Mt. Hood Solutions
Plant Relocation
The project involved relocation of process manufacturing equipment for a chemical processing
plant. The scope included civil, structural, mechanical, piping and electrical modifications of the
new facility, and close coordination with the owner to minimize process downtime.
Tom Mulflur
503-227-3505
$2,700,000
7/08 – 11/08
Schnitzer Steel
Metal Screening Project
The project entailed installing 18 new conveyors and mechanica l screen for a scrap metal facility.
The project was design build, and executed in a two month period of time, including all civil,
structural steel, equipment, piping and electrical.
Darrell Ford
503-286-6911
$1,300,000
8/08 – 10/08
Hecla Mining
Process System Upgrade
The project involved an expansion of processing capabilities for a silver mine. The scope
included civil, steel erection, mechanical, pipe and electrical for the new ore refining area.
Dale Dean
208-769-4197
7/08 – 11/08
$2,500,000
Jorgensen Forge
Tacchi and Bar Peeler Foundations
The project included installation of foundations for installation of two vibration sensitive pieces of
equipment. The scope included demolition, sheet piling, excavation, formwork, rebar, embeds
and concrete.
Pat Collins
206-357-1068
$900,000
2/08 – 8/08
T-5 Hallbuck Marine
Soda Ash Expansion
The project consisted of supply and installation of 2,000 LF of belt conveyor for an existing soda
ash storage facility, along with take-up towers.
Rachael Brake
360-213-0474
$1,700,000
8/07 – 11/07
Aurora Energy
Baghouse Installation
The project consisted of mechanical installation of a 350,000 ACFM baghouse for an existing coal
fired power plant.
Randy Hobbs
907-278-7283
$450,000
7/06 – 8/06
Ashgrove Cement
Electrical Service Building
Relocate 2000 amp electrical service, 4.2kv primary feeder, 1500kva transformer, service
switchgear, MCC and power panels
Mike Begley
206-623-5596
$600,000
7/07 – 10/07
Oregon Steel Mills
Warehouse Storage Building
Construction of a 45’ x 100’ pre-engineered metal building, including foundation, structure,
electrical, HVAC and fire protection
Phillip Angelechio
503-978-6062
$350,000
9/07 – 12/07
Hecla Mining Company
Plant Expansion
Installation of foundations, steel, equipment, piping a nd electrical for silver mine expansion
Dale Dean
208-769-4197
$5,000,000
6/07 – 12/07
Cascade Steel Rolling Mills
Billet Yard Craneway
Installation of piling, foundations, electrical and 1,300 tons of steel for new overhead crane
system
Arden Tarum
503-434-3216
$9,000,000
11/06 – 5/07
Oregon Steel Mills
Coating Mill
Installation of concrete slabs and equipment for new Spiral Tube Coating Facility
Phillip Angelechio
503-978-6062
$4,000,000
9/06 – 3/07
RR Donnelly
Printing Press Electrical Service
Installation of 4000 amp electrical service for new printing press, including new 12kv primary
feeder, 3000kva transformer, and 480 volt secondary service conductors
Frank Womack
503-251-3608
$550,000
6/06 – 8/06
Oregon Steel Mills
Spiral Tube Mill
Installation of concrete foundations, equipment and piping for new Spiral Tube Facility
Phillip Angelechio
503-978-6062
$7,000,000
11/05 – 3/07
Oregon Steel Mills
Roll Grinding Machine
Installation of foundations, steel, equipment and piping for new Roll Grinding Ma chine
Bob Appleby
503-286-9651 ext. 2252
$1,750,000
6/05 – 12/05
Hawaiian Commercial & Sugar Company
Product Storage Warehouse
Installation of concrete foundation and building for a 35,000 SF warehouse
Robert Hirozawa
808-877-6911
$900,000
4/05 - 9/05
Hecla Mining Company
Plant Expansion
Installation of foundations, steel, equipment, piping and electrical for silver mine expansion
Dale Dean
208-769-4197
$1,700,000
9/05 – 11/05
BOC
Plant Maintenance
Ongoing maintenance for gas production plants, including mechanical and process piping work.
Doug Sponseller
503-681-8833
$250,000
6/03 – Present
General Energy Services
Power Plant Shutdown
Fabrication and installation of power piping spools for gas-fired cogen shutdown
Terry Toland
360-992-3065
$100,000
4/05 – 5/05
Nalco Chemical
Process Piping Projects
Fabrication and installation of small and large bore, carbon and stainless steel pipe for a chemical
production plant.
Brett Misener
360-694-9587
$150,000
7/05 – 9/05
West Linn Paper
Process Piping Projects
Fabrication and installation of large bore stainless steel piping for paper mill.
Bob Hart
503-557-6525
$125,000
6/05 – 9/05
Boise Paper
Process Piping
Fabrication and installation of 3” stainless steel piping.
Dave Tobin
509-546-3415
$100,000
4/05 – 5/05
Owens Corning
Plant Maintenance
Completed a variety of civil, structural, mechanical and piping projects for an asphalt shingle
plant.
Mike Engh
503-273-1450
$15,000 (Average contract size)
6/02 - present
Port of Tacoma
Control Tower Stairway
Fabrication and installation of new galvanized access stairway for control tower at the Port of
Tacoma.
Poli Luis, Jr.
253-428-8638
$75,000
4/03 – 5/03
HC&S Sugar
Power Plant Outages
Provide boilermaker and millwright services for power plant outages on an annual basis.
Steve Onaga
808-877-6911
$500,000 (Average Contract)
1/03, 1/04, 1/05, 1/06, 1/07
Columbia River Carbonates
Micronatex Addition
Installation of structural steel, mechanical equipment and piping for calcium chlorate plant.
Don Connell
360-225-4152
$400,000
3/03 – 6/03
Ashgrove Cement
Ventilation Project
Demolition of existing dust collection system and installation of new pipe, baghouse and rotating
equipment.
Gary Wright
503-247-5424
$400,000
10/02 – 12/02
Owens Corning
Miscellaneous Maintenance Projects
Completed a variety of civil, structural, mechanical and piping projects for an asphalt plant.
Tony Katzenberger
503-273-1467
$15,000 (Average contract size)
6/02 - present