Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
APA463
SUSITNA HYDBOELECTRIC PROJECT FEDERAL ENERGY REGULATORY COMMISSION PR<'J::~T No.7114 1983 FIELD SEASON CULTURAL RESOURCES INVESTIGATION VOLUME II UNIVERSITY OF ALASKA MUSE.UM .........,CONTRACT TO FINAL REPORT TK 1425 .88 F472 no.463 ~~~~~~®OO rNA JOINT VENTURE JANUARY 1884 DOCUMENT No.463 __-ALASKA POWER AUTHORITY __----" Document No.463 Tl~·~ {t..{ """ - SUSITNA HYDROELECTRIC PROJECT 1983 FIELD SEASON CULTURAL RESOURCES INVESTIGATION Volume 2 Report by University of Alaska Museum r~?~ Do,~~i - ! E.James Dixon,Ph.D Principal Investigator William Andrefsky,Jr.,Ph.D. Archeologist Charles J.Utermohle,M.A. Archeologist George S.Smith,M.A. Assistant Principal Investigator Becky M.Saleeby,Ph.D. Archeologist Maureen L.King,B.A. Archeologist Under Contract to Harza-Ebasco Susitna Joint Venture Prepared for Alaska Power Authority Final Report January 1984 ARLIS Alaska Resources Library &Information Services Auachorage,AJaska ,----------------- - - - ..... APPENDIX MAPS OF SITE LOCATIONS AND SURVEY LOCALES A number of federal laws,as well as ethical considerations,mandate that site locational data not be rel eased to the general publ ic if there is a possibility that the release of this proprietary data could create a risk of harm to such resources.The specific laws and ethical standards concerning the confidentiality of such data are summarized below: (a)The National Historic Preservation Act,1966 (Public Law 89-665), Title I,sec.101,(a)4.Infonnation relating to the location of sites or objects listed on,or eligible for,inclusion in the National Register,should be withheld from the general public if it would create a risk of destruction or harm to such sites or objects. (b)ProcedUires of the Advi sory Council on Hi storic Preservation, 36 CFR 800,Part 800.15(a).Infonnation concerning the undertak- ing and effects of sites on or el igible for the National Register, should be made available to the general public within the limits of the Freedom of Information Act (5 U.S.C.552),but need not include information on budget,financial,personnel and other proprietary matters,or the specific location of archeological sites. (c)Archeological Resources Protection Act of 1979 (Public Law 96-95)• Section 9{a).IQformation concerning the nature and location of any archeological resource for which the excavation or removal requires a permit or other permission under this Act or under any other pJ~ovision of Federal Law,may not be made ava"nable to the public unless the federal land manager concerned determines that such disclosure \\Ould not create a risk of harm to such resources or to the sites at which such resources are located. A-I APPENDIX FIGURES Page -Figure A.l.location of Sites and Survey locales,Tal keetna Mts.0-5.·· · · · ·· ··· · ·······A-lO ""'"Figure A.2.location of Sites and Su rvey Locales,Tal keetna Mts.0-4.····· · ··· · ··· ·· · · · A-lI ~Figure A.3.location of Sites and Survey locales,Tal keetna Mts.0-3.·· ··· ·· · ···· ··· · ··A-12 Figure A.4.Location of Sites and Survey Locales,Tal keetna F Mts.0-2.A-13· · · ····· ··· ·· · · ···, Figure A.S.Location of Sites,Talkeetna Mts.C-4.A-14 Figure A.6.Location of Site,Talkeetna Mts.C-3.····A-15 Figure A.7.Location of Sites and Survey Locales,Tal keetna Mts.C-2.····· ·· ··· · · ······ ··A-16 Figure A.8.Location of Sites and Survey locales,Tal keetna .-Mts .C-l.········ · ···· · A-17 Figure A.9.location of Site,Talkeetna Mts.B-2.······A-18 1-Figure A.10.Location of Site,Talkeetna Mts.B-1...·· ···A-19 Figure A.lI.Location of Sites,Healy A-3.· ·····A-20 Figure A.12.Location of Sites,Healy A-2.····· ·· · ··A-21 ~ Figure A.l3.Location of Sites Along Railroad Route,Tal keetna Mts.0-6.··· · · ··· · ··· ··A-22 Figure A.14.Location of Sites Along Railroad and Access Routes,Tal keetna Mts.D-5.·····A-23 ......Figure A.15.Location of Sites Along Access Route,Tal keetna Mts.0-4.·· · · ·········· ·· · ···A-24 C'1 Figure A.16.Location of Sites Along Access Route,Tal keetna m r·1ts.0-3.· · · A;..250·· · ······· ····· ·I""'-Figure A.17.Location of $ites Along Access Route,Healy A-3.A-26U") "¢ 0 Figure A.18.Access Route and Phase I Recreation Areas,Healy0 0 B-3.A-27P""LO ..··· ··· ·· ······ · ·LO, I""'-Figure A.19.Site Adjacent to Phase I Recreation Area,C'1 C'1 Tal keetna Mts.C-l.A-28·· · ···· · Figure A.20.Phase I Recreation Area,Healy B-5.A-29 A-3 (d)Code of Ethics and Standards of Performance for the Society of Professional Archeologists t Sec.lIlt 3.2.An archeologist shall not reveal confidential information unless required by law. Because of the possibility that cultural resources in the Upper Susitna Basin could be damaged if maps showing their locations were made avail- able to the general public t this appendix will receive limited distribu- tion. A-2 - - Page ,....Figure A.54"Surface Reconnaissance and Subsurface Testing in Survey Local e 8 (1983).· ······ ····A-63 -"~Figure A.55.,Surface Reconnaissance and Subsurface Testing in Survey Locale 9 (1983).· ··· · ··· · · ·A-64 ,.,,..Figure A.56.Surface Reconnaissance and Subsurface Testing in Su rvey Local e 13 (1983).····· · · ·· · A-65 Figure A.57.-Surface Reconnaissance and Subsurface Testing in Survey Locale 14 (1983).······· · · · A-66 Figure A.58.Surface Reconnaissance and Subsurface Testing in r-Survey Locale 15 (1983).A-67······ · · ·· Figure A.59.Surface Reconnaissance and Subsurface Testing in Survey Locale 18 (1983).·· ··· · · ··A-68 Figure A.60.Surface Reconnaissance and Subsurface Testing in Survey Local e 22 (1983).······· ···A-69 Figure A.6l.Surface Reconnaissance and Subsurface Testing in-Survey Local e 27 (1983).·· ·· · ·····A-70 Figure A.62.Surface Reconnaissance and Subsurface Testing in Survey Locale 35 (1983).·· ····· · ··A-71 Figure A.63.Surface Reconnaissance a~d Subsurface Testing in Survey Local e 49 (1983).··· · ·· · · ··A-72 Figure A.64.Surface Reconnaissance and Subsurface Testing in -Survey Local e 50 (1983).···· ·····A-73 Figure A.65.Surface Reconnaissance and Subsurface Testing in Survey Local e 57 (1983).···· ···· ··A-74 Figure A.66.Surface Reconnaissance and Subsurface Testing in Survey Local e 80/32 (1983).· ·· · · ···A-75 Figure A.67.Surface Reconnaissance and Subsurface Testing in Survey Locale 80/32 (1983).········A-76 Figure A.68.Surface Reconnaissance and Subsurface Testing in Survey Locale 114...········· · A-77 Fig ureA.69.Surface Reconnaissance and Subsurface Testing in Survey Locale 115...·· · · · · ··· · ·A-78 A-5 Figure A.2I. Fig ure A.22. Figure A.23. Fig ure A.24. Figure A.25. Figure A.26. Figure A.27. Figure A.28. Figure A.29. Figure A.30. Figure A.3I. Figure A.32. Figure A.33. Fig ure A.34. Figure A.35. Figure A.36. Figure A.37. Figure A.38. Figure A.39. Figure A.40. Figure A.4I. Fig ure A.42. Figure A.43. Figure A.44. Figure A.45. Figure A.46. Figure A.47. Figure·A.48. Figure A.49. Figure A.50. Figure A.51. Fig ure A.52. Figure A.53. Phase I Recreation Area,Healy 8-4. Phase I Recreation Area,Healy A-4. Phase I Recreation Area,Healy A-2. Sites Along Transmission Route,Fairbanks 0-4. Sites Along Transmission Routes,Fairbanks 0-3 .. Site Along Transmission Routes,Fairbanks 0-2. Sites Along Transmission Routes,Fairbanks C-5. Site Along Transmission Routes,Fairbanks C-4. Transmission Routes,Fairbanks C-3 . Transmission Routes,Fairbanks C-2 . Site Along Transmission Routes,Fairbanks 8-5. Transmission Routes,Fairbanks B-4 ..••.... Sites Along Transmi ssion Routes,Fairbanks A-5 .. Si tes Along Transmi ssion Routes,Heal y 0-5.• . . Sites Along Transmission Routes,Healy 0-4 ...• Sites Along Transmission Route,Tal keetna Mts.0-6 Sites Along Transmission Route,Talkeetna Mts.0-5 Sites Along Transmi ssi on Route,Tal keetna Mts.0-4 Sites Along Transmission Routes,Tyonek 0-1. Sites Along Transmission Routes,Tyonek C-1. Si tes Along Transmi ssi on Routes,Tyonek B-I. Sites Along Transmission Routes,Anchorage C-8 .. Sites Along Transmission Routes,Anchorage C-7 .. Sites Along Transmission Routes,Anchorage C-6 .. Sites Along Transmission Routes,Anchorage 8-8 .. Sites Along Transmission Routes,Anchorage B-7 .. Sites Along Transmission Routes,Anchorage B-6 .. Transmission Routes,Anchorage A-8 ... Site Location Map TLJ.1 153. Site Location Map TLM 155 and TLM 168. Site Location Map TLM 205. Site Location Map TLM 208. Si te Location Map HEA 211. A-4 A-3D A-31 A-32 A-33 A-34 A-35 A-36 A-37 A-38 A-39 A-40 A-41 A-42 A-43 A-44 A-45 A-46 A-47 A-48 A-49 A-50 A-51 A-52 A-53 A-54 A-55 I A-56 A-57 A-58 A-59 A-60 A-61 .A-62 '""" -. 1 - - ~! - ,.... Page Figure A.86.Surface Reconnaissance and Subsurface Testing in Survey Locale 135.······· ······A-9S Figure A.87.Surface Reconnaissance and Subsurface Testing in Survey Local e 136.· · ···· · · ···· · A-96,-Figure A.88.Surface Reconnaissance and Subsurface Testing in Survey Locale 136.······· · · · ···A-97 Figure A.89.Surface Reconnaissance and Subsurface Testing in Survey Locale 137.····· · ·· ·· · ··A-98 .....Figure A.90.Surface Reconnaissance and Subsurface Testing in Survey locale 138.· ········ ·· ··A-99 Figure A.91.Surface Reconnaissance and Subsurface Testing in-Survey locale 138.············ · A-100 Figure A.92.Surface Reconna i ssance and Subsurface Testi ng in Survey Locale 139.· ····· ··· · ·· · A-101 Figure A.93.Surface Reconnaissance and Subsurface Testing in Survey Locale 140.· · · ······ · ···A-102 Figure A.94.Surface Reconnaissance and Subsurface Testing in-Survey Locale 140.A-103········ · · ··· Figure A.95.Surface Reconnaissance and Subsurface Testing in Survey Locale 141.··· ····· · ··· · A-104 Figure A.96.Surface Reconnaissance and Subsurface Testing in Survey Locale 141.······· ··· · ··A-IDS Figure A.97.Surface Reconnaissance and Subsurface Testing in Survey locale 142.· ·· · ··· ··· ···A-106,- Figure A.98.Surface Reconnaissance and Subsurface Testing in Survey Local e 142.·· ·· ·····A-I07 ~Figure A.99.Surface Reconnaissance and Subsurface Testing in Survey Local e 143.·· · ·· · · · ···· · A-lOB Figure A.100.Surface Reconnaissance and Subsurface Testi ng in Survey Locale 143.······ ······ · A-l09 Figure A.lOl.Surface Reconnaissance and Subsurface Testing in Survey Locale l44A.············ · A-lID A-7 - - Page term, Figure A.70.Surface Reconnaissance and Subsurface Testing in Survey Locale 117.··· ·· ·· ··· ·· · A-79 Figure A.71.Surface Reconnaissance and Subsurface Testing in Survey Local e 120.········· · ·· · A-80 Figure A.72.Surface Reconnaissance and Subsurface Testing in Survey Local e 122.········· ····A-81 Figure A.73.Surface Reconnaissance and Subsurface Testing in Survey Locale 123.· ··········A-82 Figure A.74.Surface Reconnaissance and Subsurface Testing in Survey Local e 124.·········· · · · A-83 Figure A.75.Surface Reconnaissance and Subsurface Testing in Survey Locale 124.· · · ·· ····· · ·A-84 Figure A.76.Surface Reconnaissance and Subsurface Testing in ~ Survey Locales 128 and 129.··· · ····A-85 Figure A.77.Surface Reconnaissance and Subsurface Testing in Survey Local es 128 and 129.·········A-86 Figure A.78.Surface Reconnaissance and Subsurface Testing in Survey Locales 128 and 129.· ····· ··A-87 Figure A.79.Surface Reconnaissance and Subsurface Testing in Survey Local e 129.· · ···· ····· · · A-88 ~, Figure A.80.Surface Reconnaissance and Subsurface Testing in Survey Locale 132.········ ····A-89 Figure A.81.Surface Reconnaissance and Subsurface Testing in Survey Local e 132.············ · A-90 f"lI'l'1, Figure A.82.Surface Reconnaissance and Subsurface Testing in Survey Locale 133.······ · ·····A-91 -Figure A.83.Surface Reconnaissance and Subsurface Testing in Survey Locale 134.······· ··· ··A-92 Figure A.84.Surface Reconnaissance and Subsurface Testing in Survey Local e 134.······ ·· · · · · ·A-93 Figure A.85.Surface Reconnaissance and Subsurface Testing in Survey Local e 135.·· ···········A-94 - A-6 I~ Page :~Figure A.llB.Surface Reconnaissance and Subsurface Testing in Survey Locale 153.· ··· · · · ····· · A-127 Figure A.119.Surface Reconnaissance and Subsurface Testing in Survey Locale 153.·············A-128 ~Figure A.120.Surface Reconnaissance and Subsurface Testing ·in Survey Locale 154.···· ··· ··· ···A-129 Figure A.12l.Surface Reconnaissance and Subsurface Testing in Survey Local e 155.····· · ·· · ···A-l30 Figure A.122.Surface Reconnaissance and Subsurface Testing in.-Survey Locale 156.···· · ·· ·· · · · · A-131 Figure A.123.'Surface Reconnaissance and Subsurface Testing in Survey Locale 157.········ ·· · ··A-132 Figure A.124"Surface Reconnaissance and Subsurface Testing in Survey Locale 158.· · · · · · · ··· · ··A-133 Figure A.125.Surface Reconnaissance and Subsurface Testing in Survey Locale 159.·· · ········· · A-134 Figure A.126.Surface Reconnaissance and Subsurface Testing in Survey Locale 160.· ··········· · A-l35 Figure A.127.Surface Reconnaissance and Subsurface Testi ng in Proposed Borrow Areas C and F.·· ··A-136 Figure A.128.Surface Reconnaissance and Subsurface Testing in Proposed Borrow Area F.······ · ····A-137 Fig ureA.129 •Surface Reconnaissance and Subsurface Testing in Proposed Borrow F.· ··· ······· · ·A-138 A-9 -Page ..... Figure A.102.Surface Reconnaissance and Subsurface Testing in Survey Locale 144A.·· · ···· · ··A-111 -,Figure A.103.Surface Reconnaissance and Subsurface Testing in Survey Locale 144B.· · ·· ···· · · · A-112 Figure A.104.Surface Reconnaissance and Subsurface Testing in Survey Locale 145.·· · · ·· ·· · · ·· · A-113 Figure A.lOS.Surface Reconnaissance and Subsurface Testing in Survey Locale 145.·· ···· · ·····A-114 Figure A.106.Surface Reconnaissance and Subsurface Testing in ~, Survey Locale 146.· · · · ·· · ·· · · · A-115 Figure A.107.Surface Reconnaissance and Subsurface Testing in Survey Locale 146.·· · · ·· · · ·· · ··.•A-116 Figure A.10B.Surface Reconnaissance and Subsurface Testing in -Survey Local e 146.· ····· · ······A-117 Figure A.109.Surface Reconnaissance and Subsurface Testing in Survey Local e 147.··· · ·· · ·· · · · ·A-11B Figure A.11O.Surface Reconnaissance and Subsurface Testing in Survey Local e 147.· · ··· ···· · · ··A-119 Figure A.l11-Surface Reconnaissance and Subsurface Testing in Survey Local e 14B.· ···· · · · ·····A-120 - Figure A.112.Surface Reconnaissance and Subsurface Testing in Survey Locale 149.·· · · ····· · · · A-121 -Figure A.113.Surface Reconnaissance and Subsurface Testing in Survey Locale 150.·· · · ·· · · · ···A-122 Figure A.114.Surface Reconnaissance and Subsurface Testi ng in Survey Local e 150.··· · · · · · ·· · · · A-123 Figure A.11S.Surface Reconnaissance and Subsurface Testi ng in '""", Survey Local e 151.··· · · ·· · ···A-124 Figure A.116.Surface Reconnaissance and Subsurface Testing in Survey Locale 152.·· · ·· ·· · · · ··A-125 Figure A.117.Surface Reconnaissance and Subsurface Testing in Survey Locale 152.·· · ·· ·· ·· · · · A-126 - A-B Figure A.I.Location of Sites and Survey Locales,Tal keetna Mts.D-5. A-IO Figure A.2.Location of Sites and Survey Locales,Talkeetna Mts.D-4. A-II Figure A.3.Location of Sites and Survey Locales,Tal keetna Mts.D-3. A-12 Fig ure A.4.Location of Sites and Survey Locales,Tal keetna Mts.0-2. A-13 Figure A.5.Location of Sites,Talkeetna Mts.C-4. A-14 Figure A.6.Location of Site,Talkeetna Mts.C-3. A-15 Figure A.7. .".."...,... ~......--' Location of Sites and Survey Locales t Talkeetna Mts.C-2.> A-16 Fig ure A.8.Locati on of Sites and Survey Local es,Tal keetna ~1ts.C-1. A-17 Figure A.9.Location of Site,Talkeetna Mts.B-2. A-18 Figure A.10.Location of Site,Talkeetna Mts.B-1. A-19 Figure A.I!.Location of Sites,Healy A-3. A-20 Fig ure A.12.Location of Sites,Healy A-2. A-21 Figure A.I3.Location of Sites Along Railroad Route,Talkeetna r'1ts.0-6. A-22 Figure A.14.Location of Sites Along Railroad and Access Routes, Talkeetna Mts.0-5. A-23 Figure A.IS.Location of Sites Along Access Route,Talkeetna Mts.0-4. A-24 Figure A.16.Location of Sites Along Access Route,Tal keetna Mts.0-3. A-25 Figure A.17.Location of Sites Along Access Route,Healy A-3. A-26 Figure A.18.Access Route and Phase I Recreation Areas.Healy B-3. A-27 Figure A.19.Site Adjacent to Phase I Recreation Area, Talkeetna Mts.C-1. A-28 Figure A.20.Phase I Recreation Area,Healy 6-5. A-29 Figure A.21.Phase I Recreation Area,Healy 8-4. A-30 Figure A.22.Phase I Recreation Area,Healy A-4. A-31 Figure A.23.Phase I Recreation Area,Healy A-2. A-32 Figure A.24.Sites Along Transmission Route,Fairbanks 0-4. A-33 Figure A.25.Sites Along Transmission Routes,Fairbanks 0-3. A-34 Figure A.26.Site Along Transmission Routes,Fairbanks D-2. A-35 Figure A.27.Sites Along Transmission Routes,Fairbanks C-5. A-36 Figure A.28.Site Along Transmission Routes.Fairbanks C-4. A-37 Figure A.29.Transmission Routes,Fairbanks C-3. A-38 Fi gure A.30.Transmission Routes,Fairbanks C-2. A-39 Figure A.31.Site Along Transmission Routes,Fairbanks B-5. A-40 Figure A.32.Transmission Routes,Fairbanks 6-4. A-41 Figure A.33.Sites Along Transmission Routes,Fairbanks A-5. A-42 Figure A.34.Sites Along Transmission Routes,Healy 0-5. A-43 Figure A.35.Sites Along Transmission Routes,Healy D-4. A-44 Figure A.36.Sites Along Transmission Route,Talkeetna Mts.D-6. A-45 Figure A.37.Sites Along Transmission Route,Talkeetna Mts.D-5. A-46 Figure A.38.Sites Along Transmission Route,Talkeetna Mts.0-4. A-47 Fi gure A.39.Sites Along Transmission Routes,Tyonek 0-1. A-48 Figure A.40.Sites Along Transmission Routes,Tyonek C-1. A-49 Figure A.41.Sites Along Transmission Routes,Tyonek B-1. A-50 Figure A.42.Sites Along Transmission Routes,Anchorage C-8. A-51 Fig ure A.43.Sites Along Transmission Routes,Anchorage C-7. A-52 Figure A.44.Sites Along Transmission Routes,Anchorage C-6. A-53 Figure A.45.Sites Along Transmission Routes,Anchorage B-8. A-54 Figure A.46.Sites Along Transmission Routes,Anchorage B-7. A-55 Figure A.47.Sites Along Transmission Routes,Anchorage B-6. A-56 ,.• ••• ,. Figure A.48.Transmission Routes,Anchorage A-8. A-57 oo- t~ ~--N- ~'""" Surface RE~connaissance ----_ Subsurface Test -._._. Helicopter Landing Zone LZ METERS Contour Interval:100 ft. Talkeetna Mts.D-3 T.33N.,R.5E.,S.M. SE 1/4 Sec.26,SW 1/4 Sec.25 NE 1/4 Sec.35,NW 1/4 Sec.36 Shovel Tests:4 o I 300 I 600 I - -Fig ure A.49.Site Location Map TLM 153. A-58 - Contour Interval:100 ft. ~ I Talkeetna Mts.D-2 T.33 N.,R.8 E.,S.M. Sec.35,36 S 1/2 Sec.25,.26 o I 500 I METERS 1000 I Figure A.51.Site Location r1ap TLM 205. A-GO - """" ""'" - - 0 610 1220 Talkeetna Mts.D-3 I I I """"T.22 N.,R.4 W.,F.M.METERS Sec.21 100 ft.Contour Interval: - - Figure A.50.Site Location Map TLM 155 and TLM 168. A-59 - I~ - 0 200 400 Healy A-3 , T.21 S.I R.4 w.I F.M.METERS SW 1/4 Sec.33 Contour Interval:100 ft.- Fig ure A.53.Site Location Map HEA 211. A-62 ooo C') ~j~~ -H- ~-- - -. oo CD ('lI - Contour Interval:100 ft. Talkeetna Mts.C-3 T.30N.,R.BE.,S.M. N 1/2 Sec.6 Talkeetna Mts.C-3 T.31 N.,R.7 E.,S.M. E 1/2 Sec.36,SE 1/4 Sec.25 T.31 N.,R.BE.,S •M. S 1/2 Sec.30,Sec~31 T.30 N.,R.7 E.,S.M. NE 1/4 Sec.1 o I 610 I METERS 1220 Figure A.52.Site Location ~1ap TLM 208. A-61 - .- Shovel Tests:157 o I 300 600 Surface Reconnaissance Subsurface Tests Helicopter Landing Zone Survey Locale 9 Boundary LZ HETERS. contour Interval:100 ft. Talkeetna Mts~-D-4 T.32 N.,R.4 E.,S.M. S 1/2 S 1/2 Sec.15 SW 1/4 SW 1/4 SW 1/4 Sec.14 m~1/4 mq 1/4 NW 1/4 Sec.23 N 1/2 N 1/2 Sec.22 Figure A.55.Surface Reconnaissance and Subsurface Testing in Survey Loca'le 9 (1983). A-54 'SUSITNA RIVER ""'" - - - - 1500 ~ Shovel Tests:39 ('.'200 I 400, ...... Surface Reconnaissance Subsurface Tests Helicopter Landing Zone Survey Locale 8 Boundary LZ HETERS Contour Interval:100 ft. Talkeetna Mts.D-4 T.31N.,R.3E.,S.H. ffil 1/4 NW 1/4 NW 1/4 Sec.21 Figure A.54.Surface Reconnaissance and Subsurface Testing in Survey Local e 8 (1983). A-63 - Surface Reconnaissance Subsurface Tests Helicopter Landing 'Zone Survey Locale 14 Boundary Contour Interval:100 ft. Talkeetna Mts.D-4 T.31 N.,R.4 E.,S.M. W 1/2 Sec.2,E 1/2 Sec.3 600 I 300 I METERS o I LZ 191ShovelTests: ..... Figure A.57"Surface Reconnaissance and Subsurface Testing in Survey Loc ale 14 (1983). A-66 \ I ~I.\. ~2DDD .... '"'"' Shovel Tests:791 a I 300 I 600 I Surface Reconnaissance ----- Subsurface Tests -._.-.- Helicopter Landing-Zone LZ Survey Locale 13 Boundary ---- METERS Contour Interval:100 ft. Talkeetna Mts.D-4 T.31 N.,R.4 E.,S.M. N 1/2 SW 1/4 Sec.15 S 1/2 NW 1/4 Sec.15 N 1/2 SE 1/4 Sec.16 S 1/2 NE 1/4 Sec.16 Figure A.56.Surface Reconnaissance and Subsurface Testing in Survey Locale 13 (1983). A-55 .----2000 -'-~ Surface Reconnaissance METERS contour Interval:100 ft. Shovel Tests:148 a I 200 [ 400 I Subsurface Tests Helicopter Landing·Zone Survey Locale 18 Boundary LZ Talkeetna Mts.D-3 T.32 N.,R.5 E.,S.M. Sec.26 Figure A.59.Surface Reconnai ssance and Subsu rface Testing 1n Survey Locale 18 (1983). A-68 Shovel Tests:160 Surface Reconnaissance subsurface Tests Helicopter Landing Zone Survey Locale 15 Boundary ~ ~- -N- ~- -, - - - 0 300 600 I I I ~HETERS Contour Interval:100 ft. Talkeetna Mts.D-4 LZ T.32 N.,R.4 E.,S.M. NE 1/4 Sec.36,SE 1/4 Sec.25 T.32 N.,R.5 E.,S.M. NVI 1/4 Sec.31,Sv-l 1/4 Sec.30 -Figure A.58.Surface Reconnaissance and Subsurface Testing in Survey Locale 15 (1983). A-57 o -.......... "".... ".... """"""""... "..., ... "... """"...,,, \ \ \ \ I I I I } - . -.._ - - - -I,...._'Ii ....;"-'.~-'---...,c.....> '......_..--'"..."--- Shovel Te,sts:213 Surface Reconnaissance a 300 METERS 600 """ Subsurface Tests Helicopter Landing Zone LZ Survey Locale 27 Boundary ---- Contour Interval:100 ft. Talkeetna Mts.D-3 T.32N.}R.7E.}S.M. Sec.29 Figure A.61.Surface Reconnaissance and Subsurface Testing in Survey Locale 27 (1983). A-70 ..... Shovel Tests:110 o 300 600 Surface Reconnaissance _._-- Subsurface Tests _._._.- Helicopter Land~ng Zone LZ Survey Locale 22 Boundary ---- METERS contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.6 E.,S.M. S 1/2 Sec.24 Sec.25 - ~, Figure A.50.Surface Reconnaissance and Subsurface Testing in Survey Locale 22 (1983). A-59 } I \ 1, I Shovel Tests:129 Surface Rleconnaissance - - --- a I ......,".......'.I'........./.....,, ............... \ \ \ I",...............__... 300 I ME TE HS 600 I Subsurfacle Tests _._._.- Helicopter Landing-Zone LZ Survey Locale 49 Boundary - - - - Contour Interval:50 ft. T~lkeetna Mts.C-1 T.30 N.,R.11 E.S.M. Sec.35 Figure A.53.Surface Reconnaissance and Subsurface Testing in Survey Locale 49 (1983). A-72 ) .................. "", ", (t. ~\ .,:". - - - - Shovel Tests:90 Surface Reconnaissance o 300 I METERS 600 S·ubsurface Tests Helicopter Landing Zone Survey Locale 50 Boundary LZ Contour Interval:50 ft. Talkeetna !'1ts.C-l T.30 N.,R.Il E.,S.M. E 1/4 Sec.35,W 1/2 Sec.36 T.29 N.,R.11 E.,S.M. N.1/4 Sec.1 - Figure A.64.Surface Reconnaissance and Subsurface Testing in Survey Local e 50 (l983). A-73 !""'" I ".... Shovel Tests:2 o 200 METERS 400 Surface Reconnaissance Subsurface Test --e--e--e--Contour Interval:100 ft. Helicopter Landing Zone LZ Survey Locale 57 Boundary --- Talkeetna Mts.D-5 S.M. T.31 N.,R.1 E. NE 1/4,SE 1/4,Sec.3 Figure A.65.Surface Reconnaissance and Subsurface Testing in Survey Local e 57 (l983). A-74 Shovel Tests:976 (Total) o 300 600 Survey Locale 80/32 Boundary - --- Surface Reconnaissance Subsurface Tests Helicopter Landing.Zone LZ METERS Contour Interval:100 ft. Talkeetna Mts.D-2 T.32 N.,R 8 E.,S.M. SE 1/4 Sec.8,S 1/2 Sec.9 SW 1/4 Sec.15,Wl/2 Sec.15 N 1/2 Sec.16,E 1/2 Sec.17 Figure A.66.Surface Reconnaissance and Subsurface Testing in Survey Locale 80/32 (1983). A-75 \,-- I', I' / I I ", 'I \I . II ",~,_.-.~~~....r_-.___.....~\\ -.-..........\1 '-'-.~, 1--- 2 - 5 -°-°~-J Shovel Tests:976 (Total)a,300 I 600 Surface Reconnaissance !.ffiTERS Subsurface Tests Helicoptlar Landing Zone LZ Survey Locale 80/32 Boundary - - - Contour Interval:100 ft. Talkeetna Mts.D-2 T.32 N.,R.8 E.,S.M. SE 1/4 Sec.8,S 1/2 Sec.9 SW 1/4 Sec.15,W 1/2 Sec.15 N 1/2 Sec.16,'E 1/2 Sec.17 Figure A.67.Surface Reconnaissance and Subsurface Testing in Survey Local e 80/32 (1983). A-76 ~, ...... .... .' '.' '. \ \ \ \ "".... \ \ \ \ "........ '. ........ ........ ........ Shovel Tests:43 a 300 600 Surface Reconnaissance Subsurface Tests Helicopter Landi~g Zone Survey Locale 114Boundary 50 ft.Contour Interval LZ ..................... METERS Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.5 E.,S.M. NW 1/4 Sec.35 ""'" Figure A.58.,Surface Reconnaissance and Subsurface Testing in Survey Local e 114. A-77 ..... . .' I I I, I ,/ ,/ ./ '"'" , I I I I I \ \,~-'....._--..,....--- - Shovel Tests:40 . a I 200 I 400 I Surface Reconnaissance METERS Subsurface Tests Contour Interval:100 ft. Helicopter Landing Zone LZ Survey Locale 115 Boundary - - - - 50 ft.Contour Interval ....... Talkeetna Mts.D-3 T.32 N.,R.5 E.,S.M. NE 1/4 Sec.35 NW 1/4 Sec.36 Figure A.59.Surface Reconnaissance and Subsurface Testing in Survey Local e 115. A-78 ..... ./ ~,..-r.z-""!".......,"......-'\"""'"""....".\I .'.,....) I -N-\j I I .....~..-, I I I 2200/""",I < I ,II"/,-//I /\, /I /\ /J /f'_.-.'.I·/1 -._.- G\.iJ \, \'·_/fD\\-\I. \." !' \l ._.......-......,~, \\I \I I \, I\\i ~ \I i\\ \')I \(J \i \I \I \.",'~- Shovel Tests:43 Surface Reconnaissance a I 300 I METERS 600 I Subsurface Tests _._._.- Helicopter Landing Zone LZ Survey Locale 117 Boundary __-- Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 n.,R.6 E.,S.M. E 1/2 SE 1/4 Sec.16 W 1/2 W 1/2 SW 1/4 Sec.15 E 1/2 NE 1/2 Sec.21 W 1/2 NW 1/4 NW 1/4 Sec.22 Figure A.70.Surface Reconnaissance and Subsurface Testing in Survey Locale 117. A-79 TLM 033 --~2000 400 Shovel Tests:77 o 200-IL-'........I Surface Reconnaissance METERS Subsurface Tests Contour Interval:100 ft. Helicopter Landing.Zone Survey Locale 120 Boundary LZ Talkeetna Mts.D-3 T.31 N.,R.B E.,S.M. SE 1/4 Sec.7,SW 1/4 Sec.B ffil 1/4 Sec.l7,NE Sec.lB Figure A.71.Surface Reconnaissance and Subsurface Testing in Survey Locale 120. A-80 ---............ - ..... Shovel Tests:63 o I 300 I 600 I •• Surface Reconnaissance Subsurface Tests Helicopter Landing Zone LZ Survey Locale 122 Boundary - --- METERS Contour Interval:100 ft. Talkeetna Mts.C-2 T.30 N.,R.10 E.,S.M. N 1/2 Sec.16 S 1/2 Sec.7 W 1/2 Sec.17 .. Figure A.72.Surface Reconnaissance and Subsurface Testing in Survey Local e 122. A-81 - ~ I ~~1;lOi/Il -N- ,...,~ ,..., Shovel Tests:10 Surface Reconnaissance o I 300 I !<1ETERS 600 Subsurface Tests Helicopter Landing 'Zone LZ Survey Local 123 Boundary - --- Contour Interval:50 ft. Talkeetna Mts.C-l T.29 N.,R.11 E.,S.M. E 1/2 Sec.6 NW 1/4 Sec.5 Figure A.73.Surface Reconnaissance and Subsurface Testing in Survey· Local e 123. A-82 Shovel Tests:151 (124 A) Surface Reconnaissance o ! 300 METERS ~ °0 o 600 - .... - - Subsurface Tests _._._.- Helicopter Landing Zone LZ Survey Locale 124 Boundary - - - - Contour Interval:SO ft. Talkeetna Mts.C-l T.29 N.,R.11 E.,S.M. NW 1/4 Sec.3,SE 1/4 Sec.3 NW 1/4 Sec.10 SU 1/4 Sec.10 Figure A.74.Surface Reconnaissance and Subsurface Testing in Survey Local e 124. A-83 - Shovel Tests:156 (124 B) Surface Reconnaissance o I 300 I METERS 600 I Subsurface Tests Helicopter Landing Zone Survey Locale 124 Boundary LZ Contour Interval:50 ft. Talkeetna Mts.C-l T.29 N.,R.12 E.,S.M. NW 1/4 Sec.3,SE 1/4 Sec.3 NVi 1/4 Sec.10 SVJ 1/4 Sec.10 -I ~, Figure A.75.Surface Reconnaissance and.Subsurface Testing in Survey Locale 124. A-84 /J,- I ....(\ \"'-V,/').-.-._----~_..... C::::>' S.L.129 a .- # I I I Iz1 0'o \I 40?\I~}, 1 7 I 300 ! -N- ~ (SOL.12 • \ \ 600 ..... - - ~I Survey Locale 128 &129 Boundary -- Shovel Tests:1690 (Total) Surface Reconnaissance Subsurface Tests Helicopter Landing'Zone LZ METERS Contour Interval:100 ft. Talkeetna Mts.C-2 T.30 N.,R.8 E.,S.M. E 1/2 Sec.8,Sec.9 Figure A.76.Surface Reconnaissance and Subsurface Testing in Survey Locales 128 and 129. A-85 ..- \, ~..... ..•..........••................•••......••.<... .············0 -----_....- o 128 Shovel T,ests:1690 (Total) Surface Reconnaissance o I 300 I l-'lETERS 600, Subsurface Tests Helicopter Landing Zone LZ Survey Locale 128 &129 Boundary contour Interval:100 ft. Talkeetna Mts.C-2 T.31 N.,R 8 E.,S.M. E 1/2 Sec.32,Sec.33 T.30 N.,R.8 E.,S.M. E 1/2 Sec.·5,Sec.4 Figure A.77.Surface Reconnaissance and Subsurface Testing in Survey Locales 128 and 129. A-86 - - - "\. I....-' \ I I I I I I I I I I I • I!, I I S.L. Shovel Tests:1690 (Total) Surface Reconnaissance o f 300 I l1ETERS 600 I ,.,., Subsurface Tests Contour Interval:100 ft. Survey Locale 128 &129 Boundary - - Helicopter Landing Zone LZ Talkeetna Mts.C-2 T.31 N.,R.8 E.,S.M. SW 1/4 Sec.28 Figure A.78.Surface Reconnaissance and Subsurface Testing in Survey Locales 128 and 129. A-87 ,~ ~ ~,.",. ,/ I I I i I / ~I II .,.'.~._,,_"_"_4'-- I METERS Contour Interval:100 ft. Talkeetna Mts.C-2 T.31 N.,R.8 E.,S.M. SW 1/4 Sec.21,SW 1/4 Sec.22 W.1/2 Sec.27,Sec.28 -Shovel Tests:1690 (Total) Surface Reconnaissance Subsurface Tests _._._._ Helicopter Landing Zone LZ Survey Locale 129 Boundary - - - - o I 300 600 Fi gure A.79.Surface Reconnaissance and Subsu rface Testi ng in Survey Local e 129. A-BS - - ..........._......---~,.-...., -~. ............._.-.....................-................---...,......_- "-:-:......... "..'\"'('.,\"-.I l'•,\i~l .....-\\ . \\\00I!"'" \~_ ". ."'....-"".".-.'...,'[,...._....\'.... i '-.....,.,.- .-.........I......_._....,',...._ (I . .,-...;.-..........,.-._..'\-- II!f.-.-..I.@:,(J ._...:),:-.....-._.~;.~.._. )._.,,-,,.,\.-"",._._.....•I.~.~.....i "LZj""'"'...,-',._'"I ..f''.i \.....I I....··_.-f ....1 ,._-_.,I ,".."./.' ,.',,""~-f':;""'- I /' ,..I f i ,\._... Shovel Tests:312 (Total) o I 300 I 600 Surface Reconnaissance METERS Figure A.BO.Surface Reconnaissance and Subsurface Testing in Survey Locale 132. Survey Locale 132 Boundary --- Subsurface Tests Helicopter Landing Zone LZ Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.I R.5 E.I S.M. SE 1/4 SE 1/4 SE 1/4 Sec.23 SE 1/4 SE 1/4 SE 1/4 Sec.24 E 1/2 Sec.26 Sec 25 ... A-B9 , \ 1\ I I I J....c_...... \ \ \, 1 1 I / / ""/ ~ '"", ~ '"/ / / / / / I I I LZ I-"-., I .f I-._._.-' 1 /--........-' ,..... .".'..."LZ ...."'.."....- , I .... .-.....'".... .".....--.....-...-." - r l Shovel Tes'ts:312 (Total) a I 300 I 600 Surface Reconnaissance METERS Subsurface Tests _._._.- Helicopter Landing ~one LZ Survey Locale 132 Boundary - - - - Contour Interval:100 ft. Talkeetna Mts.0-3 T.32 N.R.5 E.,S.M. SE 1/4 SE 1/4 SE 1/4 Sec.23 SE 1/4 SE 1/4 SE 1/4 Sec.24 E 1/2 Sec.26 Sec.25 - Figure A.81.Surface Reconnaissance and Subsurface Testing in Survey Local e 132. A-gO - - - """----:-~'~,I ~""'----l ....... ,L~-------.-",,"...-----.............I \."__\ I I I,---II\,,,.- I I !," I I ---I I ' I I I \ I I \,,\\' I \,\ \\..\, \"'.,-------- \~177 LZ '-._.,.-.-. \., \.",~.....,,~.\....- .......---\."'".-...........,---.....-._'-.'\-', a 300 600 Shovel Tests:116 Surface Reconnaissance Subsurface Tests Helicopter Landing Zone Survey Locale 133 Boundary LZ METERS Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.5 E.,S.M. E 1/4 Sec.25 T.32 N.,R.6 E.,S.M. S 1/2 Sec.30,W 1/4 Sec.29 Figure A.82.Surface Reconnaissance and Subsurface Testing in Survey Local e 133.-. A-91 ---- - -- --,.--------- , / --_.--------------~~~~~_.-~~-"_.-.-'-'-'-'-'- ~".------' ,~ .- Shovel Tests:203 (Total) '0 I 300 I 600 Surface Reconnaissance METERS .- Subsurface Tests Helicopter Landing Zone Survey Locale 134 Boundary LZ Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.4 W.,S.M • SW 1/4 SW 1/4 SW 1/4 Sec.21 NVl 1/4 Sec.28 Sec.29 Figure A.83.Surface Reconnaissance and Subsurface Testing in Survey Local e 134. A-92 - """ ~ -H--~- -. \, '\ \, ~ c C N C\l _.;:..---., J I I / I I I ._. ,/... \ .-.-~ Shovel Tests:203 (Total) o I 300 I 600 I Survey Locale 134 Boundary-- - - Surface Reconnaissance Subsurface Tests Helicopter Landin~Zone LZ METERS contou=Interval:100 ft. Talkeetna Mts.D-3 T.32 N.I R.4 W.,S.M. SW 1/4 SW 1/4 SW 1/4 Sec.21 NW 1/4 Sec.28 Sec.29 - - Figure A.84.Surface Reconnaissance and Subsurface Testing in Survey Locale 134. A-93 " ,.... \, o I', I ................ G '"'..../ , \ ,, I I, J I I / ",~~-~-~-~~ J'._~-.'......-------....---...... ". _ . _ .. - . - ._.-LZI1'/\-.- •_.- .- •_.-'-'- • - . -I' 1/"-'","~I' I \ I 1 I \ I \, \ I \) \\1 \ \'. \1 I .'\\._.....-..... \\ ~~_I \ I \'\ '\.-.-..... "'-.... Shovel Tests:190 (Total)a I 300 I 600 I Surface Reconnaissance METERS Subsurface Tests Helicopter Landing Zone Survey Local 135 Boundary LZ contour Interval:100 ft. Talkeetna Mts.0-3 T.32 N,R.6 E.,S.M. S 1/2 Sec.16,Sec.21 SW 1/4 Sec.15 -Figure A.85.Surface Reconnaissance and Subsurface Testing in Survey Locale 135. A-94 - - \ ".".,- ~ ~,, I I I I I, I I I, I• \ I J I I I I, I I I,,, , \ I I I I I I I, I I . I I I I I I , I I \ \\ \', \, \', \, \, \ \ \ \ \ Shovel Tests:190 (Total) a,300 600 Surface Reconnaissance METERS Subsurface Tests Helicopter Landing.Zone Survey Locale 135 Boundary LZ Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.6 E.,S.M. SW 1/4 Sec.15 SE 1/4 Sec.21 W ~/2 Sec.22 Figure A.86.Surface Reconnaissance and Subsurface Testing in Survey Local e 135. '""" A-95 - ..... .- Shovel Tests:222 (Total) Surface Reconnaissance a I 300 I METERS 600, Subsurface Tests Helicopter Landing Zone Survey Locale 136 Boundary LZ Contour Interval:100 ft. Talkeetna Mts.0-3 T.32 N.,R.6 E.,S.M. Sec.10,W 1/2 Sec.11 _. Figure A.8?Surface Reconnaissance and Subsurface Testing in Survey Locale 136. A-96 I """I I i .Ii'~..../"".I /,~~.' ~/,-N-, ~\I , ~\/I, I I\0\0 I I \C\'IC\'\ I, ~ I I \I . J .',~ /~;' I "I I I -f I,, ( I I I ~I \I \ \ \~ \ I I I """, I..."'-'...-~- 0 300 600 Shovel Tests:222 (Total), Surface Reconnaissance -----METERS Subsurface Tests --_.._.-Contour Interval:100 ft. Helicopter Landing Zone LZ Talkeetna Mts.D-3 ~ Survey Locale 136 T.32 N.,R.6 E.,S.M.---- Sec.15,W 1/2 Sec.14 Figure A.SS.Surface Reconnaissance and Subsurface Tes,ting in Survey Local e 136. A-97 LZ I I LZ \ I / .".- ,.~ l .I.......J' I I .......... , '"-'(..... --------...-, .----_LZ .... .-._-----\. '-., ..... .- .'._.- ........-.- ......... ..-.-.....- .'( ......-._.-.-..... j..........-......- ......_.-'-. ,.-..... ,(:...LZ I -._._. I -'-'.) I ~ ,. '/ 1 "'''',~/._.-../\ 01 ._.-.-\ f'lI/.,.-" 1<'·-.-._'-. Shovel Tests:217 o 300 I 600 I Surface Reconnaissance Subsurface Tests Helicopter Landing'Zone Survey Locale 137 Boundary - - LZ METERS Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.6 E.,S.M. E 1/2 Sec.22 W l/4 Sec.23 Figure A.89.Surfac'e Reconnaissance and Subsurface Testing in Survey Locale 137. A-98 Shovel Tests:863 (Total) Surface Reconnaissance I o (/0 o o ....... 610 METERS 1220 Subsurface Tests _._._.- Helicopter Landing Zone LZ Survey Locale 138 Boundary - - --- 50 ft.Contour .•...• contour Interval:100 ft. Talkeetna ~ts.D-3 T.32 N,R.6 E.,S.M. Sec.14,15,22,23 N 1/2 Sec.27,N 1/2 Sec.26 W 1/2 Sec.13,W 1/2 Sec.24 ...., - Figure A.90.Surface Reconnaissance and Subsurface Testing in Survey Locale 138. A-99 ..... Shovel Tests:863 (Total) C:>roO a 610 1220 I Surface Reconnaissance Subsurface Tests Helicopter Landing Zone Survey Locale 138 Boundary 50 ft.Contour LZ .......... HETERS Contour Interval:100 ft. T.32 N.,R.7 E.,S.M. W 1/4 Sec.17,W 1/4 Sec.20 Sec.18,Sec.19 T.32 N,R.6 E.,S.M. E 1/4 Sec.14,E 1/4 Sec.23 Sec.13,Sec.24 Figure A.91.Surface Reconnaissance and Subsurface Testing in Survey Local e 138. A-lOO ."".----....-...., - -.-._\7.-.-"• _,,'Ie , I I 1 I 1 \ 1...........-." - Shovel Tests:138 Surface Reconnaissance o 300 I METERS. 600 Subsurface Tests Helicopter Landing·Zone Survey Locale 139 Boundary LZ Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.6 E.,S.M. N 1/2 Sec.26 Figure A.92.Surface Reconnaissance and Subsurface Testing in Survey Local e 139. A-lOl ~, Shovel Tests:506 (Total) Surface Reconnaissance o 610 METERS 1220 Subsurface Tests Helicopter Landin~Zone Survey Locale 140 Boundary 50 ft.Contour LZ ."~""••O'O'. Contour Interval:100 ft. Talkeetna Mts.0-3 T.32 N.,R.7 E.,S.M. Sec.7,8,17,18 W 1/2 Sec.9,W 1/2 Sec.16 Figure A.93.Surface Reconnaissance and Subsurface Testing in Survey Locale 140. A-102 .j.t?#1.......~. ..'.., o . ... .:.." -.'." .' .......' "....."\.." .'..... - - """"I -! Shovel Tests:506 (Total)o,610 I 1220, Survey Locale 140 Boundary _ 50 ft.Contour ,"..... Surface Reconnaissance Subsurface Tests Helicopter Landing Zone LZ METERS Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.7 E.,S.M. W 1/2 Sec.2,Sec.3,4 T.33 N.,R.7 E.,S.M. E 1/2 Sec.32,Sec.33,34 Figure A.94.Surface Reconnaissance and Subsurface Testing in Survey Local e 140. A-103 ,....",-- ........ ".. .". ··0.. .... Shovel Tests:160 (Total) Surface Reconnaissance - - - - - o,200, METERS 400, Subsurface Tests _ ._._._ Helicopter Landing Zone LZ Survey Locale 141Boundary _ 50 ft.Contour ........ Contour Interval:100 ft. Talkeetna Mts.D-3 T.33 N.,R.7 E.,S.M. N 1/2 Sec.34 Figure A.95.Surface Reconnaissance and Subsurface Testing in Survey Local e 141. A-104 ~. - - .,.,. ~ ·0 -N- 00 ~~ -~ LZ \ I I I I I I I,, I I I I / ", I, I \ \\ j I .'I .',/ ""/ / o / .'/ .",/ /I .'I / f I I I I I 1, I I I I I I Shovel Tests:160 (Total) Surface Reconnaissance 200 1 METERS 400 I ..... Subsurface Tests _._._._ Helicopter Landing Zone LZ Survey Locale 141 Boundary _ 50 ft.Contour .................. Contour Interval:100 ft. Talkeetna Mts.D-3 T.33 N.,R.7 E.,S.M. SW 1/4 Sec.27 - Figure A.96.Surface Reconnaissance and Subsurface Testing in Survey Local e 141. A-105 - - /.."'/-~/)"':'.! ,:..'.,"'.:I . ..'.--'.,~. -I'--•'"'. ("1~{,./.,.':T . .~ ,~ Shovel Tests:540 (Total) .Surface Reconnaissance o I 610 1 METERS 1220, Subsurface Tests Contour Interval:100 ft.-Helicopter Landing.Zone LZ Talkeetna Hts.0-3 142 Boundary T.32 N.,R.7 E.,S.M.Survey Locale ----Sec.2,3,10,11 50 ft.Contour .......S 1/2 Sec,34,35 Figure A.97.Surface Reconnaissance and Subsurface Testing in Survey Locale 142. A-106 ". .... Contour Interval:100 ft. Talkeetna Mts D-3 T.32 N.,R.7 E.,S.M. Sec.27,28,34,35 '. Shovel Tests:540 (Total) Surface Reconnaissance Subsurface Tests Helicopter Landing ~one LZ Survey Locale 142 Boundary - - - - 50 ft.Contour ".". ... ....... o, o . 0..., .'III ..,( 610 I METERS 1220 I ~I - - - Fi 9 ure A.98.Surface Reconnaissance and Subsu rface Testing in Survey Local e 142. A-I07 .- - - ......... .." ...."":--....- ~ -H- I -".-... "J, / / ,/ .~--....----...,-.. Shovel Tests:540 (Total) Surface Reconnaissance a I 300 I METERS 600 Contour Interval:100 ft.Subsurface Tests Helicopter Landing Zone Survey Locale 143 Boundary 50 ft.contour LZ .'....... Talkeetna Mts. T.32 N.,R.7 SE 1/4 Sec.8, N 1/2 Sec.17, 0-3 E.,S.M. SW 1/4 Sec.9 NW 1/4 Sec.16 -Figure A.99.Surface Reconnaissance and Subsurface Testing in Survey Local e 143. A-I08 ..... -....LZ - -.."........".".. , --- .... ",.... \...., ,'.I, ~.-.',,'", \,-_...\ 1 l \ \ "'-----::-.......\.,;.~-Q \ \ \ I I '. J I.'.'.: .'.,.' I I I "~......... Shovel Tests:540 (Total) o r 300 r 600 Surface Reconnaissance Subsurface Tests Helicopter Landin~Zone Survey Locale 143 Boundary 50 ft.Contour ....".. LZ METERS Contour Interval:200 ft. Talkeetna Mts.D-3 T.32 N.,R.7 E.,S.M. S 2/2 Sec.9,SW 1/4 Sec.20 NW 1/4 Sec.25,N 1/2 Sec.26 Figure A.IOO.Surface Reconnaissance and Subsurface Testing in Survey Locale 143. A-lOg ..... (,.) - - .- .,'-.."....'.'../,.1 \,( \,.,1/'•',,1./_.....\'\.". .."",\S).'.".._......._."........LZ ~.~..•.('-~ ...•...,......'........."J...\.'.,._._.J"" ,,'-I ._.'".. \\..........{.TLM 17'4' \",...I . I ~ I 1,, r Shovel Tests:500 (Total) Surface Reconnaissance o 300 I METERS 600 I Subsurface Tests Helicopter,Landing Zone LZ Survey Locale 144 A Boundary_-- Contour Interval:100 ft. Talkeetna Mts.0-3 T.32 N.,R.7 E.,S.M. W 1/2 Sec.30 Figure A.IOI.Surface Reconnaissance and Subsurface Testing in Survey Lac ale 144A. A-lID Surface Reconnaissance Shovel Tests:500 (Total) 600300 METERS o, "......,...,_. ,'.'I\,- \....\. "~ -'-0'- -)"......" .-'.Y/!-_'.A.:'.-......• \\).........1".-"':--,........_LZ :...,.-\-,'-:,!..... ,".,,'-._._._......\..~"~I.,..\,!~...\.......--~'--'-...\,,'_.J TLM 174\.. 1 \,,_.~L , i :- , I ... I i ('r I '., I \_.j I I,' I "..'r-' ''"\,........: I I \ \'----- Subsurface Tests Contour Interval:100 ft. Survey Locale 144 A Boundary _ - - Helicopter Landing Zone LZ Talkeetna Mts.D-3 T.32 N.,R.7 E.,S.M. S 1/2 Sec.19,W 1/2 Sec.29 Sec.30 Figure A.I02.Surface Reconnaissance and Subsurface Testing in Survey Loc ale 144A. A-Ill -.... I' ,~ .-..-. ". .'...... ......\, 0 610 1220 I I , METERS Shovel Tests:444 Surface Reconnaissance .~..- Survey Locale 144 B Boundary _ - - Subsurface Tests Helicopter Landing'Zone 50 ft.Contour LZ .... Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R.7 E.,S.M. Sec.17,18,19,20 Figure A.I03.Surface Reconnaissance and Subsurface Testing in Survey Local e 1448. A-112 - - -,, I J, J I J / /,. " <zfJ ~: ... -....__...._~--- I I I I, \ 21 00 '- ...----,, I I I I I J I I I I I I, I I I I \ \,-----...~-"......., ~ \ '"".......... Shovel Tests:276 (Total) o I 300 600 Surface Reconnaissance METERS Subsurface Tests Helicopter Landing Zone Survey Locale 145 Boundary LZ Contour Interval:50 ft. Talkeetna Mts.D-3 T.32 N.,R.7 E.,S.l1. S 1/2 Sec.20,21 N 1/2 Sec.28,:!') Figure A.104.Surface Reconnaissance and Subsurface Testing in Survey Local e 145.-, A-l13 -- -- '"-" ...._-- .."-.. ----..~-----"""'"""2200 _7;.::;-- - -.........." --'\.......--"., ~'"-~,. { ( \ J I I \...--........::->;:LZ \'.-' ..... Shovel Tests:276 (Total) o I 300 I 600 I Surface Reconnaissance METERS. Subsurface Tests Contour Interval:50 ft. .~, Helicopter Landing Zone Survey Locale 145 Boundary LZ Talkeetna Mts.0-3 T.32 N.,R.7 E.,S.M. S 1/2 Sec.21,SW 1/4 Sec.22 N 1/2 Sec.28,NW 1/4 Sec.27 Figure A.lOS.Surface Reconnaissance and Subsurface Testing in Survey Locale 145. A-114 .'....,--- ----~;---".-.,.O'.O'......:..._.-----"' ~--.-.----,............_--_... 1""'1', o 300 600ShovelTests:481 (Total)LI 'L-~I Surface Reconnaissance - - - - -r1ETERS Figure A.106.Surface Reconnaissance and Subsurface Testing in Survey Local e 146. Subsurface Tests Helicopter Landing Zone LZ Survey Locale 146 Boundary _ Contour Interval':100 ft. Talkeetna Mts.D-3 T.32 N,R.7 E.,S.H. SW 1/4 Sec.28,SE 1/4 Sec.29 N 1/2 Sec.32,NW 1/4Sec.33O'O'O'..50 ft.Contour A-llS ; I ( ~ \ '- ...- ! -N- 1- \ \ ...\ ".\'"".'"........---\..-....... '" """:\ :"' "" , ".... ,'." ...-........"".............._..... "".. ..,:i --- LZ , I i ,.. {.', ... .'..:" .,_._.-.-.......... "'...........",.... """~"'-. '..,~,, \" '" ,- "... - ...,.,, Shovel Tests:481 (Total)o I 300 I 600 Surface Reconnaissance Subsurface Tests Helicopter Landing Zone LZ Survey Locale 146 Boundary _ 50 ft.Contour METERS Contour Interval:100 ft. Talkeenta Mts.D-3 T.32 N.,R.7 E.,S.M. S 1/2 Sec.27,SE 1/2 Sec.28 E 1/2 Sec.33,Sec.34 Figure A.107.Surface Reconnaissance and Subsurface Testing in Survey Locale 146. A-116 Shovel Tests:481 (Total) Surface Reconnaissance ,, \, \ \ \ \ a I 300, METERS 600 ! - - -. - -. - Subsurface Tests Helicopter Landing Zone Survey Locale 146 Boundar:' 50 ft.Contour LZ .... Contour Interval:100 ft. Talkeetna Mts.0-3 T.32 N.,R.7 E.,S.M. SE 1/4 Sec.34,SW 1/4 Sec.35 T.31 N.,R.7 E.,S.M. NE 1/4 Sec.3,~m 1/4 Sec.2 .., - Figure A.108.Surface Reconnatssance and Subsurface Testing in Survey Local e 146. A-II?- ~-------~~~-~----------~~ .... I \ J r I J, I I I I, I, \, I \. I }, ............... .......-2200 - ...., - i)300 600 Shovel Tests:90 (Total)I I I,-Surface Reconnaissance -----METERS Subsurface Tests _.._._.-Contour Interval:100 ft. Helicopter Landing Zone LZ Talkeetna Mts.D-3 Survey Locale 147 Boundary T.32 N.,R.6 E.,S.M.---- S 1/4 Sec.25,26 50 ft.Contour .............N 1/2 Sec .34,35..- ..... - Figure A.109.Surface Reconnaissance and Subsurface Testing in Survey Local e 147. A-lIB - - -I I I I I I I I I, I I /, 2200 --------..... ----------...... a 300 600 Shovel Tests:90 (Total) Surface Reconnaissance Subsurface Tests METERS . Contour Interval:100 ft. Helicopter Landing Zone LZ Survey Locale 147 Boundary - - - - Talkeetna Mts.D-3 T.32 N.,R.6 E.,S.M. S 1/4 Sec.25,26 N 1/2 Sec.34,35 Figure A.llO.Surface Reconnaissance and Subsurface Testing in Survey Locale 147.- A-119 .- ,~ - I,, \ \ \ \ \ ta \o \ \,,,,,,,,, " Shovel Tests:162 Surface Reconnaissance o 300 !'lETERS 600 I Subsurface Tests Helicopter Landing Zone Survey Locale 148 Boundary LZ Contour Interval:100 ft. Talkeetna Mts.D-3 T.32 N.,R 6 E.,S.M. Sec.36 - Figure A.lll.Surface Reconnaissance and Subsurface Testing in Survey Local e 148. A-120 Shovel Tests:10 Surface Reconnaissance o I ~oo ~'"" 0 __ -H- I """ - - GOO J METERS Survey Locale 149 Boundary _ Subsurface Tests Helicopter Landing Zone LZ Contour Interval:100 ft. Talkeetna Mts.100 ft. T.32 N.,R.6 L.,S.M. N 1/2 Sec.31 W 1/2 Sec.32 Figure A.IlZ.Surface Reconnaissance and Subsurface Testing in Survey Locale 149. A-I2l "J ; " 1220 TLM 197., '...:-;, .1 'TLM 016 \ "\ I I,., .._."-.....~~~~.~t.!j ~-_.-~'.t!!J.:.•.;.•.i _'.".'••••:~..J,.:.::\i:::-:..:::......,~.-......'S!J....'lii.iI oo ". C'I n , J, J I,, ;', I J I, J I I I I I I,,, I .. .."........ : ......... Shovel Tests:1010 (Total) t::>.'. - -Surface Reconnaissance t1ETERS Subsurface Tests Contour Interval:100 ft. Helicopter Landing Zone Survey Locale 150 Boundary 50 ft.Contour LZ ............ Talkeetna !-Its.D-3 T.32 N.,R.5 E.,S.H. Sec.21,22,23;26,27 w 1/2 Sec.24,E 1/2 Sec.28 Figure A.113.Surface Reconnaissance and Subsurface Testing in Survey Local e 150. A-122 HETERS Contour Interval:100 ft. Talkeetna I1ts.D-3 T.32N.,R.5E.,S.H. Sec.10,11,12,13,14,15 ~-N- 2400~~ ·. Shovel Tests:1010 (Total) Surface Reconnaissance Subsurface Tests Ilelicopter Landing Zone LZ Survey Locale 150 Boundary - - - - "',0 ft.Contour a I 610 1220 ~, - - - - Figure A.114.Surface Reconnaissance and Subsurface Testing in Survey Local e 150. A-123 ~I ..'. oo ...... \,,,,, 1, \ \ \.::?) ~ , I I I \ \ I I,, - - -Shovel Tests:940 o Gl0 1220 Surface Reconnaissance i'IETERS Survey Locale 151 Boundary _ Subsurface Tests Helicopter Landing Zone 50 ft.Contour ooOO ... LZ contour Interval:100 ft. Talkeetna Mts.0-4 T.32 N.,R.5 E.,S.H. Sec.15,16,21,22 E 1/2 Sec.17,20 Figure A.llS.Surface Reconnaissance and Subsurface Testing in Survey Local e 151. A-124 - - - -...,...........- --- -- ~-H- I ~I ! I /".', I I " ", """"""...".. . . ..~ "..... " " -------- I .....-~..."......-.......-,,'. " _.,.-.~ I....·_.-' ....-.....-.....--~.....- .... Shovel Tests:339 (Total) o I 300 I 600 Figure A.1l6.Surface Reconnaissance and Subsurface Testing in Survey Locale 152. Surface Reconnaissance Subsurface Tests Helicopter Landing Zone LZ Survey Locale 152 Boundary - - - - 50 ft.Contour METERS Contour Interval:100ft. Talkeetna Mts.D-4 T.31 N.,R.5 E.,S.t·1 • Sec.29,S 1/2 Sec.20 NW 1/4 Sec.28 A-125 ~ -.N- ~ 2200 ..".. ......... .. .. ",, 0': J (.. .. .. .. ..............:..................\ ~\. ",....,--,---,,,\ "...._ 1 ~Ai)J {'../~J '-J ....I,, I../..'....' I ,/ '. ..........._.... 192 ... ;:,.00........ .....----~---_....----- -....---.,........ .-.~.-._---......... •TLM, ......~ "'"" - Shovel Tests:339 (Total)o 300 600 Surface Reconnaissance :·lETEt-:.::i Subsurface Tests Contour Interval:100 ft. - Helicopter Landing Zone Survey Locale 152 Boundary 50 it.contour LZ ...0.° Talkeetna Mts.0-4 T •32 N.,R.S E.,S .1·1. S 1/2 Sec.21,S 1/2 Sec.22 N 1/2 Sec.28,N 1/2 Sec.23 Figure A.lll.Surface Reconnaissance and Subsurface Testing in Survey Local e 152. A-126 ,. ".' >.<-"---.-.,.......~~f~;:2» SUSITNA RIVER o Shovel Tests:914 (Total) I . I I. .. .......,.,.-:".':;'.-.- .,....LZ I -,:::.!''''... ."--.:~\. ~TLM 16 "" 2200 --1 300 - - - Surface Reconnaissance METERS Figure A.IIB.Surface Reconnaissance and Subsurface Testing in Survey Locale 153. Survey Locale 153 Boundary - - - - Subsurface Tests Helicopter Landing Zone 50 ft.Contour LZ .............. Contour Interval:100 ft. Talkeetna Mts.D-4 T.32 N.,R.5 E.,S.H. W 1/2 Sec.30,E 1/2 Sec.29 NE 1/4 Sec.31,N 1/2 Sec.32 - A-127 \ r \ '\, .- f '-------....... .. ..................,.. ..... .....,:....... ",. \:, : I . I ..I I / / I / , ,,,,, ,\, ..,.' .'"-'-'r'-_ ,., r"......._..-._..-..\ LZ .•.• ".-"-...... ":......._.-._..-"..., TLM 165 •_"_,,i''', ..,~",, .~LM 166 LZ, .""4, .'""I . ";".0_,........._.._._,_........;,'\....oJ ..'J ,.,....'\.----_... --~...................... ........ ........ "" r Shovel Tests:914 (Total)o I 300 600 Su~face Reconnaissance METERS Subsurface Tests Helicopter Landing Zone LZ Survey Locale 153 Boundary _ .- 50 ft.Contour ....... Contour Interval:100 ft. Talkeetna Mts.0-4 T.32 N.,R.5 E.,S.M. S 1/2 Sec.28,N 1/2 Sec.33 Figure A.119.Surface Reconnaissance and Subsurface Testing in Survey Local e 153. A-128 ~I !- -M- j ~~ f1900~ ""'" - - Shovel Tests;33 Surface Keccnnaissance l I 300, ;·1ETERS 600 I Subsurfa<.:e Tests Helicopter Landing Zone Survey Locale 154 Boundary Corps.of Engineers Cabin LZ o Contour Interval:100 ft. Talkeetna Mts.D-5 T.32 N.,R.1 E.,S.M. SE 1/4 Sec.32,SW 1/4 Sec.33 T.31 N.,R.1 E.,S.M. NE 1/4 Sec.5,NW 1/4 Sec.4 Figure A.120.Surface Reconnaissance and Subsurface Testing in Survey Local e 154. A-129 ~ !F" -N- .~ .- I, J I , I \,~ I I II \ I t , I I \ I I \,\-, _.ShoVE:l T2StS:11 Surface Reconnaissance o 200 l'lETERS 400 .....Subsuridce Tests Helicopter Landing Zone LZ Survey Locale 155 Boundary - - - - Contour Interval:100 ft. Talkeetna L'itS.0-4 T.31 N.,R.4 E.,S.H. W 1/2 Sec.21 Figure A.121.Surface Reconnaissance and Subsurface Testing in Survey Local e 155. A-130 IIIVe'J,~ -H- I .~ ~ Shovel Tests:28 Surface Reconnaissance a,300 HETERS 600 I ~. i - - Subsurface Tests Helicopter Landing Zone Survey Locale 156 Boundary LZ Contour Interval:100 ft. Talkeetna Mts.D-4 T.31 N.,R.4 E.,S.M. Sec.9,10 N 1/2 Sec.16 - Figure A.122.Surface Reconnaissance and Subsurface Testing in Survey Locale 156. A-131 - --I / ....-------........_-----------:--- 2500 __-----1 -. Shovel Tests:157 Surface Reconnaissance o I 300 I t1ETERS 600 Subsurface Tests Helicopter Landing Zone LZ Survey Locale 157 Boundary - - - - Contour Interval:100 ft. Talkeetna Mts.C-2 T.30 N.,R.10 E.,S.M. S 1/2 S 1/4 Sec.12 E 1/2 SE 1/4 SE 1/4 Sec.11 Figure A.123.Surface Reconnaissance and Subsurface Testing in Survey Local e 157. A-132 Survey Locale 158 Boundary ---- 0 200 400 I I 1 HETERS -, Contour Interval:50 ft. Shovel Tests:0 Surface Reconnaissance Helicopter Landing Zone LZ ....._-'-.... Talkeetna Mts.C-l T.30 N.,R 11 E.,S.M. N 1/2 Sec.18,S 1/2 Sec.7 T.30 N.,R.10 E.,S.M. SE 1/4 Sec.12 0!l1!l, ..... - - Figure A.124.Surface Reconnaissance and Subsurface Testing in Survey Local e 158. A-133 .....__........' /\/1- - -Shovel Tests:54 II JOO I surface Reconnaissance :'lETERS Subsurface Tests Contour Interval:50 ft. - Helicopter Landing Zone Survey Locale 159 Boundary LZ Talkeetna Mts.C-l T.30 tl.,R.11 E.,S.H. S 1/2 ':;ec.32,S 1/2 Sec.33 Figure A.125.Surface Reconnaissance and Subsurface Testing in Survey Locale 159. A-134 ,,.,_..-...--- Shovel Tests:250 -, 1 200 I -lOO I ... ~I Surface Reconnaissance subsurface Tests Helicopter Landing Zone Survey Locale 160 Boundary LZ HETERS Contour Interval:50 ft. Talkeetna Mts.C-l T.30 N.,R.11 E.,S.M. N 1/2 Sec.34,SW 1/4 Sec.34 Figure A.126.Surface Reconnaissance and Subsurface Testing in Survey Locale 160. A-135 - ,~ Shovel Tests:401 (Borrow C)o :)10 J \ LM 091 lr .~ -N- .~ 1220 Surface Reconnaissance SUDsurface Tests Helicopter Landing Zone Borrow C,F Boundary LZ :lETERS Contour Interval:100 ft. Talkeetna Hts.D-4 T.33 N.,R.5 E.,S.H. Sec.19,20,21,28,29,30 S 1/2 Sec 16,17,18 Figure A.127.Surface Reconnaissance and Subsurface Testing in Proposed Borrow Areas C and F. A-136 - ..... ..... - 0 610 1220 I I I METERS - Contour Interval:100 ft. Shovel Tests:736 (Borrow F) Surface Reconnaissance Subsurface Tests Helicopter Landing Zone Borrow F Boundary LZ Talkeetna Mts.D-4 T.33N.,R.5E.,S.M. Sec.31,32 T.32N.,R.5E.,S.M. Sec.4,5,E 1/2 Sec.6 - Figure A.128.Surface Reconnaissance and Subsurface Testing in Proposed Borrow Area F. A-137 - ,.,... 1220610o rShovel'rests:736 (Borrow F) 18~ .m-.~ -N- ~.- - ..- Surface Reconnaissance r1ETERS Subsurface Tests Contour Interval:100 ft. Helicopter Landing Zone Borrow F Boundary LZ Talkeetna Mts.D-4 T.32N.,R.5E.,S.M. Sec.8,9,16,17 N 1/2 Sec.20,21 Figure A.~29.Surface Reconnaissance and Subsurface Testing in Proposed Borrow F. A-138