HomeMy WebLinkAboutCostworksheet ver 2 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Estimated at 2 megawatts of run-of-river hydro. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other This information would need to be obtained through Alaska Power and Telephone. ii. Rated capacity of generators/boilers/other iii. Generator/boilers/other type iv. Age of generators/boilers/other v. Efficiency of generators/boilers/other b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor ii. Annual O&M cost for non-labor c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) i. Electricity [kWh] ii. Fuel usage Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Mat anuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 3. Proposed System Design a) Installed capacity .5 to 2 megawatts of hydroelectric b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] To be determined iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system To be determined by feasibility study b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat iii. Transportation b) Price of displaced fuel c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale To be determined by Feasibility Study Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio The final report of the feasibility study will discuss the project benefit/cost ratio and make a recommendation to the Authority. Payback