Loading...
HomeMy WebLinkAboutB - HBC AEA table of contentsCordova Electric Cooperative: Humpback Creek Hydroelectric Facility Alaska Energy Authority Renewable Energy Fund Application Table of Contents   Table of contents  ..........................................................................................................................   i  AEA Application Form  ...............................................................................................................   1  AEA Cost Worksheet  ...................................................................................................................  23  AEA Project Budget  .....................................................................................................................  26  CEC Resolution Authorizing AEA Renewable Energy application …………………..  27   .......  28 Attachments  ............................................................................................................................ rt     Humpback Creek Hydro‐electric Project Team organization cha   Humpback Creek Hydro‐electric Life Cycle Cost Analysis, R&M   dule by Task     Humpback Creek Hydro‐electric Construction Activity Sche ewable Energy Efficiency, 1991 – 2008     CEC Increase in Ren t    Letters of suppor   CEC Rate Tariffs    Award Notification/Notice to Proceed for removal of Damaged Hydro‐ electric facilities  tor’s bid for road access construction   Contrac    electriHumpback Creek Hydro c Facility Conceptual Design drawings .................  47   Project location    Overall Site Plan    Intake/diversion Facilities Rehabilitation Design   Elevation    Intake/diversion Facilities,  Plan and Intake Section    Intake/diversion Facilities, Developed Upstream Diversion Dam   Intake/diversion Facilities, Diversion Dam and Tunnel Sections   Project Personnel Resumes …………………………………………………………………………. 69