HomeMy WebLinkAbout2 - Cost Worksheet & Budget Form Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 20,500-24,700 MWh Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the Railbelt1 grid, leave this section blank) i. Number of generators/boilers/other 14 (see page 8 of grant agreement for breakdown) ii. Rated capacity of generators/boilers/other 20.05 MW (see page 8 of grant application) iii. Generator/boilers/other type Fairbanks Morse, Enterprise, Caterpillar, Solar iv. Age of generators/boilers/other Ranges from 1952-1998 v. Efficiency of generators/boilers/other Ranges from 9.3 kWh/gallon to 14 kWh/gallon b) Annual O&M cost (if system is part of the Railbelt grid, leave this section blank) i. Annual O&M cost for labor $1,157,000 (Includes operation of Solomon Gulch) ii. Annual O&M cost for non-labor $498,000 (CVEA budget estimate 2008) c) Annual electricity production and fuel usage (fill in as applicable) (if system is part of the Railbelt grid, leave this section blank) – CVEA NOTE: Includes Solomon Gulch i. Electricity [kWh] 82,267,391 kWh’s – 2007 gross generation ii. Fuel usage Diesel [gal] Estimated 987,000 gallons per year Other LSR: Estimated 2,438,000 gallons per year iii. Peak Load Coincident peak 13.50 MW (2007 actual) iv. Average Load 11.6 MW (2007 actual) v. Minimum Load 6.3 MW (2007 actual) vi. Efficiency Ranges from 9.3 kWh/gallon to 14 kWh/gallon vii. Future trends No growth d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] N/A ii. Electricity [kWh] iii. Propane [gal or MMBtu] 1 The Railbelt grid connects all customers of Chugach Electric Association, Homer Electric Association, Golden Valley Electric Association, the City of Seward Electric Department, Matanuska Electric Association and Anchorage Municipal Light and Power. Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet revised 9/26/08 Page 2 iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 3. Proposed System Design a) Installed capacity 4 MW b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] Range of 20,500,000 – 24,700,000 kWh’s iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $45,058,000 b) Development cost $40,320,000 c) Annual O&M cost of new system Estimated at $10/MWh d) Annual fuel cost 0 5. Project Benefits a) Amount of fuel displaced for i. Electricity 3,125,000 gallons per year ii. Heat iii. Transportation b) Price of displaced fuel $9,885,000 per year c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale Energy cost of 16.5-18.1¢ per kWh 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio $9,885,000 / $4,081,000 (1st year costs) = 2.42 Payback $45,058,000 / $4,830,000 = 9.32 years Alaska Energy Authority - Renewable Energy Fund BUDGET INFORMATION BUDGET SUMMARY: Milestone or Task Federal Funds State Funds Local Match Funds (Cash) 20% Local Match Funds (In-Kind)Other Funds TOTALS 1 - Reconnaissance $0 $200,000 $0 $200,000 2 a - Licensing & Feasibility (2007-2008)$0 $800,000 $0 $800,000 2 b - Licensing & Feasibility (2009-2011)$0 $1,168,000 $292,000 $1,460,000 3 - Final Design $0 $1,120,000 $280,000 $1,400,000 4 - Construction $0 $29,168,000 $7,292,000 $36,460,000 $0 $32,456,000 $7,864,000 $0 $0 $40,320,000 Milestone # or Task # BUDGET CATAGORIES:1 2a 2b 3 4 TOTALS Direct Labor and Benefits $0 Travel, Meals, or Per Diem $0 Equipment $4,380,000 $4,380,000 Supplies $0 Contractual Services $200,000 $800,000 $1,460,000 $1,400,000 $1,400,000 $5,260,000 Construction Services $30,680,000 $30,680,000 Other Direct Costs $0 TOTAL DIRECT CHARGES $200,000 $800,000 $1,460,000 $1,400,000 $36,460,000 $40,320,000 RFA AEA09-004 Budget Form