO 1-116 Moose Movements and Habitat Use Along the Upper "Susitna River--A Preliminary Study of Potential Impacts of the Devils Canyon Hydroelectric Project by Kenton P.Taylor and Warren B.Ballard Alaska Department of Fish and Game Division of Game Robert A.Rausch,Director March 1978 II-l CONTENTS Summary. Background. Description of Area Procedures. Findings Numbers of Moose Captured. Movements. Devil Mountain Area • Watana Creek. Susitna Bend Area Maclaren River Area Habitat Use. Discussion. Conclusions Recommendations Acknowledgements. Literature Cited. Appendix 1. Appendix II II-2 Page 3 4 7 8 11 11 13 13 16 20 22 '.24 26 31 34 34 36 39 76 SUMMARY During October i976 and March 1977,18 radio and 21 visual collars were placed on moose along the Susitna River from the mouth of the Maclaren River downstream to Devil Creek.Radio tracking flights over 13 months yielded 270 observations of radio-collared moose.Visual collars were located 43 times.Movements were slight for radio-collared moose between Jay Creek and Devil Mountain,generally within 48 km 2 • One visual collar from Devil Creek was seen near Lone Butte,84 km east of her tagging location.Movements·of moose collared east of Jay Creek were substantially longer,and migrations up to 103 km were observed. Radio-collared moose were found most often (70 percent)in spruce dominated habitats during all seasons.Seven of the eight cows that had calves gave birth in spruce vegetation.The bend of the Susitna River from Goose Creek to the mouth of Tyone River was identified as important winter habitat for moose from many areas of the Susitna River drainage. Lower elevations along the Susitna River were found to be important as both wintering and calving areas for resident populations,particularly on the south side,east of Stephan Lake.Collared moose crossed the Susitna a minimum of 26 times during this study,15 of which were across that portion which would be inundated by dam construction •. Movement data gathered over a period of only 13 months are insufficient to accurately delineate separate moose populations.Evidence to date suggests that moose from many portions of the Susitna River drainage utilize habitats adjacent to or portions of the area which will be flooded by dam construction.Intensive vegetative studies and research II-3· on movements both upstream and downstream are needed to adequately assess the impacts of the proposed construction (Appendix II). BACKGROUND Feasibility studies on providing hydroelectric power from the Susitna River to the railbelt area of southcentral Alaska have been conducted since 1948.Potential dam sites were identified by the U.S. Bureau of Reclamation,the Alaska Power Administration and the Henry J.Kaiser Company.Proposed hydroelectric projects have included from 2 to 12 dams within the Susitna River basin,along with associated maintenance facilities and transmission lines to Anchorage and Fairbanks (Dept.of Army 1975). The Devils Canyon-Watana dam system has been selected by the Army Corps of Engineers as the most viable of several alternatives (Fig.1). This system would theoretically provide 6.1 billion kilowatt-hours of electrical power annually from a dependable capacity of 1,568 megawatts (Army Corps of Engineers 1975).The Devils Canyon dam would be a concrete structure 193 m high,and the Watana dam would be a rock fill impoundment rising 247 m above the river bottom.A 103 km road from Chulitna to the Watana site including a 198 m bridge across the Sus tina would be constructed for transporting materials and personnel to the dam sites.Five hundred eighty-six km of transmission line corridors,57-64 m wide,would be cut across the mountains between Anchorage and Fairbanks.Warehouses, vehicle storage buildings and permanent living quarters would be erected at the dam sites.The total projected cost of completing this project 11-4 '\ l I I ~ '1 I --'_-.I /<::::, \ '1 ) I q30" (-v SUS'!no \ --....-J AR o '" ." /\ BASIN BOUNDARY J 1./r .....( JV"/'-'"'r Vr\.\,,-"/\/V L.___.r- ~ -"'\ \ r\~ '-<l "U}1-'""--.. <90 1 (.,,1-;\ O~(~)-\ ) MOVEME~TS Di.'onett ,It""10 Mit..abOVe mouth. [1,..aliDn.,,'.r 10 m'd"_d ltw.l. Watana Access Road (Proposed) MOOSE ...r UPPER SUSITNA RIVER PROFILE RIVER MILES 120-290 CJ F:LLure 1.Devils Canyon Proposed Hydroelectric Project Moose Movement Study Area.Devils Canyon Project,March 1978. itl .,.~ l~ll; [ !!( ')TALKEETNA ,> AI! -'- is $2,100,000,000 (Army Corps of Engineers 1977).The estimated annual cost for operation for 100 years following completion is $104,000,000. Power on the line from the Watana site is scheduled for 1986 and from the Devils Canyon dam by 1990.Construction and maintenance of this system would constitute the largest hydro-power project in North America (Gravel 1977). Construction of both proposed dam sites would inundate 51,000 acres of the river valley,132 km upstream to a point between the Tyone and Oshetna Rivers (Fish and Wild1-Ser.1975).Water levels of the Devils Canyon reservoir are expected to remain almost constant but may fluctuate up to 55 m (ob.cit.).The Watana.reservoir is projected to have substantial ) seasonal fluctuations up to 78 m.Downstream flow is expected to be maintained at a constant rate between 8,000 and 10,000 cubic feet per second,eliminating the flooding action that presently occurs each spring when downstream flows may be as high as 90,000 cfs (Army Corps of Engineers 1975). The Susitna River Basin has long been recognized as an extremely rugged wilderness area of high esthetic appeal and as an important habitat to a wide variety of wildlife species (ADF&G,unpubl.data). Most important to sport and subsistance users are moose (Alces alces) and caribou (Rangifer tarandus).Hydroelectric development has been under consideration in this area for a number of years and some very general ungulate population assessment work was begun in 1974 (USF&W 1975).Since then no studies were conducted in the project area until 1976 when limited funds were made available to begin acquiring baseline II-6 information on moose and caribou populations within and adjacent to the project area.The purpose of this report is to present the findings of this one-year study and to discuss their implications in relation to the construction of the proposed hydroelectric project. DESCRIPTION OF AREA Moose movements and habitat use were studied in that portion of the Susitna River Basin lying between latitudes 60°30'-63°15'north and longitudes 146°30'-149°west (Figure 1).The landscape is primarily mountainous and ranges in elevation from 300 to 1900 m.Semi-arid conditions dominate this area of the basin.Temperatures are generally cool in the summer and overcast days are common.Snowfall is usually moderate and ground accumulation does not often exceed one meter. Prevailing winds are out of the east and north.High winds are common along the river during any season. Along the banks of the Susitna and its tributaries from the Maclaren River to Devil Creek the dominant vegetative cover is black spruce (Piaea mariana),interspersed with muskeg bogs on the basin floor. Occasional stands of black cottonwood (PopuZus triahoaarpa)are found on the islands in the river.Understory vegetation in the lower elevations includes highbush cranberry (Viburnum eduZe),devil's club (Eahinopanax horridus),blueberry (Vaaainium spp.),lowbush cranberry (Vaaainium vitis-idaea)and several representatives of the rose and grass families. Hardwoods such as aspen (PopuZus tremuZoides)and birch (Betula papyrifera) are often found interspersed among the spruce,predominantly on south- II-7 facing slopes.White spruce (Picea glauca)replaces the smaller,stunted black spruce on better drained soils.The understory above 300 m contains blueberry,lowbush cranberry,Labrador tea (Ledum spp.),fireweed (Epilobium spp.),crowberry (Empetrum nigrum),and several mosses and lichens. Alder (AZnus spp.)dominates the reaches just above timberline, particularly along the headwaters of streams.Willow (SaZix spp.) , exists throughout the study area but occurs most frequently at timberline and on riparian sites.Alpine tundra extends above the alder-willow zone about 1200 m.A network of old caribou trails scars the tundra slopes of the mountain foothills throughout most of the area. PROC~U~S During October 1976 and March 1977,moose were captured along the Susitna River from its confluence with the Maclaren River downstream to Devil Creek.They were darted from a Bell Jet Ranger helicopter using standard techniques described by Franzmann et ale (1974)with doses of Anectine (Succinylcholine chloride),ranging from 23 to 29 mg.All captured moose were marked with plastic flagging affixed with metal ear tags and with either a radio collar,visual collar,or both.Radio collars were manufactured by AVM Instrument Company (Champaign,Illinois). These collars weighed 1.1 kg and were constructed of machine belting 13 mm thick and 65 rom wide with an adjustable inner circumference of 101 to 106 cm.The belting surrounded the radio components which were encased in dental acrylic,making the unit waterproof.Each radio was equipped with a SB-2 transmitter powered by cold resistant lithium batteries. 11-8 All radios operated on frequencies between 150.700 and 151.875 MHz. Each visual collar (as described by Franzmann et al.1974)had three sets of numerals,one on top and one on each side,to facilitate identification from the air.Visual collars were placed over many of the radios to enable observers to more easily pick out the radioed individual from a group of moose. When conditions permitted,a lower front incisor was removed from each moose for age analysis using techniques developed by Sargent and Pimlott (1959).Blood and hair samples also were collected to aid in assessing physiological condition using methods described by Franzmann et al. (1975).Several physical measurements were taken when time permitted and general physical condition was assessed according to criteria developed by Franzmann and Arneson (1973).Cows captured in March were rectally palpated using techniques described by Greer and Hawkins (1967)to \ determine pregnancy. Radio tracking flights were made monthly in a Piper PA-lS Supercub equipped with two three-element Yagi antennas connected to a four band, 12 channel portable receiver manufactured by AVM Instrument Company. Tracking methods were similar to those described by Mech (1974).Radio locations,vegetation type and miscellaneous notes were recorded for each observation (Fig.2).During parturition,flights were increased to approximately every 3 to 5 days to more adequately assess initial production and survival of calves. 11-9 Figure 2.Survey form used"to record data during radio tracking flights along the Susitna River.Devils Canyon Project,1978. SUSITNA SWDY MOOSE RADIO OBSERVATION FO~l Observer:Weather: Time off:Temp.: Time On: NotesVegetationLocationCalvesSeenChannel"Radio /#. ". "8583 4-7-4.0 8584 4-8-2.0 8586 4-10-3.2 8589 4-12-3.0 . 8580 4-6-2.0 8038 4-3-2.8 8573 2-9-3.5 8576 3-6-0.0 . 8022 1-4-2.5 8588 4-12-2.4 8040 4-11-.5 ...... 3578 4-4-3~9 " 8579 4-5-1.9 , 8031 3-8-2.5 8035 3-12-1.4 8018 1-2-3.8 1 8030 3-7-1.5 [8575 2-12-4.2 II-lO FINDINGS Numbers of Moose Captured Thirty-nine moose were captured and collared during October 1976 and March 1977 along the Susitna River in the vicinity of that portion of the river which would be inundated by the construction of the proposed dams at Devils Canyon and Watana Creek.Although the 13 moose collared in October were not originally part of this study,the data from these animals is included in this report.Collaring location and other pertinent tagging statistics are summarized in Table 1.Eighteen moose were fitted with radio transmitters and 21 wore numbered visual collars only. Twenty-seven incisor teeth were collected during the collaring operation, and cementum layer analysis indicated the average age for females was 6.7 years with a range from 2 to 13 years.Yearlings were generally avoided during the collaring operation.Of 21 females palpated,18 were pregnant (85.7 percent). Blood and physical measurement data were combined with those from other moose studies and were presented elsewhere (Ballard and Taylor,in prep.).Briefly,the pooled blood parameters tested were very comparable to values obtained from other studies of populations considered to be in good condition.Some parameters tested (hemoglobin and pack cell volume)from the Devil Mountain area were lower than those from the other tagging sites,but it is not known if those differences were statistically significant since no tests have as yet been performed. II-ll Table 1.Date,location and general information of female moose radio and visual collared along the Susitna River.Devils Canyon Project,March 1978. Collar Number 8583 8584 8586 8589 8580 8038 8573 8576 8022 8588 8040 8578 8579 8031 8035 8018 8030 8575 2 Blue 4 Blue 5 Blue 6 Blue 7 Blue 71 Blue 50 Blue 51 Blue 52 Blue 53 Blue 54 Blue 56 Blue 58 Blue 60 Blue 61 Blue 63 Blue 64 Blue 75 White 79 White 80 White 81 White Collaring Date 3/18/77 3/18/77 3/18/77 3/18/77 3/18/77 10/27/76 3/19/77 3/19/77 10/28/76 3/19/77 10/28/76 3/20/77 3/20/77 10/22/76 10/27-/76 10/27/76 10/22/76 3/21/77 10/22/76 10/22/76 10/22/76 10/22/76 10/22/76 10/28/76 3/22/77 3/22/77 3/22/77 3/22/77 3/22/77 3/22/77 3/22/77 3/20/77 3/20/77 3/20/77 3/20/77 3/19/77 3/19/77 3/18/77 3/18/77 Location E.of Devil Mtn. E.of Devil Mtn. Devil Mtn. E.of Devil Mtn. Devil Mtn. Watana Susitna-Watana Susitna-Watana Upper Watana Upper Jay Creek Upper Watana Susitna-Tyone Susitna-Tyone S.Bend-Susitna S.MacLaren Flats Butte Creek W.of Ballard L. Lower Maclaren N.Oshetna R. Susitna-Tyone Susitna-Tyone Susitna-Tyone Susitna-Tyone Jay Creek Lower Maclaren R. Lower Maclaren R. Lower Maclaren R. Lower Maclaren R. Lower Maclaren R. Lower Maclaren R. Lower Maclaren R. Susitna N.of Tyone Susitna N.of Tyone Susitna Bend Susitna Bend Jay Creek Jay Creek E.Devil.Mtn. E.Devil Mtn. Anectine Dosage 27 mg. 25 mg. 23 mg. 27 mg. 23 mg. 27 mg. 28 mg. 29 mg. 29 mg. 29 mg. 27 mg. 25 mg. 27 mg. 29 mg. 25 mg. 29 mg. 27 mg.' 27 mg. 25 mg. 29 mg. 27 mg. 25 mg. 27 mg. 27 mg. 25 mg. 27 mg. 27 mg. 28 mg. 25 mg. 27 mg. 27 mg. 28 mg. 28 mg. 25 mg. 27 mg. Cementum Age (years) 4 10 9 8 10 8 2 3 2 6 11 9 4 6 5 6 3 8 3 7 4 7 12 13 5 11 4 C:ondition* 6 6 4 7 6 7 7 7 5 6 7 7 6 6 7 7 6 6 7 5 7 7 7 7 7 7 Pregnant** No Yes Yes No Yes No Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes *Condition was determined by general appearance and relative amount of fat over rump and ribs.Scale of 1-10,10=excellent.See Franzmann et a1.(1974)for criteria. **Only cows collared in March and palpated are included in this column. 11-12 A total of 270 observations were recorded for 18 radio collared moose between late October 1975 and mid November 1977.One radio collared moose was found dead two weeks after collaring.The cause of death was undetermined;we suspect,however,that it was drug related.Another moose was lost from the sample when we were unable to relocate it after one month of tracking.Its loss was attributed to a faulty transmitter. Movements Radio-collared moose occupied areas ranging from 21 1an 2 to 520 km 2 (Table 2).Significantly smaller areas were occupied in the rugged terrain between Jay Creek and Devils Canyon than east of Jay Creek where the terrain becomes more open and level.The correlation between the number of sightings and size of range for each moose was r =0.50. Observed locations and detailed movements of each radio-collared moose are presented in Appendix I.A brief description of radioed moose movements follows. DeviZ Mountain Area Three moose (#s 8583,8584 and 8586)were radio-collared on Devils Mountain on 18 March 1977,approximately 3 Ian north of the Susitna River (Fig.3).All three remained in the vicinity of their tagging location until spring when #8583 moved 8 1an east.Both #8584 and #8586 remained on their winter range through April.At the end of May,during the peak -of calving,#8584 and #8586 were located 10-11 km to the southeast on the other side of the Susitna River within 2 km of each other.Three II-13 Table 2.Range size,number of locations and minimum number of river crossings of radio collared moose along the Susitna River.Devils Canyon Project, ,~March 1978. Collar Number 8583 8584 8586 8589 8580 8038 8573 8576 8022 8588 8040 8578 8579 8031 8035 8018 8030 8575 Number of Locations 12 12 10 2 3 19 14 12 18 11 19 17 10 26 23 18 24 20 Range Length km. 11.6 17.7 17.7 14.2 14.8 6.9 24.8 13.5 17.1 14.3 30.6 16.1 62.3 65.0 55.5 103.0 Range Width km. 4.8 4.5 5.3 9.3 7.9 6.4 17.2 8.2 6.4 5.5 11.9 12.1 14.0 18.7 21.2 10.5 Total Area km 2 30.9 37.3 30.9 51.5 47.6 20.6 180.2 39.9 49.9 32.2 173.2 74.7 373.4 520.1 415.8 291.4 Minimum number of river crossings o 3 1 o 2 o 1 1* o 1 2 o o 2 2 o 270 Total *Cow observed on island. Ave.range size 148.1 km 2 15 Total Correlation between number of sightings and size of range for each moose =.50. II-14 Figure 3.Location and General Range Size for Radio-Collared Moose Along the Susitna River near Devil Mountain.Devils·Canyon Project,March 1978. #8580 =ED ~85 84 -[[l]I1'll] ..#"8583 =WllA -:;P8586 =-~ .. .:.....,.... ~mi. II-iS N 1 J I days later #8584.was seen with two new calves and #8586 was seen with one.Number 8583 was not pregnant when palpated in March.She remained on the north side of the river within a 3 km radius of her April location. Number 8586 lost her calf within two weeks and remained through the fall within 6 km of her calving location.Moose #8584 lost one calf within the first two weeks and the other prior to the first week in July.She .was found on the north side of the river on 28 June and on the south side on 5 July where she remained through the fall.All three moose remained at elevations below 950 m during the time they were monitored. Some seasonal fluctuation in elevation occurred just prior to calving as #8584 and 118586 moved down from the south facing slope of the riverbank and crossed the river to calve.Seasonal home ranges for all three I moose appeared to be small,probably not in excess of 20 km 2 • Watana Creek Area Three radios'were placed on cows along upper Watana Creek in October. Two of these females,#8040 (Fig.4)and #8022 (Fig.5),were collared together.Both moved to lower elevations as winter progressed and remained there until June.Number 8040 was seen with twins on 8 June but on 16 June the calves were missing and were never seen again.The cow returned to upper Watana Creek and remained within a 2 km radius throughout the fall.Number 8022 traveled considerably farther than #8040 as she crossed the Susitna sometime in February and returned in March.On 1 June she was seen in the same vicinity as #8040 on lower Watana Creek.On 16 June they were again found in close proximity.Her movements indicated no distinct migration between winter and summer 11-16 ~. I I Figure 4.Location and General Range of Radio Collared Moose Numbers ? 8038,8040 and 8573 Along Watana Creek.Devils Canyon Project, March 1978. 8573 =~"Z'@ 8038 =11111111111 8040 =I I 11--17 ..".. Figure 5.Location and General Range of Radio Collared Moose Numbers'~ 8022,8576 and 8588 Along Watana Creek.Devils Canyon Proj ect,.-- March 1978. 8022 = 8576 =11111111111 85 88 =ft~~~\~..l./:;.:I II-18 ranges.Number 8022 was never seen with a calf.During the calving season she was found in four different locations. Number 8038 was collared 5 km south of Big Lake.During all 19 observations this moose was between 600 m and 950 m elevation (Fig.4). Although she was observed with a new calf on 26 May,when checked again on 31 May the calf was missing.From June through fall she appeared to move constantly,and ranges used throughout this period overlapped that of winter observations. On 19 March three females (#s 8573,8576 and 8588)were collared on the north side of the Susitna between Watana and Jay Creeks.Number 8576 moved less extensively than any of the other radio collared females (Fig.5).She was observed 12 times,all on the north side of the river within an area of approximately 28 km 2 •When last observed on 30 November she was within 2 km of her tagging location.Female #8588 also wintered along the north bank of the Susitna.She moved to an island in the river in early June and was observed again on the north bank on 8 June where she remained through November (Fig.5).Nu~ber 8573 wintered along the north shore of the Susitna and crossed to the south bank during calving season (Fig.4).She was never observed with a calf, although it was determined that she was pregnant when collared.However, she was not visually observed between 26 May and 3 June.She remained on the south side of the river until July when she returned to her collaring location.She stayed there until 30 November when,after a moderate snowfall,she moved to lower elevations near the mouth of Watana Creek. 11-19 Susitna Bend Area Movements were more extensive for those moose collared east of Jay 'Creek.Number 8031 was collared in October 1976 on the north side of the Susitna near the mouth of the Tyone River.Two others,#s 8578 and 8579,were collared in the same vicinity in March 1977.Number 8031 was observed almost exclusively between 600 mand 950 m in spruce habitats along the north and west banks of the Susitna (Fig.6).She was never observed on the south bank of the river.She had a calf when tagged which survived the winter,but she was never observed with a calf the following spring.No seasonal range preference is discernible from her movement pattern. Number 8579 was once found 30 km from where she was collared (Fig.6). She wintered along the Susitna and crossed to the mouth of Goose Creek in May.She returned to the north side and moved to higher elevations near the headwaters of Coal Creek during calving where she remained through November.She was not located during June and was not observed with a calf in July,although it had been determined in March that she was pregnant.She remained in the high country through November. Cow #8578 wintered in the same vicinity as 8579 and then crossed the Susitna to the mouth of the Oshetna River (Fig.6).She never returned to the north side and spent the remaining summer months and fall in an area of approximately 7 km 2 ,west of the mouth of Goose Creek.Number 8578 was not pregnant when collared in March., II-20 Figure 6.Location and General Range of Radio Collared Moose Numbers 8031,8578 and 8579 Dminstream from the MacLaren River.Devils Canyon Project,March 1978. 1 III II-21 Number 8030 was collared very close to #s 8031,8578 and 8579,but her movement patterns were totally dissimiler (Fig.7).She moved south across the Susitna River and wintered along the drainage of the Tyone River.By 10 May she had moved 2 kIn to an island in Susitna Lake and was observed there with a calf on 30 May.She remained with her calf through August in the vicinity of Tyone Village and returned on 5 October to within 1 kIn of her collaring location. MacZaren River Area Two females,fls 8035 and 8575,were collared along the Maclaren River.Number 8035,collared on 27 October 1976,moved 59 kIn during November and early December to the mouth of the Oshetna River where she remained through March (Fig.8).On 22 April she was observed returning to the vicinity of her tagging location.She was observed on several occasions in this area without a calf throughout the summer and fall. By 22 November she had returned to the mouth of the OshetnaRiver,50 km from her previous location.During April 1977,#8575 migrated 103 km, the longest movement recorded during this study,from the lower Maclaren River to Sucker Lake south of the Glenn Highway near Tazlina Lake (Fig.7). She was pregnant when collared in March but was never observed with a calf.This moose remained near Sucker Lake through May and moved 11 kIn north to Tolsona Ridge during June where she spent most of July and August.She returned once to Sucker Lake and made one trip to Lost Cabin Lake,but both times moved back to Tolsona Ridge.On 30 September she was observed moving back towards her tagging location on the Maclaren. By 5 October she had returned 82 kIn and was within 9 kIn of her collaring location. Figure 7.Location and General Range of Radio Collared Moose Numbers 8030 and 8575 Southeast from the MacLaren andSusitna Rivers.' Devils Canyon Project,March 1978. Clarence _--Fe:---.....'-3ke -.1o..,t{..&--:I.~::...a: .-----..... II-23 .. ·Female #8018 was collared in October along Butte Creek.She was accompanied by a calf and remained in the Butte Creek vicinity through January (Fig.9)•.On 7 February she and her calf were observed across the Susitna,43 kIn away on the north side of Kelley Lake.She wintered there with her calf and began moving up the Maclaren in April.On 30 May she was seen with a new calf which was observed until 10 June. By 12 July she had returned 30 kIn in the direction of her tagging location and remained in the same vicinity she had inhabited the previous fall through November. Radio-collared moose movement data were supplemented somewhat by incidental observations of visually collared moose.Eleven additional river crossings were documented and possible migratory directions were identified (Fig.10).The second longest movement during this study occurred when the moose wearing visual collar #80 was found near Lone Butte,84 kIn southeast of her tagging location at Devils Mountain.Of the moose collared west of Jay Creek,she alone showed any migratory movement of significant distance.Collar number 60 was tagged in March 1977 just north of the mouth of Tyone Creek and was found 78 kIn to the northwest between the Nenana River and West Fork Glacier in August.One moose. #10,collared along Butte Creek in October 1976 moved down Watana Creek to the Susitna where she was found in August.Another,#67,was collared near Susitna Lodge in March 1977 and was located in November at the headwaters of Jay Creek. Habitat Use Habitat types being utilized by collared moose were noted during Figure 9.Location and General Range of Radio Collared Moose Number 8018 Along the Maclaren and Susitna Rivers.Devils Canyon Project March 1978. radio-tracking flights,and observations were categorized in nine groups (Table 3).Because spruce is the dominant vegetation over much of the study area and is widely variable in density,three categories were used to describe it.One hundred and seventy-two habitat observations of radio-collared moose were noted during tracking flights.Seventy percent of all observations were in spruce dominated habitats.Moose were most often (29.7 percent of observations)found in medium spruce areas where trees ranged from six to 15 m high in stands of moderate density. Calving took place primarily in open spruce areas,most often at lower elevations where stands of trees four to 14 m high were interspersed with openings.Eight calves,including one set of twins,were born in spruce habitats while one cow gave birth to a set of twins in alder dominated habitat.Alder and willow areas at and above timberline were utilized during the rutting season until late in the fall when snow depths approached one meter. Between Devil Creek and Watana Creek,radio-collared moose remained throughout the year almost exclusively at the lower spruce dominated elevations.Moose collared along upper Watana Creek were observed more often in willow-alder communities except during late winter when they were generally found in spruce habitats at lower elevations. DISCUSSION Movement patterns of moose are highly variable.Studies.throughout North America (Edwards and Ritcey 1956,Houston 1968,Goddard 1970, IT-?~ '\---J J Table 3.Number of observations of radio collared moose in vegetation types along the Susitna River between October 1976 and December 1977.Devils Canyon Project,March 1978. -- Collar Total Open Medium Dense Spruce/Alpine Riparian Number Sightings Spruce*Spruce Spruce Hardwood**Tundra Alder Willow Willow Open 8583 10 4 2 1 3 8584 9 5 2 1 1 8586 7 3 4 8589 1 1 8580 2 1 1 8038 13 5 4 1 1 1 1 8573 10 6 1 1 1 1 8576 12 3 8 1 8022 8 1 2 3 1 1 8588 9 2 3 1 1 2 8040 10 1 6 1 2 8578 12 6 1 1 2 1 1H8579911221 1H1I N 8031 11 1 7 2 1 -....J 8035 12 3 3 1 1 1 3 8018 11 3 2 1 2 2 1 8030 11 2 3 6 8575 -15 3 3 7 1 1 172 43 51 26 7 7 16 11 10 1 Percent of Total 100.0 25.0 29.7 15.1 4.1 4.1 9.3 6.4 5.8 .6 *Spruce categories include both white spruce (Pioea gZauca)and black spruce (Picea mariana). **Hardwoods in this category include aspen (Populus tremuloides)and birch (Betula papyrifera), LeResche 1972)support the hypothesis that movement patterns in moose ~ may range from being sedentary to seasonal migrations of great distances. Peterson (1955)believed that many moose spend their whole lives in an 2areaof32-800 km..This appears to be true for many of the moose in the Susitna study area.Nine of the 16 moose radio-collared and tracked for 13 months along the Susitna River occupied areas smaller than 52 km.2 • All but one of these were collared west of Jay Creek where the river valley is fairly narrow and is surrounded by mountains. LeResche (1974)found that home range seldom exceeds 5-10 km 2 during a given season.Because radio-collared moose were only monitored for 8 to 13 months during this study,data were inadequate to allow computation of seasonal home range sizes.It was noticed,however,that several of the radio-collared moose were found repeatedly in areas less than 10 km.2 in extent.Others appeared to be more nomadic,particularly those collared in the eastern portion of the study area where they wandered across areas up to 50 km.2 during the spring and sunnner. Areas of low elevation are often inhabited by both migratory and nonmigratory mOose during winter and spring (LeResche 1972).This was apparent in the Devil Mountain area where #80 was collared.Between March and September 1977 she moved a straight line distance of 84 Ian to the southeast while a cow collared at the same time in the same location remained within 11 km of her collaring site throughout the year.This was also true of the wintering area between the Tyone River and Goose Creek to which many moose migrated considerable distances.Number 8031 remained in this area throughout the 13 months of this study. 11-28 Edwards and Ritcey (1956)noted that increasing snow depths above timberline triggered moose migrations out of the high country to their wintering areas in the lowlands.Their observations have been supported in Alaska by Rausch (1958)and LeResche (1974),both of whom concluded that the fall migration in Interior Alaska is closely related to snow conditions.Snow depths along~the Susitna River during the winter of 1976-77 were below normal until late March.They appeared to be greater along the eastern portion of the study area than west of Jay Creek. Shortly after accumulated snow reached its maximum depths,most collared moose east of Jay Creek either migrated short distances where a considerable drop in elevation was possible,or made long treks to their wintering areas,gradually moving to lower elevations.Except for #80,those west of Jay Creek showed no tendency to migrate at alL Radio collared moose in this area may be representative of a sedentary population,but it is recognized that data collections over a l3-month period which includes subnormal snow depths are inadequate to accurately assess the migratory nature of moose along this stretch of the Susitna River.If data from this small sample are representative of the moose population currently inhabiting this stretch of the Susitna River,construction of the Devils Canyon dam would have a highly detrimental effect on the population as the dam would inundate a major portion of the winter habitat presently available.Destruction of this winter range would substantially reduce the carrying capacity of a major portion of the Devil Creek drainages. Some of the possible migratory routes represented by data accumulated thus far are illustrated in Fig.10 and others are illustrated in Appendix I. The relative significance of each of these is unknown at this time, 11-29 although it is apparent that a substantial number of moose migrate to and utilize the area near the mouth of the Tyone and the Oshetna Rivers for winter range.Coady'(1974)noted that the depth,density and hardness of snow are appreciably lower in coniferous and deciduous tree communities making them more favorable to moose under stress from severe winter snow conditions.The lower,spruce-covered reaches of the Watana Creek Valley are probably critical for the majority of moose inhabiting this area during a severe winter.A major portion of this area would be inundated by construction of the Watana dam.Additional observations of moose during normal or severe winter conditions are necessary to determine the importance of this area as winter range.If this area is used as winter range during more severe winters which would normally occur in this area,construction of the Watana Dam would substantially reduce the carrying capacity of this portion of the study area. Present information indicates moose depend heavily upon the river bottoms and adjacent areas for winter habitat both above and below the Watana and Devils Canyon damsites.Lack of adequate wintering areas in the lower Susitna Valley has been a major limiting factor to moose population growth there in the past (Chatelain 1951).Most existing winter range is along the major rivers where periodic flooding has caused rechanneling of the main stream,allowing riparian willow to colonize the dry stream beds.Regulating the flow of water from the dam at Devils Canyon could have a highly detrimental effect on growth of riparian vegetation downstream to the mouth of the Susitna.It is possible that maintaining a steady flow of 8,000 to 10,000 cu~ft./sec. from the Devils Canyon dam would effectively prevent the flooding activity II-30 that presently occurs periodically.This could create a short-term abundance of winter range along the riverbanks that might last 30 or more years.The net long-term effect could well be a negative one, however,as it is suspected that the present natural flooding activity of the Susitna River produces favorable conditions for browse production. Without these annual floods,these riparian areas could become mature stands of hardwoods after 25 or 30 years and provide little or no winter forage.Research on riparian vegetation habitat types and associated moose usage downstream of dam construction is essential to determine potential impacts on moose populations. CONCLUSIONS The emphasis of this telemetry study focused almost exclusively on the north side of the Susitna River upstream from the Devils Canyon dam site.Information on migratory routes and annual movement patterns was limited by the small sample of radio-collared moose (18),many of which were observed for less than nine months.Moose which were collared in October 1976 were monitored through the winter of 1976-77 which was considered to be mild.Information pertinent to identifying critical wintering areas is most appropriately obtained during winters of high to severe snow depths as moose tend to congregate in greater densities on the most vital ranges as snow depths increase.Acquisition of moose movement information downstream and on the south side of the Susitna River is essential in order to evaluate the full effects of the proposed hydroelectric project.Downstream effects on moose would be expected to be significant since vegetation composition would be altered substantially as a result of regulated water flow. 11-31 Annual moose harvests within the immediate drainages along the upstream portion of the Sustina River have averaged 146 moose since 1974 (ADF&G,unpublished data).Approximately 475-500 sportsmen participate in moose hunts in this area each fall (ob.cit.).How significantly dam construction might reduce or increase this level of activity is difficult to project with the limited data available.Construction of an access road to the Watana site would substantially increase hunter pressure in the area,creating a corresponding increase in total man days spent hunting.The quality of the hunting experience would probably decline, however,as well as the rate of hunter success.Dam construction and maintenance schedules are projected on a basis of a dam life of 100 years.If impacts of the project reduced local moose populations by 50 percent this would amount to a corresponding loss of harvest of 7,300 moose during the life of the dam. Construction of the Devils Canyon dam would flood a 45 km portion of the Susitna River having a surface area of 7,500 acres (USF&WS, 1975).The riverbanks along this portion of the river are generally steep and provide marginal habitat for moose.The low density of moose tracks in this area throughout the winter of 1977-78 indicates that little utilization occurs during winters of moderate snowfall.Since water levels in the Devils Canyon reservoir are expected to remain fairly constant,low mortality rates associated with ice shelving and steep mud banks would be expected. Construction of the Watana dam would result in inundation of 43,000 acres along Watana Creek and the Susitna River.Approxiamtely 35,000 TT_1? acres ,sustain moderate to heavy utilization by moose during an average winter (USF&WS 1975).Much of it supports moderate moose densities during the spring and swmner seasons as well.The preliminary movement data gathered thus far from radio collared moose indicate that moose from several surrounding areas of the Susitna Basin migrate across or utilize this portion of the river during some period of the year.The Alaska Department of Fish and Game recorded observations of 2 t 037 moose during their fall 1977 sex and age composition counts of these areas (ADF&G t unpublished data).LeResche and Rausch (1974)concluded that an observer generally sees between 43 to 68 percent of the moose in an area during an aerial census.Using 50 percent to extrapolate roughlYt the resident population utilizing this portion of the basin probably falls between 4 t OOO and StOOO moose.Random stratified counts weighted with an accurate sightability index are needed to accurately assess numbers of moose. Effects of the construction of the Watana dam on these mOOSe populations could be substantial.The resident nonmigratory segment of the population could be eliminated.The immediate loss of a major portion of the winter range along Watana Creek and parts of the Susitna River to flooding would have the effect of reducing the carrying capacity of the habitat at higher elevations used only during the warm seasons and mild winters. The Watana Reservoir would be 87 kIn long and may during some seasons prove to be an effective barrier to migrations.The resulting disruption of movements to traditional breeding grounds may adversely affect productivity. Increased mortality of neonates during post calving movements.might occur.Since water levels are expected to fluctuate as much as 78 rot ice shelving could become a significant cause of mortality as well. 11-33 Calving is a common occurrence in these portions of the study area.The loss of calving habitat notwithstanding~fluctuating water levels would convert the presently timbered slopes from the Watana dam site to the Oshetna River to enormous mud banks.Calf mortality from slipping downhill or getting stuck in the mud could become a common occurrence. RECOMMENDATIONS Collection of baseline biological data and completion of resource assessment in the area affected by the proposed hydroelectric project in far greater depth than this study is an essential prerequisite to understanding the possible impacts of the proposed action (Appendix II).Identification of moose populations~movement patterns,and habitat use downstream and on the south side of the Susitna River is essential to predict both negative and beneficial impacts of the proposed prject.Habitat studies should be conducted concurrently to determine seasonal use and degree of dependency of populations on habitat to be impacted by the project. Alternate areas suitable for habitat rehabilitation to mitigate range losses should be investigated as well as suitable methods for habitat enhancement. ACKNOWLEDGEMENTS Several biologists with the Alaska Department of Fish and Game gave freely of their time and expertise to assist us during the initial phase of this study.Drs.A.Franzmann and T.Bailey from the Moos~Research Center participated in the collaring operation,and area biologists 11-34 S.Eide and T.Spraker provided their assistance during several phases of the study.Technician Tom Balland helped during all phases of field work.A.Cunning constructed figures for this manuscript.We wish to express our gratitude to the air taxi operators (Ken Holland,Rick Halford, Ken Bunch,Al Lee and Vern Loftstead)for their many safe hours of flying and their willingness to modify their aircraft to accommodate our telemetry equipment.We wish to give special thanks to all those whose comments and criticisms helped in the preparation of this manuscript. II-35 Plan of study for Prepared for the State LITERATURE CITED Alaska District,Army Corps of Engineers.1975.Hydroelectric power and related purposes for the upper Susitna River Basin.Interim Feasibility Rept.,125 p. Alaska District,Army Corps of Engineers.1977. Susitna hydropower,feasibility analysis. of Alaska.297 p. Ballard,W.B.and K.P.Taylor (In prep).Upper Susitna River moose population study.Alaska Dept.Fish and Game P-R Proj.Rept.W-17- 10,Job IB-l.20. Chatelain,E.F.1951.Winter range problems of moose in the Susitna Valley.Proc.Alaskan Sci.Conf.,2:343-347. Coady,J.W.1974.Influence of snow on the behavior of moose.Naturaliste Can.,101:417-436. Edwards,R.Y.and R.W.Ritcey.1956.The migrations of a moose herd. J.Mammal.37(4):486-494. Franzmann,A.W.,A.Flynn and P.D.Arneson.1975.Levels of some mineral elements in Alaskan moose hair.J.Wildl.Mgmt. 39(2):374-378. 11-36 Franzmann,A.W.,P.D.Arneson,R.E.LeResche and J.L.Davis.1974. Developing and testing new techniques for moose management.Alaska Dept.Fish and Game P-R Proj.Final Rept.,W-17-2, W-17-3,W-17-4, W-17-5 and W-17-6.54 p.(mu1ti1ith). Franzmann,A.W.,and P.D.Arneson.1973.Moose Research Center studies.Alaska Dept.Fish and Game P-R Proj.Rept.,W-17-5.60 p (mu1ti1ith). Goddard,J.1970.Movements of moose in a heavily hunted area of Ontario.J.Wi1d1.Mgmt.34(2):439-445. Gravel,M.1977 •Tapping Sus itna t s power.Sen.Mike Gravel Reports to Alaskans.July Newsletter.4 p. Greer,K.R.and W.W.Hawkins.1967.Determining pregnancy in elk by rectal palpation.J.Wi1d1.Mgmt.,31:145-149. Houston,D.B.1968.The Shiras moose in Jackson Hole,Wyoming.Grand Teton Nat.Hist.Assoc.Tech.Bull.No.1.110 p. LeResche,R.E.1972.Migrations and population mixing of moose on the Kenai Peninsula Alaska.8th N.Am.Moose Conf.Works.,Thunder Bay Ontario.Onto Minist.Nat.Res.,Toronto.p.185-207. LeResche,R.E.1974.Moose Imigrations in North America with emphasis on Alaska.Natura1iste Can.101:393-415. 11-37 LeResche,R.E.and R.A.Rausch.1974.Accuracy and precision of aerial moose censusing.J.Wi1d1.Mgmt.38(2):175-182. Mech, L.D.1974.Current Techniques in the study of elusive wilderness carnivores.Proc.XI Internat.Congress of Game Bio.,pp.315-322. Peterson,R.L.1955.North American moose.Univ.Toronto Press, 280 p. Rausch,R.A.1958.Moose management studies.Fed.Aid.Wi1d1.Restor. Job Completion Rept.Vol 12,Proj.W-3-R-12.Alaska Game Corom. Juneau,138 p. Sargent,D.E.and D.H.Pim1ott.1959.Age determination in moose from sectioned incisor teeth.J.Wi1d1.Mgmt.23 (3):315-321. u.s.Fish and Wildlife Service.1975.Sauthcentra1 rai1be1t area upper Susitna River Basin hydroelectric project two dam plan.u.S.Dept. Interior,Anchorage,AK.25 p. 11-38 Appendix I.Individual Observations and Locations of each Radio Collared Moose Between October 1976 and November 1977.Devils Canyon Project, March 1978. o •tagging sit • MOOSE .. .:.....,..•• 8583 -. II-39 Number 8583 Collar Color Orange Collar Number Date 7 18 March 1977 Remarks Not pregnant~a1one~snow 2"above moose belly / Observations 1 2 3 4 5 6 7 8 9 10 31 March 1977 22 April 1977 26 May 1977 31 May 1977 3 June 1977 8 June 1977 28 June 1977 5 July 1977 5 August 1977 5 October 1977 With #8580~no visual observation (SE-KB) Alone and spooky ~medium spruce- up1and~condition 5 or 6 (WB-KB) Alone~1600'~riparian spruce (Egbert-KB) Alone,spruce/hardwood (?B) Alone,heavy spruce (KT) Alone,spruce (KT) Alone,spruce/hardwood (KT) Alone,open spruce (KT) Alone,tall open spruce/hardwood (TB) With large bull,spruce (KT) 11 30 November 1977 Alone,open medium spruce (KT) 11-40 (.. MOOSE 0 ...tCJ9ged site ... 8584 .. 11-41 Number 8584 Collar Color Orange Collar Number Date 9 18 March 1977 Remarks Pregnant Observations 1 (3:20 PM)31 March 1977 Alone in spruce (SE-KB) 2 (8:30 AM)22 April 1977 Alone,upland spruce and some willow, condition 7 (WB-KB) 3 31 May 1977 No calf seen tall spruce (TB) 4 3 June 1977 With 2 new calves,open spruce (KT) 5 8 June 1977 No visual (KT) o 16 June 1977 With one calf,location not recorded (Erickson) 6 28 June 1977 No visual contact,spruce/hardwood (KT) 7 5 July 1977 Alone,open spruce (KT) 8 (11:30 AM)5 August 1977 1/2 mile from bull and 2 cows,med.spruce (TB) 9 5 October 1977 With large bull and 3 cows,open spruce (KT) 10 30 November 1977 With one cow,open medium spruce (KT) 11-42 ..........•• MOOSE .. ." 5 8586 .. 11-43 J Number 8586 Collar Color Orange Collar Number Date 11 18 March 1977 Remarks Pregnant,with one calf and 3 cows 1/4 mile 30 November 1977 Could not pick up signal Observations 1 2 3 4 5 6 7 8 (11:30 AM) 9 10 31 March 1977 22 April 1977 3 June 1977 8 June 1977 16 June 1977 28 June 1977 5 July 1977 5 August 1977 5 October 1977 With 1 calf and 1 moose 1/4 mile away With 1 calf,2 cows and 1 small bull within 100 yds medium spruce-riparian With one new calf,spruce With 1 calf,spruce Alone,open spruce Alone,open spruce Alone,spruce With 3 cows Alone 11-44 o •TAG G I NG SITE MOOSE .:---.•• s .-.... 8580 ". Collar Number Color 8580 none Collar Number Date none 18 March 1977 Remarks Down only 5-10 minutes,collar too small, no p~egnancy test,wlth cow and calf 1/4 mile and 2 others Observations 1 (3:00 PM) 2 31 March 1977 22 April 1977 With 1 adult,spruce (SE-KB) Alone,no ear tags,tall riparian spruce-(WB-KB) 11-46 0·tagging site .. MOOSE 8038 • ..• • Number 8038 Collar Color Red Collar Number Date NA 27 October 1976 Remarks With DA#3,1 cow and one small bull Observations 1 (11:40 AM)22 November 1976 Unable to visually observe due to dense vegetation and poor snow. 2 (1:30 PM) 3 (11:00 AM) 4 (9 :35 AM) 5 6 (10:30 AM) 7 (6:05 PM) 8 (9:15 AM) 3 December 1976 Alone 24 December 1976 With 2 cows 19 January 1977 With 3 cows and 1 small bull 4 February 1977 Not visually observed due to high winds 3 March 1977 With 1 cow 6 April 1977 With 2 moose,sparse tall spruce 22 April 1977 With 6 moose (1 bull),sparse tall spruce and cottonwood,condition 6 t"'!"""'... 17 26 May 1977 31 May 1977 3 June 1977 8 June 1977 16 June 1977 28 June 1977 5 July 1977 5 or 6 August 1977 5 October 1977 30 November 1977 With 2 cows,small spruce II-48 10·tagging site MOOSE .. 3573 , .. II-49 ..'.. Number 8573 Collar Color Orange Collar Number Date 5 19 March 1977 Remarks Pregnant Observations 1 6 April 1977 2 (10:15 AM)22 April 1977 3 26 May 1977 4 31 May 1977 91 1 June 1977 5 3 June 1977 6 8 June 1977 91 16 June 1977 7 28 June 1977 8 5 July 1977 9 5 August 1977 10 5 October 1977 With 1 cow,sparse short spruce,condition 7 With 1 cow,dense tall spruce Not visually observed Not visually observed,dense tall spruce Alone,medium medium spruce Alone,medium medium spruce Alone,medium medium spruce Not visually observed,alder Alone,medium medium spruce With 2 cows and white #75 Alone,medium medium spruce 11 30 November 1977 With 1 cow,willow II-50 0·tagging s ita ":.~". ., MOOSE 8576 ... -• • II-51 11 Remarks With 1 bull,pregnancy status unknown Alone,in spruce (SE-KB) With 2 cows,medium tall spruce,near radio 8588 Alone,medium short spruce Alone,sparse medium spruce Alone,medium medium spruce Alone,medium medium spruce Alone,medium medium spruce Alone,medium medium spruce with some alder Within 1/2 mile Blue fflO,sparse medium spruce With 1 large bull and 3 cows,medium medium spruce,not visually observed. 30 November 1977 Alone,open medium spruce II-52 , .. MOOSE 8022 0·tagging site • -• • Number 8022 Collar Color Red Collar Number Date NA 28 October 1976 Remarks Artificial respiration for 10-15 min. Observations 1 (1:30 PM) 2 (1:45 PM) 3 (11:00 AM) 4 5 (11:00 AM) 6 7 (4:05 PM) 8 (9:00 AM) 9 0 22 November 1976 Unable to observe due to poor snow conditions and dense vegetation 3 December 1976 With 1 cow 24 December 1976 With 1 cow 19 January 1977 Alone 4 February 1977 Not visually observed due to high winds 3 March 1977 Alone,standing,sparse medium spruce 6 April 1977 With 2 moose 22 April 1977 Alone,medium medium spruce 25 May 1977 Alone,riparian willow 1 June 1977 No visual observation,in steep wall canyon, near radio 8040 10 8 June 1977 11 16 June 1977 0 28 June 1977 12 5 July 1977 13 (11:00 AM)5 August 1977 14 5 October 1977 Alone,medium medium spruce Alone Couldn't locate Not observed,alder With 1 cow,tall alder With radio 8040,alder 15 30 November 1977 With 1 cow,willow II-54 MOOSE 8588 0·tagging 5 He, • -• II-55 , RemarksDate Collar Number -----"---- Collar ColorNumber 8588 Orange 16 19 March 1977 none Observations 1 (4:05 PM)6 April 1977 Close to radio 8022,medium medium spruce 2 22 April 1977 With 2 cows,sparse short spruce 3 27 May 1977 With 1 yearling and 1 cow,sparse short spruce' 31 May 1977 Not visually observed 4 3 June 1977 Not visually observed on island,dense tall spruce 5 8 June 1977 Alone,spruce (KT) 6 16 June 1977 Alone,willow-alder 5 July 1977 Alone 7 21 August 1977 Alone,sparse tall spruce 5 October 1977 Could not locate 8 3 November 1977 With one bull and 3 cows 9 30 November 1977 With one yearling,willow II-56 o -tagging site , MOOSE 8040 • -• • II-57 Collar Number Color 8040 Green Collar Number Date NA 28 October 1976 Remarks Lone cow,old moose (10+),artificial respiration-5 minutes Observations 1 (11:50 AM)22 November 1976 With 1 cow and 1 large bull 2 3 December 1976 With 1 yearling and 2 cows 3 27 December 1976 With 2 cows,1 small bull and 2 large bulls 4 (9:30 AM)17 January 1977 Alone 5 (10:30 AM)3 March 1977 Alone 6 (6:16 PM)6 April 1977 Alone 7 (9:20 AM)22 April 1977 With 1 cow,riparian willow,condition 4 8 26 May 1977 Alone,sparse short spruce o 31 May 1977 Not visually observed o 1 June 1977 Alone 9 3 June 1977 Alone,willow 10 8 June 1977 With 2 new calves,alder 11 16 June 1977 Alone,alder 12 28 June 1977 Not observed,alder 13 5 July 19i7 Not observed,tall alder 14 (11:00 AM)5 August 1977 Not observed 15 5 October 1977 With 1 cow and 1 small bull,alder 16 30 November 1977 With 1 yearling,riparian willow II-58 .. •... 857B.'MOOSE• •• • II-59 RemarksDate Collar Number ---==--- Collar Number Color 8578 Orange 10 20 March 1977 Not pregnant,with 1 bull Observations 1 30 March 1977 Not visually observed (TB-AL) 2 (10:30 AM)22 April 1977 3 13 May 1977 Alone,upland small spruce bog No visual observation due to two other cows in area,steep river banks and heavy spruce (TB-AL) (11:00 AM)30 May 1977 4 (2:00 PM)3 June 1977 5 (2:30 PM)6 June 1977 10 June 1977 17 June 1977 (10:30 AM)27 June 1977 30 June 1977 (10:00 AM)6 July 1977 6 (10:15 AM)23 July 1977 No calf,with 1 bull and 2 cows (TS-KB) With 10 cows and 1 bull,open spruce, no calf (TB-KB) Up high in scrub sparse spruce,with 1 cow and yearling No calf,with a cow with calf an 1 lone cow, yearling male grizzly present (SE-KB) With 1 adult,no calf Alone (TB-AL) With 1 cow and bull,cow with calf 1/8 mile away (KB-TB) Alone,upland tundra,no calf,feeding (WB-KB) Bedded down with 3 adults and 1 small bull, mixed brush upland tundra with short scattered spruce (WB-KB) 7 22 August 1977 Alone within 1/4 mile is cow with yearling, in sparse medium spruce with lots of dwarf birch almost alpine (WB-KB) (8:55 AM)30 August 1977 With cow and calf in sparse short spruce, feeding (WB-KB) ..-.( 8 (5:00 PM) 9 (1:40 PM) 5 October 1977 Alone,standing in scrub spruce,willow (WB-KB) 22 November 1977 Alone,standing in upland short sparse spruce (WB-KB) 11-60 ~)J \ , J {J ..• • • .' • .II-61 MOOSE ..-.. • iI~.....~umber 8579 Collar Color Orange Collar Number Date 14 20 March 1977 Remarks Pregnant,15 minutes artificial respiration (broke couple of ribs),with 1 calf Observations 1 22 March 1977 With cow,upland willow surrounding medium spruce,condition 4 (WB-KB) 2 13 May 1977 Definite location didn't see due to steep riverbanks and heavy spruce (TB-AL) 3 (11:30 AM)3 July 1977 Alone,feeding in upland tundra (WB-KB) 4 (10:15 AM)25 July 1977 Alone,no calf,riparian willow habitat in upland tundra,bedded down 5 (5:30 PM)18 August 1977 With a cow with calf in tall spruce sparse and dwarf birch (WB-KB) 6 (2:00 PM)5 October 1977 With 10 cows,1 small bull in upland short spruce (WB-KB) 7 3 November 1977 With #61 which has calf (SE) 8 (2:00 PM)22 November 1977 Alone,running,in tall riparian spruce (\~-KB) II-62 • • • 11-63 MOOSE 8031 - • Collar Collar Number Color Number 8031 Green NA Visual Blue 3 Observations 1 2 (11:15 AM) 3 (10:15 AM) 4 (Noon) 5 (3 :30 PM) 6 (1:00 PM) 7 (Noon) 8 (3:00 PM) 9 (Noon) '10 (3:30 PM) 11 (8:15 AM) 12 (3:15 PM) Date Remarks--"---"=~------------------- 22 October 1976 none 2 November 1976 With several bulls and cows within 1/4 mile, also #2 with calf (TB) 19 November 1976 Unobserved due to vegetations and poor snow (WE) 16 December 1976 With a yearling cow 24 December 1976 With a calf 19 January 1977 With a calf,within 1/4 mile 2-3 year old bull with 1 antler and cow with calf 3 February 1977 Did not attempt to observe (TS) 4 February 1977 Visually observed accompanied by calf 22 February 1977 With calf,with cow with twins (TS) 5 March 1977 With calf 30 March 1977 Didn't visually observe (TB-AL) 25 April 1977 With calf and another cow,tall spruce-willow 13 May 1977 Didn't see due to steep river banks but definately there,singnal not heard until almost overhead (TB-AL) (2:00 PM)20 May 1977 13 (11:00 AM)30 May 1977 14 3 June 1977 (1:30 PM)6 June 1977 10 June 1977 With calf,also 2 cows with calves,1 cow, medium spruce upland,2500' With yearling and 1 cow,no calf,feeding,less than 40'spruce and muskeg (TS-KB) With yearling and 1 cow With a yearling in scrub spruce 200'above river (WB-KB) With yearling,sparse medium spruce (SE-KB) 11-64 8031 continued I"'"17 June 1977 15 24 June 1977 16 (11':'45 AM)3 July 1977 17 (10:35 AM)23 July 1977 With yearling (SE-KB) Couldn't see due to wind (TB-AL) Bedded down with yearling (bull)at least 17 other moose there (WB-KB) With bull yearling in dense medium spruce, 2700',standing together (5:30 PM) (9:15 AM) 18 (1:15 PM) 19 (1:30 PM) 18 August 1977 Bedded~down with her yearling bull with 1 large bull in dense medium spruce (WB-KB) 30 August 1977 Unable to observe,probably bedded down in thick medium spruce 5 October 1977 With 4 cows,1 cow with calf,1 yearling in dense medium spruce upland (WB-KB) 22 November 1977 With 4 cows,1 calf,2 large bulls,1 yearling bull,standing,feeding,dense medium tall spruce,essentially same location as 17 II-65 oX ce Ftc:lcl N c:.1.o_rn~~~ ALASKA RANGE 8035MOOSE 11-66 Number 8035 Collar Color Blue Collar Number Date NA 27 October 1977 Remarks 3-4 minutes artificial respiration,with one 1111.probably 3 other cows.1 large bull, 1 small bull Observations 1 2 (10:15 AM) 3 (Noon) 2 November 1976 With 1 cow 19 November 1976 Not visually observed,with radio 8030 and cow 16 December 1976 Did not visually observe due to fog 24 December 1976 With 1 cow,within 1/4 mile 1 cow with calf and 5 cows 4 (3:45 PM)19 January 1977 With 2 yearlings (1 is bull),over 1/4 mile a total of 11 moose which included 2 medium bulls with 1 antler and 2 calves 5 (1:00 PM) 6 (1:00 PM) 7 (3:30 PM) 8 0 9 10 (2:30 PM) (2:00 PM) (Noon) (8:3G AM) 3 February 1977 No attempt to observe 4 February 1977 With 2 yearlings (1 bull),other moose in area but no count 22 February 1977 With 2 moose 5 March 1977 With 1 yearling 30 March 1977 No visual observation 22 April 1977 Condition 5-6,riparian willow 25 May 1977 Alone,medium medium spruce,feeding 1 June 1977 Alone,bedded down,sparse medium spruce 6 June 1977 Alone,dense ripariam tall spruce 10 June 1977 With cow,standing in riparian spruce 17 June 1977 With 1 cow 11 25 June 1977 6 July 1977 Alone With 1 cow in upland tundra,resting 11-67 8035 continued.r-. (Noon)12 July 1977 12 (1:15 PM)23 July 1977 13 (4:45 PM)18 August 1977 With 1 cow,upland riparian Bedded down,sparse medium spruce Bedded with a cow and yearling bull,sparse short spruce 14 (4:30 PM) 15 (2:00 PM) 5 October 1977 With 1 large bull,13 cows,small moose 1 calf, scrub willow with medium medium spruce 22 November 1977 Feeding,alone,medium short spruce II-68 11-69 ..... •4 •• (. \ Collar Collar Number Color Number Date Remarks 8018 Green NA 27 October 1976 Probably with a calf,with one cow Observations 1 (12:10 PM)22 November 1976 With calf,3 cows and 3 calves (1 set twins) 2 (1:50 PM)3 December 1976 With medium bull,within 1/4 mile 5 cows, and 3 cows with 2 calves 3 (11:15 PM)24 December 1976 With 1 cow 4 (1:20 PM) 5 (1:00 PM) 6 (1:00 PM) 19 January 1977 Alone 7 February 1977 Alone 5 March 1977 With calf 7 (11:02 AM)30 March 1977 8 25 April 1977 9 (7:45 PM)10 May 1977 0 27 May 1977- 10 (Noon)30 May 1977 91 (4:30 PM)6 June 1977 11 (8:00 AM)10 June 1977 12 (10:30 AM)12 July 1977 13 (12:30 PM)23 July 1977 14 (9:00 AM)22 August 1977 With calf With calf,medium medium small spruce -With 3 cows,sparse medium spruce With 1 new calf,feeding,near a cow with twins With calf,resting,river floodplain with medium medium spruce With calf,lying down in sparse tall spruce Unable to observe,in thick upland tundra, within 1/2 mile cow with calf No visual,dense willow and alder must be bedded down Unable to observe due to dense alder-willow within 1/4 mile cow with calf 15 (2:15 PM)5 October 1977 Alone,standing,riparian willow 16 (10:30 AM)22 November 1977 With 2 cows,3 calves,bedded riparian willow rI-70 I MOOSE- 8030 1 N TT _71 Number Collar Color Collar Number ;:.D.::a.;:t.;:e _Remarks 8030 Black NA 22 October 1976 With 5-6 cows Observations 1 2 3 (9:07 AM) 4 5 6 (Noon) 2 November 1976 19 November 1976 With 1 cow,and close to radio 8035 16 December 1976 With cow and ca1f- 19 January 1977 Alone,however,large concentration moose in area 3 February 1977 No attempt to observe 5 March 1977 Alone 7 (10:22 AM)30 March 1977 8 (12:30 PM)22 April 1977 9 (5:00 PM)10 May 1977 ~(9:52 AM)13 May 1977 10 (10:00 AM)30 May 1977 ~(11:45 AM)6 June 1977 ~(Noon)10 June 1977 11 (1:15 PM)15 June 1977 o 17 June 1977 o 25 June 1977 o 30 June 1977 o (10:15 AM)7 July 1977 o (10:00 AM)12 July 1977 12 (10:00 AM)23 July 1977 With 2 cows,medium medium spruce No attempt to observe Walking,dense tall spruce With one new calf on island,feeding,sparse medium spruce With calf,feeding,sparse tall spruce With calf on island,resting,sparse tall spruce Alone,moved to next island,feeding on shore in water Alone Unable to observe due to dense vegetation With calf on island,medium medium spruce With calf With calf,bedded,medium medium spruce With calf,running dense medium spruce 11-72 8030 continued 13 14 15 (1:00 PM) 16 (1:15 PM) 25 August 1977 With calf and 1 cow 7 sparse medium spruce 30 August 1977 With ca1f 7 bedded,dense medium spruce 5 October 1977 With calf,1 cow with ca1f 7 and 1 small bul1 7 medium short spruce 22 November 1977 With ca1f 7 standing in dense short spruce 11-73 ~I . 1 N. 11-74 MOOSE 8575 .. Number Collar Color Collar Number Date Remarks 8575 Orange 3 21 March 1977 Pregnant,with group of 3 moose Observations 1 (2:40 PM)30 March 1977 2 (7:45 AM)22 April 1977 0 10 May 1977 3 (9:10 AM)11 May 1977 4 (8:30 AM)25 May 1977 5 (2:45 PM)26 May 1977 Alone Alone,bedded Did not attempt to observe Within 1/2 mile of 3 cows,dense tall spruce A1on~,appeared pregnant,medium medium spruce With cow that has new calf,resting,medium medium spruce 30 September 1977 No visual,cow was traveling 13 September 1977 Alone,bedded,dense medium spruce 22 November 1977 With 1 cow,bedded,dense tall spruce 5 October·1977 Alone,in dense medium spruce,within 1 mile 1 cow with twins and 1 cow with calf Alone,feeding,sparse tall spruce Alone,bedded,dense medium spruce Alone,bedded,dense medium spruce Alone,bedded,riparian willow Alone,bedded,medium medium spruce Alone,bedded,sparse medium spruce With 2 cows,bedded,medium medium spruce Alone,feeding,sparse tall spruce Alone Alone,traveling,willow 30 May 1977 10 June 1977 17 June 1977 22 June 1977 28 June 1977 6 July 1977 12 July 1977 2 August 1977 17 August 1977 18 August 1977 6 7 0 8 (8:00 PM) 9 (1:00 PM) 10 (9:00 PM) 11 (1:00 PM) 12 (7 :30 AM) 13 (9:45 AM) 0 (2:00 PM) o (9:45 AM) 0 14 (5:00 PM) 15 (1:00 PM) T~"71:: APPENDIX II Wildlife Studies Introduction The proposed Susitna Hydropower Project will have impacts on several wildlife species which either reside in the project area,use the area for migration or other seasonal purposes or use habitat downstream which will be altered by the stabilization of water flow.The following individual proposals comprise an integrated program to provide information needed to predict the impacts of the Project on wildlife and to provide a basis for making decisions which might minimize those impacts. This program will not answer all questions.It is designed to provide an acceptable basis of knowledge in a limited time period using presently available techniques.Emphasis has been placed on species which are likely to be most adversely affected by the project and are of greatest interest to man. The design,timing,manpower requirements and funding levels of the individual projects have been coordinated for efficiency.No single project can be conducted by itself without considerable change in design and increase in cost.For example the moose study is the core of the entire package.The wolf,wolverine,bear and caribou studies are dependent on the moose study for manpower equipment and logistic support. The moose,habitat mapping and vegetation studies are also dependent on each other as each will influence the design of the others and their results must be compatible for final data analysis.If one project does not produce results at the proper time other projects will be delayed, reducing the quality of information and increasing the overall cost of the program. Title:Habitat mapping and vegetation studies required for analysis of the effects of the Susitna Hydropower Project on wildlife. Objectives:To prepare a vegetative type map of areas within and adjacent to proposed impoundments,along transmission corridors and along the downstream floodplain. To identify key moose browse species and determine the condition and trends of selected moose habitats. To determine the effects of altered water flow on key plant species and map areas where substantial vegetation changes will occur. Background:Most impacts of the Susitna Hydropower Project on wildlife will occur through loss or alteration of habitat.Where habitat is totally lost to a population through inundation or blocking of migrations it is necessary to know the importance of that particular habitat to the population and the availability of alternative habitats.Whexe habitat will be merely altered,it is also necessary to know what elements within that habitat are important to the population and what changes will occur in those elements.Direct studies of wildlife species can TT-7h delineate a population and tell us where various components of the population are at different times and to a certain extent why they are there.However,wildlife studies must be accompanied by habitat studies if we are to determine the full significance of habitat alteration to the population. This proj ect is not an actual proposal.Several of the studies outlined here could be expanded to meet the needs of other disciplines.Therefore, this is a statement of information needed to evaluate the effects of the Susitna Project on wildlife.Actual study proposals should be developed to provide this information on the schedule outlined. Procedures:A habitat type map of the proposed impoundment areas,all drainages flowing into the impoundments,access and transmission corridors and the downstream floodplain should be prepared during the first two years of the study.This map should be of sufficient detail to permit delineation of specific habitats favored by moose and must be accompanied by sufficient ground truth data to identify the distribution and abundance of moose browse species.In order to accomplish this it is essenital that the principal investigators of moose studies work directly with the habitat mappers. Studies of the effects of water table and influence of water level fluctuations on vegetation,particularly moose browse species,along the floodplain of the Susitna River should be initiated immediately.A map of areas where changes in flow caused by the dams will alter the vegetation, either through changes in soil moisture or by allowing plant succession to occur,should be prepared.Emphasis should be placed on areas of high moose use such as the lower Susitna River. Detailed studies of vegetation in important moose wintering areas should be conducted to identify plant species used by moose and quantify their presence,use and trends.Study areas would be identified from data collected under the moose studies. Schedule: FY 78 FY 79 FY 80 FY 81 FY 82 Habitat mapping,effects of water level studies Habitat mapping,effects of water level studies Map areas of expected plant composition changes. vegetation studies on moose winter range Moose winter range studies Moose winter range studies II-77 Title:Impact of the Susitna Hydropower Project on Moose Populations Objectives:To identify moose subpopulations using habitat subject to direct and indirect impact of the Susitna Hydropower Project. To determine the seasonal distribution,movement patterns,size and trends of those subpopulations. To determine the timing and degree of dependency of those subpopulations on habitat to be impacted by the Susitna Hydropower Project. Background:Several subpopulations of moose occupy habitats that may be inundated or substantially altered by the proposed Susitna Hydropower Project.Limited studies conducted in 1977 identified one subpopulation which occupied the upper ends of tributaries north of the proposed impoundment areas during spring,summer and fall,then migrated to the Susitna River bottomlands during winter.Similar populations almost certainly occupy drainages to the south of the impoundments.There is also strong evidence that riparian habitat along the mainstem,which may be significantly altered by the stabilization of water flow,also serves as winter range for several subpopulations of moose.These habitats may be critical to these populations in severe winters.Other subpopulations may be nonmigratory and use areas to be affected all year.Some migratory populations may not rely on the river bottoms for seasonal range but may migrate through them on their way between seasonal ranges. The degree of impact will vary depending on the subpopulations size, status and degree of dependence on altered habitat and the nature of the habitat alteration.Many factors must be considered including:the sex and age composition of members of the subpopulation using the habitat (often pregnant cows or cows with calves are more dependent on lowland areas than bulls),the overall range of the subpopulation (some members of a nearby subpopulationmigrate up to 60 miles indicating that reductions in moose densities could occur over a vast area),the availability of alternative ranges particularly during severe winters (habitat alterations which may be relatively insignificant in normal or mild winters may be devastating when heavy snowfall makes alternative ranges unavailable), etc. An adequate assessment of the potential impacts of the Susitna Project on moose requires a thorough understanding of moose populations using the area.This information must then be related to a knowledge of the habitat and the elements within that habitat that are necessary for moose.This study is designed to provide the necessary information on moose.It is essential that certain habitat studies be conducted concurrently. A habitat map of sufficient detail to delineate types selected by moose, covering the impoundment area,surrounding drainages,transmission corridors and the floodplain of the Susitna River to its mouth,should be prepared at an early stage of the studies.Detailed browse studies should be conducted at sites selected on the basis of use by moose to identify important browse species,measure the degree of use and.identify other elements of the habitats that are important to moose.The role of II-78 the water table and spring flooding in maintaining moose habitat below Devils Canyon should be determined and maps delineating areas where the alteration of the flow will result in vegetation changes should be prepared. This moose study and the habitat studies outlined above should be closely coordinated as each will influence the final design of the other and all are necessary to relate habitat changes to moose. Procedures:During 1977,12 moose were radio collared and 14 others were collated with visually identifiable collars.These moose were tracked from March to December 1977.Under this study,tracking of those moose will be continued,to further delineate the ranges of that subpopulation. Additional moose will be radio collared in drainages along the south side of the proposed impoundment area and in riparian habitats along the mainstem below Devils Canyon. Each radio collared moose will be relocated regularly.For each relocation the exact location,habitat type,activity of the moose and association with other animals will be recorded. A random stratified census and seasonal sex and age composition counts will be conducted on subpopulations most likely to be affected by the Susitna Hydropower Project.Concentrations of moose will be mapped throughout the area whenever the opportunity arises. These data will be used to identify subpopulations using areas to be impacted,to determine the seasonal ranges and migration routes of each subpopulation and to estimate the size and composition of those subpopulations most likely to be impacted.Locations of moose will be overlayed on habitat maps to determine the degree of use of certain habitat types as well as specific habitats.This information will be analyzed by subpopulation, season,sex and age class and reproductive status.Areas likely to be altered by the project that are critical to a subpopulation will be identified and recommended for more detailed vegetation studies. Schedule: FY 78 FY 79 FY 80 FY 81 FY 82 FY 83 Radio collar moose,tracking flights,composition counts Tracking flights,composition counts,random stratified count.Review habitat map and map of downstream areas to be impacted and identify data gaps.Identify areas for detailed vegetation studies. Replace radios and radio collar new moose to fill identified data gaps,tracking flights,composition counts. Tracking flights,composition counts,random stratified counts. Tracking flights,composition count,start final analysis of data. Tracking flights,complete analysis of impact of Susitna Hydropower Project on moose,write final report. 11-79 Cost: FY 78 FY 79 FY 80 FY 81 FY 82 FY 83 $220,000 $210,000 $180,000 $210,000 $175,000 $85,000 11-8"0' Title:Mitigation measures for lost moose habitat. Objectives:To identify and evaluate measures for enhancing moose habitat. To locate areas where moose habitat enhancement would effectively mitigate loss or deterioration of moose habitat resulting from the Susitna Hydropower Project. Background:Important and perhaps critical moose habitat will be totally lost or reduced in quality by the Susitna Hydropower Project.The proposed moose and habitat studies should quantify this loss and its resulting impact on moose populations. Moose tend to favor subc1imax ranges.In recent years several agencies have recognized a potential for enhancing habitat for moose by setting back plant succession through artificial means.The Alaska Department of Fish and Game,u.s.Fish and Wildlife Service and u.s.Forest Service have all experimented with such techniques as mechanical crushing, prescribed burning and fertilizing.At present these techniques have not been fully evaluated. Such techniques are probably effective only in certain types of habitats. In some cases it might be possible to fully mitigate the impact on a particular subpopu1ation of moose.For example,if an effective technique can be found to maintain willow habitats on river bars wi~hout periodic flooding,impacts on subpopu1ations dependent on downstream habitat might be kept to a minimum. In other cases where critical habitat will be completely destroyed it might be possible to make alternative habitat available to the affected subpopu1ation of moose.However,there will likely be some subpopulations for which mitigation measures will not be possible.In these cases the . loss to human users could be offset by enhancing the range of populations of moose away from the Project area. In order to assess these possibilities it is necessary to evaluate the various techniques and to delineate habitat where these techniques would have a positive effect on moose. This project is designed to provide information to assess the feasibility of mitigation and to initiate long term studies which would direct actual mitigation efforts.Evaluation of these long term studies will take many years.The need to complete the long term studies will depend on the results of the feasibility study. Procedures:A complete review of potential moose habitat manipulation techniques will be made.Areas which have been experimentally manipulated in the past will be visited and the quantity and quality of potential moose browse produced will be assessed.Information gaps will be identified and if necessary further experimental manipulation will be recommended. 11-81 Data from the habitat mapping,vegetation and moose studies will be used to identify areas where habitat manipulation might offset adverse impacts on each of the subpopu1ations of moose that are identified. Schedule: FY 79 FY 80 FY 81 FY 82 FY 83 ·Cost: FY 79 FY 80 FY 81 FY 82 FY 83 Preliminary review of techniques and identification of areas of past experimentat.ion. Evaluation of success of previous manipulation efforts. Identification of data gaps.Recommendations on future experimentation. Continue evaluation of manipulated areas.Initiate manipulation experiments to fill data gaps. Evaluate techniques.Identify potential areas for mitigation. Evaluate techniques.Identify potential areas for mitigation. $5,000 $20,000 $275,000 (actual cost will depend on results of FY 79 and 80 studies) $20,000 $20,000 11-82 Title:Impact of the SusitnaHydropower Project on caribou populations. Objectives:To identify subpopulations of caribou in the Nelchina Basin. To determine the seasonal ranges and migration routes of these subpopulations with emphasis on traditional migration routes across proposed imp oundmen t_areas and potential alternative routes. To determine the availability of suitable alternative seasqnal ranges to caribou subpopulations that might be isolated frcJtn.traditional ranges by the proposed impoundments. Background:The Nelchina basin has been the most important sport hunting area for caribou in Alaska.Although caribou numbers were reduced from a recorded high of 72,000 to a low of 10,000 the population is presently increasing and is now estimated to exceed 14,000 cariobu.Proposed management plans state that the population will be allowed to increase until it numbers 20,000 caribou. Caribou traditionally have used a variety of ranges on both sides of the Susitna River and varying numbers have crossed the Susitna at least twice a year.Major crossing locations have been recorded in areas which would be affected by the proposed hydropower project.Because caribou frequently migrate long distances and may periodically overgraze one range and shift to another,it is necessary to examine the status of caribou and identify alternative ranges over a large area. Range studies conducted by the Alaska Department of Fish and Game have shown that the most desirable winter ranges remaining in the Nelchina basin are located in the Clearwater Mountains,Chunilna Hills,Susitna Uplands and Monahan Flats.Most of these ranges are north of the Susitna River while historical and recent calving and summer ranges exist south of the river.The preferred lichens south of the river have generally declined and have not shown substantial recovery even with lowered caribou populations.Meanwhile,the Nelchina population has used this area to a greater extent than the other portions of its range.A portion of the winter range exists east of the Richardson Highway in the Wrangell Mountains but movement into this range may be affected by the recent construction of the oil pipeline from Prudhoe Bay to Valdez.All of these factors make it likely that the ability to cross the Susitna will remain critical to the well being of the Nelchina caribou herd. To determine the extent that the impoundments will affect this movement is difficult.Other migration routes may be used in addition to those already shown in the literature or sufficient range may be available to the east to support the proposed population level.It is also possible that a separate but smaller population exists north of the Susitna which may increase to fill the available range in that area even if the existing Nelchina population were confined to the area south of the proposed impoundment s. 11-83 Procedures:Caribou on both sides of the Susitna River will be radioco11ared during the breeding season.Monitoring flights will be made at a relatively low intensity (approximately monthly)throughout most of the year to determine if more than one population exists in the area and to determine .seasona1 ranges of each population identified.More intensive monitoring flights will be made during the periods of preca1ving and postca1ving movements and winter shift to determine present migration routes and the timing of migration.It will be necessary to repeat this procedure for several years to determine variation among years. Traditional migration routes will be determined by mapping trails and will be compared with present routes. Potential alternative ranges will be identified and evaluated using the modified Hu1t Surlander method of range analysis.These ranges will be compared with Ne 1 china ranges that have been studied for a number of years. Schedule: radios~monitor movements. radios~monitor movements. radios,monitor movements. Repeat range analysis to determine FY 79 FY 80 FY 81 FY 82 FY 83 Cost: FY 79 FY 80 FY 81 FY 82 FY 83 Radio collar caribou~monitor movements. analysis. Replace inoperative Replace inoperative Replace inoperative Monitor movements. trends. $120,000 $95,000 $95,000 $95~000 $102,000 11-84 Conduct range Title:Effects of the Susitna Hydropower Project on wolves. Objectives:To determine the number of wolf packs and the number of wolves in each pack that inhabit areas·to be directly affected by the Susitna Hydropower Project. To determine the proportions of each pack's territory that lies within areas of impact. To determine the location of dens,rendezvous sites,hunting areas and the other essential activity areas of each pack in relation to proposed impoundments and construction activities. To determine the dependence of each pack on prey populations that may be adversely affected by the Project. Background:Wolves are of considerable national concern as evidenced by recent newspaper and magazine articles.They are known to inhabit the entire project area and information on population size and movements is needed to determine project impacts. Studies in other areas of southcentral Alaska have demonstrated that some wolves have home ranges as large as 2,000 square miles while many packs have territories ranging from 200 to 600 square miles.It is known that the immediate project area may contain five or more wolf packs.It appears that some of these packs use the Susitna River as a territory boundary,and inundation and associated development could have a dramatic influence on them.These packs depend heavily on moose populations that use the impoundment areas.In addition other studies have shown that any human disturbance relatively close to a wolf den may cause abandonment of the traditional site and perhaps reproductive failure. Procedures:Two to four wolves will be radio collared in each pack whose territory is believed to include potential impoundment areas and construction sites.The numbers of wolves in each pack will be determined, each pack's territory will be delineated and the degree and nature of use of potential impact areas will be determined through repeated relocations and observation of activities.Specifically,all den sites,rendezvous sites and favored hunting areas will be mapped.These data will be used to determine the degree of dependence of wolves on various areas that will be impacted by the Project. Dependency on various prey species will be determined by scat analysis and observation of hunting behavior and kills.This information will be used in conjunction with data from the accompanying studies of prey species,particularly the moose study,to estimate indirect impacts on wolves caused by a reduction in prey availability. Field activities and manpower for this study will be integrated with the moose study.Wolves frequently will be tagged and relocated at the same time as moose.Full funding of the moose study is required for the successful implementation of this study. 11-35 Schedule: FY 78 FY 79 FY 80 FY 81 FY 82 FY 83 Cost: FY 78 FY 79 FY 80 FY 81 FY 82 FY 83 Radioco11ar wo1ves~monitoring flights. Replace lost radios,monitoring flights. Replace lost radios,monitoring flights. Radioco11ar new wolves to fill data gaps. Monitoring flights. Monitoring flights. Monitoring flights. $55,000 $36,000 $29,000 $40,000 $25,000 $13,000 11-86 Title:Effects of the Susitna Hydropower Project on black and brown/grizzly bears. Objectives:To estimate the numbers of black and brown/grizzly bears using the area to be impacted by the Susitna Hydropower Project. To determine the dependency of these bears on areas to be impacted, with emphasis on identification of denning areas and seasonal feeding areas. Background:Very little is known of either brown or black bear populations in the Susitna Basin except that brown bear densities appear to have been very high for several years.We do not know how many bears inhabit the area or how dependent they are on the impoundment areas.Studies should be conducted to estimate bear numbers in and surrounding project area~determine whether the same bears are resident or whether a larger number have a seasonal dependency on the area~and determine the location and extent of denning activities. A major problem with any large construction project is the a'L:traction of bears to camps and construction sites.This usually results in threats to human safety,delays in construction and destruction of bears.If areas of bear concentration can be identified and avoided during construction, these problems can be substantially reduced. Procedures:Bears will be radiocollared in the project area.Movements in and around the area will be monitored.Den sites and concentration areas will be mapped. Bear numbers will be estimated through marked/unmarked ratios observed during spring and fall composition counts and by recording all bears seen during tracking flights. Field activities for this study will be closely integrated with those for the moose and wolf studies.Full funding of the moose study is required for the successful implementation of this study. Schedule: FY 79 FY 80 FY 81 FY 82 Cost: FY 79 FY 80 FY 81 FY 82 Radiocollar bears,monitoring flights composition counts. Monitoring flights,composition counts. Monitoring flights,composition counts. Monitoring flights. $95,000 $57,000 $50,000 $35,000 II-87 Title:Effects of the Susitna Hydropower Project on wolverine. Objectives:To determine the population status of wolverines using areas to be impacted by the Susitna Hydropower Project. To determine movement patterns and identify habitats of seasonal importance to wolverines. Background:Less is known about the wolverine than any other big game species in Alaska.Threatened with extinction throughout most of its range in the Scandinavian countries,parts of Russia,the continental United States and Eastern Canada,it is still considered relatively abundant in Alaska.Studies in Idaho and Sweden indicate that wolverines have exceptionally large home ranges.Records of males moving 15 miles in a 24 hour period are not uncommon. The Talkeetna mountains on either side of the Susitna River between Gold Creek and the MacLaren River presently support a healthy population of wolverines.Although th~ir density is not known at this time,it is probably as high or higher there than ,in any other portion of their range in Southcentral Alaska.Because the welfare of this species in Alaska is of both national and international concern,some intensive efforts to determine the status,distribution,and movement patterns of wolverine in the project area are warranted. Procedures:A limited number of wolverines will be radiocollared and tracked in conjunction with other telemetry studies in the area.Home ranges,movement patterns,and seasonal habitat use will be determined by systematic relocation of radiocollared animals. A systematic aerial survey of wolverines and their tracks will be made in conjunction with wolf studies to determine the distribution and numbers of wolverines using the area. These data will be used to estimate the number of wolverines using the impoundment areas,determine the degree of dependency of certain wolverines on those areas and identify specific areas of importance to wolverines. ,Schedule:. FY 79 FY 80 FY 81 Cost: FY 79 FY 80 FY 81 Radiocollar,monitoring flights,census. Radiocollar,monitoring flights,census. Monitoring flights. $30,000 $25,000 $10,000 11-88 Title:Distribution and status of Dall sheep adjacent to the Susitna Hydropower Project area. Objectives:To determine the numbers of Dall sheep inhabiting mountains adjacent to proposed dam sites. To delineate the seasonal ranges of the sheep population. Background:A relatively isolated sheep population inhabits mountains adjacent to the proposed dam sites.While there will probably be little direct impact on this population by the proposed project,there is a possibility of adverse impacts from human disturbance a's a result of dam construction activities and increased access. Procedures:Aerial surveys will be conducted to determine the size of the sheep population and to delineate seasonal ranges. Schedule: FY 79 FY 80 FY 81 Cost: FY 79 FY 80 FY 81 Aerial surveys. Aerial surveys. Aerial surveys. $3,000 $3,000 $1,000 11-89 Title:Distribution and abundance of furbearers and small game in the proposed Susitna Hydropower Project impoundment areas. Objectives:To determine the distribution and relative abundance of furbearers and small game in the proposed impoundment areas and determine the degree of use of those species by humans. To determine the dependence of furbearers and waterfowl on downstream habitats which will be altered by changes in water flow. Background:Little is known about the distribution and abundance of either furbearers or small game.In order to assess the potential impact of the project on small game it will be necessary to conduct a basic biological reconnaissance.It is known from data collected incidentally to other projects that the Susitna River Basin provides habitat for large numbers of fox,wolverine,and river otter.All three of these species are highly sought by trappers. Stabilization of water flow could substantially alter aquatic furbearers and waterfowl habitat downstream. Procedures:Limited aerial surveys will be conducted to determine the presence,distribution and relative abundance of fox,otters,beavers, ptarmigan,waterfowl and raptors.On the ground observations will be made in conjunction with the nongame project. Trappers and residents of the area will be interviewed. Surveys of aquatic furbearers and waterfowl will be conducted in downstream areas of probable habitat alteration that will be identified by studies on the effects of water flow on habitat. Schedule: FY 79 FY 80 FY 82 FY 83 Cost: FY 79 FY 80 FY 82 FY 83 Surveys in impoundment areas,interviews. Surveys in impoundment areas,interviews. Surveys downstream. Surveys downstream. $35,000 $35,000 $25,000 $25,000 11-90 Title:Distribution and abundance of nongame species of wildlife in the area to be impacted by the Susitna Hydropower Project. Objectives:To determine the occurrance,distribution and relative abundance of small mammals and passerine birds in the proposed impoundment areas. Background: abundance of birds in the conducted: Little is known about the occurrence,distribution or small mammals and both resident and migratory passerine Project impact area.A limited reconnaisance should be Procedures:A literature search will be conducted.Surveys from the ground will be made and limited trapping will be done.Portions of this study will be coordinated with small game and furbearer studies. Schedule: FY 79 FY 80 Cost: FY 79 FY 80 Literature search,initiate surveys. Complete surveys. $7,000 $8,000 I1-91