Loading...
HomeMy WebLinkAboutCostworksheet 10-07-08 Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. At least 5,880 MBF of commercially-available wood from Haines State Forest. Recent annual uses have been around 700 MBF. Unit depends on project type (e.g. windspeed, hydropower output, biomass fuel) Biomass fuel 2. Existing Energy Generation a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other Four wood-fired boilers ii. Rated capacity of generators/boilers/other 425,000 BTU/hr each iii. Generator/boilers/other type Garn WHS 2000 iv. Age of generators/boilers/other new v. Efficiency of generators/boilers/other 84% b) Annual O&M cost i. Annual O&M cost for labor $15,000.00 ii. Annual O&M cost for non-labor $22,000.00 c) Annual electricity production and fuel usage (fill in as applicable) – N/A d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 11,520 gal ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] 100 cords vi. Other 3. Proposed System Design a) Installed capacity 425,000 MBTU/hr X4 – 1,700,000 b) Annual renewable electricity generation – N/A Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 2 4. Project Cost a) Total capital cost of new system $441,229.00 b) Development cost $47,444.00 c) Annual O&M cost of new system $15,000.00 d) Annual fuel cost $22,000.00 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat 11,520 gal iii. Transportation b) Price of displaced fuel $57,600.00/yr c) Other economic benefits Local resource, local employment, less dependence on petroleum fuels d) Amount of Alaska public benefits Using local resources, independence from foreign oil 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Cost: $139,400.00 more to construct wood system Benefits: $24,850.00/year fuel cost savings 14,500.00/year wages for maintenance 39,350.00/year Payback 3.5 years