Loading...
HomeMy WebLinkAboutSusitna FERC Vol 10B exhibit E chapter 11 1983,.SUSITNA HYDROELECTRIC PROJE FERC l,.ICENSE APPLICATION PROJECT NO.7114-000 ...~....."a=~Ar:".lulu.27.1983" - - - DATE DUE- - - - - - - I - Demeo,Inc.38-293 -- ARLIS Alaska Resources Library &Information Services Anchorage,Alaska - ...... - AUG 2 3 1983 BEFORE THE FEDERAL ENERGY REGULATORY COMMISSION APPLICATION FOR LICENSE FOR MAJOR PROJECT SUSITNA HYDROELECTRIC PROJECT VOLUME lOB EXHIBIT E Chapter 11 FEBRUARY 1983 lK:1 6 0 \L.\'Ls,. ,S~ Fl1r\ no ,11;2.. ..... ARLIS Alaska Resources Library &Informat1on Services Anchorage,Alaska I....--__ALASKA POWER AUTHORITY __----I - - .-. - SUSITNA HYDROELECTRIC PROJECT VOLUME lOB EXHIBIT E CHAPTER 11 ApPENDICES I THROUGH J AGENCY CONSULTATION APPENDIX Ell! CORRESPONDENCE RELATING TO DRAFT LICENSE REVIEW - ,~ - - .... APPENDIX 11.1 DRAFT LICENSE REVIEW On November 15,1982,a Draft Exhibit E of the license application was distributed to appropriate federal,state,and local agencies.Following the workshop (see Appendix 11.H)and the 60-day review period,comments were received from the resource agencies.This appendix contains copies of all agency correspondence received related to review of Draft Exhibit E. Responses to all these comments are contained in Volume _of this chapter. Comments relating to any mitigation measures or facilities recommended by the agencies are addressed specifically at the end of the appropriate chapters of Exhibit E. - -[Ii] Dear November i5,1982 Susitna Hydroelectric Project Document Transmittal -- On behalf of the Alaska Power Authority I am pleased to provide herewith a draft of Exhibit E of the license application for the Susitna Hydro- electric Project.Your earliest possible review and comment would be very much appreciated. Approximately a month ago,Acres American Incorporated informed you that today's distribution would be made,and advised you of our plans to hold a workshop during the week of November 29 through December 3, 1982.I am convinced that,with your cooperation,the workshop sessions will be extremely valuable to us as a partial basis for refining and improving the enclosed document. Earlier this year,your agency received copies of the draft feasibility report for the Susitna Hydroelectric Project.With a few exceptions generally noted in the attached document,Volume 1 (Engineering and Economic Aspects)of the draft feasibility report remains valid. (Particularly important project changes since March,1982 include a new access plan and a major modification to the post-project flow regime.)Volume 2 (Environmental Report)of the draft feasibility report is superseded by the attached draft Exhi bit E.'. Simultaneously with your receipt of this draft Exhibit,we are delivering copies of the draft license application to the Federal Energy Regulatory Commission (FERC).FERC's critical review along with your input to us will greatly influence the content of the final application now planned for submission on February 15,1983. It is my sincere desire that we can together achieve interactive,face- to-face consul tation on the various aspects of the project.The WOt~k­ shop noted above will be valuable in that regard.Insofar as written comments are concerned,I would very much appreciate it if we could receive them --even in draft form if necessary --by the end of December. The final deadline for receipt of written comments is 60 days after your receipt of the enclosed document. ACRES AMERICAN INCORPORATED Consulting Engineers The Liberty Bank Building.Main at Court Buffalo.New York 14202 .-Telephone 716-853-7525 Telex 91-6423 ACRES BUF Other Offices:Columbia,MD:Pittsburgh,PA:Raleigh,NC:Washington,DC November 15,1982 Page 2 Please be assured that after the official application is submitted to FERC, you will have continuing opportunity for review as an essential part in the licensing process. Thanking you in advance for your diligent efforts on this important matter, I am Sincerely, C.A.Debel ius Project Manager Enc1:a/s ACRES AMERICAN INCORPORATED Letter on Preceding Page a~d Copy of Draft Exhibit E was Provided To: - Mr.John E.Cook Reqional Director Alaska Region National Park Service 450 West Fifth Avenue Anchorage,Alaska 99501 Mr.Larry Wright National Park Service 1011 East Tudor Road Suite 297 Anchorage,Alaska 99503 Director of Planning Fairbanks-North Star Borough 520 5th Avenue P.O.Box 1267 Fairbanks,Alaska 99701 Mr.David Haas State-Federal Assistance Coordinator State of Alaska Office of the Governor Division of Policy Development and Planning Pouch AW Juneau,Alaska 99811 Ms.Wendy Wolt Office of Coastal Management Division of Policy Development &Planning Pouch AP Juneau,Alaska 99811 Mr.Roy Huhndorf President Cook Inlet Region,Inc. P.O.Box 4N Anchorage,Alaska 99509 Mr.Phil Emery Office of the Director U.S.Geological Survey 218 IIE II Street Anchorage,Alaska 99501 Mr.Robert Lamke Water Resources U.S.Geological Survey 733 West 4th Avenue Suite 400 Anchorage,Alaska 99501 Mr.John Katz Commissioner Alaska Dept.of Natural Resources Pouch M Juneau,Alaska 99811 Mr.Alan Carson Division of Natural Resources Alaska Dept.of Natural Resources Pouch 7-005 Anchorage,Alaska 99510 Mr.Lawrence H.Kimball Jr. Di rector Division of Community Plann'ing Department of Community and Regional Affairs 225 Cordova,Bldg.B Anchorage,Alaska 99501 Mr.Ed Busch Planning Supervisor Dept.of Community and Regional Affairs 225 Cordova,Bldg.B Anchorage,Alaska 99501 Mr.Robert McVey Director,Alaska Region National Marine Fisheries Service NOAA P.O.Box 1668 Juneau,Alaska 99802 Mr.Brad Smith Anchorage Field Office National Marine Fisheries Service 701 C Street,Box 43 Anchorage,Alaska 99513 Mr.Michael Meehan Director,Planning Department Municipality of Anchorage Pouch 6-650 Anchorage,Alaska 99502 Mr.Ernst W.Mueller Commissioner Alaska Department of Environmental Conversation Pouch 0 Juneau,Alaska 99811 Mr.Robert Martin Alaska Department of Environmental Conservation 437 E Street,2nd Floor Anchorage,Alaska 99501 Co 1.Neil E.Sa il i ng District Engineer Alaska District U.S.Army Corps of Engineers P.O.Box 7002 Anchorage,Alaska 99510 Mr.Wayne A.Bodin District Manager U.S.Bureau of Land Management 4700 E.72nd Avenue Anchorage,Alaska 99507 Mr.John Rego Bureau of Land Management Anchorage District Office 4700 E.72nd Avenue Anchorage,Alaska 99507 Mr.Keith Schreiner Regional Director.Region 7 U.S.Fish and Wildlife Service lOll East Tudor Road Anchorage,Alaska 99503 Mr.Robert Bowker U.S.Fish and Wildlife Service Western Alaska Ecological Service 733 W.4th Avenue Anchorage.Alaska 99501 Page 2 Mr.Gary Stackhouse U.S.Fish and Wildlife Service lOll East Tudor Road Anchorage,Alaska 99503 Mr.Ty Dillip1ane State Historic Preservation Officer Alaska Dept.of Natural Resources Division of Parks 619 Warehouse Avenue.Suite 210 Anchorage,Alaska 99501 Mr.Herb Smelcer.President General Manager AHTNA Corporation Drawer G Copper Center,Alaska 99573 Mr.Ronald O.Skoog Commissioner State of Alaska Department of Fish and Game P.O.Box 3-2000/Subport Bldg. Juneau,Alaska 99801 Carl M.Yanagawa Regional Supervisor for Habitat Division State of Alaska Department of Fish and Game 333 Raspberry Road Anchorage,Alaska 99502 Don McKey Habitat Protection Section State of Alaska Dept.of Fish and Game 333 Raspberry Road Anchorage,Alaska 99502 Mr.William Lawrence U.S.Environmental Protection Agency Alaska Operations Office 701 C Street,Box 19 Anchorage,Alaska 99513 Mr.Claudio Arenas Planning Director Matanuska-Susitna Borough Box B Palmer,Alaska 99645 Mrs.Agnes Brown President and Chairman Tyonek Native Corporation 912 East 15th Avenue,Suite 200 Anchorage,Alaska 99501 ""'" UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmi:lspheric Administration National Marine Fisheries Service P.o.Box 1668 nE'1f\fii ~.J'.'~.<'._....••~.Juneau~Alaska 99802 ur~~'~~'nl A1Ast<APdNER"-~ AUrHORm J 'SUSITNA FILE P5l~1·t.-!-/I Alaska Power Authority 99510 November 29,1982 Mr.Eric Yould Executive Director, 334 West 5th.Ave. Anchorage,Alaska Dear Mr.Yould: SEQUENCe No.1 .t:-J 2.()3 ~'I 1 i ~ §~~I ~'jtJu..II)[..-i 4'.?;0 ~I -I--_..j JDG i 1-1'--t---------l [)iTS 1--+-£.----II!""JWH',1--_.._, ~Rn •f--------I Sell I..~-"I~le have received a letter from Acres American dated November 15;1982L-MPB. accompanying the Draft FERC license application Exhibit E for the.WD Susitna Hydroelectric Project.In that letter our comments are re--MS -_.--- quested,and a deadline for receipt of written comments established as'R.C --1--: 60 days after receipt of the document.As you know,the FERC gui del i n-e;-DF ----! require consultation between the applicant and the National r'1arine --·--1 Fisheries Service (NMFS)regarding project impact to the environment 1_DC .I' Specifically,Subpart E,section 4.41 (f)requires an environmental 'I~r-~=== report (License Exhibit E)to be prepared after consultation with NMFD I and that NMFS shall be afforded a minimum of sixty (60)days for consul BUFF,. tation and documentation of concerns.The FERC has clarified this RlE process in jtsApri1 1982 publication Application Procedures for Hydro- pm"er Licenses,Exemptions and Preliminary Permits.Appendix A of this document concerns the Consultation Process,and describes a three-level process;initial agency contact after which an application is prepared; formal consultation requested by the applicant who at this stage pro- vides NMFS with a copy of the application,a detailed description of the project and the results of any studies performed,then must allow a minimum of 60 days for agency comment;and finally documentation of the consultation process,wherein the applicant presents in the application its response to comments and recommendations received during the agency review period. ,~ ,..... - As we enter the second stage of this process,our agency recognizes the concerns over permitting and licensing delays and wishes to provide as timely a response as possible.However,the 60 day review constitutes the minimum period prescribed by FERC for all projects larger than 5 MW. Considering the magnitude of the Susitna proposal and the environmental values which must be addressed,we believe a more liberal response period is certainly appropriate. 2 Also,as suggested by the FERC 1982 Application Procedures,our review would be facilitated by receiving the complete application and werequestthatsuchbeprovided. Sincerely, /-.~·-9/6~f /ROb7A~y~ctor,Alaska Region DEC 081982 ALASKA POWER AUTHORITY 34 WEST 5th AVENUE·ANCHORAGE,ALASKA 99501 Review of Draft Exhibit E,Susitna Hydroelectric Project UASKA POWEll AUTHORITY SUSITNA Phone:(907)2n·7641 (907)276-0001 Susitna File 78.2.7 Task 7.1 December 6,1982 Service .__._----..- - F1LE.:2f.-_ ~r.9U7tC?~~ -.!I ~.'~.1\~.'I ~IMr.Robert W.McVey \~I 0 ~Director,Alaska Region -~\JOG'---National Marine Fisheries '.....--IVTS-P.o.Box 1668 j ~\lH-'-TJuneau,Alaska 99802rc,'-=!SUbject: I Dear Mr.McVey: The letter transmitting a copy of Draft Exhibit E pointed out that the description of facilities remained unchanged from that found in the Feasibility Report (with the exception of access and transmission routes).As your agency is already in receipt of the Feasibility Report,we did not send you copies of the engineering draft exhibits. Until submission of the formal application,we are trying to minimize distribution of transitory documents to reduce the burden of review upon agencies.We suggest it may be appropriate to wait for the application document in February,but,if you wish to review these documents as well,we will attempt to make a set available. :\..~';.:-I The Alaska Power Authority appreciates the burden that our request :~c -por a sixty-day review and comment on the Draft Exhibit E makes upon DF -your staff.To assist them in their review,we presented extensive ------material to agency personnel during the review workshop from ..DC November 29,1982,through December 2,1982.Our intenti on was to ~~~~~acilitate the sixty-day review and comment period which we feel must be ~!1aintained if the Power Authority is to remain on its submission1--+B-U-FF-.-+--I~chedule. ~-+-- RLE Sincerely, FOR THE EXECUTIVE DIRECTOR --/I Richard S.Fleming Deputy Project Manager,Environment Susitna Hydroelectric Project RSF:cb cc:<·John~.Hayden,Acres American,Anchorage Gary Lawley,-Envfrosphere,Anchorage u.s.DEPARTMENT OF COMMERCE National OCllanic and Atmospheric Admfnf.tr8tfan NationaZ Marine Fisheries Service 701 C St./lox 43 JAN 27 1983 Anchorage,Alaska 99513 BUFF. IfilE Mr.Eric Yould Executive Director Alaska Power Authority 334 ~J.5th.Ave. Anchorage,Alaska 99501 January 12,1983 SJLDearI~r.Yould:1!.JIB -I The National Marine Fisheries Service is currently reviewing the draft li~-slwD~--I application Exhibit E for the Susitna Hydroelectric project.Due to staf~gi MS __ constraints and the magnitude of the Susitna project.we will require a ~v ~RC __ period exceeding the 60 day minimum specified in the FERC regulations.we-Df anticipate our official response will be completed and available to you b --OC------ January 28 of this year.APA------ Sincerely, "1 Sf:t~~·-r~'V~ Ronald J:orris Western Alaska Office Supervisor Environmental Assessment Division .,- .'r _..... January 25,1983 ...~....) .nDD 00J0 83 UNITED STATES DEPARTMENT OF COMMERCE National Oceanic and Atmospheric Administration National.Marine Fisheries Service P.o.Bo:z:1668 Juneau,ALaska 99802 RECEIVED JAN 2 G1983 A\~~\A r~//w'i 1~~~.0":<:;l Mr.Eri c Youl d Il·E P/5T:A/I Executive Director,Alaska , •_I,I _!334 W.5th Avenue SEQL':-dCr:N c.~Anchorage,Alas ka 99501 r--I I 1 Dear Mr.Youl d:z~i a:i 1-' §~I ~\'~1The National Marine Fisheries Service (NMFS)is entrusted with Federal 4'I ~~\'jUrisdiction over marine,estuarine,and anadromous fishery resources.-;-,r.r.7:-r--Under Reorganization Plan No.4 of 1970,3 C.F.R.Section 203 (1970-f~l,,"~--I~compilation),reprinted in 5 U.S.C.Appendix II at 64 (1970),NMFS was -irl:.:.~;-~;established to exercise those functions previously carried out by the Ii :--";;--i-;Bureau of Commercial Fisheries.By virtue of this delegation of ;__;authority,NMFS is responsible for oversight and evaluation of activi-Ir'---ties which may affect marine,estuarine,and anadromous ·fishery •resources.Under the Fish al1d Wildlife Act of 1956,16 -U.S.C.Section -'661-666 (c)requires that NMFS be consulted "whenever the waters of any ---,stream or other body of water are proposed or authorized to be im- ---'pounded •••for any purpose whatever ••~by any public or private agency -I _.,---.tunder Federal permit or 1icense.1I NMFSinterests in the protection of --i~...j-marine,estuarine,and anadromous fishery resources also derives from J ~."•._._'.',....I-J _1---1 the.Anadromous.Fish Conservation Act,the Magnuson Fishery Conservation 1--'n'lA =1 land Management Act,and the National Environmental Policy Act.The FERe1rulesandregulationsrequireconsultationwithNMFSwheneveraproject :~~~.- -may affect anadromous,estuarine,or marine fishery resources. FILE~~---------The National Marine Fisheries Service has reviewed draft Exhibit E of _the Jicense_application for_the.Susitna Hydroelectric_Project._We are._._ submitting comments on this document which satisfy,in part,the agency coordination mechanism established by the Federal Energy Regulatory Commission (FERC).The formal position of NMFS in regards to the Susitna Project has been requested and provided to the Alaska Power Authority (APA)in several previous instances.Specifically,we refer to the following NMFS correspondence which should be considered,along with the Exhibit E comments,as formal ~oordination. ~.Letter to Eric Yould from Robert McVey,Director,Alaska Region .....NMFS,November 29,1982 • .,....z.Statement of Robert McVey before the Alaska Power Authority Board of Directors,April 16,1982. 3.Letter to Eric JOl,lJd Jr".o,m Robert McVey,October 15,1982. ,..~I _-.J •t •.....:../.L...=.:~..~_~_. .....y',APR I I Em -r>'~._S~:1;tj;~'::::cr~?-:;". 2 v Because of the nature and magnitude of this project,and certain unresolved issues concerning resources for which NMFS bears responsibility,we do not feel the formal consultation process is complete at this stage.NMFS will continue to assist your agency throughout the planning and licensing process. General Comments Our review found this license exhibit to be very informative and gen- erally well developed.It represents a considerable improvement over the 1981 Feasibility Report,particularly in its consideration of filling concerns and in discussing project effects from a Watana alone and Watana/Devil Canyon combined perspective. We have not commented extensively on chapters 5,Socioeconomic impacts or 10,Alternatives.However we believe it is important to recognize certain recent developments which will influence the feasibility of this project.World oil prices have failed to escalate as projected in earlier economic studies.Natural gas alternatives have been influenced by recent pricing agreements and a proposal to construct a gas pipeline capable of supplying much of the Southcentral population.We have recently revi ewed the Batte 11 e Rail be 1t El ectri c Power Authori ty Study Newsletter #4,December,1982.This newsletter presents an updated electrical demand forecast which,for the year 2010,is 44 percent lower than the 1980 ISER forecast.Load forecasts will dictate facility design and operations which,in turn,will determine the amount of water required for power production and available for downstream fisheries flow.In an ACRES report of October 1982,Energy Simulation Studies to Select Project Drawdown and Mitigation Flows,energy simulations were made which assumed a medium load forecast for the year 2010 of 7791 GWH, a figure significantly in excess of the recent Battelle forecast of 3844 and 4986 for medium and low 2010 demand.It appears that many of the basic economic premises upon which this project was planned have now changed.We believe the license application should fully consider the impact of these events and discuss their effect or impact on overall project feasibility,the need for Watana to be_operational by 1993,and the economics associated with providing sufficient downstream flows to minimize fishery impacts. The data gathered from the environmental field studies,begun in June 1981,and presented in the Exhibit,show the Susitna River system to support large,valuable runs of pacific salmon,other anadromous fish, and several freshwat~r resident fish species.T~e proposed project would impact these resources,particularly in that reach of the Susitna River between Devil Canyon and Talkeetna.The primary interests and concerns of NMFS in the Susitna feasibility studies have been to assure that (1)the fishery resources are identified and quantified,(2) specific impacts are identified,(3)impacts are avoided whenever possible,and (4)specific and effective mitigative measures are developed for all unavoidabl~adverse impacts. ,~ - - "'"' !"'" I ~- ,~ 3 The results of these studies and other materials presented within license Exhibit E indicate that project construction and operation will significantly affect fishery resources through changes in streamflow, water quality,temperatures,ice conditions,vegetation,and slough habitat.Studies to identi~y and assess these changes and to describe the fishery resources of the project area were initiated in 1981.At this time two field seasons of data have been gathered.However,the draft Exhibit E does not.include most of the 1982 data nor the results or analysis of that data.The document clearly suffers by this omi~sion,and we recommend that Exhibit E of the license application include a presentation and analysis of the 1982 data. Throughout Exhibit E references are made to ongoing or proposed studies which will address issues we consider critical to the feasibility of this project.Yet it is not clear what these studies will entail,who will conduct them or when they will occur.We recommend that the license application detail ongoing and proposed studies. The information presented in Exhibit E regarding reservoir operations does not sufficiently convey the range of impacts presented by the project.We recomnlend the license application be expanded to include a more precise description of impacts and present the following design/operating concerns:. Flow releases -based upon weekly rather than monthly averages. Quantification of II norma lll spillages,below the 1 in 50 year event, passed through the outlet/cone valve facility. Potential peaking operations at Watanawithout the Devil Canyon Dam. ACRES has identified this as a possibility.What circumstances would dict1ate such operation?What daily and hourly fluctuations would result?How would such 'fluctuations be attenuated by tributary input and the river distance between Watana and Devil Canyon? Compensation flow pumps at the Devil Canyon facility.What flows will they provide?How were these flows established?Are these pumps still planned for this facility? We continue"to be concerned about development"of"a release schedule which would mitigate impacts to fisheries.The draft Exhibit Estates that reduced flows could impair fish migration,de-water spawning and rearing habitat,prevent access to slough and side channel habitats,and lower or eliminate inter-gravel flows to slough and side channel spawning grounds.The minimum flows proposed in Exhibit E,however, were not developed using any recognized in-stream flow predictive methodologies,and may not constitute the preferred flow regime for minimizing such effects.The license exhibits do not explain how the 12,000 cubic feet per second (cfs)minimum operational flows for August and September were determined.We note that these flows have been reduced from those recommended minimum flows presented in the 1982 Final Draft Feasibility Report,Volume 2.Similarly,no rationale is provided which supports II minimum ll winter flows ten times that of existing natural winter flows.We believe that maximum winter flow limits should be required as well,particularly in light of p'otential staging should ice cover develop below Devil Canyon. 4 Exhibit E suggests that it may be desirable to spike spring flows to accommodate out-migrants and facilitate flushing of sloughs and side channels.It also states that the project release schedule will need to incorporate both vol ume and temperature consi derati ons.However', neither of these concerns is reflected in the proposed flow regime.The release schedule presented is not supported by biological data,nor does it reflect concerns for fish passage.We recommend that the license- application contain a specific,detailed flow release schedule, developed through a guantifiable in-stream flow analysis and coordinated with NMFS.US Fish and Wildlife Service and the Alaska De artment of 1S an Game DFG,which wou d minim1ze impacts and/or en ance conditions for s awnin ,feedin,assa e,out-mi ration,and overw1ntering in t e Susitna River. The Watana and Devil Canyon dams will cause changes to the existing water temperature regime of the Susitna River,generally releasing cooler water during summer months and warmer water in winter. Temperature variations affect the ability of fish to migrate,spawn, feed,and develop in the Susitna system.Ice formation will be delayed or possibly not occur.Exhibit E discusses this matter at length but does not present an accurate description of post-project temperature alterations.A model was developed to project temperatures,yet it has been operated with only one year of data (1981).Further,this model was run only for the months of June through October.Temperature modeling is not presented for the Devil Canyon Reservoir,yet Exhibit E states that the location of ice formation above Talkeetna will depend on the outflow temperatures from Devil Canyon Dam. Realizing the importance of an accurate understandin~of the thermal structure within the reservoirs and of outflow temperatures,we believe additional information is warranted.We recommend that modeling be done for both reservoirs throughout the year,and the resultant data be incorporated into the riverine temperature model calibrated with at least two seasons data. ----._...~---Of the various fish habitats below Devil Canyon Dam.the sloughs between Talkeetna and Portage Creek are the most likely to be adversely affected by the proposed work.Approximately thirty-five sloughs exist in this reach.Adult salmon have been observed in at least twenty-six of these. Post project flows and water temperatures will present several significant impacts to these habitats.These are discussed in some detail in Exhibit E.However,on only one of these,slough 9,has detailed investigation been conducted which included groundwater flow, upwelling,and temperature studies.These sloughs are the most impor- tant spawning areas influenced by the mainstem Susitna River.They are also identified as potential sites for mitigating fishery resource losses through physical modification.We feel it is important therefore, that Exhibit E present an informed opinion based on site specific data as to the effects of project operation on slough habitat.In a draft ~. ..... I"'", .... - - ..- - - 5 report prepared for Acres American,Illc.1/,the author notes that until the 1982 field data are analyzed.any statements regarding streamflows necessary for chum salmon access to the side sloughs are provisional.Within Exhibit E.there are vague and seemingly contradictory statements concerning slough impacts.Statements are made ~jthin this Exhibit that data on the areal extent of upwelling within the sloughs at low flows are not presently available,that ground water upwelling is driven by mainstem river stage,that spawning areas of the sloughs may be affected by reduced upwelling,and that flows of 16.000 to 18,000 cfs are required for easy access to the sloughs.The document also contains statements that 12,000 cfs will provide access to most sloughs,that a 12.000 cfs release will assist in maintaining groundwater flow and upwelling within sloughs,and that changes in streamflow during the open water season predicted under operation of Devil Canyon are not expected to affect slough habitats.Clearly, post-project impacts to these important and sensitive habitats are poorly understood.NMFS recommends that the final license application contain the results and analfsis of the 1982 field data being gathered by the Alaska Department of ish and Game,et al,and results of an expanded study ·of sloughs in the Devil Canyon to Talkeetna reach which would provide a larger and more representative sample than currently available. Exhibit E discusses the impact of project construction and operations on river ice formation.Apparently,post-project ice formation will be delayed due to higher release temperatures from Devil Canyon. Currently,ice originating from the upper Susitna contributes 75 to 85 percent of the ice load to the lower River.With this input reduced or delayed by the project,ice formation on the lower River will be affected.This impact is not adequately discussed in the Exhibit. Ice formation above Talkeetna will also be delayed by the project.The location of the ice front in this reach has ilTlportant implications to fisheries habitat within the mainstem,side channels,and sloughs.In areas with ice cover,staging is expected to occur which would increase water surface elevations,possibly increasing upwelling,overtopping the ..__..._~.__upst~eam ..berms of sloughs.and causing 'high velocities and scour to occur. In those areas where ice formation does not occur,water elevations would drop below natuarally occurring levels,leading to potential de- watering of spawning gravels and reductions in upwelling areas.Exhibit E predicts that the ice front should occur at some location between Talkeetna,RM 100 and Sherman,RM 130 and will depend upon the upstream temperature,i.e.the"Devil Canyon outflow.As no model was completed for winter riverine or reservoir temperatures,the full scope and measure of these effects cannot be assessed. - 1.Pre1iminar Assessment of access b Habitat above Ta eetna.Drart Report. 1982. Salmon to Side Slou h erlcan.Inc.Novem er. i i 6 Measures to mitigate unavoidable impacts to fisheries resources are presented in the Exhibit.Many of those measures designed to mitigate construction impacts effectively address this concern.Development of a flow regime that minimizes loss of habitat and maintains normal timing of flow related biological stimuli is also proposed.We recommend that such a release schedule be included in the final license a~Plication. The Exhibit proposes to mitigate fishery losses by physica modification of side sloughs and creatio~of mafnstem and side channel spawning areas.This vague commitment to an approach that is only a paper concept dependent upon the results of ongoing or proposed studies does not allow us to fully evaluate the feasibility of the proposed project nor to assess the effectiveness with which project impacts can be mitigated. We support the concept of retaining the habitat value of side sloughs through physical alteration.Further,we recommend that Exhibit E incorporate a slough mitigation plan which identifies the sloughs to be modified,the desi n criteria,and the 0 erational lan and tar et fish species specific to each s oug.Detai s for the mitlgation goa sand operational monitoring efforts for this plan should be included.The applicant should note,however,that we feel the release schedule proposed in Exhibit E should be refined based upon an accepted instream flow predictive methodology and the specific requirements of the selected species.We believe this is essential to serious consideration of a slough modification program. Exhibit E states that if-alter.native mitigation schemes prove infeasi- ble,a hatchery could be developed.While we regard such artificial methods to be the least desirable form of addressing fishery losses,we realize that slough modification is largely untried in Alaska and that these mitigative efforts may indeed fail.Therefore,we recommend that Exhibit E should advance this discussion beyond the statement that lI a hatchery could be develo§ed.1I Information should be included within license Exhibit E which escribes the number of hatcheries needed, locations,sizes,what the production target for each species would be, g,l1d .cost,estimates._._.,,____.__.__.. Finally,none of the mitigative measures presented comply with FERC rules and regulations under Section 4.41 (F)(3)(iii);i.e.,costs for these features are not presented,nor are design plans for mitigation features included. Specific Comments Exhibit E Chapter One -No comment. Chapter Two .... ..... ..... --"..,...._.'- - 7 page 15,para.4.Breakup The section should describe when breakup normally occurs,specifically the dates of the earliest,mean,and latest recorded events. page 38,para.3 This section should consider that at least eight sloughs exist above Gold Creek,several of which support large numbers of spawning salmon, e.g.,slough 21.While Gold Creek may be a logical point at which.to gauge flow,it does not necessarily guarantee that upstream flowWlll be sufficient to maintain habitat value in these sloughs.Exhibit E should discuss this concern and recommend necessary measures to guarantee adequate flow to these sloughs. page 47.Section (v)Impacts on Sloughs The section notes that data to conftrm the areal extent of upwelling at low flows are unavailable at this time.Currently only one slough has been investigated sufficiently to predict project influences on groundwater and upwelling.This slough is not representative of all such sloughs in the Devil Canyon to Talkeetna reach. Under existing winter flows,ice formation causes staging equivalent to an open water flow elevation exceeding 20,000 cfs.Filling flows of 1,000 cfs,for which i.ce formation may be delayed or fail to occur, could significantly impact sloughs through de~watering gravel spawning areas and overwintering habitat . page 49,para 2 As the temperature of groundwater is considered a function of the average annual temperature of the rna instem Sus itna;.what will be the impacts of the second filling year release temperatures to the groundwater?How long would~ny change persist?No data are presented to support the statement that groundwater temperatures will not change. page 51,para 3.Monthly Energy Simulations The referenced program uti'i~ed load forecasts developed by ISER, Woodward-Clyde,and Battelle.These forecasts are now seriously questioned .in light of recent developments (see General Comments):We recommend these simulation studies be updated and run with the most recent load forecasts available. page 58,para.1.Reservoir and Outlet Water Temperatures .This suggests that winter outflow temperatures between 1°and 4°C can be selectively withdrawn through a multiple intake structure.This control would be dependent upon the thermal profile of the reservoir during winter,a set of conditions which has not been modeled. Therefore,we question the validity of the statement which suggests one degree water temperatures would be available on request. Information presented by ACRES during the Nov.29 -Dec.3 workshop showed winter temperatures in Eklutna Lake to be between 0 and 3.6 0 in the upper 2 meters,while isothermal conditions exist below this level. 8 page 59,para.2.Ice It is not clear what impact will occur to the lower River from reduction of ice flow from the upper Susitna.How far downriver would ice formation occur?When does freeze-up normally occur? page 91,para.2.Miti~ation of Watana Impoundment Impacts This section states t at a proposed 12.000 cfs flow at Gold frreek would provide salmon access to most of the sloughs and would assist in maintaining adequate ground water levels and upwelling rates.There are no studies which would support these conclusions,as only one of approximately thirty-six sloughs has receive detailed study. Similarly,current information does not permit the development of mitigation measures within the sloughs.as stated in the last paragraph on this page. page 93,para.2.Nitrogen Supersaturation While we support the concept of installing cone v·alves at the outlet works of both dams,the subject requires further discussion.These valves will only operate (and afford gas supersaturation benefits) during spillages below the 1 in 50 year high flow event.According to the discussion presented on pages 79 through 81,such spillages would be a relatively uncommon event (for the 32 year period simulated, there were 4 years during which spillages occurred).The discussion on these valves should present data on their frequency of use and explain the criteria by which they are planned and installed.This should include the following: 1.Potential temperature impacts resulting from withdrawal from these outlet structures. 2.Potential impacts to river ice formation attributed to operation of these valves during winter. page 95,para.1.Temperature The discussion of Devil Canyon post-project temperature mitigation is inadequate.What advantages are gained by the multiple release --structure?Will Devil"Canyon reservoir stratify during summer and wi nter? Chapter Three page 8,para.2 IISince the greatest changes in physical habitats are expected in the reach betw~en-Talkeetna and Devil Canyon.fishery resources using that portion of the river were considered to be the most sensitive to project effects.1I Transforming the mainstem Susitna River into a reservoir is also a considerable change.Later in this paragraph is the statement liThe mitigations proposed to maintain chum salmon should allow sockeye and pink salmon to be maintained as well.1I We are unable to locate specific mitigation plans for chum salmon.Those conceptual plans presented for slough modification and mainstem p--- --._-- .... - 9 spawning bed construction deal principally with one life history stage.The statements made here that improved mainstem conditions will replace loss of slough rearing habitat and that juvenile overwintering areas are not expected to be adversely affected by the project are not supported.In fact,preliminary data presented elsewhere in the Exhibit indicate that overwintering habitat will be impacted and that sloughs may provide important rearing habit~ page 12.Species Biology and Habitat Utiljzation in the Susitna River Drainage Estimates of adult salmon presented in this section depict only escapement.A more meaningful'estimate should be made using catch to escapement ratios,as done in chapter five.For instance,in 1982 77,000 pink salmon migrated above Talkeetna.However only one fish in every 3.8 escaped the commercial fishery.Using the 3.8 to 1 ratio, this reach of the Susitna accounted for over 350,000 pink salmon of which over 277,000 were available to the commercial fishery. Escapement estimates alone fail to indicate the high values associated with anadromous fishery resources. page 76.Slough.Habitat This section does not describe impacts associated with lowered winter river stage during filling.'Should upwelling and backwater effects during winter prove critical to developing eggs or juvenile salmonids,any reduction in these areas could create significant damage. We question the figure presented as the number of sloughs in which salmon spawn within the Chulitna to Devil Canyon reach.Using information supplied by the ADFG and from Exhibit E,adult salmon have been observed in 26 of these sloughs.Exhibit E should clearly present the total numbers of sloughs in this reach and the 1981 and 1982 data on spawning adults. page 77 The discussion presented on impacts to slough habitat is not clear . . -__A~Exhibjt Estates thaJ groundwater up~ellj.r!g_in the21o!:J9hs.i s probably driven by the mainstem stage,which would cause a decreased flow in the sloughs (post-project),why does this section state that under post-project conditions only the backwater areas (of the sloughs)would be affected? The second paragraph of this page states,"With mainstem flows above 14,000 cfs,a backwater forms at the mouth of the slough.1I How is this known?Which slough is being discussed?Is this true for each slough?The same paragraph explains that,during the 1982 field season,flows in the 12,000 to 14,000 cfs range occurred and afforded opportunity to observe fish passage at flows below normal August levels.These flows appeared to hamper or restrict fish passage into sloughs.Backwater effects were not seen at flows of approximately 12,000 cfs~yet project low flow limits for August have been established at 12,000 cfs.This section underscores the prob~ems 10 associated with such proposed flows.It is apparent that some significant changes occur to the slough habitat within a relatively narrow range of flows;changes which may have important biological implications. page 87,para.5 While the described floods may transport sediment and scour the River bed,-t"eduetion or elimillatiunthrough flow regulation may not necessarily be beneficial.The Exhibit presents no data to support the comment that high mainstem velocities limit fish usage (page 87, para.2).Further,such high flow events may be critical to maintain- ing side channel and slough habitat through flushing and replenishment of gravels and by removing vegetation and beaver dams which may reduce habitat value.This point is not discussed in the following sections on slough or side channel habitats. page 103,paragraph 3.Slough Habitat We disagree that changes in streamflow during the open-water season are not expected to affect slough habitats. page 116.Aquatic Studies Program We believe this discussion suffers from omission of the majority of the 1982 field study results.We strongly believe that two years of study are the minimum required as a basis to discuss the impact of hydroelectric development on the Susitna River. page 130.Measures to Minimize Impacts , It is stated that IiA flow release schedule will be used that minimizes the loss of downstream habitat and maintains normal timing of flow-related biological stimuli.1I The flow schedule presented in Exhibit'E,chapter 2 does not minimize habitat loss,nor does it maintain normal flow related biological stimuli.This section should also discuss installation of compensation flow pumps at Devil Canyon which would provide flow between the dam and tailrace channel. page 130,para.2.Measures to Minimize.Impacts --" -The section states that IIInstream flow requirements are being determined for each species/life stage/time unit combination.1I Who is performing these studies?How will they be determined?Again,it is impossible to understand what flow regime,if any,is actually being suggested within Exhibit E.Is the release schedule presented in Table 2.17 just a IIfirst cut?1I This is apparently the case. Considering that the final release schedule is to be based on future studies as suggested here and may be modified to accommodate Qut- migration (page 3-132,para.1)and will need to consider temperature and volume (page 3-143,para.1);why is a flow regime proposed in the absence of such information? page 131,para.1 This states,in effect,that slough habitat will either be enhanced or degraded by the project,and that actual impacts to habitat are the~subject of ongoing studies.These ongoing studies should be described.What will be investigated?Which sloughs will be studied?. ·'--- .... __.J"""'_•.,", 11 page 132,para.4 This states that flows of 12,000 cfs are sufficient to undertake rectifying impacts by modifying habitat.How is this known?The paragraph shoul d discuss the'studi es upon whi ch thi sis based or qualify any such conclusions as preliminary and subject to further study. page 133,para.1.Winter Flows The .statement is made that i1Since minimal impacts are expected during both filling and operational winter flow,rectifying measures are not needed.II This is not supported.On page 131,para.1,we learn slough habitat may be degraded by winter flows and that these'impacts are the subject of ongoing studies.Page 94 presents a lengthy discussion of impacts attributed to altered winter flows. page 133,para.5.Reduction of Impacts Over Time "Post-operational monitoring will be conducted to evaluate the effectiveness of mitigation measures (see Section 2.6).11 The license application should detail what monitoring will occur and how the effectiveness of mitigation efforts will be evaluated . .page 136,para.3 The discussion of hatchery development is inadequate.In the event that other mitigation alternatives fail,it will be important to present a clear picture of what measures would be taken to compensate for fisheries losses. page 137,para.3 , We believe that the water temperatures of 5°to 6°e during the second filling year will present significant adverse impacts to salmon. Addition of a low level portal could apparently avoid much of these effects.We recommend such a device be incorporated into the final design. page 143,para.1 .__...._ "Continuin'g reservoir thermal mo'delfng will allow an evaluation of available water temperatures throughout the year so that a detailed release plan can be developed.The release plan will need to consider both water temperatures and volume in order to minimize impacts~"We strongly agree with this,and recommend that the license application contain just such a release plan which would most effectively minimize impact. Chapters 4-9 -No Comment. Chapter 10 page 28,para.6.Diversional Emergency Release Facilities The release levels referred to do not avoid adverse effects on the salmon fishery downstream. •l 12 page 30,para.3 Figure E.2.90 indicates that three,rather than four portals would be constructed at Watana.We question which is correct and how the numbers and position of the portals were considered in minimizing impact.Also we cannot concur that temperatures will be controlled within acceptable limits. page 30,para.4 We are not aware of studies which have occurred to mitigate project impacts through provision of streamflow at Gold Creek.These should be described. page 31,para.5 According to presentation by ACRES American at an APA-sponsored workshop in Anchorage during the week November 29 to December 3,1982, no temperature model has been run for Devil Canyon reservoir.How, then,can the utility of a multi-level draw-off at Devil Canyon be known?This again underscores the present lack of understanding of project temperature impacts. The following statements of concern were presented by NMFS before the APA Board of Directors on April·16,1982. 1I0 ne area of limited information in the Feasibility Report deals with the.effects of post project flows on the fishery resources ••.II IIThese sloughs therefore represent an area requiring consideration of potential mitigation and/or enhancement measures.To date,less than one eighth of the side channels and slough areas have been surveyed. Further,the impacts of various flow regimes on the habitat are unknown because the hydrological and ecological relationships between the mainstem Susitna and these areas have not been adequately studied •.•11 liThe results of a comprehensive In-Stream Flow Study would allow a balancing of fish habitat losses against power generation ••."IlCurrently,we do not believe a high level of confidence exists in the projected post project temperature within the _.--_:two_res~r..\foi.r:s_'_tbe Susitna mainstem,.~l1..d.the side channels and __ sloughs •••11 Il .••spec ific studies must occur which will develop mitigation options ••.""It is not reasonable to assume that (one field season of fisheries data)is adequate for proper characterization of the resources." "We are concerned that the (license)application will reflect the serious deficiencies we have mentioned.If our review shows this to be the case,we feel oUr agency will have no alternative but to request the FERC to reject the application or direct that the deficiencies be corrected." Our review of the material presented in draft license Exhibit E indicates that these deficiencies still exist.It is regrettable that we have reached the draft license application stage while these issues remain unresolved.We feel that these issues and data must be incorporated into Exhibit E and that without them the license ..-.. - ..... - ....}-. ..... ...., ...... 13 application will be found deficient.We believe that Exhibit E should be sufficiently developed so as to fdrm the ba3is for specific license conditions which would protect anadromous fish and their habitat.As written,Exhibit E only leads to further studies.The FERC guidelines specify that information within Exhibit E be developed to a level commensurate with the scope of the project.The Susitna project will be the most 27 0stly and complex hydroelectric facility ever considered by the FERC-,and this complexity and'depth should be reflected in license Exhibit E.. We appreciate this opportunity to comment on the draft Exhibit E. McVey Alaska 2/SusHna Project Status Report -Preliminary Draft.Federal Energy Regulatory Commission -Data for Decisions.December 1,1982 • ",... ",.(:::,c-:r,r:-;:J:-::::J.. ::.I': \~~.;U ~)-~j ~J L~:_-; .r--.....(r,~!(. i I •I •~ . I :::.': \'.J I i I.,-,l, --., .':'ILL SHEFfiELD,GOVERNOR D~PT.OF COM1\-IUNITY A REGIONAL AFFAIRS OFFICE OF THE COMMISSIONER March l6~1983 o POUCH 8 JUNEAU,ALASKA 998// PHONE:(907)465·4100 0225 CORDOVA STREET·BLDG 8 ANCHORAGE.ALASKA 99501 PHONE:(907)264·2294 RECEIVED - Mr.Eric Yould~Executive Director Alaska Power Authority 334 West 5th Avenue Anchorage,Alaska 99501 Dear Mr.Yould: MAR 1 :1983 :}J..ASM POWER AUTHORITY 1""", .... .... i.>ll H We have received a copy of the Susitna Hydroelectric Project FERCLicense Application,Exhibit E,and have focused our review primarily to chapters on socioeconomic and land use issues,Chapters 5 and 9~respectively.In proposed major resource development projects such as the Susitna project,the Department is concerned that:1)proposed development activities be sensitive to Statewide,regional,and local interests and limitations;and 2)the capability of local/regional governments be strengthened in order to meet demands placed on them by major development activities.In the review of Exhjbit E,we found many of the Department concerns raised earlier in our review of the Susitna Hydroelectric .Project Feasibility Report remain in effect.We have,however,re-emphasized Department concerns as they apply to the information contained in Exhibit E.A number of gage specific comments are also provided toward the end of this letter.' The major issues of concern to the Department in review of the Susitna Hydroelectric Project FERC License Application -Exhibit E are: 1)the assumptions underlying the socioeconomic analysis imply significant and yet uncorrmitted policy positions on the part of the State.For example, Exhibit E contains assumptions regarding the origins of the labor force, housing opportunities for that labor force,and mobility of the work force during construction.Implicit in these assumptions are policies addressing local hire and job training,worker residence at the project site,mode(s)of access to and from the construction site,and the use of construction camps as opposed to transporting workers.Should any of these implicit policies fai 1 to materi al ize as presumed,tile nature of the impacts descri bed in Exhibit E could change drastically~ In order to clarify the relationship between assumptions of the socioeconomic impact model and State policy,the Department's recommendation is that the Alaska Power Authority provide a process for key State agencies to become actively involved in the methodology and use of the model.This would,in our opinion,serve two useful purposes.One,it would enable the State to constructively critique the assumptions of the model,particularly in light of existing State policies.Secondly~a better understanding and practical use of the model by State agencies could help form the basis for establishment of new State policies for the project.In tne same manner, involvement of the Matanuska-Susitna Borough in the critique and application of the model should be provided for,should the Borough choose to participate . :T:,;:-,3 [.:"C:::;py .I·:!____ Mr Eric You1d March 16,1983 Page Two 2)It is the Department's opinion that the socioeconomic impacts identifiea in Exhibit E as resulting from the Susitna project are significantly understated. As was described in -the Department's review comments for the Susitna Project Feasibility Study,we feel that the proposed impacts from the Susitna project will far exceed those expressed in Exhibit E.We base our predictions on the impacts historically caused from other large construction projects in Alaska, most notably the Trans-Alaska Pipeline project (TAPS). In order to account for a larger impact than described in Exhibit E,the Department recommends that an alternate socioeconomic impact model scenario(s)be established to represent,as closely as possible,appropriate factors of the TAPS experience for the Susitna project.At a minimum,this alternative analysis should assess those impacts due to induced population growth and increased numbers of people seeking employment.For example, Exhibit E (on page E-5-20)describes that within the period 1983-1991,the latter date representing the peak year of the Watana construction phase,the population of the Matanuska-Susitna Borough )s proposed to increase by approximately 22,355 persons.Of this total,only 4,700 persons are proposed to be connected to the project,including direct and indirect/induced workers and their dependents.This estimate appears to be low,particularly in Jight of the experience gained fr.om the TAPS project,when a far larger than . ·anticipated influx of people was attracted to the area.As a result,this in-migrant population competed with local residents for both direct and indirect/induced jobs and greatly strained the capabilities of public services and facilities.The Department feels that the types of impacts found with the TAPS project could likely reoccur with the Susitna project. We recommend,therefore,that a model scenario be developed which utilizes information gained from the TAPS experience in calculating population influx and resultant impacts.Even with the difficulty in predicting precise numbers of secondary or induced workers and families,the model can at least be used to generate likely or alternative scenairos to guide deicsion makers in assessing potential impacts and preparing mitigation measures. 3)Responsibilities for provision of services and facilities within the. local project area (Matanuska-Susitna Borough)should be more clearly defined for the State,Borough and the contractor. Exhibit E does present a discussion regarding projected public service and facility needs for the Matanuska-Susitna Borough (and selected cities within) both in base-case and project-induced scenarios.More specific data, however,could have been provided regarding the costs and revenues anticipated for the State,Borough and contractor for specific services and Mr.Eric Yould March 16,1983 Page Three ~facilities required under both scenarios.Such information,for example, would clearly illustrate the levels of State support anticipated both with and without the Susitna project • ..... 4)Legal responsibilities for access to the project site both during and after construction need to be clearly defined. Exhibit E (Chapter 9)briefly discusses the location of the proposed access road and its potential future use.It is also discussed that during the .construction phase,only project personnel will be allowed passage on the road.Land management planning for the access road area is proposed to also take place during the construction phase. .- ..... .... .... ..... The Department recommends that legal responsibilities should be clearly identified prior to opening of the road for any purpose.This action would clarify,for example,maintenance responsibilities and liable parties in the event of unauthorized use of the road.Secondly,the Department recommends that land use planning take place before the original road is constructed in order to incorporate future land use considerations within the original road design and layout.Similar considerations,as described above,should be given to the proposed rail access route to the Devil Canyon site. 5)The possibility of dam failure should be taken into consideration for the Susitna project,particularly for areas downstream of the dam.This is a critical issue given the"size of the dam and impoundments and the proven seismicity of the project area.The Department has stressed in our previous comments that the downstream flood hazard due to catastrophic dam failure should be mapped and appropriate stipulations should be placed on downstream development in order to prevent potential loss of life and property. Exhibit E (Chapter 6)gives attention to seismicity,however,it is simply stated on Page E-6-36 that the main structures (dams)have been analyzed to accommodate the ground motions induced by the maximum credible earthquake. The Department stresses,however,that our above concerns be addressed within the land use planning for the project area. 6)More information needs to be provided about the proposed permanent townsite. Exhibit E presents in various chapters the concept of a permanent townsite to be established at Watana.Chapter B (Aesthetic Resources),for example, presents a 'conceptual layout of the proposed townsite.The Department is concerned that if a permanent townsite is to be established near the project, much more information needs to be provided regarding:physical site suitability,livability factors,community expansion areas,government,and Mr.Eric Yould March 16,1983 Page Four opportunities for economic diversification.Additionally,the costs and providers (State,Matanuska-Susitna Borough,community)of facilities and services for the community should be specifically identified. The Department has a number of more specific comments on Exhibit E as follows. Chapter 5.Socioeconomic Impacts 1)It would be helpful to summarize in one section of Chapter 5 all the assumptions,standards,and input variables that were used within the impact model.Data sources of each should be cited. 2)Chapter 5 does not identify if and when sensitivity analysis will be done for key variables used in the socioeconomic impact model. 3)It would be useful in Chapter 5 to portray in graphic format the data regarding baseline and project-induced costs vs revenues.The percentage of costs and revenues per contractor,State,and Matanuska-Susitna Borough should also be shown in graphic format.Additionally,if various scenarios are to be eventually portrayed by the model,graphic representations of costs vs revenues per scenario would be useful. 4)On page E-5-23,reference is made to the absence of impact on the Matanuska-Susitna Borough School District because a contractor provided school at.the construction site will seJ:..ve the residents.As specified in previous Department comments,under Alaska Statutes,the Matanuska-Susitna Borough is mandated to exercise areawide education powers.The District would therefore be responsible,by law,for the provision of educational facilities and services to all residents of the Borough.This does not prohibit the project contractor and the School Di strict from formally agreeing to share costs or take other steps to lessen impacts;however,any educational facilities,programs,and faculty will have to comply with School District standards and guidelines.Therefore,there will be an impact on the School District. 5)Page E-5-47:The 1981 vacancy rate for housing (outside of incorporated communities)within the Matanuska-Susitna Borough is given as 25%.Does this figure include secondary homes? 6)Page E-5-137;Table E.5.35:A more detailed breakout of costs and revenues for each service or facility per year would be useful to include somewhere in Chapter 5 as back-up data to Table E.5.35. .... ...- ..... ~- - ,. r~r.Eric Yould March 16,1983· Page Five Chapter 9.Land Use 1)Pages E-9-20 through E-9-22,Section 23 -Description of Existing Land Use Management Plans for the Project Area:Among management plans listed in this section,the Denali Scenic Highway Study [pursuant to the Alaska National Interest Lands Conservation Act,Section l3ll(b)]should also be included. 2)Page E-9-59;Figure E.9.8:The biophysical coastal boundary for the Matanuska-Susitna Borough Coastal Management Program has been amended from that shown on Fig.E.9.8. Thank you for the opportunity to comment • cc:Lawrence H.Kimball,Jr.,Director Division of Community Planning Al Carson,Chairman Susitna Hydroelectric Steering Committee Gary Thurlow,Manager Matanuska-Susitna Borough Claudio Arenas,Director Matanuska-Susitna Borough Planning Department Lennie Corin U.S.Fish and Wildlife Service IN REPLY lutn.a TO: 018 (ARO-P) ATTACHMENT II --("-"L - United States Department of the Interior NATIONAL PARK SERVICE A1as ka Reg iona 1 Offi ce 540 West Fifth Avenue Anchorage t Alaska 99501 RECEIVED 1.'1 DEC 7.1982 - Mr.Eric Yould,.Ex~£utive Oi re~~POWER f\',;"t •.."./ .Attention:Richard fleming~ Al aska Power AuthoH"ty 344 W.5th Avenue t Suite SOl Anchorage t Alaska 99501 Dear Mr.Yould: I appreciate the opportunity to have participated in the recent Susitna.Hydro- electric Proje~t fERC li£ense Application Exhibit E Presentation and Disc~ssion and to discuss issues related to cultural resource management with Dr.Fleming t and Don follows of Acres Americah t Inc.,both of whom have done an outstanding job in my opinion. ihe point that I made there t and wish to repeat here,is that the comments of the Advisory Council on Historic Preservation should be solicited without delay in the interest of expeditious development of a plan for future survey and inventory,and for mitigation of potential impact on sites already inven- toried and evaluated.It is not necessary to wait until the inventory is complete to solicit Advisory Council comments since the Council can accommodate actions at this early stage.Council's comments now could negate the need for the compressed,one-year,program of mitigation that was proposed as a probable necessity if Council comments are delayea until the survey is completed.In my opinion more lead time is necessary for development and implementation of a mitigation plan for a project of this magnitude.- Again t I appreciate the hospitality of the Alaska Power AuthoritYt and the opportunity to comment. Sincerely, ~.L-,..JWS-~~,~.<­ Floyd W.Sharrock Archeologist cc: Don Follows,Acres American,Inc. DEPARTMENT OF NATURAL RESOURCES December 3.1982 Re:1130-13 Mr.Eric Yould.Executive Director ATTN:Dr.Richard Fleming Alaska Power Authority 334 W.5th Avenue Ancho~age,Alaska 99501 Dear Mr.Yould: i ! I JAY S.HAMMOND,GOVERNOI 619 WAREHOUSE DR••SUITE 2 ANCHORAGE.ALASKA 99501 PHONE:274-4676 This letter is to reaffirm our views on two important points discussed in the Cultural Resource Section of the Susitna Hydropower meetings on November 30th. Fiest.we feel the Advisory Council on Historic Preservation should be in- volved in the cultural rdsources mitigation program at the earliest possible time.While FERC regulations do not specifically require Advisory Council consultation during the preparation of Exhibit E.the prudent course is to have them well-informed as soon as possible.The Advisory Council must be consulted under 36 CFR 800 when the time comes for determinations of eligi- bility and effect,and they would be a signatory party to any Memorandum of Agreement on mitigation of adverse effects to cultural resources. Second,concerning the remaining fieldwork.we feel that two field seasons are .preferable to one.An estimated 70 archaeologists will be required to do the ne~essary work in a single season.We have reservations about the availa- bility of 70 people with appropriate experience and the limited time left for logistics planning. Further.few.if any.institutions have the space required to properly process the mass of raw data and artifacts generated by so many field workers.This problem would be greatly ameliorated if the work is spread over two seasons. In general.we feel that the quality of the work would suffer and can see no compelling reasons to force the remaining work into a single season. Once again.we congratulate Dr.Dixon and Mr.Smith of the University of Alaska Museum on the fine work that they have done to date.We trust that work of this quality will continue. - ...... ..... Mr.Eric Yould.Executive Director December 3,1982 Page 2 - Please call or write if we can be of additional assistance. Sincerely, Judith E.Marquez Director ·lliplane 'storic Preservation cc:Hr.Dan Follows Dr.E.J.Dixon Dr.E.Slater TAS:clk December 15,1982 Fi Ie No.1130-3 Hr.Al Carson DPDP Pouch 7-005 Anchorage,Alaska 99501 Dear Mr.Carson D1VIS10TJ OF PM:KS JAY S.HAJ.it.~OND.GOVERNOR 619 WAREHOUSE DR.,SUITE 210 ANCHORAGE.AUlSKA 99501 PHONE:2744676 Thank you for the review copy of the draft Exhibit E.We are pleased to comment on Chapter 4 -Report on Historic and Archaeological Resources. The report is well done and addresses all the pertinent questions about mitiga- tion.Table E.4.2 is particularly informative and is a good synthesis of the available information to date.We concur with the mitigation plan as it stands in this draft document.We would also like to add our recommendations to the proposed education program recommended on page E.4.114.We consider such a program to be a necessary part of any large construction project.It seemed to be quite effective during construction of the Alyeska Pipeline.If project personnel are adequately trained and sites are clearly marked,avoidance should be a viable mitigative measure in a fair number of the indirect and potential impact cases. We look forward to continuing to work with all concerned parties on this pro- ject.. Sincerely, Judith E.Marquez Director z"'''"''j.~~X {}f)c/'(.''--'l' By:Ty L.Dilliplane ~~(:State Historic Preservation Officer cc:Leila Wise,Division of Natural Resources Coordinator Dr.Edward Slatter,FERC Archaeologist Hr.Lou Wall,Advisory Council on Historic Preservation Dr.E.James Dixon,Lead Archeologist,Susitpa Hydro Project Dr.Glenn Bacon,Lead Archeologist,Alaska Heritage Research Group DR:ces -- "DEPARTMENT OF-FISH AND GAME OFFICE OF THE COMMISSIONER Janua ry 13,1983 Alaska Power Authority 334 West Fifth Avenue Anchorages Alaska 99501 Attention:Eric Yould,Executive Director Bill Sheffield,eo"ernc.H' P.O.Box 3-2000 Juneau s AK 99802 Phone:465-4100 .RECEIVED JAN.!41983 NASKA POWER AUTHORITY - - Gentlemen: Re:Review Comments -Draft Exhibit E -Susitna Hydroelectric Project The Alaska Department of Fish and Game (ADF&G)has reviewed the Draft Exhibit E,dated Novembet:'15,1982,that was prepared for inclusion in the license application for the Susitna Hydroelectric Project that the Alaska Power Authority (APA)intends to submit to the Federal Energy Regulatory Commission (FERC). The Department's review of the Draft is based on the adequacy with which the fish and wildlife resources affected by the project,the impacts to those resources attributable to the project,and specific mitigation proposals to offset impacts are identified and quantified. The types of information reqUired for an adequate assessment of feasibility,with respect to fish and wildlife resources were originally identified for the APA in November 1979 through correspondence relative to the Plan of Study and were most recently identified in Commissioner Ronald Skoog's statement to the APA Board of Directors on 16 April,1982. Our review comments on the following chapters are appended to this letter:. Appendix A-Chapter 2 -Water Use and Quality; Appendix B -Chapter 3 -Fish,Wildlife and Botanical Resources; Appendix C -Chapter 5 -Socioeconomic Impacts; Appendix D-Chapter 7 -Recreational Resources;and Appendix E -Chapter 9 -Land Use. The time afforded the ADF&G to review the Draft Exhibit E has not been sufficient to allow a detailed review of all the chapters,nor has it Alaska Power Authority -2-January 13,1983 enabled us to present our comments in as thorough and refined a manner as we would have liked.We do,however,expect to take advantage of future review opportunities to further address these issues. The appended reviews (Appendices A-E)contain general statements regarding the overall adequacy of each chapter.Following these are specific comments addressing the technical content of the report.In the specific comment section,we have on occasion clarified the Department's policies and positions with respect to the proposed Susitna Hydroelectric project. Throughout the chapters of the Draft Exhibit E that we reviewed,both the information presented and the assessment of irrlpacts are generally insufficient for the kind of a planning and source document needed for preparation of an EIS.We are concerned that·the benefits and cost aspects of the project have not beeri presented completely and clearly. The general problems with the Draft Exhibit E chapters that were reviewed by the ADF&G are .as follows: 1.Data and information contained in the Exhibit E are,in many cases,incomplete or not properly interpreted. 2.Many potential impacts and issues attributed to the Susitna Hydroelectric Project are not addressed.Impacts to fish and wildlife resources and users that are addressed are not adequately quantified and proposals to mitigate impacts are not sufficiently developed. 3.Not all source materials,other Draft Exhibit E chapters,or the results of other study disciplines that are pertinent to the project are referenced. 4.Throughout the document there is a failure to discriminate between fact and speculation. Our comments,recommendations,and suggestions to strengthen the material contained in Draft Exhibit E in relation to the problem areas identified above are as follows: 1.The APA should examine the specific comments appended to this letter and clarify or expand sections in the Draft Exhibit E chapters where inadequate treatment of the data or information is suggested.The suggestion here is that while some interpretations by the authors are not necessarily inaccurate, they are incomplete.This type of problem in the Draft Exhibit E may be either editorial or a function of the short time frame allotted to assemble,assess and analyze the information available.The Draft Exhibit E chapters should utilize currently available and relevant information and data sources. Alaska Power Authority -3-January 13,1983 - -- 2.The Draft Exhibit E chapters should accurately reflect the current state of resource knowledge and information on impacts which are understood and those which are still undetermined. Consequently,the mitigation plans cannot be considered adequate unless the information and analysis of impacts is current and comprehensive.The mitigation plans should clearly indicate how impacts are considered in the design of the project;what-measures will be taken to avoid,minimize or rectify impacts;and how effective these measures will be in mitigating losses. 3.Source material in the Draft Exhibit E is not adequately referenced.Furthermore,data and information reported in chapters of the document should be consistent with other chapters.The lack of coordination between the resource groups and the engineering and construction groups is evident; conflicts have not been clearly identified between uses and disciplines.To remedy this deficiency all conflicts between engineering and economic factors and environmental alternatives should be identified and the consequences of altering those factors should be listed.The environmental concerns should be weighed equally with engineering and economic constraints. 4.Throughout the document,there is not always adequate discrimination between fact and speculation about resource values,concerns,issues,impacts and mitigation alternatives. In some cases adequate referencing and reporting of data in the chapters may resolve this.Where baseline data collection is required to remove speculation it should be done,or if relevant data and information are available elsewhere they should be collected and evaluated. The Department of Fish and Game recognizes the general character of the above recommendations.These recommendations are made based on an overview of the ADF&G comments for the chapters we have examined.We invite further consultation by the APA with our agency to discuss the specifics of the chapters we reviewed and our general recommendations. The fish and wildlife resources of the Susitna River Basin are of high value.Construction and operation of the proposed Susitna Hydroelectric Project can have wide ranging implications for these resources and their users.It is the objective of this Department to help Governor Sheffield insure that fish and wildlife resources are considered along with other project features during all stages of project planning, construction and operation. Based on the above overview of the Draft ExhibitE and the chapter-specific comments contained in the enclosed Appendices,the ADF&G does not believe that this planning document ;s sufficiently complete.Furthermore,we believe that the APA can best insure expeditious review and approval by FERC if it does as much as possible Alaska Power Authority -4-January 13,1983 to resolve agency concerns or establishes the mechanism to resolve those concerns. We hope our review assists the APA in addressing the concerns expressed herein and consider that this review represents only part of the process needed to reach the objective we wish to ~ttain.It is highly important from our perspective that the FERC License Application scheduled for submission in February and the process of consideration of the Exhibit E will positively contribute to the equitable consideration of fish and wildlife concerns. Thank you for the opportunity to review and comment on this document. We would appreciate your providing an explanation of how you eventually respond to the corrments we have made. Sincerely, Don W.Collinsworth Acting Commissioner Enclosures cc w/enclosures:Lennie Boston,Special Assistant to the Governor APA Board Members: John Schaeffer Charles Conway Robert Weeden Daniel A.Casey,Commissioner, Department of Transportation and Public Facilities Richard A.Lyon,Commissioner, Department of Commerce and Economic Development Richard A.Neve,Commissioner, Department of Environmental Conservation Peter McDowell,Office of Management and Budget John Hayden,Acres American Mark Robinson,FERC,Washington D.C. - -) I, APPENDIX A Susitna Hydroelectric Project,Draft Exhibit E Volume 1,Chapter 2 Water use and quality GENERAL COMMENTS This document generally fails to cite supporting evidence for the statements made or for potential impacts considered to be of major importance to this agency.An example can be found in the discussion of ice processes in the lower river.The ice formation proc~sses are simply stated as causing staging of 4 feet at Talkeetna to 3 feet at Sherman (E-2-59).The method used to determine this estimate has not been defined.Also,no references have been provided that evaluate whether ice processes are or are not a problem below other hydro projects.If this is a purely speculative scenario,it should be so noted.Otherwise,a scenario assuming that the staging would be 6 to 8 feet at Talkeetna during the winter months and annual floods would occur is just as supportable as the statements provided. The failure to provide a separation of the speculative comments from the -segments of the text supported by documentation creates severe problems in assessing the overall credibility of the report. A-1 This document also needs a preface on how the flow scenario and access route were selected for the li~ense submittal and a discussion of other available options.The Exhibit A document referenced on page E-2-86 on access routes was not provided for our review. SPECIFIC COMMENTS The following comments are addressed to page specific areas and paragraph~. and primarily address general deficiencies rather than grammatical errors. Page/Par·agraph E-2-3/4 The source of the 40 percent stream flow statistic should be identified~ E-2-3/5 State that all the flows listed other than upper Susitna River are also mean annual flows. E-2-4/1-4 References are needed to support the flood information discussed. E-2-S/1 A-2 References are needed to support the statement that the shape of the llsted duration curves is indicative of flow from northern glacial rivers. E-2-5/3 Reference(s)are required to support the discussion regarding Susitna River morphology. E-2-10/1 ,-. The description of sloughs as having a steeper gradient than the mainstem is misleading.The gradient within the sloughs is generally variable,with a steep upper section and a lesser slope in the lower end.In upland sloughs,those without scour channels,the gradient appears to be even less.Overall,the sloughs have a steeper gradient, but the variability of their gradient is important to their fisheries production. E-2-11/2· There is a need to cite specific references in the water quality text even though a general reference section was provided in the preface for the water quality section. E-2-12/3 &4 A-3 The months that are included in the "winter,spring and summer"time frames need to be identified. E-2-12/5 Clarification needs to be provided as to whether the Gold Creek temperature data presented in Fig~E-2-30 were correct.The location of this station was determined to be influenced by Gold Creek flows in 1981 and the station location was changed in 1982 to the northwest bank as a consequence. E-2-14/1 A reference is needed for the Portage Creek temperature data. E-2-14/3 It should be noted here that under natural conditions,staging during freezeup reportedly causes flooding of portions of the town of Talkeetna near the downtown airport.There is a need to reference the material presented in this paragraph. E-2-14/5 &6 The term frazil ice should be defined for the readers.Also it cannot be ~verstated that.ice jams could have severe consequences to portion~ of the community of Talkeetna. A-4 ..... .- -I In order to properly assess the effects of the project on the downstream fisheries and fisheries potentials of the impoundments,a relationship of suspended-sediment and associa~edparticle size to vertical illumination is desirable.This does 'not appear to have been done,in that no quantitative measurement~o~vertical illumination have been obtained • E-2-20/5 The dissolved gas concentrations above the Devil Creek rapids were not supersaturated and were recorded as approximately 100 percent.The 105 percent value was recorded above the Devil Canyon dam site. E-2-24/2 These sloughs also contain important anadromous and resident fish rearing habitat. E-2-25/5 Power generation could be considered an instream flow use under only unusual circumstances.In the case of reservoirs which store water for later power generation,the storage of water is definitely an out of A-S stream use.Using the ternrinology of "in-stream flow"in the context presented here for power generation is inappropriate and inaccurate. E-2-26/3 Fry emergence occurs at different times within and among species. Emergence is most closely correlated with accumulated thermal units and has 1ittl e t~do wi th the hydrograph.Al so burbot and Dolly Varden should be added to the list of important resident species. E-2-28/6 &E-2-29/1 Seasonal salinity measurements should be collected and correlated to a wide range of flow levels and tide conditions instead of to a few selected flow levels. E-2-29/2 The location of·the sampling site and a definition of the mouth of the Susitna River should be provided to give credence to this statement. Saltwater intrusion would be expected to be dependent upon tidal action so this must also be taken into account when describing saltwater mixing and intrusion. A-6 .~ - E-2-29/4-S The use of regression equations to calculate the peak and low flows without data on actual discharge of the tributary streams to be crossed by the access road is inappropriate and should not be used as a substitute for collection of discharge information.This;s particularly important to the design of bridges or culverts for engineering integrity or for fish passage.The sizes of many drainage structures placed in the North Slope haul road and pipeline workpad were underestimated when these methods were applied.This resulted in hydraulic erosion and structure failures that were unnecessaroY. E-2-29/6 It is stated that liThe line between the dam and the intertie has yet to designed,sited or constructed."The Exhibit E should include infonnationon the siting (corridors)of the transmission lines, baseline infonnation on resources which may be impacted,an assessment of the impacts,and the methods proposed to offset impacts. E-2-30/1-S Discharge measurements should be collected at any stream crossings associated with the transmission lines if road access is to be developed.These measurements should be used in determining the size of bridges or culverts for fish passage and engineering integrity.If A-7 any other transmission line routes were considered they should be listed. E-2-31/General COl'll1lent on Section 3,PRO,JECT IMPACT ON WATER QUALITY AND QUANTITY. It is essential to present a discussion of the rationale and "process for selecting the operational schemes on which the impact discussions were based.In other words,it needs to be made clear why this specific operational scheme was selected above other alternatives,what the engineering rationale is and how considerations of environmental values,concerns or needs were incorporated into the judgement that this is a satisfactory operational scheme 0 E-2-32/1 The statement that dewatering a 1-mile section of the Susitna River will not result fn any serious impacts is incorrect.This area is used by grayling for wintering,and dewatering will result in a permanent barrier to migrating fish in the system.Data collected by the ADF&G in 1981 on intrasystem movements of grayling between Deadman and Tsusena Creek indicated migration between these systems. A-a ,~ - E-2-33/4 The statement does not address the large amount of "spoil that will be generated and the 1arge amount of gradi ng and washi ng that wi 11 be necessary to obtain proper sized materials for the construction of the ; dam.This will generate an enormous water quality and spoil disposal problem that has not been addressed.Spoil disposal sites should be located in a manner to preclude introduction of sediments into the Susitna River and fish-bearingtributari~s. E-2-34/4 Petroleum and petroleum product spills in the smaller g.rayling streams can have significant impacts on these fisheries •.An oil spill contingency plan is essential to provide proper direction to prevent or mitigate spill events. .E-2-34/5 The description of the treatment of the waste water is totally inadequate.The discussion of waste water treatment should describe the volume of the waste water,the nature of the contaminant,a documented system for appropriate water treatment,the anticipated quality and the volume of the effluent,and an analysis of the instream concentrations of the effluent. A-9 E-2-35/1 Groundwater can be impacted by polluted surface water drained into a well. E-~-35/2 The term minor impacts,to describe the effects of excavation of borrow material,appears to be a mis-statement.If borrow material is taken from streams or lakes in the impoundment area,the impacts could have serious consequences on these fish populations.The types and volume of borrow materials to be removed,and the availability of materials need to be identified.An inventory of the fisheries in these areas needs to be made and baseline water quality conditions need to be documented.An analysis of the effects of borrow removal and mitigative actions to reduce the impacts by altering site locations or construction and operation techniques should be presented.This is a major oversight in this document. E-2-35/5 Structural measures to prevent downstream movement of fishes through the tunnels is a necessary mitigative action that is not addressed. Downstream movement of fish without passage upstream essentially means these fish are lost to the population. A-I0 .... - ,fflIiIlIllII E-2-35/6 Upstream migration of fishes will be completely blocked by the velocity barrier in the diversion gates. E-2-36/5 As with earlier comments (E-2-29/4-5)t the regression analysis of .peak and minimum dis~harges should not be substituted for the collection of discharge information. E-2-37/3 The level of analysis presented here and detail of mitigation of the effluent should be provided for all effluents related to the project t not just sewage. E-2-38/6 Reference to this information as a personal communication is inappro- priate.The outmigration of salmon in the spring is as likely related to photoperiod and development as the other factors listed.Very low flows in the spring could cause many of the juveniles to remain trapped in backwater pools that are normally flooded by the mainste~under pre-project conditions. A-ll E-2-39/2 The proposed flows of 12,000 cfs have not been demonstrated to maintain the character of sloughs and provide the flushing flows needed to clean .. fines out of the gravel.Also the cycle of vegetation.succession will be altered if flows do not wash away old vegetative growth. Consequently,what is now aquatic habitat may become terrestrial habitat over time. E-2-39/3 Minimum flows for the winter period should be established according to fishery resource requirements.This is a critical period for the populations of overwintering fish and even minor dewatering may have significant deleterious effects. E-2-39/5 &E-2-40 There needs to be an analysis of longer filling periods and associated consequences.The short filling period evaluated (3 years)may produce unacceptable consequences to fisheries resources.An extended schedule for filling may provide for a higher and more preferable mitigation option for fisheries through the 3-year schedule. A-12 .- _. E-2-42/5 The potential negative impacts to slough areas downstream from. Talkeetna resulting from decreasing the recurrence intervals of what are now mean annua 1 bank fu 11 floods is not addr.essed. E..2..43/2-5 The timing and the consequences of the thermal regime.s created within the reservoir during filling to downstream water temperatures must be better defined. E-2-43/5 The water temperatures downstream from Watana need to be defined more accurately.The cause of these low temperatures should be identified • E-2-44/4 What are the predi cted depths at whi ch photosynthesi s wi 11 occur and how will the quality of water discharged downstream compare with the preproject conditions with regard to photosynthetic processes?Data or discussion regarding this question should be presented. A-13 E-2-4513 The method used to estimate the 30-50NTU values should be defined and better described.The ·reasons why winter turbidity levels are neither quantifiable nor subject to estimation should be clarified. E-2-47/6 The section regarding impacts to slough habitats is not adequately presented.Basically,the relationship of mainstem discharge to slough discharge should be illustrated graphically.The response of the ground water wells to changes in the mainstem at the various locations (for those wells that were not silted in)should be plotted;a gradient profile of the groundwater,rather than just the thalweg of the slough, should be illustrated;and a map of the locations of upwelling in the sloughs should be presented.The text as written does not present data and many speculative comments are provided without appropriate qualifications. E-2-49/2 The statements suggesting that there will be no changes in the tempera- ture of upwelling groundwater and consequently,no impacts to incubating salmon eggs are not supported by data or citation.The reduction of flows through these sloughs is not quantitatively defined and could easily be major as well as minor.The loss of scouring flows that remove sediment in these sloughs as well as beaver dams,and A-14 '""" - removal of spring ice buildups could easily cause a senesence process to begin which may ultimately destroy the sloughs is not addressed. E-2-49/4-5 There are no citations,references or data to support these statements. E-2-50/1 There is no reference to the commercial boat launch at Sunshine located im~ediately below the Parks Highway bridge on the east bank nor is there acknowledgement of the boat launch at the Talkeetna Village airstrip which is becoming more heavily uSed due to bank degradation and channel erosion at the II new ll Talkeetna boat landing.If the mainstream of the Chulitna River moves west from its present position as defined in the Draft .Exhibit E (E-2-42/4),access to the Chulitna River and Susitna River north of Talkeetna River confluence could be considerably mor~difficult than at present.The source of the data, analysis or other documentation to support the comment that minor restrictio~on upstream access to Alexander Slough may occur during years of low stream flow needs to be provided. E-2-51/1 Downstream flow requirements have not yet been determined or agreed upon. A-15 E-2-51/2 The criteria used to develop the 5,000 cfs minimum flow as well as any of the other "target"flows should be presented.There must be some documentation of the rationale,review or selection process by which these "target flows"were developed and justified. E-2-52/1 Optimally operated reservoir scenarios should be examined for other target flows downstream using the new synthesized flows. E-2-52/3 A scenario wherein Devil Canyon Dam is not constructed in the projected time frame should be presented. E-2-56/2 A detailed discussion on ice processes should be presented. E-2-57/5 To evaluate the effectiveness of the multiple level intake structures, their efficiency at removal of a layer of water at a particular depth must be analyzed hydraulically.The velocity at the port of the intake structure must be low enough to prevent upwelling at the face of the 1\-16 - - ""'" dam.This is a common occurrence that effectively eliminates the functionality of these types of structures. E-2-58/1 E-2-59/2 The-process by-which staging elevations were estimated should be documented.Under preproject conditions with lesser flows~staging is often much higher than these levels.Local flooding in November reportedly affects the town of Talkeetna. E-2-61/1 There should be an explanation why turbidity;n the top 100 feet of the reservoir is the-main interest. E-2-63/5 Other potential sources of waste water need to be listed. A-I7 E-2-64/3 We recognize that this section refers to the operational phases; however,there is no explanation how the valves will be operated during the initial filling and startup procedure.An explanation of the thermal effects of using these valves is also needed,since the valves will facilitate discharge of waters from the hypoliminion. E-2-66/1-3 Data to support this presentation should be provided. E-2-66/S-6 We disagree that navigation and transportation will not be significantly impacted.These are somewhat contradictory to the statements in E-2-66/5-6.Information to substantiate this conclusion should be presented. In the continuation of paragraph 6 on the next page it is stated that Ii •••caution will be required in navigating various reaches.1I Also E-2-67/2 refers to the winter season and the fact that winter travel by snowmachine and dog sled will be impeded. A-IS r --- - -. - ..... E-2-67/1 Reduction of floating debris will not benefit navigation significantly in our opinion.Low water flows are expected to be the most significant hazard in the downstream reach.The source or data to support statements in this paragraph should be provided. E-2-69/2 This paragraph conflicts with Page E-3-137,·second paragraph,wherein it states the dam construction will adversely impact temperature·from a fisheries perspective. E-2-70/3 See earlier review comments for E-2-34/S concerning the analysis needed to determine the water quality hazard from the discharge of concrete .wastewater. E-2-76/4 Documentation of the statement that,liAs Devil Canyon reservior is filled,additional fishery habitat will become available in the reservoir."should be provided . A-19 E-2-87/1 Accurate discharge information on the creeks is needed to insure proper culvert sizing and fish passage.This information is needed to insure proper mitigation of potential impacts. E-2-90/2 The minimum flow to maintain fisheries should be refined because 12,000 cfs may not be adequate. E-2-90/3 The seasonal timing of the construction has.not been addressed.This is an important factor in addressing fish and wildlife impacts. E-2-91/2 Twelve thousand cfs for a flow at Gold Creek will not afford adequate access to 50 percent of available slough spawning habitat.A higher flow is required to maintain adequate access.This flow must be determined by an analytical process.Also,other life phases of fish in the downstream reaches below Devil Canyon are not addressed.All of the statements regarding the effects of 12,000 cfs flows are purely speculative and are not supported by data or measurements yet available.The release of water through the valves may present downstream thermal problems by releasing cold water in mid-summer. A-20 ~I E-2-91/4 Changes in downstream river morphology have not been fully assessed. To state that no mitigation is necessary to maintain slough habitats is premature.The lack of ice scour and flood flows may cause an aggrada .. tion of sediment in sloughs and may reduce natural cleaning processes necessary to maintain productive spawnit"!g substrate and rearing areas. ~E-2-91/5 Line 8 Mitigation should be required and should be borne by the project developer as a standard project cost. E-2-92/1 Data to support statements in this paragraph should be provided. E-2-9213 .... - Thermal control by withdrawing water close to the surface can result in vortices causing air entrainment and supersaturation which is detrimental to fisheries.This subject should be addressed with supporting analysis to ensure that surface withdrawal of water can occur without detrimental impacts to fisheries. A-21 E-2-9214 The report cited did not demonstrate supersaturation because of faulty analytical techniques.The sample of water was not pressurized before gas chromatographic analysis as is required by standard methods. Therefore.any supersaturation would have probably dissipated before the sample was analyzed.The study did show,however.that the thermal conditions will not be affected by the valve and that the temperature downstream will essentially be the same as the temperature at the withdrawal layer in the dam. Tables E-2-1 through E-2-20 References to data sources for tabular material should be made where they are missing. Figures· E-2-1 through E-2-39 Reference to data sources for figures should be made where they are missing. A-22 Appendix B Susitna Hydroelectric Project,Draft"Exhibit E Volume 2,Chapter 3 Fish,Wildlife and Botanical Resources GENERAL COMMENTS -FISH ...... Thi s report·1acks suffi cient data to support most of the statements on project impacts,whether adverse or benefi Cia 1.It does not reference or F""use the literature or experience obtained from other hydro projects.Many of the statements regardi ng populations of fi shes do not adequately refl ect r consideration of the instream flow requirements necessary to s·ustain those populations.It does not separate opinion from statements supported by correlative data regarding responses of the fishery to river regulation and impoundment..It also does not refer to or cite in the text the economic consequences of the flow regime presented.The document does not provide infonnation relative to Alaska or other locations as to the success or failure of proposed mitigation measures.In short,the data base presented is insufficient to support most statements of impacts or the quantitative effects that the project will have on downstream fisheries. Additional difficulties in reading the report are encountered due to lack of ""'"literature references,processes by which conclusions or assumptions were 8-1 developed,and an absence of lists of technical documents and their locations.Sources of tabular or figure material often are not cited.In general,mistakes are common,many errors.are apparent,.and the report is neither well organized nor edited. GENERAL COMMENTS .-WILDLIFE AND BOTANICAL RESOURCES There are numerous typographical .errors,incomplete sentences,and inconsis- tent or contradictory statements.The fonnat is frequently violated with impacts of one project feature incorporated into the discussion under the heading of another feature.Terminology is at times inconsistent or vague. The level of detail varies greatly from one subsection to another with Ilminor"impacts often treated more comprehensively than II ma jor"impacts. There are numerous examples of incompletely thought out ideas,some of which will not stand up to close scrutiny.These are all indications that the terrestri a1 portions of Draft Exhibit E,especi ally the impact sections, were written too quickly before infonnation was organized -and had received very 1 ittle proofing.The draft is in such poor shape that a meaningful, detailed review is very difficult if not impossible.However,some major problem areas that require extensive modification of the impact and mitigation sections can be identified and specific examples of types of deficiencies can be cited .. B-2 r-~--- -- 1.guantification of impacts -Magnitude of impacts are rarely indicated except in tenns such as II minimal ll or II mo derate.1I Even those tenns are rarely supported by a rationale.Most j~dgments of the significance of impacts appear to be subjective.While studies are incomplete,and some data (such as available vegetation maps)are of marginal value,it should be possible to place outer 1 imits oTt many impacts,at 1east indicating the order of magnitude.Indication of the general propor- tion of a population's range subjected to a particular impact would be useful as a crude indi cator of magnitude that coul d be refined at a later date.As written,the reader does not know if a species will lose 10 percent or 90 percent of its habitat. ..... 2.Impacts based on current populations -Current populations are almost always used as the basis for impact assessment.Impacts·are judged under current management plans and management strategies.This approach is not adequate for assessing many of the impacts of the Susitna Hydroelectric Project.Impacts should be assessed in terms of the range of population levels that·could reasonably be expected to occur during the life of the impact.Current populations might be adequate for short-term impacts,as the population would not change· greatly duri ng that peri od.However for long-term impacts,such as those resulting from inundation of habitat,a full range of population levels that could be supported by the habitat (carrying capacity)and the range of management objectives that could be supported by those population levels should be presented . B-3 It should be recognized that carrying capacity as well as population level s may vary over time.Consequently,1ikely changes in carrying capacity during the life of an impact should be considered.Any action that maintains ~arrying capacity at a generally higher or lower level than expected in the absence of the project would have a positive or negative impact respectively. Carrying capacity cannot always be measured.Where current populations are near carrying capacity,they are an appropriate measure even for long-term impacts.Where current populations are believed to be below c~rrying capacity,some estimate of carrying capacity is required.In some cases,historical population data may suffice.In other cases, measures of habitat quality may be used as direct or indirect indicators of carrying capacity. There are numerous examples where the Draft Exhibit E completely ignores these concepts.Prime examples are caribou and wolf.Both populations are currently at levels below carrying capacity,caribou because of current management goals and wolves because of high harvest, much of which is illegal.Exhibit E concludes that project impacts.. would be minimal under current harvest levels and avoids discussin~ impacts that would occur if these goals and actions were altered and the populations were allowed to increase.Wildlife populations,user demand,and management goals have changed dramatically over the last 50 years and can be expected to continue to change over the life of the Susitna project.For example,increased hunter demand is likely to result in an upward adjustment of the caribou population and harvest 8-4 goals,perhaps even before construction begins.If the Susitna project precludes attainment of goals that could have been attained without the.-project,there will be a negative impact that has not been adequately addressed by the Draft Exhibit E. 3.Failure to discuss cumulative impacts -Impacts are usually discussed one at a time,with little discussion of the potential cumulative effects on the population.Often each 'impact is sufficiently isolated that its effect on the population is judged II minimal.1I However the cumulative effect of all habitat alteration and all mortality factors may significantly affect the population's ability to sustain major impacts such as habitat loss.For example,inundation of moose winter range may reduce carrying capacity,increasing the impact of severe winters on the population.Project induced mortal ity could slow or even prevent recovery duri ng subsequent years of milder winters.At the very least,there would be an impact on the amount of hunter use the population could sustain. 4.Ranking of impacts -When impacts are ranked,the most significant impact listed is often one that is easily mitigated.For example, increased hunter harvest resulting from improved access is often sug- gested to overwhelm a11 other impacts.In such cases,the'di scuss ion of other impacts is often cursory.'However,hunting can be regulated and it is certain that the Board of Game will take measures to minimize adverse effects of hunting on wildl ife populations,usually shifting the impact to the users.This treatment is inconsistent with that of B-5 other easi 1y miti gated impacts such as borrow pits where the impact after rectification (revegetation)is discussed. By suggesting that the greatest impact will be unregulated hunting,a distorted view of total impacts is created.Less easily mitigated imp~cts such as loss of critical foods tend to be obscured and are discussed only superficially. 5.Incomplete and inconsi stent treatment of impacts of improved access - Some of the greatest and longest term impacts of the Susitna project will be secondary effects of improved access and attraction of people to the area.This will likely precipitate development and increased recreational use of the area that might not occur for decades without the project.Impacts of improved access through hunting,including direct mortality,disturbance,and ORV use,are discussed repeatedly, often to the exclusion of less controllable impacts.But impacts of improved access through individuals other than the hunters are almost completely ignored.This is inconsistent and·ignores a significant source of impacts. 6.Inadeq,uate treatment of habitat alteration -Habitat alteration is consistently treated superficially.As noted above,this is sometimes done through failure to even roughly quantify the impact or consider cumulative effects.There are other examples where alteration is dismissed without adequate rationale.The most serious example is downstream impacts to moose habitat. 8-6 ~,It is concluded that habitat may be enhanced between·Devil Canyon and Talkeetna during the license period.However it fails to consider that areas of current·early successional stages may become mature more rapidly than new areas will become vegetated,resulting in an immediate loss of habitat quality. Changes in frequency of flooding are di smissed because bank full floods will still occur every 5 to 10 years.However this could reduce the rate of cutting and filling to 20 percent of current levels with a corresponding reduction in habitat created by that mechanism.Effects of peak floods and ice scouring below Talkeetna are dismissed ever though changes in stage will exceed 4 feet in some areas. This is an example where conclusions were presented without supporting rationale.Close scrutiny of the problem shows that the underlying rationale was either faulty or that alternative conclusions are possible. The problems listed above,singly or in combination,work to systematically minimize potential impacts that might require mitigation.This appears to stem from a tendency to seek a rationale that nullifies the need to fully discuss impacts.However,if an underlying assumption is rejected (e.g., downstream effects on moose habitat),the entire section of the·impact assessment becomes inadequate.Virtually every sectiDn of the wildlife impact assessment suffers from at least one of the problems listed. B-7 Mitigation Plan The wildlife mitigation plan is too incomplete to warrant detailed comments. Measures to avoid,minimize,or rectify impacts are scattered.Some are included in the vegetation section but there is 1ittle indication of how effective these measures will be for wildlife.It also is not clear which measures have been incorporated into the project design and which are merely recommendations from environmental consultants.The mitigation plan should clearly indicate how wildlife impacts are considered in the design of the project;what measures will be taken to avoid,minimize,or rectify impacts; and how effective these measures will be in mitigating losses.This is necessary to demonstrate that the option analysis the Susitna Hydroelectric Project Fish and Wildlife Mitigation Policy has been followed and so that residual impacts can be estimated for compensation planning. The inadequacies of the impact assessment are evident in the mitigation plan.There is no mention of compensation for impacts to species other than moose.It is suggested that miti gation measures for moose wi 11 partially mitigate for losses to bears and wolves,but that will depend on what actions are taken and where.No mention of options for out-of-kind compensation is made. B-8 SPECIFIC COMMENTS -FISH Page/Paragraph E-3-2/5 In this paragraph it is stated,"•••criteria for assessing the rel~tive importance of biologi.c.al impact issues have been provided by ••••(2) comments and testimony by the Alaska Depar~ment of Fish and Game (Skoog,1982;•••)."We have reviewed the text of Sl(oog,1982 and,we do not believe this statement can be construed as establishing It •••criteria for assessing relative importance of biological impact issues ••••II The context of the COlTll1ents by AOF&G were specific to three alternative access plans,numbers 13,16,and 17,and provided qualitative assessment of impacts for each of those plans.It was clearly noted in several areas of the 1etter that ADF&G's assessment was subjective and qualitative.We would like to state that the criteria by·which project impacts are judged should lead to a quantifiable determination of impacts.These criteria for project access routes to our knowl edge have not been establ i shed.Programs which will collect quantifiable information to insure equal consideration of fish and wildlife and their habitats and mitigation of those impacts in access corridors have not been performed. A reference to Commi ssioner Skoog I s April 1982 testimony to the APA Board of Directors would be appropriate.Also,references to comments B-9 and testimony provided by Schneider (1979,1982 a.b.c.)are not cited in the bibliography. E-3-3/1 The.ADF&G disagrees that its policy implies "•••that project impacts on fish and game species will be of greater concern than changes in the distribution and abundance of non-game wildlife and invertebrate species."First,the terms "fish and game"and IIfish and wildlife"are used interchangeably throughout our policy document,and secondly,the ADF&G's greatest concern is fish and wildlife habitat and its ability to maintain productive populations.As stated in ADF&G policy,liThe overall mitigative goal of the Department of Fish and Game is to maintain or establish an ecosystem with the project in place that is as nearly desirable as the ecosystem that would have been there in the absence of that project."We are primarily interested in maintaining the quality,quantity and diversity of the habitat for fish and wildlife with the project that is similar to that existing without the project. E-3-3/2 The genera1 tone of statements in this paragraph indicates a process of rationalization rather than of a clear sense of direction and logic. It is stated in this paragraph,II~Jhere there is a high degree of confi dence that an impact wi 11 actua 11y occur,it has been ranked above impacts predicted with less certainty.II For this thesis to have any B-10 ..... validity one must also specify the vulnerability of the resource to be evaluated.The same applies to assessing the process for evaluating the probability that an impact will occur.It is equally important.if not more so,to specify the magnitude of the impact that will occur. E-3-3/3-4 The priority sequence for ADF&Gmitigation policy is not only for mitigation option analysis in a planning sense but also for mitigation option implementation.We have five potential .options for implementation as listed,and require an assessment which quantifies project impacts,and determines the parameters under which the project must operate to implement each option.The highest priority mitigation optl0n which is feasible is the one which this Department will require for direct implementation.Quantifiable information sufficient to determine whether an option is feasible must be available to enable the ADF&G and others to select the appropriate mitigation option.As stated in the ADF&G mitigation policy,liThe burden of proof to justify lower estimates of damage to fish and wildlife habitat lies with the deve 1oper.II E-3-5/3 We suggest that management strategies will require the concurrence of resource management boards and agencies. B-11 E-3-7/2 Chinook,pink,chum and coho salmon mi 11 at the entrance to Devil Canyon.Chinook salmon spawn in Devil Canyon in Cheechako Creek (RM 152.5)and Chinook Creek (RM 156.8).The lower limit of Devil Canyon is defined as RM 152.It would therefore be correct to state that liThe Susitna River is a migrational.corridor,spawning area and juvenile rearing area for five species of salmon from its point of discharge into Cook Inlet to upstream within Devil Canyon.1I E-3-8/1 Impacts to less sensitive species with similar habitat requirements would be mitigated,however,species with a lower evaluation priority may be highly sensitive to change and may not be mitigated.For example,species that are adapted to .turbid waters may be adversely affected if a project creates substantial decreases in turbidity. Burbot are an example of a species which may be so affected. E-3-8/3 Chinook and coho do not have a greater conmercial value than chums, although they do have a greater sport fishing value. The projected change in conditions in the mainstem are not necessarily beneficial to rearing juveniles as suggested in this·paragraph.The condiltions (parameters)referred to should be i denti fied.Further, B-12 -- ",. i mainstem habitat will not necessarily be improved in winter·months, higher turbi dity is an example..Juveni les are al so consi stently present in sloughs.There are no data or literature cited to support the last two statements in this paragraph. E-3-8/4 Arctic grayling also utilize mainstem habitats not only clearwater tributaries as implied. E-3-9/1 What are the resident evaluation species below Talkeetna?None are' indicated in the listing. Rainbow and burbot should be included in the list of evaluation species because of their importance to the sport fishery and because of their abundance and adaptation to the turbid conditions.There may bea particular sensitivity to possible changes in the case of burbot. E-3-10/3 Table E.3.3 does not reflect the 1.2 million figure discussed in text. 8-13 E-3-10/4 Table E.3.4.reflects different figures than the text with regard to chum salmon escapement.The chum salmon escapement was 20,800 and 49,100 in 1981 and 1982 respectively. E-3-11/1 Value (ex-vessel)on coho salmon is not presented. E-3-11/S If Mills (1980)data are to be used to indicate significance of recreational use,the 1981 information should be included. E-3-12/1 The harvest figures reported here reflect primarily Susitna River harvest.Additional harvest occurs on some of the anadromous species (chinook for example)outside the Susitna drainage,i.e.,in Lower Cook Inlet saltwater fisheries.The statement that the sport fishing harvest is from an area larger than that which may be impacted is incorrect. B-14 ....., , ~ I E-3-12/3 The Tyonek Village subsistence fishery is principally.suppor.ted by Susitna River chinook salmon stocks,not "at least in part"as stated in the text.The Department not only recognizes the subsistence harvest of fish by Tyonek,but.is responsible to insure the continuation of this stock of fish • E-3-13/1 Throughout the discussion,the escapement year is unidentified. E-3-13/4 Types of individuals or species of fish should be identified. E-3-16/1 The statement that,"Out-migration in the reach from Talkeetna to Devil Canyon peaks prior to early June and terminates by the end of July throughout the drainage."requires documentation. B-15 E-3-18/2 There"are lakes with sockeye in the upper Susitna River (Talkeetna to Devil Canyon reach).The potential for sockeye enhancement in the upper Susitna Basin should also be mentioned. E-3-19/3-4 Based!on -ehe:1982 evaluation of sonar versus tag/recapture Petersen estimat:es~~the latter has been detennined to be more representative of escapements than sonar estimates.Therefore~it is recommended that Petersen population estimates be used where available. E-3-22/1-5 We.suggest Petersen population estimates would be more meaningful in lieu of sonar counts for the stations at Sunshine,Talkeetna and Curry. The 1982 evaluation of sonar versus tag/recapture Petersen estimates indicates that the latter are more rel iable.Therefore escapement should be defined on Petersen estimates when available. E-3-24/1-7 The year the data represent ;s not stated in the text. 8-16 - ..... "I'" I E-3-26/4 Eulachon are known to extend as far upstream as RM 58 based on 1981 observations by Su Hydro !'quatic Studies staff.The RM 48 figure provided by Trent (1982)was for 1982 observations. E-3-28/2 Principal study areas were located in the first mile of the tributaries upstream of their confluence with the Susitna.The reference to upper stream reaches in the fourth sentence should be removed. E-3-29/1,Subsections 1 and 2 These statements are speculative and cannot be supported by existing data. E-3-29/2 A much larger number of grayling depend upon the area to be inundated over and above those included in this estimate. 8-17 E-3-29/3 Grayling fry were captured at Watana Creek area in 1981,indicating spawning in the immediate vicinity. The final sentence concludes that if other unidentified conditions are suitable,spawning habitat will not be a limiting factor for grayling. This needs proper referencing and evaluation. E-3-30/1 Burbot also inhabit Susitna River tributaries,not just the mainstem. E-3-30/2 Areas downstream from Talkeetna of importance to burbot were identified specifically.The four mainstem sites upstream from Talkeetna should also be specifically identified. E-3-31/3 The discussion of whitefish occurrence in the impoundment is not clear. 8-18 E-3-32/4 The juvenile long nose sucker collection effort was not sufficiently uniform to conclude changes in distribution from the catch per unit effort data. E-3-37/3 .Chinook salmon extend to RM 156.8 (Chinook Creek)not RM 158.2. E-3-37/4 Resident species of sculpin also occur in the Susitna mainstem.The text should therefore report seven species. E-3-40/1 Timing for respective salmon use based on 1981 data would be more accurate if changed to: Coho -30 July through mid-September, Pink-27 July through 20 August. E-3-41/1 The Arctic lamprey also occurs in the Susitna River above the Chulitna confluence. 8-19 E-3-41/5 Based on set net and electrofishing catches in 1982,pink salmon mill in the Susitna mainstem immediately below Devil Canyon. E-3-43/1 Not all sloughs a re overtopped by flows of 20,000 to 24,000 cfs. Examples are Sloughs 10,11,14,and 15. E-3-44/4 Holding areas at the mouth of sloughs are not considered a critical factor any more than "hol di ng areas ll at the confl uence of many of the chum salmon producing streams.The fact that there are holding areas does not necessarily make the sloughs more productive. E-3-44/8 In the last sentence,are the authors speaking of a tributary mouth or tributary?In either case,importance of the habitat type for rearing cannot be measured simply by number of fish captured at a site.This is particularly true for tributary mouths because they are part of the downstream and out-migratory pathway where fish may be seasonally concentrated. B-20 i! i· """ I E-3-46/4 Thes~are not static populations.The populations of individuals becomes redistr'ibuted to favorable rearing habitat locations,including tributary mouths. E-3-46/7 Chum salmon preference to slough habitat over tributary streams is unsupported.Only index surveys were conducted on tributaries whereas sloughs have been surveyed in total •.The 1974 investigations and 1982 ADF&G surveys indicate that tributaries may be equally as important to overall chum salmon spawning in the Talkeetna to Devil Canyon reach as slough habitats. E-3-47/1 Indian River is a major chum salmon spawning stream.Based on 1974, 1981,and 1982 escapement surveys,this stream supported higher numbers of chum salmon than chinook and coho salmon. E-3-49/4 Eulachon were found upstream to RM 58 in 1981,and to RM 48 in 1982. 8-21 E-3-51/7 Based on 1981 and 1982 ADF&G spawning surveys,sloughs do serve as chum,sockeye and pink spawning habitat. E-3-"S2/3 Yes,all speci es of sa 1mon were recorded in tri butari es ;n 1981 but- sockeye were not found in notable numbers.We do know that the Chase Creek system supports a "small"sockeye run.ADF&G surveys·are conducted in the half mile reach of tributaries upstream from the con~ fluence with the Susitna River.The balance of the tributaries are not surveyed.If the report is to reflect that all species utilized tributaries,then it would be appropriate to modify Page E-3-46, paragraph 2 which presently excludes sockeye as being present in tributaries. E-3-SS/3 Fish Creek in the:Big Lake drainage supports a significant rainbow trout population and also pink salmon. B-22 - r I I I >F' I ! E-3-62/4 Cheechako Creek is a ch"inook salmon spawning stream.Chinook salmon spawn both in the creek and the mixing area at its confluence with the Susitna River. Gravel removal/dam construction will·destroy this production area. which is along term impact.The Cheechako Creek pl ume area is a spawning site.Will project impacts be mitigated here at least until Devil Canyon is built? If Tsusena Creek will have the long-term and degree of impacts stated it seems contradictory and optimistic to say it will or can be rehabilitated. E-3-65/4 Investigations should be conducted to determine the presence or absence of fish in the referenced lake. E-3-67/3 This is a mid-summer estimate of only those·grayl ing inhabiting the impoundment area and is not an accurate reflection upon the number of grayling that depend upon that same area for spawning.rearing,or wintering. B-23 E-3-68/3 Data are required to support the suggestion that the reservoi r may provide additional wintering habitat. E-3-71/3 The ADF&G studies document juvenile salmon occurrence in mainstem habitats all summer.Catch rates were relatively low,however,and· large numbers of fish could be present in low densities over a large area at any time. E-3-73/4 Water temperatures of 5°to 6°C at Talkeetna during open water period may have major impact on returning adults.If higher flows will reduce temperature,it may be better to reduce flows or find ways to tap warmer layers of water for discharge. E-3-74/2 The statements in this paragraph are speculative and reflect the need for further study and analysis. B-24 ~ ! i .,... ! rr i Pj" I r I ''- ! ! . r r E-3-75/2 Same comment as E-3-74,.paragraph 2. E-3-78/1 The statements here are speculative and not supported by data or references • E-3-7813 Beaver dams in Sloughs 9Band 19 did not inhibi·t use by adult salmon in August of 1982.Slough 9B had a peak survey count in 1982 of five chum and one sockeye salmon on 19 September.Low water condition in mid-August generally precluded adult salmon access to Slough 9 which is the access corridor for salmon using Slough 9B.Slough 19 was essentially void of adul t salmon spawning in 1982.Only one pink salmon was observed in thi s slough and this fish was recorded on 4 August 1982.No beaver dams were present in Slough 19 which would have precluded fish access. E-3-79/4 Oeadhorse Creek (RM 121.0)is not an establ ished anadromous fish stream.Occasionally,one or two adults enter this stream,usually pink salmon.However,no successful spawning has been documented. B-25 Annua lly,Deadhorse Creek flows go below the surface in the lower one-third mile during the late fall and winter period. It is questionable whether successful salmon production occurs in Sherman Creek.About 25 pink salmon entered Sherman Creek on or about 12 August 1982,presumably for spawning,it has not been establ ished that the eggs will·successfully incubate.The creek flows subsurface in the winter and eggs may be frozen. Skull Creek (RM 124.7)is another stream which probably will be perched with flow changes in the Susitna mainstem.This creek supports a small chum salmon population. E-3-80/1 Devil Creek (RM 161.0)would be equally accessible to salmon as Tsusena or Fog creeks.Devil Creek appears to have potential chinook salmon spawning habitat. E-3-80/2 Data regarding flow characteri stics are i nsuffi cient to substanti ate minimal impacts into Susitna River reaches downstream from Tal keetna. A greater proportion of the Sus itna 'Ri ver fi shery resources uti 1 ize thi s downstream reach.A sma 11 change may affect a proportionately larger resource base. 8-26 E-3-80/3 See cormnents for E-3-80/2. E-3-80/4 In addition to salmon utilization,the Susitna River reach from approximately RM 4.5 to RM29 is·almost entirely eulachon spawning habitat,sustaining a spawning adult population ranging in the millions of fish. E-3-81/1 All resident species occupy mainstem habitats during ice free months, not II may II occupy. E-3-82/1 Eulachon spawning limits extend from approximately RM 4.5 to RM 58. E-3-82/3 Eulachon do not spawn in backwater or semi-placid areas.Principle spawning areas are adjacent to cut banks where the substrate included deposits of unconsolidated sands and gravels,and riffle zones or bars with relatively moderate velocity and unconsolidated sands and gravels. B-27 E-3-88/4 The statement on sediment in this paragraph contradicts the statement on page E-3-90,paragraph 2,sentence 3. E-3-90/1 These statements are not supported by data. E-3-90/3 Ice cover would probably form at RM 114 not RM 14 as presented. E-3-90/4 The impacts to fi sh habitat due to backwater and staging processes caused by increased post-project winter flows are not defined. E-3-90/5 These statements are not supported by data and are speculative. E-3-95/6 Eulachon do not spawn in backwaters.See comment on E-3-82,paragraph 3. 8-28 ,.,.. ,, , I I T E-3-98/6 Other species are known to be present.A relatively small population of Dolly Varden inhabits the subject areas along with at least one sculpin species. E-3-100/3 Additionally,Jack Long Creek supports adul t coho salmon.Portage Creek also has spawning populations of chum and pink salmon. E-3-103/3 Changes in streamflow during open-water seasons will affect slough habitats depending on the flow released.The potential for destroying these aquatic habitats appears high. E-3-122/S Does restricting unauthorized traffic mean that project personnel will be allowed to fish and the general public will not be allowed access to the fisheries?This may not be an acceptable form of mitigation during a construction phase that may span 20 years.The Board of fisheries management deci s ions wi 11 a 1so supercede the stated pol icy of APA on catch and rel ease fisheries by project personnel.It does net seem 1ike ly tha t the pub 1ic wi 11 be ba rred from the a rea wh i 1e proj ect personnel have exclusive access and use of the fisheries. B-29 E-3-126/4 The lakes for water withdrawal should be identified and their resources inventoried. E-3-127/2 Individual fish will not necessarily be lost by filling of the reservoir.Fish do not have to be moved through the diversion tunnel • .Structural protection from passage through the tunnel is a potenti al mitigative measure. E-3-130/3 A 10 percent reduction of flows during a critical and stressful period for fish does not constitute a minor reduction.The potential effect of reducing the November flow have on the recharge of groundwater reserves which will be needed throughout winter should be evaluated. Icing may take place much sooner with reduced flows and be much more severe. E-3-130/4 There are no data presented to support the statements regarding fisheries impacts at the referenced flows. 6-30 rr I E-3-131/5 Pink·salmon fry moved out primarily during the ice breakup period. Chums out-migrated primarily following the early run-off period. E-3-134/2 There are no assurances that responses,i.e.,releases of water,will happen quickly enough to keep from losing one year class of fish.By the time the problem appears to be sufficiently severe to warrant correction,it is most probao1y too late to act.This problem needs to be further examined. E-3~134/4 We are not aware of testing of this procedure.in this area of Alaska, or that the technique is feasible.Additional research needs to be conducted to evaluate the feasibi1 ity of the concept of introdudng spawning substrate. E-3-135/4 Data have not been presented to suggest thi s procedure wi 11 work for chinook salmon.It is as likely that suitably sized gravels placed in side channels,given maintenance flow,may attract chum salmon. B-31 E-3-136/3 There is no definition of species to be produced,nor a management scenario.In addition a suitable location for the proposed hatchery facility has not been identified.To be considered a feasible mitigation alternative,these considerations must be included • .E-3-138/3 There are no data or references presented to document the feasibil ity of this mitigation approach.Altered thermal regimes in the main- stem and side-channels would cause potential pre-emergence of salmon fry in these i;l.reas.However,early emergence of salmon fry spawned in sloughs may not result as a consequence of higher mainstem tempera- tures.Therefore,the proposed feeding and rearing of pre-emergent salmon fry would not be resolved by the proposed spawning.channel and rearing ponds (E-3-143-and 144)as mainstem fish would have no access to them. E-3-138/4 A much larger number of grayling than .included in this est.imate depend upon the area to be inundated.Also,this is not a wintering population estimate. 8-32 -- Additional Comments on Mitigation On a more general basis,the attitude implicit in the mitigation plan is "that losses are inevitable but unquantifiable,and that some mitigation measures will be implemented but may not work."It is also implied that if monitoring demonstrates inadequacy of a mitigation measure other steps wil1 be taken. How and by whom will the effectiveness of mitigation measures be determined? Under natural conditions small sub~populations of salmon undergo extreme vari ations in survival.Thi s wi 11 confound eval uation of the mitigation measures and could be a source of continuing conflict between the operators and the resource agencies.The frequent references to alternatives and operations which could be implemented if a mitigation measure proves inadequate puts the burden on the wrong parties.The mitigation aspects of this document are too tentative and too speculative.Substantially more detail and information is required before ADF&G can make a reasonable decision on mitigation methods. Other additional comments specific to the mitigation section are as follows: E-3-136 and E-3-140/1 Reference the following statefllent from the Exhibi t E document: IISince the effective mitigation measures to avoid~minimize,rectify or reduce impacts to the grayling population in the impoundment area are 8-33 not available,it will be necessary to compensate for the loss of these grayling.Compensation is proposed to be in the form of hatchery propagation of grayling •.•Sufficient grayling will be planted such the number [sic]of catchable grayling will be similar to the number lost." The FRED'Division of ADF&G has been experimenting with grayling culture for several years,first at Fire lake,then Ft.Richardson,and now at Clear Hatchery.We are continuing to work with grayling and intend to develop techniques that someday wi n support a grayl i ng production .....program.At this time and for the forseeable future,grayling produc- tion in Alaska must be considered experimental.In brief,several factors impact hatchery grayling production: 1.It is difficult to find egg sources that are sufficient in number. Whereas salmon egg takes in the tens of millions are common,a one million grayling egg take is a major undertaking. 2.The eggs and fry are extremely small and from a culturist's stand- point,very difficult to work with.Grayling fry hatch at 30,000 per pound as compared with salmon which are ten times that size at emergence.Marking and therefore evaluation-of survival after stocking are not possible with existing technology. 3.Survival from green egg to fry have generally been low -50 percent as compared to 80 to 95 percent for salmon production. 8-34 4.Attempts to rear fry in hatcheries have been largely unsuccessful. The obvious survival advantage that could be gained by releasing larger fish cannot be obtained until techniques are developed which will permit holding and feeding of fry.Grayling have been successfully reared in the lower 48.However,those fish hatch at a larger size (20,OOO per pound)and'behave differently in raceways. We intend to -overcome these problems as we learn more about the performance of grayling in our hatcheries.However,the idea that an irrevocable loss of grayl ing due to habitat inundati'oncan be compen- sated by hatchery propagation must be judged speculative at this point. The development and operation of spawning channel s and the modifi ca ... tions of sloughs,that has been proposed as mitigation warrants further discussion. Reference the fo 11 owi n9 .seven excerpts from Chapter 3,of the Draft Exhibit E document: 1.liThe slough habitat for the incubating salmon embryos may be enhanced through increased intergravel flow associated with larger flows,or it may be degraded if the higher flows substantially alter the intergravel temperature regime or ice conditions.II [E-3-131] 8-35 ---------------------------------------- 2."The [proposed]flows are of sufficient magnitude,however,to undertake to rectifying (SIC)impacts to salmon spawning activity by modifying existing spawning habitat to maintal"natural spawning by salmon."[E-3-132] 3."If further impact reduction is required to maintain existing fish populations,additional mitigation measures will be incorporated. Certain target mitigation issues will receive priority in the monitoring program.1I [E ..3..133] 4.liThe outmigration of salmon fry will be monitored to evaluate if proper timing of outmigration is achieved.The basis for such an evaluation will be the basel ine outmigration studies and within year comparison to adjacent unregulated systems."[E-3 ..134] 5."Success of a multi-level intake depends on the thermal structure of the reservoir,the existence of sufficient water at the desired temperature and location with the reservoi r ...Temperatures near this [8 to 12°C]range may exist in the top 100 feet •..If this layer is present,it can be accessed by the multi-level intake gates •.."[E-3-137,'138] 6."The most significant adverse impact associated with the altered thermal regime would be accelerated incubation and early emergence of salmon fry ...The modified sloughs or spawning channels designed to rectify or compensate for lost spawning and incubating habitat will be provided with a rearing pond at their downstream end ... 8-36 - Used to collect early emergents and hold them to prevent their downstream migration ..•Until appropriate conditions,including temperatures are reached in downstream habitats."[E-3-138] 7.The fry will be fed if natural food production is insufficient to support the number of fry present."[E-3-144] In response to the above:The major problems appear to be flow alteration with resulting affects on slough access,hydraulics and water temperature.As might be expected,the determination of the degree of impact (loss of habitat and fish)is very difficult to quantify and there is not specific information provided.Instead, engineering solutions are proposed for engineering problems.Modified sloughs also known as spawning channels are addressed on a conceptual level.Somehow it is proposed,that an unquantifiab1e loss .of fish \'1111 be rectified/compensated by a multi-purpose habitat modification program which includes channelization,flow control structures with day-to-day flow alteration,gravel cleaning,gravel introduction, enhancement of upwelling,rearing ponds with fry screens on the outlets and artificial feeding of fry. The engineering,construction and operation of these channels is totally lacking in detail.There are not operational spawning channels for these species in Alaska.Canada has had mixed success,but they are located in environments far more temperate. B-37 --._-------_._---- The cost of maintenance and operation of these channels should be included in any determination of feasibility.The proposed demonstration project should focus on fish production and'survival as well as the physical properties of the modified slough. The concern about changes in the thermal regime are inadequately addressed.It is apparent that the impoundment temperatures and hence the utility of a multi-level intake are not known.The rearing ponds at the downstream end of the channels may not be effective in accomplishing the desired objective.Emergence of fry will not occur within a short time span but over a period of weeks.Therefore,at any given time the fish in the slough or pond will cover a wide range of deve 1opmenta 1 stages.A schedul e of 11 re 1ease"of these fry into the mainstream must be provided.Once emergence timing is upset due to altered temperatures it is unlikely that survival levels could be maintained by holding them in a pond. Fry will not automatically feed on an artificial diet,there is an aspect of "trainingll which is obviously successful in a hatchery raceway.Washi ngton has had some success with pond cul ture but the fish are generally hatchery lots of similar size. Assuming that the 'operator'of these sloughs and the proposed rearing ponds determines that artificial feeding is required,how will this be accomplished through the ice cover that may develop on the rearing ponds? B-38 ..... SPECIFIC COMMENTS -WILDLIFE AND BOTANICAL RESOURCES The following specific comments are intended to illustrate the types of deficiencies in the wildlife sections of the draft Exhibit E.The poor. 'state of editing and overriding major problems'listed in the general comments precluded a complete listing of inconsistencies,errors,omissions and other deficiencies. Page E-3-279 Rationale for considering alteration of habitat less significant than hazards is not supported. Increased predation is mentioned on page 284,with no indication of its significance to the population,but ignored in the ranking of impacts. The current moose population is highly impacted by predators.The project is likely to increase the vulnerability of the moose population to predation in several ways.Brown bear.and wolf populations are likely to be less affected than moose in the early years of the project,causing an alteration in predator/prey ratios.The project could reduce the availability of spring foods for bears and caribou for certain wolf packs,causing a further increase in predation on moose. The drawdown zone and ice conditions are likely to facilitate hunting of moose by wolves.The moose population may have reduced productivity B-39 \...,."'._--,----~."---- because of poorer habitat quality,especially after severe winters, reducing its ability to sustain predation.These factors could allow predation to drive the moose population to very low levels and maintain it there for long periods.Similar situations have occurred throughout much of Interi'Or Al aska.Ul timately predator popul ations would suffer and any habitat enhancement attempts could fail. E-3-280 Sections relating to impoundment clearing are inconsistent, illustrating poor editing and confusion about the certainty of mitigative actions.Most sections assume the impoundments will be cleared in a stepwise manner,but on page 306 it says,"lf portions of the impoundment are cleared •••11 On page 286 it suggests a brief increase in forage,but on page 287 it predicts a substantial reduction in value. Moose are sometimes attracted to areas being-logged by availability of branches of deciduous trees. E-3-283 Overuse of winter range can lead to reduced natality as well as mortality.Moose that never use impoundment areas will be impacted by over utilization of adjacent areas (see page 287 also).This could expand the zone of impact for several decades. B-40 r i E-3-284 .No rationale for concluding that mortality factors wi 11 have a negligible effect on the population.Mortality along access routes should be considered along with dam construction activities because they occur together. E-3-288 Effects of drifted snow on vegetation~availabil ityof vegetation and phenology are not addressed. E-3-289-290 See general comments on adequacy of assessment of downstream effects on vegetation.Frequency of flooding (290 first paragraph).is probably very important.No rationale is provided for assessment of the effects of ice scouring on vegetation.The potential effects of scouring should be quantified. 8-41 III E-3-290 The effects of drifted snow on movements of moose are not mentioned here,but are for caribou (page 298). E-3-292 Increased morta.l ity resul ting from increased predation should be considered.Floating ice during latter stages of breakup could have the same effect as floating debris. Accidental kills will continue during operation of Watana. E-3-294 The summary of impacts for Watana comes closest to addressing cumulative impacts.However it is not systematic,ignores some impacts mentioned earlier and contains many subjective judgements that are not supported by quantitative rationale.It also does not include impacts of access routes and transmission lines which must accompany Watana. The uninformed reader is likely to be confused and have no real concept of the range of potential changes in moose populations. B-42 E-3-297 There is no b.asis for the conclusion that the Nelchina caribou herd will not use the area north of the impoundments at its current population size.It is highly likely that this area of high quality range will be used heavily in the future even at moderate population levels. Large movements of caribou across the impoundment areas have only been observed once since 1973.Movements were not monitored closely in most years. It is highly likely that the management goal of 20,000 caribou will be modified,perhaps before Watana is constructed.Therefore the 'F' I conclusions about level of impact are invalid even if the assumptions about range use were correct. E-3-298 Statements about drifting snow remaining in the impoundment conflict with statements made in the Feasibility Report.This needs to be clarified and documented. B-43 E-3-298 The most significant mortality factor to caribou could be floating ice. In many years the spring migration to the calving grounds would coincide with breakup of the Watana impoundment.During a period of northerly winds~caribou could encounter open water when they reach the north shore.Seeing no obvious barrier they would start to swim across and would encounter a mass of broken floating ice.This would create a problem similar to floating debris.Mortality could be substantial in some years. E-3-299 The impression is created that the four possible responses are mutually exclusive.More likely all four responses will be exhibited by varying proportions of the herd. E-3-300 The statement that the Mount \~atana sheep popul at;on does not occur near the impoundment is an example of a statement based on a brief period of observation.Sheep have been observed near the impoundment in the past. B-44 - - - .- r I i - E-3-301 All portions of exposed soil at the Jay Creek mineral lick are not used equally.Some of the most heavily used areas are low on the bluff. Therefore the percentage of the lick that would be inundated is misleading.This is also an example of an lIoperationl1 impact being discussed under "construction." E-3-305 Carrion is not mentioned as a spring brown bear food in the first paragraph •. The assumption that spring foods are not important to bears is incorrect.Food intake during periods of stable weight or even weight loss can be absolutely critical because it reduces a negative energy balance.A prime example is the importance of winter forage for moose • The suggestion that loss of carrion is more important than loss of green vegetation ~s.questionable.A moderate quality,but abundant, food may be more important to the population than a high quality,but sparse,food. The assumption that,because lactating female brown bear do not use areas that would be inundated,other bears could do well without those areas is not supportable.Females with cubs probably have overriding reasons to avoid these areas.,This includes the cub's ability to 8-45 travel and the risk of predation on cubs by males.Pregnant females develop heavier fat deposits that probably help sustain them during this period.A female that was not able to coast through this period would probably lose her cubs and move to riparian areas near the river. Spring foods in the impoundments are probably most important to yearlings which emerge from dens in poorer condition,particularly in years following poor berry crops,and suffer the highest rate of morta- lity.It is unreasonable to conclude that yearlings could survive as well as a lactating female without spring foods. E-3-303-308 Importance of spring foods to brown bears is inconsistent among "construction,""filling"and "operatio~"sections. E-3-308 While bears are capable of crossing the impoundments and ~ome will, there still may be a hindrance of movements between seasonal food concentrations that could reduce productivity of the population.This section is inconsistent with a similar section on black bears (page 310).This is another example of where the potential significance of an impact to the population is not discussed in even general terms. The fact that healthy bear populations exist where salmon are not available is not pertinent.Salmon are one of several seasonal food concentrations.They are probably most important during years when 8-46 other summer foods,such as berries fail.Bear productivity and survival are probably higher because salmon are .present and hence the population is generally higher. The entire brown bear impacts section is filled with unsubstantiated speculation.Most of it is biased towards minimizing potential impacts.It fails to consider how several ,impact mechanisms may work in combination and how they might influence the population.The impact section should 1 ist important foods of bears'by season,indicate how the project might influence the availability of each food to bears,and indicate the possible effects of these changes in availability on bear productivity and survival. E-3-310 The consequences of disturbance of denning black bear during clearing are not emphasized.This is likely to cause problems for both bears and crews.A number of bears are 1ike ly to be shot.r-1any of the disturbed bears will not be able to find new dens and mortality is likely to be high.This can result in a more rapid,more violent and more visible adjustment of the bear population to the project. 8-47 E-3-31O There currently is no resident black bear population near the Tyone River confluence and the Fog Lake area supports low densities. Therefore it is unreasonable to expect these areas to support viable populations-during operation. E-3-310 Project facilities may block movements of bears from the Devil Canyon impoundmeRt area to berry areas adjacent to Watana. E-3-311-312 The entire wolf impact section is deficient in that it fails to adequately address "impacts of reduced prey densities. Caribou populations may be reduced.Even if changes in caribou numbers are m"inor the distribution is likely to be altered in a way that reduces availability of caribou to specific packs.There are data from the Susitna basin indicating that moose densities influence wolf territory size~pack size and pack stability.Some current territories may be reduced to the point where social factors would cause loss of a pack. 8-48 r ~, E-3-313 The statement that the amount of habitat lost would potentially affect only two wolverines is not completely accurate.The habitat lost will remove portions of territories of a number of wolverines,not all of only two territories. E-3-314 Impacts of prey loss on belukha whales is inadequately addressed.This section appears to focus on adult salmon only.Outmigrating salmon and eulachon are more likely the foods attracting belukhas to the area. Eulachon in particular may be important.·Until effects of the project on the availability of these foods are detennined~no conclusions on impacts on belukha can be drawn. 8-49 E-3-340 Statements of cl imat·ic effects should be documented and quantified with regard to magnitude of impact. Elimination of ice scouring is suggested as a benefit,yet ice scouring may be the most important factor maintaining early successional stages north of Talkeetna (on page 289 reduction in ice scouring is seen as detrimental).Even the potential short term benefits may be offset by current shrub cormnunities advancing to more mature stages. E-3-341 The flow regime would be used for fisheries management and its affect on vegetation should be identified.It could prevent vegetation of newly exposed substrate and further offset the potential benefits suggested on page 340. E-3-340-342 The discussion of downstream effects·of Devil Canyon Dam are misleading.On page 340 it states "moose may benefit from an increased availability of riparian habitat."Then,on page 341 it points out that much of the habitat will not be available in winter because of open water.(The potential effects of ice fog on use of these areas by moose is ignored.)Finally on page 342 it pulls the two statements together and states that effects on moose could be "moderate to B-50 fF" I severe.1l Then on page 370 it says changes in vegeta ti on wi 11 have a "sma ll population -level effect." This is an example where the combined eff~cts of several impacts have not been clearly thought out.The full range of possible changes in vegetation has not been discussed,only the most optimistic possibilities.When one of several potential overri,ding factors is identified,the acreage affected is not quantified. A far more enlightening impact assessment should be possible by building a simple model with existing data.The ana1ys-is on page 172 takes a step in the right direction but does not carry it to a useful conclusion.It crudely estimates the maximum acreage that could become available for vegetation.This should be refined to estimate the amount that would enter productive successional stages annually during the life of the project.Uncertainties about rates of colonization would produce a broad range of estimates,but the order of magnitude of change and more importantly the chronological patterns of change should become apparent.Similar estimates for currently productive habitat that will advance to mature s~ages should be subtracted to provide an estimate of net change in acreage of value to moose.TFie proportions of thiS acreage that occurs on islands and would be inaccessible to moose during winter should be subtracted to produce a crude estimate of possible changes in available winter range. A similar systematic approach should be appl ied to all areas that might be subject to habitat loss or alteration.Impacts that show a 8-51 potential for serious effects can then be studied in more detail to refine the estimates for mitigation planning. E-3-342 Devil Canyon impoundment wi 11 primarily affect different moose.than Watana.Therefore the statement that moose population will have already been greatly reduced is misleading.The sumnary of impacts uses the word II minima1"five times in reference to impacts on moose in the upper basin",but completely fails to convey any impression of the range of popu 1at i on changes that cou 1d occur du ri n9 the 1i fe of the project. E-3-343 II small proportion of acceptable black bear habitat proportion of what area?How important is that proportion? E-3-350 II What The orientation of access routes in relation to wildlife concentrations and movement patterns should be considered.Some subpopu1ations will be more heavily impacted than others.Mortality and habitat loss from access routes should be added to other impacts affecting the same sub- populations during the same time periods. B-52 E-3-351 Impacts of road and railroad traffic start at tidewater.Increases in unscheduled traffic on existing roads,particularly the Parks and Denali Highways are likely to be substantial.Levels should be estimated and impacts assessed. E-3-352 The timing of rail road and highway traffic is more important than an average rate.Both seasonal and diurnal patterns should be considered. Scheduling of traffic should be considered as a mitigation measure. Secondary impacts of access routes,other than hunting,shoul d be considered •. Combined effects of access potential of transmission corridors and access routes should be considered. E-3-355 Caribou calving north of the Susitna River is sufficiently dispersed that no alignment of the Denali access road will avoid calving areas completely. B-53 E-3-356 Frequency of traffic will be substantially higher during co"nstruction unless unscheduled traffic is restricted. E-3-355-356 It is not always clear which "herd"is being referred to.The Denali access road runs through a central part of the upper Susitna-Nenana subherd's range.It also runs through one of the highest quality portions of the main Nelchina herd1s range.Use·of the word "peripheral"is highly misleading. Potential cumulative effects of the access routes and impoundments on caribou range use should be discussed. E-3-359 Potential alterations of prey distribution,especially caribou,on specific wolf packs should be discussed. E-3-360 The access routes will provide excellent access to tundra habitats. Therefore human use of areas important to wolverine during summer will increase. 6-54 E-3-366-368 Transmission corrido~s should be considered along with other impacts. For example where they intersect the range of a subpopulation the changes in habitat quality shoul d be added to changes caused by 'pther ! project features within the range of the same subpopulation. Pl acement and management of transmi ssion lines in proximi ty to roads and railroads.can influence animal movements and rates of mortality. For example moose train collisions could be greatly increased if a transmission corridor attracted moose in a manner that "increased crossings of the railroad. E-3-370-371 The big game impact summary is completely inadequate.It addresses only impacts on existing populations.It ignores many impacts, including some judged substantial,suggesting that these need not be mitigated.It conveys no impression of the potential magnitude of change,even in current populations.The one effort at quantification uses the smallest possible number of moose that would be impacted by one mechanism.Even those numbers are stated in a misleading way. They are numbers estimated on one survey during a mild winter.There is no basis for the statement that this represents "most years,11 and it certainly does not represent even a minimum number of moose that would be eliminated by the project. 8-55 - -- Appendix C Susitna Hydroelectric Project,Draft Exhibit E Volume 3,Chapter 5 Socioeconomic Impact GENERAL COMMENTS The ADF&G has continuously expressed concern regarding the adequacy of socioeconomic studies relating to the determination and assessment of potential impacts of the Susitna Hydroelectric project.to fish and wildlife. Expression of these concerns dates back ta initial meetings with the Alaska Power Authority in 1979.The original study plan developed by the AOF&G in 1979 contained an objective designed to assess these very impacts. Upon review of this chapter,these concerns remain.In our view,little substantial progress has been made to define project related socioeconomic impacts. Impacts to fish and wildlife ~sers have not been adequately addressed, either in the areas most directly effected by construction or those areas outside the immediate project area.Portions of the fish and wildlife resources produced within the Susitna project area are harvested or utilized in other more distant regions.There needs to be an assessment of these uses of fish and wildlife with regard to (1)identification of resources used;(2)quantification of use levels;(3)description of use patterns including seasonality,its context within the local communities,etc.;and (4)description of geographic areas of use. C-1 Throughout this chapter reference is made to current and/or planned studies. These studies,however,are not described,objectives are not presented and time of implementation or completion is not defined. SPECIFIC COMMENTS Page/Paragraph E-5-6/l Only characteristics of personal monetary income have been described. There should be some description (especially in the Local Impact Area) of relative importance of natural resource harvests as part of the household income.Any income determ-ination need not necessarily be made in monetary terms,but should be done (1)qualitatively by (a) assigning importance values to the harvest and use of each resource; (b)assessing culturally significant practices;(c)describing the type of economic organization of the area;and (2)quantitatively by (a) assessing amounts of time spent harvesting resources;(b)assessing estimated proportions of household food consumption;(c)determining amounts of money spent in pursuit of wild resources;and (d)expressing the overall output or consumption of a household unit. r·" ""'" .... - E-5-12/4-6 This section on recreational facilities related to fish and wildlife resources would be more appropriately termed recreational opportunities.This area has an abundance of opportunities but little development like trail systems,shelters and other man-made facilities. A full assessment of the use of these opportunities and existing facil- ities would be appropriate.Certainly there is information available on Mt.McKinley National Park and the State park recreation areas. E-5-54/4 The indirect influences affecting commercial businesses dependent upon fish and wildlife resources as discussed are undefined. E-5-54/5 The "partial short term displacement ll as discussed is not defined.The statement made that with increased access,business opportunities will increase is purely speculative.One might also expect business opportunities to be reduced as a result of "increased access,particu- larly if the business·is associated with the commercial use the of limited fish and wildlife resources. C-3 E-5-54/7 This paragraph indicates similar factors are necessary for both successful lodge and guide operations.This statement is incorrect. Commercial lodges are most successful with improved access and visita- tion by large numbers of visitors or customers.With construction of new roads,railroads and airstrips the project area would appear to best fit this category. A big game guide,on the other hand.,appreciates and can tolerate less competition from additional hunters and recreational visitors.-His type of business best functions at low levels of human activity and participation. E-S-54/8 Loss of additional habitat,and the change in location and amount of salmon harvested as stated requires definition.The statement "lorig term"impacts to Cook Inlet fishermen and other fish and wildlife users will be small,is speculative.Long term is not defined,nor are "other user groups,"or "recent activity levels."No supportive data or study results are presented to support this statement.Types of on-going studies should also be clarified and referenced. This entire section includes many categories of users who are not licensed.Trappers and subsistence users,for example,are not C-4 - - ..... required to have business licenses to operate.The definition of business needs to be presented. SECTION 3.7,LOCAL AND REGIONAL IMPACTS ON FISH AND WILDLIFE USER GROUPS General Comments 1.Organizationally,the section of FISH is not comparable to that of GAME which make it deficient in the presentation of vital informa- tion: a.It makes no mention of guided sport fishing activities which area major use of the Susitna River and its tributaries. b.No mention is made of fishing lodge operations dependent on ~usitna River fisheries. c.No category comparable to that of liThe Hunter,"E-5-75,is made for sport or subsistence fishermen. d.The category "Resources"on E-S-7S elaborates on game resources,their characteristics and the users of those resources.Only limited information is currently available pertaining to recreational and subsistence uses in the Susitna River Basin.There is a need for additional data collection. C-5 e.In the Game section,no "Methodology"is presented as it is for Fish. Although it may be true that impacts to the fishery resource depend upon loss of habitat and subsequent loss of fish,the issue in this section (3.7) is also the impact upon user groups.In this case,the methodology in this chapter should address both impacts to the respective user groups,and to fish and wildlife resources. Specific Comments E-5-68/1-3 This section is labeled "Methodology,1l but provides no methods appropriate to the evaluation of impacts to user groups.Implicit in this type of evaluation is the need for a measure of existing use.The only statement defining methods is included in Paragraph 2 which described data used to determine impacts of the dam on the fishery resources.It should be noted that pink salmon are more abundant on even years than on odd numbered years.As such,1981 was a year of low pink salmon occurrence. C-6 ...... ..,.. E-5-68 A survey of conmunity usage of wild resources by Cantwell would be useful in assessing levels of use and importance of the salmon,moose, caribou,and other resources. The Cantwell area is likely to be affected by (1)wildlife population fluctuations due to construction activity;(2)population fluctuations because of increased hunting pressure which could result from (a)_ increased human population,and/or (b)increased access to resources. While local residents may not appear-as a "significant"portion of the overall harvest,those resources may very well be important to the community in many ways. E-5-68/4 The assumption is made in the first sentence that "•.•the conmercial fishery for salmon produced in the Susitna system occurs only in Upper Cook Inlet."This assumption is invalid since Susitna River salmon stocks are harvested throughout Cook Inlet,including the lower district.Impacts to Susitna River fish are indeterminable because it is not possible to separate the mixed salmon stocks as they migrate through Cook Inlet. C-7 E-5-68-69/5 The monetary figures presented here cannot be used to determine the specific financial loss of Susitna fish,because of the mixed stock (see comment E-5-68/4).Many of these fish are Kenai River or Kasilof River fish. E-.5.-69/3 The fi rst sentence states IITtie specific impacts whi ch woul d result from construction of the Susitna dams have not been determined in a manner which allows accurate quantification."This statement invalidates comments in E-5-70/1-3,and statements in other Draft Exhibit E report chapters. The paragraph does not address impacts to Susitna River salmon resources downstream of Talkeetna.Greater salmon occurrence exists in these areas,than does the area further upstream of Talkeetna. E-5-70/3 Chinook salmon are harvested incidentally by commercial fishermen in both upper and lower Cook Inlet.Project impacts to these users requires definition as do the criteria for establishing II s ignificant quantities ll as stated. C-8 .... --I E-5-71/1 Personal communications with sport fish biologists should be properly cited. E-5-71/2 The discussion indicates the area and level of impacts to resident and migratory fishes is not determined.Chapter 2 and Chapter 3 of the Draft Exhibit E present relatively detailed presentations of these impacts. The statement,IIData on specific angler use of the Susitna and tributaries above the Talkeetna River confluence are virtually nonexis- tent.1I is incorrect.Data are available on angling use in this area from the ADF&G Statewide Harvest Survey. Impacts are limited not only to areas upstream of the Talkeetna River confluence,as impl ied.Sport harvest of stocks util izing the upper Susitna River are thought to occur elsewh.ere in Cook Inlet,as far south as the Homer area . E-5-71/4 Table E.5.40 as referenced in the paragraph omits burbot in the list of major species.This paragraph states study is underway to define recreational values of Susitna River fisheries resources which may be C-9 impacted by the project.We are unaware of these studies,and they should be referenced. Section Surrmary: The sport fish discussion is not complete nor does it compare with the commercial section in the presentation of figures and numbers.For example, population estimates are available for several species as are data regarding recreational utilization.These data are not presented.The research mentioned as "currently unden'laY"is not referenced. E-5-71/5 Generally, the section on Subsistence Fishing is based on the assumption that the harvests which occur in Cook Inlet are from the Susitna River.This assumption is not necessarily true as most of the effort occurred in the Central District where Kenai and Kasilof salmon stocks are taken.Information in Stanek (1980)indicated the residency of subsistence permit holders.Net survey information (Stanek,unpub- lished data)is available depicting general areas utilized by subsistence fishermen "in the Northern District.Similar information is available for the Central District (AOF&G,1980). Additional assessment of user groups should be made under the category of domestic use of salmon.Salmon for domestic use is obtained from commercial,sport and subsistence fisheries. C-lO Infonmation on use of salmon resources in Tyonek is also available (Stanek arid Foster,1980).More recently,data were collected during the spring of 1982 on the specific uses of salmon by Tyonek residents (Foster,1982).It is assumed that most of the chinook salmon caught in the subsistence fishery at Tyonek are Susitna River fish. E-5-72/2 The value elf "su bsistence"caught fish cannot adequately be determined using a shadow price.Usher (1976)described the difficulty in determining the value of wild foods.The "po int of ~ubsistence capture estimate"would not adequately estimate value.A more appropriate value would be the processed cost.In addition,the nutritional value, cultural value,and equipment investment must be added as cost qua 1 ifi ers. It is also stated that value might be determined using 1I •••the price of an equally desirable alternative food source.II A major question would b~how an equally desirable food would be determined when,for many people,there is not a better source in terms of quality,nutritional value,cultural value,social value and recreational value.Indeed, salmon is the standard by which value is determined. C-11 E-5-73 Under the category of Game there is no section on methodology as under the Fish section. In the section on "Guides and Guide Services"'there is no quantification of the number of guides ~perating in the area or their revenue.In addition quantification of the numbers of people providing outfitti ng and transporti ng servi ces that are not gui des is requi red. Information is available from the AOF&G and from the Guide Licensing and Control Board. E-5-74/2-3 There is no discussion of available data (Phase 1 of big game reports) that provide estimates of losses of animals,effects of access,new hunting regulations,etc.~that would influence "available harvestable animals." In the category of lILodgeOperators"no indication is made of the amounts of services and relative value of services furnished. Many additional lodges on the highway system provide services to the individuals who hunt along the highway system or who use the highway system as a point of departure. C-12 ~c·."""""---··~·,','"-~"__.__',_---;---:-~·---:-~;~-~-'-nr--;;-;c:-.".-,,-_·-· -~ .- {qlSa I E-5-75/2 Apparently the intention of the"statement "The impact of the proposed project on the lodge operators would be indirect and of the same nature as that of the guiding industry.1I is that any direct impacts would be upon the resources.However,in the case of the inundation of land areas utilized for hunting,camps and travel,the impact would be direct. E-S-76/2 Reference to the figure 71,000 animals must be put into proper perspective with regard to the present management for the popul ati on and range carrying capacity. E-5-76/3 The infonmation presented deals with the residency of hunters rather than the experiences they seek. E-S-77 /l A comparison is drawn between hunting pressures or numbers of hunters during the early 1970's and 1980's.Hunting pressure is a function of the number of permits and the number of animals in recent years.This paragraph is misleading and,in fact,the comparisons are invalid. C-13 E-5-78/5 The category IIExperience Sought ll is inappropriate for the informational content of this section.It provides information on characteristics of user groups. E-5-79/2 Although harvest ticket reports allow for the reporting of multiple means of transportation~analysis of the data allow for only one primary means of transport.The use of highway vehicles is the most common method of transport to the general area.Within the area~ however~other forms are more common. E-5-80/1 References should be noted with regard to who is doing the studies and their schedules for completion. E-5-80/2 The first sentence is misleading and inaccurate because the implication is that regulations will be of greatest impact to the users. Regulations are a function of resource status and user groups charac- teristics.Those regulations which may be promulgated due to any reduction in quantities of resources are a reflection of resource status and perhaps increased user access to the area. C-14 ..... The statement,"In such cases,the project would cause little or no additional reduction in hunting opportunity."when referring to a1ready stri ngent regul ations on some speci es is inaccurate.·Indeed, some regulations are more stringent as with caribou,but may become even more stringent if range is inundated and the area of available habitat is reduced.Regulations on increasing numbers of moose in the region may be relaxed in the near future,but if these prove unsatisfactory and mitigation measures do not compensate for moose losses in the impoundment area,further restrictions may be required. E-5-80/3 The statements indicating that regulatory structures will be the major impact on the user is misleading and inappropriately identified as the major impact on the user. E-5-80/4 There is no indication of how the quality of the surrounding environment will be changed thereby affecting the expectations of the user. E-5-81/2 Subsistence users in the region have not been identified with regard to the use of game resources,except caribou.In this case,a set of criteria were developed which qualify a certain number of people on a C-15 first-come first-served basis.For other game resources,further work is required to determine resource use patterns.Information provided in the text refers only to caribou. Although "bringing home food meat may be the 'main goal,11I there are other goals of the user.These include (I)o~taining a high quality goods at a relatively low pr"ice;(2)fulfi11.ing certain cultural traditions and obligations to the community and/or family;(3) attaining goals of self-determination and independence of welfare programs;and (4)attaining the knowledge and ability to support one's self. E-5-82/3-4 &E-5-83/1 Data limitations on trappers do exist;however,a survey of trappers in the Local Impact Area would be appropriate. E-5-84/5 The term lion balance"is unclear.There is some question as to whether existing trappers will benefit or if there will just be more numbers of trappers due to access.It is doubtful that increased access to the inundated area will,in fact,benefit trappers since fluctuating water levels will not benefit more aquatic species especially if draw-downs occur during winter months where food caches and burrows may become inaccessible. C-16 - E-5-85/2-3 Construction of access roads and transmission lines may provide added access to some areas for trappers.However,the loss of habitat and increased pressure on martens from trapping and human activity generally may reduce the numbers of marten and thereby be a major loss to trappers.Paragraph 3 more accurately portrays likely impacts than does paragraph 2. E-5-86/3-4 The assessment of trapping activity and its importance to users in the Local Impact Area should be more extensive.There is some confusion as who an Alaskan trapper is,compared to "recreational"trappers who supplement their income by trapping.Especially when,as stated in paragraph 4,"It is estimated that there are a large number of residents in the Local Impact Area who do some trapping on a part-time basis •••,"more information is required on how large this group is and the level of importance trapping is to them. E-5-88/4-6 There is no mention of what people's attitudes were toward changes in section other than 3.1 and 3.5.Because natural resource use is important in the area,there should be some indication of local attitudes toward changes in the availability of resources. C-17 II It therefore follows from E-5-89/3 that only the attitudes presented with regard to section 3.1 and 3.5 are addressed. No further mention is made regarding measures to mitigate impacts to resource users.There should be some indication as to what can be done to resolve the impacts. C-18 -- -i Appendix 0 Susitna Hydroelectric Project,Draft Exhibit E Volume 4,Chapter 7 Recreational Resources GENERAL COMMENTS This report segment lacks supportive data for many statements related to project impacts.Statements or-discussions are often simplistic,based on faulty assumptions and methodologies;and lack the necessary definitions to provide adequate project impact analysis. In general,analysis of current trends in recreational boating and fishing in Upper Cook Inlet,leads to the conclusion that many of the recreational use projections in this report are far too conservative. Discussion of project impacts in some instances is limited only to statements that anticipa~ed impacts are similar to others discussed,or to other impoundment projects.The specific comments that follow will demonstrate many of these deficiencies. SPECIFIC COMMENTS Page/Paragraph 0-1 E-7-13/2 Fairbanks is not considered to be within the Southcentral area of Alaska. E-7-13/3 The paragraph implies members of the Knik Kanoers and Kayakers are representative of the overall increase in recreational boating within the Susitna River basin.They are not,as they comprise only a minor segment of the recreational boating users.Substantially greater increase in boating,and water oriented recreation with other types of watercraft has occurred. E-7-15/3 Lake Susitna,Tyone Lake and Tyone River are already major recreation areas.They are not potential areas for IIfuture development ll as stated in the text.Both Lake Susitna and Tyone Lake have numerous recreational cabins located around their perimeters. Boaters are not able to float down the Susitna River and up to Lake Louise as stated.Powered watercraft are necessary (often equipped with jet or air-drive propulsion)to ascend the Tyone River,to Tyone Lake. D-2 E-7-20/1 We are not aware of any recreational boaters traveling upstream on the Talkeetna River to Stephen Lake for fishing,due both to the distance and presence of major rapids on the Talkeetna River. E-7-21/2 See comment (E-7-20/1) E-7-24/2 Management of lands for public recreation and appreciation as presented in the paragraph requires additional clarification.It is not clear what will be accomplished to achieve these goals. E-7 -25/1 This paragraph refers primarily to wildlife related impacts,and little mention is made of potential fisheries impacts.In addition to quarry activities discussed for Tsusena treek,it can be anticipated that the lower reaches of all Susitna River tributaries within the impoundment may be effected by vegetative clearing,road construction,gravel removal,as well as the stated water quality changes. 0-3 Paragraph one also implies the actual construction area is a relatively minor one.It in fact will be almost 50 miles in length,and one which does not constitute only a minor inconvenience to recreational users. E-7-25/2 As in the previous paragraph the discussion is directed primarily to wildlife and wildlife related impacts.The discussion fails to address the fact that the lower reaches of all clear water tributaries to the Susitna River,within the impoundment,will be inundated.These areas are the most valued aquatic habitats at present,and are the areas where all recreational use currently occurs. E-7 -25/5 This paragraph does not clarify why fish populations are not expected. to occur in the impoundment.Statements in Chapter 3 (fish,wildlife & botanical resources)indicate the impoundment waters are expected to provide additional fisheries habitat. The apparent inconsistency in these statements,and report segments, requires clarification. 0-4 - - ..... - E-7-25/6 This paragraph is uncl ear as to locations of areas where sport fishing will be disturbed.Dredging reference is to "channel"but does not clarify if it is within the Susitna River or the tributaries where sport fishing currently occurs. Additionally,dredging may create impacts other than just changes in water quality as stated.Quarry activities,road construction and resultant recreational use restrictions as a result of these activities are not discussed. E-7-26/1 The flows predicted during the fill period will not only "temporarily diminish"fishing opportunities as stated,but will totally eliminate some of the slough and side channel habitats.The effects of slough dewatering during the fill period may result in the loss of several year classes of some species of fish,creating not a temporary impact, but a "long-term"one. E-7-26/2 There is no information to support the statement of increased fishing opportunities with increased winter turbidity levels as stated. D-5 £-7-28/1 No data exist to support the statement that the presence of construction workers will not have detrimental effects to the recreational resources,nor is there an adequate discussion of what constitutes "proper contro1.11 £-7-28/2-3 References to the impacts of 550 workers,the loss of 32 miles of river,construction of a 34-111ile road,and current uses of the river are treated superfi ci·a lly.Impacts to recreational resources resulti n9 from improMed road access alone will affect not only waters within the impoundment but those of adjacent areas as well. £-7 -29/3 This paragraph is speculative.No data are presented to support the statement that winter fishing is unaffected by increased turbidity levels.The increase in turbidity levels requires definition. E-7-30/3 No data are presented to support the assumption that recreational use is non-specific to the area,and can simp1y be moved to adjoining areas.A definition of subject species and recreationa1 uses discussed is requ ired. 0-6 - - .... .... E-7-37/4 Data extracted from the 1970 report should not be used when similar data from the 1976 and 1981 reports are available.Existing ADF&G data suggest that per capita participation days and projected increases as published in the 1970 plan,and for dema-nd estimation,are inappro- priate for 1980 and 2000. E-7-38/1 Quality is not the same for all activities and should not be discussed as though it were.The assumption that travel time and cost totally. influences recreational use is faulty. E-7-39/4 Data in this paragraph are interpreted incorrectly ..A careful review of the evidence cited does not suggest that fishing effort has been ~ecreasing in the impact area,or even that it has decreased relative to statewide trends.Areas used for yearly comparisons do not repre-· sent the impact areas.In addition,areas used for comparison were not the same from year to year . E-7-40/4 No data are presented in this paragraph to support the assumption of a declining recreational demand in the Susitna River area.The 0-7 discussion does not define the other "attraction values,11 nor does it address the increasing recreational needs of an increasing human popu- lation in the rail belt area. E-7 -41/4 The doubling of recreational use as presented is considered conser- vative.With the addition of a road system into the upper Susitna River area and the expanding human population,greater increases are expected to occur. E-7-41/6 With the decreased flows downstream from Devil Canyon dam,and improved road access to the dam site,we would expect increased days of recreational use by kayakers,canoers and rafters. 0-8 -, "F' ! r I Appendix.E Susi~na Hydroelectric Project Draft Exhibit E V~lume 4,Chapter 9 land Use GENERAL COMMENTS This document is written in such a general manner that it is difficult to comment on.It contains information that contradicts statements made in other chapters,and ignores potential impacts to land use and access downstream from Gold Creek. Although mitigation of impacts to land use is mentioned,there is no commitment to impl ementing possibl e measures.In additi on,there is no discussion of which measures will be implemented or when or how.Some impacts to land users are completely glossed over and it is suggested that users will have to accept impacts or move elsewhere. SPECIFIC COMMENTS Page/Paragraph E-9-2/7 , Activities such as consumptive,recreational or subsistence use of fish and and wildlife resources are considered as dispersed use and isolated non-site-specific activities which do not involve a commitment of resources at any particular site. E-l .Harvest,and production of harvestable resources is specifically dependant on a commitment of a speci fic amount of 1and {habitat}. Participation in the harvest of fish and game {levels of effort}is therefore site-specific.Consequently,the loss of species habitat including the lands and waters used as harvest areas win have a measurable impact both on management of wildlife and 9n public use. E-9-3/5 An assumption is made that because the project is isolated and located in a subarctic environment,extremely low density land use results. However,use of 1and both by the pub 1ic and wil dl ife is seasonal and can be very high for a specific season. E-9-15/3 Hunting use of Zone 1 is less than in Zones 2 and 3.However,hunting in Zones 2 and 3 is basically associated with the existing lodges and cabins and is more readily quantifiable than identifying independent hunter effort.Use of AOF&G harvest stati sti cs woul d hel p quantify independent hunter effort. Figure E.9.5 Reference to rating public use of lands occurs throughout Chapter 9 and is ultimately reflected in Figure E.9.5 a map which identifies 11 use or ·sample use sites with evaluations of use intensities for each site. E-2 I~ I~ .~ ~, r' I, The designation of Low,Medium and High intensity uses should be defined. E-9-32/1 Proposed mitigation for the loss of public use of project lands has only addressed the consideration of establishing restrictive access regulations.Other mitigation alternatives should be identified including replacing opportunities lost with lands that provide equal value . E-3 nEI-AIlTl"IENT 0 ..'NATURAl.n":SOURCES OFFICE OF THE COMMISSIONER January 13,1983 BILL SHEFFIELD,GOVERNOR i 555 Cordota Slreel Pouch 1..{J05 Anchorage.AK 99510 19011 216-2653 Mr.Eric Yould Executive Director Alaska Power Authority 334 W.5th Avenue Anchorage,AK 99501 Dear Mr.Yould: REceIVED JAN 1 71983 ALASKA POWER.AUTHORITY 1()-J2LH The Alaska Department of Natural Resources has reviewed the draft Exhibit E application for the Susitna Hydroelectric Project.We are submitting comments on this document which in part satisfy the agency coordination requirements established by the Federal Energy Regulatory Commission, (FERC). The formal position of the Department of Natural Resources regarding the Susitna project is contained.in the Exhibit E comments which follow;our April 16,1982 testimony to the Alaska Power Authority Board of Directors (copy attached)and the letter to Eric Yould from Reed Stoops dated October 11,1982 (copy attached).We request that an-unabridged copy of these comments accompany the perfected application submitted to FERC. ORGANIZATION AND PRESENTATION OF EXHIBIT E In some cases the Exhibit E text,tables,and figures do not reference the documents from which the material was taken.The consequence of this inadequate documentation is that the reader cannot determine the specificity,accuracy or sufficiency of the Exhibit E.We recommend that the specific references to original documents be included in this Exhibit E before the application is submitted to FERC. WATER QUANTITY AND QUALITY During the past two years the Department of Natural Resources has emphasized the great importance of acquiring a clear understanding of the relationship of various flow-release rates from the proposed dams and the corresponding impacts on downstream aquatic resources,habitats,and uses.This information is vital to enable DNR to make informed decisions with respect to instream flow reservations and water appropriations both of which are required in order to facilitate the Susitna Hydro Project.The flow releases schedules presented in Exhibit E for filling and operation of the Watana and Devil Canyon Dams have not been developed in consultation with the Department of Natural Resources or by a methodology approved by this Department which is charged by law with authority to adjudicate all water ...... ...... - (,) (v appropriations and instream flow reserv~tions in the State.Indeed, Exhibit E does not explain the process by which these release schedules flows were devised.We strongly recommend that the license application contain a specific,detailed flow release schedule developed through a quantifiable instream flow analysis pr~gram coordinated with DNR and with state and federal fi$p and wildlife agencies. Attached please find the entire text of the review comments from our Division of Land and,Water Management.Please consult that text for additional specific comments relating to navigability,thermal modeling,and nitrogen gas supersaturation. ACCESS This department's comments regarding the proposed route from the Denali Highway to the project site should not be construed as support for that project route as the preferred means of access.This agency,along with the other state and federal resources agencies,has consistently favored road access to the project from the Parks Highway.However,1£the route proposed in Exhibit E is selected,we recommend certain design modifications. We recommend that the principal design criteria for the proposed route be the enhancement of scenic values and public safety.We consider the proposed high-speed design of the road inappropriate.The long-term use of the road aft~r dam construction will be primarily sightseeing and recreation.The highway should,therefore,be designed to take maximum advantage of the scenic potential of the area which traverses some of the most dramatic in North America. In,addition to being an,Unattractive counterPoint to the natural'landscape ," the high-speed road proposed '(55 miles per hour with 40 miles per hour at difficult curves)may create serious safety problems.The long braking distance for a vehicle traveling 55 miles per hour 'on a gravel road endangers the stop and go driver and those who park and stand along the side of the road to take photographs.Although a high-speed road will yield cost savings during dam construction,it is questionable whet~er these,cost savings outweigh the long term benefits of a scenic road.The rationale for a high-speed access road design should be based on an explicit quantification of the cost saved by that design.We believe the scenic and public safety benefits foregone by a high-speed design when accumulated over the expected life of the road are almost c;ertainly greater than the costs saved by such a design to facilitate the brief construction phase of the dams. Although design standards for upgrading the Denali Highway between Cantwell and the proposed access road were not discussed in Exhibit E the issue merits comment because an upgrade will be necessary to accommodate project-related traffic."The portion of the Denali Highway affected provides exceptional views of the Alaska Range,Reindeer Hills and the (0 Talkeetna Mountains.The Alaska National Interest Lands Conservation Act (ANrLCA)of 1981 called for a joint state.federal and private study of the scenic qualities of the Denali Highway.The intent was to encourage cooperative land management of lands adjacent to the highway to protect its important scenic values.The Denali Scenic Highway Study will be published in early 1983.DNR encourages APA to consider carefully the recommendations of that report and to.support a design which is consistent with the study recommendations. Finally.we recommend re-routing of the proposed access road where feasible to take'advantage of the extraordinary vistas.'Presently the road transects a large wetland in the upper Brushkana drainage.Consultants responsible for the aesthetics portion of Exhibit E recommended that this section of the road be re-routed to higher ground to the west.We concur and support that recommendation.which will also protect the wetland from the impacts of road construction and should result in lower long-term maintenance costs because of better soil conditions. RECREATION AND AESTHETICS We agree with the consultants'conclusions that recreation plans be focused on those opportunities occurring elsewhere in the project area rather than those directly associated with the reservoirs.Because of fluctuating water levels and steep shorelines.the reservoirs themselves will not present an attractive recreation environment except for "occasional use by speedboats. The greater recreation opportunities will be associated with the access road ,Jud the .many lakes •streams •and alpine hiking_areas that can be reached from -that road.""The consultants'identification"of recreation"resources on Cook Inlet Region.Incorporated (CIRI)land raises the question as to how these recreation opportunities might be realized.We recommend that the Power Authority consider some sort of leasing or concession arrangement with crRI to facilitate public recreation use on Stephan Lake.At least one public use site of a suitable size (40 acres or more)should be provided at Stephan for camping.fishing.and as a staging area for those people using the lake for float trips down the Talkeetna River.In addition.legal access across village and regional corporation lands should be secured and a trail constructed from the reservoir to Stephan Lake.In order to most effectively enhance the recreational potential of the proposed projects.We would recommend that the recreational element of Exhibit E add three sites adjacent to the Alaska Railroad.These sites are Indian River.Gold Creek. and Curry.Each of these sites would provide a destination point for recreation users of the Alaska Railroad and would provide a greater diversity of recreation opportunities.We recommend that management of the off-site recreational facilities associated with the access road are best met through the budgeting process of the Alaska Power Authority.If the Division of Parks is expected to manage these sites.then we will have to work closely with APA to identify priorities for project funding. In summary.we feel that the consultant has done an excellent job in identifying the recreation opportunities and resources available in the project area and would request that the scope of the study be expanded to look at the identified sites along the Alaska Railroad as described above. !",r.+.F 111~··-C--'-----.-.--.---,~-.__._ .- HISTORIC AND ARCHEOLOGICAL The report on historic and archeological resources is well done and addresses all the pertinent questions about mitigation.We concur with the mitigation plan as presented in the draft document. We concur with and support the proposed education program described on Page E.4.114.We consider such a program to be a necessary and effective part of any large construction project.If project personnel are adequately trained and sites are clearly marked,avoidance should be a viable mitigative measure in many of the indirect and potential impact cases • TRANSMISSION LINE ,.... (0 The Access Plan Recommendation Report dated August,1982 proposes routing a transmission line through a non-roaded area south of the proposed road between the dam sites.The line was well sited taking advantage of terrain and vegetation to minimize environmental and visual impacts as well as minimizing construction costs.We support the route proposed in the August report.We have since been informally advised that APA has decided to route the transmission line along the road between the dam sites to allow year-round access for maintenance (winter over-land access via all terrain vehicle is feasible without a road).If road access is determined to be absolutely necessary,we agree with this decision;it would be inappropriate to have two east~est road corridors through this area.However,. presentation by consultants at the APA sponsored workshop in Anchorage during the week of November 29 to December 3,1982,indicated that t~ere may be excessive concern by maintenance engineers with year-round access.The consultants argued persuasively that maintenance by helicopters is not only feasible,but is cheaper than road maintenance and is a common practice in states other than Alaska.Helicopter maintenance has also proven itself in more rugged terr8in;~nd extreme weather conditions of southeast Alaska. The need for road access in case of bad weather is a concern,but it.is important to clarify precisely what is gained in terms of minimizing the risk of power outage by having road access.That gain should then be compared with the costs.In this case the major cost is a strong negative visual impact on the road between the dam sites.In contrast,the gain seems to be minimal.In short,the value of year-round access is not infinite and in this case may be significantly less than the costs. SOCIOECONOMIC IMPACTS l~The permanent townsite appears to have been located in an exceptionally wet area.Apparently the major criterion for locating the townsite was land status.A more appropriate location from the standpoint of land ~apability and general amenities for the inhabitants of the townsite would be in the Fog Lakes area south of the Susitna River on privately owned land.The townsite is particularly important because.as indicated in the Exhibit E. the tendency for workers to reside on-site depends on the quality of housing and other amenities.Exhibit E emphasizes that a high amenity site will minimize impacts on outlying communities by encouraging a higher percentage of workers to live on-site.We support this objective but do not think siting the townsite as proposed will help achieve it.We strongly suggest finding a more suitable location for the townsite. Exhibit E projects minimal project impacts on local facilities and services due principally to the provision of on-site housing for workers. The total Mat-Su Borough population increase as a result of the project is projected as 4,700 in 1990 (peak year),1,110 of whom are expected to live off-site in rural communities.Should that projection be accurate,the off-site impacts would,indeed,be limited.However,the projection assumes absolutely no in-migration by unsuccessful workers.This is a misleading assumption.In fact,in-migration by unsuccessful job seekers will probably be considerable.Such in-migration is a likely result of decreases in job opportunities in the lower 48 and has occurred in Alaska during construction of the oil pipeline.Current economic conditions would stimulate extensive in-migration to a greater extent than is predicted in Exhibit E. If in-migration is seriously underestimated in Exhibit E,then a wide range of socioeconomic impacts is underestimated as well.Past experience in the state shows that boom conditions,such as the proposed dam construction would create,have led to rent increases,proliferation of sub-standard housing and strain on public facilities and services.The potential impact caused by unemployed in-migrants is particularly significant in light of their tendency to be more of a disruptive influence on small communities than employed in-migrants.Unemployed in-migrants,for example,tend to require more services such as public health and family assistance of various forms.They pay fewer taxes and may have little stake in the community, thus caring less about relatively minor issues such as yard maintenance and the appearance of local parks.In the small,rustic communities in the project area,these problems could create considerable tension between current residents and the new in-migrants.We consider the socioeconomic impact assessment to be inadequate without an attempt to estimate the. numbers and effects of unsuccessful job seekers arid their dependents who will move into the region. It would be more accurate and useful to provide a range of projected' population increases in affected communities rather than a precise number such as 263 in Talkeetna by 1990 or 75 in Trapper Creek.These numbers convey a precision not supported by the methodology or the probability of error inherent in such projections.More useful information for community planning purposes would be a high-low range.A key consideration in planning for public services is the population threshhold which requires new capital expenditures.For example,if a population increase of 300 would require a new community well in Talkeetna,the city would be better off knowing that it fac~s a probable increase of 250 to 350,rather than knowing that someone has dis aggregated a series of numbers to produce an estimate of 263. Exhibit E discusses generally the need for measures to ensure that the local unemployed get a chance at project-related jobs.Assuming there will be considerable competition for jobs by in-migrants and that the state's objective is to encourage local hire,it will be necessary to develop a clearly defined and legal program to achieve that objective.The measures recommended by Exhibit E are vague and do not reflect the significance of this issue to the state or the borough.We suggest more attention be given to developing a more comprehensive approach to address this issue in the Exhibit E application to FERC. ~ I ALTERNATIVE ENERGY The Exhibit E devotes about four and one half pages to the geothermal energy alternative.This information is factual and provides general ba~kground for the reader.The Exhibit E could be improved by noting that the Department of Natural Resources has a geothermal lease in the Mount Spurr area planned for May,1983.The Exhibit E should acknowledge that geothermal energy is immune to fuel price escalation as is hydropower.We agree with the Exhibit E statement that little is known about,'the geothermal properties.Until exploration of the geothermal properties of Mt'.,Spurr has occurred the viability of geothermal power for the railbelt region is unknown.We recommend that the Exhibit E be revised to include this information. In summary,we appreciate this opportunity to provide formal review comments to APA on the draft Exhibit E. Sincerely yours, ~~;J~ Es ther Wunnicke Commissioner Attachments cc:Division Directors Special Assistants MEMORANDUM State of Alaska DEPARTMENT OF NATURAL RESOURCES DIVISION OF LAND AND WATER MANAGEMENT December 23,1982 3430.3 276-2653 DATE: FILE NO: SUBJECT: TELEPHONE NO:~~cr-P~~ Y.R.(MOHAN)NAYUOU,Chief Water Management Section Su Hydro Draft Exhibit E-FERC Li cense Application Paul Janke,Gary Prakosch and Mary Lu Harle of my staff have reviewed the Draft FERC License Application,Exhibit E,dated November 15,1982, prepared by Acres American,Inc.and provide the folowing comments. TO:AL CARSON,Acting Director Division Of Research And Development FROM: I.General -Organization The report lacks documentation.With few exceptions.·~uch of the textual material,tables and figures do not reference the documents from which the material was taken,the specific page n'umbers in the original documents,or where those original documents reside. These references should be incorporated into Exhibit E before the finalized license application 1s submitted to FERC.The organization of draft Exhibit E is poor.Separation af Volumes I and II.Chapters 2 and 3 makes review and evaluation of the Exhibit very difficult.Issues,impacts and mitigations should be combined in a more logical manner to allow easier evaluation .. Many of the statements and conclusions presented in this docume~t are unquanti fled 'and speculative.The revi ewer is conti nually"': confronted by words such "as IImay ll,II pro bablyll and lIis expected ll • Statements whi ch are quanti fled should be so noted and referenced and speculative statements and conclusions should be so noted. Speculative statements must be quantified before effective evaluation of the .document can be performed.As such;the document does not present enough data and analysis to adequately evaluate the project at the present time. II.Major Issues The following are major issues concerned with the draft Exhibit E. They are not in prioritized order. A.Flow Releases The flow releases presented for both filling and operation of Watana and Devil Canyon Dams have not been developed with nor approved by the Alaska Department of Natural Resources.The document does not,in fact,explain the process by which these flows were developed,except to say they were selected to satisfy power production requirements and fisheries concerns. Other water uses,including navigation,river based recreation and wildlife are assumed to be covered by these flows.This may not be the case,and this conclusion should be quantified. This department in its review comments on this project has continually asked for a range flows and their associated impacts.This has not been provided by this document,and should be included. Su-.~dro Exhibit E Page 2 -- - Further,the impacts from the selected flow releases are eval uated only for indivi dual parameters,such as temperature, river morphology and ice,and are not well quantified.What is needed is the cumulative effects from all the affected parameters and thei r impacts on issues of concern,such as fisheries and navigation.Only then can mitigation measures be addressed.It ~pears from the data presented in this documeni that the propose flow releases are inadequate. 8.Access Road A final decision should be made now as to whether the access road to the dam sites will be public or private.Plans for road construction indicate the road will be built as a private road to move personnel,supplies and equipment to the construction sites.However,the recreation plan seems to indicate that the access road will provide public access for recreation to the area once the dams are operational.A decision should be made on this issue now to obtain public review and comment on this issue during the formal FERC review proc~ss .. C.Townsite Further investigation into the townsite location should be conducted..The present location is apparently located in a swampy area.Additionally,the water supply is questionable.-~~? Ground water is preferable to surface water for the water supply source as drilled wells are of less environmental consequence.However,·a ground water source of adequate quantity is questionable in the present planned location •. D.Land Status The land status of the land involved in the damstte,access roads and transmissions corridors should be addressed now. Types of land acquisition such as land exchanges,permitting, leasing and condemnation should be investigated and action begun in order to prevent delay to the project further down the line. III.Specific Comments There are many sections in this report where inadequacies are recognized by the authors.It would be a futile effort to reiterate all the statements made in this report that ~ay "further work is on-going"or "documentation has not yet been made",etc. As a reviewing agency we also recognize this and would expect that the work will be done and the inadequacies addressed~without each statement having to be noted in these comments. SU-Hydro Exhibit E A.Volume I.Chapter 2 -Water Use and Quality Pages E-2-26 and 27;£-2-49 and 50;E-2-66 and 67: Page :r "Navigational difficulties between Devil Canyon and the confluence with the Chulitna River will be increased due to shallower water and a somewhat constricted channel.Although there will be sufficient depth in the river to navigate it,greater care will be required to avoid grounding M ,Since "greater care will be required".this is a project impact and therefore needs to be discussed along with proposed mitigation measures.This statement also differs from the following report: Susitna KYdroelectric Project.Task 7-Environmental,Subtask 7.04-Water Resources Analysis.A Preliminary Analysis of Potential Navigational Problems Downstream of the Proposed Hydroelectric Dams on the Susitna River,March 1982.The above statement does not indicate what depth is assumed to be sufficient for navigation.The above March 1982 report studies ice-free navigation only and assumes a depth of 2.5 feet is required for the following reasons:(1)The cross-sectional data used was obtained for purposes other than studying project effects on navigation,and (2)the accuracy of the predicted water surface profiles is,at best,approximately one foot.From an extrapolation of Figure 2 in this report.to maintain a depth of 2.5 feet at cross-section 32. located near Sherman,a discharge of 6500 cfs is required.Thus.from Table E 2.17.post-project navigational difficulties may Occur near Sherman during both filling and operation during May,June.July 1-27, September 19-30 and October.This is when the project flows are less than 6500 cfs.This conclusion differs from the no navigational problems statement in Exhibit E.It is believed that the March 1982 report provides the latest information available.If a more recent report or different criteria are used,this should be stated and discussed. Additfonally,it is stated that lithe reach downstream of Talkeetna is navigable under low flow condition but can be treacherous at times". What flows are considered low flows?Are the proposed releases from the project considered low flow when considering navigation?What flow conditions should be considered low flows in the areas above Talkeetna when considering the possible impacts on navigation? The impacts on navigation,including commercial boating.recreational boating.float planes,and winter transportation use of the Susitna River from dam sites to Cook Inlet is inadequately addressed.The impacts need to be quantified and mitigation measures proposed. Pages E-2-27;E-2-50 These sections say that information on recreation and recreational water uses are contained in Chapter 7 of Draft Exhibit E.However.Chapter 7 addresses a recreation plan for the Susitna Hydroelectric Project.It does not address project impacts on downstream recreational uses of the Susitna River by boats and float planes for sport fishing and hunting. This is a major use of the Susitna River in its entirety.The impacts on this water use should be identified and quantified and mitigation measures proposed. SU-Hydro Exhibit E Page 4 """ If a more recent report or different criteria are used.this should be stated and discussed. Pages E-2-36 The availability of groundwater for village and camp water supply in the location of Tsusena Creek is in question.Before construction begins on any water supply system a permit to appropriate water and construct a dam must first be granted by the Department of Natural Resources per AS 46.15. Figures E-2-18 thru 2-25: These figures do not include low or high flow frequency curves for January -April,November and December.These curves may be useful when looking at the minimum flow releases for these months. Pages E-2-14, E-2-47. E-2-51.E-2-56. E-2-66,and E-2-72thru 75; E-2-83:. Sloughs and side channels are very important fish and wildlife habitat. The effects on this habitat due to all phases of the project should be well documented.Some of the basic questions not answered are as foll ows: Regarding ice,what will the effects on slough and side channel winter habitat be with minimum flows of 1000 cfs during filling of the Watana reservoi r?Taking into account the .!ncreased tel!!p.erature and associ ated lack of ice formation ;0 th.e._t~actL~bove Talkeetna,without the normal . ~formatlOn river staging will be lower.What are the effects of the lower stagi ng on slough upwelling and water temperature?If water upwelling in the sloughs will be decreased,what effect will this have on all life stages of fish which use the sloughs. ~ith the predicted flows of 10,000 cfs during operation of Watana Dam, what effects will this have on the slough and side channels above Talkeetna and below Talkeetna?With increased flows and water temperature at O°c below Talkeetna,increased ice formation will cause higher water stage than normal.What effect will these hi gher water stages have on sloughs and side channel habitat?Will the sldugh heads be overtopped?What effect would ice formation in the slough due to possible overtopping have on overwintering fish,out-migration,slough water temperatures,etc?If the sloughs below Talkeetna are overtopped due to increased ice formation and associated higher river staging and ice does from in the sloughs.beside the effect on overwintering fish and possible delays in out-migration due to cooler than normal water temperature,how will this ice and othr debris be removed from these sloughs without the annual spring flooding?If artificial flooding by scheduled release from the dam is tried.how will timing of flooding Page E-3-55: The fishery resource in some specific streams in the transmission line corridor is discussed.Also stated is:"little is known about the other streams that will be crossed in this segment."Is it possible that valuable resources in other streams may be impacted by the transmission line?It appears more·stUdy is needed here. SU-Hydro Exhibit E Page 5 Page E-3-58: The discussion of the Watana dam construction states the following:"The movement of fill materials and the actual process of construction of the fill dam are potential contributions to turbidity and siltation.1I Acceptable levels of turbidity and siltation should be specified,and these should be written into the construction specifications.This is not discussed in mitigation of construction impacts,pages E-3-120 to 127. Page E-3-73: The statement liThe entire canyon is expected to be passable by chinook salmon,allowing them to enter Tsusena and Fog Creeks ll is found in the discussion of potential impacts from Talkeetna to Watana dam during filling of the Watana reservoir.What are the impacts of dam construction and operation on chinook salmon movement into these creeks?If there are impacts,what are the proposed mitigation measures?This is not discussed in the mitigation on pages E-3-128 to E-3-144. Pages E-3-74 to 76: In discussion of potential impacts from Talkeetna to Watana dam during filling of the Watana reservoir,the following statements are made: a."Many of the physical changes identified for mainstem habitats would also,occur in side-channel habitats.Since side-channels are generally characterized by higher streambed elevations,the forecasted changes in streamflow may cause greater effects in side-channel habitats.11 b.I'Many side channels that normally convey water in May,June and the first three weeks of July,would likely be dewatered under filling flows •••11 c.IIIn other side channels,flow may be reduced to an extent that the outmigration of salmon fry wO,uld be delayed.1I , d~·"Some side'':channels-'above Talkeetna would be completely dewatered under the proposed filling flows •••" e."Reduced flows in the spring may inhibit emergence and outmigration in some side'-channel spawning area ••" f.liFo recasted August and September flows under the fi 11 i ng schedule may adversely affect spawning habitat in side-channels.1I g.lilt is unlikely that new spawning areas would become available under the filling flows.1I It is understood that with reduced flow rates in sloughs and side-channels,beaver may become more active in these areas.Thus,it is possible that the beaver dams may block the outmigration of fry.What are the impacts from this?Mitigation measures associated with side-channels are not discussed on pages E-3-128 to 144. Pages E-3-75 Through E-3-77: The following statements are made with regard to the problems related to flow releases during the different times of the year,"reduced flows in spring may inhibit emergence and outmigration in some side channel spawning area","August and September flows may adversely affect spawni ng Su-Hydro ~xhibit ~Page 6 habitat in side-channels","16,000 to 18,000 cfs is needed at Gold Creek to insure easy fish passage into sloughs··,and lithe stage of the mainstem at flows of approximately 12,000 cfs did not create backwater effects at the mouths of ~sloughs great enough to allow free passage by adult sa1mon ll • The total effect of low flows on the fisheries can not be evaluated until the total number of sloughs and side channels both below and above Talkeetna that will be affected,and to what extent they will be affected,'is known.What percent of the total salmon population are using the slough or side channel habitats that are expected to be impacted ,and at what time of the year these i mpa.cts wi 11 be most severe. Page E-3-80 through E-3-85;E-3-95 through E-3-97 The impacts on the Cook Inlet to Talkeetna reach during both filling and operation are extremely generalized and lack documentation.Impacts on the mainstream,side channels,sloughs and tributaries must be investigated and quantified.This includes impacts resulting from changes in discharge and stage,water temperature,water quality, sediment transport,ice and river morphology.While this reach of the river will be impacted less than the Talkeetna to Devil Canyon reach,the possibility remains that small project changes may result in significant impacts.Of particular importance in this reach is the determination of the cumulative effect of the individual impacts noted above."Mitigation measures associated with these impacts are not addressed in pages E-3-128 to 144. Page E-3-129: The list of reasons for providing suitable flows should include the following additions: 1."~~~~t~~,~U1t sa1monacc:ess to slol'gh and side channel spajning 2.Maintain flow through the spawning gravel during the incubation and rearing periods. 3.Maintain suitable flows to preserve slough upwelling waters. 4.Maintain flows to control proper water temperature needed in the mainstem,sloughs and side channels. Page E-3-133: Regarding winter flows,'IMinima1 impacts are expected".The possible impacts addressed on Page E-3-94 seem to be major. The only rectification of impacts on sloughs that is presented is slough modification.This is an untested mitigation measure in this river system.What are the costs involved with design,testing,construction and operation and maintenence of slough modifications.How many sloughs will need to be modified.This sect~?n should include other alternatives besides slough modification to recti~y impacts on sloughs. Pages E-3-136: On this page and elsewhere,the document predicts water temperatures in the reservoirs and downstream of the dams.No information,however,is given describing how these temperatures were predicted.The model used Su-Hydro Exhibit E Page 7 should be given or referenced.along with the details describing its verification for use on this system.The validity and hence the accuracy of the temperatures predicted.therefore.must be questioned. Page E-3-137: "The impacts associated with alteration of the temperature regime during reservoir operation can be minimized by incorporating multiple level gates in the power intake.11 Not discussed are water quality parameters other than temperature associated with each reservoir level.A monthly schedule should be given that quantifies the water levels to be used and the associated water quality parameters of the release water.Of specific concern is the dissolved oxygen content of water released from Devil Canyon if the intake is drawing water from the hypolimnion. Page E-3-140: IIGas supersaturation will be avoided by includ"ing fixed-cone valves in the outlet facilities ••eA prototype test of Howell-Bunger valves showed them to be effective in preventing gas superstaturation (Ecological Analysts Inc.1982).11 Since this reference is an unpublished report,it can not be easily obtained.The bibliography leads one to believe that this valve was tested at one site.If this is true.it is inadequate. Due to the potential negative impacts from nitrogen supersaturation,the valves to be employed here should be well tested for this applicaiton. It appears that this in not the case for these Howell-Bunger valves. IV.Summary In summary,this draft Exhibit E is a start at answering questions regarding issues and resources to be affected by this project and their impactSjand.possible mitigation.However,a great deal more data collecti~n and analysis is needed in order to answer still unanswered questfons before this project can be effectively evaluated. These comments on the Draft Exhibit E prepared by the Alaska Department of Natuaral Resources should be included unabridged with the finalized comments transmitted to the Alaska Power Authority. cc:Mary lu Harle Gary Prokosch Paul Janke 11f.IlEPLY REnR TO: L3031 (ARO-P) United States Department of L_~Interior NATIONAL PARK SERVICE Alaska Regional Office 540 West Fifth Avenue Anchorage,Alaska 99501 1 4 J1U~1983 ..... .... r r, r Mr.Eric P.Yould~Executive Director Alaska Power Authority 334 West Fifth Avenue Anchorage,Alaska 99501 Dear Mr.Yould: We have reviewed the proposed Susitna Project recreation planas presented in the draft license application Exhibit E and have the following comments. Cultural resource management issue comments were addressed previously in the December 3,1982,letter from our archeologist,Dr.Floyd Sharrock. The recreation plan .appears to be well-conceived.A diversity of recreation resource opportunities are planned with facility development in stages which will permit future modification where it is appropriate.The plan also reflects excellent coordination between its authors and appropriate public agencies and the private sector. We support the following recommendations,many of which were shared with the· EDAW,Inc.,representatives at the December 1,1982,workshops for recreation and aesthetics. 1.Before construction begins,existing river conditions from upstream of the project (perhaps the confluence of the Tyone and Susitna Rivers)to Gold Creek should be recorded on film.A high quality motion picture with narrative describing preconstruction resource conditions could be an effective interpretive tool for the visitor center(s).A permanent film record of the Devil Canyon whitewater is especially important.A film record of the project construction process and the project in operation, including a description of the recreation opportunities,should also be made and perhaps combined with the preconstruction film for use at the visitor center(s). 2.If normal operation of the Watana Dam will minimize the danger now asso- ciated with kayaking the unregulated Devil Canyon whitewater,consideration shou.ld be given to providing public access to the Susitna River below the dam prior to the completion and operation of the Devil Canyon Dam. 3.Consideration should be given to providing public access from the project transportation corridor to Portage Creek for fishing and/or kayaking. 2 4.Appropriate day use and/or overnight facilities should be considered for Gold Creek.These facilities could accommodate:river users coming out of the project~backpackers who enter the project area via the Devil Canyon Dam construction right-of-waYt and other recreationists using the Alaska Railroad who wish to layover in the Gold Creek area. 5.The status of the Stephan Lake-Prairie Creek corridor is presented on pages E-7-83 t 84 as a lower priority resource area.The priority should be elevated to Phase One implementation as negotiations with Cook Inlet Region,Incorporated t and/or the village corporations could be lengthy.- Public access to the Talkeetna River (a potential State Recreation River) via the Stephan Lake-Prairie Creek corridor is an important issue that needs to be resolved early so that public use may continue during project construction. There is an incorrect statement in paragraph 6 t page E-l-15,that should be revised.The text incorrectly states that the Susitna River has been studied for potential inclusion in the National Wild and Scenic Rivers System.A study and evaluation under the authority of the Wild and Scenic Rivers Act has never been undertaken. Recently it came to our attention that the electrical transmission corridor between the Watana Dam and Gold Creek will now be relocated closer to the transportation corridor to facilitate maintenance.We trust that careful attention will be given to the development of appropriate mitigation measures to safeguard,as much as possible,the scenic values associated with the corridor. My staff looks forward to continued involvement with the project and is avail- able to answer any questions you may have concerning the above recommendations. Sincerely, -\\-...~£:..I,....u~.~\\.-\-"'\. Associate Regional Director Planning,Recreation,and Cultural Resources Alaska Region cc: Jack Wiles,Division of Parks Al Carson t Division of Research and Development Robert Erickson,EDAW,Inc. Bruce Bedard,Alaska Power Authority - - .DEP.\.RTMENT OF N ..<\.TURAL RESOURCES DIVISION OF f1{)8fST,LAND AND WATER MANAGEMENT NORTHCENTRAL DISTRICT January 28,1983 BILL SHEFFIELD,GOVERNOR 4420 AIRPORT WA Y FAIRBANKS,ALASKA 9970' PHONE:479-2243 RECEIVED Bob Mohn Susitna Hydro Project Manager Alaska Power Authority 334 West 5th Avenue 2nd Floor Anchorage,Alaska 99501 Dear Mr.Mohn: FEB 31983 l\l.ASKA POWER AUTHORITY -- The Southcentra1 District of the Division of Land and Water Management forwarded to this District your November 1982 Exhibit G and project maps of the Susitna Hydro Project FERC license application.The Northcentral District is concerned about the proposed 400'wide alignment of the right-of-way for the stub (transmission line)from Healy to Fairbanks and its impacts on past and present land disposal actions within the subject alignment. We have mapped out the land disposals that are along the proposed route and the following text lists the status of those disposals. 1.Healy Agricultural Sale:Proposed for F.Y.1985,a soil survey has already been ordered for this disposal. 2.Spruce Hill Large Lots:These lots will be offered during F.Y. 1985. 3.Windy Creek Remote:This area is currently open for staking and preliminary investigation indicates that the right-of-way passes through six leases;402154, 408803,407791, 402157,402156,and 409474. 4.Windy Hills Subdivision:This was preViously disposed of and is classified private recreation.It appears the line passes in proximity to sale 406226. Bob Mohn January 31,1983 Page 2 5.Southwind Remote:This is proposed for disposal in F.Y.1985. 6.Windy Agricultural Sale:Proposed for F.Y.1985 and a soil survey has already been ordered. 7.Proposed area of Tanana Industrial Site. 8.Goldstream Agricultural Sale:This disposal is proposed for sale in F.Y.1984 and a soil survey has been done. 9.Alder Creek Subdivision:The proposed right-of-way line appears to be in close proximity to this subdivision which has already been offered for sale. 10.Northridge Subdivision:Portions of the proposed line appear to abut and/or cross into ASLS 81-214.All lots within this subdivision were sold in the last lottery and placement of the line in proximity to the subdivision would greatly effect the viewshed from the subdivision. The overall District concern is the impacts the proposed right-of-way will have on land disposal actions and proper land management practices. Particularly,we would like to know why the new transmission line couldn1t be placed adjacent to the existing transmission lines to lesson impacts? I am sure other questions and concerns will become evident as the project becomes more finalized.We look forward to working with you on the resolution of these conflicts.Please keep us informed on the progress of your studies in these matters. Sincerely, .".......---~-~'.,..•..,- Jerry L.'Bross;a District Manager Attachment:Map Showing Conflicts cc:George Hollett,Acting Director ---1 ]--J J J j i -k?:,---I(~"'J~ ~e LAIC!OWN£"_SCHt:DUU:.........-....1...,'"LA........MAlll.MlN1' OIl -naT(cw ...a........-cOQll;I'U'T .1."",,_1tC• ~~us .....-"",",10 ""nl .,...,--lHTp ,UlU alii:'OIl« via "Dlul....""'''10 nATlI 'IIKII"".....IIlQAO~••-PIU ..AU wn:......L.uro ~.....n-KC"r1OICI:~IINLl.u ...ttf:..........,.,. stAU:Q '...._....... Ie...·,··.1_. ~~iJ ALASKA POW"R AUTHORITY ®"';tt~,lull'".....O"Ol.UCnC "IIQ.II:UiTRANSMISSIONL1Hf: .~PROJECT BOUNDARYt ~::a "•~t PLATE G..: -_.... LAN)OWN[A_SCH£ . -~01 UNJ M&llAlCk -ITAR OP'AI...I...I.CA -COClilll .........CUMI,INC. -INn.ITAla I./IIVf -lHl"i::DnA'.....II~ -....'.......,...•.,.hI..IOl"OwC -~01~.." 1II01'1~loLL LAND OWICII...I'"t4 ......'Uonclllw_~ SU~,"A t«OflCl'UCT.PlItO..c' ALASKA POWER AUTllORf TRANSMISSION LINE PROJECT BOUNllARY EXNlelT G ............. <tIO i '"AMI1' ·1=.u....... {}:r. ~ e@~~~~~J I:..'"J/j 0 e-....~"'"-<..'••~....:J.;,.~~..~~t ;:-•••C'. II ..~!\& ::-4i ••..,.~.--•~~.~r-1 !I:.~--........J !.. o r"J\~ _. "'IMtoCl.".I.'u#'11(1 .."a.a.to ".140 ""'...lIlA lNADlUNlIl..ce. "..I.fI.llA·'I. ~-W-_.......~-t,-- - r.. .. :.. ... :; ! I'\I~.·~I·i>'\\) ::1 I Ir-,, ! ICALI'['I Mill I TRANSMISSION LINE PROJECT BOUNDARY (XHIBIT'PLAT['.9 LAND OWNERSHIP $I:HEOULf ....IU'I[AU 0'LAND ....H..GIMl:NT ....nAn ~&\.&5111 • ....CD',)of ....IY "CGION._. .....,..1'ID It..Tn ..filMY -.....'LD unn AlA ...ORe" ........nNuSllo.·IU~'''A eMO.IOM -"'UNC~AlI'"or a..cI'tOLIIlAC( fIOlI·au.LAND Ollllhl(lI,"".,.IlellOW ""lUI O'I-I(IIWII.('HOw" ••••,,',s_ ALASKA POwER AUTHORITY. iUii1 ....-.;"L"i,;"[\.[C.....·(1l_;Jf;:'!'! ............. ell............... MAT"IU ..0 ..", 1m "_1_.'"-_. i I _C'(LIIl(N'(,..It ,.LIIlOW UI.I '6'.nO ALA'."OU ..OA ......",II. '...111 ,.....,AHD 'a ••'.IHC,J ,c...... )i I )I 1 TRANSMISSION LINE PROJECT BOUNDARY r.:;:l ALASKA powER AUTHORITY UWJ.'USIY".HODllOCUC'''¢"";.r:" •ICAl.C 0 .....fr:::=__ k •••·•.••· PL~'f Ci~1 LAND OWN(RSH"SCHlDULf •_CAU·WL.NlI ......GI ..INl•".n Clf'Al.AlIC. •C_....l NllON.N: -,"",no It.lll .-, -_TID .UlUAIII '(111(1 -"III VIII •_U'IIL.n·Clf'AllH;OOOUGC NlIlC'ALL LbO one........10 IlClICMPl&.n.O"CllWdl ._.. [IUUBIT G us.·.... M C... us_ lISol' P "Clf'&He n ® ~ ~ ~a :; ....-..~,..,-_. "."I_'NCI·...S(u '.0"uS GS I IJ.I.0 .L ....... OUID"GLI.'1....1 ....Ie -41 "" ---2:'1 .-!- j i 1 TRANSMISSION LINE PROJECT BOUNDARY ALASICA POWER AUTHORITY II I ."'....."_GUICTIIOC .'OCJle' ICALI 0 •I "ILl I Ie;'.'r ...... .L&~OWN[RSHP SCHEDULE -.".....,IW LAHO ......OI.."T.-n."..""'''111''-e_N.t,1l1."'''.M.. -_rou"'n "-.-rID n.TlI 1'_ -....'.""'11 '.."~ --~,,,..Me_••-P"..,.,&:. 1ll71'1'.....LLAHOOWOCIl......,II~.""n.CJTIIIIl•••_.. USA'IUI.. .~~ VI Mil" USAI' """·.v IllWlUIC ~~~ ~.~~~-".4.--,~~~A ,.... f\l' ~t ® '••1-,. @ ·r-·I •i ~ ALASKA POWER AUTHORITY 334 WEST 5th AVENUE -ANCHORAGE,ALASKA 99501 February 8,1983 Department of Natural Resources Division of Parks,NDe 4418 Airport Way Fairbanks~Alaska 99707 Attn:Dave Sharski Dear Mr.Sharski: Re:Susitna Transmission Line Routing Effort Phone:(907)277-7641 (907)276-0001 We appreciate your working with us to identify issues related to the proposed routing of the Susitna Hydroelectric Project Transmission Line near Anchorage (Fairbanks).The next step is for our consultant routing team (Harza/Ebasco Susitna Joint Venture)to actually begin its work of confirming the proposed route or suggesting improvements.We will contact you once this effort is underway. There are a variety of objectives that will be considered in routing,including: ·Maximizing system stability. ·Minimizing construction and operation costs. ·Minimizing conflicts with land uses,communities,natural systems and cultural resources. ·Minimizing visual impacts. Another item to resolve will be the appropriateness of sharing existing utility corridors. We look forward to continuing the informal consultation recently begun,and please do not hesitate to contact us with any questions or comments you might have. Sincere ly, ~JJ-'/-/prL Robert A.Mohn Susitna Project Manager IN REPLY REFER TO: L3031 (ARO-P) .g ni ted--States-Department-oLt-he-Inter-ioI: NATIONAL PARK SERVICE Alaska Regional Office 540 West Fifth Avenue Anchorage,Alaska 99501 Mr.Eric P.Yould,Executive Director Alaska Power Authority 334 West Fifth Avenue Anchorage,Alaska 99501 ,.... iF" I Dear ~~r.Yould: We have had an opportunity to review the final draft of Exhibit E ("Report on Historic and,Archeological Resources ")of the Susitna draft license application and offer the following supplemental comment to our letters of January 14, 1983,and October 22,1982,evaluating the final cultural resources report. The mitigation plan proposed in Section 4 appears to us to be well conceived and designed,and the plan for implementation realistic.However,the role of the Advisory Council on Historic Preservation should be better developed and clarified.Specifically the detailed mitigation plan should be developed and approved by the State Historic Preservation Officer and representatives of all appropriate land managing agencies in the Project area.This document would be the basis for Advisory Council comment and,if approved by the Advisory Council as adequate and appropriate,would constitute the core of an Advisory Council Memorandum of Understanding. We appreciate the opportunity to comment.If you have questions concerning our comment,please contact Dr.Floyd W.Sharrock (907/271-4051). Si ncerely, --IS:'-~J.<:....'-<..\-\ Associate Regional Director Planning,Recreation,and Cultural Resources Alaska Region cc: L.Wright/ARO-P IN REPL Y REFER TO: \rJAES United States Department of the Interior FISH AND WILDLIFE SER VICE lOll E.TUDOR RD. ANCHORAGE,ALASKA 99503 (907)276-3800 .'4 JAN 1983 Eric P.You1d,Executive Director Alaska Power Authority 334 West 5th Avenue Anchorage,Alaska 99501 Dear !·1r.You1d: The"Fish and Wildlife Service (FWS)has been requested by letter dated 15 November 1982,from Acres American,Inc.,to formally review and comment on the Federal Energy Regulatory Commission (FERC)draft license application Exhibit E for the Sus'itna Hydroelectric Project.This response is being provided as partial fU'lfillment of your request and is intended to be a constructive evaluation'.in regard to fisl1 and wildlife resources.\~e hope that our comments will be of value in drafting the final license application. The following FWS letters \'iere also provided in response to formal pre-application requests on this project: l.23 June 1980,1etter to Er ic You ld. 2.17 December 1981,letter to Eric Yould. 3.30 December 1981,1etter to Er ic You 1d. 4.5 January 1982,letter to Eric Yould. Since these letters were formally requested as part of the FERC pre-application coordination process we consider it appropriate that our responses be specifically addressed as part of the Exhibit E. The following letters were provided as informal consultation to facilitate the Susitna Project planning process: 1.15 November 1979,letter to Eric Yould. 2.16 April 1982,testimony presented to the Alaska Power Authority (AP A)Board. 3.17 August 1982,letter to Eric Yould. 4.5 October 1982,letter to Eric Yould. ,.... .- ..- .... -2- We anticipated seeing in the draft Exhibit E specific responses to the concerns and recommendations raised in the letters ~nd testimony provided. This is consistent with advice provided by the FERC.!I.In that this did not occur,we recommend that the APA respond in the Exhibit E to the specific co~nnents and recommendations which are contained in these letters and testimony. The response provided by this letter,our previous letters (both those formally and informally requested),the testimony presented to the APA Board, and the letter recently provided to you on.19 November 1982,constitute the official position of the FWS on this project. The principal authority of the FWS to provide comments and recommendations rests in the Fish and Wildl ife Coordination Act (48 Stat.401,as amended;15 U.S.C.661 et seq.}g!.The Coordination Act requires that fish and wildlife conservation be given equal consideration with other project features throughout the Federal lead agencies'planning and decision-making processes. The Act also requires consultation with State and Federal fish and wildlife resource agencies to ascertain what project facilities,operations,or measures may be considered necessary by those agencies to mitigate and compensate for project-related losses to fish and wi ldl ife resources,as ~"ell as to enhance those resources.The reports and recommendations of the fish and wildlife resource agencies on the fish and wildlife aspects of such projects must be presented to action agency decision-makers and (where applicable)to Congress.The Coordination Act requires mare than a consultative responsibility;it is an affirmative mandate to action agencies. Like the National Environmental Policy Act (NEPA)(42 U.S.C.4321 et seq.),it requires early planning and post-construction coordination and full consideration of recommendations made by resource agencies. Our recommendations,under the Coordination Act,must be,lias specific as is practicable with respect to features recommended for wildlife conservation and development,lands to be utilized or acquired for such purposes,the results expected,and shall describe the damage to wildlife attributable to the project and the measures proposed for mitigating or compensating for these daralages .11 Similar language is found in NEPA's Section l02{2){B}that agencies identify and develop methods and procedures which will insure that presently unquantified environmental amenities and values may be given appropriate consideration in decision-making,along with economic and technical considerations • 11 Appendix A.FERC Application Procedures for Hydropower Licenses, Exemptions and Preliminary Permits.A~ril 1982. g;The Federal Power Act (16 U.S.C.791a-825r;41 Stat.1603),as amended, as interpreted in Regulations (F.R.Vol.46,No.219,13 November 1981)specifies requirements to satisfy the Coordination Act. -3- Both the Coordination Act and NEPA,necessitate,commensurate with the scope of a project: (1)A description and quantification of the existing fish and wildlife and their habitat within the area of project impacts; (2)A description and quantification of anticipated project impacts on these resources;and (3)Specific mitigation measures necessary to avoid,minimize,or compensate for these impacts. We have reviewed the draft Exhibit E in consideration of these statutes.The adequacy of the review document has been examined in respect to whether or not the information,analysis,and mitigation plan provided would allow the FERC to be in compliance with the requirements of these environmental mandates if they issued a license to the applicant. Our review has been undertaken in light of our former correspondence, including the 16 April 1982,testimony presented to the APA Board by Deputy Regional Director LeRoy Sowle Except for item (8)we find the testimony as valid today as it was at that time.It is apparent that the consultation process has failed in so far as the intent of the FERC regulations~.We have written numerous letters on this project to assist APA in planning measures to protect and enhance fish and wildlife resources.Responses to our letters have been non-existent,or too late to deal with the problem of concern (e.g.,FWS letters dated 5 October 1982,and 19 November 1982).An illustration of what we have found to be an inadequate level of consultation can be found in the 15 December 1982,response to our 19 November 1982, letter.We considered our requests to be fully within the intent of the FERC regulations±!• Attached to this letter are our formal comments on the FERC draft license application Exhibit E for the Susitna Project.Comments are provided on Chapters 2,3,5,7,8,9,and 10.We have also reviewed Chapters 1,4,and 6.However,we do not at this time have any comments to offer on these chapters. The comments provided are organized into general comments and specific comments for each chapter.In our attempt to be as responsive as possible within the limited time frame APA has established for our review and comments, we have not been able to organize our comments into a comprehensive listing of deficiencies,clarifications,information needs,and recommendations.Many of these comments have been left within the context of the section within which they are raised.We feel by commenting in this way it will assist you in consistently correcting the deficiencies identified. ~See Footnote 1,supra. 4/See Footnote 1,supra. ~.,, - -4- - - The following comments are generally applicable to several chapters and,in some cases,are applicable to all of the chapters: 1.It is our understanding that the projections of future power needs used in the license application are generally agreed to be high§!and are being reevaluated for submittal to the FERC after the license application is submitted (Acres American Deputy Project Manager John Hayden,personal communication).The changes in the load forecasts are dramatic.Ip the Acres American report evaluating economic tradeoffs of flow regimes~ the assumed moderate Toad forecast for the year 2010 is 7 791 gegawatt-hours (GWh).In the latest Battelle NewsletterzJ the moderate forecast is 4,986 GWh and the low forecast is 3,844 GWh.The significant decline in projected power demands has large implications to many of the project assumptions which have constrained mitigation planning,for example:available water for downstream flows;mode,timing,and routing of construction access;and scheduling of work.The license application should fully discuss the implications of the latest load forecasts. 2.The intent of the Coordination Act and NEPA is that environmental resources be given equal consideration with project features.Consistent with NEPA,as well as the APA Mitigation Policy,avoidance of adverse impacts should have been given priority as a mitigation measure.We have found this generally not to be the case,for example:mode,timing,and routing of construction access;scheduling of work;type and siting of the construction camp/Village;recreation development;instream fTow regime;and filling schedule.Other examples can be found in our Specific Comments. 3.Engineering and environmental stUdies do not seem to be interactive.It appears that the findings of enviornmental studies have not been integrated into the engineering design.This maybe due in part to the short time frame established for project planning.An examination of the sequencing of the studies illustrates this problem.It is our understanding that the Aquatic Studies Program,designed to be the basis for determination of impacts to the aquatic system and associated mitigation measures,was established as a five year study.We are now two years into this program.The analysis of the data to allow an assessment of impacts and formulation of mitigation proposals may add another year to this process.APA expects to obtain a license,and Railbelt Electric Power Alternatives §j Acres Anierican.Energy Simulation Studies to Select Project Drawdo\'Jn and Mitigation Flows.October 1982. §!Battelle.Newsletter #4 (Final): Study.December 1982. ""'"I Z!See Footnote 4,supra. -5- begin construction in late 1984,or early 1985~.Obviously,this does not allow for an impact analysis and mitigation planning based on these studies prior to licensing.Mitigation planning,and an assessment of the impacts of different mitigative options needs to be undertaken in regard to project costs,viability,socioeconomic considerations,and mitigation proposed for potentially competing interests.This should all be considered through the development of the environmental impact statement,and certainly prior to license issuance. 4.Numerous examples of lack of coordination and/or communication between the groups responsible for the different study elements are evident. Examples can be found by comparing discussions concerning minimum downstream flow releases in Chapters 4 and 10 to what is found in Chapters 2 and 3.Reservoir temperature modeling discussions in Chapter 10 are not consistent with what is stated in Chapters 2 and 3.Another example is found in the minimal level of concern expressed in Chapter TO for socioeconomic (Chapter 5)considerations,such as impacts of license denial.lv'lore specific comments are included in the attached document. Other Exhibits were not provided to us for review although we requested them by letter dated 19 November 1982. 5.Research of background information is frequently inadequate and incomplete.An example would be the discussions concerning subsistence (Chapters 3 and 5).r,lore adequate research of th is very important area appears justified.We have Tisted several readily available references which would be of value in improving this discussion. In Chapters 2 and 3 minimal information is brought into the discussions concerning physical changes which have been observed at similiar hydropower projects.We are sure that many of the potential impacts that are discussed for Susitna (e.g.,temperature concerns)are not unique to this project.The State1s experience with the Trans-.:M.aska Pipeline System (TAPS)project could have been drawn upon more fully as an example,particularly in regard to socioeconomic (Chapter 5) discussions.Another example is the discussion concerning natural gas and geothermal electric generation as alternatives to Susitna (Chapter 10).Very little use was made of existing information bases. 6.Speculation is not always clearly distinguished from data-based conclusions.This problem is most apparent in Chapters 2 and 3 and should be corrected. 7.Lack of quantification is a recurrent problem in the Exhibit.Neither base line data nor impacts are appropriately quantified (e.g.,Chapters 2,3,5,and 10).Statements in the document let us know that,"Much of the discussion is based on professional judgement,1I (page E-3-3),and, IIt:lany of the statements are specu 1at ive • • •and • • •unsupported,II (page E-3-56).Other statements 1et us know that ongoing,or planned studies,will fill these numerous data gaps to allow a quantification of the resources and impacts which would let us go beyond,lithe conceptual ~Alaska Power Authority.Request for Proposal No.APA-83-R-030 Construction Management Services for the Watana Phase of the Susitna Hydroelectric Project.15 November 1982. - 8. -6- mitigation plan,"(page E-3-ll6).Recognizing a problem does not,in and of itself,correct it.We were particularily concerned with this in our review of Chapter 3.In the Exhibit E,the existing resources should be quantified.The potential impacts to these resources should be q1d~ntified and then evaluated over the life of the project.Only at that point can specific,effective mitigation measures emerge.We consider quantification of existing resources and impacts and a specific, effective mitigation plan essential to the development of an acceptable environmental impact statement. The ongoing,and planned studies,which are frequently noted (particularly in Chapters Z and 3)should be fully identified so we can examine them in regard to their scope.We cannot,otherwise,determine what needs to be done and the time frame for accomplishment.Further discussion is provided in our Chapters 2 and 3 general comments,and throughout our specific comments sections. - - 9.In several of the chapters (e.g.,Chapters 2,3,and 5)we are faced with mitigation options to contend \Jith identified (although frequently unquantified)adverse impacts.For example,in Chapter 3 there are discussions on the potential value of spiking spring flows for salmon out-migration and the installation of a fifth portal on the multi-level intake structure to provide \'1armer downstream temperatures during filling.If these mitigation proposals have validity,they should have been incorporated into the project design and operational plan.The docu~ent does not provide an adequate mitigation plan as required. In addition,mitigation measures which are presented should have proven successful in Alaska,or in a similar environment.If the proposals are not proven,then they would need to be demonstrated effective in the project area.Further discussion is provided in our Chapter 3 general comments sections. 10.The need for an effective monitoring program through construction and the operation phase is discussed in many of the chapters.However,the program is not adequately described.We fully support the establishment of a monitoring program.We believe the program should provide for participation by representatives of appropriate State,Federal,and local agencies and be financed by the project.This panel should have the authority to recommend modification of how activities are conducted to assure that mitigation is effective.Recommended changes in the mitigation program should be adopted through a mechanism established in the license,mutually acceptable to all concerned bodies. 11.Unfortunately the rush to meet the schedule for the license application has resulted in poor quality control,i.e.,countless typographical errors,missing lines,misreferenced tables and figures,unclear sentences,internal inconsistencies,inadequate documentation,missing references in bibliographies,etc.This should have been eliminated in a thorough editing prior to release for agency pre-license application review.Our review for biological completeness was somewhat hampered by this problem. ill -7- In the previously referenced FWS letters and testimony,many of the same concerns discussed above and in the attached comments were raised.It is our view that unless the issues raised in this letter are satisfactorily resolved we do not believe the application could provide the basis of an acceptable environmental impact statement.In this respect we consider the license application to be deficient. We recommend that you strengthen the license application by including information resulting from a thorough evaluation of the biological data collected during the 1982 field season.This would enable an assessment of the adequacy with the data base to support a sufficiently quantified impact analysis and,in turn,a specific,effective mitigation plan.We believe a realistic appraisal could then be made as to when any remaining deficiencies could be satisfied. Attachment cc:WAES Yvonne Weber,WO-FWS C.Debelius/Acres American Quentin Edson/FERC NMFS,EPA,NPS,USGS,BLH,ADEC,AEIDC -Anchorage Al Carson/ADNR,Anchorage ADF&G,Hab.Div.,Su Hydro Studies,Anchorage - - - ~ i I I Chapter 1.GENERAL DESCRIPTION OF THE LOCALE:No comments. -1- Chapter 2.WATER USE ArlO qUALITY General Co~ents In exa@ininy Chapter 2 we were concerned that sufficient scope and quantifications are not provided to allo\1 a quantified impact evaluation of the fisheries and other biolo~ical resources.The information provided should allow for the development of specific and effective measures \/hich would fully mitigate for all adverse impacts.We are left with the definite impression that the project would,through changes in stream flow,water quality, temperatures,ice conditions,vegetation,and slough habitats,have significant effects upon the resources of concern to us,particularly the fisheries.However,quantification of the potential i~pacts is generally lacking,as are specific effective mitigation measures.Of course the latter can not be accomplished prior to the former,despite the attempts found in this chapter. A significant portion of the lack of specificity found in Chapter 2 is due to the fact that although two years of data have been gathered (1981 and 1982) the Exhibit E reflects only the 1981 data.We have consistently stated that the 1982 data be analyzed and included in the Exhibit E (see Deputy Regional Director LeRoy Sowl l s 16 Apri 1 1982 statement to the APA Board,and our letter dated 5 October 1982 to Eric Yould).Our position remains the same. The chapter does not identify what studies have been completed,what studies were ongoing in 1982,and what studies are proposed.Until this ;s provided \'1e cannot determine ~/hat studies \'Ie \lould like to see modified,and what we see as being missed.Without this type of information,the resource agencies are placed in a reactive ri1ode,i.e.we can only cOliDllent on Hhat should have been examined in completed studies.However,in so doing,\le can better facilitate the applicant1s efforts to plan a project we can support.An example of a proposed study which is not addressed in this chapter is the Arctic Environmental Information and Data Center (AEIDC)study.The following ;s a summary of this proposed study: The AEIDC proposal is designed to (1)accurately and comprehensively predict system-wide streamflow and temperature effects of the dam(s),and (2)interpret effects of such changes in terms of aquatic habitats and fish populations.To accomplish these general objectives,AEIDC proposes using a linked system of simulation models which requires data from other project studies,available literature sources,and professional judgement. The study is a result of the need to consider the special aquatic habitat relationships in the Susitna River basin and the need to account for the interrelated effects of ice,sediment,streamflow,and temperature changes which will accompany construction,filling,and operation of the selected dam or dams. Most assessments of hydroelectric projects are based upon impacts associated with changes in mean monthly streamflo\/s and temperatures. HO\/ever,the actual iiilpacts of the project lJay not be caused by the mean events but through changes in the natural pattern of streamflow or temperature variation.Further,a single set of mean ~onthly flo\/s does not actually reflect instantaneous flows in the river;the actual -2- - - ",.. r predicted mean monthly discharge will probaply not occur during a given d6nth because of expected anomalies in hydrologic statistics:Therefore, it is necessary to predict the range of mean monthly flovs expected,based on reservoir inflow,power generation requirements,and downstream demands. The AEIDC model system would depend heavily upon a reservoir operation model to generate an exhaustive range of feasible weekly or monthly flow regi~es and the expected variation over a 30 year forecast period. The model syster.l would include provisions for ice and sediment modeling to account for changes in substrate distribution,bed elevation or channel configuration which might result from project operation.At a minimum, ice and substrate modeling would support the assumptions that hydraulic boundary conditions either remain stable or change \~ithin predictable liQits with project operation. The array of predicted weekly or monthly flows and temperatures may be biologically interpreted in several ways.The available habitat data base is heav'ily \Jeighted at this time toward kno\m chum and sockeye salmon spawning areas in sloughs and side channels in the Susitna River bet\Jeen Talkeetna and Devil Canyon.Access and spawning dynamics with respect to mainstem discharge are the major simulation goals of several ongoing field studies.The AEIDC modeling system could provide a time-series approach to deterQine effects upon critical life history stages of these species. It is possible that the entire riverine life cycle of chum salmon might be simulated under various flow regimes to predict long-term population trends.A similar analysis of sockeye salmon might be possible. The primary concept,again,is first to credibly and corllprehensively predict all project operations and their effect upon the habitat-related physical parameters \dthin the system;secondly,those effects will be interpreted,through long-term forecasting,in terms of their influences upon affected salmon populations. We support the proposed AEIDC study.It should provide the basis for determining project instream flow impacts and a reasonable assessment of mitigative alternatives. It is apparent that the proposed instream flml releases are designed for maximum power production and do not reflect biological needs.The 12,000 cubic feet per second (cfs)figure for August reflects the maximum amount of water that can be discharge without significant economic effects.It is our understanding that the project releases would be 10,000 to 12,000 cfs year round.No consideration was given to the potential impact of the project during winter when flows of this magnitude might prove highly detri~ental to the fishery.The potential value of spiking flo\/S during the spring to facilitate smolt out-migration and flush the sloughs of ice and debris is discussed.However,these flows are not reflected in the proposed releases. We consider it very important that the license application contain a specific, detailed flow release schedule,which is designed to mitigate project impacts, protect or enhance conditions for fish spawning,feeding,unrestricted fish passaye,out-migration,and provide overwintering habitat for fish in the Susitna River.This schedule should be developed through a quantified -3- " instrea~flow analysis which has been coordinated with the FWS,National r'larine Fisheries Service,and the Alaska Departr.1ent of Fish and Gar.le (ADF&G). In response to the APA request of 2 September 1982,the ~S,by letter dated 5 October 1982,provided input specific to the draft Exhibit E.We had expected our cOr.lr.lents to be addressed in the draft Exhibit E.This is in cOr.lpliance with the FERC recomr.lendation that inforr.lation included at the initiation of forr.lal consultation,1I •••responds to the preliminary cOr.m1ents and recor.u;lendations of the agencies.lI~Since this was not done,our 5 October 1982 letter should be made part of our forQal response on the draft Exhibit E.As such,the points raised in that letter should be specifically addressed in the Exhibit E submitted as part of the license application.tlany of the points raised would be r.1ost appropriately responded to in Chapter 2. Avoidance of adverse impacts should,in COQpl iance with the APA f1itigation Policy document,and NEPA guidelines,be given top priority in the license application.In particular,our concerns as to the decisions which led to such project features as the carllp/vi 11 age,transmi ss ion 1ine routing, construction access routing,turbine configuration,filling regiQe,flow regime,etc.,with regard to avoidance of ir.lpacts should be addressed. Specific Comments 2 -BASELINE DESCRIPTIONS 2.3 -Susitna River Water Quality (a)Physical Parameters (i)Water Temperature -Mainstem:Paragraphs 1 and 2:Those months vhich are being referred to by winter and SUr.1r.1er snould be indicated. -Sloughs:paragraph 1:The first step in understanding the temperature relationship between the mainstem and the sloughs is to measure the tempera- tures of both sites.This has been done.The relationship between the r.1ainstern and the sloughs regarding temperatures (as well as other water quality parar.leters)then r.1ust be established.This process,apparently,is just beginning.To this end,one slough (#9)has been examined.This exami- nation has focused,correctly,on the groundwater relationship.According to Tony Burgess (Acres American),in his Susitna Hydro Exhibit E IJorkshop presen- tation (12/1/82)on groundwater upwelling and water ter.lperature in sloughs. the yroundwater regime can be modeled,but locally the match is not very good:The groundwater temperatures near the surface do not match the predic- ted temperatures.Continued study is obviously indicated for slough #9. After an understandiny is achieved for that slough,the program would need to be expanded to other sloughs,possibly slouyhs SA,11,19,20 and 21.These sloughs have been r.1ore intensively examined than other sloughs in this reach of the Susitna River.iJe recommend that this general pro~ram be undertaken. 2!FERC Application Procedures for Hydropower Licenses,Exemptions and Preliminary Permits.April 1982. - - - .- r- i I -Tributaries:Paragraph 4:The difference in temperatures of the Chulitna and Talkeetna Rivers should be referenced at least by ~onth.It would appear that the cooler temperatures displayed by these rivers ~JOuTd be useful in an assess~ent of post-project temperatures effects at the confluence and further dO\-mstre~.Ue recof.lr.lend th is be exa~ined. liiUc! -Freeze-u~:paraaraph 3:The i~pact of this process should be fully explained 1n regar to river r.1orphology and maintenance of the present riparian zone. -Winter Ice Conditions:paragrahh 2:Please refer to our comments on Section 2.3 (a}(i)-Sloughs.The S10U9 s should be identified by number,and percentage to which the statements apply. (iii)Suspended Sediments:The percent contribution,by season,from the ~ajor suspended sediment sources should be indicated.An analysis of the anticipated changes,by season,due to the project operation should be made. (ix)pH:The pH range,from 6.6 to 8~1,is broad and should continue to be ~onitored.The potential exists for a lethal pH shock to occur to aquatic life with a change of 1.0 pH.A change of this r.1agnitude ~ight be possible from a reservoir ~Jater release.A pH below 6.6 Iilay be harmful to fish depending on the amount of free carbon dioxide present in excess of 100 parts per ~illion.Egg hatchability and growth of alevins could be adversely effected at a pH range between 6.5 and 6.0.The need for a predictive ~,ater quality model is apparent given the toxic heavy metals that occur in the drainage.We recommend that one be utilized. (d)Other Parameters (iii)Others:The railroad right-of-way that parallels the Susitna River has been sprayed with various herbicides for vegetation control for a period of years.Herbicides used include amitrole,2-40,bromicil,and Garlon (tordon). Strealils of prililary concern are Chase,Indian,Lane,and Gold Creeks.A spill of Garlon occurred in Lane Creek in 1977.Sloughs located along the railroad right-of-way could also be recipients of sOlile of the herbicide spray.No fish and/or \Jildlife tissues have been analyzed for food chain herbicide impacts in the area.Due to the type of herbicide used,we are certain that detectable amounts will occur over a long period of ti~e.Please incorporate this information into your discussion • 2.4 -Baseline Ground Uater Conditions Cd}H It should be noted that the s aug s provlde va ua e rearlng a ltat oranadromous and resident fish. Additional comments concerning the groundwater connection and current studies are prOVided under Section 2.3 (a)(i)-Sloughs. 2.5 -Existing lakes,Reservoirs,and Streams (a)lakes and Reservoirs:parasraph 1:Project features include transmission lines,access roaas,transrniss10n line maintenance roads,railroad staging -!i- areas,etc.and should be exar.tined within the context 'of this section.The proposed Recreation Plan would lead to the encourager.tent of impacts to nu~erous lakes throughout the upper Susitna basin.Secondary i@pacts resulting from the project would expand impacts to additional syste~s. 2.6 -Existing Instream Flow Uses (b)Fishery Resources:Reference should be made to burbot and Dolly Varden as important resident species. (9)Freshwater Recruitment to Estuaries:Paragraph 2:It should be noted that salt water intrusion and mixing "QuId be relate:d to tidal action. 2.7 -Access Plan (a)F10~/s:?aragraeh 2:The use of regression equations in calculations of peak and low flows 111 1ieu of actual discharge data should not be a substitute for the co11ection of data,when sizing culverts for engineering integrity or fish passage.Washouts due to undersized culverts resulted on the north slope haul road and,more recently,at the Terror Lake Hydro construction site. 2.8 -Transmission Corridor:Base line information on the transmission corrldor from the dam sites to the Intertie has been acknowledged as lacking within the Exhibit.As with other project features,the Exhibit E should provide base line data,ir.tpact assessment,and mitigative planning.We recor.Jrilend that th is be done for th is project feature.For further comments please refer to our letter dated 5 January 1982 on the Transmission Corridor Report.~e provided this letter as formal pre-license consultation and continue to view it as SUCh. 3 -PROJECT HlPACT ON ~£iTER QUALITY ArlO QUANTITY 3.2 -Watana Development:Reference is ~ade to Exhibit A.By letter dated 19 Novel,lber 1982 we requested a complete copy of all the Exhibits.This infor~ation has not be received. (a)Uatana Construction (i)Flows:paragraph 1:The significance of the loss of the one mile reach due to construction would more appropriately be assessed in Chapter 3,under Fishery Resources. (ii)Effects on Water Quality -Suseended Sediments/Turbidity/Vertical Illumination:parafiraph 2: Anticlpated suspended sedlment and turbidity levels shoulde co~pared,by month,to the ambient conditions.This would allow an evaluation and understanding of potential project impacts.The amount of spoil which wou1d be generated and the extent to which grading and \/ashing of material would be needed is not addressed.This has obvious i~plications in regard to \/ater quality and spoil disposal.We do not at this time have sufficent data or maps ~/ith wh ich to provide specific input.lie vlOuld recof.lmend to the extent possible,borrow material be obtained from within the future impoundment area. -6- ,...,. - - '""" - - - It is stated that,"downstrear.J,turbidity and suspended sedir.Jent levels should rer.Jain essentially the safole as baseline conditions.1I This \>Jould not appear to be the case during the \/inter,when the ambient conditions are crystal-clear. -Contafolination by Petroleum Products:Spillage of petroleum products into the local graylingstrearol y/ouldhave significant impacts on this fishery.An oil spill contingency plan should be presented in the mitigation plan which is in cOfolpliance with State and Federal regulations. -Concrete Contamination:The types of potential problel'i1s associated with this activity should be identified and a pollution control contingency plan should be developed as a component of the proposed r.Jitigation plans.Such a plan r.Just be in compliance \/ith State and Federal regulations.The Uastewater Treatment section (page E-2-37)is a much more appropriate level of analysis. (iv)Ir.J act on Lakes and Streal'i1s in 1m oundr.Jent Area:Discussions regarding orrowan SpOl materla s are extrer.le y genera.The potential sites, quantity of material to be removed,or deposited,extent of cleaning that \"ould be necessary,and biological description of the sites to be disturbed, should an be described.flitigative analysis should address suoh issues as timing constraints on various operations and measures required to reestablish pre-project conditions for those sites which would not be permanently lost. (v)Instream Flow Uses:Anticipated impacts for flows yreater than the one in 50-year event should be described. -Fisheries:para~raph 2:The desirability of avoidiny this fishery loss by gating the diverslon tunnel should be discussed. (vi)Facilities:General input is provided in our cownents on Chapters 5 and 10.·The decisions regarding the type,administration,and siting of the construction cafolp/village \/ere made \/ithout input from resource agencies.In addition,the timing constraints placed upon the construction of this project are no longer supported by economic studies ••(Chapter 10.General Comments).The Exhibit should be revised to reflect updated forecasts. Reference is made to Exhibit F.Although we have requested this Exhibit,it has not been provided. -Uater Supply:It should be noted whether or not the features described in this section were coordinated with the Alaska Department of Environmental Conservation. (b)Iopoundr.Jent of Yatana Reservoir (i)Reservoir Filling Criteria -~linimum Do\/nstream Taryet Flows:Paragraph 1:The factors that went into this fishery vs econor.Jics tradeoff analysis for determining the appropriate downstream flows should be discussed in detail.At the Susitna Hydro Exhibit E Uorkshop (conducted on 29 November throu~h 2 December)it ../as indicated that the analysis consisted of determining at what sumfoler flows econol'i1ic benefits drop off.Given that the econolilic analysis upon which this is based is generally considered out-of-date (Battelle Newsletter #4,Railbelt Electric Power Alternatives Study),confidence in this analysis frolil an econot'lic perspective f.lUSt be 10 ../.From a fishery perspective,it is unacceptable. -7- Paragraph 2:Once we have an acceptable instrea~flow regi@e,several gauging stations wl11 be necessary to assure proper flows.It should be recognized that at least eight sloughs are located above Gold Creek and that several of these currently support fish.Flows to ~aintain or,if possible,enhance the productivity of these sloughs should be provided. parafiraph 4:The out-~igration of sal~on in the spring is as likely related to p ota-period and develop~ent as the other factors listed.Very low flows in the spring could cause @any of the juveniles to re~ain trapped in back\/ater pools that are norQally flooded under pre-project conditions. Paragraph 6:The proposed flows of 12,000 cfs have not been de~onstrated to ~aintain the integrity of slough ~orphology and provide the flushing flows needed to clean fines out of gravel.Also,the potential problem of beavers coloniziny many of the sloughs,not being naturally controlled by flooding, and therefore interferiny with fish usage of the sloughs should be addressed. COQpeting interests of aquatic and terrestrial project co~ponents such as sal~on ~beaver conflicts have been given ~ini~al attention in the Exhibit. Paragraph 7:Adequate instrea~flows for the winter period should be established according to fish require~ents.This is a critical period for fish and even ~inor dewatering ~ay have significant deleterious effects. (ii)Reservoir Filling Schedule and I~!act on Flows:Once an acceptable fnstrealil flo\'J study has allo\~ed an eva uation of various flo\~regimes,an acceptable filling regime for the project which would IJini~;ze ;~pacts to aquatic resources can be developed.The proposed filling regiQe has been established upon an inadequate biological information base. (iii)River f.1orphology:Paragraph 3:The potential negative impacts on slough areas downstream of Talkeetna due to decreasing the recurrence intervals of what are now mean annual bank-full floods are not addressed. elV)Effects on Ilater Quality -Water Temperature:The timing and consequences of the filling regi~e on downstream temperatures should be better defined.Just as modeling needs to define operational the~al changes,the thermal processes should be modeled for the filling period.From this we ~ay be able to consider mitigative measures. -Suspended Sediments/Turbidity/Vertical Illu~ination •Watana Reservoir:Paragraph 3:Discussion should be provided on the impact of water quality changes on the photosynthetic process downstrealil of the reservoir. Paragraph 4:It is stated that,".••the river will be clearer than under natural conditions."This ~ay be true during the su~mer,however,it is our understanding that this will not be the case during the winter • •Watana to Talkeetna:We believe the increase in winter turbidity ~ight be more important in terms of potential fishery i~pacts.Quantification of potentia 1 changes shou 1d be provided.The methodo 1o~y by vJh ich the sumer -8- - ,~, ,..,. ..... turbidity levels Here established and Hhy it is not applicable to predicting Hinter conditions needs to be explained. ·Talkeetna to Cook Inlet:Antic"ipated changes during the \dnter should be discussed. iY.LEffects on Ground\Jater Cond it ions -I~pacts on Sloughs:Paragra~:The potential impacts on slough habitats are not clearly described.tne-aiscussion provides the i~pression that there is a greater understanding of the groundwater relationship between the sloughs and mainste~than is ~iarranted by studies to date.Please refer to our cOlaMents under Sect i on 2.3 (a)(i)-Slough s. Paragraph 4:It is indicated that reduced staging would result from the decreased winter flows.The potential impact should be addressed in regard to the potential to dewater spawninyand rearing habitats. Paragraph 5:Although the temperature relationship of the mainstem and sloughs does not appear to be well understood,discussion should be included on this potential impact,particularly during the second year of filling when the differences from pre-project conditions are greatest. (vii)Effects on Instream Flo\'J Uses:Please refer to our comments on Section 2.3(a}(i)-Sloughs,and 3.2(b)(v)-Impact on Sloughs.The statements of no temperature effects are not supported by data or citation.The reduction of flows through these sloughs is not quantitatively defined.The loss of scouring flows to clean fines,remove beaver dams,and clear ice could result in siynificant loss or degradation of slough habitat for fish. (c)Watana Operation -t··linimuTiI Downstream Tartet Flows:The criteria are not provided ~Jhich Ted to the development of the"arget"flows.Apparently,no consideration is provided concerning maximum flows,which may be a more important consideration during winter than establishing a minimum flow level. •t,10nthly Ener'Sililulations:Paragraph 1:The potential impacts of the water year 69 extreme rought should be fully addressed.The effect of this naturally occuring event should be described in regard to ~Jatana operations, how downstream flo\Js would be maintained and how it would effect the biological resources.For example,we suspect that higher downstrealils flows would be necessary to allow entrance to sloughs during this period. •Daily Operation:In that the Devil Canyon development @ay not come on-line for many years,if ever,consideration should be given to operations without the Devil Canyon dam.A greater level of conc~rn and discussion should be forthcoming on avoidance of potential impacts to the sloughs above Gold Creek. -Floods •Spring Floods:Para~raph 2:In that spring floods are part of the pre-project regime,dlScussion should be prOVided as to the importance of this pheno~enon and whether or not post-project simulated spring floods should be included in the post-project flow regi~e. -9- (in River llorphology:Parayraph 2:The discussion on ice process should be expanded. Paragraph 3:The discussion leads to a view that eventual loss of the slough habitats is inevitable.The flow regi@e proposed does not counteract this potential proble~.Avoidance of this impact through flow ~odifications is consistent with the APA tlitigation Policy document and NEPA.It illustrates a low level of biological consideration in the formulation of the proposed instream flow regime. (iii)Water Quality -Water Temperature .Reservoir and Outlet Water Tern erature:1982 data from Eklutna Lake,\Jhic \Jatana eserVOlr lS expecte tOmlnllc,was presented at the Susitna Hydro Exhibit E ~orkshop.During the winter,Eklutna Lake showed temperatures ranging from 00 to 3.6 0 C in the upper 2 meters,dropping to isother~al conditions below this depth.If Watana Reservoir exhibits a similar shallow winter stratification it would appear that Watana could not be operated to,II •••take advantage of the temperature stratification \,rith in the reservior.1f Paragraphs 5 through I:Given that the temperature l'iIodel has only been run for five months and has only one year of data for that period (1981)this discussion must be considered speculative.It is our understanding that input for this model is lacking because previous data was tailored to an earlier temperature ~odel which is no longer considered applicable to this project. It would seem premature to place Iiluch faith in the ne\~model based on the minimal level of testing to date.We recommend that data from two full years be inputted to the model and the results be provided in the Exhibit E. Paragraph 8:This sugyests that ~~inter outflow temperatures between 10 and 40C can be selectively \dthdrawn through a multi-level intake structure. This would be dependent upon the thermal profile of the reservoir during the winter,a period which has so far not been modeled.The statement suggesting that one degree water temperatures can be selectively obtained is speculative.It is also in conflict with the information provided at the Susitna Hydro Exhibit E \Jorkshop where Eklutna Lake was presented as a Iilodel for Watana Reservoir.Eklutna Lake showed winter temperatures between 00 and 3.6 0 C within the upper two l'iIeters of the surface.If Watana Reservoir shows a similar winter stratification one should not expect to be able to tap temperatures other than 40 C with the proposed multi-level intake structure. It would have been appropriate to reference the Eklutna study findings here as is done on page £-2-61 . .Sloug~~'ater Temperatures:paragraph 1:Please refer to our cO~Jents on Section 2.3{a)(i)-Sloughs. ::-Ice:Paragraph 1:It should be clarified as to \Jhat would be the ililpact of the reduced contribution frolil the upper Susitna River.Estimations of post-project ice staging should be compared to pre-project conditions and the methodology by which the predictions were made should be explained,and/or referenced. -10- -- - para gra 7h 2:HO~i ice is lost to the system,post-project,would dralilatically changero~pre-project conditions.The i~pact of this ~ajor change in this riverine system should be thoroughly explored,not merely noted. -Turbidity:Paragraph 1:Please provide an explanation as to ~ihy,"Turbidity in the top 100 feet of the reservoir is of primary interest." -Nitrogen surersaturation:Discussion should be provided specific to the fixed-cone va ves.It is stated that the valves would discharge spills up to a one in 50 year event,but we have no indication of the anticipated extent of their use.Withdrawing water from the hypolimnion they would often be counterproductive to what is intended to be achieved through use of the lilulti-level intake.The potential for thermal shock in fishes,or shock due to rapid shifts in other water quality parameters,should be evaluated.Rapid water level changes would also be an obvious result of their use,particularly between the dam face and the powerhouse. 3.3 Devil Canyon Development (a)Watana Operation/Devil Canyon Construction:paraaraph 1: Exhibit A has not been provided,although we requeste it. The referenced - lii)Water Quality -Concrete Contar.1fnation:Please refer to our COlillilents on Section 3.2(a)(ii) -Concrete Contar.Jination. (vi)Facilities:Decisions regarding the Devil Canyon support facilities were r.Jade without input from resource agencies. -Construction,a eration and t·1aintenance:The,".appropriate preventatlVe tec nlques ••.11 S ou e described,and incorporated into the mitigation plan. (b)Watana Operation/Devil Canyon Impoundment (iii)Effects on Water Quality -~Jater Temperature:The ability to continue to selectively remove very narrow temperatures bands would depend upon numerous unknowns;assuming the ability exists with operation of IJatana alone.Removal of such a sizeable quantity of \Jater in so short a period of tir.le certainly would have ir.lplications for one1s ability to select temperature bands during certain times of the year.It should be stated that the tel7lperature r.Jodel upon which this all rests only has input fro~five Iilonths of one year. -Support Facilities:Please refer to our comments on Section 3.3 (a)(vi)- Construction,Operation and Maintenance. ,'!"""(vi)Instream Flow Uses:It is our understanding that significant losses to the existing fisheries i~ould result.The basis for the statement that,II. additional fishery habitat will becorae available •.•11 with Devil Canyon Reservoir should be explained in detail. (cl Uatana/Devil Canyon Operation (i)F1 ows ~-project Operation:It is indicated in the Feasibility Report Vol.1,page 13-32,that cO/j']pensation flow pur.tps would be installed.An explanation as to the function af these devices,their purpose,the flo\is \/hich they Hould provide,whether or not they are to be installed in one da/j']or both,how water froQ this source would effect the Hater quality paraQeters of the water released from the powerhouse,and the basis for the flows which would be provided fror.t this source should be provided.We would also like to see an explanation of the fixed-cone values regarding their expected periodicity of use (at least by Qonth)and impacts on water quality parar.teters and flow levels. (ii)Effects on Vater Quality -\Jater Temperatures:Since Devil Canyon Reservoir has not yet been r.todeled, the rationale for this discussion should be presented.The therr.tal Qodels for IJatana and Devi1 Canyon should provide information on the follOWing: (1)The te/j']perature profile,depth to isother~al conditions,and ti/j']ing of Iilixing; (2)The timing of winter stratification; (3)The extent of turbulence that would be generated at the reservoir intake;and (4)The capability of the intake structure to select fro/j']one temperature layer in a stratified reservoir. This should be included in the Exhibit E. -Ice:Please refer to our co~ents on Section 3.2{c)(iii)-Ice. Inforr.lation should be provided on the extent of scour in the sloughs under winter and spring break-up conditions.Discussion should address where the ice front would develop under "worst case"conditions for post-project Watana and ~Jatana/Devi1 Canyon operations.Fluctuating high po~,er demand in a record cold year and a record warm year should be discussed.Scenarios which would produce over-topping of river ice and ~ultiple break-ups which may scour the river channel should be described. -tlitroyen Supersaturation:Please refer to our co~aents under Section 3.3{c)(i)-Project Operation. -Facilities:Erosion control weasures should be described and incorporated into the Qitiyation plan. 3.4 Access P1an Impacts:paragraph 2:Reference is ~ade to Exhibit A.By letter dated 19 Nove~ber 1982 ~Je requeste~a co~plete copy of the license application.We have not yet received this Exhibit. -12- ,.,.. .- "". - (a)Flovs:Accurate discharge information on the creeks is needed to insure proper culvert sizing for fish passage.Utilization of culverts rather than bridges could result in ~ore blockages to grayling migration due to beaver activity. 3.5 Transmission Corridor Impacts:Please refer to our letter dated 5 January 1982 regarding the Transmission Corridor Report. 5 -t4ITIGATION,ENHANCE~1ENT,AND PROTECTIVE ~1EASURES 5.1 Introduction:paragraah 2:It is stated that,II •••mitigative measures,1I were incorporate,II •••in the preconstruction planning,design, and scheduliny,1I yet we see construction camps/villages which were planned with no outside coordination with resource agencies,or even consideration of alternatives.The transmission corridor from the \Jatana dam was also planned with essentially no resource agencies input.We see scheduling,(based on an out-of-date economic analysis),determining access routing,timing of construction activities,and reservoir filling with no input from resource agencies.This has precluded an objective examination of alternative mitigation measures. r.1inimum flo\'ls are proposed with the il;Jpression that they were arrived at through an as yet undisclosed fisheries vs.economic tradeoff.In the draft Exhibit E we have an evaluation of economically determined flow releases,the basis for which are no longer accepted by the economists that developed them (Battelle Newsletter #4 (Final),Railbelt Electric Power Alternatives Study, December 1982),competing against flow releases.The 12,000 cfs flow release is apparently the maximum discharge for August without significant economic effects. We suspect that the flexibility for providing instream flows,once this issue has been resolved,is highly dependent upon the hydraulic turbines which are selected for the project.We recommend that a tradeoff analysis be presented to display the relationship of different hydraulic turbine configurations with both a one dam and two dam configuration related to maximizing flow release options vs more flexible turbine systeQ alternatives.If the proposed turbines-,in either dam,~lould adversely effect future instrear.l flow options then the decision as to the preferred turbine configuration should be deferred until a specific,detailed flow release schedule,developed through a quantified instrearn flow analysis,is ayreed upon which \iould mitigate impacts or enhance conditions for spawning,feeding,passage,out-migration,and overwintering in the Susitna River. The proposed multi-level intake structure would provide the flexibility to select a desirable temperature regime only if the temperature bands exists in the reservoir of sufficient size and of sufficient depth.It has not been established that the multi-level intake would provide sufficient temperature control.At present,Watana Reservoir has been thermally modeled for five months of one year.It is our understanding that this is insufficient to even test the model for the five months for which it was run.Devil Canyon Reservoir has not been modeled,yet the recent incorporation of a multi-level intake here leads one to believe the applicant expects this reservoir might stratify.~Je recor;lmend that model ing be carried out for both reservoirs, throughout the year,and the resultant data be incorporated into a river -13- ter;Iperature lilode1.This should be based upon two years of data (e.g.1981 and 1982)and presented in the license application. Reference is ~ade to the incorporation of fixed-cone values to prevent nitrogen supersaturation.The frequency,periodicity,and anticipated voluQe of use is not addressed.Since they \JOuld be drawing upon 'iJater very 10\_in the da~and then dumping an unknown volume of this water into an essentially dry riverbed we would expect potential adverse i@pacts to the ~itigation flow and tegperature regi~es.The potential effects upon icing conditions and, depending upon the time of year,sal~on movements needs to be assessed.We reco~end that these potential impacts be discussed in the Exhibit E. Paragraph 3:The importance of monitoring construction practices,operation and maintenance and monitoring of mitigation is recognized in the APA Mitigation Policy document.How this will occur needs to be examined in the Exhibit Eo \.e recommend that a panel of appropriate State,Federal,and local agency personnel be established,at project expense to monitor project construction,operation and maintenance.The monitoring panel,~andate,and operational mechanisms should be discussed in the license application. 5.2 -Construction:Please refer to our co~ents above,Section 5.1: Paragraphs 2 and 3. Paragraph 2:Please refer to our discussion of instream flO\JS under Sections 5.1:Paragraph 2,3.2(b)(i)-Minimum Downstream Target Flows,and 3.2(c) -r1inimu~Downstream Tar~et Flows.Additional pertinent com~ents can be found throughout.The statements contained in Section 5.3 can only be considered speculative,to date there are no studies to support them.Only one slough, identified as #9,has received detailed study.In the November 1982 draft report provided at the Susitna Hydro Exhibit E Workshop,Prelir.linary Assessment of Access by Spawning Sal~on to Side Slouyh Habitat above Talkeetna,the author noted that until the 1982 field data are analyzed,any statements regarding streamflows necessary for chum salmon access to the side sloughs are provisional.It should also be recognized that the examination of slough access flows is not only without support,but one dimensional.No analysis is put forth to examine other life phases of fish,or project related changes in \Jater qual ity pararjleters. Paragraph 5:'Changes in downstream river morphology have not been fully assessed.It is premature to conclude that no mitigation would be necessary. The lack of ice scour and flood flows may cause sloughs to silt in and may reduce natural cleaning processes necessary to maintain productive spawning substrate and rearing areas. Paragraph 6:It would seem appropriate to exa~ine,in the Exhibit E,methods of mitigating the potential thermal effects anticipated during the filling period,to include extending the filling period. 5.4 -r1itigation of ~Jatana Operation If.1pacts (a)Flows:para~raph 2:Please refer to our comments under Section 5.1: Paragraph 2 andectl0n 5.3:Paragraph 2. -14- - ..... Paragraph 3:It is stated that,"Watana,when it is operating alone,will be operated pri~arily as a base load plant."Please discuss the extent to which it is intended to be operated as a peaking facility.Of particular concern would be how it ~ight operate under worst case conditions,such as fluctuating high power deQand during a record cold year.The i~plications of scenarios like this should be explored in the Exhibit E if \Jatana is being proposed for periodic peaking use. (b)TeQperature and D.O.:Please refer to our co~ents addressing the ~ulti-level intake structure and reservoir temperature modeling in Sections 5.1:pararraph 2,and 3.3(b)(iii)-Water Temperature.lie have provided add it iona corillilents on these subjects throughout. our discussion of the flitrogen Supersaturation and ,.,.. 5.6 Mitigation of Devil Canyon/Watana Operation (b)Te~perature:Discussion should be provided as to why @ulti-level intake ports are proposed at Devil Canyon.It would appear that it has been concluded,without benefit of a thermal reservoir lilodel,that Devil Canyon \'/OU 1d strat ify. -15- Chapter 3.FISH,iJILDLIFE.Arm BOTANICAL RESOURCES General Comments Fishery Resources of the Susitna River Drainage Periodically in the Fishery Section are disclaimers such as,"Much of the discussion is based on professional judgement,"(Section 1.2,page E-3-3),or "r1any of the stater.lents are speculative •••and •••unsupported,"(Section 2.3, page E-3-56).Other statements let us know that ongoing.or planned studies, will fill these numerous data gaps to allow a quantification of the resources and ir.lpacts (Sections 2.2(b)(i;),2.4(b){i;).2.5,2.5(c)(i;),etc.)and let us go beyond,"the conceptual mitigation plan,"(Section 2.5,page £-3-116) which is provided in this chapter.Recognizing a proble~does not,in and of itself,correct it.\Je are concerned that the Fishery Section generally fails to quantify the existing resources,fails to quantify the potential ir.lpacts, and fails to provide specific mitigation measures to deal with identified, quantified,adverse impacts.Once we have potential mitigation measures, these proposals would need to be evaluated,for exar.lple,in regard to potential impacts on:project costs,design,and feasibility;socioeconomic considerations;and fish and wildlife resources other than those for which the mitigation is targeted.This type of evaluation would form the basis of an acceptable environmental impact statement and should be provided as part of the license application. The ongoing and planned studies ~Jhich are frequently cited (Sections 2.2(b)(ii),2.4,2.4(b)(ii),2.5,2.5(c)(ii),etc.)should be fully identified so we can examine them in regard to their scope.We cannot,otherwise, determine what needs to be done and what is being done (with assurances that it will be done). Potential impacts are frequently identified in the Fishery Section,such as loss of the apparently important high spring flows for out-migrations (Section 2.3(a)(ii)),and 4QC flows during the second surn~er of Watana Reservoir filling (Section 2.3(a)(ii)).Potential mitigation to contend with these antic'ipated adverse impacts are suggested,such as spiking spring flows (Section 2.4(b)(ii})and installing a fifth portal on the multi-level intake structure (Section 2.4(b)(ii)[SIC,iiiJ}.If these r,litigation proposals have validity,then they should be incorporated into the design and operations proposa 1. ~litigation measures which are proposed should have proven success in Alaska, or in a similar environ~ent.If the proposals are not proven,then they would need to be demonstrated effective in the project area.For example,hatchery propagation of grayling may need to be demonstrated as an effective alternative since grayling hatcheries have not been particularly successful in Alaska.Likewise,the proposed slough ~odifications are unproven and thus should also be de~onstrated in the Susitna systeQ before project operation. tJe support the establishment of a monitoring progra~funded by the project, containins a board of representatives from appropriate State,Federal,and local agencies.The board should have the authority to recor.lmend project Qodification measures to assure that ~itigation is effective.The procedure -16- ,..,. by which this would occur should be incorporated into the license as an article.This type of monitoriny progra~should be discussed in the witigation plan. Botanical Resources At the recent Susitna Hydro Exhibit E Workshop,29 November to 2 December,we were pleased to learn of the recent efforts to coordinate botanical and \iild 1ife data needs.Vegetat ion types \dth in the project area are apparent ly now being subcategorized and remapped on the basis of more recent, larger-scale photography and additional field \iork.Analyzing the value of vegetation as part of wildlife habitat,an information need we have consistently cited (e.g.FWS letter to Eric Yould,APA,5 October 1982),will better allow quantification of project impacts and the development of mitigative measures.However,these efforts render the current Botanical Resources Section at least partially obsolete. Because there is no explanation of ongoing studies,the reader is left with the perception that vegetation studies have been completed.~'e recommend that descriptions of the following be provided in the Exhibit E:(1)current remapping efforts for both overall vegetation and wetlands;(2)plans for SUr.1T,ler 1983 ground truthing of this data;(3)1984 field \Iork \ihich may be necessary for verifying wetlands;(4)proposed productivity studies relative to project moose studies (see Section 4.2(a)(i),page E-3-204,paragraph 2 and Section 4.3(a)(i),page E-3-281,paragraph 3);and (5)schedules for cOr.1pleting these investigations and analyses in conjunction with overall mitigation and project planning.Such information is provided,to some extent,relative to the Aquatic Studies Program,Section 2.5. In general,the description of vegetation types and potential project impacts is thorough.Still,a major problem with this section involves incomplete coverage of wetlands.Minor problems involve the need for some additional maps and tables,and conflicting citations of figures and tables (e.g. referring to Figure Wl and Table W3 as Figure E.3.Wl and Table E.3.~J3 in the text)• Wildl ife We found the Wildlife Section both too general and incomplete.Judgr.1ental stateraents are rarely referenced (e.g.page E-3-376,last paragraph) qualitative tertas are seldom defined (e.g.page £-3-315,last paragraph;page E-3-310).Perhaps most critical is the minimal detail and coverage of the mitigation plan. Lack of quantification is a serious problem throughout this section.~Jhile baseline populations are occasionally estimated,impacts are typically ~-qualified only as major or r.1inor,and no values are provided for those mitigation ~asures which are recommended. Ue are highly concerned \/ith the lack of attention to habitat values,although \/e have repeatedly Cited the need for project evaluations to consider habitat values as \/ell as populations (please refer to F\JS letters to Eric Yould,5 October 1982,5 January 1982,23 June 1980,and 15 November 1979;and testir,lony of LeRoy Sowl,FWS,before the APA Board,16 April 1982).We -17- a~preciate the initial efforts to evaluate habitats for furbearers and birds, and the reported plans to wadel carrying capacity for moose.Yet we see no evidence of how such evaluations \iill be continued,expanded to other species, and most i~portantly,used in developing timely,comprehensive mitigation liIeasures,\Jhich are an integral part of project plans. Where population inforlilation is provided,it is for the current situation.No accounting is given for long-term habitat potentials,fQr example,(1) habitats may be able to support greater populations over the long-term (e.g. pine r.Jarten near ~Jatana Creek);(2)habitat values TililY decline as,through succession,vegetation proceeds to more mature stages which are less productive for moose;or (3)harvest management.goals may be modified and caribou populations allowed to increase to where available habitats are more completely stocked. We recommend providing information on continuing studies (including habitat modeling)and how data gaps identified here,in previous agency comments,and the August 1982 Adaptive Environmental Assessment (AEA)Workshop will be ans\iered.Our Specific COr.JTilents below,further address this need.Another major problem is that the Wildlife Section is not integrated,nor is it consistent relative to impact potentials and mitigation options with other sections in Chapter 3 or with other chapters in the Exhibit E.For example, in Chapter 3 the impacts discussions are based on no access along the transmission corridor;in Chapter 5,such access is assumed (Section 3.7(c)(i),page E-5-84). flot only do \ie recor.1r.1end that this probler.l be corrected,but that evidence be provided as to this section has been inteyrated into project designs and scheduling.That integration is I;lOSt critical \'Jith regard to the Iilitigation plan.Information should be prOVided on the mechanism for notifying project enyineers of key wildlife areas and at the same time for the engineers to notify the environr.1ental consultants and resource agencies of design changes or mitigation r.Jeasures they believe are unfeasible.Additional information should be provided on the process to be followed for finalizing and then implementing mitigation requirements. Integration of the various report sections would be aided through an overview discussion of overall project objectives for wildlife,fisheries,vegetation, recreation,land use,and socioeconomics. Presently we find apparent objectives of the Wildlife Section often contrary to recreation or socioeconomics;within the \Jildlife Section,objectives for one species may conflict with those for another species. Because of the voluminous nature and co~plexity of ~aterial involved,it is difficult to assess population status,habitat values,impacts,and ~itigation for each species relative to all other species.This is particularly important where mitigation for one species may be at the expense of another, as above.Thus we suggest some type of SUr.1mary chart which would show,by species:(l)populations;(2)habitat types and values;(3)status (i.e. increasing/decreasing,upper/lower basin,etc.);(4)values (com~ercial, recreational,and/or subsistence with monetary figures where possible);(5) past and present harvest effort,success,and management restrictions;(6) ilJpacts;and (7)~iti9ation alternatives.Please refer to our suggestions -18- I~ r j under Section 3.4 for evaluating mitigation alternatives as prioritized under NEPA guidelines.The schedule for filling resultant data gaps could then be outlined;additional ~itigation needs or tradeoffs in benefits/impacts Hould also be obvious. We recolilr.lend quantifying the level of mitigation to be achieved by different measures.This is particularly important where management policies are unclear (e.g.housing and transportation of workers,harvest regulations,and prohibitions on use of the access road pre-and post-construction will determine the ~agnitude of project impacts). Fina lly,VJe are concerned that although the fragmentation of project impacts by project feature allo\~s for a iilore comprehensible analysis,the report lacks a broad overview.Cumulative it:1pacts are generally ignored.We recomr.lend that such iupacts be compiled in conjunction with a list of unavoidable adverse i~pacts. Lack of key data has made it essentially impossible to ~ore than outline the types of measures which should be included in the mitigation plan.In many cases,no evidence is provided for the proven success of reco~"ended iileasures in Alaska or similar enviromaents.For such unproven measures,demonstration projects should now be established or back-up mitigation measures outlined for ir.lpler.lentation if unproven measures fail (e.g.blasting to enlarge the Jay Creek mineral lick,provision of artificial raptor nests). The TllOnitoring prograr.l \ie recom~ended under the Fishery Section should also be extended to wildlife resources in the project area. Specific Comments 1 -INTRODUCTION 1.2_-Impact Assessments:paragra*h 1:Please refer to our Fishery Section - General Co~ents regarding quanti ication and the status of the project studies. Paragraph 4:Several of these references do not appear in the bibliography. 1.3 -~1itigation Plans:paragra~h 8:Avoidance of adverse impacts rarely appears to occur,particularly 1n regard to project features.For example, missed opportunities to avoid adverse fish and wildlife resources iiilpacts exist in:project scheduling;iilode and routing of construction access; recreation planning;siting,administration,and type of construction cali1p/village;and instream flow regime. The rllonitoring program,which has been supported in several chapters,should be fleshed out.The program should provide for participation by appropriate representatives of State,Federal,and local agencies,be supported by the project,and be able to reco~mend changes in the iilitigation prograr.lto be adopted through a mechan i sm estab 1i shed in the license,r,lutua lly acceptab 1e to all concerned bodies. -19- 2 -FI SHERY RESOURCES OF THE SUSITNA RIVER ORAl NAGE 2.1 -Overview of the Resources Jd)?election of Project Evaluation Species:paragra~h 4:IQproving habitat conditions for an evaluation species would be helpfu to other species with sir.lilar habitat requisites.HmJever,He ~Jould expect other species,with habitat requireQents that conflict Hith evaluation species,to be adversely affected.In addition,we recomt~end Dolly Varden and burbot be included as evalution species for the Susitna River downstreaQ of Devil Canyon. Paragraph 5:It is stated that,i1IQproved conditions in the li1ainstem are expected to provide replacement habitat •••Juvenile overwintering habitats are not expected to be adversely affected.II We are unaware of specific data to support these statements. Paragraph 8:Evaluation species and life stages should be listed for the Cook Inlet to Talkeetna reach. (e)Contr-ibution to COl11li1ercial,Sport,and Subsistence Fishery (i)Co~ercial:Species specific co~parisons are made of cO~~Jercia1 harvest to escapeli1ent.Perhaps a better gauge would be to provide estimated contribution to the comli1ercial harvest,as is assessed in Chapter 5 (page E-5-70),or esti~ated contribution to the run.This,however,also would simp1 ify the systems contribution,but would at least provide revie\.ers \dth a better understanding of production. (iil Sport Fishing:Paragraph 2:If li10re recent surveys are available,this section should incorporate them. JjiJl Subsistence Harvest:The follo\.ing three ADF&G reports would allow for a more expansive discussion of this important topic: 1.Foster,Dan.November 1982.The Utilization of King Salmon and the Annual Round of Resource Uses in Tyonek,Alaska.ADF&G.55 pp.+ appendices. 2.Stanek,Ronald,Jariles Fall and Dan Faster.f·1arch 1982.Subsistence Shellfish Use in Three Cook Inlet Villages,1981:A Preliminary Report.ADF&G.17 pp.+appendices. 3.~Jebster,Keith.Apr i1 1982.A SUr.Jlilary Report on the Tyonek Subsistence Salmon Fishery,1981.Upper Cook Inlet Data Report Number 81-3.ADF&G.16 pp.+appendices. 2.2 -Species Biology and Habitat Utilizaton in the Susitna River Drainage (al Species Biology (iiil Resident Species -20- _'"'"l 2.3 our ,~(a) "'"" -Arctic Grayling:Parayraph 8:The state~ent that,"Assu~ing other conditions for Spa\mlng are favorable,•••"should be expanded to al1o\'i an understanding of what these other conditions are and why we should assu~e they would be favorable. (b)Habitat Utilization (ii)Talkeetna to Devil Canyon -Hainste~and Side Channels:References are ~ade to 10\1 flow and ~aximum f1ow.---rhe flo\is should be quantified so that an understanding of potential project i~pacts and ~itigative flows can be related to how it would influence habitat . .Species Occurrence and Relative Abundance:The baseline infor~ation and analysis should incorporate the 1982 fleld season data. :-S]~ugh Habitat:ParagraQhs 2 and 3:The effects of various flo\i levels should be referenced by the number of sloughs which would be impacted by the particular problem and the relative importance of the effected sloughs in terms of salmon habitat. p!ragraph 4:The basis for the intragravel te~perature statements should be provided,whether conjecture or based upon a study of X number of sloughs. ~Sjgnificance of Habitat ••Sal~on:Paragraph 2:The relative value of tributary sites (mouths?)vs iloughs ~ay be a reflection of ease of study,or effort.-- Please refer to Anticipated Impacts to Aguatic Habitat Associated with IJatana Dam 11)Construction of Watana Dam and Related Facilities -~Ja tana Dam ~Ch~nyes in Water Quality:Although turbidity levels may be decreased,on the average,throughout the year,a more appropriate impact evaluation would be to examine turbidity levels by season or month ~aquatic life stage. Paragraph 11:Exa~ples of 11 •••good engineering practices,and a thorough SPCC plan,"should be provided in the mitigation plan.The abbreviation of the plan should be spelled out • .Direct Construction Activities:Paragraph 1:Material sources should general1y be confined,unless unavoidable,to that area which \'iould be inundated by the i~poundment,or upland sites.In that the Devil Canyon da~ is not~certainty,rehabilitation of Cheechako Creek should be planned. -21- Joyce,Rundquist,and lloulton (1980)is referenced several tir.les.\Je request that this reference be provided,and the pertinent discussions fro~this paper be incorporated into this section • .::'-'y~tana Carolps,Vinage and Airstrips ••Indirect Construction Activities:We expect secondary impacts,avoidable and unavoidable,to be fi1uch greater than that indi~ated by this discussion.He provided co~ents on this topic in response to appropriate Chapter 5 sections, where this topic is also inadequately discussed. ili)Filling Watana Reservoir -Watana Reservoir Inundation ~t1ainsteQ Habitats:Paragraph 4:Although overwintering habitat would be increased,the overall ;r,lpact \/Ou1d probably be a net loss of habitat value. The discussion does not identify \/hat species might benefit fro~this increase in overwintering habitat. f.ar~9raph 5:The basis for the statelilent,"Reservoir tefilperatures in the top 100 ft are expected to be in the range of 10 to 20 C,"should be provided. First,the reservoir te~perature ~odel has not been run for the period Novefi1ber through May.Second,the state~ent is in apparent conflict with the inforfilation provided at the Susitna Hydro Exhibit E Workshop in \,hich Ek1utna Lake was presented as a model for Watana Reservoir.Ek1utna Lake shows winter ter.lperatures bet'vJeen 00 and 3.6 0 C within the upper tHO li1eters. -Talkeetna to Watana Dam .Mainstelil Habitats:Paragraph 1:In that the river would no longer be clear, the effect of this Change in turbidity upon ~ovement of juvenile salmon and resident fish should be addressed. par~graph 4:The apparent i~portance of the receding limb of high spring flows to sti~ulate out-migration is noted yet \/e see no effort to simulate this in the recommended instream flow regime. Paragraph 9:It is recognized that the outflow tefilperatures during the second open-\/ater season could have substantial adverse ifilpacts.This prob1e~in relationship to how it was handled at other hydropower projects should be discussed • .Side-Channel Habitats:paragra~h 3:Until an adequate instrear;l flow study is conducted,these stateli1ents wll refilain speculative. Par.!graph 4:It should be stated Hhether or not rearing habitat is considered 1irili ted. -22- .~ j~, - paraGraph 5:The decreased ter.lperatures expected would probably counteract any enefits derived through decreased suspended sediments • .Slough Habitats:The potential impacts during filling should be discussed. Flows and temperatures would be changed from ambient.Until the ground water relationship,in regard to flo\-is and temperatures,is adequately established the potential for impacts should not be dismissed.\Jhether or not the colder second year releases \Iould have a delayed temperature effect upon the sloughs should be examined. Par~yr~~:It should be explained that the basis for these stat~ents is preliminary results from an examination of one slough (#9). faragraphs 4 and 5:The slough which had a back\Jater form above 14,000cfs should be identified.It is not explained whether this is typical of all sloughs,some sloughs,or even just that one unidentified slough.It is apparent from this section that 12,000cfs would hamper or restrict passage of adults into an undisclosed proportions of the sloughs and would not create a backwater effect for an unkno\1n proportion of the sloughs.The biological basis by which 12,000cfs Has chosen as the preferred flow for August should be explained in light of the discussion of this section • •Tributary Habitats:Paragraph 4:It is noted that some creeks may become perched under the proposed filling schedule.The desirability and feasibility of altering the filling schedule to avoid this impact should be discussed. -Cook Inlet to Talkeetna Reach:It has not been clearly established that the project would not adversely impact fisheries below Talkeetna during reservoir filling and project operation • •Mainstern Habitats:It is our understanding that millions of eulachon spawn in the 10\-ier river.If this spa~ming run is stimulated by certain temperatures or peaking spring flows the project could significantly impact this species.Secondary impacts would occur to those species,such as bald eagle and belukha whale,which feed on them.This potential problem should be discussed. ~~l~ugh Habitats:Paragra~:This discussion is in apparent conflict with Section 2.2(b)(iii)Sloug~itat -Significance of Habitat .•Salmon (page E-3-51)where it is stated that these habitats may be used for spawning • ••Tributary Habitats:Paragraphs 2 and 3:A 10 percent reduction in flo'tls could mean a zero reduction in habitats of concern or 100 percent reduction or something in between.~Je recornr.Jend that these flow reduction percentages be related to their effect on habitats of importance to life stages of those species of concern. (iii)Operation of Watana Dam -Talkeetna to Watana Dam .f·lainstem Habitats:Discussion should be provided specific to the fixed-cone values.There is no indication of the anticipated extent of their use.In that they would be withdrawing \'later from the hypol imnion they ~Iould often be -23- counterproductive to what is intended to be achieved through use of the multi-level intake.The potential for thermal shock,or shock due to rapid changes in other water quality paraQeters,should be evaluated.Rapid water level changes would also be a potential proble~that should be explained. Para~raph 8:Discussion appears to be in conflict with Paragraph 16 of this sectl0n concerning suspended sediment transport. para¥raEh 9:Sediment load and turbidity are not synon~~ous.Turbidity shou d lncrease sUbstantially over ambient winter levels. Paragra~h 16:The observation that fish apparently overwinter in the turbid Kenai Rlver allows one to conclude that,over a long period of time,these (unidentified)species can adapt to turbid conditions.The conclusion that the Susitna stocks can,in one year,adapt to Kenai River like conditions is a big step.Please more fully discuss this potential problem. -Cook Inlet to Talkeetna Reach:Please refer to our COlilI'i1ents under Section 2:'3-(a)(ii)-Cook Inlet to Talkeetna Reach. (b)Anticipated Impacts to Aquatic Habitat Associated with Devil Canyon li)Construction of Devil CanyonDam and Related Facilities -Devil Canyon Darn -Alteration of Waterbodies:Paragraph 3:Please refer to our comments on Section 2.3(a)(i)-Watana Dam.Dlrect Construction Activities • .Disturbance of Fish PopUlations:Please refer to our comments on Section ~3Ta)(i)-Watana Da~•Direct Construction Activities. -_D~~il Canyon Ca~p and Village _.C~_nstruction and Operation of Camp and Village:ParagraB!l.l:Reference is made to Exhibit A,which we requested.It has not been provided.We have not had input into the decisions regarding the type,administration,or siting of the construction camp/villaue.Avoidance of impacts to fish and wildlife resources should have been a major consideration in these decisions.In that we did not participate in these decisions and no alternatives to those which are considered "preferred"are examined in Chapter 10 we can only conclude that little,or no,consideration \/as given to this ~itigation procedure . .Direct Construction Activity:Please refer to our cow~ents under Section 2.3(a)(;)-Watana Camps,Village and Airstrip.Construction and Operation of Camps,Vill age and Airstrips •.Indirect Construction Activities. (iii)Operation of Devil Canyon Dam -Talkeetna to Devil Canyon Dam ~Mainstern Habitats:Paragraph 1:We assume that the SOOcfs flows in this reach \Jould be provided by compensation flow pumps,discussion of which does not appear to be provided in this Exhibit.An explanation should be provided as -24- --------~~~~~~~~~~~~~~~~~~~- to the function of these devices,their purpose,and how water from this source ~,ould effect water quality paralileters of the water released frolil the powerhouse and the fixed-cone values,and the basis for the flows ~,hich would be provided from this source.Please provide the rationale for the stater.Jent that a reduction in flows of the magnitude which would occur would not be expected to adversely affect fish populations in this portion of the river • •Slough Habitats:An explanation should be provided for the statement that changes in strear.rflow during the open-water season are not expected to affect slough habitats.~Je consider the potential for significant adverse effects to this habitat type to be high. -Cook Inlet to Talkeetna:Small changes in flows can have dramatic impacts on habitat.The relationship between flows and impacts on habitat must be established before one can dismiss small changes in flows.We expect the AEIDC instream flow study will sufficiently define this relationship.. (c)Ir.Jpacts Associated with Access Roads and Auxi liary Roads 1:0_Construction -Construction of Watana Access Road and Auxiliary Roads:Once an acceptable access routing is agreed upon,studies would need to evaluate the existing resources.Only at that point can specific mitigative lileasures be satisfactorily addressed,based upon quantified ir.Jpacts.We recor.lmend that you procede in this manner • •Alteration of ~Jater Bodies:The potential problelil of beavers damming culverts and thus interfering with fish passage needs to be addressed. -Construction of Devil Canyon Access Road and Auxiliary Roads:Paragraph 1: We assume that APA has decided on a preferred access p1an-to Devil Canyon- consistin~of road or rail access,or both.Whatever it is should be stated. Paragraph 3:Although ~,e have previously expressed our preference for rail access in lieu of road access,proper siting of rail is highly important to minimizing impacts,primarily through avoidance.Coordination specific to this issue should occur when siting decisions are being made. (ii)Operation and l-1aintenance of Roads -Operation of Watana Access Road and Auxiliary Roads .Disturbance to Fish Populations:Paragraph 3:In that II the increased accessibility of fish streams and lakes to fisherr.1en •••11 would possibly be 1I •••the greatest source of adverse impacts •••11 it would appear to be consistent with the APA Hitigation Policy document and NEPA to give emphasis to mitigation through avoidance of these impacts. (d)Transmission Line Impacts ii)Construction of Trans@ission Line -25- -\Jatana Dam:Paragraph 1:Base line information on the transmission corridor from the dam sites to the Intertie has been ackno\iledged as lacking ~iithin the Exhibit.As \·dth other project features,the Exhibit E should provide base 1ine data,ililpact assessr.lent,and r.titigation planning.Avoidance of adverse ililpacts would occur by a combined construction access/transmission line access corridor north of the Susitna River bebJeen the t".,o dam sites.This is our preference.For further comments please refer to our letter dated 5 January 1982 on the Transmission Corridor Report.This letter was provided as formal pre-license consultation and \le continue to view it as such. (ii)Operation of the Transmission Line -Watana Dam .Alteration Qf Waterbodies:Please refer to our cor.~ents under Section ~.31d)(;t -Watana Dam • .DistUFoance to Fish Populations:Please refer to our comments under Chapter 5,Section 3 .7(c)(i):.ACluatic Species.Ir.Jpac!s-9f.the Project ~-Nitigation Issues and Proposed f.1itigatiny Heasures Fish and A uatic Habitats:Please----Genera Comments. 1i)_Stream Crossings and Encroachments :.Mitigation:Please refer to our cOlilments under Section 2.3(c)(i)- Construction of Watana Access Road and Auxiliary Roads.Alteration of Water Bodies • .l1ethods of Installation:Paragraph 3:Certain construction practices should be scheduled to occur during the winter to minimize and/or avoid adverse impacts. 1-ii)Increased Fishing Pressure -Impact Issue:If the construction access and transmission line bet\Jeen the two darn sites were in the same corridor the impact could be partially reduced or avoided.Please refer to our letter dated 5 January 1982 on the Transmisson Corridor Report for additional comr~ents. liv)Material Removal -t1itlgation:Please refer to our comments under Section 2.3(a)(i).Direct Construction Activities:Paragraph 1. Paragraph 3:Mining should be scheduled to avoid conflicts with fish migrations,spawning,or other important occurrences. Para~raph 6:Please refer to our comwents under Fishery Section -General C9mments reyarding monitoring. -26- ''''''' (vi i5 )Sus itna River Diversions -~titj~ation:Grating of the diversion tunnel would prevent losses to fish and should be considered as a mitigative measure. J~)Clearing the Impoundment Area ~_Mitigation:If it would ~inimize these impacts,then clearing should occur during the winter. (~)J·titigation of Filling and Operation Impacts Jj)_A.QE.roach to r·1itigation:Although,IIAvoiding ir.1pacts through design features or scheduling activities to avoid loss of resources,'1 is listed as top priority,in reality it has not received this type of emphasis. (ii)Hitigation of Downstream Impacts Associated_with Flow Regi~le:Under General Co~ments for Chapter 2 we have ~rovided a synopsis of the AEIDC instrearn flow proposal 'flhich has been contracted by MJA.~Je believe that this proposal ~/ouldprovide the basis for a reasonable,quantified instrearn flow impacts analysis which would allow an assessment of mitigative alternatives. Since APA has contracted this study,'tIe assume that APA agrees with our view. The AEIDC proposal should be fully described in either Chapter 2 or 3.It seems pre@ature to discuss mitigative flows prior to quantification of potential i~pacts. -Ililpact Issue:Paragraph 1:Reference is made to Exh ibit A.Although we have requested this,as well as other Exhibits,it has not been forthcoming. =-Measures to Minimize Ililpacts:Please refer to our comments under Sections 2.3(a)(ii)-Talkeeta to Watana Dar.1 .Slough Habitats:Paragraphs 4 and 5 and 2.3 (a)(ii)-Talkeetna to ~Jatana Dam.Hainstern Habitat:Pa!,a~U.It is apparent that the flow release schedule neither minililizes loss of downstrea~ habitat nor maintains norlilal timing of flow-related biological stimuli • •Winter Flow Re ime (November - A rill:P~ra.9.!:!PLJ:Please refer to our cOlillilents un er ectlon 2.3 a 11 -Cook-l.!!.1et_t.Q.Talkeetna Reach·.Tributary Habit~ts:Paragraphs 2 and 3. Paragra~:We also feel strongly both ways. _.~u~mer Flow Regime (July -October):Paragraph 3:Discussion should be provided regarding the instream flow studies which lead to the conclusion that l2,OOOcfs is of sufficient magnitude to allow rectification of project impacts. -Rectification of Impact .Winter Flows:~Je strongly disagree ..lith the conclusion reached in this section.How this conclusion can be derived from the inforr.1ation provided in this chapter and Chapter 2 needs to be fully explained • .Su~er FlOriS:We fully agree that the proposal must be der.l0nstrated effective before it can be incorporated into a mitigation plan. -27- -Reduction of I~Dacts Over Ti~e:Please refer to our comr.lents under Section 2.4(a)(lv)-Miti~atlon:Paragraph 6. -Co~pensation for I~pacts:para~ra~h 2:Please provide docuQentation on the success of this alternative in A as a,or si~ilar environs.Several ideas are discussed in this section ~Jhich should be considered for der.lonstration projects during the 1983 field season. Para~raph 9:Discussion of the development of a hatchery should be expanded. If other mitiyation alternatives prove not to be feasible then we will need to fully understand what could be achieved through hatcheries. (ii)Mitigation of Downstream Impacts Associated with Altered Water Temperature Regime -tleasures to t·)in imize Impacts .Water Temperatures during Filling Watana Reservoir:If the addition of a fifth portal would,based upon therQal modeling of the reservoir,provide additional temperature control during filling,then \Je recommend that this be added • •Water Tern eratures Durin a eration of h 3:Please"";'r';';'e....e.;...r~t....;.o..;.;.;;.ouj;,.r.;;..;.-c.;...o;.;;mt1;.;..."';;'e";'nt.,....;s;;..;.;;u....;n~e-r..;.S!:O-e.;...c......t.;..;1,..;0...;;,n.;.;,2,....;;.,.3.-..,..;.~..;,-,;.~..;..;.,.;:,..;...;,.-:-;.-.;...,,......;.-.;.~T-I;..,I,-n..;;..u nda t ion • tla instem Habitats:Paragraph 5. -Measures to Rectify Impacts:Documentation should be provided on the success on this type of proposal in Alaska,or other sub-arctic systems. De~onstration of the techniques would need to occur prior to incorporation into the mitigation plan.In that the sloughs are also utilized for rearing by chinook and coho juveniles,discussion should be provided on hO\>I churn salmon (we have assu~ed that churn is the species which is being managed for although it is not stated)would interact with the other species.Also,the ~echanisms which ~ight allo\>I entrance to chinook and coho salmon into the sloughs while holding the churns from egressing needs to be explained. -Compensation for I~pacts:Documentation should be provided on the success of hatchery propagation of grayling. (ii)Operation Mitigation In that other toward resolving potential agreed upon,"best"uses for -Hitigation for Downstream Impacts:paragrarh 2:~Je fully support the statelilent that,"Cont inuing reservoir therma model ing wi 11 a 11 ow an evaluation of available water temperatures throughout the year so that a detailed release plan can be developed.The release plan will need to consider both water temperature and volume in order to ~inili1ize impacts."We reco~mend that this be carried out and the proposed release plan be included in the license application. -28- .,... 2.5 -Aquatic Studies Program:Please refer to our comments under Fishery Section -General Co~~"ents. 2.6 -Honitorin';#Studies:Please refer to our COri1Talents under Section 1.3: Paragraph 8• -29- 3 -BOTANICAL RESOURCES 3.1 -Introduction (a)Regional Botanical Setting:A ~ore cOQplete description should be provided for vegetatlon north of the Susitna River to the Denali Highway, through which the proposed access road is to pass.The primary importance of botanical resources as a key component of wildlife habitat should be restated here as the object of this report (see Section 1.2,page E-3-3,paragraph 1). (b)Floristics (i)General:Paragraph 1:We suggest that the difference in numbers of plant species bet\leen the upper and lower basins are a result of the following: larger study area;greater time spent in sampling the upper basin,and the numerous vegetation communities associated with elevation changes and topographical diversity. Paragraph 3:Please explain the quantification of plant species for the Wil10w-to-Cook Inlet and Healy-to-Fairbanks transmission corridors,when no floristics work was done in that area.(Section 3.2(e)(i)and (ii)and Tables W24 and ~J25). (c)Threatened or Endangered Species:Since no plant species are official1y listed,we suygest addltion of the word "candidate"prior to any discussion of "threatened or endangered"plant species.In many pla~es the discussion would be more accurate by referring to "plant taxa"rather than species since these plants are generally varieties or subspecies rather than distinct species. Please clarify that the calciphilic plants referred to in paragraph 4 of subsection (i)refer to 11urray's,not HiS,categories for threatened or endangered. (d)Contribution to ~Jildlife,Recreation,Subsistence,and Commerce:Because of their key functions both as habitat for fish and wildlife resources and in maintaining water quality relative to drainage,high water energy dissipation, flood storage,ground water recharge,filtering surface runoff,etc.,\Jetlands and floodplains have been protected by Executive Orders (11990,11998)and national legislation (e.g.Clean Water Act as amended in 1977).Since vegetation is a characteristic component of any wetlands,we suggest addition of a general section here on the prevalence of wetlands in the project area and their widely recognized biological and water quality values (please also see our following co~ents on Section 3.2(a)(vi),Wetlands. (iii)Subsistence:Use of area timber resources for building or heating homes is an additional subsistence use ~ihich should be r.1entioned. 3.2 -Baseline Description:Paragraph 1:A brief description is needed here of the Viereck and Dyrness hlerarchical vegetation classification system for Alaska,levels used for this study,and number of categories mapped (note, this description should cover the vegetation type maps nO\J under preparation).An explanation for the r.1apping of up to 16 kilor.1eters (km)from the Susitna River and .8 kr.1 from the impoundments should be provided. -30- ....., - para~raph 2:A brief description should be given as to sampling intensity. Whet er vegetation dominance within the project area and/or susceptibility to project impacts were considered in study design should be explained.General information on elevation,slope,aspect,and land form should be briefly related here and in subsequent sections of the report to better define areas and their vegetation cover.The prevalence of permafrost,a determining factor in some project impacts (e.g.pages E-3-166,paragraph 2 and E-3-170, paragraph 3),should also be considered. Paragraph 3:Successive descriptions of vegetation types by project area would be clarified here by defining closed,open,and ~Joodlandforests,tall versus low shrublands,and wetlands (also see comment under Section 3.2(a)(vi)),rather than defining them in the following sections (a)and (i). The discussion \Jould also be aided by including an overlay of project features 011 the vegetation map,Figure \/1,as well as restating information on the elevation range for each proposed impoundment area.Ue recommend the license application include a larger,more readable vegetation map and that quantitative data on how common or uncoomon specific vegetation types are,as well as the occurrence of various types relative to elevation or aspect,be presented in the text as well as tables.In so describing the revised vegetation classification,it will be possible to better evaluate potential project impacts on vegetation,and thus wildlife habitats,by project feature.This recommended level of effort also applies to the proposed access and transmission corridors. (a)Watana Reservoir Area (i)Forests:Please see comment under Section 3.2 re including quantified information in the text as well as tables.Providing the range of elevation in which these types \iere sampled rather than one average \Jould show the extent and overlap in distribution of each forest type. -sruce Forest:Paragraph 5:Black spruce forests on poorly drained soils wou d most llkely also be classified as wetlands.Please refer to our comments under Sections 3.l(d)and 3.2(a)(vi). (ii)Tundra:Please refer to comments under Section 3.2:Paragraph 3 re providing quantitative data on the prevalence of different tundra types and of ranges rather than average elevations.The ~Jet sedge-grass tundra should also be described as a wetland type,see Sections 3.Hd)and 3.2(a)(vi),as above. (iii)Shrubland:Refer to cOli1li1ents under Sections 3.2(a)(i)and (it)above. (iv)Herbaceous:For consistency with the rest of the report,we recommend describing common species within the referenced herbaceous pioneer com~lunities.Corresponding tables on the herbaceous vegetation types are missing. (v)Unvegetated Areas:Ayain,quantification of the extent,and thus importance,of these areas should be provided. (vi)Wetlands:This section is significantly lacking in three areas.First, the leglslatively recognized importance and protection of wetlands should be described,including the U.S.Army Corps of Engineers·(CE)definition of -31- wetlands and regulation of activities on these areas.(Please also refer to our co~~ents under Section 3.l(d)regarding this concern.)Second1y,there should be a discussion of how ~,etlands may be a second level of classification applied to the vegetation types previously discussed.Finally,as ~,ith other ongoing studies,this section should cover the lIetlands delineation scheme agreed to at the 2 Decer.lber 1982 wetlands session of the Susitna Hydro Exhibit E Workshop.This agreement included the following:project consultants will Qeet with the FWS and CE to identify the appropriate detail for wetlands ~apping;existing wetlands r.laps will be improved on the basis of additional aerial photography and overall vegetation remapping;soils information will be obtained frofil theCE;ground truthiny,in consu1tation with F\1S and CE,will be undertaken in summer,1983;final maps should be available by fall,1983; and additional field checks may be necessary in su~mer 1984 (see page 5 of Wetlands !·leeting notes,received from John Hayden,Acres Ar,lerican,Inc.). Given the doubtful accuracy of existing wetlands maps,it would be inappropriate to include those r.laps in the license submittal. Redefinition of wetlands to properly include such types as black spruce bogs, willow and poplar along watercourses,and herbaceous sedge-grass marshes,in addition to the more completely aquatic types now described under the wetlands section.A definition of "wet tundra"(paragraph 6)should be included.The final paragraph of this section would be a better opening statement to the expanded discussion needed on wetland values and types. (b)Devil Canyon Reservoir Area:Please refer to COmr.lents under Section 3.2(a)re need for a brief elevational and landform description.Again,there will be need for an overlay of the impoundr.lent area on the (revised) vegetation type map.We appreciate inclusion of the percent of the iQpoundment area covered by major vegetation types.Please refer to our previous comments re need for a co~prehensive discussion and definition of wetlands. (c)Talkeetna to Devil Canyon:Clarification of this specific area is needed. Agaln,refer to comments under Section 3.2{a)(i)and (ii),above.While early,mid,and late successional stages appear a suitable categorizaion for floodplain vegetation,these stages should be correlated with the forest, shrub,tundra,wetlands,etc.classification previous1y used. (d)Talkeetna to Cook Inlet:Please refer to comments under Section 3.2(a)(i) and (ii),above.We believe that existing data do not substantiate the conclusion that the project will have mini~al impacts on vegetation in this area.Thus we recomr~end mapping the area within the 10 year floodplain downstream of Talkeetna at least to the Delta Islands.Further discussions on expected impacts should be initiated to better pinpoint the precise area which should be covered. (e)Transmission Stubs and Intertie:Again,we suggest adding a map,and elevation inforr.lation,as well as quantifying the vegetation type,for each of the follo~ing four subsections. (i)Healy to Fairbanks:Paragraph 5:Reference to "wet lowland sites"should be expanded to discuss wetlands per our comments on Section 3.2(a)(vi). -32- Section 3.2(a)(vi). Paragraph 2:The first sentence is contrary to data provided in Table U25, please clarify. Paragraph 5:Pl aceli1ent of th is paragraph between the first and second paragraphs would be 1i10re logical. (iii)Willo\~to Healy:The compatability of vegetation types as mapped by Commonwealth Associates,Incorporated (1982)with those mapped by McKendrick et ale (1982)should be described. (iv)Dalils to Intertie:We question the comparability of vegetation types mapped here at a scale of 1:250,000 with those in all other transmission corridors which were mapped at 1:63,360,e.g.Tables W2?and ~~8 doculi1ent difficulties of mapping closed birch and balsali1 poplar types at the 1:250,000 scale.This transmission corridor should be separately Iilapped during ongoing mapping. 3.3 -Ili1pacts:Fragmenting this analysis into a .project feature by ili1pact issue forli1at is useful for a first overview.However the section lacks a -comprehensive picture of cumulative impacts to vegetation.That cumulative picture is essential for understanding overall ili1pacts of the project on fish and wildlife spec ies occupying areas \~ith in and beyond each project feature. Although this section identifies the full range of vegetation ili1pact issues, there is no attempt to quantify areas \1'hich may be potentially affected by chan~es in vegetation cover.A given change may be both beneficial to one specles of wildlife yet adverse to another.By not cOli1pletely prioritizing r-mitigation in the previous Fishery Section and later\Jildl ife Section,the report fails to identify the tradeoffs or objectives of a project-wide mitigation plan or mitigation plan alternatives.For exalilple,inforli1ation should be provided here on the tradeoffs analysis relative to fish,wildlife and botanical ili1pacts,as well as cost and design considerations in the siting of project support facilities,roads and transmission lines.We remain concerned that we were not consu1ted in the siting of project support fac il it ies. .... F ! I .- (a)~atana Developement (i)Construction -Vegetation Removal:Para~raph 1:Again,we suggest restating the elevation range within WhlCh vegetabon will be removed.Spoil areas shou1d also be described. Paragraph 2:Please provide the percent loss expected for birch forests as shown in Tab1e U2?Loss of a vegetation type 'relative to its abundance within the basin is half the issue relative to the loss of vegetation;however the value of each type relative to other types for selected wildlife species should also be provided.In sOli1e cases habitat factors would also be considered;see our COG1l'.lents throughout the Uildlife Section. -33- -Ve etation Dama e by Wind and Dust:Para-ra h 1:Given the difficulty of rea 1n9 t e vege at10n r,lap supp 1e ere an t e later need to understand the potential for lost nest sites or wildlife cover,please describe the primary tree species and veyetation type(s)in which blowdown may occur on ~le southside of the Uatana damsite. paragraeh 3:Some relationship should be made between referenced possible delays 1n snowmelt and vegetation types which may be affected.Similarly, increases in cottongrass and decreases in mosses anq lichens should be related to their occurrence in vegetation types adjacent to impoundment and borro\i areas.Such relationships should be the basis for fully considering the impacts of project-induced changes on vegetation r~lative to wildlife (see our comlLlents under Sections 4.3(a)(i),(ii),(iv),and (vU. (ii)Filling and Operation -Ve~etation Succession Following Removal:In order to understand the magnltude of vegetation a1terations,some quantification should be presented for the areas of forest,shrub,tundra,etc.which will be rehabilitated during project filling and operation.A scenario should be developed outlininy potential acreages of each affected vegetation type and the various successional stages they will pass through during the life of the project • .Forest Areas and Shrubland:Anticipated heights of each vegetation stage, over time,should be inc1uded here • •Tundra:The extent of perr.lafrost should be described,please see our COr;1Jilent under Section 3.2. Information is needed on successional patterns in herbaceous vegetation types and on wetlands within each type,for consistency with Section 3.2(a).An additional concern is the nutritional quality and quantity of plant regrowth relative to wildlife. -Effects of Erosion and Deposition:Paragraph 2:See preceeding comment and that under Section 3.2 re need to map and quantify the aerial extent of permafrost. -Effects of Altered Downstream Flows:Overall,this discussion is too general.Consideration of daily flow fluctuations in response to peak power needs is neglected. Several other potential project impacts are left unclear;especially those related to wetlands and floodplains.For example,please provide the extent of floodplain areas,(1)now subject to annual,5 year,10 year,etc. flooding,and (2)which will become exempt from flooding.Given the successional information depicted in Figure W3 and revised vegetation ~aps,it should be possible to quantify expected changes in vegetation,over time,for a variety of flow regimes.Such information is necessary to fully deter~ine project impacts to wildlife and make mitigation reco~endations.If existing hydrologic or vegetation information is considered insufficient for developing such models,additional stUdies should be initiated. -34- •\latana to Devil Canyon:A raore detailed treatment of the potential for r;r,le;ce or ;cefog formation is needed here.For example,ice buildU8 on vegetation has been found to keep the soil surface open in forests.l.! Sap 1ing tree stands heavi ly damaged by ice produced lIlore brush \/hereas ice damage in mixed-oak tree stands resulted in loss of understory saplings and 10\1 tree branches with herbaceous plant growth enhanced in summer.l!!Such changes in understory or reduction in winter browse availability could be particularly critical to wildlife subject to extensive adjacent habitat losses. The types of vegetation \ihich may form,over the project life,on "newly-exposed areas with adequate soils ll should be described relative to adverse or potential benefits for various wildlife species. •Devil Canyon to Ta"/keetna:paragrat 3:This quantified description of expected vegetation type changes ;s t e type of detailed impact analysis necessary for other project areas (e.g.preceeding section on Uatana to Devil Canyon and following section on Talkeetna to Yentna River).Once the revised vegetation mapping and analysis is completed,this type of analysis should be the basis for exa~ining the positive and/or negative impacts to wildlife of -these vegetation changes,over the life of the project. Paragraph 4:The statelilent that,"Post-project ice forlilation in th is reach will be s;r.tilar to present conditions,"appears to conflict with previous descriptions whereby ice forraation will not occur until approxililately river mile 130,slightly raore than half way to Devil Canyon fror.t Talkeetna (Section 2.3(a)(iii),page E-3-90).In order to understand how area vegetation raay be less-influenced under post-project break-up,it would be useful to explain present impacts of break-up on the vegetation.Please address the change from a bank-full flood interval of 1 to 2 years for this section of the river. Quantification is needed of the area over which vegetation could be established with this schedule for less frequent disturbances. •Talkeetna to Yentna River:Paragraph 2:Again,the vegetated areas and types which could become established on the active gravel floodplain under less frequent bank-full floods should be described. Paragraph 4:~Je question the suggested vegetation changes between Talkeetna and the Yentna River.Vegetation allowed to establish over a longer period of tilile (e.g.5 to 10 rather than 1 to 2 years)would seem less l"ikely to be disturbed when the bank-full flood does occur.Given the annual flow .l.Q.I Butler,R.t·l.,N.H.Wooding,and LA.Myers.Spray-Irrigation Disposal of Wastewater.Special Circular 185.The Pennsylvania State University,College of Ayriculture Extension Service,University Park,Pennsylvania.17 pp. l!!Uood,G.W.,P.J.Glantz,H.Rothenbacher,and D.C.Krodel.1975. Faunal response to spray irrigation of chlorinated sewage effluent. Research Publication No.87.Pennsylvania State University, University Park,Pennsylvania.89 pp. -35- ,II variations over this stretch of the river,it would see~possible and necessary to predict areas of vegetation change for maxi~u~and mini~um flow scenarios. Effects on Ve etation:As for other ongoing studies,a_;;";""r-..~-T-;;""';~~--,,,,--..;o..~--~...,.;..,..;.....;~;....;...;....;...o.""lncorporatlny ogy study results into project Paragraph 3:~Je recommend calculating the potential vegetated area and types therein within the referenced 2.5 k~area downwind of the reservoir within which air temperatures may be affected.Resultant ifilpacts on timing of veyetation ~reen-up or leaf-drop could be important for area wildlife. paragraah 4:A more extensive treatment of foy bank development should be include here,please refer to our cOI.lr,lents under Section 3.3(a)(ii)-Effects of Altered Downstreara Flows .~Jatana to Devil Canyon. Also see co~mlent above re calculating the area within 3 km offshore which may be affected by ice development. -Effects of Increased Human Use:We have repeatedly cited the important opportunlty for r'linimizing project impacts on fish and wildl ife by carefully siting and regulating access (see FWS letter to Eric Yould,APA,of 17 August 1982).The potentials for off-road vehicle (ORV)use and accidental fires with project access described here confirm that such use may need to be effectively controlled as fish and wildlife mitigation.Please refer to cOQments under Section 3.4(c)(ii)re our recommendations to eliminate the Denali Highway access route and to restrict worker and public use of project access routes. We are concerned about inconsistencies with the first sentence here,re greater access opportunities,and with points made in the Wildlife Section. That section appropriately contains repeated descriptions of (1)the siynificant negative ir.lpacts froGl increased use and access;and (2)the need to carefully control project area use and access (e.g.Sections 4.4(a)(i), (ii),(iv),and (r)and 4.4(c)(ii)).Please clarify • •Off-Road Vehicles:Para ra h 3:In view of previous incomplete coverage of wet ands see our COfiTJents un er Section 3.2(a)(vi)),we question the definition behind use of the ter@ wetlands here.This discussion illustrates the need for the improved wetlands map which is to be developed. (b)Devil Canyon Development (i)Construction:Other than quantifying direct vegetation losses froQ reservoir lnundation,the section fails to provide any indication of the relative magnitude of other potential losses or alterations in vegetation. -Vegetation Removal:Please refer to our concerns under Section 3.3 re lack of consultation in siting camp,village,and borrow areas. -36- -Vegetation Loss by Erosion:Again,a map of permafrost areas \iould be usefu1.Given the likely ineffectiveness of replacing topsoil and recontouriny (Section 3.3(b)(i).Indirect Conse9uences of Vegetation Re~oval),we suggest that clearing may be a signlficant source of erosion. -Effects of Altered Drainalje:~Je recommend that this section include the area of lakes,ponds,and other wetlands which may be affected by proposed borrow areas. (ii)Fillin¥and Operation:Paragraph 3:The potential for movement of the 1arge lands ide at river ~11e 175,causing upstream flooding and loss of mid- and late-successional vegetation in valuable riparian areas,should be described in ~ore detail.For example,the potential size of the area to be impacted should be described. Please refer to ~ur previous ..- -Downstream Effects:The unknown consequences of frost buildup on vegetation adjacent to the reservoir represent a significant potential change in vegetation and thus impact to \/ildlife (see our comments under Section 3.3(a}(ii)}.These consequences should be the subject of continuing studies and quantification • (c)Access (1)Construction:Please refer to our CQr.1r,lent under Section 3.2 regar lng 0li11SS10n 0 ase lne data on proposed access corridors.Because of this omission,the exact areas which would be cleared within the 34 meter (m) x 67 kr,l access corridor described here are unclear.Please explain vJhy this description appears to conflict with earlier descriptions of road width and length (Section 2.3(c)(i}).Inconsistent use of both metric and English units within the same report adds further confusion. (ii)D1eration:Parayraph 1:Our comments under Section 3.3(a)(ii)apply here a so. Paragraph 2:The potential for ice buildUp on the railroad tracks and resultant impacts on vegetation should be examined. (d)Transmission Corridors (i)Construction:Paragraph 1:Please clarify the differences among hectares to be impacted by the transmission corridors as cited here and in Tables W24, W25,and U26.~itoreover,referenced Table U29,has nothing to do with transmission corridors. paragraah 2:Uetlands,as used here,should be defined.Precalculation of affecte vegetation types will need to be undertaken after the ongoing vegetation relilapping.Notation should be made that,(l)lo\/-lying vegetation types \/;11 r·emain largely undisturbed,and (2)beneficial impacts of increased browse production will be realized,only if access and DRV use along transQission corridors are effectively controlled.Quantification of potential increases in browse should be possible on the basis of succession -37- ~odels and continuing classification studies.Such quantification is needed to cOQpare overall losses and thus mitigation requirements for the project. ~lii)Operation:Our comments above under Section 3.3(d)(i)apply. (e)lfil act Sur,lmar:An explanation is needed for the process or criteria for etermlnlng lmpact "priorities of importance." (i)though (v):This qualitative sumrJary describes several data gaps which He believe should be answered,e.g.the vegetated area which may be lost with land slumpage from permafrost,changes in downstream floodplain vegetation. etc.Overall,we are concerned with lack of attention to cumulative impacts, an inattention made ~ore acute by nonquantification of most impacts.The numerous "minimal"and "minor"impacts for each project feature may cumulatively represent significant alterations or loss of vegetation.From the standpoint of fish and wildlife habitats,project-related activities throughout this primarily undisturbed area represent the first intrusions similar to those which have led to significant and losses of fish and wildlife throughout the conterfilinous United States.A serious omission in this section is consideration of ililpacts to ~/etlands and floodplains. (vi)Prioritization of Impact Issues:We concur with the evaluation of acreage Josses for a vegetation type relative to the proportion of that type in the region.Since vegetation is a key co~ponent of wildlife habitats,the basis for evaluating whether community changes are "good"or "bad"should follow in the Wildlife Section of this chapter.However as discussed there, an inte~rated evaluation of all species is lacking.There is little basis for makiny decisions on prioritizing species concerns or resultant tradeoffs in project impacts or mitigation alternatives.Our previous co~ents on each i~pact issue identified here apply.Additionally,vie have a few specific cowments. -Direct Losses of Vegetatio~ Access Roads:While the actual area covered may be s~all relative to other project impacts,access routes indirectly impact a ~luch larger area because of their linear nature • .Trans~ission Corridors:We would like to be assured that the reference to a lir.1edian strip for transport of personnel and materials!!,is consistent vdth the environmental guidelines for transmission corridors (Appendix AE - Transmission Corridors,item 1)with which we concur.As with access roads, above,transmission corridors indirectly impact a very large area. -Indirect Losses of Vegetation:The cumulative impact of project features mentioned previOUSly,is of particular concern here.Many of the identified losses will be in riparian corridors which are of particular significance to wildlife species. -Alteration of Vegetation Types:We a~ain recom~end that successional type changes over the project life be quantified in the license application. -38- ..... - ~, 3.4 -r'litigation Plan:~Je find the proposed plan 'incomplete and too general. There are two main problems with this plan.First,because impacts are incompletely quantified,it is not possible to determine the value of recommended/accepted mitigation measures or the magnitude of unavoidable, adverse impacts which will not be mitigated.Not integrating this plan with the fish and \Jildlife mitigation plans is the second main problem.Thus there is no comprehensive picture of overall project impacts,priorities for mitigation,potential for achieving those priorities,or tradeoffs among mitigation options for various area resources. An approach similar to that for the Fishery Section mitigation plan (pages E-3-120 through E-3-144)Hould be r,lore appropriate.~Je recommend restating the full range of mitigation alternatives here,prioritized in accord with NEPA guidelines:avoid,minimize,rectify,reduce or eliminate over tili1e,and finally,compensate.This approach should be expanded to include reasons for rejecting high priority mitigation in lieu of lower ~riority measures (e.g. proposing regulations on access rather than alternate siting or scheduling of access).A mitigation plan,incorporating specific,effective measures which have been selected through this process,should then be presented. r·lany of the identified ir.lpacts are not addressed in the mitigation plan itself.In those cases,impacts should be clearly identified as unavoidable, short or 1on g-terr.1 ,adverse impacts.Horeover,vie find the report lacks information specifically required by FERC regulations (F.R.Vol.46,No.219, 13 Noveli1ber 1981),Section 4.41{f)(3)(iv),i.e.there are no implementation, construction,or operation schedules for recomli1ended mitigation measures; which measures have actually been incorporated into project plans is unclear; and neither replacement lands nor habitat manipulations have been identified as to either suitable sizes or locations. Generalities of the plan are exemplified by references to using,"depleted or non-operational upland borrow pits •••as overburden storage areas where feasible"(page E-3-187)or reference to "a feasible haul distance,"(page E-3-187)• .Gi)Watana Developement (i)Construction:Paragraph 1:t1itigative features which have been incorporatea into engineering design and construction planning should be clearly stated.Reasons for rejecting our recommendations have never been formally provided (e.g.access road siting).Location of the construction camp and vill age on shrub 1ands (per Tab 1e U27)rather than forest 1ands may not minimize i~pacts,depending on the wildlife species of concern,erosion potentials,proximity to construction and access facilities,etc.Again, since we were not consulted in siting of those facilities and have not seen Exhibit A,we cannot fully understand the situation.A mechanism for enforcing the referenced prohibition of off-road or all-terrain vehicle use should be included (see FERC regulations Sections 4.41{f)(3){iv)in F.R.Vol. 46,Uo.219,13 November 1981). paragraph 3:We suggest that facility siting to avoid wetlands be rereviewed in consultation with the FWS and CE and proposed revisions to the wetland r,laps.As with similar points about "minir.lizing"or "reducing",there is no quantification,particularly relative to the amount of \'ietlands,or other -39- impacts in other report sections,which will be impacted and which can be avoided. Paragraph 5:We concur that spoils should be placed in the inundation area as 10ng as such place~ent will not create a sedimentation problem. Para~raRh 6:We recommend explaining whether project engineers have confirTned that floodplains or first-level terrace locations will not be needed for borrow for ancillary project facilities. Para;iraph 7:tJe recof.ltlend that sir.1i1ar detailed information be provided tnrouyhout the report. (1i)Filling:Please refer to our General Comments,Botanical Resources,re identifying feasible habitat enhancement measures or replacement lands.The contention that moose winter browse I!may be cor,lpensated l'is useless,given that (1)there is no guarantee in this plan that enhancement or land. acquisition will ever occur;and (Z)quantification for how much/where/what type of land must be enhanced or acquired is lackiny.~oreover,tradeoffs re co~pensation for moose to the neglect or adverse impact of other species have not been settled or even discussed. Paragraph 3:Because of internal inconsistencies,the overall effect of siltation is unclear. Paragraph 5:Whether rectification will be one percent or 99 percent is unc1 ear. Paragraph 7:We concur with revegetation plans to e~phasize fertilization and minimize seeding where erosion will not be a problem. Paragraph B:We strongly support plans to rehabilitate all sites by the first growing season after they are no longer needed.Assurances should be provided that sufficient quantities of seeds would be stockpiled and regrowth potentials of available native strains ~/ill be tested prior to project abandonment of disturbed sites.Choice of plants for site rehabilitation should be in consultation with Federal and State natural resource ayencies. (iii)Operation:Paragraph 1:We concur with the proposed ~onitoring of dO~Jnstream veyetatl0n changes but note that monitoring in itself is not mitiyation.Periodic controlled flooding to Qaintain primary and secondary successional stayes must be coordinated with the Fishery Section and tJildlife Section mitigation plans. paragra~h 2:We have assumed that nonessential portions of the disturbed areas wll1 be promptly rehabilitated.Please specify. (b)Devil Canyon Development (1)Construct ion:Paragrarh l:Our comlilents re 1at ive to the ~Jatana development (Section 3.4(a (ii))mitigation apply here also.An additional mitigation need is monitoring and enforcement relative to DRV and unauthorized access uses.Spoil disposal described here was not discussed or previously covered in the impacts Section 3.3(b)(i). -40- (ii)Fillint and Operation:A~ain,our COfilr.rents under \·Jatana Development, Section 3.4 a)(li)and (lii)apply. (c)Access (i)Construction:Paragraph 1:Please clarify why avoidance of closed forests was terQed as a mitiyative measure in siting of the Denali Highway to Watana access road.Section 4.4(b),paragraph 2 supports this siting re minimization of project i~pacts to pine marten.If this is the reason,that reference should be made here and further information is necessary on other species adversely affected by this siting and adverse/beneficial impacts of alternative sitings which were eliminated.Wetlands will need verifying per ~our previous comments (Section 3.4(a)(i)).At least one line of this paragraph was omitted. Paragraph 3:We refer you to our previous comments on wetlands,Sections 3.2(a)(vi)and 3.4(a)(i). """ - ,~ - r I Paragraph 4:Information is too general.We concur with the intent but do not have necessary specifics as to the extent of mitigation which will be ach ieved. (ii)O~eration:The referenced management prov1s10ns should be described here ;nclud1ngbusing of ~vorkers and restrictions on non-project-related uses. Paragraph 2:The extent of mitigation which can be achieved for many project impacts wi 11 depend upon the folanagelilent options under revie\v by the APA.In the flPA I,litigation Policy document and under NEPA guidelines,avoidance is to be the first priority in implementing mitigation.Therefore ~Je refer you to our previous correspondence on this issue (letter to Eric Yould from FWS,17 Auyust 1982)as part of our pre-license consultation.In brief,the necessary avoidance should include elimination of the Denali Highway to Watana access road and prohibiting use of other project access routes for non-project-related access.Instead,construction access should be by rail from Gold Creek,along the south side of the Susitna River to Devil Canyon, and access on the north between the two dams.Non-project-related use of these access routes should be prohibited during project construction.A thorough analysis should be provided here of public access from the standpoint of adverse impacts to fish and wildlife and their habitats in comparison to any positive impacts for recreational and subsistence fish and wildlife uses. IJe note sOlile confl ict between the statement that the flPA is reViewing a variety of access management options with the suggestion that the project access route from the Denali Highway may be eligible as a National Scenic Highway.That designation would stimulate public access to the increased detriment of fish and wildlife,effectiv~ly foreclosing some mitigative management options. Paragraph 3:Please refer to our more extensive comments on the Recreation Plan re consistency with fish and wildlife protection priorities.Ue strongly concur Hith the proposal to r.Jonitor fish,.,.iildlife,and vegetation impact but again note the report's deficiency in not describing how and by whom -41- ~onitoring will be completed (see our General Co~ments,Fishery Section). f1oreover,the process for modifying project operations or the Recreation Plan to better effect mitigation is not described. (dl Transli1ission (i)Construction:Please clarify what criteria were used for siting of transmission corridors.Assurance is required that project plans include construction by helicopter or winter access. Paragraph 2:Again,refer to our previous co~ents on wetlands.~e recommend minimum 150 m buffers between swan nests and any portions of the transli1ission corridor. (ii)Operation:We concur with this plan but are concerned that it may not be implemented.IJe hope to avoid a repeat of the Intertie situation where on-ground access was later guaranteed to the operating utilities contrary to residents'and agencies'recoD~Jendations.That guarantee already contradicts this plan,given the dependence and interrelationship of the Susitna project ~Iith the Intertie. Since habitat ~anipulations,including fire,crushing,etc.(Section 4.4(a)(i) and (iv))are being suggested as a prime mitigation measure for wildlife,\/e recorn~end that potential effects of those activities on veyetation types within different project areas be discussed here.The potential value for uitigation of various habitat manipulations should be explained similar to the discussion on fire,Section 3.2(a)(ii). Two additional items which should be covered in this ~itigation plan are the monitoring and surveillance plans referred to earlier and an erosion control plan specific to project features and schedules. Specific co~~ents on tables and figures relative to the Botanical Resources Section follow: Table \~:Please change in accord with our recomli1endations under Section 3.1(c),to "Candidate endangered and threatened plant species",etc. Tables WS through W19:We suggest including a footnote or appendix briefly describing how these data were collected with some explanation of whether sampling intensity was commensurate with the availability of the vegetation type within the project area and potential for that type to be impacted by the project. Tables IJ2l through IJ23:The number of sites saIJpled in each type should be included.As in our COli1r.lents on the text,information should be provided on how these categories compare with the vegetation categories sampled within the upper Susitna basin. Tables ~24 throu 1h W26:Please clarify whether the 400 to 500 foot right-of-~Iay or 10 foot cleared centerline area was used in these calculations.Per our previous cO"IDent on the transQission corridor,a similar table for the Intertie portion of the transmission corridor should be -4:;'- .- inc 1uded.~Je a1so suggest a suri1i1ary tab 1e sho~Jing the vegetati on impacts fror.J all seg~ents of the transmission corridor. Please refer to our cOr.Jments in the text on need for an additional table showing vegetation types to be i~pacted by all access corridors,preliminarily identified borrow areas (e.g.borrow area G is not included in Table ~i23)and spoil areas.Where questions rer.Jain on the size of borrow/spoil areas to be used or the necessity of all potential1y identified areas,notation should be made of potential maxi~um and mini~um sizes and any ordering re use of these areas. Figure ~Jl:Granted,it is difficult to reproduce such a ~ap at this scale. However,\Je recor.lmend a larger reproduction be included in the final application.That map should include an overlay showing reservoir inundation areas,access roads,transmission corridors,and other project features.A correspondiny map of downstream vegetation and overlay of transmission corridors is also needed. Figure W3:Once the remapped vegetation classification is completed it should be correlated to this table to quantify potential vegetation changes and types over the life of the project. I""'"Figure ~J4:As above,this figure should be a basis for analyzing dO\Jnstrear.l successional trends given the projected longer tir.Jes between floods. Maintenance of habitat manipulations should be specified on the basis of this figure and ~itigation objectives • .... r i -43- 4 -WILDLIFE 4.1 Introduction:~e reco~end expanding this section to at least ackno\J1edye the ecological values of all wildlife species,as well as to ~ore clearly outline objectives of the report and resultant ~itigation plan.We again point out the need for an overall discussion of fish,wildlife,and botanical resources,overall ~itigation plans,and tradeoffs in benefits to so~e resources at the expense of others. ecl Species Contributing to Recreation,Subsistence and CO~uerce:Not only birds,but all w11dlife species in the project area contribute to non-consumptive forms of recreation.Incidental viewing of wildlife in conjunction with other activities is an unquantifiable but well documented value.For example,the importance of downstream fish and wildlife habitats to fish,wildlife,and the significant numbers of people using them has been recognized by the State and agreed to by the Hatanuska-Susitna Borough Assembly.Fish and wildlife have been designated a primary use on every State land ~anagement unit on the east side of the Susitna River from Cook Inlet to just below its confluence with the Kashwitna River.These management units and state guidelines for protecting fish and wildlife are described in the recent State report,Land Use Plan for Public Lands in the ~Ji11ow Sub-basin, October 1981,by the Alaska Depart~ent of Natural Resources (ADNR), Matanuska-Susitna Borough,and ADF&G. A discussion as to why the evaluation species were selected and prioritized as described here is as applicable to terrestrial wildlife species as it is to fish (Section 2.l(d)).We suggest referencing that discussion here.Such infor~ation is particularly important with regard to mitigation plans for one species which conflict with another species.\Je also suggest noting values of key bird species,i.e.bald and golden eagles have received national protection (Bald Eagle Protection Act,16 U.S.C.668-668c);trumpeter swans are highly valued because of their former endangered status;and other Qigratory birds are protected under international treaties and the t1igratory Bird Conservation Act (16 U.S.C.701-718h). Please note,all references to tables in the \Jildlife section of the text are to table numbers one greater than on the actual table.~e have referred to tables as they are actually numbered. 4.2 Baseline Description (a)Big Game (i)Moose:~issing figures and values are a problem throughout this section. -Distribution:Please docu~ent hO\'1 ~oose are "o ne of the most econolilically important wildlife species in the region;1I also see our cor.~ents on Chapter 5, Section 3.7(b). •Special Use Areas:In view of your repeated citations that winter range is a key area for Iiloose (e.g.Section 4.2(a)(;)•Seasonal t1ovelilents:Para ra h 6;Section 4.2(a)(i)•r:tortality Factors:Paragrap ;an Sectl0n . a 1) Uinter Use),we suggest inclUding a section here on the use and availability of ~nnter range in both severe and mild \dnters,as \Jel1 as the data gaps and -44- - - .- - ..... plans to overco~e them relative to this study.Maps showiny use areas described here relative to project features would clarify this section. Calving Areas:paragraphs 3 and 4:NUli1bers of male and female moose radio - collared in each of the downstrea~study areas should be described here. •River Crossings:To better understand how not only the reservoirs,but ancillary project features such as the Devil Canyon camp and village,may also influence moose crossings of the Susitna River,crossings both immediately up and downstream of the impoundment areas should also be described (also see our co~ments under Sect i on 4.3 (b)(i)-Interference with ~10vernents}. -Habitat Use:.The main proble~with this and the follovling section on populations is that there has,apparently,been no integration of moose and vegetation data. ·Cover Requirements:parafraph 7:Please describe the scope and schedule for the necessary studies 0 habitat use,or reference the discussion under Section 4.3(a)(i}-uantification of Project Effects.Correlating aerial observations to the remappe vegeta 10n types s ou ~rovide additional inforr.lation on habitat use.Elevation,slope,or other habitat parameters may also need to be incorporated in this analysis. Habitat Use in the utper Susitna Basin:Paragraph 3:Further inforrllation is needed on the unders aries assoclated with these habitat types.Please indicate t/hen such information ~~ill become available • Habitat Use in the Lower Susitna Basin:Para ra h 2:For consistency,the num er 0 ema e moose ra lO-CO are nort 0 a eetna should be provided, also see our cornraents under this section,Calvin~Areas.The discussion is confusing due to frequent co~bining of quantitatlve data with qualitative 'staternents such as 1I1:1ost female use,"Ilat most relocation sites,"etc.Where it is available,we recommend supplying quantitative information,with qualifying discussions on limited sample sizes,periods of observations,etc. •Food Habits:Paragraph 2:Again,please describe the scope and schedule of onyoing analyses and how that information will be integrated into mitigation planning in a timely manner.Reference to your Section 4.3(a)(i)- Quantification of Project Effects will prOVide some of this information. Paragraehs4 and 5:We suggest examining how browse availability and vegetatlon types utilized by ~oose correlate with moose relocations in reference to the remapped vegetation types. •HOr.le Ranges The UpperSusitna Basin:The rational should Qe given for selecting an 8 k~ wide analysis zone adjacent to the impoundment. Lower Susitna Basin:Paragraph 2:Please describe or reference the scope and schedule for continuing studies.We recommend giving so~e consideration to the relative habitat values of all river study areas • -45- -Population Characteristics ·Historical Po ulation Trends:Para ra h 1:An overlay of project features on the ~ap 0 count areas F1gure 1S needed. Parasraph 2:Substantiating population and productivity data in Tables W32 through W34 should be referenced here. •Population Estimates -Upper Susitna Basin:Pleas~describe Hhat types of habitat correlations can be made from remapped vegetation types and other habitat parameters for low,high,and moderate moose density areas. •Population Estimates -Lower Susitna Basin:Paragraph 2:Please describe differences between habitats up and downstream of Montana Creek. •t:1orta1ity Factors:Paragraph 1:~'e recomr,lend describing hO\i range quality has been decreasing. Paragraphs 2 throu~h 4:Please describe the comparability of brown bear populations and ha itat types bet\'een the Nelchina and Susitna River basins. We recogrnend expanding the discussion to include hunting as a mortality factor.Both recreational and subsistence hunting can affect population size and structure.Hunting figures prominently in later iIJpact discussions. Historical hunting effort and success data relative to changing management regulation~should be described,and coordinated with Chapter 5.Please also refer to our co~ments under Chapter 5,Section 3.7(b). (i i)Caribou -Distribution and Movement Patterns:Paragraph 6:Please describe how many animals were radio-collared and the numbers of radio locations made for each one. Figures ~B and W10 of caribou radio locations should include the locations of project features. -Habitat Use:Please clarify whether aerial observations or an overlay of radio locations on eXisting vegetation type maps were used to determine caribou use of different ve~etation types.A correlation should be provided for the proportion of the basin which is in each type relative to the proportion of radio-collared caribou sightings within each type (Table W36). Please discuss whether vegetation remapping efforts will affect the interpretation of caribou data. -Population Characteristics:paragra~h 1:This section should reflect present and future management plans an be consistent with Chapter 5,Section 3.7(b)(ii). Paragraph 10:Changes in the number of permits frofi1 1972 to 1981 should be described and percents of the herd harvested,by year,included in Table W38. -46- - - ..... paraGraph 11:Please tabulate data on wolf population,wolf predation,and carl ou nUQbers fro~1957 to 1981. (iii)Dal1Sheep •Distribution:Paragaph 2:We reco~vJend including ~aps which ~ore specifically delineate seasonal sheep use of the Susitna basin relative to project features. para¥raeh 5~We reco~end further justification be provided to support the conc USlon that impacts from the impoundments will be minor.Clarification of ~Jhere the sheep winter and of sheep movements between seasonal ranges should be pro vi ded • paragra~h 6:Reference should be provided for the judgement that the sheep populatlon has remained stable or slightly increased. Paragraph 8:Please provide a map of the Jay Creek mineral lick,and probable traveJ corridors to the area,relative to the Watana impoundment.We reco~end providing historical harvest data and explaining how project surveys relate to area populations. (iv)BrO\Jn Bears ·Distribution:We recommend prOViding data on the numbers of bears radio- collared and radio locations made,as well as maps of those radio locations relative to project use. ·Habitat Use:Para~raph 2:Please describe whether aerial observations or vegetation type maps were used to deter~ine vegetation types relative to brown bear radio locations.An explanation should also be provided of hO\J more detailed veyetation data and the vegetation remapping efforts will be integrated with the analysis of bro\m bear habitat use. •Ho~e Range:Para~raph 1:Please correct the referenced Table W42 which lists data from proJect studies in the Susitna,not the Nelchina basin. Paragraph 2:An explanation should be provided as to why 1.6 km and 8 k~were chosen as the breakdown for study zones around the impoundments. paragra~h 4:Please describe data on bear radio locations relative to access roads,ransmission corridors and ancillary project features • (v)Black Bears ·Distribution:We recommend including maps of bear radio locations relative to project features. ·Habitat Use:Please describe how further vegetation studies and remapping will be integrated ~Jith the analysis of black bear habitat use. •Food Habits:The scope,schedule,and integration of ongoing predation studies relative to further project planning should be addressed here. (viii)Belukha Whales:Please nate that several of the references cited here do not appear in the bibliography. -Distribution and Habitat Use:Paragaph 5:We suggest integrating data on chinook salmon from the fisheries studies in order to obtain SOQe estiQate of the hllportance of that fi shery and of project ir.1pacts to the fi shery an belukha whales.Please also describe what data will be gathered on smelt for better evaluating project ir.1pacts on belukhas. (b)Furbearers (1)Beavers:We recor.Jrnend including a map of the study area which details specific study sections,available density data,and representative main channel,side channel,slough,and clear water areas.The discussion should be expanded to cover the extent to which suitable beaver habitats are fully utilized or explanations where they are not. Para~raph 4:Ue recor.11i1end investi~ating the extent to 'Ilhich bank lodges are used by beaver and to 'IJhich the activity levels reported in Table ~J53 may be underestimated.An on-ground survey when beavers come out of their dens to forage just before spring break-up could verify such use. Paragraph 8:Further quantification should be provided on trapping effort and success,see our comments under Chapter 5,Section 3.7(c). (ii)Muskrat:para~raph 2:Please clarify whether the 106 lakes surveyed contitute all theakes betHeen the Oshetna River to Gold Creek i~pact area. Please relate this discussion to the number of muskrats potentially inhabiting this area. para~raeh 3:Please provide an indication of downstream muskrat populations and abltat quality. Paragraph 4:Please quantify present and historical trapping effort/success. (v)r·1arten -Population Characteristics:para~raph 2:No data is prOVided to substantiate tfiaf pine marten are he "etonornically most important furbearer," or to relate densities to populations and habitat quality.Please also refer to our co~ents under Chapter 5,Section 3.7(c). -Habitat Use:Please refer to the comment i~diately above. (vi)Red Faxes -Habitat Use -48- - - •Denning Habitats:Please provide infor~ation on the density of fox dens relative to habitat quality,and to other Alaskan and/or florth American fox populations. Paragraph 5:Some explanation shou~d be provided for the disparity of more fox tracks on the south side of the river but ~ore dens on the north side. -Food Habits:Paragraph 3:The postulated link between fox and hare populations may be overstated.Apparently hare numbers have never been high or an important food source for fox in this area (Furbearer Study Coordinator Phil Gipson,personal conwnunication;also see Section 4.2(b)(vii):Paragraph 1 and Section 4.3(a)(xiii):Paragraph 5). -Poeulation Characteristics:Please refer to our previous cOr.1r.lents under Dennlng Habitats relative to habitat quality (Section 4.2(b)(vi)-Habitat Use).Again,trapper effort and success should be doculilented,also see our cOIilJ"ents on Chapter 5,Section 3.7(c). (vii)Lynx throu~h (x)Least Weasel:We understand that none of these species were chosen as hlgh priority for evaluating project impacts.However,we recommend providing some quantification for the descriptions of Ilfairly numerous"but not 1l1i~ited,1l 1l1ocally abundant,"and Ils parse,"in addition to trapper effort/harvest;also see our co~ents on Chapter 5,Section 3.7(c). (c)Birds:Paragraph 2:Please note that waterfowl breeding pair surveys have been conducted by FWS in the lower Susitna River basin for over 20 years •.lY The FWS has also conducted state~dde surveys for trur.Jpeter S\/ans in 1968, 1975,and 1980.J1! Paragraph 3:We recommend further information be provided on how relative abundances of bird species were determined.Please clarify the difference between 60 percent of the area being in shrublands,as cited here,with the just over 40 percent in shrublands,as cited in Table W4.At the August 1982 AEA Workshop on the project,much discussion centered on problems with· correlating the bird habitat classification sche~e used by Kessel et al.for project bird studies with the Dyrness and Viereck Alaskan vegetation classification system used for project baseline vegetation maps.~Je recommend describing those problems here and how they will or will not be overcome by ongoing vegetation rer.1apping.Throughout the bird sections of the draft application we are concerned that source(s)for referenced data,or data 12/The most current data is available in:King,J.G.and B.Conant. 1982.Alaska-Yukon waterfowl breeding pair survey,18 Hay to 13 June 1982.USFWS,Juneau,Alaska. 12!The computerized compilation of this data is available at the FWS' Alaska Regional Office,1011 E.Tudor,Anchorage 99503;please contact Greg Konkel,(907)263-3395;original data is available from Jim King,USP~S,Juneau,(907)586-7244. -49- manipulations,may not be fully documented.Thus we reco~end describing where and how data from more than one source has been manipulated for this report.In particular,the tables and figures should be more completely referenced,including explanatory footnotes. (i)Raptors and Raven:Para~raph 1:We are concerned that 1980 and 1982 raptor surveys were not conducted at the optimum time:i.e.sum~er foliage vJould make it difficult to initially locate nests (~Je note that 50 percent more nests were found in 1981 than in 1980);accordi~g to Table W60,nesting raptors will have fledged their young by 30 September making it difficult to deterwine nest activity in October.Please indicate the experience of observer(s)conducting the raptor surveys and meth~ds used,(e.g.whether surveys were by helicopter or fixed-wing aircraft).We also reco~"end that maps of actual nest locations be included.We note that goshawk nests are often difficult to find by air and thus question ~Jhether the number of nests cited here is a thorough assessment.Please clarify in the text whether all raptor nests active in 1980 were also active in 1981. Parayraph 3:Please expand the discussion to more completely describe the habitat sUTtability of the project area for golden eagles,given their apparent hiyh density. Paragraph 4:Refer to our comment under Section 4.2(c)(i):Paragraph 1, aGave,re the late timing of 1980 and 1981 surveys for nesting bald eagles. Please provide a description of the survey methods used. Paragraph 5:IJe recor.1li1end that discussion be provided relative to habitat values re how Susitna habitats compare with those along the Tanana River where slightly lower nesting densities are reported. Para~raph 7:Due to the status of the arctic peregrine falcon (Falco peregrinus tundrius)as an endangered species under the Endangered Species Act of 1973,as amended (16 U.S.C.1531-1543,as amended),we are particularly concerned with the adequacy of surveys for them,e.g.peregrines would have already left the area by October when the 1982 survey was done.Thus,we again recommend describing how the surveys were conducted,for how long,and by whom.We recommend that peregrine falcon surveys be conducted annually,in early July,throughout project studies and construction,or until there is sufficient evidence that peregrine falcons do not inhabit the project area. Sufficient evidence would be no siyhtings over several years of helicopter surveys,by a reputable observer during the proper ti~e of year.Observers should be individuals who have worked with peregrine falcons.FUS review of specific times and survey techniques would be appropriate. Ue recomr.Jend the discussion be expanded to describe the areals importance in raptor migrations as well as for breeding. (ii)Waterfo~~l and Other Large Waterbirds:Please provide some quantification for terms used ~ere,e.g."large"concentrations of waterfowl (paragraph 1); "little used"(paragraph 4}s etc. para~raph 3:We recommend you incorporate additional trumpeter swan data whic is available from the FWS.Please refer to footnotes 12 and 13. -50- - Paragraph 4:We agree with the conclusion,however \/e suggest that data fro~ FWS annual surveys be included to quantify this state~ent (e.g.see footnotes 12 and 13,as well as Conant and King 1981 and King and Conant 1980 as referenced in this section.). -tliyration:para~raph 1:We recoli1f.lend referencing the specific study(ies) frof,l which conclUSlons in the CE reference are taken.Please note that tru~peter swans are moving through the area in increasing nuri1bers. Paragraph 3:Please expain the discrepancy bebJeen the statement here that tHe "upper Susitna Basin \/as less ir,lportant to fi1igratory \laterfowl in spring than fall,t1 with data in Table W62 which shm/s spring waterfowl densities over twice that of fall densities. -Relative Importance of\Jater Bodies:Para~raph 1:Given the previously described problems with tHe wetlands classiflcation used for the project,and remapping efforts currently underway,please define t1\'letlands"as used here. \Je suggest clarifying whetne.r the reference is to 22.5 adult waterfowl/k~2 and 22.5 adult gulls/km2 or to 22.5 adult (waterfowl and gulls)/km 2 • lie question the validity of only co~paring productivity of these \w'etlands to the most productive wetlands in Alaska.Upper Susitna area waterfowl productivity fJay be f.lore typical of Alaska wetlands in general and represent average populations and productivity (FWS Marine Bird Management Project Leader John Trapp,personal co~unication). Paragraph 3:Please clarify how "Importance Values"were calculated;also refer to our comments under Figures 1-119 and \~20 and Tab 1e \/63.\Ie sug!dest describing any consumptive use of waterfowl within the project area. (iii)Other Birds -Grouse and Ptar~igan:We recommend mentioniny any consuMptive use of these spec i es \dth in the project area. -Woodpeckers and Passerines:We recommend providing some discussion of the importance of the area to migration,as \/ell as,breeding activities of these birds. -utper Basin Bird Communities:Please refer to our co~ents under Section 4.2 c)re the need to identify here how 1981 and 1982 data were combined, !-given that Kessel et al.(1982)only includes data from 1981. Last Paragraph:Please describe how these habitat types do or do not correlate to vegetation types as now being remapped. (d)Non-game (small)Ma~lrnals:We appreciate the thorough description of the ecologlcal role Of smal I mali1ll1als in project area ecosystems. -51- Iii (ii)Habitat Use:We su~gest updating the discussion to correlate with ongolny vegetation and wetlands mappin~efforts. 4.3 Impacts (a)Hatana Development (i)Hoose:Paragraph 1:Criteria for concluding that moose is one of the IImost ili1portant ll species should be provided here. Pa~~graph 2:We suggest that the proposed evaluation of carrying capacity incorporate consideration of habitat values over the life of the project. Please provide the referenced figure.Considering the severity of project impacts by spatial areas to be affected and numbers as in Ballard et al.1982 (page 106)would improve the discussion. We are further concerned with the inadequacy of the impacts definitions in not accounting for impacts to special concentration areas (e.g.breeding),in key seasons of use (e.g.calving),and under infrequent but critical conditions (e.g.severe winters),and the overall interspersion and availability of such important habitat features. Paragraph 3:Lack of quantification prevents analysis of whether an impact is half,tvJice,three times,etc.as severe as one of lO\Jer priority.Ue again recorarnend integrating the analysis with that in Chapter 5 re also providing and discussing data on hunting pressure and success here (see our comments under Section 4.2(a)(i)•Mortality Factors).Please note provision of access is a major indirect impact;additional developments or settlement sti~lulated by this access would be a secondary impact. Paragraph 5:We find the discussion entirely too general and inconclusive: (1)there is no indication of the relative difference between IIsome ll moose which will disperse,adapt,die,etc;(2)both overall cumulative impacts,and secondary impacts from moose dispersing to adjacent areas are ignored;(3) impacts on habitat values from increased use are not considered;and (4)no explanation is given for how and when ongoing studies will IIrefine this assessment.1I -Construction:We are concerned that we have been given no opportunity to comment on siting and scheduling for camps,townsites,etc.The location and use of these ancillary project features will influence the magnitude of resultant impacts.Alternative spoils sites have not been proposed,yet they should be part of the discussion • •Habitat Loss:Paragraph 1:We recommend including a more thorough, quantitative discussion of habitat loss in the text.The necessary integration of vegetation and ~Jildlife studies should include a discussion of (remapped)vegetation losses relative to their value as moose habitat i.e. ~Jinter ranye,calving and breeding areas,etc.~e also see no quantification of these losses over the life of the project,i.e.the area of each type which -52- - - - will be lost forever,vs the area which Hill be lost for some length of ti~e during construction,vS-the areas in different successional stages throughout reclamation.-- Paragraph 2:The paragraph is some\Jhat inconsistent with the Fishery Section.Given the mitigation proposed in that section of clearing areas just before flooding,successional growth develop~ent appears negligible (Section 2.4(a)(x)-Clearing the Impound~ent Area}. paragraeh 3:Ongoing studies should be fully described.Please describe when tfie habltat use analyses will be reevaluated on the basis of remapped vegetation and forage quality studies. Winter Use:.Para~raph 2:Please clarify the first sentence and inconsistencies between that sentence and the previous paragraph. Paragraph 3:It would be helpful to also express the number of moose in the impoundment area as a density and compare that density to areas outside both the impoundr.lent and project area. Paragraph 4.We recommend that ongoing studies provide data for quantifying the relative values (quantity and quality)of winter range within and outside the ir.Ipoundl,lent area.Such information is necessary for determinin~ mitigation requirer.Ients. Sprin~Use:Paragraph 2:Quantification is needed for the habitat areas descrl bed here. paragraeh 3:We recommend tying this discussion to project impacts on brown bear WhlCh could cor"pound the predation problem. Su~.ler and Fall Use:Para a h 2:We are assu~ing that ahead ing for II-Disturance ll was 01i11tte JUS efore this paragraph. paragraph 4:Since the magnitUde of project impacts would appear to significantlY vary,depending on whether hunting and harassment of moose are effectively prohibited,we suggest providing nbest n and nworse n case scenarios.Those scenarios should be used to quantify potential losses of habitat for comparing impacts and determining mitigation needs. Paragraph 5:Please refer to our previous cor.~ents under Sections 4.3(a)(i) f·100se and 4.3(a)(i)-Construction •Habitat Loss re the generality of this discussion • •Mortality:Please refer to our comments under Section 4.3(c}(i)• •Alteration of Habitat:We suggest this discussion be dropped as inapproprlateand unfounded.If this discussion only covers the construction phase of the development,then we would assume there would be no chance for successional growth.Moreover,the suggestion that moose could utilize these disturbed'areas during construction conflicts with the previous discussions on how disturbance and increased susceptability to predators would cause raoose to avoid major activity centers and lar~e cleared areas.Ue also find the suggestion that borrow pits may provide forage inconsistent with the Fishery -53- Section 'rJhich proposes to make fish ponds out of the pits (Section 2.4 (c)(i): Paragraph 2,Construction t·litigation).Please refer to our previous comli1ents under section 4.3(a)(i)-Construction,.Habitat Loss re the unlikelihood for forage development within the impound~ent area.Moreover,under •Permanent Loss of Habitat,page E-3-287,moose use of the i~poundli1ent area prior to filling is discounted.The need to resolve conflicts between sections of the draft application is amply illustrated by the latter two points above.As \Ie have recomr.1ended elsewhere,SOr.1e rolechanislil should be instituted for resolving these types of conflicts and analyzing the tradeoffs of mitigatiny for one species to the detriment another. -Filling and Operation •Perhlanent Loss of Habitat:Paragraph 1:As we cOlilltlented under Section 4.3(a)(i)-Construction,we are concerned with the lack of quantification. Of all possible ir.1pacts,loss of habitat can be most easily quantified.The analysis should include the area of each (rer.1apped)vegetation type which will be inundated each year. Paragraph 2:We again refer you to our cOr.1ments under Section 4.3(a)(i) Construction re necessary quantification,study description,and incorporation of study findings into the quantification of losses required under FERC regulations (Section 4.4l(f)(3)(ii)in F.R.Vol.46,No.219,13 November 1981)• •Alteration of Habitat Upper Susitna Basin:We concur with the points raised here.Please refer to our cOli1li1ents under Botanical Resources re the impacts of ice fog and rime ice formation,as to well as need for quantification.The discussion should also consider the effective loss of an even larger area than described here due to dust from project activities which would further retard snowmelt (see Section 3.3(a)(i)-Vegetation Dar.Iage by \Jind and Dust). Lower Susitna Basin:Paragraeh 2:Given a mid-successional stage of approximatelY 25 years (see FIgure W4)and project life of 50 years plus plannin~and development,we question the conclusion that vegetation favored by moose will still be available at the end of the license period.Please refer to our cOIi1T~ents under Section 3.3(a)(i)-Effects of Altered Downstream Flows re quantifying these and other impacts described in the reli1ainder of this section as well as discussing the potential for further alterations of habitat because of ice fog and rime ice formation. •Blockage of Movements:Given the potential for moose to avoid clear cut areas (see dlscusslon under Section 4.3(a)(i)-Construction.Interference with Seasonal Movements,page E-3-286),we suggest mapping the effective area which could be eliminated from use.Some discussion should be prOVided on the likelihood of moose crossing the flowing narrow river as compared to the wide impoundJilent,plus drawdmm zone;maximum and minililum widths of the impoundlilent should be prOVided.Also refer to our comments under Section 4.3(a)(i)• River Crossings.Information presented here will be important to later - considerations re choosing sites for habitat enhancements which may be undertaken as part of mitigation. -54- "..." - - i~ Paragraph 5:Again,please detail ongoing studies • .Disturbance:Once ~ore,we note the need to (1)consistently assess the potential for increased access and hunting;and (2)integrate consideration of this issue throughout the report.We again suggest listiny and analyzing the iQpacts fro~alternative access and use options • •Mortality:See comments under •Disturbance,above,the previous discussion for Section 4.3(a)(i)-Construction,and Section 4.2(a)(i)•140rtality Factors.Please define Hhen postulated increases in hunting win occur relative to project development. -uantification of Project Effects:\Ie appreciate this discussion of ongoing stu les u note t at re erences to this section should be made throughout the report.Once ~ore,we recommend including a schedule and describing how the studies will be incorporated into the license application,project design,and mitigation planning.Please note,references in this section are not included in the bibliography. -Watana:Sum~ary of Impacts:The summary is a useful,qualitative description of project impacts,yet provides no quantification for minimal, moderate,or severe impacts.The definitions given under Section 4.3 (a)(i) r·100se:Paragraeh 2,should be restated if they are to apply here.To better evaluate the"lfs"common to the discussion,we again suggest analyzing an array of ililpact scenarios.Attention should also be given to the cUIi1ulative illlpacts of habitat loss,alteration,disturbances,etc.\Je disagree \lith the conclusion that IIbecause hunting mortality can be easily regulated,this will not necessarily be a major impact.1I Because of the politics involved and independence frot1 project developrilent of hunting regulations,there is no guarantee that regulations consistent with project mitigation goals will be iQplemented.Moreover,increasin~hunter demands for a dililinished resource will further affect harvests and hunter satisfaction. (ii)Caribou -Construction:paragra~h 2:We recommend prOViding figures on the proportion of the hera=w ich could be affected by borrow areas A,0,and F. Although these areas will be only temporarily used ~/ithin the 50 year project life,that temporary use involves several years. -Fillin9 and Operation:para~raeh 3:Consideration should be given to the future management options whic wlll be foreclosed with project develop~ent. That is,now that the herd has recovered from previously low numbers,the ADF&G could change their management goals,even before project construction begins.We recommend considering loss of this management option in Qitigation planning. Parayraph 7:\Je recot~end also considering the compounding effect of predation on caribou which become injured in crossing the reservoir or which alter their ~ovements due to the presence of the reservoir.Predation was earlier cited as responsible for up to 30 percent of annual adult mortality (Section 4.2(a)(ii)). (iii)Dall Sheep:Paragraph 2:Please clarify the last sentence. Paragraph 4:Please provide information on when and how seasonal Dall sheep ranges will be defined and used to influence siting and scheduling of possible borrow site C. Paragraph 5:Please document other cases where remote mineral licks have been altered to remain available to wildlife;~ie are concerned with the unproven effectiveness of enlarging the area if partial loss of the Jay Creek mineral lick affects sheep.Thus there is a need to demonstrate the techiques to ensure that sheep vlould use the mineral source if one ilere provided. -Filling and Operation:The potential for disturbance from increased recreational or hunting use in the area should also be covered here. (iv)BrOim Bear -Construction:pararaph 5:Please describe the scope and schedule of ongoing studies and pans for inte~ratiny those results into project designs and mitiyation planning. Parayraph 6:We are concerned that the discussion downplays the importance of ~roject lmpacts from both disturbance and loss of additional food sources. Original project studies 14 /and other reports15/emphasize that disturbance fro~project features and associated human activities will cause bears to avoid those areas. Para~raphs 7 through 9:Two other impacts to vegetative food sources should be alscussed here.Green-up of critical spring food plants may be delayed because construction-caused dust may retard sno\fIi1elt on vegetation;at the same time,herbaceous growth in summer may be increased (see the Botanical Resources Section and our comments,Section 3.3(a)(i)-Vegetation Damage by Wind and Dust and -Effects of Altered Downstream Flows. Paragraph 12:We question the statement that,"No measurable changes in the number of moose or other important prey species are expected."Previous lack 14/11iller,S.D.and D.C.McAllister.1982.Susitna Hydroelectric Project Phase I Final Report:Big Game,Vol.VI -Black Bear and Brown Bear.Prepared by the ADF&G for the APA. 1§!Spencer,D.L.and R.J.Hensel.1980.Environmental studies of the proposed Terror Lake Hydroelectric Project,Kodiak Island,Alaska. Brown bear studies;mountain goat studies.AEIDC.Anchorage, Alaska 100 pp. """ "'... - of quantification and the ongoing nature of salmon,moose,and caribou studies make it difficult to fully assess project impacts to brown bear.However, preliminary indications that up to 2,400 moose will be affected by the project in the upper Susitna basin alone (Section 4.3{a}(i):paragraeh 4,page £-3-280),and other report findings that "moose populations wlll probably be reduced",(Section 4.3(a){vi):paragraph 5,page £-3-312)suggest that there will be both losses and distributional shifts in brown bear prey,with resultant ir.lpacts to brown bear.Brown bear concentrations on already fully utilized adjacent ranges may result in intraspecific conflicts and further decreases in brown bear populations (Spencer and Hensel 1980,footnote 15). -Operation:Paragraph I:Our coments under -Construction apply here too (Section 4.3(a){i).Please discuss potential impacts to bears resulting from impacts to the salmon resource in greater detail. Paragraph 2:Also refer to our comments under Section 4.3{c){i)re the need to define access. Paragraph 5:Please see our comments two paragraphs above (Section 4.3{a)(iv) -Operation)on the need to better evaluate the importance of salmon to area bears.Overall,we note the need to quantify impacts and discuss the cumulative effects of project ir.Jpacts on brmm bears. (v)Black bears -Construction:Paragraph 1:As in our comments under brown bears,above (Section 4.3(a}(iv}),we suggest that greater attention be given to impacts of reduced prey,compounded here by the significant loss of black bear habitat with the Watana development. -Fillinand a eration:Para ra h 1:Please refer to our comments under ectlon 4.3 a lV -onstructlon re project impacts to vegetation.Since black bears will be subject to much greater impacts than brown bears,the cumulative impacts of each additional project-caused stress could be severe. Paragraph 2:We question the ability of habitats to the east and west of the impoundr.Jent area to support bears now inhabiting the ;opoundr.Jent areas.If those areas are already fully stocked with black bears,resultant intraspecific strife and stress \iould ultimately lead to 10\ier populations. Paragraeh 3:.We again refer you to our comments under brown bear (Section 4.3(a}(lv)}.Please describe ongoing studies and their integration with project design and mitigation. (vi)Wolf:para~rath 3:Please refer to our cor,lr.lents under Section 4.3{a)(xii)re t e w1kelihood for \iolf populati'Ons to decrease and coyote populations to increase in the project area. Last Paragraph:Given the increased access expected with project development, an increased wolf harvest appears likely.We recommend that a quantification of project impacts should consider the effects of an increased harvest on wolf population levels.The cu~ulative impacts of (1)wolves concentrated in a smaller area due to disturbance,(2)effects on territoriality and stress,(3) relative values of impacted as compared to reQaining habitats,and (4) reduction in prey,should also be considered here. (ixl Beaver:lie question the certainty of the statements here,given the undeclded nature of the project water management regime.If reservoir releases are regulated to stabilize downstream flows,downstrea~beaver hab itats may be enhanced.However,the extent to \ih ioh that enhancer.lent wi 11 offset beaver losses in the upper Susitna River basin is not provided.Such data is necessary to evaluate the relative tradeoff in alternative flow regimes (i.e.,for beaver,fish,lilOose,etc.)and th.us the overall r.lagnitude of project impacts. -Construction:We recommend that the location of beaver colonies be considered,in conjunction '(lith other wildlife values,in siting borrow area access roads. -Filliny and Operation:paragra~1:Please quantify "few beavers" currently supported by the impoun lent area. Paragraph 4:Refer to our co~ents under Section 4.3(a)(ix),above;we recon~end using hydrologic data in conjunction with the revised vegetation maps and vegetation succession dynamics to quantify the areas which rilay be affected under different flow regimes.We find SOrile inconsistency between the staterilent here that,"Beaver habitat south of Talkeetna may also be enhanced as a result of the increased occurrence of favored food plants (page E-3-316),"and the statement in Section 4.3(a)(i)that,"few changes are expected in channel morphology,frequency of flooding,or vegetational succession"(page E-3-289,paragraph 1). Paragraph 5:During the August 1982 AEA ~orkshop on the Susitna project, access was considered as much of a limiting factor to trapping pressure as Has pelt price.This section justifies our mitigation recor.~endations under Section 4.4(b)for alternate access routing,restrictions on use of access routes,and prohibition of trappin~by construction workers. (x)~'Iuskrat:Paragraph 1:~Je find no section correlating to the referenced Section 3.3(a){ix).Please define "minor"i~pacts. Parayraph 2:Please refer to our previous comments on quantifying ir.lprovements in downstream habitats under Section 4.3(ix).Accordingly,He question the content ion that,"Iraproved downstrear,l habitat wi 11 probably compensate for this loss." ParagraEh 4:Again,refer to our comments under Section 4.3(ix),re mitigatlon of trapping impacts. (xi)Mink and Otter -Upstream Effects:1·le recommend defining IImoderately abundant"and IIsubstantial impacts.II Other than lacking quantification,the discussion thoroughly describes potential project impacts to mink and otter.Please clarify the reference to "65m"in Paragraph 3. co - .... -Downstream Effects:We suggest the discussion be expanded to better explain the re1ative~agnitude of project impacts to mink and otter.Since there was no previous quantification of those populations,we find it difficult to evaluate the significance of these impacts. (xii)Red Fox and Coyote:Where human activities have'developed in a previously undisturbed area,coyotes have become abundant while fox numbers have decreased (Furbearer Study Coordinator Phil Gipson,personal cor.1Ii1unication).For example,in the Cantwell to Healy corridor there has been a markea increase in coyotes with increasing numbers of people and area developments.Researchers believe there has been a corresponding decrease in both fox and wolf nur.mers,although both those species pass through the area from undisturbed habitats in the adjacent Denali National Park. Per our comments on other furbearers,quantification of relative area populations,habitat quality,and trapper demand and harvest is necessary to fully evaluate project impacts. (xiii)Other Furbearers:Again,quantification is needed re base line populations,habitat quality,and use,in order to fully evaluate project ir.1pacts. parafiraph 3:Note should be made of the previous years'trapping activity ~/hic Iilay be responsible for 10\/trapping success of pine Iilarten near \Jatana Creek (Furbearer Study Coordinator Phil Gipson,personal comlilunication). partyra~hb1:\Je suggest considering additional parameters for evaluating pine mar en a ltat quality (e.g.the availability of berries is important as late su~er/fall food)in conjunction with remapped vegetation types to reevaluate ililpact estimates. paragraah 6:\Je question the extent to/which sno\/shoe hare habitat may be improve~by revegetation of disturbed areas,given the rnuch larger arnount of habitat which will be destroyed by the project and historically low hare populations in the basin. Paragraph 8:No correlation is made between "r,loderate ll levels of disturbance from logging and different levels of disturbance from the project re the applicability of these references to project impacts. (xiV)Raptors and Raven Paragraph 4:In order to understand the relative magnitude of project ;r.1pacts,~/e recolilllend di sCtJssing the est imated loss of go 1den eag 1es in terms of project area populations and habitat values. Paragraph 5:Please clarify the stater.1ent that potential downstream nesting habitats may becorne more important as upstream habitats are lost with project development.\Jhether dotlnstrearn habitats are fully utilized,their value compared to upper basin habitats,and potential disturbances from other project activities should be described. Paragraph 9:Please clarify \Yhether downstrear.l raven habitats could absorb use by ravens displaced fro~upstrea~habitats. Paragraph 10:The blowdown of trees near cleared areas represents an additional source of habitat loss (e.g.see Section 3.3(a)(i)-Vegetation Damage by Wind and Dust)• .Bald Eagles:Paragraph 3:We recommend describing the overall impacts of the project on salmon and other fish which serve as bald eagle food.Such consideration should include potential impacts to smelt runs near the mouth of the Susitna River.Any impacts to these resources could affect eagles now depending on them as food. Paragr~:We question the significance of any compensation for lost eagle feedinglnaoitat through attraction of waterfowl to the impoundment.Please quantify the potential for such compensation and/or provide an explanation of why waterfowl may be attracted to the reservoir without a concomitant increase in their food sources (also see our comment under Section 4.3(a)(xv) Waterbirds,below). -Disturbance:Paragraph 1:We appreciate the description of protection afforded eagles under the Bald Eagle Protection Act (16 U.S.C.668-668c). However we are concerned that the intent of this act relative to project design has not been adequately acknowledged or incorporated,as explained be 1O\J. Parayraph 6:Under a recent amendment to the Bald Eagle Act,the Secretary of the Interior may permit the taking of golden eagle nests which interfere with resource development or recovery operations (16 U.S.C.668a).Regulations for implementing this amendment should be available within the next couple of months. Paragraph 7:The Bald Eagle Protection Act does not authorize the taking of bald eagle nests which interfere ~Jith resource development or recovery operations.The Act does provide for the taking of nests for scientific and certain specific exhibition purposes when compatible with the preservation of this species.Service eagle permit regulations,50 C.F.R.22.21,implement this section of the Act.Secretarial approval is not required for the taking of bald eagle nests in Alaska provided no eagles are killed and the nest is not exported from the United States.Authority to take such nests has been delegated to the FWS Regional Director.\Ie suggest that the applicant promptlY consult with the FWS to reach a mutually satisfactory solution to this potential conflict. (xv)Waterbirds -Habitat Alteration:Paragraeh 2:Please substantiate that "fish populations wll1 probably remaln sufficient ll to support birds such as mergansers.Accord ing to lleeting Summary notes frorll the 2 December 1982, Susitna Hydro Exhibit E Workshop on Water Use and Quality and Fishery Resources,most of the grayling population (estimated to be at least 10,000 in Section 2.3(a)(ii)-Watana Reservoir Inundation)will be lost and any production of lake trout is expected to be limited. """I Paragraph 3:\Je suggest quantifying the number of lakes,miles of strear.ls, and acres of wetlands (per revised wetlands typing)\'ih.ich may be affected by project borrm'i areas,spoils sites,etc.,as \/ell as those \/hich \'Ii11 be co@pletely lost.\Je recom~end including those habitat types in Table W78a. This information will allow better quantification of project i~pacts. Paragraph 4:Please substantiate further the value of the reservoir as habitat for migrating birds.Since existing resident fish populations are expected to be severely impacted by reservoir develop~ent and no biologically productive nearshore zone will be developed,we question that there "'/ould be food necessary to support birds attracted to the reservoir.Moreover,winter open water areas could attract waterbirds to their detriment,particularly since food supplies are already li~ited.Swans attracteu to open water at Red Rocks Lake National Wildlife Refuge in Montana must now be fed during winter; similar problems have occurred in other areas of the conterminus United States (FWS Higratory Bird t·lanagement Project Leader Rod King,personal communication). -Disturbance:Paragraph 2:We suggest that greater emphasis be placed on the potential for the project to disturb trumpeter swans.Recent increases and overstocking of swans in the Gulkana Basin may result in more swans moving into the upper Susitna Basin (FWS ~ligratory Bird Management Leader Rod King, personal co~unication).Yet those habitats will become less suitable with the human activities and disturbances cause by the project.As areas in the Cook Inlet Basin and Kenai Peninsula have been affected by human use and deve1op~ent)swan use of those areas has shifted to areas largely inaccessible to peop1e.~ (xvi)Other Birds -Construction •Habitat Loss:We appreciate the thorough,quantitative discussion included here • •Habitat Alteration:We suggest that species and their relative abundance be corre1ated to the postulated negative and positive effects of habitat alteration.This would provide some indication of net project impacts.Loss to the Uatana irllpound~ent of existing natural edge,e.g.rivers,ridgetops, etc.,will undoubtedly be far greater than the increases in edge suggested here. -Operation:We question whether any feeding habitat for spring migrant shorebirdS-will be created in the drawdown zone.The reservoir drawdown zone \;1111 re~ain an unveyetated mudflat.If current low bird populations indicate lack of hi~h quality habitat,it seems doubtful that food organisms would suddenly prol iferate with reservoir development'.. l§I King,J.G.and B.Conant.1981.The 1980 census of trumpeter swans on Alaskan nesting habitats.Ar.1erican Birds 35(5):789-793. (xvii)Non-game (small)~·1amr:lals:For small r.Jar,lmal species \/l1ich inhabit identlflable vegetation types,we suggest describiny whether the percent of the habitat to be lost is proportionately yreater or less than the occurrence of the type within the entire basin. lPl Devil Canyon Develop~ent (i)I'loose:Convert ing the number of filoose in the Dev i1 Canyon impoundment to a density figure and then comparing that to a similar figure for the Watana impoundment would allow a better quantitative comparison of impacts.We are concerned with the judgemental nature of the discussion in stating that impacts "are of less concern"and suggest that,"will be of smaller magnitude" might improve the statement (pge E-3-338l.The smaller area of the Devil Canyon as compared to ~atana area should also be mentioned,although we do note that moose density here is about half that of the Watana area.An evaluation of relative habitat values of the adjacent areas which will be less directly impacted,and any lands proposed for acquisition or enhancement,is necessary for a complete impact and mitigation anaysis. -Construction:Again,spoils disposal is an additional impact which should be described. •Habitat Loss:Our comments under this heading (Section 4.3(a)(i)),for the \/atana development also apply here. •Interference with Movements:The discussion should consider whether a 1.6 km crossing would also be a barrier to Qoose in that area or moose diverted from upstream crossings because of the Watana impoundment.Quantification should also be provided of the additional distances which might have to be traveled and consideration given to additional energy expenditures relative to foraye quality should moose alter their movement patterns.Also refer to our cor.lr.1ents under this heading,Section 4.3(a)(i),for the Watana developr.lent. •Disturbance:Please refer to our comments under this heading,Section 4.3(a){;),for the Watana development. -110rtality:As above,our IJrevious cOf.lr.1ents under Section 4.2(a)(i) •Morality Factors;4.3(a)(i)-Filling and Operation,•Disturbance;and 4.3(c}(i}-Mortality apply. -Filliny and Operation ·Alteration of Habitat:Please refer to our comments under this heading, Section 4.3(a)(i),for the ~atana development.We are concerned that increased water temperature could result in a larger area being affected by ice fog and rime ice formation,also see our co~ments under Section 3.3(a)(i).~e again reco~end quantifying several impact scenarios re successional vegetation changes from any of the impacts discussed here. •Interference with r,1ovements:By reducing browse availability due to rime ice formation,the presence of ice fog could be a compounding impact to moose. ~1oose ~ovements may already be inhibited because of greater visual exposure to predators in the vicinity of the reservoir.\Je refer you to our cor.Jments under the Watana develop~ent (Section 4.3(a)(i)-Filling and Operation. Blockage of MoveQents).- .- ·Disturbance:Again,our cOlilli1ents for Watana (Section 4.3(a}(i)}apply. ·Mortality:Please refer to our previous comments on hunting (Section 4.2(a)(i)•nortality Factors,and Disturbance and t'lortality discussions under Section 4.3(a)(i)). •Devil Canyon:Sur.lmary of 1m acts:As we commented on the Uatana impacts sur.lmary,quantl lcatlon an etter definition of impacts is needed here.\Je are also concerned about inattention to cumulative impacts.While habitat alterations,disturbance,or blockage of mover.lents may each be a "lilinirnaP impact,together they may be sufficient to severely stress moose or reduce moose use of the project and adjacent areas. (ii)Caribou:Definitions for the qualitative terms used here should be provided (e.g."1ittle use ll ) • (iv)Brown Bears:Lack of quantification here,as in Section 4.3(a)(iv} precludes evaluating evenr.elative impacts fror.,each r.Tajor project feature. (v)Black Bears:As in Section 4.3(b}(iv)above,lack of quantification prevents a thorough analysis.Consideration should be given to the cumulative effects of disturbances,loss of habitat,decrease in habitat value,and increased r.lortality from human/bear conflicts from the Devtl Canyon development in conjunction with the \Jatana development. (vi)\~o1f:Please refer to our comments under Section 4.3(a)(vi)re the importance of disturbance and cumulative ili1pacts. (ix)Beaver:Refer to our cOli1ments under Section 4.3{a)(ix}re the need to quantify the amount and quality of downstream habitat ir.1provements which could offset upstream habitat losses and the dependence of any habitat improvement on the operating flow regime.We suygest describing impacts under a variety of potential flow regimes. (x)Muskrat:Please refer to our previous comments under Sections 4.2(b}(ii} and 4.3(a)(ix}-Filling and Operation re quantifying and controlling potential increases in trapping. -(xi)I·link and Otter:Again,we recommend providing some quantification, definition,or relative correlation among species and project areas for the qualitative impact descriptions. (vii)Co ote and Red Fox:We would expect an increase in coyotes per our prev i ous cOlilJi1ents Sect i on 4.3 (a){x i i})• (xiii)Other Terrestrial Furbearers:Our comt'i1ents under Section 4.3(a)(xiii} apply here too. (xiv)Raptors and Ravens -Construction and Filling .Habitat Loss:Paragraph 1:Refer to our com~ents under Section 4.3(a)(xiv) -D1sturbance. Paragraph 2:Should any eagle build a nest,between now and fining of Devil Canyon Reservoir,which would subsequently be lost in construction and/or filling of Devil Canyon,please refer to our comments under Section 4.3(a)(xiv)-Disturbance. Paragraph 3:Please clarify what is meant by the first sentence. para~ra1h 4:Please refer to our comments under Section 4.2(c)(i)re the clifflCU ties in locating goshawk nests. Paragraph 5:Please clarify the discussion and consider whether the cliffs and trees \-Ihich filay increase in nesting importance are as suitable as existing nest habitats • .Disturbance:paragraeh 1:Again,please refer to our cor.~ents under Section 4.3{a)(xiv)-Dlsturbance. Paragraph 2:See our comments under Section 4.3(b)(xiv)this section,.t!.abitat Loss:Paragraph 2,above. (xv)Waterbirds:Please refer to our comments under Section 4.3(a)(xv)as to the questl0nable value of the reservoir area,i.e.generally birds will not appear in the area any earlier;birds which remain in the area longer may have problems finding food when encountering frozen \/aterbodies once they do leave; no data has been provided re any supplemental food value in the reservoir area. (xvi)Other Birds:Paragraph 2:Please clarify the last sentence. Paragraph 3:Please quantify the extent to which open water in the reservoir win compensate for loss of dipper breeding habitat and describe what feeding habitat would be available in the reservoir. (xvii)IJon-galile (small)t·1ali1mals:Please refer to our cOli1ments under Section 4.3(a)(xvi). (c)Access (i)l;loose:The qual itative,general discussion precludes any definitive analysis of potential impacts.We suggest quantifying current and potential hunter demand and harvests,area moose populations and habitat quality for access route areas.Varying degrees of winter severity and the length of each access link should then be considered in conjunction with the information described above and data on vehicle/moose collisions in other areas of the state to assess the potential for railroad or automobile collisions with moose. Since access is a key feature to any mitigation plan for the project,we again recom~end evaluating the range of i~pacts which would result from a variety of access/use options and coordinating this with the Socioeconomics and Recreation Chapters.Please refer to our 17 August 1982 letter to Eric Yould re access alternatives;our COIJQents there remain applicable. - Please correct internal inconsistencies in this paragraph:loss and alteration of habitat,disturbance,and ~ortality are certain,not ffpossible", impacts as verified in subsequent portions of this section (page E-3-350). Maps of proposed access routes should also be included. -t10rtality:Paragraph 2:Before discussing impacts from access,please specify any pUblic access and hunter take restrictions assu~ed to be in effect for planning,construction,and operation phases of the project.Impacts will vary from severe with no restrictions to ~inimal with strong restrictions on access.In this respect,\le find Chapter 3 confusing.The potential impacts fro~public access and hunting along project access rO'utes are discussed here and then the suggestion is made that these impacts will be minimized by prohibiting worker access and hunting,yet the chapter never consistently describes what restrictions actually will apply.Project impacts,such as habitat degradation and population disturbance associated with increased access,could be further minimized by controlliny public access (through restrictions on DRVs,seasons or times of day of use,etc.). Please substantiate the conclusion here that "carefully managed hunting ~ay effectively mitigate for some indirect project effects.II The impact of diminished hunter opportunities is not fully described here or in Chapter 5 (see our comments there,Section 3.7(b)(ii)-I~pacts on the Hunter). Paragraph 4:Please define use of the terms "small"and "negligible."During severe winters,moose may seek cleared roadways as travel corridors and be subject to collisions.Since the Denali Highway is not kept open during the winter,it is not possible to fully compare the collisions on that road with the potential for collisions on project access roads.However,we suggest that a better understanding of the subject could be gained with information as described under Section 4.3(c)(i),above.Ue also note that if Horkers are allowed to commute to the project site or have free access in and out of the project area,the volumes of road traffic would be significantly higher.The analysis should be coordinated with that in Chapter 5.Consideration should be given to the times of year and day for recorded collisions and utilized in scheduling access if patterns exist in that infor~ati6n.. Parayraph 5:Please describe current railroad use as compared with the projected additional eight round train trips each week.~e believe that project railroad use ~ay be a significant impacts to wildlife in view of present winter use of four round trips each week. The length of additional track,as well as existing track,should also be given for comparison \dth the mortality figures given here.Information on r.loose densities and habitat values in the area of the new as cor,lpared to existing railroad \/ould also be helpful in quantifying potential impacts,as described above.~Je are concerned that in severe winters the loss of winter range may be compounded by the potential for nu~erous vehicle/moose collisions. •Loss of Habitat:We concur with the analysis but suggest some quantificatlon be made of areas and vegetation types \'1hich could become -f-i5- unuseable in a worst case scenario \/here disturbance causes ~oose to avoid usin~the road corridor area • •Interference \/ith Seasona 1 r'love~ents:With respect to the seasonal ~igrations described here,please refer to our CO~lQents under Section 4.3(c)(i)-Mortality,re the cOQPounded potential for even greater numbers of vehicle/~oose collisions. (ii)Caribou:para~raph 1:We reiterate our recomfuendation to eliminate the Denali Highway to Jatana access route (also see Section 3.4(c)(ii))which,as documented here,is "1ikely to have a substantial effect on caribou movements." Paragraph 6:Please provide substantiating data for the judgment that although cows calving in the area may avoid the road,there will not be an effect on herd productivity.~Je recoramend quantifying the portion of the herd utilizing this area. Paragraph 7:Please provide further information on times of day or seasonal variations expected for truck traffic.An additional concern in considering the potential severity of access-related impacts is the question of worker access.If project \/orkers are all housed on site,the intensity of road use will still be greater than described here;workers traveling to and from the site at the beginning and end of their times off represent a substantial road, or even airstrip,use.Moreover,if workers are allowed to individually cOQrnute,or even if buses are used on a daily or \/eekly basis,road use will be even ~ore significant. Paragraeh 9:Our previous comments on herd management apply (Section 4.2(al (11)).\Je recommend quantifying ir.lpacts described throughout this section. (iii)Dall Sheep:Paragraph 1:The issue of disturbance fro~air access to the project should be covered here;as described in Section 4.3(a)(iii). Please provide information on the expected intensity of aircraft use for the period of construction. paragraeh 2:Consideration should be given to increased recreation and other activitles which may compound habitat loss impacts near the critical Jay Creek ~ineral lick.Please restate those i~pacts as described in Section 4.3(a)(iii). (iv)Brown Bears:We concur with the assessment but recomruend that quantification of impacts be provided. (vi)Wolf:Our previous comments under Section 4.3(a)(vi)apply. (vii)Wolverine:paragra1h 2:Quantification of trapping effort and potential increases relative to wo verine populations should be given.Please justify the inference that emigration from other areas will mitigate for loss of wolverine to trappers yet not affect overall populations. -~ - (viii)Furbearers:In general,we find the discussion somewhat inconsistent with other sections,with no clear objectives outlined for ~itigation (see paragraphs 2,8,and 9 of this section).Please also re~er to our corn~ents on the socioeconomics (Chapter 5,Section 3.7 (c)(i)-Impacts of the Project) and our recomr.1endations under the \iildlife mitigation plan (section 4.4(6)). \Je recommend you then ensure these sections are consistent with each other and with overall project objectives and mitigation goals.Specific comments foll O\i. Paragraph 1:Please provide further data to substantiate the conclusion that pine marten ho~e ranges may become realigned along the access road.Although we appreciate the thorough discussion of potential project impacts,we are concerned that repeated lack of quantification makes if difficult to assess the relative importance of such "minor 'l impacts as compared to the more severe impacts of direct habitat losses and increased trapping mortality. Paragraph 5:The \iell-documented likelihood of beavers using bridges and culverts for damsites more probably represents further negative impacts to beaver than a source of habitat improvement.Beaver use of those structures \Jould conflict with project access,undoubtedly resulting in road maintenance to remove beaver dams.If that removal occurs at the \Jrong title of year,i.e. autumn,beaver in the area may be effectively eliminated (Furbearer Study Coordinator Phil Gipson,personal communication). Paragraph 9:\Je are concerned 'ilith use of the word Ildesirable."Thus we suggest modifyiny the last sentence to say that to date,trapping pressure on mink and otter has been low in this part of Alaska (Furbearer Study Coordinator Phil Gipson,personal communication). (ix)Raptors and Ravens -Denali Highuay toWatana Darnsite:Paragraph 1:We recomrolend describing hO\i this area was surveyed. paravraph 2:Our comments under Section 4.3(a)(xiv)-Disturbance would apply shou d golden eagles subsequently nest along the access road. Para<Jraeh 3:Refer to our comments under Section 4.3(a)(xiv)-Disturbances re the l11egality of destroying a bald eagle nest. -~latana Dam Site to Devi 1 Canyon Dam Site •Disturbance:We again refer to you to our comments under Section 4.3(a){xiv)-Disturbance. -Devil Canyon Dam Site to Gold Creek •Disturbance:We recommend that the conclusions of minitlal disturbance here, 6e conslstent with those in Table \J76 which says that "construction and operation activities may result in considerable disturbances.1I If the nest is active,we will recommend timing constraints on the construction activities near it (see Section 4.4(c)(i)). i I (d)Transmission Lines As with the previous Section 4.3,(c)Access,the severlty of impacts from the transmission lines will depend on restrictions on access (e.g.by siting,access to the lines,and/or access along the lines)as well as the methods of construction and maintenance (e.g.helicopter,winter, and/or onground).Please c1arify \"hat methods and schedule for construction and maintenance will be utilized and what restrictions,if any will be placed on access;we find the Exhibit E inconsistent on these points.The reference here is to helicopter and winter construction and only selective clearing of vegetation;in Chapter 5,reference is made to increased hunter access along the lines which infer greater clearing and road access (Section 3.7(c)(i)• Impacts of the Project).Increased snowmobile and ORV access and their - disturbance along the transmission corridors should also be addressed here. Our cor.~Jents under (Section 4.3(c))Access on the need to quantify expected additional harvests also apply here. Please refer to our transmission corridor comments under Botanical Resources, Sections 3.3(d)and 3.4(d).We refer you to our 5 January 1982 review letter on the 9 November 1981 Transmission Corridor Report.Our com~ents there remain applicable.In particular,we recommend incorporating into project plans:(1)on-ground evaluations with representatives of the FWS,ADF&G,and the Alaska Plant Materials Center regarding the appropriate management along various lengths of the transmission lines (e.g.the extent of clearing, maintenance,poss'ible seeding,etc.should depend on the wildlife species of concern and vegetation types present;(2)coordinated access to the transmission lines with access to other project facilities;(3)controls on public access to the transmission lines during and post-construction to reduce habitat degradation and population disturbances;and (4)controls on access along the length of the lines.We would appreciate your response where project plans may be in conflict with either these paints or the five specific recon~endations in our January letter. We are concerned with the generality and lack of quantification of this section.Using the vegetation remapping,a successional model should be applied;the selective clearing and maintenance to be used along the transmission lines should be factored into that model.Areas within each type to be impacted and vegetation type changes over the project life can then be calculated.r·1aps of the proposed transmission line corridors should also be provided. (i)Bi~Game -Cook Inlet to ~JillmJ:Paragraph 1:Again,the degree of ili1pact will depend on the type of clearing and maintenance and thus,habitat alterations which result.\Je have recommended selective clearing,winter and helicopter construction and Iilaintenance and controlled access alonq the line. l·taintenance should involve selective clearing and topping of trees and tall shrubs to help maintain increased forage production.We agree that transmission line clearing ~ay increase moose and black bear carrying capacities if vegetation types which can be enhanced are present along the line.Thus-We reco~end quantifying the types present and their value to big game. paraGraph 2:Please describe the presence or absence of ~oose calving grounds and ear denning sites.The cu~ulative i~pacts of the trans~ission lines in conjunction with existing disturbances should be discussed. -Healy to Fairbanks:Again,quantification of types to be i~pacted and successional changes over the project life should be provided. -WillO\I to Healy:Please refer to our 5 January 1982 letter regarding the dependence of the Susitna project on the Intertie.Thus,we reco~~end full consideration of impacts from the Intertie ~Jithin this analysis. Quantification of impacts is needed,as above. -Uatana Dam to the Intertie:Please provide a quantification of impacts,as above. (ii)Furbearers:Para a h 3:Please refer to our coments under Section 4.3 c V1l1 re lnCOnslstencles between Chapters 3 and 5 in presenting impacts.Ue are also concerned with inconsistencies between the increased access acknowledged here and mitigation guidelines to prohibit such access (Appendix EE,item l);please clarify.Our previous recommendations to quantify impacts apply here too. (iii)Birds:Paragraph 1:We recommend providing references for the broad conclusion that species diversity may increase near the transmission lines. Removal of nest and forage trees will decrease available habitat for species such as pine grosbeak and boreal chickadee. paragraeh 2:We concur.Please also refer to our co~ments under Section 4.2(c)(1)re continuing peregrine falcon surveys. Parayrapn 4:PO\Jerlines are particularly deadly to s\lans •..!§!HO\vever, r.lorta1ity fror.l collisions,not electrocution,is the ~ajor adverse ili1pact to swans.Locating and ~arking lines is the key to minimizing that i~pact (see our cor.~ents under Section 4.4(c). ~Je reco~mend expanding this discussion to describe:(1)the potential for swan collisions;(2)miyrations of swans throuyh the project area;and (3) swan use of relilote lakes,including those in the r··latanuska-Susitna Va11ey,for nesting and rearing.Refer also to our comments on increasing developli1ents and disturbances which have caused swans to abandon areas,Section 4.3(a)(xv) -Disturbance,and our 5 January 1982 letter to Eric Yauld,as above. (e)Impact Summar¥ We are concerned with the emphasis of this sUrnli1ary on impacts which can be most easily mitigated.Consideration should also be given to documenting unavoidable,adverse i~pacts,cumulative project impacts,and differences between long v~rsus short-term impacts.The uncertainty if predicting project impacts on the basis of existing inforr.Jation are clearly apparent here. 16/Avery,M.~.,P.F.Springer,and r~.s.Dailey.1980.Avian mortality at man-made structures:an annotated bibliography (revised).U.S. Oepart~ent of the Interior,~IS/OBS-80/54. Parayraeh 2:We concur that increased human use is positive,but the habitat alteratlon and disturbance which may also result from increased access are often a significant negative i~pact to \Jildlife populations.There is a need to integrate this discussion with those in the Socioeconomic and Recreation Chapters of the Exhibit. para~ralh 3:~Je recor.u.lend also considering habitat values and hO\'J they relate to wlld ife populations over the life of the project. (i)Big Game:Paragraph 1:As above,the increased access afforded to fiunters is more of a concern from the standpoint of resultant population disturbances and habitat alterations;assuming that harvest is regulated to protect population levels. Paragraph 3:We are concerned with the subjectivity of the first sentence here.Please provide quantitative data for co~parison with the previous paragraph to justify the relative magnitude of project i~pacts. ~lention should also be made that project impacts will be particularly critical during years of severe winter.During such years,an additional i~pact to be considered would be moose/vehicle collisions.Cumulative i~pacts are also of concern \l1th moose. Para9raph 4:Inability to predict major impact on caribou,as cited here,is a serious data gap.Ue recommend describing additional infor~ation to be gathered to help make such predictions.Best and \Jorst case i~pact scenarios should be described to provide at least an indication of how caribou could suffer from increased disturbance,impacts near calvin~areas,and alterations in seasonal movements. paragraph 6:Again,cumUlative i~pacts are a concern in evaluating overall project impacts to both bro\m and b1ack bear. Para9\a~h 7:0i sturbance frol'i1 increased access and the presence of hUl;1an activltles should be the more direct concern here (please see our co~ments under Section 4.3(a)(vi)). (ii)Furbearers:Para9:~1:We again note the potential for red fox populations to decrease as coyote populations increase (please see our cOl'i1rnents under Section 4.3(a)(xiii). para~raph 2:~le suggest clarifying these conclusions to be consistent with prevlous lmpact descriptions,e.g.Section 4.3{a){ix),paragraph 1,page E-3-315,says beaver populations are likely to increase,this paragraph says they IImay increase,II downstreal'i1 (page E-3-371).~Je again recOT,lmend describ ing the water management regimes under which furbearer populations will l'i1ost likely benefit.Overall,\Je are concerned with the uncertainties expressed in this discussion and reco~Jend that additiona1 furbearer work to satisfy these uncertainties be considered (e.g.\Je suggest focusing on beaver and pine marten per our co~ents under Section 4.4(b)).Since i~pacts to valuable habitat in the vicinity of Deadman Creek can be mitigated,by alternative road siting,they should be described here. -70- - """ "9' I I !i (iii)Birds:Ue recommend also describing the negative impacts from swan collisions and raptor electrocution with transmission line development. Similarly,disturbance to nesting swans and raptors is another negative impact which should influence mitigation planning. 4.4 Mitigation Plan:As was the mitigation plan for Botanical Resources,~/e find the mitigation plan for wildlife incomplete and too general.Our detailed co~ents on lack of quantification,lack of integration with other resources evaluated,and need to consider the full range of mitigation options possible should be considered here as well (see Section 3.4). Because the \111dlife analysis is much more qualitative than quantitative,we common ly found the emphas is on minor impacts rather than on r.lajor ones.A sir.iilar misemphasis is in the mitigation plan,where attention is often focused on small,more easily mitigated impacts.Alternatively,severe impacts are left to undefined and uncertain mitigation measures such as later habitat enhancement and/or lands acquisition.Please refer to our earlier comments on the need to clarify overall project mitigation objectives (Section 4.1)• This section should clearly explain why mitigation measures already recommended by FWS and other resource agencies have not been adopted.For example,negative impacts to wildlife from the Denali Highway to Uatana development access route are consistently documented throughout the report: the road will result in substantial disturbances;the Deadman Creek area paralleling the road is particularly important habitat to numerous \/ildlife species (e.g.calving moose,Section 4.2(a)(i)-Distribution •s~ecial Use Areas:Calving Areas:paragraph 2;brown bear denning,Section 4.(a)(iv)- Construction:Paragraph 10;caribou movements,Section 4.3(c)(ii);\Iolf denning,Section 4.3(c)(vi);valuable beaver habitat,Section 4.3(c)(viii); bald eagle nesting,Section 4.3(c)(ix),etc.).Mitigation of these impacts can be effectively accomplished by completely avoiding the impact,that is, alternative siting as recoll1t1ended in our 17 August 1982 letter to Eric Yould and further detailed in our comments on the Botanical Resources r.1itigation plan,Section 3.4(c)(ii). We also request that you (1)confirm the inclusion of reco~ended measures in project design,and (2)clarify the extent of public access and uses in the project area throughout planning,construction,and operation of the project. For example,please specify the extent to which the environmental guidelines in Appendices EA to EE have and will be guaranteed in project design and operation. Establishment of a monitoring and follo\l-up program for all phases of project construction and operation is an essential feature of the mitigation plan. Key components of this program are that it:(1)include appropriate Federal, State,and local ayency participation;(2)be fully supported by project funding;and (3)be utilized to modify,delete,or add to the mitigation plan in response to both information from ongoing studies and needs which becor.1e apparent as project impacts are realized.Uhile monitoring by itself is not mitigation,actions taken as a result of that monitoring can ensure the effectiveness of the implemented mitigation plan. -71- Our final general recor.~endation on the ~itigat;on plan is that continuing consultation between the license applicant and resource agencies include initiation of working sessions with project design engineers to fully incorporate wildlife ~;tigation plans. (a)Big Game (i)Moose:Paragraeh 3:We concur with the processes now being used to quantify probable l~pacts of habitat loss and to develop selection criteria for replaceQent lands.Our previously described concerns for the need to evaluate habitat values are of particular note here;habitat quality ~ust be a factor in quantifying the areas of specific land parcels which are to be enhanced or acquired as ~itiyation.A schedule for the availability and incorporation of this data into project plans is also needed.Some assess~ent should be made of the locations and potential sizes of such areas. Paragraph 5:Further details should be provided on the schedule,potential size,habitat types,and studies,which would be involved in the Alphabet Hil1s burn.Land ownership,vegetation types,and other constraints to the potential value of burning or other ~anipulations to enhance habitat should also be described. Paragraph 6:Please clarify the criteria to be used in replace~ent land selection.~Je caution that replaceQent lands only contribute to offsetting unavoidable habitat quality losses elsewhere when:(a)habitat value of the replacement land would be degraded by so~e predictable means other than the project during the life of the project but,through management for fish and wildlife that degradation could be prevented;or (b)replacement lands are currently degraded and through management for fish and I;lildlife,productivity could be increased over the life of the project;or (c)through management of fish and I;lildlife,the productivity of an existing natural unit of habitat could be increased by reducing or eliminating one or more factors limiting its productivity.Identified replacement lands must be a manageable unit. pararath7:To r.laintain the increased value of r.lanaged habitat,prOVisions shou cr e included for ongoing manage~ent of thel,1 until such tir.le as the project area is returned to the pre-project state. Paragraph 8:The filaximum design speed of 40 miles per hour referred to in Appendix EC,item 1,should be assured here as one means of minimizing the potential for moose/vehicle collisions. Parayraeh 9:We strongly support the proposal Environr,lenta 1 Bri·efings Pro!:irar.1 and recommend that it be a mandatory requirement for all project personnel before they begin \~ork on the project. Paragraph 10:Assistance from APA in regulating access should also be for the purposes of minimizing habitat degradation and unnecessary disturbances. (ii)Caribou:Provisions to ~onitor and remove logs and other debris from the impoundments should be included in the overall project monitoring program, this wi11 ensure that such debris does not inhibit caribou movements (see Section 4.3(a)(ii)-Filling and Operation,paragraph 9). -72- (iii)Dall Sheep:Please describe how the prohibition on visits to the Jay Creek mineral lick is to be enforced.~Je recornr.lend that the portion of the reservoir adjacent to the lick be closed to boat and floatplane use.~Je suygest that the effectiveness of any ~easures to expose new portions of the mineral lick be demonstrated and then incorporated into the mitigation plan if effective. (iv)Brown and Black Bear:Para~raph 2:We strongly concur with recoTiIilendations to pror.lptly inclnerate garbage and fence camps.Experience fror.1 other projects (e.g.Terror lake hydroelectric project)sho\ls the need to clearly siyn and monitor gate closures to maintain the effectiveness of fencing.The Environmental Briefings Program referred to under Section 4.4(a)(i),paragraph 9,is particularly applicable here. paragraah 3:The habitat values to be gained from mitigation ~easures referre*to here must be quantified before any mitigation for bear impacts can be claimed. (v)Wolf:Please refer to our comments in the previous paragraph about quantifying recommended mitigation measures. Beaver and pine r.1arten are both ecologically and economically important; mitigation of some project impacts is possible.We recommend revising the first sentence to describe what process and/or criteria ~'1ere used here in deciding to emphasize beaver and pine marten in mitigation planning. Potential benefits to other species from beaver activities is the type of minor impact we believe to be overemphasized while more significant,and difficult to ~itigate,impacts are not treated as thoroughly.For example, beaver activities may conflict with slough management plans for salmon. Moreover,benefits from beaver activities may ultimately be negated by increased trapping which ~dll be facilitated by project access and transmission corridors.The consistent lack of quantification in the draft Exhibit E precludes evaluting the si.9.!!ificance of any such benefits relative to overa 11 project impacts and recornr.rended mit igation measures. Paragraph 2:We recoQr.lend discussion be provided on how proposed mitigative siting of the transmission corridor for pine marten will conflict with,or benefit,other wildlife species. Paragraeh 3:Per our previous comments,we recomr~end coordinating the cliscusslons of impacts and mitigation measures between Chapters 3 and 5.We see a need to clearly and consistently state project objectives in both chapters.We concur that workers and their families be prohibited from trapping or hunting while working in the project area and request assurance that such prohibitions will be part of project plans. Although increased access TIlay be viewed as a net benefit to trappers,habitat degradation,disturbances to the population,and conflicts with project management (e.g.re~oval of beavers which conf~ict with road culverts)would result in less than expected benefits to these groups.Thus ~~e recommend continued monitoring to assess that potential.We also then recomr.lend that a process be developed for implementing further mitigation (e.g.reco~endations -73- :! to the Ga~e Board on greater harvest restrictions,habitat ~anipulations, alternative flow regi,~es,etc.}should these efforts fail or impacts be found more severe than initially evaluated. Paragraph 4:We request confir~ation that project design plans will not include gravel extraction from Deadman Creek.Please provide further infor~ation on ho~disturbance of riparian vegetation will be minimized. paragraeh 5:Please refer to our comments under Sections 4.3(a}(ix)and 4.3(b)(lX)re the need for quantified data to support the conclusions here. Ue strongly support the proposed monitoring and model development programs. These programs should also be the basis for verifying impact predictions. Although by itself monitoring does not mitigate project impacts,it should be the basis for determining additional mitigation needs. Paragraph 6:We concur.To maximize the effectiveness of the mitigation plan,we recommend continuing studies to fill data gaps,quantify conclusions given here,and complete habitat models for beaver and pine marten. (c)Birds (i)Raetors and Ravens:Paragraph 1:~Je recor.lT.lend expanding the list of major lmpacts to include loss of hunting habitat,a corollary impact to the loss of nesting habitat identified here.A mitiyation need ~ie have repeatedly recommended is realignment of roads and transmission corridors away fro~ riparian corridors and other wetlands valuable in migration as well as breeding (e.g.letter from FWS to Eric Yould,5 January 1982). Further~ore,we recommend that the monitoring proyram include continuing surveys for peregrine falcons (see Section 4.2(c)(i))as ~iell as other raptors (see Sections 4.3(b){xiv)•Habitat Loss),to confirm their absence in construction activities areas. We are concerned with the emphasis on creating artificial nests.That emphasis is based on the assumption that nest sites are the lir.liting factor to raptor use of the project area.This has not,to date,been adequately supported by ongoing studies.For example,overall loss of feeding habitat may negate potential benefits from such structures. -Creating Artificial Cl iff-Nesting Locations:~Je concur vlith the recommendations to continually monitor for nest destruction and to provide additional mitigation later,if found necessary. -creatin~Artificial Tree-Nesting Location~_~_Paragraph 1:Please provide or correct t e complete reference for creating successful bald eagle nests;it was apparently omitted from the bibl iography.~Je question the suitabil ity of presently unused habitats cited here as potential nest sites.Since eagles are not using these areas,food or some other habitat parameter may be limiting. paragrab~l~:We suggest expanding the discussion to describe the compara 1 lty of habitats,circumstances,and species of birds using artificial nesting platforms as listed in Table ~rel.The success of those efforts may not be directly applicable to the project area,given the -74- - -- ,.. I I different habitats and species involved.Please include infor~ation on whether such structures have ever been successful in Alaska. -Seasonal Restrictions:\Je strongly support the lileasures included here with the addition of three points.First,we recolimlend coordinating with project design engineers to ensure that such tililing and siting restrictions are fully incorporated into project designs,schedules,and cost esti~ates.Secondly, our previous COlilments on the need for follow-up lilonitoring of raptor nesting in response to construction activities are critical here.Finally,for bald eagles,\/e recommend there be no blasting \'/ithin 0.5 miles of nests. (if)Haterbirds:Paragraph 1:We recomlilend revising this paragraph to describe factors which may limit benefits outlined here (see ourcoli1li1ents under Section 4.3(a)(xv)).An additional concern \/e believe should be described here is the potential for collisions of swans with translilission lines. PfiraTaabh 2:We recoli1li1end that the Iilonitoring progra~described previously s ou e coordinated ~lith ongoing FUS surveys for trumpeter swans and other waterfowl,with particular attention to the ililpacts of project disturbances on trumpeter swans.We again note the importance of carefully siting all project facil ities,roads,and transrllission 1ines away fror.l ~/etlands (as being remapped),including stream corridors and lakes.Since trulilpeter swans and other waterbirds frequently liligrate alony strearll corridors,siting and Iilarking of transmission lines is particularly critical to avoid collisions and electrocutions in those areas. (iii)Other Birds:We again note the ecological importance of these species. We recommend that nest and roost boxes be considered as mitigation for passerines.Hairy woodpecker,boreal chickadee,and brown creeper would all adapt readily to such structures.These three species populations would be reduced by 10.1,7.4,and 19.9 percent,respectively.The hairy woodpecker is on the National Audubon Society1s "Blue List"and is thought to be declining in the Pacific Northwest.We also recomlilend that all unavoidable adverse impacts from the project be fully acknowledged. (d)Slila 11 (non-game)'ilalilma 1s:We refer you to our corilments,above,re fu 11 y acknowledging unavoldable adverse project impacts. Co~ents on Tables and Figures for Section 4 -Wildlife Overall,many of the tables and figures are inco~p1etely footnoted and referenced.Few will stand on their o\/n and many are confusing or inconsistent even when referring to the text.\Je reco~lilend cleaning up the tables and figures to alleviate these prob1elils in general,as described in our comraents on the text of the report itself,and as specified below.Rather than cOlilfaentingon all editiny or corrections needed,we have focused on lilajor problems or points i~portant in understanding our cOuuaents on other portions of the doculilent. Table U2l,~J22 and \J23:Please include the number of sites,safilpled in each cOli1munity. -75- i I Tab le W64: ratings.1I ~Je recomrilend footnoting a brief definition of lIimportance value Please provide dates for the sumfiler 1981 survey. Tables 1,165,W66,W68 and ~a8a:Please clarify how habitat types as classified nere do or do not coordinate with the revised vegetation classification scheme.We are concerned that data manipulations not obvious from the original references be fully described here (see Section 4.2(c):Paragr'.~.e.b_l.J. figure 1,111:We suggest adding reservoir elevation levels. Figures ~n9 and 1,120:~Je recommend including some description of ho\-/'IIrelative importance II was determined and IIImportance Indices"were calculated.Sources for this data should be cited here. -76- Appendices EA to EE General Co~ents Overall,we concur with the environmental guidelines to the extent that they are presented here.HO\/ever,we are concerned that the yuidel ines are sOQewhat incomplete and lack specifics needed for effective imple~entation. Please specify the degree to which these yuidelines are being incorporated into project planning.We reco~end that you explain any situations where the guidelines will not be followed.In order to most effectively implement these guidelines,and thus,to achieve greater mitigation of project i~pacts to fish and wildlife,we recoh~end a team approach between project environmental specialists and design engineers throughout design,siting,and construction. The interagency monitoring group recommended previously should be part of this effort (see our cOlim1ents on Section 4.4:Paragraph 5).Probler.Is \lith lack of integration between project studies and different chapters in the Exhibit E would then be more easily overcome.Follo\iing are our Specific Comr.lents on individual items in the environmental guidelines. Specific Comments A-All Facilities 1.The referenced buffer to waterways or wetlands should be a 500-foot minimum width,not maximum width as presented here. 8. 7. """ -I Please define project IIfacility ll as used here.LIe suggest the definition include project carilps,access roads both to and within the project site, and any constr~ction areas (including the dams,borrow areas,disposal sites,etc.). Trumpeter swan nests and caribou calving areas should be added to the list of areas to which the guideline is to apply. Blasting determinations should be made in consultation with the resource agencies.Such determinations cOl'ld be incorporated into the previously recomr,lended mon i tori ng program (see our COl'iI,lents on Sect i on 4.4: Paragraph 5). 9.Please discuss the feasibility of disposing of part,or all,of project spoils within the impoundment area in accord with project scheduling.An estimate should be provided of the quantities which may be involved,or when those quantities will be determined.Stockpiling needs,and reclamation considerations should also be provided.We suggest this itel,' be expanded into an additional appendix section similar to Appendix AD - Material Sites. 11.Please refer to our previous cor.~ents on the need to map permafrost areas (Section 3.2 and 3.3(a)(ii)~ffects of Ero~jon and Deposition}. 13.We recommend specifying that fertilization and seeding be initiated in the growing season ifiJ,lediately following site disturbance.The interagency monitoring prograr:l referred to in iteril 8,above,should review and concur with species chosen for revegetation. -77- 14.Please refer to our cOQrnents under iteQ 13,above. 15.~Je concur;again please refer to our cor.ltlents on item 13.Initiating test plots as part of continuing project studies would provide inforuation on which successful site restoration can be based.Plantings to provide ~lildlife food and/or cover should also be considered in developing restoration plans. 16.We strongly endorse both progra~s outlined here.Reference should be made to U.S.Coast Guard (C.F.R.33,Part 154(b))and Environmental Protection Agency (C.F.R.40,Part 112)regulations which require use of a Petroleulil and Hazardous Substance Plan and Manual with such developments.It should be mandatory for all project personnel to take part in the Environmental Safety Progra~prior to starting work on the project. 17 •~Je suggest that storage containers for fuels and hazardous substances also be located at least 1,500 feet fro~wetlands.All personnel involved in transfer and handling operations for such materials should carry portable spill contain~ent/absorption ~aterials.Impervious [,later ia1 used to 1i ne conta inment areas shOLl 1d be secure ly tacked in place and frequently monitored for tears;such tears should be promptly repaired and water which may collect in the areas should be pro~ptly removed. 18.Please s~ecify the degree to which this reco~IJendation is bein~followed as descr ibed under our General Comr.lents for these append ices. 19.We recoro~end addition of an item outlininy the need for the contractor to train personnel,prepare,and follow an erosion control plan which is subject to resource agency rev i e~/and comment (see our comr,lents on Section 3.4(d)(ii)).That plan should then be incorporated into these guidelines. B -Construction Camps 1.and 2.We concur and reco~end that there be no trucking of garbage between camps;each camp should have its own incinerator capable of burning that day's wastes. 3.~Je concur;please refer to our cOr.1lilents under Section 4.4(a)(iv)on the need to clearly sign and monitor all gates to ensure they remain closed. We recommend the interagency monitoring group review and concur vlith the fencing specifications. 4.We suggest that the recommended effluent sampling and testing prograQ be outlined in construction camp design plans. 5.Again,resource a~ency review and concurrence should be involved. -78- C -Access Roads 3.Ue concur and reco~end that the proposed program for identifying \/etlands in consultation with the CE and FWS be used in access route siting (see Section 3.2{a)(vi». 5• ~~6. ~ 13. Instrea~work should be scheduled to avoid critical spawning times and minimize sedimentation of downstream habitats. through 10.Criteria should be included for deter~ining \/hen a culvert rather than a bridge can be used for stream crossings.Resource agencies should be consulted in the develop~ent of such criteria. We suggest adding,"as well as after significant storm .events"at the end of this item This issue needs further definition. .,.., - o-Material Sites 1.We concur and recommend that the interagency monitoring program be inteyrated with the interdisciplinary team effort so that resource agencies are consulted in the developnent and iTilplementation of mining plans. 2.and 3.Please identify the extent of borrml Tilaterials needed for project construction \/hich may be available ,;lithin the impoundment area,relative to the extent of borrow which will have to come from other sites.Our comments under APpendix EA -All Fa~il..ities,item 9,on stockpiling and reclamation,ana under Appendix EC -Access Roads,items 6 through 10 re criteria for determining when to use the lower priority mitigation measure (e.g.culverts instead of bridges;first-level terrace sites over well-drained uplands)apply here also. 7.We suggest that construction schedules be evaluated in order to determine optimum coordination and use of material and disturbance sites. E -Transmission Corridors 1.We recommend addition of the phrase "and maintained ll after the vlord "constructed ll in line 2 of this item.Our text comments on the need to fully integrate Intertie development with all other project transl,lission lines apply here (see Sections 3.4(d)(ii)and 4.4(d}(i)-~Jillow to Healy}.--- 3.Transmission towers should not be placed in wetlands,as defined by ongoing remapping efforts. 4.We concur,and suggest that selective cutting be used to control vegetation along transmission corridors. Appendix EG:Please provide the source for data cited which was not provided by the University of Alaska f:luseur.l. -79- Chapter 4.REPORT ON HISTORIC AND ARCHEOLOGICAL RESOURCES:No COlilT,lents. -80- Chapter 5.SOCIOECOUOmC HfPACTS F'"Genera 1 Comments ~Je see this socioeconomic impact evaluation as an integral component of the overall evaluation of alternative means of satisfying energy needs in the least environmentally damaging way.Accordingly,\/e offer the follovJing comments for consideration in the evaluation of this alternatives. Evaluation of a proposal must exafi1ine impacts,positive and negative,and mitigation over the life of the proposal.Data bases provide the point from which this evaluation must progress.Ho\/this project could effect fish and \/ildlife resources over its life is strongly dependent upon how the project influences future user demand of those resources.This evaluation should incorporate:(l)a widely accepted projection of future population and economiv growth (increasing user groups)or,if there is substantial uncertainty as to the validity of key assumptions (as we believe there is), then a multiple scenario model should be pursued examining at least high, medium,and low projections;and (2)a tradeoff analysis examining the competing mitigation proposals for the different interests.Chapter 5 fails in respect to both points. The Base Case,as expressed in this document,is a mini~um project impacts scenario.We are led to this conclusion by the following: 1.The recent do\mturn in State oil revenues directly leads to a downturn in State spending.Increased State expenditures result in economic expansion which then attracts and supports the new population (Department of Policy Development and Planning (DPDP) Policy Analysis Paper No.82-l0).The expected lower level of State spending should be reflected in decreased econofi1ic expansion and population.One could deduce from this that the without project economic and population Base Case should be substantially lowered fror.l what is presented in this dOCUMent.Since this turn of events obviously does not impact the cost of the project,the project socioeconomic impacts would be accentuated. 2.With less oil revenue the State would need to concentrate a greater percentage of its income and/or bonding capability on this project. The State \'1ould then not be able to afford projects in other areas of the State.We,therefore,believe a closer look at State-wide impacts is necessary. 3.The power which this project would prOVide could act as an attractant to various industries,to the detriment of other areas of the State. 4.Potential impacts due to the seasonality of the \/orkforce is not fully addressed in this document.Other hydropower projects in Alaska,such as Terror Lake,and those constructed in other refi10tely situated areas should be examined to e~plore this potential impact. -81- 5.IQpacts result from the nu~ber of people attracted by potential jobs not by the number of jobs created,either directly or indirectly. This is supported by the letter to Eric Yould dated 27 March 1982 fro~the Alaska Department of COQmunity and Regional Affairs (ADCRA). 6.The implications of item 5 above regarding local and regional hiring assumptions and iQpacts to local cOffiQunities. We have not previously had input into many of the decisions which were reached regarding the construction camp/village such as siting,type of camp,and administration.These decisions have large implications for the fish and wildlife resources and users.Consideration of a Prudhoe Bay type ca~p should be given.We are not aware of any construction ca~p alternatives having been discussed in ter~s of minimizing adverse impacts to fish and \/ildlife resources,and their use. As i 11 ustrated by Iilany of our cOli1rtlents,we are concerned that not on ly \iere the resource agencies not consulted previously on ~any of the actions described herein but that communication and coordination between the socioeconomic component and the fish and wildlife resources co~ponents has been insufficient. It is stated several times in this chapter that monitoring of i~pacts is proposed and that this program would add flexability to the mitigation program.We concur.However,we believe this monitoring team should better reflect the spirit of the APA ~1itigation Pol icy document.~Je bel ieve a monitoring program should be established,at project expense,consisting of representatives of appropriate local,State,and Federal agencies,to carry out the function of assessing the extent of actual impacts and recom~ending modifications to the mitigation program.Modification of the mitigation plan, as represented in the license,would then be through license amendment. Modification of the Base Case to accomodate the concerns raised in the ADCRA letter of 27 May 1982 and in our comments would dramatically change the impacts predicted and ultimately the mitigation requirement.Additionally,an assessment of socioeconomic impacts must be reactive to other study components.For example,to evaluate i~pacts to users of fish and wildlife resources,the impacts to the resources ~ust first be assessed.In that many of these resource impacts have not been sufficiently quantified,one could not expect an acceptably quantified socioeconomic analysis.This could only have lead to a highly general mitigation plan,which is what we find here.In fact,reference ;s made to certain actions which (Section 4.2(a),page E-5-91),n •••will be considered in the ~itigation plan".A Qitigation plan should be a part of this docu@ent,and be specific to the anticipated impacts based upon a broadly accepted data base.The burden of formulating an acceptable ~itigation plan is the applicants. Specific Comments 2 -BASELINE DESCRIPTION 2.1 -Identification of Socioeconomic Impact Areas -82- .... i - ..... - - (c)State:Ue concur that identifiable impacts \/ould be concentrated at the T6cal level,and most difficult to evaluate on a state-viide basis.It should be recognized that how this project is approached economically has tre~endous implications for the State.If the State provides a grant of billions of dollars,that money can't be spent on other programs.Bonding of the project would have a large impact on the State's ability to bond other projects. Additionally,the relationship between large projects and population growth should be given greater emphasis.Increased State expenditure results in economic expansion that attracts and supports the new population (DPDP Policy Analysis Paper Ho.82-10).The state would be impacted through services provided to this project caused higher population level. 2.2 -Description of Employment,Population,Personal Income and Other Trends in the Impact Areas (a)Local (ii)Poeulation:.parafraSh 3:Acceptance of the projected Nat-Su Borough populabon figures wou de on the basis of a review and acceptance of the underlying assumptions.\Jithout these we are left with what appears to be relatively high projections which apparently come from a single source,the Mat-Su Borough,which could be viewed as having a vested interested in the project,and a high probability that the projections rest upon by the original,outdated project economic analysis.The impacts analysis and mitigation planning is strongly tied to population projections with and without the project.We recommend that the data base be broadened and projections updated. Paragraph 4:\Je recently received a Scoping DocUlilent (dated 29 Nover.tber 1982) for the Knik Arm Crossing from the Alaska Department of Transportation and Public Facilities (ADOT/PF).In that ADOT/PF is just beginning to evaluate the desirability of this project it would be premature for APA to view it as a foregone conclusion. paragraeh 5:Please discuss the assumptions upon ~/hich these population projectlons are based. (b)Regional (ii)PopUlation:Paragraph 2:We accept the underlying assumption that,in Alaska,population growth is strongly associated with natural resource development projects.Please identify the development projects that have been assumed to be going forth.The recent downturn in State income,due to weakening of oil prices,should be factored into this analysis. 3 -EVALUATION OF THE IMPACT OF PROJECT 3.1 -Impact of I n-r,l i grat i on of People on Go.Y~r:!:!ment~1 Faci 1it i es and SerVices:Paragra~h 2:The underly;n~assumptions which lead to the conclusion that thlS project would have minimal impacts to the Mat-Su Borough should be discussed in greater detail.Peak project employment ~Jould be 3,498 (page E-5-37)and 95 percent of these \Jorkers would have dependents,with an average of 2.11 dependents (page £-5-44).This would lead one to believe direct project worker impacts \'/ould be r.Jore than 10,000 people.If all these -83- people \/ere housed at the construction site we \/ould have a city approximately three times the size of Palmer,with all the encumbent needs of this size corl1filunity.This figure \lOuld be substantially inflated by secondary and induced jobs resulting from the project.Spreading these numbers out over the small,local communities \/ould be expected to result in significant adverse impacts.In the 27 May 1982 letter from the ADCRA to Eric Yould it was noted that,II ...given the current state of the econor.1Y,it seems reasonable to expect a sizeable influx of people from the Lower 48 seeking highly-paid employr~ent,therefore competing directly with the local labor force.This was the State's experience during the Trans-Alaska Pipeline project (TAPS)and,in fact,just recently for the as-yet to be started Alaska Natural Gas Transportation System.Yet this proven phenomenon apparently was not considered in the analysis.This influx of people seeking instant riches in Alaska during major construction projects has historically contributed to impacts far in excess of what otherwise mights normally be expected.1I In reference to,II •••the buffering effect of the expected continued increase of the population,1I please refer to our Chapter 5 General Comrilents. (a)Watana -Construction Phase (i)Local -Mat-Su Borough:As stated in our Chapter 5 General Comments we find it difficult to accept that,IIIn most areas of the Mat-Su Borough,the population influx related to the project will only add slightly to the substantial increases in need for public facilities and services that \/ill be resulting from the population growth projected under the Base Case.1I It is stated in the previously referenced 27 t1ay 1982 letter from ADCRA,liThe State's experience has been that the impacts from large construction projects (rilost notab ly TAPS)are far in excess of what ~Jere originallY anticipated.Those impacts were due to a substantially greater inmiyration [SIC]of people than those anticipated based solely upon the size of the required construction and support work force.This was due in part to a large nUillber of people who migrated to Alaska with no intention whatsoever of seeking employment,at least on the construction project.Another unforeseen impact was in the secondary job market.Inmiyrants [SIC]competed for,and filled,secondary and induced jobs,many of which were vacated by local residents obtaining employment on the high-paying construction project.This situation only exacerbated the local unemplo~~ent situation. "Certain public services were severely taxed as a result of the larger than expected influx of people.The public safety and public health were jeopardized by increased ·people problems l ;too few public safety officials and inadequate or non~existent facilities delayed the State·s ability to adequately respond.Lack of adequate housing led to overcrowded living conditions and sanitation problems.Increased vehicular traffic devastated the roads and at times created safety problems as well.Utilities,such as power and telephone,were overtaxed.Heightened demand for housing produced rent gouging,displaced families,hastily and poorly constructed housing,and use of substandard or even non-residential units as places of residence. lilt seems,therefore,that the potential exists for the types of impacts described above to occur as a result of the Susitna project,and to occur in -84- ,- .,.. - - - larye part in the Matanuska-Susitna Borough.Si~ply putt we believe that past experience has shown that more people will show up than originally anticipated t bringing with the~all the proble~s attendant to a I booM-town , situation.We do not feel that this was adeg~ately addressed in the draft feasibility report t nor that the State's prior experience with TAPS was taken into account.1I We would expect that a high percentage of those attracted to the area would becor.te fish and wildlife resource users.This would lead to increased de~and for these resources at the same tir,le and in the vicinity of r.tore direct project related i~pacts to these resources.AdditionallYt because the project work force \rould be highly seasonal t (page E-5-37)the i~pact of these e~ploYees on the fish and wildlife resources would be greater than other area residents. ~~~~~~~~~~~~~~~p_ar~a~~aFi-h~l.:Please clarify \1/hether the e provided by the project through Ue understood this was not the case Use projections and anticipated fish and wildlife resource impacts should be examined. •Transportation:para~raph 1:We concur that t "The ultimate status of the road is unsettled at thlS tir.te.1I The road is a proposed project feature and as such the ulti~ate resolution or ~echanis~s for resolution of this issue needs to be provided in the FERC license t if in fact we do still have road access at that time as a project feature.We have not conCurred that road access is either necessary or desirable. Paragraph 3:Reference is Tilade tOt "schedul ing of COr.1I,luting workers".Yet t on page E-5-91 it is stated that t II •••there will be no daily cor.1filuting •and \Iorkers \/ill not have the opportunity to drive personal vehicles to the camp/village ••••"These conflicts need to be resolved. -Cantwell •Transportation:Paragraph 2:Reference is again made to commuting workers.Please refer to our co~ents immediately above (Section 3~1(a)(i)- Mat-Su Borough.Transportation:Paragraph 3). (ii)Regional:Please refer to our Chapter 5 General Convuents and to our comments regarding Sections 3.1 and 3.1(a)(i).-Mat-Su Borough. (b)Watana -Operation Phase and Devil Canyo~~_Construction Phase (i)Local -t1at-Su Borough:Please refer to our conll~ents ir.1T.lediately above (Section 3.1(a)(ii)). 3.2 -On-site I\anpower Requirements and Payroll t by Year -85- ,, (b)Seasonality of nan ower Re uirer.Jents:Please refer to our cor,lr,lents regarding Section 3.a i -1·1at-Su BoroJ:!9b..The seasonality of the project work force could,if they remain in the State,result in significantly higher use levels of fish and wildlife resources,and recreational resources than that found for residents er.Jployed year-round.Ue recolill',lend that this should be exar.Jined.The TAPS project and in-state hydropower projects,such as Terror Lake,should provide valuable information. 3.3 -Residency and Movement of Project Construction Personnel:Paragraph 3: The proposed administration of the construction car.Jp/village appears to simplify probler.Js by minimizing constraints on the work force.Given the APA Mitigation Policy,which is consistent with NEPA and out Mitigation Policy,to first avoid adverse ir.Jpacts to fish and wildlife resources we find it difficult to accept the construction site calilp/village plan or adli1inistration of it.In many ways it tends to r.Jaximize adverse ir.Jpacts to fish and Hildlife resources,in direct conflict with APAls stated'rolitigation goals.It appears that plans other than that proposed have not been evaluated as none appear in Chapter 10.We recommend that a Prudhoe Bay type car.Jp be examined as an alternative which could r.Jinimize project-related impacts to fish and wildlife resources and socioeconor.Jic impacts to the local communities.Our position concerniny rail vs road access to the construction camp/village has been previously statea-(FWS letter to Eric Yould dated 17 August 1982). (a)Region (i)Regional \Jork Force:paragra~h 4:The assumptions stated for the on-site constructlon work force were ques ioned in the previously referenced 27 May 1982 letter from ADeRA,IIAlthough there are currently enouyh unefilployed in Southcentral Alaska to li10re than fulfill the project1s labor demands,in terms of numbers,that does not necessarily r.Jean that the appropriately skilled people are local1y available.Also,given the current state of the econor.ty, it seer.ts reasonable to expect a sizeable influx of people from the LO~ier 48 seeking highly-paid employment,therefore competing directly with the local labor force."In addition on paye E-5-94,it is stated,IIThere are at least a couple of reasons to believe that local labor might have a difficult time obtaining construction jobs."This would appear to support the contention that hiring assulilptions are overstated,and thus the -ililpacts of project-induced population increases are understated. iiv)Relocatin~Workers and Associated Popu]ation Influx:Concerning secondary and lnduGed population please refer to our COtffilents under Section 3.1 and 3.1(a)(i}-Mat-Su Borough. 3.4 Adequacy of Available Housing in Impact Areas la}Watana -Construction Phase (i)Local -Hatanuska-Sus itna Borough:para2raph 1:It is stated that,"The filajority of constructlon ~lorkers on the proJect are expected to use the on-site housing facilities.These \lorkers \dll not be in-r,ligrating into established cOlilr.1unities and therefore will have no impact on the housing r.larket in the -86- ..- t1at-Su Borough."Could \"le not conclude from the .above that a minority of sOr.Je unknown number of \'1orkers would not be housed on-site?This ~-Iould lead one to expect workers co~uting,and impacts to the housing market.Please quantify these potential impacts.Concerning cOr.Jmuting workers please refer to our comr.Jents on Section 3.l(a)(i):.Transportation:_P.a.ra_graph 3.In addition,in the previously referenced 27 !·1ay 1982 letter from ADeRA,the follo~iing statement is provided: I'The key supposition in support of the r.Tiniro1al impacts described is that the majority of the labor force and their families will live on-site and largely remain on-site throughout the duration of the project.This presumes affirmative actions are taken to preclude or limit mobility, particularly by private automobile,and to provide sufficient incentives for workers to locate their families on-site rather than in the r.Jore attractive and urban settings of Anchorage,Palmer,or Wasilla.If those conditions do not occur,workers and their families in some undetermined numbers will reside elsewhere,and the workers will commute.If that occurs,impacts on the Borough will increase dramatically." 3.5 -Displacement and Influences on Residences and Businesses .... .... (b)Businesses:Paragraph 2:It would follow that if,"t10st businesses in the upper basin are dependent upon abundance of fish,big game,and furbearer species,"and the project holds the potential to severely impact these species through elimination of their habitats,then most of the businesses \iould suffer severe adverse impacts.Th is paragraph illustrates a poss ib 1e prob 1em relating to coordination or cOt1li1unication of Exhibit E study programs. Paragraph 3:Please refer to our cogments i~o1ediately above (Section 3.5(b): Paragraph 2)• Paragraph 4:Please refer to our comments above (Section 3.5(b):ParagraphI).We cannot dismiss impacts to fish and wildlife resource users as insignificant.The existing user levels must be established in addition to fish and wildlife resource levels with and without the project.Proposals designed to r.Jitigate for unavoidable fish and \iildlife resource losses should then be examined as to potential impacts on these user groups. 3.7 -Local and Regional Impacts of Fish and Wildlife User Groups Ca)Fi sh (1)Hethodology:The work \/hich was completed for 1981 did provide point estimates.The capability of the system to produce salmon is dependent upon a number of factors which are being eXar.Tined as part of the Aquatic Studies Progralil (e.g.winter water temperature,availability of spawning gravel,flO~J regime,etc.).The number of fish that pass a point along the river does little to establish a river's production capability other than to establish a bottolil figure for it. A comparison of point estimates of 1981 vs 1982 demonstrates the great variability that exists in this system.Both years are "representative"• -87- -Guides and Guide Services:Para ra h 7:Please refer to our com~ents on ec 10n.. n t a 11\i1orst easel potential loses were examined in Section 3.7(a)(ii)we recommend that a similar examination be provided here, particularly since moose estimates have previously been furnished by the ongoing Big Game Study Program. Discussion should be included on the possible decrease in the area1s attractiveness for remote,wilderness hunting given the increase in access and human activities with project development.By definition,guided hunting involves a more remote type experience.Loss of this remoteness and potentia1 -88- ..... .- i~pacts to the guiding industry should be considered here.Ongoing data collection/analysis regarding this issue needed to be fully described. iii)Recreational -Resources:lJe recomr.Jend expanding the discussion to consider relative demands and values for commercial,recreational,and subsistence hunting for each species in comparison to other species. Including a section on nf.1anagement ll would clarify the remaining discussion on recreational hunting.The section should briefly describe ADF&G ~anagement responsibilities and the Game Board;and include a map of Ga~e Management Units in relation to major project features and access routes • •Caribou:Including the map recoQrnended under Section 3.7(b)(ii)-Resources above,would clarify the discussion.- Resource Status:The present permit system is designed to under harvest the herd so that it can continue to grow.This section should reflect the present and future management plans for this i~portant resource,see simi 1ar comlJents under Chapter 3,Section 4.2(a)(ii)Population Characteristj~? The Experience Sought by Hunters:'Please clarify by identifying the other area or resource to which hunting of the Nelchina herd by nearby Anchorage, Fairbanks,etc.residents is being compared. Transportation to and fror.l Hunting Groun~s:Project impacts on hunter access, and indirectly,to the caribou herd should be discussed.We suygest coordinating the discussion with that in Chapter 3,page E-3-356,paragraph 3 and page E-3-371,paragraph 1,and our comments on those sections. Hunting Pressure:Management changes invalidate direct comparisons between the number of hunters in 1980 and 1970.Increases of human populations should also be described.If it were not for the permitting system the hunting pressure would be much higher.Although the number of permit applicants provides a clearer picture of the importance of the herd we consider this figure to also underestimate the importance of the herd.Since the chance that an applicant would obtain a permit is low,many people are discouraged from applying.If warranted,a survey could provide an estimate of the number of people who would hunt the Nelchina herd if the permit system were removed. To adequately evaluate potential project impacts to the herd one \'lould need to examine ADF&G present and future managment plans,projected demand forecasts, most likely behavioral responses to the reservoirs,access routing and control,alternative reservoir filling and operation schemes,construction and public use of the access mode and routing alternatives,the tradeoffs involved in conflicting mitigative proposals,impacts of mitigative proposals on user groups,etc.We reCOLT.lend that the impacts evaluation exa~ine the aforementioned factors. Supply and Demand for Huntin2 0eportunity:Again,the situation is not fully discussed.Data should be provlded comparin~rates of increase for both permit applications and human area populations. -89- Success Rate:The i@pact of hunting on caribou populations should be described here (e.g.see Chapter 3,pages E-3-220 to 222).Increases in herd nu~bers @ay have also contributed to the increased success rate.A map of take relative to existing and proposed project access points may aid in evaluating project impacts.An analysis of those i@pacts on existing supply and demand for caribou should be provided • •Hoose:Since the subject of this chapter is socioeconomics,~/e reco@mend expanding the discussion to include information on moose being the most economically important wildlife species in the region,per Chapter 3 (see page E-3-197)• Resource Status:The paragraph is inconsistent with Chapter 3 \lhich includes 1981 data and an estimate of 4,500 moose in the upper basin.Recent and long-ter@ ADF&G management plans for moose,as well as a map of applicable Game t·1anay'~ment Units \"ould help relate impacts de·scribed here to potential mitigation measures. Transportation To and From Hunting Grounds:The discussion describes the type of data.available yet fails to provide any quantification.Figures delineattny present and project-related access points should be included and correlated to current hunting intensities. Hunting Pressure:Please explain the hunting permit and/or habitat chanyes responsible for the significant decrease in hunters and harvest while area human populations have substantially increased.Reference to 2,859 hunters in 1981 is the same number of hunters as for 1980 in Table E-5-42.Please correct if this is not the case. Success Rate:Refer to comment above,local human populations,permit regulations,and area moose populations are critical factors in the success rate which should be discussed • •Other Species:We concur that a large data gap exists.The schedule for acquiring these data and incorporating them into project planning should be discussed.Once socioeconomic mitigation proposals are established,they must be examined in regard to impacts on fish and wildlife resource user groups.A tradeoff analysis would then be needed to examine conflicting mitigative proposals.Because coordination among project studies has been lacking,each study described impacts relative to opti@al project manage~ent for the subject of that study,e.g.recreation,fish,moose,subsistence,power,etc.~Je recommend alternative management scenarios be evaluated within each study before the necessary tradeoff analysis is completed • •Importance of Regulations:paragra¥h 1:Access routes,restrictions on access,and construction schedules wi~1 also greatly influence opportunities to hunt in the project area.Quantification should be provided for possible impacts under at least twa"scenarios -severely restricted access and ~ermits and open access without perluits.Such analysis should be fully coordinated with ongoing big ga~e studies and also discussed in Chapter 3.Given the substantial agency recommendations to omit any project access from the Denali Highway,and the importance of that recommendation as a wildlife mitigation measure,we recommend your analyzing the impacts on hunter access both \/ith and without that road corridor.Additional discussion should also be provided -90- ..... .- - on impacts both with and without restrictions on \Jorker access and hunting. Again,regulation of such use is a significant ~itigation measure. Quantification of possible use levels is necessary for full quantification of project impacts on ~oose populations in Chapter 3. ~ara9r~~:Consideration should be given to the greater losses expected for black bear than for brown bear habitat in view of the harvest regulations described here • •I~pacts on the Hunter:Factors contributing to a high quality hunt should be defined here.Availability and accessabi1ity of animals are key factors which will be affected by the project.Again,the schedule for quantifying recreational project impacts should be described.The present inability to quantify economic effects of the project is recognized as a major prob1e~and should be resolved in the license application.The econo~ics analysis should occur after quantification of wildlife impacts and formulation of mitiyation proposals.Please refer to our com~ents under Sections 3.7(b}(i)and 3.7(b)(ii). (iii)Subsistence Hunting:This section should be rewritten to ~ore accurately reflect current laws and regulations.For exa~ple,non-residents cannot qualify as subsistence users.A complete,rather than partial,listing of all qualifications for subsistence use should be included here.The first sentence of the second paragraph pertains to a one-time only re'gulation which is no longer in effect.The last sentence of this paragraph is an editorial comr.lent which should be deleted.t;lention of the controversial nature of subsistence use would be appropriate.The referenced future data compilation and analysis should be provided in the Exhibit E.At a mini~um,scope and scheduling of this work should be fully discussed.The concerns expressed under Section 3.7(a)(iv)Subsistence Fishing would apply to this section in regard to hunting.Please refer to Section 810 of the Alaska National Interest Lands Conservation Act (Public La\l 96-487,2 December 1980)for guidance. (c)Furbearers (i)COlilrilercia1 Users:During the August 1982 AEA Workshop on the Susitna project,trapping was considered the pri~ary mortality factor affecting beaver in the project area.Access,in addition'to species abundance and pelt prices,is also a key deter~inant of trapping intensity. -Data Limitations:Given that there are problems with available trapping data,the records which are available should be described here as a general indication of area trapping activities.We are concerned about the apparent lack of coordination with project furbearer studies which do provide some population and trapping data (see Chapter 3,pages £-3-250 to 251;£-3-253 to 256;E-3-315 to 317;£-3-321 to 322;£-3-344 to 346;E-3-361 to 362;and E-3-368.) -Trapping Activity:para~raph 1:Any examination of project impacts needs to examine future opportunlties lost.Again,please provide whatever quantification of trapper numbers and harvest values is available. Consideration should be given to the number of additional trappers the area -91- could support under alternative project access location and reyulation alternatives. Paragraph 3:Based on the suggested 25 mile trap line length,it is doubtful whether the project area,with projected access routes,could support more than an additional dozen trappers.There is so~e indication that the area r~ay be near trapping saturation now (Furbearer Study Coordinator Phil Gipson, personal co~munication). -Aquatic Species •Baseline:Paragraph 2:To compliment and parallel the beaver discussion, information should be included on muskrat populations and habitat utilization; please refer to our comnents under Section 3.7{c){i)-Data Limitations, above. Paragraph 3:Subsistence value of furbearer species should be identified. Paragra~h 4:References such as "abundant"and "COiil~onll should be deleted. Quantiflcation should be available from the 1981 and 1982 field seasons for those species.Please incorporate these data into the discussion and analysis . •Iiilpacts of the Project:The conclusion that the access road and transiilission lines would ~rovide increased harvest opportunities through increased access appears to be in conflict with conclusions and statements offered in other chapters and sections (e.g.Chapter 3,pages E-3-317 to 323; E-3-345 to 346;E-3-360 to 363;E-3-368;and in particular,E-3-377).The stater.lent offered in this section would lead one to conclude that open access is expected to be provided by the preferred access road and through a maintenance road for the transmission line from Watana damsite.It has been our understandiny that the forli1er has not been established and the latter was not to occur.Please refer to our COf,1IiIents on Sections 3.1(a)(i)-Public Recreation.Facilities:Paragraph 1 and 3.1(a)(i)-Transportation: paraaraph 1.The lost future opportunities and the potential impact that coul occur to trappers due to the expected ice-free winter condition of the Susitna River above Talkeetna should be fully described in this section.The potential for furbearer populations to be trapped out,if open access is provided,should also be considered here. -Pine t1arten •Impacts:Paragraph 1:Please refer to cOmli1ents under Section 3.7(c)(i)- Aquatic Species:Impacts of the Project,above.The last two sentences are contradictory;there is some inconsistency with the last line of the second paragraph which otherwise appears to be an accidental repetition of Paragraph 1 under this section. -Lynx:Paragraph 2:Again,quantification should be given to this trapping pressure and success rate relative to other area furbearers. -Fox:Please refer to our co~~ent under Section 3.7(c)(i)-Lynx,above. Consideration should also be given to project impacts on fox,as they r;lay relate to the fox trapper (also see our comnents under Chapter 3,Section 4.3(a)(xii)). -92- .... .".... - -Secondary Industries:In order to fully assess project i~pacts on secondary industries,the IIrelatively sr.Jall percentage of Alaskan trappers \~ho operate in the impact area"should be quantified here • (ii).Recreationa 1:Inadequacy of data base is identified.Information on this user group should be acculilulated,ir.Jpacts analyzed,mitigation proposed and then re-evaluated to assess effectiveness and impacts in the Exhibit E. The impact due to the loss of access across the upper Susitna River resulting from the probable loss of winter ice cover requires examination in this section. We suggest addition of a paragraph (iii)Subsistence to complete this section.Information under paragraph 3,page E-5-84 would apply,see co~ent under that section (Section 3.7(c)(i)-Pine t1arten 0 Impacts). 4 -MITIGATION:paragra~h 1:The definition should reflect that established in the APA f~itigation Po icy document and the NEPA definition. Paragraph 4:~ithout proper coordination between Susitna study cOr.Jponents, actions designed to r.Jini~ize one component's adverse i~pacts can un\/ittingly adversely effect the ability of another component to mitigate.The major mitigation proposals offered here are often in conflict with the mitigation goals of the fish and wildlife resources components.Greater co~unication, coordination must result in an open process to examine the tradeoffs when mitigation proposals are offered which may pose impacts to other components. Please refer to our CO~Jents concerning Section 3.7(c)(i)Aquatic Species which appears to indicate a lack of component coordination. para~raph 5.:Appropriate local,State and Federal agencies need to have input to t is process.ContinuedClonitoring of changing mitigation needs in regard to co~patability \lith r.Jitigation goals of other components is very important. 4.2 -Miti2ation Alternatives:How the goal of r.Jitigation as expressed in this section conforms to the goals of l.litigation in the APA t1itigation Policy document and the NEPA definition of mitigation should be explained. (a)Tools that Influence the t-1agnitude and Geographic Distribution of Project-Induced Changes Paragraph 3:Scheduling constraints need to be reassessed in light of the 1atest power needs forecasts.Ue recommend that the extent to which impacts could be mitigated-in each study component be examined through a tradeoff analysis of the tir.Jing constraints which have been imposed. paragra¥h 4:II.1pacts to fish and \lildlife resources,and thus indirectly to users 0 tnese resources,are related to the type of construction car.Jp established,access provided (route and mode),and the adQinistration of these facilities.We perceive little coordination designed to Qini~ize i~pacts to fish and wildlife resources as a part of the socioeconomic analysis. para~raph 5:It appears as if management of the construction site is to be passlve.That is,workers can come and go without restrictions.This appears to be in confl ict with the statelilent on page E-5-91,"For th is project,there will be no -daily cOmrJuting."Also,the assur.Jption that ~Jorkers will maintain -93- their existing residences would follo\/only if the assuQption that the workers would co~e almost entirely fro~the local and regional areas households.This was strongly questioned in the previously referenced letter dated 27 nay 1982 from ADCRA,and on page E-5-94,IIThere are at least a couple of reasons to believe that local labor ~ight have a difficult ti~e obtaining construction jobs.1I Paragraph 8:This paragraph suffers fro~internal inconsistences concerning daily com~uting and use of personal vehicles.Please clarify the discussion. Paragrap~:This section is supposed to be the Qitigation plan. para,raph 12:The referenced studies should be coordinated with fish and wild ife resources analyses and mitigation planning.Please refer to Section 4:Paragraphs 4 and 5 for additional cOr.lfilents. (b)Tools that Help Communities and Other Bodies Cope \Jith Disruptions and Budget Deficits Paragraeh 2:In accordance \'1ith the APA IHtigation Policy docur.1ent,a ~onitorlny panel \Jould need to be established,at project expense,consisting of representatives of appropriate local,State,and Federal agencies to carry out the function of assessing the extent of actual iQpacts and recoh~endin~ modifications to the Qitigation progra~.t-1odification of the r,litigation plan in the license would be through license a~endment. paraGraph 10:Please refer to the cor.ll.lents imr.lediately above (Section 4.2():Paragraph 2). Paragraphs 13 and 14:The question of whether or not the labor needs of the project could be fulfilled largely through local hire (page E-5-44)or not obviously is going to substantially effect socioecono~ic i~pacts.In that uncertainty exists,as expressed in these paragraphs and in the 27 I~ay 1982 ADCRA letter to APA,\Je recommend a re-evaluation be carryed out as indicated in Section 4.3 (on page E-5-95)and incorporated into the Exhibit E. 4.3 -IQ act Mana e~ent Pro ra~:Para ra h 4:Iter.1 1:In Qany respects the Base Case,as lscussea 1n t lS ocuQent,1S a r.11n1mUm project impacts scenario;this opinion is clearly expressed in our Chapter 5 .General Comments.We believe that substantial uncertainty exists in key assumptions and that a multiple scenario model is in order.The study should be updated to reflect current state economic and population forecasts. Item 2:Please refer to our COr.'lr.1ents on Section 4.2(b):Paragraph 2. Item 3:Please refer to our comments on Section 4.2(b):Paragra~h 2. I ter,l 4:Please refer to our comr.lents on Section 4.2(b):Paragraph 2. Paragraph 5:Please refer to our COQments on Section 4.2(b):paragraph 2. Table E-5-42:~'e recor;lITIend the addition of population estimates and any changes in per~it regulations from 1970 to 1981.The nu~ber of hunters in 1980 is attributed to 1981 on page E-5-79. -94- I~ - -. .... - Chapter 6.GEOLOGICAL Arm SOIL RESOURCES:No COTl1Iilents. -95- Chapter 7.RECREATIONAL RESOURCES General Co~ments Primary objectives of the Recreation Plan should be:a)to identify and mitigate the project related adverse impacts to the existing uses of fish and wildlife and other resources and,b)to maximize additional recreational opportunities that are not in conflict with existing uses and the resources they are based upon.This should be accomplished in the context of projected demand during the construction and operation phases of the project. In general ~Je find this chapter suffers from a lack of necessary information which would achieve these objectives.In particular,the chapter fails to outline alternative recreation options;evaluate the reco~ended plan and alternatives over the entire economic project life;distinguish between specific recreation users;recognize and identify specific responsibilities with regard to implementation and operation of the plan;and lacks specificity necessary to influence project development for the betterment of recreational opportunities. To allow the maximum flexibility for meeting recreational demands,it is important that an array of alternative options be evaluated.This is e~phasized by the lack of definitive demand projections and potential for access during the construction periods.Furthermore,we view the tremendous influx of people during the construction period as a major consideration for a recreation plan.Specific measures r.Just be identified ~'ihich will not only satisfy demand but also act as controls on overuse.The plan r.Just also recognize the limited recreational carrying capacity of the area and deal with the fact that all demands may not be satisfied. Identification of specific responsibilities for ir.Jpler.Jentation and operation of the Recreation Plan should be included.It does not suffice to place the responsibility on the "management agencies,"without a detailed coordinated effort with the agencies prior to issuance of the license.The plan must clearly identify the applicant1s responsibility,the agencies·responsibility, and clearly outline the procedures to be followed.The plan must recognize the inherent restraints placed on the agencies and include as a project cost compensations of them as appropriate for mitigation of project-induced ir.Jpacts. The plan clearly fails to recognize the differences between sport,trophy,and subsistence use of particular wildlife resources.The tendency has been to lump these users as hunters with a major objective of bagging game.We submit these are clearly distinct groups and should be so recognized.Cultural differences regarding recreational pursuits have also been totally ignored in the plan. Lastly,the plan appears to have been written in a clearly reactive mode. There is no recognition of any recreational planning initiative that has influenced the physical layout of the project.This lack of initiative has precluded developr~ent of recreational opportunities which could have avoided some impacts while maintaining a higher aesthetic quality to the recreational experience. -96- - - - Specific Comments 3 -PROJECT H1PACTS ON EXISTING RECREATION 3.1 -Watana Development (al Reservoir (il Construction:The discussion in this section needs to be expanded to address non-consumptive and subsistence recreational users as \Je11 as sport and trophy hunters.Furthermore,the section needs to address the eminent competition bet\Jeen existing recreational users and construction ~Jorkers. (ii)Operations:Discussions should be provided to address a new recreational opportunity~~e.,boating on the reservoir,primarily for access to other areas. (b)_Talkeetna to Devil Canyon Fishery (iil Construction:Since a plan for flow releases during the construction and filling period has not been finalized,we do not know what effect flow will have on fishing opportunity.Mitigation measures will be aimed at maintaining existing fishing opportunities. l!i)Operations:Since the proposed operational flo~J regime will likely reduce Hater quantity in the sloughs,He anticipate a reduction in fishing opportunity that must be mitigated,the potential for this adverse impact and appropriate mitigation should be addressed. (dl Other Land Related Recreation (i)construction:parafiraph 2:Please expand and clarify the discussion.It is our understanding t at the area !.:!l.l be open to the recreating public. Paragraph 3:The discussion fails to address whether or not existing use shifts to other areas is dependent upon several factors;e.g.,species involved,availability of and restrictions on use of those species elsewhere, existing demand already present in other areas,and cultural association with those species. (iil Operations:It is the responsibility of the project sponsor to identify specific mitigation measures and develop a comprehensive plan which will address this irapact."Proper control by lando\mers and managers,1J is not a mitigation measure \Jithout appropriate compensation to implement and operate the recreation plans.This cost should be identified and evaluated over the economic project life and included as a project ~ost. 3.3 -Access l!)Watana Access Road ..Li)Construction:para1rahh 2:Estimated recreational vehicle traffic both prior to and after 199 S ould be presented. (b)Devil Canyon Access Road 151 Construction:Paragraph 2:Mitigation for excavation of the borrow areas could include the future use of these areas for recreation development.These measures should be specifically identified and incorporated as part of the Recreation Plan. (ii)Op~rations:These "careful plans"should be a part of this docur.lent,if not,who will develop these plans and when?The as~ociated costs should also be discussed and displayed as project costs.Also,management responsibilities during construction should be identified and discussed along with associated costs. (d)Other Land-Related Recreation (ii)Operation:We feel this will be a significant impact and specific plans should be identified and discussed in this document. 3.5 -Indirect Impacts --Project-Induced Recreation Demand 1~_LAssur,lptions:Paragraph l:This paragraph is very confusing and needs to be clarified.In particular,that part dealing with mitigation.~e would suggest,liThe proposed recreation plan is designed as mitigation for recreation opportunities lost due to projectdevelopment ••••" Para~raph 3:Assumption 6:We would suggest that a likely scenario associated with this development will be a road access provided to the area without the project.This scenario could drastically affect your evaluation. (c)Estimated Recreation Demand (ilPer Capita Participation nethod:Paragraph 8:This paragraph needs to be expanded to discuss how subunits were considered,since you rely on the "manager.1ent agencyn to contro 1 project demand,and th is wi 11 be done on a un it and subunit basis. P~r~:The simplification of your methodology also does not consider tha~~~creation opportunities may becowe saturated,hence areas of low use (project area)~ay become much ~ore important for future use and receive an increase in dewand. III fl--111·-·--c_•~._c_•••_ Chapter 8.AESTHETIC RESOURCES General COli1li1ents Ue find the chapter deficient in the following areas:1)it lacks the detail necessary to d1st ingui sh the various user groups \/ith in the category "hunters and fishermen,lI e.g.,the chapter characterized this group as only subsistence users;2)avoidance has not been acknowledged as a mitigation measure,which could significantly reduce potential impacts;and 3)the chapter does not reference the incorporation of any mitigation measures into the project plans. Specific Comments 3 -EXISTING ENVIRONNEHT (STEP 3) 3.2 -Viewer Sensitivity (Step 4) Types of Viewers (A)Hunters and Fishermen:Your categorization of hunters and fishermen lacks thenecessary depth to anow meaningful analysis.There are three distinct groups which must be identified and discussed,i.e.,sport,subsistence,and trophy users.Ue submit that they are unique in their appreciation of aesthetic quality. (D)Nonresident Outdoor Recreation Enthusiasts:Trophy hunting and fishing are readily identifiable user groups,especial1y in the Stephan Lake area. This should be identified and evaluated. Expectation of Views (A):The prime concern of some users is not bagging their game or catching their limits.This distinction should be:made. 5 -PROPOSED tHTIGATION r,IEASURES (Step 9):The mitigation rneasures you have identified are commendable.However,there is no indication in this section that these measures have been addressed and incorporated into the project plans.Pertinent sections of the license application should be cited to show where these measures are addressed and/or reasons why they were not addressed.We are also concerned that "avoidance,"as a mitigation measure has not been addressed.We refer specifically to project features which could be located elsewhere as a mitigation r,leasure or be more easily rnitigable in another location.Access routes and town sites would fall into this category. Chapter 9.LAND USE General Comments With regard to Section 2.2.(d)(i),we find the chapter suffers from a lack of definitive information regarding wetlands and floodplains.These areas should be graphically displayed by type in the document.Furthermore,the chapter should discuss the specific values of these areas,their relationship with other vegetative types,and specifically address the effects of the projects on wetland and floodplains. 11itiyation measures recommended to minimize impacts to It/etlands and floodplains should be discussed including alternative site locations. This analysis is extremely important to avoid any delay necessitated to insure compliance with federal requirements with Section 404 of the Clean Water Act as amended (86 Stat.884,U.S.C.1344),associated regulations,guidelines and Executive Orders (11988,11990). Specific measures to mitigate impacts from the transmission line should also be addressed,including right-of-way management techniques. - r ~ I I. i Chapter 10 •ALTERNATIVE LOCATIONS,DESIGNS,AND ENERGY SOURCES General COlillilents r·lr.John Lawrence of Acres Ali1er i can,by 1etters dated 9 November 1981, requested that the FWS review the Development Selection Report and the Transmisson Corridor Report.These requests \lere made for the purpose of fulfilling the FERC requirements of formal pre-license application coordination.He responded to the first review request by letter dated 17 December 1981 and to the second by letter dated 5 January 1982.In that these letters were requested as part of the formal coordination process,they should be responded to at this time. ~le have been requested to review the draft Exh ibit E without benefit of the other draft license Exhibits.In Chapter 10 numerous references are made to other Exhibits (pp.E-IO-l,E-IO-l,E-10-14,E-IO-16,E-IO-23, E-IO-28, E-IO-32,E-10-38,E-1O-62,E-1O-81).Since vie are unable to examine the other Exhibits we view this pre-license coordination as unsatisfactory. Additionally,in our examination of the Exhibit E chapters we have seen numerous examples of insufficient internal coordination and/or communication. In that this appears to be a problem within the Exhibit E,we can only assume that this problem occurs between the Exhibit E and the other Exhibits. Examples of lack of coordination and/or cor.~unication between Chapter 10 and Chapters 2 and 3 are apparent in the discussion concerning minimum flow releases (pp.E-IO-28,E-IO-30),temperature modeling (pp.E-IO-30,E-IO-31) and socioeconomic consideration between this chapter and Chapter 5 Jpp. E-IO-138)•These concerns are discussed ~iith in the text of our Specific Comments. There is essentially no attempt in this chapter to assess the possibility of no Susitna project or how the Railbelt should contend with time delays of various lengths.Just listing various types of alternative energy sources does not allow an evaluation of what would,or should occur in the event that Susitna is delayed for a period of years,or is never built.We recommend that this type of planning effort be carried out to examine the effects of short-term delays and to examine long-term alternatives. Any assessment of alternatives,needs to take into account the most current pO\ier needs project ions.It is our understanding that the power projections which are beiny used in the license application are generally agreed to be high and are being reevaluated for submittal to FERC after the license application is submitted (Acres Ar.lerican Deputy Project r·1anager John Hayden, personal communication).The environmental implications are rather evident. Alternatives to Susitna should be exar.lined on the basis of fulfilling future power needs rather than matching the power production of Susitna.Under previous projected power needs,it probably would have taken a combination of a greater number of individual power yenerating stations than under the latest projections.Several,smaller individual generating facilities should lead to greater flexibility in potential combinations and fewer adverse environmental impacts.We recom.~nd that this be examined. In the assessments provided on hydropmier alternatives,Susitna as proposed and alternative basin developments are not evaluated on an equitable basis. Tables are displayed which contrast the weak and strong points of these alternatives yet we never see how the Susitna project ranks.This is particularly unfortunate since Susitna would leave one with the initial i~pression (which is the level to which the alternatives are examined)that it would have significant adverse impacts to many of the environmental criteria (page E-l0-4),includiny:(1)big game,(2)anadromous fish,(3)de facto vlilderness,(4)cultural (subsistence),(5)recreation (existing),(6) restricted land use,and (7)access. There is no attempt in this chapter to examine the environmental tradeoffs of the different power generation alternatives,including Susitna.Therefore,an assessment as to \/hat would be the IIbest"pO\/er development for the Railbe1t is not possible.Additionally,in that no single alternative source of power is contemplated to provide the same level of power as Susitna (assuming the updated future power demands projections assert that this power generation capability is needed)various power generation mixes should be examined. These alternative combination plans should then be compared to Susitna in a tradeoff analysis. One obvious alternative power generation mix (which is further discussed in our Specific Comraents)should center on the power generating capability of the West Cook Inlet area.In close proximity to each other and existing transmission lines we have Chakachamna hydropower,Beluga Coal fields,Mt. Spurr geothermal,and the West Cook Inlet natural gas fields. Natural gas is considered by many to be a highly attractive alternative to Susitna.1Zl,l§I Yet the coverage devoted to this subject was disappointing,particularly when compared to other alternative power generating technologies.Three times as much space is devoted to nuclear power which is not generally considered as a socially acceptable alternative to Susitna.Biomass,as an energy source,received twice the coverage of natural gas,and wind power received more than four times the coverage devoted to natural gas.This confirms what we perceive as misappropriation of emphasis.Numerous reports have been issued over the last three years on the natural gas alternative,including the two footnoted below.Few reports are referenced in Section lO.3(c)(i)giving the ;Qpression that a very limited effort was expended in researching this section. Section lO.3(f)fails to reco~nize the most attractive geothermal alternative, Mt.Spurr.Further discussion on this alternative is furnished in our Section lO.3(f)specific co&vaents. 1Z!Erickson,G.K.March 1981.Natural Gas and Electric Power Alternatives for the Railbelt.Legislative Affairs Agency,State of Alaska.9 pp. 18/Tussing,A.R.,and G.K.Erickson.August 1982.Alaska Energy Planning Studies:Substantive Issues and the Effects of Recent Events (Draft). Institute for Social and Economic Research,University of Alaska.15 pp. .... pPi'i'Il. Apparently no attempt has been made to assess alternatives to the proposed construction calilp/village such as siting,type of camp,and administration of the calilp.Alternatives to those proposed in the draft application obviously exist and need to be openly examined.These implicit decisions have large impl icat ions for the fish and wildlife resources and users.Considerations of a Prudhoe Bay type camp should be given.Construction camp alternatives should be discussed in terms of minimizing adverse impacts to fish and wildlife resources and their use.We are concerned that not only were the resource agencies not consulted previously on these actions but that communication and coordination between those responsible for this chapter and those involved in the socioeconomic,and the fish and \iildlife components did not occur to a satisfactory level. Due to the numerous inadequacies mentioned above the "concluding"Section 10.4 should not be expected to provide enlightenment regarding the consequences of license denial.It does not.Additional inadequacies are discussed in the Specific Co~wents which follow. Specific Comments 10.1 -Alternative Hydroelectric Sites (a)Non-Susitna Hydroelectric Alternatives:Paragraph 1:Reference is made to Exhibit B which was not provided,although we requested it. (i)_ScreenjQg of Candidate Sites:Paragraph 1:Reference is rJade to Exhibit B,which has not been furnished,although we requested it. -Second Iteration:Paragraph 2:The criteria should reflect that:(1)just because salmon migrate above a site doesn't mean losses to anadromous fish are unavoidable (e.g.Chakachamna);and (2)just because anadromous fish are not found above a potential site,adverse impacts are avoidable (e.g.Susitna). (ii)Basis of Evaluation:It would appear appropriate to include Susitna and within Susitna basin alternatives in the evaluation matrices. (iii)Rank Weighting and Scoring:para~raah 1:The interrelationships of the environmental criteria should be recognlZe and assessed.Dramatic changes in anyone itelil would have repercussions to all others. (iv)Evaluation Results:We recommend that all evaluation matrices include Susitna and within Susitna basin alternatives. (v)Plan Forlilulation and Evaluation:We recolilmend that all evaluation matrices include Susitna and within Susitna basin alternatives. This evaluation should be reassessed in terms of current projections for future power needs.The present examination apparently is geared toward looking at various power generation alternatives (which are not specifically described)on the basis of providing an equal alilount of generating capacity to what Su.sitna would provide.We recolilJTIend that these alternative plans be reassessed in light of current power projections. (c)Upper Susitna Basin Hydroelectric Alternatives:Paragraph 3:Reference is made to Exnibit B,which has not been furnished,although we requested it. (ii)Site Screening -Energy Contribution:Reference is r.lade to Exhibit B,which has not been furnished,although we requested it. (v)Comparison of Plans -Energy Contribution:paragrahh 2:Reference is made to Exhibit B,which has not been furnished,althoug we have requested it. 10.2 -Alternative Facility Deisgns ~Watana Facility Design Alternatives (i)Diversion/Emergency Release Facilities:Paragraph 1:Reference is made to Exhibit B,which has not been furnished,although we requested it. It is stated that,"Tables B.61 and B.62 of Exhibit B show the minimum flm~ releases from the Watana and Devil Canyon dams required to maintain an adequate flow at Gold Creek.These release levels have been established to avoid adverse affects on the Salmon [SIC]fishery downstream."Perhaps a more accurate appraisal can be found in Chapter 4 (page E-4-3),liThe impact of •• •upriver and downriver changes in hydrology •.•cannot be assessed at this time due to the lack of information concerning the amount,type and location of disturbances associated with these activities."In Chapters 2 and 3 it is stated that the reduced flows could impair fish migration,de-water spawning and rearing habitat,prevent access to slough and side channel habitats and lower or eliminate intragravel flows to slough and side channel spawning grounds.The minimum flows proposed were not developed using any recognized instream flow methodologies,and lack any biological basis other than the most rudimentary.In fact,no explanation is offered in the Exhibit E as to how the 12,000 cfs minimum operating flows for August and into September were arrived at. (iii)Power Intake and Water Passages:Paragraph 2:The statement is made that a multi-intake structure would be used,IJ •••in order to control the dmmstream river temperatures within acceptable limits.11 The Yatana and Devil Canyon dams will cause changes to the existing water temperature of the Susitna River,generally releasing cooler water during summer months and warmer water in winter.This,in turn,may present significant impact to the downstream riverine environment.TeIJperature variations Iilay affect the ability of fish to migrate,spawn,feed,and develop in the Susitna system. Ice formation may be delayed or possibly not occur above Talkeetna.This issue is discussed at length in Chapters 2 and 3 although an accurate description of post-project temperature impacts is not presented.The raodel which was developed to describe reservoir outflow temperatures contains input data fro~only five months (June through October)of one year (1981).The Devil Canyon Reservoir was not ~odeled,but in Chapter 2 it is stated that the location of ice for~ation (above Talkeetna)will depend on the outflml telilperature fror.1 Devil Canyon darn (paye E-2-83). ~ I Paragraph 3:Please reference our comments on Section 10.2{a)(i)concerning min ililut1·f1 O\lS. (b)Devil Canyon Facility Design Alternatives (iil Plan Evaluation:para~raph 1:Reference is made to'Exhibit B,which has not been furnished,althoug·we requested it. Item Nur.1ber 5:Paragraph 1:It is ackno\~ledged that a problem exists in the potential of the access road and traffic to affect caribou movements, population size,and productivity.Avoidance of the problem by eliminating the Denali Highway to ~Jatana access segment \Iould be consistent with the APA r·litigation Policy docufilent,the recommendations of the resource agencies,and NEPA.As is stated in Appendix B.3 of the Susitna Hydroelectric Project Access Plan Recoli1r.lendation Report (Au~ust,1982),IIFrom a caribou conservation viewpoint,the Denali access route is far less desirable than proposed routes originating on the Alaska Railroad and Parks Highway.The Denali route would most certainly have ili1li1ediate detrimental impacts on the resident subherd and future negative impacts on the main Nelchina herd although these impacts cannot be quantified." Item Number 7:parawaE.!!....i:Both the M'A t·1itigation Policy document and NEPA acknowledge that it 1S Detter to avoid an adverse impact than to try to filinifilize it,uthrough proper engineering design and prudent manageli1ent.11 M'A's approach should better reflect this in their decisions concerning access routing.In addition,reference is made to discussion "in Exhibit E."This is the Exhibit E. (d)·Transmission Alternatives:By letter dated..9 November 1982,r·1r.John Lawrence of Acres American requested our review of the Transmission Corridor Report as part of the formal pre-license coordination process.We responded by letter dated 5 January 1982.In that it was requested as part of this formal pre~license coordination process and \Ie responded vilth this understanding,the issues raised and recommendations made in that letter should be addressed at this time.. -105- (iii)Identification of Corridors:para~raph 2;Reference is made to Exhibit B,which has not been furnished,altnoug we requested it. (vi)Screening Results -Central Study Area Corridors Technically and Economically Acceptable o Corridor One (ABCD)-Watana to the Intertie via South Shore of the Susitna River •Environmental:Given the APA decision to have road access for the Watana damsite to the Devil Canyon damsite along the north.side of the river,we do not understand how it can be considered best environmentally (rating of "A") to have the transmission line along the south side of the Susitna River.In our 5 January 1982 letter \,ie stated,"How construction -and maintenance- related access is obtained to a great extent determines the project-related wildlife and socioeconomic impacts.Construction and maintenance of transmission lines should not provide for additional public access over that provided by the dam accessroute."and,IIAccess to the dams should be fully coordinated with transmission line routing.Access corridors which serve a dual purpose in regard to project access needs would be highly desirable from several decision-making criteria."This potential for increased access provided by the transmission line routing is readi1y acknowledged elsewhere in the Exhibit E (page E-5-84).This apparent inconsistency needs to be clarified. o Corridor Thirteen (ABCF)-Watana to Devil Canyon via South Shore,Devil Canyo~to Intertie via North Shore,Susitna River .Environmental:Please refer to our comments above on Corridor One (ABCD). (ix)Results and Conclusions:Paragraph 3:Reference is made to Exhibit G which was not provided,although we requested it. (e)Borrow Site Alternatives:Unless unavoidable,borrow sites should be restricted to within the future impoundments and/or to upland sites. Selection should be coordinated with access and transmission line routing and with resource agencies.We have not previously been contacted for the purpose of providing input and we do not have any project plans or assessments upon which to provide specific input. No attempt is offered to assess the environmental tradeoffs that would be made by selecting one borrow site alternative over another.We have assumed this is the underlying intent of including this type of alternatives comparison in the environmental Exhibit Eo We recommend that this be undertaken to an equal level for alternative borrow sites,access routes,transmission routes,and other alternative project features. 10.3 -Alternative Electrical Energy Sources -106- .... .- (a)Coal-Fired Generation Alternative There are three main deficiencies in the discussion of Beluga Coal development as an alternative to the Susitna project: 1.No quantitative estimates of the areas or resources to be affected by coal development are included.We recommend you include a description of:Ca)schedules for development;(b)area fish and wildlife populations;(c)habitat types and areas to be disturbed,altered,or destroyed;(d)construction and operation work forces necessary for project development;(e)magnitude of commercial,recreational,and subsistence use of Beluga area fish and wildlife resource;and (f) numbers of fish and wildlife which may be impacted by project development • We realize that such information is still very tentative for the Beluga project and project impacts have barely been evaluated.However,recent field studies should allow you to approximate the magnitude of the resources involved and potential for impacts to them. 2.A direct comparison with Susitna development plans and anticipated impacts is lacking.Comparison of the information identified in 1., above,with similar information for the Susitna project should be provided.For example,the commercial,recreational,and subsistence harvests and pressures for use of the Beluga area should be compared to Susitna area resources.Acreages and habitat types that would be impacted by alternative development scenarios should be compared.The magnitudes of project impacts relative to fish and wildlife needs to be analyzed.Also,the work force and time frame which would be required for Susitna should be compared to Beluga developments,for the same power needs. 3.Reasons for rejecting Beluga coal-fired generation or Beluga coal in combination with smaller hydroelectric projects or other energy sources, as an alternative to development of Susitna hydropower are not given. Paragraph 1:Since ~4e were not provided with a copy of Exhibit B,we cannot'+ comment on the adequacy of the referenced analysis of the economic feasibility of Beluga Coal.We would hope the analysis includes discussion of private financial backing for Beluga Coal development as compared to State financing involved with the Susitna project.Further discussion of the feasibility of alternative Beluga development schemes may be found in a State report by Gene Rutledge,Darlene Lane,and Greg Edb1em,1980,Alaska Regional Energy Resources Planning Project,Phase 2,Coal,Hydroelectric,and Energy Alternatives,Volume 1,Beluga Coal District Analysis.Current soft foreign market conditions are exemplified by recent slow downs of the most active Beluga coal lease-holders in completing ongoing environmental studies necessary for permitting.It would be helpful to know to what extent the State is working with the private 1iaseho1ders to consider State use of any portion of Beluga Coal production.We understand that the lease holders do not expect to complete financial feasibility studies before the second half of 1983. parafraeh 2:Although specifics of plant design and location are not yet avai able,more detailed information can be provided on the magnitude,and -107- probable initial development alternatives,including export of Beluga coal to Pacific Rim countries.We recommend addition of an area map with locations of existing leases,potential camps and development facilities,and alternative transportation and transmission corridors. para1raeh 3:We recommend expanding this paragraph to consider the aval ablllty and probability of coal development in Southcentral Alaska. According to current industry plans,Beluga coal resources are sufficient to allow mining for export of 5 million tons per year (with possible expansion to 10 million tons)on Beluga Coal Company leases and 6 to 13 million tons per year from the 20,500 acre Diamond Alaska Coal Company lease for at least 30-;0' years •.!V The availability of this or other developments as an energy'", source for Alaska has been increased with recent State promotions of _~ additional coal exploration.The State has proposed a competitive coal lease sale during the first half of 1983 for 25,000 acres near Beluga Lake.Also' under consideration is a non-competitive coal rights disposal west of the Susitna River.~10reover,Bering River coal development has been the subject of recent proposals for exploration and environmental studies. (i)Existing Environmental Condition:As described earlier,the qualitative discussion provided here allows no comparison with the Susitna project.We recommend describing detailed U.S.Forest Service and Soil Conservation Service data for the area and ongoing studies which should result in a more detailed classification of area vegetation. The predominance of wetlands,particularly near the coast,are discernable on FWS 1 National Wetland Inventory maps available for the area.Those wetlands are particularly important habitats for the diverse bird life described in later paragraphs. o Fauna,Paragraph 1:Clarification is necessary regarding the referenced "Selvon fishery". Paragraph 2:We recommend describing numbers of bald eagle and trumpeter swan nests relative to numbers in the Susitna project area. -Aquatic Ecosystem:Additional information should be prOVided on the quantity and quality of this system (e.g.the extent to which spawning, rearing,and overwintering areas have been identified within and downstream of the lease areas). -Marine Ecosystem:Although species presence is described,there is no quantitative information on their relative abundance,or habitat quality., Figures cited for the referenced Cook Inlet fishery is dependent upon Beluga, Susitna,and other area systems.An assessment of the proportion of that fishery which depends on the Beluga system compared to the Susitna system should be prOVided. l2!Beluga Coal Company and Diamond Alaska Coal Company.January 1982. Overview of Beluga Area CoaT Development Projects. -108- "... -Socioeconomic Conditions:The discussion should be expanded to cover current levels of cofoll.lerclal,subsistence,and recreational fish and wildlife use. (ii)Environmental Impacts -Air Quality:The potential for mitigating the air pollutLnts described here should be dlscussed. -Terrestrial Ecosystems:The range of terrestrial habitat to be annually impacted should be quantified and compared with Susitna development plans.In addition to habitats disturbed by mining,project features such as roads and transmission corridors which could be expected with coal development should be described.While the road system required for coal develop~ent should be substantialy less than that for the Susitna project,the potential for restoring mined lands to original habitat values is untested for the area. Paragraph 2:ADF&G harvest data should be included here.The correlation between hunting pressure and current access should also be discussed in quantifying roads and human population increases anticipated fro~Beluga Coal development.Human/wildlife conflicts (e.g.bears shot in defense of life 9r property,wildlif~mortality from additional vehicle traffic and roads)is another critical impact not mentioned here. - A uatic and Marine Ecosystems:So~e quantification of anticipated impacts can e r.la e an s ou e lllC uded here.Deve 1opr.lent of both Be 1uga Coa 1 Company1s and Diamond Alaska Coal Company's lease holdings could eliminate nine stream-miles of existing anadromous and resident fish habitat.Stream restoration to original habitat quality will be difficult,to impossible,to attain.According to preliminary flow information,nearly half the total flow in the Chuitna River originates in or flows throu~h the proposed mine pits. Assuming that half the anadrornous fish production is lost from the Chuitna system,ADF&G estimates the annual loss of fish available to Cook Inlet fisheries will be within the following ranges: -109- We recon~end contrasting this information with preliminary i~pact assess~ents for Susitna and other alternative project develop~ents in the license application.The co~parison should also cover resident fish species,big game and furbearer populations and harvest levels,and areas and types of habitats to be altered or destroyed.Data gaps and uncertainties should be clarified in an acco~panying discussion. -Socioecono~ic Conditions:Recently published reports by the ADF&G docu~ent the magnitude of subsistence hunting and fishing by Tyonek area residents.~,~,22/Ue reco~mend that you discuss these findings in assessing fish and \Jildlife resource uses which may be affected by BelugacQal deve 1oprolent. A general discussion of the socioecono~ic i~pacts on Tyonek fro~developing Susitna or Chakachamna hydropower projects,as compared to Beluga coal develop~ent is given in a recent report for the ADCRA.23/Tyonek apparently supports coal development as lony as it does not inhibit their ability to subsistence hunt and fish.Consideration should be given to similar local support or opposition to the Susitna project. Although the purpose of this section is to describe Beluya as an alternative to Susitna,Beluga coal development would undoubtedly include additional ~ining for export.Thus while the discussion appropriately describes the incremental workers associated with the power generation facilities only,the entire develop~ent \lill influence the per~anence of the workforce.The report is confusing in the discussion on whether a fly-in construction camp or permanent townsite is to be established (see pages E-10-81(a)paragraph 3, E-10-88,last two paragraphs,and E-10-89,paragraph 1).So~e discussion is needed of both alternatives,resultant impacts on fish and wildlife uses,and the potential for mitigation. 20/Foster,Dan.riovember 1982.The utilization of king sallilon and the annual round of resource uses in Tyonek,Alaska.ADF&G,Division of Subsistence,Anchorage.62 pp.(see page 36 for data on fish and wildife harvest). W .I·larch 1982.Tyonik moose utilization,1981.ADF&G, Dlvision of Subsistence,Anchorage.29 pp.+appendices. 22/Stanek,Ronald T.,Jar.1es Fall,and Dan Foster.11arch 1982. Subsistence shellfish use in three Cook Inlet Villages,1981:A preliminary report.ADF&G,Division of Subsistence,Anchorage.28 pp. 23/Darbyshire and Associates.Dece~ber 1981.Socioecono~ic im~act study of resource developr,lent in the Tyonek/Beluga coal area.Anchorage, Alaska. -110- - (c)Ther~a1 Alternatives other than Coal (i)Natural Gas:In that natural gas is considered by many to be the best single source alternative to Susitna 24/,25/it is disconcerting to see so ~ini~a1 an effort expended exa~ining this alternative.The effort should be at least equal to that provided to the assessment of alternative hydropower sites and coal.Anything less must be considered inadequate.No examination specific to natural gas in regard to potential environmental impacts is provided nor is a tradeoff examination of natural gas,and other alternatives.Without this,one cannot determine whether or not a proposal is the best of all alternatives. Discussion should be provided on the potential impact of the recent signing of natural gas supply contracts between the Enstar Corporation and Marathon and Shell Oil Companies.Discussion should focus on the impacts of these contracts,if approved,not only on allocated natural gas reserves,but also on predicting future use,pricing,potential future de~and of electricity for hOlile heating through the Hatanuska-Susitna Borou~h,and future availability and pricing of natural gas for electrical energy generation. (iv)Environr.lenta1 Considerations:It is unclear as to ~/hat this section is in reference to.If it is meant to cover all types of fossil fuel burning power plants,it is insufficient.We do not consider the potential environ~enta1 impacts of burning natural gas to be the same as for diesel, oil,or coal.We recommend that environmental considerations be examined separately for each of these fuel alternatives.Then they should be examined through a tradeoff analysis which would include Susitna,as proposed,other hydropower projects,and alternative within basin alternatives,and other alternatives to Susitna. lluch of the section centers on the potential ir.lpacts/prob1ems "/hich \lOu1d occur with increased dependence on coal for power generation.Given that the section is entitled (c)Ther~a1 Alternatives other than Coal this would seew inappropriate. (f)Geother~a1:This section fails to recognize,other than parenthetically, the most attractive geothermal alternative,Mt.Spurr.We therefore, recolilT.lend that APA examine the feasibility of geothermal energy development at this site as an alternative to Susitna.Mt.Spurr is being considered by the Division of llinera1s and Ener~y Manage~ent of the ADNR as their first 24/Erickson,G.K.!·tarch 1981.Natural Gas and Electric PO\'ier Alternatives for the Rai1be1t.Legislative Affairs Agency,State of Alaska.9 pp. 25/Tussing,A.R.,and G.K.Erickson.August 1982.Alaska Energy Planning Studies:Substantive Issues and the Effects of Recent Events (Draft).Institute for Social and Economic Research,University of Alaska.15 pp. -111- geothermal lease sale area.They concluded it is the best potential yeothermal development site within their jurisdiction.It is beiny proposed because:(1)it has high potential;(2)it is located on State land;and (3) it is close to existing transmission lines (Beluga Station).In addition.it is in an area already being explored for po\/er development,being located between the Chakachatna River and the Beluga Coal fields,and the area is crisscrossed by logging roads.It \wuld also seelil logical to explore the possibility of a \Jest Cook Inlet power generation alternative to Susitna. This combination would be composed of Mt.Spurr geothermal,Chakachamna hydropower.Beluga coal,and West Cook Inlet natural gas.Obvious advantages would be found in the isolation of adverse environ~ental impacts to a relatively small area which already has transmission facilities. 10.4 Environmental Consequences of License Denial:This section provides little insight as to what might occur if Susitna were not built.We hope that a greater planning effort is ongoing to allow the State to adequately address this issue.It would seem that the first approach to this problem would involve a tradeoff analysis,looking at environmental as well as other issues, to examine appropriate alternatives to the Susitna project.The analysis should be directed at:(1)short-term planning.in the event that Susitna is delayed for various lengths of time;and (2)long-term planning so that we do have a fall back plan in the event that Susitna is not licensed.We recomr.lend that this be undertaken. There is no examination of socioeconomic impacts in the event that the Susitna project license is denied.We consider the potential for a boom-bust occurrence to be yreat with construction of Susitna.Without Susitna we. therefore,would consider this as ~uch less likely.In the event we do not have Susitna,we would expect the construction of much smaller power generation units which .../Quld COlile on-line over a r.luch longer period of til.le. He recor.1r.lend that the socioeconomic ir,lplications of license denial be assessed. -112- SOUTHCENTRAL REGIONAL OFFICE January 21,198 ~~~~[@~~~~~~& DEPT.OF ENVIRONMENTAL CONSERVATION Mr.Eric You1d Executive Director Alaska Power Authority 334 West 5th Avenue Anchorage,Alaska 99501 Dear Mr.You1d: o o RECEIVED JAN 2 11983 0 I.:J.SKA ruWER AUTHORITY BILL SHEFFIELD,GOVERNOR 437 E.:iTREEl SECOND FLOOR ANCHORAGE.ALASf(A 99501 (907)274·2533 P.O.BOX 615 KODIAK.ALASKA 99615 (9071 486-3350 P.O.BOX 1207 SOLDOTNA.ALASKA 99669 (907)262-5210 P.O.BOX 1709 VALDEZ.ALASKA 99686 (907)835-4698 P.O.BOX 1064 WASILLA.ALASKA 99687 (907)376-5038 ..... ,~ The Alaska Department of Environmental Conservation is pleased to respond to the Alaska Power Authority's request for comments on the Susitna Hydroelectric Project,Federal Energy Regulatory License Application,Exhibit E.These comments are organi zed i "to seven primary categori.es and are presented below. A.Water ,.Qua 1;ty 1.The discussion on water quality impacts is well done for both the Watana and Devil Canyon dams.The major impact to water quality is from a change in the downstream water temperature that will occur with the project operati on.The Reservoi r Temperature Model (DVRESM)is des;gned to predi ct reservoi r outflow temperatures to an accuracy of ±2°C.That is a range of vari ation of 4°C.A di fference of 4°C in predicted outflow temperatures could have a significant effect on the actua.1 versus the predi cted impact on downstream fi sheri es.Thi s model i ng effort shou1 d be developed to predi ct reservoi r operati ng parameters when using a given downstream impact,essentially working the model backwards.Accurate estimates of the predi cted downstream river temperatures are an essential component of the impact assessment process. 2.The sheer magnitude of the construction project will create a high potential for soil erosion that may affect water quality.The Exhibit E needs to be more specific on how these problems will be mitigated. Methodologies need to be described in detail for construction of the road,dam and townsites,and other project ent"ities. B.Hazardous Substances A very 1arge amount of hazardous substances wi 11 be transported to,and ut ili zed at,the project site.Oi scharges of hazardous substances cou1 d contami nate 1and as well as surface and ground water.Further impacts could occur to human welfare,fish,and wildlife. The Exhibit E document does not address the major possible sources of fuel spi 11 s,but rather the mi nor ones (1 eaky hydrau1 ic 1i nes and water pumps). A very deta'iled oil spill contingency plan needs to be developed that will have several major objectives and be written to account for a major (i .e., tank truck roll-over),as well as a minor spill event. Mr.Eric Yould January 21,1983 Page 2 The plan should be responsive to project needs and yet be simple enough to be functional.Major objectives of the plan are discussed in detail below: 1.To develop a training program that will stress ,spill prevention.This program needs to cover spill response under all project conditions and set up several response scenarios. 2.To develop the response capability to adequately handle the worst case spill expected.This response capability should be developed for the Watana and Devil Canyon camps and the railhead staging area.This would mean staging spill cleanup equipment at all sites.All hazard- ous substances that will be used on site need to be considered (sol- vents,chemical additives,etc.). 3.To develop an immediate response team for each work shift,consisting of personnel dedicated to spill containment.and cleanup,should a discharge incident occur.This response team would have a designated 1eader who woul d di rect the team.A compl ete trai ni ng program in spill response for this team would be essential. 4.To contai n a small secti on on the project area envi ronment.Thi s would include a map of major drainage areas,fish habitat and seasonal descriptions,and wildlife habitat and seasonal descriptions.The environmental section is very important in prioritizing spill response actions (i.e.,most sensitive areas first),and for developing an ap- preciation for the impact a spill can have. C.Wastewater Treatment The type of wastewater treatment plant to be used at each camp site has to be described in greater detail to more adequately evaluate its effective- ness.The discharge from the Watana treatment facility may not meet fecal coliform standards because of inadequate dilution.The discharge zone should be well defined for both facilities.The Watana and Devil Canyon camp wastewater treatment plants are to be functioning and approved before each camp ;s in operation. D.Concrete Batching Plant Potenti al impacts that may occur from the concrete producti on process are not described in enough detail.The discharge from this process will also have,in addition to pH changes,problems with siltation,turbidity and possibly toxic additives used in the curing process.Siltation from concrete can form a mat over substrate gravels.This could suffocate emergi ng sal mon fry or other i ndi genous organi sms that requi re substrate habitat.Discharges that may have toxic concrete additives as a component may k-ill aquatic organisms.The batching process may also have airborne particulate problems.Specific control measures need to be described in detail for each type of problem that may be encountered. Mr.Eric You1d January 21,1983 Page 3 E. F. Access Corridors The access route (Plan 17)was determined,during the access route selec- tion process,to have greater potential for major environmental impacts than the other route options."The major impacts of concern were: 1.The Denali Highway to"Watana Dam site portion passes through habitat that has historically been used by portions of the Ne1china caribou herd. 2.Many native grayling streams can potentially be affected during the construction of the Denali Highway to Watana Dam site access section. 3.Access along the s.quth side of the Susitna River from the Watana to Devi 1 Canyon Dam sites passes through the Stephan Lake regi on.Thi s region is important habitat for moose,wintering caribou,migrating waterfowl,and fur bearers~ 4.Wetlands habitat is crossed southwest of Devil Canyon. Because of the greater potential for major impacts associated with the Plan 17 access option,more attention should be given to defining the methods that will be implemented to mitigate these impacts.For example: 1.How will the access route be designed to minimize disruption to the caribou herd? 2.What technique will be implemented to prevent impacts to native grayling streams from road construction? 3.How will impacts to the Stephan Lake region be reduced? 4.How wi 11 project and post-project access be contro 11 ed to prevent secondary impacts related to access? Fishery Impact Assessment The field data base is incomplete for an accurate prediction of the impact the Susitna Hydroelectric Project will have on fishery resources.A good set of data has been collected for only two years.Fishery population and related water quality data can have inherent fluctuations from year to year.Long term,1 arge-sca1e programs need to be implemented in order to make a reasonably accurate population estimate.Very specific detailed studies designed to correlate physical and chemical aspects of the aquatic habitat to population fluctuations need to be part of the long term program. This program should be continued through project construction. Mr.Eric Yould January 21,1983 Page 4 If impacts cannot be accurately predicted,a worst case (100%loss)estimate of the fishery population should be assumed and the implications this impact would have to the aquatic community and related resource use need to be discussed.By assuming a worst case estimate,a type of mitigation program can then be developed where compensation to the fishery population can occur to resu1t in an acceptable loss. A long term "post-project aquatic monitoring program should be developed as an integral part of the project.Funds should be allocated in advance to insure the continued existance of this program.The monitoring program is essential to determine the effectiveness of mitigation measures that are implementedo G.Interagency Review Board It is strongly recommended that a formal interagency review board be estab- lished to work with the Alaska Power Authority in the development of the Susitna Hydroelectric Project.This board will identify and comment on socioeconomic and environmental issues and regulatory requirements.It is suggested that the Formal Designation of the Susitna Technical Advisory Committee (see attached memo to you dated November 17,1982)be implemented to accomodate this recommendation. Once project construct ion begi ns,a simi 1ar interagency board shaul d be established to monitor the socioeconomic and environmental impacts and regulatory compliance.This board would make recommendations to the Alaska Power Authority to correct associated problems as necessary. The Alaska Department of Environmental Conservation appreciates this oppor- tunity to comment on the Susitna Hydroelectric Project,Federal Energy Regula- tory Li cense Appl i cati on,Exhi bit E and hopes that these comments wi 11 be useful to you.If you have any questions,or if we can be of further assistance,do not hesitate to contact Bob Martin or Steve Zrake in Anchorage. Si ncere ly,<---I ..-. Richard A.Neve Commissioner Attachment cc:Bob Martin,ADEC,Anchorage Steve Zrake,ADEC,Anchorage Su-Hydro Steering Committee 1f"T"l------n1·-------..~--"--..-----...---------- Srate of Alaska -Board of Directors TO:Alaska Power Authori ty Al Carson.Chairman FROM:Susitna Hydro Steering Committee INTRODUCTION: DATE: FILE NO: TELEPHONE NO: SUBJECT: November 17.fuse E,V Eo JAN 2 11983 274 -2533 ALASKA POWER AUTHORITY. Formal Designation of the Susitna Technical Advisory Committee - .- The Susitna Hydro Steering Committee was establ ished in 1979 as an ad hoc advi sory group compri sed of representatives of State and federal agencies to provide comments,and advice to the Alaska Power Authori ty (APA)staff regardi ng feasibil;ty studies of the Susi tna Hydroelectric Project.The group has met on an liaS needed"basis over a peri od of some blo years.revi e\'li ng reports prepared for the Susitna Feasibi li ty Study by vari ous contract consul tants to the Power Authori ty.In recent testimony before the Power Author;ty Board the majority of State and Federal ,agencies expressed the need for a more formal mechanism to provide advice to the APA staff and Board on a variety of subjects relating to Susitna.In response to agencies testimony on this topiC.the A.P.A.Board requested that a charter and agreement be drafted to formal i ze the advi sory rel ation- ship between the State and federal regulatory agencies and the APA. Therefore.we recommend that the following organization and charter be considered for adoption. FORMAL ORGANIZATION &CHARTER: It is proposed that an interagency.interdisciplinary organization of State and federal personnel be establ i shed to provide advice and comment on feasibility studies and FERC applications to the Alaska PO\,/,er Authority staff and Board of Directors.The focus of this Susitna Technical Advisory Committee (STAC)would be in an advisory capaci ty to comment on the adequacy of studi es done for the FERC application for the Susitna Project.The committee would be charged with advising the APA staff and Board on the acceptability of feasi- bilityand mitigation studies.The charter includes the formal des i gnati on of agency representatives,and a memorandum of agreement (attached)which all parties would be signatory to.The committee's tasks would be specified in detail via the coopel·ative agreement. The APA staff would commit sufficient support to the ST~C to provide clerical assistance in typing and mailing..information and STAC meeting minutes to STAC members.In addition.the APA staff would provide briefings by its staff,contractors and External Review Panel members 02·001 AlAn.10/191 Board of f>.:,,"ectors Page 2 November 17.1982 on those"proj ect matters germane to the STAC.Formal STAC parti ci pati on would be limited to those agencies which share a responsibility for reviewing and/or issuing permits for the project.The respective State and federal agencies in cooperation with the APA Staff \'/ill provide advice on the State and federal permit activities and with the FERC licensing process.This agreement in no way affects,binds or changes the authority or responsibility of any participating agency wi th respect to proj ect penni tti og or formal comments and recommendations to FERC. PROPOSED ORGANIZATION CHART: The following chart (attached)represents a proposed organization of the State and federal agencies to coordinate with and advise the APA Board regarding all technical aspects of the Susitna Hydroelectric Project. ORGANIZATION AND SCOPE: The Susitna Technical Advisory Committee (STAC)would operate in an "advi sory capaci ty to the APA staff and Board.The APA woul d provide staff assistance to the STAC.The focus of this organization is to provide advice on studies and required permits,appropriate to assist the APA to meet the goal of fulfilling the Exhibit E require- ments of the FERC 1 icense appl ication (Federal Register,Vol.46. #219,November 13.1981). i ]-1 i J 1 J -1 1 ---1 J J 1 1 r I I ALASKA POWER AUTHORITY BOARD OF DIRECTORS I I I I \ I I I \I I .,..1-------:---------,-\ I ALAS~A POWER I \SUSITNA HYDROELECTRIC PROJECT I I AUTHORITY STAFF I I TECHNICAL ADVISORS STEERING COMMITTEE I I \I l I I I Designee ...................................'.I I \CHA I Rr4AN I I I . I \ Community &Regional Affairs Environmental Conservation Fish &Game Natural Resources Transportation &Public Facilities I I I I Ex Officio State U.S.Geological Survey Arc tic Env i ronlnen ta 1 Information and Data Center I \ Federal Bureau of Land Management Corps of Engineers Environmental Protection Agency Fish &Wildlife Service National Marine Fisheries Service National Oceanic &Atmospheric Administration l National Park Service COOPERATIVE AGREEMENT Between the State of Alaska Resource Agencies, the Federal Resource Agencies, and the Alaska Power Authority .Board of Directors This cooperative agreement formalizes an interagency,interdisciplinary Susitna Technical Advisory Committee (STAC)to be staffed by both State and federaf resource agencies to provide the APA staff and Board of Di rec tors assi stance in assessi ng the feasibil ity of the Susi tna Hyd:-o- electric ?roject.The State agencies,including the Alaska Departments of COiill1uni ty &Regional Affairs,Envi ronmental Conservation,Fish &Game, Ua tural Resources,and Transporta ti on &Publ ic Facil i ti es and the federal agencies i ncl udi ng the Bureau of Land i1anagement,Corps of Engineers, Environr.tental Protection Agency,Fish &\Hldlife Service,National Park Service,and National Oceanic &Atmospheric Administration,agree to serve coll ecti vely,as descri bed herei n,in an ad'li sory capaci ty regarding the util i ty,rel evance and approp";ateness of studi es funded by the APA for the Susitna Hydroelectric Project through possible licensing and implementa- ti on.Tili s agreement in no way affects,bi nds or changes the authori ty or responsibility of any participating ~gency with respect to project permit- ting or formal comments and recommendations to FERC. TerDs of the Agreement Each agency agrees to designate an appropriate level official to serve as the rep:"'~sentative to the STAC and to provide the necessary support to enable its representative to the STAC to advise the APA staff and Board on regula- tory,·equirernent.:associated with developing the Susitna Hydroelectric Project.It is agre~d that the objective of the STAC is to'identify the socio-economic and environmental issues that should be addressed in order to assist the APA to cornply with the FERC licensing process.It is further agreed,that the STAC \"ill provide in writing,.comments to the A?A staff and Board: a)on study requests for proposal(s)and scope(s}of work required to meet permiting and FERC licensing requirements; b)on draft technical study documents; c)on compatibility of study products with agency management objectives. guidelines and criteria; d)regarding analysis and investigation necessary to determine miti- ga ti on ::1easures; e)on project timing as it may relate to regulato,·y matters; f)regarding coordination issues within the pur'liew of the ST;'~. It is further agreed that the participants shall designate a chairman from their members for the STAC,and that the STAC will provide a written report as needed to the APA staff,Board and participating agency admi ni stra tors. It is agreed that the APA staff and Board will: a)provide cierical support to type meeting minutes and mail infonnation to STAC members; b)provide to the STAC access to appropriate project documentation and presentation of briefings by APA staff,contractors and External Review Panel members on relevant project matters. c)respond in writing to STAC requests,correspondence and recommendations within 15 days of receipt. idIIr I Page 2 ~----'F ---_ Amend:nents to thi s Agreeillent become effective upon approval of all signatores.This Agreement becomes effective on signature by all parties. and remai"ns in force until terminated by mutual consent. STATE OF ALASKA Alaska PO\'/er Authori ty by ""C"'-h-uc""'k--"C""'o-m-'1a-y-,.-------- Chairman on ttfte Board by -.=--..-:--;;--...,....,_ Eric '(ould Executive Di.rector Departments of~ Comr.lUnity &RegJonal Affairs by ,--::--;;--;-:;----;---;_ lee HcAnerney.Commissioner Envi roniilentaT Conserva ti on by "-~""""7."~::--.,.....,.-----=--.-----,---Ernst ~.Mueller.Commissioner Fish &Game by nR~on::-a:'11I.:drt';"O-.'S"Tk=-=o-=o-=g-.~C,ro-:n-IO""i-s-s -'-io-n-e-r Natural Resources by 'Jo:lh--n::--ilK-:"a7"tz--.---;:C;-:"o-fij-m7"i-ss-'i""'o-n-e-r--- Transportation &Public Facilities by "RODert ~.IJara,Co.nmlssloner FEDERAL AGEUCIES Bureau of Land t·1anagement by ""C-ur-t~i"""'lc":TV e~e-.--"S"'t-a-:-te--"D""i~r--:-e-=-c L""to:"":r=- Corps of Engineers by Colonel Neii Saling District Engineer Environmental Protection Agency by Ron Kriezenbeck.Director Alaska Operations Office Fish &Wildlife Service by Keith Schreiner.Regional Director National Oceanic &Atmospheric Administration by Robert McVey.Regional Director-NMFS National Park Service by John Cook.Regional Director Effective this day of _,1982. """ Januil ry 21,J9~~ Pr.!(rith Bayhi' Re9io~a'nir~ctor H.S.Oep;rortl'llcnt of the T!"tp.rioY' Fi5~8 Wi'dlif~S~rvir.e 1011 F~st Tudor Poad Ar.r.horage.Alaska 99503 ()e~r Mr.Bl'lyha: Thank you very much fer your t1~ly 5nd t~ornuQh rQspon~p.to our recent r~qupst for consu't~tion or.the Su~ftn~'~ydr~p.lp.ctr1r Project. real1zr how iAPo.s~nQ the draft Federal Energy Pp.gul~to~y Commission (FERC)licp.nsp.apr1icatior wa~~~d th~p.xtensiv~staff r~$ources needed to carefully review it. Your COMment.~rel~ti~g to propos~d mitfa~tion measures will b~ inte9rllted into theapproprhte chapters of Exhibit E.Your letter will appear in its entire~y in a new chapter of thp.Exhibit and will be accornp~nied by our responses. Tn some cases.we will have ~ully addressed your concern fn th~ rewritt~n Exhibit E,in others we will irlent1fy ongoing work wh1c~will le~d to acceptable answers.Also.ther~wil'be inst~nc~s wh~re we will need to.insurP that the coming year's study program is rlp'sign~d to provide thp.info~tion you identify as being lack;ng.Over the next several months you will be a5k~d to review the study plan so we can he confident th~pro~ram will result in the desired infonM~tio". It is my ffrA belief that th~extent of thp Su~itn~proj~ct'~ r ! imp~ct.prior to ~it198t1o",has bepn we11 defined.ft.fflit19~tio" ~pproach has bp.en propcspd.but it win need to be refif'lP,d over time the effectiveness of thp various MP.asurp.~are more fully evalu~t~d. env1ror.ment~1 study program will then be Cont1r.u~rl to MOnitor that ~f'fectiveness. Si"'cerely, EricP.Youlcl Executiv~Director ?S The ALASKA POWER AUTHORITY Distribution List Susitna Hydroelectric Project Mr.Ke ith Bayha Regional Director U.S.Department of the Interior Fish &Wildlife Service 1011 East Tudor Road Anchorage,Alaska 99503 Ms.Esther Wunnicke Commissioner State of Alaska Department of Natural Resources 555 Cordova Street Pouch 7-005 Anchorage,Alaska 99510 Mr.Don W.Collinsworth Acting Commissioner State of Alaska Department of Fish &Game Office of the Commissioner P.O.Box 3-2000 Juneau,Alaska 99802 Mr.William Welch Associate Regional Director U.S.Department of the Intertior National Park Service Alaska Regional Office 540 West 5th Avenue Anchorage,Alaska 99501 Mr.Richard Neve' Commissioner State of Alaska Department of Environmental Conservation Pouch 0 Juneau,Alaska 99811 Mr.Robert W.McVey Director,Alaska Region U.S.Department of Commerce National Oceanic &Atmoih~eric Administration v~ National Marine Fisheries Service P.O.Box 1668 Juneau,Alaska 99802 ~---Tr -----~~-.---c---~------- - ,... February l1,19B3 Hr.Keith Bayha Regional Director U.S.Oep~rtment of the Interior Fish &Wildlife Service 1011 East Tudor Road Anchorage,-Alaska 99503 SUB~lECT:Agency Commetlts Draft Exhibit E (Novembet"1982) Susitna Hydroelectric Prc:lect Dear Mr.Bayha: As a follow-up to our January ?4~19B3,letter regarding your agency's draft Exhibit E comments,be advised that we will address all comments,point by point.in Exhibit E,Chapter 11,"Agenc.y Consulta- tion"of the fOrm6l application. When the Application is submitted to the Federal Energy Regulatory Commission.we will provide you with a complete license applicat1on, including Chapter 11.We anticipatp.that you will receive your copy during the first week of March 1983. Thank you for your past responsiveness,and do not hesitate to contact us if·you have any Questions. Sincerely, Eric P.Yould Executive Director ALASKA POWER AUTHORITY Distribution List Susitna Hydroelectric Project Mr.Keith Bayha Regional Director U.S.Department of the Interior Fish &Wildlife Service 1011 East Tudor Road Anchorage,Alaska 99503 Ms.Esther Wunnicke Commissioner State of Alaska Department of Natural Resources 555 Cordova Street Pouch 7-005 Anchorage,Alaska 99510 Mr.Don W.Collinsworth Acting Commissioner State of Alaska Department of Fish &Game Office of the Commissioner P.O.Box 3-2000 Juneau,Alaska 99802 Mr.William Welch Associate Regional Director U.S.Department of the Intertior National Park Service Alaska Regional Office 540 West 5th Avenue Anchorage,Alaska 99501 Mr.Richard Neve' Commissioner State of Alaska Department of Environmental Conservation Pouch 0 Juneau,Alaska 99811 Mr.Robert W.McVey Director,Alaska Region U.S.Department of Commerce National Oceanic &Atmoihaeric Administration v~ National Marine Fisheries Service P.O.Box 1668 Juneau,Alaska 99802 - ,~ r-et'rUrl ry ?.1983 Mr.Curtis V.McVec U.S.Oepartment of Ipterior U.S.Bureau of Land ~anagement 701 "CD Street,eox 13 Anchorage.Alaska 99513 Re:Agency Coordination Suhsec:uent to Appl ication fot·license - Susitna Hydroelectric Pruject De a r Hr.He"ee : To facilitate communicaticn and coordination with State,Federal and Lucal resource agencies,with respect to the Susftna Hydroelectric Project.the Alaska Power Authority has designated rtr.Thomas J. Anminski as Agency Coordinator.Mr ••Jack Robinson of Herza-Ebasco has been designated the fonw~l agency contact for the design consultant. Hr.Arminski will be responsible to my Susitna Project Manager to insure that coordination charnels remain unobstructed,that agency suggestions are provided to the appropriate members of the project team. and that we,in turn,keep you advised of how your suggestions have been acconmodated. We are extremeiy appreciative of your past efforts in working with the Power Authority on the project.With the designation of these two positions.we hope to maintain a responsive relationship with your agency throughout the licensing phase of the project. Mr.Arminsk1 and Mr.Robinson may be contacted as follows: Mr.Thomas J.Arm1nski Alaska Power Authority 334 West Fifth Avenue Anchorage,Alaska 99501 907 277-7641 or 276-0001 Mr.Jack Robinson Ha rza-Ebasco lloi nt Venture 8740 Hartzell Reed Anchorage,Alaska 99507 907 349-5881 Please be advised th~t designation of formal coordioctors does not preclude informal communications between your agency and project staff.' PleasF feel free to contdct us if yOU have any questions or COmtr"IC n t s • Eric P.Yould Ex€cutive Director cc:Mr.John Merrick LETTER Curt V.McVee U.S.Bureau of Land Management 701 "C"Streett Box 13 Anchorage t Alaska 99513 DISTRIBUTION LIST CARBON COpy John Merrick U.S.Bureau of Land Management 4700 E.72nd Avenue Anchorage t Alaska 99507 ----------------,----------------------------------------------------'-----------'---- ,.,.. .... J.R.Spencer Regional Administrator U.S.Environmental Protection AgencYt Region X 1200 6th Avenue Seattle t Washington 98101 John E.Cook Regional Director National Park Service 450 West Fifth Avenue Anchorage t Alaska 99501 Colonel Neil E.Saling District Engineer U.S.Army Corps of Engineers Pouch 898 Anchorage t Alaska 99506 Robert W.McVey Director t Alaska Region National Marine Fisheries Service P.O.Box 1668 Jun eau tAl as ka 99802 Mr.Keith Schreiner Regional Director Keith Bayha t Assistant Regional Director-Environment U.S.Fish and Wildlife Service 1011 East Tudo~Road Anchorage t Alaska 99503 Page 1 Ron Krei zen beck Alaska Operations Office t Director Environmental Protection Agency 3220 Hospital Drive Juneau t Alaska 99811 William Lawrence U.S.Environmental Protection Agency Alaska Operations Office 701 IIC"Streett Box 19 Anchorage t Alaska 99513 Wi 11 i am Ri 1ey U.S.Environmental Protection Agency Environmental Evaluation Branch Ma i1 Stop 443 1200 6th Avenue Seattle t Washington 98101 Larry Wright National Park Service 1011 E.Tudor Road t Suite 297 Anchorage t Alaska 99507 Mr.James Wolfe U.S.Army Corps of Engineers Regulatory Functions Branch Anchorage District P.O.Box 7002 Anchorage t Alaska 99513 Brad Smith National Marine Fisheries Service 701 IIC II Streett Box 43 Anchorage t Alaska 99513 Lenny Corin t Field Supervisor Western Alaska Ecological Services U.S.Fish &Wildlife Service 605 West 4th Avenue t Room G-81 Anchorage t Alaska 99501 Robert Bowker U.S.Fish and Wildlife Service 605 West 4th Avenue t Room G-81 Anchorage t Alaska 99501 LETTER (Cont.) Philip A.Emergy District Chief U.S.Geological Survey 1515 E.13th Avenue Anchorage,Alaska 99501 ~1s.Wendy Wol f State-Federal Coordinator Division of Policy Development and Planning State Clearinghouse Pouch AW Juneau,Alaska 99811 Richard Nevel Commissioner Department of Environmental Conservation Pouch 0 Juneau,Alaska 99811 Don Collinsworth (Acting) Commissioner Alaska Department of Fish &Game Subport Building Juneau,Alaska 99811 Esther Wunnicke Commissioner Department of Natural Resources Pouch M Juneau,Alaska 99811 Page 2 (Cont.) CARBON COpy (Cont.) Gary Stackhouse U.S.Fish and Wildlife Service 1011 East Tudor Road Anchorage,Alaska 99501 Robert Lamke Water Resources U.S.Geological Survey 1515 E.13th Avenue Anchorage,Alaska 99501 Robert Martin Regional Environmental Supervisor Department of Envi ronmenta 1 Conservat i 0'- 437 "E"Street Anchorage,Alaska 99501 Carl M.Yanagawa Habitat Division Alaska Dept.of Fish &Game 333 Raspberry Ro~d Anchorage,Alaska 99502 Alan Carson Department of Natural Resources 323 E.Fourth Avenue Anchorage,Alaska 99501 Judy Marquez Department of Natural Resources Division of Parks 619 Warehouse Avenue,No.210 Anchorage,Alaska 99501 Larry Dutton,District Manager Department of Natural Resources Division of Forest,Land &Water Management 3601 "C"Street Pouch 7-005 Anchorage,Alaska 99510 Keith Quintavell (Principal Contact for: Permits) Special Projects Officer Div.of Land &Water Management Alaska Dept.of Natural Resources Pouch 7-005 Anchorage,Alaska 99510 ..... LETTER (Cont.) Ms.Lee McAnerney Commissioner Department of Community and Regional Affairs Pouch B Juneau,Alaska 99811 CARBpN COpy (Cont.) Janet Burleson Mat-Su Area Manager Division of Land &Water Management Centara Plaza,Suite 202 Pouch 4008 Wasilla,Alaska 99687 Ed Bushch,Director Division of Community Planning 225 Cordova,Building B Anchorage,Alaska 99501 ------------------------------------------------------------------------------------ - ,.... Daniel A.~Casey Commissioner Department of Transportation & Public Facilities Pouch Z Juneau,Alaska 99811 Claudio Arenas Planning Director Matanuska-Susitna Borough P.O.Box B Palmer,Alaska 99645 Page 3 (Cont.) Kei th Morberg Dept.of Transportation & Public Facilities Design &Construction Division Pouch 6900 Anchorage,Alaska 99502 Appendix ElIJ Comments Received from Agencies Concerning the Draft License and the Power Authority's Response to These Comments APPENDIX 11.J ,~RESPONSES TO AGENCY COMMENTS Thi s appendix contains theA1aska Power Authority's responses to all comments received on the Draft Exhi bit E.These are presented by agency in a comment- ~ i response format.Portions of this appendix contain numbered footnotes;the explanations 'of these footnotes can be found in the U.S.Fish and Wildlife Service covering letter contained in Appendix 11.1. -, - - -I .... - - DEPARTMENT OF ENVIRONMENTAL CONSERVATION ,.., I -, - - - -. ,- COMMENTS CONTAINED IN ALASKA DEPARTMENT OF ENVIRONMENTAL CONSERVATION'S LETTER OF JANUARY 13,1983 Tile A1 aska Department of Envi ronmenta1 Conservation is p1 eased to respond to the A1 aska Power Authority's request for comments on the Susitna ~droe1ectric Project,Federal Energy Regulatory License App1i- cati on,Exhi bi t E.These comments are organi zed into seven pri ma ry categories and are presented below. A.Water Quality Comment 1 The discussion on water quality impacts is well done for both the Watana and Devil Canyon dams.The major impact to water qual ity is from a change in the downstream water temperature that wi 11 occur wi th the project ope rat ion.The Reservoi r Temperature Model (DYRESM)is designed to predict reservoir outflow temperatures to an accuracy of +2°C.a range of variation of 4°C.A difference of 4°C in predicted outflow temperatures could have a signi ficant effect on the actual versus the predicted impact on downstream fisheries.This model ing effort shoul d be developed to predi ct rese rvoi r operat i ng parameters when using a given downstream impact,essentially working the model backwards.Accurate estimates of the pr~icted downstream river temperatures are an essential component of the impact assessment process. Response We concur that predicted downstream river temperatures are an essential component of the impact assessment process.DYRESM isa state-of-the-art reservoir temperature model and,in our opi ni on, is as good as any other computer model that is available.It was selected for use on the Susitna Hydroelectric Project only after a thorough search of all models was conducted.DYRESM is a process- oriented thermal model requi ring only minor calibration.The model has been successfully used on the Well ington r'eservoi ri n Australia and in Kootenai Lake,British Columbia.Recently,it has been used to model Ek1utna Lake.Results are presented in Fi gu res E.2.166 and E.2.167.Outfl ow temperatures are predicted to within 1°C,thus indicating the suitability of the model. Comment 2 The shear magnitude of the co,nstruction project will create a high potential for soil erosion that may affect water qual ity.The Exhibit E needs to be more specifi c on how these prob1 ems wi 11 be mitigated. Methodologies need to be described in detail for construction of the road,dam and townsites,and other project entities. Response We agree that the magnitude of the construction project will create a high potential for soil erosion that may affect water qual ity.Discussion on how soil erosion will be mitigated can be found in Chapter 3,Section 2.4.3(c)(iii)and Chapter 2,Sections 4.1.1(c)(iii)and 6.2. B.Hazardous Substances Comment A very large amount of hazardous substances will be transported to, and utilized at,the project site.Discharges of hazardous sub- stances could contaminate land as well as surface and ground water. Further impacts could occur to human welfare,fish,and wildlife. The Exhibit E document does not address the major possible sources of fuel spills,but rather the minor ones (leaky hydraulic lines and water pumps).A very detailed oil spill contingency plan needs to be developed that will have several major objectives and be written to account for a major (i.e.,tank truck roll-over),as well as a minor spill event. The plan should be responsive to project needs and yet be simple enough to be functional.Major objectives of the plan are dis- cussed in detail below: 1.To develop a training program that will stress spill preven- tion.This program needs to cover spill response under all project conditions and set up several response scenarios. 2.To develop the response capability to adequately handle the worst case spill expected.This response capability should be developed for the Watana and Devil Canyon camps and the rail- head staging area.This would mean staging spill cleanup equi pment at all sites.All hazardous substances that will be used onsite need to be considered (solvents,chemical addi- tives,etc.) 3.To dev~lop an immediate response team for each work shift,con- sisting of personnel dedicated to spill containment and clean- up,should a discharge incident occur.This response team woul d have a des ignated 1 eader who woul d di rect the team.A complete training program in spill response for this team would be essential. ,- .... .... .... .... 4.To contain a small section on the project area environment. This would include a map of major drainage areas,fish habitat and seasonal description,and wildlife habitat and seasonal descriptions.The environmental section is very important in prioritiZing spill response actions (i .e.,most sensitive areas fi rst),.and for devel opi ng an appreci at ion for the impact a spi1l can have. Response Federal law requires that as part of the management proce- dures there will be an oil spill contingency plan (40 CFR) l02.F).This is discussed in Chapter 3,Section 2.4.3(c) (i i ) • C.Wastewater Treatment Comment The type of wastewater treatment plant to be used at each camp site has to be described in greater detail to more adequately evaluate its effectiveness.The di scharge from the Watana treatment facil- ity may not meet fecal col iform standards because of inadequate dilution.The discharge zone should be well defined for both facilities.The Watana and Devil Canyon camp wastewater treatment plants are to be functioning and approved before each camp is in operat ion. Response All wastewater discharges from the treatment facil ities will meet permit requirements.Chlorine will be utilized, if deemed appropriate,to ensure discharge water will meet fecal coliform standards. D.Concrete Batching Plant Potential impacts that may occur from the concrete production pro- cess are not described in·enough detail.The discharge from this process will also have,in addition to pH changes,problems with siltation,turbidity,and possibly toxic additives used in the cur- ing process.Siltation from concrete can form a mat over substrate gravels.This could suffocate emerging salmon fry or other indi- genous organi sms that requi re substrate habitat.Di scharges that may have toxic concrete additives as a component may kill aquatic organisms.The batching process may also have airborne particulate problems.Specific control measures need to be described in detail for each type of probl em that may be encountered. Response Potential impacts associated with concrete wastewater and preliminary mitigative measures are discussed in Chapter 2.Sections 4.1.1(c)(vi).4.2.1(c)(vi).and 6.2. E.Access Corridors Comment The access route {Plan 17)was determined.during the access route selection process.to have greater potential for major environmen- tal impact than the other route options.The major impacts of con- cern were: 1.The Denal i Hi ghway to Watana damsite portion passes through habitat that has historically been used by portions of the Nelchina caribou herd. 2.Many native grayl ing streams can potentially be affected during the construction of the Denali Highway to Watana damsite access section. 3.Access along the south side of the Susitna River from the Watana to Devil Canyon damsites passes through the Stephan Lake region.This region is important habitat for moose.wintering caribou.migrating waterfowl.and furbearers. 4.Wetlands habitat is crossed southwest of Devil Canyon. Because of the greater potential for major impacts associated with the Plan 17 access portion.more attention should be given to defining the methods that will be implemented to mitigate these impacts.For example: 1.How will the access route be designed to minimize disruption to the caribou herd? 2.What technique will be implemented to prevent impacts to native grayling streams from road construction? 3.How will impacts to Stephan Lake region be reduced? 4.How wjll project and post-project access be controlled to pr€- v~nt secondary impacts related to access? Response 1.The initial alignment of the access rou~-e has been modified to avoid the major portion of the carinou range.In addition.specific design features to be utilized are discussed in Section 4~4 of Chapter 3. - ..... - ~, F. 2.Impacts to native grayling streams from road construc- tion will be avoided or minimized by adhering to spe- cific design and construction practice criteria. These criteri a,when appl ied to stream crossi ng and encroachments,give consideration to location of cros- sing,type of crossing structure,flow regime,and method of installation.In addition.continued moni- tori ng of the constructi on facil ities and activit ies will ensu re that impacts to g rayl i ng streams are avoided or minimized.A detailed presentation of these criteria is found -i n the text under Section 2.4.3. 3.The access road passes north between the damsites, therefore avoiding the Stephan Lake region. 4.Project access will be restricted to the construction work force.Post-project access is discussed in Chapters 7.3.and 9. Fishery Impact Assessment Comment The field data base is incomplete for an accurate prediction of the impact the Susitna Hydroelectric Project will have on fishery resources.A good set of data has been collected for only two years.Fishery population and related water quality data can have inherent fluctuations from year to year.Long-term,large-scale programs need to be implemented in order to make a reasonably accurate population estimate.Very specific detailed studies designed to correlate physical and chemical aspects of the aquatic habitat to population flucutations need to be part of the long term program.This program should be continued throughout project con- struction. If impacts cannot be accurately predicted,a worst case (100%loss) estimate of the fishery population should be assumed and the impli- cations this impact would have to the aquatic community and related resource use need to be discussed.By assuming a worst cast esti- mate,a type of mitigation program can then be developed where com- pensati on to the fi shery popul ati on can occur to result in an acceptable loss. A long-term,post-project aquatic monitoring program should be developed as an integral part of the project.Funds shoul d be allocated in advance to insure the continued existence of this pro- gram.The monitoring program is essential to determine the effec- tiveness of mitigation measures that are implemented. Response It is recognized that continued studies are needed to refine impact predictions and develop appropriate mitiga- tions.The data are considered adequate for evaluating the magnitude of potential impacts to the selected evalua- tion species.These potential impacts are assumed as reasonable worst case scenarios in the revised document. The Power Authority is continuing to support studies that will refine these estimates.The mitigation monitoring program is discussed in Chapter 3,Section 2.6.2 G.Interagency Review Board Comment It is strongly recommended that a formal interagency review board be establ ished to work with the Al aska Power Authority in the development of the Susitna Hydroelectric Project.This board will identify and comment on socioeconomic and environmental issues and regulatory requirements.It is suggested that the Formal Designa- tion of the Susitna Technical Advisory Committee (see attached memo to you dated November 17,1982)be implemented to aicommodate this recommendation. Once project construction begins,a similar interagency board should be established to monitor the socioeconomic and environmen- tal impacts and regulatory compliance.This board would make recommendations to the Alaska Power Authority to correct associated problems as necessary. Response The Power Authority bel ieves there is 1 ittle reason to establ ish a formal interagency revi ew board at thi slate date.Past agency and Su-Hydro Steering Committee coordi- nation has identified environmental and socioeconomic concerns in slJfficient detail to have allowed the Power Authority to begin and,in some cases,complete studies from which impacts in these areas can be quantified. Future efforts will be directed towards development of mit i gat i on measures,monitoring impacts,and assessing efficacy of mitigation. The Power Authority does bel ieve,however,that there needs to be contil1uous,effective coordination between itself and agencies.To accomplish this,the Power Authority has designated a person from within itself and its design consultant to take the responsibility for insuring that agency concerns,suggestions,and questions a re add ressed. F"I r~' .- .... - - .... The Power Authority has designated Mr.Thomas J.Arminski as its Agency Coordinator and Mr.Jack Robinson,of Harza- Ebasco,as the formal agency contact for the design con- sultant.With this clear assignment of responsibility,it is believed that working relationships among all parties will be improved • The Agency Coordinator will be responsible to the Susitna Project Manager to insure that coordination channels remain unobstructed,that agency comments and recommenda- tions are provided to the appropriate members of the pro- ject team (environmental,engineering,regulatory,etc.), and that the Power Authority keeps agencies advised of how their recommendations have been dealt with. We foresee this well-defined effort as being superior to the proposed Steeri ng Committee concept which,in the past,has been less than effective,both from the Agencies'and the Power Authority's perspective. With respect to regul atory requi rements and permitti ng, the Power Authority has al ready formally requested that each agency wi th regul atory authority des ignate a contact with whom the Power Authority can coordinate all pemitting activities.This facet of agency coordination has been underway for several months and is resulting in early identification of permits. As for monitoring,it is the intention of the Power Authority to estab 1ish a monitori ng prog ram that responds to and implements the articl es of any forthcomi ng Federal Energy Regulatory Commission (FERC)license for the Pro- ject. We invite and also expect your agency,as well as other regulatory entities,to playa major role in the formula- tion of the specifics of the program.With respect to moni tori ng the effectiveness of mit igat i on measures and compliance with stipulations of the license application, we see that as the licensee's responsibility. Comment The Alaska Department of Environmental Conservation appreciates this opportunity to comment on the Susitna Hydroelectric Project, Federal Energy Regulatory Commission License Application,Exhibit E,and hopes that these comments wi 11 be useful to you.If you have any questions,or if we can be of further assistance,do not hesitate to contact Bob Martin or Steve Zrake in Anchorage. Response The Power Authority appreciates the input from the DEC and will continue to pursue active coordination throughout the FERC license review process • - ...... I""", - - DEPARTMENT OF NATURAL RESOURCES ..... - - COMMENTS CONTAINED IN THE DEPARTMENT OF NATURAL RESOURCES LETTER OF JANUARY 13,1983 Comment 1 The Alaska Department of Natural Resources has reviewed the draft Ex- hibit E application for the Susitna MYdroelectric Project.We are sub- mitting comments on this document which in part satisfy the agency coordination requirements established by the Federal Energy Regulatory Commission,(FERC).The formal position of the Department of Natural Resources regarding the Susitna project is contained in the Exhibit E comments which follow;our April 16,1982 testimony.to the Alaska Power Authority Board of Di rectors (copy attached)and the 1etter to Eri c Youl d from Reed Stoops dated October 11,1982 (copy attached).We request that an unabridged copy of these comments accompany the perfec- ted application submitted to FERC. Response Receipt of the above comments is acknowledged.An unabridged copy of these comments is included in Chapter 11 along with responses prepared by the Power Authority. Comment 2 ORGANIZATION AND PRESENTATION OF EXHIBIT E In some cases the Exhibit E text,tables,and figures do not reference the documents from which the material was taken.The consequence of this inadequate documentation is that the reader cannot determine the specificity,accuracy or sufficiency of the Exhibit E.We recommend that the specific references to original documents be included in this Exhibit E before the application is submitted to FERC. Response The accuracy and completeness of documentation has been improved in the final license application. Comment 3 WATER QUANTITY AND QUALITY During the past two years the Department of Natural Resources has em- phasized the great importance of acquiring a clear understanding of the relationship of various flow-release rates from the proposed dams and the corresponding impacts on downstream aquatic resources,habitats, and uses.This information is vital to enable DNR to make informed decisions with respect to instream flow reservations and water appro- priations,both of which are required in order to facilitate the Susit- na Hydro Project.The flow releases schedules presented in Exhibit E for filling and operation of the Watana and Devil Canyon Dams have not been developed in consultation with the Department of Natural Resources or by a methodology approved by this Department which is charged by law with authority to adjudicate all water appropriations and instream flow reservations in the State.Indeed,Exhibit E does not explain the pro- cess by which these release schedules flows were devised.We strongly recommend that the license application contain a specjfic~detailed flow release schedule developed through"a quantifiable stream flow analysis program coordinated with DNR and with state and federal fish and wildlife agencies. Attached please find the enti re text of the review comments from our Di vision of Land and Water Management.Pl ease consult that text for additional specific comments relating to navigabil ity,thermal model- ing,and nitrogen gas supersaturation. Response A discussion of the rational and process for selecting the opera- tion scheme is contained in Chapter 2,Sections 3.2 and 3.8. Alternatives are discussed in Chapter 10. Comment 4 ACCESS This department1s comments regarding the proposed route from the Denali Highway to the project site should not be construed as support for that project route as the preferred means of access.This agen.cy,along with the other state and federal resources agencies,has consistently favored road access to the project from the Parks Hi ghway.However,if the route proposed in Exhibit E is selected,we recommend certain de- sign modifications. We recommend that the principal design criteria for the proposed route be the enhancement of scenic values and public safety.We consider the proposed hi gh-speed desi gn of the road i nappropri ate.The long-term use of the road after dam construction will be primarily sightseeing and recreation.The highway should,therefore,be designed to take maximum advantage of the scenic potential of the area which traverses some of the most dramatic in North America. In addition to being an unattractive counterpoint to the natural land- scape,the high-speed road proposed (55 miles per hour with 40 miles per hour at difficult curves)may create serious safety problems.The long braking distance for a vehicle traveling 55 miles per hour on a gravel road endangers the stop and go driver and those who park and stand along the side of the road to take photographs.Although a high- speed road will ,yield cost savings during dam construction~it is ques- t ionabl e whether these cost savi ngs outweigh the long term benefits of a scenic road.The rationale for a high-speed access road design should be based on explicit quantification of the cost saved by that design.We believe the scenic and public safety benefits foregone by a high-speed design ,when ,accumulated over theexpe£ted,tHe;of the road .... ..... -- .~ are almost certainly greater than the costs saved by such a design to facilitate the brief construction phase of the dams. Although design standards for upgrading the Denali Highway between Cantwell and the proposed access road were not discussed in Exh i bit E, the issue merHs comment because an upgrade wil 1 be necessary to accom- modate project-related traffic.The portion of the Denali Highway affected provides exceptional views of the Alaska Range,Reindeer HillS and the Talkeetna Mountains.The Alaska National Interest Lands Con- servation Act (ANILCA)of 1981 called for a joint state,federal and Iprivatestudyofthescenic qualities of the Denali Highway.The in- tent was to encourage cooperative land management of lands adjacent to the highway to protect its important scenic values.The Denali Scenic Hi ghway Study wi 11 be pub 1i shed in early 1983.DNR encourages APA to consider carefully the recommendat i onsof that report and to support a design which is consistent with the study recommendations. F"ina11y,we reconmend re-rout ing of the proposed access road where feasible to take advantage of the extraordinary vistas.Presently,the road transects a large wet1 and in the upper Brushkana drainage.Con- sultants responsible for the aesthetics portion of Exhibit E recon- mended that this section of the road be re-routed to higher ground to the west.We concur and support that recommendat i on,whi ch wi 11 also protect the wetland from the impacts of road construction and should result in lower long-term maintenance costs because of better soil con- dit ions. Respons,e The extent and mode of post-construct ion pub1 ic access has not yet been determined.The Power Authority sees this issue as one which should be reviewed in the latter stages of project construction to determine public preferences and then current resource tradeoffs • The recreation plan and impact analysis assumes public access so far as to not understate possible impacts. While the ultimate use of the access road will probably not be resolved for almost a decade,we agree that the road design cri- teria and routing should consider eventual public use and there- fore its scenic potential.It must be remembered,however,that the first 15 years of its life will be dedicated primarily ,to con- structionactivities.Therefore,its suitabil ity for construction uses is a1 so very important.The tradeoff between construction cost savings and long-term scenic values will be considered in an i"nterdiscip1inary review of the access design during the first half of 1983.This review w"ill also consider the recommendations of the Denali Scenic Bighway Study. Comment 5 RECREATION AND AESTHETICS We agree with the consultant's conclusions that recreation plans be focused on those opportunities occurring elsewhere in the project area rather than those directly associated with the reservoirs.Because of fluctuating water levels and steep shorelines,the reservoirs them- selves will not present an attractive recreation environment except for occasional use by speedboats.The greater recreation opportunities will be associ ated with the access road and the many 1akes,streams, and alpine hiking areas that can be reached from that road.The con- sultants'identification of recreation resources on Cook Inlet Region, Incorporated,(CIRI)1and rai ses the questi on as to how these recrea- tion opportunities might be realized.We recommend that the Power Authority consider some sort of leasing or concession arrangement with CIRI to facilitate public recreation use on Stephan Lake.At least one public use site of a suitable size (40 acres or more)should be pro- vided at Stephan for camping,fishing,and as a staging area for those people using the lake for float trips down the Talkeetna River.In ad- dition,legal access across village and regional corporation lands should be secured and a trail constructed from the reservoir to Stephan Lake.In order to most effectively enhance the recreational potential of the proposed projects,we would recommend that the recreational ele- ment of Exhi bit E add three sites adj acent to the Al aska Rai 1 road. These sites are Indian River,Gold Creek,and Curry.Each of these sites would provide a destination point for recreation users of the Alaska Railroad and would provide a greater diversity of recreation op- portunities.We recommend that management of the off-site recreational facil ities associated with the access road are best met through the budgeting process of the Alaska Power Authority.If the Division of Parks is expected to manage these sites,then we will have to work closely with APA to identify priorities for project funding. In summary,we feel that the consultant has done an excellent job in identifying the recreation opportunities and resources available in the project area and would request that the scope of the study be expanded to look at the identified sites along the Alaska Railroad as described above. Response The Alaska Power Authority will investigate the recreational opportunities associated with poss"ible site development adjacent to the railroad at Indian River,Gold Creek,and Curry.These facilities and Stephan Lake would not be any more accessible as a consequence of the Project,and thei r development must be as- sessed with respect to thei r non-profit rel ated development as opposed to their general and regional contribution,which would more appropriately be undertaken by recreation agencies. .... F""'" i: ..... ..... comment 6 HISTORIC AND ARCHEOLOGICAL The report on historic and archeological resources is well done and addresses all the pertinent questions about mitigation.We concur with the mitigation plan as presented in the draft document. We concur with and support the proposed education program described on Page E.4.114.We consider each program to be a necessary and effective part of any large construction project.If project personnel are ade- quately trained and sites are clearly marked,avoidance should be a viable mitigative measure in many of the indirect and potential impact cases. Response Comments noted. Comment 7 TRANSMISSION LINE The Access Pl an Recommendation Report dated August 1982 proposed rout.,. ing a transmission line through a non.,.roaded area south of the proposed road between the dam sites.The Hne was well sited taking advantage of terrain and vegetation to minimize environmental and visual impacts as well as minimizing construction costs.We support the route pro- posed in the August report.We have since been informally advised that APA has decided to route the transmission line along the road between the dam sites to allow year-round access for maintenance (winter over- land access via all terrain vehicle is feasible without a road).If road access is determi ned to be absol utely necessary,we agree with thi s deci si on;it woul d be i nappropri ate to have two east-west road corridors through this area.However,presentation by consultants at the APA sponsored workshop in Anchorage during the week of November 29 to December 3,1982,indicated that there may be excessive concern by mai ntenance engi neers with year-round access.The consultants argued persuasively that maintenance by helicopters is not only fea~Jble;-Dut is cheaper than road maintenance andi s a common pl'~ac-tice in states other than Alaska.Helicopter maintenance__bas--aTso proven itself in more rugged terrainand--ex-treme1featfjer conditions of southeast Alaska. The need for road access in case of bad weather is a concern,but it is important to clarify precisely what is gained in terms of minimizing the risk of power outage by having road access.That gain should then be compared with the costs.In this case,the major cost is a strong negative visual impact on the road between the dam sites.In contrast, the gain seems to be minimal.In short,the value of year-round access is not infinite and in this case may be significantly less than the costs • Response A reevaluation of the access road and transmission line arrange- ment as proposed in the draft Exhibit E of November 15,1982, indicated that the south bank alignment of the.transmission line would require helicopter access unless a pioneer road was con- structed as well.The terrain would require significant construc- tion to provide ground access as a back-up alternative to helicop- ter service of the line.Relocating the line onto the north bank would permit emergency service of the transmission line without any pri or constructi on of an access road.The requi rement for hi gh rel i abil ity and qui ck response in any weather conditions i ndi cates that the north bank route provides the best conngura- tion with the least overall environmental impact. Comment 8 SOCIOECONOMIC IMPACTS The permanent townsite appe~rs to have been located in an exceptionally wet area.Apparently,the major criterion for locating the townsite was land status.A more appropriate location from the standpoint of land capabil ity and general amenities for the inhabitants of the town- site would be in the Fog Lakes area south of the Susitna River on.pri- vately owned land.The townsite is particularly important because,as indicated in the Exhibit E,the tendency for workers to resideon-site depends on the quality of housi ng and other amenities.Exhi bi t E em- phasizes that a high amenity site will minimize impacts on outlying communities by encouraging a higher percentage of workers to live on- site.We support this objective but do not think siting the townsite as proposed will help achieve it.We strongly suggest finding a more suitable location for the townsite. Response The permanent townsite location will be the subject of an inter- disciplinary review conducted during the first half of 1983.The review will consider the proposed alternative location in the Fog Lakes area south of the Susitna River. Comment 9 Exhibit E projects minimal project impacts Ofl local facilities an<i ser- vices due principally to the provision of on-site housing for workers. The total Mat-Su Borough population increase as a result of the project is projected as 4.700 in 1990 (peak year).1.110 of whom are expected to live off-site in rural communities.Should that projection be accu- rate.the off-site impacts would,indeed.be limited.However,the project assumes absolutely no in-migration by unsuccessful workers. This is a misleading assumption.In fact.in-migration by unsuccessful job seekers will probably be considerable.Such in-migration is a - - - likely result of decreases in job bpportunities in the lower 48 and has occurred in Alaska during construction of the oil pipeline.Current economic conditions would stimulate extensive in-migration to a greater extent than is predicted in Exhibit E. If in-migration is seriously underestimated in Exhibit E,then a wide range of socioeconomic impacts is underestimated as well.Past experi- ence in the state shows that boom conditions,such as the proposed dam construction would create,have led to rent increases,proliferation of sub-standard housing and strain on public facilities and services.The potent ial impact caused by unemployed i n-mi grants is parti cul arly si g- nificant in light of their tendency to be more of a disruptive influ- ence on small communities than employed in-migrants.Unemployed in- migrants,for example,tend to require more services such as public health and fami 1y assi stance of vari ous forms.·They pay fewer taxes and may have little stake in the community,thus caring relatively less about relatively minor issues such as yard maintenance and the appear- ance of local parks.In the small,rustic conununities in the project area,these problems could create considerable tension between current residents and the new in-migrants.We consider the socioeconomic im- pact assessment to be inadequate without an attempt to estimate·the number and effects of unsuccessful job seekers and their dependents who will move into the region. Response We agree that it is reasonable to expect an influx of persons seeking Susitna construction and construction-related jobs.This .i nfl ux of persons woul d probably create the types of impacts that you mention,especially in the greater Anchorage area and,per- haps,Fairbanks. We did review the TAPS experience.We found no analysis of the impact of unsuccessful job seekers on Fairbanks and the State;nor could,we find any analysis of the degree to which "outside U labor displaced Alaska labor.We cbuld not even find any data that would allow such analysis to be done. Aside from this lack of information,it should be noted that even if appropriate studies had been done on TAPS,they would have been of little help in trying to estimate the number of persons who will be attracted to Alaska by the Susitna Project.This is be- cause each project (e.g.TAPS,ANGTS,and Susitna)is unique,and different economi c forces prevail indifferent years.For exam- ple,the types and amounts of workers,and wage rates are differ- ent for each proect.This will infl uence the attractiveness of the project to workers living "ou tside".Also,economic condi- tions "ou tside"relative to those in Alaska change and influence the attractiveness of ~aska projects to outsiders. For these reasons and several others it was not possible to esti- mate how many persons woul d be attracted to Al aska by the Sus itna Project.The monitoring and mitigation program discussed in Sec- tion 4.5 is designed to detect the total project-induced increase in population and to help appropriate institutions mitigate im- pacts that might be caused by persons who come to the Rail belt region in search of Susitna construction and construction-related (secondary and induced)jobs. Comment 10 It woul d be more accurate and useful to provide a range of projected population increases in affected communities rather than a precise num- ber such as 263 in Tal keetna by 1990 or 75 in Trapper Creek.These numbers convey a precision not supported by the methodology or the probability of error inherent in such projections.More useful infor- mation for community planning purposes would be high-low range.A key consideration in planning for public services is the population thresh- hold which requires new capital expenditures.For example,if a popu- lation increase of 300 would require anew community well in Talkeetna, the city would be better off knowing that it faces a probable increase of 250 to 350,rather than knowi ng that someone has di saggregated a series of numbers to produce an estimate of 263. Response The purpose of the population increase projections in the FERC 1i cense appl i cat ion wes to provi de best poi nt estimates of the increases in popul at i on that are expected to occur in affected communities,where possible.In Cantwell,the level of uncertain- ty about the ability of the community to provide housing for large influx of people necessitated use of a range of high and low im- pacts (see Section 3.4). We agree with the Department of Natural Resources that a high-low range of projected population impacts will be most useful to plan- ners in the affected areas.During Phase II of the Susitna proj- ect,the impact model will be updated to include new developments, and the results will be shared with Mat-Su Borough and other rele- vant planning agencies,in a high-low range form,where possible. Comment 11 Exhibit E discusses generally the need for measures to ensure that the 1oca 1 unemployed get a chance at proj ect-re 1ated jobs.As sumi ng there will be considerable competition for jobs by in-migrants and that the state's objective is to encourage local hire,it will be necessary to develop a clearly defined and legal program to achieve that objective. The measures recommended by Exhibit E are vague and do not reflect the significance of this issue to the state or the borough.We suggest more attention be given to developing a more comprehensive approach to address this issue in the Exhibit E application to FERC. Response The Power Authority·s approach to encouraging local hire will be formulated during the design phase of the project in cooperation with the Power Authority·s Construction Manager and legal advi- sors.The formulation of a clearly defined and legally defensible local hire program is a high priority of the Power Authority. Comment 12 The Exhibit E devotes about four and one-half pages to the geothermal energy alternative.This information is factual and provides general background for the reader.The Exhibit E could be improved by noting that the Department of Natural Resources has a geothermal lease in the Mount Spurr·area pl anned for May,1983.The Exhi bit E shoul d ack- nowledge that geothermal energy is immune to fuel price escalation as is hydropower.We agree with the Exhibit E statement that little is known about the geothermal properties.Until exploration of the geo- thermal properties of Mt.Spurr has occurred the viability of geother- mal power for the railbelt region is unknown.We recommend that the Exhibit E be revised to include this information. Response This information has been incorporated into Chapter 10 of Exhibit E. DNR MEMORANDUM From:V.R.(Mohan)Nayuda Chief,Water Management Section To:A.L.Carson,Acting Director Division of Research and Development as attached to the 1etter from DNR to the Al aska Power Autho rity dated January 13,1982. Paul Janke,Gary Prokosch and Mary Lu Harl e of my staff have reviewed the Draft FERC License Application,Exhibit E,dated November 15,lQ82, prepared by Acres American Inc.and provide the following comments. Comment 1 General -Organization The report lacks documentation.With few exceptions,much of the text- ual material,tables and figures do not reference the documents from which the material was taken,the specific page numhers in the original documents,or where those origi nal documents resi de.These references shoul d be incorporated into Exhi bit E before the fi nal i zed 1i cense application is submitted to FERC.The organization of draft Exhibit E is poor.Separation of Volumes I and II,Chapters 2 and 3 makes review and evaluation of the Exhibit very difficult.Issues,impacts and mit- igations should be combined in a more logical manner to allow easier evaluation. Many of the statements and concl usi ons presented in thi s document are unquantified and speculative.The reviewer is continually confronted by words such as II may ll,II pro bablyll and lIis expected ll •Statements which are quantified should be so noted and referenced and speculative state- ments and conclusions should be so noted.Speculative statements must be quantified before effective evaluation of the document can be per- formed.As such,the document does not present enough data and anal y- sis to adequately evaluate the project at the present time. Response The draft Exhibit E submitterl for review on November 15,1982,was indeed a draft.Significant revisions have occurred in producing the final document. Comment 2 Major Issues The following are major issues concerned with the draft Exhibit Eo They are not in prioritized order. .- ..-, .- ..... - f"'" I ..... A.flow Releases The flow releases presented for both filling and operation of Watana and Devil Ganyon Dams have not been developed with nor approved by the Alaska Department of Natural Resources.The document does not,in fact,explain the process by which these flows were developed,except to say they were sel~cted to satisfy power production requirements and fisheries concerns.Other water uses,including navigation,river based recreation and wi 1dl i fe are assumed to be covered by these flows. This may not be the case,and this conclusion should be quantified. This department in its review comments on this project has continually asked for a range flows and their associated impacts.This has not been provided by thi s document,and shoul d be incl uded. Further,the impacts from the sel ected flow rel eases are eval uated onl y for individual parameters,such as temperature,river morphology and ice,and are not well quantified.What is needed is the cumulative effects from all the affected parameters and their impacts on issues of concern,such as fisheries and navigation.Only then can mitiqation measures be address~d.It appears from the data presented in thi s doc- ument that the proposed flow releases are inadequate. Response Chapter 2 Section 3,entitled Project Operation and Flow Selec- tion,has been added to the license document.This section discusses the factors considered in the selection of downstream flows.Alternative operati on scenari os are di scussed in Chapter 10• B.Access Road A final deci si OR shoul d be made now as to whether the access road to the dam sites will be public .or private.Plans for road construction indicate the road will be built as a private road to move personnel, supplies and equipment to the construction sites.However,the recrea- tion pl an seems to indicate that the access road will pr-ovide publ ic access f-Or recreation to the area once the dams are operational.A dec1sion should be made on this issue now to obtain public review and comment on this issue during the formal FERC review process • Response We believe a final d~cision Of'!tllis issue at this time is prema- ture.As stated i1l the text,the recreation plan is based on the premjse of pub~ic access.If there is no public access a recrea- ti~n plan is not needed. Townsite Further investigation into tbe townsite location should be conducted. The presen~location is apparently located in a swampy area.Addition- ally,the water supply :is iluestjonable.Ground water ispr:eferab~e to surface water for the water supply source as drilled wells are of less environmental consequence.However,a ground water source of adequate quantity is questionable in the present planned location. Response The permanent townsite location will be the subject of an inter- disciplinary review conducted during the first half of 1983.The review will consider the alternative location in the Fog Lakes area south of the Susitna River as proposed in Commissioner Wun- nickels letter to the Power Authority of January 13,1983. D.Land Status The land status of the land invol ved in the dam site ,access roads and transmissions corridors should be addressed now.Types of land acquis- ition such as land exchanges,permitting,leasing and condemnation should be investigated and action begun in order to prevent delay to the project further down the line. Response This subject is being actively pursued by the Power Authority. Comment 3 There are many sections in this report where inadequacies are recog- nized by the authors.It would be a futile effort to reiterate all the statements made in this report that say "further work is on-going"or "documentation has not yet been made",etc.As a revieweing agency we also recognize this and would expect that the work will be done and the inadequacies addressed,without each statement having to be noted in these comments. Response Comment noted. r:.--, ,~ ..... SPECIFIC COMMENTS VOLUME I -CHAPTER 2 -WATER USE AND QUALITY N-2-001 Pages E-2-26 and 27;E-2-49 and 50;E-2-66 and 67: "Navigati onal diffi culti es between Devi 1 Canyon and the con- fluence with the Chulitna Ri ver will be increased due to shallower water and a somewhat constricted channel.Al though there will be sufficient depth in the river to navigate it, greater care will be required to avoid grounding".Since "greater care will be required",this is a project impact and therefore needs to be discussed ~ong with proposed mitigation measures.This statement also differs from the following report:Susitna Hydroelectric Project,Task 7-Environmental, Subtask 7.04-Water Resources Analysis,A Preliminary Analysis of Potential Navigational Problems Downstream of the Proposed Hydroelectri c Dams on the Susitna Ri ver,March 1982.The above statement does not indicate what depth is assumed to be sufficient for navigation.The above March 198?report studies 'ice-free navigation only and assumes a depth of 2.5 feet is required for the following reasons:(1)the cross- sectional data used was obtained for purposes other than studying project effects on navigation,and (2)the accuracy of the predicted water surface profiles is,at best,approxi- mately one foot.From an extrapolation of Figure 2 in this report,to maintain a depth of 2.5 feet at cross-section 32, located near Sherman,a di scharge of 6500 cfs is requi red. Thus,from Table E.2.17,post-project navigational diffi- culties may occur near Sherman during both filling and operation during May,June,July 1-27,September 1Q-30,and October.This is when the project flows are less than 6500 cfs.This conclusion differs from the no navigational problems statement in Exhibit E.It is believed that the March 1982 report provides the latest information available. If a more recent report or di fferent criteri a are used,thi s shoul d be stated and di scussed. Response We concur that the March 1982 report,A Prel imi nary Analysis of Potential Navigational Problems Oownstream of the Proposeq Hydroelectric Dams on the susitna River, provides the latest information available,except that suppl emental informati on was col1 ected during the summer and fall of 1982 at Sherman and Al exander Slough. A reconnai ssance made in September 1982 between Ri ver Mile (RM)127.0 and RM 128.5,where the Susitna shifts its main channel from the west side to the east side, indicated that the central channel in this reach was still navigable at flows of 6000 cfs at Gold Creek (Butera 1982). Chapter 2 of Exhi bit E has been mod ifi ed to refl ect the navigation criteria used in the above mentioned report and a quantitative analysis has been provided.Since there could be a project impact near Sherman~mitigation measures have been incorporated. If navi gati on probl ems result at a di scharge of 6000 cfs~flow will be increased to 6500 cfs (the no naviga- tion impact flow identified byADNR 1982)or the channel elevation will be lowered. A reconnaissance of Alexander Creek undertaken on August 18 and 19~1982~indicated that with a Susitna Station discharge of approximately 90,00n cfs,the channel depths at the inlet to the slough were of the order of 6 feet. N-2-002 Additionally~it is stated that "the reach downstream of Talkeetna is navigable under low flow condition but can be treacherous at times".What flows are considered low flows? Are the proposed releases from the project considered low flow when considering navigation?What flow conditions should he considered low flows in the areas above Tal keetna when con- sidering the possible impacts on navigation? Response The intent of the statement "the reach downstream of Talkeetna is navigable under low flow conditions but can be treacherous at times"was meant to impl y that the reach downstream of Tal keetna would be navigable under the reduced post project flows.We agree that the statement as worded is uncl ear.The document has been modified to reflect a clearer understanding of the navi- gability of this reach. N-2-003 The impacts on navigation,including commercial boating, recreational boating,float planes~and winter transportation use of the Susitna River from dam sites to Cook Inlet is in- adequatel y addressed.The impacts need to be quanti fi ed and mitigation measures proposed. Response As menti oned in the response to comments N-2-001 and N-2-002 above~navigation impacts have been quantified and mitigation measures proposed in Chapter 2. N-2-004 Pages E-2-27;E-2-50 These sections say that information on recreation and recreational water uses are contained in Chapter 7 of the .... .... r ..... .... I II On1l.ft [Xih'fbit E.However,Chapter 7 addresses a recreation plan for the Susitna Hydroel ectri c Project.It does not address project impacts orJoownstre-am recreational uses of the Susitna River by boats arnd float plaines for sport fishing and hunting.This is a major use of the Susitna river in its entirety.The impacts on th'is water use should be identified and'quant ified and mit i gat ion measures proposed. If a more recent report or ·d.ifferent criteri a 'lire used,thi s should be stated and discussed Response Project impacts on downstream recreational uses of the Susitna Rivell"by boats and floatplanes,for sport fishing and hu:mi,ng has been incorporated in Section 4.1.2 (hHii i). N~2-005 Page £-2-36 The avai labfl ity o·fgroundwater fo,r vil 1age and camp water supply in the location of Ts,usena,Cr'eekis in question. Before·construction begi ns on any water supply system a permit to appropriate water and construct a dam must first be granted by the Department of Natural Resource's per AS 46.15. Response We appredat,e that before construction begins on any water su'pply system,a permi t to appropri ate water and construct a dam must fi rst be granted by the Department of Ncatural Resources per AS 46.15.This will be under- taken during the detail design phase.It is unlikely that ground water for village and camp water supply will be necessary because of the potenti al water supply available from Tsusena Cr\eek.However,ground water well s arec.urrently being drilled at Watana camp.These wells should provide information on the availability of groundwater • N-2-006 Fi gures E-2-18 thru 2-25 These fi gures do not i ncl ude low 0 I"hi gh flow frequency cu rves for January -Apri l,November and December.These curves may be useful when looking at the minimum flow releases for these months. Response Hi gh and low f1 ow frequency curves for January -Apri 1, November and December have now been i ncl uded in Chapter 2 as FiguresE.2.43-E.2.62 • N-2-007 Pages E-2-14,E-2-47,E-2-51,E-2-56,E-2-66.and E-2-72 thru 75;E-2-83: Sloughs and side channels are very important fish and wildlife habitat.The effects on this habitat due to ~l phases of the project should be well documented.Some of the basic questions not answered are as follows: Regarding ice.what will the effects on slough and side channel wi nter habitat be with minimum fl ows of 1000 cfs during filling of the Watana reservoir?Taking into account the increased temperature and associated lack of ice formation in the reach above Talkeetna.without the normal ice formation ri ver stagi ng will be lower.What are the effect s of the lower staging on slough upwelling and water temperature?If water upwelling in the sloughs will be decreased.what effect will this have on all life stages of fish which use the sloughs. Response The fi 11 i ng regime from November through Apri 1 has been modified so that natural flows are passed through Watana.Therefore,there will be essentially no impact on slough and si de channel wi nter habitat from ice- rel ated effects. In reaches above Tal keetna where an ice cover wi 11 not form.the ice formation river staging will be lower. The effects of the lower staging on slough upwelling and water temperature are di scussed in Secti ons 2.4.4 and 4.1.2 (f)(ii).Upwelling rates in the sloughs will essentially be unchanged.although an area at the upper end of the slough may be dewatered as the result of a lowering of the ground water table;this is discussed in Section 4.1.2(f)(ii).Because there is a minimal up- welling decrease in the slol1ghs.no effects on any life stage of fish which use the sloughs are anticipated. N-2-008 With the predicted flows of 10,000 cfs during operation of Watana Dam,what effects wi 11 thi s have on the slough and si de channel s above Tal keetna and below Tal keetna?With increased flows and water temperature at O°C below Tal keetna.increased ice fo rmati on wi 11 cause hi gher water stage than normal.What effect will these higher water stages have on sloughs and side channel habitat?Will the slough heads he overtopped?What effect would ice formation in the slough due to poss"ible over- topping have on overwintering fish,out-migration,slough water temperatures,etc.?If the sloughs below Tal keetna are overtopped due to increased ice formation and associated higher river staging and ice does form in the sloughs,beside the effect on overwintering fish and possible delays in out- mi grati on due to cool er than normal water temperature,how I~ ..... ,.- ,- I wi 11 thi s ice and other debri s be removed from thse sloughs without the annual spring flooding?If artificial flooding by scheduled release from the dam is tried,how will timing of flooding be determined? Response The effects of the winter flows of 10,000 cfs during operati on of Watana Dam on the slough and si de channel s above Tal keetna are di scussed in Secti on 4.2.3.At present there is insufficient information to evaluate the effect on sloughs and si de channel s below Tal keetna. Fish utilization of habitats downstream from Talkeetna is not well understood since most effort was expended in the Devil Canyon to Tal keetna reach;thus the rol e of sloughs as fish habitat is preliminary.Further data are forthcoming in the June 3n,1983,analytical reports.If these studies indicate that sloughs down- stream from Talkeetna represent significant fish habi- tat,then impacts to these habitats wi 11 be further anal yzed and your recommendations wi 11 be consi dered in the development of futher studies • CHAPTE-R 3 -SECTION 2 -OEPARTMENT OF NATURAL RESOURCES Comment 1 Page E-3-55:The fishery resource in some specific streams in the transmission line corridor is discussed.Also stated is:"Little is known about the other streams that will he crossed in this segment." Is it possible that valuable resources in other streams may be impacted by the transmission line?It appears more study is needed here. Response The information available on some of the streams transversed by the transmission line is limited and your suggestion that addi- tional study is needed will be considered in future study p rog rams. Comment 2 Page E-3-58:The di scussion of the Watana dam construction states the following:"The mr)Vement of fill materials and the actual process of construction of the fill dam are potential contributions to turbidity and siltation."Acceptable level s of turhidity and siltation should he specified,and these should be written into the construction specifica- tions.This is not discussed in mitigation of construct.ion impacts, pages E-3-120 to 127. Response As indicated in the mitigation section of the text under water quality,effluents will comply with I1EC effluent standards speci- fied under 18 AAC 70.020. Comment 3 Page E-3-73:The statefllent "The entire canyon is expected to be pass- able by chinook salmon,allowing them to enter Tsusena anrl Fog Creeks" is found in the discussion of potential impacts from Talkeetna to Watana dam during filling of the Watana reservoir.What are the impacts of dam construction and operation on chinook salmon movement into these creeks?If there are impacts,what are the proposed mitiga- tion measures?This is not discussed in the mitigation on pages E-3-128 to £-3-144. Response IJuringconstruction of 14atana nam,fl ows which fnr average years are too high to allow for passage of adults,will Tollow the -natural regime.Flows during operati on of the dam wi Tl he ~ignif4cantly reduced,allowing for passage of adult chinook -salmon through the canyon and entra{lce into Tsusena and Fog Creeks. Comment 4 Pages E-3-74 to 76:In di scussion of potenti al impacts from Tal keetna toWatana dam during fill ing of the Watana reservoir,the following statements are made: a."'Many of the physical changes identified for mainstem habitat~ wa:uldalso,occur in side-channel habitats.Since side-channels are generally characterized byt:t,i gher streambed elevations,the fa re- casted changes in streamflow may cause greater effects in side- channel habi tats.II b.IIMany side channels that normally convey water in May,June and the first three weeks of Jul y,waul d Ii kel y be dewatered under fill i ng f~ows •••H c. r-d. e. f. g. "In other side-channels,flow may be reduced to an extent that the outmi,gration of salmon fry would be delayed.1I "Somesfd.e-channe1 s above Talkeetna would be campI etel y dewatered under the propose'd fill i ng flows •••II "Reduced flows in the spring may inhibit emergence and outmigration in some side-channel spawning area •••11 IIForecasted August and September flows under the fil ling schedul e may adversely affect spawning habitat in side-channels." "It is unlikely that new spawning areas would become available under the filling flows." - It is understood that with reduced flow rates in s10ughs and channel s,beaver may become more active in these areas •Thus ~ possible that the beaver dams may block the outmigration of fry. are the impacts from this?Miti gation measures associated side-channel s are not discussed on pages E-3-128 to 144. side- it is What with -I The pre-proJect spawning habitat in the side channels is limited such that these areas pI ay a minor raJ e in sal mon producti on. Efforts,therefore ,have concentrated onassessi ng the impacts to the habitat in the more productive slough areas.Similarly,miti- gation measures have focused on maintaining the slough habitats, which incl ude passibl e impacts from beavers. Comment 5 Pages E-3-75 through E-3-77:The foll owing statements are made with regard to the problems related to flow re1 eases during the different times of the year,"reduced flows in spring may inhibit emergence and outmigration in some side-channel spawning area","August and September flows may adversely affect spawning habitat in side-channels","16,000 to 1R,000 cfs is needed at Gold Creek to insure easy fish passage into sloughs",and "the stage of the mainstem at flows of approximately 12,000 cfs did not create backwater effects at the mouths of some sloughs great enough to allow free passage by adul t sal mon".-- The total effect of 1 ow flows on the fi sheries cannot be eval uated until the total number of sloughs and side-channels both below and above Tal keetna that wi 11 be affected,and to what extent they wi 11 he affected,is known.What percent of the total salmon population are using the slough or side-channel habitats that are expected to be impacted,and at what time of the year these impacts wi 11 be most severe. Response The total number of sloughs and si de-channel s both below and above Tal keetna that wi 11 be affected by low flows and to what extent they wi 11 be affected are the subj ects of ongoi ng studi es by the Aquatic Studies Program.The number of adult salmon using the slough habitats that are potentially impacted during spawning is presented in the revised text.Emphasis in studies to date has focused on the extent to which habitat is affected by flow alterations.An attempt to estimate the percentage of the total salmon population that is impacted on a speciesjlife stage and seasonal basis is being addressed by the AEIOC instream flow analysis. Comment 6 Page E-3-80 through E-3-85;E-3-95 through E-3-97:The impacts on the Cook Inlet to Ta"lkeetna reach during both filling and operation are extremely generalized and lack documentation.Impacts on the main- stream,side-channels,sloughs and tributaries must be investigated and quantified.This includes impacts resulting from changes in discharge and stage,water temperature,water quality,sediment transport,ice and river morphology.While this reach of the river will be impacted less than the Tal keetna to Devil Canyon reach,the possibil ity remains that sm~l project changes may result in significant impacts.Of par- ticular importance in this reach is the determination of the cumulative effect of the individual impacts noted above.Mitigation measures associ ated with these impacts are not addressed in pages E-3-128 to 144. - .... I - r '! Response Available data regarding changes downstream from Talkeetna certainly indicate minimal impacts.The sufficiency of the data base will be considered in formulating the future study program for FY 1984. Comment 7 Page E-3-129:The list of reasons for providing suitable flows should include the following additions: 1.All ow adult salmon access to slough and side-channel spawning habitat. 2.Maintain flow through the spawning gravel during the incubation and rearing periods. 3.Maintain suitable flows to preserve slough upwelling waters. 4.Maintain flows to control proper water temperature needed in the mainstem,sloughs and side-channels. Response The side-channels support only limited spawning activity and providing access to these areas was not considered a primary fi shery concern.The sloughs are si gnifi cantl y more productive areas and efforts have been directed on maintaining these habi- tats.The flows provided to allow access to sloughs are expected to maintain access to most side-channel habitats. Comment 8 Page E-3-133:Regarding winter flows,"Minima1 impacts are expected". The possible impacts addressed on Page E-3-94 seem to be major. The only rectification of impacts on sloughs that is presented is slough modification.This is an untested mitigation measure in this river system.What are the costs involved with design,testing,con- struction and operation and maintenance of slough modifications?How many sloughs will need to be modified?This section should include other alternatives besides slough modification to rectify impacts on sloughs. Response The actual impacts to slough habitats resulting from post-project winter flows are not fully defined at this point.Establishment of a mainstem discharge-slough habitat relationship is required for both ice-covered and open-water winter flow conditions.These relationships are the subject of the AEIOC instream flow study and the ongoing Aquatic Studies Program.Nevertheless,the text has been revised and mitigative measures are presented to minimize adverse impacts. Additional details are provided in the text on rectification of impacts for the sloughs. Comment 9 Page E-3-136:On thi s page and el sewhere,the document predicts water temperatures in the reservoirs and downstream of the dams.No informa- tion,however,is given describing how these temperatures were pre- dicted.The model used should be given or referenced,along with the detail s describing its verification for use on this system.The val id- ity and hence the accuracy of the temperatures predi cted,therefore, must be questioned. Response Water temperature predictions are addressed in detail in Chapter 2. Comment 10 Page E~3-137:"The impacts associated with alteration of the tempera- ture regime during reservoir operation can be minimized by incorporated multiple level gates in the power intake."Not discussed are water qual ity parameters other than temperature associ ated wi th each reser- voir level.A monthly schedule should be given that quantifies the water level s to be used and the associated water qual ity parameters of the release water.Of specific concern is the dissolved oxygen content of water released from Devil Canyon if the intake is drawing water from the hypolimnion. Response The effects of the project on water quality parameters·are discussed in detail in Chapter 2. Comment 11 Page E-3-140: "Gas supersaturation will be avoided by including fixed-cone valves in the outlet facilities •••A prototype test of Howell-Bunger valves showed them to be effective in preventing gas supersaturation (Ecological Analysts Inc.1982)."Since this reference is an unpublished report, it cannot be easily obtained.The bibl iography leads one to bel ieve that thi s val ve was tested at one site.If thi sis true,it is i nade- quate.Due to the potenti al negati veimpacts from nitrogen supersatu- ration,the valves to be employed here should be well tested for this application.It appears that this in not the case for these Howell-Bunger valves. Response Acres'analysis of the physical and geometric characteristics of freely discharging,diffused Jets and the aeration efficiency of simil ar fi xed-cone val ves indicated that no serious supersatura- ti on of nitrogen 'is 1 ikel y to occur with spi 11 s up to the 1:50 .year recurrence interval.The resul ts of the fiel d tests cited support this conclusion.This subject is discussed further in Chapter 2,Section 6.4.3 -Gas Supersaturation. 1""'" ,"'" ..... - ,JfIIIMl Comment IV Summary In summary,this draft Exhibit E is a start at answering questions regarding issues and resources to be affected by this project and their impacts and possible mitigation.However,a great deal more data coll ecti on and analysi sis needed in order to answer st ill unanswered questions before this project can be effectively evaluated. Response See response to Comment 6 in the U.S.Fish and Wildlife Service covering letter of January 14,1982 to the Power Authority • - - ..... - ..- DEPARTMENT OF FISH AND GAME ..... - ,-- ALASKA DEPARTMENT 'OF FISH AND GAME (.,AD:F&G) COMMENTS CONTAINED I~LETTER OF JANUARY 13,1983 GENERAL COMMENTS The Al aska Department of Fi sh and Game (ADF&G)has reviewed the Draft Exhibit E,dated November 15,1982,that was ,prepared for inclusion in the license application for the SusitnaHydroelectric Project that the Alaska Power Authority (APA)intends to submit to the Federal Energy Regulatory Commission (FERC). The Department's review of the Draft is based on the adequacy with which the fish and wildlife resources affected by the project"the im- pacts to those resources attributable to the project,and specific mitigation proposals to offset impacts are identified and quantified. The types of information required for an adequate assessment of feasi- bility,with respect to fish and wildlife resources were originally i dentifi ed for the APA in November 1979 through correspondence rel ati ve to the Plan of Study and were most recently identified in Commissioner Ronald Skoog's statement to the APA Board of Directors on April 16, 1982. Our review comments 0,(1 the following chapters are appended to this letter: Appendix A -Chapter 2 Appendix B Chapter 3 Appendix C -Chapter 5 Appendix 0 -Chapter 7 Appendix E -Chapter 9 -Water Use and Quality; Fish,Wildlife,and Botanical -Soci oeconomi c Impacts; -Recreat lonal Resources;and -Land Use. Resources; The time afforded the ADF&G to review the Draft Exhibit E has not been sufficient to allow a detailed review of all the chapters,nor has it enab 1ed illS to present our comments in as thorough and refi ned ,a .rnanner as we would have liked.We do,however,expect to take advantage of future review opportunities to further address these issues. The appended revi ews (Appendices A-E)contai n general statements re- garding the overall adequacy of each chapter.Following these are spe- cific comments addressing the techni cal content of t,ne r;eport.In the specific comment section,we have on occasion clarified the Depa.rt- mentis policies and positions with respect to the proposed Susitna Hy- droelectric Project. Response The above info,rmation has assisted the Power Authority in re- viewing the ADF&G comments. Comment Throughout the chapters of the Draft Exhi bit E that we reviewed,both the information presented and the assessment of impacts are generally insufficient for the kind of a planning and source document needed for preparation of an ElS.We are concerned that the benefits and cost as- pects of the project have not been presented completely and clearly. The general problems with the Draft Exhibit E chapters that were re- viewed by the ADF&G are as follows: 1.Data and information contained in the Exhibit E are,in many cases, incomplete or not properly interpreted. 2.Many potential impacts and issues attributed to the Susitna Hydro- el ectri c Project are not addressed.Impacts to fi sh and wildl ife resources and users that are addressed are not adequately quanti- fied and proposals to mitigate impacts are not sufficiently devel- oped. 3.Not all source materials,other Draft Exhibit E chapters,or the results of other study disciplines that are pertinent to the proj- ect are referenced. 4.Throughout the document there is a failure to discriminate between fact and speculation. Response These comments have resulted in modifications to the Draft Exhibit E.Specific comments relating to these problems are addressed in Chapter 11. Our comments,recommendations,and suggestions to strengthen the ma- terial contained in Draft Exhibit E in relation to the problem areas identified above are as follows: Comment 1 The APA should examine the specific comments appended to this let- ter and clarify or expand sections in the Draft Exhibit E chapters where inadequate treatment of the data or i nformat i on is sug- gested.The suggestion here is that while some interpretations by the authors are not necessari ly inaccurate,they are i ncompl ete. This type of problem in the Draft Exhibit E may be either editor- ial or a function of the short time frame allotted to assemble, assess and analyze the information available.The Draft Exhibit E chapters should utilize currently available and relevant informa- tion and data sources. Response Appropriate sections of the Draft Exhibit E have been clari- fied or expanded to address the specific corrments. Comment 2 The Draft Exhibit E chapters should accurately reflect the current state of resource knowl edge andinformati on on impacts whi ch are understood and those which are still undetermined.Consequently, the mitigation plans cannot be considered adequate unless the in- formation and analysis of impacts is current and comprehensive. The mitigation ~ans should clearly indicate how impacts are con- sidered in the design of the project;what measures will be taken to avoid,minimize or rectify impacts;and how effective these measures will be in mitigating losses. Response We have made attempts to ensure that our data base and impact assessment is as current and comprehensive as possible.How- ever,as must be appreciated by your department;there is of ten a considerable lag between the collection,analysis ann availability of baseline data.In our opinion Exhibit E accuratel y refl ects the current state of resource knowl edge as based on available data.As more information becomes available,our understanding will become more detailed.Con- sequently,our mitigation planning is considered adequate to date with the understanding that refinement will occur during the licensing and final design phases. Comment 3 Source material in the Draft Exhibit E is not adequately refer- enced.Furthermore,data and information reported in chapters of the document should be consistent with other chapters.The lack of coordination between the resource groups and the engineering and construction groups is evident;conflicts have not been clear- ly identified between uses and disciplines.To remedy this defi- ciency all confl icts between engineering and construction groups is evident;conflicts have not been clearly identified between uses and disciplines.To remedy this deficiency all conflicts be- tween engi neeri ng and economi c factors and envi ronmental al terna- tives should be identified and the consequences of altering those factors shoul d be 1i sted.The envi ronmental concerns shoul d be weighed equally with engineering and economic constraints. Response Referenc i ng and documentation has been improved in the fi na 1 Exhibit E.Di scr~pancies between chapters have been cor- rected.Throughout the planning process,environmental con- cerns have been given equal consideration. Comment 4 Throughout the document,there is not al ways adequate di sc rimina- tion between fact and speculation about resource values,concerns, issues,impacts and mitigation alternatives. Response Most assessments are on a continuant somewhere between fact and speculation.However,efforts have been made to identify for the reader the degree of speculation or data base support associated with various statements. Comment In some cases adequate referencing and reporting of data in the chap- ters may resolve this.Where baseline data collection is required to remove speculation it should be done,or if relevant data and informa- tion are available elsewhere they should be collected and evaluated. Response Adequate referencing and reporting of data has resol ved many of the above concerns.Data collection and analysis is on- going to further refine many of the impact predictions and mitigation plans. Comment The Department of Fish and Game recognizes the general character of the above recommendations.These recommendations are made based on an overview of the ADF&G comments for the chapters we have examined.We invite further consul tation by the APA with our agency to discuss the specifics of the chapters we reviewed and our general recommendations. Response The character of the above recommendations is understood. The more specific comments attached augment these general comments.Further consul tation will be pursued throughout the FERC license review process. Comment The fish and widlife resources of the Susitna River basin are of high value.Construction and operation of the proposed Susitna Hydroelec- tric Project can have wide ranging implications for these resources and their users.It is the objective of this Department to help Governor Sheffield insure that fish and wildlife resources are considered along with other project features during all stages of project planning,con- struction and operation. Response Fi sh and wil dl ife resources have been and will continue to be,considered along with other project features during the planning,constructi~n,and operation of the Susitna project. It is anticipated tflat most,if not all,impacts will be mi- tigated. .- Comment Based on the above overview of the Draft Exhibit E and the chapter- specific comments containe_d in the enclosed Appendices,the ADF&G does not believe that this planning document is sufficiently complete.Fur- thermore"we believe that the APA,can best insure expeditious review a,nd approval by FERC if it does as much as possible to resolve agency ccmcerns or establ ishes the mechanism to resolve those concerns. Respons,e Refer to the response to Comment 6 of the tJSFWS 1etter dated January 14,1983 • Comment We hope our revi'ew assi sts the APA in addressing the concerns expressed herein and consider that this review represents only part of the pro- cess needed to reach the objective we wish to attain.It is highly im- portant from our perspective that the FERC License Appl ication sched- uled for submission in February and the process of consideration of the Exhli::b,tt E will positi vely;contribute to the equiitahle consi de rat ton of fish and wildlife concerns. Response The AOF&G ' s timely review'was appreciated by,the Power Au- thority. Comment Thank you,for the,opportuni ty to revi ew and comment on thi s do,cument. We would appreciate your providing an explanation of how you eventually respond to the comments we have made. Response A 1 etter dated January 21,1983 was forwarded to ADf&G ex- plaining our response procedure. COMMENTS CONTAINED IN ALASKA DEPARTMENT OF FISH AND GAME LETTER OF JANUARY 13,1983 GENERAL COMMENTS -WATER USE AND QUALITY Comment 1 This document generally fail s to cite supporting ev idence for the statements made or for potential impacts considered to be of major importance to this agency.ki example can be found in the discussion of ice processes in the lower river.The ice formation processes are simply stated as causing staging of 4 feet at Talkeetna to3 feet at Sherman (E-2-59).The method used to determine this estimate has not been defined.Also,no references have been provided that evaluate whether ice processes are or are not a problem below other hydro pro- jects.If this is a purely speculative scenario,it should be so noted.Otherwise,a scenario assuming that the staging would be 6 to 8 feet at Talkeetna during the winter months and annual floods would occur is just as supportable as the statements provided. Response Referencing has been expanded where appropriate.These include references to field observation reports,such as the R&M Consul- tants reports of 1982(a)and (d)which documented the 2-to 4-foot average water level change observed during the 1980 freezeup, methodology reports which outl ine the analytical or forecast tech- niques employed,and support documents which provide evidence of similar scenarios occurring elsewhere. Considerable effort has been involved in model ing both pre-and post-operational ice processes.It has been assumed that reviewers would know that changes in ice process can and have been a probl em below other hydro projects.None of the scenarios dis- cussed are purely specul ativ e.Estimated changes are based on a sound technical understanding of the physical processes associated with ice formation,a mathematical model that has been tested on other hydro projects,and direct observations and measurements on the Susitna River.The degree of uncertainty associated with forecasted changes is provided. Comment 2 The failure to provide a separation of the speculative comments from the segments of the text supported by documentation creates severe problems in assessing the overall credibility of the report. -Response In all sections of Exhibit E,efforts.have been made to identify the extent of judgment associated with the various predictions. However,it is not always possible to provide an absolute separa- tion between speculation and fact.Most,if not all,statements addressing impact predictions or sui tabil ity of mitigation pl an- ning.are based on a combination of basel ine data (with an asso- ciated degree of error),predictive methodologies (with an asso- ciated degree of error,assumptions,and subjective evaluation), and professi onal judgment. Comment 3 This document also needs a preface on how the flow scenario and access route were selected for the license submittal and a discussion of other available options.The Exhibit A document referenced on page E-2-86 on access routes was not provided for our review. Response Di scussion of al ternatives is contained in Chapter 10.Section 2.3 addresses Access Alternatives and Section 3 addresses Alterna- tive Operating Scenarios. SPECIFIC COMMENTS G-2-001 E-2-3/4 The source of the 40 percent stream flow stati st ic shoul d be identi fied. Comparison of Table E2.3 indicates that for the 32 year filled in record,mean annual flow at Denali,Maclaren and Gold Creek were 2850,980,and 9650 cfs respec- tively.From this,it can readily be determined that Denal i and Maclaren provide 39 percent of the Gold Creek flow. G-2-002 E-2-3/5 State that all the nows listed other than upper Susitna River are also mean annual flows. The text has been modified to state that all fl ows 1 i sted are mean ann ua 1 flows. G-2-003 E-2-4/1-4 References are needed to support the flood information dis- cussed. References are provided where appropriate. G-2-004 ~eferences are needed to support the statement that the shape of the listed duration curves is indicative of flow from northern glacial rivers. Reference is provided in text. G-2-005 E-2-5/3 Reference{s}are required to support the discussion r.egarding Susitna River morphology. Much of the discussion on river morphology is contained in the report River Morphology,R&M Consultants 1982. References are prov ided in the document where appropri- ate. G-2-006 E-2-10/1' The description of sloughs as having a steeper gradient than the mainstem is misleading.The gradient wUhin the sloughs is generally variable,with a steep upper section and a lesser slope in the lower end.In up1 and sloughs,those without scour channels,the gradient appears to be even less.CNer- all,the sloughs have a steeper gradient,but the variabil ity of their gradient is important to their fisheries production. We ag ree with thi s comment.Section 2.1.2 has been modifi ed to inc1 ude the ADF&G comments. G-2-007 E-2-11/2 There is a need to cite specific references in the water qual- ity text even though a general reference section was provided in the preface for the water quality section. The specific references cited in the preface to the water qual ity section were for criteria purposes.Spe- cific criteria levels for each parameter are provided in the water quality data summary Figures E.2.lI,E.2.78, £.2.81 and E.2.83 through £.2.119.The sources of water qual ity data (USGS,R&M consul tants and/or ADF&G)are cited in the figures and the text,where appropriate. G-2-008 £-2-12/3&4 The months that are inc1 uded in the "winter,spring and.sun- mer"time frames need to be i denti fi ed. The winter months normally inc1 ude the months of October through April when the flow is predominantly base flow and water temperatures are approximately O°C,whereas the summer months include the period after breakUp through the high runoff period,(September).Paragraphs 2 and 3 have been clarified to reflect the intended meaning.A descr"j ption of the monthly breakdown of the three seasons,as defined for water qual ity data comp1 l- ations,is provided in Section 2.3,paragraph 3. .... .... G-2-009 E-2-12/5 C1 arificati on needs to be prov ide<!as to whether the 601 d Creek.temperature data presented in Fi gure E.2.30 were cor- ree:V.The location of this station was determined to be in- fluenced by 'GCilJd Creel<fl ows in 1981 and the station location was changed itl'198Z)to the northwest bank as a consequence. The data presented~in Figure E.2.30 (revised nlJ1lber Eo 2.71),are USGS spot measurements>at all gag ing sta- tions.Data from continuously recording thermographs were not available at all stations,50 spot measurenents were compiled to maintain consistency.It is not bel ieved that the spot data collections at Gold Creek would be influenced by the Gold Creek tributary contri- butions since a cross-sectional sampling technique is used by the USGS. G-2-01O E-2-14/1 A reference is needed for the Portage Creek temperature data • The reference for the Portage Creek temperature data is the Alaska Department of Fi sh and Game.The reference has been noted in the document • .... .... G-2-011 E-2-14/3 It should be noted here that under natural conditions,staging during freezeup reportedly causes flood ing of portions of the town of Talkeetna near the downtown airport.There is a need to reference the material presented in thi 5 paragraph. The 2 to 4 foot increase in water 1 evel noted in the document was the average water level change observed during the 1980 freezeup as reported by R&M Consul tants (1982a,1'9'82d).These val ues were not intended to pro- vide the maximum water level increase,but rather the average change.Near RM 96 and the town of Talkeetna, ice advance has resulted in local ized flooding'of side" c,hannels and sloughs.Daily stage readings during freeze up 1982 have revealed overnight water 1 evel increases of 4 to 5 feet in the slOUgh adjacent to RM 97 on the left bank.This flood condition persists only as loog as it takes the leading edge of the ice front to pass • G-2-01.\Z~H,..2·~I4'J.&~&6 The'term fraziT ice -should be defined for't:hee'readers.Al so it cannot tH~overstated,that ite jam.s could)have Se\l·,ere conse- quences to portions of t.he:.community of Talkeetna. Frazil ice 1S sl ush ice formed bY'ice crysta~Tization at the water sur face when the water temperature is at aoc and the air temperatur.e is below freezing.Photograph E.2.1 illustrates frazi··l ice OR!the Susitna River. Wi thout the impl ementati on of f1 ood control features or measures,staging due to the freeze up process could have consequences to portions of the community of Ta lkeetn a. G-2-013 E-2-17-5 In order to properly assess the effects of the project on the downstream fisheries and fisheries'potentials of the impound- ments,a relationship of suspended sediment and associated particle size to vertical illumination is desirable.This does not appear to have been done,in that no quantitative measurements of vertical ill umination have been obtained. Vertical illumination for photosynthesis in the environ- ment downstream from the project site varies widely through the year.Estimation of the depth to which light is available for photosynthesis may be made by direct measurement,or by inference from other para- meters,such as turbidity.Depth of the euphotic zone is taken as the depth of penetration of 1 percent of the ill umination avail abl e at the surface (St.John et al. 1976)• Direct measurement of light available for photosynthesis was attempted in overfl ow water in slough 21 using a LiCor rvbdel LI-1925B Underwater quantum Sensor,on September 9,1982.The euphotic zone depth as defined above was cal cul ated to be 1.1 meters from the 1 imited sampling data.Visual observations at the time of samp- 1 ing,however,indicated mainstem turbidity was much greater than in slough 21.Consequently,the euphotic zone in the mainstem could be inferred to be signifi- cantly less than 1.1 meters on this date. Vertical illumination has been successfully related to turbidity at the surface in studies at Eklutna Lake. Application of this relationship to turbidities in the Susjtna River downstream from the project would yield a minimum euphotic zone depth of about 0.1 meter for the 1982 season peak turbidity (1060 NTU)from a sample from the Susitna River at Sunshine (RM 84)on August 18, 1982.By this relationship the euphotic zone would extend beyond 10 meters in depth when turbidity in the stream drops below 10 NTU,as is typical throug h the wi n ter. While the relationship between turbidity and vertical illumination is quite good for the range of turbidity apparent in Eklutna Lake,the complex relationship be- tween optical properties such as turbidity,and the physical and mineral og ical properties of the suspended sediment is not fully understood.It is 1 ikely that a --, !""'" ! water sampl e contain ing a greater suspended sed iment surface area will reflect or scatter more incident light,resulting in a higher turbidity value and a cor- responding decrease in light penetration.This would be the case if water of a given sediment concentration con- tained sediment with a smaller mean particle size, elongated or flake-shaped particles,or lighter-colored mineral s. The lake environment features sediment concentrations much lower than the summer stream values and particle si zes much small er than those might be expected in pre- project downstream conditions.(Typical mean particle size by weight for 27 lake samples was 3-4 microns equivalent diameter versus 16.67 microns equivalent di- ameter for a depth-integrated river sample taken August 18,1982 from the Susitna River near Chase (RM 103). Sediment concentrations ranged from 0.14 to 63.5 mg/l in the lake compared to typical values of 156 mg/l to 769 mg/l in the river near Chase dur"ing the 1982 summer sea- son). Because of this difference in suspended sediment regime between stream and lake,some caution should be used in" obtaining values of vertical illumination from available turbidity and sediment data.It is likely that illumi- nation in the river is somewhat greater during the sum- mer than might be inferred from turbidity alone. G-2-014 E-2-20/5 The dissolved gas concentrations above the Devil Creek rapids were not supersaturated and were recorded as approximately 100 percent.The 105 percent val ue was recorded cibove the Dev il Canyon damsite. Refer to Chapter 2,Section 2.3.6(b)for incorporation of thi s correction to our document. G-2-015 E-2-24/2 These sloughs also contain important anadromous and resident fish rearing habitat. We disagree that power generation could be considered an instream flow use undef'only unusual circumstances; hydroel ectric power generation is a use of the water in the stream. G-2-017 £-2-26/3 Fry emergence occurs at different times within and among species.Emergence is most closely correlated with accum- ulated thermal units and has I ittle to do with the hydrograph. Also burbot and Dolly Varden should be added to the list of important resident species. We agree that fry emergence occurs at different times within and among species and that emergence is most closely correlated with accumulated thermal units.The statement should have read that fry out-migration occurs on the ascending I imb of the hydrograph.The importance of burbot and Dolly Varden as important resident spec ies has been noted in Chapter 2 Section 2.6.2. G-2-018 £-2-28/6 &£-2-29/1 Seasonal salinity measurements should be collected and correl- ated to a wide range of flow I evels and tide conditions in- stead of to a few selected fiow lev~s. The recommendation that seasonal salin i ty measurements should be collected and correlated to a wide range of flow level s and tide conditions instead of a few selected flow levels will be considered in the planning of future studies. A planned winter collection trip will attempt to gather data at a low tide range throughout a tidal cycle.This data wi 11 hel p defi ne the max imum extent of sal twater instrusion during low flows.If saltwater intrusion is not appreciable at existing winter flows,additional data collection on salinity would not be warranted. G-2-019 E-2-29/2 The location of the sampling site and a definition of the mouth of the Susitna River should be provided to give credence to this statement.Saltwater intrusion would be expected to be dependent upon tidal action,so this must also be taken into account when describing sal twater mixing and intrusion. The mouth of the Susitna River has been defined as the point where the coastl ine of Cook Inlet is extended across the Susitna River,i.e.,Susitna River enters Cook Inlet.This is at a point just below Delta Island. The location of the furthest downstream sampl ing site is at RM 0.5. - .- [ r Saltwater intrusion is related to tidal action.The larger the tide,the greater the mixing and the less the salinity intrusion.At the time of the August 18 and 19,1982 salinity measurements,spring tides (i.e.large tide range)were occurring in Cook Inl et.Thi s would have the effect of reduc ing the sal twater intrusion. However,even with neap tides (Le.small tide range) and the approximate 90,000 cfs discharge at the mouth of the Susitna River,sufficient mixing would exist to pre- vent sal inity intrusion upstream from the mouth. G-2-020 E-2-29/4-5 The use of regression equations to calculate the peak and low flows without data on actual discharge of the tributary streams to be crossed by the access road is inappropriate and should not be used as a substitute for collection of discharge information.This is particularly important to the design of bridges or culverts for engineering integrity or for fish pas- sage.The si zes of many drainage strr.Jctu:--es pl aced in the North Slope haul road and pi pel ine workpad were underestimated when these methods were applied.This resulted in hydraulic erosion and structure fail ures that were unnecessary. We disagree that regression equations are inappropriate for a prel iminary estimate of the discharge of the trib- utary streams to be crossed by the access road.During final design of the access road,culverts will be sized to maintain fish passage according to the criteria established by the Alaska Department of Fish and Game. The recommendati on that actual di scharge data be col- lected will be considered in the developnent of future field studies.However,the value of regression equa- tions should not be underestimated. G-2-021 E-2-29/6 It is stated that liThe 1 ine between the dam and the intertie has yet to be designed,sited or constructed."The Exhibit E should include information on the siting (corridors)of the transmission lines,baseline information on resources which may be impacted,an assessment of the impacts,and the methods proposed to offset impacts. The transmission corridor from the damsites to the intertie has been rerouted.Both the transmission 1 ine and access road now share a common corridor.Further information can be found in Chapters 3 and 10,Section 2.4,Exhibit A Sections 4 and 10,and Exhibit B Section 2.7. G-2-022 E-2-30/1-5 Oi sc harg e measurements shoul d be c 011 ec ted at any stream c ros- sings associated with the transmission lines if road access is to be dev eloped.These measurements shoul d be used in deter- mining the size of bridges or culverts for fish passage and engineering integrity.If any other transmission 1 ine routes were considered they should be listed. The recommendati on that disc harg e measurements be made at stream crossings associated with road access to the transmission 1 ine will be considered in pl anning future studies.While these measurements would be useful this would not be suffic ient to si ze the culverts because of the 1 imited number of years of data that woul d be avail- able before construction is scheduled to commence. G-2-023 E-2-31/General Comment on Section 3,Project Impact on Water Quality and Quantity It is essential to present a discussion of the rationale and process for selecting the operational schemes on which the impact discussions were based.In other words,it needs to be made clear why this specific operational scheme was selected above other alternatives,what the eng ineering rati onal e is and how considerations of environmental values,concerns or needs were incorporated into the judgment that this is a satisfactory operation scheme. A discussion of the rational and process for selecting the operation schemes on which the impact discussions were based is contained in Chapter 2 Sections 3.2 to 3.8. G-2-024 E-3-32/1 The statement that dewatering a I-mile section of the Susitna River will not resul t in any serious impacts is incorrect. This area is used by grayling for wintering,and dewatering will result in a permanent barrier to migrating fish in the system.Data collected by the ADF&G in 1981 on intrasystem movements of grayl ing between Deadman and Tsusena Creek indi- cated migration between these systems. The significance of the loss of the I-mile reach due to construction is assessed in Chapter 3,Section 2.3.1(a) (i).Note that once the dam is completed this section of river will be permanently lost. G-2-025 E-2-33/4 The statement does not address the large amount of spoil that will be generated and the large amount of grading and washing that will be necessary to obtain proper si zed material s for the construction of the dam.This will generate an enormous water quality and spoil disposal problem that has not been addressed.Spoil disposal sites should be located in a manner to preclude introduction of sediments into the Susitna River and fish-bearing tributaries. The disposal of spoil materials and the extent of grad- ing and washing are addressed in Chapter 2,Sections 4.1.4(c)(iii)and 6.2. G-2-026 E-2-34/4 Petroleum and petro lelJJ1 product spills i nthe smaller g rayl ing streams can have significant impacts on these fisheries.An oil spill contingency plan is essential to provide proper di- rection to prevent or mitigate spill events. G-2-027 Federal law requires that as part of the management pro- cedures there will be an oil spill contingency pl an (40 CFR 102.7).This is discussed in Chapter 3 Section 2.4.3(c)(i i ) • E-2-34/5 The description of the treatment of the wastewater is totally inadequate.The discussion of wastewater treatment should describe the volume of the wastewater,the nature of the con- taminant,a documented system for appropriate water treatment, the anticipated quality and the volume of the effluent,and an analysi s of the instream concentrations of the effl uent. Refer to Chapter 2,Sections 4.1.1(c)(vi)and 4.2.1(c) (vi)for discussions of the concrete wastewater,its treatment and potential impacts.A wastewater control contingency pl an,in coopl iance with state and federal regulations will be developed.Additional information is provided in Chapter 2,Section 6.2 G-2-028 E-2-35/1 Ground water can be impacted by polluted surface water drained into a well. r-We ag ree that g round water can be impac ted by poll uted surface water drained into a well.The greatest oppor- tunity for this to occur will be in the construction area.However,safeguards such as an oil spill contin- gency pl an will minimize the risk of this occurrence. G-2-029 E-2-35/2 The term minor impacts,to describe the effects of excavation of borrow material,appears to be a mis-statement.If borrow material is taken from streams or 1 akes in the impoundment area,the impacts could have serious consequenes on these fish populations.The types and volume of borrow materials to be - - removed,and the availability of materials need to be identi- fied.hi inventory of the fisheries in these areas needs to be made and basel ine water qual ity conditions need to be docu- mented.hi analysis of the effects of borrow removal and mit- igative actions to reduce the impacts by al tering site loca- tions or construction and operation techniques should be pre- sented.This is a major oversight in this document. At present,Tsusena Creek is the only stream sc hedul ed for borrow material removal (Borrow Si te C).No si tes are proposed adjacent to any lakes. A description of the types and volumes of borrow material,the availability of material and the potential impacts are discussed in Section 4.1.1(c)(iii).A pre- liminary description of proposed mitigative measures is provided in Section 6.2.Additional information is pre- sented in Chapter 3.Potential impacts to the fi sheries resources are discussed in Chapter 3,Section 2.4.3(d). G-2-030 E-2-35/5 Structural measures to prevent downstream movement of fi sh through the tunnels is a necessary mitigative action that is: not addressed.Downstream movement of fi sh without passage upstream essentially means these fish are lost to the popula- tion. An expanded discussion of the impacts of the diversion tunnel s on fi sh is contained in Chapter 3,Section 2.3.1(a)(i)and 2.4.3(h). While it is valid to assume that individual fish will not necessarily be lost by filling the reservoir,the lost tributary and main stem habitat and the low habitat value in the reservoir subsequent to filling is expected to significantly reduce the popul ations of fi sh suscept- ible to passage through the diversion tunnels.The tem- porary mitigative measure of structural protection from passage through the tunnel will provide only short lived benefits.It woul d be more appropriate to prov ide miti- gations that will provide long-term benefits. G-2-031 E-2-35/6 upstream migration of fish will be completely blocked by the velocity barrier in the diversion gates. We concur that upstream migration of fi sh will be com- pletely blocked by the velocity barrier in the diversion gates. /""" I - G-2-032 E-2-36/5 As with earl ier comments (E-2-29/4,..5),the regression ana1ysi s of peak and minimum discharges should not be substituted for the collection of discharge information. Refer to response to question G-2-020 (ADF&G comment E-2-29/4-5)• G-2-033 E-2-37/3 The 1 eve1 of ana1ysi s presented here and detail of mitigation of the effl uent shoul d be prov ided for all effl uents rel ated to the project,not just sewage. Additional detail sand analysi s of borrow material removal,concrete wastewater,and accidental petroleum spills have been provided in appropriate sections. G-2-034 E-2-38/6 Reference to this information as a personal communication is inappropriate.The outmigration of salmon in the spring is as likely related to photoperiod and deve10Jll1ent as the other factors listed.Very low flows in the spring could Cause many of the juv enil es to remain trapped in backwater pool s that are normally flooded by the mainstem under pre-project conditions. Reference as a personal canmunication has been del eted from the document as per the Al aska Department of Fi sh and Game request. We concur that the out-migration of salmon is as likely rel ated to photoperiod and deve10jl1lent as stage,di s- charge and temperature.We disagree that very low flows in the spring could cause many of the juveniles to re- main in backwater pools that are normally flooded by the main stem under pre-proj ect c ond iti on s.Local runoff from the spring melt and/or rainfall in combination with ground water inflow will provide sufficient flow for out-migration.For exampl€in slough 9 there is a back- water pool that extends about 700 feet upstream from the slough mouth at a discharge of 12-16000 cfs (Fi gure ). The berm which controls the pool elevation is approxi- mately 400 feet downstream from the mouth.From this berm to the mainstem,there would be a reach 400 feet in 1 ength that woul d be dewatered if the mainstem flow were reduced to 6000 cfs and no sl oug h flow.Usi ng the very conservative assumptions that local runoff during spring plus ground water flow is only 1 cfs,the flow spreads laterally over a 10n foot width (i.e.no unevenness in the topograePhy which woul d concentrate flow an<l increase depth over less width),the depth of flow can be calcu- lated to be one half inch by Mal'lning f s equation (Man- ning's n=0.035,slope =.0038).This would be suffi- cient to ~ermit out-migration of 5a1mon fry. G-2-035 E-2-39/2 The proposed flows of 12,000 cfs have not been demonstrated to maintain the character of sloughs and provide the flushing flows needed to clean fines out of the gravel.Also the cycle of vegetation succession will be altered if flows do not wash away old vegetative growth.Consequently,what is now aquatic habitat may become terrestrial habitat over time. While the proposed flows of 12,000 cfs will not provide the flushing flows to clean fines out of the gravel or maintain the integrity of the slough morphology,during wet years flows will often be sufficiently high to over- top many of the upstream berms of those sloughs which have not been increased in elevation for fishery mitiga- tion.(In sloughs where the upstream berm elevation will be increased,the sloughs will be maintained on a 5-year rotating schedule.)If,during filling,the flood vol ume storage criteria are exceeded,Watana fl ows will be increased as high as 30,000 cfs (Section 4.1.2(b)[iiJ).During project operation,once the Watana reservoir is filled to the normal maximum operat- ing 1 ev el,out flow will be inc reased to equal in flow up to the operating capacity of the release facilities. From the weekly reservoir simulations,flushing flows of 20,000 cfs will occur once every seven years on the average with "Watana only."When Devil Canyon comes on line there is a 50 percent chance annually that a flush- ing flow of at least 20,000 cfs will occur.As energy demand inc reases,fl ushing flows of 20,000 c fs wi 11 occur about once every five years. G-2-036 E-2-39/3 Mi n imum flows for the wi nter peri od shoul d be estab 1 i shed ac- cording to fi shery resource requi rements.Thi sis a c ri ti cal period for the popul ations of overwintering fi sh and even minor dewatering may have significant del eterious effects. We agree with the importance of ensuring adequate flows for fisheries in the mainstream during the winter months.Adequate main stem flows are most cri tical dur- ing thi s period when cl imatic conditions are harsh and the mainstem is being utilized for overwinter rearing. Hence,during Watana reservoir filling,instream flows will be maintained at natural level s for the period November through April.Chapter 2,Section 4.1.2 has been modified accordingly. G-2-037 E-2-39/5 &E-2-40 There needs to be an analysis of longer fi 11 ing periods and associated consequences.The short filling period evaluated (3 years)may produce unacceptable consequences to fisheries resources.ftn extended schedule for filling may provide for a G-2-038 higher and more preferable mitigation option for fisheries throug h the 3-year schedu1 e. By maintaining the proposed 3-year filling period,ad- verse temperature impacts can be avoided.With the pre- sent design the~e is,at most,one year of impact (refer to Chapter 2,Section 4.1.2[e][iJ).With an extended filling regime,downstream flows would continue to be discharged through the low-level outlet for a longer period.Alternative options will continue to be invest- igated. E-2-42/5 The potential negative impacts to slough areas downstream from Talkeetna resulting from decreasing the recurrence interval s of what are now mean annual bankfull floods is not addressed. Insufficient information exists to predict the negative impacts to slough areas downstream from Talkeetna re- su1 ting from decreasing the recurrence interval of what are now mean annual bankfull floods. .-.. - ...... G-2-039 E-2-43/2-5 The timing and the consequences of the thermal regimes created within the reserv oi r during fi 11 ing to down stream water temp- eratures must be better defined. After the initial summer of filling,the Watana reser- voir will necessarily cool to 4°C.From this point un- til water can be passed throug h the re1 ease fac il iti es, the Watana outlet temperature will be 4°C.This is be- cause the out1 et .wi 11 be approximately 400 feet below the water surface at the end of the fi rst summer of filling,and there is no mechanism for any significant heat tran sfer to the water at thi s depth I The vol ume of water stored in the reservoir after October of the first summer of filling will be about 2.2 million acre-feet. From November through April ,500,000 acre-feet of 4°C water will be evacuated from the reservoir and be re- p1 aced by O°C water whic h was contributed as in flow dur- ing this time.The O°C water,because it is less dense than 4°C water,w·ill tend to float on top of the 4°C water.Althoug h t here will be some mixing of DoC and 4°C water,this w·ill be confined to the upper layers. Even with cooling before the ice cover forms,only in- significant cooling will occur at a depth of 175 feet. It is the 500,000 acre-feet stored below this depth which will be discharged during winter. In spring the ice on the reservoir surface will mel t and the reservoir will warm to 4°C,probably by about the end of May.Then the surface will continue to warm above 4°C and slowly this warmer water will penetrate more deeply.Also,warm Susitna River water will be contributed to the reservoir.Although there will be some mixing,the warmer surface water,because it is less dense,will float on the denser 4°C water.Through mid-September,approximately 1.8 mill ion acre-feet of 4°C bottom water would be released from the reservoir if the low-level outlet was continuously used.This would still leave a reserve of 4°C water.However,it is an- ticipated that sometime in late July or August the re- servoir will be sufficiently full to allow discharge through the release facil ity. G-2-040 E-2-43/5 The water temperatures fined more accurately. should be identified. downstream from Watana need to be de- The cause of these low temperatures Using the 4°C outl et temperature as a boundary condi- tion,the downstream water temperatures have been mod- eled for the first winter of f"illing and the second spring through August (using both mean-monthly flows and low-monthly flows,and assuming release facilities are not operational).In the second winter of filling,the release facilities will be operating and water close to aoc wi 11 be drwn from the surface and rel eased.In the event a low flow year occurs during filling and the water level is not high enough for the release facili- ties to be operational,the resultant temperatures for a reduced discharge of 6000 cfs were examined.The re- sulting temperature profiles from this discharge and selected filling discharges are illustrated. G-2-041 E-2-44/4 What are the predicted depths at which photoshynthesis will occur and how will the quality of water discharged downstream compare with the pre-project conditions with regard to photo- synthetic processes?Data or discussion regarding this ques- tion should be presented. Vertical illumination in the reservoir is 1 imited byab- sorption and scattering of 1 ight by suspended particu- late matter.Data from glacially fed Eklutna Lake re- veal a close carrel ation between the rate of decay of illumination with depth and surface turbidity levels, which will vary seasonally (R&M Consultants 1983).Qui- escen t settl ing of part i cul ate matter in wi nter allows relatively low turbidities in early summer and a corres- ponding maximum depth of vertical illumination.If the depth of the euphotic zone is taken as the depth of pen- etration of 1 percent of illumination available at the surface,photosynthetic activity in the reservoir may ~-,"'~""-'"~"-'~~~-.,-.~~.~-.'.~..'"-~----~~~~ -- - - - extend from the surface to as much as 17 meters depth. Suspended sediment introduced by summer streamfl ow wi 11 quickly increase-surfa,c:e turbidity levels and reduce the depth of the eupnotk zone accordingly.Mi d to 1 ate summer euphotic zone depths may be as low as 2 meters. W·ith reduced surface turbidities "in the fall,an in- crease in vertical illumination is expected.However, during the breakdown of density stratification in the fall,turbulent mixing of turbid strata in the water col umnwi 11 increase turbidities once again,red'uc ing illumin;ationsomewhat until inverse temperature strati- fication and ice cover formation oc·cur. The nature and concentration of suspended sediment in HIe powerhouse intake will control turbidity and verti- .cal illumination in the rliver downstream between Watana and Talkeetna.Tbe ,reduction in summer turbidity levels fromp1re-projectconditions will cause an increase in vertical illumination and hence photosynthesis.In fall and wi n'ter ,relative post-project increases "in down- stream turbidities will reduce illumination intensity, although 1 percent light penetration depths are likely to be greater than 2.4 meters in open water areas with a gradual increa'se in light penetration through the win- ter. G-2-042 E-2-45/3 The method used to estimate the 30-50 NTU val ues should be de- fined and better described,.The reasons why winter turbidity levels are neither quanttfiable nor subject to estimation should be clarified. Data gathered from 0utsidesources,and analysis of sed- iment concentration/turbidity data from 'the Susitna River,indicate that Watana reserv oi r turb id ity 1 evel s will be in the rang e of 10-50 NTU.Th is rang e ha s been determined from the regression equation developed be- tween turb id ity and suspended sed iment concentrati on using existing USGS data for the Susitna River. To estab 1i sh seasonal trends in turb idity at the reser- voir outlet,information on inflowing sediment concen- trations,settling characteristics of fine sediments, and water travel time through the reservoir were com- piled. Sediment inflow is at a peak in mid-summer with concen- trations as high as 1000 mg/l.Data from the USGS shows that approximately 20 percent of this sediment is in the 4 micron or finer size range.Using the turbidity- suspended sediment regression 1 ine,200 mg/l of sediment concentration corresponds to 30-40 NTU. Travel time of summer inflow in the live storage zone is approximately 150 days.Given the settl ing character- istics of glacial sediment,particles larger than 4 mi- crons will settle out of the active zone before reaching the reservoir outl et.Therefore,shortly after ice cover formation,expected turbidity in the surface lay- ers would be on the order of 40 NTU. The rate of settlement under ice will be accel erated due to reduced wind-induced and thermal currents that tend to keep sediment in suspension.We have assumed that once an ice cover forms,sediment less than 2 microns will settle out from the active zone.The 2 micron size constitutes an average of 12 percent of the total incom- ing sediment.During the summer months this is equiva- lent to approximately 120 mg/l which corresponds,in turn,to 20 NTU.Sediment inflow drops off in the fall as contribution from the basin glaciers decl ines:The average sediment input is 300 mg/l with approximately 36 mg/l in the 2 micron and finer range.This corresponds to approximately 7 NTU. Based on this analysis of seasonal trends,it appears 1 ikely that winter turbidity val ues at the outl et after formation of an ice cover on the reservoir will be in the 10-20 IHU range,summer values will be in the 20-50 NTU range,and maximum expected values at freezeup would be 40-50 NTU.Again,it shoul d be stated that these values are based on the turbidity-suspended sed"iment concentration relationship developed from the existing USGS data for the Susitna River.Also,the analysis assumes that water will move through the reservoir as a pl ug with no accounting for significant 1 ateral or lon- gitudinal mixing. Turbidity data collected in Ekl utna Lake in summer of 1982 consistently indicated that maximum turbidity lev- el s were 30-50 NTU at Station 11,a point 5 mil es down the lake from its inlet.Surface turbidity values were in the 20-40 IHU range. Turbidity values at Eklutna Lake become more uniform as the fall overturn period caused convection currents. This was observed in mid-October 1982 with near-uniform turbidity values of 30-35 NTUs.By November 4,1983, turbidities had decreased to 25-30 NTUs,with no ice cover on the lake.Turbidity values in mid-January showed a sl ightly decreasing trend with depth at two sites,with values near 20 NTU at the surface. Additional information on the sampling data at Eklutna Lake is included in Chapter 2,Section 4.1.3(c)(iii), and in the report Glacial Lakes Studies -Interim Re- port,R&M 1982. - -, .... G-2-043 E-2-47/6 The section regarding impacts to slough habitats is not ade- quately presented.Basically,the rel ationshi p of mainstem discharge to slough discharge should be illustrated graph- ically.The response of the ground water-wells to changes in the mainstem at the various locations (for those wells that were not silted in)should be plotted;a gradient profile of the ground water,rather than just the thalweg of the slough, shoul d be ill ustrated;and a map of the locations of upwell ing in the sloughs should be presented.The text as written does not present data and·many spec ul ativ e comments are prov ided without appropriate qualifications. The section describing the impacts on slough habitats during fi 11 ing ha.s been expanded.Once the heads of the sloughs are overtopped there is a unique relationship between the mainstem discharge and slough discharge be- cause mainstemdischarge dOOlinates the contributions from the ground water and local surface runoff.This information has been collected by the Alaska Department of Fish and Game and will be available in the supple- mental June 30,1983 report.However,when the heads of the sloughs are not overtopped there is not a unique re- 1ati onshi p between mainstem di sc harge and sl oug h di s- c ha rg e. The response of ground water wells to changes in the mainstem discharge has been presented in Chapter 2,Sec- t ion 2.4.4.Groun d wa te r con tour s have also been pre- sented.The 1 ocati ons of upwell ing in the sl oug hs is not avail abl e.Further in fonnation can be found in the report on Ground Water Studies (Acres 1983). G-2-044 E-2-49/2 The statements suggesting that there will be no changes in the temperature of upwelling ground water and consequently,no im- pacts to incubating salmon eggs are not supported by data or citation.The reduction of flows through these sloughs is not quantitatively defined and could easily be major as well as minor.The loss of scouring flows that remove sediment in these sloughs as well as beaver dams and removal of spring ice buildups could easily cause a senesence process to begin which may ultimately destroy the sloughs,are not addressed. Support for these statements is found in Cha pter 2,Sec- tion 4.1.3(c)(i)~The upwelling temperatures reflect the long term averag e water temperature of the Susi tna River.Since this averge temperature is not expectd to change significantly,the upwell ing temperatures should remain the same (Acres 1983). G-2-045 E-49/4-5 There are no c itati ons,references or data to support these statements. This section has been revised. G-2-046 E-2-50/1 There is no reference to the commercial boat launch at Sun- shine located immediately below the Parks Highway bridge on the east bank,nor is there acknowledgement of the boat launch at the Talkeetna Village airstrip which is becoming more heavily used due to bank degradation and channel erosion at the "new"Talkeetna boat landing.If the mainstream of the Chulitna River moves west from its present position as defined' in the Draft Exhibit E (E-2-42/4),access to the Chul itna River and Susitna River north of Talkeetna River confluence could be considerably more difficult than at present.The source of the data,analysi s or other documentation to support the comment that minor restriction on upstream access to Al exander Slough may occur during years of low stream flow needs to be provided. The commercial boat launch at Sunshine located immedi- ately below the Parks Highway bridge on the east bank is located on a constricted segment of the river.This site was not specifically investigated as water depths immediately offshore are sufficiently deep for launching even at existing low flows. There is no boat ramp at the end of the Tal keetna ai r- strip.However,the river bank is low in that area,and some people do 1 aunch boats by backing down the river bank.This site has rel atively deep water. The data available and presented in A Preliminary Analy- sis of Potential Navigation Problems Downstream of the Pro osed Hydroelectric Dams on the Susitna River, A as a Department 0 Natura Resources,1982 was suf- ficient to define the flow at Susitna Station required to keep upstream access to Al exander Sl oug h open.How- ever,discussions with Paul Gabbert,owner and operator of Gabbert's Fi sh Camp in Al exander Creek,indicated that there are access problems throug h that route every year at low flow (Gabbert,October 1982).Furthermore, the channel morphology changes every year due to hig'h flows ,maki ng se 1ecti on of a flow requi red to keep ac- cess open highly variable. G-2-047 E-2-51/1 Down stream flow requi rements have not yet been det.ermined or ag reed upon. We acknowledge that downstream flow'requ'i rementshave' not been agreed upoo. r'--'· -- - I""'" I r - .... .~ G-2-048 E-2-51/2 The criteria used to develop the 5000 cfs mlnlmum flow as well as any of the other IItarget li flows should be presented.There must be some documentation of the rationale,review or selec- tion process by which these IItarget flows"weredevel oped and justified. The 5000 cfs minimum flow from October through April represents the approximate average flow that would be available for this period if a flow as low as the droug ht of WY 1969 were to occur •Under normal ci rcum- stances flow would be much greater than the 5000 cfs minimum.However,there is only a finite storage volume available in the reservoir and without use of the low level outlet it would not be possible to provide more than 5000 cfs,during a severe drought such as occurred in WY 1969.Once power generation commences it is expected that a different fishery regime will establish itself.Therefore,if a power outage were to occur, rather than provide natural flows of 1000 to 2000 cfs which could be detrimental,it was determined that pro- viding flows of 5000 cfs,during the power outage, would be preferable. G-2-049 E-2-52/1 Optimally operated reservoir scenarios should be examined for other target flows downstream using the new synthesized flows. Optimally operated reserv oir scenarios have been examined for other target flows downstream.This is discussed in Chapter 2,Section 3.2 through 3.8. G-2-050 E-2-52/3 A scenario wherein Devil Canyon is not constructed in the pro- jected time frame shoul d be presented. If Devil Canyon Dam is not constructed in the projected time frame,Watana will continue to operate as dis- cussed in Chapter 2,Section 4.1.3(a). G-2-051 £-2-56/2 A detailed discussion on ice processes should be presented. An eKpanded discussion on ice processes is presented in Chapter 1,Sectiun 2.1.2. G-2-052 £-2-5715 To evaluate the effectiveness of the multiple level intake structures,their-efhc iency at removal of a 1 ayer of water at a particul ardepth must be analyzed hydraulically.The veloc- tty at the {lort ~of the intaKe structure must be low -e-noug h to prevent iJpwell ing cat the face of the dam.This i sa :common occurrence that effectiv-ely ~]imtnates the functionality of these "types of structlJres • These comments will be considered during the develollTIent of further design studies. G-2-053 E-2-58/1 The strata modelled for the reservoirs during the winter under alternative operational scenarios must be presented.The abil ity of the structures to control temperature during the winter needs further documentation. An expanded discussion of the winter reservoir modeling is presented in Chapter 2,Section 4.1.3[c][i]). G-2-054 E-2-59/2 The process by which stag ing el ev ations were estimated shoul d be documented.Under pre-project conditions with lesser flows,staging is often much higher than these levels.Local flooding in November reportedly affects the town of Talkeetna. Staging evaluations were computed through the use of an ice model.This is further discussed in Chapter 2,Sec- tion 4.1.3(c)(ii).For a discussion of local flooding in November at Talkeetna refer to response to comment G-2-011. G-2-055 E-2-61/1 There should be an explanation why turbidity in the top 100 feet of the reservoir is the main interest. Sediment near the surface would have the most impact in scattering or absorbing radiation,thus having the most significant impact on the depth of the photosynthetic zone in the reservoir.The 100 foot designation for turbidity was somewhat arbitrarily assigned to reflect this.In fact,turbidity at greater depths is import- ant,depending on where water is being withdrawn from the reservoir.The statement on the top 100 feet of the reservoir being of primary interest has been modified in Chapter 2,Section 4.1.3(c)(iv). G-2-056 E-2-63/5 Other potential sources of wastewater need to be 1 isted. The discussion provided in Chapter 2,Section 4.1.3(c) (v)refers to dissolved oxygen levels.It is antici- pated that human wastes generated by the residents of the town,recreational visitors to the area,and the inhabitants of new camps that may be developed in the project area will be the primary sources of oxygen demanding wastewater in the proj ect area.Thi sin forma- tion is referenced in Chapter 2,Section 4.1.3 (c)(v). G-2-057 E-2-64/3 We recognize that this section refers to the operation phases; however,there is no explanation how the valves will be oper- .- .- ,~ ~, ated during the initial fill ing and startup procedure.M explanation of the thermal effects of using these valves is also needed,since the valves will facilitate discharge of waters from the hypolimnion. The operation of fixed-cone valves during initial fill- ing and during startup has been incorporated in Section 4.1.2(c). The release facil ities will be drawing water from be- tween El 2025 and El 2085.Thi s corresponds to an aver- age depth of 135 feet when the reservoir water surface is at El 2190.Since flow releases occur only after the reservoir is full and since this occurs in August or September,then,if it is assumed that the calculated temperature profiles are appropriate and water is draw- ingun i formly over the·intake,the water temperature will be about 8°C.Hence,through the Watana release fac il ities most water wi 11 be withdrawn from the Watana epil imnion. G-2-058 E-2-66/1-3 Data to support this presentation should be provided. Support data has been incl uded in Chapter 2,Section 4.1.3(d)(i i). G-2-059 E-2-66/5-6 We disagree that navigation and .transportation will not be si gnificantl y impacted.These are somewhat contrad ic tory to the statements in E-2-66/5-6.Information to substantiate this conclusion should be presented. In·the continuation of paragraph 6 on the next page it is stated that E-27/2 refers to the winter season and the fact that winter travel by snownachine and dog sled will be im- peded. Navigation and transportation impacts in the Watana to Talkeetna reach have been quantified and expanded in Chapter 2,Section 4.1.3(f)(ii).The seemingly contra- dictory statements have been modified in Chapter 2, Section 4.1.3(f)(ii)to reflect the intended meaning. .During winter,after a solid ice cover forms,travel across the reservoir will be possible by dogsled and snow machine.However,thi s use wi 11 occur 1 ater in the year than under natural condi ti ons.Down stream from Watana,the river will remain open all winter through Dev il Canyon.. G-2-060 E-27-67/1 Reduction of fl oating debri s will not benefit navigation sig- nificantly,in our opinion.Low water flows are expected to be the most significant hazard in the downstream reach.The source or data to support statements in this paragraph should be provided. We concur that on the Susitna,low water could be poten- tially more dangerous than floating debris because a boat operator cannot necessarily see the river bottom. Additional information can be found in Chapter 2, Section 4.1.3(f)(ii). G-2-061 E-2-60/2 This paragraph confl icts with Page E-3-137,second paragraph, wherein it states the dam construction will adversely impact temperature from a fisheries perspective. We disagree that thi s paragraph confl icts with page E-3-137.There will be no detectable difference in water temperature at Devil Canyon or points downstream resulting from construc ti on of Devil Canyon.Tempera- tures wi 11 be the same as during the operation of Watana.The paragraph on Page E-3-137 discusses filling of Devil Canyon reservoir.Here,there will be temper- ature differences. G-2-062 E-2-70/3 See earlier review comments for E-34/5 concerning the analysis needed to determine the water quality hazard from the dis- charge of concrete wastewater. Refer to Chapter 2,Sections 4.2.1(c)(vi)and 4.1.1(c)(vi)for discussions on concrete wastewater,its treatment and potential impacts.A wastewater control contingency pl an wi 11 be developed in compl iance wi th state and federal regulations as discussed in Chapter 2, Section 6.2 G-2-063 E-2-76/4 Documentation of the statement that,liAs Devil Canyon reser- voir is filled,additional fishery habitat will become avail- able in the reservoir"should be provided. A discussion on the additional fishery habitat that will become available in the reservoir is provided in Chapter 3,Sections 2.3.2(c)(i). G-2-064 E-2-87/1 Accurate discharge information on the creeks is needed to in- sure proper culvert sizing and fish passage.This information is needed to insure proper mitigation of potential impacts. See response to comment G-2-020. - G-2-065 E-2-90/2 The minimum flow to maintain fi sheries should be refined be- cause 12,000 cfs may not be adequate. A discussion on the minimum flow to maintain fisheries is presented in Chapter 2,Sections 3.4 and 3.6.It is our opinion that the fisheries impacts associated with a flow of 12,000 cfs are mitigatable and thus the loss in net benefits associated with higher flows is not warranted. G-2-066 E-2-90/3 The seasonal timing of the construction has not been add- ressed.This is an important factor in address"ing fish and wildlife impacts. The seasonal timing of construction is illustrated in Exhibit C.The impacts on fish and wildlife can be found in Chapter 3. G-2-067 [-2-91/2 Twelve thousand cfs for a flow at Gold Creek will not afford adequate access to 50 percent of available sloug'hSpawning habitat.A higher flow is required to mainta"in adequate ac- cess.This flow must be determined by an analytical process. Al so,other 1 ife phases of fish in the downstream reaches be- low Devil Canyon are not addressed.All of the statements re- garding the effects of 12,000 cfs flows are purely speculative and are not supported by data or measurements yet avail able. Th~release of water through the valves may present downstream thermal problems by releasing cold water in mid-summer. ..... - We have seen no data to confi rm the ADF&G statement that 12,000 cfs will not afford adequate access to 50 percent of available slough spawning habitat.However,we are confident that with a relatively stable 12,000 cfs and incorporation of the mitigation measures discussed in Chapter 3,access will be provided to the sloughs.As discussed in Chapter 3,Sections 2.3.1(a)(ii)and 2.4.4(a)(i),the analysis did consider other life phases.The thermal impact of a rel ease through the final cone valves in mid summer during filling is dis- cussed 'in Chapter 2,Sections 4.1.3(c)(i)and 4.2.3(c)(i). G-2-068 E-2-91/4 'Changes in downstream river morphology have not been fully assessed.To state that no mitigation is necessary to main- tain slough habitats is premature.The lack of ice scour and flood fl owsmay cause an aggradation of sediment in sloughs and may reduce natural cl eaning processes necessary to main- tain productive spaWning substrate and rearing areas. As discussed in the fishery mitigation section in Chap- ter 3,sloughs that will be adjacent to ice-covered sec- tions of the main stem and berms constructed at their up- stream ends will be maintained on a five-year,rotating basi s.At sloughs located upstream from the ice front, excess flow will be rel eased from the damsites during the wet years;this will provide flushing flows.Refer to Chapter 3,Sections 4.1.3(a)and 4.2.3(a). G-2-069 E-2-91/5 Line 8 Mitigation should be required and should be borne by the proj- ec t dev eloper as a standard proj ec t cost. Methods of mitigating the potential thermal effects an- tic i pated during the second year of fi 11 ing wi 11 con- tinue to be investigated during the detailed design pro- cess.One potential mitigation is a shorter filling reg ime.Thi s woul d enabl e a flow rel ease throug h the outlet facilities early in the second summer of filling. G-2-070 E-2-92/1 Data to support statements in this paragraph should be pro- vi ded. We are uncertain as to the parag raph referred to.If it is in regard to the minimum downstream flow selection, thi sis discussed in Sections 3.2 to 3.7.If the com- ment refers to the operation of Watana as primarily a baseloaded plant,this is discussed in Section 4.1.3(a). G-2-071 E-2-92/3 Thermal control by withdrawing water close to the surface can result in vortices causing air entrainment and supersaturation which is detrimental to fisheries.This subject should be ad- dressed with supporting analysis to ensure that surface with- drawal of water can occur without detrimental impacts to fish- eries. There are as many engineering reasons as there are envi- ronmental reasons for avoiding vortices that cause air entrainment.This subject will be deal t with during de- ta il ed desi gn. G-2-072 E-2-92/4 The report cited did not demonstrate supersaturati on because of faulty analytical techniques.The sample of water was not pressurized before gas chromatographic analysis as is required by standard methods.Therefore,any supersaturation would have probably di ssi patedbefore the sampl e was an alyzed.The study did show,however,that the thermal conditions will not be affected by the valve and that the temperature downstream will essentially be the same as the temperature at the with- drawal layer in the dam. ,... ,..,. i, -- .. I The accuracy of these results is being investigated. G-2-073 Tables E-2-1 through E-2-20 References to data sources for tabular material should be made where they are missing. Re ferences to data sources fo r tabul ar materi al have been made where appropriate. G-2-074 Figures E-2-1 through E-2-39 Reference to data sources for figures should be made where they are missing. References to data sources for figures have been incor- porated where appropriate. SUSITNA HYDROELECTRIC PROJECT,DRAFT EXHIBIT E FISH,WILDLIFE AND BOTANICAL RESOURCES DEPARTMENT OF FISH AND GAME GENERAL COMMENTS -FISH Comment 1 This report lacks sufficient data to support most of the statements on project impacts,whether adverse or beneficial.It does not reference or use the literature or experience obtained from other hydro projects. Many of the statements regarding populations of fishes do not adequate- ly reflect consideration of the instream flow requirements necessary to sustain those populations.It does not separate opinion from state- ments supported by correlative data regarding responses of the fishery to ri ver regu 1at ion and impoundment.It al so does not refer to or cite in the text the economic consequences of the flow regime presented. The document does not provide information relative to Alaska or other locations as to the success or failure of proposed mitigation measures. In short,the data base presented is i nsuffici ent to support most statements of impacts or the quantitative effects that the project will have on downstream fisheries. Additional difficulties in reading the report are encountered due to lack of literature references,processes by which conclusions or assumptions were developed,and an absence of lists of technical docu- ments and their locations.Sources of tabular or figure material often are not cited.In general,mistakes are common,many errors are ap- parent,and the report is neither well organized nor edited. Response Most of these general comments are presented in a more detailed and constructive manner under the heading of specific comments. Deta il ed responses to the s pecifi c comments have been prepared. In the finalization of Exhibit E these comments have been taken into account,to the extent possible. ..... ..... .... r I ..... DEPARTMENT OF FISH AND GAME GENERAL COMMENTS -WILDLIFE AND BOTANICAL RESOURCES Comment 1 There are numerous typographical errors,incomplete sentences,and in- consistent or contradictory statements.The format is frequently violated with impacts of one project feature incorporated into the dis- cussion under the heading of another feature.Terminology is at times inconsistent or vague.The level of detail varies greatly from one subsection to another with "minor"impacts often treated more compre- hensively than "major"impacts.There are numerous examples of incom- pletely thought out ideas,some of which will not stand up to close scrutiny.These are all indications that the terrestrial portions of Draft Exhibit E,especially the impact sections,were written too quickly before information was organized and had received very little proofing.The draft is in such poor shape that a meaningful,detailed review is very difficult if not impossible.However,some major prob- lem areas that require extensive modification of the impact and mitiga- tion sections can be identified and specific examples of types of defi- ciencies can be cited • Response The text of Exhibit E was circulated for review in draft form.Si nce that time,substantial revi s ions have been made to content and format.Your constructive criticism is appre- ciated,and we are confident that the final text will repre- sent a major improvement over the draft. Comment 2 Quantification of impacts:Magnitude of impacts are rarely indicated except in terms such as "minimal"or "moderate."Even those terms are rarely supported by a rationale.Most judgments of the significance of impacts appear to be subjective.While studies are incomplete,and some data (such as available vegetation maps)are of marginal value,it should be possible to place outer 1 imits on many impacts,at least indicating the order of magnitude.Indication of the general propor- tion of a population1s range subjected to a particular impact would be useful as a crude i nd i cator of magn i tude that coul d be refi ned at a later date.As written,the reader does not know if a species will lose 10 percent or 90 percent of its habitat. Response The text has been rewritten to incorporate available data. Where quantification is reasonable and available,such data have been provided.Where possible,we have provided a de- fensible analysis of anticipated impacts.Habitat is,for most species,a nebulous and poorly-defined term.We have indicated the importance of identified vegetation types to each species as i ndi cated in ADF&G Phase 1 Reports and the literature,and we have provided data on areal extent of var- ious vegetation types lost and proportions of basin totals these represent. Comment 3 Impacts based on current populations:Current populations are almost always used as the basis for impact assessment.Impacts are judged under current management plans and management strategies.This approach is not adequate for assessing many of the impacts of the Susitna Hydroelectric Project.Impacts should be assessed in terms of the range of population levels that could reasonably be expected to occur during the life of the impact.Current populations might be ade- quate for short-term impacts,as the population would not change great- ly during that period.However for long-tenn impacts,such as those resulting from inundation of habitat,a full range of population levels that could be supported by the habitat (carrying capacity)and the range of management objectives that could be supported by those popula- tion levels should be presented. It should be recognized that carrying capacity as well as population levels may vary over time.Consequently,likely changes in carrying capacity during the life of an impact should be considered.Any action that maintains carrying capacity at a generally higher or lower level than expected in the absence of the project woul d have a posi ti ve or negative impact respectively. Carrying capacity cannot always be measured.Where current populations are near carrying capacity,they are an appropriate measure even for long-term impacts.Where current populations are believed to be below carrying capacity,some estimate of carrying capacity is required.In some cases,historical population data may suffice.In other cases, measures of habitat quality may be used as direct or indirect indica- tors of carrying capacity. There are numerous examples where the Draft Exhibit E completely ignores these concepts.Prime examples are caribou and wolf.Both populations are currently at levels below carrying capacity,caribou because of current management goals and wolves because of high harvest, much of which is illegal.Exhibit E concludes that project impacts would be minimal under current harvest levels and avoids discussing impacts that would occur if these goals and actions were altered and the populations were allowed to increase.Wildlife populations,user demand,and management goals have changed dramatically over the last 50 years and can be expected to continue to change over the life of the Susitna project.For example,increased hunter demand is 1 ikely to result in an upward adjustment of the caribou population and harvest goals,perhaps even before construction begins.If the Susitna project precludes attainment of goals that could have been attained without the - .... .... ,... project,there will be a negative impact that has not been adequately addressed by the Draft Exhibit E. Response The impacts sections have been 1 argely rewritten to address these problems.We agree that carrying capacity cannot al- ways be measured.Its ut il ity as a management tool or for as- sessing impacts is therefore questionable in those cases. Species'priorities and conflicts between species·management strategies indicate that carrying capacity is seldom used by the ADF&G in managing harvest levels'of most species -- wolves,bears and wolverine in particular.Where carrying capacity data are not available in ADF&G Phase I reports which are the basis of this docum~nt,it is obviously imposs- ible to assess the magnitude of attenuation of potential management goals. Comment 4 Fa i 1 ure to di scuss cumu1 at ive impacts:Imp'acts are usua 11y di scussed one at a time,with little discussion of the potential cumulative effects on the population.Often each impact is sufficiently isolated that its effect on the population is judged "minimal."However the cumulative effect of all habitat alteration and all mortality factors may significantly affect the popu1ation 's abil ity to sustain major impacts such as habitat loss.For example,inundation of moose winter range may reduce carrying capacity,increasing the impact of severe winters on the population.Project induced mortality could slow or even prevent recovery duri ng subsequent years of mi 1 der wi nters.At the very least,there would be an impact on the amount of hunter use the population could sustain • Response Cumulative impacts are discussed in the revised Impacts Sum- mary,Section 4.3.5,where appropriate.When quantitative data are not avail able,no assessment of the magnitude of cumu 1ati ve impacts is poss"ib1 e• Comment 5 Ranking of impacts:When impacts are ranked,the most significant impact listed is often one that is easily mitigated.For example, increased hunter harvest resulting from improved access is often suggested to overwhelm all other impacts.In such cases,the discus- sion of other impacts is often cursory.However,hunting can be regu- 1atedand it is certain that the Board of Game will take measures to minimize adverse effects of hunting on wildilfe populations,usually shifting the impact to the users.This treatment is inconsistent with that of other easily mitigated impacts such as borrow pits where the impact after rectification (revegetation)is discussed. By suggesting that the greatest impact will be unregulated hunting,a distorted view of total impacts is created.Less easily mitigated impacts such as loss of critical foods tend to be obscured and are discussed only superficially. Response Some populations,which ADF&G has apparently given low man- agement priority,may not be sufficiently protected from the adverse effects of hunting.We find this comment somewhat i nconsi stent with others emphas i zi ng our poor treatment of the impact of reduced sustainable yield.However,we have rewri tten impacts assessment sections to cl ari fy our concerns for all severe impacts and to reevaluate our assessment of increased mortality from hunting for those high-profile spe- cies for which hunted take may be adequately regulated.Im- pacts were never ranked according to ease of mitigation. Comment 6 Incomplete and inconsistent treatment of impacts of improved access: Some of the greatest and ,ongest term impacts of the Su sitna project will be secondary effects of improved access and attraction of people to the area.This will likely precipitate development and increased recreational use of the area that might not occur for decades without the project.Impacts of improved access through hunting,including direct mortality,disturbance,and ORV use,are discussed repeatedly, often to the exclusion of less controllable impacts.But impacts of improved access through individuals other than the hunters are almost completely ignored.This is inconsistent and ignores a significant source of impacts. Response Secondary deve10p11ent is an indirect impact which cannot be predicted or controll ed by the Al aska Power Authority (see Section 4.3 paragraph 1).and it is excluded from this dis- cussion.Impacts to wil dl ife popul ations by recreational users other than hunters are nearly always of minor signifi- cance relative to hunting.In specific instances,where sen- sitive wildlife areas may be affected,this impact is thoroughly treated. Comment 7 Inadequate treatment of habitat alteration:Habitat alteration is con- sistently treated superficially.As noted above,this is sometimes done through failure to even roughly quantify the impact or consider cumulative effects.There are other examples where alteration is dis- missed without adequate rational e.The most serious example is down- stream impacts to moose habitat. =-1 - It is conc1 uded that habitat may be enhanced between Devil Ca nyon and Talkeetna during the license period.However it fails to consider that areas of current early successional stages may become mature more rapidly than new areas will become vegetated,resulting in an immediate loss of habitat quality. Changes in frequency of flooding are dismissed because bank full floods wi 11 st ill occur every 5 to 10 years.However thi s cou1 d reduce the rate of cutting and filling to 20 percent of current levels with a correspondi ng reduction in habitat created by that mechani sm.Effects of peak floods and ice scouring below Talkeetna are dismissed even thoug h changes in stage will exceed 4 feet in some areas. This is an example where conclusions were presented without supporting rationale.Close,scrutiny of the problem shows that the underlying rationale was either faulty or that alternative conclusions are possible. The problems listed above,singly or in combination,work to systema- tically minimize potential impacts that might require mitigation.This appears to stem from a tendency to seek a rationale that nullifies the need to fully discuss impacts.However,if an underlying assumption is rejected (e.g.,downstream effects on moose habitat),the entire sec- tion of the impact becomes inadequate.Virtually every section of the wildl ife impact assessment suffers from at least one of the problems listed. Response Downstream impacts on moose have been reassessed with the provision of a scenario provided through consultation with project hydrologists and engineers.We consider our analysis defensible and our mitigation plan flexible enough to allow modifications if the current predicted impacts are erroneous. We have indicated when impacts are difficult to predict and monitoring is necessary. We have never intended to systemat ica11y de-emphas i ze i m- pacts.Impacts are treated to the extent that available information from ADF&G Phase 1 reports allows analysis. Impacts are ranked according to 1)the magnitude of their ef- fect on population levels,and 2)their ability to be pre- dicted.We sincerely hope the revisions we have made clarify our interest in adequately addressing the anticipated and hypothes i zed impacts to wil d1 ife result i ng f rom this project. Comment 8 Mitigation Plan:The wildlife mitigation plan is too incomplete to warrant detailed comments.Measures to avoid,minimize,or reCtify impacts are scattered.Some are included in the vegetation section, but there is little indication of how effective these measures will be for wildlife.It also is not clear which measures have been incorpora- ted into the project design and which are merely recommendations from environmental consultants.The mitigation plan should clearly indicate how wildlife impacts are considered in the design of the project;what measures will be taken to avoid,minimize,or rectify impacts;and how effective these measures will be in mitigating losses.This is neces- sary to demonstrate that the option analysis the Susitna Hydroelectric Project Fish and Wildlife Mitigation Policy has been followed and so that residual impacts can be estimated for compensation planning. The inadequacies of the impact assessment are evident in the mitigation plan.There is no mention of compensation for impacts to species other than moose.It is suggested that mitigation measures for moose will partially mitigate for losses to bears and wolves,but that will depend on what acti~ns are taken and where.No mention of options for out-of- kind compensation is made. Response The mitigation plan has been entirely rewritten.This docu- ment is the description of project design;it is provided by the Alaska Power Authority and is not composed of mere recom- mendations for environmental consultants.Measures presented herein are guaranteed incorporation into project design and construction. ..... ,.... CHAPTER 3,SECTION 2 -FISH G-3-001 E-3-2/5:In this paragraph it is stated,"•••cr iteria for assessing the relative importance of biological impact issues have been provided by •••(2)comments and testimony by the Alaska Department of Fish and Game (Skoog,1982;•••)".We have reviewed the text of Skoog,1982 and,we do not believe this statement can be construed as establishing "•••criteria for assessing relative importance of biological impact issues ...II The context of the comments by ADF&G were specific to three alternative access plans,Numbers 13,16 and 17,and provided qualitative assessment of impacts for each of those plans.It was cle,arly noted in several areas of the letter that ADF&G's assessment was subjective and qual itat ive.We would 1 ike to state that the criteria by which project impacts are judged should lead to a quantifiable determination of impacts.These criteria for project access routes to our knowledge have not been established.Programs which will collect quantifiable information to ensure equal consideration of fish and wildlife and their habitats and mitigation of those impacts in access corridors have not been performed. A reference to Commissioner Skoog's April 1982 testimony to the APA Board of Directors would be appropriate.Also,refer- ences to comments and testimony provided by Schneider (1979, 1982 a.b.c.)are not cited in the bibliography. Response The reference has been revi sed to correctly reference Commissioner Skoog's testimony on April 11,1982,and not the August 20,1982,1etter regardi ng the access road.The Schneider references have been added to the bibliography. G-3-002 E-3-3/1:The ADF&G disagrees that its policy implies "•••that project impacts on fish and game species will be of greater concern than changes in the distribution and abundance of non- game wil dl ife and invertebrate species."Fi rst,the terms "fi sh and game"and "fi sh and wil dl He"are used i nterchange- ably throughout our policy document,and secondly,the ADF&G's greatest concern is fish and wildlife habitat and its ability to maintain productive populations.As stated in ADF&G pol- icy,liThe overall mitigative goal of the Department of Fish and Game is to maintajn or establish an ecosystem with the project in place that is as nearly desirable as the ecosystem that would have been there in the absence of that project.II We are primarily interested in maintaining the quality,quan- tity and diversity of the habitat for fish and wildlife with the project that is similar to that existing without the proj ect. Response It is recognized that the goal of the various mitigation policies is to maintain habitat that will allow the entire ecosystem productivity to be maintained.It is, nevertheless,true that ADF&G policy places priority concern on certain species or groups of species.The term "fish and game species"is incorrect and the con- cept of eval uation species has been substituted.As evidence of this prioritization,the ADF&G mitigation policy document contains reference to AS 16.05.840, which provides for free passage of fish.The draft Habitat Regul ations (Edfelt 1981)define "fish"by pre- senting a list of 17 species and species groups that does not include all species of Alaskan fish.Two spe- cies common in the Susitna Basin,sculpin and stickle- back,are not included.There obviously has been a spe- cies prioriti zation.Under AS 16.05.870,there are spe- cial protections for anadromous fish streams.Again, anadromous fish have been prioritized over resident fish.In AS 16.20.185,endangered species are priori- t i zed over nonendangered speci es.Whi 1e in theory all species should be given equal consideration,in prac- tice,available time and resources must be concentrated on the most sensitive species.Sensitivity is often defined as high human use value,ecological value or sensitivity to impacts.By avoiding or minimizing impacts to the habitat of these sensitive species (i .e., evaluation species),the habitat of many,or most,other species can also be maintained.This evaluation species concept has been used in Exhibit E. G-3-003 E-3-3/2:The general tone of statements in this paragraph indicates a process of rationalization rather than of a clear sense of direction and logic.It is stated in this paragraph, "Where there is a hi gh degree of confi dence that an impact will actually occur,it has been ranked above impacts predic- ted with less certainty."For this thesis to have any validi- ty,one must also specify the vulnerability of the resource to be evaluated.The same appl ies to assessing the process for eval uating the probabil ity that an impact will occur.It is equally important,if not more so,to specify the magnitude of the impact that will occur. Response The statement has been revised to clarify the intended meaning. G-3-004 E-3-3/3-4:The priority sequence for ADF&G mitigation policy is not only for mitigation option analysis in a planning sense but also for mitigation option implementation.We have 5 po- tential options for implementation as listed,and require an assessment whi ch quantifies project impacts,and determi nes the parameters under which the project must operate to .... - ,.... - implement each option.The highest priority mitigation option which is feasible is the one which this Department will re- quire for direct implementation.Quantifiable information sufficient to determine whether an option is feasible must be available to enable the ADF&G and others to select the appro- priate mitigation option.As stated in the ADF&G mitigation policy,liThe burden of proof to justify lower estimates of damage to fish and wildlife habitat lies with the developer.II Response This comment does not conflict with the concepts discus- sed in the referenced paragraphs and is in agreement with Power Authority policy. G-3-005 E-3-5/3:We suggest that management strategies will requi re the concurrence of resource management boards and agencies. Response The Power Authority will be seeking such concurrence. G-3-006 E-3-7/2:Chinook,pink,chum and coho salmon mill at the en- trance to Devil Canyon.Chinook salmon spawn in Devil Canyon in CheechakoCreek (RM 152.5)and Chinook Creek (RM 156.8). The lower limit of Devil Canyon is defined as RM 152.It wou1 d therefore be correct to state th at liThe Su s itna Ri ver is a migrational corridor,spawning area and juvenile rearing area for five species of salmon from its point of discharge into Cook Inlet to upstream within Devil Canyon." Response The fact that chi nook,pi nk,chum and coho mi 11 at the downstream entrance to Devil Canyon has been incorpor- ated.A discussion of spawning chinook at Cheechako and Chinook creeks is included in the baseline section. G-3-007 E-3-S/1:Impacts to less sensitive species with similar habi- tat requirements would be mitigated;however,species with a lower eva1 uation priority may be highly sensitive to change and may not be miti gated.For examp1 e,speci es that are adap- ted to turbid waters may be adversely affected if a project creates substantial decreases in turbidity.Burbot are an example of a species which may be so affected. Response It is true that some sp'ecies w:Lth,cr:1iowen evaluation priority may be more s::ems.:ftiwEt to dtange.In the Susitna River,however"the"four P'acific salmon species se1 ected as eva1 uat i on species (chum!,.,ch,i nook,coho,and pink.)uti'l!i'ze almost all available habitats at some point in their life cycle and are considered to be high- ly sensitive to change.Mitigations that prove effec- tive at reducing impacts to the various salmon life stages should mitigate most impacts to the other spe- ci es. G-3-008 E-3-8/3: (a)Ch i nook and coho do not have a greater commerci al value than chums,although they do have a greater sport fishing value. (b)The proj ected change in conditions in the mai nstem are not necessarily beneficial to rearing juveniles as suggested in this paragraph.The conditions (parameters)referred to should be identified.Further,mainstream habitat will not necessarily be improved in winter months;higher turbidity is an example.Juveniles are also consistently present in sloughs.There are no data or literature cited to support the last two statements in this paragraph. Response (a)The text has been revised.The discussion of conrnerical val ue properly belongs in Chapter 5 and has been removed from Chapter 3. (b)Further discussion on how these conclusions were derived is contained in Sections 3.2.1(b)(ii)and 3.2.1(c)(ii). G-3-009 E-3-8/4:Arctic grayling also utilize mainstem habitats,not only clearwater tributaries as implied. Response The text has been revised to remove the implication that grayl i ng do not util i ze the mai nstem.Detail ed discussions of grayling habitat utilization are included in Section 2.2.1(b)(iii). G-3-010 E-3-9/1 : Talkeetna? What are the resident evaluation None are indicated in the listing. species below Rainbow and burbot should be included in the 1 ist of evalua- tion species because of their importance to the sport fishery and because of thei r abundance and adaptation to the turbid conditions.There may be a particular sensitivity to possible changes in the case of burbot. -- - G-3-011 Response The four species of salmon listed in the response to questi on G-3-007 a re the eva 1uati on speci es downstream from Devil Canyon.As previously discussed,these spe- cies are considered more sensitive to change than other species within the basin.Rainbow trout and burbot are not considered to be more sensitive to the identified habitat changes than the various sal monl ife stages; thus,mitigation of impacts to all salmon life stages should mitigate impacts to rainbow trout and burbot. For example,rainbow trout primarily spawn,incubate and rear in tributaries during the summer and overwinter in the mainstem or lower portions of tributaries.A simi- lar pattern is followed by chinook and coho salmon.The available data to not indicate that significant impacts to burbot are likely to occur. E-3-10/3:Table E.3.3 does not reflect the 1.2 million figure discussed in text. Response The table has been appropriately revised. - - - G-3-012 E-3-10/4:Table E.3.4 reflects different figures than the text with regard to chum salmon escapement.The chum salmon escapement was 20,800 and 49,100 in 1981 and 1982, respectively. Response There was a typographical error in the draft table. This has been corrected. G-3-013 E-3-11/1:Value (ex-vessel)on coho salmon is not presented. Response All commercial discussions now occur in Chapter 5. G-3-014 E-3-11/5:If Mill s (1980)data are to be used to indicate significance of recreational use,the 1981 information should be included. Response The comparable data from 1978 through 1981 have been incorporated. G-3-015 E-3-12/1:The harvest figures reported here reflect primarily Susitna River harvest.Additional harvest occurs on some of the anadromous species (chinook for example)outside the Susitna drainage,i.e.,in Lower Cook Inlet saltwater fish- eries.The statement that the sport fishing harvest is from an area larger than that which may be impacted is incorrect. Response The harvest figures solely reflect Susitna Basin har- vest.Major impacts a re expected in the impoundment zone and between Watana Dam and Talkeetna.Mi nor im- pacts a re expected downstream from Ta 1keetna.The ha r- vest figures include data from basin-wide tributaries (such as the Tal achul itna)and 1 ake systems (Lake Louise/Susitna Lake)that are not expected to be impac- i:ed (see Table E.3.6).Thus the data are from an area 1 arger than that whi ch coul d be affected by the pro- j ect. G-3-016 E-3-12/3:The Tyonek Village subsistence fishery is princi- pally supported by Susitna River chinook salmon stocks,not "at least in part"as stated in the text.The Department not only recognizes the subsistence harvest of fish by Tyonek,but is responsible to ensure the continuation of this stock of fish. Response The text has been revised;the subsistence discussion primarily occurs in Chapter 5. G-3-017 E-3-13/1:Throughout the discussion,the escapement year is uni dent i fi ed. Response The appropriate revision has been made. G-3-018 E-3-13/4:Types of individuals or species of fish should be i dent ified. Response The fact that chinook salmon are being discussed has been re-emphasized. G-3-019 E-3-16/1:The statement that,"Out-migration in the reach from Talkeetna to Devil Canyon peaks prior to early June and terminates by the end of July throughout the drainage." requires documentation. ..... - - ..... """ - -- Response As noted at the begi nni ng of the statement,the i nforma- tion came from ADF&G (1981d). G-3-020 E-3-18/2:There are 1akes with sockeye in the Susitna Ri ver (Talkeetna to Devil Canyon reach).The potential for sockeye enhancement in the middle Susitna Basin should also be men- tioned. Response The text has been revi sed to indicate that Chase Lake contai ns sockeye.The potenti al for salmon enhancement in the middle Susitna Basin was the subject of an ADF&G study funded by the state legislature.It is our under- standi ng that the report wi 11 be fi na 1 i zed in February 1983.The study apparently concl uded that there is a potential for salmon enhancement in the middle Susitna drai nage by either construct ion of a fish passage facil- ity to provide for migration to the middle basin or by establishment of a hatchery.While technically feas- ible,the fish passage facility is not cost effective • G-3-021 E-3-19/3-4:Based on the 1982 evaluation of sonar versus tag/ recapture Petersen estimates,the 1 atter has been determined to be more representative of escapements than sonar estimates. Therefore,it is recommended that Petersen population estima- tes be used where available. Response The document now uses Petersen popul ati on estimates in lieu of sonar estimates,except at Yentna Station,where side-scan sonar counts are considered to be the best estimate of escapement (ADF&G 1983). G-3-022 E-3-22/1-5:We suggest Petersen population estimates would be more meaningful in lieu of sonar counts for the stations at Sunshine,Talkeetna and Curry.The 1982 evaluation of sonar versus tag/recaptu re Petersen estimates indicates that the 1 atter are more rel i abl e.Therefore,escapement shoul d be defined on Petersen estimates when available. Response See previous response. G-3-023 E-3-24/1-7:The year the data represent is not stated in the text. Response The year of the data has been added. G-3-024 E-3-26/4:Eulachon are known to extend as far upstream as RM 58 based on 1981 observations by Su Hydro Aquatic Studies staff.The RM 48 fi gure provi ded by Trent (1982)was for 1982 ob se rvat ions. Response The text has been revised to incorporate this informa- ti on. G-3-025 E-3-28/2:Principal study areas were located in the first mile of the tributaries upstream of their confluence with the Susitna.The reference to upper stream reaches in the fourth sentence should be removed. Response The text has been appropriately revised. G-3-026 E-3-29/1:These statements are specul at i ve and cannot be supported by existing data. Response The statements have been removed and will be reeva 1 ua- ted as mor:e i nformat i on becomes avail abl e. G-3-027 E-3-29/2:A much larger number of grayl ing depend upon the area to be inundated over and above those included in this est imate. Response The text has been revised to incorporate 1982 data that were received subsequent to release of the draft Exhibit E and to indicate that this is a minimum estimate. G-3-028 E-3-29/3: (a)Grayling fry were captured at Watana Creek area in 1981, indicating spawning in the immediate vicinity. (b)The final sentence concludes that if other unidentified conditions are suitable,spawning habitat will not be a limit- ing factor for grayling.This needs proper referencing and eval uation. Response (a)The new information pertaining to the grayling spawni ng area at Watana Creek in 1981 has been i ncor- porated. - - - - (b)The text has been revised to include proper refer- encing. G-3-029 E-3-30/1:Burbort also inhabit SusitnaRiver tributaries,not just the mainstem. Response The discussion as presented indicates that burbot uti- lize a wide variety of habitats and does not preclude use of tributary habitat. G-3-030 E-3-30/2:Areas downstream from Tal keetna of importance to burbot were identified specifically.The four mainstem sites upstream from Talkeetna should also be specifically identi- fied. Response The areas of highest burbot catches upstream from Talkeetna have been added. G-3-031 E-3-31/3:The discussion of whitefish occurrence in the im- poundment is not clear. Response The text has been revised to clarify the occurrence of round whitefish in the impoundment ~rea~ G-3-032 E-3-32/4:The juvenile longnose sucker collection effort was not sufficiently uniform to conclude changes in distribution from the catch per unit effort data. Response The discussion of juvenile longnose sucker has been deleted. G-3-033 E-3-37/3:Chinook salmon extend to RM 156.8 (Chinook Creek) not RM 158.2. Response The correction has been incorporated. G-3-034 E-3-37/4:Resident species of scul pin also occur in the Susitna rnai nstem.The text shoul d therefore report 7 speci es. Response The correction has been made. G-3-035 E-3-40/1:Timing for respective salmon use based on 1981 data would be more accurate if changed to: Coho -30 July through mid-September Pink -27 July through 20 August. Response The new data have been incorporated. G-3-036 E-3-41/1:The Arctic lamprey also occurs in the Susitna River above the Chulitna confluence. Response The text has been revised. G-3-037 E-3-41/5:Based on set net and electrofishing catches in 1982,pink salmon mill in the Susitna mainstem immediately below Devil Canyon. Response The new data have been incorporated. G-3-038 E-3-43/1:Not all sloughs are overtopped by flows of 20,000 to 24,000 cfs.Examples are Sloughs 10,11,14,and 15. Response The appropriate revision has been made. G-3-039 E-3-44/4:Holding areas at the mouth of sloughs are not con- sidered a critical factor any more than "holding areas"at the confluence of many of the chum salmon producing streams.The fact that there are hol di ng areas does not necessarily make the sloughs more productive. Response The text has been appropriately revised. G-3-040 E-3-44/8:In the last sentence,are the authors speaking of a tributary mouth or tributary?In either case,importance of the habitat type for rearing cannot be measured simply by number of fish captured at a site.This is particularly true for tributary mouths because they are part of the downstream and out-migratory pathway where fish may be seasonally concentrated. Response The text has been appropri ately revised to focus the discussion on slough habitats. - -- I~- - ..... G-3-041 E-3-46/4:These are not static populations.The populations of individuals becomes redistributed to favorable rearing habitat locations,including tributary mouths. Response The comment has been incorporated. G-3-042 E-3-46/7:Chum salmon preference to slough habitat over tri- butary streams is unsupported.Only index surveys were con- ducted on tributaries whereas sloughs have been surveyed in total.The 1974 investigations and 1982 ADF&G surveys indi- cate that tri butari es may be equally as important to overall chum salmon spawning in the Talkeetna to Devil Canyon reach as slough habitats. Response The text has been revised to indicate the relative importance of tributaries,sloughs and mainstem as chum spawning habitat.A preliminary estimate of the number of.chum sal mon mi grati ng past Curry that spawned in sloughs indicated that 27 percent in 1981 and 12 percent in 1982 utilized slough spawning habitat. G-3-043 E-3-47 /1/1:.Indi an Ri ver is a maj or chum sal mon spawn i ng stream.Based on 1974,1981 and 1982 escapement surveys,this stream supported higher numbers of chum salmon than chinook and coho salmon. Response The revision has been incorporated. G-3-044 E-3-49/4:Eul achon were found upstream to RM 58 in 1981,and to RM 48 in 1982. Response Th~new data have been incorporated. G-3-045 [-3-51j7:Based on 1981 and 1982 ADF&G spawning surveys, sloughs do serve as chum,sockeye and pink spawning habitat. Response Available project documents do not ;dentify sluugh spawnin9 areas downstream from Talkeetna.If the data become available,they will be inc{)rporated into the June 36,1983.,report. G-3-46 E-3-52/3:Yes,all species of salmon were recorded in tribu- taries in 1981,but sockeye were not found in notable numbers. We do know that the Chase Creek system supports a "sma ll" sockeye run.ADF&G surveys are conducted in the half mile reach of tributaries upstream from the confluence with the Susitna River.The balance of the tributaries are not sur- veyed.If the report is to reflect that all species utilized tri butaries,then it waul d be appropri ate to modi fy Page E-3-46,Paragraph 2,which presently excludes sockeye as being present in tributaries. Response The section under discussion concerns the reach down- stream from Talkeetna.Chase Creek and the ADF&G sur- veys are in the Devil Canyon to Talkeetna reach. Page £-3-46 has been appropriately revised.Downstream from Talkeetna,sockeye are found in notable numbers in some tributaries. G-3-047 £-3-55/3:Fish Creek in the Big Lake drainage supports a sig- nificant rainbow trout population and also pink salmon. Response The information has been incorporated. G-3-048 E-3-62/4: (a)Cheechako Creek is a chinook salmon spawning stream. Chinook salmon spawn both in the creek and the mixing area at its confluence with the Susitna River. Gravel removal/dam construction will destroy this production area,which is a long-tenn impact.The Cheechako Creek plume area is a spawning site.Will project impacts be mitigated here at least until Devil Canyon is built? (b)If Tsusena Creek will have the long-term and degree of impacts stated,it seems contradictory and optimistic to say it will or can be rehabilitated. Response (a)The reference to the Cheechakd Creek material site correctly belongs in the Devil Canyon Dam discussion. Cheechako Creek will only be mined when Devil Canyon Dam is built,at which time the habitat will be lost to c hi nook. (b)Rehabil itation plans for the Tsusena Creek borrow site will be developed during detailed design. ",... - - - - G-3-049 E-3-65/4:Investi gat ions shoul d be conducted to determine the presence or absence of fish in the referenced lake. Response The recommendat ion for further study will be consi dered during the development of future study programs. G-3-050 E..3-67/3:This is a mid-summer estimate of only those gray- 1 ing inhabiting the impoundment area and is not an accurate reflection upon the number of grayling that depend upon that same area for spawning,rearing or wintering. Response The number is indicated as a mlnlmum number of grayling residing within the impoundment area and is based on the best avail ab 1e estimate of grayl i ng in t he a rea.The text has been revised with the 1982 estimate,which was obtained subsequent to the previous draft. G-3-051 E-3-68/3:Data are requi red to support the suggestion that the reservoir may provide additional wintering habitat. Response The increase in reservoir volume is documented in Chapter 2,as are the expected ice cover and the water qual i ty and physi cal characteri sti cs of the reservoi r. These data indicate that the reservoir will be suitable as overwintering habitat. G-3-052 E-3-71/3:The ADF&G studies document juvenile salmon occur- rence in mai nstem habitats all summer.Catch rates were rel at i vely low,however,and 1arge numbers of fi sh coul d be present in low densities over a large area at any time. Response The comment is noted. clarify the role of rearing areas. Analysis of the 1982 data should mainstem habitats as juvenile - G-3-053 E-3-73/4:Water temperatures of 5°to 6°C at Talkeetna during open water period may have major impact on returning adults. If higher flows will reduce temperature,it may be better to reduce flows or fi nd ways to tap warmer 1 ayers of water for discharge. Response The potential impacts of reduced mai nstem temperature during the second year of filling are recognized.The model used to predict these impacts was not able to in- corporate the buffering affects of tributary inflow.As the AEIDC habitat modeling evolves,the temperature model ing capabil itites will improve and these results wi 11 be used to develop a flow rel ease strategy to mi n- imi ze the downstream temperature impacts.If flows are reduced to increase the downstream temperature,it will be difficult to extend the filling period which was identified as being desirable in Comment E-2-39/5 and E-2-40. G-3-054 E-3-74/2:The statements in this paragraph are speculative and reflect the need for further study and analysts. Response The discussion has been expanded to include additional i nformat i on. G-3-055 E-3-75/2:Same comment as E-3-74,Paragraph 2. Response The text has been appropriately revised. G-3-056 E-3-78/1:The statements here are speculative and not suppor- ted by data or references. Response It is anticipated that a refined understanding of the habitat requirements of juvenile salmon will be estab- lished by the ongoing Aquatic Studies program and the results will veri fy these statements. G-3-057 E-3-78/3:Beaver dams in Sloughs 9B and 19 did not inhibit use by adult salmon in August of 1982.Slough 9B had a peak survey count in 1982 of five chum and one sockeye salmon on September 19.Low water condit ion in mid-August generally precluded adult salmon access to Slough 9 which is the access corridor for salmon using Slough 9B.Slough 19 was essential- ly void of adult salmon spawning in 1982.Only one pink sal- mon was observed in this slough and this fish was recorded on August 4,1982.No beaver dams were present in Slough 19 which would have precluded fish access. Response The text has been appropriately revised. .... - - - G-3-058 [':'3-7974:Deadhorse Creek (RM 121.0)is not an established anadromous fish stream.Occasionally,one or two adults enter this stream,usually pink salmon.However,no successful spawning has been documented. Annually,Deadhorse Creek flows go below the surface in the lower one-third mile during the late fall and winter period. It is questionable whether successful salmon production occurs in Sherman Creek~About 25 pink salmon entered Sherman Creek on or about August 12,1982,presumably for spawning,it has not been established that the eggs will successfully incubate. The creek flows subsurface in the wi nter and eggs may be frozen. Skull Creek (RM 124.7)is another stream which probably will be perched with flow changes in the Susitna mainstem.This creek supports a small chum salmon population • Response The text has been revised and additional data incorpora- ted. G-3-059 E-3-80/1:Devil Creek (RM 161.0)wou-ld be equally accessible to salmon as Tsusena or Fog creeks.Devil Creek appears to have potential chinook salmon spawning habitat. Response The additional data have been incorporated into the text. G-3-060 a)E-3-80/2:Data regarding flow characteristics are insuffi- cient to substantiate minimal impacts into Susitna River reaches downstream from Talkeetna.A greater proportion of the 5usitna River fishery resources utilize this downstream reach.A small change may affect a proportionately larger resources base. Response Available data regarding flow characteristics from Tal keetna certai nly indicate mi nimal impacts.The suffi ci ency of thi s data base wi 11 be cons i dered in formulating the future study program for FY 1984. G-3-060 b)E-3-80/3:See comments for E-3-80/2. Response See response for E-3-80/2 (G-3-060). G.;,.3-061 E-3-80/4:In addition to salmon util ization,the Susitna River reach from approximately RM 4.5 to RM 29 is almost entirely eulachon spawning habitat,sustaining a spawning adult population ranging in the millions of fish. Response The addit i ona 1 data have been incorporated into the text. G-3-062 E-3-81/1:All resident species occupy mainstem habitats dur- ing ice free months.not "mayll occupy. Response The text has been appropriately revised. G-3-063 E-3-82/1:Eul achon spawning 1 imits extend from approximately RM 4.5 to RM 58. Response The text has been appropriately revised. G-3-064 E-3-82/3:Eu 1achon do not spawn in backwater or semi -pl aci d areas.Principle spawning areas are adjacent to cut banks where the swbstrate included deposits of unconsolidated sands and gravels,and riffle zones or bars with relatively moderate velocity and ·unconsolidated sands and gravels. Response The text has been revised and the new information on eulachon spawning habitat has been incorporated. G-3-065 E-3-88/4:The statement on sediment in this paragraph contra- dicts the statement on Page E-3-90,Paragraph 2,Sentence 3. Response The text has been appropriately revised. G-3-066 E-3-90/1:These statements are not supported by data. Respon se We feel that this is a reasonable interpretation of the avai 1 able data.The text has been revi sed to cl ari fy our assessment of this issue. ..... """ .... G-3-067 E-3-90/3:Ice cover woul d probably form at RM 114 not RM 14 as presented. Response The typographical error was corrected to read RM 149. G-3-068 E-3-90/4:The impacts to fish habitat due to backwater and stagi ng processes caused by increased post-project wi nter flows are not defined • The text has been revised to clarify and better define the impacts to fish habitats. G-3-069 E-3-90/5:These statements are not supported by data and are speculative. Response We feel that this is a reasonable interpretation of the available data.The text has been revised to clarify our assessment of this issue. G-3-070 E-3-95/6:Eul achon do not spawn in backwaters.See comment on E-3-82,Paragraph 3. Response The text has been revised and additional data incorpor- ated. G-3-071 E-3-98/6:Other species are known to be present.A relative- ly small population of Dolly Varden inhabits the subject areas along with at least one sculpin species. Response The new data have been incorporated into the text • G-3-072 E-3-100/3:Additionally,Jack Long Creek supports adult coho salmon.Portage Creek also has spawning populations of chum a rtd pin k sal mon • Response The additional data have been incorporated into the text. G-3-073 E-3~103/3:Changes in streamflow d.uri ng open-water seasons will affect slough habitats depending on the flow released. The potential for destroyi n9 these aquatic habitats appears high. Response The change in stream flow refers to change in relation to the Watana-only scenario~not change from pre-project conditions.The discussion has been expanded based on newly acquired data. G-3-074 E-3-122/5:Does restri cting unauthori zed traffic mean that project personnel will be allowed to fish and the general public will not be allowed access to the fisheries?This may not be an acceptable form of mitigation during a construction phase that may span 20 years.The Board of Fisheries manage- ment decisions will also supercede the stated policy of APA on catch and rel ease fi sheri es by project personnel.It does not seem likely that the public will be barred from the area while project personnel have exclusive access and use of the fish- eri es. Response The Power Authority will be propos i ng pol i ci es as part of their 1 icense appl ication.We accept the authority of the Board of Fisheries and~in fact,solicit specific mitigation policies that would be acceptable to them. G-3-075 E-3-126/4:The lakes for water withdrawal should be identi- fied and their resources inventoried. Response The recommendat i on for conducti ng a resource inventory of the water bodies used for miscellaneous water with- drawal is acknowledged and will be considered in devel- opment of the future study programs. G-3-076 E-3-127/2:Individual fish will not necessarily be lost by filling of the reservoir.Fish do not have to be moved through the diversion tunnel.Structural protection from passage through the tunnel is a potential mitigative measure. Response While it is valid to assume that individual fish will not necessarily be lost by filling the reservoir~the lost tributary and majnstem habitat and low habitat value in the reservoir subsequent to fill ing is expected to significantly re~uce the populations of fish suscept- ible to passage through the diversion tunnel.The tem- p-Orary mitigative measure of structural protection from passage through the t-unnel will provide only short-]ived r - benefits.It is more appropriate to provide mitigations that provide long-term benefits.Mitigation for these losses is discussed under Mitigation for Inundation Im- pacts in Section 2.4.4(c). G-3-077 E-3-130/3:A 10 percent reduction of flows during a critical and stressful period for fish does not constitute a minor reduction.The potential effect of reducing the November flow have on the recharge of groundwater reserves which will be needed throughout wi nter shoul d be eval uated.lei ng may take place much sooner with reduced flows and be much more severe. Response The fl ow schedul e for fi 11 i ng Watana has been revi sed; the flow regime from November 1 through April 30 is now proposed to reflect the inflow to the reservoir.Thus no impacts wi 11 occur as a resul t of flow schedul e during these months.If,in the question,icing refers to the ice format ion process,then that process wi 11 be delayed slightly by the warmer temperatures coming out of the reservoir and the process should be less severe. If the question refers to icings (aufeis),it is anticipated that these will be less severe under reduced fall flows because of decreased hydraulic pressures. November to April are unchanged during filling. G-3-078 E-3-130/4:There are no data presented to support the state- ments regarding fisheries impacts at the referenced flows. Response See response to comment G-3-066. G-3-079 E-3-131/5:Pink salmon fry moved out primarily during the ice breakup period.Chums out-migrated primarily following the early runoff peri ode Response The additional data have been incorporated into the text. G-3-080 E-3-134/2:There are no assurances that responses,i.e., releases of water,will happen quickly enough to keep from losing one year class of fish.By the time the problem appears to be sufficiently severe to warrant correction,it is most probably too 1 ate to act.This probl em to be further examined. Response Response time for water releases is rapid;flows will be monitored at Gold Creek and adjusted immediately at the damsite if it reaches a designated minimum.Minimum flow levels are being investigated during the ongoing mitigation design efforts. G-3-081 E-3-134/4:We are not aware of testing of this procedure in this area of Alaska,or that the technique is feasible.Addi- tional research needs to be conducted to evaluate the feasi- bility of the concept of introducing spawning substrate. Response Additional documentation has been provided to substanti- ate the statements.The concept of introducing spawning substrate has proved successful in Washington and as a mitigative measure needs to be evaluated for site spe- cific situations on the Susitna River. G-3-082 E-3-135/4:Data have not been presented to suggest this pro- cedure will work for chinook salmon.It is as likely that suitably sized gravels placed in side channels,given mainte- nance flow,may attract chum salmon. Response Additional documentation has been provided to substanti- ate the statements. G-3-083 E-3-136/3:There is no definition of species to be produced, nor a managelnent scenario.In addition,a suitable location for the proposed hatchery facil ity has not been identified. To be considered a feasible mitigation alternative,these con- siderations must be included. Response A hatchery siting study has been completed (Kramer, Chin,and Mayo,Inc.1983).A salmon hatchery is a low priority compensation alternative.It is anticipated that onsite mitigation will be effective at maintaining production of slough and mainstem spawning salmon. G-3-084 E-3-138/3:There are no data or references presented to docu- ment the feasib"il ity of this mitigation approach.Altered thermal regimes in the mainstem and side-channels would cause potential pre-emergence of salmon fry in these areas.How- ever,early emergence of salmon fry spawned in sloughs may not result as a consequence of higher mainstem temperatures. ..- - -, - Therefore,the proposed feedi ng and reari ng of pre-emergent salmon fry would not be resolved by the proposed spawning channel and rearing ponds (E-3-143 and 144)as mainstem fish would have no access to them. Response The section on slough mitigations has been substantially revised and the spawning channel/rearing pond alterna- tive has been removed.It is anticipated that full mitigation can be achieved by habitat enhancement tech- niques rather than compensatory techniques. G-3-085 E-3-138/4:A much larger number of grayling than included in this estimate depend on the area to be inundated.Also,this is not a wintering population estimate. Response Refer to response to Comment E-3-67/3. On a more general basis,the attitude implicit in the mitiga- tion plan is that losses are inevitable but unquantifiable, and that some mitigation measures will be implemented but may not work.It is also implied that if monitoring demonstrates inadequacy of a mitigation measure other steps will be taken. Response Wi th the development of the Su si tna proj ect 1 oca 1i zed losses would be inevitable;however,no net loss or en- hancement in many areas is possible.All losses have not been quantified.Although considerable efforts have and continue to be expended for this purpose,as ADF&G has stated,the detenni nati on of the degree of impact (loss of habitat and fish)is very difficult to quanti- fy.No guarantee can be provided that any proposed ·mitigation measure will achieve 100 percent of its goals.Thus,the committment has been made by the Power Authority to monitor the success of its mitigation pro- gram and to implement modifications as required.This is considered a rational and responsible approach to mitigation. How and by whom will the effectiveness of mitigation measures be determined?Under natural conditions small sub-portions of salmon undergo extreme variations in survival.This will con- found evaluation of the mitigation measures and could be a source of conti nui ng confl ict between the operators and the resource agencies.The frequent references to al ternat i ves and operations which could be implemented if a mitigation mea- sure proves inadequate puts the burden on the wrong parties. The mitigation aspects of this document are too tentative and too speculative.Substantially more detail and information is required before ADF&G can mqke a reasonable decision on mitigation methods. Response It is assumed that the FERC,who has the responsibility of regulating hydroelectric projects,will be the arbitrator in these matters. Other additional comments specific to the mitigation section are as follows: G-3-086 E-3-136 and E-3-140/1:Reference the foll owi ng statement from the Exhi bi t E document:"Si nce the effecti ve miti gat ion mea- sures to avoid,minimize,rectify or reduce impacts to the grayling population in the impoundment area are not available, it will be necessary to compensate for the loss of these gray- 1 ing.Compensation is proposed to be in the form of hatchery propatation of grayling •••Sufficient grayl ing will be planted such the number [sic]of catchable grayling will be similar to the n um be r los t . " The FRED Division of ADF&G has been experimenting with gray- ling culture for several years,first at Fire Lake,then Ft. Richardson,and not at Clear Hatchery.We are continuing to work with grayl ing and intend to develop techniques that some- day will support a grayling production program.At this time and for the foreseeable future,grayling production in Alaska must be considered experimental.In brief,several factors impact hatchery grayling production: 1.It is difficult to find egg sources that are sufficient in number.Whereas salmon egg takes in the tens of mi 11 ions are common,a one million grayling egg take is a major un- dertaking. 2.The eggs and fry are extremely small and from a cultur- ist's standpoint,very difficult to work with.Grayling fry hatch at 30,000 per pound as compared with salmon which are ten times that size at emergence.Marking and therefore eval uati on of survival after stocking are not possible with existing technology. 3.Survival from green egg to fry have generally been low - 50 percent as compared to 80 to 95 percent for salmon pro- ducti on. - r G-3-087 4.Attempts to rear fry in hatcheri es have been 1argely un- successful.The obvious survival advantage that could be gained by releasing larger fish cannot be obtained until techniques are developed which will permit holding and feeding of fry.Grayling have been successfully reared in the lower 48.However,those fish hatch at a larger size (20,000 per pound)and behave differently in raceways. We intend to overcome these problems as we learn more about the performance of grayl i ng in our hatcheri es.However,the idea that an irrevocable loss of grayling due to habitat inun- dati on can be compensated by hatchery propagat i on mu st be judged speculative at this point. Response It is recognized that grayling propagation is not well developed.The mit i gat i on pl an p rovi des for a three- year experimental phase to develop grayling propagation technology that will have utilization beyond project needs.Since ADF&G intends to develop grayling propaga- tion techniques and the Power Authority has a need for such technology,a cooperative experimental effort would be desirable. The develolJ1lent and operation of spawning channels and the modifications of sloughs,that has been proposed as mitigation warrants further discussion. Reference the following seven excerpts from Chapter 3,of the Draft Exhibit E document: 1."The slough habitat for the i ncubati ng salmon embryos may be enhanced through increased intergravel flow associated with 1arger flows,or it may be degraded if the hi gher flows substantially alter the intergravel temperature regime or ice conditions." 2."The [proposed]flows are of sufficient magnitude,how- ever,to undertake to rectifying (SIC)impacts to salmon spawning activity by modifying existing spawning habitat to mai ntain natural spawning by salmon./I 3.If further impact reduction is required to maintain exist- ing fish populations,additional mitigation measures will be incorporated.Certain target mitigation issues will receive priority in the monitoring program."[E-3-133] 4."The out-migration of salmon fry will be monitored to evaluate if proper timing of out-migration is achieved. The basis for such an evaluation will be the baseline out-migration studies and within year comparison to adj acent unregul ated systems."[E-3-134] 5."Success of a multi-level intake depends on the thennal structure of the reservoi r,the exi stence of sufficient water at the desired temperture and location with the re- servoir •••Temperatures near this (8 to 12°C)range may exist in the top 100 feet •••If this layer is present,it can be accessed by the multi-level intake gates ••••" [E-3-137,138J 6.liThe most significant adverse impact associ ated with the altered thermal regime would be accelerated incubation and early emergence of salmon fry •••The modified sloughs or spawning channels designed to rectify or compensate for lost spawning and incubating habitat will be provided with a reari ng pond at thei r downst ream end •••Used to collect early emergents and hold them to prevent thei r downstream migration •••Until appropriate conditions,including tem- peratures are reached in downstream habitats."[E-3-138J 7.The fry will be fed if natural food production is insuf- fi ci ent to support the number of fry present.'TE-3-144J In response to the above:The major problems appear to be flow alteration with resulting affects on slough access,hy- draulics and water temperature.As might be expected,the de- termination of the degree of impact (loss of habitat and fish) is very difficult to quantify and there is not specific infor- mation provided.Instead,engineering solutions are proposed for engineering problems.Modified sloughs aslo known as spawning channels are addressed on a conceptual level.Some- how it is proposed,that an unquantifiable loss of fish will be rectified/compensated by a multi-purpose habitat modifica- tion program which includes channelization,flow control structures with day-to-day flow alteration,gravel cleaning, gravel "introduction,enhancement of upwelling,rering ponds with fry screens on the outlets and artificial feeding of fry. The engineering,construction and operation of these channels is totally lacking in detail.There are not operational spawning channels for these species in Alaska.Canada has had mixed success,but they are located in environments far more temperate. The cost of maintenance and operation of these channels should be included in any determination of feasibility.The proposed demonstration project should focus on fish production and sur- vival as well as the physical properties of the modified s 1 oug h. ~- -. - .... The concern about changes in the thermal regime are i nade- quately addressed.It is apparant that the impoundmant tem- peratures and hence the utility of a multi-level intake are not known.The reari ng ponds at the downstream end of the channels may not be effective in accomplishing the desirec objective.Emergence of fry will not occur within a short time span but over a period of weeks.Therefore,at any given time the fish in the slough or pond will cover a wide range of develorxnental stages.A schedule of "release"of these fry into the mainstream must be provided.Once emergence timing is upset due to altered temperatures it is uinlikely that sur- vival levels could be maintained by holding them in a pond. Fry will not automatically feed on an artificial diet,there is an aspect of "training"which is obviously successful in a hatchery raceway.Washi ngton has had some success with pond culture but the fish are generally hatchery lots of similar size. Assuming that the "operator"of these sloughs and the proposed rearing ponds determines that artificial feeding is required, how will this be accomplished through the ice cover that may develop on the rearing ponds? Response These concerns are addressed in more detail in the final Exhibit E and in the responses to the specific questions received from ADF&G and FWS.It should be noted however,that the emphasis of the slough mitigation program is not to create a series of artificial spawning channel s but rather to avoid habitat loss and mi nimi ze habitat disruption within the sloughs by implementing modifications to compensate for changes in the mainstem flow regime. SPECIFIC COMMENTS -WILDLIFE AND BOTANICAL RESOURCES G-3-088 E-3-279:Rationale for considering alteration of habitat less significant than hazards is not supported. Increased predation is mentioned on page 284,with no indica- tion of its significance to the populations but ignored in the ran ki ng of impacts.The current moose popul at ion is hi ghly impacted by predators.The project is likely to increase the vulnerability of the moose population to predation in several ways.Brown bear and wolf popu1 at ions are l"j ke ly to be 1ess affected than moose in the early years of the project,causing an alteration in predator/prey ratios.The project could re- duce the availability of spring foods for bears and caribou for certain wolf packs s causing a further increase in preda- tion on moose.The drawdown zone and ice conditions are like- ly to facilitate hunting of moose by wolves.The moose popu- lation may have reduced productivity because of poorer habitat qua1itys especially after severe winters s reducing its ability to sustain predation.These factors could allow predation to drive the moose population to very low levels and maintain it there for long periods.Similar situations have occurred throughout much of Interior Alaska.Ultimately predator popu- lations would suffer and any habitat enhancement attempts could fail. Response Rationale for the priorities assigned in this introduc- tory passage are provi ded in foll owi ng text.Recruit- ment in the moose population is currently highly af- fected by predators.We appreciate the qualitative dis- cussion of cumulative hypothesized impacts.We agree that impacts on middle basin moose inhabiting the im- poundment area will be severe. Mortality to accidents s predation,and hunting will all increase.The modeling approach outlined will allow as- sessment of all level s of all mortal ity sources on the population (see Section 4.3.1(a)(iii).The section has been 1 argely rewritten to i ndi cate the above-mentioned impacts (see Sect jon 4.3.1(a)(ii)-Mortality). G-3-089 E-3-280:Sections relating to impoundment clearing are inconsistent,illustrating poor editing and confusion about the certainty of mitigative actions.Most sections assume the impoundments will be cleared in a stepwise manner,but on page 306 it sayss "If portions of the impoundment are cleared •••" On page 286 it suggests a bri ef increase in forages but on page 287 it predicts a substantial reduction in value. Moose are sometimes attracted to areas being logged by avail- ability of branches of deciduous trees. -. r ,..,. - Response Th i ssect i on has been rewritten to clarify and i ncor- porate these comments. G-3-090 E-3-283:Overuse of winter range can lead to reduced natality as well as mortal ity.Moose that never use impoundment areas wi 11 be impacted by over ut i1 i zat i on of adjacent areas (see page 287 also).This could expand the zone of impact for several decades. Response This section has been rewritten to address these issues. See Section 4.3.1(a)(i)-Habitat loss,paragraph 6. G-3-091 E-3-284:No rationale for concluding that mortality factors will have a negligible effect on the population.Mortality along access routes should be considered along with dam construction activities because they occur together. Response No such di scussi on occurred on page E-3-284. corridor impacts are treated in Section 4.3.3. are summarized in Section 4.3.5. Access Impacts .... I I G-3-092 E-3-288:It should be possible to quantify areas subject to erosion (and other types of habitat alteration)and estimate the proportion that will revegetate.This is an example of an impact that is mentioned with potential negative and positive effects then dropped.The reader has no idea how much a rea will be affected and whether the net impact on moose will be positive or negative. Effects of drifted snow on vegetation,availability of vegeta- tion and phenology are not addressed. Response This section has been rewritten to address these com- ments. G-3-093 E-3-289-290:see general comments on adequacy of assessment of downstream effects on vegetati on.Frequency of f1 oodi ng (290 first paragraph)is probably very important.No rationale is provided for assessment of the effects of ice scouring on vegetation.The potential effects of scouring should be quantified. Response This section has been rewritten to address these com- ments. G-3-094 E-3-290:The effects of drifted snow on movements of moose are not mentioned here,but are for caribou (page 298). Response Text has been revised,see Section 4.3.1(a)(ii)-Block- age of movements. G-3-095 Increased mortal ity resulting from increased predation should be considered.Floating ice during latter stages of breakup could have the same effect as floating debris. Accidental kills will continue during operation of Watana. Response Text has been revised,see Section 4.3.1(a)(ii)-Mor- tality. G-3-096 E-3-294:The summary of impacts for Watana comes closest to addressing cumulative impacts.However it is not systematic, ignores some impacts mentioned earlier and contains many sub- jective judgments that are not supported by quantitative rationale.It also does not include impacts of access routes and transmission lines which must accompany Watana.The unin- formed reader is likely to be confused and have no real con- cept of the range of potential changes in moose populations. Response Impacts of various project features are treated in separate sections.Where sub-populations have been identified many impacts from different project features will not be cumulative.Those which are cumulative are treated in Section 4.3.5. G-3-097 £-3-297:There is no basis for the conclusion that the Nelchina caribou herd will not use the area north of the impoundments at its current population size.It is highly likely that this area of high quality range will be used heavily in the future even at moderate population levels. Large movements of cari bou across the impoundment a reas have only been observed once since 1973.Movements were not moni- tored closely in most years. It is highly likely that the management goal of 20,000 caribou wi 11 be mod i fied,perhaps before Watana is constructed. Therefore the concl usions about level of impact are i nval id even if the assumptions about range use were correct. Response This section had been revised to treat these concerns. "'"' I~ G-3-098 E-3-298:Statements about drifting snow remaining in the im- poundment confl i ct with statements made oj n the Feas i bil ity Report.This needs to be clarified and documented. Response Disagreement represents reanalysis of available data. Portions of the Feasibility Report dealing with environ- mental matters are superseded by Exhi bit E of the FERC license application. G-3-099 E-3-298:The most significant mortal ity factor to caribou could be floating ice.In many years the spring migration to the calving grounds would coincide with breakup of the Watana impoundment.During a period of northerly winds,caribou could encounter open water when they reach the north shore. Seeing no obvious barrier they would start to swim across and would encounter a mass of broken floating ice.This would create a problem silTrilar to floating debris.Mortality could be substantial in some years. Response This section has been revised to address this comment. G-3-100 E-3-299: responses responses herd. The impression is created that the four possible are mutually exclusive.f>bre likely all four will be exhibited by varying proportions of the - - Response Text has been revised to clarify this concern. G-3-101 E-3-300:The statement that the Mount Watana sheep population does not occur near the impoundment is an example of a state- ment bsed on a brief period of observation.Sheep have been observed near the impoundment in the past. Response Sentence has been revised to indicate that the popula- tion is not usually found near the impoundment.Con- sidering the traditional nature of seasonal habitat use by sheep (see ADF&G 1982d),several years·data should be adequate to assess use patterns. G-3-102 E-3-301:All·portions of exposed soil at the Jay Creek mineral 1 ick are not used equally.Some of the most heavily used areas are low on the bluff.Therefore the percentage of the lick that would be inundated is misleading.This is also an example of an "operation ll impact being discussed under lIconstruction.1I Response Text has been altered to indicate this possibility. However t no data are provided in ADF&G (1982d)to sup- port this statement. G-3-103 E-3-305:Carrion is not mentioned as a spring brown bear food in the first paragraph. The assumption that spring foods are not important to bears is incorrect.Food intake du ri ng peri ods of stabl e wei ght or even weight loss can be absolutely critical because it reduces a negative energy balance.A prime example is the importance of winter forage for moose. The suggestion that loss of carrion is more important than loss of green vegetation is questionable.A moderate qualitYt but abundant t food may be more important to the population than a high qualitYt but sparse t food. The assumption that t because lactating female brown bear do not use areas that would be inundated t other bears coul d do well without those areas is not supportable.Females with cubs probably have overridi ng reasons to avoi d these areas. This includes the cub's ability to travel and the risk of predation on cubs by males.Pregnant females develop heavier fat deposits that probably help sustain them during this per- iod.A female that was not able to coast through this period would probably lose her cubs and move to riparian areas near the river.Spring foods in the impoundments are probably most important to yearlings which emerge from dens in poorer condi- tion t particularly in years following poor berry cropst and suffer the highest rate of mortality.It is unreasonable to conclude that yearlings could survive as well as a lactating female without spring foods. Response The text has been al tered to address the.se concerns. G-3-104 E-3-303-304:Importance of spri ng foods to brown bears is inconsistent among IIconstructiont""filling"and 1I0peration" sect ions. Response These sections have been rewritten.Popul at i on effects on brown bear because of the loss of spri ng foods wi 11 be much less severe because of the short time period (1 or 2 years after clearing)of the loss. ..... - ..... ...... , f ....., I "I G~3-105 E-3-308:While bears are capable of crossing the impoundments and some will,there still may be a hi ndrance of movements between seasonal food concentrations that could reduce produc- tivity of the population.This section is inconsistent with a similar section on black bears (page 310).This is another example of where the potential significance of an impact to the population is not discussed in even general terms. The fact that healthy bear populations exist where salmon are not available is not pertinent.Salmon are one of several seasonal food concentrati ons.They are probably most impor- tant during years when other summer foods,such as berries fail.Bear productivity and survival are probably higher because salmon are present and hence the population is gene- rally higher. The entire brown bear impacts section is filled with unsub- stanti ated specu1 ati on.Most of it is bi ased towards mi nimi z- ing potential impacts.It fails to consider how several im- pact mechani sms may work in combi nat i on and how they mi ght influence the population.The impact section should list im- portant foods of bears by season,i ndi cate how the project mi ght i nf1 uence the avail abil ity of each food to bears,and indicate the possible effects of these changes in availability on bear productivity and survival. Response Thi s section has been rewritten to address these com- ments.Where quantification is provided in ADF&G (1982f)such data are provided.Section 4.2.l{d)de- scribes food habits and identifies potentially sensitive periods • G-3-106 E-3-310:The consequences of disturbance of denning black bear during clearing are not emphasized.This is likely to cause problems for both bears and crews.A number of bears are 1i ke1y to be shot.Many of the di sturbed bears will not be able to find new dens and mortality is likely to be high. This can result in a more rapid,more violent and more visible adjustment of the bear population to the project. Response This section has'been rewritten to give greater emphasis to thi s impact. G-3-107 E-3-310:There currently is no resident bl ack bear popul at ion near the Tyone Ri ver conf1 uence and the Fog Lake area supports low densities..Therefore it is unreasonable to expect these areas to support viable populations during operation. Response This discussion has been eliminated. G-3-108 E-3-310:Project facilities may block movements of bears from the Devil Canyon impoundment area to berry areas adjacent to Watana. Response This impact has been added to the discussion. G-3-109 E-3-311-312:The entire wolf impact section is deficient in that it fail s to adequately address impacts of reduced prey densities. Caribou populations may be reduced.Even if changes in cari- bou numbers are minor the distribution is likely to be altered in a way that reduces availability of caribou to specific packs.There are data from the Susitna basin indicating that moose densitieSl"nfluence wolf territory size,pack size and pack stabil ity.Some current territories may be reduced to the poi nt where soci al factors woul d cause loss of a pack. Response This section has been rewritten.Impacts to the Watana pack are specifically treated.Anticipated changes in moose density are unlikely to be severe enough to impact most wolf packs at current exploitation rates of wolves. If the wolf population is allowed to increase through better management of harvest levels,prey availability may then become a 1 imiting factor.No reduction in caribou populations are anticipated to result from the Susitna Hydroelectric Project. G-3-110 E-3-313:The statement that the amount of habitat lost would potentially affect only two wolverines is not completely accurate.The habitat lost will remove portions of terri- tories of a number of wolverines,not all of only two terri- tories. Response The text has been altered to clarify this statement. G-3-111 E-3-314:Impacts of prey loss on belukha whales is inadequately addressed.This section appears to focus on adult salmon only.Outmigrating salmon and eulachon are more likely the foods attracting belukhas to the area.Eulachon in particular may be important.Until effects of the project on the availability of these foods are determined,no conclusions on impacts on belukha can be drawn. ..... Response This discussion has been revised slightly to indicate a degree of uncertainty which may be addressed in ongoing research.Our predictions relative to a detectable im- pact on be1ukhas remains and we consider it to be a de- fensible discussion. G-3-112 E-3-340:Statements of c1 imat ic effects shou1 d be documented and quantified with regard to magnitude of impact. Elimination of ice scouring is suggested as a benefit,yet ice scouring may be the most important factor mantaining early successi ona1 stages north of Talkeetna (on page 289 reduction in ice scouring is seen as detrimental).Even the potential short-term benefits may be offset by current shrub communities advancing to more mature stages. Response Quantification is supplied where data are available. The di scussi ons of downst ream vegetati on changes have been rewri tten. G-3-113 G-3-114 E-3-341:The flow regime would be used for fisheries manage- ment and its affect on vegetation should be identified.It could prevent vegetation of newly exposed substrate and fur- ther offset the potential benefits suggested on page 340. Response Flow regimes following completion of the Devil Canyon Dam are not expected to differ greatly from flow regimes of the Watana project.Thus,no additional differences to those described in Section 4.3.1(a)(ii)are expected when Devil Canyon becomes operational. E-3-340-342:The di scussi on of downstream effects of Devi 1 Canyon Dam are misleading.On page 340 it states "moose may benefit from an increased avail abil ity of riparian habitat." Then,on page 341 it poi nts'out that much of the habi tat wi 11 not be available in winter because of open water.(The potential effects of ice fog on use of these areas by moose is i gno red.) Finally on page 342 it pulls the two statements together and states that effects on moos'e coul d be II mo derate to severe." Then on page 370 it says changes in vegetation will have a "small population-level effect." This is an example where the combined effects of several im- pacts have not been clearly thought out.The full range of possible changes in vegetation has not been discussed,only the most optimistic possibilities.When one of several poten- tial overriding factors is identified,the acreage affected is not quantified. A far more enlightening impact assessment should be possible by building a simple model with existing data.The analysis on page 172 takes a step in the right direction but does not carry it to a useful conclusion.It crudely estimates the maximum acreage that could become available for vegetation. This should be refined to estimate the amount that would enter productive successionaly stages annually during the life of the project.Uncertainties about rates of colonization would produce a broad range of estimates,but the order of magnitude of change and more importantly the chronological patterns of change shoul d become apparent.Similar estimates for cur- rently productive habitat that will advance to mature stages should be subtracted to provide an estimate of net change in acreage of val ue to moose.The proporti ons of thi s acreage that occurs on islands and would be inaccessible to moose dur- ing winter should be subtracted to produce a crude estimate of possible changes in available winter range. A similar systematic approach should be applied to all areas that might be subject to habitat loss or alteration.Impacts that show a potential for serious effects can then be studied in more detail to refine the estimates for mitigat ion pl an- ning. Response Downstream impacts have been reassessed,and thi s sec- tion has been largely rewritten.See Mitigation Plan 6. G-3-115 E-3-342:Devil Canyon impoudment will primarily affect di fferent moose than Watana.Therefore the statement that moose popul ati on will have a 1 ready been greatly reduced is misleading.The summary of impacts uses the word II minimal ll fi ve times in reference to impacts on moose in the upper basin,but completely fails to convey any impression of the range of population changes that could occur during the life of the project. Response This summary has been deleted and a more comprehensive summary appears in Section 4.3.5(a}. G-3-1l6 E-3-343:1\small proportion of acceptable black bear habitat •••11 What proportion of what area?How important is that proport ion? I~ - Response The correct quote is:"•••small portion of acceptable black bear habitat •••".The indication is that very 1 ittle habitat occurs.No measure of "habitat ll loss is possible.Vegetation types lost are presented in Table E.3.83 (Devil Canyon);a discussion of use of vegetation types appears in Section 4.2.1(e).Based on information presented in these sections,our analysis of impacts of Devil Canyon development on black bear are considered adequate. G-3-117 E-3-350:The ori entat i on of access routes in rel at i on to wildlife concentrations and movement patterns should be consi- dered.Some subpopulations will be more heavily impacted than others.Mortality and habitat loss from access routes should be added to other impacts affecting the same subpopulations during the same time periods. Response See Section 4.3.3(a)(ii).Data presented in ADF&G (1982a)indicate no special use areas for moose which will be rendered unusable by road access corridors. Section 4.5 summarizes impacts. G-3-118 E-3-351:Impacts of road and railroad traffic start at tide- water.Increases in unscheduled traffic on existing roads, particularly the Parks and Denali Highways are likely to be substantial.Levels should be estimated and impacts asses- sed. Response Our assessment of impacts on access ,road and rai 1 traf- fic are based on'the best ava 11 able forecasts provided by Frank Orth and Associates,Inc.as summarized in Table E.3.167.These are for the peak constructi on season.Assessment of actual mortality levels-is not possible based on currently available information. G-3-119 E-3-352:The timing of railroad and highway traffic is more important than an average rate.Both seasonal and diurnal pattern should be considered.Scheduling of traffic should be considered as a mitigation measure. Secondary impacts of access routes,other than hunting,should be consi dered. Combined effects of access potential of transmission corridors and access routes should be considered. Response No data on seasonal or diurnal traffic patterns have been provided.Mitigation measures are described in Section 4.4.Secondary impacts of develop-nent are not treated as we have discussed in response to initial com- ments above. G-3-120 E-3-355:Caribou calving north of the Susitna River is suffi- ciently dispersed that no alignment of the Denali access road will avoid calving areas completely. Response We have not indicated that complete avoidance of this impact was accomplished by initial realignment of the access road.We indicate avoidance of the areas where most calving has recently occurred. G-3-121 E-3-356:Frequency of traffic will be substantially higher during construction unless unscheduled traffic is restricted. Response This sentence has been rewritten to clarify this point. G-3-122 E-3-355-356:It is not always clear which "herd"is being referred to.The Denal i access road runs throug h a central part of the upper Susitna-Nenana subherd l s range.It al so runs through one of the highest qual ity portions of the main Nel chi na herd I s range.Use of the word "peri pheral"is highly misleading. Potential cumulative effects of the access routes and impound- ments on caribou range use should be discussed. Response The discussion has been cl arified.Cumul ative impacts are treated in Section 4.3.5. G-3-123 E-3-359:Potential alterations of prey distribution,espe- cially caribou,on specific wolf packs should be discussed. Response It is impossible to predict alterations of caribou range use even without major disturbance.In any particular year,individual wolf packs may suffer from reduced avail abil ity of cari bou whil e other packs benefit.No predictions on availability of caribou to individual packs is possible.However,at current harvest levels, availability of prey is unlikely to act as a limiting factor for wolves.(See comment on carrying capacity above.) - .... - .".. I""";:Ii G-3-124 E-3-360:The access routes will provide excellent access to tundra habitats.Therefore,human use of areas important to wolverine during summer will increase. Response We concur.The text has been altered to reflect this eventua 1i ty. G-3-125 E-3-366-368:Transmission corridors should be considered along with other impacts.Fo r exampl e where they intersect the range of a s ubpopul at i on the changes in habi tat qual i ty shoul d be added to changes caused by other project features within the range of the same subpopulation. Placement and management of transmission lines in proximity to roads and rail roads can i nfl uence animal movements and rates of mortality.For example,moose train collisions could be greatly increased if a transmission corridor attracted moose in a manner that increased crossings of the railroad. Response Cumulative impacts are considered in Section 4.3.5.The consequences of increased moose mortal ity to various subpopulations are being explored throl1gh the use of computer modeling. G-3-126 E-3-370-371:The bi g game impact summary is compl etely i n- adequate.It addresses only impacts on existing populations. It ignores many impacts,including some judged substantial, suggesting that these need not be mitigated.It conveys no impression of the potential magnitude of change,even in cur- rent populations.The one effort at quantification uses the smallest possible number of moose that would be impacted by one mechanism.Even those numbers are stated in a misleading way.They are numbers estimated on one survey during a mild winter.There is no basis for the statement that this repre- sents "most years,II and it certai nly does not represent even a minimum number of moose that would be eliminated by the project. Response The section on impacts has been substantially rewritten and the summary reflects this rewriting.Quantification is provided where data are available.A defensible dis- cussion of rel ative magnitude of impacts is provided where this is possible.See Section 4.4 for mitigation measures proposed.We hope we have clarified any mis- leading presentation of data which might have occurred inadvertently.The quantification of impacts on moose in the rewrite is based on recently available informa- tion and represents an improvement over the previously attempted quantification.Additional information from ongoing ADF&G studies may allow an improvement on analysis of impacts.The modeling approach being devel- oped will greatly increase our ability to predict the effects of many different and cumu1 ative impacts on moose.Any further information which ADF&G can provide on carrying capacity for the Big Game species on which they are conducting project-related research will great- ly enhance the ability to quantify project impacts. - - - ,...., - _. DEPARTMENT OF FISH AND GAME GENERAL COMMENTS -SOCIOECONOMIC Comment 1 The ADF&G has continuously expressed concern regarding the adequacy of socioeconomic studies relating to the determination and assessment of potenti al impacts of the Susitna Hydroel ectric Proj ect to fi sh and wildlife.Expression of these concerns dates back to initial meetings with the Alaska Power Authority in 1979.The original study plan developed by the ADF&G in 1979 contained an objective designed to assess these very impacts. Upon review of this chapter,these concerns remain.In our vew,little substantial progress has been made to define project-related socioeco- nomic impacts. Impacts to fish and wildlife users have not been adequately addressed, either in the areas most directly affected by construction or those areas outside the immediate project area.Portions of the fish and wildlife resources produced within the Susitna Project area are harves- ted or utili zed in other more di stant regi ons.There needs to be an assessment of these uses of fish and wildlife with regard to (1)iden- tification of resources used;(2)quantification of use levels;(3) description of use patterns including seasonality,its context within the local communities,etc;and (4)description of geographic areas of use. Throughout this chapter,reference is made to current and/or planned studies.These studies,however,are not described,objectives are not presented,and time of implementation or completion is not defined. Response We agree that fish and wildlife users have been active in the areas most directly affected by construction and in some areas outs ide of the immedi ate project area.Both of these areas were considered in Sections 3.5 and 3.7.We also agree that portions of the fish and wil dl He resources produced within the Susitna project area are harvested or utilized in other more distant regions.This has also been considered in Sections 3.5 and 3.7. We have identified which fish,game,and furbearer resources have been used (see Section 3.7),and have described use levels and patterns to the extent allowed by available data. Use patterns within the context of local communities is available in Braund,1982.Some of Mr.Braund1s work has been summarized and is presented in Section 3.7. Based upon the fish and wildlife impact analyses,it is clear that the biophysical impacts of the project,with mitigation, will be negligible to most users.Changes in the distribu- tions of caribou,moose,and salmon could disrupt the use patterns of local users.This includes guides,transporta- tion services and lodges,as well as local residents who use the resources for food and ther consumptive purposes.A study of the project's effects on the users,through project- induced changes in resource distributions,will be considered in future study plans if significant resource distribution changes are identified. The largest impact of the project on fish and wildlife users will probably be from easier and,therefore,increased access to fish and wildlife.Exisitng as well as potential users, will have easier access.This will increase competition for fish and wildlife among existing users and among existing and new users.Areas of greatest potenti al confl i ct are des- cribed in Sections 4.3.1 and 4.3.2 of Chapter 3.Potential conflicts could be reduced through effective management. Responses to your comment about current and/or pl anned stu- dies are provided along with responses to your detailed comments. Comment 2 1.Organizationally,the section of FISH is not comparable to that of GAME which make it deficient in the presentation of vital informa- t ion. a.It makes no mention of guided sport fishing activities which are a major use of the Susitna River and its tributaries. b.No mention is made of fishing lodge operations dependent on Susitna River fisheries. c.No category comparable to that of liThe Hunter",E-5-75,is made for sport or subsistence fishermen. d.The category "Resources"on E-5-75 el aborates on game resour- ces,their characteristics,and the users of those resources. Only limited information is currently available pertaining to recreational and subsistence uses in the Susitna River Basin. There is a need for additional data. ,... - -i .... .... e.In the Game section,no "Methodology"is presented as it is for Fish. Although it may be true that impacts to the fishery resource depend upon loss of habitat and subsequent loss of fish,the issue in this section (3.7)is also the impact upon user groups.In this case, the methodology in this chapter should address both impacts to the respective user groups,and to fish and wildlife resources. Response Businesses that depend upon fish and wildlife of the Susitna River and its tributaries are discussed under Displacement of Businesses in Section 3.5.This section has been revised to recognize the dependence of guided sport fishing activities and the partial dependence of lodges on Susitna River fish- eries. The organizational issue raised in comments c-e,have been addressed.Please refer to Section 3.7 • -i - - ..... .- -. CHAPTER 5 -SPECIFIC COMMENTS G-5-001 E-5-6/1:Only cha racteri st i cs of personal monetary income have been described.There should be some description (espe- ci ally in the Local Impact Area)of rel ati ve importance of natural resource harvests as part of the household income. Any income determination need not necessarily be made in mone- tary terms,but should be done (1)qualitatively by (a) assi gning importance val ues to the harvest and u.se of each resource;(b)assessing culturally significant practices;(c) describing the type of economic organization of the area;and (2)quantitatively by (a)assessing amounts of time spent har- vesting resources;(b)assessing estimated proportions of household food consumption;(c)determining amounts of money spent in pursuit of wild resources;and (d)experessing the overall output or consumption of a household unit. Response We agree that nonmonetary income might be more important to residents of the local area than it is elsewhere.An indication of the relative importance of natural resource harvest to the local impact area will be deter- mined during 1983 through interviews with residents of selected communities • G-5-002 E-6-12/4-6:This section on recreational facil ities rel ated to fish and wildlife resources would be more appropriately termed recreational opportunities.This area has an abundance of opportunities but little development like trail systems, shelters,and other man-made facilities.A full assessment of the use of these opportunities and existing facilities would be appropriate.Certainly,there is information available at Mt.McKinley National Partk and the State Park recreation a rea s. Response Baseline recreational use (including information on McKinley National and State Park recreational areas)and the impact of the project on recreation is covered fully in Chapter 7,Recreational Resources.Section 3.1.3 (a)(i)of Chapter 5 has been changed to refer to Chapter 7. G-5-003 E-5-54/4:The indirect influences affecting commercial busi- nesses dependent upon fish and wildlife resources as discussed are undefined. Response Section 3.5.2 contains an amended text that accommodates this concern. G-5-004 E-5-54/5:The "partial short-term displacement"as discussed is not defi ned.The statement made that with increased access,business opportunities will increase is purely specu- lative.One might also expect business opportunities to be reduced as a result of increased access,particularly if the business is associated with the commercial use of the limited fish and wildlife resources. Response The text in Section 3.5.2 (a)addresses the concerns raised in this comment.The displacement of businesses due to the project impacts can only be discussed in the context of the estimated direct project impacts on the fish and wildlife resources.If the proposed mitigation measures are successful,there will be little displace- ment of business.However,in the event that these measures do not achieve the desired results,a different scenario will emerge.For that reason,all discussions of impact estimates including impacts on businesses should not be viewed as precise predictions. G-5-005 E-5-54/7:This paragraph indicates similar factors are neces- sary for both successful lodge and guide operations.This statement is incorrect. Commerci al lodges are most successful with improved access and visitation by large numbers of visitors or customers.With const ruct i on of new roads,ra i1roads and a i rst ri ps,the pro- ject area would appear to best fit this category. A big game guide,on the other hand,appreciates and can tole- rate less competition from additional hunters and recreational visitors.This type of business best functions at low levels of human activity and participation. Response Clarification has been provided in Section 3.7.2 of Chapter 5.The discussion of impacts on lodge and guide business has also been expanded to reflect the differing concerns of the two types of businesses. - - .- G-5-006 Loss of additional habitat,and the change in location and amount of salmon harvested as stated requires definition.The statement "l ong -term"impacts to Cook Inlet fishermen and other fish and wildlife users will be small,is speculative. Long term is not defined,nor are "other use groups",or "recent activity level s.II No supportive data or study results a re presented to support thi s statement.Types of on-goi ng studies should also be clarified and referenced. Response Information on loss of habitat is provided in Chapter 3, Section 2.3.Changes in the numbers of salmon available for commerci al harvest are refl ected in the figures in Chapter 3,Section 2.2.1(a). Commercial fishing in Cook Inlet takes place on mixed stocks of salmon.With the partial exception of sock- eye,stock separation is not currently feasible.Thus, the location of potential losses to the commercial fishery in Cook Inlet is indeterminate. From the data presented in the ADF&G Statewide Harvest Survey,much of the recreational salmon fishing effort occurs in the Deshka River,Lake Creek,Alexander River, Willow Creek,Montana Creek,Sheep Creek,and a few other creeks. The location of the subsistence salmon harvest in Cook Inlet is discussed in Section 3.7.1(c)(ii).Subsis- tence fishing in the Susitna Basin is not a recognized fishery by ADF&G.Data on location of harvest are unavai 1able. Given that the present data indicate little impact,it is reasonable to assume that long-term impacts to the salmon resource will be small. G-5-007 E-5-68/1-3:Th i s secti on is 1abel ed "Methodol ogy",but pro- vides no methods appropriate to the evaluation of impacts to user groups.Implicit in this type of evaluation is the need for a measure of existing lJ,se.The only statement defining methods is included in Paragraph 2 which described data used to determine impacts of the dam on the fishery resources.It should be noted that pink salmon are more abundant on even years than on odd numbered years.As such,1981 was a year of low pink salmon occurrence. Response Section 3.7.1(a)has been expanded to more fully de- scribe the methodology utilized. G-5-008 E-5-68:A survey of community usage and wi 1d resources by Cantwell would be useful in assessing levels of use and impor- tance of the salmon,moose,and caribou and other resources. The Cantwell area is likely to be affected by: (1)Wildlife population fluctuations due to construction activity; (2)Population fluctuations because of increased hunting pressure which could result from: (a)Increased human population,and/or; (b)Increased access to resources. While local residents may not appear as a "significant"por- tion of the overall harvest,those resources may very well be important to the community in many ways. Response We concur that more data,which is not now available, should be collected in future studies.A survey of community usage of fish and wildlife will be included as part of an already planned data collection effort in Cantwell and other communiti es.Th is data will be collected in 1983. G-5-009 E-5-68/4:The assumpti on is made in the fi rst sentence that "•••the commercial fishery for salmon produced in the Susitna system occurs only in the Upper Cook Inlet."This assumption is invalid since Susitna River salmon stocks are harvested throughout Cook Inlet,including the lower district.Impacts to Susitna River fish are indeterminable because it is not possible to separate the mixed salmon stocks as they migrate through Cook Inlet. Response The text has been revised to emphasize the mixed stock nature of the commercial fishery in Cook Inlet.With the exception of sockeye salmon,stock separation on stream of origin using scale pattern analysis is not presently possible.Therefore,the commercial fishery statistics for Lower Cook Inlet will be included to make the section comprehensive. r'-- G-5-010 E-5-68-69/5:The monetary figures presented here cannot be used to determine the specific financial loss of Susitna fish, because of the mixed stock (see comment E-5-69/4).Many of these fish are Kenai River or Kasilof River fish. Response We do not agree with the comment.The section on the commercial fishery in Cook Inlet provides overall infor- mation on the magnitude and value of the harvest and provides some information on commercial fishermen as a user group.Specific information on potential monetary loss of Susitna salmon are presented in Section 3.7.1(b). G-5-011 E-5-69/3:The first sentence states liThe specifi c impacts which would result from construction of the Susitna dams have not been determined in a manner which allows accurate quanti- fication./I This statement inval idates comments in E-5-70/l-3 and statements in other Draft Exhibit E report chapters. The paragraph does not address impacts to Susitna River salmon resources downstream from Ta"lkeetna.Greater salmon occur- rence exists in these areas than does the area further up- stream from Talkeetna. Response The intention of the fi rst statement was to make the point that the impact assessments on salmon are prelimi- nary estimates.These preliminary estimates will be reviewed as further data is collected and additional analyses of these data takes place.The statements have been revised in the text to more clearly reflect this interest. Impacts to salmon resources downstream from Talkeetna are described as limited (see Section 2.3.1(b)(iii)). The intent in Chapter 5 was to address areas of greatest salmon impact not ares of greatest salmon occurrence. G-5-012 E-5-70/3:Chinook salmon are harvested incidentally by com- mercial fishermen in both upper and lower Cook Inlet.Project impacts to these users'requires definition as do the criteria for establishing II s ignificant quantities ll as stated. Response This statement has been changed to indicate that chinook salmon were not included in the potential loss estimates since the project impacts on chinook salmon are projec- ted to be minimal.References are Chapter 3,Sections 2.2.1(a)and 2.3.1(b). G-5-013 E-5-71/1:Personal communications with sport fish biologists should be properly cited. Response The reference has been changed. G-5-014 E-5-71/2:The discussion indicates the area and level of impacts to resident and migratory fishes is not detennined. Chapter 2 and Chapter 3 of the Draft Exhibit E present rela- tively detailed presentations of these impacts. The statement,"Data on specific angler use of the Susitna and tributaries above the Talkeetna River confluence are virtually nonexistent.II is incorrect.Data are available on angling use in this area from the ADF&G Statewide Harvest Survey. Impacts are 1 imited not only to areas upstream from the Talkeetna River confluence,as implied.Sport harvest of stocks utilizing the upper Susitna River are tho~ght to occur elsewhere in Cook Inlet,as far south as the Homer area. Response We agree with your comment that Chapters 2 and 3 of the Draft Exhibit E presented relatively detailed presenta- tions of the impacts to resident and migratory fishes. However,quantitative estimates of impacts must still be considered preliminary. Fishing activity from Talkeetna to the proposed damsite are not defined in the ADF&G statewide harvest survey. Angler activity in this area is aggregated into an "other"category.This aggregation does not allow spe- cific analysis of angler use by area. We agree that impacts to sport harvest are not 1 imited to upstream from the Talkeetna River confluence.The text has been modified accordingly. G-5-015 E-5-71/4:Table E.5.40 as referenced in the paragraph omits burbot in the 1 ist of major species.This paragraph states study is underway to define recreational values of Susitna Ri ver fi sheri es resources whi ch may be impacted by the pro- j ect.We are u nawa re of these stud i es,and they shoul d be referenced. Response Burbot will be added to the major species list.Work has been completed on the study mentioned.However, continuation of that research is not currently under contract;therefore,the reference has been removed. I"',", .... SECTION SUMMARY G-5-016 The sport fish discussion is not complete nor does it compare with the commercial section in the presentation of figures and numbers.For example,population estimates are available for several species as are data regarding recreational utiliza- tion.These data are not presented.The research mentioned as "currently underwail is not referenced. Response Recreational utilization data are presented to the extent that these data are available.Population esti- mates for sport fish are provided in Chapter 3,Section 2.2. Some research has been completed on the "currently underway"study mentioned.Further research will be considered in future study plans. G-5-017 E-5-71/5:Generally,the section on Subsistence Fi shing is based on the assumption that the harvests which occur in Cook Inlet are from the Susitna River.This assumption is not necessarily true as most of the effort occurred in the Central District where Kenai and Kasilof salmon stocks are taken. Information in Stanek (1980)indicated the residency of sub- sistence permit holders.Net survey information (Stanek, unpublished data)is available depicting general areas uti- lized by subsistence fishermen in the Northern District. Similar information is available for the Central District (ADF&G 1980). Additional assessment of user groups should be made under the category of domestic use of salmon.Salmon for domestic use is obtained from commercial,sport,and subsistence fisheries. Information on use of salmon resources in Tyonek is also available (Stanek and Foster 1980).More recently,data were coll ected duri ng the spri ng of 1982 on the spec Hi c uses of salmon by Tyonek residents (Foster 1982).It is assumed that most of the chinook salmon caught in the subsistence fishery at Tyonek are Susitna River fish. Response The text has been modified to indicate that the subsis- tence harvest is on mixed stocks with only an indeter- minate portion of Susitna Basin fish as one component. The collection of additional information on user groups will be considered in future study plans. G-5-018 E-5-71/2:The value of "subsistence"caught fish cannot ade- quately be determined using a shadow price.Usher (1976)de- scribed the difficulty in determining the value of wild foods. The "point of subsistence capture estimate"woul d not ade- quately estimate value.A more appropriate value would be the processed cost.In addition t the nutritional value t cultural value t and equipment investment must be added as cost quali- fi ers. It is also stated that value might be determined using "•••the price of an equally desirable alternative food source."A major question would be how an equally desirable food would be determi ned when,for many peopl e,there is not a better source in terms of quality,nutritional value t cultural value,social value,and recreational value.Indeed,salmon is the standard by which value is determined. Response The actual value of a subsistence-caught fish is a com- bination of the value of the salmon as food,plus other social,cultural,and perhaps,religious parameters. The food component of this total value can be addressed using a shadow price.Inclusion of the other factors is required,however,to be able to make a complete valua- tion.The text of this section has been revised. We disagree with the second part of this comment.The use of the conjunction "or"in the sentence quoted makes this comment inappropriate.In the case where "an equally desirable alternative food source"did not exist,the first part of the sentence would then hold by default • G-5-019 E-5-73:Under the category of Game,there is not section on methodology as under the Fish section. In the section on "Guides and Guide Services",there is not quantification of the number of guides operating in the area or their revenue.In addition,quantification of the numbers of people providing outfitting and transporting services that are not guides is required.Information is available from the ADF&G and from the Guide Licensing and Control Board. Response Section 3.7.2 has been modified to include introduction that provides the general approach to the discussion of wildlife resources/user interactions. F- ,"" .... -1 ..... ,..... 1 I, Section 3.7.2(b)has been modified to reflect the infor- mation from the Guide Licensing and Control Board on the number of guides that operate in GMU 13.The other types of information mentioned in the comment are not required by FERC·s guidelines for Chapter 5:Report on Socioeconomi c Impacts. G-5-020 E-5-74/3:There is no discussion of available data (Phase 1 of big game reports)that provide .estimates of losses of ani- mals,effects of access,new hunting regulations,etc.,that would influence "ava ilable harvestable animals." In the category of ULodg.e Operators"no indication is made of the amounts of services and relative value of services fur- nished. Many additional lOdges on the highway system provides services to the individual s who hunt along the highway system or who use the hi ghway system as a poi nt of departure. Response Section 3.7.2(b)has been ammended with information on the most recent estimates of project impacts on the ani- mal populations.There is,in the same section,a dis- cussi on of the importance of regul at ions and how regul a- tions may be influenced by the project impacts. Refer to Section 3.7.2(a)(ii).Information on types of services provided by the lodge operators in the imme- diate vicinity of the project were listed.Examples of the rates charged by one of the businesses for gui ded hunting (as part of the services offered)were quoted. Refer to Section 3.7.2(a)(ii).A list of lodges that are f ouod on the hi g hway system h as been p rovi ded i n response to this comment.However,it shduld be noted that these lodges cater not only to fi sh and wi 1dl i fe users,but also to people who ptJrsue various other acti- viti es that may not be affected by the project. G-5-021E-5-75j2:Apparently,the intention of the statement liThe impactor the prop(Jsed project on the lodge operators woul d be tndirect and of the same nature as that of the gtJiding indus- try",II is that any direct impacts would be upon the resourc.es. However,in the case of the inundation {)f land areas utilized forhuntjng,camps and travel,theiJRpact would be direct. Response For a dfscussion of the types of project impacts on lodge operators,se.,e Section 3.7.2(a)(ii).The question of dire:et jind jndtrect impacts has been addressed. G-5-022 E-5-76/2:Reference to the figure,71,000 animals must be put into proper perspective with regard to the present management for the population and range carrying capacity. Response The proper context of these est imates is discussed in section 3.7.2(b)(ii).The text has been expanded for thi s purpose. G-5-023 E-5-76/3:The information presented deals with the residency of hunters rather than the experiences they seek. Response The information deals with both the primary reason for hunting and hunter residences.This is now reflected in the subheading.Refer to Section 3.7.2(b)(ii). G-5-024 E-5-77/1:A comparison is drawn between hunting pressures or numbers of hunters during the early 1970's and 1980 1 s.Hunt- ing pressure is a function of the number of permits and the number of animals in recent years.This paragraph is mislead- ing and,in fact,the comparisons are invalid. Response The importance of permits and other hunting regulations are recognized in Section 3.7.2(b)(ii).In the same section,in the discussion of demand and supply of hunt- ing opportunity,it is recognized that the constaint on demand due to the knowledge that chances of obtaining a permit are limited. G-5-025 G-5-78/5:The category "Experience Sought"is inappropriate for the informational content of this section.It provides information on characteristics of user groups. Response Refer to Section 3.7.2(b)(ii),where the subheading has been expanded to accommodate the two types of informa- tion which are contained in the referenced paragraph. G-5-026 G-5-79/2:Although harvest ticket reports a 11 ow for the reporting of multiple means of transportation,analysis of the data all CM for only one primary means of transport.The use of highway vehicles is the most conmon method of transport to the general area.Within the area,however,other forms are more common. ..... G-5-027 G-5-028 Response Footnotes to the data obtained from ADF&G clearly indi- cate that hunters were asked to report the "primary" means of transportation.The data itself then shows the frequency of use as reported by successful hunters and does not contradict the statements made in the draft license application.For these statements,refer to Se ct i on 3.7.2 (b)(i i )• E-5-80/1:References shoul d be noted with rega rd to who is doing the studies and their schedules for completion. Response Reference to on-going studies was an error.However, future studies will consider the concern expressed. E-5-80/2:The first sentence is misleading and inaccurate because the implication is that regulations will be of great- est impact to the users.Regulations are a function of resource status and user groups characteri sti cs.Those regu- lations which may be promulgated due to any reduction in quan- tities of resources are a reflection of resource status and perhaps increased user access to the area. The statement,"In such cases,the project would cause little or no additional reduction in hunting opportunity."when referring to al ready stringent regul ations on some s'pecies is inaccurate.Indeed,some regulations are more stringent as with caribou,but may become even more stringent if range is inundated and the area of available habitat is reduced.Regu- 1 at ions on i ncreas i ng numbers of moose in the regi on may be relaxed in the near future,but if these prove unsatisfactory and mitigation measures do not compensate for moose losses in the impoundment area,further restrictions may be required. Response We agree with your comments.We did not mean to imply that regulations would be of the greatest impact to users.The text of this section has been modified accordingly. G-5-029 E-5-80/3:The statements i nd icat i ng that regu 1atory st ruc- tures will be the major impact on the user is misleading and inappropriately identified as the major impact on the user. Re spon se Section 3.7.2(b}(ii)contains a revised text clarifying the references to the importance of regul atory regimes. G-5-030 E-5-80/4:There is not indication of how the quality of the surrounding environment will be changed thereby affecting the expectations of the user. Response For a discussion of guides and guide services,refer to Section 3.7.2(b)(ii).The text has been revised to recognize the possibility of project impacts on quality of hunting.For a discussion of aesthetic values of the resource,refer to Chapter 8 of Exhib it E. G-5-031 E-5-81/2:Subsistence users in the region have not been iden- tified with regard to the use of game resources,except cari- bou.In this case,a set of criteria were developed which qualify a certain number of people on a first-come,first- served basis.For other game resources,further work is re- quired to determine resource use patterns.Information provi- ded in the text refers only to caribou. A1tho~gh "bringing home food meat may be the 'main goal,II. there are other goals of the u~r.These include:(1)ob- taining high quality goods at a relatively low price;(2)ful- filling certain cultural traditions and obligations to the community and/or family;(3)attaining goals of self-determi- nation and independence of welfare programs;and (4)attaining the knowledge and ability to support one's self. Response The text has been revised to take this information into consideration.Please refer to Section 3.7.2(b). G-5-032 E-5-82/34 and E-5-83/1:Data limitations on trappers do exist;however,a survey of trappers in the local impact area would be appropriate. Response We disagree with the useful ness of conduct i ng such a survey.It is believed that many of the people who live in Mat-Su Borough and Cantwell trap in the winter as a means of supplementing their income.However,that is not to say that their trapping occurs in the areas to be affected by the project. As part of the land use and wildlife studies that were performed for the Su s itna project,conversati ons with trappers and local residents indicated that a low magni- tude of trapping activity occurs in the areas in which furbearer habitat is expected to be affected by the Susitna project (the impact area as defined in Chapter 3).This was substantiated by data available from ADF&G's 1981 south-central trappers survey.As a result of the 1 imited number of i ndi vidual s that woul d be r""affected by the project and the "j ndicati ons that the biological impacts on most species of furbearers will be limited,it was concluded at the time that the benefits of conducting such a survey would not justify its cost. As more is known about the probable biological impacts of the project,a survey of trappers in the local impact area will be reconsidered. G-5-033 E-5-84/5:The term "on balance ll is unclear.There is some question as to whether·existing trappers will benefit or if there will just be more numbers of trappers due to access.It is doubtful that increased access to the inundated area will, in fact,benefit trappers since fluctuating water levels will not benefit more aquatic species,especially if draw-downs occur during winter months where food caches and burrows may become inaccessible. Response It is true that the benefit of the increased access pro- vided by the access road and transmission lines to the trapper lI user groupll as a whole does not necessari 1y mean that existing trappers (trappers who are currently trapping-in the Middle Susitna Basin)will benefit. More likely,the additional access,to the extent that it is permitted to be used,will benefit trappers who do not currently trap in that area but will find it to be more feas"j b1e than before.A statement has been added to the introduction on users of furbearers to clarify this distinction. It is true that the fluctuating water levels of the im- poundment areas will not benefit aquatic species 1 iving in that part of the Susitna River,and this section did not mean to imply that there will be increased use of the inundated areas by aquatic furbearer species after construction of the dam •.... i ..... G-5-034 E-5-85/2-3:Construction of access roads and transmission 1i nes .may·provide added access to some a reas for trappers. However,the loss of habitat and increased pressure on martens from trapping and human activity generally may reduce the num- bers of marten and thereby be a major loss to trappers.Para- graph 3 more accurately portrays 1 ikely impacts than does paragraph 2. Response There was a typographical error in the section on impacts to pi ne marten in whi ch part of the paragraph was repeated.This has been corrected. The possibility that the benefits to trappers associated with increased access to marten in the project area could be limited to the short-and medium-term,and that overtrapping could result,has been added to this section. G-5-035 E-5-86/3-4:The assessment of trapping activity and its importance to users in the local impact area should be more extensi vee There is some confusi on as to who an Al askan trapper is,compared to IIrecreationalll trappers who supplement their income by trapping.Especially when,as stated in paragraph 4,lilt is estimated that there are a large number of residents in the local impact area who do some trapping on a part-time basis •••II ,more information is required on how large thi s group is and the 1 evel of importance t rappi ng is to them. Response While there is a large number of residents of the local impact area (the socioeconomic impact area,which in- cludes a large geographical area as a result of the rural nature of the area and the dispersed population living in it)who trap on a part-time basis,very few of the individuals trap in the areas in which furbearer habitat or access will be affected by the Susitna pro- ject.For this reason,primary data collection on this user group was not conducted. In addition,secondary information is limited.The information on the activity of residents of the local impact area who trap on a part-time basis was derived from a report on resources in the Mat-Su Borough.This source has now been added as a reference in the text for clarification. The section now contains no distinction between IIcommer- cial ll and IInoncommercialll trappers,since part-time trappers will often sell the furs they obtain,and since there is no data to support such a distinction. G-5-036 E-5-88/4-6:There is no mention of what people1s attitudes were toward changes in sections other than 3.1 and 3.5. Because natural resource use is important in the area,there should be some indication of local attitudes toward changes in the availability of resources. It,therefore,follows from E-5-89/3 that only the attitudes presented with regard to Sections 3.1 and 3.5 are addressed. No further mention is made regarding measures to mitigate impacts to resource users.There should be some indication as to what can be done to resolve the impacts. ~I Response People's attitudes toward changes that could result from developing hydropower on the Susitna River are contained in Stephen R.Braund &Associates,March 1982:Susitna Hydroelectric Project Sociocultural Studies (prepared for Acres American Inc.and the Alaska Power Authority). Mr.Braund1s main reason for learning about these atti- tudes was to find out how people felt about the various access corridors that were under consideration at the time.Mr.Braund asked open-ended questions and in the process,somethi ng was 1 earned about local attitudes toward changes in the avail abil ity of resources.We refer you to this document because it meets your infor- mation need and,as important,putspeoplels attitudes about various potential changes into perspective. Local users I att itudes will conti nue to be taken into account as project design work process and mitigation measures are further refined.Through survey work scheduled during 1983 in Cantwell and other communities, additional information on users·attitudes,and the relative importance of fish and wildlife as income will be available to support project design and mitigation efforts. DEPARTMENT OF FISH AND GAME GENERAL COMMENTS -RECREATIONAL RESOURCES Comment 1 This report segment lacks supportive data for many statements related to project impacts.Statements or discussions are often simpl istic, based on faulty assumptions and mehtodologies;and lack the necessary definitions to provide adequate project impact analysis. In general,analysis of current trends in recreational boating and fishing in Upper Cook Inlet,leads to the conclusion that many of the recreational use projections in this report are far too conservative. Di scuss ion of project impacts ; n some ;nstances ; s 1 imited only to statements that anticipated impacts are similar to others discussed,or to other impoundment projects.The specific comments that follow will demonstrate many of these deficiencies. Response The final version of Exhibit E addresses these genera1 comments. The recreational use projections as presented are considered reasonable estimates.If the projections do prove to be too con- servative,the additional use can be easily accommodated during Phase 5 of our recreation plan development. - -, .... - SPECIFIC COMMENTS G-7-001 Fairbanks is not considered to be within the South-Central area of Alaska. Response We agree,text has been changed. G-7-002 E-7-13/3:The paragraph implies members of the KnH Kanoers and Kayakers are representative of the overall increase in recreational boating within the Susitna River basin.They are not,as they comprise only a minor segment of the recreational boating users.Substantially greater increase in boating,and water oriented recreation with other types of watercraft has occurred. Response The emphasis has been changed in the text. G-7-003 E-7-15/3:Lake Susitna,Tyone Lake and Tyone River are already major recreation areas.They are not potential areas for "future clevel opment II as stated in the text.Both Lake Susitna and Tyone Lake have numerous recreational cabins loca- ted around their perimeters. Boaters are not able to float down the Susitna River and up to Lake Loui se as stated.Powered watercraft a re necessary (often equipped with jet of air-drive propulsion)to ascend the Tyone River,to Tyone Lake. Response Although already major recreation areas,future develop- ment is anticipated in these areas. We have clarified boater access to these areas. 6-7-004 E-7-20/1:We are not aware of any recreati onal boaters traveling upstream on the Talkeetna River to Stephen Lake for fishing,due both to the distance and presence of major rapids on the Talkeetna River. Response This has been eliminated from the text. G-7-005 E-7-24/2:Management of lands for public recreation and appreciation as presented in the paragraph requires additional clarification.It is not clear what will be accomplished to achieve these goals. Response Thi s comment has been incorporated in changes in the text. G-7-006 E-7-25/1:This paragraph refers primarily to wildlife related impacts,and little mention is made of potential fisheries impacts.In addition to quarry activities discussed for Tsusena Creek,it can be anticipated that the lower reaches of all Susitna Ri ver tributaries within the impoundment may be effected by vegetative clearing,road construction,gravel removal,as well as the stated water quality changes. Paragraph one al so implies the actual construction area is a relatively minor one It in fact will be almost 50 miles in length,and one which does not constitute only a minor incon- venience to recreational users. Response Refer to mitigation in Fish Wildlife and Botanical Resource chapter (Chapter 3),Exhibit E. G-7-007 E-7-25/2:As in the previous paragraph the discussion is directed primarily to wildlife and wildlife related impacts. The discussion fails to address the fact that the lower reaches of all clear water tributaries to the Susitna River, within the impoundment,will be inundated.These areas are the most valued aquatic habitats at present,and are the areas where all recreational use currently occurs. Response Refer to Chapter 3,Fi sh,Wil dl ife and Botani cal Resources,for environmental impacts and conditions of the Susitna project.Not all recreation use is associa- ted with the lower reaches of the clear water tribu- taries as stated above.Not even all fishing occurs in these zones as exemplified by Stephan Lake,Deadman Lake,Tsusena Lake,Butte lake,to name a few.Existing recreation use is described in Section 2.1 and 2.2. G-7-008 E-7-25/5:This paragraph does not clarify why fish popula- tions are not expected to occur in the impoundment.State- ments in Chapter 3 (fish,wildlife and botanical resources) indicate the impoundment waters are expected to provide additional fisheries habitat. The apparent inconsistency in these statements,and report segments,requires clarification. ..... r- I I ..... ..... I Response The text now references the exact s ituat ions as des- cribed in Chapter 3,Fish,Wildlife and Botanical Resources. G-7-009 E-7-25/6:This paragraph is unclear as to locations of areas where sport fishing will be disturbed.Dredging reference is to "channel ll but does not clarify if it is within the Susitna River or the tributaries where sport fishing currently occurs. Additionally,dredging may create impacts other than just changes in water quality as stated.Quarry activities,road ~onstruction and resultant recreational use restrictions as a result of these activities are not discussed. Response This is addressed in Chapter 3,Fish,Wildlife and Botanical Resources.Access to ,operating construction sites will not be allowed.However,these construction sites are not near current recreation use areas. G-7-010 E-7-26/1:The flows predicted during the fill period will not only "temporaril y dimi ni sh ll fi shi ng opportuni ties as stated,but will totally eliminate some of the slough and side channel habitats.The effects of slough dewatering during the fill period may result in the loss of several year classes of some species of fish,creating not a temporary impact,but a 1I1 0ng -term ll one. Response As mitigation for potential lost fishery resources ac- cess to new areas has been provided wi,thin the recrea- tion plan.Refer to Chapter 3,Fish,Wildlife and Botanical Resources,for mitigation measures dealing specifically with these issues. G-7-011 E-7-26/2, There is no information to support the statement of increased fishing opportunities with increased winter turbidity levels as stated. Response The comment has been changed in the text. G-7-012 E-7~28/1:No data exist to support the statement that the presence of construction workers will not have detrimental effects to the recreational resources,nor is there an ade- quate discussion of what constitutes "proper control." Response The recreation plan is intended to provide recreation opportunities for all people.Special recreation facil- iti es are provi ded for constructi on workers..There is no evidence to imply they will damage recreational resources.Their presence will be controlled by con- tract. G-7-013 E-7-28/2-3:References to the impacts of 550 workers,the loss of 32 miles of river,construction of a 34-mile road,and current uses of the river are treated superficially.Impacts to rec reati onal resources resulti ng from improved road access alone wi 11 affect not onl y waters wi thi n the impoundment but those of adjacent areas as well. Response It has been acknowledged (Section 5 for example)that the road will access new areas incl uding water-rel ated sites,which fulfill mitigation of lost recreation resources elsewhere. G-7-014 E-7-29/3:This paragraph is speculative.No data are presen- ted to support the statement that winter fishing is unaffected by increased turbidity level s.The increase in turbidity levels requires definition. Response Refer to Chapter 3,Fish,Wildlife and Botanical Resources. G-7-015 E-7-30/3:No data are presented to support the assumption that recreational use is non-specific to the area,and can simply be moved to adjoining areas.A definition of subject species and recreational uses discussed is required. Response Data does not ex i st over the maj or portion of the study area to make the determination more specific in terms of species and their use by hunters or fishermen.It is clear that the use of the area by recreationists is more tied to the pote.ntial for access.Refer to Chapter 3, Fish,Wildlife and Botanical Resources,for species descriptions and mitigation measures. G-7-016 E-7-37/4:Data extracted from the 1970 report should not be used When similar data from the 1976 and 1981 reports are available.Existing ADF&G data suggest that per capita parti- ci pati on days and projected increas es as publ i shed in the 1970 plan,and for demand estimation,are inappropriate for 1980 and 2000. ..... Response Data developed in the 1976 and 1981 reports are not applicable as base data because participation days per capita statistics were not provided. 6-7-017 E-7-38/1: shoul d not that travel is faulty. Q,lal ity is not the same for all activities and be discussed as though it were.The assumption time and cost totally influences recreational use ,.... Response Refer to Sections 4 and 5 for the discussion on recrea- tion concept,inventory and evaluation.We agree travel time is not the only criteria influencing recreation use.The willingness to drive or fly is only one of several criteria used.Attractiveness,for example,was al so used. 6-7 -018 E-7 -39/4:Data in thi s paragraph are interpreted incorrectl y. A careful review of the evidence cited does not suggest that fishing effort has been decreasing in the impact area,or even that it has decreased rel ati ve to statewi de trends.Areas used for yearly comparisons do not represent the impact areas. In addition,areas used for comparison were not the same from year to year. Response These data have been re-examined to more accurately describe the existing trends in this section. 6-7-019 £-7-4·0/4:No data presented in this paragraph to support the assumption of a decl ining recreational demand in the Susitna River area.The discussion does not define the other "a ttracti on val ues,"nor does it address the increasing recre- ational needs of an increasing human population in the rail- belt area. Response Data for E.7.14. inherent 5. the asserti ons are incl uded in Tabl es E.7.2- Attractiveness of the study area and its recreation potential is discussed in Section ,- I I '. ~ I G-7-020 E-7-41/4:The doubl ing of recreational use as presented is considered conservative.With the addition of a road system into the upper SusitnaRiver area and the expanding human population,greater increases are expected to occur. Response The above forces were all considered as well as other criteria (site attractiveness,other recreation site attractions and competition,remoteness)in determining estimated recreation use.In addition Phase 5 recrea- tion plans are intended to provide additional resources if demand is higher than projected. G-7 -021 E-7 -41/6:With the decreased f1 ows downstream from Devi 1 Canyon dam,and improved road access to the dam site,we would expect increased days of recreational use by kayakers, canoers,and rafters. Response Downstream recreation w"ill be considered during supple- mental recreation study prior to June 30,1983,and included in the Exhibit E supplement. - - - r- ! - DEPARTMENT OF FISH AND GAME GENERAL COMMENTS -LAND USE This document is written in such a general manner that it is to diffi- cult to comment on.It contai ns i nformat i on that contradicts state- ments made in other chapters,and ignores potential impacts to land use and access downstream from Gold Creek. Although mitigation of impacts to land use is mentioned,there is no commitment to implementing possible measures.In addition,.there is no discussion of which measures will be implemented or when or how.Some impacts to land users are completely glossed over and it is suggested that users will have to accept impacts or move elsewhere. Response Revisions have been made to correct any contradictions that occurr.ed in the Draft Exhibit E.The report continues to focus on land use in the project area (i.e.,upstream of Gold Creek);however,additional information on floodlands down- stream has been added. Some land use mitigation alternatives have not been committed to,since they are outside the jurisdiction of the Alaska Power Authority (see ADF&G comment on Chapter 3 numbered G-3-074). SPECIFIC COMMENTS G-9-001 E-9-2/7:Activities such as consumptive,recreational or sub- sistence use of fish and wildlife resources are considered as dispersed use and isolated non-site-specific activities which do not i nvol ve a commitment of resources at any parti cul ar site. Ha rvest,and product i on of harvestab 1e resources,is spec i- fically dependant on a commitment of a specific amount of land (habitat).Participation in the harvest of fish and game (1 eve 1s of effort)is therefore site-specific.Consequently, the loss of species habitat including the lands and waters used as harvest areas will have a measurable impact both on management of wildlife and on public use. Response For the purposes of the land use report,"site-specific activity includes that involving some form of long-term development or other commi tment of resources."Th is definition includes the construction and maintenance of structures or the alteration and maintenance of the terrain.Although hunting,fishing,and trapping re- qu i res the use of equipment,that equi r;rnent can eas ily be relocated without mechanical assistance.The aban- doned activity site and surrounding terrain would not have been si gnifi cantly di stu rbed.The reduct ion of fish and wildlife is a commitment of resources;however, with the implementation of sound harvest techniques the resource is replenished at a specific activity site withi n the proj ect area.The loss of speci es habitat and the management techniques used to minimize the impact of the project are included in Exhibit E,Chapter 3. G-9-002 E-9-3/5:M assumption is made that because the project is isolated and located in a subarctic environment,extremely low density 1 and use results.However,use of 1 and both by the public and wildlife is seasonal and can be very high for a specific season. Response The result of the remote location of the project area is that no roads exi st within the project area.The few existing trails are primitive and allow foot or ORV use only.Existing access into the area is predominantly by ai r and for the purpose of short-term,recreational hunting and fishing.Existing land use is seasonal but it is not high density. .... F"'" I 1 G-9-003 E-9-15j3:Hunting use of Zone 1 is 1ess than in Zones 2 and 3.However~hunting in Zones 2 and 3 is basically associated with the existing lodges and cabins and is more readily quan- t ifi ab 1ethan i dent ifyi ng i nde pendent hunte r ecHo rt.Use of ADF&G harvest stat istics woul d hel p quantify i nde-pendent hun- ter effort. Response The independent hunter effort is quantified for caribou and moose in Section E.5.3.7.2 -Local and Regional Impacts on Fi sh and Wildl He Groups -Game.These values are call ed hunter success rates.The project area crosses several ADF&G Game Management Units.Con- sequently ~it is difficult to rel ate estimates of har- vests in particul ar game units with harvests "i n the project impact area.Quantifying harvest levels in the project a rea may be further cons i de red in Phase II of the Susitna Hydroelectric Project • G-9-004 E-9-5:Reference to rating public use of lands occurs throughout Chapter 9 and is ultimately renected in Figure E.9.5~a map which identifies 11 use or sample use sites with evaluations of use intensities for each site.The designation of low,medium,and high intensity uses should be defined. Response These comments have been addressed in Section E.9.2.2.2- Existing Land Use Activity. G-9-005 E-9-32/1:Proposed mitigation for the loss of public use of project lands has only addressed the consideration of estab- lishing restrictive access regulations.Other mitigation alternatives should be identified including replacing oppor- tunities lost with lands that provide equal value. Response These comments have been addressed in Section E.9.3.4.3- Access -Mitigation. .... ..... I DEPARTMENT OF COMMUNITY AND REGIONAL AFFAIRS ALASKA POWER AUTHORITY ..-, 334 WEST 5th AVENUE·ANCHORAGE,ALASKA 99501 August 3,1983 Phone:(907)2n·7641 (907)276-0001 Mr.Mark Lewis Connnissioner Department of Connnunity Pouch B Juneau,Alaska 99811 and Regional Affairs ..- - Subject:Your March 16,1983 Letter Connnenting on the Susitna Hydroelectic Project Draft FERC License Application Dear Connnissioner Lewis: Thank you for reviewing the draft Susitna Hydroelectric Project FERC License Application,Exhibit E and for providing comments related to the Socioeconomic and Land Use chapters.Your comments have been reviewed in detail by appropriate staff and are discussed in Attach- ment A. It is important to note the following points pr~or to examining Attach- ment A.First,several concerns raised by your Department regarding the draft License Application were addressed in the Socioeconomic and Land Use chapters of the License Application submitted to the Federal Energy Regulatory Commission in February,1983.Second,a working paper,entitled Project Assumptions,Methodology,and Output Formats (July 1983),has been prepared.The purpose of this paper (Working Paper IJ:l)is to present assumptions and methods that were used to pro- jectpotential socioeconomic impacts 6f the proposed project.Addi- tionally,Working Paper IJ:l describes the format that will be used to report the results of future socioeconomic analyses.This document, which has been enclosed for your use,more fully addresses many of the concerns raised in your letter.Third,in direct reponse to your letter,an interagency workshop was organized and held in Palmer on July 19,1983.(Dave Tremont of your staff attended this workshop.) Follow-up meetings were held on July 19 and 20 in Trapper Creek and Talkeetna.The purpose of the workshop and follow-up meetings was to provide your Department,and other agencies and organizations,with an BILll Mr.Mark Lewis August 3,1983 Page 2 opportunity to more fully understand and to contribute to the socio- economic impact projection process.The workshop focused on detailed methodological discussions of information presented in Working Paper 11,as well as additional concerns raised by participants. We look forward to continuing our working relationship with your staff on issues of concern related to the Susitna Project. Sincerely,Lr?1J .l Erif P.Yould Executive Director TA/ljc Enclosures as stated cc:Dave Tremont,DCRA,Anchorage,Alaska William Wakefield II,FERC,Washington,D.C. Dwight L.Glasscock,H.E.,Anchorage,Alaska Jane Drennan,PMS,Washington,D.C. B/L/l ATTACHMENT A The following discussion provides a point-by-point issues of concern raised by tbe Alaska Department Regional Affairs'March 16,1983 letter. Comment #1 (Page 1) response to the of Community and - ..... I The assumptions underlying the socioeconomic analysis imply significant and yet uncommitted policy positions on the part of the State.For example,Exhibit E contains assumptions regarding the origins of the labor force,housing opportunities for that labor force,and mobility of the work force during construction.Implicit in these assumptions are policies addressing local hire and job training,worker residence at the project site,mode(s)of access to and from the construction site,and the use of construction camps as opposed to transporting workers.Should any of these implicit policies fail to materialize as presumed,the nature of the impacts described in Exhibit E could change drastically. In order to clarify the relationship between assumptions of the socio- econom~c impact model and State policy,the Department's recommendation is that the Alaska Power Authority provide a process for key State agencies to become actively involved in the methodology and use of the model.This would,in our opinion,serve two useful purposes.One,it would enable the State to constructively critique the assumptions of the model,particularly in light of existing State policies.Secondly, a better understanding and practical use of the model by State agencies could help form the basis for establishment,of new State policies for the project.In the same manner,involvement of the Matanuska-Susitna Borough in the critique and application of the model should be provided for,should the Borough choose to participate. Response It is recognized that several assumptions underlying the socioeconomic analysis are based on uncommitted policy positions on the part of the Alaska Power Authority,and that the results of the impact analysis could change if the implicit policy positions and corresponding assump- tions do not occur.As described in Working Paper #1,the impact model is designed to analyze multiple scenarios and to provide sensitivity analyses of changes in key assumptions,including the assumptions and policies delineated in Comment iF!(such as local hire,construction camp,and worker transportation issues).These model attributes were discussed at the socioeconomic workshop and are described on pages 10, 16-18,37, 39,and 41-52 of Working Paper #1. As described in the cover letter,in response to the second part of Comment #1,an interagency workshop was held July 19,1983 in order to actively involve key State agencies and the Matanuska-Susitna Borough in the methodology and use of the socioeconomic model.The workshop BILl1 1 and subsequent meetings ~n Trapper Creek and Talkeetna gave the agencies and communities an opportunity not only to understand and critique assumptions and methods used in the model,but also to guide the model I s use. Comment #2 (Page 2) It is the Department's op~n~on that the socioeconomic impacts identifi- ed in Exhibit E as resulting from the Susitna project are significantly understated. As was described in the Department's review comments for the Susitna Project Feasibility Study,we feel that the proposed impacts from the Susitna project will far exceed those expressed in Exhibit E.We base our predictions on the impact historically caused from other large construction projects in Alaska,most notably the Trans-Alaska Pipeline project (TAPS). In order to account for a larger impact than described in Exhibit E, the Department recommends that an alternate socioeconomic impact model scenario(s)be established to represent,as closely as possible, appropriate factors of the TAPS experience for the Susitna project.At a minimum,this alternative analysis should assess those impacts due to induced population growth and increased numbers of people seeking employment.For example,Exhibit E (on page E-5-20)describes that within the period 1983-1991,the latter date representing the peak year of the Watana construction phase,the population of the Matanuska- Susitna Borough is proposed to increase by approxiamtely 22,355 persons.Of this total,only 4,700 persons are proposed to be connected to the project,including direct and indirect/induced workers and their dependents.This estimate appears to be low,particularly in light of the experience gained from the TAPS project,when a far larger than anticipated influx of people was attracted to the area.As a result,this in-migrant population competed wi th local res idents for both direct and indirect/induced jobs and greatly strained the capa- bilities of public services and facilities.The Department feels that the types of impacts found with the TAPS project could likely reoccur with the Susitna project.We recommend,therefore,that a model scenario be developed which utilizes information gained from the TAPS experience in calculating population influx and resultant impacts. Even with the difficutly in predicting precise numbers of secondary or induced workers and families,the model can at least be used to generate likely or alternative scenarios to guide decision makers ~n assessing potental impacts and preparing mitigation measures. Response The socioeconomic impacts identified in Exhibit E of the License Application projected to result from the construction and operation of the proposed Susitna Project are based on a specific set of assumptions B/L/l 2 ..... ..... outlined ~n Chapter 5.As discussed at the workshop and in Working Paper #1,the projected impacts may change if different assumptions and project scenarios are used.Thus,the model selected for use in the socioeconomic analysis is capable of providing impact projections for a wide variety of scenarios and assumptions,including a limited analysis of speculative in-migration by job seekers. Based on characteristics of the Susitna Project in contrast to the TAPS,the analysts responsible for conducting the socioeconomic analysis for the Susitna Project do not anticipate that the Railbelt Region will face the same magnitude of demand for housing,facilities, and services due to the Susitna Project as was experienced by the City of Fairbanks during the construction of TAPS.For example,the work force requirements for TAPS rose to 22,000 workers wi thin two years. The lower-48 was experiencing a moderate to severe recession and wages associated with the pipeline work were very high.In contrast,for the Susitna Project the peak construction work force is estimated to increase steadily over five years,peaking at approximately 3,500 workers;the lower-48 mayor may not be in a recession;and the real wage differential,which has decreased significantly,will most likely continue to close.As a result,potential impacts due to speculative in-migration of job seekers are.likely to be considerably smaller for the Susitna Project than they were for TAPS.Thus,due to differences in the size of the construction work force,length of the construction period,and to changing economic and wage conditions,there is little basis for anticipating that the socioeconomic impacts related to TAPS and the Susitna Project would be comparable. Comment #3 (Page 2) Responsibilities for prOV1S~on of services and facilities within the local project area (Matanuska-Susitna Borough)should be more clearly defined for the State,Borough,and the Contractor. Exhibit E does present a discussion regarding projected public service and facility needs for the Matanuska-Susitna Borough (and selected cities within)both in base-case and project-induced scenarios.More specific data,however,could have been provided regarding the costs and revenues anticipated for the State,Borough,and Contractor for specific services and facilities required under both scenarios.Such information,for example,would clearly illustrate the levels of State support anticipated both with and without the Susitna project . Response An analysis of State,Borough,and Contractor responsibility for the prOVks~on of services and facilities within the local impact area (e.g.,the Matanuska-Susitna Borough,and communities therein and nearby)will become more clearly defined during the mitigation planning process scheduled for the Fall of 1983.·An Impact Mitigation Plan is B/L/1 3 also scheduled to be developed by March 1984.This plan will be updated,as necessary,due to changes in the local project area,prior to project construction.Final responsibilities will be defined prior to the initiation of construction. Comment #4 (Page 3) Legal responsibilities for access to the project site both during and after construction need to be clearly defined. Exhibit E (Chapter 9)briefly discusses the location of the proposed access road and its potential future use.It is also discussed that during the construction phase,only project personnel will be allowed passage on the road.Land management planning for the access road area is proposed to also take place during the construction phase. The Department recommends that legal responsibilities should be clearly identified prior to opening of the road for any purpose.This action would clarify,for example,maintenance respons ibilities and liable parties in the event of unauthorized use of the road.Secondly,the Department recommends that land use planning take place before the original road is constucted in order to incorporate future land use considerations within the original road design and layout.Similar considerations (as described above)should be given to the proposed rail access route to the Devil Canyon site. Response Legal responsibility for access to the project site (both road and rail)will be identified prior to the opening of the road for any use. The legal issues to be resolved will include the reponsibilities for winter plowing and maintenance as well as enforcement and the estab- lishment of liable parties in the event of unauthorized use of the road.Furthermore,prior to construction of the access route,potent- ial land use conflicts will be identified and future land use consider- ations will be assessed. Comment #5 (Page 3) The possibility of dam failure should be taken into consideration for the Susitna project,particularly for areas downstream of the dam. This is a critical issue given the size of the dam,and impoundments, and the proven seismicity of the project area.The Department has stressed in our previous comments that the downstream flood hazard due to catastrophic dam failure should be mapped and appropriate stipula- tions should be placed on downstream development in order to prevent potential loss of life and property. B/LIl 4 ,~ ,{PSI'JiIo, i - ,...... Exhibit E (Chapter 6)gives attention to seismicity,however,it is simply stated on Page E-6-36 that the main structures (dams)have been analyzed to accommodate the ground motions induced by the maximum credible earthquake.The Department stresses,however,that our above concerns be addressed within the land use planning for the project area. Response The Susitna Dams will be designed and constructed so that downstream areas are protected from the consequences of a fai lure or untimely release of water from the reservoir.The dam foundations will be designed to be stable under all conditions and capable of carrying the weight of the structures.The des ign criteria will be such that the strains on the dams resulting from external,static,and dynamic forces such as earthquakes,will be maintained within acceptable limits.The selected dam types,earth-rockfill and concrete arch,have proven records of safety.Operation and maintenance procedures will be developed to assure that the dams and their appurtenant facilities will be properly maintained throughout the life of the project.Structures and foundatins will be monitored so that any physical change can be detected and any necessary corrections can be promptly made. Flood discharges on the Susitna River will be controlled by operation of the powerhouse,the valved outlet facilities,and the service and emergency spillways.The powerhouse and gate outlet facilities will be operated so that the peak outflow from all floods will be less than the peak inflow to the reservoirs.In the case of the 50-year return period flood where the inflow peak is about 65,000 cfs,the ou tflow will be about 31,000 cfs.Therefore,with these project releases,no changes in the land use downstream of the project area is anticipated. The operations manual for the Susitna Project will include appropriate public safety coverage.This document will include a specified proce- dure should a catastrophic dam failure occur. During the final design and construction phases of the Susitna Project, the Power Authority will map areas downstream of the dams for potential flood hazard associated with any catastrophic dam failure.This mapping will be carried out according to the procedures recently established by the U.S.Bureau of Reclamation and the Corps of Engi- neers for their major water retaining structures. Comment #6 (Page 3) More infqrmation needs to be provided about the proposed permanent townsite. B/L/1 5 Exhibit E presents in various chapters the concept of a permanent townsite to be established at Watana.Chapter 8 (Aesthetic Resources) for example,presents a conceptual layout of the proposed townsite. The Department is concerned that if a permanent townsite is to be established near the project,much more information needs to be provided regarding:physical site suitability,liveability factors, community expansion areas,government,and opportunities for economic diversification.Additionally,the costs and providers (S tate, Matanuska-Susitna Borough,community)of facilities and services for the community should be specifically identified. Response Information on the location of the proposed permanent townsite and the expected services and facilities is being developed as part of the on- going studies to support the licensing process.The design and layout of the permanent townsite will be developed in cooperation with the Department of Community and Regional Affairs,Native Corporations,the Matanuska-Susitna Borough,and other responsible state and federal agencies. Comment #1,Socioeconomic Impacts (Page 4) It would be helpful to summarize in one section of Chapter 5 all the assumptions,standards,and input variables that were used within the impact model.Data sources of each should be cited. Response Assumptions,standards,and input variables are summarized for the economic-demographic,public facilities and services,and fiscal modules of the impact model in Sections V,VI,and VII of Working Paper #1.Additionally,relevant assumptions,standards,and input variables were discussed at the socioeconomic workshop. Comment #2,Socioeconomic Impacts (Page 4) Chapter 5 does not identify if,and when,sens1t1v1ty analysis will be done for key variables used in the socioeconomic impact model. Response Refer to the response to Comment #1,page 1. Comment #3,Socioeconomic Impacts (Page 4) It would be useful in Chapter 5 to portray 1n graphic format the data regarding baseline and project-induced costs versus revenues.The percentage of costs and revenues per contractor,State,and Matanuska- Susitna Borough should also be shown in graphic format.Additionally, if various scenarios are to be eventually portrayed by the model, graphic representations of costs versus revenues per scenario would be useful. BILII 6 .- ...... Response The percentage of costs and revenues per contractor,the State,and the Mat-Su Borough will be estimated in the Fall of 1983.Graphic formats will be considered as one of several alternative presentation tools. Comment #4,Socioeconomic Impacts (Page 4) On page E-5-23,reference is made to the absence of impact on the Matanuska-Susitna Borough School District because a contractor provided school at the construction'site will serve the residents.As specified in previous Department comments,under Alaska Statutes,the Matanuska- Susitna Borough is mandated to exercise areawide education powers. Therefore,the District would be responsible,by law,for the provision of educational facilities and services to all residents of the Borough. This does not prohibit the project contractor and the School District from formally agreeing to share costs or take other steps to lessen impacts;however,any educational facilities,programs,and faculty will have to comply with School District standards and guidelines. Therefore,there will be an impact on the School District. Response The potential impacts on the Matanuska-Susitna School District will be re-evaluated and analyzed in more detail in the Fall of 1983 as part of the overall revisions to the socioeconomic impact analyses.Revised socioeconomic projections are scheduled to be available on computer print-outs in November 1983. Comment 1~5,Socioeconomic Impacts (Page 4) Page E-5-47:The 1981 vacancy rate for housing (outside of incorporat- ed communities)within the Matanuska-Susitna Borough is given as 25%. Does this figure include secondary homes? Response The 1981 vacancy rate for housing outside of incorporated communities but within the Matanuska-Susitna Borough (25 percent),excluded second- ary homes where houses were easily identified as secondary dwelling units.Nonetheless,the Matanuska-Susitna Borough Planning Department population and housing survey inadvertently included some secondary dwe ll:i.ng uni ts • Comment #6,Socioeconomic Impacts (Page 4) Page E-5-137;Table E.5.35:A more detailed breakout of costs and revenues for each service or facility per year would be useful to in- clude somewhere in Chapter 5 as back-up data to Table E.5.35. B/L/l 7 Response Additional back-up data,including cost and revenue information,will be developed in the Fall of 1983.Revsied socioeconomic projections are scheduled to be available on computer print-outs in November 1983. Comment #1,Land Use (Page 5) Pages E-9-20 through E-9-22,Section 23 -Description of Existing Land Use .Management Plans for the Project Area:Among management plans listed in this section,the Denali Scenic Highway Study [pursuant to the Alaska National Interest Lands Conservation Act,Section 1311 (b)] should also be included. Response Paragraph six on page E-9-27 of the February,1983 License Application identifies and briefly describes the Denali Scenic Highway Feasibility Study.The study recommendation was that the Denali Highway not be designated a scenic highway. Comment #2,Land Use (Page 5) Page E-9-59;Figure E.9.8:The biophysical coastal boundary for the Matanuska-Susitna Borough Coastal Management Program has been amended from that shown on Fig.E.9.8. Response Consultation with the Mat-Su Borough Planning Department indicates that Figure E.9.I5 of the February,1983 License Application reasonably reflects the biophysical coastal boundary for the Matanuska-Susitna Borough Coastal Management Program. BIL/1 8 - - ~, -- I""'" c • SUSITNA HYDROELECTRIC PROJECT 'SUST ASK 4.5:SOCIOECONOMIC STUDIES Draft Fraal PROJECTION ASSUMPTIONS, METHODOLOGY AND OUTPUT FORMATS .For:HARZA-EBASCO and the ALASKA POWER AUTHORITY By:FRANK OATH & ASSOClATES,INC• .JUy 1983 - TABLE OF CONTENTS Page No. I.INTR.ODUCT ION.0 0 .. I I.FERC REQUIREMENTS AND NEEDS..................................2 III.OBJECTIVES OF THE SOCIOECONOMIC STUDIES......................4 IV.OVERVIEW OF THE MODEL.GO....5 A.Ceonceptual Foundation,Choice of Method and Techni ques.. . . . . . . . . . . . . . . . . . . . . . . . .•.. . . . . . . .5 B.~del Structure .............•.•~........•.........e •••••~10 V.ECONOMI C-DEM();RAPHIC MODEL...................................23 A.Baseline Projections.....................................26 B.Di rect Work Force..........................................................................36 C..Seconda ry Work Fa rce.... .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. ......55 VI.PUBLIC FACILITIES AND SERVICES...............................60 Overvie\"i of Methodo'ogy..................................60 Geograph i c Scope III .. ......60 The Computerized Module....61 Types of Service Standards...............................61 Assumptions and Service Standard Used....................67 VII.FISCAL MODULE....75 A.Overview of the Fiscal Impacts Module.75 B.Impact Areas and Locai Jurisdictions...............•.76 C.Projection of Revenues and Expenditures..................77 D.Li nl<of the Fi scal Modul e to Other Modes.................82 E.Baseline Projections.....................................83- F.Impact Projections.89 G..Re po rt s ".. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .89 REFERE NC ES..... . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .93 Tab 1e 1: Tabl e 2: Table 3: Table 4: Table 5: Table 6: Table 7: Tabl e 8: Tabl e 9: Tabl e 10: Table 11: LIST OF TABLES Page No. Potent;a1 Impact Areas and/or Worker Tracking Points 13 Projected Percent Share That Census Divisions Will Represent of Employment in the Anchorage and Fairbanks Subareas...............................29 Projected Percent Share That Census Divisions Will Represent of Population in the Anchorage and Fairbanks Subareas 32 Assumptions for Baseline Population Growth Rates for Selected Communities Located Near the Project Si teo ... .. . .. .. . . ..... . . . .. . . .. . .... .33 Population per Household Assumptions 35 seasonality of Project Employment ..........•...........38 1981 Hourly Wage Rates Used to Calculate Payroll 54 Impact of the Project on Police Protection in the Matanuska-Susitna Borough 62 Summary of Public Facility and Service Standards for Selected Communities in the Local Impact Area 66 Fiscal Module Reports:Revenues and Expenditures.Impacts on Budgets (1985 -1993)...•...91 Fiscal Module Reports:Revenues and and Expenditures.Impacts on Budgets (1994 -2005)...92 LIST OF FIGURES Page No. Figure 1: Fi gure 2: Structure of $Usitna Model ~...••.•.........•...... Potential Impact Locations in the Local 12 27 Fi gure 3: Fi gure 4: Figure 5: Figure 6: Impac t Area...........................................15 Design Overvi ewo f Da ta*Mode 1 Economic Modeling Software............21 Structure of Economic/Demographic Module......24 Resident and Non-Resident Project and Related Employment and Population.............................25 Baseline Population,Employment &Housing Projections ...••...........•.~.......••..... - Figure 7:Methodology Used to Project Settlement Patterns of Direct Work Force..............40 Figure 8:Direct Construction Work Force...........•..........••...42 Figure 9:Structure of Public Facilities and Service Module........63 I.INTRODUCTION The main purpose of this paper is to present the assumptions and methods that have been used to project potential socioeconomic impacts of the proposed Susitna Hydroelectric Project.Another purpose is to describe the formats that will be used to report results of future analyses. Many of the assumptions and methods described in later sections of this paper are the same as those used in the preparation of Chapter 5 of Exhi bi t E (February,1983).Because of the current need to determi ne potential impacts that could result from alternative management and design scenarios,some methods were refined,and some new assumptions and methods were developed. Most of the changes from earlier methods occurred in the portion of the economic-demographic module that involves origin and settlement of workers.A gravity allocation element was created in response to the need to model the effects of alternative camp/village sizes and other attributes,work force characteristics,transportation options for workers,access corridors,and scheduling.Other changes,which primarily increased the ease with which assumptions may be changed, occurred in most elements of all of the modules of the model. This paper is organized in seven sections.Section II presents the Federal Energy Regulatory Commission's (FERC1s)requirements and needs, while Section III describes the near~and long-term objectives of the socioeconomic stUdies.Section IV provides an overview of the impact projection methods,and the structure of the model used to project impacts.The paper concludes with detailed presentations of each of the three parts (modules)of the model. ~ , - - II.FERC REQUIREMENTS AND NEEDS The Report on Socioeconomic Impacts,a required section of the Susitna MYdroelectric Project license application Exhibit E,must identify and quanti fy the impacts of constructi ng and operati ng the Susitna MYdroelectric Project,including impacts on employment,population, housing,personal income,local government services and tax revenues, and socioeconomic.conditions in the communities and other jurisdictions in the vicinity of the project. The Report is to include,among other things: 1.An evaluation of the impact of any substantial project-induced in-migration of people on the impact areals governmental facilities and services,such as police,fire,health,and· educational facilities and programs; 2.Estimation of the numbers of project construction personnel who: -currently reside within the impact area; -Would commute daily to the construction site from places si tuated outsi de the impact area;and -Would relocate on a temporary basis within the impact area. 3.A determination of whether the existing supply of available housing within the impact area 1S sufficient to meet the needs of the additional project-induced population;and 4.A fiscal impact analysis evaluating the increme.ntal local government expenditures in relation to the incremental local government revenues that would result from the construction of the proposed project..(Federal.Register,November 13, 1981). 2 FERC regulations do not explicitly define mitigation policy nor goals for socioeconomic impacts.However,mitigation measures for addressing significant and adverse potential effects of the project must be developed to satisfy the mitigation and other requirements of the National Environmental Policy Act.Hence,it is necessary for the Report to also address mitigation issu~s. The Report on Socioeconomic Impacts,as part of the .Susitna Project license application,was submitted to FERC in February,1983.The Report was accepted by the FERC,although FERC requested supplemental information primarily concerning the methods utilized in analyzing impacts and the formulation of an impact mitigation plan.The Report presents alternative mitigation measures,and a definite mitigation plan will be prepared as project management and design plans evolve. 3 ,.... :-. III.OBJECTIVES OF THE SOCIOECONOMIC STUDIES The main objective of the socioeconomic studies is to satisfy FERC's requirements and needs.secondary objectives include: o Providing information that will help the Alaska Power Authority make decisions on measures to mitigate potential adverse socioeconomic impacts and on interdisciplinary-issues,such as the selection of an access corridor or camp/village sizes and qual ity. o Providing planning information to communities,the Mat-Su Borough and state agencies so that they can anticipate and cooperatively plan for avoiding and mitigating potential adverse project-induced socioeconomic impacts. 4 IV.OVERVIEW OF THE MODEL To meet the above objectives.it was necessary to develop impact projections and assessments.and alternative mitigation measures.that would help in designing the project.assessing environmental impacts. and determining project feasibility.Additionally,it was desirable to develop impact projection methods and procedures that would allow projections to be easily and periodically revised before and during project construction. A.Conceptual Foundation.Choice of Method and Technigues 1.Conceptual Foundation Any of several alternative theoretical concepts can be used as the foundation of an impact projection and assessment model.These alternatives include location.central place.and economic base theories. Location theory has limited usefulness for this socioeconomic assessment.Itls strengths are in estimating the potential for the development of interrelated industries.and for assessing the growth potential of direct industries and industry sectors.This information was not required as part of this study. Like location theory,central place theory has limited usefulness for this study.It's strength lies in providing a means to estimate the geographic distribution of impacts.Although it was not the main conceptual foundation for the projections.it provided part of the conceptual basis for predicting workers l settlement patterns.This is discussed further in Section V-B-2. Economic base theory was relied upon heavily for this study because its strength lies in estimating how secondary industry sectors will change in reponse to a change in direct industry sectors.This is relevant 5 6 for this project because one of the most significant sources of impacts will be employment and population growth that is stimulated by the project1s direct employment.As a result,the quantifying approach is detenni ni sti c (causa 1 )--rel ati onshi ps between the vari ab 1 e (s r to be forecast and influencing variables/factors are identified and determined,and then incorporated into the forecasting process. In economic base theory,there are two key concepts.First,it assumes that the economy may be split into two sectors:direct and secondary. Businesses and other economic entities that sell goods and services at places outside of the local economy comprise the direct sector,and those that sell goods and services within the local economy comprise the secondary sector.second,it assumes that the amount of secondary activity is determined by the amount of direct.activity.Thus,an increase in direct activity (e.g.,employment)is accompanied by a corresponding,and roughly predictable,increase in secondary activity. Aggregate employment multipliers are commonly used to estimate employment effects that are 1 ikely to resul t from changes in di rect employment.Other multipliers may be used to estimate population effects that result from the increases in direct and secondary employment.Aggregate employment and other multipliers are discussed further in later sections of this paper. 2.Choi ce of Method Methods that were considered for implementing an economic base model included aggregate employment multiplier,intersectoral flows,and input-output.Several criteria were developed to evaluate these methodological alternatives.There were also several constraints that influenced the choice of methodology.The criteria and constraints may be grouped as follows: a.Cri teri a: -Must quantify impacts at the local (comrnunity)level ,and to a lesser extent,regional and statewide level s. -Must use best possible techniques to estimate secondary employment impacts. -Must have consi stent methodology for IIwith projectll and IIwi thou t proj ec til proj ection s. -Must be easy to update results. -Must provide information that is useful to decision makers (FERC,APA,local jurisdictions). b.Constraints: -Must be able to develop and use the model within the bUdget and other resources available. -Availability of data. -Must be consistent with the Institute of Social and Economic Research's (ISER's)projections of employment and population at the statewide and regional (railbelt and subareas)levels. Each of the three alternative methods differ substantially in their data requirements,cost and time for development,and the level of detail provided in the results.The input-output method can be the best method to use from a results perspective (e.g.,it is capable of providing detailed projections of impacts on industry sectors).For this analysis,however,this method could not have provided detailed projections because the local economies (boroughs/census divisions)of Alaska are not large enough for an input-output method to be functional.Further,the cost of development and implementation of this method would have been prohibitive even if it were potentially functional.The intersectoral flows method would have also been preferred from a results perspective,but it too would have resulted in excessive development and implementation costs. Part of the reason for the high costs associated with these methods is that 1arge amount of primary data woul d have been requi red on a continuing basis.For the input-output method,it would have been 7 ,F'-o necessary to collect primary data to support the development of technical coefficients (direct requirements coefficients or input~output table)at the borough/census division level.Besides the bUdge~and time constraints,it is very doubtful that a meaningful input-output table could have been developed.This is because the Mat-Su Borough's economy is not yet well-developed,among other factors. Similarly,the intersectoral flows method would have required a table sryowing requirements coefficients.Because it focuses solely on exports,data requirements are less than those reqired for the input-output method.Nevertheless,these data requirements would have been quite substantial,and it is doubtful that a meaningful table could have been developed due to the limited size and breadth of the Mat-Su Borough's export economy.Moreover,the level of detail of the regional economy produced by this type of method would exceed the requirements of this project. The aggregate employment multiplier method was chosen because techniques were available to provide more detail to the impact projections,and i~did not share the shortcomings of the methods discussed above.Further,ISER's MAP model,being an economic base-econometric model,fit well with this decision.Accordingly,it was decided that the ISER employment and population projections woul d ser.ve as baseline projecti~ns for the statewide,railbelt region,and subarea (multi-borough/census division)levels,and that baseline projections for borough/census divisions and smaller areas would be derived by disaggregating the ISER projections.The techniques used to disaggregate these projections are discussed in Section V-B-2. The·method used to project impacts of the project foll ows economi c base theory in that secondary (support sector)impacts of the project are estimated using employment multipliers.It is assumed that the level of secondary activity is uniquely determined by the level of direct (basic sector)activity,and that a given change in the level of direct activity will bring about a predictable change in secondary activity (Leistritz and Murdock,1981).Thus,the creation of a given number of c~nstruction jobs will create a predictable number 'of secondary jobs in 8 related industries and the service sector.The techniques used to estimate secondary employment effects are discussed further in Section V-C -1. It would have been preferable to use income instead of employment as the indicator to measure economic change if adequate data had been available.Employment may not be an accurate indicator of economic activity in sectors that experience technological change,and if different direct industries have significantly different wage rates and/or input purchasing patterns).However,it was not possible to use income because adequate income data was not available. 3.Techni ques Several techniques were used in conjunction with employment multiplier method to project impacts. ;mportant techni ques are: the aggregate Some of the more o Gravity allocation model (used to allocate inmigrating workers to cormnunities) o Trend analysis (used to allocate ISERls MAP model IS baseline employment and population projections to smaller geographic areas) o Person per household trend multipliers (used to project numbers of households) o Per capita planning standards (used to project demands for public facilities and services) o Per capita fiscal multipliers (used to project local jurisdictions'revenues and expenditures,with and without the projec t Each of these techniques is discussed in Sections V-VII. 9 "..., I I - B.ttbdel Structure 1.Overview Having established aggregate employment mUltiplier as the method,the next step was to desi gn a model that coul d use thi s method to produce appropriate projections.Several needs were considered during the design process.These were: o Ability to meet the information requirements of FERC,NEPA,APA, and local officials (e.g.,employment,population,housing, public facilities and services,and fiscal impacts1. o Ability to produce annual projections for up to 25 years. o Ability to efficiently handle mUltiple scenarios. o Amenable to sensitivity analysis. o Ability to quantify potential impacts in detail,and for small geographic areas. o Ability to efficiently interact with monitoring and mitigation act i vi ti es. o Ability to produce results that are useful:(1)in identifying potential problems,(2)to decisionmakers,and (3)to the mitigation activity. o Capable of being updated quickly,efficiently,and at low cost. o Capable of being manipulated at low cost. o Relatively short processing (run)time. o Ability to create many diverse reports (output formats), o Ability to have resu1ts validated and the model calibrated. 10 With these considerations in mind,the structure for the model was developed.The general structure is shown in Figure 1.Here it can be seen that the model is composed of three main modules,each containing equati ons that compute basel i ne and IIwith-project"(constructi on and operations)projections.Comparisons of these projections yield impact projections. This general structure mirrors economic base theory,as the source of impacts rests in the economic-demographic module ,(creation of direct jobs),and these impacts are reflected in the pUblic facilities and services,and fiscal modules.New populations associated with construction workers,secondary workers,and dependents create demands on housing and public facilities and services.The budgets of local jurisdictions are impacted by these new demands. Each of the modules are discussed further in Sections V,VI,and VII, and each of the considerations presented above are addressed at appropriate places in these sections.Before proceeding on to the detailed discussions,however.it is appropriate to discuss in more detail several key considerations,including the need for computeri zati on.These are di scussed below. 2.Key Considerations a.Ability to Quantify Impacts in Detail,and for Small Geographic Areas As the nearest communities to the construction sites are quite small, and any settlement by workers would create measurable impacts,it was necessary to consider developing the capability to quantify potential impacts for small geographic areas.Based upon a review of the attributes of these communities,it became apparent that some workers, under certain conditions,would probably be attracted to,and settle in these small communities.As a result,a rather large number of small impact areas were delineated.These are shown in Table 1.A map showing the impact Areas is shown in Figure 2. 11 Figure 1 STRUCTURE OF SUSITNA MODEL Ie. I CM.rlrilJ~~ I OjJE..ro...!'Of/S I I~t-j,~L I l.::4rrj-:ICllI"l'slrvc.ft oJ (..Vo"'.J"1l ,) r 0cro.1'ofu I IA. 1:(.¥£1-,,=_f:.c,l/,.....r ~U v,ca i I&'s,/';'&I I .]-,S'1,:)£;/'(CMslr(Jc!CJ/1 I I I I O~~ra-io,,~I 16 r:-sc..a./ \1/ f?1olrJ.Ie:...ro----------.-----_.- ,I Ba..:;e.j~I:.1 '----: - -"7l c../%~/~/-s c O~j:J0S'C:J 01 -3 maJ/7 /7?O~/~~ £.a.c.;;'c..O/lIa..I/7~1~£-/7U:J...lo/1!/(~·~C/Ofi...r 0/1 de...6a..-:;£I//7£:" a-/1 /:"Ii fPr 0../'e;c.1 I)/~~a c..ls·. ~.II·..L'I /J,C!.,rj a../7 I Z E cY ~/V/1c.7"a/?C2 //'11<£a... 12 Table 1 POTENTIAL IMPACT AREAS,AND/OR WORKER TRACKING POINTS LOCAL Work sites: Work camp 1 (At Watana) Village 1 (At Watana) Work camp 2 (At Devil Canyon) .Village 2(?) Cantwell Cantwell railroad camp Cantwell community Cantwell area (Cantwell,Denali and other areas of Western Denali Highway) (not to be used at this time due to lack of baseline data) Healyarea (not to be used at this time due to lack of baseline data) McKinley (not to be used at this time due to lack of baseline data) Nenana area (not to be used at this time due to lack of baseline data) Paxson (not to be used at this time due to lack of baseline data) Trapper Creek Talkeetna Gold Creek (not to be used at this time due to lack of baseline data) Railroad communities:(not to be used at this time due to lack of baseline data) Shennan Curry Chase Chul i tna Canyon Lane Hurricane/Indian River subdivision (not to be used at this time due to lack of baseline data) Palmer Wasill a Houston Other Mat-$u Borough Surburban Rural and Remote 13 Tabl e 1 (conti nued) REGIONAL (census divisions) Anchorage Fairbanks-North Star Borough SE Fa i rbank s Seward Kenai -Cook In1 et - - Yuko n-Koyukuk Ma t-Su Borough Valdez-Chitina-Whittier Glennallen Val dez Copper Center Gulkana (Trapper Creek,Talkeetna,Palmer,Wasilla,Houston, Hurricane-Indian River,Gold Creek,Railroad commnities) Note:The model is structured to include these communities should it become necessary to conduct impact analyses for these communities. Basel i ne data woul d be required for these analyses. Note:The region will be expanded from the original ISER Railbelt region to include a portion of the Yukon-Koyukuk -census division as Cantwell and other potentially impacted communities are in this census division. 14 Figure 2 POTENTIAL IMPACT LOCATIONS IN THE LOCAL IMPACT AREA Me Kin 1ey Park Cantwell Hurrieane,~~-----r __~~~~~ Chu1 i t na -;'""7"":-=:---~~fa..J Tra pper Creek----+7~~,...._~~~~.~ Talkeetna 15 Canyon Gold Creek Sherman Curry Lane Chase r Paxson Local Impact Area Regional Impact Area I~ - ..- b.Ability to Efficiently Handle MUltiple Scenarios There are several aspects of project design and management that will affect the level,distribution,and composition of socioeconomic effects that are currently uncertain.These include: o Choice of access corridor o Transportation mode(s)and frequency for workers o Size and quality of construction camp/village o Work schedules o Local hire and training programs Additional project characteristics possibly subject to revision during detailed project design are: o Manpower requirements and timing of same o Timing of construction for Watana and Devil Canyon dams Analysis of alternative scenarios will help decisionmakers select policies,with substantial knowledge of the range of possible impacts. The model is designed to project with-project socioeconomic variables using these scenarios,and to accommodate and produce different baseline projections.Hence,ranges of potential impacts can be provided. c.Amenable to Sensitivity Analysis The model must be able to accommodate alternative assumptions concerning various economic and demographic relationships in the impact areas,and to determine the sensitivity of projections to variations in these assumptions.Some examples of assumptions are: 16 a Percent of total work force that will relocate (settle)in cOlTUTluniti es o Possible deviations from derived employment multipliers o Local supply of skilled and unskilled labor o Number of dependents per accompanied worker o Number of school-age children per accompanied worker o Attractiveness indicators for communities Determining how sensitive the results are to changes in these and other assumptions helps decisionmakers and planners prepare for a possible range of impacts.As actual data for these assumptions are obtained from monitoring local community conditions prior to and after construction begins,the assumptions can be revised.This will result in more accurate projections,and permit formulation of responsive mitigation measures. The model is designed to easily accolTUTlodate changes in assumptions in the pre-cons tructi on,constructi on,and pos t-constructi 0 n phases. d.Computer Software It was appropriate to computerize the model in view of the following needs: o Ability to efficiently handle multiple scenarios. o Amenable to sensitivity analysis. o Ability to efficiently utilize results from and provide input to the monitoring and mitigation activities. 17 f":-- - o Ability to produce results that are useful:(l)in identifying problems,(z)to decisionmakers,and (3)to the mitigation acti vi ty. a Capable of being updated quickly,efficiently,and at low cost. o Capable of being manipulated at low cost. a Relatively short processing (run)time. a Ability to create many useful and diverse reports (output formats)• The model was computerized using the Data*Model economic and financial modeling software package.It is operated on a Wang Virtual Memory computer system.It takes between two and three hours to run the Susitna impact model and generate the 50 standardized reports that were developed for it (print-out of all the results takes considerably longer).The model has been structured so that assumptions and data are easily changed and the set of alternatives can be performed effi ci entl y. The planning of a computerized economic impact model needs to take into account both hardware and software considerations.The major criteria that were used to determine the way the model would be computerized i ncl uded: 1.Ability of the computer system (hardware)to handle a very large model,in terms of both on-line computer memory and storage capaci ty; 2.Cost of development of the model; 3.Operation and storage cost; 4.Flexibility of reporting (a software consideration); 5.Operation speed (related to both hardware and software); 18 A modeling software package was chosen over the alternatives of custom programming of a model or using a timeshare statistical package for several reasons.Use of modeling software results in a lower set-up cost than the first alternative by avoiding the development time of programming,and has a lower operating cost than timeshare systems. The advanced report-writing capability of the system means that any combination of variables in the various parts of the model can be displayed in a report,and that the model and equations can be defined before all the report formats are developed.In addition,this software allows non-programmers to create and modify the model. Finally,use of in-house software and computer equipment will allow integration of the model with custom programming or statistical analysis software,as appropriate.Some speed in running the model was given up as result of the choice of using a minicomputer rather than timesharing options on a mainframe. Description of the Software Data*Model is a computerized spreadsheet program in which the data, calculations and reports are independent modules.The model can handle up to 500 time periods and 30,000 rows.Data*Model is available for approximately 12 differen~mini-and micro-computer systems.The major components of a model using this software are: 1.A Row Definition,which defines all names of data inputs, parameters and variables that are used in the model. 2.Model definition files,which store data and equations.The interrelationships of data input,parameters,and variables are defined here. 3.A Spreadsheet,the data file in which the results of the model IS calculations are stored. 19 l~': - / 4.Report formats,which store instructions for the presentation of any combination of projections (results)and assumptions.A variety of reports are generated from each spreadsheet model. Vertical report formats store instructions for the vari~bles that are to be displayed,and the order in which they will appear. -Horizontal report formats define the horizontal dimension of the reports:the time periods that are to be shown and the order in which they will appear. As Figure 3 shows,the rowname file and model definition files combine to produce a spreadsheet of all data and calculations in the model.A report is generated by specifying the spreadsheet to be reported on and the vertical and horizontal definitions to be combined.This modular structure allows an efficient way of handling multi-scenario models,in that th~data or assumptions can change without affecting the rest of the model or the structure of the reports.. Data*Model contains a number of built-in features that increase the efficiency and ease of model building and manipulation.These include (1)linking statements,which allow various modules to run automatically,in sequence,without further i'nput from the user;(2) automatic percent change calculations over time;(3)goal-seeking routine (in which a result is requested and the model calculates a component of the equation);(4)lead and lag equations,(5)routines for inflation,sums and means,accumulation of values over time,and financial routines such as depreciation,amortization,present value, etc.The equa ti ons in the model are functi.ona 11 y 1 inked. A limitation of Data*Model is its lack of sophisticated matrix handling functions,which increases its set-up cost relative to other spreadsheet programs.An equation needs to be written out for each variable and each impact area.This facet of the software was accepted as a cost that is compensated for by the speed of operation (compared 20 Figure 3 DESIGN OVERVIEW OF DATA*MODEL ECONOMIC MODELING SOFTWARE I MODEL DEFN.I 1------------------1 I DATA I I &I I COMPUTATIONS I ,:' N ........ I I ROW DEFINITIONS 1---->1 I I I I ROWS I I I I I V SPREADSHEET I i DATA I I ---~--------------------------------- I I ------------------------------I I HORIZONTAL REPORT FORMAT I ------------------------------ I I V V I V R D I lEE E I I R P F I I ITO I 1----->1 I I R N I I leT I I I I A T I I I L I I I I 0 I I I N I I REP 0 R T -------------------------------~---- " ,~ -, - to other modeling programs),the flexible reporting options,and the abi1 ity of the system to .hand1 e the 1arge number of equations and impact areas.Its effects were mitigated by use of a custom program which facilitated the copying and editing of groups of row definitions and equati ons. e.Ability to Create Many Useful and Diverse Reports (output formats) As discussed above,the reporting flexibility of the model is substantial.The reports now being generated by the model are intended to meet most of the decisionmakers'needs.However,it is probable that additional reports will be required or desired.Because of the reporting flexibility.these reports will be available quickly and at low cost. The model currently produces reports that compare conditions with the project during the projection period (1985-2005)to projected conditions without the project,rather than to current conditions. This is an important distinction for two reasons.First,the magnitude of population influx and other effects related to the project need to be evaluated in light of the size of population (and other variables) that would be in the impact area in the absence of the project. Second,because many of the impact areas are expected to grow and change rapidly over the next 20 years,whether the project occurs or not,comparison of the "with project"scenario to current conditions would be misleading. In the areas of housing and pUblic facilities and services,the model also compares total demands with the project to the "capacity of the communities to fulfill these demands. 22 V.ECONOMIC-DEMOGRAPHIC MODEL The economic-demographic (E-D)module calculates the impacts of the project on population,employment,and housing,by impact area and year,and provides detailed population influx and efflux information to the public facilities and services,and fiscal modules.This information is used in these modules to determine impacts on pUblic facilities and services,and local jurisdictions!expenditures and revenues.Input information,and information concerning impacts,is provided by year and by impact area to help local jurisdictions with mitigation planning. In response to FERC's requirements and needs,and the needs of the APA and local jurisdictions,the module also provides detailed information on employment,payroll,spending,and settlement patterns of the direct construction work force.For example,this information includes employment by residence and by year,payroll by labor category and year,spending patterns of construction workers by year for selected impact areas,and demand for housing,by impact area and by year. The general structure of this module is shown in Figure 4.Here it can be seen that the module produces both total and direct impacts. Another important feature,implicit in Figure 4,is that direct construction employment is separate from indirect construction-induced employment (i.e.,secondary employment generated by direct construction activity and employment),and that contruction employment is separate from the operations employment.This allows for more detailed impact projections and assessments,and is methodologically superior to a more aggregated treatment of the work forces. The general method for projecting total project-related employment,and total in-migrant workers and population,is shown in Figure 5.Here it can be seen that the number of direct and secondary jobs created is a function of (1)direct manpower requirements and (2)the number of secondary jobs created by the direct construction jobs.Employment multipliers were used to estimate these secondary jobs (see Section V-C-l ). 23 .~ .Figure 4 STRUCTURE OF ECONOMIC/DEMOGRAPHIC MODULE .-8a..$~i=..r.s I ~4~. B ~LJ."'!.+ J~.fJr 6,jLC f.. Co /t oS .;,'"c 1.011 2k h f"r!.r£cf (QII 26 2!.'"Rv I:cf.K~Ia{£/' 0r,£r (I,.:I,~t1.r :?,{ 'I.2t'8~.rc:.j,~,£,+ , I O,r<-c.f p(v~(. H 2.1 .!f).r~Co .f>! I PrIJjL ,-1-RL/a..I.t.J.Ii"'"'>j 2: f/oasing Supp/lt 2" (c C'/1 -Ierr Is of 2a.·2 f) !;pa c r .£,!'ornr ",I ~,.,Lc",!a.,,.,<I / PafJU /a.-l 011 ~~fJlojnr['/71 !lO(/S~ £c.0/71 £., 24 Ouo..~/'lo..l'v, bjJr-.£.-S..s/0~0 r ~ea.r-I.s %/:<c r-!:0.-':~_Or;<-, 8a."J"!:-j~~ ~c..r"'[,.a...s c:...OJ!!or (]a.-oS ,£//1 l:.//l ;[/0... Cc.~a CI ij 1/It /z 0.1 Q rr !JI..slrI6",/;·o//,of ;[;rcn:.o...sL ,Dv~Cc:::.Jra..~j,Co. LJ..--.....,~ I t ! 1'L.-1 _ I I I ~ 1\ t I I i z 0-~et: -.J :::lc.. 0c.. 0 %c::r:: ~ Z L.U ~» 0 ....Ic.. ::E: UJ Q L.U I-c::r:: -.J L.U l.(l ex ClJ 0s..% ::l c::r:: O'l ~ ~U L.U '-::l 0exc.. 25 f'- The total number of in-migrant workers is simply total direct manpower requirements less the number of jobs filled by local residents,plus the number of secondary jobs that are not filled by local residents. Total in-migrant population is calculated by applying a dependents per i n-mi grant worker val ue to the di rect i n-mi grant workers,and addi ng this to the in-migrant secondary population.This population is calculated by applying a persons per household value to the in-migrant secondary work force. Total in-migrant population is compared to baseline population projections to arrive at total impacts,as indicated in Figure 5. Similarly,direct project-related population is compared to baseline population projections to arrive at direct impacts of the project. The techniques used to make baseline projections are discussed in the next section.This discussion is followed in subsequent sections by presentati ons of techni ques used to make lIwi th projectll projecti ons. A.Baseline Projections Figure 6 displays the structure of the baseline projection portion of .the economic-demographic module.The approaches and projection techniques used are discussed below. 1.Employment Baseline projections for employment in the Railbelt region and its tilree subareas,Anchorage,Fairbanks and the Valdez-Chitina-Whittier census division (see Figure 2),were generated by the Institute of Social and Economic Research's (ISER's)Man-in-the-Arctic-Pl"'ogram (MAP) econometri c model (September 1981 ).Thi s madel was also used for the determination of the need for energy during the projection period.As additional data from the MAP model is made available,baseline projections can be updated. 26 t 1 .~ -~~~~~~-...:::"t: ~t ~ 'll '\.J., V,~ ~~ ~f'"'""~.., ~.... ~-..;:.~" ",I(;.""~ -7 ~~~~~~~Q ~......\j ~0 t ~~~<!~Qi:- ~M~~v...,;l ~ rt 1 ~~ ~., )'"'0"1..~~ ~ ·1 ...,~~Io,j-::os,~.-~~~~::> 'd'"~ ~"}:,, .......(}~."~ 27 I-z: lJ.J ::E >-V) 0 :z: -l 0a..I-< ::E:I- lJ.J Uw \.0 ~'""J Z 0 (J)0 c::: l-e... ::l I- O"l c:e:C.!:l.,...-l Z l.J....:::J I-< a..V) 0 ::::la..0 :::I: LWz:~ ......I lJ.J Vlc:e:c::: ,fi!JflIllil1 - -I I~ Frank,Orth &Associates t Inc.used ISER's projections as the basis for the employment projections for the various census divisions that comprise the Anchorage and Fairbanks subareas (Anchorage/Kenai~Cook Inlet/Seward/Mat-Su Borough,and Fairbanks-North Star/Southeast Fairbanks,respectively).These were calculated from ISER's subarea employment projections using several steps: 1.A time series of employment in each census division was co 11 ected for 1964-1980).These data were deri ved from unemployment insurance records collected by the Alaska Department of Labor.They are considered to be the most consistent and accurate 'series of statistics on employment in Alaska.The major limitations of the series are that (1) employment is listed by place of work rather than place of residence;and (2)the figures do not include workers who are not covered by unemployment insurance. 2.The percentage that each census division in the Anchorage subarea and Fairbanks subarea represented of total employment in that subarea was calculated annually.In general,the trends in employment were relatively stable t with the Mat-Su and Kenai census divisions increasing their percent shares of the Anchorage subarea slightly during the 1970's. From these numbers t percent change in the percent shares was also calculated.For each ~ensus division,a trend analysis of the increase in percent share over time was performed,which yielded the average increase or decrease in percent share for that census divi sion. 3.Based upon the assumption that these historical trends will continue,the average increase in percent share was applied to the 1980 figure to obtain a set of projections of percent share of employment for each census division for the years 1981 through 2005 (see Table 2). 28 Tab 1e a PROJECTED PERCENT SHARE THAT CENSUS DIVISIONS WILL REPRESENT OF EMPLOYMENT IN THE ANCHORAGE AND FAIRBANKS SUBAREAS* Percent of Employment In Percent of Employment In Anchorage Subarea Fairbanks Subarea Kena i-Ma t-Su Fa i rbanks Southeast Anchorage Cook In 1et Seward Borough North Star Fa i rbanks 1981 87.0 7.7 1.5 3.6 95.4 4.6 1982 86.8 7.8 1.5 3.7 95.4 4.6 1983 86.7 7.9 1.5 3.8 95.4 4.6 1984 86.5 7.9 1.5 3.9 95.4 4.6 1985 86.3 8.0 1.5 4.0 95.4 4.6 1986 86.2 8.1 1.5 4.1 95.4 4.6 1987 86.0 8.2 1.5 4.2 95.4 4.6 1988 85.8 8.3 1.5 4.3 95.4 4.6 1989 85.6 8.3 1.5 4.4 95.4 4.6 1990 85.5 8.4 1.5 4.4 95.4 4.6 1991 85.3 8.5 1.5 4.5 95.4 4.6 1992 85.1 8.6 1.5 4.6 95.4 4.6 1993 85.0 8.7 1.5 4.7 95.4 4.6 1994 84.8 8.7 1.5 4.8 95.4 4.6 1995 84.6 8.8 1.5 4.9 95.4 4.6 1996 84.5 8.9 1.5 5.0 95.4 4.6 1997 84.3 9.0 1.5 5.1 95.4 4.6 1998 84.1 9.1 1.5 5.2 95.4 4.6 1999 83.9 9.1 1.5 5.3 95.4 4.6 2000 83.8 9.2 1.5 5.3 95.4 4.6 2001 83.6 9.3 1.5 5.4 95.4 4.6 2002 83.4 9.4 1.5 5.5 95.4 4.6 2003 83.3 9.5 1.5 5.6 95.4 4.6 2004 83.1 9.5 1.5 5.7 95.4 4.6 2005 82.9 9.6 1.5 5.8 95.4 4.6 *As defined in the Institute of Social and Economic Research's Man-In-the-Arctic economic model. 29 .- 4.These percent share projections were then multiplied by ISER's employment projections for the Anchorage and Fairbanks subareas to obtain projections of employment,by place of employment,for each census division. Employment data for the communities of the Mat-Su Borough are not reliable,due to data collection and reporting problems.Thus, employment was not projected at the community level. 2.Population The methodology used to project population in the various impact areas, without the project,is similar to the employment methodology listed above.Baseline population was projected independently of the employment projections as a result of the need to disaggregate the regional trends to smaller areas.In these census divisions and communities,population and employment trends differ significantly. Baseline projections of population in the Railbelt region and the three subareas of Anchorage,Fairbank's and the Valdez-Chitina-Whittier census di vi si on were genera ted by the MAP model (September 1981).As additional data from the MAP model is made available,these projections can be updated. Population projections for the various census divisions that comprise the Anchorage and Fairbanks subareas (Anchorage/Kenai-Cook Inlet/ Seward/Mat-Su Borough,and Fa i rbanks-North Star/Southeast Fa i rbanks, respectively)were calculated from the population projections for the subareas using these steps: 1.A time series of population in each census division was collected for 1964-1980.These data are mostly derived from U.S.Bureau of the Census data.The Mat-Su Borough data included data collected in annual surveys conducted by the Mat-Su ~orough Planning Department.As a result of the rural and rapidly increasing population in the Borough,it was believed that the Planning Department's surveys were more accurate than U.S.census data. 30 2.The percentage that each census division in the Anchorage subarea and Fairbanks subarea represented of total population in that subarea was calculated annually.In the Anchorage subarea, the figures showed that the percent shares of population accounted for by Mat-Su Borough and the Kenai-Cook Inlet areas have increased rapi dly,whil e the percent share of the Municipality of Anchorge has declined. From these numbers,percent change in the percent shares was also calculated.For each census division,a linear regression of the increase in percent share over time was performed,which yielded the average increase or decrease in percent share for that census division. 3.Based upon the assumption that these historical trends will continue,the average increase in percent share was applied to the 1980 figure (or 1981 for the Mat-Su Borough)to obtain a set of projections of percent share of population for each census division for the years 1981 through 2005.These are displayed in Tabl e 3. 4.These percent share projections were then multiplied by ISER1s population projections for the Anchorage and Fairbanks subareas to obtain projections of population,by place of population,for each census division. 5.Population projections for several of the communities of the Ma t-Su Borough were cacul ated separately.Annual growth rates were projected for the future based on historical growth rates and the changing population distribution patterns in the Borough.These growth rates are displayed in Table 4. As a result of this methodology,both (1)the population increase based on historical trends and (2)the population increase related to economic development are taken into account.ISERls regional and subarea projections explicitly 31 - Table ~ PROJECTED PERCENT SHARE THAT CENSUS DIVISIONS WILL REPRESENT OF POPULATION IN THE ANCHORAGE· AND FAIRBANKS SUBAREAS* Percent of Population In Percent of Population In Anchorage Subarea Fairbanks Subarea Kena ;-Mat-Su Fairbanks Southeas t Anchorage Cook Inlet Seward Bqrough North Star Fa i rbanks --1981 78.4 10.3 1.3 10.0 91.2 8.8 1982 77.8 10.4 1.3 10.4 91.2 8.8 1983 77.2 10.6 1.3 10.9 91.2 8.8 1984 76.6 10.7 1.3 11.3 91.2 8.8 1985 76.a 10.8 1.3 11.8 91.2 8.8 1986 75.4 11.0 1.3 12.2 91.2 8.8 1987 74.8 11.1 1.3 12.7 91.2 8.8-1988 74.2 11.3 1.3 13.1 91.2 8.8 1989 73.6 11.4 1.3 13.5 91.2 8.8 1990 73.0 11.6 1.3 14.0 91.2 8.8 1991 72.4 11.7 1.3 14.4 91.2 8.8-1992 71.7 11.9 1.3 14.9 91.2 8.8 1993 71.1 12.0 1.3 15.3 91.2 8.8 1994 70.5 12.2 1.3 15.8 91.2 8.8 ""'"1995 6 9.9 12.3 "1.3 16.2 91.2 8.8 1996 69.3 12.5 1.3 16.7 91.2 .8.8 1997 68.7 12.6 1.3 17 .1 91.2 8.8 1998 68.1 12.8 1.3 17.6 91.2 8.8 1999 67.5 12.9 1.3 18.0 91.2 8.8 2000 66.9 13.1 1.3 18.5 91.2 8.8 2001 66.3 13.2 1.3 18.9 91.2 8.8 2002 65.7 13.4 1.3 19.4 91.2 8.8 2003 65.1 13.5 1.3 19.8 91.2 8.8 2004 64.5 13.7 1.3 20.3 91.2 8.8 2005 63.9 13.8 1.3 20.7 91.2 8.8 ,.....*As defi ned ;n the Insti tute of Soc;a1 and Economic Research's Man-In-the~Arctic economic model. 32 Table 4 ASSUMPTIONS FOR BASELINE POPULATION GROWTH RATES FOR SELECTED CO~l~IUNITIES LOCATED NEAR THE PRC11ECT SITE ) Community 1981-1990 1991-2005 Pa 1mer 6.5%3.5% Wasi 11 a 7.5%7.5% Houston 10.0%10.0% Trapper Creek 4.0%4.0% Ta 1keetna 5.0%5.0% Cantwell 2.0%2.0% 33 included assumptions on economic development scenarios and the percent share metho~ology reflects the trends in the distribution of growth within the region. 3.Housi ng Projections of housing demand were calculated for each of the communities likely to be affected by the project and for the Railbelt region as a whole.Housing demand was ca1cuated by applying population-per-household projections (see Table 5)to the projected populations of each community and census division.The population-per-household measures were assumed to decline gradually over time to converge with the national and state averages.'These measures were dervied from the ISER study of the need for power in the Railbelt (Goldsmith and Huskey.1980).In the ISER model,average population per household is estimated to decline by 20 percent over the next twenty years,and is consistent with the projected decline in the national level. Current housing supply estimates were obtained from the U.S.Census Bureau (1980)and community surveys where available.Housing stock was assumed to increase in direct proportion to the growth in the number of households.Baseline housing supply was projected by multiplying the number of households by an assumed average vacancy rate of five percent.The exception was the area of the Mat-Su Borough outside the incorporated communities,for which it was assumed that the vacancy rate (25 percent in 1981)would'fall over time. No di fferenti ati on among types of housi ng was made,and the timi ng of housing construction was not estimated.These simplifications were appropriate for the following reasons.The Mat-Su Borough is increasingly becoming a bedroom community in which single family dwellings on plots of an acre or more predominate.As a result of the large population increase expected in the Mat-Su Borough in the next twenty years,with or without the project,it is Hkely that there will be a continuous need for new housing,fueled by increasing demand.In many of the communities closest to the project,there is currently very 34 TABLE 5 POPULATION-PER-HOUSEHOLD ASSUMPTIONS Ma t-Su Trapper State Borough Creek Talkeetna Cantwell Palmer Wasi 11 a Houston 1981 a 3.073 3.270 3.300 3.300 2.750 3.153 3.127 2.900 1982 3.064 3.240 3.269 3.269 2.741 3.128 3.103 2.885 1983 3.053 3.210 3.238 3.238 2.733 3.103 3.079 2.871 1984 3.040 3.180 3.207 3.207 2.725 3.078 3.055 2.856 1985 3.041 3.150 3.176 3.176 2.717 3.053 3.027 2.842 1986 3.031 3.121 3.144 3.144 2.709 .3.028 3.008 2.828 1987 2.998 3.091 3.113 3.113 2.701 3.003 2.984 2.813 1988 2.960'3.061 3.082 3.082 2.693 2.978 2.960 2.799 1989 2.932 3.031 3.051 3.051 2.685 2.953 2.936 2.785 1990 2.900 3.002 3.020 3.020 2.677 2.929 2.912 2.770 1991 2.876 2.972 2.989 2.989 2.669 2.904 2.889 2.756 1992 2.849 2.942 2.958 2.958 2.661 2.879 2.865 2.742 1993 2.824 2.912 2.927 2.927 2.652 2.854 2.841 2.727 1994 2.801 2.883 2.896 2.896 2.644 2.829 2.817 2.713 1995 2.777 2.853 2.865 2.865 2.636 2.804 2.793 2.699 1996 2.754 2.823 2.834 2.834 2.628 2.779 2.770 2.684 1997 2.731 2.793 2.803 2.803 2.620 2.754 2.746 2.670 1998 2.707 2.764 2.772 2.772 2.612 2.730 2.722 2.656 1999 2.682 2.734 .2.741 2.741 2.604 2.705 2.698 2.641 2000 2.657 2.704 2.710 2.710 2.596 2.680 2.674 2.627 2001 2_.637 2.674 2.679 2.679 2.588 2.655 2.651 2.613 2002 2.617 2.645 2.648 2.648 2.580 2.630 2.627 2.598 2003 2.597 2.615 2.617 2.617 2.572 2.605 2.603 2.584 2004 2.577 2.585 2.586 2.586 2.564 2.580 2.579 2.570 2005 2.556 2.556 2.556 2.556 2.556 2.556 2.556 2.556 a.Matanuska-Susitna Borough Planning Department,1981. 35 r little vacant housing available to support a sizable increase in population.Housing distribution within communities,the types of housing that will be constructed,and the speed with which the supply of housing will respond to or anticipate the demand can only be guessed at,and this was complicated by the long time frame for the project and the impact model. Thus,it was felt that detailed projections of housing supply would be of limited usefulness due to the expected large changes in the housing market in the local impact area and the uncertainty surrounding any set of assumptions.In this model,the emphasis of the determination of project-related effects on housing is placed on the effects that the project will have on the demand for housing.Housing supply will be addressed by the community and household monitoring program. B.Direct Work Force 1.Work Force Requirements a.Annual Work Force. Estimates of work force requirements for the project,by trade and by year,were obtained from the project engineers (Acres American,1981). The estimates include all manpower required for the construction of the access road and camp/village;power facilities and transmission facilities;and all management,adminstrative.and operations personnel.Manpower for off-site activities such as procurement, manUfacturing,shipping and a portion of the engineering staff are not included in these estimates.The different types of workers are added up into three labor categories -laborers,semi-skilled/skilled and administrative/engineering,and total work force by year is al so calculated. Construction of the first phase of the Watana dam will require a signi fi cantly greater number of workers than both the second phase of Watana and construction of the Devil Canyon dam.This difference can 36 be attributed to the additional labor requirements in the initial years for construction of the work camp and village,the access road and to the more labor-intensive nature of a gravel-fill dam (Watana)than a concrete arch dam (Devil Canyon). b.Accommodation of Changes in Manpower Requirements and Construction Schedules. In the model,the construction and operations work force requirements, by trade (such as carpenter,millwright,ironworker,plumber,etc.)for each dam,are entered separately.This will facilitate adjustment of the model if the size of the work force changes,if the trade mix is altered,or if the schedule for either or both of the dams is changed. c.5easona 1i ty • The demand for constructi on manpower wi 11 vary duri n9 any gi ven year. Monthly manpower requirements are calculated by the model using the following steps: 1.The percentages of the total yearly work force that will work in' each month were projected.These percentages are displayed in Table 6.The model was designed to accommodate different seasonality assumptions for the major labor categories,if appropriate. 2.For each labor category,the number of workers in each year are multiplied by the percentages for each month to yield the numbers of workers in that labor category needed in each month. 3.For each month,the number of laborers,semi-skilled/skilled and adminstrative/engineering personnel are added to obtain the total construction work force needed per month. 37 .- r 'fable 6 SEASONALITY OF PROJECT EMPLOYMENT: PERCENTAGES OF PEAK ANNUAL CONSTRUCTION WORK FORCE THAT WILL BE EMPLOYED IN EACH MONTH January 30 % February 31 % March 43 % Apr;l 66 't May 72 't June 87 't July 99 % August lOa 't September 90 % October 69 % November 51 % December 35 % 38 .... ! !~' .- 2.Origin and Settlement Patterns a.Overvi ew This portion of the module addresses four basic questions: o From where do the direct workers originate? o Which direct workers settle in the local communities? o Where do the in-migrant direct workers settle? a How many in-migrant workers leave when they are no longer employed on the project,and when do they leave? This portion of the module is a critical part of the model because it largely determines the magnitude and geographic distribution of the project1s impacts.For this reason,special care has been taken to structure this portion to allow for quick and efficient analysis of multiple scenarios,and sensitivity analysis of key assumptions. The methodology used to project settlement patterns for the work force is diagrammed in Figure 7.Here it can be seen that,in general.only married workers are expected to relocate their permanent residences (The model has been structured to also account for single workers who may relocate their residences).It can also be seen that the magnitude of in-migration by married workers is expected to be influenced by several major factors.These include: o place af origin o labor category a attractiveness of the work camp o leave schedules (days on and days off-work) a access carri dor/mode of transportat;on 39 Figure 7 METHODOLOGY USED TO PROJECT SETTLEMENT PATTERNS OF DIRECT WORK FORCE ));("€c-f WOfK.ot'f..;Z.. 6y: •~)4t:-e...O~Or~(t.e. •t-~bo~ea-fe!pY'( ,At!(,(Y I'1e4 WOr'k f v.::r ·~,jty,W,."to Altt>r~.Jr C~V'IUJ1/ly 7 Re)od,~;)f.Uor/(IU';J i J-Y1 C~t.e-or }r,mJ~f UJ"yt(U,f'1'l1" I....:r ").....;..../(~I-J....L:;;J':-r·.J'-'-{/.-.- K.;I;;c:.f:'J ~{/CJY",(."-'S tis J ~Cf C1~u'f /;106(/ /-./ *The work camps are currently planned to accommodate all workers.Single and married workers will have a strong incentive to relocate if the camps are not large enough to accommodate all 40 workers. 40 -, Assumptions concerning the last three of these factors can be varied to provide socioeconomic input to the work force and project access analyses that will be conducted by the Power Authority. Further,it can be seen in Figure 7 that the distribution of inmigrant workers to impact areas is projected using a gravity model.Travel time or cost of travel to the work sites,relative attractiveness of communities as places to live,and other factors are incorporated into this model.This model is designed to address several of the work force and project area access issues that will be consi dered by the Power Authority,including the transportation and access corridor/mode of transportation options. In reviewing Figure 7,it should be noted that workers will relocate to local communities temporarily or permanently if the work camp is not large enough to accommodate all single and married workers.In this case,single as well as married workers that cannot be accommodated will relocate to the community located nearest to the work camp that can accommodate additional residents. The following sections prOVide more detailed descriptions of the methodology outlined in Figure 7.Assumptions and methods concerning outmigration of workers are provided at the end of Section Y-B-2. b.Origin of the Direct Workforce The technique for estimating the origin of the direct work force is shown in Figure 8.Here it can be seen that the direct work force trades data was aggregated over trades into labor categories (Laborers, Semi-skilled/Skilled and Administrative/Engineering).Next, assumptions regarding the percentage of workers in each labor category that would originate from the Railbelt Region,other parts of Alaska excluding the Railbelt Region,or outside of Alaska were developed. Assumptions for the proportion of workers that will originate from (a) the Railbelt Region,and (b)other parts of Alaska excluding the .Railbelt Region,were based upon analysis of unemployment d~ta for the 41 ~~~-\~.,~~'<),-~~" / ,"<.':~-...::: OJ ~ ,"~~~,,''\ """~,J......'V; '10.- ~--:'--<?l,- "\,~ i~~ I I I IL..,,"'; \~'<! .~ .~ I a "-:~ -,;.,01 '/\ ,,'-,!~ L ~: ~---- wuc::: 0 t.L., ~c::: 0 3: CO z 0 (I)...... S-I- ::::l U C'l :::la::: '-"-l- V! Z 0 U I- U Wa:::...... 0 ~/ / \.{I <')1 I __,__"....I 42 "... /,,'''vt trades,and discussions with labor union business managers,Alaska Department of Labor economists,and construction contractors.Current and probable future availabilities for workers were approximated,and compared to direct work force requirements.Based upon these comparisons,the amount of labor,by labor category,that would be supplied from each of the three areas was estimated.These estimates (ori gi n assumpti ons)are as foll ows: Work Force Origin Assumptions Railbelt Region Other AK Outsi de AK Laborers 85%5%10% Semi-skilled/skilled 80 5 15 Administrative/Engineering 65 5 30 The model is structured to allow for sensitivity testing of these assumpti on s. The amounts of labor that will originate from the census divisions of the Rail bel t Regi on and sel ected convnuni ti es/cities of the Ma t-Su Borough and Cantwell were,al so estimated.These estimati ons were made by assuming that project employment will be distributed among census divisions based,in part,upon each census divisionis average share of total construction employment in the Rai1belt Region during 1979 - 1981.These shares were adjusted to reflect the census divisionis proximity to the construction sites relative to other census divisions.The shares (origin assumptions)are as follows: Assumptions on Work Force Origin Within the Railbelt: Anchorage: Ma t-Su Kenai-Cook Inlet Seward: Fai rbanks S.E.Fa i rbanks Valdez-Chitina-Whittier Yukon-Koyukuk 43 55.9% 6.7 11 .1 0.2 2:1.8 0.2 2.1 (to be determined in coordination' with the above shares) Direct employment was estimated for residents of selected Mat-Su Borough cities/communities based upon each city/community's recent average share of total population in the Borough.Trends in population shares were also taken into account in making initial estimations of city/community shares of the Borough's direct project employment. Population data were used in lieu of employment data because employment data are not available for most cities/communities. As with the census divisions,these shares were adjusted to reflect a city/communityi s proximity to the construction sites relative to other cities/communities.The shares (origin assumptions)that were used are as follows: Assumptions on Work Force Origin Within the Mat-Su Borough: Palmer Wasilla Houston Trapper Creek Talkeetna Other Mat-Su Borough Suburban Rura~an~remote l~ 8 5 1 4 72 Both Mat-Su city/community share assumptions and census division share assumptions can be easily altered for sensitivity testing. c.Residency and Movement of Direct Workers The direct construction work force will be composed of single and married workers (the latter category includes cohabitants that are not married).It is assumed that none of the single workers will choose to relocate their permanent residence closer to the construction sites. Instead,the single workers will reside at the camp/village while at· work,and maintain their original permanent residences.The only exception to this pattern will occur if the camp is not large enough to 44 .- ! accommodate all single workers that need housing.In this case,it is assumed that some of the single workers will seek temporary housing,or establish pennanent residence,in nearby cOrmlunities.Because single workers will generally not relocate,they are handled separately in this part of the model. In contrast,it is assumed that some of the married workers will choose to relocate their permanent residences closer to the construction sites (though they themselves will remain at the work camp during the week). Married workers will also have an additional incentive to relocate if the camp cannot accommodate all marri ed workers. i.Relocation of Married Direct Workers Numbers of Workers That Will Face the Relocation Decision The first step to estimating the number of married workers who will relocate to cities/communities is to determine the total number of married workers.This is done using single:married data from other projects (U.S.Army Corps of Engineers,1981).Next,married workers are allocated to the three labor categories using the labor category multipliers discussed above.It should be noted that the single:married ratio,and the labor category multipliers can be adjusted to provide for sensitivity testing. Workers who will be confronted with the relocation decision will be those for whom there is no room at the village.It was assumed that housing would be available at the village for the engineering/administrative (E/A)and semi-skilled/skilled (5-5/5) workers and their families.The available housing will be split -unequally between these labor categories,with more of the housing available to the E/A workers.The model is structured to allow for adjustment of the shares of housing availabl e at the village for each of these labor categories. 45 Once these E/A and S-S/S workers are subtracted from total married workers.the number of workers who are confronted with the decision to relocate to cities/communities.remains.The next step is to apply the origin multipliers discussed above to each labor category.This calculation provides the number of married workers, by place of origin (Railbelt Region,other parts of Alaska outside of the Railbelt Region,and outside of Alaska),that face the relocation decision. Number of Workers That Will Relocate The number of workers that will relocate is estimated according to workers'place of origin and labor category.It is assumed that both these factors will influence the relocation decision.Place of origin is important because it affects travelling time;labor category may also affect the magnitude of inmigration because the number of workers who have dependents and the average duration of employment may vary by 1abor category. In addition,the attractiveness of the camp and village,leave schedules,and access corridor/mode of transportation may influence workers 'incentives to relocate.As the attractiveness of the camp and village increases,the incentive to relocate should decrease. As leaves become more frequent,or the time/cost of travel increases,the incentive to relocate (or obtain temporary housing) will become greater. Accordingly,unique relocation multipliers can be assigned to workers from each place of origin and labor category.The model is structured to allow for adjustments in camp and village attractiveness,and leave schedules. The projected number of relocating workers,by place of or1g1n and labor category,is calculated by applying the relocation multipliers to the number of workers who face the relocation decision.These workers have the option to relocate to the Railbelt Region,and census divisions and cities/communities therei n. 46 ;~, Geographic Places of Relocation It is difficult to accurately predict where workers will settle. They wi'll consider a myriad of things when they make their deci si ons-. Recognizing that it is not possible nor appropriate to try to account for all factors that workers may consider.the approach is to focus upon the most likely factors.After reviewing the socioeconomic literature.and analyzing the situation in the Railbelt Region.the attractiveness indicators listed below were determined to be the most r~levant for that segment of the Susitna work force that will consider relocating. Community Attractiveness Indicators Housi ng School s Public Facilities and Services Wholesale/Retail/Finance,Insurance.Real Estate/Services (number of establishments or employment) Land available for development The previous version of the model considered the above indicators in an informal way.Workers were allocated to communities based upon judgement.With a growing need to take into account alternative assumptions,it was decided to allocate workers in a more systematic and explicit manner. To systematically apply these indicators (decision criteri a), incorporate other important factors,and to be able to perform sensitivity analysis,it was decided to create an equation whose parameters and vari ab 1es coul d be easi 1y manipul ated.The attraction-constrained version of the gravity model was chosen over more complex formulations,such as capacity-constrained and linear programming (lP)models,for two reasons:(1)considerably more 47 data would be required for the more complex formulations, particularly for the LP model (these data are not now available, and would only be available at substantial cost);and (2)the simpler formulation can predict quite well magnitudes and locations of demand that are important for planning. The equation that incorporates the indicators is: -aTij=Bj OJ Wi di j (Stenehjem and Metzger,1980), where: T..=Number of workers that are predicted to settle inlJ place i and commute to work site j (j =Watana or Devil Canyon). Bj =A constant scaling factor that constrains the total number of workers commuting from alternative communities to the number of jobs that these workers fill at the work site -a )-1(~T ..=D.).B.={<W.d ..D..•lJ J J L..1 lJ J(...:; O.=Number of workers that are predicted to relocate. J Wi =Measure of the attractiveness of a community as a place to settle;this measure is,itself,the result of a calculation in which the community IS rating on each attractiveness indicator is weighted and tallied.The following weights are used: Community Atractiveness Indicator Housing Schools Public facilities and Services Whol esal eiRe tail/FI·RE/Servi ces Land available for development 48 Wei ght 3 2 2 2 1 ,~. Each indicator.is weighted according to its perceived importance relative to another indicator.These weights will remain constant in all applications of the model.An ordinal 'scale of 1 -5 will be used to rate the attractiveness of an indicator in one place relative to that same indicator in anoth~r place. dij =Mean transit time from community to work site (an average of the winter and summer transit times).Note:Mean transit time could be replaced by out-of-pocket travel expenses,where dij could become e-aCij (C =out-of-pocket travel expenses). a =Weighting factor attached to the mean transit time measure.Note:"a "becomes larger as the worker gains more opportunities to leave the camp (e.g.,more frequent leaves, or more liberal camp rules).Also,as cross-sectional data for Tij ,Wi'and dij become available,the parameter "a " can be more accurately calibrated through the use of regression analysis.It will also be possible to assess the statistical significance for alternative values for a. The following assumptions will be used in the implementation of the model: Travel time to the work site:workers will prefer to minimize travel time from their residence to the work site.Places with lm~er transit times to the work site will be preferred over those with higher transit times. Cost of travel to the work site:workers will prefer to m1n1m1ze the cost of travel from their residences to the work site. Places with lower costs of travel to the work site will be preferred over those with higher costs of travel. Leave schedule:as leaves become more frequent,places located closer to the .work site will be preferred over those located farther away. 49 As data on project-related population change in the various communities becomes available (through the monitoring program),the above equation may be modified with the intent of improving the accuracy of settlement projections. The gravity model will be used to project settlement for: -Workers who originate from other parts of Alaska,and outside of Alaska.These workers may relocate to Anchorage, Fairbanks,Mat-Su (and cities/communities therein), Yukon-Koyukuk (and cities/communities therein),and Val dez-Chi ti na-Whi tti er (and ci ti es/communiti es therei n) census divisions. -Workers who originate from Anchorage,Kenai-Cook Inlet,and Fairbanks census divisions.These workers may relocate to the cities/communities of the Mat-Su and Yukon-Koyukuk census divi sions. ii.Relocation of Single and Married Workers (Special Case) As discussed earlier,single and married workers may live in nearby co~munities if the camp does not have enough capacity to accommodate all workers.In this case,the single-to-married ratio is applied to the number of workers that cannot be accommodated at the camp,to obtain numbers of single and married workers that must find accommodations elsewhere.It is assumed that these workers seek housing in the nearest community. The origin and labor category multipliers are applied to these temporarily or permanently relocating workers to obtain information that is necessary for worker tracki ng purposes.In addi ti 0 n,an estimate is made for the percent of married workers who will choose to have their dependents accompany them to their place of relocation. This information is used in the population influx calculations discussed in Section V-B-3. 50 (~, -( The total number of married workers,used as the starting point for projections in the general case (discussed in section i.above ),is diminished by the number of married workers that cannot be accommodated at the camp.This is done to avoid double-counting. d.Ou tmi grati on of Workers It is assumed that a percentage of the inmigrant workers that are no longer employed on the project will choose to move due to lack of employment opportunities or other factors.The model has the flexiblity to move these inmigrant workers from their places of relocation in any given year,and at any given rate. Currently,it is assumed that50~of the workers who in-migrated·from outsi de of Al aska,or from other parts of Al aska outsi de of the Railbelt Region,and lose their employment on the project,will out-migrate.They wi'l1 leave their places of relocation and return to their original place of residence or go elsewhere in search of employment. On large projects in the lower 48 states,an average of about 30-40 percent of the workers who completed their employment on projects chose to remain at their places of relocation.The percentage is assumed to be hi gher for thi s .project because it is expected that workers wi 11 stay in the area after construction on Watana ends,hoping to obtain employment on the Devil Canyon Dam during 1994-2002.After 2002,it is expected that a large number of these workers will choose to remain in the area because by that time they will know about job opportunities in the area and will have an attachment to the area. It is assumed that workers who relocated from areas of the Rai~lbe1 t· Region to pl aces closer to the work sites,do not outmigrate when'their employment of the project ends.Instead.these workers remain at their places of relocation and search for new employment. 51 3:Population Calculations The cumulative population influx into each impact area is calculated in the model as a function of :(1)the cumulative number of in-migrating direct workers;(2)the percentage of those workers that are assumed to be accompanied by dependents;and (3)the average number of dependents per accompanied worker. It was assumed that 100 percent of the direct workers who relocate to the Railbelt region will be accompanied by dependents (The model is now structured to allow this percentage to vary).Since housing will be provided on-site,there will be little incentive for most single workers who come from outside the Railbelt region to establish residences in a nearby community.On the other hand,in-migrating direct workers with families who cannot obtain family housing on-site will be more likely to desire housing for their dependents in the region.It should also be noted that a large percentage of the work force for this project will be skilled tradesmen,and such workers are more likely to have families than unskilled construction laborers. This assumption can be easily changed in the computerized model,for sensitivity analysis purposes. An assumption of 2.11 dependents per accompanied construction worker was used to calculate the population influx associated with the direct work force.This figure is an average derived from a survey of constructi on projects throughout the United States that was performed for the U.S.Corps of Engineers (U.S.Army Corps of Engineers,June 1981).Comparable data on Alaskan projects are not available.The resultant population per household figures differ from the household size projected for the state.The specific construction worker measure was used because construction workers have been observed to have characteristics slightly different from the population as a whole. 52 4.Payroll Payroll is calculated by multiplying the number of workers of a given trade by the number of hours worked in an average month by the hourly pay rate.The payroll figures are projected in constant 1981 dollars. Numbers of Hours.The assumptions on numbers of hours varied by type of worker: Laborers - Semi-skilled/skilled - 232 hours 232 hours (54 hours per wee k,4.3 week s per month) (54 hours per week,4.3 weeks per month) Administrative/Engineering -208 hours (48 hours per week,4.3 weeks per month) Operations Work Force -208 hours (48 hours per week,4.3 weeks per month) il'/f<W... ,I""'" Wage Rates.Wage rates for laborers and semi-skilled/skilled workers were obtained from the Alaska Department of Labor (ADOL)and are displayed in Table 7.These wage rates are routinely collected by ADOL through industry surveys,and are the workers'base rate of pay exclusive of any fringe benefits and prior to standard deductions. Wage rates for engineering/adminstrative ana operations/maintenance personnel were obtained from Acres American,Inc.and are the workers I Alaskan base rate of pay exclusive of any fringe benfits and prior to standard deductions.These wage rates do not include travel allowances,housing allowances,or other other highly variable types of compensation. 53 Table 7 1981 HOURLY WAGE RATES USED TO CALCULATE PAYROLL TRADE LABORERS Dr;11 ;ng cement Pumping Material Handling Securi ty Pol ice Waste Di sposa1 HOURL Y WAGE $18.30 17 .13 16.16 15.66 6.10 10.10 14.43 TRADE Blasting Laborers Excavating Mov;ng Storage Fire Janitor HOURLY WAGE $11.36 16.62 18.30 7.17 7.55 10.00 $15.00 13.21 17.48 15.80 6.00 5.75 7.63 16.93 20.97 17.57 9.50 18.51 18.82 20.73 13.13 5.71 19.45 10.24 18.29 7.21 6.41 4.67 9.49 SEMI-SKILLED/SKILLED Stationary Engineer Machanic -Machine Mechanic -Engine Truck Driver (Light) Bus Driver Radio/T.V. Medical Assistant Structural Steel Bo i 1ennakers E1 ectroni cs Rail Transport Carpenters Roofers Plumbers Chefs Kitchen Workers Electrical Transmission Photography Airplane Pilots Bookkeeping Ac commoda ti on Writers Office Managers ADMINISTRATIVE/ENGINEERING Electrical Engineer 14.37 Civil Engineer 14.17 Mechanical Engineer 11.38 Mining Engineer 22.00 Geologist 12.92 Hydrology 12.00 Managers 9.49 54 Electric Powere Gen. Mechanic -Auto Tr.uck Driver (Heavy) Air Nurses Telephone Operator Purchasing Agent Sheetmetal Welders £1 ectri ci ans Painters Bricklayers Pipefitters Bartenders Cooks Launder;ng Recreation Nursery Secretari al Data Processi ng Teachers Commercial Artists La ndscapers Electrical Eng.Draft Civil Engineer Draft Mechanical Eng.Draft Surveyers Geotech Envi ronment Misc.Professionals $14.37 ,4.81 15.80 9.50 9.14 6.09 12.45 20.93 17.46 21.31 18.65 18.93 20.73 8.25 8.12 5.94 6.46 4.61 7.24 7.63 7.87 7.45 9.25 11.10 9.21 9.21 12.92 10.10 8.92 10.00 c.Secondary Work Force 1.Multipliers Secondary employment was estimated by applying location and time-specific secondary employment multipliers to the on-site construction work force and any operations workers that maintain permanent residences in the region outside of the villages and construction camps.These work forces include both the single and married workers discussed in the previous section.The following multipliers were applied to these work forces: The value of each location-specific multiplier was assumed to increase with time due to import substitution and other factors that reflect a maturing and growing economy. It is implicitly'assumed that the secondary employment multiplier associated with workers housed on-site is zero.This multiplier is expected to be very low or insignificant in all areas except,perhaps, Cantwell and the Mat-Su Borough.Accordingly,the multipliers for these areas have been raised slightly. The secondary employment multiplier for Anchorage was developed as part of an in-depth theoretical and empirical analysis of the Anchorage economy (Tuck,1980),and the multiplier for Fairbanks was taken from an industrial development projects impact assessment model developed by Dr.Bradford Tuck and Environmental Services Ltd.for the Fairbanks Northstar Borough. The secondary employment multiplier for the Mat-Su Borough is based upon research conducted jointly by Dr.Tuck and Frank Orth & Associates,Inc.The multiplier was initially e~timated to be 0.76, and was raised to 0.80 to account for the expected effect of expenditures made by workers who reside at the camp or village and take occasional excursions in the Railbelt Region and/or travel to their residences outside of the Railbelt Region. Multipliers for the remaining census divisions are based upon work conducted by Dr.David Reaume (Reaume,1980).Dr.Reaume estimated regional multipliers as follows: Gulf (Cordova-McCarthy,Kenai-Cook Inlet,Kodiak,Seward,and Valdez-Chitina-Whittier census divisions):0.2 Interior (Fairbanks,S.E.Fairbanks,Upper Yukon,and Yukon-Koyukuk census divisions):0.4 56 .-, ~, The multipliers used for the Kenai-Cook Inlet,Seward,and Valdez-Chitina-Whittier census divisions are slightly higher than Dr. Reaume's estimate for the Gulf Region.This is because it was assumed that the secondary sectors of these census divisions'economies would gro\'i relative to the basic (direct)sectors of their economies during 1980 -1983. The mUltiplier used for ·the S.E.Fairbanks census division is lower than that for the Interior Region because it was known that the multiplier for the Fairbanks census division was about 1.5.Given that the economy of S.E.Fairbanks is far less developed than that of Fairbanks,a multiplier of 0.2 was assumed for S.E.Fairbanks. The model is structured to allow for adjustment of these mUltipliers. This flexibility is especially appropriate because several of these multipliers may change more or less qUickly than the rates of change assumed above. Fl ex;bi 1i ty is also important because it may be appr-opri ate to lower the multipliers associated with the direct construction work force. Recent research (Denver Research Institute,1982)has shown that th~se multipliers are frequently over stated.Accordingly,the model will be run using several values for the mUltipliers. 2.Origin and In-migration Since the employment multipliers were applied to the on-site constructi on workers accordi ng to thei r pl aces of resi dence,the di stri buti on of secondary sector j obswi thi n the region was simultaneously determined.Thus,it was assumed that secondary sector jobs wi 11 be created w.here constructi on workers rna i nta in thei r permanent residences • Some of these jobs will be filled by local residents while the remainder will be filled by i n-mi grant workers from other areas.The number of in-migrating secondary workers was determined by estimating 57 the percent of total secondary jobs,created in each census division and community,that is likely to be filled by in-migrants.The following percentages were used: Anchorage:25% Kenai-Cook Inlet:15 Seward:a Fairbanks:15 S.E.Fairbanks:20 Valdez-Chitina-Whittier:30 Yukon-Koyukuk:90 Mat-Su Borough: Palmer: Wasilla: Houston: Trapper Creek: Talkeetna: Other Areas: l~ 10 10 70 25 10 These percentages resulted from an analysis of the amount of labor potentially available at each location.Unemployment data,labor force participation rates,and underemployment information were utilized in this analysis.These percentages were then applied to the total secondary employment estimates,by location,to obtain the number of in~igrating secondary workers in each location. It should be noted that this represented an extension of the economic base method,as this method usually ignores underemployment of labor and often results in overestimation of the in-migration of secondary workers and related population.This extension serves to provide for a more realistic (lower)estimate of in-migrant secondarY workers.It should also be noted that the percentages discussed above will be estimated for other locations (impact areas)at a future time. 58 i"""" 3.Population Calculations Cumulative population influx associated with the secondary work force is calculated for each impact area by multiplying the population-per-household measures that were projected for the state under the Base case by the estimated number of in-migrating secondary workers.It was assumed that these workers would have the same general demographic characteristics as present residents. D.Housing Impacts The impacts of the project on housing are quantified using the following steps: 1.The number of cumulative project-related in-migrant households is calculated as equalling the number of direct and secondary workers that in-migrate into a community or area by a given year. 2.The percent increase that this number of households represents of the total projected number of households in the impact area is calculated. 3.The projected project-related influx is compared to the number of vacant houses that is expected under "wi thout projectJl condi ti ons. 59 VI.PUBLIC FACILITIES AND SERVICES A.Overview of Methodology The general approach to forecasting public facility and service requirements during 1985-2005 was: 1.to develop appropriate standards.for each service category and for each relevant community,that relate service and facility requirements to the size of population; 2.to assess the adequacy of existing facilities and services and to quantify any over-or under-capacity using these standards; 3.to estimate future needs based on the application of these standards to the population growth forecasts with and without the Susi tna project; 4.to indicate the significance of the impact on local jurisdictions;and 5.to provide indicators of need for project-impact mitigation measures. B.Geographic Scope Projections of impacts of the project on pUblic facilities and services are calculated only for communities and other jurisdictions in the Local Impact Area.The flexibility to project facility and service requirements of other communities and jurisdictions in the Railbelt region has been built into the computerized model.At this tim~. however,no further work has been done to develop appropriate per capita service standards for these jurisdictions. 60 ""'I .1' C.The Computerized Module The public facility and service model utilizes three types of data input.First,the module reads in the population and household projecti ons from a data fil e that is created as an output of the economic-demographic module.Second,assumptions on service standards and data on capacity are accepted.Third,information on present and pl anned capaci ty is entered. A schematic of the structure of the facilities and services module is presented in Figure 9.Per capita service standards are multiplied by the projected population of each comnunity,under the "with project" and "without projectJl scenarios,and the results are stored as service requirements for that community.The effects of the direct population influx and the total project-related population influx are calculated independently,so that direct and total impacts can be separated for mitigation planning purposes. Impacts of the project are displayed quantitatively in various ways. Project-related requirements are compared to the requirements without the project as a percent increase,and to 1981 capacity in both absolute and percent capacity utilization terms. The results of the model are presented for each community or impact area,by variable,on a yearly basis.Table 8 is an example of the report format that is produced by this module. D.Types of Service Standards Service standards can be divided into two categories--average and prescriptive.Average standards are based on recent data on existing service levels on a per capita basis for a given area.Average standards may be based on national,regional,state or local averages, or on averages for a given type or size of cormnunity;their distinguishing feature is that they are based on an average of what currently exists.As such,they reflect the realities of funding and staff 1imi tati·ons that l.oca.l governments face . 61 FSER/POLICEV/POllCWAH/FSERRPT Alternate 02 ot 02 06/12/83 AT 02:52:21 Table 8 USER RlH IMPACT OF THE PROJECT ON POLiCE PROTECTiON IN THE MATANUSKA-SUSITNA BOROUGH INUMBERS OF OFFICERSl --------------------------------------------------------------- YE AR S 1985 1986 1987 1986 1989 !990 199 I 1992 1993 ------- ------- -------------------_..........-.....--------------........------_....- PROJECT-RELATED REQUIREMENTS ---------------------------- Direct Project o .0 0.0 0.0 0.0 0.0 {).0 0.0 0.0 0.0 Total Project o .0 0.0 o .0 0.0 a .{)o .0 0.0 o•(I o .0 m N BASELINE (Cum.)26.0 33.0 35 .03I.0 37.0 39.0 4 I .{)42.0 45 .0 -----------------------~------------------------------~------------------------.--- TOTAL REQUIREMENTS 26.0 3 I .0 33.0 35.0 37.0 39.0 4 1 .{)42.0 45.{) ------------------======:;==.===~=====;=;;;:;;;:============;;;:====.;:;;::==__,;;;:i:i;l ===;;;========:=lO:l::;;;:;;;;:==~ Direct Require.As % Increase Over Basel.0.0 o .0 0.0 0.0 0.0 0.0 o .0 o•{)0.0 Total Require.As % Increase Over Bas e I .0.0 0.0 o .0 0.0 o.0 0.0 0.0 0.0 0.0 I 981 Capacity 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 20.0 Excess (Underl Cap.e 8 . 0 ) ( 1 I . 0 )(13.0l ( I 5 . 0 )(17.0)(19.0)<21.0)( 2 2 . 0 )(25 • 0 I %Capacity ut:lllz.140.0 155 .0 !65 .0 I 75 .0 185 .0 I 95 .0 205.0 2 I 0 • 0 225 .0 Figure 9 STRUCTURE OF PUBLIC FACILITIES AND SERVICE MODULE 8~c.../.~l.~ fJr~Lc:.t 3,t 3 R-v£c/-R~Ia{£ 3,( f),r£,f PrfJjLc..I-RL/a.I~J. ~: Se n',::"£.S -I~o/Is > (.3-<~3~) Vu a.rr ;'"!a.I"v c! &;o'-e:.~..s/o/(0 r .:£rea.r:..1.s ,;..r:zcr~o....rc.-().;<.., 8a.st!:.Jt1l:- £,C r'l.a...s L 0((1 8a...s£;;~~1/7 ;Uo~. Cc..;o12.CI'~til /:z Cli or? !J1.5Ir;J",lto'7 of f;,crz:.o...S<::.c;Lr c::::-5.r a..~j,C.63 ,....~p"s of :t,forn1ct/~", i./a-f£.-r }Ja.//:,-r..r ~~r /0.;; s~~-..--JClaAS"~u4' !"""So~-~Ua.-sl£-a.c~.s ;:;~/~E" /l//f;,-V O //c.c:...-/?C/,n(1)c/07 ;00 leG. /....//../('/.j /()I;70.5~'rC2Ys -L?J>./c UI)(joc].ors S Jo o/s -c.k..ss-roo/71J l~aJif") For some service types,prescriptive standards are set by relevant agencies or associations.For instance,a state government may require certain standards for health care and education;standards for fire protection based on insurance tables may be used.widely.These standards often vary by size,type and community,and may be voluntary or mandatory. A mix of average and prescriptive standards have been used in this analysis.The objective has been to provide detailed measures of adequate service levels,for those services which the local governments now provide,while keeping under consideration the resource constraints that communities face.Local preferences,based upon conversations with local,state and borough officials,have been taken into account. For some facilities and services,the required level of service varies among communities,depending on factors such as the size of the community and the type of community (urban,suburban or rural). In some cases,relevant standards may be based on variables other than population per se --for example,the number of dwellings or the number of school-age children.These variables are related to population levels,but the actual ratios may change over time.Service categories such as education and health care are especially sensitive to demographic changes.Where possible,predictors of demographic changes have been incorporated into the model. Due to the many factors that influence the needs for public facilities and services,the uniqueness of each community,and the subjectivity in deciding adequate service levels,the standards used in the model should not be considered absolutes,but rather as general indicators of changing requirements with and without the Susitna project.A summary of the standards used is displayed in Table 9.In the sections below, specific considerations-relating to the choice of standards are discussed. 64 .... -r For some service types,prescriptive standards are set by relevant agencies or associations.For instance,a state government may require certain standards for health care and education;standards for fire protection based on insurance tables may be usedwtdely. These standards often vary by size,type and community,and may be voluntary or mandatory. A mix of average and prescriptive standartts have been used 1n this analysis.The objective has been to provide detailed measures of adequate service levels,for those services which the local governments now provide,while keeping under consideration the resource constraints that communities face.Local preferences, based upon conversations with local,state and borough officials, have been taken into account. For some facnities and services,the required level of service varies among communities,depending on factors such as the size of the community and the type of community (urban,suburban or rural). In some cases,relevant standards may be based on variables other than population per se --for example,the number of dwellings or the number of school-age children.These variables are related to population levels,but the actual ratios may change over time. Service categories such as education and health care are especially sensitive to demographic changes.Where possible,predictors of demographic changes have been incorporated into the model. Due to the many factors that influence the needs for public facilities and services,the uniqueness of each community,and the subjectivity in deciding adequate service levels,the standards used in the model shaul d no't be consi dered absol utes,but rather as general indicators of changing requirements with and without the Susitna project.A summary of the standards used is displayed in Table 9.In the sections below,specific considerations relating to the choice of standards are discussed. 65 Table 9 SUMMARY OF PUBLIC FACILITY AND SERVICE STANDARDS FOR SELECTED CXlMMJN ITIES IN THE LOCAL II-F'ACT AAE.A Trapper Mat-Su Pa Imer Was r II a Houston Creek Ta J keetna Borough Cantlie I I Water Supp Iy Average Water S~pply IZQ-Isdl 120-ISdl (gpd per capital Sewage Treatment Sewage Treatment ISO (a verage gpd per cap It a) SolId Waste Disposal Landf II I Requirements .il-.2I b .11-.21°.11-.21°.11-.2I b •11-.21 b .11-.2I b .1 1-.2I b (acres per 1,000 popu latlon) EducatIon Average Pr Imary 25 2S 25 25 25 15 Schoo I-Age Chi I drsn To Teacher Ratio Average Secondary 21 21 21 15 School-Age Chi Idrsn To Teacher Ratio Teacher to Support 8:!8:1 8 :1 8:I 8:1 Staff Ratio Health Care Desired Hosp Ital Bed 55% O:cupa ncy Rate Law Enforcement Po IIce Off i cers 1.5 1.0-1.5 1.0 (officers per thousand population) Parks and Recreation Playgrounds (acres per 3.9 3.9 3.9 1000 d""ei I r ng un its) Neighborhood Parks 3.3 3.3 3.3 (acres per thousand dwel II ng un its) CommunIty Park 4.8 (acres per thousand d""elilng units) Assumed to Increase from 120 gallons per day per capita in 1981 to 150 ga I Ions per day r n 2000. b Assumed to increase from .1 I acres per year per thousand populatIon In 1981 to .21 acres per year in 2000. 66 - - I~ E.Assumptions and Service Standard Used 1.Water Supply Water systems are comprised of three components --the supply source, the treatment facility and the distribution system.The most widely used standards for water service are the average and peak water consumption per capita.in terms of gallons per day (gpd).Facility standards sometimes include pipe length per thousand dwellings,and treatment capacity. The standards are relevant only for communiti es that have or are expected to develop water systems.Only two communities in the Local Impact Area,Pa 1mer and Wasi 11 a,have ci ty-wi de water supply systems. Other residents,including inhabitants of the communities that will be most affected by the project,rely on i ndi vi dual well s or IIcommuni tyll systems that serve a particular subdivision,trailer park or other small area. An average per capita water consumption standard of 120 gallons per day in 1981 rising to 150 gpd by the year 2000 was used.The city of Palmer currently has an average per capita water use rate of 120 gpd, and this relatively low usage may be attributed to the relatively small amount of industry in the area.It is expected that future growth will include an increase in business activity and hence a rise in per capita water consumption. 2.Sewage Treatment The amount of sewage generated is a function of the amount of water that is used daily.In the literature on national standards,it has been estimated that an average of 65 percent of total water supplied ~ecomes sewage,or 100 gpd per capita,with the remainder used for miscellaneous purposes such as watering lawns and gardens,firefighting and generating steam (Stenehjem &Metzger,1980).This standard is not appropriate for application to many Alaska communities.In the winter 67 in parts of Alaska,more water than required for use flows through the distribution system,in order to keep the water from freezing within the pipes.This water is then returned as sewage.resulting in sewage flows representing close to 100 percent of water use.This is the case in Palmer,where sewage requirements equal 100 percent of average water usage,or 120 gallons per day per capita.For the purposes of projections of impacts,a constant standard of 120 gpd has been used for Palmer,the only community with a sewage treatment system in the Mat-Su Borough.and for Wasilla,which is planning a sewage system at this time. 3.Solid Waste Disposal Solid waste can be disposed through incineration or sanitary landfill disposal;sanitary landfill has become the prevalent mode.-Facility requirements for solid waste disposal can be measured in terms of the amount of land needed per capita on an annual basis.Pubiished standards range from 0.2 to 0.3 acres per thousand people,depending on assumptions of pounds of waste per capita,depth of the site and the rate of compression of the waste. A lower standard of .11 acres per thousand population has been assumed initially for communities in the Mat-Su Borough and other communities in the Local Impact Area,based on the premises that waste production per capita is much lower and the fill depth of the central landfills is twice as high as national averages.This standard is calculated to rise to 0.21 acres by 2000 and held constant at this level between 2001 and 2005. 4.Education The major determinant of the requirement for educational facil-ities a~d ~ervices is the ratio of school-age children to population, modified to take into account private school attendance.Two different methodologies were used to estimate the number of school-age children associated with the (1)Base Case population and (2)in-migrant population associated with the Susitna project. 68 I~ - - Under the Base Case,for the Mat-Su Borough,the standards that the school district uses for planning were used in this study as well. Short-term planning through 1987 uses an estimate of 22.8 percent (school-age children :total population).For long-range planning purposes,an estimate of 25 percent is used.For the purposes of this study,the ratio is assumed to rise gradually from 22.8 percent in 1987 to 25 percent in 2000 and then hel d constant at that 1evel through 2005.In Cantwell,the present 18 percent level was assumed to remain constant over time in the Base Case. The number of school-age children accompanying workers on the project has been estimated using a ratio that was calculated,through surveys of other large projects,of .89 schoolchildren per i-n-migrant worker accompanied by dependents (U.S.Army Corps of Engineers,1981).The number of school-age children associated with the in-migrant secondary population was calculated on the same basis as Base Case school-age chil dren. A major service standard for education relates the number of school-age children to the number of classes and teachers.Local preferences have been used as standards in this case.In the Mat-Su Borough school aistrict,planning standards include an optimum of 25 students per class for primary schools and 20-22 for secondary schools.In addition,Mat-Su Borough statistics show that teachers comprise about 50 percent of total school district personnel requirements.In Cantwell,the Railbelt School District1s planning standard teacher-student ratio of 15:1 was used. Requirements for classroom space can be measured in terms of number of cl assrooms or al ternatively,the number of square feet per pupi 1 (90 square feet for primary school students and 150 square feet for secondary school students).The square feet calculations are useful to the estimation of the cost of constructing new facilities.The model is able to provide both sets of calculations. 69 It is assumed that the present ratios of primary school students (54 percent of total)and secondary school students (46 percent of total) will remain constant.It is beyond the scope of this analysis to forecast changes in distribution by school and by grade. 5.Heal th Care Standards for acute public health care focus on the capability of hospital facilities and staff to accommodate the expected number of patients without building overcapacity that will then add to hospital costs.While rule-of-thumb bed multipliers of between 2.1 and 5.8 beds per 1000 population are often used,it has become customary to base the number of beds required on a measure of the long-term daily average daily census of patients using the hospital divided by the desirable occupancy rate.In Alaska,the recommended occupancy rates are 80 percent for urban hospitals and 55 percent for rural hospitals.The formulas used are: Acute Care Patient Days at Valley Hospital plus Days at Alaska and Providence Hospitals for Borough Resi dents /Borough = Popul ati on ' Hospital Use Rate for Borough Resi dents Hospital Use Rate for Borough Resi dents x Estimated Borough / Population" 365 days "in year =Projected Average Daily Census (PADC) Projected Average Daily Census x Proportion of Bed Need Met at Valley Hospi tal Minimum I Occupancy for Rural Hospi tal (55%) =Valley Hospital Acute Care Bed Need A significant aspect of the hospital system in Alaska deserves note.The Municipality of Anchorage has developed a comprehensive acute and long-term health care system that provides the main medical care for the residents of Southcentral Alaska,as well as other areas of the state.A large percentage of people living in areas such as the Mat-Su Borough,as well as Cantwell,presently elect to use hospitals in Anchorage over the local hospital due to the larger number of doctors (especially specialists)and the more modern facilities.However,the percentage of patients that use 70 -, ,P"!l"I' - the Valley Hospital in Palmer has been rlslng rapidly in recent years,and this trend is expected to be accelerated by the planned ad'dition to and renovation of this hospital,as well as the possible addition of certain medical specialists to the staff.It is as- sumed that the usage of Valley Hospital as a percentage of total Alaskan hospital use by Mat-Su Borough residents will rise from 38 percent in 1980 to 75 percent in 2000 and remain constant at that 1evel through 2005. Age and sex distributions of the population are important determinants of hospital use.Due to data limitations,these and other demographic factors have been assumed to remain constant.As data become available from communities and workers through the monitoring program,the model may be restructured to project age and sex distributions. 6.Law Enforcement Police service standards range from one officer per thousand population in unincorporated rural areas to 1.5 officers per thousand population in small communities and 2 officers per thousand in moderately large cities.For rural parts of the Local Impact Area,a standard of 1.0 officers per thousand was applied to the population projections.For the southern part of the Mat-Su Borough (outside Palmer,which has its own police force),a standard of 1.5 officers per thousand population was used;it is anticipated that the growing sUburbanization of the borough will soon justify use of the increased standard. Alaska State Troopers judge the relative adequacy of their staffs in tenns of the average ca"se load (i.e.number of crimes)that each officer is charged with investigating.Six cases per Trooper is considered average,and eight is considered the level at which additional staff is needed.In the Mat-Su Borough,in 1981,there was approximately one Trooper per thousand population,and the average case load was about six per officer."This indicated that the rural standard discussed above was appropriate for this area. 71 7.Recreation Projected requirements for recreation facilities.in terms of acreage for playgrounds.neighborhood parks and community parks, were calculated by applying national standards for rural areas. Standards for playgrounds and neighborhood parks are most applicable to the cities of Palmer,Wasilla,and Houston,whereas community parks are planned for larger areas,and the standard pertaining to this category is most relevant to Mat-Su Borough as a whole. 8.Other Facilities and Services Some categories of public services did not lend themselves to this type of quantitative approach.The method of analysis used for these categories are discussed below. 9.Fire Protection The major criteria that can used to evaluate the adequacy of fire protection are (1)the available water flow rate (gallons per minute),(2)response time,and (3)manpower availability.There are several standards that relate these variables to population size in the socioeconomic impact literature.Water flow,response time or service radii,and the equipment capacity are commonly used.It is common in communities of less than 7,000 to rely on volunteer firefighters;as this is not a cost item,requirements for manpower have not been projected for communities of the local impact area. However,fire protection planning in Alaska,as in many other states,often takes the form of trying to achieve a certain fire rating as measured by the Insurance Service Organization (ISO).The ISO is a national organization that rates fire protection on a scale from one (best)to ten (worst);fire insurance rates closely reflect these rati ngs. 72 Communities without a community water system can at best achieve an ISO rating of 8 (which is the objective that the Mat-Su Borough presently hopes to achieve for its most populous fire districts). Requirements to achieve a rating of 8 are:that dwelling class property be within five road miles of a fire station (on roads that are in good,condition)and that the fire department has demonstrated its ability to deliver 200 gallons per minute (gpm)for a period of twenty minutes without interruption.The latter requirement implies a need for a capaci ty of 4,000 gall ons of water "o,n wheel s.II The ISO rating does not relate service availability to the size of popu1.ati on. 10.Transportati on The impacts of the project on transportation were analyzed with the consultation of public officials who have responsibility for transportation infrastructure in the region. The capacity of the Parks Highway,the main highway in the project area,was discussed with the Alaska Department of Transportation and Publ ic Facil iti es,and specifi c areas whi ch coul d be transportati on bottlenecks were determined.Officials at the Alaska Railroad confinned that the rail line is underutilized,and could easily handle the additional freight that the project would generate. The Mat-Su Borough has a skeletal roa9 framework which will need to be expanded significantly to handle the population growth that is expected in the next twenty years.Discussions with Mat-Su Borough officials yielded estimates of the threshold borough population sizes that are expected to trigg€r the need for additional roads~ For instance,as the population of the borough exceeds 30,000,there will be a need to build a collector road ring with a radius of four or five miles from Wasilla.Using these threshold levels,it was possible to estimate by how much the population influx related to the Susitna project would accelerate the need for these ;nfrastructure addi tions. 73 Possible future enhancements to the impact model would entail (1) projecting the increase in traffic counts on major roads in the impact area related to the project and (2)relating the project-related population influx to the demand for airport facil i ti es. 74 .... ~-. VII.FISCAL MODULE A.Overview of the Fiscal Impacts Module 1.Purpose The purpose of fi scal impact analysi s of resource development projects,such as the Susitna Hydroelectric Project,is three-fold: o To identify the types and magnitude of project-induced changes in the expenditures and revenues of local governments; o To identify or estimate the timing of project-related expenditures and revenues;and o To make the above infonnation available to the mitigation planning process. 2.General Approach The general approach taken in the analysis of the fiscal impacts of the Susitna HYdroelectric project was to consider two futures. First,baseline conditions were analyzed and projected,for'each local jurisdiction,to provide a basis for comparison.Second, conditions with the project were project~d,using data inputs from the economic-demographic and the public facilities and services modul es. In the analysis of baseline conditions,emphasis was placed on i dentifyi ng the most important sources of revenue and expendi ture items.Past and current trends in both revenues and expenditures were examined and analyzed,and these trends were used as the basis for the projections of future fiscal conditions in the project area. In the projection of fiscal impacts related to the project,the effects of the direct population influx and the total project-related population influx are calculated independently,so that direct and total impact~can be separated for mitigation planning purposes. 75 B.Impact Areas and Local Jurisdictions Within the project impact area,there are a number of jurisdictions that hold a variety of powers to collect taxes or otherwise receive revenues and to provide certain pUblic services.The fiscal powers vested in these jurisdictions.to a large extent,determine 1ikely sources of future revenue and future needs for expenditures for public facilities and services.The distribution of fiscal responsibilities among jurisdictions also will affect the extent to which any given jurisdiction is impacted by the project.In the following section a brief description of the government organization and fiscal responsibilities of jurisdictions in the project area is given.For additional information on government organization in the project area,refer to Frank Orth &Associates,Inc.,1982. 1.The Municipality of Anchorage and the City of Fairbanks These centers comprise by far the largest population centers in the project area.The Municipality of Anchorage is a first class home rule municipality while Fairbanks is a first class city.This first class status provides both population centers powers to levy taxes on real and personal property as needed in order to provide services to their residents.Each one of these centers provides a wide range of public facilities and services. 2.Ma t-Su Borough. The powers and responsibilities of the Borough are comprised of four general functions:general fund administration.provision of fire protection and road services to service areas.land management functions,and responsibilities for the school district.General fund administration and responsibility for the school district are part of the Borough's area-wide duties to serve all areas in the Borough;provision of fire protection and road maintenance to service areas are non area-wide functions whereby only selected areas are served. 76 - .... 3.Incorporated ci ti es -- The incorporated cities in the Mat-Su Borough are Palmer,Wasilla, and Houston.Palmer is a first class home rule city,while both Wasilla and Houston are second class ci~ies. 4.Palmer As a home-rule city,Palmer has certain certain powers of taxation. Home rule and general law municipalities may levy tax on all real and personal property located in the municipality to support services provided throughout the municipality.The maximum rate of taxation is three percent (thirty mills)of the full and true value of taxable property. 5.Wasilla and Houston As second class cities,Wasilla and Houston require a majority vote to exercise the power of taxation.In addition,there is a tax ceiling of five mills.For additional discussion of the tax powers of local authorities in the State of Alaska',refer to Frank Orth & Associates,Inc.,1982. C.Projection of Revenues and Expenditures 1.Revenues Sources of revenue are,in the mai n,-detenni ned by the taxati on powers of a given jurisdiction together with its eligibility for intergovernment transfers.For each jurisdiction.the major traditional sources of revenue were determined and its tax powers were exami ned. 77 The next step was to determine appropriate methods of projecting future revenues.The discussion -that follows presents a list of alternative methods including the ones chosen for this analysis. a.IIOwn Source ll Revenues IICk1n source ll revenues i ncl ude all source of revenue that the local jursidiction raises for itself,such as property,sales and income taxes.These are a function of the size of the tax base and the tax rates used. Property values are influenced by many factors,inclUding the level of demand as population increases.To estimate changes in the property tax base,a real rate of growth of four percent was assumed for the Mat-Su Borough baseline assessed value.This rate is based on recent observed growth rates in the Borough's total assessed value.For the IIwith project ll scenario,baseline per capita assessed valuation was applied to the population influx to estimate additional growth in the property tax base.Certain tax rates were assumed for the analysis peri ode Sales tax revenues were assumed to grow in direct proportion to population.The sales tax rates were assumed to be constant. b.Intergovernmental Transfers In estimating intergovernment revenues,it is important to understand the criteria used by the state and federal government in allocating transfer funds to local jurisdictions.Allocations are usually made on the basis of local population size.Therefore,per capita based projections are good approximations of this form of revenue and were used in this analysis.In some cases,both population size and geographic location are considered when allocating transfer funds. Whenever appropriate,the per capita based projections in the model were adjusted to account for location specific factors. 78 ,.,.. - ..- c.Bondi ng The Borough has in the past utilized school revenue·bonds primarily for school capital projects.The authority to do thi sis always sought from the local taxpayers,as,in principal,they are responsible for repaying this form of obligation.However,the state legislature has in the past provided varying levels of reimbursement to the borough. Current law allows up to 90 percent reimbursement of both principal and interest payments.In this analysis,maximum bonded indeptedness is projected as a ratio of assessed valuation. d.Political Factors It is important to note that political factors,such as the form of government of a jurisdiction and changes in state statutes,can heavily influence the amount of revenue that may be available to a local jurisdiction.For example,a local decision to incorporate or upgrade the level of incorporation from a second class to a first class city, can lead to increased taxation powers and potential revenues. Similarly,a decisio.n at the state level to change the criteria for providing revenue sharing assistance to local jurisdictions can have far reaching effects. 2.Expenditures A first step to projection of expenditures is to identify the types of public facilities and services provided by a jurisdiction.This initial step provides a listing of the expenditure items for wnich.. projections must be made.Suitable methods can then be identified for making the projections.In the following section,alternative methods are discussed as is the rationale for selecting the method which was used in this study. 79 Generally,there are two groups of methodologies for projecting public expenditures:(l)the average cost approaches and (2)the marginal cost approaches.Methodologies in both groups were examined for advantages and disadvantages and for applicability to the project area.The following is a brief review of these methods. a.Average Cost Methodolog-ies Average cost methodologies include the per capita cost,service standards,and cross-sectional regression analysis approaches.The per capita cost method is based upon the assumption that.in real terms, present per capita costs are reasonable estimates of future cost.It is a relatively inexpensive methodology to apply,as it readily utilizes available historic data.Its major weakness lies in its lack of direct accounting for threshold effects (i.e.predicting the large amount of new investment that is needed when a community reaches a certain "s ize threshold"),existence of excess capacity in pUblic facilities,and economies of scale in providing new services. The service standards method would multiply the results of the service requirements calculated in the facilities and services module by unit costs to project total facilities costs.The cross-sectional regression analysis approach estimates average service requirements based on data from several communities in the region.Both the service standards and regression methods require considerably more data than the per capita method.Additionally,because the regression method must draw on regional data to have enough data points,it is sometimes regarded as being too regionally based to constitute an appropriate local impact projection method. b.Marginal Cost Methods These i ncl ude the case study approach,the comparabl e city method,and the economic engineering method.An important advantage of these methods is that they are able to explicitly account for the threshold effects,excess capacity and economies of scale.However,marginal cost approaches require great amounts of data,may not be accurate if 80 there is uncertainty surrounding assessment of excess capacity in public facilities and services,and in addition reqyire great amounts of .effort to update the estimates..In general,these methods are more expensive to apply. c.Criteria for Methodology Selection The following criteria were used to make a selection of expenditure projections methodology: o Simplicity of application while providing reasonably accurate results; o Availability of data; o Ease of update and therefore usefulness in mitigation planning and mitigation measure revisions;and a Applicability to impact area fiscal conditions. The first criterion demands a method that,although simple,would meet current standards of acceptability.The per capita cost method meets these requirements and is the most commonly applied fiscal impact methodo logy. With the exception of the cross-section regression method,the average cost methods tend to require historical data that is read"ily available.The marginal cost methods require great amounts of data that may not be available and can be complex in application. I Cost projections for this project will need to be revised repeatedly to reflect the most current information on the project and its schedule. It is,therefore,necessary to have a method of projection that can be updated easily.Although the marginal cost methods (and in particular the case study method)can have a great deal of accuracy,their application demands a correspondingly higher data c011ection effort. As a result,marginal cost methods are mor~suited to a one~time appl ication. 81 Using the above criteria,the per capita cost method was selected for use in this study.It was recognized,however,that the method's weaknesses could be minimized by incorporating some features of the Case Study approach.Thus,interviews with local officials were conducted in order to gain perspectives on trends in public facilities usage.Furthermore,public facilities thresholds and public preferences concerning the extent of public facilities and services will be monitored during the project period so that adjustments can be made during a dynamic mitigation planning process.During that process,the per capita multipliers used and assumptions that underlie them will be compared to actual costs to better facilitate mitigation. If revised cost estimates are required.they can be made easily and quickly.This is one advantage of the per capita method -it facilitates a continuous mitigation process. D.Link of the Fiscal Module to other Modules 1.Input Da ta As discussed above,many of the revenue items and most of the cost items are projected applying per capita multipliers to the projections of population and school-age children.Per capita multipliers were obtained or computed from current and historic budgets.Interviews with local officials supplemented this information.These multipliers are contained within the fiscal module.The rest of the data are derived from the other modules of the model. 2.Link to the Economic-Demographic Module The fiscal module obtains population data from the Economic-Demographic module.The data extracted corresponds to the type of cost projections to be made (baseline projections,impact of the direct project-related population influx,and impact of the total project-related population influx)and the appropriate phase of the project.Accordingly,changes in the economic and demographic scenarios affect the revenue and cost estimates in the fiscal calculations. 82 ..... ~ r 3.Link to the Public Facilities Module A significant portion of the Mat-Su Borough budget goes to education. In fact,the school district budget constitutes about 58 percent of the borqugt'1 revenues.Consequently,one of the important variabl es in projecting fiscal conditions is the number of children in the borough •. These estimates are provided by the pUblic facilities module. A possible future enhancement of the fiscal calculations will introduce a link to the public facilities module to specifically extract indicators of threshold effects.This linkage would then be used together with monitoring information to adjust cost estimates,as more data become available regarding supply shortfall s. E.Baseline Projections This section discusses the estimation of baseline projections.A detailed analysis is given regarding component revenue and cost items, some of the assumptions made,and specific methods of estimation for each jurisdiction.The jurisdictions covered are Mat-Su Borough,the cities of Palmer,Wasilla,and Houston within the borough,the Municipality of Anchorage and the City of Fairbanks.Within the Mat-Su Borough,special attention is given to the general fund,the school operating fund,the service area fund,and the land management fund. For jurisdictions in the local impact area including Mat-Su Borough and Palmer,Wasilla,and Houston,considerable effort was devoted to projection of both the revenues and expenditures.Major sources of revenue and important expenditure items were identified.The Municipality of Anchorage and the City of Fairbanks are outside of the local impact area.Consequently,only expenditure projections were made.Major expenditure items were emphasized.The following is a discussion of the module structure for calculations. 83 1.Mat-Su Borough Revenues:Two types of revenues are projected.They are Il own source ll revenues and intergovernmental revenues.The only source of own revenues is the property tax.Intergovernmental transfers received by the borough include such categories as state shared revenues,municipal assistance revenues,and federal revenue sharing.All intergovernment revenues were estimated using per capita multipliers.Property taxes were projected based on an assumed real growth in th~tax base of four percent.The applicable tax rates are of two kinds:(1)the area-wide tax rate and (2)the non area-wide rate.The first is applied to the total Borough assessed valuation while the second is applied to the non area-wide assessed value.Residents of those selected areas where the Borough provides fire protection and road services pay a non area-wide tax in addition to the area-wide tax that is paid by all residents of the Borough.The general equations used for the two types of revenues are given below: I GRi t =the ith item intergovernment revenue in the year (t) IGH;t =the i th item per capi ta revenue J • POP t =population in the Mat-Su Borough J , PT t =property tax ,, AV t =assessed valuation ,, Mf\=the mill rate (tax rate),, Expenditure items for the borough,such as area-wide general fund administration,service area cost items,and land management fund,are projected based on per capita expenditure estimates using the following general equation: COST it =PCCit*POP it PPC =the per capita cost mUltiplier POP =the population size Subscripts:(i)identifies the ith cost item,and (t)identifies the year. 84 2.The School District BUdget Revenues:The school di stri ct revenues come primari ly from the state government,area-wide local taxes,and the federal government.All government contributions,with the exception of those from the state's foundation program,are based on school-age population.Foundation program monies are granted on a per instruction unit basis and take into account area specific cost adjustment factors.This revenue item, however,can also be said to be based on population since instructional units are determined by the number of students.Estimation of property taxes was discussed above;the state and federal government contributions are projected using per capita school child revenues and the total school-age children.The general form of the equation used is as follows: SR it =PR i t *TSC i t S~t =nonlocal school revenue from the ith source in year (t) PR i t =revenue from the i th source per school child in year (t) TSC t =total school age children in year (t) 3.The City of Palmer Budget Revenues:The City of Palmer derives revenues from own sources, intergovernment transfers,and miscellaneous sources.Own sources include the local property taxes,sales taxes,and service charges. Own sources constitute close to 60 percent of all revenues while i ntergovernment sources contr"j bute some 25 percent.Mi scell aneous sources are responsible for the balance.Own source revenues are projected using per capita multipliers;intergovernmentrevenues are projected based on historic percentage contributions. Other revenue sources are the speci al fund charges for water and sewer services.The projections in this category were based on per capita charges. 85 Expenditures:The city of Palmer provides a number of standard services.Cost projections for all the various services listed below were based on per capita cost mUltipliers. Services provided include: o General administration o Police a Fire service o Pmbul ance a Parks and recreation a Health services o L;brary o Pub 1i c work s a Water supply o Sewer Thus,the general formula for projecting the total outlay for each item is as follows: The various terms in the equation are explained above. 4.City Of Wasilla Revenues:There are two categories of revenues that the city of Wasilla receives.They include intergovernment transfers s and own-sources.Unlike the City of Palmer,Wasilla receives by far the greatest amount of its revenue from intergovernment funds,which include state-shared taxes,state and federal revenue sharing,state grants for capital projects,various transfers from Mat-Su Borough and elsewhere for the librarys and other miscellaneous intergovernment transfers.All the revenue items were projected using per capita revenue multipliers. 86 ..- - - Expenditures;Expenditure items for the City of Wasilla include: o General administration; o Parks and recreation; o Library; o Fire service; o Capital projects. All these were projected based on per capita expenditure multipliers with a general formula of the form: 5.City of Houston Revenues:Al though the composition of revenue i terns and purposes is quite varied,there are only two important sources of revenue for the Ci ty of Houston.These are the state and Mat-Su Borough.To project basel i ne revenues for Houston,per capita revenues estimates were obtained for each important revenue item and applied to the projected population of the city. Expenditures:To project expenditures,per capita expenditure multipliers for the various cost items were obtained and used with the projected population of the city.The applicable expenditure items oj ncl ude: o Local government administration; o Fire service; o Parks and recreatibn; o Road maintenence; o Solid waste. 87 6.Municipality of Anchorage For the Municipality of Anchorage,expenditure projections were made using the per capita cost method.Per capita expenditures for major expenditure items were applied to the population projections;the total expenditure was then obtained by summing over the individual items. The most important components of expenditures are as listed below: o Pol ice; o Fire service; o Mibulance; o Parks and recreation; o Li brary; o Health services; o Transportation; o Sewage service; o Solid waste disposal; o Water supply. 7.City of Fairbanks As with the Municipality of Anchorage,only the expenditures were projected for the City of Fairbanks.The per capita cost approach was used.The items included in the expenditure projections are: o Police; o Fire sevice; o Ambulance; o Parks and recreation; o Library; o Health services; o Transportation; o Sewage service; o Solid waste disposal; o Water supply. 88 ~, F.Impac t Proj ecti on s Project impacts were projected using the same formulas as were used in the baseline projections.One difference in methodology concerns estimation of property tax revenues associated with the population influx.The approach was to use the baseline derived per capita assessed valuation together'with the total population (including population influx)to estimate total assessed valuation.Tax revenues are then derived,as in the baseline projections,using the same mill rate multipliers. Incremental revenues and costs were projected for vari ous aspects of the project.The aspects considered in the fiscal calculations include the direct increment associated with the direct project populations, and the increment associated with the total population influx.Pr~ject scenario total revenues and expenditures (Baseline+Project -direct and secondary)are also projected. G.Reports Reports are organized by jurisdiction.The revenues and expenditures are reported as well as indications of deficits.The revenue projections reported include baseline revenues,incremental revenues due to direct population influx,increments due to total project-related population influx,and overall revenues in the "with project lJ scenario.Similar information is reported for expenditures. The reports display total revenues and total expenditures for each jurisdiction,rather than individual revenue/cost items.However, back-up tables that report on the detailed computations can be designed and produced to facilitate local plannning. For the jurisdictions where both revenues and expenditures are projected,!>aseline deficits and "with Broject"scenario deficits are reported.In additi on,the percent increase (decrease); n the 89 jursidiction's deficit as a result of the project is reported.Two sample reports are included as Table 10 and 11.These two reports are similar.but differ in the time period of reporting.Table 10 covers the period from 1985 to 1993 while Table 11 reports on the remainder of the project development and beyond to the year 2005. 90 1 1 J 'I ')1 1 ]1 J J ]1 I F ISM/F ISB5MSV/fIBHORIH 06/16/63 ~T I I :50 :55 Table 10 fISC~L MODULE REPORTS REVENUES ~ND EXPENDITURES IMPACTS ON BUDGETS (Thou sa n d s I Mot-Su Borough Generol fund USER·lBG Year 1965 1986 1987 1988 1989 1990 199 I 1992 1993 lD I-' ------------------ ------------------------------------ REVENUES PROJECT REl",TED Dlract Portion Project Total B",SElINE PRO'JECTION TOT'"L REV ENUE·S EXPENDITURES PRO J ECT REl ~.T E 0 Direct Portion ProJact Total B~SElINE PROJECT ION T01 ...L EXPENDITURES Bosal Ina Oat lelts Totol bellcts ~Incroose In delict FISM/FISB5MSV/FIBHOR2H 06/16/83 AT 12:15:13 Table 11 FISCAL MODULE REPORTS REVENUES AND EXPENDITURES IMPACTS ON BUDGETS (Thousandsl Mllt-Su Borough General fund USER ..lBG Yeor REVENUES PROJECT RELATED Direct PortIon Project Totol :~BASEl.INE PROJECTION i TOTAL REVENUES EXPENDITURES PROHCT RELATED Direct Port Ion Project Totol BASELINE PROJECTION TOTAL EXPENDITURES Bosel Ina Def lefts Toto!Daflets $'1:r a ~_I I._\f 1 ~, 1994 1995 1996 1991 !998 1999 2000 2001 2002 2003 2004 200 !.11II!"liI REFERENCES Alaska Department of Labor,Wage Rates for Selected OCcupations,1981. Alaska Department of Labor,Di vi si on of Research and Ana1ysi s, personal communication,January 30,1981. A1 aska Department of Labor,Division of Research and Analysis, personal communication,December 15,1981. Alaska Department of Labor,Statistical Quarterly,various issues. Alaska Department of Transportation and Public Facilities, Traffic Division,personal cOl1ll1unication,September 21,1982. Alaska State Department of Transportation and Public Facilities,Planning and Research Division,personal communication,September 22,1982. Alaska State Department of Transportation and Public Facilities,Maintenance and Operations Division,personal communication,September 23,1982. Alaska Railroad,personal communication,January,1981. Anderson,E.and J.Chalmers,-Econoroi c/Demographi c Assessment Manual:Current Practices,Procedural Recommendations,and a Test Case,Mounta1n West Research,Tempe,AZ,1977. Arctic Environmental Engineers,Solid Waste Disposal Study, prepared for the Matanuska-Susitna Borough,1977 and 1978. Burchell,R.W.and D.Listokin,The Fiscal Impact Handbook, The Center for Urban Policy Research,Pr1nceton,NJ,1978 .. Community of Cantwell,Inc.,1982 Population Census,conducted in coordination with the U.S.Postal Service,Cantwell,AK. Denver Research Institute,Socioeconomic Impacts of Power Plants,prepared for Electric Power Research Institute, February,1982. Frank Orth &Associates,Inc.Susitna Hydroelectric Project Environmental Studies,Subtask 7.05:Soc;oeconom1c Analys1s Phase I Report,prepared for Acres Affier1can,Inc.and the Alaska Power Authority,April,1982. Goldsmith,S.and Huskey,L.,Electric Power Consumption for the Railbe1 t:A Projection of Requ1rements -Techmcal Appendices,tnst1tute of Soclal ana Econom1c Research, prepared for State of Alaska House Power Alternatives Study Committee and Alaska Power Authority,May 1980. 93 Leistritz,F.L.and S.Murdock,The Socioeconomic Impact of Resource Development:Methods for Assessment,Westview Press, Boulder,co,1981. Matanuska-Susitna Borough Engineering Division,personal communication,January 3,1983. Matanuska-Susitna Borough Planning Department,Matanuska- Susitna Borough Population Survey,Palmer,AK,1981. Matanuska-Susitna Borough Service Area Coordinator,personal communication,December,1981. Railbelt School District Superintendent,personal communication,September 30,1982. Reaume,D.M.,uAlaska Regional Economies:1980 to 1982 11 , Daily Journal of Commerce,Seattle WA,December 25-26,1980. Stenehjem,E.J.and J.E.Metzger,A Framework for Projecting Employment and Population Changes Accompanying Energy Development,Argonne National Laboratory,Argonne,IL,1980. Tuck,S.H.,Economic Development Planning for Anchorage:A Theoretical and Empirlcal Analysis,Anchorage,1980. U.s.Army Corps of Engineers,Engineer Institute for Water Resources,Constuction Workforce,Fort Belvoir.Virginia. June,1981. Valley Hospital,personal communication,October 14,1982. 94 .- ,- NATIONAL MARINE FISHERIES SERVICE ALASKA POWER AUTHORITY ,-.334 WEST 5th AVENUE·ANCHORAGE,ALASKA 99501 Mr.Robert W.McVey Director,Alaska Region National Marine Fisheries Service P.O.Box 1668 Juneau,Alaska 99802 August 3,1983 Phone:(907)2n-7641 (907)276-0001 Subject:NMFS January 25,1983 Letter of Comment on the November 15, 1982 Draft Exhibit E of the Draft FERC License Application for the Susitna Hydroelectric Project. Dear Mr.McVey: National Marine Fisheries Service's January 25,1983 comments regarding the November 15,1982 Draft FERC Exhibit E for the Susitna Hydroelec- tric Project,and Alaska Power Authority responses to those comments, were inadvertently omitted from Chapter 11,Exhibit E,of the February 28,1983 formal License Appl icat ion submittal to the Federal Energy Regulatory Commission. In order to rectify this omission,this letter transmits our point- by-point responses to your agency's comments.Your letter and these responses will be incorporated into the License Application document authorized by the FERC for distribution to the resource agencies and the publ ic.- -I I~ 1. General Comments Comment:It appears that many of the basic economic prem~ses upon which this project was planned have now changed.We believe the License Application should fully consider the impact of these events and discuss their effect or impact on overall project feasibility,the need for Watana to be operational by 1993,and the economics associated with providing sufficient downstream flows to minimize fishery impacts. Response:Following submittal of the License Application on February 28,1983,the FERC requested similar information concern- ing project economics and downstream flows.Portions of Exhibits Band D were revised (as of July 11,1983)and information added that specifically addresses the economic issues as they apply to instream flows.For example,in the revised application three new flow regimes,which consider project economics and instream flows, were cons idered in addit ion to the seven flow regimes originally Mr.Robert W.McVey August 3,1983 Page 2 described in the February 1983 License Application.The revised License Application will be available to the resource agencies in the near future. 2.Comment:•••we recommend that Exhibit E of the License Application include a presentation and analysis of the 1982 data. Response: Data from the 1982 field season were incorporated throughout Chapters 2 and 3 of the February 28,1983 submittal,to the extent possible.Additional information from the 1982 field season was provided in Appendix E.2.A of the July 11,1983 submission. 3.Comment:We recommend that the License Application detail ongoing and proposed studies. Response:An interagency meeting (including NMFS)was held by the Power Authority on July 18,1983 to describe the 1983 aquatic studies progam.Details of the proposed 1984 fiscal year (FY) field program (July 1,1983 to June 30,1984)were also submitted (on July 11,1983)to the FERC as part of the supplemental infor- mation requests.The Power Authority will provide additional details to the study plans when study scopes for FY 1984 are .finalized. 4.Comment:We recommend the License incl ude a more precise descript ion Application be of impacts and expanded to present the A.Flow releases based upon weekly rather than monthly averages. B.Quantification of "normal"spillages,below the 1 in 50 year event,passed through the outlet/cone valve facility. C.Potential peaking operations at Watana without the Devil Canyon Dam.ACRES has identified this as a possiblity.What circumstances would dictate such operation?What daily and hourly fluctuations would result?How would such fluctua- tions be attenuated by tributary input and the river distance between Watana and Devil Canyon? D.Compensation flow pumps at the Devil Canyon facility.What flows will they provide?How were these flows established? Are these pumps still planned for this facility? Response:A and B -The November 15,1982 draft License Applica- tion has been expanded to include weekly analyses in addition to the monthly analyses.This has resulted in a quantification of "normal"spillages,below the 1 in 50 year event,passed through the outlet/cone facility as described on p.E-2-l1l. B/C/2 .- Mr.Robert W.McVey August 3,1983 Page 3 C.-The potential for peaking operations at Watana without the Devil Canyon dam has been defined in the February 28,1983 license submittal (p.E-2-104).A daily variation of not more than 2000 cfs is anticipated and would be attenuated through natural storage in the river channel prior to reaching Portage Creek.A flow routing study has not been performed for determining river stage variation between Watana and Portage Creek.However,the daily flow variability of no more than 2,000'cfs is not expected to cause significant changes in water surface elevation downstream from Devil Canyon.A 2,000 cfs change in flow from 20,000 cfs would cause approximatley a one-quarter foot change in mainstem stage neglecting the natural attenuation.It is our judgement that this change will not adversely affect the downstream fisher- 1es.However,this will be confirmed by future studies. D -The compensation flow pumps at the Devil Canyon facility have been eliminated as they were not considered cost effective.The value of the dewatered reach to the fisheries resource was not considered significant. 5.Comment:We continue to be concerned about development of a release schedule which would mi tigate impacts to fisheries.The draft Exhibit E states that reduced flows could impair fish migra- tion,de-water spawning and rearing habitat,prevent access to slough and side channel habitats,and lower or eliminate inter- gravel flows to slough and side channel spawning grounds.The minimum flows proposed in Exhibit E,however,were not developed using any recognized in-stream flow predictive methodologies,and may not constitute the preferred flow regime for minimizing such effects.The license exhibits do not explain how.the 12,000 cfs minimum operational flows for August and September were deter- mined. Response:A section entitled Project Operation and Flow Section has been added to Chapter 2,Exhibit E of the License Application. The section explains how the minimum operational flows for August and September were determined.Although Exhibit E states that these impacts could occur,specific mitigation measures to avoid or minimize these impacts have been added to Chapter 3 of the Exhibit E. Potential impacts to fisheries are being refined.As this process continues,the operational flows and the specific m1t1gation measures will also be refined in consultation with appropriate resources agencies.The present schedule and plan calls for completion of many of the instream flow related studies during the 1983 field season.The -results of these studies will be incorpor- ated into aquatic habitat modeling efforts being performed by the Arctic Environmental Information and Data Center (AEIDC).Initial B/C/2 Mr.Robert W.McVey August 3,1983 Page 4 results of these modeling efforts are anticipated to be available in late 1983 followed by final results in mid-1984. 6.Comment:We believe that maximum winter flow limits should be required as well,particularly in light of potential staging should ice cover develop below Devil Canyon. Response:We concur that maximum winter flow limits should be established.The ice modeling studies will be used to predict the mainstem stage increases during ice cover conditions.This in- formation will be used to predict fishery impact and potential flood conditions for the town of Talkeetna.Mitigation measures including setting maximum winter flow limits will then be estab- lished.This will be done during the continuing studies and will assist in the interagency negotiations concerning instream flow. 7.Comment:We recommend that the License Application contain a specific,detailed flow release schedule,developed through a quantifiable in-stream flow analysis and coordinated with NMFS, U.S.Fish and Wildl He Service and the Alaska De artment of Fish and Game ADF&G,which would m~n1m1ze impacts and/or enhance conditions for spawning,feeding,passsage,out-migration,and overwintering in the Susitna River. Response:An expanded discussion of one flow select ion procedure is presented in the revised Chapter 2,p.E-2-S6.Also,Exhibit B has been revised to examine three additional flow regimes (Cases E,F,and G)that consider a wider range of flow alternatives. These flow regimes are being assessed through a quantifiable in- stream flow analysis that will be coordinated with NMFS,USFWS, ADF&G,Alaska Department of Natural Resources,Alaska Department of Environmental Conservation,Alaska Department of Transportation and Public Facilities,the Alaska Railroad,and the Corps of Engineers.This analysis will be performed on an incremental basis whereby the effects of flow alteration can be examined on a continuous basis over a range of flows rather than on just a discrete individual flow basis.The final flow regimes will be negotiated during interagency discussions and negotiations. 8.Comment:The Watana and Devil Canyon dams will cause changes to the existing water temperature regime of the Susitna River,gener- ally releasing cooler water during summer months and warmer water in winter.Temperature variations affect the ability of fish to migrate,spawn,feed,and develop in the Susitna system.Ice for- mation will be delayed or possibly not occur.Exhibit E discusses this matter at length but does not present an accurate description of post-project temperature alterations.A model was developed to project temperatures,uet it has been operated with only one year of data (1981).Further,this model was run only for the months of June through October. B/C/2 Mr.Robert W.McVey August 3,1983 Page 5 Response:Additional temperature modeling results were presented in the February 28,1983 license submittal (p.E-2-l18 to E-2-l20 for Watanaoperation and p.E-2-164 to E-2-l67 for WatanalDevil Canyon operation).These model results cover the period of June through December.A criterion was established to match outflow temperatures to inflow temperatures as closely as possible.It is our judgement that for .the year modeled (1981),the model reason- ably describes post-project temperature alterations.At Watana.., it was possible to match summer outflow temperatures to inflow temperatures although the outflow temperature does not exhibit as high or as Iowan extreme as the inflow temperature.For a period in the spring and a period in the fall,it was not possible to match temperatures.At Devil Canyon,it was not possible to match natural water temp~ratures until late in the summer. The APA does appreciate the concern of NMFS that the model was run with only one year of data.The APA is currently carrying out studies to examine the effect of various hydrological and meteoro- logical conditions on outflow temperatures including low flow and average flow years to complement the high flow year (1981). r 9.Comment:Realizing the importance of an accurate understanding of the thermal structure within the reservoirs and of outflow temperatures,we believe additional information is warranted.We recommend that modeling be done for both reservoirs throughout the year,and the resultant data be incorporated into the riverine temperature model calibrated with at least two seasons data. Response:As discussed in the response to Comment 8,additional modeling is currently being undertaken.This modeling effort will include both reservoirs and all seaspns.As per the NMFS sugges- tion,the resultant data will be incorporated into the riverine temperature modeling with at least two years data. It is our judgement that one year of modeling has demonstrated that summer temperature control is possible. I~ '10.Comment:NMFS recommends that the final License Application con- tain the results and analysis of the 1982 field data base being .gathered by the Alaska Department of Fish and Game,et al.,and results of an expanded study of sloughs in the Devil Canyon to Talkeetna reach which would provide a larger and more representa- tive sample than currently available. Response:To the extent possible,additional 1982 field data collected by the Alaska Department of Fish and Game were included in the February 28,1983 License Application submittal. B/C/2 Mr.Robert W.McVey August 3,1983 Page 6 In addition,detailed information on these sloughs in the Devil Canyon to Talkeetna reach was provided in Appendix E.2.a in the July 12,1983 submission.The 1982 field data will also be incorporated in future analyses. The sloughs which were selected for percentage of spawning salmon 1n Talkeetna. study the contain sloughs the greates t upstream of 11.Comment:Exhibit E discusses the impact of project construction and operations on river ice formation.Apparently,post-project ice formation will be delayed due to higher release temperatures from Devil Canyon.Currently,ice originating from the upper Susitna contributes 75 to 85 percent of the ice load to the lower river.With this input reduced or delayed by the project,ice formation on the lower river will be affected.This impact is not adequately discussed in the Exhibit. Response:As stated in the February 1983 license submittal,the reduced ice contributions to the lower Susitna River will result in about a four-week delay in the formation of ice downstream from Talkeetna.Future ice studies will review this information and provide more detail concerning ice development and staging. 12.Comment:Ice formation above Talkeetna will also be delayed by the project.The location of the ice front in this reach has important implications to fisheries habitat withip.the mainstem, side channels,and sloughs.In areas with ice cover,staging is expected to occur which would increase water surface elevations, possibly increasing upwelling,overtopping the upstream berms of sloughs,and causing high velocities and scour to occur. In those areas where ice formation does not occur,water eleva- tions would drop below naturally occuring levels,leading to potential de-watering of spawning gravels and reductions in up- welling areas.Exhibit E predicts that the ice front should occur at some location between Talkeetna,RM 100 and Sherman,RM 130 and will depend upon the upstream temperature,i.e.,the Devil Canyon outflow.As no model was completed for winter riverine or reser- voir temperatures,the full scope and measure of these effects cannot be assessed. Response:Although no winter reservoir temperature modeling was completed for the November 15 draft,the locat ion of the down- stream ice front was bracketed based on preliminary information. Since the November 15 draft,the results of the reservoir tempera- ture and instream ice modeling were completed and included in the February 1983 license document.Discussions on the ice-related impacts during Watana and Watana/Devil Canyon operation were B/C/2 ..... Mr."Robert W.McVey August 3 t 1983 Page 7 expanded (p.E.2.89 t E.2.l24 -E.2.l27 t and E.2.169 -E.2.170). Reservoir temperature modeling results for both Watana and Devil Canyon reservoirs were used as input to riverine temperature modeling.Additionally t maximum and minimum expected reservoir outlet temperatures t for both Watana and Devil Canyon reservoirs t were used as input boundary conditions for riverine temperature modeling to bracket the maximum upstream and downstream locations of the ice front. To futher refine and expand these ice m?deling results,further instream ice studies are currently being undertaken.These studies will define the ice front location for various inputs t the time of ice formation t the ice staging,and the ice breakup. 13.Comment:Measures to mitigate unavoidable impacts to fisheries resources are presented in the Exhibit.Many of those measures designed to mitigate construction impacts effectively address this concern.Development of a flow regime that minimizes loss of habitat and maintains normal timing of flow related biological stimuli is also proposed.We recommend that such a release schedule be included in the final License Application. Response:In the License Application submitted on February 28 t 1983 t seven alternate flow regimes were considered (see Exhibit B).These regimes ranged from those which optimize project economics (Case A)to those which consider flows that minimize or eliminate impacts to fish (Case D).In order to expand the range of possible flow regimes which would encompass any plausible flow regime,three additional flows (Cases E,F,and G)were added to Exhibit B in July 1983 t including one (Case G)that reflects aver- age pre-project or run-of-river conditions.Final flow regime selection will be made following interagency review and negotia- tions. At present t there is no indication that flow provides stimuli for outmigration.Instead,it may be related to other factors such as photoperiod_. 14.Comment:The Exhibit proposes to mitigate fishery losses by physical modification of side sloughs and creation of mainstem and side channel spawning areas.This vague commitment to an approach that is only a paper concept dependent upon the results of ongoing or proposed studies does not allow us to fully eval uate the feas i- bility of the proposed project nor to assess the effectiveness with which project impacts can be mitigated. Response:The revised mitigation plan in the License Application submitted February 28 t 1983 has further developed the details associated with the various habitat enhancement measures. B/C/Z Mr.Robert W.McVey August 3,1983 Page 8 A detailed comprehensive mitigation planning effort will be com- pleted through consultation with the various resource agencies. This effort will be based,to a large extent,on already completed field studies and on the aquatic habitat modeling studies by the AEIDC which will be compelted in Fy84.The modeling studies are necessary to determine the level and extent of mitigation measures needed. 15.Comment:We support the concept of retaining the habitat value of side sloughs through physical alteration.Further,we recommend that Exhibit E incorporate a slough mitigation plan which identifies the sloughs to be modified,the design criteria,and the operational plan and target fish species specific to each slough.Details for the mitigation goals and operational monitoring efforts for this plan should be included.The applicant should note,however,that we feel the release schedule proposed in Exhibit E should be refined based upon an accepted instream flow predictive methodology and the specific requirements of the selected species.We believe this is essential to serious consideration of a slough modification program. Response:An expanded slough mitigation plan is incorporated into Chapter 3,Exhibit E of the February 28,1983 License Application submittal.As mentioned in the response to Comment 14,a stepwise approach to mitigation is currently underway.This approach first involves completion of modeling studies to quantiatively assess any positive or negative impacts.The second step will be to com- plete the detailed plan,in consultation with the various resource agencies,to mitigate these impacts. 16.Comment:Exhibit E states that if alternative mitigation schemes prove infeasible,a hatchery could be developed.While we regard such artificial methods to be the least desirable form of addressing fishery losses,we realize that slough modification is largely untried in Alaska and that these mitigative efforts may indeed fail.Therefore,we recommend that Exhibit E should advance this discussion beyond the statement that "a hatchery could be developed."Informat ion should be incl uded within license Exhibit E which describes the number of hatcheries needed, locations,sizes,what the production target for each species would be,and cost estimates. Response:The salmon hatchery alternative loS a low-priority alternative that is not anticipated to be needed.The Power Authority believes that full mi~igation can be achieved by an B/e/2 ,~ ,.... Mr.Robert W.McVey August 3.1983 Page 9 adequate flow regime and/or employing the habitat enhancement techniques described in revised Section 2.4.4,Chapter 3,Ex- hibit E.A report..!.!on the assessment of hatchery potential and siting has been prepared for the Power Authority and will be considered in future mitigation planning efforts. 17.Comment:None of the mitigative measures presented comply with FERC rules and regulations under Section 4.41 (F)(3)(iii);i.e., costs for these features are not presented,nor are design plans for mitigation features included. Response:Cost of mitigation is discussed in Chapter 3,Section 2.7 of the February 28,1983 License Application.Cost estimates are shown in Tables E.3.39,E.3.41, E.3.45,and E.3.47;design drawings are presented in Figures E.3.26 through E.3.31. Additional details and refinement to the mitigation facilities will result from on-going mitigation planning efforts.This will include extensive consultation with the resource agencies. 1.1 Kramer ,Chin and Mayo,Inc.1983.Susitna hatchery siting study.Prepared for the Alaska Power Authority and Acres American Incorporated. B/C/2 Mr.Robert W.McVey August 3,1983 Page 10 Specific Comments -Chapter Two 1.Comment:Page 15,para.4.Breakup.The section should describe when breakup normally occurs,specifically the dates of the ear- liest,mean.and latest recorded events. Response:Breakup information for the Susitna River at Talkeetna is contained in Table 4.6 in the Ice Observations 1980-81 report by R&M Consultants. 2.Comment:Page 38,para.3.This section should consider that at least eight sloughs exist above Gold Creek.several of which support large numbers of spawning salmon.e.g.,Slough 21.While Gold Creek may be a logical point at which to gauge flow,it does not necessarily guarantee that upstream flow will be sufficient to maintain habitat value in these sloughs.Exhibit E should discuss this concern and recommend necessary measures to guarantee ade- quate flow to these sloughs. Response:Flows at Gold Creek are used as an index of flows throughout the Susitna basin above Talkeetna.By targeting flows to be accommodated at Gold Creek.flows throughout the basin can be apportioned on a drainage area ratio basis.Since the drainage area between Watana or Devil Canyon and Gold Creek will not be altered,reduction or increase of flow at Gold Creek is indexed to changes at any point in the river above Talkeetna.The rationale is discussed at p.E-2-l10. The sloughs upstream from Gold Creek that support fish are down- stream from Portage Creek.Since the drainage area between Watana and Gold Creek is approximately 980 square miles and the drainage area between Portage Creek and Gold Creek is approximately 176 square miles,the discharge at the most upstream slough will be about 17.7 percent less than the total discharge contributed from the drainage area between Watana and Gold Creek if it is assumed that the runoff per square mile does not vary over this drainage area.For example,if the Gold Creek flow is 12.000 cfs,of which 8.000 cfs is released at Watana and the remaining 4,000 cfs is contributed from the drainage area downstream from Watana,the flow at the slough immediately downstream from Portage Creek would be approximately 11,300 cfs.(Under natural conditions,a flow of 4,000 cfs from the drainage area between Watana and Gold Creek would imply a Gold Creek discharge of 20,000 cfs.)This flow,1n conjunction with proposed mitigation measures,would be used to maintain the productivity of the sloughs.With distance down- stream,the flow would increase such that the flow adjacent to sloughs just upstream from Gold Creek would be close to the 12,000 cfs flow at Gold Creek. It must also stream of Gold analysis. B/C/2 be remembered that the water level at sloughs Creek are being indexed to Gold Creek for future up- Mr.Robert W.McVey August 3,1983 Page 11 - .- 3.Comment:Page 47,Section (v)Impacts on Sloughs.The section notes that data to confirm the areal extent of upwelling at low flows are unavailable at this time.Currently only one slough has been investigated sufficiently to predict project influences on groundwater and upwelling.This slough is not representative of all such sloughs in the Devil Canyon to Talkeetna reach. Under existing winter flows,ice formation causes staging equiva- lent to an open water flow elevation exceeding 20,000 cfs. Filling flows of 1,000 cfs,for which ice formation may be delayed or fail to occur,could significantly impact sloughs through de- watering gravel spawning areas and overwintering habitat. Response:While it is true that groundwater studies have focused on slough 9,studies have also been conducted at slough 8A.These studies have been useful in understanding the mainstem-ground- water-slough upwelling interaction.Although there certainly are differences among sloughs in the Devil Canyon to Talkeetna reach (path length,groundwater gradient,soil properties,tributary inflow etc.)~the groundwater processes are similar. Because of the potential for adversely affecting groundwater upwelling rates and area during the filling of Watana Reservoir, filling flows have been revised 1n the February 1983 License Application submittal.Natural flows will be provided from November through April during the filling period. ..... ,.... 4..Comment:Page 49,para.2.As the temperature of groundwater is considered a function of the average annual temperature of the mainstem Susitna what will be the impacts of the second filling year release temperatures to the groundwater?How long would any change persist?No data are presented to support the statement that groundwater temperatures will not change. Response:The impacts of the second filling year release tempera- tures on the groundwater would depend on the location downstream • Immediately downstream of the damsite,the mainstem water temperature would be a constant 4 degress C from the first winter of filling through the second summer of filling until the outlet ,facilities can be operated.This would tend to cause an increase in groundwater upwelling temperature just downstrea~from the dam, assuming existing conditions approximate 3 degrees C.Farther downstream climatic condition.s will have an effect on mainstem water temperatures.For example,at Gold Creek,water tempera- tures will be cooled in October to less than 4 degrees C,but will be above natural conditions.Winter temperatures (i.e.,November to March)will be a degrees C.April temperatures are likely to be above existing conditions,but will be close to 0 degrees C. T.emperatures will continue to be above natural conditions B/C/2 Mr.Robert W.McVey August 3,1983 Page 12 until natural temperatures begin to rise above 0 degrees C in early May,when the ice is flushed out.At that time,natural temperatures will be greater than filling temperatures and will remain so for the sUllDJler or until the outlet facility can be operated.thus,although the warmer fall temperatures and April temperatures during filling will tend to compensate for the cooler summer water temperature at Gold Creek,the net effect will be a cooler average for the approximate one year period.However,the lower average water temperature for this period will only be short term.Although this dynamic process has not been modeled,the temperature differences during this period would be dampened by the buffering capability of the soil and groundwater,as it is now.Hence upwelling temperatures during the filling process would likely be within 0.5 degrees C of existing temperatures. 5.Comment:Page 51,para.3.Monthly Energy Simulations.The referenced program utilized load forecasts developed by ISER, Woodward-Clyde,and Battelle.These forecasts are now seriously questioned in light of recent developments (see General Comments). We recommend these simulation studies be updated and run with the most recent load forecasts available. Response:Simulation studies were updated and run with the most recent load forecasts available.The results were included in the License Application revisions submitted to FERC on July II,1983, and will appear in the Application distributed for agency and public review. 6.Comment:Page 58,para.1.Reservoir and Outlet Water Tempera- tures.This suggests that winter outflow between 1 degree and 4 degrees C can be selectively withdrawn through a multiple intake structure.This control would be dependent upon the thermal pro- file of the reservoir during winter,a set of conditions which has not been modeled.Therefore,we question the validity of the statement which suggests one degree water temperatures would be available upon request.Information presented by Acres during the Nov.29 -Dec.3 workshop showed winter temperatures in Eklutna Lake to be between 0 and 3.6 degrees in the upper 2 meters,while isothermal conditions exist below this level. Response:We concur that temperature control of the outflow would be dependent upon the thermal profile of the reservoir.We also agree-that 1 degree C water may not necessarily be available upon request.The analysis was meant to bracket the range of outflow temperatures expected.Experience at the W.A.C.Bennett dam in British Columbia,Canada has shown that winter outlet temperatures from an intake 150 feet and 250 feet below water surface have been as low as 1 degree C or less.With a deeper intake,it would also be theoretically possible to maintain an outlet temperature of 4 degrees C.Winter thermal modeling results of Watana and Devil B/c/2 Mr.Robert W.McVey August 3,1983 Page 13 Canyon is included in the February 28,1983 License Application submittal. ,..... I - 7. 8. Cc:mnnent:Page 59,para.2.Ice.It is not clear what impact will occur to the lower River from reduction of ice flow from the .upper Susitna.How far downriver would ice formation occur?When does freeze-up normally occur1 Response:The reduction.of ice from the upper Susitna will cause a delay in the ice format ion process downstream of Talkeetna. Since the reach below Talkeetna has not been modeled,a quantifi- cation of the delay has not been·made.However,it is anticipated that the lower river will be ice covered with both Watana and Watana/Devil Canyon in operation.Discussions of the ice forma- tion processes are presented in the February 1983 License Applica- tion submittal (p.E.2.90,E.2.127,and E.2.170).As discussed in the response to your General Comment No.12,further instream ice modeling for the Devil Canyon to Talkeetna reach will be conducted during FY84.In addition,the need for ice modeling studies down- stream of Talkeetna is presently being examined,but a decision regarding the necessity for detailed ice modeling below Talkeetna must await the results of field studies to be conducted this coming winter. Comment:Page 91,para.2.Mitigation of Watana Impoundment Impacts.This section states that a proposed 12,000 cfs flow at Gold Creek would provide salmon access to most of the sloughs and would assist in maintaining adequate groundwater levels and upwelling rates.There are no studies which would support these conclusions,as only one of approximately thirty-six sloughs has received detailed study.Similarly,current information does not permit the development of mitigation measures within the sloughs, as stated in the last paragraph of this page. Response:The statement that a proposed flow of 12,000 cfs would provide salmon access to most of the sloughs was deleted from the February 1983 License Application final submittal.The statement that a flow of 12,000 cfs would assist in maintaining adequate groundwater levels and upwelling rates remains relevant.Under natural conditions,in September and early October,when Gold Creek flows drop below 12,000 cfs,upwelling continues to exist. The water table is necessarily lowered to maintain a balance with the mainstem water level.This is further discussed in Section 4c.1.2(f)and 4.1.3(d)of the February 28,1983 License Application document.However,as discussed in Appendix E.2.A of Chapter 2 of the License Application to be distributed to the resource agencies for review,this reduction in water table depth is of a magnitude which may not be significant.It is our judgement that a flow of 12,000 cfs in conjunction with mitigation measures,will provide salmon access to most sloughs. B/c12 Mr.Robert W.McVey August 3,1983 Page 14 9.Comment:Page 93,para.2.Nitrogen Supersaturation.While we support the concept of installing cone valves at the outlet works of both dams,the subject requires further discuss ion.These valves will only operate (and afford gas supersaturation benefits) during spillages below the 1 in 50 year high flow event.Accord- ing to the discussion presented on pages 79 through 81,such spillages would be a relatively uncommon event (for the 32 year period simulated,there were 4 years during which spillages occurred).The discussion on these valves should present data on their frequency of use and explain the criteria by which they are planned and installed.This should include the following: 1.Potential temperature impacts resulting from withdrawal from these outlet structures. 2.Potential impacts to river ice formation attributed to operation of these valves during winter. Response:The discussion on Nitrogen Supersaturation in the February 28,1983 submittal was expanded to include frequency of use,volumes discharged and maximum annual discharge of the fixed cone valves (Sections 4.l.3(a)(v),pp.E-2-111 through E-2-112 and 4.2.3(a)(v),pp.E-2-163 through E-2-164).The rationale for the use of these valves is presented on pp.E-2-87 to E-2-l88.The valves have been proposed as one means in which to decrease the potential for gas supersaturation. Potential temperature impacts resulting from withdrawal from these outlet structures can be found ~n Sections 4.1.3(c)(i)and 4.2.3(c)(i)of the license document.Operation of the Watana fixed-cone valves will not be a problem.However,operation of the fixed-cone valves at Devil Canyon could have an adverse impact on the downstream fishery.As stated in Section 4.2.3(c)(i),this effect will be minimized by releasing flow at Watana and generat- ing power at Devil Canyon to the extent possible.During project operation,the fixed-cone valves will not normally be operated during winter.Only in the event of a power outage would their operation become necessary. 10.Comment:Page 95,para.1.Temperature.The discussion of Canyon pos t-proj ect temperature mitigation is inadequate. advantages are gained by the multiple release structure? Devil Canyon reservoir stratify during summer and winter? Devil What Will B/e/2 Response:The advantages of the multiple release structure at Devil Canyon are discussed in Section 4.2.3(c)(i)of the February 1983 license document.Results of the Devil Canyon modeling,are presented in Chapter 2 of Exhibit E the February 28,1983 license document.Based on the results of the thermal modeling of Devil Mr.Robert W·.McVey August 3,1983 Page 15 Canyon Reservoir,thermal stratification will occur between May and December.See Figures E.2.213 and E.2.214. Specific Comments -Chapter Three ,... 1. 2. Comment:Page 8,para.2."Since the greatest changes in physi- cal habitat·s are expected in the reach between Talkeetna and Devil Canyon,.fishery resources using that portion of the river were considered to be the most sensitive to project effects."Trans- forming the mainstem Susitna River into a reservoir is also a con- siderable change.Later in this paragraph is the statement "The mitigations proposed to maintain chum salmon should allow sockeye and pink salmon to be maintained as well."We are unable to locate specific mitigation plans for chum salmon.Those concept- ual plans presented for slough modification and mainstem spawning bed construction deal principally with one life history stage. The statements made here that improved mainstem conditions will replace loss of slough rearing habitat and that juvenile over- wintering areas are not expected to be adversely affected by the project are not supported.In fact,preliminary data presented elsewhere in the Exhibit indicate that overwintering habitat will be impacted and that sloughs may provide important rearing habitat. Response:The Power A~thority concurs that changes of physical habitat in the impoundment zone are also considerable.The referenced paragraph 'should refer to changes that affect anadro- mous species.In that case,the Talkeetna to Devil Canyon reach is where the greatest changes in physical habitat associated with these specie.s are expected to occur. The mitigation plans for the sloughs are primarily focused on chum salmon because of their proportionally greater use of the sloughs. However,other species of salmon that utilize the sloughs such as sockeye and pink salmon are also being considered in the plans. Additional studies to support impact assessment and mitigation planning are continuing,as detailed in an interagency meeting held July 18,1983 to describe the 1983 field season studies. These inc!ude studies on all life stages.The revised mitigation plan has further developed the details associated with the various habitat enhancement measures and addresses the overwintering and rearing habitat concerns.See Section 2.4.4(a)of the revised Chapter 3. Comment:Page 12.Species Biology and Habitat Utilization in the Susitna River Drainage.Estimates of adult salmon presented in this section depict only escapement.A more meaningful estimate should be made using catch to escapement ratios,as done in chap- ter five.For instance,in 1982 77,000 pink salmon migrated above Talkeetna.However only one fish in every 3.8 escaped the commer- B/c/2 Mr.Robert W.McVey August 3,1983 Page 16 cial fishery.Using the 3.8 to 1 ratio,this reach of the Susitna accounted for over 350,000 pink salmon of which over 277,000 were available to the commercial fishery.Escapement estimates alone fail to indicate the high values associated with anadromous fish- ery resources. Response:These computations have been provided (Chapter 3, Section 2.l.5(a)). 3.Comment:Page 76.Slough Habitat·.This section does not des- cribe impacts associated with lowered winter river stage during filling.Should upwelling and backwater effects during winter prove critical to developing eggs or juvenile salmonids,any reduction in these areas could create significant damage. We question the figure presented as the number of sloughs in which salmon spawn within the Chulitna to Devil Canyon reach.Using information supplied by the ADF&G and from Exhibit E,adult salmon have been observed in 26 of these sloughs.Exhibit E should clearly present the total numbers of sloughs in this reach and the 1981 and 1982 data on spawning adults. Response:There will be no reduction of flow during winter filling periods (see revised Chapter 2 as well as revised Chapter 3,Table E.3.26).The number of sloughs utilized by salmon is based on data from ADF&G's 1981 and 1982 field studies.For both years,20 of the 34 surveyed sloughs between Devil Canyon and Talkeetna have supported spawning salmon (p.E~3-95 of revised document and individual species discussions in Section 2.2.1). 4.Comment:Page 77.The discussion presented on impacts to slough habitat is not clear.As Exhibit E states that groundwater up- welling in the sloughs is probably driven by the mainstem stage, which would cause a decreased flow in the sloughs (post-project), why does this section state that under post-project conditions only the backwater areas (of the sloughs)would be affected? The second paragraph of this page states,"With mainstem flows above 1'4,000 cfs,a backwater forms at the mouth of the slough." How is this known?Which slough is being discussed?Is this true for each slough?The same paragraph explains that,during the 1982 field season,flows in the 12,000 to 14,000 cfs range occurr- ed and afforded opportunity to observe fish passage at flows below normal August levels.These flows appeared to hamper or restrict fish passage into sloughs.Backwater effects were not seen at flows of approximately 12,000 cfs,yet project low flow limits for August have been established at 12,000 cfs.This section under- scores the problems associated with such proposed flows.It is apparent that some significant changes occur to the slough habitat B/c/2 I""" I - Mr.Robert W.McVey August 3,1983 Page 17 within a relatively narrow range of flows;changes which may have important biological implications. Response:The discussion has been expanded to address these con- cerns,see pages E-3-95 to E-3-97 of the revised document.Addi- tional analyses.of the backwater effect are provided in Appendix E.2.Aof the July 11,1983 revised License Application. 5.Comment:Page 87,para.5.While the described floods may trans- port sediment and scour the river bed,reduction or elimination through flow regulation may not necessarily be beneficial.The Exhibit presents no data to support the comment that high mainstem veloci ties limit fish usage (page 87,par a.2.).Further,such high flow events may be critical to maintaining side channel and slough habitat through flushing and replenishment of gravels and by removing vegetation and beaver dams which may reduce habitat value.This point is not discussed in the following sections of slough or side channel habitats. Response:The data to support the statement that high streamf10ws appear to inhibit upstream salmon migration occurs in the refer- enced ADF&G documents (see page E-3-l09 of the February 1983 License Application).As discussed in the revised Section 2.2.2(b)(ii),these high flows are beneficial in flushing fines from spawning gravels.The mitigation plan (Section 2.4.4,p. E-3-l68)provides a means for mitigating this loss of a flushing flow.· 6.Comment: changes expected Page 103,para.3.Slough Habitat. in streamflow during the open-water to affect slough habitats. We disagree that season are not - r r ,- 7. 8. Response:The statement referred to the additional impacts to sloughs caused by the Devil Canyon dam above those already imposed by the Watana dam.This has been clarified (see p.E-3-l32). Comment;Page 116.Aquatic Studies Program.We believe this discussion suffers from omission of the majority of the 1982 field study results.We strongly believe that two years of study are the minimum required as a basis to discuss the impact of hydl:o- electric development on the Susitna River. Response:Additional 1982 data have been incorporated throughout the document. Comment:Page 130.Measures to Minimize Impacts.It is stated that "A flow release schedule will be used that minimizes the loss of downstream habitat and maintains normal timing of f10w-related biological stimuli."The flow schedule presented in Exhibit E, Chapter 2 does not minimize habitat loss,nor does·it maintain B/C/2 Mr.Robert W.McVey August 3,1983 Page 18 normal flow related biological stimuli.This section should also discuss installation of compensation flow pumps at Devil Canyon which would provide flow between the dam and tailrace channel. Response:An expanded discussion of the flow selection procedure is presented in the revised Chapter 2,p.E-2-56 (July 1983 update).The compensation flow pumps below Devil Canyon have been removed from the project.In addition,see response to General COllDUent 13.This response describes how the Exhibit B has been revised to examine three additional flow regimes (Cases E,F,and G)• 9.COllDUent:Page 130,para.2.Measures to Minimize Impacts.The section states that "Instream flow requirements are being deter- mined for each species/life stage/time unit combination.i •Who is performing these studies?How will they be determined?Again,it is impossible to understand what flow regime,if any,is actually being suggested within Exhibit E.Is the release schedule pre- sented in Table 2.17 just a "first cut?"This is apparently the case.Considering that the final release schedule is to be based on future studies as suggested here and may be modified to accom- modate outmigration (page 3-132,para.1)and will need to consid- er temperature and volume (page 3~143,para.1);why is a flow regime proposed in the absence of such information? Response:ADF&G and AEIDC are continuing to evaluate the effects of the flow regime and develop,in consultation with the resource agencies,a release schedule to minimize impacts.These efforts will be relying on the AEIDC hydraulic modeling efforts to evalu- ate various mitigation flow alternatives. l~Comment:Page 131,para.1.This states,in effect,that slough habitat will either be enhanced or degraded by the project,and that actual impacts to habitat are the subject of ongoing studies. These ongoing studies should be described.What will be investi- gated?Which sloughs will be studied? Response:The referenced text properly belongs in the impacts section.The discussion has been revised to focus on mitigation (p.E-3-l62).The on-going studies were presented in detail to NMFS and other resource agencies during a meeting on July 18,1983 at the APA.The APA plans to continue to inform and consult with the resource agencies concerning any existing future aquatic studies. -Extensive field and modelling efforts that address impacts to sloughs (and other habitats)are continuing.These efforts are being conducted by the ADF&G and the Arctic Environmental Informa- tion and Data Center.Intensive efforts are focused on sloughs B/C/2 Mr.Robert W.McVey August 3,1983 Page 19 8A,9,11,and 21 with additional studies on other sloughs.The primary relationships being investigated are: ll. ..... 12. 13. 1.flow inmainstem versus flow and groundwater in the sloughs; 2.habitat (as measured by velocity,depth,and substrate) changes with flow; 3.species abundance and distribution; 4.incubation and emergence of salmonids; 5.overtopping of the head end of the slough;and 6.timing of outmigration and rearing. Connnent:Page 132,para.4.This states that flows of 12,000 cfs are sufficient to undertake rectifying impacts by modifying habitat.How is this known?The paragraph should discuss the studies upon which this is based or qualify·any such conclusions as preliminary and subject to.further study. Response:The text has been revised to indicate the preliminary nature of the discussion,although considerable field observations are available to substantiate the statement (see Trihey 1982d reference in revised Chapter 3). Connnent:Page 133,para.1.Winter Flows.The statement is made that "Since minimal impacts are expected during both filling and operational winter flow,rectifying measures are not needed." This is not supported.On page 131,para.I,we learn slough habitat may be degraded by winter flows and that these impacts are the subject of ongoing studies.Page 94 presents a lengthy discussion of impacts attributed to altered winter flows. Response:The referenced sentence has been changed in the February 28,1983 submittal.It should only have been in refer- ence to filling flows.Since the filling flow regime from November 1 to April 30 is proposed to reflect the inflow to the reservoir,only minor impacts are expected and no mitigations are proposed. Connnent:Page 133,para.5.Reduction of Impacts Over Time. "Post-operational monitoring will be conducted to evaluate the effectiveness of mitigation measures (see Section 2.6)~11 The license application should detail what monitoring will occur and how the effectiveness of mitigation efforts will be evaluated. B/C/2 Mr.Robert W.McVey August 3,1983 Page 20 Response:The expanded discussion on monitoring starts on p. E-3-l80 of revised Chapter 3. 14.Comment:Page 136,para.3.The discussion of hatchery develop- ment is inadequate. tives fail,it will what measures would In the event that other mitigation alterna- be important to present a clear picture of be taken to compensate.for fisheries losses. Response:The salmon hatchery alternative is a low-priority alternative that is not anticipated to be needed.The Power Authority feels that full mitigation can be achieved by an ade- quate flow andlor employing the habitat enhancement techniques described in revised Section 2.4.4.If necessary the hatchery alternative will be investigated in more detail in the future. Recent efforts in considEf7ation of a hatchery include a siting study for such a facility-• 15.Comment:Page 137,para.3.We believe that the water tempera- ture of 5°to 6°C during the second filling year will present significant adverse impacts to salmon.Addition of a low level portal could apparently avoid much of these effects.We recommend such a device be incorporated into the final design. Response:This option is being evaluated in light of the'temp- eratures anticipated during the second year of filling.This evaluation includes field studies by the ADF&G on egg incubation temperatures,laboratory studies by the USFWS on incubation temperatures,and a literature review.Results of the field and laboratory studies are expected to be completed in FY84.If indicated by these studies,provision of a lower level intake would be considered in the detailed design phase of the project. 16.Comment:Page 143,para.1."Continuing reservoir thermal model- ing will allow an evaluation of available water temperatures throughout the year so that -a detailed r-elease plan can be devel- oped.The release plan will need to consider both water tempera- tures and volume in order to minimize impacts."We strongly agree with this,and recommend that the license applicat ion contain just such a release plan which would most effectively minimize impact. Response:This evaluation is continuing through hydrologic model- ing efforts.In fact,the importance of this effort was given high priority by the Power Authority.This has resulted in an expansion of efforts to complete this evaluation. l/Kramer,Chin,and Mayo.1983.Susitna hatchery s~t~ng study. Prepared for the Alaska Power Authority and Acres American,Inc. B/e/2 Mr.Robert W.McVey August 3,1983 Page 21 Specific Comments -Chapter Ten 1.Comment:Page 28,para.6.Diversional Emergency Facilities.The release levels referred to do not avoid effects on the salmon fishery downstream. Release adverse 2. Response:We concur that release levels referred to do not com- pletely avoid adverse effects on the salmon fishery downstream. However,these flow releases permit the development of mitigation measures to these effects. Comment:Page 30,para.3.Figure E.2.90 indicates that three, rather than four portals would be constructed at Watana.We question which is correct and how the numbers arid position of the portal were considered in minimizing impact.Also we cannot concur that -temperatures will be controlled within acceptable limits. Response:Figure E.2.90 actually shows that four portals would be constructed at Watana.Thus,Figure E.2.90 is in agreement with Chapter 10.Since water nearer the surface of the reservoir will be closer to natural temperatures it is desirable to draw water from the surface.However,because the reservoir will be drawn down in late spring it will be necessary to have an intake portal at an elevation near the surface.As the reservoir fills,the water surface elevation will increase.Therefore,in order to continue to draw water from close to the surface an intake portal at a higher elevation must be provided.As the filling process continues,additional intakes mUst be provided to take advantage of the warmer surface waters.The elevation of the top intake is near the maximum reservoir operating elevation.As the reservoir elevation is drawn down in the fall and winter the process is reversed.Water is drawn from near the surface to take advantage of the cooler surface waters.The selection of four portals is based on engineering considerations (i.c.the number of portals that could be technically and economically constructed)and the thermal profile of the reservoir at various times of the year. The degree of temperature control is discussed General Comment No.8.It is our judgement within the natural range can be provided during However,this judgement is being confirmed studies. in our response to that temperatures the summer period. through on-going r 3.Comment:Page 30,para.4.We are not aware of studies which have occurred to mitigate project impacts through provision of streamflow at Gold Creek.These should be described. B/c/2 Mr.Robert W.McVey August 3,1983 Page 22 Response:A discussion of the project operational flow selection process has been added in Chapter 2 of Exhibit E.Although specific studies addressing flow selection have not been completed at this time,the studies being funded by the Power Authority are directed towards ultimately providing a basis for flow selection. 4.C01mnent:Page 31,para.5.According to presentation by ACRES American at an APA-sponsored workshop in Anchorage during the week November 29 to December 3,1982,no temperature model has been run for Devil Canyon reservoir.How,then,can the utility of a multi-level draw-off at Devil Canyon be known?This again under- scores the lack of understanding of project temperature impacts. Response:As of the November 15,1982 draft,no temperature model had been run for the Devil Canyon reservoir.However,preliminary modeling of Watana reservoir indicated a multi-level intake at Watana was beneficial.Hence,it was assumed that a multi-level intake at Devil Canyon would also be beneficial until this could be verified by modeling Devil Canyon reservoir.The results of the Devil Canyon reservoir modeling are presented in the February 28,1983 License Application document. The Alaska Power Authority appreciates the effort expended by NMFS per- sonnel in formulating comments on the Draft Exhibit E.If you have any questions regarding our responses,please do not hesitate to contact Mr.Thomas J.Arminski,Deputy Project Manager,Permitting,Alaska Power Authority. Sincerely, ~~'1--JlJ Executive Director TA/dlc cc:Brad Smith,NMFS,Anchorage,Alaska William Wakefield II,FERC,Washington,D.C. Dwight L.Glasscock,H-E,Anchorage,Alaska Jane Drennan,PMS,Washington,D.C. B/C/2 - NATIONAL PARKS SERVICE COMMENTS CONTAINED IN THE NATIONAL PARK SERVICE LETTER OF JANUARY 14,1983 We have reviewed the proposed Susitna Project recreation plan as pre- sented in the draft license application Exhibit E and have the fo1low- i ng conments.Cultural resource management issue comments were ad- dressed previously in the December 3,1982,letter from our archeolo- gist,Dr.Floyd Sharrock. The recreation plan appears to be well-conceived.A diversity of rec- reation resource opportunities are planned with facility development in stages which will permit future modification where it is appropriate. The plan also reflects excellent coordination between its authors and appropriate public agencies and the private sector. We support the following recommendations,many of which were shared with the EDAW,Inc.,representatives at the December 1,1982,workshops for recreation and aesthetics. Comment 1 Before construction begins,existing river conditions from upstream of the project (perhaps the confluence of the Tyone and Susitna Rivers)to Gold Creek should be recorded on film.A high qual ity motion picture with narrative describing preconstruction resource conditions could be an effective interpretive tool for the visitor center(s).A permanent film record of the Devil Canyon whitewater is especially important.A film record of the project construction process and the project in operation,including a description of the recreation opportunities,should also be made and perhaps com- bi ned with the preconstruction film for use at the vi sitor cen- ter(s). Response A high quality movie as described will be considered as part of the visitor interpretation program.The detailed program- ming,functional design,and final engineering for the visitor center(s)will occur during Phase II design development. Comment 2 If normal operation of the Watana Dam wi 11 ml ml1ll ze the danger now associ ated with kayaki ng the unregulated Devi 1 Canyon whitewater, consideration should be given to providing pUblic access to the Susitna River below the dam prior to the completion and operation of the Devil Canyon Dam.. Response This suggestion will be considered. Comment 3 Consideration should be given to providing public access from the project transportation corridor to Portage Creek for fishing and/or kayaking. Response Access to Portage Creek was examined in Exhibit E as a recrea- tion opportunity.Because of fragile salmon spawning grounds and localized wetland conditions at the creek,trail access was determined to be undesirable. Comment 4 Appropriate day use and/or overnight facilities should be consid- ered for Gold Creek.These facilities could accommodate:river users coming out of the project,backpackers who enter the project area via the Devil Canyon Dam construction right-of-way,and other recreationists using the Alaska Railroad who wish to layover in the Gold Creek area. Response Recreation use of the Susitna River below the Devil Canyon damsite and within the transmission intertie will be consid- ered as part of supplemental transmission corridor recreation planning.This will occur prior to June 30,1983. Comment 5 The status of the Stephan Lake-Prairie Creek corridor is presented on pages E-7-83,84 as a lower priority resource area.The pri- ority should be elevated to Phase One implementation as negotia- tions with Cook Inlet Region,Incorporated,and/or the village cor- porations could be lengthy.Public access to the Talkeetna River (a potential State Recreation River)via the Stephan Lake-Prairie Creek corridor is an important issue that needs to be resolved early so that public use may continue during project construction. Response Access to the Stephan Lake-Prairie Creek corridor by air will continue at Stephan Lake.Current recreation use on the Prairie Creek-Talkeetna River run typically means a fly-in to Stephan Lake and rafting or kayaking out;this usually takes three days.Other recreation use of Stephan Lake incl udes liPortsmen's lodges,a commercial lodge,and private cabins from which people enjoy hunting and fishing.Public use will continue as currently defined.The potential for public camp- ing will be dependent upon the above-mentioned agreements and if Phase Five provides the necessary time to negotiate and de- sign any public facilities as needed without restricting existing use. - - - Comment 6 There is an incorrect statement in paragraph 6,page E-7-15,that shou1 d be revi sed.The text incorrectly states that the Su sitna River has been studied for potential inclusion in the National Wild and Scenic Rivers System.A study and evaluation under the author- ity of the Wild and Scenic Rivers Act has never been undertaken. Response Text has been revised. Comment 7 Recently it came to our attention that the electrical transmission corri dor between the Watana Dam and Go1 d Creek wi 11 now be relo- cated closer to the transportation corridor to facilitate mainten- ance.We trust that careful attention will be given to the devel- opment of appropriate mitigation measures to safeguard,as much as possible,the scenic values associated with the corridor. Response All project facility relocation and/or design refinements will be studied and visual mitigation measures applied to protect scenic values.An aesthetic mitigation measure app1 ied to the new transmission corridor was locating the corridor out of primary viewsheds toward the Talkeetna Mountains.This was accomplished by placing the transmission corridor along the north side of the road. - i", i - FISH AND WILDLIFE SERVICE - -, COMMENTS CONTAINEO I~THE U.S.FISH AND WILDLIFE SERVICE LETTER OF JANUARY 14,1983 GENERAL COMMENTS Comment 1 The Fish and Wildlife Service (FWS)has been requested by letter dated 15 November 1982,from Acres J'rneri can Incorporated,to forma"y revi ew and comment on the Federal Energy Regul atory Commi ssi on (FERC)draft license application Exhibit E for the Susitna Hydroelectric Project. Thi s response is being provided as parti al fulfillment of your request and is intended to be a constructive evaluation in regard to fish and wil dl ife resources.We hope that our comments wi 11 be of val ue in drafting the final license application. Response The receipt of the FWS comments within the regulated minimum 60 day review period was appreciated. Comment 2 The following FWS letters were also provided in response to formal pre- application requests on this project: 1.June 23,1980,letter to EricYould. 2.'December 17,1981,letter to Eric Yould. 3.December 30,1981,letter to Eric Yould. 4.January 5,1982,letter to Eric Yould.Response April 4/R2. Si nce these 1etters were formall y requested as part of the FERC pre-appl ication coordination process we consider it appropriate that our responses be specifically addressed as part of the Exhibit E. Response The four letters cited are incl uded in section of Chapter 11. Letters previously forwarded to FWS in response to letters 1,3 and 4 are al so incl uded.As requested,a speci fi c response to letter 2 has been included in Exhibit E,Chapter 11. Comment 3 The foll owi ng letters were provided as informal consultation to facil i- tate the Susitna Project planning process: 1.November 15,1979,1etter to Eri c Youl d. 2.April 16,1982,testimony presented to the Al aska Power Authority (APA)Board. 3.August 17,1982,letter to Eric Yould. 4.October 5,1982,lester to Eric Yould. We anticipated seeing in the draft Exhibit E specific responses to the concerns and recommendations raised in the letters and testimony provided.This is consistent with advice provided by the FERC 1•In that this did not occur,we recommend that the APA respond in the Exhibit E to the specific comments and recommendations which are contained in these letters and testimony. Response The FWS letter of October 5,1982 and testimony of April 16,1982 are considered as formal consultation since this input was pro- vided in response to requests from APA.This letter and corre- sponding response is included in Appendix 11.E of Chapter 11.All spec ifi c comments and recommendations received from the Fi sh and Wildlife Services to date are responded to in Exhibit E. Comment 4 The response provided by this letter,our previous letters (both those formally and informally requested),the testimony presented to the APA Board,and the 1etter recently provided to you on 19 November 1982, constitute the official position of the FWS on this project. Response This correspondence is noted as the official position of the U.S. Department of the Interior,Fish and Wildlife Service. Comment 5 The principal authority of the FWS to provide comments and recommenda- tions rests in the Fish and Wildlife Coordination Act (48 Stat.401,as amended;16 U.S.C.661 et seq.)2.The Coordination Act requires that fish and wildlife conservation be given equal consideration with other project features throughout the Federal lead agencies'planning and decision-making processes.The Act also requires consultation with State and Federal fish and wildlife resource agencies to ascertain what project facilities,operations,or measures may be considered necessary by those agencies to mitigate and compensate for project-related losses to fish and wildlife resources,as well as to enhance those resources. The reports and recommendat ions of the fi sh and wi 1dl i fe resource agencies on the fish and wildlife aspects of such projects must be presented to action agency decision-makers and (where appl icable)to Congress.The Coordination Act requires more than a consultative responsibility;it is an affirmative mandate to action agencies.Like the National Environmenta1 Policy Act (NEPA)(42 U.S.C.4321 et seq.), it requires early planning and post-construction coordination and full consideration of recommendations made by resource agencies. .,... Our recommendations,under the Coordination Act,must be,lias specific as is practicable with respect to features recommended for wi ldl ife conservation and development,lands to be utilized or acquired for such purposes,the results expected,and shall describe the damage to wild- 1 ife attributable to the project and the measures proposed for mitigat- ing or compensating for these damages.1I Similar language is found in NEPA's Section 102(2)(B)that agencies identify and develop methods and procedures which will insure that presently unquantified environmental amenities and values may be given appropriate consideration in decision-making,along with economic and technical considerations. Both the Coordination Act and NEPA,necessitate,commsurate with the scope of a project: ~ l. 2. F""3. A description and quantification of the existing fish and wildlife and their habitat within the area of project impacts; A description and quantification of anticipated project impacts on these resources;and Specific mitigation measures necessary to avoid,minimize,or com- pensate for these impacts. 1"""\ I I ..... Response The authority of the FWS under the Fish and Wildlife Coordination Act is recognized.The APA has made considerable effort to actively solicit input from State and Federal fish and wildlife resource agencies.The APA has especially encouraged any specific recommendations regarding project features,operations or measures the resource agencies may consider necessary to mitigate or com- pensate for project-related losses to fish and wildl ife resources. Comment 6 We have reviewed the draft Exhibit E in consideration of these statutes.The adequacy of the review documents has been exami ned in respect to whether or not the information,analysis,and mitigation plan provided would allow the FERC to be in compliance with the requirements of these environmental madates if they issued a license to the applicant. Response A number of reviewers question the adequacy of the studies to date and the sufficiency of the Appl ication.The Alaska Power Author- ity perceives a sequential process,each step requi ring progres- sively more refined study,analysis and design • Step 1 -Feasibility In it i all y t engi neeri ng and envi ronmental studi es are undertaken to determine the feasibil ity of the Project.Studies identify major Project characteristics t critical resource and design issues t and economic feasibil ity of the Project.The Feasibil ity Report of March t 1982 t represented the culmination of this step. Step 2 -Prelicensing Prelicensing studies continue t expand and refine the analysis in sufficient detail to allow rigorous analysis of the Project with respect to technical detail of design conceptst economic feasibil- itYt impact assessment t and mitigation planning.These studies provide the basis for:The Application for License;fonnal agency consultation;and Federal Energy Regulatory Commission (FERC IS) preparation of an Environmental Impact Statement (EIS).The con- tents of the Application for License are specified in FERC regula- tions.The Power Authority's interpretation of the general intent of the prel icensing studies and these regulations is that studies have to be of sufficient detail to identify all of the major impacts of the Project and to allow effective mitigation planning t but not in the detail that is required to support final design prior to construction.The studies should be sufficient to pro- vide a basis for the development of realistic mitigation plans for construction and operation. Studi es perfonned to thi s standard rel y on ex i st i ng informati on and a rigorous sampling program t and estimates and predictions such as can be appropriately drawn t based upon professional judgment.The FERC regulations t themselves t speak in terms of lIexpected impacts ."t"lI an ticipated impacts ..q ll "pos s ible changes ••••11 Inherent in the decision to proceed with licensing is that studies have sufficient quantification to support the Application.What constitutes sufficient quantification is a judgmental decision. FERC's regulations state only that the information should be "•••commensurate with the scope of the project •••"While the level and sophistication of quantification varies from study to studYt in sum t the current studies allow impacts to be determined and mitigation activities planned with a resolution more precise than the range of variations that naturally occur t both tempor- arily and spatially. One of the objectives of the studies is to support mitigation planning to the point of "•••proposing mitigation measures or facilities including functional design drawings t proposed opera- tion and maintenance procedures t costs t etc."Functional design drawings reflect preliminary engineering and environmental analy- sis necessary to prove the practical ity of the proposed facil ity and drawings that demonstrate the conceptst spatial and structural characteristics of the proposed facilities.These drawings are not design drawings from which construction could proceed. - r The Power Authority feels that the studies on the Project to date adequately meet the objectives of prelicensing studies.Ongoing studies will expand and support the current analysis and be pro- vided to FERC (and resource agencies)in time for FERC's devel~p­ ment of their Draft EIS (OEIS).Ongoing and proposed studies will support the refinement of the proposed Prbject flow regime and of the other mitigation measures during the design phase of the Project.The Design Phase will be concurrent with the development of the actual license and its attendant stipulations. Comment 7 Our review has been undertaken in light of our former correspondence, including the 16 April 1982,testimony presented to the APA Board by Deputy Regional Di rector LeRoy Sowl.Except for item (8)we fi nd the testimony as val id today as it was at that time.It is apparent that the consultation process has failed in so far as the intent of the FERC regulations 3 •We have written numerous 1 etters on this project to assist APA in planning measures to protect and enhance fish and wild- 1 ife resources.Responses to our letters have been non-existent,or too late to deal with the problem of concern(e.g.,FWS letters dated October 5,1982,and November 19,1982).An illustration of what we have found to be an inadequate level of consultation can be found in the December 15,1982,response to our November 19,1982,letter.We considered our requests to be fully within the intent of the FERC regu 1ati ons 4• Response A review of comments by resource agencies on the draft of Exhibit E for the Application for License'indicates that the preponderance of comments address adequacy of study pl ans and the result.A smaller number of comments address the nature of the 1 icensing process and the Alaska Power Authority1s performance to date. Only a few agency comments convey statements of pol icy or recom- mendations with respect to Project design,and mitigations of construct ion or operat i on.Chapter 11 of Exhi bit E contai ns the formal consultations with agencies and includes point by point responses to their comments on the November 15,1982,draft of Exhibit E. Subsection (d)Section 4.40 states that appropriate State,federal and local resource agenci es must be given the opportunity to comment on the proposed project prior to filing of the Application for License.Further definition on consultation requirements is spelled out in Section 4.41 (f),which outlines the components of the Environmental Report,Exhibit E.While procedural require- ments are outlined,the objectives of the consultation process are not.The objectives of the consultat i on process are discussed in Application Procedures for Hydropower Licensing,Exemptions,and Prel iminary Permits,Federal Energy Regul atory Commi ssi on (FERC), April,1982.Objectives include: first Step -Predraft Consultation -Provide a basis for analysis of the environmental and natural resource management aspects of proposed projects; -Identify problems that should be considered; -Meet the FERC's requirements under fish and Wildlife Coordina- tion Act,Endangered Species Act,National Historic Preservation Act,and other Federal statutes; -Agenci es must understand the project and its effects;and -Provide an opportunity for agencies to comment on and define any studi es needed to ident Hy potential impacts and recommend ade- quate protective and mitigative measures. Second Step -Formal Consultation -Formal request for review of draft application (in writing to document);and -Results of studies (if possible,a copy of the application). Third Step -Response to Agency Comments -Applicant1s responses to agency review comments Step 1 -Predraft Consultation A long history of interaction with State,federal and local resource agencies dates back to Bureau of Reclamation and Corps of Engineer's (COE),studies of the Susitna River potential.Ini- tially,resource agencies encouraged the investigation of the Susitna River as a more benign alternative to the Rampart Project on the Yukon River. Several configurations were studied before the current arrangment was i dent Hi ed by the COE as represent i ng the best accommodat ion between power development and envi ronmental protection (see Exhi- bit B,Chapter 1).COE studies culminated in a final Environmen~ tal Impact Statement issued in July of 1979.Agency consultation during COE studies extends back into the early 1970s.The con- cerns raised by agencies during the review of the COE EIS have been further studied during the studies for the license applica- tion. Because of assumed the and general attributes. engineering the existing COE studies when the Power Authority project in 1979,there existed a well defined Project familiarity on the part of resource agencies with its As the Power Authority planned environmental and studi es to support the more demand;ng FERC 1 i cense ..- ,.... I, r applicat i on,resource agenci es were again invited to comment on important resource issues,study design and recomment mitigative activities.The subsequent study program incorporated many of the comments received from agencies. To coordinate interactions between resource agencies and the Power Authority,the Susitna Hydro Steering Committee evolved.This in- formal interagency Commi ttee proveded a mechani sm for exchanges between the Power Authority and resource agencies.Design develorments,study plans and Phase I master contracts were reviewed by the Steering Committee and their comments were incor- porated,in part,into Project studies • The first t~years of Project studies culminated in a Feasibility Report and many attendant reports.Volume 7 of this Report out- lines public review and comments on the Project,and Volume 12 dOCllTlents agency consultation to March 1982.The Feasibil ity Report was wi del'y disseminated and recei ved conspi cuous agency and public review.In response to these comments on the Feasibility Report,the Power Authority rescheduled the proposed date for sub- mitting the application for license from June of 1982 to the 1st Quarter of 1983 (February 28,1983).Major refinement of study programs was undertaken to address issues rai sed duri ng the review.In part,the postponement of submittal was to allow for the inclusion of additional environmental data. As part of the refi nement and redi rect i on of envi ronmenta 1 study programs,a series of workshop meetings occurred in May and June of 1982.In these meetings,the Power Authority and the resource agencies redefined the study programs.Terrestrial studies were reviewed again during an extensive weeklong workshop during August 23-27,1982.Agency personnel,topi cal experts and project per- sonnel participated in this workshop (see Appendix 11.6 in Chapter 11). On September 2,1982,the Power Authority,by way of letter, informed the resource agencies of the intended schedule for pre- paring and filing the application and requested any guidance an agency could offer with respect to the project configuration and mit 19at ion planning. In summary,duri ng Step 1 of the three-step consultati on process, resource agencies and the public were presented wi th extensi ve, i:nformal a.rld f.ormal opportuoites to familiari ze themselves with the proposedPr'ojectand Project studies.The evolving natu.r~of the project and studies have-,been extensively r-eported and ref Teets accommodation to agencey and publ it prefefe;nces. Step 2 -Formal Consultation Formal preapplication consultation was initiated with the dissemi- nat i on of the draft Exhi bit E on November 15,1982.The draft Exhibit was sent to resource agencies with the request that they review and comment on the draft by January 15,1983.A review of the Project (essentially unchanged since the Feasibility Report in March 1982)took place on the first day.Topical sessions followed in which Project personnel reviewed haseline conditions, impact analysis and mitigation planning.Sessions included: 1 -Project description,1/2 day 2 -Hydrology/Hydraulics/Temperature/Channel Norphology, 1-1/2 days 3 -Aquatic Ecosystems,1-1/2 days 4 -Terrestrial Wildlife and Habitat,1 day 5 -Wetlands,1/2 day 6 -Archaeology/history,1/2 day 7 -Socioeconomic,1/2 day 8 -Recreation,1/2 day 9 -Aesthetics,1/2 day 10 -Land Use,1/2 day Step 3 -Applicant's Response to Review Comments The Exhibit E of the Application for license reflects substantial modifications in response to the informal comments that occurred during the workshop of November 29 through December 2,1982. Specific responses,and often redrafting of the text of the Exhibit E,have followed receipt of formal agency comments. Chapter 11 of Exhibit E contai ns all agency responses to the request for revi ew of the draft Exhi bit Eo Each comment by an agency has received a response. Comment 8 Attached to this letter are our formal comments on the FERC draft 1i cense appl i cati on Exhibit E for the Susitna Project.Comments are provided on Chapters 2,3,5,7,8,9,and 10.We have also reviewed Chapters 1,4 and 6.However,we do not at this time have any comments to offer on these chapters. The comments provided are organized into general comments and specific comments for each chapter.In our attempt to be as responsive as poss- ible within the limited time frame APA has established for our review and comments we have not been abl e to organi ze our comments into a comprehensive listing of deficiencies,clarifications,information needs,and recommendat ions.Many of these comments have been 1eft within the context of the section within which they are raisp..We feel by commenting in this way it will assist you in consistently correcting the deficiencies identified. ,... ~ I r Response The FWS complete letter of January 14,1983 with attached comments is contained in Appendix I,Chapter 11 of Exhibit E.In Appendix J of Chapter 11 are responses to these comments. Comment 9 The following comments are generally app1 icab1e to several chapters and,in some cases,are applicable to all of the chapters:It is our understanding that the projections of future power needs used in the license application are generally agreed to be high 5 and are being reevaluated for submittal to the FERC after the license application is submitted (Acres American Deputy Project Manager John Hayden,personal communication).The changes in the load forecasts are dramatic.In the Acres American report evaluating economic tradeoffs of flow regimes 6 the asumed moderate load forecast for the year 2010 is 7,791 gegawatt-hours (GWh).In the 1atest Batte"e Newsl etter7 the moderate forecast is 4,986 GWh and the low forecast is 3,844 GWh.The significant decl ine in projected power demands has 1 arge impl ications to many of the project assumptions which have constrained mitigation planning,for example:available water for downstream flows;mode, timing,and routing of construction access;and scheduling of work. The license application should fully discuss the implications of the latest load forecasts. Response There is no single projection of future power needs used in the license application.Instead,there is a range of forecasts sufficiently wide to cover most perceptions about the Railbelt region's future.Battell e has indicated,based on a 1 imited review of their earlier work,that a more current outlook for state oil revenues would tend to appreciably lower their base case set of forecasts.Battell e l s 1 imited revi ew·did not address the influence of Susitna power costs on power demand,nor did it take account of recent actual Rai"lbelt power generating growth rates approximately three times greater than the forcasted average annual.mid-range growth rate of 3.5 percent.Thus,we disagree with the contention that the projections used in the license application are generally agreed to be high. The license application contains an explanation of the analytical tools used for power demand forecasting,presents a set of fore- casts based on wide ranging sets of assumptions,and includes a thorough sensitivity and multivariate analysis addressing alterna- tive futures.It is readily acknowledged that the pace of future load growth cannot be predicted with precision,especially in Alaska.Fu rther,the outlook will change from year to year.It is important that decision makers are kept abreast of the most current outlook,and this will be done.At the same time,this variability and uncertainty cannot be used as an excuse to indefinitely postpone decisions,nor to annually alter the project configuration to conform to that year's outlook. With the respect to the Watana Proj ect in pa rti cul ar,it is impor- tant to note that the Project's timing is insensitive to forecasts of future load growth.Since it is designed to be fully utilized in displacing existing generation,the need for the Watana phase is dependent on the cost and avai 1 abi 1 ity of al ternati ve genera- tion,but not on load growth. The combination of Watana and Devil Canyon will provide power to first displace fossil fuel-fired generation,and subsequently to accommodate any growth in demand over the next several decades. The two proj ect phases are of approximate equal output,thereby allowing phased development to match the growth in demand. The financing approach to Susitna is designed to insure that the cost of Susitna power,even in the early years of operation,is equal to,or less than,the variable generation costs facing Rail- belt util ities. Assuming that such a finance plan is implemented,Railbelt utili- ties should be willing to shut down their fossil fuel-fired plants and purchase Susitna power.In the Railbelt today,total annual generation,excluding self-supplied industrial demand,exceeds 3,500 GWh.Netting out the generation potential from existing hydroelectric facilities (which would not be displaced),leaves a present-day market of 3,300 GWh.The most pessimistic Battelle forecast calls for another 450 G~rh before 1990,giving a total potential market of at least 3,750 GWh when the Watana Project is completed.Watana will be able to provide 3,450 GWh,and therefore,be fully utilized immediately upon its completion. The Devil Canyon phase/of the Project would then be added sometime later,as Railbelt demand increased and the need dictated.[)evil Canyon's additional 3,330 GWh would be available to accommodate demand growth whether that resulted from popul ati on increases, increased per capita use,conversi on from fossi 1 fuel s to el ectri- city,or industrial demands. With respect to the specific planning decisions mentioned by the Fish and W-ildl ife Service,several comments can be made.The schedul ing of work on Watana and choice of construction access mode,timing,and routing were,and remain,independent of changes in the outlook for future load growth.Irrespective of when the Project is needed,a primary concern of the Power Authority is to mi nimi ze the durati on of constructi on and,therefore,interest during construction and the Project cost.Further,introducing any increased risk of Project delay,once construction has begun, has serious implications for the ultimate cost of this capital intensive Project.The scheduling of work and the choice of access have been significantly influenced by these concerns;the decisions have not been driven by the load forecast. ..... ..... ..... Comment 10 The intent of the Coordination Act and NEPA is that environmental resources be given equal consideration with project features.Consis- tent with NEPA,as well as the APA Mitigation Policy,avoidance of adverse impacts should have been given priority as a mitigation measure.We have found this generally not to be the case,for example: mode,timing"and routing of construction access;scheduling of work; type and siting of the construction camp/village;recreation develop- ment;instream flow regime;and filling schedule.Other examples can be found in our Specific Comments.. Response It is the Power Authority's intention to build the optimal power producing Project commensurate with environmental,cost,and other considerations.Needless to say,decisions about Project design and operation require the balancing of these several considera- tions. As major design decisions are made,environmental information pertaining to that decision is developed and fed into the decision-making process.For example: Avqi dance of adverse impact has been an important factor from the earli~st stages of Project formulation. The middle Susitna Basin was originally considered as a preferred location for hydroelectric development,not only because of the relative economics,but also because of its compatibility with the natural environment.Compared to other potential large hydro- electric development sites (e.g.Wood Canyon on the Copper River), the middle Susitna location has less potential environmental impact.Within the Basin itself,consideration of environmental impact resulted in the early elimination of the Gold Creek,Tyone, and Olson projects,three of thetwel ve damsites identified in the middle portion of the Susitna Basin.Lesser environmental impact was one of two primary reasons why the Watana-Devil Canyon combination was selected as the basin development plan over the High Devil Canyon-Vee scheme • Extensive analysis of the access route was accomplished.This analysis incorporated many facets of analysis:construction cost; logistic costs of the construction period;risks to Project schedule;impacts on fish,wildlife,and habitat;and impacts on adjacent communities.Balancing all of these considerations,an access route was selected which was identified as not being the envi ronmentally preferred route.Nevertheless,envi ronmental att.ributes were given more than equal consideration during the decision process;other considerations simply domi nated,as was documented during the analysis. Compa rab ly,the type and 1ocat i on of the construct i on vill age reflects the balancing of several considerations,primary among them:impact of work force on adjacent communities;safety and producti vity of the work force;Project costs;and envi ronmental impacts.Factors other than proximate environmental impacts governed the selection of the proposed camp configuration. Most features of design and operation reflect a multidisciplinary assessment of benefits and liabilities of several options.The Environmental Report (Exhibit E)of the 1 icense appl ication provides the analysis of the proposed Project and reasonable· alternatives which permit the Power Authority,FERC,Agencies,and the public to determine the benefits and liabilities of decisions about design and operation of the Project and its mitigation program. Comment 11 Engineering and environmental studies do not seem to be interactive. It appears that the findings of environmental studies have not been integrated into the engineering design.This may be due in part to the short time frame established for project planning.An examination of the sequencing of the studies illustrates this problem.It is our understanding that the Aquatic Studies Program,designed to be the basis for determination of impacts to the aquatic system and associated mitigation measures,was established as a five year study.We are now two yea rs into thi s program.The analys is of the data to allow an assessment of impacts and formulation of mitigation proposals may add another year to this process.APA expects to obtain a license,and begin construction in late 1984,or early 19858 •Obviously,this does not allow for an impact analysis and mitigation planning based on these studies prior to licensing.Mitigation planning,and an assessment of the impacts of different mitigation options needs to be undertaken in regard to project costs,viability,socioeconomic considerations,and mitigation proposed for potentially competing interests.This should all be considered throug the development of the environmental impact statement,and certai nly pri or to 1i cense issuance. Response The Power Authority seeks to effectively incorporate into the decision-making process of the Project the findings and recommen- dations of the environmental studies'program.Numerous design and operation aspects reflect tempering the optimum power develop- ment/mi n imum Project cost criteri a with envi ronmental protecti on and its attendant costs.Proposed spawni ng season flows are 12,000 cubic feet per second (cfs)instead of the 6,VOO cfs that optimum power operat ion waul d suggest.Fi xed-cone val ves have been incorporated for the rel ease of excess flows without the entrainment of dissolved gases,even though the problem would be only occasional (and,at Watana,substantially upstream from any existing anadromous fish populations).The number and location of - .... ..- - borrow sites has been reduced to m1 n1m1 ze habitat impacts.Vege- tat ion in the rese rvoi r wi 11 be cl ea red to avoi d potent ia 1 impacts from floating debris to animals swimming across the reservoir. Multilevel intakes have been incorporated to permit temperature regul at i on of downstream releases. A 1arge construction camp ;s pl anned and a number of transporta- tion options for workers have been planned in order to reduce impacts to the small adjacent communities • In response to agency comments at the time of their review of the Feasibility Report,additional environmental scientists were assi gned to the Project,and the Power Authority staff was aug- mented with two environmental scientists • Interaction between the engineering and environmental rlisc-iplines has occurred throughout the project development studies.This has included significant input into important development decisions including dam location,basic project configuration,access plans, construction camps,and project operation. The sequencing of studies identified,has not presented a signifi- cant problem.During the preliminary design and feasibility assessment of most projects,all study di sci pl i nes have 1ess quantified data than would be ideal.Rather than identify this as an insurmountable problem and thus failing to incorporate environ- mental criteria into early planning,the approach has been to integrate Sounrl professional engineering,economic,and environ- mental judgment,as well as quantified knowns,into the planning decisions.As additional data become available,decisions are reassessed,impact predictions further quantified,and design specifications and operation modes finalized. Substantially before the point of finalization,however,prelimi- nary assessments of Project impacts will be avail able and func- tional design drawings can be produced for mitigation measures. Thus,for example,a five-year plan for studying impacts of aquatic ecosystems may be needed to permit the final design for construction of facilities,although an adequate assessment of impacts and mitigation plans can be made after two years of studies to support a license application.The ongoing study prog rams wi 11 pe rmi t refi nement in des i gn and ope rat ions of the Project and its mitigation facilities.The Power Authority believes it is not necessary for these studies to be completed prior to any license application. Comment 12 Numerous examples of lack of coordination and/or communication between the groups responsible for the different study elements are evident. Examples can be found by comparing discussions concerning minimum downstream flow rel eases in Chapters 4 and 10 to what is found in Chapters 2 and 3.Reservoir temperature modeling discussions in Chapter 10 are not consistent with what is stated in Chapters 2 and 3. Another example is found in the minimal level of concern expressed in Chapter 10 for socioeconomic (Chapter 5)considerations,such as impacts of license denial.More specific comments are included in the attached document.Other Exhi bits were not provi ded to us for revi ew although we requested them by letter dated November 19,1982. Response Although it is recognized that some inconsistencies existed in the Draft Exhibit E submitted for review in November 15,1982,this draft document and our final license application provide numerous examples where extensive coordination among the various study disciplines occurred. Comment 13 Research of background information is frequently inadequate and incom- plete.An example would be the discussions concerning subsistence (Chapters 3 and 5).More adequate research of this very important area appears justified.We have listed several readily available references which would be of value in improving this discussion. In Chapters 2 and 3 minimal information is brought into the discussions concerning physical changes which have been observed at similar hydro- power projects.We are sure that many of the potential impacts that are di scussed for Susitna (e.g.,temperature concerns)are not uni que to this project.The State's experience with the Trans-Alaska Pipeline System (TAPS)project coul d have been drawn upon more fully as an example,particularly in regard to socioeconomic (Chapter 5)discus- sions.Another example is the discussion concerning natural gas and geothermal electric generation as alternatives to Susitna (Chapter 10). Very little use was made of existing information bases. Response Extensive use was made of existing information.A review of the reference section of each chapter should serve to confirm this. Additional references identified under specific comments have been revi ewed. Comment 14 Speculation is not always clearly distinguished from data-based conclu- sions.This problem is most apparent in Chapters 2 and 3 and should be corrected. - - - Response Although even most data-based concl usionshave a judgmental compo- nent associated with them,a special effort has been made to identify,for the reader,those conclusions based more on profes- sional judgment than quantitative assessment.The inclusion of these statements is evidenced by the following comment. Comment 15 Lack of quantification is a recurrent problem in the Exhibit.Neither base line data nor impacts are appropriately quantified (e.g.,Chapters 2,3,5,and 10).Statements in the document let us know what,IIMuch of the discussion is based on professional judgment ,II (page E-3-3), and,"Many of the statements are specul at i ve •••and •••unsupported,II (page E-3-56).Other statements let us know that ongoi ng,or pl anned studies,will fill these numerous data gaps to allow a quantification of the resources and impacts which would let us go beyond ,lithe con- ceptual mitigation plan,"(page E-3-116).Recognizing a problem does not,in and of itself,correct it.We were particularly concerned with this in our review of Chapter 3.In the Exhibit E,the existing re- sources should be quantified.The potential impacts to these resources should be quantified and then evaluated over the line of the project. Only at that point can specific,effective mitigation measures emerge. We consider quantification of exi st i ng resources and impacts and a specific,effective mitigation plan essential to the development of an acceptable environmental impact statement. Response See response to general comment 0 above. Comment 16 The ongoing,and planned studies,which are frequently noted (particu- larly in Chapters 2 and 3)should be fully identified so we can examine them in regard to their scope.We cannot,otherwise,determine what needs to be done and the time frame for accomplishment.Further dis- cussion is provided in our Chapters 2 and 3 general comments,and throughout our specific comments sections. Response The FWS determi nat i on as to what they perceive needs to be don,e should be based upon a review of the data and assessments C6n- tained within Exhibit E.~Any suggestions for specific studies will be considered in planning future studies. Comment 17 In several of the chapters (e.g q Chapters 2,3,and 5)we are faced with mitigation options to contend with identified (although frequently unquant ifi ed)adverse impacts.For exampl e,in Chapter 3 there are di scu ss ions on the potent i alva1 ue of spik i ng spri ng flows fo r salmon out-migration and the installation of a fifth portal on the multi-level intake structure to provide warmer downstream temperatures during filling.If these mitigation proposals have validity,they should have been incorporated into the project design and operational plan.The document does not provide an adequate mitigation plan as required. In addition,mitigation measures which are presented should have proven successful in Alaska,or in a similar environment.If the proposals are not proven,then they would need to be demonstrated effective in the project area.Further discussion is provided in our Chapter 3 general comments sections. Response The mitigation plans have been revised to state a preferred miti- gation program.Additional options in some areas are discussed and the procedures that would be followed to add these options or substitute these options for the presently proposed program element. Comment 18 The need for an effective monitoring program through construction and the operation phase is discussed in many of the chapters.However,the program is not adequately described.We fully support the establish- ment of a monitoring program.We hel ieve the program should provide for participation by representatives of appropriate State,Federal,and local agencies and be financed by the project.This panel should have the authority to recommend modification of how activities are conducted to assure that mitigation is effective.Recommended changes in the mitigation program should be adopted through a mechanism established in the license,mutually acceptable to all concerned bodies. Response It is the intention of the Power Authority to establish a monitor- i ng program that responds to and impl ements the Arti cl es of any forthcoming FERC license for the Project. With respect to formul at i on of the specifi cs of the program,we invite and al so expect your agency,as well as other regul atory entities,to playa major role in this effort.With respect to monitoring the effectiveness of mitigation measures and compliance with stipulations of the license application,we see that as the licensee's responsibility. - ,.... - - We expect that no matter who does the monitori ng,thei r observa- tions will establish whether the mitigation programs are achieving their goals.If they are not,the mitigation programs will be modified as will undoubtedly be required by the license. Comment 19 Unfortunately the rush to meet the schedule for the license application has resulted in poor quality control,Le.,countless typographical errors,missing lines,misreferenced tables and figures,unclear sentences,internal inconsistencies,inadequate documentation,missing references in bibliographies,etc.This should have been eliminated in a thorough editing prior to release for agency pre-license application revi eWe Our revi ew for bi 01 ogi cal compl eteness was somewhat hampered by this problem. Response It is recognized that the draft Exhibit E submitted for review and comment was indeed a draft document.Considerable effort has been made to improve the quality of our final license application. Comment 20 In the previously referenced FWS letters and testimony,many of the same concerns di scussed above and in the attached comments were rai sed. It is our view that unless the issues raised in this letter are satis- factorily resolved,we do not believe the application could provide the basi s of an acceptabl e envi ronmental impact statement.In thi s respect we consider the license application to be deficient. Response The Power Authority acknowl edges the concerns expressed in thi s and previ ous 1etters submitted by the FWS.The Power Authority contends that the 1 icense appl icati on sati sfactoril y addresses these concerns.The final resolution of these concerns is expected to occur during the FERC license review process. Comment 21 We recommend that you strengthen the license application by including information resulting from a thorough eval uation of the biological data collected during the 1982 field season.This would enable an assess- ment of the adequacy with the data base to support a sufficiently quantified impact analysis and,in turn,a specific,effective mitiga- tion plan.We believe a realistic appraisal could then be made as to when any remaining deficiencies could be satisfied. Response 1982 biological data and the accompanying analysis will be sub- mitted toFERC when available.It is recognized this information will improve the data base and allow for refinement of impact predictions and mitigation plans. COMMENTS CONTAINED IN THE U.S.FISH &WILDLIFE SERVICE LETTER OF JANUARY 14,1983 CHAPTER 2 -WATER USE AND QUALITY GENERAL COMMENTS Comment 1 In examining Chapter 2,we were concerned that sufficient scope and quantifications are not provided to allow a quantified impact evalua- tion of the fisheries and other biological resources.The information provided should allow for the developnent of specific and effective measures which would fully mitigate for all adverse impacts.We are 1 eft with the definite impression that the project would,through changes in streamflow,water quality,temperatures,ice conditions, vegetation,and slough habitats,have significant effects upon the resources of concern to use,particularly the fisheries.However, quantificati on of the potenti al impacts is generally 1 acki ng as are spec ifi c effective miti g ati on measures.Of course,the 1 atter cannot be accompl ished prior to the former,despite the attempts found in this chapter. A significant portion of the lack of specificity found in Chapter 2 is due to the fact that,although two years of data have been gathered (1981 and 1982),the Exhibit E reflects only the 1981 data.We have consistently stated that the 1982 data be analyzed and included in the Exhibit E (see Deputy Regional Director LeRoy Sowl 's April 16,1982, statement to the APA Board,and out 1etter dated October 5,1982,to Eric Yould).Our position remains the same. Response Substantial additional quantification has been incorporated in Chapter 2 since the original draft was distributed in November 15,1982.The sections on streamflow,water quality,water tem- perature,ice conditions,vegetation,and slough habitats have been expanded.Whenever possible,information collected in 1982 has been incorporated in the docllTlent. Comment 2 This chapter does not identify what studies have been completed,what studies were ongoing in 1982,and what studies are proposed.Until this is provided,we cannot determine what studies we would like to see modified,and what we see as being missed.Without this type of infor- mation,the resource agencies are placed in a reactive mode,i.e.,we can only comment on what shoul d have been examined in compl eted studies.However,in so doing,we can better facilitate the appli- cantls efforts to plan a project we can support.An example of a pro- posed study which is not addressed in this chapter is the Arctic Envi- ronmenta 1 In formati on and Data Center (AEIDC)study.The fo 11 owi ng is a sunmary of thi s proposed study: ...., - -I - The AEIDC proposal is designed to (1)accurately and comprehensively predict system-wide streamflow and temperature effects of the dam(s)t and (2)interpret effects of such changes in terms of aquatic habitats and fish populations. To;accompli,sh these general objectives t AEIDC proposes,using a 1 inked system of simulation model s which requires data fr'om other project studies t available literature sources t and professional judgment. The study is a result of the need to consider the special aquatic habi- tat relationships in the Susitna River basin and the need to account for the interreTated effects of icet se&iment t streamfl OW t and tempera- ture changes which will accompany construction t fill ing t and operati on of the selected dam or dams. Most assessments 0 f hyd roel ec tric proj ects are based upon impac ts asso- cia,ted with c bange's in mean monthly streamfl ows and temperatures.How- evert the actual impacts of the project may not be caused by the m:ean events but through changes in the natural pattern of streamflow or tem- perature variation.Further t a single set of mean monthly flows does not actually reflect instantaneous flows "in the river;the actual pre- dicted mean monthly d ischar~e wi 11 probably not occur during a given month because of expected anomal ies in hydrologic stati sties..There- fore t it is necessary to predict the'r'an~e of mean monthly flows expected t based on reservoir inflowt power generation requiranents t and downstream demands. The AEIDC model system would depend heaVily upon a reservoir operation model to generate an ex,haus'tive range of feasible weekly or monthly flow regimes and the expected variation over a 30-yr forecast period. The model system would include provisions for ice and sediment modeling to account for changes in substrate distributiont bed elevation or channel configuration which might resul t from project operation.At a minim,um t ice and substrate modeling would support the assumptions that hydraul ic boundary conditions either remain stable or change within predictable limits with project operation. The array of predicted weekly or monthly flows and temperatures may be biologicall'y:i,nterpr'eted in several ways.TtTe available hab;itat data base is heavily weighted at this time toward known chum and sockeye salmon spawning areas in sloughs and side channels in the Susitna River between Talkeetna and Devil Canyon.Access and spawning dynamics with respect to mainstem discharg,e are the major simul ation goal's of several ongoing field studies.The AEIDC modeling system could provide a time- series approach to determine effects upon critical life history stages of these species.It is possible that the entire riverine life cycle of chum salmon might be simul ated under various flow regimes to predict long-term populati on trends.A simi lar analysi s of sockeye salmon might be possible. The primary concept,again,is first to credibly and comprehensively predict all project operations and their effect upon the habitat- related physical parameters within the system;secondly,those effects will be interpreted,through long-term forecasting,in terms of their influences upon affected salmon populations. We support the proposed AEIDC study.It shoul d prov ide the basi s for determin ing proj ect in stream flow impacts and a reasonab 1e assessment of mitigative alternatives. Response The ongoing 1982 and 1983 studies are reflected in the Power Authority study contracted to the AEIDC,as summarized in the US Fish and Wildlife general comments on Chapter 2. Comment 3 It is apparent that the proposed instream flow rel eases are designed for maximum power production and do not reflect biological needs.The 12,000-cfs figure for August reflects the maximum amount of water that can be discharged without significant economic effects.It is our understand ing that the proj ect rel eases wo ul d be 10,000 to 12,000 cfs year round.No consideration was given to the potential impact of the project during winter when flows of thi s magnitude might prove highly detrimental to the fishery.The potential value of spiking flows dur- ing the spring to facilitate smolt out-migration and flush the sloughs of ice and debri sis discussed.However,these flows are not refl ec ted in the proposed releases. We consider it very important that the 1 icense appl ication contain a specific,detailed flow release schedule,which is designed to mitigate projectimpacts,protect or enhance conditions for fish spawning,feed- ing,unrestricted fish passage,out-migration,and provide overwinter- ing habitat for fish in the Susitna River.This schedule should be developed through a quantified instream flow analysis which has been coordinated with the FWS,National Marine Fisheries Service,and the Al aska Department of Fi sh and Game (ADF&G). Response The proposed instream flow releases are not designed for maximum power production and do reflect biological needs.If instrealll flow rel eases were sol ely to maximi ze power produc ti on benefit, Case A (8,000 cfs)woulq have been selected.This selection process is described in Section 3 of Chapter 2. The potential impact of the project during winter was considered. Temperatures,ice front location,the delay in ice cover,and the potential impact on sloughs have been discussed.Appropriate mitigation measures have been incorporated to ensure that produc- tive salmon sloughs will not be overtopped during the freezeup process (Chapter 3).The impact of these flows on the fishery is discussed in Chapter 3. - -, -i - The potential value of spiking to facilitate smolt out-mitigation is being examined.However,because the desi red timing and mag- nitude is not known at this time,a spring release was not included in the minimum flows specified. With the five-year slough maintenance program and the increased upstream berms included in the mitigation plan,there will be no need to flush the sloughs of debris and ice. Conment 4 In response to the APA request oJ september 2,1982,the FWS,by 1 etter dated October 5,1982,provided input specific to the draft Exhibit E. This is in compliance with the FERC recommendation that information included at the initiation of formal consultation,1I •••respongs to the preliminary comments and recommendations of the agencies.1I Since this was not done,our October 5,1982,letter should be made part of our formal response on the draft Exhibit E.As such,the points raised in that letter should be specifically addressed in the Exhibit E sub- mitted as part of the 1 icense appl ication.Many of the points raised would be most appropriately responded to in Chapter 2. Avoidance of adverse impacts should,in compl iance with the APA Miti- gation Pol icy document and NEPA guidel ines,be given top priority in the license application.In particular,our concerns as to the deci- sions which led to such project features as the camp/village,transmis- sion line routing,construction access routing,turbine configuration, filling regime,flow regime,etc,with regard to avoidance of impacts, should be addressed. Response - All correspondence received from addressed in Chapter 11 of Exhibit priate chapters has also been comments. FWS has been specifically E.The text in other appro- mod ifi ed to address thei r - -l I Avoidance has been given top priority as an environmental mitiga- tion measure.However,in compl iance with NEPA and the Power Authority mitigation policy,our decision-making process has only g iv en env i ronmenta 1 consi derati ons equal status with economic s, not priority status. SPECIFIC COMMENTS 2 -BASELINE DESCRIPTIONS 2.3 -Susitna River Water Quality (a)Physical Parameters (l)Water Temperature W-2-001 -Mai nstem:Paragraphs 1 and 2:Those months whi ch are bei ng referred to by wi nter and summer should be i ndi cated. Response The winter months normally include the months of October through Apri 1 when the flow is predomi nant1y base flow and water temperatures are approxi mate ly O°C,whereas t he summer months inc 1ude the peri od after breakup through the hi gh runoff peri od (September).Paragraphs 2 and 3 have been clarlf\ed to reflect the intended meani ng. W-2-002 -Sloughs:Paragraph 1:The fl rst step in understandi ng the temperature relationship between the mainstem and the sloughs is to measure the temperatures of both sites.Thi s has been done.The relationship between the mainstem and the sloughs regardi ng temperatures (as well as other water quality para- meters)then must be establi shed.Thi s process,apparently, is just beginning.To this end,one slough (#9)has been exami ned.Thi s ex ami nati on has focused,correct ly,on the ground water rel ati onshi p.Accordi ng to Tony Burgess (Acres Ameri can),in hi s Susi tna Hydro Exhi bi t E Workshop presenta- tion (12/1/82)on ground water upwelling and water temperature in sloughs,the ground water regime can be modeled,but local- ly the match is not very good:The ground water temperatures near the surface do not match the predi cted temperatures. Conti nued study is obvi ous1y i ndi catedfor Slough 9.After an understandic,ng is dchi eved for that slough,the program would need to be expanded to other sloughs,possibly Sloughs 8A,11, 19,20 and 21.These sloughs have been more i ntensi ve1y exami ned than other sloUghs in thi s reach of the Susitna Ri ver.We recommend that thi sgenera1 program be undertaken. Response The comment that the ground water re1 at;onshi ps for only one slough (#9)have been examined and that the program would need to be expanded to other sloughs,possibly Sloughs 8A,11,19,20 and 21 is well taken and will be considered for future studies.However,the Slough 9 studi es have provi ded an overall understandi ng of the ground water processes withirn,the slougns..Gi ven the similarities of the sloughs,i.e.,similar soil condi- ti ons and hence permeabi 1ity,similar flow path lengths, ..... ,- and simi lar upwelling tempe'ratur€s~we expect simi lar ground water processes in all the sloughs between Portage Creek and Talkeetna.For example,ground water measurements conducted on both Slough 9 and Slough 8A ,demonstr,ate that groundwater flow is in a downstream direction and locally laterally toward the sloughs. The ground water flow pattern as deduced from the model compares reasonably well with measured field data.The FWS comment~IIlocal]y the match is not very good ll applies to the ground water condition's in the vicinity of we 11 9-11.The poor match may be due to a number of reasons. - A surface stream exi sts in that area,probably due to runoff from the upland areas.This could locally recharge the alluvial aquifer; -Pondi ng of surface water behi nd the rai lway embankment has also been observed,and would lead to elevated ground water levels;ar:ld -Soil stratigraphy adjacent to the valley wall may be much more vari able than in the center of the valley. It may contain silty layers which would result in perched water table conditi ons.The wells in thi s area may therefor,e not b,e meas!lring the main alluvi al water surface. To address the questi on of why ground water temperatures near the surface do not match the predi cted tempera- tures,deep wells have been dri lled near Slough 9. These wells are bei ng monitored for temperature and piezometric head.These data along with continued ground water temperature measurements near the surface should provide the i nformati on nec.essary to address thi s question.Results will be available in the June 30~ 1983 supplemental report. ,W-2-003 -Tri butari es:Paragraph 4:The di fference in temperatures of theChi,uli tna and ita lkeetna Ri vers should be referenced at least by month.It would appear that the cooler temperatures displayed by these rivers would be useful in an assessment of post-project temperatures effects at the confl uence and further downstream.We recommend thi s be examined. Response We concur that the temp'eraturesof the Chulitna and Talkeetna Ri vers would be useful in an)as~s'essment of post-project tempe,ratureeffects at the confluence. Mont~ly data for June 1982 through September )982 have been incl uded in Section 2.3.1(c).From approximately mid-October through April,water temperatures in both the Chul itna and Talkeetna Rivers are near O°C. W-2-004 -Freezeup:Paragraph 3:The impact of thi s process shoul d be fully expl ained in regard to river morphology and mainten- ance of the present riparian zone. Response The discussion on freezeup has been expanded to provide a more detailed explanation on the freezeup process in Section 2.3.2(a).The impacts to river morphology and riparian vegetation are discussed in Section 4.1.3 (c)(ii). W-2-005 -Winter Ice Conditions:Paragraph 2:Pl ease refer to our comments on Section 2.3 (a)(i)-Sloughs.The sloughs should be identified by number,and percentage to which the state- ments apply. Response The sloughs which were observed to have open leads during mid-winter 1982 have been identified in Table E.2.18. W-2-006 (iii)Suspended Sediments:The percent contribution,by season,from the maj or suspended sediment sources shoul d be indicated.An analysis of the anticipated changes,by season, due to the project operation should be made. Response Sediment sources and the contribution of suspended sedi- ment by season have been included in Section 2.3.3(b). Project effects are discussed in Sections 4.1.3(c)(iii) and 4.2.3(c)(iii). W-2-007 (ix)pH:The pH range,from 6.6 to 8.1,is broad and should continue to be monitored.The potential exists for a lethal pH shock to occur to aquatic 1 i fe with a change of 1.0 pH.A change of this magnitude might be poss'ible from a reservoir water release.A pH below 6.6 may be harmful to fish depend- ing on the amount of free carbon dioxide present in excess of 100 parts per mill ion.Egg hatchabil ity and growth of alevins could be adversely effected at a pH range between 6.5 and 6.0. The need for a predictive water qual ity model is apparent given the toxic heavy metal s that occur in the drainage.We recommend that one be utilized. - - ,- - - ..- Response Cantin ued monitoring of pH 1 ev el s will be taken into consideration.No large pH variations are expected as a result of a reservoir water release.Releases from Watana will be withdrawn from the same four upper 1 evel intakes as powerhouse flows.Adverse pH and free carbon dioxide concentrations will not occur in this portion of the reservoir.At Devil Canyon,the intakes for the seven fixed-cone valves will be at elevations of 1050 and 930 feet.The lower of these intakes will be approximately 100 feet above the reservoir floor.Con- sequently,the acidic waters which will exist immediate- ly adjacent to the reservoir floor,due to the leaching process,will not be withdrawn and passed downstream. Acceptable pH values are expected throughout the balance of the reservoir.The utilization of a predictive water qual ity'model will be considered. (d)Other Parameters W-2-008 (i i i)Others:The rail road right-of-way that parall el s the Susitna River has been sprayed wlth various herbicides for vegetation control for a period of years.Herbicides used include amitrole,2-40,bromicil,and Garlon (tordon). Streams of primary concern are Chase,Indian,Lane,and Gold Creeks.A spill of Garlon occurred in Lane Creek in 1977. Sloughs located along the railroad right-of-way could also be recipients of some of the herbicide spray.No fish and/or wil dl ife ti ssues have been analyzed for food chain herbic ide impacts in the area.Due to the type of herbic ide used,we are certain that detectable amounts will occur over a long period of time.Please incorporate thi s information into your disc us s ion. Response The use of herbicides along the railroad right-of-way has been incorporated into Section 2.3.8(m}.Although it is true that no ti ssue analysi s was undertaken,the presence of these contaminants is not a project related impact.Water sampl es at Cantwell and Gold Creek were analyzed for endrin,lindane,methoxychlor,toxaphene, 2,4-0,and 2,4,5-TPsilvex.All concentrations were below detection 1 imits (R&M 1982).Water sampl es analyzed for h,erbicides by USGS at Susitna station in 1982 wer~also below detectable limits. Project regulation of the Susitna River will serve to reduce the dil ution of existing herbicides in the main- stem by approximately one-hal f during the months of May through September and increase the dilution effect by a factor of approximately 6 from November through April • Herbicides will not be used for vegetation control on the Susitna Hydroelectric Project. 2.4 -Baseline Ground Water Conditions W-2-009 (d)Hydraulic Connection of Mainstem and Sloughs:It should be noted that the sloughs provide valuable rearing habitat for anadromous and resident fish.Additional comments concerning the ground water connection and current studies are provided under Section 2.3(a)(i)-Sloughs. Response The statement that slougchs provide valuable rearing habitat for anadromous and resident fish has been added to Section 2.2.4.Additional information can be found in Chapter 3. 2.5 -Existing Lakes,Reservoirs,and Streams W-2-010 (a)Lakes and Reservoirs:Paragraph 1:Project features include transmission lines,access roads,transmission line maintenance roads,railroad staging areas,etc,and should be examined within the context of this section.The proposed Recreation Plan would lead to the encouragement of impacts to numerous lakes throughout the upper Susitna basin.Secondary impacts resulting from the project would expand impacts to additional systems. Response We concur that impacts to the water quality of existing lakes and streams could occur due to project features. Additional discussion has been provided in Section 2.5. A listing of the lakes which could be subject to second- ary impacts from the access roads and transmission lines. is al so provided.Further information is al so provided regarding the proposed recreation plan. 2.6 -Existing Instream Flow Uses W-2-11 (b)Fishery Resources:Reference should be made to burbot and Dolly Varden as important resident species. Response The importance of burbot and Dolly Varden as important resident species has been noted in Section 2.6.2. ,~ .- - - - ,.... W':'2-012 (g)Freshwater Recrui tment to Estuari es:Paragraph 2:It should be noted that salt water ;ntrusi on and mi x;ng would be re1 ated to ti da1 acti on . Response Salt water intrusion is related to tidal action.The 1arger the ti de range,the greater the mi xi ng and the less the salinity intrusion.At the time of the August 18 and 19,1982 salinity measurements,spring tides (i.e.,large tide range)were occurring in Cook Inlet. Thi s would have the effect of reduci ng the salt water intrusion.However,even with neap tides (i .e.,small tide range)and the 90,000 cfs discharge at the mouth of the Susi tna Ri ver,suffi ci ent mi xi ng would exi st to prevent sa1i ni ty i ntrusi on upstream of the mouth.Thi s information has been incorporated into Section 2.6.7 of Ch apter 2. 2.7 -Access Plan W-2-013 (a)Flows:Paragraph 2:The use of regressi on equati ons in calcul atl ons of peak and low flows in 1i eu of actual di scharge data should not be a substitute for the collection of data, when si~ng culverts for engineering integrity or fish passage.Washouts due to undersized culverts resulted on the north slope haul road and,more recently,at the Terror Lake Hydro construction site. Response During final design of the access road,culverts wi 11 be si zed to mai ntai n fi sh passage accordi ng to the cri teri a estab1i shed by the A1 aska Department of Fi sh and Game. The recommendati on that actual di scharge data be co1- 1ected wi 11 be taken into consi derati on in the develop- ment of future field studies.However,the value of regression equations should not ~e underestimated. W-2-014 2.8 -Transmi ssi on Corri dor:Base 1i ne i nformati on on the t ransm;ss;on corri dor from the damsi tes to the Interti e has been acknow1 edged as 1acki ng withi n the Exhibi t.As wi th other project features,the Exhibit E should provide base line data,impact assessment,and mitigative planning.We recom- mend that this be done for this project feature.For further comments,please refer to our letter dated January 5,1982,on the Transmission Corridor Report.We provided this letter as formal pre-license consultation and continue to view it as such. Response The transmission corridor from the damsites to the i nterti e has been rerouted subsequent to the draft application.Both the transmission line and access road now share a common corridor.Further infonnation can be found in Chapter 2,Sections 2.8,3.6 and 6.2;Chapter- 3;Chapter 10,Section 2.4;Exhibit A,Sections 4 and 10;and Exhibit B,Section 2.7. 3 -PROJECT IMPACT ON WATER QUALITY AND QUANTITY W-2-015 3.2 -Watana Development:Reference is made to Exhibit A.By letter dated November 19,1982,we requested a complete copy of all the Exhibits.This infonnation has not been received. Response Watana development explained in feasibility report. (a)Watana Construction W-2-016 (i)Flows:Paragraph 1:The significance of the loss of the one-mile reach due to construction would more appropriately be assessed in Chapter 3,under Fishery Resources,2.3.1(a)(i). Response The significance of the loss of the one mile reach due to construction is assessed in Chapter 3 Section 2.3.1 (a)(i). (ii)Effects on Water Quality W-2-017 -Suspended Sediments/Turbi day/Vertical III uminat ion:Para- graph 2:Anticipated suspended sediment and turbidity levels should be compared,by month,to the ambient conditions.This would allow an evaluation and understanding of potential pro- ject impacts.The amount of spoil which would be generated and the extent to which grading and washing of materials would be needed is not addressed.This has obvious impl ications in regard to water quality and spoil disposal.We do not at this time have sufficient data or maps with which to provide speci- fic input.We would recommend to the extent possibl e,borrow material be obtained from within the future impoundment area. It is stated that,"downstream,turbidity and suspended sedi- ment 1ev el s shoul d remain essenti ally the same as basel ine conditions."This would not appear to be the case during the winter,when the ambient conditions are crystal-clear. Response Seasonal assessments of antic i pated suspended sed iments and turbidity level s for the construction period are provided in Section 4.1.1(c)(iii).Disposal methods and ," W-2-018 the extent of grading and washing have also been addressed in Sections4.1.1(c)(iii)and 6.2.The stockpi ling of gravel is expected to alleviate the need for excavati on duri ng wi nter.Therefore,downstream turbidity and suspended sediment levels during winter should be close to ambient conditions. -Contami nation by Petroleum Products:Spi 11 age of petroleum productsi nto thelocalgrayli ng stream would have si gni fi cant impacts on this fishery.An oi 1 spi 11 contingency plan should be presented in the mitigation plan which is in compliance with state and federal regulations. Response Federal law requires that as part of the management procedures there wi 11 be an oi 1 spi 11 conti ngency plan (40 CFR 102.7).Thi sis di scussed in Chapter 3,Secti on 2.4.3(c)(i i). - ".... W-2-0l9 -Concrete Contami nati on:The types of potenti al problems associated with this activity should be identified and a pollution control contingency plan should be developed as a component of the proposed mitigatlon plans.Such a plan must bei n compliance with state and federal regulations.The Wastewater Treatment secti on (Page E-2-37)is a much more appropn ate level of analysi s. Response W-2-021 (v)Instream Flow Uses:Anticipated impacts for flows greater than the one 1n 50-year event should be described. Response The anticipated impacts for flows greater than 1:50-year event are discussed in Section 4.1.1(f). W-2-022 -Fisheries:Paragraph 2:The desirabi lity of avoiding t~s fishery loss by gating the diversion tunnel should be dis- cussed. Response An expanded discussion of the impacts of the diversion tunnels on fish is contained in Chapter 3,Sections 2.3.l(a)(i)and 2.4.3(h).While it is valid to assume that i ndi vi dual fi sh wi 11 not necessari ly be lost by fi lli ng the reservoi r,the lost tri butary and mai nstem habitat and the low habitat value in the reservoi r sub- sequent to fi lli ng is expected to si gni fi cant ly reduce the popul ati ons of fi sh suscepti ble to passage through the diversion tunnels.The temporary mitigative measure of structural protection from passage through the tunnel will provide only short-lived benefits.It would be more appropri ate to provi de mi ti gati ons that wi 11 provide long-term benefits. W-2-023 (vi)Faci lities:General input is provided in our comments on Chapters 5 and 10.The deci si ons regardi ng the type,admi ni s- tration,and siting of the construction camp/village were made wi thout input from resource agenci es.In addi ti on,the ti mi ng constrai nts pl aced upon the constructi on of thi s project are no longer supported by economi c studi es (Chapter 10,General Comments).The Exhi bi t should be revi sed to reflect updated forecasts.Reference is made to Exhibit F.Although we have requested t~s Exhibit,it has not been provided. Response These comments are addressed under the appropri ate chapters. W~2-024 -Water Supply:It should be noted whether or not the features descrfbed in thi s secti on were coordi nated wi th the Alaska Department of Environmental Conservation. Response The detailed design of support facilities,including water supply development,wi 11 afford an opportunity for agency input.Water ri ghts appropri ati ons wi 11 be pursyed as required by law.Please refer to Section 4.1 (g)(i)for addi ti onal di scussi ons. ·- -I - r f""". i (b)Impoundment of Watana Reservoi r (i)Reservoir Fi lling Criteria W-2-025 -Minimum Downstream Target Flows:Paragraph 1:The factors that went into thi s fi shery vs economi cs tradeoff analysi s for determi ni ng the appropri atedownstream flows should be di s- cussed in detai 1.At the Susitna Hydro Exhibit E Workshop (conducted on November 29 through December 2),it was i ndi- cated that the analysi s consi sted of determi ni ng at what summer flows economi c benefi ts drop off.Gi ven that the economi c analysi s upon whi ch thi sis based is generally con- si dered out of date (Battelle Newsletter #4,Rai lbelt El ectri c Power Alternati ves St udy),confi dence in thi s analysi s from an economic perspective must be low.From a fishery perspective, it is unacceptable. Response Section 3,Project Operation and Flow Selection,has been added to the li cense document.Thi s secti on di scusses the factors consi dered in the selecti on of downstream flows.Al ternati ve operati on scenari os are di scussed in Chapter 10. W-2-026 Paragraph 2:Once we have an acceptable instream flow regime, several gaugi ng stati ons wi 11 be necessary to assure proper flows.It should be recognized that at least eight sloughs are located above Gold Creek and that several of these currently support fish.Flows to maintain or,if possible, enhance t~e productivity of these sloughs should be provided. Response The sloughs upstream from Go 1d Creek that support fi sh are downstream from Portage Creek.Si nee the drai nage area between Watanaand Go ld Creek is 980 square mi 1es and the drai nage area between Portage Creek and Gold Creek is approximately 176 square miles,the discharge at the most upstream slough wi 11 be about 17.7 percent less than the total di scharge contri buted from the drai nage area between Watana and Go ld Creek if it i s assumed that the runoff per square mi 1es does not vary over thi s drainage area.For example,if the Gold Creek flow is 12,000 cfs,of whi ch 8000 cfs is released at Watana and the remai ni ng 4000 is contri buted from the .drai nage area downstream from Watana,the flow at the slough il1ll1ledi ately downstream from Portage Creek would approximate 11,300 cfs.(lJndernatural conditions,a flow .of 4'0.00 cfsfrom the drai nage area between Watana ant)Gold Cleek would imply a Gold Creek discharge of ZO,OOO cfs.~Thi snow,in conjuncti on wj th proposed W-2-027. mitigation measures,would be used tomai ntai n the productivity of the sloughs.With distance downstream, the flow would increase such that the flow adjacent to sloughs just upstream from Gold Creek would be close to the 12,000 cfs flow at Gold Creek. pararaPh 4:The out-mi grati on of salmon in the spri ng is as like y related to photo-period and development as the other factors listed.Very low flows in the spring could cause many of the juveni les to rem~n trapped in backwater pools that are normally flooded under pre-project conditions. Response During Watana reservoir filling,very low flows in the spring may occur;however,this wi 11 not cause juveni 1es to rem~n trapped in backwater pools that are normally flooded under pre-project conditions.Local runoff from the spring melt and/or rainfall in combination with ground water inflow will provide sufficient flow for out-mi grati on. W-2-028 Paragraph 6:The proposed flows of 12,000 cfs have not been demonstrated to mai nt ai n the i ntegri ty of slough morphology and provi de the f1ushi ng flows needed to clean fi nes out of gravel.Also,the potential problem of beavers colonizing many of the sloughs,not being naturally controlled by flood- ing,and therefore interfering with fish usage of the sloughs should be addressed.Competi ng interests of aquati c and terrestri al project components such as salmon vs beaver con- flicts have been given minimal attention in theexhibit. Response Whi 1e the proposed flows of 12,000 cfs wi 11 not provide the flushing flows to clean fines out of the gravel or maintain the integrity of the slough morphology,during wet years flows often will be sufficiently high to over- top many of the upstream berms of those sloughs whi ch have not been increased in elevation for fishery mitiga- tion.(In sloughs where the upstream berm elevation wi 11 be increased,the sloughs wi 11 be mai ntai ned on a 5-year rotating schedule.)If,during filling the flood volume storage,criteri a are exceeded,Watana flows wi 11 be increased up to 30,000 cfs (Section 4.1.2(b)(ii)). During project operation,once the Watana reservoir is fi 11ed to the normal maximum operating level,outflow wi 11 be increased to equal inflow up to the operati ng capacity of the release faci 1i ti es.From the annual flood frequency curves (Figures E.2.147 and E.2.199), f1ushi ng flows of 20,000 cfs wi 11 occur once every 7 ...years on the average wi th Watana only.When Devi 1 :...p'o,_.,. "'"' I"'" - W-2-029 W-2-030 Canyon comes online,there is a 50 percent chance annually that a f1ushi ng flow of at least 20,000 cfs wi 11 occur.As energy demand increases,flushi ng flows of 20,000 cfs wi 11 Occur about once every fi ve years. The salmon vs beaver·component of thi s questi on is addressed in responses to comment sin Ch apter 3. pararaPh 7:Adequate i nstream flows for the wi nter peri od shou d be estab1i shed accordi ng to fi sh requi rements.Thi sis a critical period for fi sh and even minor dewatering may have significant de1eterinus effects. Response We agree with the importance of ensuring adequate flows for fi sheri es in the mai nstem duri ng the wi nter months. Adequate mai nstem flows are most cri ti cal duri ng thi s period when climatic conditions are harsh and the main- stem i s bei ng uti 1i zed for overwi nter reari ng.Hence, duri ng Watana reservoi r fi 11i ng,i nstream flows wi 11.be increased to natural level s for the peri od November through Apri 1.Secti on 4.1.2 has been modi fi ed accord- i ng ly. (ii)Reservoi r Fi lli ng Schedule and Im~act on Flows:Once an acceptableinstream flow study has alowed an evaluation of various flow regimes,an acceptable fi lli ng regime for the project which would minimize impacts to aquatic resources can be deve loped.Th e proposed fi 11i ng regi me h as been est ab- 1ished upon an inadequate biological information base. Response The summer (i.e.,May through September)fi 11i ng regi me i s based on the mi ni mum operati on flows (See Secti ons 3.2 to 3.7).With average fi 11i ng conditi ons,the reservoir 1eve1i s high enough by August of the second year of fi 11i ng to permi t the release faci 1i ti es to operate.Hence,the adverse temperature impact s from 4°C water being released through the low level outlet c an be avoi ded. W-2-031 (iii)River Morphology:Paragraph 3:The potential negative impacts on.slough areas downstream of Talkeetna due to decreasi ng the recurrence intervals of wh.at are now mean annual bank-full floods are not addressed. Response The discus~on has been expanded. (iv)Effects on Water Quality W-2-032 -Water Temperature:The timing and consequences of the fill- ing regime on downstream temperatures should be better defined.Just as model ing needs to define operational thermal changes,the thermal processes should be modeled for the fill- ing period.From thi s we may be abl e to consider mitigative measures. Response After the initial summer of filling,the Watana reser- voir will necessarily cool to 4°C.From this point un- til water can be passed throug h the rel ease fac il iti es, the Watana outlet temperature will be 4°C.This is because the outlet w"ill be approximately 400 feet below the water surface at the end of the first summer of the fill ing and there is no mechanism for any significant heat tran sfer to the water at this depth.The vol ume of water stored in the reservoir after October of the fi rst summer of filling will be about 2.2 million acre-feet. From November through April,0.5 million acre-feet of 4°C water will be evacuated from the reservoir and be replaced by O°C water which was contributed as inflow during this time.The O°C water,because it is less dense than 4°C water,will tend to float on top of the 4°C water,although there will be some mixing of O°C and 4°C water;however,this will be confined to the upper 1ayers.Even with cool ing before the ice cover forms, only insignificant cooling will occur at a depth of 175 feet.It is the 0.5 million acre-feet stored below this depth which will be discharged during winter.In spring,the ice on the reserv oi r surface wi 11 mel t and the reserv oi r will warm to 4°C,probably by about the end of May.Then the surface will continue to warm above 4°C and slowly this warmer water will penetrate deeper.Also,warm Susitna River water will be contrib- uted to the reservoir.Although there will be some mix- ing,the warmer surface water,because it is less dense, will float on the denser 4°C water.Through mid- September,approximately 1.8 million acre-feet of 4°C bottom water would be released from the reservoir if the low level outlet was continuously used.This would still leave a reserve of 4°C water.However,it is antic i pated that sometime in 1 ate July or August the reservoir will be sufficiently full to allow discharge through the release facility. -Suspended Sediments/Turbidity/Vertical Illumination W-2-033 •Watana Reservoi r:Paragraph 3:Di scussion should be pro- vided on the impact of water qual ity changes on the photosyn- thetic process downstream of the reservoir. I"""' I .... r ..... - - - Response Vertical ill uminat;on in the reservoir will be 1 imited by absorption and scattering of 1 ight by suspended par- ticulate matter.Data from glaciany-fed Eklutna Lake reveal a close correlation between the rate of exponen- tial decay of illumination with de,pth and surface tur- biditylevels,(R&M Consultants,1983).Quiescent settling of particulate matter in winter allows rela- tively low turbidities inearlysurnmerand ,a correspond- ing maximum depth -of vertical illum"ination.If the depth of the euphotic zone is taken as the depth 0 f penetration of 1%of illumination available at the surface,photosyntheti c activ ity in the reserv oi r may extend from the surface to as much as 17 meters depth. Suspended sed iment introduced by summer streamflow will quickly increase surface turbidity 1 evel s and reduce the depth of the euphotic zone accordingly.Mid to late summer euphotic zone depths may be as low as 2 meters (fig.E.2.147).With reduced surface turbidities in the fall,an increase in vertical illumination is expected. However during the breakdown of density stratification- in the fall,turbul ent mixing of turbid strata in the water column will increase turbidities once again, reduc ingill uminati on somewhat until inverse temperature strati fkation and ice cover formation occur. The nature and concentration of suspended sediment at the powerhouse intake will control turbidity and v erti- cal illllTlination in the river downstream between Watana and Talkeetna.The reduction in summer turbidity levels from pre-project conditions will cause an increase in vertical illumination and hence photosynthesis.In fall and winter,relative post-project increases in down- stream turbidities will reduce illumination intensity, although 1 percent 1 ight penetration depths are 1 ikely to be greater than 2.4 meters in open water areas with a, gradual.increase in 1 ight penetration throug h the wi nter. W-2-034 Paragraph 4:It is stated that,"...the river will be clearer than under natural conditions."This may be true during the summer;however,it is our understanding that this will not be the case during the winter. Response The statement that the river will be cl earer than under ,natural conditions was meant to reflect sunmer condi- tions only.Section4.1.2(e)(iii)has been amended accord ing ly. W-2-035 •Watana to Talkeetna:We bel ieve the increase in winter turbidity might be more important in terms of potential fishery impacts.Quantification of potential changes should be provided.The methodology by which the summer turbidity levels were established and why it is not applicable to predicting winter conditions needs to be explained. Response See response to ADF&G comment G-2-042. W-2-036 •Talkeetna to Cook Inlet:Anticipated changes during the winter should be discussed. Response The anticipated changes in suspended sediment and tur- bidity in the Talkeetna to Cook Inlet reach during the winter have been incorporated in Section 4.1.2(e)(iii). (v)Effects on Groundwater Conditions W-2-037 -Impacts on Sloughs:Paragraph 1:The potenti al impacts on slough habitats are not clearly described.The discussion provides the impression that there is a greater understanding of the groundwater relationship between the sloughs and main- stem than is warranted by studies to date.Please refer to our comments under Section 2.3(a)(i)-Sloughs. Response The potential impacts on slough habitats have been revised in Section 4.1.2(f)(ii).Further information on slough hydrogeology can be found in the Ground Water Studies Report (Acres,1983). W-2-038 Paragraph 4:It is indicated that reduced staging would result from the decreased winter flows.The potential impact should be addressed in regard to the potential to dewater spawning and rearing habitats. Response As discussed in the response to comment W-2-029 above, natural flows will be released from November through April.Si nce ice stag ing occurs in November and December,reduced stag ing shoul d not occur.However,a delay in ice cover formation and,hence,staging will occur. W-2-039 Paragraph 5:Although the temperature relationship of the mainstem and sloughs does not appear to be well understood, discussion should be included on this potential impact,par- ticularly during the second year of filling when the differ- ences from pre-proj ect cond iti ons are greatest. - ..- W-2-040 Response The temperature re1 ati onshi p of the main stem and sl oug hs is fairly well,altho~gh not totally,understood.As discussed in Section4.1.3(c)(i),the slough water temperatures are related to the long-term average mainstem temperature which is approximately 3°C.For about eight months during filling,the low level release will be passing water which is near 4°C.Therefore, near the Watana reservoir outlet and for some distance down stream,temperatures will be warmer than the natural winter conditions,but cooler from May to August,the time at which the re1 ease fac il iti es will be operable. The net effect will be an increase in temperature above natural conditions for this time period of about 1°C. Further down stream,temperatures at Go1 d Creek from November through April.wi 11 have cool ed to an ambient DOC and from May to "August will average 5 to 6°C (see Figures E.2.141 to E.2.146).Hence,at this location there wi 11 be a net dec rease in average temperature for this period.However,the difference is less than 1°C. When these temperature changes are considered in con- junction with the buffering effect of the soil skeleton, the impact on g round water upwell ing temperatures of this eight-month period should not be significant. Prior to and after thi s period,temperatures wi 11 be close to ambient except for a period in the fall when they will be warmer and a period in spring when they will be cooler. Vll Effects on .Instream Flow Uses:Please refer to our comments on Section 2.3 a i -Sloughs,and 3.2(b)(v)- Impact on Sloughs.The statements of no temperature effects are not supported by data or citation.The reduction of flows through these sloughs is not quantitatively defined.The loss of scouring flows to clean fines,remove beaver dams,and clear ice could result in significant loss or degradation of slough habitat for fish.· Response For a discussion of the temperature effects in sloughs, refer to secti on 4.1.3 (c)(i)•Flow rates throug h sloughs contributed by upwelling will not change signi- ficantly.However,without mitigation,there will be a dewatering of the upper areas in some sloughs during summer because of a lowering the mainstem water 1eve1 and,hence,ground water table.Refer to Section 4.1.2(f)(ii)for a complete discussion.The comment on a loss of scouring flows is discussed in the response to comment W-2-D28. (c)Watana Operation W-2-041 -Minimum Downstream Target Flows:The criteria are not provided which led to the developnent of the "target"flows. Apparently,no consideration is provided concerning maximum flows,which may be a more important consideration during winter than establishing a minimum flow level. Response Criteria considered in the developnent of the "target" flows are prov ided in Secti on s 3.4 to 3.6.We concur that consideration should be given to maximum flows during winter.At present the max imum winter powerhouse discharge as determined by the weekly energy simulation program is 16,000 cfs.This maximum will be examined in future project operation simulations. W-2-042 •Monthly Energy Simulations:Paragraph 1:The potential impacts of the water year 1969 extreme drought should be fully addressed.The effect of this naturally occurring event should be described in regard to Watana operations,how down- stream flows would be maintained,and how it would effect the biological resources.For example,we suspect that higher down streams flows would be necessary to allow entrance to sl oug hs during thi s period. Response The potent ia 1 impact 0 fad roug ht year suc h as water year 1969 is discussed in Section 3.2.8.Downstream flows would be maintained during the summer of the drought occurrence.By the end of September,the reser- voir elevation would be well below the normal level at approximately El 2125.The available energy would be distributed over the October to May time period.Dis- charge from water taken out of storage would average 4000 cfs.With the natural flow averaging 1000 cfs during this time period,total flow from Watana would be 5000 cfs.Thus,the minimum flow of 5000 cfs would be maintained throughout the winter.Only with a 1 ate spring breakup would there be a problem of maintaining a flow of 5000 cfs.If this occurred Watana would become a run of the river power pl ant until natural flows exceeded downstream now requirements. W-2-043 •Daily Operation:In that the Devil Canyon developnent may not come 00.1 ine for many years,if ever,consideration Sh-ould be given to operations without the Dev'iT Canyon dam.A greater 1 evel of concern and di scussi on shaul d'be'forthcoming on avoidan'Ce of potential impacts to the sloughS abeove Gold' Creek. Response The operati on of Watana before Dev il Canyon comes onl ine is di-scussed in Section 4.1.3(a)(1).Discussion of the avoidance of potential impacts to the sloughs above Gold Creek can be found in the response to comment W-2 -026. -Floods W-2-044 •Spring Floods:Paragraph 2:In that spring floods are part of the pre-project reglme,discussion should be provided as to the importance of thi s phenomenon and whether or not post- project simulated spring floods should be included in the post-project flow regime. Response During spring floods,there can be a substantial supple- ment to in Watana discharges contributed by the drainage area betweenWatana and Gold Creek.Examples of this for daily simulations of years 1964,1967,and 1970 are illustrated in Figures E.2.156,E.2.157 and E.2.158.In the 1964 simulation,the spring flood flow is 24,000 cfs at Gold Creek. The spring floods are of paramoun t importance to the project.This flow provides the necessary annual storage which is subsequently rel eased for winter power generation.Hence,at this time,no simulated spring floods have been included in the post-project flow regime.Further information on the consideration of simul ated spring floods can be found in Section 3.6.3(d). W-2-045 (i i)River Morphology:Paragraph 2:The di scussi on on ice process should be expanded. Response The discussion on ice processes has been expanded and is contained in Section 4.1.·3(b). W-2-046 Paragraph.3:The discussion leads to a view that eventual loss of the slough habitats is in-evitable.The-flow regime proposed~does not counteract this potenti a 1 problem.Avoid- ance of thi s impact through flow modifications is consi stent with the APA Mitig.atton Pol icy document and'NEPA.It illus- trates a low 1 evel of biological Consideration in the formul a- tion of the proposed i'nstrearn flow reg ime. Response The Toss of slough habitats ts'not inevitable (see Chapter 3 s Secti on 2'.2.<2(b)(i 1),Fi sher fes. The flow reg ime proposed does not av oid hab itat impacts. It does,however,minimize certain impacts while improving the technical feasibility of other mitigation options. Av oidance of fi sheries impacts strictly through flow modifications is not consi stent with the Power Authority Mitigation Policy since the passage of avoidance flows would be in severe confl ict with other project objectives (i.e.,economics and power production),and alternative mitigation measures are available (i.e., slough modification and enhancement). (iii)Water Quality -Water Temperature W-2-047 •Reservoi r and Outlet Water Temperature:Paragraph 2:1982 data from Eklutna Lake,which Watana Reservoir is expected to mimic,was presented at the Susitna Hydro Exhibit E Workshop. During the winter,Ekl utna Lake showed temperatures ranging from 0°to 3.6°C in the upper 2 meters,dropping to isothermal conditions below this depth.If Watana Reservoir exhibits a similar shallow winter stratification,it would appear that Watana could not be operated to,"•••take advantage of the temperature stratification within the reservoir." Response See response to comment W-2-049. W-2-048 Paragraphs 5 through 7:Given that the temperature model has only been run for five months and has only one year of data for that period (1981),this discussion must be considered speculative.It is our understanding that input for this model is lacking because previous data was tailored to an earl ier temperature model which is no longer considered appl i- cable to this project.It would seem premature to place much faith in the new model based on the minimal level of testing to date.We recommend that data from two full years be inputted to the model and the results be provided in the Exhi bitE. Response Your recommendati on that data from two full years be inputted to th~DYRESM temperature model will be con- sidered during the pl anning of future studies. W-2-049 Parag raph 8:Thi s sug gests that wi nter out flow temperatures between 1°and 4°C can be selectively withdrawn through a multi-level intake structure.This would be dependent upon - I~ ..... ....., - the thermal profile of the reservoir during the winter,a period which has so far not been modeled.The statement sug- gesting that one degree water temperatures can be selectively obtained is speculative.It is also in conf1 ict with the in formation provided at the Susitna MYdro Exhibit E Workshop where Ek1utna Lake was presented as a model for Watana Reser- voir.Ek1utna Lake showed winter temperatures between O°C and 3.6°C within the upper two meters of the surface.If Watana Reservoir shows a similar winter stratification,one should not expect to be able to tap temperatures other than 4°C with the proposed multi-level intake structure.It would have been appropriate to reference the Ek1utna study findings here as is done on Page E-2-61. Response We concur that winter outflow temperatures wou1 d be dependent upon the thermal profile of the reservoir. The resu1 ts of the winter temperature model ing are dis- cussed in Section 4.1.3(c)(i).Ek1 utna Lake temperature model ing was underaken to determine the sui tabil ity of the temperature model DYRESM in predicting temperatures in a glacially fed reservoir.Watana would not neces- sarily exanp1 ify the same temperature structure.There is good agreement with actual Ek1utna Lake measurements and model predictions from October through December. It is possible that a period of calm,cold weather could have caused an ice cover to form on Ek1 utna Lake in the fall of 1981 shortly after the 1 ake reac hed an i sother- mal temperature of 4°C,with the result that the ice cover cou1 d have acted as a thermal insu1 ator preventing further heat loss.This could have caused the Ek1utna Lake profil e measured on April 16,1982,which showed winter temperatures between O°C and 3.6°C within the upper two meters of the surface.However,we do have suspicions on the val idity of the measurements.Recent temperature measurements taken on January 10,1983, showed the temperature varying from O°C at the surface tol.6°C at 2 meters,to 2.6°C at 10 meters,to 3.0°C at 15 meters,to 3.2°C at 20 meters,and to 3.4°C at 25 meters. At Williston Reservoir in British Columbia,Canada, winter temeprature profi 1 es were measured on Apr i1 14 and 15,1982 (Figure L1.168).These profiles indicate a gradual inc rease in temperature wi th depth.Outl et temperatures from the G.M.Shrum powerhouse,were 1.aoe at thi s time. In 1977,recorded water temperatures at the G.M.Shrum tail race indicated a gradual temperature decrease from 3°C in early January to approximately 1.3°C at the end of Jan uary.February temperatures varied between 0.4°C and 109°C,averaging about 102°C.In March,tailrace temperatures warmed up to about 2°C.Therefore,based on the temperature model ing and experience el sewhere, temperature regulation during winter is possible. However,to state that a temperature of 1°C can be maintained may have been optimistic. W-2-050 •Slough Water our comments on Response Pl ease refer to Refer to the response to comment W-2-002. W-2-051 -Ice:Paragraph 1:It should be clarified as to what would be the impact of the reduced contribution from the upper Susitna River.Estimations of post-project ice staging should be compared to pre-project conditions and the methodology by which the predictions were made should be expl ained,and/or referenced. Response comment noted. W-2-052 Paragraph 2:How ice is lost to the system post-project, would dramatically change from pre-project conditions.The impact of this major change in this riverine system should be thoroughly explored,not merely noted. Response The post-project changes in ice conditions have been expanded in Section 4.1.3(c)(ii). W-2-053 -Turbidity:Paragraph 1:Please provide an exp1anation as to why,"Turbidity in the top 100 feet of the reservoir is of primary interest. Response Turbidity in the top 100 feet of the reservoir is of primary interest because this is the layer in which photosynthesis would occur. W-2-054 -Nitrogen Supersaturation:Discussion should be provided specific to the fixed-cone valves.It is stated that the valves would discharge spills up to a one in 50-year event, but we have no indication of the anticipated extent of their use.Withdrawing water from the hypolimnion;they would often be counterproductive to what is intended to be achieved ..... """ ! through use of the multi-level intake.The potential for thermal shock in fishes,or shock due to rapid shifts in other water quality parameters,should be evaluated.Rapid water level changes would also be an obvious result of their use, particularly between the dam face and the powerhouse. Response The anticipated usage of the fixed-cone valves has been incorporated in Section 4.1.3(a).The rel ease facil i- ties at Watana will be drawing water from between El 2025 and El 2085.This corresponds to an average depth of 130 feet when the reserv oi r water surface is at El 2185.Si ncefl ow releases occur only after the reser- voir is full and since this occurs in August or Septem- ber,then if it is assumed that the temperature profil es are appropriate and water is drawn uniformly over the intake,the water temperature through the release facil- iti es will be about 8°C.Hence,thermal shock will not occur and most water wi 11 be wi thdrawn from the epi 1 im- nion where no adverse water qual ity conditions are expected to exist. 3.3 -Devil Canyon Development W-2-055 (a)Watana Operation/Devil Canyon Construction:Paragraph 1: The referenced Exhibit A has not been provided,although we requested it. r'"Response See the response to comment W-2-015. (ii)Water Quality W-2-056 -Concrete Contaminati on:Pl ease refer to our comments on section 3.2(a}(ii}-Contrete Contamination. Response r I l Refer to Section 4.1.1(c)(vi)for a di scussion of the potential impacts associated with concrete construction activities.A detailed pollution control contingency plan will be developed in compliance with appropriate regulations.Refer to Section 6.2 for proposed mitiga- tion measures. W-2-057 (vi)Facilities:Decisions regarding the Devil Canyon support facilities were made without input from resource agencies. Response Resource agencies will have an additional opportunity to provide input on decisions regarding the Devil Canyon support facilities during the detail design. W-2-058 -Construction,Operation and Maintenance:The,II •••appropri- ate preventative techniques ..."should be described and incor- porated into the mitigation plan. Response Mitigative techniques are described in Chapter 3, Section 2.4.3.and Chapter 2,Section 6.2. (b)Watana Operation/Devil Canyon Impoundment (iii)Effects on Water Quality W-2-059 -Water Temperature:The abil ity to continue to selectively remove very n arrow temperature bands woul d depend upon nlll1er- ous unknowns,assuming the abil ity exists with operation of Watana alone.Removal of such a sizable quantity of water in so short a period of time certainly would have impl ications for one1s ability to select temperature bands during certain times of the year.It should be stated that the temperature model upon which this all rests only has input from five months of one year. Response Devil Canyon Reservoir will be filled either during the fall or winter.The outl et temperature from Watana will be close to 4°C.Hence,it will not be necessary to, nor will it be possible to,select temperature bands during filling. The statement that the summer temperature model ing is based upon five months of input from one year is cor- rect.The val ue of the five months of summer reservoir model ing is that it demonstrates that down stream temper- ature control is possibl e with the proposed design of the intake structures. W-2-060 -Support Facilities:Please refer to our comments on Section 3.3 (a)(v8)-Construction,Operation,and Maintenance. Response See the response to comment W-2-058. W-2-061 (vi)Instream Flow Uses:It is our understanding that significant losses to the existing fisheries would result. The basi s for the statement that,II •••additi onal fi shery habitat will become available •••11 with Devil Canyon Reservoir should be explained in detail. Response Refer to Chapter 3,Section 2.3.2(c)(i). (c)Watana/Devil Canyon Operation (i)Flows W-2-062 -Project Operation:It is indicated in the Feasibility Report Vol.1,page 13-32,that compensation flow pumps would be installed.M explanation as to the function of these dev ices,thei r purpose,the flows which they woul d prov ide, whether or not they are to be in stall ed in one dam or both, how water from this source woul daffect the water qual ity parameters of the water rel eased from the powerhouse,and the basi s fo r the flows whi ch wo ul d be prov i ded from thi s so urce should be provided.We would also like to see an explanation of the fixed-cone valves regarding their expected periodicity of use (at least by month)and impacts on water qual ity para- meters and flow levels. Response .... The compensation flow pumps have been eliminated.It is our opinion that the cost of the compensation flow pumps does not warrant prov id ing a fi shery flow in the 3300 feet that would be dewatered downstream from Devil Canyon.The operation of the fixed-cone valves is dis- cussed in Section 4.2.3(a). r (ii)Effects on Water Quality W-2-063 -Water Temperatures:Si nce Dev il Canyon Reserv oir has not yet been modeled,the rationale for this discussion should be presented.The thermal model s for Watana and Dev il Canyon should provide information on the following: (1)The temperature profile,depth to isothermal conditions, and timing of mix ing : (2)The timing of winter stratification; (3)The extent of turbulence that would be generated at the reservoir intake;and (4)The capability of the intake structure to select from one temperature layer in a stratified reservoir. This should be included in the Exhibit E. Response Results of Devil Canyon Reservoir modeling have been incorporated into Chapter 2,Section 4.2.3(c)(i).' W-2-064 -Ice:Please refer to our comments on Section 3.2(c)(iii) -Ice.Information should be provided on the extent of scour in the sloughs under winter and spring breakup conditions. Discussion should address where the ice front would develop under ll wors t case ll conditions for post-project Watana and Watana/Devil Canyon operations.Fl uctuating high power demand in a record cold year and a record warm year should be dis- cussed.Scenarios which would produce over-topping of river ice and multiple breakups which may scour the river channel shau1d bed e sc rib ed • Response In formati on on the extent of scour in the sl oug hs under winter and spring breakup conditions is discussed in Section 4.2.3(c)(ii).Worse case conditions are al so described. W-2-065 -Nitrogen Supersaturation:Pl ease refer to our comments under Section 3.3(c)(i)-Project Operation. Response The operation of the fixed-cone valves is expl ained in Section 4.2.3(a).The expected frequency of use for v ari ous energy demands is ill ustrated.Except for temperature,water quality is not expected to be signi- ficantly different than powerhouse outflow water quality conditions. W-2-066 -Facilities:Erosion control measures should be described and incorporated into the mitigation plan. Response Erosion control measures have been described and incor- porated into the mitigation pl an in Chapter 3,Section 2.4.3(c).A detailed erosion control plan will be pre- pared subsequen to FERC licensing. W-2-067 3.4 -Access Plan Impacts:Paragraph 2:Reference is made to Exhibit A.By letter dated November 19,1982,.we requested a compl ete copy of the 1 icense appl ication.We have not yet received this Exhibit. _. .- - ,.... I Response See the response to comment W-2-015. W-2-068 (a)Flows:Accurate discharge infonnation on the creeks is needed to insure proper culvert sizing for fish passage. Utilization of culverts rather than bridges could result in more blockages to grayling migration due to beaver activity. Response We concur that accurate discharge information on the creeks is needed to insure proper culvert sizing for fish passage.During final design of the access route, appropriate information will be collected to insure proper culvert sizing • W-2-069 3.5 -Transmission Corridor Impacts:Pl ease refer to our letter dated January 5,1982,regarding the Transmission Corridor Report. Response Our response to this letter is contained in Chapter 11. 5 -MITIGATION,ENHANCEMENT,AND PROTECTIVE MEASURES W-2-070 5.1 -Introduction:Paragraph 2:It is stated that,II ••• miti gativ e measures,Ii were incorporated,II •••in the precon- struction pl anning,design,and schedul ing,1I yet we see con- struction camps/villages which were pl anned with no outside coordinati on with resource agenc i es,or even consi derati on of alternatives.The transmission corridor from the Watana dam was also planned with essentially no resource agencies input. We see scheduling (based on an out-of-date economic analysis), determining access routing,timing of construction activities, and reservoir filling with no input from resource agencies. This has precluded an objective examination of alternative mitigation measures. Response As detailed ;n Chapters 10 and 11,considerable effort has been directed toward coordination with resource ag enc ies and examinati on of alternatives. W-2-071 Minimum flows are proposed with the impression that they were arrived at through an as yet undisclosed fisheries vs.eco- nomic tradeoff.In the draft Exhibit E,we have an eval uation of economically determined flow releases,the basis for which are not longer accepted by the economists that developed them (Battelle Newsletter #4 (Final),Railbelt Electric Power Alternatives Study,December 1982),competing against flow releases.The 12,000 cfs flow release is apparently the maximum discharge for August without signi ficant economic effects. Response Refer to Sections 3.2 to 3.7 for the discussion on the selection of minimum flows. W-2-072 We suspect that the flexibility for providing instream flows, once this issue has been resolved,is highly dependent upon the hydraulic turbines which are selected for the project.We recommend that a tradeoff analysis be presented to display the relationship of different hydraulic turbine configurations with both a one dam and two dam configuration related to maxi- mizing flow release options vs.more flexible turbine system alternatives.If the proposed turbines,in either dam,would adversely effect future instream flow options than the deci- si on as to the preferred turbine configuration should be deferred until a specific,detailed flow release schedule, developed through a quantified instream flow analysis,is agreed upon which would mitigate impacts or enhance conditions for spawning,feeding,passage,out-migration,and overwinter- ing in ths Susitna River. Response Premature turbine Sl zlng is recogni zed as a generic F&W concern since it can result in reduced discharge flexibil ity. As designed,however,the Susitna project is capable of efficiently operating at any flow above 1500 cfs up to the maximum of the powerhouse. W-2-073 The proposed multi-level intake structure would provide the flexibility to select a desirable temperature regime only if the temperature bands exists in the reservoir of sufficient size and of sufficient depth.It has not been established that the multi-level intake would provide sufficient tempera- ture control.At present,Watana Reservoir has been thermally modeled for five months of one year.It is our understanding that this is insufficient to even test the model for the five months for which it was run.Devil Canyon Reservoir has not been modeled,yet the recent incorporation of a multi-level intake here 1eads one to bel ieve the appl icant expects thi s reservoir might stratify.We recommend that modeling be carried out for both reservoirs,throughout the year,and the resultant data be incorporated into a river temperature model. This should be based upon two years of data (e.g.,1981 and 1982)and presented in the license application. ,.... - ,.... r i Response We agree that the proposed multi-level intake structure would provide the flexibility to select a desirable temperature regime only if a temperqture band of suffi- cient size and of sufficient depth exists in the reser- voir.Based on the model ing effort to date,in our judgment,temperature control is provided through the mul ti-level intake.As with any model ing effort,addi- ti onal model ing woul d prov ide added confi dence in the ability of the multi-level intake to control outlet temperatures.The Dev il Canyon reserv oi r model ing is contained in Secti on 4.2.3(c)i). W-2-074 Reference is made to the incorporation of fixed-cone valves to prevent nitrogen supersaturation.The frequency,periodicity, and anticipated volume of use is not addressed.Since they woul d be drawing upon water very low in the dam and then dumping an unknown vol ume of thi s water into an essentially dry riverbed,we would expect potential adverse impacts to the mitigation flow and temperature regimes.The potential effects upon icing conditions and,depending upon the time of year,salmon movements needs to be assessed.We recommend that these potential impacts be discussed in the Exhibit E. W-2-075 Response see the response to comments in FWS covering letter. W-2-076 5.2 -Construction:Please refer to our comments above,Sec- tion 5.1:Paragraphs 2 and 3. Response See the response to comments W-2-070 and W-2-075. W-2-0n Paragraph 2:Please refer to our discussion of instream flows under Sections 5.1:Paragraph 2,3.2(b)(i)-Minimum Down- stream Target Flows,and 3.2(c)Minimum Downstream Target Flows.Additi onal pertinent comments can be found throug hout. The statements contained in Section 5.3 can only be considered specul ativ e;to date,t here are no stud ies to support them. ()lly one slough,identified as #9,has received detailed study.In the November 1982 draft report provided at the Susitna Hydro Exhibit E Workshop,Preliminary Assessment of Access by Spawning Salmon to Side Slough Habitat above Talkeetna,the author noted that until the 1982 field data are analyzed,any statements regarding streamflows necessary for chun salmon access to the side sloughs are provisional.It should also be recognized that the examination of slough access flows is not only without support,but one dimensional. No analysis is put forth to examine other life phases of fish, or project related changes in water quality parameters. Response As discussed in Chapter 3,Sections 2.3.1(a)(ii), 2.3.1(a)(iii),and 2.4.4(a)(i),the analysis did con- si der other 1 ife phases.As has been disc ussed in other comments and in Chapter 3,Section 2.4.2,mitigations focused on chun salmon as the evaluation species. Al tho ug h prov is i ona 1,statements reg ard ing sl oug h access flows are not without support. W-2-078 Paragraph 5:Changes in downstream river morphology have not been fully assessed.It is premature to conclude that no mit- igation would be necessary.The 1 ack of ice scour and flood flows may cause sloughs to silt in and may reduce natural cl eaning processes necessary to maintain productive spawning substrate and rearing areas. Response The discussions on changes in downstream river morpholo- gy have been expanded in Section 4.1.2(d).As discussed in the fishery mitigation section in Chapter 3,sloughs that will be adjacent to ice covered sections of the mainstem and have berms constructed at their upstream ends will be maintained on a five-year rotating basis. At sloughs located upstream from the ice front,during wet years,excess flow wi 11 be rel eased from the dam- sites,providing flushing flows. ~- - ..- .-, , - - W-2-079 Paragraph 6:It would seem appropriate to examine,in the Exhibit E,methods of mitigating the potential thermal effects anticipated during the filling period,to include extending the filling period. Response Methods of miti g ati ng the potenti al thermal effects anticipated during the second year of filling will continue to be investigated during the detailed design process.(}je potential mitigation is a shorter filling regime.This would enable a flow release through the outl et fac il ities early in the second sllllmer of filling. 5.4 -Mitigation of Watana Operation Impacts W-2-080 (a)Flows:Paragraph 2:Pl ease refer to our comments under Section 5.1:Paragraph 2 and Section 5.3:Paragraph 2. Response Re fer to responses above. W-2-.Q81 Paragraph 3:It is stated that,"Watana,when it is operating alone,will be operated primarily as a base load plant." Please discuss the extent to which it is intended to be operated as a peaking faciT ity.Of particul ar concern woul d be how it might operate under worst case conditions,such as fluctuating high power demand during a record cold year.The implications of scenarios like this should be explored in the Exhibit E if Watana is being proposed for periodic peaking use. Response It is intended that from October through April,there will not be more than a 2000 cfs spread between maximum and minimum powerhouse discharges within a 24-hour period during Watana operation. W-2-082 (b)Temperature and D.O.:Please refer to our ccmments addressing the multi-level intake structure and reservoir temperature model ing in sections 5.1:Paragraph 2,and 3.3(b)(iii)-Water Temperature.We have provided additional comments on these subjects throughout. Response Refer to previous comments. W-2-083 (c)Nitrogen Supersaturation:Please refer to our discussion of the fixed-cone valves under Sections 3.2(c)(iii)-Nitrogen Supersaturation and 5.1:Paragraph 2. Response Refer to previous comments. 5.6 -Mitigation of Devil CanyonjWatana Operation W-2-084 (b f Temperature:Discussion should be provided as to why mu ti-level intake ports are proposed at Devil Canyon.It would appear that it has been concluded,without benefit of a thermal reservoir model,that Devil Canyon would stratify. Response Refer to Section 4.2.3(c)(i)wherein a discussion on the results of the Dev i1 Canyon thermal reserv oi r model ing has been presented. ,--:--- .- ..... - i~ ..... .- - ..... ""'" COMMENTS CONTAINED IN THE U.S.FISH AND WILDLIFE SERVICE (FWS) LETTER OF JANUARY 14,1983 CHAPTER 3 -FISH,WILDLIFE,AND BOTANICAL RESOURCES GENERAL COMMENTS -FISHERIES Comment 1 Periodically in the Fishery Section are disclaimers such as,"Much of the discussion is based on professional judgment,"(Section 1.2, Page E-3-3),or "Many of the statements are speculative ...and ... unsupported,II (Secti on 2.3,Page E-3-56).at her st atementsl et us know that ongoing,or planned studies,will fill these numerous data gaps to allow a quantification of the resources and impacts (Sections 2.2(b)(ii),2.4(b)(ii),2.5,2.5(c)(ii),etc.)and let us go beyond, liThe conceptual mitigation plan,"(Section 2.5,Page E-3-116)which is provi ded in thi s chapter.Recogni zi ng a prob 1em does not,in and of itself,correct it.We are concerned that the Fishery Section generally fails to quantify the existing resources,fails to quantify the potential impacts,and fails to provide specific mitigation mea- sures to deal with identified,quantified,adverse impacts.Once we have potential mitigation measures,these proposals would need to be evaluated,for example,in regard to potenti al impacts on:project costs,design,and feasibility;socioeconomic considerations;and fish and wi ldli fe resources other than those for whi ch the miti gati on is targeted.Thi s type of evaluati on would form the basi s of an accept- able environmental impact statement and should be provided as part of the license application. Response At the request of resource agencies,efforts were made to di sti ngui sh between hi ghly specul ati ve comments and those of a more quanti fi able nature.The i nclusi on of thi s i nformati on was meant to assist the reader,not to discl~m the logic or validity of the assessments presented . Comment 2 The ongoing and planned studies which are frequently cited (Sections 2.2(b){i i),2.4,2.4(b)(i i),2.5,2.5(c)(i i),etc.)should be fully identified so we can examine them in regard to their scope.We cannot, otherwi se,determine what needs to be done and what is being done (with assurances that it wi 11 be done). Response Agencies'determination of what they consider needs to be done should be based upon their review of the information contained in the FERC 1 icense application.The supply of this review to FERC and the Power Authority will have a major influence upon what will be done. Comment 3 Potential impacts are frequently identified in the Fishery Section~ such as loss of the apparently important high spring flows for out- migrations (Section 2.3[a][ii]).Potential mitigation to contend with these anticipated adverse impacts are suggested~such as spiking spring flows (Section 2.4[b][ii][SIC,iii]).If these mitigation proposals have validity~then they should be incorporated into the design and operations proposal. Response The mitigation proposals identified have merit.However,they will not be incorporated until their environmental benefit vs. cost is more fully evaluated. Comment 4 Mitigation measures which are proposed should have proven success in Alaska,or in a similar environment.If the proposals are not proven, then they would need to be demonstrated effective in the proj€ct area. For example,hatchery propagati on of grayl i ng may need to be demon- strated as an effective alternative since grayling hatcheries have not been particularly successful in Alaska.Likewise,the proposed slough modifications are unproven and,thus~should also be demonstrated in the Susitna system before project operation. Response This suggestion is compatible with our -approach as indicated by our proposed evaluation of slough habitat enhancement. Comment 5 We support the establ ishment of a monitoring program funded by the p roj ect ~contai ni ng a board of representati ves from appropri ate state, federal,and local agencies.The board should have the authority to recommend project modification measures to assure that mitigation is effective.The procedure by which this would occur should be incor- porated into the 1 icense as an article.This type of monitoring program should be discussed in the mitigation plan. - - - - Response The Power Authority mitigation policy contains a provls10n for program monitoring.If a board of representatives from appropriate state,federal,and local agendes is established,it wi 11 be necessary to determi ne the authori ty,fundi ng,and composi ti on of such a board. COMMENTS CONTAINED IN THE U.S.FISH AND WILDLIFE SERVICE LETTER OF JANUARY 14,1983 GENERAL COMMENTS -BOTANICAL RESOURCES Comment 1 At the recent Susitna Hydro Exhibit E Workshop,November 29 to December 2,we were pleased to learn of the recent efforts to coordi- nate botanical and wildlife data needs.Vegetation types within the project area are apparently now being subcategorized and remapped on the basis of more recent,larger scale photography and additional field work.Analyzing the value of vegetation as part of wildlife habitat, an information need we have consistently cited (e.g.,FWS letter to Eric Yould,APA,October 5,1982),will better allow quantification of project impacts and the development of mitigative measures.However, these efforts render the current Botanical Resources Section at 1 east partially obsolete. Response Paragraph 1:We concur that as the mitigation planning process proceeds,the impact assessments and planning documented in Exhibit E will become "at least partially obsolete."This is as it should be.The Susitna project approach to mitigation is one of iterative refinement based on continuing data analysis and close coo pe rat i on bet ween p roj ec t eng inee rs,en vi ronment a 1 speci ali sts , and agency representatives.Exhibit E is based only on prelimi- nary design commensurate with completed feasibil ity studies.As the project enters the detail ed design stage,impact assessment and mitigation planning will not only influence ongoing design, but change with it as well. Comment 2 Because there is no explanation of ongoing studies,the reader is left with the perception that vegetation studies have been completed.We recommend that descriptions of the following be provided in the Exhibit E:(1)current remapping efforts for both overall vegetation and wet- lands;(2)plans for summer 1983 ground truthing of this data;(3)1984 field work which may be necessary for verifying wetlands;(4)proposed productivity studies relative to project moose studies (see Section 4.2[a][i],Page E-3-204,Paragraph 2 and Section 4.3[a][i],Page E-3-281,Paragraph 3);and (5)schedules for completing these investi- gations and analyses in conjunction with overall mitigation and project planning.Such information is provided,to some extent,relative to the Aquatic Studies Program,Section 2.5. Response Paragraph 2:All of the requested information has been incorpora- ted into the mitigation plan for botanical resources (Section 3.4).F"'I - -I -, - - Comment 3 In general,the description of vegetation types and potential project impacts is thorough.Still,a major problem with this section involves incomplete coverage of wetlands.Minor problems involve the need for some additi onal maps and tables,confli cti ng citations of fi gures and tables (e.g.,referring to Figure WI and Table W3 as Figure E.3.Wl and Table E.3.W3 in the text). Response Paragraph 3:We appreci ate your statement that II In general,the descri pti on of vegetati on types and potenti al project impacts is thorough.1I We have recognized the need for greater documentation of wetland areas,potenti al impacts to wetlands,and how these impacts will be mitigated.All previous wetland mapping is incor- porated in the revi sed Exhi bit E,and quantifi cati on of wet 1and impact areas is provi ded to the extent justi fi ed by the mappi ng detail.Our technical meeting of December 2,1982,on wetlands was held to find ways to improve the project analysis of wetlands, and a new mappi ng program descri bed in the text (Secti ons 3.2.3 and 3.4.2)is in its early stages as a result of that meeti ng. GENERAL COMMENTS -WILDLIFE Comment 1 We found the Wi ldli fe Secti on both too general and incomplete.Judg- mental statements are rarely referenced (e.g.page E-3-376,last para- graph)qualitative terms are seldom defined (e.g.·page E-3-315,last paragraph;page E-3-310).Perhaps most critical is the minimal detail and coverage of the mitigation plan. Response The comment concerni ng judgmental statements apparent 1y refers to the prioritization of species.The utilization of a prioritiza- tion scheme is inescapable.A discussion of its advantages and drawbacks can be found in Secti on 4.1 Introducti on.The actual priorities assigned are justified in Sections 4.1.2 and 4.1.3 and speci fi c values of each speci es are referenced throughout the text.The assessment of the importance of a species is obviously dependent on the opinion and background of the assessor.Whi le an ecologist might not agree with an assessment based on socio- economic considerations,these priorities are legislatively man- dated.Even from a soci opo 1i tic a1 vi ewpoi nt,di fferences in pri ori ti es are arguable.In actual fact,the method is far from bi03:ogically meaningful and the exact order in which species are treated matters very litt le from that standpoi nt.See speci fi- cally Section 4.1 paragraph 2,sentence 4. Most of your comments relative to definitions of qualitative evaluation lacking a succinct definition are premature.Where quantification is available data are provided.Where we have relied on relative,but unquantifiable analysis,the qualitative terms used are justified as thoroughly as possible in the ensuing text.The mitigation plan has been largely rewritten. Comment 2 Lack of quantification is a serious problem throughout this section. While baseline populations are occasionally estimated,impacts are typically qualified only as major or minor,and no values are provided for those mitigation measures which are recommended. Response Where data are available quantification is provided.Estimation of popul ati ons is rarely possi b1e in wi ldli fe i nvesti gati ons. Where a defensible estimate can be made it is provided.Obviously if no popul ati on estimate can be made,other dat a may be used to predict the proportions of the population affected by various impacts.Your remarks regardi ng our consi stent use of current populations rather than potential populations seem somewhat incon- si stent with this comment. ,~ .- ,- Comment 3 We are highly concerned with the lack of attention to habitat values, although we have repeatedly cited the need for project evaluations to consider habitat values as well as populations (please refer to FWS letters to Eric You1d,5 October 1982,5 January 1982,23 June 1980, and 15 November 1979;and testimony of LeRoy Sow1,FWS,before the APA Board,16 Apri 1 1982).We appreci ate the i niti a1 efforts to evaluate habitats for furbearers and birds,and the reported plans to model carrying capacity for moose.Yet we see no evidence of how such evalu- ati ons wi 11 be conti nued,expanded to other spec;es,and most i mpor- tantly,used in developing timely,comprehensive mitigation measures, which are an integral part of project plans. Response Where habitats can be evaluated and it is deemed appropriate,we have attempted to do so.In general,habitat is a poorly defined concept which attempts to define where animals are found. The reasons for not utilizing the USFWS Habitat Evaluation Pro- cedure (HEP)are both uti 1i tari an and phi losophi cal.Measures simi lar in concept to HEP may be the appropriate tool for assessing impacts for some species.Species which utilize their habitats in a simple,easily defined and measured way lend themselves well to such evaluati on.Other,more opportuni sti c,complex or poorly understood species do not (see Mule 1982).Some species wi 11 never 1end t hemse 1ves tot hi s approach and other t echni ques are more likely to prove efficient and effective.In its particulars,HEP is neither effective nor objective for most Alaskan species.There is no reason to assume that measures of vegetati on characteri sti cs alone wi 11 accurately predict the value of a particular area to every species,or that the biologist armed with such knowledge wi 11 be able to accurately predi ct the number of i ndivi dua 1s of each speci es the area supports now or potenti ally under further i dea1- ized (but for whatever reason not presently attained)conditions. The development of a techni que for eva1 uati ng impacts to vari ous speci es is necessary and HEP is an admi rab 1e fi rst attempt.How- ever,the enforced use of this technique can only lead to poor management deci si ons and a confused,inaccurate assessment of impacts. We would rei terate here that habi tat value must fi rst be based on an understanding on the nuances and intricacies of habitat use and wi 11 be useful only as a hypotheti cal construct for compari ng general patterns of habitat use among speci es.Other methods of evaluating impacts are equally useful and often may be more effi ci ent. Comment 4 Where population information is provided,it is,for the current situa- tion.No accounting is given for long-term habitat potentials,for example,(1)habitats may be able to support greater popu1at.ions over the long-term (e.g.pi ne marten near Watana Creek):(2)habitat values may decli ne as,through successi on,vegatati on proceeds to more mature stages whi ch are less producti ve for moose;or (3)harvest management goals may be modified and caribou populations allowed to increase to where avai lable habitats are more completely stocked. Response Many sections have been rewri tten to address the li ke li hood of alteration of management goals and the carrying capacity of habi- tats.The range of possi ble changes in habi tat values for moose is i nfi ni teo Where the project itself wi 11 affect such changes they h ave been we 11 addressed.Moose in any area are dependent upon the periodic occurrence of vegetative recession and we con- sider the natural occurrence of thi s phenomenon before and after project construction to be treated as thoroughly as is presently possi ble. Comment 5 We recommend provi di ng i nformat i on on conti nui ng st udi es (i nc 1udi ng habitat modeling)and how data gaps identified here,in previous agency comments,and the August 1982 Adapti ve Envi ronmental Assessment (AEA) Workshop wi 11 be answered.Our Specific Comments below,further address thi s need.Another major problem is that the Wi ldli fe Secti on is not integrated,nor is it consistent relative to impact potentials and mitigation options with other sections in Chapter 3 or with other chapters in the Exhibit E.For example,in Chapter 3 the impacts dis- cussions are based on no access along the transmission corridor;in Chapter 5,such access is assumed (Section 3.7[c][i],page E-5-84). Not only do we recommend that this problem be corrected,but that evi- dence be pro vi ded as to thi s section has been integrated into project designs and scheduling.That integration is most critical with regard to the mitigation plan.Information should be provided on the mechan- ism for notifying project engineers of key wildlife areas and at the same time for the engineers to notify the environmental consultants and resource agencies of design changes or mitigation measures they believe are unfeasi b 1e.Ad di t i on ali nformat i on shou 1d be provi ded on t he pro- cess to be followed for finalizing and then implementing mitigation requi rements. Integrati on of the vari ous report secti ons would be ai ded through an overview discus~on of overall project objectives for wi ldlife,fish- eries,vegetation,recreation,land use,and socioeconomics. Response Projects for which the APA has guaranteed support are described in as much detai 1 as possible.No expansion of the studies mentioned ..- - to include other speci es is i ndi cated.For several hypothesi zed impacts for which no production of occurrence or relative serious- ness can be provi ded,moni tori ng programs are proposed.Appro- priate levels and forms of mitigation must,in those instances,be re legated to future assessment.The miti gati on secti on has been rewri tten. Comment 6 Present ly we fi nd apparent objecti ves of the Wi ldli fe Secti on often contrary to recreation or socioeconomics;within the Wildlife Section, objectives for one species may conflict with those for another species. Because of the voluminous nature and complexity of material involved, it is difficult to assess population status,habitat values,impacts, and mitigation for each species relative to all other species.This is particularly important where mitigation for one species may be at the expense of another,as above.Thus we suggest some type of summary chart which would show,by species:(1)populations;(2)habitat types and values;(3)status (i .e.i ncreasi ng/decreasi ng,upper/lower basi n, etc.);(4)values (commercial,recreational"and or subsistence with monet ary fi gures where possi b le);(5)past and present harvest effort, success,and management restrictions;(6)impacts;and (7)mitigation alternatives.Please refer to our suggestions under Section 3.4 for evaluating mitigation alternatives as prioritized under NEPA guide- lines.The schedule for filling resultant data gaps could then be outlined;additional mitigation needs or tradeoffs in benefits/impacts would also be obvious. Response Objectives of proponents of recreation,wi ldli fe and soci 0- economics are different by definition.Conflicts in mitigation plans for project features proposed by recreation,soci oconomi c and fisheries consultants have been identified and altered to avoid such inconsistencies.We are aware of no internal inconsis- tenci es in the wi ldli fe secti ons. Comment 7 We recommend quanti fyi ng the 1eve 1 of mi ti gati on to be achi eved by di fferent measures.Thi sis parti cul arly important where management policies are unclear (e.g.housing and transportation of workers,har- vest regulations,and prohibitions on use of the access road pre-and post-construction wi 11 determine the magnitude of project impacts.) Response The mitigation section has been rewritten. Comment 8 Fi nally,we are concerned that although the fragmentati on of project impacts by project feature allows for a more comprehensi ble analysi s, the report lacks a broad overview.Cumulative impacts are generally ignored.We recommend that such impacts be compiled in conjunction with a li st of unavoidable adverse impacts. Response Cumulative impacts are treated in Section 4.3.6. Comment 9 Lack of key data has made it essenti ally i mpossi b le to more than out- line the types of measures which should be included in the mitigation plan.In many cases,no evidence is provided for the proven success of recommended measures -in Alaska or similar environments.For such unproven measure,demonstrati on projects should now be establi shed or backup mitigation measures outlined for implementation if unproven measures fail (e.g.blasting to enlarge the Jay Creek mineral lick, provi~on of artifici al raptor nests). The monitoring program we recommended under the Fishery Section should also be extended to wi ldlife resources in the project area. Response Unproven measures:Any hope of mi ti gati on wi thi n the actual pro- ject area wi 11 depend on the wi 111 ngness to allow an adapti ve, experi ment a1 approach.However,all the measures proposed here are based on an underst andi ng of known processes and bi 01 ogy and all are deemed entirely feasible with a high probability of suc- cess.The Susitna Hydroelectric Project Fish and Wildlife Policy includes provi si on for monitori ng of wi ldli fe populati ons. .... -. r .... SPECIFIC COMMENTS 1 -INTRODUCTION 1.2-Impact Assessments W-3-001 Paragraph 1:Please refer to our Fi shery Section -General Comments regarding quantification and the status of the project studi es. Response Refer to general responses. W-3-002 Para~raph 4:Several of these references do not appear in the bi tih ography. Response This has been corrected. 1.3 -Mitigation Plans W-3-003 Paragraph 8:Avoi dance of adverse impacts rarely appears to occur,particularly in regard to project features.For example,missed opportunities to avoid adverse fish and wild- li fe resources impacts exi st in:project scheduli ng;mode and routi ng of constructi on access;recreati on pl anni ng;siti ng, admi ni strati on,and type of constructi on camp/vi 11 age;and i nstream flow regime. Response Avoi di ng impacts through desi gn features or scheduli ng activities to avoid loss of resources has received highest priority,and this approach has been applied whenever possible.Environmental values have been given,and wi 11 ~ontinue to be given,equivalent consid- erati on wi th other project parameters such as cost, schedule,etc.However,plannning based solely on envi- ronmental consi derati ons would be contrary to NEPA and the Power Authority mitigation policy. As identified in Chapter 10 and in our Development Selecti on Report,si gni fi cant envi ronmental impacts were avoided by selecting the middle Susitna basin.Impacts were further avoi ded by rejecti ng damsi tes downstream from Devi 1 Canyon or upstream from Vee Canyon.As a consequence,ina number of subsequent p1anni ng deci- sions'the magni tude of the impacts bei ng mi tigated di d not justify the cost,schedule,or energy differential between avoi dance and other accept ab le forms of miti ga- t ion. W-3-004 The monitori ng program,whi ch has been supported in several chapters,should be fleshed out.The program should provide for participation by appropriate representatives of state, federal,and local agencies,be supported by the project,and be able to recommend changes in the mitigation program to be adopted through a mechanism established in the license, mutually acceptable to all concerned bodies. Response See response to General Fisheries Comment No.5. 2 -FISHERY RESOURCES OF THE SUSITNA RIVER DRAINAGE 2.1 Overview of the Resources W-3-005 (d)Selection of Project Evaluation Species:Paragraph 4: Improving habitat conditions for an evaluation species would be hel pful to other species with simil ar habitat requisites. However,we would expect other species,with habitat require- ments that conflict with evaluation species,to be adversely affected.In addition,we recommend Dolly Varden and burbot be included as evaluation species for the Susitna River downstream of Devil Canyon. Response It is true that some species with a lower evaluation priority may be more sensitive to change.In the Susitna River,however,the four Pacific salmon selected as eval uation species (chum,chinook,coho,and pink) utilize almost all available habitats at some point in their life cycle and are considered to be highly sensi- tive to change.Mitigations that prove effective at reducing impacts to the various salmon life stages should mitigate most impacts to the other species. These four species of salmon were selected as the evalu- ation species downstream from Devil Canyon.Dolly Varden and burbot are not considered to be more sensi- tive to the identified habitat changes than the various salmon life stages,thus mitigation of impacts to all salmon life stages should mitigate impacts to Dolly Varden and burbot.For example,Dolly Varden primarily spawn,incubate and rear in tributaries during the summer and overwinter in the mainstem or lower portions of tributaries.A similar pattern is followed by chinook,coho,and salmon. W-3-006 Paragraph 6:It is stated that,II Improved conditions in the mainstem are expected to provide replacement habitat ••• Juvenile overwintering habitats are not expected to be adversely affected.II We a re unaware of specific data to support these statements. - r - Response The discussion has been expanded to clarify and support t he statement. W-3-007 Paragraph 8:Eva1 uation species and 1 ife stages should be listed for the Cook Inlet to Talkeetna reach. Respon se The fish evaluation species that were selected for the Devil Canyon to Talkeetna reach also apply downstream from Talkeetna.The text has been revised to indicate this. W-3-008 (i)Commercial:Species specific comparisons are made of com- mercial harvest to escapement.Perhaps a better gauge would be to provide estimated contribution to the commercial har- vest,as is assessed in Chapter 5 (page E-5-70),or estimated contribution to the run.This,however,also would simplify the systems contribution,but would at least provide reviewers with a better understanding of production •. Response These estimates have been made for the 1981 and 1982 estimated escapement past Talkeetna. W-3-009 (ii)Sport Fishing:Paragraph 2:If more recent surveys are available,this section should incorporate them. Response W-3-010 Surveys from 1978 through 1981 have been incorporated. (iii~Subsistence Harvest:The following three ADF&G reports woul allow for a more expansive discussion of this important topi c: 1.Forster,Dan.November 1982.The Utilization of King Salmon and the Annual Round of Resource Uses in Tyonek, Alaska.ADF&G.55 pp.+appendices. 2.Stanek,Ronald,James Fall and Dan Foster.March 1982. Subsistence Shellfish Use in Three Cook Inlet Villages, 1981:A Preliminary Report.ADF&G.17 pp.+appen- dices. 3.Webster,Keith.April 1982.A Summary Report on the Tyonek Subsistence Salmon Fishery,1981.Upper Cool<Inlet Data Report Number 81-3.ADF&G.16 pp.+appendices. Response The expanded di scussi on of subsi stence harvest is in Chapter 5. 2.2 -Species Biology and Habitat Utilization in the Susitna River Drai nage (a)Species Biology (iii)Resident Species W-3-011 -Arctic Grayling:Paragraph 8:The statement that, IIAssumlng other conditions for spawning are favorable,..." should be expanded to allow an understandi ng of what these other condi ti ons are and why we should assume they would be favorable. Response The text has been appropri ate1y revi sed. W-3-012 (b)Habitat Uti 1i zati on (ii)Talkeetna to Devi 1 Canyon -Mainstem and Side Channels:References are made to low flow and maximum flow.The flows should be quantified so that an understanding of potential impacts and mitigative flows can be related to how it would influence habitat. Response The text has been revised to include specific flow values where avai 1ab1e.See Chapter 2,Section 2.2 for a more detailed discussion of the river morphology and sediment transport characteristics. W-3-013 .Species Occurrence and Relative Abundance:The baseline information and analysis should incorporate the 1982 field season data. Response Substantial 1982 field season data have been incor- porated into the baseli ne and ana1ysi s secti ons. W-3-014 -Slough Habitat:Paragraphs 2 and 3:The effects of various flow levels should be referenced by the number of sloughs which would be impacted by the particular problem and the rel- ative importance of the effected sloughs in terms of salmon habitat. Response Information indicating the importance of the various sloughs to spawning adult salmon has been added.The r--·' ~, impact on each slough from operati ona1 flows is bei ng addressed in the referenced AEIDC study. W-3-015 Paragraph 4:The basi s for the i ntragrave1 temperature statements should be provi ded,whether conjecture or based upon a study of x number of sloughs. Response The referenced report (Atki nson 1982)is the basi s for the statements;the study covered sloughs 8A,9,11,19, 20,and 21. W-3-016 .Significance of Habitat .Salmon:Paragraph 2:The relative value of tributary sites (mouths?)vs sloughs may be a reflection of ease of study,or effort. Response The text has been appropri ate1y revi sed to focus the discussion on slough habitats. 2.3 -Anti ci pated Impacts to Aquati c Habi tats W-3-017 Para~raph 3:Please refer to our di scussi on under Fi shery Sectlon -General Comments. Response P1 ease refer to our response under Fi shery Secti on - General Comments. (a)Anti ci pated Impacts to Aquatic Habitat Associ ated with Watana Dam (i)Constructi on of Watana Dam and Re 1ated Faci li ti es -Wat ana Darn W-3-0l8 .Changes in Water Quality:Although turbidity levels may be decreased,on the average,throughout the year,a more appro- priate impact evaluation would be to examine turbidity levels by season or month ~aquati c 1i fe stage. Response As stated in the text,turbi dity would vary with the type and durati on of constructi on acti vi ty and may be significantly influenced by rainfall events.The pro- bable temporary nature of turbi d conditi ons would make predi cti on of turbi dity levels on a season or monthly basis not feasible.In any event,increases in turbid- i ty as a result of constructi on acti vi ti es wi 11 not exceed the DEC standards in 18 AAC 70.020. W-3-019 Paragraph 11:Examples of "•••good engineering practices~and a thorough SPCC plan~"should be provided in the mitigation plan.The abbreviation of the plan should be spelled out. Response The appropriate discussion is included in the mitigation plan (Section 2.4.3). W-3-020 .Direct Construction Activities:Paragraph 1:Material sources should generally be confined~unless unavoidable~to that area which would be inundated by the impoundment~or up- land sites.In that the Devil Canyon dam is not a certainty~ rehabilitation of Cheechako Creek should be planned. Joyce~Rundquist~and Moulton (1980)is referenced several times.We request that this reference be provided~and the pertinent discussions from this paper be incorporated into this section. Response The concerns are addressed in the mitigation section (2.4.3(d)(ii)of Chapter 3). Copi es of the Joyce~Rundqui st~and Moulton (l980a and b)references which are USFWS/OBS publications are available through John Stout of the U.S.Fish and Wildlife Services~1011 E.Tudor Road~Anchorage~ Alaska.Pertinent discussion occurs in Section 2.4.3 (Mitigation)• W-3-021 -Watana Camps~Village and Airstrips .Construction and Operation of Camps~Village and Airstrips: Paragraph 1:Reference is made to Exhibit A which has not been provided~although we have requested it. Response Comment noted. W-3-022 ••Indirect Constructiorl Activities:We expect secondary im- pacts~avoidable and unavoidable~to be much greater than that indicated by this discussion.We provided comments on this topi c in response to appropri ate Chapter 5 secti ons ~where this topic is also inadequately discussed. I,~ r Response Additional discussion of this topic has been included. Secondary impacts are consi dered to be the most si g- nificant construction-related impacts and this point is more clearly stated. W-3-023 (i i)Fi 11 i ng Wat ana Reservoi r -Watana Reservoir Inundation .Mai nstem Habi tats:Paragraph 4:Although overwi nteri ng hab- itat would be increased,the overall impact would probably be a net loss of habitat value.The discussion does not identify what speci es mi ght benefi t from thi s increase in overwi nteri ng habit at. Response Agreed -thi s poi nt has been reemphasi zed.The fact that grayling,whitefish,burbet,lake trout,Dolly Varden and scuplin are expected to uti lize the impound- zone has been added. W-3-024 Paragraph 5:The basi s for ~he statement,"Reservoi r tempera- tures in the top 100 ft are expected to be in the range of 1° to 2°C,1I should be provi ded.Fi rst,the reservoi r temperature model has not been run for the period November through May. Second,the statement is in apparent conflict with the infor- mati on provi ded at the Susi tna Hydro Exhi bi t E Workshop in which Eklutna Lake was presented as a model for Watana Reser- voi r.Ek 1utna Lake shows wi nter temperatures between 0°and 3.6°C within the upper two meters. Response The basi s for the st atement regardi ng reservoi r temper- atures is now provi ded inCh apter 2 on the basi s of temperature model runs for the wi nter peri ode Data from Eklutna Lake were considered in the modeling of Watana Reservoir. W-3-025 -Talkeetna to Watana Dam .Mai nstem Habi tats:Paragraph 1:In that the ri ver would no longer be clear,the effect of this change in turbidity upon movement of juveni le salmon and resident fish should be addressed. Response It is not known why it is expected that increased winter tur~dity levels would affect movement of juvenline and adult salmonids.If more study is needed your recommendations win be considered when develop- ing future study plans. W-3-026 Paragraph 4:The apparent importance of the receding 1 imb of high spring flows to stimulate outmigration is noted yet we see no effort to simulate this in the recommended instream flow regime. Response Other factors besides declining flows may influence salmon fry out-migration,including photoperiod and water temperature.Salmon fry out-migration will be exasmined during Spring 1983.If more study is needed, your recommendat ions wi 11 be considered in devel opi ng the future study program.When the significance of flow-related stimuli to smolt out-migration is defined, the flow regime can be adjusted. W-3-027 Paragraph 9:It is recogni zed that the outfl ow temperatures du ri ng the second open-water season coul d have s ubstant ial adverse impacts.This problem in relationship to how it was handled at other hydropower projects should be discussed. Response No data from equivalent hydroelectric projects has been found regarding i nfl uence of low water temperatures on upstream migration of adult salmon.The discussion has been expanded,but we are continuing to investigate the problem. W-3-028 .Side-Channel Habitats:Paragraph 3:Until an adequate instream flow study is conducted,these statements will remain speculative. Response Comment noted -this is being addressed by the refer- enced AEIDC studies. W-3-029 Paragraph 4:It should be stated whether or not rearing habi- tat is considered limited. Response Any statements at this time on rearing habitat would be speculative;this topic is being addressed by ongoing studies.In many systems,rearing habitat does 1 imit Chinook and coho populations. - .... W-3-030 Paragraph 5:The decreased temperatures expected would probably counteract any benefits deri ved through decreased suspenderl sediments. Response The decrease in water temperature is li mited to the second year of fi 1 n ng.Decreased suspended sed;ment s duri ng the summer wi 11 conti nue for the li fe of the project. W-3-031 .Slough Habitats:The potenti al impacts during fi 11ing should be di scussed.Fl ows and temperatures would be changed from ambient.Until the ground water relationship,in regard to flows and temperatures,is adequately establi shed the poten- Hal for impacts should not be di smi ssed.Whether or not the colder second year releases would have a delayed temperature effect upon the sloughs should be examined. Response Potenti al impacts to sloughs are di scussed;the poten- tial for impacts is not dismissed.The text has been expanded to c 1ari fy these imp act s. W-3-032 Paragraph 3:It should be explai ned that the basi s for these statements is preliminary results from an examination of one s 10 ug h (No.9). Response We have revised the text to incorporate your comment. W-3-033 Paragraphs 4 and 5:The slough whi ch had a backwater form above 14,000 cfs should be identified.It is not explained whether this is typical of all sloughs,some sloughs,or even just that one unidentified slough.It is apparent from this secti on that 12,000 cfs would hamper or restri ct passage of adults into an undisclosed proportions of the sloughs and would not create a backwater effect for an unknown proporti on of the sloughs.The biological basis by which 12,000 cfs was chosen as the preferred flow for August should be explained in light of the discussion of this section. ,..., Response Wie have revised;the text to reflect the analy,si s of the potenti al problem of fish sloughs.The basi s'for the proposed flow presented in Ch'apter 2,Section 3.2.3(a) natives are (H,sclJssed'in Chapter 10. most recent access into rel eases is and alter- W-3-034 •Tri butary Habitats:Paragraph 4:It is noted that some creeks may become perched under the proposed filling schedule. The desirability and feasibility of altering the filling schedule to avoid this impact should be discussed. Response The Chapter 2 and Chapter 3 texts have been revised to discuss potential mitigative measures for perched t ri butari es. W-3-035 -Cook Inlet to Talkeetna Reach:It has not been clearly established that the project would not adversely impact fisheries below Talkeetna during reservoir filling and project operation. Response It is recognized that small changes in flow can have dramatic impats on habitat in some situations;however, based on avai 1abl e data it is expected that impacts on fishery resources resulting from the proposed flow alterations will not be significant below Talkeetna. If more study is needed regarding project impacts in aquatic habitat/fisheries resources in the Susitna Ri ver downstream from Talkeetna,your recommendati ons will be considered for FY 1984 program. W-3-036 .Mainstem Habitats:It is our understanding that millions of eulachon spawn in the lower river.If this spawning run is stimulated by certain temperatures or peaking spring flows the project could significantly impact this species.secondary impacts would occur to those species,such as bald eagle and belukha whale,which feed on them.This potential problem should be discussed. Response As indicated in the text,little change is expected in water temperature in this reach,and reductions in long term average monthly streamflows of 12 percent are predicted at Susitna Station during May.These changes are not expected to affect the spawning run of eulachon. W-3-037 .Slough Habitats:Paragraph 1:This discussion is in appar- ent conflict with Section 2.2(b)(iii)Slough Habitat - Significance of Habitat..Salmon (page E-3-51)where it is stated that these habitats may be used for spawning. Response The text has been appropri ately revi sed to refl ect the current level of knowledge. W-3-038 ••Tributary Habitats:Paragraphs 2 and 3:A 10 percent reduc- tion in flows could mean a zero reduction in habitats of con- cern or 100 percent reduction or·something in between.We recommend that these flow reduction percentages be related to their effect on habitats of importance to life stages of those species of concern. Response We have identified the percentage reductions in flow. These reductions will lead to some reduction in habitat, primarily in side channel s and sloughs.The percentage of habitat loss in these areas will depend on the channel geometry;these relationships are being addres- ~ed by the AEIDC study.The tributarymouth habitats discussed in the section bei ng referenced are expected to be relatively insensitive to flow changes of this magnitude. ..... W-3-039 (iii)Operation of Watana Dam -Talkeetna to Watana Dam -Talkeetna to Watana Dam .Mainstem Habitats:Discussion should be provided specific to the fixed-cone valves.There is no indication of the anticipated extent of their use.In that they would be withdrawing water from the hypol imnion they woul d often be counterproductive to what is intended to be achieved through use of the multilevel intake.The potential for thermal shock,or shock due to rapid changes in other water quality parameters,shoul d be eval uated.Rapid water 1evel changes would also be a potential problem that should be explained. Response An expanded discussion of the fixed-cone valves occurs in Chapter 2• I ! !""'" I - W-3-040 Paragraph 8:Discussion appears to be in conflict with Para- graph 16 of this section concerning suspended sediment trans- port. The text has been clarified to remove this conflict. W-3-041 Paragraph 9:Sediment load and turbidity are not synonomous. Turbidity should increase substantially over ambi'€nt winter level s. Response The text has been clarified to remove the confusion between sediment load and turbidity. W-3-042 Paragraph 16:The observation that fish apparently overwinter in the turbid Kenai River allows one to conclude that,over a long period of time,these (unidentified)species can adapt to turbid conditions.The concl usion that the Susitna stocks can,in one year,adapt to Kenai River like conditions is a big step.Please more fully discuss this potential problem. Response There is no evidence to suggest that a long period of time is required for the species discussed to adapt to turbid conditions.All species discussed are frequently exposed to high turbidity 1 evels and ADF&G indicates that substantial number of juvenile salmon may be present in the mai nstem throughout the summer (ADF&G comment E-3-71/3).Resident species were al so captured in the mainstem throughout the summer.If these juvenile anadromous and resident species can success- fully rear in the open-water rna i nstem condit ions it seems reasonable to expect that the moderate increases in winter turbidity will have minimal effects. W-3-043 -Cook Inlet to Talkeetna Reach:Please refer to our comments under Section 2.3(a}(ii)-Cook Inlet to Talkeetna Reach. Response Comment Noted. W-3-044 (b)Anticipated Impacts to Aquatic Habitat Associated with Devil Canyon i Construction of DeVl Canyon Dam and Related Facilities -Devi Canyon Dam -Alteration of Waterbodies:Paragra h 3:Please refer to our comments on Section 2.3 a -Watana Dam -Direct Construction Activities. Response Please refer to our response on Section 2.3(a)(i) Watana Dam Direct Construction Activities. W-3-045 Disturbance of Fish Populations:Please refer to our comments on Section 2.3(a)(i)-Watana Dam -Direct Construction Act ivai es. Response Please refer to our response on Section 2.3(a)(i) -Watana Dam Di rect Constructi on Act iviti es. ~, Response Please refer to our response on Section 2.3(a)(i) -Watana Dam Direct Construction Activities. W-3-046 -Devil Canyon Camp and Village •Construction and Operation of Camp and Village:Paragraph 1:Reference is made to Exhi bit A,whi ch we requested.It I'"'"has not been provided.We have not had input into the deci s- 'ions regarding the type,administration,or siting of the construction camp/village.Avoidance of impacts to fish and ,....wildlife resources should have been a major consideration in these decisions.In that we did not participate in these decisions and no alternatives to those which are considered II pre ferred ll are examined in Chapter 10,we can only conclude that little,or no,consideration was given to this mitigation procedu reo Response The discussion of alternatives has been expanded in Chapter 10.Al so,see our response to comment W-10-010. W-3-047 .Direct Construction Activity:Please refer to our comments under Section 2.3(a)(i)-Watana Camps,Village and Aicrstrip. Construction and Operation of Camps,Village and A"jrstrips. Indirect Construction Activities. Response See responses under Section 2.3(a)(i). W-3-048 (iii)Operation of Devil Canyon Dam -Talkeetna to Devil Canyon Dam .Ma i nstem Habitats:Parag raph 1:We as sume that the 500 cfs flows in this reach would be provided by compensation flow pumps,discussion of which does not appear to be provided in thi s Exhi bit.An expl anat ion s houl d be provi ded as to the function of these devices,thei r purpose,and how water from this source would effect water quality parameters of the water released from the powerhouse and the fixed-cone valves,and the basi s for the fl ows whi ch woul d be provided from thi s source.Please proviae the rationale for the statement that a reduction in flows of the magnitude which would occur would not be expected to·adversely affect fi sh popul ati<m s in thi s portion of the river. Response Surface water i nfl ow wi 11 be the only fl ow in approx- imately 1.3 miles of river between the dam and the powerhouse outlet;this is a change in the project operation since the draft Exhibit E was submitted for review.Since this reach of Devil Canyon has not been sampled because of safety considerations for the study crew and the i nabil ity to maintai n gear set in high velocities (9-16 ft/s),the loss to resident species is unquanitified,but is not expected to be great.The area used used by salmon for mill ing activity will be displaced to the powerhouse outlet facilities. W-3-049 .Slough Habitats:M explanation should be provided for the statement that changes in streamflow during the open-water season are not expected to affect slough habitats.We consi- der the potent i al for si gnifi cant adverse effects to thi s habitat type to be high. Response The additional alterations in streamflow,(i.e.,beyond that incurred during the operation of Watana and filling of Dev"il Canyon)are not expected to affect slough habitats during the open-water season. W-3-050 -Cook Inl et to Tal keetna:Small changes in flow,s can have dramatic impacts on habitat.The relationship between flows and impacts on habitat must be established before one can dis- mi ss small changes in fl ows.We expect the AE IDC i nsteam flow study will sufficiently define this relationship. Response It is recognized the small changes in flow can have dramatic impacts on habitat in some situations;however, based on the available data,it is expected that impacts alterations will not be significant below Talkeetna. W-3-051 with Access Roads and Auxiliary Roads -Construction of Watana Access Road and Auxiliary Roads: Once an acceptable access routing is agreed upon,studies woul d need to eval uate the exi st i ng resou rces.On ly at that point can specific mitigative measures be satisfactorily ad- dressed based upon quatified impacts.We recommend that you proceed in this matter. .... Response The recommendation for studies to evaluate existing resources impacted by access routing is acknowledged and will be considered,in devel dpment of future·study pro- grams • W-3-052 •Alteration of Water Bodies:The potential problem of beavers damming culverts and thus interfering with fish pas- sage needs to be addressed. Response Appropriate control measures as a part of routine main- tenance will be undertaken to insure that beaver dams do not interfere with fish passage needs. ..... .... .... W-3-053 W-3-054 -Construct ion of Devi 1 Canyon Access Road and Auxi 1i ary Roads:Paragraph 1:We assume thatAPA has decided on a pre- ferred access plan to Devil Canyon consisting of road or rail access,or both.Whatever it is should be stated. Response The preferred access pl an to Devil Ca nyon cons i sts of both road and rail access • Paragraph 3:Although we have previously expressed our pref- erence for rail access in lieu of road access,proper siting of ra il is hi ghly important to mi nimi zi ng impacts,primarily through avoidance.Coordination specific to this issue should occur when siting decisions are being made. Response Coordination for proper siting of rail access has occurred and is continuing to occur • W-3-055 (ii)Operation and Maintenance of Roads -Operation of Watana Access Road and Auxiliary Roads •Disturbance to Fish po~ulations:Paragraph 3:In that "... the increased accessibi ity of fish streams and lakes to fishermen •••"would possibly be "•••the greatest source of adversei mpacts •••II tt woul d appear to be consi stent with the APA Mttigation Policy document and NEPA to give emphasis to mitigation through avoidance of these impacts. Response Emphasis has been placed on avoidance of potential impacts,whenever possible,to streams and lakes resulting from increased accessibility. W-3-056 d)Transmission Line 1m acts i Construction 0 Transmlssion Line -Watana Dam:Paragraph 1:Baseline information on the trans- mission corridor from the damsites to the Intertie has been acknowledged as lacking within the Exhibit.As with other project features,Exhibit E should provide baseline data,im- pact assessment,and mitigation pl anning.Avoidance of ad- verse impacts would occur by a combined construction access/ transmission 1 ine access corridor north of the Susitna River between the two dams ites.Thi sis our preference.For fu rther comments plea se refer to ou r 1ette r dated J anua ry 5, 1982 on the Transmission Corridor Report.This letter was provided as formal pre-license consultation and we continue to view it as such. Response The transmission line has been realigned to follow the Devil Canyon access road. W-3-057 (ii)Operation of the Transmission Line -Watana Dam •Alteration of Water Bodies:Please refer to our comments under Section 2.3(d)(i)-Watana Dam. Response Please refer to our response under Section 2.3(d)(i) Watana Dam. W-3-058 •Disturbance to Fish Populations:Please refer to our com- ments under Chapter 5,Section 3.7(c)(i)-Aquatic Species. Impacts of the Proj ect. Response This subject is addressed in the revised Chapter 5. W-3-059 2.4 -Mitigation Issued and Proposed Mitigating Measures (a)Mitigation of Construction Impacts Upon Fish and Aquatic Habitats:Please refer to our comments under Fishery Section -General Comments. Response r-Please refer to ou'r responses under Fish~ry Section - General Comments~ W-3-060 i Stream Crossi ngs and Encroachments -Mltlgatl0n:Pease re er to our cOO1ments under Section 2.3(c)1i)-Construction of Watana Access Road and Auxiliary Roads.Alteration of Water Bodies. Response ~The text has been appropriately revised. W-3-061 •Methods of Install at i on:Paragraph 3:Certai n construct ion practices should be scheduled to occur during the winter to minimize and/or avoid adverse impacts. Response Construction practices will be scheduled whenever feas- ible to minimize and/or avoid adverse impacts,as indi- cated in the text. :".., r I W-3-062 \\1-3-063 (ii)Increased Fishing Pressure -Impact Issue:If the construction access and transmission 1 ine between the two damsites were in the same corridor the impact coul d be partially reduced or avoi ded.Please refer to our letter dated January 5,1982 on the Transmission Corridor Report for additional comments. Response The construction access and transmission line have been moved to the same corridor to minimize impacts. (iv)Material Removal -Mitigation:Please refer to our comments under Section 2.3(a)(i).Direct Construction Activities:Paragraph 1. Response The text has been appropriately revised. W-3-064 Paragraph 3:Mining s,hould be scheduled to avoid confl tcts with fish migrations,spawning,or other important occur- rences. Response Efforts wi 11 be made to schedule ml m ng acti viti es to avoid conflicts with fish migrations,spawning,or other import ant concurrences. W-3-065 Par agr aph 6:Please refer to our comment sunder Fi sher y Section ~General Comments regarding monitoring. Response Pl ease refer to our responses under Fi shery Secti on - General Comments regarding monitoring. W-3-066 (vi i i l Susitna Ri ver Oi versi ons -Mitigation:Grating of the diversion tunnel would prevent losses to fish and should be considered as a mitigative measure. Response Provi di ng fl sh screens or a bypass f aci li ty at the di versi on tunnel is a miti gati ve measure of temporary va 1ue si nce the habi tat of the fi sh that may pass through the tunnel would be elimi nated with reservoi r fi lling,and successful reproduction would no longer be possible.The mitigation efforts would be more appro- priately allocated to measures with long-term benefits. W-3-067 (xl Clearing the Impoundment Area -Mitigation:If it would minimize these impacts,then clear- i ng should occur duri ng the wi nter. Response Clearing wi 11 be undertaken at a time of year that would minimize impacts whenever fea~ble. W-3-068 (b)Miti gati on of Fi lli ng and Operati on Impacts (i)Approach to Mltigation:Although,"Avoiding impacts through design features or scheduling activities to avoid loss of resources,"i sli sted as top priority,in reality It has not received this type of emphasis. Response Avoi di ng impact s through desi gn features or scheduli ng activities to avoid loss of resources has received - - - ,..... , highest mitigation priority and this approach has been appli ed whenever possible.Envi ronmental values have been gi ven,and wi 11 continue to be gi ven,equi val ent consi derati on wi th other project parameters,such as cost,schedule etc.However,planning based solely on envir.onmental considerations would,be.contrary to NBPA and the Power Authority mitigation policy. W-3-069 (ii)Miti gati on of Downstream Impacts Associ ated wi th Flow Regime:Under General Comments for Chapter 2 we have provided a synopsis of the AEIDC instream flow proposal which has been contracted by APA.We bell eve that thi s proposal would pro- vide the basis for a reasonable,quantified instream flow impacts analysis which would allow an assessment of mitigative alternatives.Si nee APA has contracted thi s study,we assume that APA agrees with our view.The AEIDC proposal should be fully descri bed in ei ther Chapter 2 or 3.It seems premature to discuss mitigative flows prior to quantification of poten- t i ali mp act s. Response The i nstream flow modeli ng present ly bei ng conducted for the Power Authority by the AEIDC will,in con- j uncti on wi th the input from ongoi ng fi sheri es and hy- drauli c studi es,provi de a si gni fi cant input into the assessment of flow alterati ons.Thi s assessment wi 11 assist in refining the proposed mitigation alternatives. W-3-070 -Impact Issue:Paragraph 1:Reference is made to Exhi bit A. Although we have requested this,as well as Qther Exhibits,it has not been forthconring. Response See response to comment W-2-015. W-3-071 -Measures to Minimize Impacts:Please refer to our comments under Sections 2.3(s)(1i)-Talkeetnato Watana Dam.Slough Habitats:Para~raphs 4 and 5 and 2.3(a)(ii)-Talkeetna to Watana Dam .Mal nstem Habitat:.Paragraph 4:It is apparent that the flow release schedule neither mlnimizes loss of down- stream habitat nor maintains normal timing of flow-related biological stimuli. Response Pl ease refer to our response under Secti ons 2.3(a)(i i) Talkeetna to Watana Dam Slough Habi tats:Paragraph 4 and 5 and Mainstem Habitat:Paragraph 4.The text has been modified to include alternative flow regimes to habitat and provi de flow- The optimal flow regimes analys is of the ongoi ng minimize loss of downstream related biological stimul i 0, will be determined for an Aquatic Studies Program. W-3-072 •Winter Flow Regime (November - A ril :Paragraph 1:Please refer to our comments under Sections 2.3 a 11 -Cook Inlet to Talkeetna Reach.Tributary Habitats:Paragraphs 2 and 3. Response Please refer to our response under Section 2.3(a)(i i) Cook Inlet to Talkeetna Reach,Tributary Habitats:Par- agraphs 2 and 3. W-3-073 Paragraph 2:Weal so feel strongly both ways. Response Comment noted. W-3-074 •Sununer Flow Regime July -October:Paragraph 3:Oi scus- s 1 on shoul d e provi ded regar i ng the 1 nstream f ow studi es which lead to the conclusion that 12,000 cfs is of sufficient magnitude to allow rectification of project impacts. Response The proposed flow releases of 12,000 cfs for a portion of the summer flow regime is equivalent to a volume of water that has been allocated for mitigation of down- stream impacts to fishery resources.This volume of water was derived from a cost-analysis of lost power production vs flow augmentation for fisheries.Chapter 2 contains an expand,ed discussion of the flow selection methodology. W-3-075 -Rectification of Impact •Winter Flows:We strongly disagree with the conclusion reached in this section.How this conclusion can be derived from the i nformat ion provi ded in thi s chapter and Chapter 2 needs to be fully explained. Response The statement has been clarified. W-3-076 •Summer Flows:We fully agree that the proposal must be demonstrated effecti ve before it can be incorporated into a mitigation plan. Response Comment noted. W-3-07T -Reduction of Impacts Over Time:Please refer to our comment under Section 2.4(a)(iv)-Mitigation,Paragraph 6. Response Please refer to our response under the same section. W-3~078 -Compensation for Impacts:Paragraph 2:Please provide doc- umentation on the s.uccess of this alternative in Alaska,or similar environs.Several ideas are di,s,cussed in this sectioA which should be considered for demonstrative projects during the 1983 field season. - Response The text has been modified to include documentation. W..3-079 Paragraph 9:Oi scuss i on of the development of a hatchery should be e*panded.If other mitigation alternatives prove not to be feasible then we will need to fully understand what could be achieved through hatcheries. Response -Measu res to~Min fmi ze Impact s Additional discussion of hatchery development has,been provi ded in the text. W-3-080 (ii)Mitigation of Downstream Impacts Associated with Altered Water Temperature Regime ~, •Water Temperatures Duri ng Fi 11 1'ng Watana Re'servoi r:If the addition of a fifth portal would,based upon thermal modeling of the reservoir,provide additional temperature control dur- ing filling,then we recommend that this be added. Response Comment noted. W-3-0'81 .•Water Temperatu,res During Open'diti,(j)n of Watana Reservoli/r: Paragraph 3:Please refer to!our comments under Section 2.3(a)(ii)-Watana Reservoir Inundation.Mainstem Habitats: Paragraph 5. Response Please refer ,to our responses under Sect'i on2,•.ala'HiT). r- I ! W-3-082 -Measures to Rectify Impacts:Documentation shaul d be pro- vided on the succ:€:ss on this type of proposal 'im Alaska,or other subarcuic systems.:.Demonstrat'iron afthe techniques would need to occur prior to incorporation lnto the mitigation plan.In that the sloughs are also uti'lized for rearing by chi nook and coho ,JuvenUes,di scuss ion "shoul d be provided on how chum salmon (we havl!(etsaumed -:-that chum is the species whfch i's befng ma'na:geGf;ur :ail'tlh:ou!lh,it is not stated)would interact with the other species.Al so,the mechani sms which might allow entrance to chinook and coho salmon into the sloughs while holding the chums from egressing needs to be explained. Response The text has been revised. W-3-083 -Compensation for Impacts:Documentation shoul d be provided on the success of hatchery propagation of grayling. Response The text has been revised to include a discussion of the steps requi red for successful hatchery production of grayling. W-3-084 (ii)Operation Mitigation -Mitigation of Access and 1m oundment Impacts:Paragraph 1: In that other study components e.g.wild ife,and recreation) are also considering uses for the borrow areas,coordination should be directed toward resolving potential problems.Maps depicting the borrow pits and the agreed upon,"best"uses for the individual sites should be provided. Response Maps appear in Chapter 2;Mitigation Measures appear in Chapter 3. W-3-085 -Mitigation for Downstream Impacts:Paragraph 2:We fully support the statement that,"Conti nui ng reservoi r thermal modeling will allow an evaluation of available water tempera- tures throughout the year so that a detailed release plan can be developed.The release plan will need to consider both water temperature and volume in order to minimize impacts." We recommend that this be carried out and the proposed release plan be included in the license application. Response The proposed release plan is included in the license application.Modifications to this plan may occur as results of the design studies and aquatic studies are acquired. W-3-086 2.5 -Aquatic Studies Program:Please refer to our comments under Fi sherySection -General Comments. Response Please refer to our response under Fi shery Sectlon - General Comments. W-3-087 2.6 -Monitoring Studies:Please refer to our comments under Section 1.3:Paragraph 8. Response Please refer to our response under Section 1.3. SPECIFIC COMMENTS 3 -BOTANICAL RESOURCES 3.1 -Introduction W-3-088 (a)Regional Botanical Setting:A more complete description should be provided for vegetation north of the Susitna ~ver to the Dena li Hi ghway,through whi ch the proposed.access road is to pass.The primary importance of botanical resources as a key component of wi ldli fe habi tat should be restated here as the object of t'hi s report (see Secti on 1.2,Page E-3-3,Para- graph 1). Response Additions made;see Sections 3.1 and 3.1.1. W-3-089 (b1 Floristics (i)General:Paragraph 1:We suggest that the di fference in numbers of plant species between the upper and lower basins are a result of the followi ng:Larger study area;greater time spent in sampling the upper basi n,and the numerous vege- tation communities associ ated with elevati on changes and topo- graphical diversity. Response We agree~A,statement to thi s effect has been added to Section 3.1.2(a)~ W-3-090 Paragraph 3:Pl ease exp Tai n the quanti fi cati on of pTant spe- c;es for the Wi How-to-Cook Inlet and Healy-to-Fai rbanks transmi ssioncorridors,when no floristics work was done in that area.(Section 3.2[e][i]and [ii]and Tables W24 and W25.) Response Plant species of the Wi llow-to-Healy intertie corridor were identified by Commonwealth Assoc.(1982)and are listed in Appendix 3.0.Hectares,acres,and percent total area of vegetation types within the Healy-to- Fairbanks,Wi llow-to-Cook Inlet,and Wi llow-to-Healy study corridors are presented in Tables E.3.??,E.3.78, and E.3.79,respectively. - - - W-3-091 (c)Threatened or Endangered Sped es:5i nee no pl ant speci es are off;dally li sted,we suggest addi ti on of the word li C andi - date ll pri or to any di scussi on of "threatened or endangered ll plant species.In many places,the discussion would be more accurate by referri ng to lip 1ant taxa"rather than spec;es s'ince these plants are generally varieties or subspecies rather than distinct species.Please clarify that the ca1ci- phi li c pl ants referred to in Paragraph 4 of subsecti on (i) refer to Murrayl s,not FWS,categor;es for threatened or en- dangered. Response All of the above recommendations have been incorporated in Section 3.2.1. W-3-092 (rl)Contribution to Wildlife,Recreation,Subsistence and Commerce:Because of thei r key functi on both as habi tat for fish and wildlife resources and in maintaining water quality relative to drainage,high water energy dissipation,flood storage,ground water recharge,fi lteri ng surface runoff, etc,wetlands and floodplains have been protected by Execu-' tive Orders (11990,11998)and national leq;fs.illat.ion (e.g.' C1 ean Water Act as amended in 1977).Sinl!e.vreg;e.1tati on is a characteristic component of any wetlandl$",W~SU[gEst addition of a general secti on here on the prevalence'o:ff w.~tj;Tands in the project area and their widely recognized biol'ogi'cal and water quality values (please also see our following comments on Sec- tion 3.2[a][vi],Wetlands.) Response A separate and expanded discussion of wetlands and their si gni fi cance has been added (Secti on 3.2.3). W-3-093 {iii}Subsi stence:Use of area timber resources for bui lding or heating homes is an additionalsubsi stence use whi ch should be menU oned. Response Noted in Section 3.2.2. W-3-094 3.2 -Baseline Description:Paragraph 1:A brief description is needed here of the vi ereck and Dyrness hi erarchi cal veget a- tian ·classification system for Alaska,levels used for this study,and number of categori es mapped (note,thi s descri pt;on should cover the vegetation type maps now under preparation). An explanation for the mapping of up to 16 kilometers (km) from the Susitna River and 0.8 km from the impoundments should be pravl ded. Response All of the above recommendations have been incorporated in Section 3.2.2(a). W-3-095 Paragraph 2:A bri ef descri pti on should be gi ven as to samp- ling intensity.Whether vegetation dominance within the pro- ject area and/or susceptibi lity to project impacts were con- sidered in study design should be explained.General informa- tion on elevation,slope,aspect,and land form should be briefly related here and in subsequent sections of the report to better define areas and their vegetation cover.The preva- lence of permafrost,a determining factor in some project im- pacts (e.g.pages E-3-166,paragraph 2 and E-3-170,paragraph 3)should also be considered. Response Di scussions of sampling intensity and factors governing study desi gn have been incorporated ina new and expanded discussion of methods (Section 3.2.2[a]).Ter- rai n features and permafrost occurrence are treated in relation to vegetation patterns and project impacts in the revi sed and expanded di scussi ons of plant communi- ties (Sections 3.2.2[b-f]),wetlands (Section 3.2.3), and imp act s (Section 3.3). W-3-096 Paragraph 3:Successi ve descri pti ons of vegetati on types by project area would be clarified here by defining closed,open, and woodland forests,tall versus low shrublands,and wetlands (also see comment under Section 3.2(a)[v]),rather than de- fining them in the following sections (a)and (i).The dis- cussion would also be aided by including an overlay of project features on the vegetati on map,Fi gure WI,as well as resta- ting information on the elevations range for each proposed im- poundment area.We recommend the license application include a larger,more readable vegetation map and that quantitative data on how common or uncommon specific vegetation types are, as well as the occurrence of various types relative to eleva- ti on or aspect,be presented in the text as well as tables. In so describing the revised vegetations classification,it wi 11 be possible to better evaluate potential project impacts on vegetation,and thus wi ld1ife habitats,by project feature. Thi s recomended 1eve 1 of effort a1so app 1i es to the propo sed access and transmission corridors. Response Definitions of vegetation types are consolidated in Section 3.2.2(a).Project features are shown in Figure E.3.3?In Agures E.3.39 through E.3.41,boundaries of project features are overlain on the 1:63,360 scale vegetation mapping of the middle basin.Project features are discussed relative to locations,eleva- ti ons,and vegetati on types in the impact secti on (3.3). .... .... ...- [ .... Figure E.3.38,the 1:250,OOO-scale vegetation map of the Watana and Gold Creek watersheds,is included as a large-format enclosure.Data presented in tabular for- mat,including percent cover,as well as more detailed information on elevation ranges,aspect,and other ter- rain features,are incorporated throughout the plant community descriptions and tables presented in Sections 3•2•2(b-f). W-3-097 (a)Watana Reservoi r Area (i)Forests:Please see comment under Section 3.2 regarding i nc1udi ng quantifi ed i nformati on in the text as well as tables.Providing the range of elevation in which these types were sampled rather than one average would show the extent and overlap in distribution of each forest type . Response Quantitati ve data on percent cover and elevati on ranges have been incorporated in text descri pti ons of forest communi ti es. W-3-09S -Spruce Forest:Paragraph 5:Black spruce forests on poorly drained soi 1s would most likely also be classified as wet- lands.Please refer to our comments under Sections 3.1(d)and 3.2(a)(vi ). Response Bl ack spruce forests on poorly drai ned soi 1s are di scussed as wet 1ands in Secti on 3.2.3;quantit ati ve data on percent cover are provided in Table E.3.55 . W-3-099 (ii)Tundra:Please refer to comments under Section 3.2;par- agraph 3 regarding providing quantitative data on the preva- 1ence of di fferent tundra types and of ranges rather than average elevations.The wet sedge-grass tundra should also be described as a wetland type.See Sections 3.1(d)and 3.2(a)(iv),as above. Response See response to W-3-092 and W-3-096 above.In addition, Section 3.2.3 describes forest,shrub and tundra wetland categori es as well as more completely descri bi ng aquati c veget ati on. W-3~lOO (iii)Shrubland:Refer to comments under Sections 3.2(a)(i) and (1 i)above. Response Defi ni ti ons of shrub 1and community types and descri p- tions of classHication procedures are consolidated in the new methods section (3.2.2[aJ). W-3-101 (iv)Herbaceous:For consistency with the rest of the report, we recommend describing common species within the referenced herbaceous pioneer communities.Corresponding tables on the .herbaceous vegetati on types are mi ssi ng. Response Done;see Section 3.2.2(b)(iv),Table E.3.64,and Figures E.3.53 through E.3.65.Percent cover of herba- ceous communities is quantified in Table E.3.52 for a portion of the study area (see response to W-3-102). W-3-102 (v)Unvegetated Areas:Again,quantification of the extent, and thus importance,of these areas should be provided. Response Quanti fi cati on of the areal extent of unvegetated por- ti ons wi thi n the Watana and Gold Creek watersheds is provided in the new Table E.3.51 as hectares and percent of total area,based on mapping at a scale of 1:250,000. New Table E.3.52 provides simi lar data for the area 16 km on each si de of the Sus,tna Ri ver from the Mac 1aren Ri ver (RM 260)to Go ld Creek (RM 136.8),based on 1 :63,360-scale mappi ng.These data have been i ncor- porated into the text. W-3-103 (vi)Wetlands:This section is significantly lacking in three a re as.Fl rst,the 1egi slat i ve 1y recogni zed import ance and protection of wetlands should be described,including the U.S. Army Corps of Engineers'(CE)definition of wetlands and regu- 1ati on of acti viti es on these areas.(Pl ease al so refer to our comments under Section 3.l(d)regarding this concern.) Secondly,there should be a discussion of how wetlands may be a second level of classification applied to the vegetation types previously discussed.Finally,as with other ongoing studies,this section should cover the wetlands delineation scheme agreed .to at the 2 Qecember1982 wetlands session of the'Susitna Hydro Exhibi't E'Workshop.This agreement included the followi ng:project consultants wi'll meet wtth the FWS and CE to identify the appropriate detallfor wet'lands mapping; exi sti ng wetlands mapswil 1 ,be improved on the basi s of addi- tional aerial photography and overall vegetation remapping; soils i nformati on wi 11 be obtai ned from the CE;ground truth- tng,in consultatlon with FWS and CE,wi 11 be undertaken in summer,t983;ifinal maps should be available by fall,1983; F- f'"- - ..... and additional field checks may be necessary in summer 1984 (see page 5 of Wet 1ands Meeti ng notes,recei ved from John Hayden,Acres Ameri can,Inc.).Gi yen the doubtful accuracy of existing wetlands maps,it would be inappropriate to include those maps in the li cense submittal. Redefi ni ti on of wet 1ands to proper ly inc 1ude such types as black spruce bogs,wi 11 ow and poplar along watercourses,and herbaceous sedge-grass marshes,in addi ti on to the more com- pletely aquatic types now described under the wetlands sec- ti on.A defi niti on of "we t tundra"(paragraph 6)should be included.The fi nal paragraph of thi s secti on would be a bet- ter openi ng statement to the expanded di scussi on needed on wetland values and types. Response We concur and have made substanti ve addi ti ons to the wetlands discussion now in Section 3.2.3.The subject section includes (1)a discussion of the legislative and regul atory provi si ons governi ng acti ons affecti ng wet- lands;(2)existing wetland maps of impoundment and borrow areas at a scale of 1:24,000 (Fi gure E.3.66 through E.3.73),and of access corridors at a scale of 1:63,360 (Figures E.3.W29 through E.3.45);(3)a dis- cussion of wetland types as a secondary classification level based on Vi ereck and Dyrness (1980)vegetati on types (Table E.3.81);(4)quantification of wetland areas potentially affected by project components (Table E.3.82);and (5)an explanation of agency consultations and ongoing activities implementing the wetlands deline- ati on program proposed at the 2 December 1982 wet 1ands session of the Exhi bitE workshop . Existing wetlands mapping is included in Exhibit E to provide the FERC with information necessary to determine the adequacy of environmental input to preliminary engi- neering design and construction planning. Section 3.2.3 describes forest,shrub,and tundra wet- land categories as well as more completely describing aquati c vegetati on.The 1atter is di scussed in further detai 1 in Secti on 3.2.2(b)(v). W-3-104 (b)Devi 1 Canyon Reservoi r Area:Pl ease refer to comments under Section 3.2(a)regarding need for a brief elevational and 1andform descri pti on.Agai n,there wi 11 be need for an overl ay of the impoundment area on the (rev;sed)vegetati on type map.We appreci ate i nc 1usi on of the percent of the i m- poundment area covered by major vegetati on types.Pl ease re- fer to our previ ous comments regard;n9 need for a compre- hensive discussion and definition of wetlands. Response Brief elevation and landform descriptions are provided in Section 3.2.2(b),which describes the Watana and Gold Creek watersheds (the Upper Susitna Basin of McKendrick et al.1980).The impoundment areas have been overlaid on the 1:63,360 vegetation maps of the Susitna River and environs (Figures E.3.39 through E.3.41). W-3-105 (c)Talkeetna to Devi 1 Canyon:Cl ari fi cati on of thi s speci fi c area is needed.Agai n,refer to comments under Secti on 3.2(a)(i)and (ii),above.While early,mid,and late suc- cessional stages appear a suitable categorization for flood- pl~n vegetation,these stages should be correlated with the forest,shrub,tundra,wetlands,etc.classification previ- ously used. Response The recommended areal clarification is provided in Section 3.2.2(c)and Figure E.3.34.Correlations bet- ween successi onal stages and vegetati on types are pro- vided in Section 3.2.2(c). W-3-106 (d)Talkeetna to Cook Inlet:Please refer to comments under Section 3.2(a){i)and (il),above.We believe that existing data do not substantiate the conclusion that the project will have minimal impacts on vegetation in this area.Thus we recommend mapping the area within the 10 year floodplain down- steam of Talkeetna at least to the Delta Islands.Further discus~ons on expected impacts should be initiated to better pinpoint the precise area which should be covered. Response Effects of regulated flows on downstream floodplain vegetation are discussed as an impact issue in Section 3.3.l(b)(i i i).The recommended mappi ng wi 11 be con- si dered duri ng preparati on of detai led study plans for fi scal year 1984.Further di scussi on on downstream impacts to vegetation will be initiated at mitigation planning workshops and technical meetings. W-3-107 (e)Transmission Stubs and Intertie:Again,we suggest adding a map,and elevation information,as well as quantifying the vegetation type,for each of the following four subsections. Response The recommend additions have been made to Sections 3.2.2(e)(i-iv).Quantifications of vegetation types is presented in Tables E.3.77 and E.3.80.Mapping is provided in Figures E.3.39 through E.3.41 and E.3.48 through E.3.52. _. ,-. - ,~ ,""", W-3-108 (i)Healy to Fairbanks:Paragraph 5:Reference to IIwet lowland sites"should be expanded to discuss wetlands per our comments on Secti on 3.2(a)(vi). Response Comment noted. W-3-109 (ii)Wi llow to Cook Inlet:Paragraph 1:Here too,"wet sedge- grass marshes'!,should more completely be di scussed as wet- lands,see Section 3.2(a)(vi). Response The discus~ons have been expanded as recommended;see Secti ons 3.2.2(e)(i and i i)and 3.2.3,and Fi gures E.3.48-52. W-3-110 Paragraph 2:The fi rst sentencei s contrary to data provi ded in Table W25,please clari fy. Response In the revi sed Secti on 3.3.2(e)(i i),paragraph 3 now reads,IIClosed coni fer-deci duous forest is the predomi nant vegetati on type,coveri ng 29 percent of the total area.1I W-3-111 Paragraph 5:Pl acement of thi s paragraph between the fi rst' and second paragraphs would be more logical. Response Thi s revi si on has been made as recommended. W-3-112 (iii)Wi llowto Healy:The compatab1 lity of vegetation types as mapped by Commonwealth Associates,Incorporated (1982) wi th those mapped by McKendri ck et al.(1982)should be de- scri bed. Response The referenced vegetation types are not compatible beyond Level 1 of the Vi ereck and Dyrness (1980) clas~fication system;noted in Section 3.2.2(a). W-'3-113 (i v)Dams to Interti e:We questi on the comparabi li ty of vege-I ati on types mapped here at a scale of 1:250,000 wi th those in a 11 other t ransmi ssi on corri dors which were mapped at 1:63,360,e.g.Tables W27 and W28 document difficulties of mapping closed birch and balsam poplar types at the 1:250,000 scale.Thi s transmission corridor should be separately mapped during ongoing mapping. Response Mappi ng of vegetati on types crossed by the Watana-to- Go ld Creek t ransmi ssi on corri dor (i nc 1udi ng the ti e-i n from Devi 1 Canyon)is presented at a scale of 1:63,360 in Figures E.3.39 through E.3.41.Quantification is provided in Table E.3.80. W-3-114 3.3 -Imeacts:Fragmenti ng thi s analysi s into a project fea- ture by nnpact issue format is useful for a fi rst overvi ew. However,the section lacks a comprehensive picture of cumula- tive impacts to vegetation.That cumulative picture is essen- tial for understanding overall impacts of the project on fish and wi 1dli fe speci es occupyl ng areas wi thi n and beyond each project feature.Although thi s secti on i denti fi es the full range of vegetati on impact issues,there is no attempt to quantify areas which may be potentially affected by chan~es in vegetation cover.A given change may be both beneficlal to one speci es of wi 1d1i fe yet adverse to another.By not com- pletely prioritizing mitigation in the previous Fishery Sec- tion and later Wildlife Section,the report fails to identify the tradeoffs or objectives of a project-wide mitigation plan or mitigation plan alternatives.For example,information should be provided here on the tradeoffs analysis relative to fish,wildlife and botanical impacts,as well as cost and de- si gn consi derati ons in the siti ng of project support faci li- ti es,roads and transmi ssi on 1i nes.We remai n concerned that we were not consulted in the siting of project support faci li- ti es. Response We concur.A secti on on cumul ati ve impacts has been added.Discussions of individual impact issues have been revi sed to provi de an esti mate of changes in vegetation type over time for each area which will be affected by development.Al though such esti mates must of course be highly conjectural,as the timing of plant successi on is dependent on c 1i mate,soi 1 type,slope, aspect,elevation,moisture,fire,flooding,ice scouri ng,use by wi 1d1i fe,and other factors all complexly interacting over time,an effort has been made to base our estimates on discussions such as those found in: Ni eland,B.J.,and L.A.Vi ereck.1977.Forest types and ecosystems.In North Ameri can 1ands at 1atitudes north of 60 degrees.Proceedi ngs of a s}fllposi urn held at the University of Alaska,Fairbanks.September 19,20, 21, and 22,1977. Viereck,L.A.1970.Forest succession and soil develop- ment adj acent to the Chena Ri ver in i nteri or Al aska. Arctic and Alpine Research 2:1-26. Areas whi ch wi 11·be affected by changes in vegetati on are quantified in Tables E.3.82-86.Cost and design considerations are discussed in relation to mitigation in Section 3.3.4.The Alaska Power Authority will con- sult further wi th resource agenci es in the si ti ng of project support facilities during the detailed siting and design program. W-3-115 (a)Wat ana Development (i)Construction -Vegetation Removal:Paragraph 1:Again,we suggest re- stating the elevation range wlthin which vegetation will be removed.Spoi 1 areas should also be described. Response Elevation ranges of areas whi chwi 11 be affected by vegetati on removal have been incorporated into the impact discus~ons.Spoil disposal sites are described for the Wat ana and Devi 1 Canyon f aci li ti es in the impact and miti gati on analyses for bot ani cal resources (Sec- tions 3.3 and 3.4,respectively). /""1 - W-3-116 para~raPh 2:Pl ease provi de the percent loss expected for birc forests as shown in Table W27.Loss of a vegetation type relative to its abundance within the basin is half the issue relative to the loss of vegetation;however the value of each type rel ati ve to other types for selected wi ldli fe spe- cies should also be provided.In some cases habitat factors would also be considered;see our comments throughout the Wi ldli fe Secti on. Response Percent loss expected for birch forest i s presented in Section 3.3.1(a)(i).The relative values of vegetation types as components of wi ldli fe habi tat aredi scussed in Section 4.In revising the botanical resources and wi ldli fe secti ons,we have made an effort to emphasi ze the fact that habitat-based assessments of wi ldli fe impacts are derived largely from vegetation type quanti- fications provid~d in the botanical resource baseline, impact,and mitigation discussions (Sections 3.2,3.3 and 3.4,respectively). W-3-117 -Vegetati on Damage by Wi nd and Dust:Paragraph 1:Gi ven the difficulty of reading the vegetation map supplied here and the 1ater need to understand the potenti a1 for lost nest si tes or wi 1d1if e cover t please descri be the pri mar y tree speci es and vegetation type(s)in which b10wdown may occur on the south- side of the Watana damsite. Response A statement that wood1 and black spruce stands wi th a typi cal rooti ng depth of less than 35 cm (12 inches) wi 11 be the primary vegetation type subject to b10wdown on the south si de of the Watana reservoi r has been incorporated in Section 3.3.1(a)(iii). W-3-118 para9raPh 3:Some relationship should be made between refer- ence possible delays in snowmelt and vegetation types which may be affected.~mi 1ar1Yt increases in cottongrass and de- creases in mosses and lichens should be related to their occurrence in vegetati on types adj acent to impoundment and borrow areas.Such relationships should be the basis for fully consi deri ng the impacts of project-i nduced changes on vegetati on re1 ati ve to wi 1d1i fe (see our comments under Sec- tions 4.3(a)[i]t [ii]t [ivJt and [v]). Response The relationship between potenti a1 delays in snowmelt as a result of heavy dust accumu1 ati on and the vegetati on types whi ch may be affected is di scussed bri efly in Section 3.3.1(a)(iii).Where potential increases or decreases in plant taxa are discussed relative to project-induced climatic changes in Section 3.3.1(b) (iv)t we have indicated the occurrence of these taxa in veget ati on communi ty types present in the potenti ally affected areas. W-3-119 (ii)Fi 11ing and Operation -ve~etation Succession Following Removal:In order to under- stan the magnitude of vegetation alterations t some quantifi- cation should be presented for the areas of forest t shrub t tundra t etc.whi ch wi 11 be rehabi 1i tated duri ng project f111- ing and operation.A scenario should be developed outlining potenti a1 acreages of each affected vegetation type and the various successional stages they wi 11 pass through during the life of the project. Response Areal coverage of vegetati on types in locati ons to be rehabi litated is quanti fi ed in Secti on 3.4.2(a).The scheduli ng of rehab-Ili tati on on a locati on-by-locati on basis is also indicated.We have provided rough esti- mates of the length of time required for rehabi litated areas to return to their pre-project vegetative cover, and a general descripti on of the sl../ccessi onal stages likely to occur during the license period,based primarily on Nieland and Viereck (1977)and Viereck (1970)as cited above. W-3-120 •Forest Areas and Shrubland:Anticipated heights of each vegetation stage,over time,should be included here. Response The requested information has been included. W-3-121 •Tundra:The extent of permafrost should be descri bed, please see our comment under Section 3.2. Response Areal extent and locati ons of permafrost are descri bed in Exhibit E,Chapter 6,Sections 2.5.5 (Watana)and 2.6.5 (Devil Canyon),and shown in Figure E.6.3.2 through E.6.4.5 (Watana)and E.6.2.1 through E.6.2.9r(Devi 1 Canyon).. W-3-122 Informati on is needed on successi onal patterns in herbaceous vegetation types and on wetlands within each type,for consis- tency with Section 3.2(a).An additional concern is the nu- tritional quality and quantity of plant regrowth relative to wi ldli fe. Response The di scussi on of successi onal patterns has been expanded to i hcl ude herbaceous vegetati on types and wetlands.Nutritional quality of successional stages following project di sturbance,rehabi litati on,or intentional browse enhancement measures is addressed in Sections 4.3 and 4.4.Changes i nand loss of moose browse vegetation'receives particular emphasis in these sections,and is the subject of an intensive simulation modeli ng program now in progress.In addi ti on,browse baseline inventories initiated and funded by the Alaska Power Authority wi 11 be documented in a report avai lable in May 1983.A detai led browse nutri ti onal study is under consideration for the spring and summer of 1983. r- I W-3-123 -Effects of Erosi on and Deposi ti on:Paragraph 2:See pre- ceedi ng comment and that under Section 3.2 regardi ng need to map and quantify the aerial extent of permafrost. Response Areal extent and 10cati ons of permafrost are descri bed in Exhi bit E,Chapter 6,Secti ons 2.5.5 (Watana)and 2.6.5 (Devi 1 Canyon). W-3-124 -Effects of Altered Downstream Flows:Overall,thi s di s- cuss;on ; s too general.Consi derat;on of dai 1y flow fluctua- tions in response to peak power needs is neglected. Several other potenti a1 projects impacts are left unclear; especially those related to wetlands and floodplains.For example,please provide the extent of floodplain areas,(1) now subject to annual,5 year,10 year,etc.flooding,and (2) which will become exempt from flooding.Given the succession- ali nformati on depi cted in Fi gure W3 and revi sed veget ati on maps,it should be possi b1e to quanti fy expected changes in vegetation,over time,for a variety of flow regimes.Such i nformati on is necessary to fully determi ne project impacts to wildlife and make mitigation recommendations.If existing hydrologic or vegetation information is considered insuffi- cient for developing such models,additional studies should be i ni ti ated. Response The di scussi on has be€n revi sed to provi de a more detailed assessment (Section 3.3.l(b)(iii).Your requests wi 11 be consi dered duri ng formul ati on of detai led study plans for Fi scal Year 1984. W-3-125 .Watana to Devi 1 Canyon:A more detai led treatment of the potent;al for·r;me ice or i cefog formati on is needed here. For example,ice bui 1dup on vegetation has been found to keep the soil surface open in forests.l0 Sapling tree stands heavi ly damaged by ice produced more-Drush whereas ice damage in mi xed-oak tree stands resulted in loss of understory sap- 1i ngs and low tree branches with herbaceous plant growth en- hanced in summer.ll Such changes in understory or reducti on in wi nter browse avai 1abi lity coul d be parti cul ar1y criti cal to wi ldlife subject to extensive adjacent habitat losses.The types of vegetation which may form,over the project life,on IInewly-exposed areas with adequate soi 15"should be descri bed relative to adverse or potenti a1 benefits for various wi 1d1ife speci es. .... .... .....r ! ro-, .... -I Response Section 3.3.1(b)(iv)has been revised to provide a more detailed {jiscussion of potential ice fog and rime ice formation,wHh possible effects on vegetation.The p'rovi ded references have been revi ewed and incorporated • The relative values of plant successional stages to wildlife are discussed in Sections 4.3 and 4.4 W-3-126 .Dev;1 Canyon to Talkeetn.a.;Paragraph 3:Thi s quanti fi ed descr;pti on of expected ve~etat;on type changes is the type of detai led impact analysis necessary for other project areas (e.g.preceeding section on Watana to Devi 1 tanyon and follow- ing section on Talkeetna to Yentna River).Once the revised vegetation mapping and analysis is completed,this type of analysi s should be the basi s for ex ami ni ng the positi ve and/or negative impact to wi ldlife of these vegetation changes,over the life of the project. Respo;nse Section 3.3.l(iii){b)has been revised to provide more det ai led i nformati on for the Wat ana-to':'Devi 1 Canyon and Ta lkeetna-to-Yenta Ri ver reaches.Your recommendati on concerning use of revised vegetation mapping coupled with hydrologic analysis wll be considered during formulation of detailed study plans for Fiscal Year 1984. W-3-127 Paragraph 4:The statement that,'IIPost-project ice formati on ;n this reach will be similar to present conditions,1I appears to confH ct wi th previ ous deseri ptons whereby ice formati on will not occur until approximately river mile 130,slightly more than half way to Devi 1 Canyon from Talkeetna (Secti on 2.3(a)(iii),PageE-3-90).In order to understand how area vegetation may be less-influenced under post-project breakup, it would be useful to expl ai n present impacts of breakup on the vegetation.Please address the change from a bank-full flood interval of 1 to 2 years for this section of the river. Quantification is needed of the area over which vegetation could be established with this schedule for less frequent dis- t urbances . Response Section 3.3.1(b)(iii)now states that lithe ice front at the end of wi nter is expected to occur between Portage Creek (RM 149)and Curry (RM 120.5).11 A discussion of breakup impacts on vegetation under pre-project condi- tions has been incorporated as a basis for comparison wi th potenti al effects on regul ated flows.The effect s of less frequent flood events on floodplain vegetative recession and succession are also discussed.The re- vi sed analysi s emphasi zes that vegetati on removal wi 11 depend primari lyon ice scouring at freezeup and break- up.The area of floodplain scoured wi 11 be dependent on winter flow releases,as determined'by power demand. Modeli ng of scour effects on vegetati on could be done for a series of hypothetical flow releases,and wi 11 be considered during formulation of detailed study plans for Fi scal Year 1984. W-3-128 .Talkeetna to Yentna River:Paragraph 2:Again,the vegeta- ted areas and types which could become established on the ac- tive gravel floodplain under (less frequent bank-full floods should be described. Response As stated in Section 3.3.l(b)(iii),lilt is impossible to predi ct wi th certai nty the vegetati on changes that wi 11 occur post-project in thi s reach.The bankfull flood wi 11 have a post-project recurrence interval of once every 5 to 10 years,as opposed to the present 2-year interval (R&M 1982).In areas where such floods control the vegetation,early-successional stands may develop for about 5 to 10 years before being removed by the next bankfull flood.In some of these stands,however,si It depositi on of vegetati on growth may be rapi d enough to stabi li ze the area agai nst subsequent floods.Increased wi nter flows wi th subsequent increases in ice stagi ng may cause other areas to undergo regul ar ice scouri ng duri ng freezeup.The amount of area supporti ng mature stands of vegetation will be directly influenced by floods and the flow releases from Watana each winter.1I W-3-129 Paragraph 4:We question the suggested vegetation changes be- tween Talkeetna and the Yenta Ri ver.Vegetation allowed to establish over a longer period of time (e.g.5 to 10 rather than 1 to 2 years)would seem less likely to be disturbed when the bank-full flood does occur.Gi ven the annual flow vari a- tions over this stretch of the river,it would seem possible and necessary to predict areas of vegetation change for maxi- mum and minimum flow scenarios. Response Please see the previous two responses .. W-3-130 -Climatic Changes and Effects on Vegetation:As for other ongoing studies,a schedule is needed for incorporating phen- ology study results into project plans. Response This schedule has been provided in Section 3.4.3. ,.... - W-3-131 Paragraph 3:We recommend calculating the potential vegetated area and types therein within the referenced 2.5 km area downwind of the reservoi r within which ai r tempertaures may be affected.Resultant impacts on t imi ng of vegetati on green-up or leaf-drop could be important for area wildlife. Response The requested information has been provided in Section 3.3.1(b)(i v). W-3-132 Paragraph 4:A more extensive treatment of fog bank develop- ment should be included here~please refer to our comments un- der Section 3.3(a)(ii)-Effects of Altered Downstream Flows •Watana to Devil Canyon.Al so see comment above reca1cul a- ting the areas within 3 km offshore which may be affected by ice development. Response A more detailed discussion development has been provided. recalculations. concerning fog bank Comment noted concerning - - f""", W-3-133 -Effects of Increased Human Use:We have repeatedly cited the important opportunity for minimizing project impacts on fish and wildl ife by carefully siting and regulating access (see FWS letter to Eric Yould~APAt of 17 August 1982).The potentials for off-road vehicle (ORV)use and accidental fires with project access described here confirm that such use may need to be effectively controlled as fish and wildlife mitiga- tion.Please refer to comments under Section 3.4(c)(ii)re our recommendations to eliminate the Denali Highway access route and to restrict worker and public use of project access routes. We are concerned about inconsistencies with the first sentence heretregarding greater access opportunities~and with points made in the Wildlife Section.That section appropriately con- tains repeated descriptions of (1)the significant negative impacts from increased use and access;and (2)the need to carefully control project area use and access (e.g.Sections 4.4(a)[nt [ii]t [ivJt and [r]and 4.4(c)[in).Please clar- ify. Response Po li cy matters concerni ng access are di scussed in the response to general comments raised in the USFWS cover letters of 14 January 1983. The first sentence is true as stated.The section goes on to discuss consequent impacts.The mitigation plan states how those impacts wi 11 be allevi ated,and resi- dual impacts which will remain despite mitigation.No i nconsi stenci es in thi s approach have been i denti fi ed. W-3-134 .Off-Road Vehicles:Paragraph 3:In view of previous incom- plete coverage of wetlands (see our comments under Section 3.2(a)(vi),we question the definition behind use of the term wetlands here.This discussion illustrates the need for the improved wet 1ands map whi ch i s to be deve loped. Response Use of the term wet 1ands is quite vali din thi s context. The di scussi on addresses potenti al effects of off-road vehi cles on wet lands ina general sense,and has no beari ng on preci sely defined vegetati on or soi 1 types, or mapping of any kind. W-3-135 (b)Devi 1 Canyon Development (i)Construction:Other than quantifying direct vegetation losses from reservoir inundation,the section fai ls to provide any indication of the relative magnitude of other potential losses or alterati ons in vegetati on. Response Additional quantification for camp and village,borrow sites,access routes,rai 1 termi nal,and transmi ssi on corridors to be developed in conjunction with the Devi 1 Canyon faci li ty is provi ded in Tables E.3.80,82, 84, and 85. W-3-136 -Vegetation Removal:Please refer to our concerns under Sec- tion 3.3 re lack of consultation in siting camp,village,and borrow areas. Response These concerns are di scussed in the responses to general comments rai sed in the USFWS cover letter of January 14, 1983. W-3-137 -Vegetation Loss by Erosi on:Agai n,a map of permafrost areas would be useful.Given the likely ineffectiveness of replacing topsoil and recontouring (Section 3.3(b)(i).In- direct Consequences of Vegetation Removal ),we suggest that clearing may be a significant source of erosion. ~Response We concur that clearing may produce erosion which may in turn result in further vegetation loss in adjacent uncl eared areas.Thi s statement has been added to the text. W-3-138 -Effects of Altered Drainage:We recommend that this section include the area of lakes,ponds,and other wetlands which may be affected by proposed borrow areas. Response These areas are quantified in Tables E.3.82 and E.3.84. W-3-139 (ii)Filling and Operation:Paragraph 3:The potential for movement of the large landslide at river mile 175,causing up- stream flooding and loss of mid-and late-successional vegeta- tion in valuable riparian areas,should be described in more detail.For example,the potential size of the area to be im- pacted should be described. - - Response The potential extent of the area which might be affected by river blockage due to landsli~e would depend on season,river stage and flow,and the volume,height, and duration of blockage material persisting in the active channel.It would be foolhardy to attempt a quantitative prediction based on such unpredictable variables. W-3-140 -Veetation Succession Following Clearing:Please refer to our previous comments,Section 3.3 a i1 • Response Please refer to the corresponding responses. W-3-141 -Downstream Effects:The unknown consequences of frost buildup on vegetation adjacent to the reservoir represent a significant potential change in vegetation and thus impact to wildlife (see our comments under Section 3.3(a)(ii)).These consequences shoul d be the subject of conti nui ng studi es and quant ifi cat ion. Response This recommendation will be considered during formula- tion of detailed study plans for Fiscal Year 1984,and will also be incorporated into post-construction envi- ronmental monitoring. W-3-142 (c)Access (i)Constructi on:Paragraph 1:Pl ease refer to our comment under Section 3.2 regarding omission of base line data on pro- posed access corri dors.Because of thi s omi ss i on,the exact areas which would be cleared within the 34 meter (m)x 67 km access corridor described here are unclear.Please explain why this description appears to conflict with earlier descrip- tions of road width and length (Section 2.3(c)(i)).Incon- sistent use of both metric and English units within the same report adds further confusion. Response Areas of each vegetation type to be cleared within the specific access road routing presented for this license application are shown in Table E.3.85 for the Denali Hi ghway-to-Watana and Watana-to-Dev il Canyon roads and Dev il Canyon-to-Go 1d Creek ra i1 road.Proposed c1ea ri I1g widths have altered as design has progressed.Correct widths are 37 m (120 ft)for access roads and 15 m (50 ft)for the rai1 road.In the revised botanical resources and wildlife sections,metric units are pre- sented with equivalent English units to aid coordination with other sections,chapters,and exhibits. W-3-143 1:Our comments under Section:-l-i::-TL-...-T-!~"";;;"";'''';''';;';'';'';''''-'''''-:-=~..:..-.;;;J~'''''';:;' Response Please refer to corresponding responses. W-3-144 Paragraph 2:The potential for ice buildup on the railroad tracks and resultant impacts on vegetation should be examined. Response This potential was examined,but the results were too negligible to mention. W-3-145 (d)Transmission Corridors P)Construction:Paragraph 1:Please clarify the differ- ences among hectares to be impacted by the transmission corri- dors as cited here and in Tables W24,W25,and W26.Moreover, - .... referenced Table W29,has nothing to do with transmission cor- ridors. Response The i nconsi stenci es and error have been corrected;see Tables E3.80 and 86. W-3-146 Paragraph 2:Wetlands,as used here,should be defined.Pre- calculation of affected vegetation types will need to be un- dertaken after the ongoing vegetation remapping.Notation s hou 1d be made that,(l)1ow-l yi ng vegetat i on types wi 11 re- main largely undisturbed,and (2)beneficial impacts of in- creased browse production will be realized,only if access and ORV use along transmi ssion corridors are effecti vely con- trolled.Quantification of potential increases in browse should be possible on the basis of succession models and con- tinuing classification studies.Such quantification is needed to compare overall losses and thus mitigation requirements for the project. Response The undefined useage of wetlands has been deleted,and quant ifi cat i on of vegetati on types to be a ffected by transmission corridors is provided in Tables E.3.80 and 86.The requested notations are appreciated and have been incorporated into the revised discussions of trans- mission corridor construction and operation.The recom- mendation concerning quantification of potential browse increase will be considered during ongoing mitigation planning and development of detailed study plans for Fiscal Year 1984 • W-3-147 (ii)Operation:Our comments above under Section 3.3(d)(i) apply. Response Please refer to corresponding responses. - W-3-148 (e)Impact Summary:An explanation is needed for the process or criteria for determining impact "priorities of importance.1I Response The requested explanation has been incorporated into an expanded introductory statement to Section 3.3.6,which explains the criteria and process of impact prioritiza- tion and relates them to the Susitna Hydroelectric Proj- ect Mitigation Policy. W-3-149 (i)through (v):This qual itative summary describes several data gaps which we believe should be answered,e.g.the vege- tated area whi ch may be lost with 1and sl umpage from perma- frost,changes in downstream floodplain vegetation,etc. Overall,we are concerned with lack of attention of cumulative impacts,an inattention made more acute by nonquantification of most impacts.The numerous uminimal U and uminor"impacts for each project feature may cumulatively represent signifi- cant alterations or loss of vegetation.From the standpoint of fish and wildlife habitats,project-related activities throughout this primarily undisturbed area represent the first intrusions similar to those which have led to significant and losses of fish and wildlife throughout the conterminous United States.A serious omission in this section is consideration of impacts to wetlands and floodplains. Response The impact summary has been quanti fi ed and expanded to include topics previously lacking,e.g.,effects or the downstream floodplain,discussions of thermal erosion, and alterations to sheet flow and drainage patterns by linear structures.We strongly concur with the need to emphasize cumulative impacts and have incorporated this concern into the revised mitigation plan,Section 3.4. W-3-150 vi Prioritization of 1m act Issues:We concur with the eval- uation of acreage osses for a vegetation type relative to the proportion of that type in the region.Since vegetation is a key component of wildlife habitats,the basis for evaluating whether community changes are ugood"or ubad ll should follow in the Wildlife Section of this chapter.However as discussed there,an integrated evaluation of all species is lacking. There is little basis for making decisions on prioritizing species concerns or resultant tradeoffs in project impacts or mitigation alternatives.Our previous comments on each impact issue identified here apply.Additionally,we have a few spe- cific comments. Response We agree that the basis for evaluating changes in sparse vegetation should be relative values to wildlife,and that prioritization of species for mitigation must have a rational and defensible basis.These issues are dis- cussed in the revised Sections 4.3 and 4.4 W-3-151 -Direct Losses of Vegetation Access Roads:While the actual area covered may be small rel- ative to other project impacts,access routes indirectly im- pact a much larger area because of their linear nature. ,..... ! W-3-l52 •Transmission Corridors:We would like to be assured that the reference to a limedian strip for transport of personnel and materials",is consistent with the environmental guide- 1 ines for transmission corridors (Appendix AE -Transmission Corridors,iteml)with which we concur.As with access roads,above,transmission corridors indirectly impact a very 1arge area. Response Transmission corridor design has been revised and no longer incorporates a longitudinal access strip.Low shrub vegetation will not be cleared during construction or maintenance.Access for maintenance of the Watana- to-Devil Canyon corridor will be from the adjacent access road.For other transmi ss ion corri dors,access wi 11 be overland from the nearest road.Nodwell or Roll i gon-type vehi cl es wi 11 be used for mai ntenance purposes. W-3-l53 -Indirect Losses Of Vegetation:The cumulative impact of project features mentioned previously,is of particular con- cern here.Many of the identified losses will be in riparian corridors which are of particular significance to wildlife species. - r - Response We concur.Many of these impacts wi 11 not be quantifiable and must therefore be monitored during construction and operation (Section 3.4.2[b]). W-3-154 -Alteration of Vegeta'tion Types:We again recommend that successional type changes over the project life be quantified in the license application. Response These estimates have been provided in discussions of downstream floodplain impacts and rehabilitation of di stu rbed areas. W-3-155 3.4 -Mitigation Plan:We f"ind the proposed plan incomplete and too general.There are two main problems with this plan. First,because impacts are incompletely quantified,it is not possible to determine the value of recommended/accepted miti- gation measures or the magnitude of unavoidable,adverse im- pacts which will not be mitigated.Not integrating this plan with the fish and wildlife mitigation plans is the second main problem.Thus there is no comprehensive picture of overall project impacts,priorities for mitigation,potential for achieving those priorities,or tradeoffs among mitigation op- tions for various area resources. W-3-156 An approach similar to that for the Fishery Section mitigation plan (pages E-3-120 through E-3-144)would be more appropri- ate.We recommend restating the full range of mitigation al- ternatives here,prioritized in accord with NEPA guidelines; avoid,minimize,rectify,reduce or eliminate over time,and finally,compensate.This approach should be expanded to in- clude reasons for rejecting high priority mitigation in lieu of lower priority measures (e.g.proposing regulations on ac- cess rather than alternate siting or scheduling of access).A mitigaton plan,incorporating specific,effective measures which have been selected through this process,should then be presented. W-3-157 Many of the identified impacts are not addressed in the miti- gation plan itself.In those cases,impacts should be clearly identified as unavoidable,short or long-term,adverse im- pacts.Moveover,we find the report lacks information specif- ically required by FERC regulations (F.R.Vol.46,No.219,13 November 1981),Section 4.41(f)(3)(iv),i.e.there are no im- plementation,construction,or operation schedules for recom- mended mitigation measures;which measures have actually been incorporated into project plans is unclear;and neither re- placement lands nor habitat manipulations have been identified as to either suitable sizes or locations. W-3-158 Generalities of the plan are exemplified by references to using,"depleted or non-operatonal upland borrow pits •••as overburden storage areas where feasibile"(page E-3-187)"or reference to "a feasible haul distance,"(page E-3-187). Response The revised mitigation plan (Section 3.4)is responsive to all of the above comments and recommendations. Specifically,the following major changes have been made: 1.Greater emphasis is placed on the complementary re- lationship between the mitigation plans for botani- cal resources,fisheries,and wildlife,both in an introductory statement (Section 3.4.1)and through- out the text. 2.In Section 3.4.2,the full range of mitigation op- tions is explained for each of the impact issues discussed in Section 3.3.Where a particular option has not been followed,the reasons are stated. 3.In accordance with 18 CFR Part 4,Subpart E (Federal Register,Vol.46,No.219,13 November 1981), mitigative measures recommended through agency con- sultation are described and documented in Section 3.4.2. porated vided. adopted Where such recommendations have been incor- in the mitigation plan,explanation is pro- Cases where alternative measures have been are also explained. - ..... ""'"i - 4.In further compl i ance with the regul ati ons cited above,Section 3.4.2 provides estimates of the costs of construction,operation,and maintenance of pro- posed miti gati ve measures where such measures are not included as project capital costs.Project cap- ital costs are described in Exhibit D. 5.Every effort is made to provide defensible quantifi- cation,where available,of the extent to which mitigation will be achieved by area and over time for each impact issue.In accordance with the regu- lations cited above,implementation,construction, and operation schedules for mitigative measures are stated by month or year,commensurate with the level of detail provided by the overall project schedule presented in Exhibit C. 6.Only measures actually incorporated into project features or into mitigation planning currently in progess are described.Further recommendations for mitigation measures not actually incorporated are not discussed,except where provided through agency consultation;see (3)above. 7.In accordance with the regulations cited above,the following mitigative design modifications are illus- trated in Figures E.3.79-82: a)Changes in the general routing of access roads; b)Localized access route adjustments to avoid site-specific biological features; c)Alterations in construction procedures for the Denali Highway-to-Watana access road section; and d)Cl eari ng and mai ntenance features for transmi s- sion corridors. 8.A consolidated,itemized mitigation summary (Section 3.4.3)is presented in well-organized format after the option analysis has been completed.This plan provides a summary of mitigative measures,schedule, and costs relating to each impact issue and,where justified,provides estimates of residual impacts. 9.A synopsis of agency consultation and mitigation re- commendations is provided in Section 3.4.4,with re- ferences to the text where these recommendations are discussed. The option analysis (Section 3.4.2)clearly states miti- gative features which have been incorporated into engi- neering design and construction planning;reasons for i ncorporat i ng or not i ncorporat i ng agency recommenda- tions pertinent to botanical resources are also stated. These topics are further summarized in Sections 3.4.3 and 3.4.4,respectively.Siting of construction camps and villages is discusssed in Section 3.4.2.Policies and enforcement measures of the Al aska Power Authority regarding off-road or all-terrain vehicle use will be consistent with concurrent management policies of land- owners or resource agencies with jurisdiction over lands surrounding the project. W-3-159 (a)Watana Development (i)Construction:Paragraph 1:Mitigative features which have been incorporated into engineering design and construction planning should be clearly stated.Reasons for rejecting our recommendations have never been formally provided (e.g.access pond siting).Location of the construction camp and village on shrublands (per Table W27)rather than forestlands may not minimize impacts,depending on the wildlife species of con- cern,erosion potentials,proximity to construction and access facilities,etc.Again,since we were not consulted in siting of those facilities and have not seen Exhibit A,we cannot fully understand the situation.A mechanism for enforcing the referenced prohibition of off-road or all-terrain vehicle use should be included (see FERC regulations,Section 4.41(f)(3)[iv])in F.R.Vol.46,No.219,13 November 1981. Response Engineering design and construction planning mitigative measures are described in Chapter 3,Section 3.4 and 4.4 and in Chapter 10.Reasons for access road location are discussed in Chapter 10,which has been expanded. Reasons for location of construction camps and villages are discussed in the response to your comment in Chapter 10.A mechanism for enforcing prohibition of ATV use is described in Section 4.4 • .W-3-160 Paragraph 3:We suggest that facil ity siting to avoid wet- lands be rereviewed in consultation with the FWS and CE and proposed revisions to the wetland maps.As with similar points about "minimizing"or "reducing",there is no quantifi- cation,particularly relative to the amount of wetlands,or other impacts in other report sections,which will be impacted and which can be avoided. r .- i """! ..... '"'" ,.... ,.. I ,..,. Your recommendation will be considered during early stages of the detailed facility siting and design pro- gram.Quantification of impacts to wetlands and vegeta- tion community types is provided in the impact discus- siGn (Section 3.3). W-3-161 Paragraph 5:We concur that spoils should be placed in the inundation area as long as such placement will not create a sedimentation problem • Response Spoil disposal sites within the impoundment areas will be located to avoid or mi nimi ze entrai nment of fines during inundation.In the Watana impoundment area, spoil will be deposited on relatively flat sites at higher elevations within the impoundment area.These sites wi 11 not be inundated unti 1 after the di verson tunnel has been blocked.Exact locations of spoil dis- posal areas will be determined during detailed engineer- ing design and mining plan developments • At the Devil Canyon facility,spoil wi 11 be deposited at borrow site G,which ranges from about 280 m (925 ft)to about 356 m (1175 ft)in elevation.Spoil deposited on this first-level terrace site will not be entrained dur- ing river diversion. W-3-162 Paragraph 6:We recommend expl ai ni ng whether proj ect engi- neers have confi rmed that fl oodpl ai ns or fi rst-l evel terrace locations will not be needed for borrow for ancillary project facilities. Response Project engineers stated on 14 February 1983 that active floodplain and first-level areas downstream from the Watana damsite will in fact be used to obtain borrow for the construction of ancillary facilities.No active floodplain borrow sites are planned for the Devil Canyon development,but borrow area G,a fi rst-l evel terrace 1ocat lon,wi 11 be used. W-3-163 Paragraph 7:We reconunend that simllar detailed information be provided throughout the report. Respons.e Recommendation noted. W-3-164 (ii)Filling:Please refer to our General COfflllents,Botanical Resources,regarding identifying feasible habitat enhancement measures or replacement lands.The contention that moose wi nter browse u may be compensated II is useless,given that (1) there is no guarantee in thi s pl an that enhancement or 1and acquisition will ever occur;and (2)quantification for how much/where/what type of 1and must be enhanced or acqui red is lacking.Moveover,tradeoffs regarding compensation for moose to the negl ect or adverse impact of other species have not been settled or even discussed. Response Habitat enhancement measures and acquisition of replace- ment lands for compensatio~of adverse impacts to wild- life are discussed in Sections 3.4 and 4.4.Quantifica- tion has been provided on a preliminary basis but will depend on the refinement of ongoing habitat-based simu- lation modeling as well as the results of monitoring during construction and operation. W-3-165 Paragraph 3:Because of internal inconsistencies,the overall effect of siltation is unclear. Response The revised Exhibit E,Chapter 2 (water resources)dis- cusses siltation effects in greater detail. W-3-166 Paragraph 5:Whether rectification will be one percent or 99 percent is unclear. Response The point of this comment is not understood and appears to be out of context. W-3-167 Paragraph 7:We concur with revegetati on pl ans to emphasi ze fertilization and minimize seeding where erosion will not be a problem. Response Noted.This approach is maintained in the revised re- port. W-3-168 Paragraph 8:We strongly support plans to rehabilitate all sites by the first growing season after they are no longer needed.Assurances should be provided that sufficient quanti- ties of seeds would be stockpiled and regrowth potentials of available native strains will be tested prior to project aban- donment of disturbed sites.Choice of pl ants for site reha- bilitation should be in consultation with Federal and State natural resource agencies. -, - Response These assurances have been provided in the revised draft. W-3-169 (iii)Operation:Paragraph 1:We concur with the proposed monitoring of downstream vegetation changes but note that mon- itoring in itself is not mitigation.Periodic controlled flooding to maintain primary and secondary successional stages must be coordinated with the Fishery Section and Wildlife Sec- tion mitigation plans. Response As explained in Section 3.3.1(b)(iii),flow releases co- ordi nated with freezeup and breakup wi 11 be the deter- mining factors in'maintaining early plant successional stages downstream.Flow rel eases requi red for fi shery impact mit i gati on wi 11 not necessari ly correspond with these times (Section 2.4).Considerable attention will be given to the magnitude and timing of mitigative flow releases during detailed operations planning. W-3-170 Paragraph 2:We have assumed that nonessential portions of the di sturbed areas wi 11 be promptly rehabil itated.Pl ease specify. Response Quantification of areas to be rehabil itated after dis- mantling of the construction camp and temporary portions of the village is provided in the revised report. i,pllll W-3-171 (b)Devil Canyon Development i Construction:Paragra h 1:Our comments relative to the Watana development Section 3.4(a)[ii])mitigation apply here also.An additional mitigation need is monitoring and en- forcement relative to ORV and unauthorized access uses.Spoil disposal described here was not discussed or previously covered in the impacts Section 3.3(b)(i). Response The appropriate revisions have been made. W-3-172 under Watana Response Please refer to the corresponding responses. W-3-173 (c)Access (i)Construction:Paragraph 1:Please clarify why avoidance of closed forests was termed as a mitigative measure in siting of the Denali Highway to Watana access road.Section 4.4(b), paragraph 2 supports this siting regarding minimization of project impacts to pine marten.If this is the reason,that reference should be made here and further information is necessary on other spec i es adversely affected by ,thi s sit i ng and adverse/beneficial impacts of alternative sftings which were e 1imi nated.Wetlands will need verifyi ng per our pre- vious comments (Section 3.4(a)[i]).At least one line of this paragraph was omitted. Response Avoidance of closed forest by access routing is cited as a mitigative measure because of avoidance of impacts to pine marten and bird species which utilize this vegeta- tion type.Appropriate references have been incor- porated.It is recognized,however,that closed forest may not be more valuable than shrubland or tundra where other species are concerned,and the tradeoffs are dis- cussed in the wildlife mitigation plan (Section 4.4). cussed in the wildlife mitigation plan (Section 4.4). As a botanical resource in itself,closed forest is not necessarily more or less valuable than any other vegeta- tion type,but less total clearing of vegetative biomass is achieved by avoiding closed forest,as noted in the revised text (Section 3.4.2[a]). W-3-174 Paragraph 3:We refer you to our previ ous comments on wet- lands,Sections 3.2(a)(vi)and 3.4(a)(i). Response Please refer to the corresponding responses. W-3-175 Paragraph 4:Information is too general.We concur with the intent but do not have necessary specifics as to the extent of mitigation which will be achieved. Response Considerably more detail is provided in the revised text,including the introduction of side-borrow tech- niques as a means to reduce gravel extraction require- ments to an absolute minimum.An illustration of side- borrow procedures has been incorporated (Figure E.3.83). W-3-176 ~ii)Operation:The referenced management provisions should e described here including busing of workers and restrictions on non-project-related uses. ..... - Response Management options for mitigating access-related impacts during project operation are under review by the Alaska Power Authority and will depend largely on inter-agency agreements whi ch have not yet been reached.Busi ng of workers during operation is not planned.Any restric- t ions on non-project-re1 ated use of access roads by the public will be consistent with management policies of landowners and resource agenci~s with jurisdiction over 1ands surroundi ng the project. W-3-177 Paragraph 2:The extent of mitigation which can be achieved for many project impacts wi 11 depend upon the management op- tions under review by the APA.In the APA Mitigation Pol icy document and under NEPA guidelines,avoidance is to be the first priority in implementing mitigation.Therefore,we re- fer you to our previous correspondence on this issue (letter to Eric You1d from FWS,17 August 1982)as part of our pre- license consultation.In brief,the necessary avoidance should include elimination of the Denali Highway to Watana ac- cess road and prohi biti ng use of other project access routes for non-project-re 1ated access.Instead,construct i on access should be by rail from Gold Creek,along the south side of the Susitna River to Devil Canyon,and access on the north between the two dams.Non-project-re1ated use of these access routes should be prohibited during project construction.A thorough analysis should be provided here of public access from the standpoint of adverse impacts to fish and wildlife and their habitats in comparison to any positive impacts for recrea- tional and subsistence fish and wildlife uses. Response The Alaska Power Authority Mitigation Policy and NEPA guidelines do not indicate that avoidance of a project feature for purposes of mitigating impacts to biological resources must take pri ority over all other project- related considerations.Recommended mitigation measures and facil ities included in the cited correspondence are discussed in the revised option analysis,(Section 3.4.2).Where a recommendation has been rejected,the reasons are provided and the selected alternative mea- sure or facility is then explained.Any analysis of im- pacts to fish,wildlife,and their habitats in compari- son to enhancement of recreational and subsi stence op- portunities afforded by increased access wt11 indicate that impacts to fish and wildlife wi 11i ncrease as re,creationa1 and subsistence activities increase.In reality,adverse impacts to fish and wildlife resulting from increased non-project-re1ated human activity must depend on .management decisions implemented ,cooperatively by the boards,agencies,and landowners with jurisdic- tion over the affected lands and resources.Management options available to state,federal,and private enti- ties are reviewed in Section 3.4.2 of the revised docu- ment.Access-related management policies of the Alaska Power Authority will be consistent with the policies of boards,agencies and landowners with jurisdiction over the affected lands. W-3-178 We note some confl i ct between the statement that the APA is reviewing a variety of access management options with the sug- gestion that the project access route from the Denali Highway Illay be eligible as a National Scenic Highway.That designa- tion would stimulate public access to the increased detriment of fish and wildlife,effectively foreclosing some mitigative management options. Response The point of the referenced statement,as clearly stated,is that National Scenic Highway designation II wou ld entail restrictions on off-road vehicle use and other potentially disturbing activities initiated from the access road.1I W-3-179 Paragraph 3:Please refer to our more extensive comments on the Recreation Plan regarding consistency with fish and wild- 1 ife protection priorities.We strongly concur with the pro- posal to monitor fish,wildlife,and vegetation,impact but again note the report1s deficiency in not describing how and by whom monitoring will be completed (see our General Com- ments,Fi shery Section).Moreover,the process for mod ify i ng project operations or the Recreation Pl an to better effect mitigation is not described. Response We have revi ewed the referenced comments,but suggest that protection of fish and wildlife is not the only ob- jective of FERC requirements for a recreation plan. Commitments for monitoring fish,wildl ife,and vegeta- tion are discussed in in the corresponding mitigation plans (Sections 2.4,3.4,and 4.4,respectively).At- tention is given to the process by which the Alaska Power Authority wi 11 modi fy project operat ions and re- creational planning to achieve mitigation objectives with respect to biological resources. W-3-180 (d)Transmission (i)Construction:Pl ease cl arify what criteri a were used for siting of transmission corridors.Assurance is required that project plans include construction by helicopter or winter ac- cess. "..,., I""" I I ..... - Response The primary consideration in siting the Watana-to-Gold Creek transmission corridor was to provide as nearly as possible a common corridor with the access road,so that an alternative de facto access route would not be created along thetransmission corridor.Criteria for the evaluation and selection of all transmission corri- dor alternatives is provided in Chapter 10.Construc- tion will therefore emphasize access from the adjoining road.Construction by helicopter is no longer planned. Winter access for construction will be considered during detailed construction planning. W-3-181 Paragraph 2:Again,refer to our previous comments on wet- lands.We recommend minimum 150 m buffers between swan nests and any portions of the transmission corridor. Response This recommendation will be considered during detailed alignment determination. W-3-182 (ii)Operation:We concur with this plan but are concerned that it may not be implemented.We hope to avoid a repeat of the Intertie situation where on-ground access was later guar- anteed to the operating utilities contrary to residents'and agencies'recommendations.That guarantee already contradicts this plan,given the dependence and interrelationship of the Susitna project with the Interti~. Response Access for maintenance of transmission corridors will be ground-based and may occur at any time of the year at- tention is required.In the corridor between Watana and Devil Canyon,the adjacent access road will allow direct overl and entry of mai ntenance equi pment across a di s- tance rangi ng from about 0.1 to 1.2 km (up to 0.75 mile).Where nearby road support is not available, equipment will be transported from the point of entry along the corridors themselves.Equipment will be mounted on flat-tread or balloon-tire vehicles to mini- mize soil or ground-cover disturbance.As explained in the revised text,the area directly beneath the lines and to about 1.5 m (5 ft)on each side will be cleared to about 0.75 m (24 inches)above ground level.Trees and tall shrubs will be removed only where they present an obstruction or hazard to lines or towers. W-3-183 Since habitat manipulations,including fire,crushing,etc. (Section 4.4(a)[i]and [iv])are being suggested as a prime mitigation measure for wildlife,we recommend that potential effects of those activities on vegetation types within differ- ent project areas be discussed here.The potential value for mitigation of various habitat manipulations should be ex- plained similar to the discussion on fire,Section 3.2{a){ii). Response A discussion of the effects of controlled burning, clearing,and crushing on various vegetation types has been incorporated in Section 3.4.2. W-3-I84 Two additional items which should be covered in this mitiga- tion plan are the monitoring and surveillance plans referred to earl ier and an erosion control pl an specific to project features and schedules. Response Monitori ng as an impact-reduct i on measure is di scussed in Section 3.4.2.An erosion control plan specific to project features,soil and terrain types,and construc- t ion schedul ing wi 11 be prepared during detail ed engi- neering design. W-3-I85 Specific comments on tables and figures relative to the Botan- ical Resources Section follow: Response Comment noted. W-3-I86 Table W3:Please change in accord with our recommendations under Section 3.I{c),to "Candidate endangered and threatened plant species",etc. Response The requ~sted change has been made. W-3-I87 Tables W5 tnrough WI9:We suggest including a footnote or ap- pendi x briefly descri bi n9 how these data were coll ected with some explanation of whether sampling intensity was commensur- ate with the availability of the vegetation type within the project area and potential for that type to be impacted by the project. Response Sampling methods are described in a new addition to the botanical resources baseline dscription (Section 3.3.2{a)),and sampling locations are shown in new Fig- ures E.3.34,E.3.79,and E.3.80.Sampling intensity was greatest in areas of high impact potential. W-3-188 Tables W21 through W23:The number of sites sampled in each type should be included.As in our comments on the text,in- formation should be provided on how these categories compare with the vegetation categories sampled within the upper Susitna basin. Response The requested information is provided in Section 3.3.2(a)and Table E.3.50. W-3-189 Tables W24 through W26:Please clarify whether the 400 to 500 foot right-of-way or 110 foot cleared centerline area was used in these calculations.Per our previous comment on the trans- mission corridor,a similar table for the Intertie portion of the transmisson corridor should be included.We also suggest a summary tabl e showi ng the vegetation impacts from all seg- ments of the transmission corridor. Response Actual right-of-way widths likely to be affected by con- struction were used in the referenced calculations,as follows: 2 towers wide =91 m (300 ft) (Watana to Devil Canyon,Anchorage to Fairbanks) 4 towers wide =155 m (510 ft) (Devil Canyon to Gold Creek) Areas or vegetation types within the Willow-to-Healy in- tertie corridor are provided in Table E.3.79,based on a uniform right-of-way width of 91 m (300 ft). W-3-190 Please refer to our comments in the text on need for an addi- tiona 1 t~b 1e s howi ng vegetat i on types to be impacted by all access corridors,preliminarily identified borrow areas (e.g. borrow area G is not included in Table W28)and spoil areas. Where questions remain on the size of borrow/spoil areas to be used or the necessity of all potentially identified areas, notation should be made of potential maximum and minimum sizes and any ordering regarding use of these areas. Response Additional Tables E.3.80,82,83,84, 85,and 86 show areas of vegetation types to be affected by all prlject facilities quantifiable by area and location at this time. W-3-191 Figure WI:Granted,it is difficult to reproduce such a map at this scale.However,we recommend it larger reproduction be included in the final application.That map should include an overlay showing reservoir inundation areas,access roads, transmission corridors,and other project features.A corres- ponding map of downstream vegetation and overlay of transmis- sion corridors is also needed. Response Figure E.3.40 is reproduced in large format as a poc- keted enclosure in the revised Exhibit E.This figure shows vegetat i on types of the Wa tana and Gold Creek watersheds (formerly Upper Susitna Basin)at a scale of 1:250,000 (McKendrick et ale 1982). W3-192 Figure W3:Once the remapped vegetation classification is completed,it should be correlated to this table to quantify potent ia1 vegetation changes and types over the 1ife of the project. Response We concur and foresee use of the remapped vegetation types as allowing not only refinements of impact quanti- fication,but also more precise input to design engi- neers during detailed siting studies. W-3-193 Figure W4:As above,this figure should be a basis for anal- yzing downstream successional trends given the projected longer times between floods.Maintenance of habitat manipula- tions should be specified on the basis of this figure and mitigation objectives. Response This recommendation has been noted. - CHAPTER 3 -SECTION 4 -WILDLIFE W-3-194 4.1 Introduction:We recommend expanding this section to at least acknowledge the ecological values of all wildlife spe- cies,as well as to more clearly outline objectives of the re- port and resultant mitigation plan.We again point out the need for an overall discussion of fish,wildlife,and botani- cal resources,overall mitigation plans,and tradeoffs in benefits to some resources at the expense of others. Response This section has been expanded to explain the treatment of various species of wildlife. W-3-195 (c)Species Contributing to Recreation,Subsistence and Com- merce:Not only birds,but all wildlife species in the proj- ect area contribute to non-consumptive forms of recreation. Incidental viewing ofw"ildlife in conjunction with other ac- tivities is an unquantifiable but well documented value.For example,the importance of downstream fish and wildlife habi- tats to fish,wildlife,and the significant numbers of people using them has been recognized by the State and agreed to by the Matanuska-Susitna Borough Assembly.Fish and wildlife have been designated a primary use on every State land manage- ment unit on the east side of the Susinta River from Cook In- let to just below its confluence with the Kashwitna River. These management units and state guidel ines for protecting fish and wildlife are described in the recent State report, Land Use Plan for Public Lands in the Willow Sub-basin,Octo- ber 1981,by the Alaska Department of Natural Resources, (ADNR),Ma tan us ka-Su si tn a Bo roug h,and ADF&G. Response Incidental viewing in conjunction with other activities is an unquantifiable value which "increased access will facilitate.This impact is therefore treated superfici- ally throug hout.Current use of upstream areas is ex- tremely low.Downstream from Talkeetna,where access is less prohibitive,a larger number of users may currently view wildlife incidentally.However,the project is not anticipated to negatively impact "incidental viewing in this area. W-3-196a A discussion as to why the evaluation species were selected and prioritized as described here is as applicable to terres- trial wildlife species as it is to fish (Section2.1[d]).We suggest referencing that discussion here.Such infonnation is particul arly important with regard to mitigation pl ans for one species which confiict with another species. Response See paragraph 1 and 2 of Section 4.1,and Sections 4.1.2 and 4.1.3.With regard to confl icts in mitigation pl an s,see Secti on 4.1,parag raph 2. W-3-196b We also suggest noting values of key bird species,i.e.bald and golden eagles have received national protection (Bald Eagle Protection Act,16 U.S.C.668-668c);trumpeter swans are highly valued because of their former endangered status;and other mig ratory birds are protected under internati onal treaties and the Migratory Bird Conservation Act (16 U.S.C. 701-718h)• Response This section has been expanded,and specifically men- tions the value of eagles and trumpeter swans.Most bird species in North America are protected under inter- national treaties and the Migratory Bird Conservation Act.However,we do not feel that this protection just- ifies the prioritization of these bird species over other species not similarly protected.Also,please note that trunpeter swans have never been endangered in Al aska. W-3-197 Please note,all references to tables in the wildlife section of the text are to table numbers one greater than the actual table.We have referred to tables as they are actually n lJllbered. Response This has been corrected. W-3-198 4.2 Baseline Descri tion a B1g Game 1 oose: -Distribution:Please document how moose are Il one of the most economically important wildlife species in the region;1l also see our comments on Chapter 5,Section 3.7(b). Response See Section 4.2.1(a)(i)paragraph 1 Ilbecause of their regional contribution to subsistence ••••11 See Chapter 5. W-3-199 •Special Use Areas:In view of your winter range is a key area for moose •Seasonal Movements:Paragraph •Mortality Factions:Paragraph 5; repeated citations that (e•g.Sec t ion 4.2(a)(i ) 6;Section 4.2(a)(i) and Section 4.3(a)(i) •Winter Use,we suggest including a section here on the use and availability of winter range in both severe and mild winters,as well as the data gaps and plans to overcome them relative to this study.Maps showing use areas described here relative to project features would clarify this section. Response See Section 4.3.1{a)(i)paragraphs 4-7.See Section 4.3.1(a)(iii)for treatment of data gaps. W-3-200 Calving Areas:Paragraphs 3 and 4:Numbers of male and fe- male moose radio-collared in each of the downstream study areas should be described here. Response Male moose do not calve.Sample sizes are given in Sec- tion 4.2.1{a)(i)under -Seasonal Movements,paragraph 8 and -Special Use Areas,paragraph 3. W-3-201 •River Crossings:To better understand how not only the reservoirs,but ancillary project features such as the Devil Canyon camp and village,may also influence moose crossings of the Susitna River,crossings both immediately up and down- stream of the impoundment areas should also be described (also see our comments under Section 4.3{b)(i)-Interference with Movements). Response No interference with moose cross i ngs upst ream from the Watana reservoir will occur since no facilities or other project-i nduced obstacl es will be located there.Si nce the Devil Canyon reservoir will extend upstream to the Watana damsite,your statement pertains only to the area immediately downstream from the Devil Canyon damsite. The Susitna River adjacent to the Devil Canyon damsite is bordered by steep canyon wall s whi ch physically pre- vent moose crossings.No moose crossings have been documented in thi s area;thi s has been noted in the river crossing discussion. W-3-202 -Habitat Use:The main problem with this and the following section on populations is that there has,apparently,been no integration of moose and vegetation data. W-3-203 method for evaluating the relative importance of vegeta- tion types in the Susitna Basin and el sewhere in Al aska is being developed.This method is described in Section 4.3.1 (a)(i i i)• •Cover Reruirements:Paragraph 7:Please describe the scope and schedu e for the necessary studies of habitat use,or ref- erence the discussion under Section 4.3(a)(i)-Quantifica- tion of Project Effects.Correlating aerial observations to the remapped vegetation types should provide additional infor- mation on habitat use.Elevation,slope,or other habitat parameters may also need to be incorporated in this analysis. Response Section 4.3.2(a)(iii)outlines the approach for evalua- ting the rel ative importance of vegetation types in the Susitna Basin. W-3-204 Habitat Use in the Upper Susitna Basin:Paragraph 3:Further information is needed on the understories associated with these habitat types.Please indicate when such information will become avail abl e. Response See Tables E.3.89, E.3.90,and E.3.91.Mapping of vege- tation,including understory classifications in open and woodland forest stands,will be conducted in 1983. W-3-205 Habitat Use in the Lower Susitna Basin:Paragraph 2:For consistency,the nLl11ber of female moose radio-col fared north of Talkeetna should be provided,also see our comments under this section,Calving Areas.The discussion is confusing due to frequent combining of quantitive data with qual itative statements such as IImost female use ll ,lI a t most relocation sitesll ,etc.Where it is available,we recommend supplying quantitative information,with qualifying discussions on 1 imited sampl e si zes,periods of observations,etc. Response see Section 4.2.1(a)(ii)paragraphs 1l-13~See also discussion in paragraph 3 of the introduction. W-3-206 •Food Habits:Paragraph 2:Again,please describe the scope and schedule of ongoing analyses and how that information will be integrated into mitigation pl anning in a timely manner. Reference to your Section 4.3(a)(i)-Quantification of Project Effects will provide some of this lnformation. Response The food habits discussion has been expanded to include data coll ected in 1982.The scope and schedul e of addi- tional food habits work is found in Section 4.3.1(a) (iii). W-3-207 Paragraphs 4 and 5:We suggest examining how browse avail- abil ity and vegetation types util i zed by moose correl ate with moose rel ocati ons in reference to the remapped v egetati on types. Response Thi s analysi s woul d be inappropri ate because of sampl ing biases during moose captures and tel ocati ons,and be- cause of the probl ems described in Section 4.2.1(a) (ii),paragraphs 6 and 7.The approach outlined in Sec- tion 4.3.1(a)(iii)will provide more meaningful re- sults. ..... W-3-208 •Home Ranges The Upper Susitna Basin:The rational should be given for sel ecting an 8 km wide analysi s zone adjacent to the impound- ment. Res.ponse This distance was arbitrarily selected by the Principal Investigator of the moose stud ies based on moose home range data. I""" I ..... -I ..... .... W-3-209 Lower Susana Basin:Paragraph 2:Pl ease desc ribe or refer- ence the scope and schedule for continuing studies.We recom- mend giving some consideration to the relative habitat values of all river study areas. Response The resul ts of radio-tracking studies and bi-weekly winter river surveys conducted in 1982 will be available in June 1983.Study pl ans for additional field studies beyond that date are still being formulated. Studies conducted since 1980 have included the entire Susitna River from its source in the Alaska Range to its mouth at Cook Inl et.Because of the 1 arge si ze of thi s study area,more i nten siv e work has been conducted at representative sites along the river floodplain. W-3-210 -Population Characteristics •Historical Population Trends:Paragraph 1:An overlay of project features on ~the map of count areas (Figure W6)is needed. Response A map showing project features is included in the impact section.For purposes of clarity and consistency,proj- ect features are not included on figures in the baseline sections • W-3-211 Paragraph 2:Substantiating population and productivity data in Tabl es W32 throug h W34 shoul d be referenced here. Response These tables have been referenced in Section 4.2.1(a) (iii)paragraph 1. W-3-212 •Population Estimates -Upper Susitna Basin:Please describe what types of habitat correlatlons can be made from remapped vegetation types and other habitat parameters for low,high, and moderate moose density areas. Response Stratification of census areas is a statistical method of reducing sample variance by subdividing the census area into subareas with rel atively homogeneous moose densities.Densities within strata are rel ative val ues within a particular census area only.Stratification is based on a subjective evaluatiorl""'Of"moose densities de- rived from whatever clues to density are available,in- cluding prior knowledge of the area,observations of moose or moose sign during strati fication fl ights,and habitat characteristics.However,habitat characteris- tics alone may not give accurate stratification data, parti c ul arl y when den sitie s are non-un Horm.Therefo re, strata designations of high,medium and low density may be unrelated to vegetation types and certainly should not be used for correlation or extrapolation to assess habitat use patterns. W-3-213 •Population Estimates -Lower Susitna Basin:Paragraph 2: Please describe differences between habitats up and downstream of Montana Creek. Response See Section 4.2.1(a),paragraph 1. W-3-214 •Mortality Factors:paragraph 1:We recommend describing how range qual ity has been decreasing. Response See discussion in paragraph 1:"decreasing range qual- ity •••thought to be less important ••••11 However, range quality may be decreasing because fire suppression reduces the frequency of creation of early sucessional habitat.Nonetheless,moose are likely to be below carrying capacity even considering any reduction in range qual ity,for reasons discussed in the above refer- enced and foll owing parag raphs. - - -I W-3-215 Paragraphs 2 through 4:Please describe the comparability of brown bear populations and habitat types between the Nelchina and Susitna River basins. Response The referenced calf mortality studies were conducted in the Nelchina and middle Susitna River Basins.This has been clarified in the discussion.Predation patterns and bear movement data collected during the studies in 1977-1979 were similar to those found recently in the Watana watershed.The two study areas overlap each other considerably and therefore the habitat types and brown bear populations are similar. W-3-216 We recommend expanding the discussion to include hunting as a morta 1 i ty factor.Both recreat i ona 1 and subs i stence hunt i ng can affect population size and structure.Hunting figures prominently in later impact discussions.Historical hunting effort and success data relative to changing management regu- 1 ations should be described,and coordinated with Chapter 5. Pl ease also refer to our comments under Chapter 5,Section 3.7(b). Response This is discussed in Chapter 3,Section 5. W-3-217 (ii)Caribou -Distribution and Movements Patterns:Paragraph 6:Please describe below how many animals were radio-collared and the numbers of radio locations made for each one. Response See Section 4.2.1(6)paragraph 3.Number of radio- locations for each individual are available in ADF&G 1982c,appendix 1. W-3-218 Figures W9 and WID of caribou radio locations should include the locations of project features. Response Project features are not shown on figures in the base- l ine section for clarity and consistency.See Figure E.3.37 for major features. W-3-219 -Habitat Use:Please clarify whether aerial observations or an overlay of radio locations on existing vegetation type maps were used to determine caribou use of different vegetation types.A correlation should be provided for the proportion of the basin which is in each type relative to the type (Table W36).Pl ease di scuss whether vegetati on remappi ng .efforts will affect the interpretation of caribou data. Response See Section 4.2.1(c)(iii)paragraph 1.Basin vegetation coverage is presented in Table E.3.51.Habitats used by caribou are widespread and a very small proportion of total range will be lost to the Susitna project (see Section 4.3.2(c)).Habitat loss is not considered a significant impact and greater emphasis is placed on more important a spects of ca ri bou ecology.No add i - tional interpretation of caribou vegetation relation- ships is planned. W-3-220 -Population Characteristics:Paragraph 1:This section should reflect present and future management plans and be con- sistent with Chapter 5,Section 3.7(b)(ii). Response See Section 4.2.1(c)(iv)paragraph 1.Future changes in management plan's will refl ect the abil ity of the re- source to sustain harvest and the demand for harvest op- portunities,and will be determined by the Alaska Board of Game.This is beyond the control of the Alaska Power Authority to predict or control. W-3-221 Paragraph 10:Changes in the number of permits from 1972 to 1982 shoul d be descri bed and percents of the herd harvested, by year,included in Table W38. Response Permit controlled hunts were begun in 1977.Number of permits issued since that date are given in Section 4.5. Data on harvests from 1972 to 1981 appear in Tabl e E.3.104 and total herd size estimated in years for which an estimate was made appear in Table E.3.103.The per- cent of the herd harvested each year has been added to Table E.3.104. W-3-222 Paragraph 11:Please tabulate data on wolf population,wolf predation,and caribou numbers from 1957 to 1981. Response A summary of this relationship is provided in Figure E.3.96.More information on wolf populations appears in Section 4.2.1(g). .- i -! "... W-3-223 (iii)Oall Sheep -Oi stri buti on:Paragraph 2:We recommend i ncl udi ng maps which more speci fi cally del tneate seasonal sheep use of the Susitna basin relative to project features. Response Maps showing project features are not included in the baseline sections for reasons of clarity and consis- tency.The information given in the text is considered adequate • W-3-224 Paragraph 5:We recommend further justification be provided to support the conclusion that impacts from the impoundments will be minor.Clarificati on of where the sheep winter and of sheep movements between seasonal ranges should be provided. Response Sheep studies in the Susitna Basin have been conducted for over 15 years.There is no evidence that sheep cross the Susitna River,and the populations found north and south of the river are considered distinct.Con- sidering the topography of the project area,and infor- mation on sheep movements obtained in the Susitna Basin and elsewhere,it 'is extremely unlikely that the im- poundments will interfere with normal sheep movements. The exception to this is in the vicinity of the Jay Creek mineral lick,as discussed in the text. W-3-225 Paragraph 6:Reference shoul d be provided for the judgment that the sheep population has remained stable or slightly in- creased. "... I I .... W-3-226 Response Thi s statement was made by AOF&G i nvesti gators and has been referenced in the application. Paragraph 8:Please provide a map of the Jay Creek mineral lick,and probable travel corridors to the area,relative to the Watana impoundment.We recommend prOViding historical harvest data and explaining how project surveys relate to area populations • Response Intensive ground observations at the Jay Creek lick will be made in April-June 1983.The results will be pro- vided when they become available.Historical harvest data have been discussed in Section 5.The relationship between project surveys and area populations is 'de- scribed in Section 4.2.1(c)paragraph 1,and in Section 4.2.1(c)(i). W-3-227 (iv)Brown Bears -Distribution:We recommend providing data on the numbers of bears radio-collared and radio locations made,as well as maps of those radio locations relative to project use. Response These data have been Added to Se ct ion 4.2.1 (d)(i)•The analyses of home range overlap included in the text were felt to be more informative than a map of radio loca- tions,and no map has been included. W-3-228 -Habitat Use:Paragraph 2:Please describe whether aerial observations or vegetation type maps were used to determine vegetation types relative to brown bear radio locations.An explanation should also be provided of how more detailed vege- tation data and the vegetation remapping efforts will be inte- grated with the analysis of brown bear habitat use. Response Vegetation types were recorded during relocation flights;this has been clarified in the text.The util- ity of additional vegetation mapping and ground sampling to brown bear research is bei ng di scusse d,but there are currently no pl ans to expand on the habitat use analyses already provided. W-3-229 •Home Range:Paragraph 1:Pl ease correct the referenced Table W42 which lists data from project studies in the Susitna,not the Nelchina basin. Response The referenced data were collected in both the Nelchina and Middle Susitna basins.This has been clarified in the table. W-3-230 Paragraph 2:An explanation should be provided as to why 1.6 km and 8 km were chosen as the breakdown for study zones around the impoundments. Response These di stances were arbitrarily sel ected by the Pri n- cipal Investigator for bear studies for purposes of a quantitative analysis. W-3-231 Paragraph 4:Please describe data on bear radio locations relative to access roads,transmission corridors and ancillary project features. - Response The potential impacts of these facilities are discussed in Sections 4.3.3 and 4.3.4.See also the brown bear summary section in 4.3.5. W-3-232 (v)Black Bears -Distribution:We recommend including maps of bear radio lo- cations relative to project features. Response The analysis of home range overlap with project features as included is more informative than a map of radio lo- cations,and no map has been included. .- I W-3-233 W-3-234 -Habitat Use:Please describe how further vegetation studies and remapping will be integrated with the analysis of black bear habitat use. Response See response to this statement under brown bear,above. Food Habits:The scope,schedule,and integration of ongo- ing predation studies relative to further project planning should be addressed here • Response Study plans for fiscal year 1984 are being developed in conjuncti on with invest i gators and agency representa- tives.These studies have not yet been finalized. r""" I j W-3-235 (viii)Belukha Whales:Please note that several of the refer- ences cited here do not appear in the bibliography. Response The bibliography has been completely revised and edited. W-3-236 -Distribution and Habitat Use:Paragraph 5:We suggest integrating data on chinook salmon from the fisheries studies in order to obtain some estimate of the importance of that fishery and of project impacts to the fishery on be1ukha whales.Please also describe what data wi11 be gather ed on smelt for better evaluating project impacts on belukhas. Response As discussed in Section 4.3.1,belukha whales will not be measurably affected by anticipated reductions in sal- mon populations during the period when whales concen- trate at the river's mouth.Smelt studies conducted in 1982 found that the upstream 1imit of the elll achon spawning migration is near RM 48.0,and that the habitat requi rements necessary for eul achon spawni ng were quite broad.Eulachon were seldom found in areas of low water velocity or backwater or eddy habitat zones. Additional eulachon and salmon spawning data will be available in June 1983. W-3-237 (b)Furbearers (i)Beavers:We recommend including a map of the study area which details specific study sections,available density data, and representative main channel,side channel,slough,and clearwater areas.The discussion should be expanded to cover the extent to which suitable beaver habitats are fully util- ized or explanations where they are not. Response The study area is described in sufficient detail in the text,Section 4.2.2(a)(i)paragraphs 2-3.Maps with the landmarks mentioned appear in Figure E.3.101.Available density data appear in Tables E.3.118 and E.3.119.Bea- ver habitat studies are continuing;additional data will be provided in June 1983. W-3-238 Paragraph 4:We recommend investigating the extent to which bank lodges are used by beaver and to which the activity levels reported in Table W53 may be underestimated.An on- ground survey when beavers come out of thei r dens to forage just before spring break-up could verify such use. Response Fall surveys of caches are a more effective means for providing data on beavers which use bank dens.This was attempted in 1982,but summer fl oodi ng had destroyed many food caches.Study plans for additional investiga- tions are being formulated. W-3-239 Para~raph 8:Further quanti fi cat ion shoul d be provi ded on trapplng effort and success,see our comments under Chapter 5, Section 3.7(c). Response Records of effort and success are not available. .... r W-3-240 (in Muskrat:Paragraph 2:Please clarify whether the 106 1akes surveyed contitute all the lakes between the Oshetna River to Gold Creek impact area.Please relate this discus- sion to the number of muskrats potentially inhabiting this area. Response The text has been changed to indicate all lakes within 4.8 km of the river.It is impossible to relate number of pushups to number of muskrats and we suggest that the number of 1akes with resi dent muskrat is the best pos- sible index of muskrat density. W-3-241 Paragraph 3:Please provide an indication of downstream musk- rat populations and habitat quality. Response The text has been altered to indicate availability and characteri st i cs of muskrat habitat.Muskrat si gn,as ....reported in the text,is the only available index to population size. W-3-242 Paragraph 4:Please quantify present and historical trapping effort/success. Response Such data are not available. W-3-243 (v)Marten - - -Population Characteristics:Paragraph 2:No data is pro- vided to substantiate that pine marten are the "economically most important furbearer,1I or to relate densities to popula- tions and habitat quality.Please also refer to our comments under Chapter 5,Section 3.7(c). Response Gipson et a1.(1982)indicate that pine marten are eco- nomi cally the most important furbearer in the impound- ment zones.Few other furbearers are regu1 ar1y sought in the area.An index to habitat preferences and den- sity in various vegetation types is provided by snow track data which appear in Tables E.3.121 and E.3.122. W-3-244 (vi)Red Foxes -Habitat Use •Denning Habitats:Please provide information on the density of fox dens relative to habitat quality,and to other Alaskan and/or North American fox populations. Response It is unlikely that all fox dens ,in the study area were located (see Section 4.2.2(f)(i}paragraph 3 and Gipson et ale 1982).This is true in most red fox study areas. A comparison of densities woul d be misleading .at best. Fox popul ati ons are generally not 1imited by den site availability and den site location has little direct relation to habitat quality per see Appropriate denning habitat as characterized in the text is widespread in the study area.Den sites are relatively small and can be found in micro-habitats of many vegetation and terrai n types. W-3-245 Paragraph 5:Some explanation should be provided for the dis- parity of more fox tracks on the south side of the river but more dens on the north side • Response The text has incorporated more information on this dis- crepancy.See Section 4.2.2(f}(i}paragraph 2. W-3-246 -Food Habits:Paragraph 3:The postulated 1 ink between fox and hare popul ati ons may be overstated.Apparently hare num- bers have never been high or an important food source for fox in this area (Furbearer Study Coordinator Phil Gipson,per- sonal communication;also see Section 4.2(b)(vii):Paragraph 3 and Section 4.3(a}(xiii}:Paragraph 5}. Response Gipson et al (1982)state,"Several investigators have found that snowshoe hares are a very important component in the diets of red foxes.Snowshoe hares are presently scarce in the Susitna study area and therefore relative- ly unimportant in the diets of foxes."We postulate the presence of hares in the basin would increase the avail- able prey base and obviate the necessity of foraging for ptarmigan at higher elevations in winter.Very little historical information is presented by either Gipson et ale (1982)or Kessel et ale (1982a)on snowshoe hares. However,both sources indicate a probable chronic scar- city of hares in the basin which we reference in the paragraph in question and in Section 4.2.2(g)and ~.2.4. - ..... - ..... ,... ..... ..... - - W-3-247 -Population Characteristics:Please refer to our previous comments under Dennlng Habltats rel ative to habitat qual ity (Section 4.2(b){vi)-Habitat Use).Again,trapper effort and success shoul d be documented,al so see our comments on Chapter 5,Section 3.7(c). Response ftl1 objective measure of hab itat quality fo r red foxes does not exist.The concept of habitat in itself is problematic.Habitat is the place where a particular organism is found.Characteristics of an area which determine whether or not it's habitat include a multi- tude of considerations,particularly for a complex and highly mobile species,and particularly for higher order carnivores and opportunistic species.The utility of defining and evaluating an area as habitat of high or low quality irrespective of its use is questionable, although it may be of great theoretical interest. Indeed,it is dangerous for a manager or consultant to pretend to be capable of precisely estimating the abil- ity of an area to support populations of all species based on a few simpl e measures of vegetation character- istics used as indicators of supposedly high,medium or low qual ity habitat.For red foxes in particul ar,prey avail abil ity varies week to week,season to season and year to year as small mammal popul ations ri se and fall, and migratory bird populations arrive,nest and leave. Red foxes are residents of a very wide range of habitats in North America and Eurasia and their ecology varies dramatically from site to site.While we can say that fox den sity is rel ated to hab itat qual ity (by defin i- tion)we cannot objectively identify good qual ity habi- tat and accurately predict fox density. No data are avail ab 1e on trapper effort and success. Fur records for GMU 13 do not accuratel y refl ect the actual location of take.However,harvest data have been added to Section 4.2.2(f)(ii). W-3-248 (vii)Lynx through (x)Least Weasel:We understand that none of these species were chosen as high priority for eval uating proj ect impacts.However,we recommend prov id ing some quanti- fication for the descriptions of IIfairly numerous ll but not IIlimited,1I IIlocall y abundant,"and "sparse,1I in addition to trapper effort/harvest;al so see our comments on Chapter 5, Section 3.7(c). Response My attempt at quantification beyond track counts given in Table E.3.121 for marten,fox,short-tailed weasel, mink and otter,and those given in the text for lynx and least weasel would be sheer conjecture.The qualitative terms used above are sel f-expl anatory and no further information should be read into them. W-3-249 (c)Birds:Paragraph 2:Please note that waterfowl breeding pair surveys have been conducted by FWS in the lower Susitna River basin for over 20 years.12 The FWS has al so con- ducted statewide surveys for trt.rnpeter swans in 1968,1975, and 1980.13 Response Pl ease note that trunpeter swan surveys were in the far eastern edge of the basin and did not cover the project area.They therefore provide no appl icable data. Breeding pair surveys are restricted to three transects in the extreme lower floodplain.No impacts to water birds are anticipated in the regions covered by those surveys. W-3-250 Paragraph 3:We recommend further information be provided on how relative abundances of bird species were determined. Please clarify the difference between 60 percent of the area being in shrublands,as cited here,with the just over 40 per- cent in shrublands,as cited in Table W4.At the August 1982 AEA Workshop on the project,much discussion centered on pro- blems with correlating the bird habitat classification scheme used by Kessel et ale for project bird studies with the Dyrness and Viereck Alaskan vegetation classification system used for project baseline vegetation maps.We recommend des- cribing those problems here and how they will or will not be overcome by ongoing vegetation remapping.Throughout the bird sections of the draft appl ication,we are concerned that sources(s)for referenced data,or data manipulations,may not be fully documented.Thus,we recommend describing where and how data from more than one source has been manipulated for this report.In particular,the tables and figures should be more completely referenced,including explanatory footnotes. Response The text has been revised. W-3-251 (i)Raptors and Raven:Paragraph 1:We are concerned that 1980 and 1982 raptor surveys were not conducted at the optimum time:i.e.summer foliage would make it difficult to ini- tially locate nests (we note that 50 percent more nests were found in 1981 than in 1980);according to Table W60,nesting raptors will have fledged their young by 30 September making it difficult to determine nest activity in October.Please indicate the experience of observer(s)conduct"ing the raptor surveys and methods used,(e.g.whether surveys were by he 1 i- copter or fixed-wing aircraft).We al so recommend that maps of actual nest locations be included.We note that goshawk nests are often difficult to find by air and thus question whether the number of nests cited here is a thorough assess- ment.Pl ease cl arify in the text whether all raptor nests ac- tive in 1980 were al so active in 1981. - - Response No raptor surveys as such were conducted in 1982,with the exception of a bald eagle survey of the lower Susitna River floodplain,and reference to an October survey as such has been deleted.This error arose because a short hel icopter fl ight was made on October 16,1982,in a prel iminary attempt to recheck elevations of some nesting locations using the aircraft al timeter (di screpanc ies were found between orig inal survey maps and data presented in Kessel et al.1982a). Because precise elevations of nests and cliff-tops rela- tive to max imum impoundment fi 11 1evel s are in teg ral to a sound mitigation plan,a survey to obtain this infor- mation is planned for May-June 1983 using an American Paulin precision Micro-Surveying Altimeter (or equiva- 1ent)• Regarding timing of 1980 and 1981 surveys and personnel and survey methods,survey methods for raptors are des- cribed in Section 4.2.3.The 1980 survey by hel icoptor was conducted by University of Al aska Museum personnel (especially B.Cooper)with the inv ited assi stance of Alan M.Springer (see Kessel et ale 1982a,p.8).Mr. Springer is a biologist with approximately 12 years ex- perience with raptors in Alaska including extensive aerial surveys for cl iff-nesting species on the Seward Peninsula in the early 1970s and 1980,and boat-based surveys for peregrine falcons on the Porcupine,Yukon, Colv ille and Tanana Rivers,Al aska since 1976.He has al so conducted work on bat fal cons and peregrines in South America.Mr.Springer was invited to participate in the 1980 surv ey to beg in in st rue ti ng B.Co 0 pe r,Un i- versity of Alaska Museum,in appropriate techniques, because of his famil iarity with a wide range,and his experience in looking for and identi fying raptors and raptor nests from the air. The 1981 survey by hel icopter was conducted by Univer- sity of Alaska Museum personnel (especially B.Cooper) with the invited assistance of D.G.Roseneau (see Kessel et ale 1982a,p.8),a biologist with approximately 20 years experience wi th raptors in Al aska.Mr.Roseneau devised and tested aerial survey techniques for cliff/ nesting gyrfalcons,golden eagles and rough-legged hawks in northwestern Al aska in the 1ate 1960s whil e working for the Alaska Department of Fish and Game.This tech- nique subsequently came into regul ar use to cover 1arge areas of habitat in Alaska,and has since been used by several other raptor biologists (including T.Cade of Cornell and C.M.White of Brigham Young),personnel of the ADF&G,and personnel of other agenc i es (inc 1 ud ing BLM).Mr.Roseneau,who also has considerable experi- ence with Al askan peregrines and peregrine habitat,has surveyed much of northern,northwestern and interior Al aska for pereg rines and other raptors,and was inv ited to participate in the 1981 survey to provide B.Cooper, University of Alaska Museum,additional instruction in the use of aerial techniques,to assi st in checking some areas farther from the impoundment zones and to provide additional advice on where peregrines might attempt to nest. Regarding assessment of goshawks,surveys in 1980 and 1981 were not designed to specifical ry incl ude goshawks or other tree,ground or cavity nesting species (with the exception of tree-nesting bald eagles)because nests of many of these species are indeed very difficul t or impossible to locate from the air,and because many of these species occur throughout their breeding range in very low densities (relative to other groups of birds, incl uding passerines,waterfowl and shorebirds).Sur- veys for many of the tree,ground and cavity-nesting species require ground-based plot censuses (e.g.Kessel et al.1982a)or other appropriate ground-based sampl ing techniques in various habitat types.However,it should be pointed out that in northern regions of Alaska beyond the coastal zone dominated by such coniferous species as sitka spruce,western hemlock and cedar,goshawks are one exception to the general case.An experienced aerial observer who is also familiar with this species· nesting requirements and habits has little difficulty locating a relatively large number of nesting terri- tori es prior to 1eaf-out in the spring or after 1eaf-- drop in the fall (at 1east to the extent that a reason- able assessment of general numbers present and relative importance of sel ected areas can be made)(e.g.see Roseneau and Bente 1981;see also />'cGowan,J.D.1975. Distribution,Densiti and Productivity of Goshawks in Interior Alaska.Fe.Aid in wildl.Restoration.Final rep.W-1 7-3,W-1 7-4,W-1 7-5 an d W-1 7-6•Jo b No.10.6R • 3lp.).That point aside,and of more irnportance in the specific case of the Susitna River drainage,it was readily apparent after two years of survey that 1 ittl e goshawk nesting habitat occurred in the middle and upper basin (D.G.Roseneau and A.M.Springer pers.obs.). Goshawks,north of the coni ferous-cov ered coastal areas of Alaska (e.g.Prince William Sound,portions of the Kenai Peninsula),predominantly prefer to build nests in large,mature paper birch trees in stands of paper birch or in stands of mature white spruce-paper birch wherever it occurs (and especially on hillsides).Some nests are also built in medium to large aspen trees,and very occasionally in medium to large poplar trees.Use of trees other than birch appears to depend in part on the region (regul ar use of aspen occurs in one section of the middl e Tanana Vall ey where very few birch occur), ...... and in part on the popul ation 1 evel of goshawks (gos- hawks fluctuate markedly in nunber and productivity in response to snowshoe hare cycles).In interior Al aska most of the nestings that have occurred in aspen and poplar have occurred during the height of a population cycle (with the exception of a few areas where birch do not occur~as mentioned above).In any event~reason- able goshawk nesting habitat becomes very limited upstream from Dev il Canyon in the Susitna vall eYe For this reason~the few nests that have been found probably are reasonably representative of the area in spite of no formal surveys for them.The vast majority of suitable goshawk nesting habitat is found below Devil Canyon along the widening valley slopes. We feel that including maps of raptor locations in what wi 11 become a public doc ument serves 1 ittl e posi tiv e purpose.Maps of the scal e which would be appropriate to thi s document woul d not be accurate enoug h to base engineering and other design changes on~or to help determine accurate buffer zones to protect nesting loca- tions from disturbance.Detail ed maps of the nesting locations exist and are being provided to the Alaska Power Authority for incorporation into engineering design.Copies of these maps can al so be provided to agencies for in-house use. W-3-252 Paragraph 3:Please expand the discussion to more completely describe the habitat suitabil ity of the project area for golden eagles~given their apparent high density. Response The text has been revised. W-3-253 Paragraph 4:Refer to our comment under Secti on 4.2(c)(i): Paragraph 1 ~above,regarding the 1 ate timing of 1980 and 1981 surveys for nesting bald eagles.Please provide a description of the survey methods used. Response See Section 4.2.3.Timing of surveys for tree-nest ing location of bald eagles is much less critical than for spec ies such as goshawks.Pre-l eafout surveys offer some advantages in that some nests can be detected at greater distances~and some nests that are not occupied (i.e.inactive in the survey year)are easier to detect. Some of these 1 atter nests can go undetected after 1 eaf- out if the stand of trees is not carefully scrutinized. On the other hand~in much of central Al aska (and the upper and middle Susitna River basins are no exception) many bald eagle pairs nest in white spruce trees; pre-l eaf out surveys often provi de 1ittl e advantage in detecting these nesting locations.In general,the majority of bald eagle nests are conspicuous throughout much of the year (even during the winter months)and remain conspicuous even when foliage is present,because the nest structure is large and exposed (i.e.conforma- tion of the tree tops is an important feature of nesting trees,and openness of the canopy is a requi rement of the eagles,so that they may easily enter or depart from the nest).Furthermore,the 1981 survey of the middle basin occurred at a time (May 16-17)prior to advanced leaf-out of poplar trees and visibility into and through tree canopies was good (as planned on the basis of the preliminary 1980 survey). W-3-254 Paragraph 5:We recommend that discussion be provided rela- t i ve to habi tat values re how Sus itna habi tats compa re with those along the Tanana River where slightly lower nesting densities are reported. Response The text has been revised. W-3-255 Paragraph 7:Due to the status of the arctic peregrine falcon (Falco peregrinus tundrius)as an endangered species under the Endangered Species Act of 1973,as amended (16 U.S.C.1531- 1543,as amended),we are particul arly concerned with the adequacy of surveys for them,e.g.peregrines would have a 1 ready 1eft the area by October when the 1982 survey was done.Thus,we agai n recommend descri bi ng how the surveys were conducted annually,in early July,throughout proj ect studies and construction,or until there is sufficient evi- dence that peregrine falcons do not inhabit the project area. Sufficient evidence would be no sightings over several years of hel i copter surveys,by a reputabl e observer duri ng the proper time of year.Observers should be individuals who have worked with peregrine falcons.FWS review of specific times and survey techniques would be appropriate. Response Surveys for cliff-nesting raptors,including the pere- grine falcon,were not conducted in 1982 (see above). Furthermore,the II...status of the arctic peregrine falcon (Falco peregrinus tundrius)as an endangered species •••11 has little bearing in regard to the proposed Susitna Hydroel ectric Project.The reference to f..•..p.. tundrius in this question is of concern,because the USFWS is the lead federal agency with responsibility for endangered species.f ...P..tundrius,given the name larctic peregrine falcon l by the USFWS,was described by C.M.White in 1968 (see Auk 85:17191)(this race is - - - - still not formally recognized by the American Ornitho10- gists's Union).In Alaska,birds generally considered to be the tundrius type breed north of the Brooks Range and southwestward into parts of northwestern Alaska (see USFWS Arctic Peregrine Falcon Recovery Plan).Pere- grines breeding in the taiga zone of Alaska,including those that might occasionally occur in the region of the Susitna River,are I ..E..anatum,a second North American race considered to be endangered (the third North Ameri can subspec i es,F..E.peal ei,is.a coastal race t hat has never been -1 i sted as endangered)•'£.•.E.. tundrius would only occur as an occasional migrant in the project area.It is recommended that agency ques- tions regarding peregrines first be routed through the USFWS Endangered Species Coordinator,Anchorage. Methods of survey are descri bed in Secti on 4.2.3 (see also Kessel et a1.1982a).In 1981 special ground and aerial searches were made for peregrines at the few locations identified by D.G.Roseneau that appeared to offer some degree of potential for nesting peregrines (see Kessel et a1.1982a,pp14 and 15).Attention was also given to two general locations where White (1974) observed si ng1 e,non-broodi ng peregrines.In 1980 the time of survey (July 6)corresponded to the early nest- ling stage of peregrines when active sites become easier to fi nd from the ai r.In 1981,the aeri a1 survey was conducted on May 16-17,a time corresponding to the genera 1 egg 1 ayi ng/ear1y i ncubati on peri ods when pere- grines are more secretive,but also when some pairs are present that may fail reproductively and thus often not be present later in the summer.All potentia1- appearing habitat was rechecked from the ground in June 1981,after pairs would have laid eggs (see Kessel et a 1.1982a,p.15). It should also be noted that it is clear that the Susitna River drainage does not provide habitat typical of or comparable to any of the important areas of pere- grine nesting habitat in the taiga zone of Alaska (i.e. the upper Porcupine,upper Yukon-Charley,middle Yukon, lower Yukon,Tanana and Kuskokwim river drainages). Furthermore,it is the opinion of several biologists with considerable experi ence with northern peregri nes and peregrine nesting habitat that the Susitna River drainage provides only marginal potential peregrine nesting habitat (see also Kessel et a1.1982a,p64). Key elements of the existing habitat,in addition to the combi ned surveys conducted in 1980 (aeri a1)and 1981 (aerial and ground),provide reasonable evidence that peregri nes do not presently inhabit the project area, and that biologically significant numbers of them are unlikely to in the future with or without project development. Su rveys to monitor for the cont i nued absence or future occasional presence of breeding peregrines can easily be combined with planned efforts to monitor the success of a mitigation program for other cliff-nesting raptors. Such a program will be conducted by a raptor biologist whose experience will encompass Alaskan peregrines.It can be assured that all such efforts will occur at appropriate times of the year(s). W-3-256 We recommend the discussion be expanded to describe the area's importance in raptor migrations as well as for breeding. Response A comment on raptor migrations has been included (see Section 4.2.3(a). W-3-257 (i i)Waterfowl and Other Large Waterbi rds:Pl ease provi de some quantification for terms used here,e.g."l arge "concen- trations of waterfowl (paragraph 1);"little used"(paragraph 4),etc. Response See Kessel et al.(1982a,1982b). W-3-258 Paragraph 3:We recommend you incorporate additi onal trum- peter swan data which is available from the FWS.Please refer to footnotes 12 and 13. Response If si gnifi cant additional trumpeter swan data exi sted, these data woul d be incorporated.However,such data either do not exist or are unavailable.King and Conant (1981)summarize information through 1980,and provide the most up-to-date,complete published information available.It was cited by Kessel et a1.(l982a).In 1981 and 1982,BLM conducted partial,informal surveys (only one 1:63,360 quad was surveyed in the Gulkana Basin region in 1981,and only two 1:63,360 quads were surveyed in 1982--both quads surveyed in 1982 were far to the east near the Ri chardson Highway).These data were subsequently provided to J.Ki ng by BLM,and are mentioned in King and Conant (1982).Since only rela- tively small areas of the Gulkana Basin were surveyed in 1981 and 1982 and since most of the survey effort was expended well east of the project area,it would be i napppopri ate to draw compari sons or concl us ions from them.Furthermore,the computerized compilation of this 1 imited data set will not be avail abl e until at 1east January 26,1983 (G.Konkel pers.comm.to M.K. Raynolds,January 20,1983). I'""" ,.... ..... I""'" ! - W-3-259 Paragraph 4:We agree with the conclusion,however,we sug- gest that data from FWS annual surveys be included to quantify this statement (e.g.see footnotes 12 and 13,as well as Conant and King 1981 and King and Conant 1980 as referenced in this section). Response The text has been altered. W-3-260 -Mi ration:We recommend referencing the specific study ies from which conclusions in the CE reference are taken.Please note that trumpeter swans are moving through the area in increasing numbers. Response Although numbers of swans have increased,the 1eve 1 of increase does not appear to justify changing the con- clusion that "•••does not appear to be a major migration route for waterbirds". W-3-261 Paragraph 3:Pl ease expl a in the di screpancy between the statement here that the "upper Susitna Basin was less impor- tant to migratory waterfowl in spring than fall,"with data in Table W62 which shows spring waterfowl densities over twice that of fall densities. Response Table W62 (now Tables E.3.130,E.3.131,and E.3.132)was corrected. W-3-262 Relative Importance of Water Bodies:Paragraph 1:Given the previously descr-ibed problems with the wetlands classification used for the project,and remappi ng efforts currently under- way,please define "wetlands"as used here. Response The term wetlands as used in Exhibit E is defined in Section 3.2.3 as "lands where saturation with water is the dominant factor determining the nature of soil development and the types of plant and animal communi- ties living in the soil and on its surface.These areas are characterized by soil or substrate that is at least peri odi cally saturated with or covered by water (Cowardin et ale 1979)." W-3-263 We suggest clarifying whether the reference is to 22.5 adult waterfowl/km 2 and 22.5 adult gulls/km 2 or to 22.5 adult waterfowl and gulls)/km 2• Response The text has been altered to clarify this. W-3-264 We question the validity of only comparing productivity of these wetlands to the most productive wetlands in Alaska. Upper Susitna area waterfowl productivity may bp.m~re typical of Alaska wetlands in general and represent average popula- t ions and producti vity (FWS Mari ne Bi rd Management Proj ect Leader John Trapp,personal communication). Response It is agreed that "middle Susitna area waterfowl produc- tivity may be more typical of Alaska wetlands in general and represent average populations and productivityll. Comparing the productivity of such less productive wet- lands with wetlands that typically support high produc- tivity provides contrast,scale and perspective.It is agreed that no areas of high productivity will be lost as a result of the Susitna Hydroelectric Project,and that impacts to waterfowl populations will be consider- ably less (i.e.'average'at the worst)than if richer wetlands were involved. W-3-265 Paragraph 3:Please clarify how IIImportance Values ll were calculated;also refer to our comments under Figures W19 and W20 and Table W63.We suggest describing any consumptive use of waterfowl within the project area. Response The text has been revised to clarify how IIImportance Values ll were calculated (see Section 4.2.3[bJ[iiiJ). W-3-266 (iii)Other Birds Grouse and Ptarmigan:We recommend mentioning any consumptive use of these species within the project area. Response Such statements are contained in Section 4.4. W-3-267 Woodpeckers and Passerines:We recommend providing some discussion of the importance of the area to migration,as well as,breeding activities of these birds. Response This recommendation has been noted. W-3-268 U er Basin Bird Communities:Please refer to our un er Sectlon .2 c re t e need to identify here how 1982 data were combined ,given that Kessel et ale only includes data from 1981. comments 1981 and (1982) Response The 1981 and 1982 data are provided separately in TablesE.3.136 and E.3.137. W-3-269 Last Paragraph:Please describe how these habitat types do or do not correlate to vegetation types as now being remapped. W-3-270 Response There is no di rect correspondence between the habitat types of Kessel et ale (1982a)and any other publish,ed vegetati on cl ass ifi cati on system.Mappi ng now in the preparatory stage will identify vegetation known to be important as moose browse and vegetation characteristic of wetlands,using the system of Viereck,Dyrness and Batten (1982)to Level IV and,for wetlands,the system of Coward;n et al.·(1979)as adopted by the U.S.Fish and Wildlife Service (l980).Approximate vegeatation type equi val ents to Kessell s Avi an Habitat Types are presented in Table E.3.139. (d)Non-game (small)Mammals:We appreciate the thorough description 'of the ecological role of small mammals in project area ecosystems. Response .~ I I - Thank you. W-3-271 (ii)Habitat Use:We suggest updating the discussion to correlate with ongoing vegetation and wetlands mapping efforts. Response The thrust of the remapping effort will be to provide more accurate maps of vegetative cover using the same cl assificat i on scheme.Therefore,no updating of the discussion on habitat use is necessary. W-3-272 1m acts Watana Develo ment Moose:Paragra h 1:Criteria for concluding that moose is one of the Ilmost important ll species should be provided here. Response This statement is supported by hunter effort and harvest data presented in Chapter 5.The importance of moose as a prey resource for bears and wolves is discussed in detail throughout the application. W-3-273 Paragraph 2:We suggest that the proposed eva 1 uat i on of carrying capacity incorporate consideration of habitat values over the life of the project.Please provide the referenced figure.Considering the severity of project impacts by spatial areas to be affected and numbers as in Ballard et ale 1982 (page 106)would improve the discussion. Response The simulation modeling approach being developed is particularly suited to assessing habitat changes through time.Potential changes will be incorporated through this approach to the extent that they can be predicted. The deleted figure number has been added.The model ing approach is based on different spatial areas extending to and occasionally beyond the watershed boundaries. The movements of moose between these areas wi 11 be included in the analyses. W-3-274 We are further concerned with the inadequacy of the impacts definitions in not accounting for impacts to special con- centration areas (e.g.breeding),in key seasons of use (e.g. calving),and under infrequent but critical conditions (e.g. severe winters),and the overall interspersion and availabil- ity of such important habitat features. Response The text incorporates references to speci al use areas and periods of greater sensitivity to disturbance.The carrying capacity model will provide an understanding of the effects of winters of any snow depth,which in the a bsence of census data ina deep snow wi nter is pre- sently difficult to accurately assess.Habitat use and characteristics such as interspersion of forage and cover vegetation are discussed. W-3-275 Paragraph 3:Lack of quantifi cat i on prevents analysi s of whether an impact is half,twice,three times,etc.as severe as one of lower priority.We again recommend integrating the analysis with that in Chapter 5 re also providing and discuss- ing data on hunting pressure and success here (see our com- ments under Section 4.2(a)(i)•Mortality Factors}.Please note provision of access is a major indirect impact;addi- tional developments or settlement stimulated by this access would be a secondary impact. Response Quantification has been included wherever a defensible statement is possible.There are many situations where no data from past experiences are available,and one ...... ~ i, ..... person's guess is as good as another's.Some insight into potential effects of increased mortality or other changes resulting from the project will be gained through the use of habitat and population modeling. This approach is described in Section 4.3.2(a)(iii). The statement regarding access has been corrected. W-3-276 ParagraphS:We find the discussion entirely too general and inconclusive:(l)there is no indication of the relative difference between "some "moose whi ch wi 11 di sperse,adapt, die,etc;(2)both overall cumulative impacts and secondary impacts from moose dispersing to adjacent areas are ignored; (3)impacts on habitat values from increased use are not considered;and (4)no explanation is given for how and when ongoing studies will "re fine this assessment.1I Response The inability to adequately quantify these impacts reflects the need for the approach being developed.The approach and its implementation is described in Section 4.3.1(a)(iii). W-3-277 Constructi on:We are concerned that we have been gi ven no opportunity to comment on siting and scheduling for camps, townsites J etc.The location and use of these ancillary project features will influence the magnitude of resultant impacts.Alternative spoils sites have not been proposed,yet they should be part of the discussion. Response This procedural matter has been addressed in the Alaska Power Authority's response to the general statements included in the cover letter. W-3-278 •Habitat Loss:Paragraph 1:We recollUTIend i ncl udi ng a more thorough,quantitative discussion of habitat loss in the text. The necessary integration of vegetation and wildlife studies should include a discussion of (remapped)vegetation losses relative to their value as moose habitat Le.winter range, calving and breeding area,etc.We also see no quantification of these losses over the life of the project,i.e.the area of each type which will be lost forever,vs the area which will be lost for some length of time duringconstruction,vs the areas in different successional stages throughout recTama- t'ij'(!>n • Response While accurate estimates of the area of various well- defi ned vegetation types lost can be made,the only objective quantification of lhabitat 'loss possible is through measurement of forage availability in these habitats at various seasons and snow depths.Vegetation types are eas ily defi ned.Habitat is quite another thing.Any estimate of the value of a particular vege- tation type as calving,breeding or winter habitat must be qualitative.Accurate estimates of areas lost to various project features appear in Tables E.3.82, E.3.83,E.3.84,E.3.85,and E.3.86.A schedule of anti- cipated impacts appears in Table E.3.144.Plant succes- sion will begin within a several year period for nearly all of the Watana impacts,and simil arly for the Devil Canyon impacts (Table E.3.144),approximately 10 years later. The approach outlined address these concerns. moose carrying capacity into the application. in Section 4.3.1(a)(ii)will Preliminary calculations of changes have been incorporated W-3-279 Paragraph 2:The paragraph is somewhat "inconsistent with the Fishery Section.Given the mitigation proposed in that section of clearing areas just before flooding,successional growth development appears negligible (Section 2.4 (a)(x)- Clearing the Impoundment Area). Response Impoundment clearing is scheduled just prior to flood- ing.Much of the low-growing vegetation will remain after clearing,and some species grow rapidly enough in one or two seasons to provide forage for a large number of moose.The cleared impoundment area will be utilized by moose for feeding,but we agree that the eventual loss of this habitat makes the availability of this new growth of little consequence. W-3-280 Paragraph 3:Ongoing studies should be fully described. Pl ease descri be when the habitat use ana lyses wi 11 be reeva 1uated on the bas is of remapped vegetation and forage quality studies. Response The ongoing studies are a continuation of studies fully described in the application.The schedule for habitat analyses is given in Section 4.3.1(a)(iii). r .... W-3-281 Winter Use:Paragraph 2:Please clarify the first sentence and i nconsi stenci es between that sentence and.the previous paragraph. Response These two paragraphs have been corrected. W-3-282 Paragraph 3:It would be helpful to also express the number of moose in the impoundment area as a density and compare that density to areas outside both the impoundment and project area. Response The impoundment area and areas outside of it consist of several density strata,and therefore no single density figure was given.Since densities in a particular area are greatly influenced by season and'snow depth,it would be inappropriate to compare the density of moose within the impoundment area as determined in March 1982 with other areas surveyed under different conditions. W-3-283 Paragraph 4:We recommend that ongoing studies provide data for quantifying the relative values (quantity and quality)of winter range within and outside the impoundment area.Such information is necessary for determining mitigation require- ments. Response The data being collected,and the planned approach for incorporating these data,will allow these comparisons. W-3-284 Spri ng Use:Paragraph 2:Quant ifi cat ion is needed for the habitat areas described here. Response Plant phenology stud i es re 1ated to spri ng use of the impoundments by moose will continue in spring 1983 and provide results by December 1983.A map of moose calving locations has been added to the application. W-3-285 Paragraph 3:We recommend tying this discussion to project impacts on brown bear which could compound the predation problem. Response This has been treated in Section 4.3.1(d](i). W-3-286 Sununer and Fall Use:Paragraph 2:We are assuming that a heading for "-Disturbance"was omitted just before this parag raphe Response The heading and first paragraph of the Di sturbance Section,which were omitted from the draft appl ication, have been added to the appl ication. W-3-287 Paragraph 4:Since the magnitude of project impacts would appear to significantly vary,depending on whether hunting and harassment of moose are effectively prohibited,we suggest providing "best"and "worse"case scenarios.Those scenarios shoul d be used to quanti fy potenti al losses of habitat for comparing impacts and determining mitigation needs. Response These possibil ities can be best addressed through the planned modeling approach. W-3-288 Paragraph 5:Pl ease refer to our prev ious comments under Section 4.3(a)(i)Moose and 4.3(a)(i)Construction .Habitat Loss re the generality of this discussion. Response Please refer to our response under Section 4.3(a)(i). W-3-289 .Mortality: 4.3(c)(i). Pl ease refer to our comments under section Response Please refer to our responses to your previous comments. W-3-290 .Alteration of Habitat:We suggest this discussion be dropped as inappropriate and unfounded.If this discussion only covers the construction phase of the development,then we would assume there would be no chance for successional growth. Moreover,the suggestion that moose could ut"il ize these dis- turbed areas during construction confl icts with the previous discussions on how disturbance and increased susceptability to predators would cause moose to avoid major activity centers and large cleared areas.We also find the suggestion that borrow pits may·prov ide forage inconsi stent with the Fi shery Section which proposes to make fish ponds out of the pits (Section 2.4 (3)(e):Paragra h 2,Construction Mitigation). Please refer to our previous canments under Section 4.3 a i) ..... - - -Construction,.Habitat Loss re the unlikelihood for forage development withi n the impoundment area.Moreover,under •Permanent Loss of Habitat,page E-3-287,moose use of the impoundment area prior to filling is discounted.The need to resolve conflicts between sections of the draft application is amply illustrated by the latter two points above.As we have recommended elsewhere,some mechanism should be instituted for resolving these types of conflicts and analyzing the tradeoffs of mitigating for one species to the detriment of another. Response This discussion was el iminated from the appl ication • Several of the points made in the draft are now covered in other sections of the application.The inconsisten- cies between sections as pointed out have been elimi- nated. W-3-291 -Filling and Operation Permanent Loss of Habitat:Paragra h 1:As we commented under Section 4.3 a i -Construction,we are concerned with the lack of quantification.Of all possible impacts,loss of habitat can be most easily quantified.The analysis should include the area of each (remapped)vegetation type which will be inundated each year. Response Quantification has been provided where possible.Where data are unavailable,an approach for making reasonable predictions about future situations has been outlined. Si,mce the impoundment area will be.cleared prior to fill i ng,the area of each vegetat i on type inundated each year seems irrelevant. W-3-292 Paragraph 2:We again refer you to our comments under Section 4.3(a)(i)Construction re necessary quantification,study description,and incorporation of study findings into the quantification of losses required under FERC regulations (Section 4.41(f)(3)(ii)in F.R.Vol.46,No.219,13 'November 1981). Response See response above. W-3-293 .Alteration of Habitat u~per Susitna Basi n:We concur with the.poihts<rai sed here. P ease refer to our comments under BOtanital:Res'ources re the impacts of ice fog and rime ice formati on,as.to welT as need for quantification.The discussion should also consider the effective loss of an even larger area than described here due to dust from project activities which would further retard sno\ltffielt (see Section 3.3(a)(i~-Vegetat:;on Damage by Wind and Dust ). Response Dust from project activities could have the opposite effect on snowmelt if only a thin layer were deposited. In addition,the ground during the snow-covered period would often be frozen or damp,thus reducing dust prob- lems.It is therefore impossible to give an accurate prediction of the effects of this impact on vegetation or wildl ife. W-3-294 Lower Susitna Basin:Paragraph 2:Given a mid-successional stage of approximately 25 years (see Figure W4)and project life of 50 years plus planning and development,we question the conclusion that vegetation favored by moose will still be available at the end of the license period.Please refer to our comments under Section 3.3(a)(i)-Effects of Altered Downstream Flows re quantifying these and other impacts described in the remainder of this section as well as discuss- ing the potential for further alteration of habitat because of ice fog and rime ice formation. Response These sections have been completely rewritten. W-3-295 .Blockage of Movements:Given the potential for moose to avoid clear cut areas (see discussion under Section 4.3(a)(i) -Construction .Interference with Seasonal Movements,page E-3-286),we suggest mapping the effective area which could be el iminated from use.Some discussion should be provided on the likelihood of moose crossing the flowing narrow river as compared to the wide impoundment,plus drawdown zone;maximum and minimum widths of the impoundment should be provided. Also refer to our comments under Section 4.3(a)(i),River Crossings.Information presented here wi 11 be important to 1 ater considerations re choosing sites for habitat enhance- ments which may be undertaken as part of mitigation. Response The discussions in the application related to these concerns are considered adequate. W-3-296 Paragraph 5:Again,please detail ongoing studies. Response The ongoing studies are a continuation of the studies thoroughly described in the application. W-3-297 .Disturbance:Once more,we note the need to (1)consistently assess the potential for increased access and hunting;and (2) integrate consideration of this issue throughout the report. We again suggest listing and analyzing the impacts from alternative access and use options. Response The potential effects of increased access and hunting is described in Section 4.3.3(a).The enti re appl ication has been revised to make sections more consistent. Al ternate access options are discussed in Chapter 10, and in Section 4.4.1. W-3-298 .Mortal ity:See comments under .Oi sturbance,the prev ious discussion for Section 4.3(a)(i)-Construction,and Section 4.2(a)(i).Mortality Factors.Please define when postulated increases in hunting will occur relative to project develop- ment. Response The access roads and airports will be closed to the pub- 1 ic during construction,and as outl ined in the Mitiga- tion Plan,project personnel will not be able to use these project facilities for hunting or trapping. Increased hunting as a result of the project probably began in the late 1940s when the area was first investi- gated for its hydroelectric potential.Regulation of hunting is controll ed by the Al aska Board of Game,and the Al aska Power Authori ty has no j ur i sd ic ti on over future changes in fish and game management pol icies. W-3-299 -Quantification of Project Effects:We appreciate this dis- cussion of ongoing studies but note that references to this section should be made through out the report.Once more,we recommend incl uding a schedul e and describing how the studies will be incorporated into the 1 icenseapplication,project design,and mitigation planning.Please note,references ·in this section are not included in the bibl iography. Response This section has been expanded.The 1 ist of references has been rev i sed. W-3-300 -Watana:Summary of Impacts:The sllnmary is a 'useful,qua 1- itative description of project impacts,yet provides no quan- tification for minimal,moderate,or severe impacts.The definitions given under Section 4.3 (a)(i)Moose:Paragraph 2,should be restated if they are to apply here.To better evaluate the "ifs"common to the discussion,we again suggest analyzing an array of impact scenarios.Attention should al so be given to the cumulative impacts of habitat loss,altera- tion,disturbances,etc.We disagree with the conclusion that "because hunting mortality can be easily regulated,this will not necessarily be a major impact-"Because of the pol itics involved and independence from project development of hunting regulations,there is no guarantee that regulations consistent with project mitigation goals will be implemented.Moreover, increasing hunter demands for a diminished resource will further affect harvests and hunter satisfaction. Response A summary of project impacts on each species or group of species has been incorporated into the application. Your other comments regarding quantification have been addressed above.The A1 aska Power Authority has no authority for fish and game management. W-3-301 (ii)Caribou -Constructi on:Paragraph 2:We recommend provi di ng fi gures on the proportion of the herd which could be affected by borrow areas A,0,and F.Although these areas will be only temporarily used within the 50 year project life,that tempo- rary use involves several years. Response Please reread Section 4.2.1(b)to gain an understanding of factors limiting caribou population.Given the size and location of these borrow sites,the requested data a re unnecessary. W-3-302 Filling and Operation:Paragraph 3:Consideration should be given to the future management options which will be fore- closed with project development.That is,now that the herd has recovered from previ ous1y low numbers,the ADF&G coul d change thei r management goal s,even before project construc- tion begins.We recommend considering loss of this management option in mitigation planning. Response The appl ication has been rewritten to consider future management possibilities. W-3-303 Paragraph 7:We recommend a1 so considering the compounding effect of predation on caribou which become injured in cross- i ng the reservoi r or whi ch alter thei r movements due to the pres€nce of the reservoir.Predation was earlier cited as responsible for up to 30 percent of annual adult mortality (Section 4.2[a][ii]). Response This section has been modified to further consider this hypothetical impact. W-3-304 (i i i)Da 11 Sheep: sentence. Paragraph 2:Pl easecl arify the last F" I I ..... ..... ..... Response This introductory sentence is explained in later para- graphs. W-3-305 Paragraph 4:Please provide information on when and how seasonal Dall sheep ranges will be defined and used to influence siting and scheduljhg of possible borrow site C. Response Borrow site C wi 11 not be used for con st ruct ion mate- ri al s and therefore has been e1imi nated from the Da 11 sheep discussion. W-3-306 Paragraph 5:Please document other cases where remote mineral 1 ieks have been altered to remain available to wildl ife;we are concerned with the unproven effectiveness of enlarging the area if partial loss of the Jay Creek.mineral lick.affects sheep.Thus there is a need to demonstrate the techniques to ensure that sheep woul d use the mineral source if one were provided. Response There are no comparable examples where additional mineral soil has been exposed. W-3-307 -Fill i ng and Operation:The potential for di sturbance from increased recreational or hunting use in the area should also be covered here. Response This has been included in the discussion. W-3-308 (iv)Brown Bear -Construction:Paragraph 5:Please describe the scope and schedule of ongoing studies and plans for integrating those results into project designs and mitigation planning. Response The ongoing studies are a continuation of the studies thoroughly described in this appl ication.Studies will be continued in spring 1983 and will provide results by December 1983.Section 4.4 describes mitigation proce- dures for avoidance of bear-human conflict. W-3-309 Paragraph 6:We are concerned that the discussion downplays the importance of project impacts from both disturbance and loss of additional food sources.Original project studies 14/ and other reports 15/emphasize that disturbance from project features and associated human activities will cause bears to avoid those areas. Response This section has been largely rewritten to more accu- rately reflect a similar concern for these problems. W-3-310 Paragraphs 7 through 9:Two other impacts to vegetative food sources should be discussed here.Green-up of critical spring food plants may be del ayed because construction-caused dust may retard snowmelt on vegetation;at the same time,herba- ceous growth in summer may be increased (see the Botanical Resources Section and our comments,Section 3.3(a)(i) Vegetat i on Damage by Wi nd and Dust and -Effects of Altered Downstream Flows. Response Constructi on-caused dust is more 1i ke ly to speed snow- melt.No accurate predictions of these effects on wildlife is possible,although in this case both might be considered beneficial. W-3-311 Paragraph 12:We question the statement that,IINo measurable changes in the number of moose or other important prey species are expected.II Previous lack of quantification and the ongoing nature of salmon,moose,and caribou studies make it difficult to fully assess project impacts to brown bear. However,preliminary indications that up to 2,400 moose will be affected by the project in the upper Susitna basin alone (Section 4.3(a)(i):Paragraph 4,page E-3-280),and other report findings that IImoose populations will probably be reduced ll ,(Section 4.3(a)(vi):Paragraph 5,page E-3 -312) suggest that there will be both losses and distributional shifts in brown bear prey,with resultant impacts to brown bear.Brown bear concentrations on already fully utilized adjacent ranges may result in intraspecific conflicts and further decreases in brown bear populations (Spencer and Hensel 1980,footnote 15). Response The text ha~been clarified relative to the fact that the above quotation appl ies to the construction phase only,when impacts on moose will be mainly distribu- tional.We concur on the difficulty of assessing impacts.The section has been largely rewritten to clarify these concerns.Please refer to the text (Section 4.2.1[a])re:the accuracy of the figure (2,400 moose)affected. -I - - ,... ! ..- ..-,. -! - - .... ! rI"'" ! W-3-312 - 0 eration:Para ra h 1:Our comments under -Construction apply here too Section 4.3{a)(i).Please discuss potential impacts to bears resulting from impacts to the salmon resource in greater detail. Response The importance of spawni ng salmon cannot currently be assessed.Although the occurrence of this resource in the areas downstream from Devil Canyon increases the sustainable population,the exact extent of this effect cannot be predicted.Bear studies in spring 1983 will include research along the salmon sloughs. W-3-313 Paragraph 2:A1 so refer to our comments under Secti on 4.3(c)(i)re the need to define access. Response Di scussi on of access impacts has been transferred to Section 4.3.3 and is defined there. W-3-314 Para ra h 5:P1 ease see our comments two paragraphs above Section 4.3 (a){iv)-Operation)on the need to better eva1u~ ate the importance of salmon to area bears.Overall,we note the need to quantify impacts and discuss the cumulative effects of project impacts on brown bea rs. Response Continuing studies will provide additional information on the importance of salmon,but may fail to resolve this complex issue quantitatively.Where data are available and a defensible prediction of impacts is possible we have provided an analysis.The magnitude of cumulative unquantified impacts is difficult to predict. We have,however,predicted a decrease in carrying capa- city and increases in mortality. W-3-315 (v)Black bears -Construction:Paragra h 1:As in our comments under brown bears,above Section 4.3 a)(iv)),we suggest that greater attention be given to impacts of reduced prey,compounded here by the significant loss of black bear habitat with the Watana development • Response This section has been revised. W-3-316 -Fi 11 i ng and Operati on:Paragraph 1:P1 ease refer to our comments under Section 4.3(a)(iv)-Construction re project impacts to vegetat ion.Si nce black bears wi 11 be subj ect to much greater impacts than brown bears t the cumulative impacts of each additional project-caused stress could be severe. Response Cons i derat i on of these impacts has been added to the text. W-3-317 Paragraph 2:We question the ability of habitats to the east and west of the impoundment area to support bears now inhabit- i ng the impoundment areas.If those areas are already fully stocked with black bears t resultant intra-specific strife and stress would ultimately lead to lower population. Response The sentence was misleading and has been altered.We did not intend to suggest that bears inhabiting the impoundment area would be able to invade adjacent habi- tats without consequence to resident bears. W-3-318 Para ra h 3:We again refer you to our comments under brown bear Section 4.3(a)(iv)).Please describe ongoing studies and their integration with project design and mitigation. Response Ongoing studies are a continuation of those described here.Additional results of 1982 field work will be available in June 1983. W-3-319 Please refer to our comments under populations to increase in the project Response Our statement that wolves habituate readily to man-made disturbance stands.Experience with construction of the Trans-Alaska Oil Pipel ine has amply demonstrated that wolves habituate readily to human presence in the absence of hunting and harassment.Coyotes are excluded from areas inhabited by wolves and are unlikely to invade if wolf populations remain healthy and produc- tive.Coyote populations will replace wolves if wolves are el imi nated through attempted predator-control practices or uncontrolled harvest t both of which are independently managed by the ADF&G. - ..... .... - W-3-320 Last paragra¥h:Given the increased access expected with project deve opment,an increased wolf harvest appears likely. We recommend that a quantification of project impacts shoul d consider the effects of an increased harvest on wolf population levels.The cumulative impacts of (1)wolves concentrated in a smaller area due to disturbance,(2)effects on territoriality and stress,(3)relative values of impacted as compared to remaining habitats,and (4)reduction in prey, should also be considered here. Response Impacts due to increased access are considered in Secti on 4.3.3.Cumulative impacts are treated in the impacts summary.However,the discussion indicates that disturbance is unlikely to cause changes in distribution and that current wolf population levels are unlikely to be affected by a reduction in prey.Also current high harvest levels are likely to have an overriding effect on territoriality in this far from natural environment (for wol ves).The val ue of affected habitats to the Watana pack which utilizes them is thoroughly discussed. -W-3-321 (ix)Beaver:.We question the certainty of the statements here,given the undecided nature of the project water manage- ment regime.If reservoir releases are regulated to stabilize downstream flows,downstream beaver habitats may be enhanced. However,the extent to which that enhancement will offset beaver losses in the upper Susitna River basin is not pro- vided.Such data is necessary to evaluate the relative trade- off in alternative flow regimes (i.e.,for beaver,fish, moose,etc.)and thus the overall magnitude of project impacts. Response No losses in the impoundment areas are expected.At 1east 40 beaver are expected to be lost due to access (Section 4.3.3(h)).See mitigation section for informa- tion on habitat enhancement for beaver in downstream sections.Reservoir releases will stabilize downstream flows.Any stabilization ofdownstream flows will enhance use of river habitats by beaver and muskrat. W-3-322 -Construction:We recommend that the location of beaver colonies be considered,in conjunction with other wildlife values,in siting borrow area access roads. Response This has been done.As discussed in the Mitigation P1 an,the areas of Deadman Creek inhabited by beaver are no longer to be used for borrow materials,and the borrow sites for the Watana dam support no beaver.One or two beaver colonies may be destroyed by the Devil Canyon facilities,but this loss will be more than compensated for as a result of regulated flows. W-3-323 -Filling and Operation:Paragraph 1:Please quantify IIfew beavers ii currently supported by the impoundment area. Response The text has been altered. W-3-324 Paragraph 4:Refer to our comments under Section 4.3(a)(ix), above;we recommend using hydrologic data in conjunction with the revised vegetation maps and vegetation succession dynamics to quantify the areas which may be affected under different flow regimes.We fi nd some i nconsi stency between the state- ment here that,IIBeaver habitat south of Talkeetna may also be enhanced as a result of the increased occurrence of favored food plants (page E-3-316),II and the statement in Section 4.3(a)(i)that,"few changes are expected in channel morphol- ogy,frequency of flooding,or vegetational succession ll (page E-3-289,paragraph 1). Response Section has been largely rewritten.Available hydro- logic data will be used to determine the most likely locations for enhancement in downstream sections. W-3-325 Paragraph 5:During the August 1982 AEA Workshop on the Susitna project,access was considered as much of a limiting factor to trappi ng pressure as was pelt pri ceo Thi s secti on justifies our mitigation recommendati ons under Section 4.4(b) for alternate access routing,restrictions on use of access routes,and prohibition of trapping by construction workers. Response Ease of acc~ss is limiting at low pelt price levels. Access is not a factor when pelt values are high (P.Gipson 1982 pers.comm.).Restrictions to access and regulating harvest are even more important when pelt values are high. ..... W-3-326 (xl Muskrat:Paragraph 1:We find no section correlating to the referenced Section 3.3(a)(ix).Please define II minor ll impacts. Response Increased val ue of beaver habitat downstream is refer- enced throughout the above-mentioned section.The extent of impacts are further defi ned in paragraphs following this introduction. W-3-327 Paragraph 2:Please refer to our previous comments on quanti- fyi ng improvements in downstream habitats under Section 4.3(ix).Accordingly,we question the contention that, IIImproved downstream habitat will probably compensate for this loss.II Response See our response to your above-referenced comments. Sentence has been changed to read "•••will compensate.1I W-3-328 Paragraph 4:Agai n,refer to our comments under Secti on 4.3(ix),re mitigation of trapping impacts. Response Regulation of trapping after construction is the respon- si bi 1 ity of the Al aska Board of Game.Ouri ng construc- tion,the mitigation plan notes that trapping and hunt- ing by project personnel in the project area will be prohibited. W-3-329 (xi)Mink and Otter -Upstream Effects:We recommend defi ni ng II mo derately abun- dant"and "substantial impacts ll •Other than lacking quantifi- cation,the discussion thoroughly describes potential project impacts to mink and otter.Please clarify the reference to J"""1165111 11 in Paragraph 3. I r Response Reference to the baseline description has been added for access to available data on abundance.Available information related to assessing the impacts to mink and otter are discussed in subsequent paragraphs.The reference to 65m was a typographi cal error and shoul d read:1165 mi.II W-3-330 -Downstream Effects:We suggest the discussion be expanded to better explain the relative magnitude of project impacts to mink and otter.Since there was no previous quantification of those populations,we find it difficult to evaluate the significance of these impacts. Response Available information allows no expansion of this discussion. W-3-331 (xii)Red Fox and Coyote:Where human activities have devel- oped ina previ ous1y undi sturbed area,coyotes have become abundant whi 1e fox numbers have decreased (Furbearer Study Coordinator Phil Gipson,personal communication).For example,in the Cantwell to Healy corridor there has been a marked increase in coyotes with increasing numbers of people and area developments.Researchers bel ieve there has been a corresponding decrease in both fox and wolf numbers,although both those speci es pass through the area from undi sturbed habitats in the adjacent Denali National Park. Per our comments on other furbearers,quantification of rela- tive area populations,habitat quality,and trapper demand and harvest is necessary to fully evaluate project impacts. Response See our response to the comment on section 4.3.1(f). Coyotes are likely to increase significantly only where wolves are e1iminpted.No data are available indicating a decrease in fox numbers in the Cantwell to Healy corridor.See also Section 4.3.a(1).Where numbers are available quantification is provided.Harvest data are discussed in Section 4.2.2(f).No data are available on t rapper demand. W-3-332 ~Xiii)Other Furbearers:Again,quantification is needed re ase1ine populations,habitat quality,and use,in order to fully evaluate project impacts. Response Quantification has been provided where possible.When data are unavailable,the most reasonable predictions of impacts are provided. W-3-333 Paragraph 3:Note should be made of the previous years·trap- ping activity which may be responsible for low trapping success of pine marten near Watana Creek (Furbearer Study Coordinator Phil Gipson,personal communication ). -. W-3-334 Response This has been noted.It is also possible and we consider more l"ikely that seasonal differences in trapability are responsible for low trap response in July. Paragraph 4:We suggest considering additional parameters for evaluating pine marten habitat quality (e.g.the availability of berries is important as late summer/fall food)in conjunc- tion with remapped vegetation types to reevaluate impact estimates. r-, - Response Direct estimates of density are likely to provide more accurate and timely information on numbers to be affected than indirect and subjective measures of habi- tat quality. W-3-335 Paragraph 6:We question the extent to which snowshoe hare habitat may be improved by revegetation of disturbed areas, given the much larger amount of habitat which will be destroyed by the project and historically low hare populations in the basin. Response Current and historically low population levels reflect the lack of early successional habitat available. Di sturbance of soi land vegetation by the proj ect and mitigation plans for moose wiTl increase availability of early successional habitat in the middle and lower basin.Burning,in particular,will improve habitat for snowshoe hare. W-3-336 Paragraph 8:No correlation is made between II mo derate li levels of disturbance from logging and different levels of disturb- ance from the project re the applicability of these references to project impacts. Response Disturbance associated with logging is likely to be similar (in adjacent habitats)to borrow extraction or construction site activities and is therefore referenced as an equivalent impact. W-3-337 (xiv)Raptors and Raven ,- '~ -Habitat Loss:Paragra Pl ease refer to our Disturbance,below Response Protection afforded bald eagles and their nests under the Bald Eagle Protection was clearly recognized (see. Section 4.3.1(n),IIDi sturbance ll ). W-3-338 Paragraph 4:In order to understand the rel ative magnitude of project impacts,we recommend discussing the estimated loss of golden eagles in terms of project area populations and habitat values. Response Discussion has been added to the text. W-3-339 Paragraph 5:P1 ease clarify the statement that potenti al down stream nesting hab itats may become more important as upstream habitats are lost with project deve10pllent.Whether downstream habitats are fully utilized,their value compared to upper basin habitats,and potential disturbances from other project activities should be described. Response Proj ect-re1 ated disturbances are not expected to occur in the potential downstream bald eagle habitats that are referred to (i.e.especially Portage Creek,Stephan Lake and Prairie Creek).These areas may become more impor- tant to bald eagles because they are the closest locales to the project area that contain habitat similar to that typically used by bal d eag1 es.These potential habitat. ...., areas do not appear to be currently used by bald eagles with the exception that one ba1 d eag1 e nest was found near Stephan Lake.Among the three areas,two basi c nesting habitat types are found--ba1sam poplar stands (especially Portage Creek)and occasional small stands of 1arger spruce.The val ue of these areas and the few locales of habitat that will be lost as a result of the project are judged approximately equiva1 ent.Portage Creek is of particular interest since bald eagles do not appear to be usi ng it at present.One reason for that may be that the medium and occasional larger poplars appear to lack larger branches of appropriate form,and canopies tend to be relatively closed.This area may become considerably more suited to eagles if some appropriate habitat enhancement measures are taken. W-3-340 Paragraph 9:Please clarify whether downstream raven habitats could absorb use by ravens displaced from upstream habitats. I"""Response The text has been revised and clarification provided. W-3-341 Paragraph 10:The b10wdown of trees near cleared areas represents an additional source of habitat loss (e.g.see Section 3.3(a)(i)...Vegetation Damage by Wind and Dust). - ,.... -I f""" I Response Potential b10wdown of trees is recognized as an addi- tional potential source of perching habitat loss,if the trees that are blown down are of appropriate sizes and conformat ions to provi de perches.If one recogni zes that the majority of clearing of larger trees will occur in the impoundment zones over a relatively short time, and that the area will then be inundated,also in a' relatively short period of time,it seems reasonable to conclude that any potential losses as a result of b10w- down will be negligible.Furthermore,because most raptor species readily perch on transmission towers and pol es,such losses wi 11 probably be compensated for, providing precautions are taken to reduce coll isions with lines and guy wires,and prevent electrocution. W-3-342 Ba 1d Eag1 es:Paragra ph 3:We recommend descri bi ng the over... all impacts of the project on salmon and other fish which serve as bald eagle food.Such consideration should include potential impacts to smelt runs near the mouth of the Susitna Ri ver.Any impacts to these resources coul d affect eag1 es now depending on them as food. Response Text has been revised.However because bald eagles also eat a variety of birds and some mammals,and because they are 1 imited by avail abil ity of nesting sites as well as food (see additional comments about 1 imiting factors for raptors below),we doubt that impacts to fish,especially considering planned mitigative measures for them,will be of special consequence to the bald eagle population.Smelt may provide sorTie food to bald eagles near the mouth of the river since they occur mainly below the Yentna River (see Section 2),but it is doubtful that they are an important food source for many of the nesting pairs in the total population.Further- more,no major adverse impacts to smelt are anticipated (see Section 2). W-3-343 Paragraph 4:We question the significance of any compensation for lost eagle feeding habitat through attraction of waterfowl to the impoundment.Pl ease quantify the potenti al for such compen sati on and/or prov ide an expl anati on of why waterfowl may be attracted to the reservoir without a concomitant increase in their food sources (al so see our comment under Section 4.3(a)(xv)Waterbirds,below). Response The text has been revised to reflect some attraction of waterfowl which may occur in spring solely because of open water,regardless of the presence or absence of food that would support them for longer periods of time. Furthermore,please note various comments on food as a 1 imiting factors to raptors,and the probabil ity that loss of feeding habitat will be of much less signifi- cance than loss of nesting sites in the middle basin. W-3-344 -Disturbance:Paragraph 1:We appreciate the description of protection afforded eagles under the Bald Eagle Protection Act (16 U.S.C.668-668 c).However we are concerned that the intent of thi s act rel ative to project design has not been adequately acknowledged or incorporated,as explained below. Paragraph 6:Under a recent amendment to the Bald Eagle Act, the Secretary of the Interior may permit the taking of golden eagle nests which interfere with resource develoJlTlent or recovery operations (16 U.S.C.668a).Regulations for imple- menting this amendment should be available within the next coupl e of months. Paragraph 7:The Bald Eagle Protection Act does not authorize the taking of bald eagle nests which interfere with resource development or recovery operations.The Act does provide for the taking of nests for scientific and certain specific exhi- bition purposes when compatible with the preservation of this species.Service eagle permit regulations,50 C.F.R.22.21, implement this section of the Act.secretarial approval is not required for the taking of bald eagle nests in Alaska provided no eagles are killed and the nest is not exported from the Un ited States.Authority to take such nests has been delegated to the FWS Regional Director.We suggest that the applicant promptly consult with the FWS to reach a mutually satisfactory solution to this potential conflict. Response The intent of the Bald Eagle Protection Act (including golden eagles)was acknowledged--it was stated in the text that the act prevents taki ng birds,parts thereof, eggs or nests (take includes molesting or disturbing) without a permit.Because the act does not authori ze the taking of bald eagle nests which interfere with resource develolJTlent or recovery operations,consul ta- tions to reach a mutually satisfactory solution or compromi se was understood as necessary if the proj ect were to be built.Such consultation has been initiated in a 1etter of February 1,1983,from the Al aska Power Authority,to the Al aska USFWS Reg ional Di rector. Revisions have been made in the text to clarify this. Furthermore,the mitigati on pl an for both bal d eagl es and golden eagles was developed in the spirit of satis- fying the meaning of the act.The mitigation plan will be implemented in a manner that should satisfy taking of bald eagle nests as part of a scientific study to learn about the effectiveness of several possible mitigation methods that will be useful as eval uative and mitigative tool s shoul d simil ar con fl icts ari se between thi s species and other future develorxnental or industrial proj ects. The mitigation plan for golden eagles was devised in the same spi rit and wi 11 be impl emented in the same manner. Since a recent amendment to the Bald Eagle Protection Act allows taking of golden eagle nests which interfere with resource development or recovery operations,this issue will undergo review (once regulations are avail- able)to determine implications to the project and pro- posed mitigation measures.Mutually satisfactory inter- pretations and means of complying with these new regul a- tions will be arrived at in consultation with the USFWS. W-3-345 (xv)Waterbirds -Habitat Alteration:Paragraph 2:Please substantiate that IIfish populations will probably remain sufficient ll to support birds such as mergansers.According to Meeting Summary notes from the December 2,1982,Susitna MYdro Exhibit E Workshop on Water Use and Quality and Fishery Resources,most of the gray- ling population (estimated to be at least 10,000 in Section 2.3(a)(kk)-Watana Reservoir Inundation will be lost and any production of lake trout is expected to be limited. Response The test has been revised. W-3-346 Paragraph 3:We suggest quant ifyi ng the number of 1akes, miles of streams,and acres of wetlands (per revised wetlands typing)which may be affected by project borrow areas,spoils sites,etc.,as well as those which will be completely lost. We recommend including those habitat types in Table W78a. This information will allow better quantification of project impacts. Response Your suggestion and recommenation have been noted.Also see Tables E.3.81 to E.3.86. W-3-347 Paragraph 4:Please substanti ate further the val ue of the reservoir as habitat for migrating birds.Since existing resident fish populations are expected to be severely impacted by reservoir development and no biologically productive near- shore zone will be developed,we question that there would be food necessary to support bi rds attracted to the reservoi r. Moreover,winter open water areas could attract waterbirds to their detriment,particularly since food supplies are already 1 imited.Swans attracted to open water at Red Rocks Lake National Wild]ife Refuge in Montana must now be fed during wi nter;simi 1ar probl ems have occurred in other areas of the conterminus United States (FWS Migratory Bird Management Project Leader Rod King,personal communication). Response The text has been revised. W-3-348 -Disturbance:Paragraph 2:We suggest that greater emphasis be placed on the potential for the project to disturb trum- peter swans.Recent increases and overstocking of swans in the Gulkana Basin may result in more swans moving into the upper Susitna Basin (FWS Migratory Bird Management Leader Rod King,personal communication).Yet those habitats will become - .- I - less suitable with the human activities and disturbances caused by the project.As areas in the Cook Inlet Basin and Kenai Peni nsul a have been affected by human use and develop- ment,swan use of those areas has shifted to areas 1argely inaccessible to people.16 Response This suggestion has been noted. W-3-349 (xvi)Other Birds -Construction •Habitat Loss:We appreci ate the thorough,quantitati ve discussion included here • •Habitat Alteration:We suggest that species and their rela- t i ve abundance be correlated to the postul ated negative and positive effects of habitat alteration.This would provide some i nd i cat i on of net proj ect impacts.Loss to the Watana impoundment of existing natural edge,e.g.rivers,ridgetops, etc.,wi 11 undoubtedly be far greater than the increases in edge suggested here. Response This suggestion is being considered.However,revised wetland mapping is not yet available. W-3-350 -Operation:We question whether any feeding habitat for spring migrant shorebirds will be created in the drawdown zone.The reservoi r drawdown zone wi 11 remai n an un vegetated mudflat.If current low bird populations indicate lack of high quality habitat,it seems doubtful that food organisms would suddenly proliferate with reservoir development. Response r W-3-351 Agreed.Creation of feeding habitat for spring migrant shorebirds is doubtful.The text has been revised,and the comment acknowledged. (xvii)Non-game (small)Mammals:For small mammal species which inhabit identifiable vegetation types,we suggest desc ri bi ng whether the percent of the habi tat to be lost is proporti onately greater or 1ess than the occurrence of the type within the entire basin. Response This will be done once accurate areas for the various vegetation types are available. W-3-352 (b)Devil Canyon Development (i)Moose:Converting the number of moose in the Devil Canyon impoundment to a density figure and then comparing that to a similar figure for the Watana impoundment would allow a better quant itat i ve compari son of impacts.We are concerned with the judgmental nature of the discussion in stating that impacts "are of less concern"and suggest that,"will be of small er magnitude"mi ght improve the statement (pge E-3-338). The smaller area of the Devil Canyon as compared to Watana area should also be mentioned,although we do note that moose density here is about half that of the Watana area.An evalu- ation of relative habitat values of the adjacent areas which will bel ess directly impacted,and any lands proposed for acquisition or enhancement,is necessary for a complete impact and mitigation analysis. Response We consi der density estimates 1ess useful than actual numbers in this case (the reader can easily compute density from information provided).Wording has been changed to reflect our concern as suggested.The model- ing approach being developed will provide a means of assessing values of forage habitats.See Section 4.4 for mitigation discussion. W-3-353 -Construction:Again,spoils disposal is an additional impact which should be described. Response The exact location and area of spoil disposal sites has not yet been determined.However,the total volume of spoil wi 11 be much small er than the vol ume removed from borrow sites and will be disposed of somewhere within the impoundment.Habitat loss from spoil disposal will be inconsequential. W-3-354 •Habitat Loss:Our comments under this heading (Section 4.3(a)(i)),for the Watana development also apply here. Response See our response to your previous comments. W-3-355 •Interference with Movements:The discussion should consider whether a 1.6 km crossing would also be a barrier to moose in that area or moose diverted from upstream crossings because of the Watana impoundment.Quantification should also be pro- vided of the additional distances which might have to be traveled and consideration given to additional energy expendi- tures relative to forage quality should moose alter their movement patterns.Al so refer to our comments under thi s heading,Section 4.3(a)(i),for the Watana development. - - W-3-356 Response This discussion states that the 1.6 km cleared area may present a visual barrier to crossing.Quantification is not possible.Currently available information cannot provi de estimates of energy expenditures re1 at i ve to forage quality.The proposed modeling effort will pro- vide data by which such estimates can be made. •Disturbance:Please refer to our comments under this heading,Secti'on 4.3(a)(i),for the Watana development. Response Please refer to our response to your comments. - W-3-357 -Mortality:As above,our previ ous comments under Secti on 4.2(a)(i)Morality Fa.;.tors;4.3(a)(i)Filling and Operation,•Disturbance;and 4.3(c)(i)-Mortality apply. Response Pl ease refer to previ ous responses to your prev i ous comments. W-3-358 -Filling and ,Operation • A1terati on of Habitat:P1 ease refer to our comments under this heading,Section 4.3(a)(i),for the Watana development. We are concerned that increased water temperature could result in a larger area being affected by ice fog and rime ice forma- tion,also see our comments under Section 3.3(a)(i).We again recommend quantifying several impact scenarios re successful vegetation changes from any of the impacts discussed here. Response No data are available to determine actual areas which may be affected by icing of vegetation.Local variation in air temperature,wind speed and direction will all affect the distribution of icing.Refer to Section 4.3.2(a)(ii)Paragraphs 4 and 5. W-3-359 •Interference with Movements:By reduci ng browse avail abil- ity due to rime ice formation,the presence of ice fog could be a compounding impact to moose. Response Rime,ice There is potential inc1 uded. formation can occur independently of ice fog. no quantitative support for either of these impacts,but they have nevertheless been W-3-360 Moose movements may already be inhibited because of greater visual exposure to predators in the vicinity of the reservoir. We refer you to our comments under the Watana devel o~ent (Section 4.3(a)(i)-Filling and Operation;•Blockage of Movements)• Response See our earlier response to your comment. W-3-361 •Disturbance:Again,our comments for Watana (Section 4.3{a)(i))apply • •Mortality:Please refer to our previous comments on hunting (Section 4.2(a)(i)•Mortality Factors,and Disturbance and Mortality discussions under Section 4.3(a)(i)). Response See our responses to previous comments. W-3-362 •Dev i 1 Canyon:Sunmary of Impacts:As we commented on the Watana impacts summary,quantification and better definition of impacts is needed here.We are al so concerned about inattention to cumulative impacts.While habitat alterations, disturbance,or blockage of movements may each be a "minimal" impact,together they may be sufficient to severely stress moose or reduce moose use of the project and adjacent areas. Response Thi s discussion has been el iminated.See impacts summary for discussion of cumulative impacts (Section 4.3.5). W-3-363 ~ii)Caribou:Definitions for the qualitative terms used ere should be provided (e.g."little use"). Response No quantification is possible. rel ative to infrequently used cannot be predicted. Movements of caribou areas of t hei r rang e W-3-364 Brown Bears:Lack of quantification here,as in Section 4.3 a iv precludes evaluating even relative impacts for each major project feature. Response Where data are available,quantification is provided (see ADF&G 1982e).Evaluation of project impacts based on available information are provided. I~ - W-3-365 (v)Black Bears:As in Section 4.3(b)(iv)above,lack of quantification prevents a thorough analysis.Consideration shoul d be given to the cumul at i ve effects of di sturbances, loss of habitat,decrease in habitat value,and increased mortal ity from human/bear confl icts from the Devi 1 Canyon development in conjunction with the Watana development. Response Where data are avaflable,quantification is provided. See impact summary,Section 4.3.5 for discussion of cumulative impacts. W-3-366 under Secti on and cumu 1at i ve - - - Response Please refer to our analysis of disturbance effects here in and Section 4.3.1 (f).Cumulative impacts are treated in Section 4.3.5. W-3-367 (ix)Beaver: Refer to our comments under Section 4.3(a)(ix) re the need to quantify the amount and qual ity of downstream habitat improvements which could offset upstream habitat losses and the dependence of any habitat improvement on the operating flow regime.We suggest describing impacts under a variety of potential flow regimes. Response Refer to our responses to previ ous comments.See also Section 4.4 for mitigation plans to en han ace downstream beaver habitat.Modeling of hydrology,floodplain vegetation,and beaver is being conducted to evaluate beaver responses to different flow releases. W-3-368 (x)Muskrat:Please refer to our previous comments under Sections 4.2(b)(ii)and 4.3(a)(ix)-Filling and Operation re quantifying and controlling potential increases in trapping. Response Trapping will be prohibited from project facilities and equipment by project personnel during the construction phase.During operation,trapping will be the jurisdic- tion of the ADF&G and beyond the control of the Alaska Power Authority. W-3-369 (xi)Mink and Otter:Again,we recommend providing some quantification,definition,or relative correlation among species and project areas for the qualitative impact descrip- tions. Response Quantification is not possible on the basis of currently available data.Discussion is considered a clear and accurate portrayal of anticipated project impacts. W-3-370 (vii)Coyote and Red Fox:We would expect an increase in coyotes per our previous comments (Section 4.3(a)(xii)). Response See previous responses and revised text. W-3-371 Furbearers: here too. Our comments under Response See previous responses. W-3-372 (xiv)Raptors and Ravens -Construction and Filling •Habitat Loss:Paragr.aph 1:Refer to our comments under Section 4.3(a)(xiv)-Disturbance. Paragraph 2:Shoul d any eagl e bui 1d a nest,between now and filling of Devil Canyon Reservoir which would subsequently be lost in construction and/or filling of Devil Canyon,please refer to our comments under Section 4.3(a)(xiv) Disturbance. Response Acknowledged. W-3-373 Paragraph 3: sentence. Please clarify what is meant by the first Response Typographical error corrected:uknow u should have read "known". W-3-374 Paragraph 4:Pl ease refer to our comments under Secti on 4.2(c){i)re the difficulties in locating goshawk nests. Response Please refer to our comments regarding surveys for gos- hawks and habitat available to goshawks (above). - .... W-3-375 Paragraph 5:Please clarify the discussion and consider whether the cliffs and trees which may increase in nesting importance are as suitable as existing nest habitats. Response Text revised.In general,cliffs and trees referred to are suitable because ravens have much lower nesting requi rement II s tandards II than do raptors.Furthermore, some of these cliffs may have been used in the past by ravens since they often bu il d new nests each year,and many such nests in certain nesting situations last only a short time (i.e.one breeding season),and leave little evidence of their having been present. W-3-376 Disturbance:Para ra h 1:Again,please refer to our comments under Sectlon 4.3 a (xiv)-disturbance. ~.Response Acknowledged. W-3-377 Paragraph 2:See our comments under Section 4.3(b)(xiv)this section,Habitat Loss:Paragraph 2,above. Response Acknowledged. - .F' I W-3-378 Waterbirds:Please refer to our comments under Section xv as to the questionable value of the.reservoir area, i.e.generally birds will not appear in the area any earlier; birds which remain in the area longer may have problems find- i ng food when encounteri ng frozen waterbodi es once they do 1eave;no data has been provi ded re any supp 1ementa 1 food value in the reservoir area. Response Noted.The text has been clarified. W.,.3-379 (xvi)Other Si rds:Paragraph 2:Please clarify the last sentence. Response Clarified. W-3-380 Paragraph 3:Please quantify the extent to which open water in the reservoi r will compensate for loss of di pper breeding habitat and descri be what feedi ng habitat woul d be avail ab 1e in the reservoir • Response Text has been revised. W-3-381 under Please refer to our ,,.,--.., Response Please refer to our response to these comments. W-3-381 (c)Access (i)Moose:The qualitative,general discussion precludes any definitive analysis of potential impacts.We suggest quanti- fying current and potential hunter demand and harvests,area moose populations and habitat quality for access route areas. Varying degrees of winter severity and the length of each access link should then be considered in conjunction with the information described above and data on vehicle/moose colli- sions in other areas of the state to assess the potential for railroad or automobile collisions with moose. Response Where data are available in source documents,numbers have been provided.The outlined modeling approach will allow a more accurate assessment of the impact of direct habitat loss,various levels of mortality from both hunting and vehicle collisions,and various degrees of winter severity. W-3-383 Si nce access is a key feature to any mit i gat ion pl an for the project,we agai n recommend eval uati ng the range of impacts which would result from a variety of access/use options and coordinating this with the Socioeconomics and Recreation Chapters.Pl ease refer to our 17 August 1982 1etter to Eric Yould re access alternatives;our comments there remain applicable. Response We have referred to the 1etter and note the concerns expressed therein. W-3-384 Please correct internal inconsistencies in this paragraph: loss and alteration of habitat,disturbance,and mortality are certain,not "possible,"impacts as verified in subsequent portions of this section (page £-3-350).Maps of proposed access routes should also be included. Response Sentence has been altered.Routes appear in Figures E.3.37,E.3.42 to 47,and E.3.79 to 82. - I"'" ! W-3-385 -Mortality:Paragraph 2:Before di scussi ng impacts from access,please specify any pUblic access and hunter take restrictions assumed to be in effect for planning,construc- tion,and operation phases of the project.Impacts will vary from severe with no restrictions to minimal with strong restrictions on access.In this respect,we find Chapter 3 confusing.The potential impacts from public access and hunt- ing along project access routes are discussed here and then the suggestion is made that these impacts will be minimized by prohibiting worker access and.hunting,yet the chapter never consistently describes what restrictions actually will apply. Project.impacts,such as habitat degradation and population disturbance associated with increased access,could be further minimized by controlling public access (through restrictions on DRVs,seasons or times of day of use,etc.) Response The impact .section is based on the assumption that access roads wi 11 have unrestri cted access for project personnel during the construction period but that publi~ access will be prohibited.After construction,the roads will be open to the public,the impact discussions further assume that workers wi 11 be allowed the same hunting,trapping and rights as other Alaskans,and that regulations currently in effect will continue.The mitigation plan includes restrictions on worker recrea- tional activities as a means of avoiding or minimizing certain impacts. W-3-386 Please substantiate the conclusion here that "carefully managed hunting may effectively mitigate for some indirect project effects •II The impact of dimi ni shed hunter opportuni- ties is not fully described·here or in Chapter 5 (see our comments there,Section 3.7(b)(ii)-Impacts on the Hunter). Response Section has been revised to clarify the utility of .reduc i ng surpl us popul ati ons created by a sudden reduc- tion in carrying capacity.See also Section 4.4. Socioeconomic impacts are treated further in Chapter 5. W-3-387 Paragraph 4:Pl e.ase define use of the terms IIsmallll and "negligfble."During severe winters,moose may seek cleared roadways as t.ravel corridors and be subject to collisions. Si nce the Dena 1i Hi ghway is not kept open duri ng the wi nter, it is not possible to fully compare the collisions on that road with the potential for collisions on project access roads.However,we suggest that a better understanding of the subject could be gained with information as described under Section 4.3(c)(i),abov.e.We also note that if workers are allowed to commute to the project site or have free access in and out of the project area,the volumes of road traffic would be that in significantly higher.The analysis should be coor- dinated with that in Chapter 5.Consideration should be given to the times of year for recorded collisions and utilized in scheduling access if patterns exist in that information. Response Section has volume data E.3.167). considerably analysis. been rewritten with reference to traffic provided by Frank Orth,Assoc.(Table Traffic vol ume estimates provided are higher than those used for the original W-3-388 Paragraph 5:Please describe current railroad use as compared with the projected additional eight round train trips each week.We believe that project railroad use may be a signifi- cant impact to wildlife in view of present winter use of four round trips each week. Response We concur that impacts may be substantial. railroad traffic information has been added. Current W-3-389 The length of additional track,as well as existing track, should also be given for comparison with the mortality figures given here.Information on moose densities and habitat values in the area of the new as compared to existing railroad would also be helpful in quantifying potential impacts,as described above.We are concerned that in severe winters the loss of wi nter range may be compounded by the potenti a1 for numerous vehicle/moose collisions. Response The distribution of railroad kills,as described in the text,is concentrated in low elevation areas during severe winters.Therefore,some caution should be exercised in comparing kills per length of track.The proposed modeling effort will allow flexibility in comparing various habitat values along the new and existing corridors.The loss of winter range will be a severe impact in the Watana reservoir area and will a ffect a sepa rate popul at i on of moose,for the most part,than the rai 1 access to the Devi 1 Canyon facil ity. ..... .- ..... W-3-390 •Loss of Habitat:We concur with the analysis but suggest some quantification be made of areas and vegetation types which coul d become unuseabl e in a worst case scenario where di sturbance causes moose to av oid using the road corridor area. Response No data are av ai 1 ab 1e on the distance from t he road disturbed moose may maintain.My attempt at such an estimate would be conjectural and misleading.In real ity,indiv idua1 responses wi 11 vary.Ps ind icated in the text,little winter range or other special use areas occur in the access corridor (see also Table Eo 3.84). W-3-391 •Interference with Seasonal Movements:With respect to the seasonal migrations described here,please refer to our com- ments under Section 4.3(c)(i)-Mortality,re the compounded potential for even greater numbers of vehic1 e/moose coll i- si on s. Response The text indicates the increased likelihood of mortality due to coll isions in recognized movement corridors. ~ I W-3-392 (ii)Caribou:para~raPh 1:We reiterate our recommendation to el iminate the Dena i Highway to Watana access route Cal so see section 3.4(c)(il))which,as documented here,is "1 ike1y to have a substantial effect on caribou movements.1I Response ..... ..... ! ..... ! r- I r I Your recommendatj on wa s con sidered in access route selection.see Chapter 10• W-3-393 Paragraph 6:Please provide substantiating data for the judg- ment that although cows calving in the area may avoid the road,there will not be an effect on herd productivity.We recommend quantifying the portion of the herd util izing this a,rea. R.esponse No effect on herdproductiv ity has been found during long-term,intensive studies of the Central Arctic Herd, as discussed.This includes productivity data for a calving concentration area in the Kuparuk oilfield which is surrounded by intensive development.A1thoughca1v- ing areas are traditional,exact locations of calv ing vary from year to year in an unpredictab1 e fashion.No defensib1 e quanti fication of the portion of the herd affected in any particular year is possible. W-3-394 Paragraph 7:Please provide further information on times of day or seasonal variations expected for truck traffic.An additional concern in considering the potential severity of access-related impacts is the question of worker access.If project workers are all housed onsite,the intensity of road use will still be greater than described here;workers travel- ing to and from the site at the beginning and end of their times off represent a substantial road,or even airstrip use. Moreover,if workers are allowed to individually commute,or even if busses are used on a dai ly or weekly bas is,road use will be even more significant. Response Available projected traffic figures appear in Table E.3.167.No other traffic data are available. W-3-395 Paragraph 9:Our previous comments on herd management apply (Section 4.2[a][ii]).We recommend quantifying impacts des- cribed throughout this section. Response This section has been altered accordingly.Quantifica- tion is provided where data are available. W-3-396 111 Da 11 The issue of di sturbance from alr access project should be covered here;as described in Section 4.3(a)(iii).Please provide information on the expected intensity of aircraft use for the period of construc- tion. Response A reference to that discussion has been added here. W-3-397 Paragraph 2:Consideration should be given to increased rec- reation and other activities which may compound habitat loss impacts near the critical Jay Creek mineral lick.Please restate those impacts as described in Section 4.3(a)(iii). Response Reference to 'previous discussion of these impacts has been added. W-3-398 (iv)Brown Bears:We concur with the assessment but recommend that quantification of impacts be provided. Response Where numbers are available,quantification is pro- vided. W-3-399 (vi)Wolf: apply. Our previous comments under Section 4.3(a)(vi) - r Response Pl ease refer to our responses to your previ ous com- ments. W-3-400 (vii)Wolverine:Paragraph 2:Quantification of trapping effort and potential increases relative to wolverine popula- tions should be given.Please justify the inference that emigration frolll other areas w"ill mitigate for loss of wolver- ine to trappers yet not affect overall populations. Response No data are avai 1abl e on trapper effort.Sentence has been rewritten to prevent similar misinterpretation regarding emigration.The word lI mitigate U does not appear in this discussion and our meaning has been mis- construed.The inference is that no detectable decrease in harvest is expected because of·the wide-ranging habits of the speci es and the 1arge area of habitat surrounding the basin which will provide a source of dispersing individuals.Likewise,no detectable change in population levels will occur,though the social structure and use patterns will undoubtedly be affected. W-3-401 (viii)Furbearers:In general,we find the discussion some- what inconsistent with other sections,with no clear objec- tives outlined for mitigation (see paragraphs 2,8,and 9 of this section).Please also refer to our comments on the socioeconomics (Chapter 5,Section 3.7 (c)(i)-Impacts of the Project)and our recommendations under the wildlife miti- gation plan (Section 4.4[b]).We recommend you then ensure these sections are consistent with each other and with overall project objectives and mitigation goals.Specific comments follow: Response Please refer to Section 4.4 for mitigation plans. Socioeconomics are treated in Chapter 5 and Section 4.5. W-3-402 Paragraph 1:Please provide further data to substantiate the conclusion that pine marten home ranges may become realigned along the access road.Although we appreciate the thorough discussion of potential project impacts,we are concerned that repeated lack of quantification makes it difficult to assess the relative importance of such uminor u impacts as compared to the more severe impacts of direct habitat losses and increased trapping mortality. Response Discussion is considered adequate.Considering small ranges and use of forest habitats,the 1oca 1 di stri bu- t i on of i ndi vi dua 1s with home ranges adj acent to the road is expected to be affected.Quantification is provided where available.Increase in trapping pressure is explicitly identified as the single most significant impact. W-3-403 Pargraph 5:The well-documented likelihood of beavers using bridges and cul verts for damsites more probably represents further neg at i ve impacts to beaver than a source of habitat improvement.Beaver use of those structures would confl ict with project access,undoubtedly resulting in road maintenance to remove beaver dams.If that removal occurs at the wrong time of year,i.e.,autumn,beaver in the area may be effec- tively eliminated (Furbearer Study Coordinator Phil Gipson, personal communication.) Response Discussion should be read more thoroughly;it states that habitat improvement is not anticipated in the prime beaver habitat along Deadman Creek.No change has been made in this discussion. W-3-404 Paragraph 9:We are concerned with the use of the word Ildesirable."Thus,we suggest modifying the last sentence to say that to date,trapping pressure on mink and otter has been low in this part of Alaska (Furbearer Study Coordinator Phil Gipson,personal communication.) Response Gipson et ale (1982)state:"Local trappers seldom take river otters.The animal s are difficult to trap and pelt values have usually not been high enough to justify the effort."Mink are also taken mostly incidentally and are not specifically sought by trappers. W-3-405 (ix)Raptors and Ravens -Denal i Hi ghway to Watana Damsite:Paragraph 1:We recom- mend describing how this area was surveyed. Response See Kessel et ale (1982a).Access routes were surveyed by he 1 i copter on July 3 and 5,1981.D.G.Roseneau also surveyed the Denali Highway to Watana Damsite access road by helicopter on October 16,1982.Although ..... ..... - ,plII!, ..... - r the breeding season was long since over and snow covered the ground,it was cl ear that no cl iff-nesti ng habitat was present within several miles of the new alignment. It was also evident that bald eagle nest location BE-6 (previously identified)was the only tree nest near the alignment • W-3-406 Paragraph 2:Our comments under Section 4.3(a)(xi v) -Disturbance would apply should golden.eagles subsequently nest along the access road. Response Agreed--however,no cliff habitat occurs within several miles of the access road.(Few trees also occur near it,and furthermore,there are only about 10 instances of gol den eagl es nesting in trees known from Al aska - see Roseneau et ale 1982.) W-3-407 Paragraph 3:Refer to our comments under Section 4.3(a)(xiv) -Disturbance re the illegality of destroying a bald eagle nest. Response The illegality of destroying bald eagle nests is clearly understood (see previous comments above.) W-3-408 -Watana Damsite to Devil Canyon Damsite •Di sturbance:We agai n refer to you to our comments under Section 4.3(a)(xiv)-Disturbance • Response Comment noted. W-3-409 -Devil Canyon Damsite to Gold Creek •Di sturbance:We recommend that the concl usi ons of mi nimal disturbance here,be consistent with those in Table W76 which says that lI cons truction and operation activities may result in considerable disturbances.1I If the nest is active~we will recommend timing constraints on the construction activities near it (see Section 4.4 [c][i]). Response The inconsistent statement in the text was corrected. W-3-410 d Transmission Lines:As with the previous Section 4.3, c Access,the severity of impacts from the tran smi ssi on lines will depend on restrictions on access (e.g.by siting, access to the lines,and/or access along the lines)as well as the methods of construction and maintenance (e.g.hel icopter, winter,and/or onground).Please clarify what methods and schedule for construction and maintenance will be utilized and what restrictions,if any will be placed on access;we find the Exhibit E inconsistent on these points.The reference here is to helicopter and winter construction and only selec- tive clearing of vegetation;in Chapter 5,reference is made to increased hunter access along the 1 ines which infer greater clearing and road access (Section 3.7 [c][i]•Impacts of the Project).Increased sno\OMlobil e and ORV access and their disturbance along the transmission corridors should also be addressed here.Our comments under (Section 4.3[c])Access on the need to quanti fy expected additional harvests al so apply here. Response Transmission line impacts have been largely rewritten. W-3-411 Pl ease refer to our tran sOli ssi on corri dor c OOIments under Botanical Resources,Sections 3.3(d)and 3.4(d).We refer you to our January 5,1982 review letter on the November 9,1981 Transmission Corridor Report.Our comments there remain appl icabl e.In particul ar,we recommend incorporating into project plans:(1)on-ground evaluations with representatives of the FWS,ADF&G,and the Al aska Pl ant Material s Center re- garding the appropriate management along various lengths of the transmission 1 ines (e.g.the extent of clearing,mainten- ance,possible seed ing,etc.shoul d depend on the wi 1dl He species of concern and vegetation types present;(2)coordi- nated access to the transmission 1 ines with access to other project facilities;(3)controls on public access to the transmission lines during and post-construction to reduce habitat degradation and population disturbances;and (4) controls on access along the·length of the lines.We would appreciate your response where project plans may be in con- n ict with either these points or the five specific recommend- ations in our January letter. Response Refer to proposed mitigation plans in Section 4.4.Also note 1etter of January 5,1982,was responded to on Apr il 1 4,1982 • r;r-l - ,.... i I - .- ! I. !""'" I W-3-412 We are concerned with the generality and lack of quantifica- tion of this section.Using the vegetation remapping,a successional model should be applied;the selective clearing and maintenance to be used along the transmission lines should be factored into that model.Areas within each type to be impacted and vegetation type changes over the project life can then be calculated.Maps of the proposed transmission line corridors should also be provided. Response Please refer to Section 3.3,Botanical Resources impacts.Vegetation remapping is not yet available. Maps appear in Figures E.3.32,35,and E.3.49 to 52. W-3-413 (i)Big Game -Cook Inlet to Willow:Paragraph 1:Again,the degree of impact will depend on the type of clearing and maintenance and thus,habitat al terations which result.We have recommended selective clearing,winter and helicopter construction and maintenance and controlled access along the line.Maintenance should involve selective clearing and topping of trees and tall shrubs to help maointain increased forage production.We agree that transmission line clearing may increase moose and black bear carrying capacities if vegetation types which can be enhanced are present along tile 1i nee Thus,we recommend quantifying the types present and their value to big game. Response Methods have been more thoroughly described here and in Section 3.3.Types present are described in Table E.3.77 to E.3.79. W-3-414 Paragraph 2:Please describe the presence or absence of moose calving grounds and bear denning sites.The cumulative impacts of the transmission lines in conjunction with existing disturbances should be discussed. Response Surveys for such features have not been conducted • W-3;.415 -Healy to Fairbanks:Again,quantification of types to be impacted and successional changes over the project life should be provided. Response Types affected appear in Table E.3.86.See Botanical Resources for description of successional types. W-3-416 -Willow to Healy:Please refer to our January 5,1982 letter regarding the dependence of the Susitna project on the Intertie.Thus,we recommend full consideration of impacts from the Intertie within this analysis.Quantification of impacts is needed,as above. Response The Intert ie is descri bed and evaluated ina separate report.Additional impacts resulting from the Susitna Hydroelectric Project are thoroughly described here. See the Power Authori ty response to the FWS 1etter of January 5,1982. W-3-417 -Watana Dam to the Intertie:Please provide a quantification of impacts,as above. Response Where quantification is possible,data have been provided. W-3-418 11 Furbearers:Para ra h 3:Pl ease refer to our comments under Section 4.3 c viii regarding inconsistencies between Chapters 3 and 5 in presenting impacts.We are also concerned with inconsistencies between the increased access acknowledged here and mitigation guidelines to prohibit such access (Appendix EE,item 1);please clarify.Our previous recom- mendations to quantify impacts apply here too. Response Transmission corridor impacts have been largely rewrit- ten.Impacts anticipated as a result of use of the design described here and in Chapter 3 are dealt with in this section.Section 4.4 treats design changes and other actions which will mitigate for such impacts. Quantification has been provided where possible. W-3-419 (iii)Birds:Paragraph 1:We recommend providing references for the broad conclusion that species diversity may increase near the transmission lines.Removal of nest and forage trees will decrease available habitat for species such as pine gros- beak and boreal chickadee. - .- - Response The text has been altered and references added • W-3-420 Paragraph 2:We concur.Please also refer to our comments under Section 4.2(c)(i)regarding continuing peregrine falcon surveys. Response Comment noted.Pl ease refer to our prev ious comments regarding 1 ikel ihood of peregrines occurring in the area and surveys for them as part of a mon itoring effort. W-3-421 paragra~~4:Powerl ines are particul arly deadly to swans.!f However,mortality from collisions,not elec- trocution,is the major adverse impact to swans.Locating and marki ng 1 ines is the key to min imi zing that impact (see our comments under section 4.4(c). Response ",.. I W-3-422 W-3-423 We concur -clarification has been provided. We recommend expanding thi s discussion to describe:(l)the potential for swan collisions;(2)migrations of swans through the project area;and (3)swan use of remote 1akes,including those in the Matanuska-Susitna Valley,for nesting and rear- ing.Refer al so to our comments on inc reasi ng develorrnents and disturbances which have caused swans to abandon areas, Section 4.3(a)(xv)-Disturbance,and our January 5,1982 1etter to Er ic Youl d,as above. Response Text has been rev i sed. (e)Impact Summary We are concerned wi th the emphasi s of thi s summary on impacts which can be most easily mitigated.Consideration should al so be given to documenting unavoidable,adverse impacts,cumula- tive project impacts,and differences between long-versus short-term impacts.The uncertainty of predicting project impacts on the basis of existing information are clearly apparent here. Response The impact summary has been largely rewritten.Emphasis is concentrated on what are considered to be the most serious anticipated impacts.Impacts which are consid- ered unlikely or of small consequence are not treated in the summary except where they are considered to have a potentially significant cumul ative impact. W-3-424 Paragraph 2:We concur that increased human use is positive, but the habitat alteration and disturbance which may also result from increased access are often a significant negative impact to wildlife populations.There is a need to integrate this discussion with those in Socioeconomic and Recreation Chapters of the exhibit. Response The posit i ve and negative effects of access have been discussed in the appl ication.The appl ication has been improved to better document the considerable interaction between the recreation and wildlife programs.A section on socioeconomic/wildlife relationships has been added to Chapter 3. W-3-425 Paragraph 3:We recommend also considering habitat values and how they relate to wildlife populations over the life of the proj ect. Response Where habitat val ues can be assessed meani ngfully,they are indeed considered.The modeling approach for moose is an example.However,for many species,habitat value cannot be assessed. W-3-426 (i)Big Game:Paragraph 1:As above,the increased access afforded to hunters is more of a concern from the standpoint of resultant popul ati on di sturbances and habitat alterations, assuming that harvest is regulated to protect population levels. Response Changes in population numbers of big game species attri- butable to hunting can be easily documented.In con- t rast,few cases are avail abl e where di sturbance and habitat alteration,such as that anticipated for this project,have measurably affected population size.The emphasis has therefore been placed on direct hunting mortality rather than disturbances or habitat changes. W-3-427 Paragraph 3:We are concerned with the subjectivity of the fi rst sentence here.Pl ease provide quantitat ive data for comparison with the previous paragraph to justify the relative magnitude of project impacts. Response Section has been rewritten. ..... - - .... W-3-428 Mention should also be made that project impacts will be particulary critical during years of severe winter.During such years,an additional impact to be considered would be moose/vehicle collisions.Cumulative impacts are also of concern with moose. Response Section has been rewritten. W-3-429 Paragraph 4:Inability to predict major impact on caribou,as cited here,is a serious data gap.We recommend describing additional information to be gathered to help make such predictions.Be.st and worst case impact scenarios should be described to provide at least an indication of how caribou could suffer from increased disturbance,impacts near calving areas,Bnd alterations in seasonal movements. Response Section has been rewritten. W-3-430 Paragraph 6:Aga"in,cumulative impacts are a concern in eval- uating overall project impacts to both brown and black bear. Response Section has been rewritten • W-3-431 Paragraph 7:Di sturbance from increased access and the pre- sence of human acti vit i es shoul d be the more di rect concern here (please see our comments under Section 4.3[a][vi]). Response Section has been rewritten. ".... W-3-432 tin Furbearers:Paragraph 1:We again note the potential or redfox populations to decrease as coyote populations increase (pl ease see our comments under Section 4.3[a][xiii]). Response See o~r previous responses. W-3-433 Paragraph 2:We suggest cl arifyi ng these concl usi ons to be consistent with previous impact descriptions,e.g.Section 4.3(a)(ix),paragraph 1,page E-3-315,says beaver populations are likely to increase;this paragraph says they II may i ncrease ll ,downst ream (page E-3-371).We agai n recommend des- cri bi ng the water management regimes under whi ch furbearer populations will most likely benefit.Overall,we are con- cerned with the uncertainties expressed in this discussion and recommend that additional furbearer work be considered,to satisfy these uncertainties (e.g.we suggest focusing on beaver and pine marten per our comments under Section 4.4[bJ). Since impacts to valuable habitat in the vicinity of Deadman Creek can be mitigated by alternative road siting,they should be described here. Response Section has been rewritten. W-3-434 (iii)Birds:We recommend also describing the negative im- pacts from swan collisions and raptor electrocution with transmission line development.Similarly,disturbance to nesting swans and raptors is another negative impact which should influence mitigation planning. Response The text has been a lte red to mention those negat i ve impacts.Disturbance to birds was preViously mentioned as a primary effect.Disturbance to nesting swans is doubtful.All swan nests are well removed from the immediate project area.Potential disturbance has influenced mitigation planning (see mitigation section and impact section). W-3-435 4.4 Mitigation Plan:As with the mitigation plan for Botan- ical Resources,we find the mitigation plan for wildlife incomplete and too general.Our detailed comments on lack of quantification,lack of integration with other resources evaluated,and need to consider the full range of mitigation options possible should be considered here as well (see Section 3.4). Because the wi 1dl He anal ys i sis much more qua 1itat i ve than quantitative,we commonly found the emphasis on minor impacts rather than on major ones.A similar misemphasis is in the mitigation plan where attention is often focused on small, more easily mitigated impacts.Alternatively,severe impacts are left to undefined and uncertain mitigation measures such as later habitat enhancement and/or lands acquisition.Please refer to our earl i er comments on the need to cl ari fy overall project mitigation o~jectives (Section 4.1). - Response We have attempted to clarify and augment mitigation measures and impact assessment in response to your comments.However,differences of opinion remain in some instances.We have presented impacts we consi der significant and indicated our analysis,based on avail- able information,of each impact1s gravity.Where data are available,we have provided elaboration and defense of our analysis;thus,the emphasis on treatment of some issues over others.In addition,when impacts are hypo- thesized to which no defensible probability of occur- rence can be provided,the mitigation plan suggests action appropriate to the relative magnitude of the impact in terms of its effect on population size or carrying capacity (as determined by supportive data or scholarly opinion).We have attempted to more carefully describe measures necessary for choosing areas and tech- niques for replacement and out-of-kind mitigation. W-3-436 This section should clearly explain why mitigation measures al ready recorrvnended by FWS and other resource agencies have not been adopted.For example,negative impacts to wildlife from the Denali Highway to Watana development access route are consi stently documented throughout the report:the road wi 11 result in substantial di sturbances;the Deadman Creek area paralleling the road is particularly important habitat to numerous wildlife species (e.g.calving moose,Section 4.2[a][i]-Distribution.S ecial Use Areas:Calving Areas: Paragraph~;brown ear denni ng,Sectlon 4.3 a i v -Constructi on:Paragraph 10;cari bou movements,Secti on 4.3[c][ii];wolf denning,Section 4.3[c][vi];valuable beaver habitat,Section 4.3[c][viii];bald eagle nesting,Section 4.3[c][ix],etc.).Mitigation of these impacts can be effec- tively accomplished by completely avoiding the impact,that is alternative siting as recommended in our August 17,1982 1etter to Eri c Voul d and further detail ed in our comments on the Botanical Resources mitigation plan,Section 3.4(c)(ii). Response Refer to responses to general comments rai sed in the cover 1etter of January 14,1983,and/or treated in Chapter 10 describing the alternatives for project features.See Section 4.4.4 -Documentation of Agency Recommendations. W-3-437 We also request that you (1)confirm the inclusion of recom- mended measures in project design,and (2)clarify the extent of publ ic access and uses in the project areas throughout planning,construction,and operation of the project.For example,please specify the extent to which the environmental guidelines in Appendices EA to EE have and will be guaranteed in project design and operation. Response This document represents a guarantee by the Alaska Power Authority that actions indicated herein will be incorpo- rated into project design and operation.Appendices referred to above were guidelines for design,not design stipulations and mayor may not be incorporated by the Alaska Power Authority. W-3-438 Establ ishment of a monitoring and follow-up program for all phases of project construction and operation is an essential feature of the mitigation plan.Key components of this pro- gram are that it:(1)include appropriate federal,state,and local agency participation;(2)be fully supported by project funding;and (3)be utilized to modify,delete,or add to the mitigation plan in response to both information from ongoing studies and needs which become apparent as project impacts are realized.While monitoring by itself is not mitigation, acti ons taken as a result of that monitori ng can ensure the effectiveness of the implemented mitigation plan. Our final general recommendation on the mitigation plan is that continuing consultation between the license applicant and resource agencies include initiation of working sessions with project design engineers to fully incorporate wildlife mitiga- tion plans. Response See Section 4.4.2(a),Continued Monitoring and Study Needs,and Section 1 for a description of a proposed structu re for interact ions wi th appropri ate agency and project personnel to insure a flexible and adaptable mitigation plan.Also see the Power Authority response to FWS covering letter of January 14,1983. W-3-439 (a)Big Game (i)Moose:Paragraph 3:We concur with the processes now being used to quantify probable impacts of habitat loss and to develop selection criteria for replacement lands.Our pre- vi ously descri bed concerns for the need to evaluate habitat values are of particular note here;habitat quality must be a factor in quantifying the areas of specific land parcels which are to be enhanced or acquired as mitigation.A schedule for the availability and incorporation of this data into project plans is al so needed.Some assessment should be made of the locations and potential sizes of such areas. - I"""", - - Response Forage avail abil ity,as measured for the model ing approach described,is a measure of habitat val ue.For moose this infonnation is obtainable and represents a habitat characteristic of primary importance. W-3-440 Paragraph 5:Further deta il s shoul d be prov ided on the sc he- dUle,potential size,habitat types,and studies,which would be involved in the Alphabet Hills burn.Land ownership,vege- tation types,and other constraints to the potential val ue of burning or other manipulations to enhance habitat should also bed e sc rib ed • Response Details on the proposed Alphabet Hills burn are provided in Section 3.4.2.Land ownership constraints and a description of the potential to increase browse by burning and other techniques are also described. W-3-441 Paragraph 6:Please clarify the criteria to be used in re- pl acement land sel ection.We caution that repl acement 1ands only contribute to offsetting unavoidable habitat quality losses elsewhere when:(a)habitat value of the replacement land would be degraded by some predictable means other than the project during the life of the project but,through man- agement for fish and wildlife,that degradation could be prevented;or (b)replacement lands are currently degraded and thro~g h management for fi shand wil dl ife,produc tiv ity coul d be increased over the 1 ife of the project;or (c)through management of fish and wildlife,the productivity of an exist- ing natural unit of habitat could be increased by reducing or el iminating one or more factors 1 imiting its productivity. Identified replacement lands must be a manageable unit. Response See Section 4.4.2(b)-Mitigation Plan 6. W-3-442 Paragraph 7:To maintain the increased value of managed habitat,provisions should be included for ongoing management' of them until such times as the project area is returned to the pre-project state. Response Management obl igations will continue through the 1 icense period. W-3-443 Paragraph 8:The maximum design speed of 40 miles per hour referred to in Appendix EC,item 1,should be assured here as one means of minimizing the potential for moose/vehicle collisions. Response A variable speed design has been incorporated (not a maximum 40 mph design).This design will not signifi- cantly reduce the potential for moose/vehicle colli- sions.It will,however,reduce loss of sensitive habitats. W-3-444 Paragraph 9:We strongly support the proposed Envi ronmental Bri efi ngs Program and recommend that it be a mandatory requi rement for all project personnel before they begin work on the project. Response Comment noted.See Mitigation Plan 15. W-3-445 Paragraph 10:Assistance from APA in regulating access should also be for the purposes of minimizing habitat degradation and unnecessary disturbances. Response Comment noted. W-3-446 (ii)Caribou:Provisions to monitor and remove logs and other debris from the impoundments should be included in the overall project monitoring program.This will ensure that such debris does not inhibit caribou movements (see Section 4.3(a)(ii)- Filling and Operation,paragraph 9). Response This has been incorporated as Mitigation Plan 9. W-3-447 (iii)Dall Sheep:Please descr"ibe how the prohibition of visits to the Jay Creek mineral lick is to be enforced.We recommend that the porti on of the reservoi r adjacent to the 1 ick be closed to boat and floatplane use.We suggest that the effectiveness of any measures to expose new portions of the mineral lick be demonstrated and then incorporated into the mitigation plan if effective. Response See Mitigation Plans 10 and 13. ..... .- ,.... .- .... ,-, W-3-448 (iv)Brown and Black Bear:Paragraph 2:We strongly concur with recommendations to promptly incinerate garbage and fence camps.Experience from other projects (e.g.Terror Lake hydroelectric project)shows the need to clearly sign and monitor gate closures to maintain the effectiveness of fencing.The Environmental Briefings Program referred to under Section 4.4(a)(i),paragraph 9,is particul arly applicable here. Response Comment noted.This impact is treated in detail in this document.See Mitigation Plan 15. W-3-449 Paragraph 3:The habitat values to be gained from mitigation measures referred to here must be quantified before any miti- gation for bear impacts can be claimed. Response Comment noted.See Mitigation Plan 6 and Section 4.4.3 -Residual Impacts • W-3-450 (v)Wolf:Please refer to our comments in the previous para- graph about quantifying recommended mitigation measures • Response Comment noted.See Section 4.4.3 -Residual Impacts. W-3-451 Beaver and pine marten are both ecologically and economically important;mitigation of some project impacts is possible.We recommend revising the first sentence to describe what pro- cesses and/or criteria were used here in deciding to emphasize beaver and pine marten in mitigation planning. Response Mitigation Plan has been rewritten.Prioritization of beaver and pine marten has been justified in all fur- bearer sections. W-3-452 Potential benefits to other species from beaver activities is the type of minor ~mpact we believe to be overemphasized while more significant and difficult to mitigate impacts are not treated as thoroughly.For example,beaver activities may confl i ct with slough management pl ans for sal man.Moreover, benefits from beaver activities may ultimately be negated by increased trapping which will be facilitated by project access and transmission corridors.The consistent lack of quantifi- cation in the draft Exhibit E precludes evaluating the sig- nificance of any such benefits relative to overall project impacts and recommended mitigation measures. Response Comment noted. W-3-453 Paragraph 2:We recommend discussion be provided on how proposed mitigative siting of the transmission corridor for pine marten will conflict with,or benefit,other wildlife species. Response See Impacts Section on Transmission Corridor for other species. W-3-454 Paragraph 3:Per our previous comments,we recommend coordi- nating the discussions of impacts and mitigation measures between Chapters 3 and 5.We see a need to cl early and con- sistently state project objectives in both chapters.We concur that workers and their famil ies be prohibited from trapping or hunting while working in the project area and request assurance that such prohibitions will be part of project pl ans. Response See Section 4.4.4 -Documentation of Agency Recommenda- tions. W-3-455 Although increased access may be viewed as a net benefit to trappers,habitat degradation,disturbances to the population, and confl icts with project management (e.g.removal of beavers which confl ict with road culverts)woul d resul t in 1ess than expected benefits to these groups.Thus,we recommend continued monitoring to assess that potential.We al so then recommend that a process be developed for implementing further mitigation (e.g.,recommendations to the Game Board on greater harvest restrictions,habitat manipulations,alternative flow regimes,etc.),should these efforts fail or impacts be found more severe than intially evaluated. Response See Section 4.4.2(a)-Cont"inued Monitoring and Study Needs and section 4.4.4 -Documentation of Agency Recommendations.Also Mitigation Plan 18. W-3-456 Paragra8h 4:We request confirmation that project design plans w,ll not include gravel extraction from Deadman Creek. Please provide further information on how disturbance of riparian vegetation will be minimized. Response Confirmation provided in Mitigation Plan 17. .... ,fMi/III(It. W-3-457 Paragraph 5:Pl ease refer to our comments under Secti ons 4.3(a)(ix)and 4.3(b)(ix)re the need for quantified data to support the conclusions here.We strongly support the proposed monitoring and model development programs.These programs should also be the basis for verifying impact predictions.Although by itself monitoring does not mitigate project impacts,it should be the basis for determining additional mitigation needs. Response Comment noted. W-3-458 Paragraph 6:We concur.To maximize the effectiveness of the mitigation plan,we recommend continuing studies to fill data gaps,quantify conclusions given here,and cOll1plete habitat models for beaver and pine marten.. Response See Mitigation Plan 18,also Section 4.4.4 -Documenta- tion of Agency Recommendations and Section 4.4.2(a)- -Continued Monitoring and Study Needs. W-3-459 (c)Birds (i)Raptors and Ravens:Paragraph 1:We recommend expanding the list of major impacts to include loss of hunting habitat, a corollary impact to the loss of nesting habitat identified here.A mitigation need we have repeatedly recommended is realignment of roads and transmission corridors away from riparian corridors and other wetlands valuable in migration, as well as breeding (e.g.letter from FWS to Eric Yould,5 January 1982). Response Some realignment of road and transmission corridors has been made (see Figures E.3.79 to 82)It is agreed that loss of hunting habitat to raptors is a valid impact that must be addressed.However,it is not agreed that loss of hunti ng habitat will be a major impact compar- able to loss of nesting habitat.It is a misconception that raptors are primari ly food 1 imited (see Newton 1979).For instance,cliff-nesting habitat consists of fi xed geol ogi cal features whose di stri buti on and number are considerably more restricted than "hunting habitat" for raptors that often range cons i derab 1 e di stances to hunt in a variety of land form and habitat types. Furthermore,it shoul d be poi nted out that for many raptors,"hunting habitat ll and productive areas of prey habitat,including riparian zones and wetlands,are not necessarily equivalent.Such habitats are,of course, important--they tend to produce or concentrate prey spec i es,but they also provi de escape cover for prey species.Several large raptors,including gyrfalcons, peregrine falcons and golden eagles,have difficulties hunting in these areas.Instead,they tend to hunt over them for avian prey or in open,coverless terrain somewhere near them because "hunting habitat"must also afford prey availability and vulnerability.Peregrine falcons provide an excellent example in that the three- dimensi onal "gul f of ai r"over ri vers in front of and extending either side of their river cliff nesting locations is primary,important "hunting habitat"(see Roseneau et ale 1982).Nearby wetlands,forests,and riparian areas produce and harbor prey,but the prey are caught as they cross through thi s gul f of ai r.Land birds are especially vulnerable because they cannot (some try!)take advantage of the water as escape cover. Thus,some of the very best peregri ne nest i ng habitat is found only along major rivers,regardless that similar cliffs also may be present on narrow side tributaries. In the case of the Watana impoundment,riparian habitat (prey product ion)wi 11 be lost,but on the other hand, the wide,long water body will in turn provide excellent hunti ng habitat (prey vul nerabi 1 ity)for some raptors as prey species from other nearby,untouched terrestrial habitats cross it.In general,most raptors,including eagles and falcons,are very opportunistic hunters and are capable of and do take a wide range of prey species and sizes of prey.This tends to buffer them from some oft-times marked changes in availabil ity of some prey species.and it tends to allow them to utilize a wide variety of habitats (e.g.,golden eagles successfully inhabit and exploit mountains.forests and sea coasts from temperate latitudes to arctic latitudes).To quote from the USHJS Alaska Peregrine Falcoln Recovery Team Recovery Plan (draft-April 1982)for Alaskan peregrines, "A significant alteration of large areas of hunting habitat woul d result ina reduct i on of prey abundance. Minor habitat alterations by man,such as roads. probably do not destroy a large enough percentage of the habitat to be of consequence."And it needs be remembered that many forms of habitat alterations produce open areas that in turn enhance prey vul nerabi 1 ity. W-3-460 Furthermore.we recommend that the monitoring program include continuing surveys for peregrine falcons (see Section 4.2(c)(i))as well as other raptors (see Sections 4.3(b)(xiv) .Habitat Loss).to confirm their absence in construction activities areas. .... ..... - - r I Response The monitoring progam would automatically include moni- toring for presence/absence of peregrines.However,we also wish to refer you to previous comments regarding the quality of the area as habitat for this species--at best it is marg ina1 habitat,and it is doubtful t"hat more than the odd peregrine or t\'Kl wi 11 ever naturally inhabit it. W-3-461 We are concerned with the emphasi s on creating artific ia1 nests.That emphasi sis based on the asslll1pti on that nest sites are the 1 imiting factor to raptor use of the project area.Thi s has not,to date,been adequately supported by on-going studies.For example,overall loss of feeding habi- tat may negate potential benefits from such structures. Response We appreciate this concern.However,most raptors in most regions are in fact rimari1 limited b occurrence and availability of nesting locations e.g.a cliff or stand of trees which may contain one or more nest sites --a pair may have one or more alternate nesting loca- tions)and nest sites (the actual nests or ledges used by the pair--a pair may have one or more alternate nest sites at a given nesting location).To quote from Newton (1979),who has stlTlmari zed thi s aspect of raptor biology quite well ("popu1 ation Ecology of Raptors, Buteo Books,Vermillion,South Dakota,and T.&A.D. Poyser Ltd.,England): IIRaptors are among the few groups of birds whose numbers and nest success are in some regions clearly 1 imited by the avail abil ity of nesting p1 aces.To pick an obvious examp1 e,most cl iff-nesters are restricted geograph- ically to breeding in areas with cliffs.Within such areas,their breeding density may be 1 imited by the number of cliffs with suitable ledges,and their breed- ing success by the accessibil ity of these 1 edges to predators.Other raptors may be 1 imited in open 1 and- scapes by a shortage of trees,and even in woodlands, nest-sites may be fewer than they at first appear.In a 1 arge area of mature forest in Fi n1 and,1 ess than one in a thousand trees were judged by a biologist to be suit- able for nests of white-tailed eagles,while in younger forests,suitable open-crowned trees were even scarcer or non-existent.More concrete evidence that lack of good nest sites may often restrict breeding density or success came from the experiments described in Chapters 3 and 16,in which pair numbers increased or success improved following the provision of artificial sites." W-3-462 -Creating Artificial Cliff-Nesting Locations:We concur with the recommendations to contin ually monitor for nest destruc- tion and to provide additional mitigation later,if found necessary. Response Commen t noted. W-3-463 -Creating Artificial Tree-Nesting Locations:Paragrah 1: Please provide or correct the cooplete reference for creating successful bald eagle nests;it was apparently omitted from the bibliography.We question the suitability of presently unused habitats cited here as potential nest sites.Since eagles are not using these areas,food or some other habitat parameter may be limiting. Response The reference has been added to the bibliography section (see Olendorff et al.1980).It must be noted that there is a distinct difference between providing artifi- cial,but natural appearing nests (repl icas)in appro- priate suitable habitat,and providing other devices, including artificial platforms and nest structures.It must also be noted that when bald eagle nests have been rebuilt to replace nests that were lost nearby,these attempts were successful in virtually every case.Such attempts have been 1 imited in number primarily as a result of lack of opportunity,interest,funds or other circumstances,not because they are unl ikely to work. The state-of-the-art is such that modifying habitat and constructing nests near the project area is a rel atively small step beyond rebuilding blown down nests.It is correct to assume that some habitat parameter may be limiting bald eagle use of the unused habitats suggested for mitigation measures.However,for various reasons, including some of those mentioned in regard to loss of hunting habitat (see above)and the presence of several species of fish,especially in two of the areas (e.g •• spawning chinook and sockeye salmon in Portage Creek and white fish at its mouth.and similar fish stocks associated with Prairie Creek--see Section 2)and nearby ponds and lakes supporting water birds (e.g ••between Indian River a[ld Portage Creek,and between Portage Creek and .Dev il Creek.and Stephen La ke v ic in ity),it is unlikely that food is a limiting factor.Instead.it appears that these areas are little used because of an absence of appropr iate nesting 1 ocati ons {an extremel y important "habitat parameter"(again,see Newton 1979). The best example is Portage Creek.Considerable balsam poplar (a tree species especially favored by bald eagles in northern.non-coastal regions)are located along it. .- ..... - ,.,.. I Many of these trees are 1arge enough to support bal d eagle nests,but stands tend to be dense,canopies tend to be closed and format i on of the branches tends to be less than desirable.All basic factors considered (e.g.,food sources,land form,vegetation cover, reasonable proximity to the project area where some existing,albeit limited,nesting habitat with nests will be lost),and reasonable proximity to other nesting areas (e.g.,Deadman Creek,main channels downstream from Indian River)suggest that habitat mOdification and enhancement along Portage Creek woul d provi de a reasonable (or better)chance to successfully replace bald eagle nesting locations that will be lost as a result of the Susitna Hydroelectric Project. W-3-464 Paragraph 2:We suggest expanding the discussion to describe the comparabil ity of habitats,ci rcumstances)and speci es of birds using artificial nesting platforms as listed in Table W81.The success of those efforts may not be directly applic~ able to the project area,given the different habitats and species involved.Please include information on whether such structures have ever been successful in Alaska. Response Additional information has been provided in the text • Table E.3.176 was provided to show a range of examples of devices and species,and to show general applicabil- ity to raptors as a group.Some species listed eagles,red-tailed hawks,American kestrels)are the same species that occur in the project area,and the success of these efforts is clearly applicable to the project area (e.g.especially for golden eagles!). Differences between project area habitats and habitats where successes have occurred must be recognized. However,this is not a major issue when compared to the basic biology and behavior of the species,and choosing appropriate designs for nest sites.Many of those species,including golden eagles (a species that will perhaps be impacted by the proj ect to a greater extent than any other)are adapted to a wide range of basic habitat types (forest,mountain,seacoast,warm desert, cold arctic "desert").They make use of these habitats as long as an adequate prey base is available (most areas),and more importantly,as long as suitable nesting locations and nest sites exist in them (only in some areas).(Again,see other comments on food vs nesting locations and nest sites as limiting factors; also see Newton 1979.) Examples of successful use of many of these structures in Alaska are unavailable,because no attempts have been made to try them in Alaska.However,some examples of a few are avai 1ab 1e.Boreal owl s have readily accepted nest boxes placed out specifically for them near Fairbanks.(At least two attempts involving several boxes each--both attempts successful.D.G.Roseneau and W.Tilton pers.com.)).Hawk owls have nested in one nest box in spite of its being designed for boreal owls (W.Tilton pers.comm.).A ledge,unusable to gyrfal- cons,was Jlodified to repl ace a nest 1edge that was becoming unstable on a cliff--gyrfalcons have since nested in it (.0.G Roseneau and W.Walker,unpub 1. data)(also see text).Successes elsewhere in the world and new techniques currently being developed (with some modification of course,or individual species,partic- ular habitat situations and other particular circum- stances)clearly suggest there is little reason to doubt applicability to Alaska (in general)and the Susitna River drainage (specifically). W-3-465 -Seasonal Restrictions:We strongly support the measures included here with the addition of three points.First,we· recommend coordinating with project design engineers to ensure that such timing and siting restrictions are fully incorpor- ated into project designs,schedules,and cost estimates. Secondly,our previous comments on the need for follow-up monitoring of raptor nesting in response to construction activities are critical here.Finally,for bald eagles,we recommend there be no blasting with 0.5 miles of nests. Response We concur.However,we see no reason to restrict blast- ing to 0.5 miles or farther if the nesting location is inactive at the time the blasting occurs (non-breeding season,or nesting location unoccupied in a given breed- ing season).In fact,blasting could be conducted rela- tively close to the nesting location (as long as it and perches are not destroyed)under such circumstances. W-3-466 (i i)Waterbi rds:Paragraph 1:We recommend revi si ng thi s paragraph to describe factors which may limit benefits out- lined here (see our comments under Section 4.3(a)(xv)).An additional concern we believe should be described here is the potential for collisions of swans with transmission lines. Response Paragraph has been revised. ..... , -, - W-3-467 Paragraph 2:We recommend that the monitoring program described prev i ously shoul d be coordinated with ongoing FWS surveys for trumpeter swans and other waterfowl,with partic- ular attention to the impacts of project disturbances on trumpeter swans.We again note the importance of carefully siting all project facilities,roads,and transmission lines away from wetl ands (as being remapped),incl uding stream corridors and lakes.Since trumpeter swans and other water birds frequently migrate along stream corridors,siting and 111 ark ing 0 f t ran sm iss ion 1 ine sis pa r tic u1 ar 1y cri tic a1 to avoid collisions and electrocutions in those areas. Response Thi s recommendation will be considered during formul a- tion of detailed study plans for FY 1984. W-3-468 (iii)Other Birds:We again note the ecological importance of these species.We recommend that nest and roost boxes be considered as mitigation for passerines.Hairy woodpecker, boreal chickadee,and brown creeper would all adapt readily to such structures.These three species populations would be reduced by 10.1,7.4,and 19.9 percent,respectively.The hairy woodpecker is on the National Audubon Societyl s "Bl ue List"and is thought to be declining in the Pacific Northwest. We also recommend that all unavoidable adverse impacts from the project be fully acknowl edged. Response We concur with the ecological importance of all species. We have noted the recommendation concerning mitigative measures for passerines.The same recommendation is al so noted in regard to woodpeckers,al though wood- peckers (order Piciformes)are not passerines.These recommendations will be considered during formul ation of detail ed stUdy pl ans for FY 1984. W-3-469 (d)Small (non-game)Mammals:We refer you to our comments above,re fully acknowl edging unavoidable adverse project impac ts. Response Comment noted. W-3-470 Comments on Tables and Figures for Section 4 -Wildlife Overall,many of the tables and figures are incompletely foot- noted and referenced.Few wi 11 stand on thei r own and many are confusing or inconsi stent even when referring to the text. We recommend cleaning up the tables and figures to alleviate these problems in general,as described in our comments on the text of the report itsel f,and as specified below.Rather than commenenting on all editing or corrections needed,we have focused on major problems or points important in under- standing our comments on other porti ons of the document. Response Comments noted.Editing corrections have been made. W-3-471 Tables W21,W22 and W23:Pl ease include the nlJTlber of sites sampled in each community. Response Number of sites iampled appears in Table E.3.50.Loca- tion of sample sites is shown in Figure E.3.79. W-3-472 Table W64:We recommend footnoting a brief definition of "importance value ratings."Please provide dates for the s lJIlmer 1981 s urv ey • Response Dates and description of I.v.ratings appear in text where this table is referenced. W-3-473 Tables W65,W66,W68 and W78a:Please clarify how habitat types as classified here do or do not coordinate with the revised vegetation classification scheme.We are concerned that data manipul ations not obvious from the original refer- ences be fully described here (see section 4.2(c):Paragraph lJ· Response Thi s in formati on has been added to text and appears in Table E.3.139. W-3-474 Figure Wll:We suggest adding reservoir elevation levels. Response Such a change would imply a significant loss of range which is not at all the intent of the figure. W-3-475 Figures WIg and W20:We recommend incl uding some description of how II rel ativ e importance ll was determined and how "import- ance indices ll were calculated.Sources for this data should be cited here. Response These additions have been added to the text in sections which refer to these tables. .- I~ !"'"' I GENERAL COMMENTS -APPENDICES Convnent 1 Overall,we concur with the environmental guidel ines to the extent that they are presented here.However,we are con- cerned that the guidel ines are somewhat incomplete and lack specifics needed for effective implementation.Please specify the degree to which these guidel ines are being incorporated into project pl anning.We recommend that you expl ain any situations where the guidel ines will not be followed.In gest the definition include project camps,access roads both to and within the project site,and any construction areas (including the dams,borrow sites,disposal sites, etc.)• 8.Bl asting determinations should be made in consultation with the resource agencies.Such determinations could be incorporated into the previously recommended monitoring program (see our comments on Section 4.4:Paragraph 5). 9.Please discuss the feasibility of disposing of part,or all,of project spoil s within the impoundment area in accord with project scheduling.M estimate should be provided of the quantities which may be involved,or when those quantities will be determined.Stockpiling needs, and reclamation considerations should also be provided. We suggest thi s i tern be expanded into an additi onal appendix section similar to Appendix AD -Material Sites. 11.Please refer to our previous comments on the need to map permafrost areas (Section 3.2 and 3.3[a][ii]-Effects of Erosion and Deposition). 13.We recommend specifying that fertilization and seeding be initiated in the growing season immediately following si te disturbance.The "interagency mon itoring prog ram referred to in Item 8,above,should review and concur with species chosen for revegetation. 14.Please refer to our comments under Item 13,above. 15.We concur;again pl ease refer to our comments on Item 13. Initiating tes.t plots as part of continuing project studies would provide information on which successful site restoration can be based.Pl antings to provide wi 1dl ife food and/or cover shoul d al so be considered in dev eloping restoration pl an s. SPECIFIC COMMENTS -APPENDICES 3.A -All Facilities W-3-476 3.A -All Facilities 1.The referenced buffer to waterways or wetlands should be a 500-foot minimum width,not maximum width as presented here. 7.Please define project ufacil ity"as used here.We sug- gest the definition include project camps,access roads both to and within the project site,and any construction areas (including the dams,borrow sites,disposal sites, etc.). Trumpeter swan nests and caribou calving areas should be added to the 1 ist of areas to which the guidel ine is to apply. 8.Bl asting determinations should be made in consul tation with the resource agencies.Such determinations could be incorporated into the previously recommended monitoring program (see our comments on Section 4.4:Paragraph 5). 9.Please discuss the feasibility of disposing of part,or all,of project spoil s within the impoundment area in accord with project sc hedul ing •PrJ estimate shoul d be provided of the quantities which may be involved,or when those quantities will be determined.Stockpiling needs, and recl amation considerations shoul d al so be provided. We suggest thi s item be expanded into an additional appendix section similar to Appendix AD Material Sites. 11.Please refer to our previous comments on the need to map permafrost areas (Section 3.2 and 3.3[a][ii]-Effects of Erosion and Deposition). 13.We recommend spec ifying that fertil i zation and seeding be initiated in the growing season immediately following site di st urbance.The interagency mon itoring prog ram refe rred to in Item 8,ab ov e,s houl d rev i ew and conc ur with species chosen for revegetation. 14.Pl ease refer to our comments under Item 13,above. 15.We concur;again please refer to our comments on Item 13. Initiating test plots as part of continuing project studies would prov ide information on which successful site restoration can be based.Plantings to provide wildlife food and/or cover should also be considered in developing restoration plans. 16.We strongly endorse both programs outl i ned here.Refer- ence should be made to U.S.Coast Guard (C.F.R.33,Part 154[b])and Environmental Protection Agency (C.F.R.40, Part 112)regulations which requi re use of a Petroleum and Hazardous Substance Plan and Manual with such devel- opments.It should be mandatory for all project person- nel to take part in the Environmental Safety Program prior to starting work on the project. 17.We suggest that storage containers for fuels and hazard- ous substances also be located at least 1,500 feet from wetlands.All personnel involved in transfer and hand- ling operations for such materials should carry portable spi 11 contai nmentjabsorpt ion materi a 1s.Impervi ous mate- rial used to line containment areas should be securely tacked in place and frequently monitored for tears;such tears shoul d be promptly repai red and water whi ch may collect in the areas should be prrnnptly removed. 18.Please specify the degree to which this recommendation is bei ng foll owed as descri bed under our General Comments for these appendices. 19.We recommend addition of an item outl ining the need for the contractor to train personnel,prepare,and follow an erosion control plan which is subject to resource agency review and comment (see our comments on Section 3.4[d][ii]).That plan should then be incorporated into these guidelines. 3.B -Construction Camps 1.and 2.We concur and recommend that there be no truck- ing of garbage between camps;each camp should have its own incinerator capable of burning that day·s wastes. 3.We concur;please refer to our comments under Section 4.4(a}(iv)on the need to clearly sign and monitor all gates to ensure they remain closed.We recommend the interagency monitoring group review and concur with the fencing specifications. 4.We suggest that the recommended effl uent samp 1 i ng and testing program be outlined in construction camp design plans. 5.Again,resource agency review and concurrence should be i nvol ved. 3.C -Access Roads 3.We concur and recommend that the proposed program for identifying wetl ands in consultati on with the CE and FWS be used in access route siting (see Section 3.2[a][vi]). 5.Instream work should be scheduled to avoid critical spawning times and minimi ze sedimentation of downstream habitats. 6.through 10.Criteria should be included for determining when a culvert rather than a bridge can be used for stream c rossi ngs.Re source agenc i es shaul d be consulted in the develo~ent of such criteria. 13.We suggest adding,lias well as after significant stonn events"at the end of this item.This issue needs further definition. 3.D -Material Sites 1.We concur and recommend that the interagency monitoring program be integrated with the interdisciplinary team effort so that resource agencies are consul ted in the development and implementation of mining plans. 2.and 3.Pl ease identi fy the extent of borrow material s needed for project construction which may be available within the impoundment area,relative to the extent of borrow which will have to come from other sites.OUr comments under Appendix EA -All Facilities,Item 9,on stockpil ing and reclamation,and under Appendix EC - Access Roads,Items 6 through 10 re criteria for deter- min ing when to use the lower priority miti g ati on measure (e.g.,culverts instead of bridges;first-level terrace sites over well-drained uplands)apply here also. 7.We suggest that construction schedules be evaluated in order to determine optimum coordination and use of mate- rial and disturbance sites. 3.E -Transmission Corridors 1.We recommend addition of the phrase "an d maintained ll after the work IIconstructed"in Line 2 of this item.Our text comments on the need to fully integrate Intertie develo~ent with all other project transmission 1 ines apply here (see Sections 3.4[d][ii]and 4.4[d][i]- Willow to Healy). ..... .- r ! 3.Transmission towers should not be placed in wetlands,as defined by ongoing remapping efforts. 4.We concur,and suggest that selective cutting be used to control vegetation along transmission corridors. Appendix EG Pl ease provide the source for data cited which was not pro- vided by the University of Alaska Museum. Response Your specific comments have been noted.The referenced 500-foot maximum-width buffer was a typographical error; guidelines provided to project engineers recommended a 500-foot minimum-width buffer.All specific comments on the guidelines will be considered during detailed engi- neering design and construction planning • COMMENTS CONTAINED IN U.S.FISH AND WILDLIFE SERVICE LETTER OF JANUARY 14,1983 GENERAL COMMENTS -SOCIOECONOMIC IMPACTS -FISH &WILDLIFE Comment 1 We see this socioeconomic impact evaluation as an integral component of the overall evaluation of alternative means of satisfying energy needs in the least environmentally damaging way.Accordingly,we offer the following comments for consideration in the evaluation of these alter- natives. Evaluation of a proposal must examine impacts,positive and negative, and mitigation over the 1 ife of the proposal.Data bases provide the point from which this evaluation must progress.How this project could effect fi sh and wil dl ife resources over its 1 ife is strongly dependent upon how the proj ect in fl uences future user demand of those resources. This evaluation should incorporate:(1)a widely accepted projection of future popul at ion and economic growth (inc reasi ng user groups)or, if there is substantial uncertainty as to the val idity of key assump- tions (as we bel ieve there is),then a multiple scenario model should be pursued examining at least high,medium,and low projections;and (2)a tradeoff analysis examining the competing mitigation proposals for the different interests.Chapter 5 fa il sin respec t to both poin ts. The Base Case,as expressed in this document,is a minimum project impacts scenario.We are led to this conclusion by the following: 1.The recent downturn in State oil revenues directly leads to a down- turn in State spend ing.Inc rea sed State expend itures resul tin economic expansion which then attracts and supports the new popula- tion (Department of Policy Develop1lent and Planning (DPDP)Policy Analysis Paper No.82-10).The expected lower level of State spending should be reflected in decreased .economic expansion and population.One could deduce from this that without the project economic and population Base Case should be substantially lowered from what is presented in this doctunent.Since this turn of events obviously does not impact the cost of the project,the project soc ioeconomic impacts woul d be accentuated. Response Assumptions underlying socioeconomic forecasts of economic expan- .si on and popul ati on growth are consi stent wi th those used in the electric power requirements forecasts (see Exhibit D).Require- ments I forecasts are being reassessed in an ongoing study.If .- r r r- I ..... i" i r different forecasts are adopted,socioeconomic forecasts will be revised.(Note:Population growth for Anchorage and the Mat-Su Bo roug h has been more rapid during the 1 ast year than proj ec ted in the Base Case.Our Base Case population projections for future years in these areas might be too low.) Comment 2 With less oil revenue the state would need to concentrate a greater percentage of its income and/or bonding capability on this project. The state would then not be able to afford projects in other areas of the State.We therefore,bel ieve a closer look at statewide impacts is necessary. Response PERC does not require an assessment of statewide fiscal impacts as part of Chapter 5,Report on Socioeconomic Impacts.The FERC guidelines require aR evaluation of incremental local government expel'l~di tures in rel ati on to the incremental loca]government revenues that wou'lid resul t from the construc ti on of the proposed project.Informatlon about the state's bonding capabil ity under different scenarios is provided in Exhibit D. COl1D11ent 3 The power which this project would provide could act as an attractant to various industries,to the detriment of other areas of the state. Response It is unlikely that this project will act as an attractant to various industrtes;tsee SRI InternaUonal.July 1982.El ectric Power and Industrial Development Data for State Planning.Task III Report.Synthesis--Industrial Location Probability.Prepared for the Division of Policy Development and Planning,Office of the Governor,State of Alaska).The Base Case is i,ntended to approxi- mate a lImost 1i kely"scenario. Comment 4 Potenti al impacts due to the seasonal ity of the workforce is not fully addressed in this doclOTJent.Other hydro,power projects in Alaska,such as Terror Lake,and those constructed?in other remotely situated areas should be exam:ined to explore this potential impact. Response The discussion of potential impacts due to the seasonal ity of the work force has been expanded in Secti ons 3.2~..2 and 3.3.l(c).Your suggestion to examine impacts resulting"from seasnnal labor demands'of other hydropower projects in Al aska will be considered i,l'!'t.hedev elopnent 0 f future stud ie s. Comment 5 Impacts result from the number of people attracted by potential jobs not by the number of jobs created,either directly or indirectly.This is supported by the letter to Eric Yould dated March 27,1982,from the Alaska Department of Community and Regional Affairs (ADCRA). Response We agree that impacts will result from unsuccessful in-migrating job seekers.However,it is not possible to predict the number of unsuccessful in-migrating job seekers. As discussed in Section 4,Mitigation,a monitoring program will track this phenonomon.Information will be made available to impacted jurisdictions to help them identify the extent of disrup- tion and to indicate what can be done to reduce the disruption. Based on this information,measures to mitigate adverse impacts can be developed and implemented. The discussion concerning unsuccessful in-migrating job seekers has been expanded in Section 3.2.2.A full discussion of the types of impacts that could result is contained in (Dixon,Mim. 1978.What Happened to Fai rbanks?--The Effects of the Trans- Alaska Pipeline on the Community of Fairbanks,Alaska.Social Impact Assessment Series,No.1.Westview Press,Boulder, Colorado). Comment 6 The implications of Item 5 above regarding local and regional hiring assumptions and impacts to local communities. Response Local and regional hiring assumptions were made through analysis of unemployment data for laborers,semiskilled/skilled workers and administrative and engineering personnel;and discussions with local union officials,Alaska Department of Labor economists,and construction contractors.The assumptions provide the best esti- mates for sources of manpower for the project. We acknowledge that impacts to local communities depend,in part, On these assumptions.These assumptions cannot be improved,how- ever,until:(1)more accurate and detailed manpower requirements are developed (this will happen in the latter stages of detailed design work);(2)new unemployment data become available;and (3) labor negotiations are completed.Due to unknowns such as these, the socioeconomic forecasts with and without the project will be updated with new i nformat i on both before and duri ng construction activity.Information from the updated forecasts and the monitor- ing program will be used to develop appropriate mitigation mea- sures.This is discussed further in Section 4. ..... - ,.... i - ,...., ..... Comment 7 We have not previously had input into many of the decisions which were reached regarding the construction camp/village such as siting,type of camp,and administration.These decisions have large implications for the fish and wildlife resources and users.Consideration of a Prudhoe Bay type camp should be given.We are not aware of any construction camp alternatives having been discussed in terms of minimizing adverse impacts to fish and wildlife resources,and their use. As illustrated by many of our comments,we are concerned that not only were the resourceagenc i es not consulted previously on many of the actions described herein but that communication and coordination bet- ween the soc ioeconomic component and the fi sh and wil d1 ife resources components has been insufficient. Response We agree that construction camp/village siting,type and adminis- tration will have implications for fish and wildlife users.It will also have -implications for workers and impacts on communi- ties.The siting,type,administration,and other aspects of the construction camp/village will be further considered in the developnent of future study plans.My such plans will continue to prov ide for proper coordinati on between soc ioeconomic and fi sh and wildlife components. Comment 8 It is stated several times in this chapter that monitoring of impacts is proposed and that this program would add flexibility to the mitiga- tion program.We concur.However,we believe this monitor-jng team shoul d better refl ect the spi rit of the APA Mitigation Pol icy document. We bel i'eve a monitoring program should be establ ished,at project expense,consisting of representatives of appropriate local,state,and federal agencies,to carry out the function of assessing the extent of actua 1 impacts and recommending mod ificati ons to the miti gati on pro- gram.Modification of the mitigation plan,as represented in the 1 icense,would then be through 1 icense amendment. Response It is the intention of the Power Authority to establ ish a moni- toring program that responds to and impl ements the articl es of any forthcoming FERC 1 icense for the project. With respect to formulation of the specifics of the program,we invite and also expect your agency,as well as other regulatory enti ti es,to pl ay a maj or rol e in thi s effort.Wi th respect to monitoring the effectiveness of mitigation measures and compl iance with stipul ations of the 1 icense appl ication,we see that as the licensee's responsiblity. We expect that observations by the monitoring team will establish whether the mitigation programs are achieving their goal s.If they are not,the mitigation programs will be modified as will undoubtedly be required by the license. Comment 9 Modification of the Base Case to accommodate the concerns raised in the ADCRA letter of May 27,1982,and in our COOlments would dramatically change the impacts predicted and ul timately the mitigation requi rement. Additi onally,an assessment of soc i oeconomic impacts must be reac tiv e to other study components.For example,to evaluate impacts to users of fi sh and wil d resources,the impacts to the resources must fi rst be assessed.In that many of these resource impacts have not been suffi- ciently quantified,one could not expect an acceptably quantified socioeconomic analysis.This could only have lead to a highly general mitigation pl an,which is what we find here.In fact,reference is made to certain actions which (Section4.2(a),page E-5-91),II •••will be considered in the mitigation plan."A mitigation plan should be a part of this document,and be specific to the anticipated impacts based upon a broadly accepted data base.The burden of formul ating an acceptable mitigation plan is the applicants. Response One element of the Impact Management Program is to periodically update the Base Case (see Section 4.5).This will next be done in 1983.Your concerns and those rai sed in the ADCRA 1 etter 0 f May 27,1982,will be incorporated into this update. The socioeconomic component has been and will continue to be reactive with other study components.This interaction will intensify as the project enters the detailed planning and design phase,and as more in-depth fish and wildlife impact information becOOles avail able. As requested,the mitigation plan has been made more specific (see Sec t ion 4). - I""'" I r i' ..... SPEC IF IC COMMENTS 2 -BASELINE DESCRIPTION 2.1 -Identification of Socioeconomic Impact Areas W-5-001a 2.1(c)Impacts Areas -State (c)State:We concur that identifiable impacts would be con- centrated at the local level,and most difficult to evaluate on a statewide basis.It should be recognized that how this project is approached economically has tremendous impl ications for the state.If the state provides a grant of bill ions of doll ars,that money cannot be spent on other prog rams.Bond- ing of the project would have a large impact on the state l s ability to bond other projects.Additionally,the relation- ship between large projects and population growth should be given greater emphasis. Response Please see Exhibit D of the License Appl ication. The Institute of Social and Economic Research's Man-in- the-Arctic Prog ram model prov ides the rel ati onshi ps bet- ween large projects and population growth.This model is the best available in the state.It was used in both the el ectricity demand forecasts and the socioeconomic analysis.Future socioeconomic studies will include new asslJllptions for large projects and,therefore,new popu- lation growth projections. W-5-001b Increased state expenditure resul ts in economic expansion that attracts and supports the new population (DPDP Policy Analysis Paper No.82-10).The state would be impacted through ser- vices provided to this project caused higher population 1evel • Response We agree that the relationship between large projects and population growth is important.The specification of this relationship in the Institute of Social and Ec onomi c Re searc h t S Man-in -the-Arc tic econometric model is amon9 the best available.We used the results from several statewide and regional runs of thi s model in our baseline forecasts.Updates of the baseline forecast could also rely on results from updated runs of this model • W-5-002 2.2 -Description of Employment,Population,Personal Income and Other Trends in the Impact Areas (a)Loca 1 (ii)Population:Paragraph 3:Acceptance of the projected Mat-Su Borough popul ation figures woul d be on the basi s of a review and acceptance of the underlying assLDllptions.Without these we are left with what appears to be relatively high pro- jections which apparently come from a single source,the Mat-Su Borough,which could be viewed as having a vested interested in the project,and a high probabil ity that the projections rest upon by the original,outdated project eco- nomic analysi s.The impacts analysi s and mitigation pl anning is strongly tied to population projections with and without the project.We recommend that the data base be broadened and projections updated. Response We do not agree that the baseline (i.e.,without the Susitna project)population projections for the Mat-Su Borough are too high,nor that they were distorted by the input of the Mat-Su Borough.We agree that popul a- tion projections should be broadened and updated period- ically to reflect new knowl edge.These projections will be broadened and updated as part of future studies. These updates will incorporate new information on development projects,state government reven ues,and the resul ts of the monitoring of socioeconomic conditions in local communities before construction on the project starts. The projections of basel ine popul ation growth in the Mat-Su Borough were developed by the Alaska Power Authority.The only connection of the Mat-Su Borough government with these figures 1 ies in the use of the figures on the Borough l s popul ation in 1981 as the base- line from which future growth was calculated;these figures were derived from the Mat-Su Borough Planning Department's survey of population and housing in that year.A decision on the use of these data as a starting-off point instead of the 1980 Census data was made after an analysis of the available data on borough population growth indicated that the Census data were too low;thi s is not surprising,considering the rural and dispersed nature of population in Mat-Su Borough. The projections of growth in the Mat-Su Borough rest partially on the projections of growth in the Rai"lbelt region and in the state which were developed for the Railbelt energy requirements study by the Institute of - - - r I I, -! I Social and Economic Research.The scenario used was one of moderate economic developnent and moderate state government spending.The socioeconomics impact portion of the study used these projections in order to be con- sistent with the energy requirements study (see Exhibit D)• Calcul ations of the popul ation of the Mat-Su Borough over the next twenty years took into account the fact that growth in the borough over the past ten years has been increasing far more rapidly than the rest of the Railbelt (as many people who work in Anchorage began to move their residences to Mat-Su Borough)and that there is reason to believe that this trend will continue and perhaps accelerate.Thus,while there may be reason to bel ieve that the orig inal projection on popul ation in the Railbelt may be too optimistic,we still believe that the Mat-Su Borough will continue to grow rapidly as a result of its proximity to Anchorage and the large amount of relatively inexpensive land available for new housing.Recent popul ation estimates for 1982, developed by the Mat-Su Community and Regional Affairs, have supported thi s professional judgment.It shoul d al so be noted that the projections developed by the Al aska Power Authority for thi s chapter of Exhibit E are considerably lower than other sets of projections which the consultants reviewed during the course of their work and which have been used as the basis of planning efforts in the Mat-Su Borough. W-5-003 Paragraph 4:We recently received a Seoping Document (dated November 29,1982)for the Knik Arm Crossing from the Al aska Department of Transportation and Public Facilities (ADOTjPF). In that ADOTjPF is just beginning to evaluate the desirability of this project,it would be premature for APA'tO""view it as a foregone conclusion. Response The Power Authority does not view the Knik Arm Crossing as a foregone conclusion.When the socioeconomic base- l ine forecasts were made,it was assumed by the soc io- economics contractor that there would be a crossing in the early 1990s.However,this assumption does not affect the amount of population projected to be in the Mat-Su Borough.This assumption affects only the future distribution of popul ation in the Borough. W-5-004 Paragraph 5:Please discuss the assumptions upon which these population projections are based. Response The assumptions upon which popul ation projections are based have been added to Section 3.1.2. W-5-005 (b)Regional (ii)Population:Paragraph 2:We accept the underlying assumption that,in Alaska,population growth is strongly associated with natural resource development projects.Please identify the development projects that have been assllTled to be going forth.The recent downturn in state income,due to weaken ing of oil prices,shoul d be factored into thi s an aly- si s. Response The development projects that are assumed to be going forth are shown in (Battelle Pacific Northwest Labora- tories.1981.Alaska Economic Scenarios Review Docu- ment.Working Paper No.2.1,Railbelt Electrical Power Al ternatives Project.Prepared for the Office of the Governor,State of Al aska).Refer to the II mo derate case ll in thi s document. It has been more than a year since this development scenario was developed.Some projects that were asslJ1led to be going forth have been postponed,while others that were asslJ1led not to be developed are being developed. On bal ance,it appears that the current and 1 ikely future mix of development projects will have population effects that are similar to those associated with the moderate case in the document cited above.The Base Case update to be done during 1983 will include an updated develojlllent projects scenario as well as an updated state government spending scenario. 3 -EVALUATION OF THE IMPACT OF PROJECT W-5-006a 3.1 -Impact of In-migration of peo~le on Governmental Facilities and Services:Paragraph 2:T~e underlying assllllp- tions which lead to the conclusion that this project would have minimal impacts to the Mat-Su Borough should be discussed in greater detail.Peak project employment would be 3,498 (page E-5-37)and 95 percent of these workers would have dependents,with an average of 2.11 dependents (page E-5-44). This would lead one to believe direct project worker impacts woul d be more than 10,000 peopl e.If all these peopl e were housed at the construction site,we would have a city approxi- mately three times the size of Palmer,with all the encumbent I""" ! i" 1 ,..... - - - r needs of thi s si ze community.Thi s figure would be substan- tially inf1 ated by secondary and induced jobs resulting from the project.Spreading these numbers out over the small, local communities would be expected to result in significant adverse impacts. Response A fuller description of the methodology used to project the population influx associated with the Susitna pro- j ect has been added to the text in Secti on 3.1.2. As exp1 ained in the text,90 percent of the work force that moves into coomunities in the Mat-Su Borough will be accompanied by dependents.This high percentage is likely because workers with families will have the most incentive to move closer to the project,in light of the fact that housing facil ities for all workers will be available at the site.This is not to say that 90 per- cent of all workers on the project havefamil ies. It is true tha.t the work camps and family village at the work sites will have extensive public facility and ser- vice requirements.The project management will be responsible for providing these facilities and services. This is the reason that it is expected the impacts of the ons ite popu1 ati on wi 11 be min ima1 • The popu1 ati on inf1 ux assoc iated with the secondary and induced jobs generated by the project has been inc1 uded in the population influx projections. W-5-006b In the May 27,1982,letter from the ADCRA to Eric You1d,it was noted that,1I •••given the current state of the economy,it seems reasonable to expect a sizable influx of people from the Lower 48 seeking highly-paid employment,therefore competing directly with the local labor force.This was the state's experi ence during the Tran s-Al aska Pi pel ine proj ec t (TAPS) and,in fact,just recently for the as-yet to be started Al aska Natural Gas Tran sportati on System.Yet thi s proven phenomenon apparently was not considered in the analysis. This influx of people seeking instant riches in Alaska during major construction projects has historically contributed to impacts far in excess of what otherwi se might normally be expec ted.II In reference to,II •••the buffering effect of the expected continued increase of population,1I please refer to our Chapter 5 General Cormnents. (a)Watana -Construction Phase (i)Loca 1 Mat-Su Borough:As stated in our Chapter 5 General Comments,we find it difficult to accept that,Ilin most areas of the Mat-Su Borough,the population influx related to the project will only add slightly to the substantial increases in need for public facilities and services that will be resulting from the population growth projected under the Base Case.1l It is stated in the previously referenced May 27,1982,letter from ADCRA,liThe state l s experience has been that the impacts from large construction projects (most notably TAPS)are far in excess of what were originally anticipated.Those impacts were due to a substantially greater in-migration [SIC]of peopl e than those anticipated based sol ely upon the si ze of the required construction and support work force.This was due in part to a large number of people who migrated to Alaska with no intention whatsoever of seeking employement,at least on the construction project.Another unforeseen impact was in the secondary job market.In-migrants [SIC]competed for,and fi 11 ed,secondary and induced jobs,many of whic h were v ac ated by local residents obtaining employment on the high-paying construction project.This situation only exacerbated the local unemployment si tuati on. IlCertain public services were severely taxed as a result of the larger than expected influx of people.The public safety and public health were jeopardized by increased 'people prob- lems;1 too few public safety officials and inadequate or non- existent facilities delayed the state's abil ity to adequately respond.Lack of adequate housing led to clvercrowded 1 iving conditions and sanitation problems.Increased vehicular traf- fic devastated the roads and at times created safety problems as well.Util ities,such as power and telephone,were over- taxed.Heightened demand for housing produced rent gouging, displ aced famil ies,hasti ly and poorly constructed housing, and use of substandard or even non-residential units as places of res id en ce• lilt seems,therefore,that the potential exists for the types of impacts described above to occur as a result of the Susitna project,and to occur in 1 arge part in the Matanuska-Susitna Borough.Simply put,we bel ieve that past experience has shown that more peopl e wi 11 show up than orig inally antic i- pated,bringing with.them all the problems attendant to a I boom-town I situation.We do not feel that this was adeguately addressed in the draft feasibility report,nor that the state IS pri or experi ence with TAPS was taken into account.II r-c--- ..... ..... - - Response We agree that it is reasonable to expect an influx of person s seeki ng Sus itna c onstr uc ti on an d constructi on- related jobs.This influx of persons would probably create the types of impacts that you mention,especially in the greater Anchorage area and,perhaps,Fairbanks. We did review the TAPS experience.We found no analysis of the impact of unsuccessful job seekers on Fairbanks and the state;nor could we find any analysis of the degree to which "outside"labor displaced Alaska labor. We could not even find any data that would allow such analyses to be done. Aside from this lack of information,it should be noted that even if appropriate studies had been done on TAPS, they would have been of little help in trying to esti- mate the n umbers of persons who wi 11 be attracted to Al aska by the Susitna project.This is because each project (e.g.,TAPS,ANGTS,and Susitna)is unique and different economic forces prevail in different years. For exampl e,the types and amounts of workers,and wage rates are different for each project.This will infl uence the attractiveness of the project to workers living "outside."Also,economic conditions "outside" rel ative to those in Al aska change and infl uence the attractiveness of Al aska proj ec ts to outsi ders. For these reasons and several others,it was not pos- sible to estimate how many persons would be attracted to Al aska by the Susitna project.The monitoring and miti- gation program discussed in Section 4.5 is designed to detect the total project-induced·increase in popul ation and to hel p appropriate institutions mitigate impacts that might be caused by persons who come to the Railbelt region in search of Susitna construction andconstruc- tion-rel ated (secondary and induced)jobs. W-5-007 We would expect that a high percentage of those attracted to the area would become fish and wildlife resource users.This woul d 1 ead to inc rea sed demand for these resources at the same time and in the vicinity of more direct project-related impacts to these resources.Additionally,because the project work force would be highly seasonal (page E-5-37),the impact of these employees on the fi sh and wil dl ife resources woul d be greater than other area residents. Response Whereas it is 1 ikely that the members of the population influx caused by the project would increase the demand for recreation involving the use of fi sh and game,it does not necessarily follow that actual use will increase.For the most part,fish and wildlife use is controlled by regulation so that not everyone with the desi re to harvest these resources actually harvest s these resources.It is,therefore,erroneous to assume that new members of the area population would become resource users.Md,if they become users,there is nothing to indicate that the new members woul d tend to use the resource more than other area residents.The fact that work at the project will be seasonal does not necessarily allow these newcomer s to partic i pate in resource harvest more than other area residents.A sig- nificant amount of work in the area is usually sea- sonal. W-5-008 •Public Recreation Facilities:Paragraph 1:Please clarify whether the assumpt i on that full pub 1ic access woul d be pro- vided by the project through the upper Susitna Basin has been made.We understood thi s was not the case (see Page E-5-24, Transportation). Response For purposes of analysis,it has been assumed that the access road will be open to use by the public upon com- pletion of project construction.However,access can be restricted at a future time as a mitigation measure. W-5-009 Use projections and anticipated fish and wildlife resource impacts should be examined. Response Full description of the impacts of the project on recre- ation in the impact area are presented in Chapter 7, Recreation Plan.The text has been modified in Section 3.1.3 (a)(i)to refer to that chapter. The section that this comment is addressing is concerned with public recreation facilities and services,such as parks,playgrounds,campsites,and other facil ities that are maintained by publ ic entities.This was not con- sidered to be the place to discuss use patterns of and impacts on fish and wildlife resources.These subjects are discussed in Section 3.7 of Chapter 5 and in Chapter 3. W-5-010 •Transportation:Paragraph 1:We concur that,lithe ul timate status of the road is unsettled at this time.1I The road is a proposed project feature and as such the ultimate resolution or mechanisms for resolution of this issue needs to be pro- vided in the FERC 1 icense,if in fact we do still have road access at that time as a project feature.We have not concurred that road access is either necessary or desirable. r - Response Commen t noted. W-5-011 Paragraph 3:Reference is made to,"sc heduling of commuting workers.1I Yet,on Page E-5-91,it is stated that,"•••there will be no daily commuting •••and workers will not have the opportunity to drive personal vehicles to the campI village •••"These confl icts need to be resolved. -Cantwell •Transportation:Paragraph 2:Reference is again made to commuting workers.Please refer to our comments immediately above (Section 3.1(a)(i)-Mat-Su Borough.Transportation: Parag raph 3). Response These confl icts were resolved.Pl ease refer to Section 4.4.1 (d)• W-5-012 (ii)Regional:Please refer to our Chapter 5 General Comments and to our comments regarding Sections 3.1 and 3.1(a)(i). -Mat-Su Borough. (b)Watana -Operation Phase and Devil Canyon -Construction Phase (i)Local -Mat-Su Borough:Pl ease refer to our comments immediately above (Section 3.1(a)(ii)). Response Please see the response to Comment W-5-006(a)and (b). 3.2 -Onsite Manpowe~Requirements and Payroll,by Year W-5-013 b)Seasonality of Manpower Re uirements:Please refer to our comments regarding Section 3.1 a i -Mat-Su Borough.The seasonal ity of the project work force could,if they remain in the state,resul t in signi ficantly higher use 1evel s of fi sh and wil dl ife resources,and recreational resources than that found fo r resi dents employed year-round.We recommend that this should be examined.The TAPS project and in-state hydropower projects,such as Terror Lake,should provide valuable information. 3.3 -Residency and Movement of Project Construction Personnel: paragrafh 3:The proposed administration of the construction camp/vi lage appears to simplify problems by minimizing con- straints on the work force.Given the APA Mitigation Policy, which is consistent with NEPA and our Mitigation Policy,to first avoid adverse impacts to fish and wildlife resources,we find it difficult to accept the construction site camp/village plan or administration of it.In many ways it tends to maxi- mize adverse impacts to fish and wildlife resources,in direct confl ict with APA I S stated mitigation goal s.It appears that pl ans other than that proposed have not been eval uated as none appear in Chapter 10. We recommend that a Prod hoe Bay type camp be examined as an alternative which could minimize project-related impacts to fish and wildl ife resources and socioeconomic impacts to the local communities.Our position concerning rail versus road access to the construction camp/village has been previously stated (FWS letter to Eric Yould dated August 17,1982). Response We ag ree that both temporary and permanent mov ements of people into the state could result in a larger nlJl1ber of people seeking fish and wildlife for consumption.It is not predictable,however,whether persons who work sea- sonally on the construction of the dam(s),and remain in the state during periods when they are not working on dam construction,will have a higher per capita use of fish and wildlife than others in the state. It seems that the most important issue is controll ing the use by the work force of fish and wildlife near the construction camp and access road.The second most important issue is management of fi sh and wil dl ife use in other pl aces,in view of the increasing popul ation in Al aska and the construc ti on work force.The fi rst issue will be considered in future study pl ans.Fi sh and wildlife use information will be available from other Power Authority-funded hyd ropower proj ec ts when thi s issue is considered. Considerable study was done to determine the best si t i ng,type of camp,and admin i strativ e pol ic i es for camp operation.During the development of a camp plan, consideration was given to recent experience in Al aska on projects like the Trans-Alaska Oil Pipeline as well as large hydroelectric projects in northern Canada.In addition,the environmental concerns were taken into account. r,c-- ,- i ...... -I .... ,.... Selection of camp siting was made after studying pos- sible locations on both river banks and giving consider- ation to access,work areas,and environmental impacts. The type of camp (a balance between family and single status personnel with emphasis on community and recrea- tional facilities)was the result of an in-depth study of successful construction communities on other 1 arge scale,long-duration hydroelectric projects.The type of camp was sel ected to compl ernent the hours of work and the pol ides of time-off for personnel to vi sit famil ies.The overall objective has been to provide a cOOlmunity that would attract the skilled workers requi red for the project,whi 1 e at the same time con- trolling costs to a reasonable level and keeping envi- ronmental impacts to a minimum.Mitigation measures discussed in Chapter 3 include those specifically addressed to the camp construction and operation. A further multidisciplinary analysis of the siting, type,size,administration,etc.of the construction camp/village will be done in 1983. W-5-014 (a)Region ~i)Regional Work Force:Paragraph 4:The assumptions stated or the onsite construction work force were questioned in the previously referenced May 27,1982,letter from ADCRA, "Although there are currently enough unemployed in South- central Al aska to more than ful fill the project's 1 abor demands,in terms of numbers,that does not necessarily mean that the appropriately skilled people are locally available. Al so,given the current state of the economy,it seems reason- able to expect a sizable influx of people from the Lower 48 seeking highly-paid emploj11lent,therefore competing directly with the local labor force."In addition,on Page E-5-94,it is stated,IIThere are at 1east a coupl e of reasons to bel ieve that local labor might have a difficult time obtaining con- structi on job s.II Thi s woul d appear to support the contention that hiring assumptions are overstated,and thus the impacts of project-induced popul ation increases are understated • Response Our analysis indicates that there is a sufficient number of unemployed and appropriately skilled,and under- employed and appropriately skilled workers in South- central Al aska to fill the construction jobs that we have assumed they wi 11 fi 11. We agree that "outside"labor will compete with Alaska labor for jobs.This was considered in making the geographic sources of 1abor assumptions (see Section 3.3.1). One point that we were trying to make is that residents in the smaller communities such as Cantwell and Trapper Creek could have difficul ty compet"ing with others for jobs.This would be the case if relatively few of the small canmunity residents were members of unions,or if it were more difficult for them to be available at the p1 ac e(s)0 f hire. 3.4 -Adequacy of Available Housing in Impact Areas (a)Watana -Construction Phase (i)Local W-5-015 -Matanuska-Susitna Borough:Paragraph 1:It is stated that, "The majority of construction workers on the project are expected to use the onsite housing facil ities.These workers will not be in-migrating into established communities and therefore will have no impact on the housing market in the Mat-Su Borough."Could we not conclude from the above that a minority of some unknown number of workers would not be housed onsite?This would lead one to expect workers commuting,and impacts to the housing market.Please quantify these poten- tial impacts.Concerning commuting workers,please refer to our comments on section 3.1(a)(i)-Transportation:Paragraph 3.In addition,in the previously referenced May 27,1982, Tetter from ADCRA,the following statement is provided: "The key supposition in support of the min imal impacts described is that the majority of the labor force and their families will live onsite and largely remain onsite throughout the duration of the project.This presumes affirmative actions are taken to preclude or limit mobility,particularly by private automobile,and to provide sufficient incentives for workers to locate their families onsite rather than in the more attractive and urban settings of Anchorage,Palmer,or Wasilla.If those conditions do not occur,workers and their famil ies in some undetermined nLaTlbers will reside el sewhere, and the workers will commute.If that occurs,impacts on the Borough will increase dramatically." Response First,it should be clarified that there is a distinc- tion between workers who commute on a daily basi s to work at the site,and workers who will use the housing and fac il iti es on site and return to thei r permanent places of residence on a weekly or less frequent basis. - - r -I II jIi W-5-016 None of the communities in the Mat-Su Borough is within daily cOOlmuting distance of the project site,as a resul t of the routing of the access road from the Denal i Highway.Workers will need to stay at the project- suppl ied facil ities on a day-to-day basi s,unless they decide to commute daily from Cantwell (which is not located in the Mat-Su Borough,and which is estimated to bean 80-'minute commute from the Watana site t under the best of conditions t when the access road is in place). Workers who fall into the second category wi 11 t by their periodic commut"ing t affect the amount of traffic on the Parks and Denali Highwayst but they will not necessarily affect the housing market in the Mat-Su Borough. Periodic commuters will affect the housing market in the borough only if they were not currently living in the borough commun i ti es. The chapter has been adjusted to present a case in which there is no organized transportation program and no pro- hibition on personal vehicles at the site.Under this scenario t some workers will decide to commute ona daily basis to and from the Cantwell area t the only existing community within daily commuting distance of the project area.The amount of in-mig rati on in to Cantwell may be limited if land that is controlled by Ahtna t Inc.is not made available for housing. 3.5 -Displacement and Influences on Residences and Business Jb)Businesses:Paragraph 2:It would follow that if t lIt-bst usinesses in the upper basin are dependent upon abundance of fish t big garnet and furbearer species t ll and the project holds the potential to severely impact these species through elimi- nation of their habitats t then most of the businesses would suffer severe adverse impacts.Th is parag raph ill ustrates a possible problem relating to coordination or communication of Exhibit E study programs. Paragraph 3:Pl ease refer to our comments immediately above (Section 3.5(b):Paragraph 2). Response The concl usion in the comment presented will only resul t if the unl ikely potential of the second assumption actually occurs. The disc ussi on of impacts to natural resource-dependen t businesses has been expanded (see Sections 3.5 and 3.7). W-5-017 Paragraph 4:Pl ease refer to our comments above (Section 3.5(b):Paragraph 2).We cannot dismiss impacts to fish and w"lldlife resource users as insignificant.The existing user levels must be established in addition to fish and wildlife resource 1evel s with and without the project.Proposal s designed to mitigate for unavoidable fish and wildlife resource losses should then be examined as to potential impacts on these user groups. Response Based upon the fish and wildlife impact analyses t it is cl ear that the biophysical impacts of the project t with mitigation,will be negl igible to most users.Changes in the distributions of caribou t moose and salmon could disrupt the use patterns of local users.This includes guides,transportation services,and lodges,as well as local residents who use the resources for food and other consumptive purposes.A study of the project's effects on these users (through project-induced changes in resource distributions)should be considered in future study pl ans if/when resource distributon changes are predicted in more detail. The largest impact of the project on fish and wildlife users will probably result from easier and,therefore increased,access to fish and wildlife.Existing as well as potential users will have easier access.This will increase competition for fish and wildlife among existing users and among existing and new users.Areas of greatest potential conflict are described in Chapter 3.Potential confl icts could be reduced through effec- t ive man ag em en t. Local user l s attitudes will be taken into account,as these have been to date,as project design work con- tinues and when mitigation measures are further developed.Through survey work scheduled during 1983 in Cantwell and other communities,additional "information on users l attitudes and the relative importance of fish and wildlife as income will be available to support pro- ject design studies and the developnent of mitigation measures. W-5-018 3.7 -Local and Regional Impacts of Fish and Wildlife User Groups (a)Fish (i)Methodology:The work which was completed for 1981 did provide point estimates.The capability of the system to pro- duce salmon is dependent upon a number of factors which are being examined as part of the Aquatic Studies Program {e.g., I-~- r ! winter water temperature,availabil ity of spawning gravel, flow regime,etc.).The number of fish that pass a point along the river does little to establ ish a river1s production capability other than to establish a bottom figure for it. A comparison of point estimates of 1981 vs 1982 demonstrates the great variabil ity that exists in thissystem.Both years are II representative.II Response We agree with the comments.They support the statements in Section 3.7.1(a). W-5-019 (ii)The Commercial Fishery -Specific Impacts:Paragraph 1:We concur. Paragraph 2:Given the qual ifications stated in the fi rst paragraph,this discussion fails to recognize the potential of the project to impact fisheries downstream of Talkeetna,the potential of the river above Devil Canyon to support salmon .(future opportunities lost),the importance of cOlllmercial fishing as a way of 1 ife,the importance of commercial fishing in terms of secondary and induced job creation,value of the fishery lost over the life of the project (based upon the same economic assumptions as the rest of the project),the cost of various mitigation proposal s over the 1 ife of the project, etc.We recommend that a more detailed discussion be provided in the Exhibit E taking into account at 1 east the factors listed above. Response There are many parts to thi s comment.Eac h pa rt will be responded to separately. a) b) r i c) r ] l r Failure to recognize impact downstream from Talkeetna-.-Impacts to the salmon resource down- stream from Tal keetna are analyzed as III imited ll in the FERC appl ication.See Chapter 3,Section 2.3.1 (b)iii. Future opportunities lost,Secondary and induced job creation,and value lost over the life of the project.Comment noted.Inclusion of these issues in future study pl ans will be considered. Commercial fishing as a way of life.Section 3.7.1 provides data on the value of the commercial catch and participation levels (i.e.,no.of permits). Since the project impacts on fish populations are estimated to be small,even without mitigation,the change to the way of 1 ife for commercial fi shermen in Cook Inlet should not be significant (see Chapter 3,Section 2.2.1(a)). e)Cost of mitigation proposal s.Mitigation is eval u- ated in Chapter 3,Section 2.4. W-5-020 (iii)The Sport Fishery:Paragraph 4:We concur that the type of research described is necessary.Additional informa- tion on the scope and schedule for completing this work should be provided here.We would appreciate future coordination on this research as we had not been contacted previously. Response Work has stopped on the task mentioned,as continuation of the task is not presently under contract.The refer- ence will be removed.The Power Authority will consider this suggestion in future study plann"illgs. W-5-021 (iv)Subsistence Fishing:The impact of the project on this issue has not been ev al uated and remain sal arg e data and analysi s gap.The importance of the Susitna system to subsi s- tence,potential losses,and how mitigation proposals affect subsi stence use should be addressed in the Exhibit E.The data provided is not appl icable to the project.Enactment of a state subsi stence 1 aw in 1978,subsequent 1 itigation,and changes to that law in 1982 invalidate direct comparisons of permit nunbers for different years.Additionally,we do not consider the price of salmon at the supermarket an adequate refl ection of the importance of the resource to thi s 1 ife- style.Cultural,social,and recreational values should also be considered in thi s analysi s. Response Additional analysis of the impact of the project on sub- sistence use will have to wait until the subsistence issue is resolved.It is not possible to conduct this analysi s until subsi stence is defined,or until addi- tional subsistence data become avail able from ADF&G. The data on subsistence harvest in Cook Inlet are the only user information currently available and are pre- sented as such.Since the subsistence fishery in Cook Inl et is on mixed stocks,only an indeterminate amount of the harvest discussed in Section 3.7.1 (d)is Susitna River fish. ..... ..... , r L r i .... r ..... Subsistence fishing within the Susitna Basin is not a rec ogni zed harvest of the state of Al aska. We ag ree that compl ete eval uati on of "subsi stence" salmon would include social,cultural and religious parameters,if appropriate.Section 3.7.1(d)has been revised to reflect this point. W-5-022 (b)Game:The primary deficiencies of the Socioeconomics Chapter are prev al ent here:(1)inconsi stency with Chapter 3, Fish,Wildlife and Botanical Resources;(2)lack of coordina- tion such that mitigation recommendations from Chapter 3 are not eval uated in Chapter 5 directly confl ict with recommended mitigation measures;and (3)data gaps and "incomplete analyses which prevent full evaluation of socioeconomic issues (e.g., Pages E-5-75,paragraphs 2 and 5;E-5-76,Paragraph 1;E-5-81, Paragraphs 1 and 4;and E-5-82 to 83 discussion under Section 3.7(c)(i)-Data Limitation). Response All inconsistencies have been corrected.Additional coord in ati on between Chapters 3 and 5 personnel ha s taken pl ace to reconcil e confl icts that might have ex i sted between a ssumpt ion sand mitigati on recommenda- tions of these chapters.Some data gaps remain,leaving some analyses incompl ete.These data gaps and analyses will be considered in future study pl ans as more infor- mation about impacts on fish and wildlife become avail- ab 1 e• W-5-023 (i)Commercial -Guides and Guide Services:Paragraph 7:Please refer to our comments on Section 3.5(b).In that "worst case"poten- tial losses were examined in Section 3.7(a)(ii),we recOOlmend that a similar examination be provided here,particularly since moose estimates have previously been furnished by the ongoing Bi g Game Study Program. Response Reference is made to Section 3.7.2(a)(i)for a discus- sion of this point.Updatedinformati on on impact estimates has been added to the text.Possible decreases in the wilderness attributes of the area are recognized in the text.Implications of potential decreases for the guiding industry and other users are not clear at this time • W-5-024 Discussion should be included on the possible decrease in the area's attractiveness for remote,wilderness hunting given the increase in access and human activities with project develop- ment.By definition,guided hunting involves a more remote type experience.Loss of this remoteness and potential impacts to the guiding industry should be considered here. Ongoing data collection/analysis regarding this issue needed to be fully desc ribed. Response See Chapter 5,Section 3.7.2(a).Loss of remoteness and the implications of this loss to the guiding industry are difficult to predict.The inclusion of these issues in future study plans will be considered. W-5-025 (ii)Recreational -Resources:We recommend expanding the discussion to con- sider relative demands and values for canmercial,recrea- tional,and subsistence hunting for each species in cooparison to other species. Response A brief analysi s of the rel ative uses of game resources has been added to Section 3.7.2(b)(i i)of Chapter 5. W-5-026 Incl uding a section on "Management"would cl arify the remain- ing discussion on recreational hunting.The section should briefly describe ADF&G management responsibilities and the Game Board;and include a map of Game Management Units in relation to major project features and access routes. Response Section 3.7.2(b)in Chapter 5 has been modified to dis- cuss management.A map has been incl uded along with the discussion of use of game resources in the area. W-5-027 •Caribou:Incl uding the map recommended under Section 3.7(b) (ii)-Resources above,would clarify the discussion. Response The map included in Chapter 5 now clarifies the discus- sion of the area utilized by Nelchina caribou. W-5-028 Resource Status:The present permit system is designed to under harvest the herd so that it can continue to grow.This section should reflect the present and future management plans for thi s important resource,see simil ar comments under Chapter 3,Section 4.2(a)(ii)-Population Characteristics. "'" r -I I Response Section 3.7.2(b)(ii)of Chapter 5 now contains a fuller discussion of current management objectives for caribou and moose in the vicinity of the project. W-5-029 The Experience Sought by Hunters:Please clarify by identify- ing the other area or resource to which hunt ing of the Nelchina herd by nearby Anchorage,Fairbanks,etc.residents is being compared. Response Section 3.7.2(b)(ii)has been clarified to indicate that Nelchina caribou are harvested mainly by people from the South-central region.The compari son,therefore,is between the participation rate of South-central region residents and that of hunters from elsewhere.. W-5-030 Transportation to and from Hunting Grounds:Project impacts on hunter access,and indirectly,to the caribou herd should be discussed.We suggest coordinating the discussion with that in Chapter 3,page E-3-356,Paragraph 3 and Page E-3-371, Paragraph 1,and our comments on those sections. Response A brief discussion of the implications of the Dena'li access road is contained in Section 3.7.2(b)(ii)of Chapter 5.A more exte'nsive analysis of this road's impacts on the animal populations is given in Chapter 3. Also contained in Chapter 3 are mitigation measures which are designed to minimize this kind of impact. W-5-031 Hunting Pressure:Management changes invalidate direct com- parisons between the number of hunters in 1980 and 1970. Increases of human populations should also be described.If it were not for the permitting system,the hunting pressure woul d be much hi gher.Al though the number of permit appl i- cants provides a clearer picture of the importance of the herd,we consider this figure to also underestimate the impor- tance of the herd.Si nce the chance that an appl i cant woul d obtain a permit is low,many people are discouraged from applying.If warranted,a survey could provide an estimate of the number of people who would hunt the Nelchina herd if the permit system were removed. Response Refer to Section 3.7.2(b)(ii)of Chapter 5.Information has been provided to give additional perspective to the comparison of harvest effort over the years. W-5-032 To adequately eval uate potential project impacts to the herd, one woul d need to examine ADF&G present and future management pl ans,projected demand forecasts,most 1 ikely behavioral responses to the reservoirs,access routing and control, alternative reservoir fill ing and operation schemes,construc- tion and publ ic use of the access mode and routing al ter- natives,the tradeoffs involved in confl icting mitigative pro- posa 1s on user groups,etc.We rec ommend that the impac ts evaluation examine the aforementioned factors. Response The issues raised are,in part,discussed in section 3.7.2(b)(ii)of Chapter 5.However,as outlined in Chapter 3 of Exhibit E,the state-of-the-art does not allow for precise prediction of project impacts.None- thel ess,the suggestiDns made in thi s comment by the U.S.Fi sh and Wil dl ife Serv ice wi 11 be considered for incorporation in future studies. W-5-033 Supply and Demand for Hunting Opportunity: tion is not fully discussed.Data should paring rates of increase for both permit human area populations. Response Again,the situa- be provided com- appl ications and Refer to Section 3.7.2(b)(ii)for an expanded treatment of this question.The discussion recognizes the short- coming of using the permit appl ications to indicate demand.It would be better to be able to relate demand to human population growth.However,because of the hunting regulations,the picture is less clear.Even if the regulations did not compl icate the picture,it is unlikely that the growth in hunter participation would grow at the same rate as the population. W-5-034 Success Rate:The impact of hunting on caribou popul ations shoul d be described here (e.g.see Chapter 3,Pages E-3-220 to 222).Inc reases in herd numbers may have al so contributed to the increased success rate.A map of take rel ative to ex ist- ing and proposed project access points may aid in eval uating project impacts.An analysis of those impacts on existing supply and demand for caribou shoul d be prov ided. Response Section 3.7.2(b)(ii)of Chapter 5 now has a discussion of caribolJ poplJl ation si ze changes,changes in hunting regulations over time and how these factors relate to hunter success rates. ,.... -- The impact of increased access on caribou populations is described in Chapter 3. W-5-035 •Moose:Since the subject of this chapter is socioeconomics, we recommend expanding the discussion to include information on moose being the most economically important wildlife species in the region,per Chapter 3 (see Page E-3-197). Response The discussion in Section 3.7.2{b}{ii}has been expanded to address part of thi s comment. ~though one can state that moose is one of the most important game resources economically {as was done in Chapter 3},and whereas moose are known to be important to the guiding industry and to noncommercial use of wildlife in the area,it is impossible to state whether it is the most important.Many guided hunts are combin- ation hunts "in which the hunter has the opportunity to hunt for more than one species.Furthermore,many guides,through provid"ing hunts for individual species, will {in one season}provide guiding services to various clients for a n unber of spec ies.Thi s makes it di ffi- cult to evaluate the relative contributions of individ- ual species to the income of the guiding industry and to the economy of the area as a whole. W-5-036 Resource Status:The paragraph is inconsistent with Chapter 3 which includes 1981 data and an estimate of 4,500 moose in the upper basin.Recent and long-term ADF&G management plans for moose,as well as a map of appl icable Game Management Units would help relate impacts described here to po~ential mitiga- tion measures. Response Updated discussions are contained in Chapter 3 and in Section 3.7.2{b}(ii}of Chapter 5.The geographic area referred to in Chapter 5 is more clearly defined by including a map.. ....., .... .... .... W-5-037 Transportation To and From Hunting Grounds:The discussion describes the type of data av aila61 e yet fa il s to prov ide any quantification.Figures delineating present and project- rel ated access points shoul d be incl uded and correl ated to current hunting intensities. Responses Comment noted.JIllalysisof this type will be considered as part of future study plans • W-5-038 Hunting Pressure:Pl ease expl ain the hunting permit and/or habitat changes responsibl e for the significant decrease in hunters and harvest whil e area hlJTlan popul ations have substan- tially increased.Reference to 2,859 hunters in 1981 is the same nlll1ber of hunters as for 1980 in Table E-5-42.Please correct if thi sis not the case. Response The regul atory hi story for moose hunting is incl uded in Section 3.7.2(b)(ii)to explain some of the reasons for decl ine in hunting effort.The correct figure for reported nlll1ber of hunters for moose in GMU 13 during 1981 season is 3105.The text has been modified accord- ingly (see Section 3.7.2(b)(ii)under moose hunting pressure)• W-5-039 Success Rate:Refer to comment above.local human popul a- tions,permit regulations,and area moose populations are critical factors in the success rate which should be dis- cussed. Responses These critical factors influencing success rates of hunters are analyzed in Section 3.7.2(b)(ii)of Chapter 5. W-5-040 •Other Species:We concur that a large data gap exists.The schedul e for acqui ring these data and incorporating them into project planning should be discussed.Once socioeConomic mit- igation proposals are established,they must be examined in regard to impacts on fi sh and wil dl ife resource user groups. A tradeoff analysi s woul d then be needed to examine confl ict- ing mitigative proposal s.Because coordination among project studies has been lacking,each study described impacts rela- tive to optimal proj ect management for the subj ect of that study,e.g.,recreation,fish,moose,subsistence,power,etc. We recommend al ternativ e management scen arios be ev al uated within each study before the necessary tradeoff analysis is compl eted. •Importance of Regul ati ons:Paragraph 1:Access routes, restrictions on access,and construction schedules will al so greatly influence opportunities to hunt in the project area. Quantification should be provided for possibl e impacts under at 1 east two scenarios -severely restricted access and per- mits and open access without permits.Such analysis should be fully coordinated with ongoing big game studies and al so dis- cussed in Chapter 3.Given the substantial agency recommenda- tions to omit any project access from the Denali Highway,and the importance of that recommendation as a wildlife mitigation ~._, ..... .- I I - measure,we recommend your analyzing the impacts on hunter access both with and without that road corridor.Additional discussion should also be provided on impacts both with and without restrictions on worker access and hunting.Again, regulation of such use is a significant mitigation measure. Quantification of possible use levels is necessary for full quantification of project impacts on moose populations in Chapter 3. Response These suggestions wi 11 be considered in future study pl an s. W-5-041 Paragraph 2:Consideration should be given to the greater losses expected for black bear than for brown bear habitat in view of the harvest regulations described here. Response See Section 3.7.2(b)(ii)of Chapter 5 for the discussion of the importance and implications of regulations. W-5-042 •Impacts on the Hunter:Factors contributing to a high qual ity hunt should be defined here.Avail abil ity and access- ability of animals are key factors which will be affected by the project.Again,the schedule for quantifying recreational project impacts should be described.The present inability to quantify economic effects of the project is recognized as a major problem and should be resolved in the license applica- tion.The economics analysis should occur after quantifica- tion of wildlife impacts an'd formulationJof mitigation propo- sals.Please refer to our comments und r Sections 3.7(b)(i) an d 3.7(b)(i i)• Response Factors contributing to a high qual ity hunt are now des- cribed in Section 3.7.2(b)(ii).We agree that economic effects of the project on users are most easily addressed after impacts of the project on game are quan- tified.This type of economic analysis will be con- sidered in future study plans. W-5-043 (iii)Subsistence Hunting:This section should be rewritten to more accurately refl ect current 1 aws and regul ations.For exampl e,non-residents cannot qual ify as subsi stence users.A compl ete,rather than partial,1 isting of all qual ifications for sub si stence use shoul d be incl uded here.The fi rst sen- tence of the second paragraph pertains to a one-time only reg- ul ation which is no longer in effect.The 1ast sentence of this paragraph is an editorial comment which should be deleted.Mention of the controversial nature of subsistence use woul d be appropriate.The referenced future data c<l'npil a- tion and analysis should be provided in the Exhibit E.At a minimum,scope and scheduling of this work should be fully discussed.The concerns expressed under Section 3.7(a)(iv) -Subsistence Fishing would apply to this section in regard to hunting.Please refer to Section 810 of the Alaska National Interest Lands Conservation kt (Publ ic Law 96-487,December 2,1980)for guidance. Response Refer to Section 3.7.2(b)(i).The data on subsistence use of g arne in the reg ion are nonex i stent except for caribou.The text has been expanded to include caribou use by local residents. W-5-044 (c)Furbearers (i)COlTVT1ercial Users:During the August 1982 AEA Workshop on the Susitna project,trapping was considered the primary mor- tality factor affecting beaver in the project area.Access, in addition to species abundance and pelt prices,is al so a key determinant of trapping intensity. Response The second portion of thi s statement has been added to the text in Section 3.7.3 of Chapter 5. W-5-045 -Data Limitations:Given that there are problems with avail- able trapping data,the records which are available should be described here as a general indication of area trapping activ- ities.We are concerned about the apparent 1 ack of coordina- tion with project furbearer studies which do provide some pop- ulation and trapping data (see Chapter 3,Pages E-3-250 to 251;E-3-253 to 256;E-3-315 to 317;E-3-321 to 322;E-3-344 to 346;E-3-361 to 362;and E-3-368). Response Information on yearly harvests of furbearer species in Game Management Unit 13 have been added to the chapter, as the agency requested.However,as mentioned in the text,the 1 imitations of these data are such that the use of these data in the present context is considered to be inappropriate,except as a very general indi- cator. - II""' I r r--. - W-5-046 -Trapping Activity:Paragraph 1:Any examination of project impacts needs to examine future opportunities lost.Again, pI ease prov ide whatever quanti ficati on of trapper n lJJ1bers and harvest values is available.Consideration should be given to thenlJJ1ber of additional trappers the area coul dsupport under alternative project access location and regulation alterna- tives. Paragraph 3:Based on the suggested 25-mile trap line length, it is doubtful whether the project area,with projected access routes,coul d support more than an additi onal dozen trappers. There is some indication that the area may be near trapping saturati on now (Furbearer St udy Coord inator Phi 1 Gi pson,per- sonal communication). Response There are not sufficient popul ation data on furbearers avail abl e to estimate the magnitude of future opportun i- ties lost,the number of additional trappers the proj ect area could support,or to say whether the area is now near trapping saturation. W-5-047 -Aquatic Species •Baseline:Paragraph 2:To compliment and parallel the beaver discussion,information should be included on muskrat populations and habitat utilization;please refer to our com- ments under Section 3.7(c)(i)-Data Limitations,above. Response A summary of the information on muskrat provided in Chapter 3 has been added to Section 3.7 of Chapter 5 as requested. W-5-048 Paragraph 3:Subsistence value of furbearer species should be identified. Response This comment refers to a paragraph that states the meat of muskrat and beaver are util ized as well as the fur for dog and human consumption.We do not agree that thi sis an important sub si stence use of these spec ies, or that it is appropriate to quantify their values as food for dogs and humans. W-5-049 Paragraph 4:References such as lI abundant U and II common II should be deleted.Quantification should be available from the 1981 and 1982 field seasons for those species.Please incorporate these data into the discu$sjon and analysis. Response To the extent available.specific information on fur- bearer popul ations in the project area can be found in Chapter 3. W-5-050 •Impacts of the Project:The conclusion that the access road and transmission 1 ines would provide increased harvest oppor- tunities through increased access appears to be in confl ict with conclusions and statements offered in other chapters and sections (e.g ••Chapter 3.Pages E-3-317 to 323;E-3-345 to 346;E-3-360 to 363;E-3-368;and in particular.E-3-377). The statement offered in this section would lead one to con- clude that open access is expected to be provided by the pre- ferred access road and throug h a maintenance road for the transmission 1 ine from Watana damsite.It has been our under- standing that the former has not been establ ished and the 1 atter was not to occur.Pl ease refer to our comments on Sections 3.1(a)(i)Public Recreation.Facilities: Paragraph 1.and 3.1(arrn -Transportation:Paragraph 1.The lost future opportunities and the potential impact that could occur to trappers due to the expected ice-free winter condi- tion of the Susitna River above Talkeetna should be fully described in this section.The potential for furbearer popu- lations to be trapped out.if open access is provided.should al so be considered here. Response For purposes of analysis.it has been assumed that the access road will be open to use by the public upon com- pletion of project construction.However.access can be restricted at a future time as a mitigation measure. This has been clarified in the text of Chapter 5. There is not sufficient information available to esti- mate the magnitude of future opportunities lost.In the short-run.trapping opportunities will increase as a result of increased access.The potential for certain furbearer spec ies in spec ifi c porti ons of the impact area to be trapped out is mentioned in Chapter 5.but quantification is not possible at this time. The expected ice-free condition of the Susitna River is not expected to have a significant effect on trappers. Currently.the river does not freeze sufficiently to support sub stantlal travel on it. "...".., - W-5-051 -Pine Marten •Impacts:Paragraph 1:Pl ease refer to comments under Section 3.7(c)(i)-Aquatic Species:Impacts of the Project, above.The last two sentences are contradictory;there is some inconsistency with the last line of the second paragraph which otherwise appears to be an accidental repetition of Paragraph 1 under this section. Response There was a typographical error in the section on impacts to pine marten (Section 3.7.3(d))in which part of the paragraph was repeated twice.This has been corrected.The text has also been clarified to avoid the appearance of contradiction. ~I W-5-052 Lynx:Paragraph 2:Again,quantification should be given to this trapping pressure and success rate relative to other area furbearers. Response Harvest information of lynx in GMU 13 has been provided in Chapter 5. - W-5-053 -Fox: -Lynx, impacts see our Please refer to our comment under Section 3.7(c)(i) above.Consideration should also be given to project on fox,as they may rel ate to the fox trapper (al so comments under Chapter 3,Section 4.3(a)(xii)). Response ~Information on the magnitude of impacts to fox and coyote popul ations can be found in Chapter 3 and in the response to comments on Chapter 3,Section 4.3(a)(xii). W-5-054 -Secondary Industries:In order to fully assess project impacts on secondary industries,the "relatively small percen- tage of Al askan trappers who operate in the'impac t areal! should be quantified here. Response -I Trappers in the project area represent approximately 0.5 percent of the total nunber of trappers in the state. This information was added to Section 3.7.3(g). W-5-055 (ii)Recreational:Inadequacy of data base is identified. Information on this user group should be accumulated,impacts an alyzed,mitigati on proposed and then re-eval uated to assess effectiveness and impacts in the Exhibit E.The impact due to the loss of access across the upper Susitna River resulting from the probable loss of winter ice cover requires examina- tion in this section. We suggest addition of a paragraph (iii)Subsistence to com- plete this section.Information under Paragraph 3,Page E-5-84 would apply,see comment under that section (Section 3.7(c)(i)Pine Marten -Impacts). Response The section now contains no distinction between "commer- cial ll and "noncornmercialll trappers,since part-time trappers will often sell tne furs they obain,and since there are no data to support such a distinction. Surveys of wildlife users in the project area will be considered in future study plans.This would help to explore further the impl icati ons for trappers of the expected ice-free condition of the Susitna River. 4 -MITIGATION W-5-056 Paragraph 1:The definition should reflect that established in the APA Mitigation Policy document and the NEPA defini- tion. paragraph 4:Without proper coordination between Susitna study components,actions designed to minimize one component's adverse impacts can unwittingly adversely effect the abil ity of another component to mitigate.The maj or mitigation pro- posal s offered here are often in confl ict with the mitigation goals of the fish and wildlife resources components.Greater communication,coordination must result in an open process to examine the tradeoffs when mitigation proposal s are offered which may pose impacts to other components.Pl ease refer to our comments concerning section 3.7(c)(i)Aquatic Species which appears to indicate a lack of component coordination. Paragraph 5:Appropriate local,state,and federal agencies need to have input to this process.Continued monitoring of changing mitigation needs in regard to compatabil ity with mitigation goal s of other components is very important. 4.2 -Mitigation Alternatives:How the goal of mitigation as expressed in this section conforms to the goals of mitigation in the APA Mitigation Pol icy document and the NEPA definition of mitigation should be explained. - ~, a Tools that Influence the Magnitude and Geographic Distri- ution of Project-Induced Changes Paragraph 3:Schedu1 ing constraints need to be reassessed in 1 ight of the 1 atest power needs forecasts.We recommend that the extent to which impacts could be mitigated in each study component be examined through a tradeoff ana1ysi s of the timing constraints which have been imposed. Paragraph 4:Impacts to fish and wildlife resources,and thus indirectly to users of these resources,are re1 ated to the type of construction camp established,access provided (route and mode),and the administration of these facil Hies.We perceive 1 ittle coordination designed to minimi ze impacts to fish and wildlife resources as a part of the socioeconomic analysis. Paragraph 5:It appears as if management of the construction site is to be passive.That is,workers can come and go with- out restrictions.Thi s appears to be in conf1 ict with the statement on Page E-5-91,"For this project,there will be no daily commuting."Also,the assllTlption that workers will maintain their existing residences would follow only if the assurnpt ion that the workers woul d come almost enti rely from the local and regional areas households.This was strongly questioned in the previously referenced letter dated May 27, 1982,from ADCRA,and on Page E-5-94,"There are at 1 east a couple of reasons to bel ieve that local labor might have a difficult time obtaining construction jobs." Paragraph 8:Thi s parag raph suffers from internal tenc ies concerning dai 1y commuting and use of vehicles.Please clarify the discussion. inconsi s- personal Paragraph 9:Thi s section is supposed to be the mitigation pl an. Paragraph 12:The referenced stud ies shou1 d be coord in ated with fi sh and wil d1 ife resources analyses and mitigati on planning.P1 ease refer to Section 4:Paragraphs 4 and 5 for additional comments. (b)Tools that·Help Communities and Other Bodies Cope with Oi srupti ons ,and Budget Defi cits Paragraph 2:In accordancewit'h the APA Mitigation Pol icy doc lITl'ent,a monitoring panel wou1 d need to be estab 1i shed,at project expense,consisting of representatives of appropriate local,state,and federal agencies to carry out the function of assessing the extent of actual impacts and recommending modifications to the mitigation program.Modification of the mitigation plan in the 1 icense would be through 1 icense amend- ment. Paragraph 10:Pl ease refer to the comments immediately above (Section 4.2(b):Paragraph 2). Paragraphs 13 and 14:The question of whether or not the labor needs of the project could be fulfilled largely through local hire (Page E-5-44)or not obviously is going to substan- tially effect socioeconomic impacts.In that uncertainty exi sts,as expressed in these paragraphs and in the May 27, 1982,ADCRA 1 etter to APA,we recommend a re-eva]uati on be carried out as indicated in Section 4.3 (on Page E-5-95)and incorporated into the Exhibit E. 4.3 -Impact Management Program:paragra~h 4:Item 1:In many respects,the Base Case,as discusse in this document, is a minimum project impacts scenario;this opinion is clearly expressed in our Chapter 5 •General Comments.We bel ieve that substantial uncertainty exists in key assLlllptions and that a multiple scenario model is in order.The study should be updated to refl ect current state economic and popul ation forecasts. Item 2:Pl ease refer to our comments on Section 4.2(b): Paragraph 2. Item 3:Pl ease refer to our comments on Section 4.2(b): Paragraph 2. Item 4:Pl ease refer to our comments on Section 4.2(b): Parag raph 2. Paragraph 5:Pl ease refer to our cOOlments on Section 4.2(b): Paragraph 2. Table E-5-42:We recommend the addition of population esti- mates and any changes in permit regulations from 1970 to 1981. The nlJ11ber of hunters in 1980 is attributed to 1981 on Page E-5-79. Response Thank you for these comments.Section 4,Mitigation, has been rev i sed in response. - COMMENTS CONTAINED IN U.S.FISH AND WILDLIFE SERVICE LETTER OF JANUARY 14,1983 .GENERAL COMMENTS -RECREATIONAL RESOURCES Comment 1 Primary objectives of the Recreation Plan should be:a)to identify .and mitigate the project related adverse impacts to the existing uses of fish and wildlife and other resources and,b)to maximize additional recreational opportunities that are not in conflict with existing uses and the resources they are 'based upon.Thi s shoul d be accompl i shed in the context of projected demand during the construction and operation phases of the project. In general we find this chapter suffers from a lack of necessary infor- mation which would achieve these objectives.In particular,1)the chapter fails to outline alternative recreation options;2)evaluate the recommended plan and alternatives over the entire economic project life;3)distinguish between specific recreation users;4)recognize and identify specific responsibilities with regard to implementation and operation of the plan;and 5)lacks specificity necessary to influ- ence project developnent for the betterment of recreati onal opportun i- ties. Response 1.Section 5.5 outl ines various conceptual recreation al ter- natives including the no-build alternative.These alter- natives provided the parameters for the elements consi- dered in the proposed recr'eation plan.In addition,a phasing system has been applied in order to provide flexi- bil ity in the evolution of the recreation plan. 2.Sections 2.1.3,2.1.4,2.1.5,2.1.6 are provided to demon- strate the backg round and composition of the current recreation users.Figures E.7.6,E.7.7,and E.7.8 indi- cate existing recreation use patterns. Section 2.2.2 describes existing recreation use within the study area including user descriptions.Section 3.2.3 discusses estimated recreation demand as rel ated to spe- r-cific user categories. I 3.Section 4.3 outlines the financial responsibility of the Alaska Power Authority.Section 6.0 outlines the imple- mentation of the recreation plan.Future work includes the negotiation and formalization of the agreements be- tween the Al aska Power Authority and managing agencies and the private corporations holding land • .- r 4.Specific responsibil ities of all parties regarding imple- mentation of the recreation plan are discussed in Sections 4 and 6 of Chapter 7,Exhibit E.The responsibil ities of all parties will be formal ized and documented prior to implementation of the recreation plan. Comment 2 To allow the maximum flexibility for meeting recreational demands,it is important that an array of alternative options be evaluated.This is emphasized by the lack of definitive demand projections and poten- tial for access during the construction periods.Furthermore,we view the tremendous influx of people during the construction period as a major consideration for a recreation plan.Specific measures must be identified which will not only satisfy demand but also act as controls on overuse.The pl an must al so recogni ze the 1 imited recreational carrying capacity of the area and deal with the fact that all demand may not be satisfied. Response 1.Sections 5.1,5.2,5.3,and 5.4 discuss the study method within which a maximum flexibility could occur,as based upon the best demand information available from several different sources.The phasing concept,rel ated to con- struction and operation,is intended to provide not only fl exibil ity,but for the possibil ity of change in demand or need over the extended construction period. 2.Section 5.4.6 describes the recreation plan for the con- struction camp.These are specifically intended as alter- natives to the normal recreation opportunity. 3.The study methodology recogni zes not all recreation de- mands can be met.There has not been an emphasi s upon that concept.Instead carrying capacity,Section 5.3.4, is intended to evaluate each site on the basis of fitness of use. Comment 3 Identification of specific responsibilities for implementation and operation of the Recreation Plan should be included.It does not suffice to pl ace the responsibil ity on the "management agenc ies,"with- out a detailed coordinated effort with the agencies prior to issuance of the license.The plan must clearly identify the applicant's re- sponsibility,the agencies'responsibility,and clearly outline the procedures to be followed.The plan must recognize the inherent restraints pl aced on the agencies and include as a project cost compen- sations of them as appropriate for mitigation of project-induced impacts. r r;"" , -i I, Response In addition to Sections 2.2.2 and 3.2.3,future work includes this necessary work as discussed above.Costs for management of recreation areas are indicated in Figures E.7.19 and E.7.20. COJllllent 4 The plan clearly fails to recognize the differences between sport, trophy,and subsistence use of particular wildl ife resources.The ten- dency has been to lump these users as hunters with a major objective of bagging game.We submit these are clearly distinct groups and should be so recognized.Cultural differences regarding recreational pursuits have also been totally ignored in the plan. Response Refer to Chapters 3 and 5. Comment 5 lastly,the plan appears to have been written in a clearly reactive mode.There is no recognition of any recreational planning initiative that has precluded develoJl1lent of recreational opportunities which could have avoided some impacts while maintaining a higher aesthetic quality to the recreational experience. Response We disagree with the comment.Refer to Sections 1.0,1.1, 1.3,5.1,5.3,and 5.5,which describe the conceptual format of the recreation study. SPECIFIC COMMENTS -RECREATIONAL RESOURCES 3 -PROJECT IMPACTS ON EXISTING RECREATION 3.1 -Watana Development (a)Reservoir W-7-001 (i)Construction:The discussion in this section needs to be expanded to address non-consumptive and subsi stence recrea- tional users as well as sport and trophy hunters.Further- more,the section needs to address the eminent competition between existing recreational users and construction workers. Response Refer to Chapters 3 and 5.Competition between workers and existing users is discussed in Section 3. W-7-002 (ii)Operations:Discussions should be provided to address a new recreational opportunity,i.e.,boating on the reservoir, primarily for access to other areas. Response The potential for boating on the reservoirs was consi- dered,as described in Section 3.1.1;it was concluded that the operational and physical character of the reser- voirs created little recreation opportunity. W-7-003 (b)Talkeetna to Devil Canyon Fishery (i i)Constructi on:Si nce a pl an for flow rel eases during the construction and filling period has not been finalized,we do not know what effect flow will have on fishing opportunity. Mitigation measures will be aimed at maintaining existing fishing opportunities. Response Refer to Chapter 3,Exh-ibit E. W-7-004 (ii 1Operations:Since the proposed operational flow regime wil likely reduce water quantity in the sloughs,we antici- pate a reduction in fishing opportunity that must be mitiga- ted,the potential for this adverse impac,t and appropriate mitigation should be addressed. )0""'., .- W-7-005 Response Refer to Chapter 3,Exhibit E.In addition,new fisheries will be more accessible because of the recreation plan to repl ace the abovementioned restricti ons in opportun ity. The recreation plan is mitigation for lost opportunities. (d)Other-Land Related Recreation ~i)Construction:Paragraph 2:Please expand and clarify the ;scuss;on.It ;s our understanding that the area will be open to the recreating publ ic.-- Paragraph 3:The discussion fail s to 'address whether or not existing use shifts to other areas is dependent upon several factors;e.g.,species involved,availabil ity of and restric- tions on use of those species elsewhere,existing demand already present in other areas,and cultural association with those spec ies. Response i r Refer to Chapters 3 and 5 of Exhibit E. W-7-006 (ii)Operations:It is the responsibility of the project sponsor to identify specific mitigation measures and develop a comprehensive pl an which wi 11 address thi s impact.lIProper control by 1andowners and managers,II is not a mitig ati on measure without appropriate compensation to implement and operate the recreation plans.This cost should be identified and evaluated over the economic project 1 ife and included as a project cost. Response Tables E.7.17,E.7.18, E.7.19,and E.7.20 speak to direct recreation development and operations.Further negotia- tions will occur between the Al aska Power Authority and Division of State Parks (managing agency)for this pro- ject. W-7-007 3.3 -Access (3.1.3) (a)Watana Access Road ~i)Construction:Paragraph 2:Estimated recreational ve- ;cl e traffic both prior to and after 1993 shoul d be presen- ted. Response Refer to Chapters 5 and 9. W-7-008 (b)Devil Canyon Access Road (i)Construction:Paragraph 2:Mitigation for excavation of the borrow areas could include the future use of these areas for rec reat ion dev el olJllent.These measures shoul d be spec i fi- cally identified and incorporated as part of the Recreation Pl an. Response This is included as part of Phase 5 recreation planning. Also it is included as a mitigating measure in Chapter 3 and Chapter 8. W-7-009 (ii)Operations:These "care ful plans"should be a part of thi s doclJTlent,if not,who will develop these pl ans and when? The associated costs should also be discussed and displayed as project costs.Also,management responsibil ities during construction should be identified and discussed along with associated costs. Response Detail ed pl anning and design is the purpose of Phase II engineering.Tables E.7.17,E.7.18, E.7.19,E.7.20 are costs specific to the recreation plan. W-7-010 (d)Other Land-Related Recreation (ii)Operation:We feel this will be a significant impact and specific plans should be identified and discussed in this document. Response Other recreation study e.g.,transmission line corridors, will be incl uded. W-7-011 3.5 -Indirect Impacts --Project-Induced Recreation Demand (b)Assumptions:Paragraph 1:This paragraph is very confus- ing and needs to be clarified.In particular,that part deal- ing with mitigation.We would suggest,liThe proposed recrea- tion plan is designed as mitigation for recreation opportuni- ties lost due to proj~ct development.•••" Response Ag reed. r-- - .- - .~ I W-7-012 Paragraph 3:Assumption 6:We would suggest that a 1 ikely scenario associated with this developnent will be a road access prov ided to the area without the proj ec t.Thi s scen- ario could drastically affect your evaluation •. Response We doubt the 1 ikel iness of simil ar road access to the Susitna area without the project. W-7-013 (c)Estimated Recreation Demand Thi s para- Paragraph 17:The simpl ificati on of your methodology al so does not consider that other recreation opportunities may become saturated,hence areas of low use (proj ec t area)may become much more important for future use and receive an increase in demand. Response Although possible,the obvious capacity and capture rate of nothern offsite recreation sites within the same travel time and distance zones,pl us the attractiveness of other places,limits this scenario in its significance.These are described in section 3.2.3,Estimated Recreation Demand. COMMENTS CONTAINED IN U.S.FISH AND WILDLIFE SERVICE LETTER OF JANUARY 14,1983 GENERAL COMMENTS -AESTHETIC RESOURCES Comment 1 We find the chapter deficient in the following areas:1)it lacks the detail necessary to distinguish the various user groups within the category "hunters and fishermen,"e.g.,the chapter characterized this group as only subsistence users;2)avoidance has not been acknowledged as a mitigation measure,which could significantly reduce potential impacts;and 3)the chapter does not reference the incorporation of any mitigation measures into the project pl ans. Response 1.Refer to Chapters 3 and 5 for user group discussions.See response to specific comment W-8-001. 2. 3. Av oidance will be used,and has been used,in proposed facility design. /-"'-1 Refer to Sections 9 and 10,and the appendices for this inclusion. .... SPECIFIC COMMENTS -AESTHETIC RESOURCES 3 -EXISTING ENVIRONMENT (STEP 3) 3.2 -Viewer Sensitivity (Step 4) Types of Viewers W-8-001 (A)Hunters and Fi shermen:Your categorization of hunters and fishermen lacks the necessary depth to allow meaningful analy- sis.There are three distinct groups which must be identified and discussed,i.e.,sport,subsistence,and trophy users.We submit that they are unique in their appreciation of aesthetic quality. Response Basel ine sociological data about the characteristics of any normative recreation users do not exi st.Other than generalizations about people,the types of viewers were not as critical as was their location and what they were seeing.This section has been changed to reflect this distinction.All people have unique appreciation of aesthetic quality. W-8-002 Nonresident Outdoor Recreation Enthusiasts:Trophy hunt- lng an fl s lng are readl y ldentl la e user groups,espe- cially in Stephan Lake area.This should be identified and evaluated. Response Refer to Chapter 5. W-8-003 Expectation of Views (A):The prime concern of some users is not bagging their game or catching their 1 imits.This dis- tinction should be made. Response Section 6 has been changed.to emphasize principal views and observation points.We agree with the above comment. - W-8-004 5 -PROPOSED MITIGATION MEASURES (Step 9~:The mitigation measures you have identified are commendab e.However,there is no indication in this section that these measures have been addressed and incorporated into the project plans.Pertinent sections of the license application should be cited to show where these measures are addressed and/or reasons why they were not addressed.We are al so concerned that "avoidance," as a mitigation measure has not been addressed.We refer Ispec ifically to proj ect features which coul d be located el se- where as a mitigation measure or be more easily mitigable in another location.Access routes and town sites would fall into this category. Response Sections 8,9 and 10 include incorporated mitigation measures,including avoidance.Future supplemental work will include more aesthetic measures,and Phase II project engineering design will consider the proposed mitigation measures. - - COMMENTS CONTAINED IN U.S.FISH AND WILDLIFE SERVICE LETTER OF JANUARY 14,1983 GENERAL COMMENTS -LAND USE Comment 1 With reg ard to Secti on 2.2(d)(i),we find the c haptersuffers from a lack of definitive information regarding wetlands and floodplains. These areas should be graphically displayed by type in the document. Furthermore,the chapter should discuss the specific values of these areas,their relationship with other vegetative types,and specifically address the effects of the projects on wetland and floodplains. Mitigation measures recommended to minimize impacts to wetland flood- plains should be discussed including alternative site locations. This analysis is extremely important to avoid any delay necessitated to insure compl iance with federal requi rements with Section 404·of the Clean Water Act as amended (86 Stat.884,U.S.C.1344),associated reg- ulations,guidelines,and Executive Orders (11988,11990). Response These comments have been addressed in Section 2.2.4 -Special Lands -(a)Wetlands and (b)Floodlands.Wetland maps are included in Chapter 3.Floodplain maps are included in Chapter 2. Comment 2 Specific measures to mitigate impacts from the transmission line should also be addressed including the right-of-way management techniques. Response These comments have been addressed in Section 3.5.1 -Trans- mission -Proposed Facilities and 3.5.3 -Transmission -Miti- gation. Note:No specific comments were suppl iedon Chapter 9,Land Use. GENERAL COMMENT -ALTERNATIVE LOCATIONS,DESIGNS,AND ENERGY SOURCES Comment 1 Mr.John Lawrence of Acres American,by letters dated November 1981, requested that the FWS review the Development Selection Report and the Transmission Corridor Report.These requests were made for the purpose of fulfill"ing the FERC requirements of formal pre-license application coordination.We responded to the first review request by letter dated December 17,1981 and to the second by 1 etter dated January 5,1982. In that these letters were requested as part of the formal coordination process,they should be responded to at this time. Response The letter of December 17,1981 and our response appear in Chapter 11. The letter referred to,dated January 5,1982,was responded to on April 14,1982.Copies of each appear in Chapter 11. Comment 2 We have been requested to review the draft Exhibit E without benefit of the other draft license exhibits.In Chapter 10,numerous references are made to other Exhibits (pp.E-10-1,E-10-1,E-10-14, E-10-16, E-10-23,E-1O-28,E-10-32,E-10-38,E-10-62,E-10-81).Since we are unable to examine the other Exhibits,we view this .pre-license coordi- nation as unsatisfactory.Additionally,in our examination of the Exhibit E chapters,we have seen numerous examples of insufficient internal coordination and/or communication.In that this appears to be a problem within the Exhibit E,we can only assume that this problem occurs between Exhibit E and the other Exhibits. Examples of lack of coordination and/or communication between Chapter 10 and Chapters 2 and 3 are apparent in the discussion concerning mini- mum flow rel eases .(pp.E-10-28,E-20-3D),temperature model i ng (pp. E-10-3D,E-10-31),and socioeconomic considerations between this Chapter and Chapter 5 (pp.E-1D-138).These conncerns are di scussed within the text of our specific comments. Response The same material present in the Exhibits not received is present in the Feasibility Report material issued in March 1982.With the exception of the operating scena- rio,access road,and the transmission line,the project description,maps,etc.,have not changed.With the numerous meetings held previous to this request for com- ments and the presentation of the project by Dr •.John Hayden of Acres on November 29,1982,adequate informa- +ion was available to review Exhibit E.An updated set )"'_._-' I~ r ,- - ..... r I -, of all exhibits is now filed with FERC and will be dis- tributed to agencies on acceptance by FERC. Any inconsistencies have been corrected. Since publication of the draft license application,fur- ther temperature studies have been conducted.The re- sults of these studies are discussed in Chapters 2 and 3 of Exhi bit E. Comment 3 There is essentially no attempt in this chapter to assess the possi- bflity of no Susitna project or how the Railbelt should contend with time delays of various lengths.Just listing various types of alterna- tive energy sources does not allow an evaluation of what would,or shoul d coccur in the event that Sus itna is delayed for a peri od of years,or is never bui It.We reconmend that this type of pl anni ng effort be carried out to examine the effects of short-term delays and to examine long-term alternatives. Response Section 5 discusses the ramifications of the Susitna Project not being built.The effects or possibility of Susitna delays is not required in the FERC regulations. The need to build the project and the project schedule are discussed in Exhibits C and D,respectively.Ade- quate float time is incorporated into the schedul e to allow for foreseeable delays. Comment 4 Any assessment of alternatives,needs to take into account the most current power needs projecti ons.It is our understandi ng that the power projections which are being used in the license application are generally agreed to be high and are being reevaluated for submittal to FERC after the license application is submitted (Acres American Deputy Project Manager John Hayden,personal communication).The envi ronmen- tal implications are rather evident.Alternatives to Susitna should be examined on the basis of fulfilling future power needs rather than matching the power production of Susitna.Under previ ous projected power needs,it probably would have taken a combination of a greater number of individual power generating stations than under the latest projections.Several smaller individual generating facilities should lead to greater flexibility in potential combinations and fewer adverse environmental impacts.We recommend that this be examined. Response The power projections used were the best available and deemed to be the most accurate at the time of license application.The need to reevaluate these forecasts is being assessed by Alaska Power Authority.The Susitna Project was designed to most economically meet projected future power needs.In comparing alternatives,it was most logical to compare the Susitna Project with others having the same power output.This permitted a compari- son of the environmental impacts.We also question that several smaller individual generating facilities (with associated access and transmission)should lead to fewer adverse environmental impacts. Comment 5 In the assessments provided on hydropower alternatives,Susitna as pro- posed and alternative basin developments are not evaluated on an equit- able basis. Tables are displayed which contrast the weak and strong points of these alternatives yet we never see how the Susitna project ranks.This is particularly unfortunate since Susitna would leave one with the initial impression (which is the level to which the alternatives are examined) that it would have significant adverse impacts to many of the environ- mental criteria (page E-1O-4),including:(l)big game,(2)anadromous fish,(3)de facto wilderness,(4)cultural (subsistence),(5)recrea- tion (existing),(6)restricted land use,and (7)access. Response The Susitna Project is the proposed project.The tables and analyses referred to are not for the purpose of evaluating the Susitna project but to evaluate alterna- tives.Much more detailed analysis of the Susitna Proj- ect is appropriate and occurs in the remainder of Exhi- bit E.From an initial review,the Susitna Project would be extremely favorabl e from an envi ronmental per- spective compared to the other large hydro si~es evalua- ted. Comment 6 There is no attempt in this chapter to examine the environmental trade offs of the different power generation alternatives,including Susitna. Therefore,an assessment as to what woul d be the "best II power develop- ment for the Railbelt is not possible.Additionally,in that no single alternative source of power is contemplated to provide the same level of power as Susitna (assuming the updated future power demand projec- tions assert that this power generation capability is needed)various power generation mixes should be examined.These alternative combina- tion plans should then be compared to Susitna in a tradeoff analysis. Response An identification of the "best"alternative power devel- opment in the absence of Susitna is made in Exhibit D. This alternative consists of significant development of r-c~:, ..... - ,..... I I r I I~ coal resources suppl emented by gas power or peaking energy.The environmental impact of this plan would basically be that as described under Section 4.Without a specific mining/generating plants it is not possible to provide specific environmental impacts. Comment 7 One obvious alternative power generation mix (which is further discus- sed in our Specific Comments)should center on the power generating capabi 1ity of the West Cook Inlet area.In close proximity to each other and existing transmission lines s we have Chakachamna hydropower s Beluga Coal fields s Mount Spurr geothermal s and the West Cook Inlet natural gas fields. Response Further to the previous responses the IIbest"non-Susitna plan is a mixture of the West Cook Inlet alternatives with emphasis on Beluga coal.This plan and the asso- ciated economic comparison is supplied in Exhibit Os as specified in the FERC regulations.The Chakachamna pro- ject is addressed as part of the non-Susitna plan sensi- tivity analysis. Comment 8 Natural gas is considered by many to be a highly attractive alternative to Susitna 18/,19/.Yet the coverage devoted to this subject was disappointing,particularly when compared to other alternative power generating technologies.Three times as much space is devoted to nuclear power which is not generally considered as a socially accept- able alternative to Susitna.Biomass,as an energy sources received twice the coverage of natural gas s and wind power received more than four times the coverage devoted to natural gas.This confirms what we perceive as misappropriation of emphasis.Numerous reports have been issued over the 1ast three years on the natural gas al ternative s in- cluding the two footnoted below.Few reports are referenced in Section 10.3(c)(i)giving the impression that a very limited effort was expen- ded in researching this section. Response Natural gas was only one of t~e alternatives considered. Adequate coverage is devoted to this subject in Section 4. Comment 9 Section 10.3(f)fails to recognize the most attractive geothermal al- ternatives Mount Spurr.Further discussion on this alternative is fur- nished in our Section 10.3(f)specific comments. Response Additional information on this subject has been added to Sections 4.It should be noted that the Alaska Depart- ment of Natural Resources,in its comments to this Chapter stated IIUnt il expl orat i on of the geothermal potential of Mt.Spurr has occurred,the viability of geothermal power for the railbelt region is unknown.1I Comment 10 Apparently no attempt has been made to assess alternatives to the pro- posed construction camp/village such as siting,type of camp,and administration of the camp.Alternatives to those proposed in the draft application obviously exist and need to be openly examined. These implicit decisions have large implications for the fish and wild- 1 He resources and users.Considerations of a Prudhoe Bay type camp should be given.Construction camp alternatives should be discussed in terms of minimizing adverse impacts to fish and wildlife resources and thei r use.We are concerned that not only were the resource agenci es not consulted previously on these actions but that communication and cooodination between those responsible for this chapter and those in- volved in the socioeconomic,and the fish and wildlife components did not occur to a satisfactory level. Response Considerable study was done to determine the best sit- ing,type of camp and administrative p~icies for camp operation.During the development of a camp plan,con- sideration was given to recent experience in Alaska on projects 1 ike the Trans-Al aska Oi 1 Pi pel i ne as well as 1 arge hydroelectric projects in northern Canada.In addition,the environmental concerns were taken into account. Selection of camp siting was made after studying pos- sible locations on both river banks and giving consider- ation to access,work areas and environmental impacts. The type of camp with a balance between family and single status personnel with emphasis on community and recreational facilities,was the result of an in-depth study of successful construction communities on other large scale,long-duration hydroelectric projects.The type of camp was selected to compl iment the hours of work and the poljcies of time-off for personnel to visit famil ies.The overall objective has been to provide a community that would attract the skilled worker required (""--, r t for the proj ect,whi 1e at the same time controll i ng costs to a reasonable level and keeping environmental impacts to a minimum.Mitigation measures discussed in Chapter 3 include those specifically addressed to the camp construction and operation. Cornment 11 Due to the numerous inadequacies mentioned above the "concludingll Section 10.4 should not be expected to provide enlightenment regarding the consequences of license denial.It does not.Additional inadequa- cies are discussed in the Specific Comments which follow. Response The section on consequences of license denial has been expanded.See Section 5. SPECIFIC COMMENTS -ALTERNATIVE LOCATIONS,DESIGNS,AND ENERGY SOURCES W-10-001 10.1-r-.----..---:::---.-:-----:~r--"'_T-:__"".___n~-__;_Paragraph 1: not prov1 e , (i)Screening of Candidate Sites:Paragraph 1:Reference is made to Exhibit B,which has not been furnished,although we requested it. -Second Iteration:Paragraph 2:The criteria should re- flect that:(1)just because salmon migrate above a site doesn't mean losses to anadromous fish are unavoidable (e.g., Chakachamna);and (2)just because anadromous fish are not found above a potential site,adverse impacts are avoidable (e.g.Susitna). Res ponse The methodology for analysis of alternative sites for non-Susitna hydropower development was discussed in Section 1.4 of Volume I of the Feasibility Report,which was issued to all agencies in March 1982.The plan formulation and selection methodologies in Exhibit B discusses the engineering and economic considerations of the analysis;the environmental analysis methodology is explained in full in Chapter 10 of Exhibit E. The 91 potential sites were a result of reviewing pre- vious studies.It is not necessary nor desirable to increase the 1 ength of Chapter 10 by expanding on the sources of information.They are discussed in detail in the Development Selection Report issued to all agencies in November 1981.This report is referenced in Chapter 10. This paragraph has been revised.It is felt that pre- sence of anadromous fish makes the area more sensitive to environmental disturbances. W-10-002 (in Basis of Evaluation:It would appear appropriate to include Susitna and within Susitna basin alternatives in the evaluation matrices. Response The purpose of the analysis was to compare the various alternatives in order to select those for which develop- ment would have the least environmental impact and still meet economic and engineering constraints. .... W-10-003 Paragra h 1:The inter- relations ips of the environmenta criteria should be recog- nized and assessed.Dramatic changes in anyone item would have repercussions to all others. Response The eval uati on methodology uti 1i zed cons i ders ranks and we i ghts the most important envi ronmenta 1 criteri a. .....Attempting to include interrelationships would compli- cate the evaluation scheme,confuse the reader,and most likely not affect the outcome. W-10-004 (iv)Eval uation Results:We recommend that all eval uation matrices include Susitna and within Susitna basin alterna- tives. v)Plan Formulation and Evaluation:We recommend that all eva uatlon matrlces lnc u e Susltna and within Susitna basin alternat i ves. This evaluation should be reassessed in terms of current pro- jections for future power needs.The present examination apparently is geared toward looking at various power genera- tion alternatives (which are not specifically described)on the basis of providing an equal amount of generating capacity" to what Susitna woul d provide.We recommend that these alternative plans be reassessed in light of current power proj ecti ons. Response W-1O-005 See response to comment W-IO-002. (c)Upper Susitna Basin Hydroelectric Alternatives:Paragraph 3:Reference is made to Exhibit B,which has not been fur- nished,although we requested it. Response The selection process in Exhibit B which is referred to is described in Section 1.4 of Volume 1 of the Feasi- bil ity Report whi ch was sent to the U.S.Fi sh and Wildlife Service in March 1982.Figure E.10.4 depicts the role of environmental concerns in the selection process. W-10-006 (ii)Site Screening -Energy Contribution:Reference is made to Exhibit B,which has not been furnished,although we requested it. Response Information on load forecasts is included in the Feasi- bility Report which was distributed to the USFWS in March 1982.The information pertinent to the discussion in Chapter 10 is included;it is not necessary to go into more detail~ W-10-007 (v)Comparison of Plans -Energy Contribution:Paragraph 2:Reference is made to Exhibit B,which has not been furnished,although we have requested it. Response The reference to Exhibit B technical considerations. whi ch are the subject of Chapter 10. is in regard to economic and Environmental comparisons, Exhibit E,are included in Paragraph 1: been furni shed,Reference is made to Exhibit B,which has not although we requested it. 10.2 -Alternative Facility Designs (a)Watana Facility Design Alternatives (i)Diversion/Emergency Release Facilites: W-10-008 It is stated that,"Tables B.61 and B.62 of Exhibit B show the minimum flow releases from the Watana and Devil Canyon dams required to maintain an adequate flow at Gold Creek. These release levels have been established to avoid adverse affects on the Salmon (SIC)fishery downstream."Perhaps a more accurate apprai sal can be found in Chapter 4 (page E-4-3),"The impact of •••upriver and downriver changes in hydrology •••cannot be assessed at this time due to the lack of i nfonnati on concerni ng t he amount,type and 1ocati on of disturbances associated with these activities.II In Chapters 2 and 3 it is stated that the reduced flows could impair fish migration,dewater spawning and rearing habitat,prevent access to slough and side channel habitats and lower or eli- minate intragravel flows to slough and side channel spawning grounds.The minimum flows proposed were not developed using any recogni zed instream flow methodol ogi es,and 1ack any bi 01 ogica 1 basi s other than the most rudimentary.In fact, no explanation is offered in the Exhibit E as to how the 12,000 cfs minimum operating flows for August and into September were arrived at. F-"c-l Response The referenced tables in Exhibit B are included in Chapter 2 of Exhibit E.The impacts referred to in Chapter 3 are all potential impacts;it is expected ..... mitigation will reduce or eliminate many of these.The 12,000 cfs minimum operating flows for August were arrived at as a compromise between avoidance flows (Case D)whi ch would be 19,000 cfs in August and make the project economically unattractive and optimum power flows (Case A)which would be 6000 cfs in August and result in severe impacts.It is bel ieved the selected operating scenario (Case C)will result in impacts which can be mitigated.Further studies,as part of the fish and wildlife mitigation effort,are continuing. W-10-009 (i ii)Power Intake and Water Passages:Paragraph 2:The statement is made that a multi-intake structure would be used,II •••in order to control the downstream ri ver tempera- tures within acceptable limits.1I The Watana and Devi)Canyon dams will cause changes to the existing water temperature of the Susitna River,generally releasing cooler water during summer months and warmer water in winter.This,in turn,may present significant impact to the downstream riverine envi- ronment.Temperature vari ati ons may affect the abi 1ity of fish to migrate,spawn,feed,and develop in the Susitna system.Ice formation may be del ayed or possibly not occur above Talkeetna.This issue is discussed at length in Chapters 2 and 3 although an accurate description of post- project temperature impacts is not presented.The model which was developed to describe reservoir outflow tempera- tures contains input data from only five months (June through October)of one year (1981)•The Devi 1 Canyon Reservoir was not modeled,but in Chapter 2 it is stated that the location of ice formation (above Talkeetna)will depend on the outflow temperature from Devil Canyon Dam (page E-2-83). Response The multi-level intake structure will be utilized as stated to control downstream river temperature within acceptable limits.It is not meant to imply there will be no changes in river temperatures from current opera- tions.Revised temperature and ice modeling results, including for Devil Canyon,are presented in Chapters 2 and 3. W-10-010 Paragraph 3:Please reference our comments on Section 10.2(a)(i)concerning minimum flows. Response I~ - W-10-011 See response to comment W-10-008. (b)Devil Canyon Facility Design Alternatives iii Power Intake and Water Passages:2:Please ......r-e..".fe-r"--t~o----o-u r..;;.-c-om-m-e-n-:"t-s-o-n--:S:;"""e-'-c-:-t.....i-o"""'"n=--'1"'0-.2~a-r-""""~"'T""""-c on ce rn ing temperature modeling. Response See response to comment W-10-008. W-10-012 Paragraph 3:It should be clarified what "nonnally"and "the requirements of no significant daily variation in power flow" mean,particularly in regard to fish and wildlife impacts. Response This paragraph has been rewritten for clarity. W-10-013 (c)Access Alternatives (i)Plan Selection:Paragraph 2:Although input was solici- ted from resource agencies and the Susitna Hydro Steering Committee (SHSC),the selection certainly did not reflect this input.Please reference the SHSC letter dated November 5,1981.In addition,we wish to incorporate into our com- ments,by reference,our letter dated August 17,1982 to Eric Yould on this subject.As such,APA should respond to this letter as a part of our formal pre-license coordination. Response Although it may appear the access route selected did not refl ect agency input,the sel ecti on process most cer- tainly did.Section 2.3 more explicitly outlines the selection process and rationale.The Power Authority's response to the August 17 letter appears in Chapter 11. W-10-014 (i i)Pl an Eva 1uati on:Paragraph 1:Reference is made to Exhibit B,which has not been furnished,although we reques- ted it. Res pon se The plan evalutation section has been expanded to in- clude this information. W-10-015 Item Number 5:Paragraph 1:It is acknowl edged that a pro- blem exists in the potential of the access road and traffic to affect caribou movements,population size,and productiv- ity.Avoidance of the problem by eliminating the Denali Highway to Watana access segment would be consistent with the APA Mitigation Policy document,the recommendations of the resource agencies,and NEPA.As is stated in Appendix B.3 of the Susitna Hydroelectric Project Access Plan Recommendation Report (August 1982),"From a caribou conservation viewpoint, the Denali access route is far less desirable than proposed routes originating on the Alaska Railroad and Parks Highway. - """'I The Denal i route woul d most certai nly have immedi ate detri- mental impacts on the resident subherd and future negative impacts on the ma in Nelchi na herd although these impacts cannot be quantified." Response Schedule constraints and logistical and financial con- siderations resulted in the necessity of the Denali Highway to Watana selection.These considerations are now discussed.Measures to mitigate any potential impacts to caribou are included in the mitigation plan discussed in Chapter 3.Making decisions to avoid rather than minimize environmental impacts,while ignor- ing significant cost and schedule ramifications,is not consistent with the Power Authority's mitigation policy document. W-10-016 Item Number 7:Paragraph 5:Both the APA Mitigation Policy document and NEPA acknowledge that it is better to avoid an adverse impact than to try to minimize it,"through proper engi neeri ng des ign and prudent management."APA I S approach should better reflect this in their decisions concerning access routing.In addition,reference is made to discussion "in Exhibit E."This is the Exhibit E. Response All efforts have and will be made to avoi d adverse impacts.see Section 2.4 concerning adjustments that were made to the access route to avoi d impacts where possible.The statement referencing Exhibit E has been rewritten for clarification. - W-10-017 (d)Transmi ss i on Alternati ves:By 1etter dated November 9, 1982,Mr.John Lawrence of Acres American requested our re- view of the Transmission Corridor Report as part of the for- mal pre-license coordination process.We responded by letter dated January 5,1982.In that it was requested as part of this formal pre-license coordination process and we responded with this understanding,the issues raised and recommenda- tions made in that letter should be addressed at this time. Response The letter referred to dated January 5,1982,was re- sponded to on April 14,1982.Copies of each appear in Chapter 11. W-IO-018 (iii Identification of Corridors:Paragra h 2:Reference is made to Exhibit B,which has not been furnis ed,although we requested it. Response The three figures referred to in Exhibit B are present as Figures E.10.10,E.10.11,and E.10.12 in Exhibit E. W-10-019 and Economically Acce table Watana to the Intert ie vi a South ,ver •Environmental:Given the APA decision to have road access for the Watana damsite to the Devil Canyon damsite along the north side of the river,we do not understand how it can be considered best environmentally (rating of "A")to have the transmission line al.ong the south side of the Susitna River. In our January 5,1982 1 etter we stated~II How construct i on - and maintenance-related access is obtained to a great extent determines the project-related wil dl ife and socioeconomic impacts.Construction and maintenenace of transmission lines should not provide for additional public access over that provided by the dam access route,II and,"Access to the dams shoul d be fully coord i nated wi th transmi ss ion 1 i ne rout ing. Access corridors which serve a dual purpose in regard to pro- ject access needs would be highly desirable from several decision-making criteria."This potential for increased access provided by the transmission line routing is readily acknowledged elsewhere in the Exhibit E (page E-5-84).This apparent inconsistency needs to be clarified. Response The transmission 1 ine,in accordance with the common corridor concept to reduce access,is now routed on the north side of the Susitna'River.See Section 2.4 and Table E.10.24 which reflect this change. W-10-020 Corridor Thirteen South Shore,Devil Sus itna Ri ver (ABCF)-Watana to Devil Canyon via •Envi ronmental :Pl ease refer to our comments above on Corridor One (ABCD). Response Refer to response to comment W-10-019. W-10-021 (ix Results and Concl usions:Paragraph 3:Reference is made to Exhib,t G which was not provide,a though we reques-r= ted it. - Response Not all exhibits were distributed in the initial review phase.All exhibits will be distributed by FERC as part of their review process. W-I0-022 (e)Borrow Site Alternatives:Unless unavoidable,borrow sites should be restricted to within the future impoundments and/or to upland sites.Selection should be coordinated with access and transmission line routing and with resource agen- cies.We have not previously been contacted for the purpose of providing input and we do not have any project plans or assessments upon which to provide specific input. No attempt is offered to assess the env'i ronmental tradeoffs that would be made by selecting one borrow site alternative over another.We have assumed this is the underlying intent of including this type of alternatives comparison in the environmental Exhibit E.We recommend that this be under- taken to an equal level for alternative borrow sites,access routes,transmission routes,and other alternative project features. Response The major concern in borrow site selection was locating sites where sufficient material of the correct type was present.The environmental aspects of borrow site selection has been added to Section 2.5.Where poss- ible,primary sites were selected which would be in the impoundment zone with secondary sites being those out- si de the future impoundment zone.Thi sis now stated in Section 2.5. W-I0-023 10.3 -Alternative Electrical Energy Sources (a)Coal-Fired Generation Alternative There are three main deficiencies in the discussion of Beluga Coal development as an alternative to the Susitna project: 1.No quantitative estimate of the areas or resources to be affected by coal development are included.We recommend you include a description of:(a)schedules for developllent;(b) area fish and wildlife populations;(c)habitat types and areas to be di sturbed,altered,or destroyed;(d)construc- tion and operation work forces necessary for project develop- ment;(e)magnitude of commercial,recreational,and subsis- tence use of Beluga area fish and wildlife resource;and (f) numbers of fish and wildlife which may be impacted by project development. We realize that such information is still very tentative for the Beluga project and project impacts have barely been eval- uated.However,recent field studies should allow you to approximate the magnitude of the resources involved and po- tential for impacts to them. Response Without a specifi c proposal to mi ne Be 1uga coal,it is not possible to supply this information.The environ- mental assessment of project al ternatives is not re- quired to be as detailed as for the proposed project. The Power Authority will consider this recommendation. W-10-024 2.A direct comparison with Susitna develollTlent plans and anticipated impacts is lacking.Comparison of the informa- tion identified in 1.,above,with similar information for the Susitna project should be provided.For example,the corrmercial,recreationa 1,and subs i stence harvests and pres- sures for use of the Beluga area should be compared to Susitna area resources.Acreages and habitat types that would be impacted by alternative development scenarios should be compared.The magnitudes of project impacts relative to fish and wildlife needs to be analyzed.Also,the work force and time frame which would be required for Susitna should be compared to Beluga developments,for the same power needs. Response See response to comment W-10-034. W-10-025 3.Reasons for rejecting Beluga coal-fired generation or Beluga coal in combination with smaller hydroelectric pro- jects or other energy sources,as an alternative to develop- ment of Susitna hydropower are not given. Response These reasons are included in Section 5 and Exhibit D. W-10-026 Paragraph 1:Since we were not provided with a copy of Exhi- bit B,we cannot comment on the adequacy of the referenced analysis of the economic feasibility of Beluga Coal.We would hope the analysis includes discussion of private finan- cial backing for Beluga Coal develollTlent as compared to State financing involved with the Susitna project.Further discus- sion of the feasibility of alternative Beluga development schemes may be found ina State report by Gene Rutl edge, Darlene Lane,and Greg Edblem,1980,Alaska Regional Energy Resources Planning Project,Phase 2,Coal,Hydroelectric,and Energy Alternatives,Volume 1,Beluga Coal District Analy- sis. F- rna- ..... - - - Current soft foreign market conditions are exempl ified by recent slow downs of the most active Beluga coal lease- holders in completing ongoing environmental studies necessary for permitting.It woul d be hel pful to know to what extent the State is working with the private leaseholders to consi- der State use of any portion of Beluga Coal production.We understand that the lease holders do not expect to complete financial feasibility studies before the second half of 1983. Response Economic feasibility analysis is not a subject appro- priate for Exhibit E according to the FERC regulations. See Exhibit B. W-I0-027 Paragraph 2:Although specifics of plant design and location are not yet available,more detailed information can be pro- vided on the magnitude,and probable initial development alternatives,including export of Beluga coal to Pacific Rim countri es.We recommend the add it i on of an area map with locations of existing leases,potential camps and development facitlities,and alternative transportation and transmission corri dors. Response Until a specific plan is proposed,this information is not avail abl e.It is not felt thi s 1 evel of detail ; s necessary to compare alternatives. W-I0-028 Paragraph 3:We recommend expanding this paragraph to consi- der the availability and probability of coal development in Southcentral Alaska.Accord"jng to current industry plans, Beluga coal resources are sufficient to allow mining for export of 5 million tons per year (with possible expansion to 10 million tons)on Beluga Coal Company leases and 6 to 13 million tons per year from the 20,500 acre Diamond Alaska Coal Company 1ease for at 1 east 30 years.The avai labi 1ity of this qr other developments as an energy source for Alaska has been increased with recent state promotions of additional coal exploration.The state has proposed a competitive coal large sale during the first half of 1983 for 25,000 acres near Beluga Lake."Also under consideration is a non- competitive coal right disposal west of the Susitna River. Moreover,Bering River coal development has been the subject of recent proposal s for expl orat i on and envi ronmental studies. Response Thi sparagraph expl a ins the assumptions for the a lterna- tiveana~'ysis.The information suggested to be added is not re 1event,. W-10-029 (i)Existing Environmental Condition:As described earlier, the qualitative discussion provided here allows no comparison with the Susitna project.We recommend descri bing detai 1ed U.S.Forest Service and Soil Conservation Service data for the area and ongoing studies which should result in a more detailed classification of area vegetation. The predominance of wetlands,particularly near the coast, are discernable on FWS·National Wetland Inventory maps avail able for the area.Those wetlands are particul arly important habitats for the diverse bi rd 1 ife descri bed in later paragraphs. Response The detail of the information suggested is not deemed to be necessary for alternative comparison. W-10-030 Fauna,Paragraph 1:Cl arification is necessary regarding the referenced "Selvon fisheryll. Response "Selvon ll has been corrected to salmon. W-10-031 Paragraph 2:We recommend describing numbers of bal d eagle and trumpeter swan nests relative to numbers in the Susitna project area. Response This level of information is not required for assessing alternatives. W-10-032 -Aquatic Ecosystem:Additional information should be pro- vided on the quantity and quality of this system (e.g.,the extent to whi ch spawni ng,reari ng,and overwi nteri ng areas have been identified within and downstream of the 1 ease areas). Response This level of information is not necessary to assess alternatives. W-10-033 Marine Ecosystem:Although species presence is described, there is no quantitative information on their relative abun- dance,or habitat quality.Figures cited for the referenced Cook Inlet fishery is dependent upon Beluga,Susitna,and other area systems.An assessment of the proportion of that fishery which depends on the Beluga system compared to the Susitna system should be provided. FT' F-- ,.... I ~, - - F' I I Response This information is not available. W-IO-034 -Socioeconomic Conditions:The discussion should be ex- panded to cover current levels of commercial,subsistence, and recreational fish and wildlife use. Response This information is not necessary to assess alter- natives. W-IO-035 (ii)Envi ronmental Impacts -Air Quality:The potential for mitigating the air pollu- tants described here should be discussed. Response The figures for fly ash include the use of preclpl- tators,which is a mitigation device.The point of the discussion is that burni ng coal,even with mitigation, will result in some degradation of air quality. W-IO-036 Terrestri al Ecosystems:The range of te rrestri al habitat to be annually impacted should be quantified and compared wi ttl Susitna development pl ans.In add it i on to habitats di.sturbed by mi ni ng,p roj ect features s uc h as roads and t ransmi s si on corridors which could be expected with coal development should be described.While the road system required for coal de vel opment shoul d be substanti ally 1ess than that for the Susitna proJect,the potential for restori ng mi ned 1 ands to original habitat values is untested for the area. Paragraph 2:ADF&G harvest data s houl d be i ncl uded here. The correlation between hunting pressure and current access should also be discussed in quantifying roads and human popu- lation increases anticipated from Beluga Coal development. Human/wildlife conflicts (e.g.,bears shot in defense of life or property,wildlife mortality from additional vehicle traffic and roads)is another critical impact not mentioned here. Response The amount of 1 and to be impacted woul d depend on the quantity of coal to be mined,thickness of seam and other information;a meaningful figure could not be cal- culated without a specific mining plan.M"ining would result in continuous and increasing disturbance of wild- life habitat;the Susitna Project would not. Quantification of the relationship between hunting pressure and access is not possible.A sentence discussing the impacts from human/wildlife conflicts has been added to this paragraph. W-10-037 Aquatic and Marine Ecosystems:Some quantification of anti- ci pated impacts can be made and shoul d be i ncl uded here. Development of both Beluga Coal Company·s and Diamond Alaska Coal Company's lease holdings could eliminate nine stream- miles of existing anadromous and resident fish habitat. Stream restoration to original habitat quality will be diffi- cult,to impossible,to attain.According to preliminary flow information,nearly half the total flow in the Chuitna River originates in or flows through the proposed mine pits. Assuming that half the anadromous fish production is lost from the Chuitna system,ADF&G estimates the annual loss of fish available to Cook Inlet fisheries will be within the following ranges: Pi nk Salmon Coho Salmon King Salmon Chum Salmon Total Salmon 70,000 -650,000 mean =275,000 5,250 -48,750 mean =20,625 2,100 -19,500 mean =8,250 700 -6,500 mean =2,750 78,050 -724,750 mean =306,625 We recommend contrasti ng thi s i nformat i on with prel imi nary impact assessments for Susitna and other alternative project developments in the license application.The comparison shoul d al so cover harvest 1evel s,and areas and types of habitats to be altered or destroyed.Data gaps and uncer- tainties should be clarified in an accompanying discussion. Response Without a specific m1n1ng plan proposal,it is not pos- si ble to quantify impacts as suggested.The figures provided by the FWS have been added to the report.Sim- ilar figures for big game,furbearers,and areas and types of habitats are not available. - - W-10-038 -Socioeconomic Conditions:Recently published reports by the ADF&G document the magnitude of subsistence hunti ng and fishing by Tyonek area residents 21/22/23.We recommend that you discuss these findings inassessing fish and wild- life resource uses which may be affected by Beluga coal development. A general discussion of the socioeconomic impacts on Tyonek from developing Susitna or Chakachamna hydropower projects, as compared to Beluga coal development is given in a recent report for the ADCRA 24/.Tyonek apparently supports coa 1 development as long ash does not inhibit their ability to subsistence hunt and fish.Consideration should be given to similar local support or opposition to the Susitna project. Although the purpose of this section is to desc~ibe Beluga as an alternative to Susitna,Beluga coal development would undoubtedly include additional mining for export.Thus while the discussion appropriately describes the incremental workers associated with the power generation facilities only, the enti re development wi 11 i nf1 uence the permanence of the work force.The report is confusing in the discussion on whether a fly-in construction camp or permanent townsite is to be established (see pages E-10-81(a)Paragraph 3,E-10-88, last two paragraphs,and E-10-89,Paragraph 1).Some dis- cussion is needed of both alternatives,resultant impacts on fish and wildlife uses,and the potential for mitigation. Response Subsistence hunting and fishing by the village of Tyonek is discussed in this section.The Power Authority has conducted an extensive Public Participation Program for the Susitna Project. In addition,a report of public attitudes and sociocul- tural conditions and expected impacts from the Susitna Project was prepared by Stephen Braund and Associates. The results of his study are presented in Chapter 5 of the Susitna Feasibility Report,supplied to agencies in March 1982.A summary of this information is included in Chapter 5 of Exhibit E. The question of a pennanent town site or fly-in con- structi on camp wou1 d not be reso1 ved without further analysis of the mining plant,schedule,logistics,and cost.It is neither necessary or desirable to assess alternatives within alternatives to the proposed pro- ject. W-IO-039 (c Thermal Alternatives Other Than Coal 1 Natura Gas:In t at natura gas is considered by many to be the best single source alternative to Susitna 25/,26/, it is disconcerting to see so minimal an effort expended examining this alternative.The effort should be at least equal to that provided to the assessment of alternative hydropower sites and coal.Anything less must be considered inadequate.No examination specific to natural gas in regard to potential environment impacts is provided nor is a trade- off examination of natural gas,and other alternatives. Without this,one cannot determine whether or not a proposal is the best of all alternatives. Discussion should be provided on the potential impact of the recent signi ng of natural gas supply contracts between the Enstar Corporation and Marathon and Shell Oil Companies. Discussion should focus on the impacts of these contracts,if approved,not only on allocated natural gas reserves,but also on predicting future use,pricing,potential future demand of electricity for home heating through the Matanuska- Susitna Borough,and future availability and pricing of natural gas for electrical energy generation. Response Section 5 provides additional information on the natural gas alternative.Information on impacts on reserves, use,pricing,demand,and availability is not part of the envi ronmental assessment and not appropri ate for Exhibit E.Treatment of these topics is in Exhibit D. W-IO-040 (iv)Environmental Considerations:It is unclear as to what this section is in reference to.If it is meant to cover all types of fossil fuel burning power plants,it is insuffi- cient.We do not consider the potential environmental impacts of burning natural gas to be the same as for diesel, oil,or coal.We recommend that environmental considerations be examined separately for each of these fuel alternatives. Then they shoul d be exami ned through a tradeoff analys is which would include Susitna,as proposed,other hydropower projects,and alternative within basin alternatives,and other alternatives to Susitna. Much of the section centers on the potential impact/problems which would occur with increased dependence on coal for power generation.Given that the section is entitled (c)Thermal Alternatives Other Than Coal,this would seem inappropriate. Response The titl e of this section has been changed to avoid confusion.It does not cover impacts from burning coal, ..... "... I r as thi s was di scussed in the invnedi ately preceedi ng section.Tables E.IO.27,E.IO.28,and E.IO.29,as referenced,do not include emissions from coal-fired plants.The discussion of coal plants in this section is presented only as comparative information for the regulatory framework section.The tradeoff analysis requested is not possible without site specific plans and proposals. W-IO-041 (f)Geothermal:This section fail s to recognize,other than parenthetically,the most attractive geothermal alternative, Mt.Spurr.We therefore,recommend that APA examine the feasibility of geothermal energy development at this site as an alternative to Susitna.Mt.Spurr is being considered by the Division of Minerals and Energy Management of the ADNR as their first geothermal lease sale area.They concluded it is the best potential geothermal development site within their jurisdiction.It is being proposed because:(1)it has high potential;(2)it is located on State land;and (3)it is close to existing transmission lines (Beluga Station).In addition,it is in an area already being explored for power development,being located between the Chakachatna River and the Beluga coal fields,and the area is criss-crossed by logging roads.It would also seem logical to explore the possibility of a West Cook Inlet power generation alternative to Sus.itna.This combination would be composed of Mount Spurr geothermal,Chakachamna hydropower,Beluga coal,and West Cook Inlet natural gas.Obvious advantages woul d be found in the isolation of adverse environmental impacts to a relatively small area which al ready has transmission facil i- ties. Response The discussion of the Mount Spurr areas has been expan- ded.The Al aska Department of Natural Resources in its comment on the draft 1 icense appl ication has stated "Until exploration of the geothermal properties of Mount Spurr has occurred,the vi abil ity of geothenna 1 powe r for the rail belt region is unknown." It is not the intent of the alternative discussion to include all the various combinations of generation mixes.The reader may do this by reading the various sections. W-IO-042 10.4 Environmental Consequences of License Denial:This section provides little insight as to what might occur if Susitna were not built.We hope that a greater planning effort is ongoing to allow the State to adequately address thi s issue.It woul d seem that the fi rst approach to thi s problem would involve a tradeoff analysis,looking at envi- ronmental as well as other i ssuess to exami ne appropri ate alternatives to the Susitna project.The analysis should be directed at:(1)short-term planning,in the event that Susitna is delayed for various lengths of time;and (2)long- term pl anni ng so that we do have a fall back pl an in the event that Susitna is not licensed.We recommend that this be undertaken. There is no examination of socioeconomic impacts in the event that the Susitna project license is denied.We consider the potential for a boom-bust occurrence to be great with con- struction of Susitna.Without Susitna we,therefore,would consider this as much less likely.In the event we do not have Susitna,we would expect the construction of much smal- ler power generation units which would come online over a much longer period of time.We recommend that the socioeco- nomic implications of license denial be assessed. Response This section has been expanded.Recommendations for further studies will be considered in developing future plans.