Loading...
HomeMy WebLinkAboutCostworksheet NL Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 1 Application Cost Worksheet NELSON LAGOON Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 50kw, 95kw, 125kw iii. Generator/boilers/other type diesel iv. Age of generators/boilers/other 50kw- presently broken 6 yrs old; 95kw & 125kw- 4yrs old v. Efficiency of generators/boilers/other b) Annual O&M cost i. Annual O&M cost for labor $24,000 ii. Annual O&M cost for non-labor $$520,000 (includes diesel) c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] 25,000-34,000 gallons/month Other iii. Peak Load 80-95kw iv. Average Load 50-60kw v. Minimum Load 35kw vi. Efficiency vii. Future trends Increased usage expected due to new seafood processing plant to be constructed. d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 2 3. Proposed System Design a) Installed capacity b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat iii. Transportation b) Price of displaced fuel c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Payback Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 3