HomeMy WebLinkAboutHydroeoectric Project On Jack River App
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 1 of 10 9/2/2008
Application Forms and Instructions
The following forms and instructions are provided for preparing your application for a
Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA)
and the forms are available online at http://www.akenergyauthority.org/RE_Fund.html
The following application forms are required to be submitted for a grant recommendation:
Grant Application
Form
GrantApp.doc Application form in MS Word that includes an outline of
information required to submit a complete application.
Applicants should use the form to assure all information is
provided and attach additional information as required.
Application Cost
Worksheet
Costworksheet.doc Summary of Cost information that should be addressed
by applicants in preparing their application.
Grant Budget
Form
GrantBudget.xls A detailed grant budget that includes a breakdown of
costs by task and a summary of funds available and
requested to complete the work for which funds are being
requested.
Grant Budget
Form Instructions
GrantBudgetInstr.pdf Instructions for completing the above grant budget form.
If you are applying for grants for more than one project, provide separate application
forms for each project.
Multiple phases for the same project may be submitted as one application.
If you are applying for grant funding for more than one phase of a project, provide a plan
and grant budget for completion of each phase.
If some work has already been completed on your project and you are requesting
funding for an advanced phase, submit information sufficient to demonstrate that the
preceding phases are satisfied and funding for an advanced phase is warranted.
If you have additional information or reports you would like the Authority to consider in
reviewing your application, either provide an electronic version of the document with
your submission or reference a web link where it can be downloaded or reviewed.
REMINDER:
Alaska Energy Authority is subject to the Public Records Act, AS 40.25 and materials
submitted to the Authority may be subject to disclosure requirements under the act if no
statutory exemptions apply.
All applications received will be posted on the Authority web site after final
recommendations are made to the legislature.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 2 of 10 9/3/2008
SECTION 1 – APPLICANT INFORMATION
Name (Name of utility, IPP, or government entity submitting proposal)
Native Village of Cantwell
Type of Entity:
Government Entity (Tribal Council)
Mailing Address
P.O. Box 94; Cantwell, AK 99729
Physical Address
133.4 Denali Hwy, Cantwell, AK 99729
Telephone
907-768-2591
Fax
907-768-1111
Email
hallvc@mtaonline.net
1.1 APPLICANT POINT OF CONTACT
Name
Gordon Carlson
Title
President, Native Village of Cantwell
Mailing Address
P.O. Box 94; Cantwell, AK 99729
Telephone
907-768-2591
Fax
907-768-1111
Email
hallvc@mtaonline.net
1.2 APPLICANT MINIMUM REQUIREMENTS
Please check as appropriate. If you do not to meet the minimum applicant requirements, your
application will be rejected.
1.2.1 As an Applicant, we are: (put an X in the appropriate box)
An electric utility holding a certificate of public convenience and necessity under AS
42.05, or
An independent power producer, or
A local government, or
X A governmental entity (which includes tribal councils and housing authorities);
Yes
1.2.2. Attached to this application is formal approval and endorsement for its project by
its board of directors, executive management, or other governing authority. If a
collaborative grouping, a formal approval from each participant’s governing
authority is necessary. (Indicate Yes or No in the box )
Yes
1.2.3. As an applicant, we have administrative and financial management systems and
follow procurement standards that comply with the standards set forth in the grant
agreement.
Yes
1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached
grant form. (Any exceptions should be clearly noted and submitted with the
application.)
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 3 of 10 9/3/2008
SECTION 2 – PROJECT SUMMARY
Provide a brief 1-2 page overview of your project.
2.1 PROJECT TYPE
Describe the type of project you are proposing, (Reconnaissance; Resource Assessment/
Feasibility Analysis/Conceptual Design; Final Design and Permitting; and/or Construction) as
well as the kind of renewable energy you intend to use. Refer to Section 1.5 of RFA.
The type of project the Native Village of Cantwell is proposing is a Phase 1 – Reconnaissance
project. The village intends to use hydroelectric energy.
2.2 PROJECT DESCRIPTION
Provide a one paragraph description of your project. At a minimum include the project location,
communities to be served, and who will be involved in the grant project.
The Native Village of Cantwell wishes to improve the reliability and lower the cost of the
community of Cantwells power system. Currently they obtain power from the line between MEA
and GVEA. To accomplish this they propose to build a hydroelectric project on the Jack River a
short distance from Cantwell. The installed capacity of this plant will be in exccess of 1 MW. It
will be comprised of a dam and a short tunnel. A feasibility design and scoping are required to
provide the parameters of the project.
2.3 PROJECT BUDGET OVERVIEW
Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source
of other contributions to the project. Include a project cost summary that includes an estimated total cost
through construction.
The estimated cost to do a feasibility study for this project is $200, 000.00. This amount is
based on Earle Ausman’s, PE / President and Chief Energy Engineer with Polarconsult Alaska
Inc., many years of experience. Attached is a letter from Earle Ausman that explains his
analysis. The Native Village of Cantwell will be contributing the Village Administrators wage
for this project. The Village Administrator will be the liaison between the village, Polarconsult
Alaska and the Alaska Energy Authority for the duration of this project.
2.4 PROJECT BENEFIT
Briefly discuss the financial benefits that will result from this project, including an estimate of economic
benefits(such as reduced fuel costs) and a description of other benefits to the Alaskan public.
A hydroelectric plant is proposed on Jack River. This plant will serve the Native Village of
Cantwell and the Cantwell Community. The Jack River runs within one mile of the village. The
village needs the power for standby as they are served off of the MEA-GVEA intertie only.
Damage to the line from an avalanche caused a two day outage in the dead of the winter;
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 4 of 10 9/3/2008
temperatures without wind chill can be –50 F in this area. High winds are constant in the
Cantwell area so the wind chill is even colder. Such a transmission failure can be much longer
and poses a grave hazard to the local people. Previous years ago Cantwell had a two hour
outage from a lightning strike. If it had damaged an insulator it could have lasted for a day or
more.
Cantwell also wants to use this renewable local resource to reduce their power costs and
provide income to the village. Toward this end any surplus power will be sold to GVEA and/or
MEA.
The hydro plant will be located where the river passes through a very narrow deep canyon. A
dam will be constructed across this 50 foot wide canyon whose sides are almost vertical. The
dam will store water that will be diverted through a 1500 foot or so tunnel and will be returned
to the river after passing through a Francis turbine(s). The capacity will vary depending on the
economical height of the dam and the water flows that can be obtained and utilized. The power
will be transmitted to the community grid. Surpluses in excess of the community’s needs will be
provided to GVEA and/or MEA. GVEA and MEA have a demand for renewable energy.
A preliminary design and scoping study will be required. As part of this endeavor, measurements
will be made of stream flows. These will be correlated with flows from nearby streams. With this
data and accurate surveys and geological work, a dam type and height will be selected. The
water passage selection may be a small tunnel or micro tunnel excavated with a boring machine.
The estimated tunnel length is within the capacity of such a machine. Part of the conveyance may
be in a pipeline fastened to cliffs. It will be insulated from the extreme cold temperatures.
2.5 PROJECT COST AND BENEFIT SUMARY
Include a summary of your project’s total costs and benefits below.
2.5.1 Total Project Cost
(Including estimates through construction.)
$200,000.00
2.5.2 Grant Funds Requested in this application. $194,540.00
2.5.3 Other Funds to be provided (Project match) $5,460.00
2.5.4 Total Grant Costs (sum of 2.5.2 and 2.5.3) $200,000.00
2.5.5 Estimated Benefit (Savings) $
2.5.6 Public Benefit (If you can calculate the benefit in terms of
dollars please provide that number here and explain how
you calculated that number in your application.)
$
The total project cost is estimated to be $200,000.00. This is based on Earle Ausman’s, PE /
President and Chief Energy Engineer with Polarconsult Alaska Inc., analysis. The Native Village
of Cantwell will be contributing the Village Administrators wage for this project for the amount
of $5,460.00 (6 hours per week X 52 weeks X $17.50 Administrator’s pay rate). The Village
Administrator will be the liaison between the village, Polarconsult Alaska and the Alaska Energy
Authority for the duration of this project.
The Native Village of Cantwell will hire a contractor to address the “Estimated Benefit” and
“Public Benefit” questions.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 5 of 10 9/3/2008
SECTION 3 – PROJECT MANAGEMENT PLAN
Describe who will be responsible for managing the project and provide a plan for successfu lly
completing the project within the scope, schedule and budget proposed in the application.
3.1 Project Manager
Tell us who will be managing the project for the Grantee and include a resume and references
for the manager(s). If the applicant does not have a project manager indicate how you intend to
solicit project management Support. If the applicant expects project management assistance
from AEA or another government entity, state that in this section.
The Native Village of Cantwell has been working with Polarconsult Alaska, Inc. for several
years to get a feasibility study done for the Jack River Hydro project. Once funding has been
secured to do a feasibility study for the Jack River Hydro project, the village will hire
Polarconsult Alaska, Inc. to proceed with this study. Polarconsult Alaska, Inc. will be providing
the information requested from the above question.
3.2 Project Schedule
Include a schedule for the proposed work that will be funded by this grant. (You may include a
chart or table attachment with a summary of dates below.)
The Native Village of Cantwell will hire a contractor to address this question.
3.3 Project Milestones
Define key tasks and decision points in your project and a schedule for achieving them.
The Native Village of Cantwell will hire a contractor to address this question.
3.4 Project Resources
Describe the personnel, contractors, equipment, and services you will use to accomplish the
project. Include any partnerships or commitments with other entities you have or anticipate will
be needed to complete your project. Describe any existing contracts and the selection process
you may use for major equipment purchases or contracts. Include brief resumes and references
for known, key personnel, contractors, and suppliers as an attachment to your application.
The Native Village of Cantwell will hire a contractor to address this question.
3.5 Project Communications
Discuss how you plan to monitor the project and keep the Authority informed of the status.
The Village Administrator will be the liaison between the village, Polarconsult Alaska and the
Alaska Energy Authority for the duration of this project. The village will be submitting quarterly
reports to the Alaska Energy Authority until this project is done.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 6 of 10 9/3/2008
3.6 Project Risk
Discuss potential problems and how you would address them.
The Native Village of Cantwell will hire a contractor to address this question.
SECTION 4 – PROJECT DESCRIPTION AND TASKS
Tell us what the project is and how you will meet the requirements outlined in Section 2 of
the RFA. The level of information will vary according to phase of the project you propose to
undertake with grant funds.
If you are applying for grant funding for more than one phase of a project provide a plan and
grant budget for completion of each phase.
If some work has already been completed on your project and you are requesting funding for
an advanced phase, submit information sufficient to demonstrate that the preceding phases
are satisfied and funding for an advanced phase is warranted.
4.1 Proposed Energy Resource
Describe the potential extent/amount of the energy resource that is available.
Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be
available for the market to be served by your project.
The Native Village of Cantwell will hire a contractor to address this question.
4.2 Existing Energy System
4.2.1 Basic configuration of Existing Energy System
Briefly discuss the basic configuration of the existing energy system. Include information about
the number, size, age, efficiency, and type of generation.
The Native Village of Cantwell will hire a contractor to address this question.
4.2.2 Existing Energy Resources Used
Briefly discuss your understanding of the existing energy resources. Include a brief discussion of
any impact the project may have on existing energy infrastructure and resources.
The Native Village of Cantwell will hire a contractor to address this question.
4.2.3 Existing Energy Market
Discuss existing energy use and its market. Discuss impacts your project may have on energy
customers.
The Native Village of Cantwell will hire a contractor to address this question.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 7 of 10 9/3/2008
4.3 Proposed System
Include information necessary to describe the system you are intending to develop and address
potential system design, land ownership, permits, and environmental issues.
4.3.1 System Design
Provide the following information for the proposed renewable energy system:
A description of renewable energy technology specific to project location
Optimum installed capacity
Anticipated capacity factor
Anticipated annual generation
Anticipated barriers
Basic integration concept
Delivery methods
The Native Village of Cantwell will hire a contractor to address these questions.
4.3.2 Land Ownership
Identify potential land ownership issues, including whether site owners have agreed to the
project or how you intend to approach land ownership and access issues.
The Native Village of Cantwell will hire a contractor to address this question.
4.3.3 Permits
Provide the following information is it may relate to permitting and how you intend to address
outstanding permit issues.
List of applicable permits
Anticipated permitting timeline
Identify and discussion of potential barriers
The Native Village of Cantwell will hire a contractor to address this question.
4.3.4 Environmental
Address whether the following environmental and land use issues apply, and if so how they will
be addressed:
Threatened or Endangered species
Habitat issues
Wetlands and other protected areas
Archaeological and historical resources
Land development constraints
Telecommunications interference
Aviation considerations
Visual, aesthetics impacts
Identify and discuss other potential barriers
The Native Village of Cantwell will hire a contractor to address these questions.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 8 of 10 9/3/2008
4.4 Proposed New System Costs (Total Estimated Costs and proposed Revenues)
The level of cost information provided will vary according to the phase of funding requested and
any previous work the applicant may have done on the project. Applicants must reference the
source of their cost data. For example: Applicants Records or Analysis, Industry Standards,
Consultant or Manufacturer’s estimates.
4.4.1 Project Development Cost
Provide detailed project cost information based on your current knowledge and understanding of
the project. Cost information should include the following:
Total anticipated project cost, and cost for this phase
Requested grant funding
Applicant matching funds – loans, capital contributions, in-kind
Identification of other funding sources
Projected capital cost of proposed renewable energy system
Projected development cost of proposed renewable energy system
The Native Village of Cantwell will hire a contractor to address these questions.
4.4.2 Project Operating and Maintenance Costs
Include anticipated O&M costs for new facilities constructed and how these would be funded by
the applicant.
Total anticipated project cost for this phase
Requested grant funding
The Native Village of Cantwell will hire a contractor to address this question.
4.4.3 Power Purchase/Sale
The power purchase/sale information should include the following:
Identification of potential power buyer(s)/customer(s)
Potential power purchase/sales price - at a minimum indicate a price range
Proposed rate of return from grant-funded project
The Native Village of Cantwell will hire a contractor to address this question.
4.4.4 Cost Worksheet
Complete the cost worksheet form which provides summary information that will be considered
in evaluating the project.
Download the form, complete it, and submit it as an attachment. Document any conditions or
sources your numbers are based on here.
The Native Village of Cantwell will hire a contractor to address this question.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 9 of 10 9/3/2008
4.4.5 Business Plan
Discuss your plan for operating the completed project so that it will be sustainable. Include at a
minimum proposed business structure(s) and concepts that may be considered.
The Native Village of Cantwell will hire a contractor to address this question.
4.4.6 Analysis and Recommendations
Provide information about the economic analysis and the proposed project. Discuss your
recommendation for additional project development work.
The Native Village of Cantwell will hire a contractor to address this question.
SECTION 5– PROJECT BENEFIT
Explain the economic and public benefits of your project. Include direct cost savings,
and how the people of Alaska will benefit from the project.
The benefits information should include the following:
Potential annual fuel displacement (gal and $) over the lifetime of the evaluated
renewable energy project
Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price,
RCA tariff, or avoided cost of ownership)
Potential additional annual incentives (i.e. tax credits)
Potential additional annual revenue streams (i.e. green tag sales or other renewable
energy subsidies or programs that might be available)
Discuss the non-economic public benefits to Alaskans over the lifetime of the project
The Native Village of Cantwell will hire a contractor to address this question.
SECTION 6 – GRANT BUDGET
Tell us how much your total project costs. Include any investments to date and funding sources,
how much is requested in grant funds, and additional investments you will make as an
applicant.
Include an estimate of budget costs by tasks using the form - GrantBudget.xls
Provide a narrative summary regarding funding sources and your financial commitment to the
project.
The Native Village of Cantwell will hire a contractor to address this question.
Renewable Energy Fund
Grant Application
AEA 09-004 Grant Application Page 10 of 10 9/3/2008
SECTION 7 – ADDITIONAL DOCUMENTATION AND CERTIFICATION
SUBMIT THE FOLLOWING DOCUMENTS WITH YOUR APPLICATION:
A. Resumes of Applicant’s Project Manager, key staff, partners, consultants, and
suppliers per application form Section 3.1 and 3.4
B. Cost Worksheet per application form Section 4.4.4
C. Grant Budget Form per application form Section 6.
D. An electronic version of the entire application per RFA Section 1.6
E. Governing Body Resolution per RFA Section 1.4
Enclose a copy of the resolution or other formal action taken by the applicant’s
governing body or management that:
- authorizes this application for project funding at the match amounts indicated in
the application
- authorizes the individual named as point of contact to represent the applicant for
purposes of this application
- states the applicant is in compliance with all federal state, and local, laws
including existing credit and federal tax obligations.
F. CERTIFICATION
The undersigned certifies that this application for a renewable energy grant is truthful
and correct, and that the applicant is in compliance with, and will continue to comply
with, all federal and state laws including existing credit and federal tax obligations.
Print Name
Signature
Title
Date