Loading...
HomeMy WebLinkAboutCostworksheetFP Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 1 Application Cost Worksheet False Pass Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 3 ii. Rated capacity of generators/boilers/other 90kw, 125kw, 150kw iii. Generator/boilers/other type iv. Age of generators/boilers/other 4 years old v. Efficiency of generators/boilers/other b) Annual O&M cost i. Annual O&M cost for labor Approx. $20,000 ii. Annual O&M cost for non-labor All other electric m & o costs including diesel $213,000. c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] 49810 kWh ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] Average 42,834 gallons Other iii. Peak Load 90,647 iv. Average Load 83,321 v. Minimum Load 74,864 vi. Efficiency Average monthly kWh per gallon - $12.24 vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 2 3. Proposed System Design a) Installed capacity b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system b) Development cost c) Annual O&M cost of new system d) Annual fuel cost 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat iii. Transportation b) Price of displaced fuel c) Other economic benefits d) Amount of Alaska public benefits 6. Power Purchase/Sales Price a) Price for power purchase/sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 3 Payback