RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1
Application Cost Worksheet
Please note that some fields might not be applicable for all technologies or all project
phases. Level of information detail varies according to phase requirements.
1. Renewable Energy Source
The Applicant should demonstrate that the renewable energy resource is available on a
sustainable basis.
Annual average resource availability. Estimated at 2 megawatts of run-of-river hydro.
Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel)
2. Existing Energy Generation
a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank)
i. Number of generators/boilers/other This information would need to be obtained through
Alaska Power and Telephone.
ii. Rated capacity of generators/boilers/other
iii. Generator/boilers/other type
iv. Age of generators/boilers/other
v. Efficiency of generators/boilers/other
b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank)
i. Annual O&M cost for labor
ii. Annual O&M cost for non-labor
c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the
Railbelt grid, leave this section blank)
i. Electricity [kWh]
ii. Fuel usage
Diesel [gal]
Other
iii. Peak Load
iv. Average Load
v. Minimum Load
vi. Efficiency
vii. Future trends
d) Annual heating fuel usage (fill in as applicable)
i. Diesel [gal or MMBtu]
1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden
Valley Electric Association, the City of Seward Electric Department, Mat anuska Electric Association and Anchorage
Municipal Light and Power.
Renewable Energy Fund
RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2
ii. Electricity [kWh]
iii. Propane [gal or MMBtu]
iv. Coal [tons or MMBtu]
v. Wood [cords, green tons, dry tons]
vi. Other
3. Proposed System Design
a) Installed capacity .5 to 2 megawatts of hydroelectric
b) Annual renewable electricity generation
i. Diesel [gal or MMBtu]
ii. Electricity [kWh] To be determined
iii. Propane [gal or MMBtu]
iv. Coal [tons or MMBtu]
v. Wood [cords, green tons, dry tons]
vi. Other
4. Project Cost
a) Total capital cost of new system To be determined by feasibility study
b) Development cost
c) Annual O&M cost of new system
d) Annual fuel cost
5. Project Benefits
a) Amount of fuel displaced for
i. Electricity
ii. Heat
iii. Transportation
b) Price of displaced fuel
c) Other economic benefits
d) Amount of Alaska public benefits
6. Power Purchase/Sales Price
a) Price for power purchase/sale To be determined by Feasibility Study
Renewable Energy Fund
RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 3
7. Project Analysis
a) Basic Economic Analysis
Project benefit/cost ratio The final report of the feasibility study will discuss the project
benefit/cost ratio and make a recommendation to the Authority.
Payback