Loading...
HomeMy WebLinkAboutConversion Diesel Fired Boilers to Electric Fired Boilers Wrangell App Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 1 of 17 9/2/2008 Application Forms and Instructions The following forms and instructions are provided for preparing your application for a Renewable Energy Fund Grant. An electronic version of the Request for Applications (RFA) and the forms are available online at http://www.akenergyauthority.org/RE_Fund.html The following application forms are required to be submitted for a grant recommendation: Grant Application Form GrantApp.doc Application form in MS Word that includes an outline of information required to submit a complete application. Applicants should use the form to assure all information is provided and attach additional information as required. Application Cost Worksheet Costworksheet.doc Summary of Cost information that should be addressed by applicants in preparing their application. Grant Budget Form GrantBudget.xls A detailed grant budget that includes a breakdown of costs by task and a summary of funds available and requested to complete the work for which funds are being requested. Grant Budget Form Instructions GrantBudgetInstr.pdf Instructions for completing the above grant budget form. • If you are applying for grants for more than one project, provide separate application forms for each project. • Multiple phases for the same project may be submitted as one application. • If you are applying for grant funding for more than one phase of a project, provide a plan and grant budget for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. • If you have additional information or reports you would like the Authority to consider in reviewing your application, either provide an electronic version of the document with your submission or reference a web link where it can be downloaded or reviewed. REMINDER: • Alaska Energy Authority is subject to the Public Records Act, AS 40.25 and materials submitted to the Authority may be subject to disclosure requirements under the act if no statutory exemptions apply. • All applications received will be posted on the Authority web site after final recommendations are made to the legislature. Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 2 of 17 9/3/2008 SECTION 1 – APPLICANT INFORMATION Name (Name of utility, IPP, or government entity submitting proposal) City and Borough of Wrangell  Type of Entity: Local Municipal Government  Mailing Address City and Borough of Wrangell  P.O. Box 531  Wrangell, Alaska  99929  Physical Address City and Borough of Wrangell  205 Brueger Street  Wrangell, Alaska  99929 Telephone (907) 874‐2381  Fax (907) 874‐8952  Email cmgwrg@aptalaska.net  1.1 APPLICANT POINT OF CONTACT Name Steve Henson  Title Electrical Superintendent  Mailing Address Wrangell Municipal Light & Power  P.O.  Box 531  Wrangell, Alaska 99929  Telephone (907) 874‐3602  Fax (907) 874‐3614  Email linedept@gci.net  1.2 APPLICANT MINIMUM REQUIREMENTS Please check as appropriate. If you do not to meet the minimum applicant requirements, your application will be rejected. 1.2.1 As an Applicant, we are: (put an X in the appropriate box) An electric utility holding a certificate of public convenience and necessity under AS 42.05, or An independent power producer, or X A local government, or  A governmental entity (which includes tribal councils and housing authorities); Yes    1.2.2. Attached to this application is formal approval and endorsement for its project by its board of directors, executive management, or other governing authority. If a collaborative grouping, a formal approval from each participant’s governing authority is necessary. (Attachment A) Yes    1.2.3. As an applicant, we have administrative and financial management systems and follow procurement standards that comply with the standards set forth in the grant agreement. Yes    1.2.4. If awarded the grant, we can comply with all terms and conditions of the attached grant form. (Any exceptions should be clearly noted and submitted with the application.) Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 3 of 17 9/3/2008 SECTION 2 – PROJECT SUMMARY Provide a brief 1-2 page overview of your project. 2.1 PROJECT TYPE Describe the type of project you are proposing, (Reconnaissance; Resource Assessment/ Feasibility Analysis/Conceptual Design; Final Design and Permitting; and/or Construction) as well as the kind of renewable energy you intend to use. Refer to Section 1.5 of RFA. Final design, permitting and construction for the conversion from diesel fired boilers to  electric fired boilers in 11 public facilities located in Wrangell, Alaska.  The conversion  is proposed to utilize the reduced electric rate provided by the City to utilize the  spilling of excess water (water not used in power production) provided by the existing  Tyee Lake Hydroelectric facility.  2.2 PROJECT DESCRIPTION Provide a one paragraph description of your project. At a minimum include the project location, communities to be served, and who will be involved in the grant project. The City and Borough of Wrangell (City), through Wrangell Municipal Light and  Power (WMLP), has established a fuel displacement rate of $.08/KWH for all heat and  hot water.  There is a possibility of an interruptible rate of $.05/KWH from the Four  Dam Pool Power Agency.  This special rate is due to Tyee Lake Hydroelectric facilities  spilling of excess water (water not used in power production).  A feasibility study has  been conducted by Electric Power Systems, Inc. to determine what the savings would  be per year if the city buildings were converted from diesel fired boilers to electric  boilers, develop a rough order magnitude cost estimate (ROM), and provide estimated  engineering design fees for replacing the boilers.  The study was conducted on 11 public  buildings in Wrangell and the study found significant savings to progress this project to  the design, permitting and construction phase.  WMLP would like funding to convert  these 11 public facilities from diesel fired boilers to electric boilers.  The community  served by this project is Wrangell, Alaska.  Directly involved in this project is the City  and Borough of Wrangell and Wrangell Municipal Light and Power.  2.3 PROJECT BUDGET OVERVIEW Briefly discuss the amount of funds needed, the anticipated sources of funds, and the nature and source of other contributions to the project. Include a project cost summary that includes an estimated total cost through construction.   The feasibility study already conducted estimates the cost of the project to be $3.2  million in 2008 dollars.      To date, WMLP has spent $26,000 of their own funds for the completion of the  feasibility study/conceptual design phase for this project (See Attachment B).   Additionally, MWLP had a distribution study performed to ensure that the distribution  system could handle the increased load due to the increased use of electric energy the  Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 4 of 17 9/3/2008 conversion will produce.  This study cost $27,000.  Both of these studies were conducted  by Electric Power Systems, Inc.    In March of 2008, the City of Wrangell requested $3.26 million dollars from the United  States Department of Agriculture (USDA) for this project.  Steve Henson of WMLP has  contacted USDA on a monthly basis to determine the status of the grant applications.   The applications are still being evaluated and the amount of total funds available to the  pool of applicants from throughout the entire United States is only $5 million.  Due to  the large number of applicants, we do not anticipate receiving much if any funding  from this grant application.    Due to 57% of the population of Wrangell being in the low to moderate income level,  the community of Wrangell is eligible for community block grants.  The City and  Borough of Wrangell has received a letter stating they are eligible for up to $850,000 in  community block grants.  The City will be applying for grant funding for the  infrastructure upgrades at the Municipal Power Plant (estimated at $1.2 million) and for  funding for the boiler failure at the Elementary School (estimated at $137,375) which are  immediate needs of this project.    In terms of matching funds, the City has already created a subsidized rate of $.08 cents  per kW to help residents with their heating costs.  This rate decrease is provided to help  consumers with their fuel costs and to stimulate them to convert from diesel fired  boilers to electric boilers for their heating needs.  This is a substantial subsidy and  decreases revenue to the City while providing a decreased overall cost for consumers.   The breakpoint for using fuel versus electricity is $2.21 per gallon at $.07/kWH or $2.52  per gallon at $.08/kWH (see Attachment C).  Currently, diesel fuel cost is $4.56 per  gallon delivered to the City.    Additionally, the City offers energy to new businesses locating themselves in Wrangell  at $.07 cents for the first five years of business.  Since the City pays $.068 cents for  energy, this is a large in‐kind contribution to stimulate new business in Wrangell.                        Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 5 of 17 9/3/2008   The following is a breakdown of the cost estimate for this project (See Attachment D):    Facility Cost  Estimate  Public Safety Building $139,875 Fire Satellite Station  7,887 Public Works Building 121,607 Library 88,600 Nolan Center 148,400 Hospital 169,490 High School 195,500 Middle School 133,938 Elementary School 137,375 Power Plant 144,265 Harbor Office 10,625 Wrangell Municipal Light & Power Utility Upgrades 535,500 Miscellaneous charges (Equip. Rental, SCADA  Mods, Camp Days/Travel) 212,679 Shipping of Equipment 28,301 Prime Overhead (15%) 306,861 Prime Profit (10%) 204,574 Contingency (30%) 613,723 TOTAL COST $3,199,201 2.4 PROJECT BENEFIT Briefly discuss the financial benefits that will result from this project, including an estimate of economic benefits (such as reduced fuel costs) and a description of other benefits to the Alaskan public.   The main benefit of this project is to reduce the cost of heating municipal buildings by  48% which in turn lowers the cost of government.  The end benefit to consumers is the  decrease in their overall energy cost.  By reducing the cost of government, the benefits  to the community of Wrangell include the possibility of a reduction in sales taxes and  an increase in funds available for increased infrastructure development.                Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 6 of 17 9/3/2008   The following is a breakdown of the cost savings created by the conversion of the public  facilities (See Attachment C):    Year Fuel  Cost  Electric  Cost  Savings at  $.07 kWH     2007/2008 $406,692 $292,383 $114,309 2008/2009 $455,495 $292,383 $163,112 2009/2010 $510,154 $292,383 $217,771 2010/2011 $571,373 $292,383 $278,990 2011/2012 $639,938 $292,383 $347,555 2012/2013 $716,730 $292,383 $424,348 2013/2014 $802,738 $292,383 $510,355 2014/2015 $899,067 $292,383 $606,604 2015/2016 $1,006,955 $292,383 $714,572 Total Saving $3,263,389   As the above calculation shows, the complete cost of this project will be recovered in  savings in eight years time.  2.5 PROJECT COST AND BENEFIT SUMARY Include a summary of your project’s total costs and benefits below. 2.5.1 Total Project Cost (Including estimates through construction.) $3,260,000 2.5.2 Grant Funds Requested in this application. $3,260,000 2.5.3 Other Funds to be provided (Project match) * Additionally,  the City is already substantially subsidizing energy  cost to the consumer but the exact amount is not quantifiable in  dollars.  $123,000 2.5.4 Total Grant Costs (sum of 2.5.2 and 2.5.3) $3,200,000 2.5.5 Estimated Benefit (Savings) $3,200,000 2.5.6 Public Benefit (If you can calculate the benefit in terms of dollars please provide that number here and explain how you calculated that number in your application.) $3,200,000 The public benefit was calculated in terms of the savings of $3.2 million over an eight  year time period.    Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 7 of 17 9/3/2008   SECTION 3 – PROJECT MANAGEMENT PLAN Describe who will be responsible for managing the project and provide a plan for successfully completing the project within the scope, schedule and budget proposed in the application. 3.1 Project Manager Tell us who will be managing the project for the Grantee and include a resume and references for the manager(s). If the applicant does not have a project manager indicate how you intend to solicit project management Support. If the applicant expects project management assistance from AEA or another government entity, state that in this section. Overall project management of the project will be performed by Steve Henson,  Electrical Superintendent for WMLP.  Mr. Henson has over 39 years of experience in the  electrical, oil and gas, mining and construction industry.  He has been the project  manager for numerous projects in excess of $10 million dollars.  His experience includes  10 years as the Maintenance Electrician/Operator for the Tyee Hydroelectric Facility and  for the past two years, he has been the Electrical Superintendent for Wrangell Municipal  Light and Power.  Mr. Henson’s full resume is located in Attachment E.  The following  are references for Mr. Henson:    Mr. Dave Carlson  Chief Executive Officer  Four Dam Pool Power Agency  (907) 258‐7752  Email: dcarlson@fdppa.org    Mr. Bob Prunella  Manager, City and Borough of Wrangell  (907) 874‐2381  Email:  cmgwr@aptalaska.net    Mr. Joe Nelson  Electrical Superintendent  City of Petersburg  (907) 772‐4621  Email:  pmpl@ci.petersburg.ak.us    Upon receiving funding for this project, the City will initially issue a request for  proposal (RFP) for project management services and engineering design.  After the  design is completed, an invitation to bid will be issued for construction of the project.      Due to the fact that Electric Power Systems, Inc. (EPS) performed the two feasibility  studies for this project, it is anticipated that they will be a preferred choice to perform  the project management and engineering design for this project.  Included in  Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 8 of 17 9/3/2008 Attachment E are resumes for key personnel with EPS that may be utilized on this  project if they are the successful proposer.  These personnel include:  - Earl George, PE, Electrical Engineer  - Dave Buss, PE, Electrical Engineer    - Warren Taylor, PE, Mechanical Engineer  - Jon Morse, Mechanical Administrator  3.2 Project Schedule Include a schedule for the proposed work that will be funded by this grant. (You may include a chart or table attachment with a summary of dates below.)   The proposed project schedule is located below.  It is anticipated that the project will  begin in January 2009 with the engineering design with construction anticipated to be  completed during the summer months of 2009.  The project will be completed by end of  2009.    3.3 Project Milestones Define key tasks and decision points in your project and a schedule for achieving them. Key project milestones for this project include the following:    1) Request for Proposal (RFP) issued and awarded for Project Management and  Engineering Design.    2) Engineering Design    3) Invitation to bid for construction and equipment purchases.    4) Construction    The project will start on approximately January 2, 2009 and be completed by October 28,  2009.  The detailed schedule is shown above.  3.4 Project Resources Describe the personnel, contractors, equipment, and services you will use to accomplish the project. Include any partnerships or commitments with other entities you have or anticipate will be needed to complete your project. Describe any existing contracts and the selection process Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 9 of 17 9/3/2008 you may use for major equipment purchases or contracts. Include brief resumes and references for known, key personnel, contractors, and suppliers as an attachment to your application. City of Wrangell charter dictates that all projects must go through a formal request for  proposal or bid process for award.  For this project, we anticipate issuing separate RFPs  for project management and engineering, along with issuing an invitation to bid for the  construction phase of the project which includes the necessary equipment to be  installed.  Due to the fact that Electric Power Systems, Inc. (EPS) performed the two feasibility  studies for this project, it is anticipated that they will be a preferred choice to perform  the project management and engineering design for this project.   EPS has been  providing power system operation, engineering, planning and administration  consulting services to the electrical power industry for over 12 years.  Their experience  includes a full range of services from planning studies, design, construction, and start‐ up/commissioning to periodic testing and maintenance.  ESG maintains a full‐time staff  of approximately 90 in its Anchorage and Juneau, Alaska; and Vancouver, and  Redmond, Washington locations.  Their staff consists of seasoned planners, electrical  and mechanical engineers, drafters, electricians and technicians, and support personnel.   The following are a list of references for EPS:    Nome Joint Utility Systems  Projects:  Snake River Power Plant Relocation; and Rock Creek Line Extension  Reference:  John Handeland, Utility Manager, (907) 443‐6302     Golden Valley Electric Association, Inc.  Reference:  Greg Wyman, Project Manager (907) 451‐5629    Chugach Electric Association  Reference:  Brian Hickey, (907) 762‐4440  Reference:  Ed Jenkin, (907) 762‐4600    Alyeska Pipeline Service Company  Reference:  Mike Lewis, Project Engineer, (907) 834‐7356    Copper Valley Electric Association, Inc.  Reference:  Steve Bushong, Chief Operating Officer, (907) 835‐7004    Kodiak Electric Association  Reference:  Ron Sternberg, (907) 486‐7777  Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 10 of 17 9/3/2008 3.5 Project Communications Discuss how you plan to monitor the project and keep the Authority informed of the status.   Throughout the life of the project, the Project Manager will provide written monthly  updates to AEA which will include at a minimum:    - Expenditures to date;  - Percent complete; and  - Narrative on progress including any schedule changes.  In addition to the monthly progress reports, communication on project status will also  be provided verbally with the AEA Project/Program Manager on an informal basis  through emails and phone conversations.  3.6 Project Risk Discuss potential problems and how you would address them.   The standard project risk of the possibility of cost overruns is mitigated on this project  by providing a 30% contingency cost in our projected project cost.  Cost overruns will  also be mitigated by effectively managing the project.    Once the project is completed, the risk of a catastrophe happening to the electrical  source of power is mitigated by having diesel‐fueled generators as backup.   Additionally, all public facilities which are proposed to be converted to electrical energy  with this project will have oil fired boilers in place as a back‐up energy source.    The risk of the distribution system being overloaded by the increase in energy use has  been studied by Electric Power Systems, Inc. to ensure that the distribution system from  Tyee to Wrangell can handle the increased load factor. SECTION 4 – PROJECT DESCRIPTION AND TASKS • Tell us what the project is and how you will meet the requirements outlined in Section 2 of the RFA. The level of information will vary according to phase of the project you propose to undertake with grant funds. • If you are applying for grant funding for more than one phase of a project provide a plan and grant budget for completion of each phase. • If some work has already been completed on your project and you are requesting funding for an advanced phase, submit information sufficient to demonstrate that the preceding phases are satisfied and funding for an advanced phase is warranted. 4.1 Proposed Energy Resource Describe the potential extent/amount of the energy resource that is available. Discuss the pros and cons of your proposed energy resource vs. other alternatives that may be Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 11 of 17 9/3/2008 available for the market to be served by your project. Electrical power is provided to WMLP by the Tyee Hydroelectric facilities.  Currently,  Tyee has the capability of producing 20 MW of power, of which there is approximately  11 MW of excess during the summer months and an excess of 6‐7 MW during the  winter.  By implementing this conversion, the excess energy produced by Tyee will be  utilized and the cost of energy for City facilities will decrease by approximately 48%.    Due to the excess energy available to the City by the Tyee Hydroelectric facilities,  converting all public facilities from diesel fired boilers to electric boilers is economically  feasible and will result in a $3.2 million dollar savings over the next eight years (See  Attachment C).  There is no other economically feasible alternative for this project since the hydroelectric  power produced by the Tyee hydroelectric facilities is the most cost effective form of  energy available at this time due to the high price of oil affecting the cost of diesel fuel. 4.2 Existing Energy System 4.2.1 Basic configuration of Existing Energy System Briefly discuss the basic configuration of the existing energy system. Include information about the number, size, age, efficiency, and type of generation. The Tyee Hydroelectric facility was put into operation in 1984.  Tyee produces 20 MW of  electricity and is highly efficient. 4.2.2 Existing Energy Resources Used Briefly discuss your understanding of the existing energy resources. Include a brief discussion of any impact the project may have on existing energy infrastructure and resources. The current infrastructure of the public facilities in Wrangell use diesel fired boilers.  The  proposed project will convert these facilities to electric boilers.  Included in this project is  having the existing feeders reconfigured at the Wrangell Power Plant to carry the  increased load created by the conversion.  The conversion at the power plant will cost  $1.1 million.   4.2.3 Existing Energy Market Discuss existing energy use and its market. Discuss impacts your project may have on energy customers. The following is a breakdown of the existing energy market for WMLP:    Client 2007 Usage in kWH 2008 Usage in kWH  (8 months)  Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 12 of 17 9/3/2008 Residential 8,857,269 6,112,171  Small Commercial 6,016,820 3,780,430  Large Commercial 3,715,595 2,089,654  8 Cent Commercial 53,760 181,680  Industrial 51,261 36,120  City Usage 3,341,871 2,230,921  Light & Line Usage 534,269 440,070  TOTAL 22,570,845 14,871,046    This project will directly impact the City usage by reducing their energy costs by 48%  (See Attachment C).   By reducing the overall cost of government, this savings can be  passed on to customers either through a decrease in taxes or power rates, which benefits  all members of the community of Wrangell.  4.3 Proposed System Include information necessary to describe the system you are intending to develop and address potential system design, land ownership, permits, and environmental issues. 4.3.1 System Design Provide the following information for the proposed renewable energy system: • A description of renewable energy technology specific to project location • Optimum installed capacity • Anticipated capacity factor • Anticipated annual generation • Anticipated barriers • Basic integration concept • Delivery methods Our application is not for a new renewable energy technology but an increased  utilization of the existing Tyee Hydroelectric facility.  4.3.2 Land Ownership Identify potential land ownership issues, including whether site owners have agreed to the project or how you intend to approach land ownership and access issues. All of the land is owned by the City so there are no ownership or access issues.  4.3.3 Permits Provide the following information as it may relate to permitting and how you intend to address outstanding permit issues. • List of applicable permits • Anticipated permitting timeline • Identify and discussion of potential barriers Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 13 of 17 9/3/2008 The only permits required for this project will be electrical permits for construction  which will be issued by WMLP. 4.3.4 Environmental Address whether the following environmental and land use issues apply, and if so how they will be addressed: • Threatened or Endangered species • Habitat issues • Wetlands and other protected areas • Archaeological and historical resources • Land development constraints • Telecommunications interference • Aviation considerations • Visual, aesthetics impacts • Identify and discuss other potential barriers There are no environmental issues that apply to this project.   The only aesthetic impact  is the pad‐mounted transformers which are visually low‐impact.  4.4 Proposed New System Costs (Total Estimated Costs and proposed Revenues) The level of cost information provided will vary according to the phase of funding requested and any previous work the applicant may have done on the project. Applicants must reference the source of their cost data. For example: Applicants Records or Analysis, Industry Standards, Consultant or Manufacturer’s estimates. 4.4.1 Project Development Cost Provide detailed project cost information based on your current knowledge and understanding of the project. Cost information should include the following: • Total anticipated project cost, and cost for this phase • Requested grant funding • Applicant matching funds – loans, capital contributions, in-kind • Identification of other funding sources • Projected capital cost of proposed renewable energy system • Projected development cost of proposed renewable energy system Total Anticipated Project Cost:  The total anticipated cost of the final design, permitting  and construction phase of this project is $3.2 million.  There were two feasibility studies  performed for this project at a total cost of $53,000 which were paid for by the City.   Requested Grant Funding:  $3.2 million.    Matching Funds:  In terms of matching funds, the City has already created a subsidized  rate of $.08 cents per kW to help residents with their heating costs.  This rate decrease is  provided to help consumers with their fuel costs and to stimulate them to convert from  diesel fired boilers to electric boilers for their heating needs.  This is a substantial  subsidy and decreases revenue to the City while providing a decreased overall cost for  consumers.  The breakpoint for using fuel versus electricity is $2.21 per gallon at  Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 14 of 17 9/3/2008 $.07/kWH or $2.52 per gallon at $.08/kWH (see Attachment C).  Currently, diesel fuel is  over $5 per gallon in Wrangell.    Additionally, the City offers energy to new businesses locating themselves in Wrangell  at $.07 cents for the first five years of business.  Since the City pays $.068 cents for  energy, this is a large in‐kind contribution to stimulate new business in Wrangell.    In March of 2008, the City of Wrangell requested $3.26 million dollars from the United  States Department of Agriculture (USDA) for this project.  Steve Henson of WMLP has  contacted USDA on a monthly basis to determine the status of the grant applications.   The applications are still being evaluated and the amount of total funds available to the  pool of applicants from throughout the entire United States is only $5 million.  Due to  the large number of applicants, we do not anticipate receiving much if any funding from  this grant application.    Due to 57% of the population of Wrangell being in the low to moderate income level, the  community of Wrangell is eligible for community block grants.  The City and Borough  of Wrangell has received a letter stating they are eligible for up to $850,000 in  community block grants.  The City will be applying for grant funding for the  infrastructure upgrades at the Municipal Power Plant (estimated at $1.2 million) and for  funding for the boiler failure at the Elementary School (estimated at $137,375) which are  immediate needs of this project.  4.4.2 Project Operating and Maintenance Costs Include anticipated O&M costs for new facilities constructed and how these would be funded by the applicant. • Total anticipated project cost for this phase • Requested grant funding The operating and maintenance costs that will result from this project will be minimal  and will be borne by the City.  Normal maintenance on the boilers is minimal and the  O&M of each building will be funded from the savings of using electricity vs. diesel fuel  for energy. 4.4.3 Power Purchase/Sale The power purchase/sale information should include the following: • Identification of potential power buyer(s)/customer(s) • Potential power purchase/sales price - at a minimum indicate a price range • Proposed rate of return from grant-funded project The City buys power at $.068 cents and will be charging $.08 cents.  The rate of return on  this project is eight years.  In eight years time the project will pay for itself.  The project  will save the City $114,309 in the first year alone (See Attachment C).  Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 15 of 17 9/3/2008 4.4.4 Cost Worksheet Complete the cost worksheet form which provides summary information that will be considered in evaluating the project. The cost worksheet is provided as Attachment F.  4.4.5 Business Plan Discuss your plan for operating the completed project so that it will be sustainable. Include at a minimum proposed business structure(s) and concepts that may be considered.   A business plan is not applicable for this project since it is not a new energy source, we  are just proposing increasing the utilization of the Tyee Hydroelectric facilities energy  that is already being produced hydroelectrically. 4.4.6 Analysis and Recommendations Provide information about the economic analysis and the proposed project. Discuss your recommendation for additional project development work. The table below shows the savings per year by performing this project.  In eight years  time, the project will pay for itself in savings to the City (See Attachment C).  Year Fuel  Cost  Electric  Cost  Savings at  $.07 kWH     2007/2008 $406,692 $292,383 $114,309 2008/2009 $455,495 $292,383 $163,112 2009/2010 $510,154 $292,383 $217,771 2010/2011 $571,373 $292,383 $278,990 2011/2012 $639,938 $292,383 $347,555 2012/2013 $716,730 $292,383 $424,348 2013/2014 $802,738 $292,383 $510,355 2014/2015 $899,067 $292,383 $606,604 2015/2016 $1,006,955 $292,383 $714,572 Total Saving $3,263,389 There will be no more addition project development work related to this project after it  is performed.    SECTION 5– PROJECT BENEFIT Explain the economic and public benefits of your project. Include direct cost savings, and how the people of Alaska will benefit from the project. Renewable Energy Fund Grant Application AEA 09-004 Grant Application Page 16 of 17 9/3/2008 The benefits information should include the following: • Potential annual fuel displacement (gal and $) over the lifetime of the evaluated renewable energy project • Anticipated annual revenue (based on i.e. a Proposed Power Purchase Agreement price, RCA tariff, or avoided cost of ownership) • Potential additional annual incentives (i.e. tax credits) • Potential additional annual revenue streams (i.e. green tag sales or other renewable energy subsidies or programs that might be available) • Discuss the non-economic public benefits to Alaskans over the lifetime of the project In just eight years time, the project will save the City $3.2 million dollars.      The non‐economic public benefits to Alaskans because of this project include a decrease  in the cost of government for the City.  This may make it possible for the City to enhance  public facilities and programs that will benefit members of the community. SECTION 6 – GRANT BUDGET Tell us how much your total project costs. Include any investments to date and funding sources, how much is requested in grant funds, and additional investments you will make as an applicant. Include an estimate of budget costs by tasks using the form - GrantBudget.xls The total cost of this project is $3.2 million (See Attachment D).  The City is requested  the total amount for funding.    The investment in this project made by the City to date includes two feasibility studies.   These studies include the Boiler Replacement Feasibility Study and the Distribution  Study.  These studies cost a total of $53,000 and were performed by Electric Power  Systems, Inc.  The City is committed to this project due to its economic feasibility and the direct  decrease in the cost of government for the City.    Additional investments the City will make as an applicant is the $123,000.    The Grant Budget Form is located in Attachment G.  City of Wrangell City Boiler Replacement Study Boiler Replacement Analysis EPS Project No.: 07-0156 March 27, 2008 Prepared by: Warren B. Taylor, PE City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis Summary of Changes Revision Number Revision Date Revision Description 1 2007-08-27 Initial Release (Preliminary) 2 2007-09-07 Final 3 2008-27-03 Updated Fuel Information City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis WWW.EPSINC.COM 1 ..............................................................................................................................4 Summary 2 Fuel Displacement Analysis...............................................................................................4 2.1 Field Investigation .......................................................................................................4 2.2 Fuel Oil Conversion Analysis.....................................................................................5 3 Estimated Construction Estimate......................................................................................7 4 Estimated Engineering Fee Estimate................................................................................7 A Fuel vs. Electricity Analysis ...............................................................................................9 B ROM Construction Cost Estimate ...................................................................................10 PHONE (907) 522-1953 y 3305 ARCTIC BLVD., SUITE 201, ANCHORAGE, ALASKA 99503 y FAX (907) 522-1182 PHONE (907) 789-2474 y 2213 JORDAN AVE, JUNEAU, ALASKA 99803 y FAX (907) 789-4939 PHONE (425) 883-2833 y 3938 150 AVE. N.E., REDMOND, WASHINGTON 98052 y FAX (425) 883-8492 City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis 1 Summary The City of Wrangell, through Wrangell Municipal Light and Power (WMLP), has been present a fuel displacement electric rate by Four Dam Pool (FDP) of approximately $.05/kW-h. This special rate is due to Tyee Lake Hydro-electric facilities spilling of excess water (water not used in power production). WMLP, via Steve Henson, solicited Electric Power Systems, Inc. (EPS) to assist the City of Wrangell (COW) in determining what the savings would be per year if the city buildings were converted to electric boilers, develop a rough order magnitude cost estimate (ROM), and provide an estimated engineering design fee for the work of replacing the boilers. 2 Fuel Displacement Analysis EPS Mechanical engineer, Warren Taylor, PE, performed a site investigation in July 2007 with Mr. Steve Henson, WMLP, and COW Department of Public Works (DOPW). The site investigation collected information at each City owned candidate facility that was eligible for the special FDP electric rate. 2.1 Field Investigation The FDP fuel displacement rate is accompanied by few stipulations that the COW must follow. These stipulations include: 1. Only facilities that currently utilize fuel oil for heating purposes are eligible. 2. Each facility that is converted to electric heating must also maintain fuel oil fired heating equipment in the event of power or other electric boiler failure. The following COW facilities were identified, during the field investigation, which qualify for the FDP fuel displacement rate: o Public Safety Bldg o Fire Satellite Station o Public Works Bldg o Library o Nolan Center o Hospital o High School o Middle School o Elementary School o Harbor Office o Power Plant For the development of this study, several items of information were required to be collected from each qualifying facility. This information was collected by EPS, WMLP, and the DOPW during the site investigation. o Mechanical/boiler room configuration and dimensional information 3/27/2008 4 of 7 City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis o Boiler size and configuration, o Details on other fuel fired heating equipment (water heaters, etc.) where applicable, o Location of existing building electrical service, o Photos of existing installation (boilers, mechanical rooms, and electric service where required) o Fuel oil consumption and fuel oil cost per gal per month data for 1 calendar year 2.2 Fuel Oil Conversion Analysis The collected fuel consumption data was totaled together to determine the fuel consumed per facility per year. EPS assumed that preceding and future year’s fuel consumption per location is similar to the 2006/2007 time frame for this analysis. Fuel consumption data, coupled with the purchase price for fuel per month during the 2006/2007 time frame, allowed EPS to determine a total fuel oil cost for the given year. This cost formed the basis of analysis. EPS, from the data collected, calculated the equivalent energy in kW/hr at each facility per month and per year. The total electric energy cost calculated was then multiplied by the resulting FDP fuel displacement electric rate plus a WMLP service fee, which resulted in an fuel displacement electric kW/hr cost of $.07 per kW/hr( with a WMLP fee of 2 cents per kW/hr). In March 2008, EPS received further fuel consumption data and fuel purchase cost information. EPS has updated this analysis to show a more accurate depiction of the COW operating conditions. Additionally, a better fuel cost increase rate was established. The results for the 2006/2007 time period are as follows: Fuel Oil Analysis 2006/2007 2007/2008 Average Fuel Cost: $2.88 $3.06 Minimum Fuel Cost $2.73 $2.73 Maximum Fuel Cost $3.11 $3.48 Deviation Hight/low: 8%/5% %14/%11 Fuel Oil Consumption 2006/2007 2007/2008 Fuel Oil Consumed (total): 143,944 132,002 Average Fuel Cost: $2.88 $3.06 Total Fuel Oil Cost*: $411,204 $406,692 * Total fuel cost is based on fuel oil monthly billings per COW, not based on fuel cost average. Equivalent Electric Energy Consumption 2006/2007 2007/2008 Electric Energy (total kW/hr): 4,554,757 4,176,897 Electricity Cost (per kW/hr): $.07 $.07 3/27/2008 5 of 7 City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis Estimated Electric Cost: $318,833 $292,382 2006/2007 2007/2008 Estimated Savings $92,371 (22%) 114,309 (28%) EPS estimates that fuel oil prices will increase steadily at a rate of at least 5% per year. This assumption was validated by the Energy Information Administration which is provided by the Department of Energy (DOE) which indicated that the 2007 to 2008 estimated fuel price increases at approximately 7.3 percent. Historically fuel price increases per year are in the 3 to 5 percent range. 5 percent, a typical fuel oil year cost increase was utilized to look at future potential cost savings. After the receipt of the information from COW in March of 2008, it was apparent that the federally indicated fuel cost increase percentage is in accurate for the area. After further review the DOE stated this number for the entire US. This would be an average of the highs and lows through the US and would most likely not accurately represent actual fuel cost increases for a specific area. This analysis was updated based on the new information, which indicated that a 12 percent, or more, would be realized. Additionally FDP has indicated that the 5 cent per kW/hr would stay in effect for a minimum of 3 years. Per WMLP at the end of third year, EPS was directed to increase to fuel displacement rate to 7 cents per kW/hr. Future fuel costs and savings are provided in the table below. Table 1 – Estimated Fuel and Electrical Costs and Savings (Updated for 2007/2008 Data) Year Average Fuel Cost ($/gal) COW Fuel Oil Heating Cost2 Electric Heating Cost Savings3 2008/2009 $3.43 $452,398 $318,833 $163,112 2009/2010 $3.84 $506,686 $318,833 $217,771 2010/2011 $4.30 $567,488 $409,928* $278,990 2011/2012 $4.81 $635,711 $409,928* $264,017 2012/2013 $5.39 $711,857 $409,928* $340,809 2013/2014 $6.04 $797,280 $409,928* $426,817 2014/2015 $6.76 $892,953 $409,928* $523,146 2015/2016 $7.58 $1,000,108 $409,928* $631,034 1Rate change from 5 cents per kW/hr to 7 cents per kW/hr. 2Resultant fuel cost per based on average fuel cost per gallon. 3Cost savings is calculated from monthly averages based on monthly fuel oil average. Lastly, EPS converted the proposed electric rate (FDP plus WMLP service fee) into an equivalent fuel oil cost per gallon, $2.21 for the first 3 years. When the guaranteed fix rate expires the approximate equivalent fuel oil cost would be $2.85 per gallon after the first three 3/27/2008 6 of 7 City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis years and assumed every year after. These two rates would also represent the fuel oil/electric rate cost at which no savings are realized for the COW electric/fuel oil conversion. 3 Estimated Construction Estimate EPS developed a construction cost estimate based on gathered information, preliminary equipment selections, and indicated construction assumptions. The estimating assumptions are due to the lack of a detailed design. More accurate cost estimation would be available with a detailed design package. At this time the developed cost estimate provides a Rough Order of Magnitude (ROM) for the development of a capital improvement budget. The following items were considered/included in the estimate: 1. New Electrical Service to each building which new service is required. Including: a. Riser b. Underground Primary Cable c. 480V, 3 phase transformer (various capacities based on location) d. Underground service to building e. Metering Panel f. Disconnects/Circuit Breakers g. Feeder wiring and Protection h. Conduit (where required) 2. Mechanical Removals and Installation, Including: a. Removal of spare boiler (where required) b. Installation of new electric boiler, (480V, 3 phase, size dependent on location) c. Pipe, valves, and fittings d. Instrumentation 3. Miscellaneous Cost/Multipliers a. Wrangell Light & Power electric transmission and distribution system upgrades b. Estimate assumes Electrical and Mechanical Contractors are not local to Wrangell. i. Camp Days Included ii. Travel Costs Included c. Contingency: 30% The final project ROM cost estimate comes to $3,200,000.00. 4 Estimated Engineering Fee Estimate EPS has developed an engineering fee estimate for the development of design/construction drawings and specifications based on the information obtained and analyzed by this study. 3/27/2008 7 of 7 City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis 3/27/2008 8 of 7 The engineering fee is estimated not to exceed $140,008. The fee estimate includes: o Mechanical Design/Construction Drawings o Electrical Design/Construction Drawings o Mechanical Construction Specifications o Electrical Construction Specifications o Mechanical/Electrical Calculations o Pre-bid/Construction Services o Electrical Field Investigation/Verification City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis A Fuel vs. Electricity Analysis 3/26/2008 Location BTU/hr kW (cal)kW (proposed) Proposed Boiler Voltage - Power Jan Feb Mar Apr May June Jul Aug Sep Oct Nov Dec TotalPublic Safety Bldg 1655000 484.6 484.6 Cleaver-Brooks HW-241 504kW 480V, 3 ph, 60hz 87748 68032 93630 52432 56893 83442 0 0 63646 78347 53856 51419 689445Fire Satelite Station 133000 38.9 38.9 Qmark Unit Heater 20kW 208/240V, 3 ph, 60hz 4199 4240 6993 5632 3639 1297 0 0 0 1187 4882 6423 38493Public Works Bldg 372000 108.9 108.9 Qmark Unit Heater 20kW 208/240V, 3 ph, 60hz 11708 31927 13796 2436 0 0 0 0 0 5756 8506 10458 84587Library 236000 69.1 69.1 Cleaver-Brooks HW-121 72kW 480V, 3 ph, 60hz 9392 4335 5221 4114 4430 3164 0 4750 0 3035 3547 7661 49647Nolan Center 943000 276.1 276.1 Cleaver-Brooks HW-203 300kW 480V, 3 ph, 60hz 57134 42559 41167 16169 25219 21232 13575 9819 12657 16429 41661 38737 336358Hospital 1201300 351.8 351.8 Cleaver-Brooks HW-203 360kW; Rheem WH 208/240/480V, 3 ph, 60hz 55349 98314 54172 41926 21106 10126 64677 51834 35022 41762 68541 83964 626793Schools 5733700 1678.9 1930.8 Cleaver-Brooks HW-361, HW-204 420kW, HW-2480V, 3 ph, 60hz 300972 254628 297251 211151 185299 130684 0 0 0 154448 299940 507389 2341762Harbor Office 0 0.0 0.04091 943 0 1582 0 0 0 0 971 0 0 2224 9812kW/hr Total: 530593 504978 512231 335443 296586 249945 78252 66402 112296 300962 480933 708275 4176897BTU/gal: 130030$.05 kW/hr ($.07 kW/hr): 37,141.49$ 35,348.46$ 35,856.14$ 23,481.03$ 20,761.03$ 17,496.15$ 5,477.65$ 4,648.14$ 7,860.75$ 21,067.36$ 33,665.30$ 49,579.28$ 292,382.78$ BTU/gal (corrected): 107,969 (BTU content incorporating average boiler efficiency) $.07 kW/hr ($.09 kW/hr): 47,753.35$ 45,448.02$ 46,100.75$ 30,189.89$ 26,692.75$ 22,495.05$ 7,042.70$ 5,976.18$ 10,106.68$ 27,086.61$ 43,283.95$ 63,744.79$ 375,920.72$ kW/Hr Cost: 0.07$ Total kW Load: 3260.22007/2008: 58,353.68$ 44,365.46$ 44,193.24$ 30,742.90$ 26,525.59$ 23,302.05$ 7,443.73$ 6,568.31$ 11,037.08$ 29,770.37$ 49,852.39$ 74,537.39$ 406,692.19$ Fuel Cost Increase per Year: 12% Estimated (from this point on) 2008/2009: 65,356.13$ 49,689.32$ 49,496.43$ 34,432.05$ 29,708.66$ 26,098.30$ 8,336.98$ 7,356.50$ 12,361.53$ 33,342.81$ 55,834.68$ 83,481.87$ 455,495.25$ 2009/2010: 73,198.86$ 55,652.04$ 55,436.00$ 38,563.89$ 33,273.70$ 29,230.09$ 9,337.41$ 8,239.28$ 13,844.91$ 37,343.95$ 62,534.84$ 93,499.70$ 510,154.68$ 2010/2011: 81,982.72$ 62,330.28$ 62,088.32$ 43,191.56$ 37,266.54$ 32,737.70$ 10,457.90$ 9,228.00$ 15,506.30$ 41,825.22$ 70,039.02$ 104,719.66$ 571,373.25$ 2011/2012: 91,820.65$ 69,809.92$ 69,538.92$ 48,374.55$ 41,738.53$ 36,666.23$ 11,712.85$ 10,335.36$ 17,367.06$ 46,844.25$ 78,443.70$ 117,286.02$ 639,938.04$ 2012/2013: 102,839.13$ 78,187.11$ 77,883.59$ 54,179.49$ 46,747.15$ 41,066.17$ 13,118.40$ 11,575.60$ 19,451.10$ 52,465.56$ 87,856.95$ 131,360.35$ 716,730.60$ 2013/2014: 115,179.83$ 87,569.56$ 87,229.62$ 60,681.03$ 52,356.81$ 45,994.11$ 14,692.60$ 12,964.67$ 21,785.24$ 58,761.43$ 98,399.78$ 147,123.59$ 802,738.27$ 2014/2015: 129,001.40$ 98,077.91$ 97,697.17$ 67,962.76$ 58,639.63$ 51,513.41$ 16,455.72$ 14,520.43$ 24,399.47$ 65,812.80$ 110,207.76$ 164,778.42$ 899,066.87$ 2015/2016: 144,481.57$ 109,847.26$ 109,420.83$ 76,118.29$ 65,676.38$ 57,695.02$ 18,430.40$ 16,262.88$ 27,327.40$ 73,710.34$ 123,432.69$ 184,551.83$ 1,006,954.89$ 2007/2008: 21,212.19$ 9,017.00$ 8,337.10$ 7,261.87$ 5,764.56$ 5,805.90$ 1,966.08$ 1,920.16$ 3,176.33$ 8,703.01$ 16,187.09$ 24,958.11$ 114,309.41$ 2008/2009: 28,214.64$ 14,340.86$ 13,640.29$ 10,951.02$ 8,947.63$ 8,602.15$ 2,859.33$ 2,708.36$ 4,500.78$ 12,275.45$ 22,169.38$ 33,902.59$ 163,112.47$ 2009/2010: 36,057.37$ 20,303.58$ 19,579.86$ 15,082.86$ 12,512.67$ 11,733.94$ 3,859.76$ 3,591.14$ 5,984.16$ 16,276.59$ 28,869.54$ 43,920.42$ 217,771.90$ 2010/2011: 44,841.23$ 26,981.82$ 26,232.18$ 19,710.53$ 16,505.51$ 15,241.56$ 4,980.25$ 4,579.85$ 7,645.55$ 20,757.86$ 36,373.72$ 55,140.38$ 278,990.46$ 2011/2012: 44,067.31$ 24,361.89$ 23,438.17$ 18,184.65$ 15,045.78$ 14,171.18$ 4,670.16$ 4,359.17$ 7,260.38$ 19,757.64$ 35,159.75$ 53,541.23$ 264,017.32$ 2012/2013: 55,085.78$ 32,739.08$ 31,782.84$ 23,989.60$ 20,054.40$ 18,571.13$ 6,075.70$ 5,599.42$ 9,344.42$ 25,378.95$ 44,572.99$ 67,615.55$ 340,809.88$ 2013/2014: 67,426.48$ 42,121.54$ 41,128.87$ 30,491.14$ 25,664.06$ 23,499.07$ 7,649.91$ 6,988.49$ 11,678.56$ 31,674.82$ 55,115.83$ 83,378.80$ 426,817.55$ 2014/2015: 81,248.06$ 52,629.88$ 51,596.43$ 37,772.86$ 31,946.87$ 29,018.36$ 9,413.02$ 8,544.25$ 14,292.79$ 38,726.19$ 66,923.80$ 101,033.63$ 523,146.14$ 2015/2016: 96,728.23$ 64,399.23$ 63,320.09$ 45,928.39$ 38,983.63$ 35,199.97$ 11,387.71$ 10,286.70$ 17,220.72$ 46,623.73$ 80,148.73$ 120,807.04$ 631,034.17$ 2,845,699.90$ 2007/2008 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016Fuel Vs. Electric Break Point 2007/2008 Fuel Oil*Electricity1292,382.78$ 2.21$ 2.21$ 2.21$ 2.21$ 2.85$ 2.85$ 2.85$ 2.85$ 2.85$ Fuel403,927.04$ 3.06$ 3.43$ 3.84$ 4.30$ 4.81$ 5.39$ 6.04$ 6.76$ 7.58$ * Assumes that the total fuel oil consumption per year is approximately the same as was indicated from information from the City of Wrangell.2 No fuel consumption data was obtained from the Power Plant. Additional fuel savings could be realized.1 The electric cost indicated the price per gallon at which no savings is realized This can be considered an equivalent fuel cost per gallon of the indicate electric rate.kW/Hr (Calculated based on 2007/2008 information) 132002.3Estimated Energy Cost (by Gallon Fuel) City of Wrangell – Boiler Replacement Project (EPS 07-0156) Replacement Analysis B ROM Construction Cost Estimate 3/26/2008 Wrangell Light and Power Boiler Replacement Utility Upgrade Cost Estimate 3/26/2008 Item Description Quantity Com. Type Cost Labor (Hr) Cost Material Total Labor Total Total Shipping Weight (lbs) Public Safety Building 1 Boiler: Cleaver-Brooks HW-241 504kW 1 ea. 35,000.00$ 80 115.00$ 35,000.00$ 9,200.00$ 44,200.00$ 2450 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 35 125.00$ 15,000.00$ 4,375.00$ 19,375.00$ 4500 7 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 60 125.00$ 6,000.00$ 7,500.00$ 13,500.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 3,500.00$ 60 125.00$ 3,500.00$ 7,500.00$ 11,000.00$ Section Total:66,500.00$ 56,750.00$ 123,250.00$ Overhead:15% 9,975.00$ Profit:10% 6,650.00$ Total:83,125.00$ 56,750.00$ 139,875.00$ Fire Satellite Station 1 Unit Heaters: Qmark Unit Heater 20kW, 240/208, 3phase 2 ea. 1,315.00$ 20 115.00$ 2,630.00$ 4,600.00$ 7,230.00$ 120 Section Total:2,630.00$ 4,600.00$ 7,230.00$ Overhead:15% 394.50$ Profit:10% 263.00$ Total:3,287.50$ 4,600.00$ 7,887.50$ Public Works Bldg 1 Unit Heaters: Qmark Unit Heater 20kW, 480v 3phase 6 ea. 1,291.00$ 20 115.00$ 7,746.00$ 13,800.00$ 21,546.00$ 360 2 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 3 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 4 Install padmount transformer (480, 150kva, 3 phase) 1 ea. 10,000.00$ 25 125.00$ 10,000.00$ 3,125.00$ 13,125.00$ 2500 5 Install Secondary and service entrance equipment 1 ea. 5,000.00$ 50 125.00$ 5,000.00$ 6,250.00$ 11,250.00$ 1500 6 Install Electric Heater Feeder and Protection 6 ea. 5,500.00$ 60 125.00$ 33,000.00$ 7,500.00$ 40,500.00$ Section Total:61,246.00$ 45,050.00$ 106,296.00$ Overhead:15% 9,186.90$ Profit:10% 6,124.60$ Total:76,557.50$ 45,050.00$ 121,607.50$ Library 1 Boiler: Cleaver-Brooks HW-121 72kW 1 ea. 16,000.00$ 60 115.00$ 16,000.00$ 6,900.00$ 22,900.00$ 550 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 1000 3 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 4 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 5 Install padmount transformer (480, 75kva, 3 phase) 1 ea. 8,500.00$ 20 125.00$ 8,500.00$ 2,500.00$ 11,000.00$ 1500 6 Install Secondary and service entrance equipment 1 ea. 4,000.00$ 45 125.00$ 4,000.00$ 5,625.00$ 9,625.00$ 1500 7 Install Electric Heater Feeder and Protection 1 ea. 2,500.00$ 25 125.00$ 2,500.00$ 3,125.00$ 5,625.00$ Section Total:37,500.00$ 41,725.00$ 79,225.00$ Overhead:15% 5,625.00$ Profit:10% 3,750.00$ Total:46,875.00$ 41,725.00$ 88,600.00$ Nolan Center 1 Boiler: Cleaver-Brooks HW-203 300kW 1 ea. 25,000.00$ 80 115.00$ 25,000.00$ 9,200.00$ 34,200.00$ 1350 2 Pipe, valves, and fittings 1 lot 1,000.00$ 40 115.00$ 1,000.00$ 4,600.00$ 5,600.00$ 500 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 1000kva, 3 phase) 1 ea. 25,000.00$ 45 125.00$ 25,000.00$ 5,625.00$ 30,625.00$ 9400 7 Install Secondary and service entrance equipment 1 ea. 9,000.00$ 80 125.00$ 9,000.00$ 10,000.00$ 19,000.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 6,000.00$ 80 125.00$ 6,000.00$ 10,000.00$ 16,000.00$ Section Total:72,000.00$ 58,400.00$ 130,400.00$ Overhead:15% 10,800.00$ Profit:10% 7,200.00$ Total:90,000.00$ 58,400.00$ 148,400.00$ Hospital 1 Boiler: Cleaver-Brooks HW-203 360kW 1 ea. 30,000.00$ 80 115.00$ 30,000.00$ 9,200.00$ 39,200.00$ 1350 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Remove existing boiler & plug exhaust stack 2 lot 500.00$ 40 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 45 125.00$ 15,000.00$ 5,625.00$ 20,625.00$ 4500 7 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 80 125.00$ 6,000.00$ 10,000.00$ 16,000.00$ 1500 8 Install Electric Heater Feeder and Protection 4 ea. 3,500.00$ 80 125.00$ 14,000.00$ 10,000.00$ 24,000.00$ 9 Remove existing Amtrol hot water makers & boiler 4 ea. 125.00$ 6 115.00$ 500.00$ 2,760.00$ 3,260.00$ 10 Hot Water Heater: 65 gal, 240 v. 1 phase 4 ea. 656.00$ 10 115.00$ 2,624.00$ 4,600.00$ 7,224.00$ Section Total:75,624.00$ 74,960.00$ 150,584.00$ Overhead:15% 11,343.60$ Profit:10% 7,562.40$ Total:94,530.00$ 74,960.00$ 169,490.00$ High School 1 Boiler: Cleaver-Brooks HW-361 990kW 1 ea. 59,000.00$ 80 115.00$ 59,000.00$ 9,200.00$ 68,200.00$ 3300 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 1000kva, 3 phase) 1 ea. 25,000.00$ 45 125.00$ 25,000.00$ 5,625.00$ 30,625.00$ 9400 7 Install Secondary and service entrance equipment 1 ea. 9,000.00$ 80 125.00$ 9,000.00$ 10,000.00$ 19,000.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 6,000.00$ 80 125.00$ 6,000.00$ 10,000.00$ 16,000.00$ Section Total:106,000.00$ 63,000.00$ 169,000.00$ Overhead:15% 15,900.00$ Profit:10% 10,600.00$ Total:132,500.00$ 63,000.00$ 195,500.00$ boiler_replacement_cost_estimate.xls Wrangell Light and Power Boiler Replacement Utility Upgrade Cost Estimate 3/26/2008 Item Description Quantity Com. Type Cost Labor (Hr) Cost Material Total Labor Total Total Shipping Weight (lbs) Middle School 1 Boiler: Cleaver-Brooks HW-204 420kW 1 ea. 30,000.00$ 80 115.00$ 30,000.00$ 9,200.00$ 39,200.00$ 1550 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 4 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 5 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 35 125.00$ 15,000.00$ 4,375.00$ 19,375.00$ 4500 6 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 60 125.00$ 6,000.00$ 7,500.00$ 13,500.00$ 1500 7 Install Electric Heater Feeder and Protection 1 ea. 3,500.00$ 60 125.00$ 3,500.00$ 7,500.00$ 11,000.00$ 8 Relocate Simplex day tank 1 lot 750.00$ 40 115.00$ 750.00$ 4,600.00$ 5,350.00$ Section Total:61,750.00$ 56,750.00$ 118,500.00$ Overhead:15% 9,262.50$ Profit:10% 6,175.00$ Total:77,187.50$ 56,750.00$ 133,937.50$ Grade School 1 Boiler: Cleaver-Brooks HW-204 480kW 1 ea. 33,000.00$ 80 115.00$ 33,000.00$ 9,200.00$ 42,200.00$ 1550 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 35 125.00$ 15,000.00$ 4,375.00$ 19,375.00$ 4500 7 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 60 125.00$ 6,000.00$ 7,500.00$ 13,500.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 3,500.00$ 60 125.00$ 3,500.00$ 7,500.00$ 11,000.00$ Section Total:64,500.00$ 56,750.00$ 121,250.00$ Overhead:15% 9,675.00$ Profit:10% 6,450.00$ Total:80,625.00$ 56,750.00$ 137,375.00$ Power Plant 1 Unit Heaters:Qmark 480v, 3phase, 20kw 8 ea. 1,291.52$ 30 115.00$ 10,332.16$ 27,600.00$ 37,932.16$ 480 2 Install Secondary Equipment 1 lot 4,000.00$ 120 125.00$ 4,000.00$ 15,000.00$ 19,000.00$ 3 Install panelboard, breakers, conduit, and branch circuits 1 ea. 15,000.00$ 80 125.00$ 15,000.00$ 10,000.00$ 25,000.00$ 1500 4 Install heater feeder and protection 8 lot 2,500.00$ 30 125.00$ 20,000.00$ 30,000.00$ 50,000.00$ Section Total:49,332.16$ 82,600.00$ 131,932.16$ Overhead:15% 7,399.82$ Profit:10% 4,933.22$ Total:61,665.20$ 82,600.00$ 144,265.20$ Harbor Office 1 Installation of service drop & meter 1 lot 2,500.00$ 60 125.00$ 2,500.00$ 7,500.00$ 10,000.00$ 1500 Section Total:2,500.00$ 7,500.00$ 10,000.00$ Overhead:15% 375.00$ Profit:10% 250.00$ Total:3,125.00$ 7,500.00$ 10,625.00$ Wrangell Municipal Light & Power Utility Upgrades 1 Distribution Feeder Upgrade 1 ls 400,000.00$ 125.00$ 400,000.00$ -$ 400,000.00$ 2 Feeder Breaker Neutral CT Monitoring 1 ls 60,500.00$ 125.00$ 60,500.00$ -$ 60,500.00$ 3 Generator Control Interface 1 ls 45,000.00$ 125.00$ 45,000.00$ -$ 45,000.00$ 4 TBPA Feeder Monitoring 1 ls 30,000.00$ 125.00$ 30,000.00$ -$ 30,000.00$ Section Total:535,500.00$ -$ 535,500.00$ Overhead:0% -$ Profit:0% -$ Total:535,500.00$ -$ 535,500.00$ Misc. Charges 1 Equipment Rental 1 lot 10,000.00$ 115.00$ 10,000.00$ -$ 10,000.00$ 2 SCADA/Controls Modifications 1 lot 320 125.00$ -$ 40,000.00$ 40,000.00$ 500 3 Camp Days - Mechanical 210 days 200.00$ 125.00$ 42,093.35$ -$ 42,093.35$ 4 Camp Days - Electrical/Controls 355 days 200.00$ 125.00$ 71,050.02$ -$ 71,050.02$ 5 Travel 1 lot 15,000.00$ 125.00$ 15,000.00$ -$ 15,000.00$ Section Total:138,143.37$ 40,000.00$ 178,143.37$ Overhead:15% 20,721.50$ Profit:10% 13,814.34$ Total:172,679.21$ 40,000.00$ 212,679.21$ Total (Sections):2,045,741.91$ 80860 Shipping Cost per lb 0.35$ 28,301.00$ Prime Overhead:15% 306,861.29$ Prime Profit:10% 204,574.19$ Contingency:30%613,722.57$ Grand Total:3,199,200.96$ boiler_replacement_cost_estimate.xls Location BTU/hr kW (cal) kW (proposed)Proposed Boiler Voltage - Power Jan Feb Mar Apr May June Jul Aug Sep Oct Nov Dec Total Public Safety Bldg 1655000 484.6 484.6 Cleaver-Brooks HW-241 504kW 480V, 3 ph, 60hz 87748 68032 93630 52432 56893 83442 0 0 63646 78347 53856 51419 689445 Fire Satelite Station 133000 38.9 38.9 Qmark Unit Heater 20kW 208/240V, 3 ph, 60hz 4199 4240 6993 5632 3639 1297 0 0 0 1187 4882 6423 38493 Public Works Bldg 372000 108.9 108.9 Qmark Unit Heater 20kW 208/240V, 3 ph, 60hz 11708 31927 13796 2436 0 0 0 0 0 5756 8506 10458 84587 Library 236000 69.1 69.1 Cleaver-Brooks HW-121 72kW 480V, 3 ph, 60hz 9392 4335 5221 4114 4430 3164 0 4750 0 3035 3547 7661 49647 Nolan Center 943000 276.1 276.1 Cleaver-Brooks HW-203 300kW 480V, 3 ph, 60hz 57134 42559 41167 16169 25219 21232 13575 9819 12657 16429 41661 38737 336358 Hospital 1201300 351.8 351.8 Cleaver-Brooks HW-203 360kW; Rheem WH 208/240/480V, 3 ph, 60hz 55349 98314 54172 41926 21106 10126 64677 51834 35022 41762 68541 83964 626793 Schools 5733700 1678.9 1930.8 Cleaver-Brooks HW-361, HW-204 420kW, HW-204 480kW480V, 3 ph, 60hz 300972 254628 297251 211151 185299 130684 0 0 0 154448 299940 507389 2341762 Harbor Office 0 0.0 0.0 4091 943 0 1582 0 0 0 0 971 0 0 2224 9812 kW/hr Total:530593 504978 512231 335443 296586 249945 78252 66402 112296 300962 480933 708275 4176897 BTU/gal:130030 $.05 kW/hr ($.07 kW/hr):37,141.49$ 35,348.46$ 35,856.14$ 23,481.03$ 20,761.03$ 17,496.15$ 5,477.65$ 4,648.14$ 7,860.75$ 21,067.36$ 33,665.30$ 49,579.28$ 292,382.78$ BTU/gal (corrected):107,969 (BTU content incorporating average boiler efficiency)-$ kW/Hr Cost:0.07$ Total kW Load:3260.2 Fuel Costs 2007/2008:58,353.68$ 44,365.46$ 44,193.24$ 30,742.90$ 26,525.59$ 23,302.05$ 7,443.73$ 6,568.31$ 11,037.08$ 29,770.37$ 49,852.39$ 74,537.39$ 406,692.19$ Fuel Cost Increase per Year:12%Estimated (from this point on)2008/2009:65,356.13$ 49,689.32$ 49,496.43$ 34,432.05$ 29,708.66$ 26,098.30$ 8,336.98$ 7,356.50$ 12,361.53$ 33,342.81$ 55,834.68$ 83,481.87$ 455,495.25$ 2009/2010:73,198.86$ 55,652.04$ 55,436.00$ 38,563.89$ 33,273.70$ 29,230.09$ 9,337.41$ 8,239.28$ 13,844.91$ 37,343.95$ 62,534.84$ 93,499.70$ 510,154.68$ 2010/2011:81,982.72$ 62,330.28$ 62,088.32$ 43,191.56$ 37,266.54$ 32,737.70$ 10,457.90$ 9,228.00$ 15,506.30$ 41,825.22$ 70,039.02$ 104,719.66$ 571,373.25$ 2011/2012:91,820.65$ 69,809.92$ 69,538.92$ 48,374.55$ 41,738.53$ 36,666.23$ 11,712.85$ 10,335.36$ 17,367.06$ 46,844.25$ 78,443.70$ 117,286.02$ 639,938.04$ 2012/2013:102,839.13$ 78,187.11$ 77,883.59$ 54,179.49$ 46,747.15$ 41,066.17$ 13,118.40$ 11,575.60$ 19,451.10$ 52,465.56$ 87,856.95$ 131,360.35$ 716,730.60$ 2013/2014:115,179.83$ 87,569.56$ 87,229.62$ 60,681.03$ 52,356.81$ 45,994.11$ 14,692.60$ 12,964.67$ 21,785.24$ 58,761.43$ 98,399.78$ 147,123.59$ 802,738.27$ 2014/2015:129,001.40$ 98,077.91$ 97,697.17$ 67,962.76$ 58,639.63$ 51,513.41$ 16,455.72$ 14,520.43$ 24,399.47$ 65,812.80$ 110,207.76$ 164,778.42$ 899,066.87$ 2015/2016:144,481.57$ 109,847.26$ 109,420.83$ 76,118.29$ 65,676.38$ 57,695.02$ 18,430.40$ 16,262.88$ 27,327.40$ 73,710.34$ 123,432.69$ 184,551.83$ 1,006,954.89$ Savings @ $.07/kWH 2007/2008:21,212.19$ 9,017.00$ 8,337.10$ 7,261.87$ 5,764.56$ 5,805.90$ 1,966.08$ 1,920.16$ 3,176.33$ 8,703.01$ 16,187.09$ 24,958.11$ 114,309.41$ 2008/2009:28,214.64$ 14,340.86$ 13,640.29$ 10,951.02$ 8,947.63$ 8,602.15$ 2,859.33$ 2,708.36$ 4,500.78$ 12,275.45$ 22,169.38$ 33,902.59$ 163,112.47$ 2009/2010:36,057.37$ 20,303.58$ 19,579.86$ 15,082.86$ 12,512.67$ 11,733.94$ 3,859.76$ 3,591.14$ 5,984.16$ 16,276.59$ 28,869.54$ 43,920.42$ 217,771.90$ 2010/2011:44,841.23$ 26,981.82$ 26,232.18$ 19,710.53$ 16,505.51$ 15,241.56$ 4,980.25$ 4,579.85$ 7,645.55$ 20,757.86$ 36,373.72$ 55,140.38$ 278,990.46$ 2011/2012:54,679.16$ 34,461.45$ 33,682.78$ 24,893.52$ 20,977.50$ 19,170.08$ 6,235.20$ 5,687.21$ 9,506.31$ 25,776.89$ 44,778.41$ 67,706.74$ 347,555.25$ 2012/2013:65,697.64$ 42,838.64$ 42,027.45$ 30,698.46$ 25,986.12$ 23,570.03$ 7,640.74$ 6,927.46$ 11,590.35$ 31,398.20$ 54,191.65$ 81,781.06$ 424,347.82$ 2013/2014:78,038.33$ 52,221.10$ 51,373.48$ 37,200.00$ 31,595.78$ 28,497.97$ 9,214.95$ 8,316.53$ 13,924.49$ 37,694.07$ 64,734.48$ 97,544.31$ 510,355.49$ 2014/2015:91,859.91$ 62,729.44$ 61,841.04$ 44,481.73$ 37,878.60$ 34,017.26$ 10,978.06$ 9,872.29$ 16,538.71$ 44,745.44$ 76,542.46$ 115,199.14$ 606,684.08$ 2015/2016:107,340.08$ 74,498.79$ 73,564.70$ 52,637.26$ 44,915.35$ 40,198.87$ 12,952.75$ 11,614.74$ 19,466.65$ 52,642.97$ 89,767.39$ 134,972.55$ 714,572.11$ 3,263,389.59$ 2007/2008 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 2013/2014 2014/2015 2015/2016 Fuel Vs. Electric Break Point 2007/2008 Fuel Oil* Electricity1 292,382.78$ 2.21$ 2.21$ 2.21$ 2.21$ 2.21$ 2.21$ 2.21$ 2.21$ 2.21$ Fuel 537,437.94$ 4.07$ 4.56$ 5.11$ 5.72$ 6.41$ 7.18$ 8.04$ 9.00$ 10.08$ * Assumes that the total fuel oil consumption per year is approximately the same as was indicated from information from the City of Wrangell. 2 No fuel consumption data was obtained from the Power Plant. Additional fuel savings could be realized. Attachment C - Financial Analysis 1 The electric cost indicated the price per gallon at which no savings is realized. This can be considered an equivalent fuel cost per gallon of the indicate electric rate. kW/Hr (Calculated based on 2007/2008 information) 132002.3 Estimated Energy Cost (by Gallon Fuel) Attachment C - Financial Analysis AVG Fuel/Gal 3.06$ 2008 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 2007 Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total Public Safety Bldg 1904000 1655000 0.87 16.6 2773.1 2150 2959 1657 1798 2637 2011.4 2476 1702 1625 21788.5 Fire Satelite Station 170000 133000 0.78 1.25 132.7 134 221 178 115 41 37.5 154.3 203 1216.5 Public Works Bldg 460000 372000 0.81 3.3 370 1009 436 77 181.9 268.8 330.5 2673.2 Library 344000 236000 0.69 2.35 296.8 137 165 130 140 100 150.1 95.9 112.1 242.1 1569 Nolan Center 1084000 943000 0.87 9.4 1805.6 1345 1301 511 797 671 429 310.3 400 519.2 1316.6 1224.2 10629.9 Hospital Heat 1381000 1201300 0.87 11.6 1749.2 3107 1712 1325 667 320 2044 1638.1 1106.8 1319.8 2166.1 2653.5 19808.5 Schools 6594000 5733700 2.6085785 57.95 9511.6 8047 9394 6673 5856 4130 4881 9479 16035 74006.6 Harbor Office 129.3 29.8 50 30.7 70.3 310.1 Power Plant 460000 372000 0.81 3.3 Fuel Oil Cost 3.48$ 2.78$ 2.73$ 2.90$ 2.83$ 2.95$ 3.01$ 3.13$ 3.11$ 3.13$ 3.28$ 3.33$ 132002.3 Heating Cost Fuel 58,354$ 44,365$ 44,193$ 30,743$ 26,526$ 23,302$ 7,444$ 6,568$ 11,037$ 29,770$ 49,852$ 74,537$ 406,692$ Minimum Fuel Cost:2.73$ Maximum Fuel Cost 3.48$ Average Fuel Cost 3.06$ Deviation High:14% Deviation Low:11% Gallons Consumed (2007/2008) Location Gross BTU/hr Water BTU/hr Efficiency Gal/hr Wrangell Light and Power Boiler Replacement Utility Upgrade Cost Estimate 3/26/2008 Item Description Quantity Com. Type Cost Labor (Hr) Cost Material Total Labor Total Total Shipping Weight (lbs) Public Safety Building 1 Boiler: Cleaver-Brooks HW-241 504kW 1 ea. 35,000.00$ 80 115.00$ 35,000.00$ 9,200.00$ 44,200.00$ 2450 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 35 125.00$ 15,000.00$ 4,375.00$ 19,375.00$ 4500 7 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 60 125.00$ 6,000.00$ 7,500.00$ 13,500.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 3,500.00$ 60 125.00$ 3,500.00$ 7,500.00$ 11,000.00$ Section Total:66,500.00$ 56,750.00$ 123,250.00$ Overhead:15% 9,975.00$ Profit:10% 6,650.00$ Total:83,125.00$ 56,750.00$ 139,875.00$ Fire Satellite Station 1 Unit Heaters: Qmark Unit Heater 20kW, 240/208, 3phase 2 ea. 1,315.00$ 20 115.00$ 2,630.00$ 4,600.00$ 7,230.00$ 120 Section Total:2,630.00$ 4,600.00$ 7,230.00$ Overhead:15% 394.50$ Profit:10% 263.00$ Total:3,287.50$ 4,600.00$ 7,887.50$ Public Works Bldg 1 Unit Heaters: Qmark Unit Heater 20kW, 480v 3phase 6 ea. 1,291.00$ 20 115.00$ 7,746.00$ 13,800.00$ 21,546.00$ 360 2 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 3 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 4 Install padmount transformer (480, 150kva, 3 phase) 1 ea. 10,000.00$ 25 125.00$ 10,000.00$ 3,125.00$ 13,125.00$ 2500 5 Install Secondary and service entrance equipment 1 ea. 5,000.00$ 50 125.00$ 5,000.00$ 6,250.00$ 11,250.00$ 1500 6 Install Electric Heater Feeder and Protection 6 ea. 5,500.00$ 60 125.00$ 33,000.00$ 7,500.00$ 40,500.00$ Section Total:61,246.00$ 45,050.00$ 106,296.00$ Overhead:15% 9,186.90$ Profit:10% 6,124.60$ Total:76,557.50$ 45,050.00$ 121,607.50$ Library 1 Boiler: Cleaver-Brooks HW-121 72kW 1 ea. 16,000.00$ 60 115.00$ 16,000.00$ 6,900.00$ 22,900.00$ 550 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 1000 3 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 4 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 5 Install padmount transformer (480, 75kva, 3 phase) 1 ea. 8,500.00$ 20 125.00$ 8,500.00$ 2,500.00$ 11,000.00$ 1500 6 Install Secondary and service entrance equipment 1 ea. 4,000.00$ 45 125.00$ 4,000.00$ 5,625.00$ 9,625.00$ 1500 7 Install Electric Heater Feeder and Protection 1 ea. 2,500.00$ 25 125.00$ 2,500.00$ 3,125.00$ 5,625.00$ Section Total:37,500.00$ 41,725.00$ 79,225.00$ Overhead:15% 5,625.00$ Profit:10% 3,750.00$ Total:46,875.00$ 41,725.00$ 88,600.00$ Nolan Center 1 Boiler: Cleaver-Brooks HW-203 300kW 1 ea. 25,000.00$ 80 115.00$ 25,000.00$ 9,200.00$ 34,200.00$ 1350 2 Pipe, valves, and fittings 1 lot 1,000.00$ 40 115.00$ 1,000.00$ 4,600.00$ 5,600.00$ 500 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 1000kva, 3 phase) 1 ea. 25,000.00$ 45 125.00$ 25,000.00$ 5,625.00$ 30,625.00$ 9400 7 Install Secondary and service entrance equipment 1 ea. 9,000.00$ 80 125.00$ 9,000.00$ 10,000.00$ 19,000.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 6,000.00$ 80 125.00$ 6,000.00$ 10,000.00$ 16,000.00$ Section Total:72,000.00$ 58,400.00$ 130,400.00$ Overhead:15% 10,800.00$ Profit:10% 7,200.00$ Total:90,000.00$ 58,400.00$ 148,400.00$ Hospital 1 Boiler: Cleaver-Brooks HW-203 360kW 1 ea. 30,000.00$ 80 115.00$ 30,000.00$ 9,200.00$ 39,200.00$ 1350 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Remove existing boiler & plug exhaust stack 2 lot 500.00$ 40 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 45 125.00$ 15,000.00$ 5,625.00$ 20,625.00$ 4500 7 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 80 125.00$ 6,000.00$ 10,000.00$ 16,000.00$ 1500 8 Install Electric Heater Feeder and Protection 4 ea. 3,500.00$ 80 125.00$ 14,000.00$ 10,000.00$ 24,000.00$ 9 Remove existing Amtrol hot water makers & boiler 4 ea. 125.00$ 6 115.00$ 500.00$ 2,760.00$ 3,260.00$ 10 Hot Water Heater: 65 gal, 240 v. 1 phase 4 ea. 656.00$ 10 115.00$ 2,624.00$ 4,600.00$ 7,224.00$ Section Total:75,624.00$ 74,960.00$ 150,584.00$ Overhead:15% 11,343.60$ Profit:10% 7,562.40$ Total:94,530.00$ 74,960.00$ 169,490.00$ High School 1 Boiler: Cleaver-Brooks HW-361 990kW 1 ea. 59,000.00$ 80 115.00$ 59,000.00$ 9,200.00$ 68,200.00$ 3300 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 1000kva, 3 phase) 1 ea. 25,000.00$ 45 125.00$ 25,000.00$ 5,625.00$ 30,625.00$ 9400 7 Install Secondary and service entrance equipment 1 ea. 9,000.00$ 80 125.00$ 9,000.00$ 10,000.00$ 19,000.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 6,000.00$ 80 125.00$ 6,000.00$ 10,000.00$ 16,000.00$ Section Total:106,000.00$ 63,000.00$ 169,000.00$ Overhead:15% 15,900.00$ Profit:10% 10,600.00$ Total:132,500.00$ 63,000.00$ 195,500.00$ boiler_replacement_cost_estimate.xls Wrangell Light and Power Boiler Replacement Utility Upgrade Cost Estimate 3/26/2008 Item Description Quantity Com. Type Cost Labor (Hr) Cost Material Total Labor Total Total Shipping Weight (lbs) Middle School 1 Boiler: Cleaver-Brooks HW-204 420kW 1 ea. 30,000.00$ 80 115.00$ 30,000.00$ 9,200.00$ 39,200.00$ 1550 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 4 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 5 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 35 125.00$ 15,000.00$ 4,375.00$ 19,375.00$ 4500 6 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 60 125.00$ 6,000.00$ 7,500.00$ 13,500.00$ 1500 7 Install Electric Heater Feeder and Protection 1 ea. 3,500.00$ 60 125.00$ 3,500.00$ 7,500.00$ 11,000.00$ 8 Relocate Simplex day tank 1 lot 750.00$ 40 115.00$ 750.00$ 4,600.00$ 5,350.00$ Section Total:61,750.00$ 56,750.00$ 118,500.00$ Overhead:15% 9,262.50$ Profit:10% 6,175.00$ Total:77,187.50$ 56,750.00$ 133,937.50$ Grade School 1 Boiler: Cleaver-Brooks HW-204 480kW 1 ea. 33,000.00$ 80 115.00$ 33,000.00$ 9,200.00$ 42,200.00$ 1550 2 Pipe, valves, and fittings 1 lot 1,000.00$ 80 115.00$ 1,000.00$ 9,200.00$ 10,200.00$ 500 3 Remove existing boiler & plug exhaust stack 1 lot 500.00$ 40 115.00$ 500.00$ 4,600.00$ 5,100.00$ 4 Primary riser 1 lot 1,500.00$ 30 125.00$ 1,500.00$ 3,750.00$ 5,250.00$ 5 Install Primary UG (Trench, Conduit, and cable) 250 lf 16.00$ 85 125.00$ 4,000.00$ 10,625.00$ 14,625.00$ 1000 6 Install padmount transformer (480, 500kva, 3 phase) 1 ea. 15,000.00$ 35 125.00$ 15,000.00$ 4,375.00$ 19,375.00$ 4500 7 Install Secondary and service entrance equipment 1 ea. 6,000.00$ 60 125.00$ 6,000.00$ 7,500.00$ 13,500.00$ 1500 8 Install Electric Heater Feeder and Protection 1 ea. 3,500.00$ 60 125.00$ 3,500.00$ 7,500.00$ 11,000.00$ Section Total:64,500.00$ 56,750.00$ 121,250.00$ Overhead:15% 9,675.00$ Profit:10% 6,450.00$ Total:80,625.00$ 56,750.00$ 137,375.00$ Power Plant 1 Unit Heaters:Qmark 480v, 3phase, 20kw 8 ea. 1,291.52$ 30 115.00$ 10,332.16$ 27,600.00$ 37,932.16$ 480 2 Install Secondary Equipment 1 lot 4,000.00$ 120 125.00$ 4,000.00$ 15,000.00$ 19,000.00$ 3 Install panelboard, breakers, conduit, and branch circuits 1 ea. 15,000.00$ 80 125.00$ 15,000.00$ 10,000.00$ 25,000.00$ 1500 4 Install heater feeder and protection 8 lot 2,500.00$ 30 125.00$ 20,000.00$ 30,000.00$ 50,000.00$ Section Total:49,332.16$ 82,600.00$ 131,932.16$ Overhead:15% 7,399.82$ Profit:10% 4,933.22$ Total:61,665.20$ 82,600.00$ 144,265.20$ Harbor Office 1 Installation of service drop & meter 1 lot 2,500.00$ 60 125.00$ 2,500.00$ 7,500.00$ 10,000.00$ 1500 Section Total:2,500.00$ 7,500.00$ 10,000.00$ Overhead:15% 375.00$ Profit:10% 250.00$ Total:3,125.00$ 7,500.00$ 10,625.00$ Wrangell Municipal Light & Power Utility Upgrades 1 Distribution Feeder Upgrade 1 ls 400,000.00$ 125.00$ 400,000.00$ -$ 400,000.00$ 2 Feeder Breaker Neutral CT Monitoring 1 ls 60,500.00$ 125.00$ 60,500.00$ -$ 60,500.00$ 3 Generator Control Interface 1 ls 45,000.00$ 125.00$ 45,000.00$ -$ 45,000.00$ 4 TBPA Feeder Monitoring 1 ls 30,000.00$ 125.00$ 30,000.00$ -$ 30,000.00$ Section Total:535,500.00$ -$ 535,500.00$ Overhead:0% -$ Profit:0% -$ Total:535,500.00$ -$ 535,500.00$ Misc. Charges 1 Equipment Rental 1 lot 10,000.00$ 115.00$ 10,000.00$ -$ 10,000.00$ 2 SCADA/Controls Modifications 1 lot 320 125.00$ -$ 40,000.00$ 40,000.00$ 500 3 Camp Days - Mechanical 210 days 200.00$ 125.00$ 42,093.35$ -$ 42,093.35$ 4 Camp Days - Electrical/Controls 355 days 200.00$ 125.00$ 71,050.02$ -$ 71,050.02$ 5 Travel 1 lot 15,000.00$ 125.00$ 15,000.00$ -$ 15,000.00$ Section Total:138,143.37$ 40,000.00$ 178,143.37$ Overhead:15% 20,721.50$ Profit:10% 13,814.34$ Total:172,679.21$ 40,000.00$ 212,679.21$ Total (Sections):2,045,741.91$ 80860 Shipping Cost per lb 0.35$ 28,301.00$ Prime Overhead:15% 306,861.29$ Prime Profit:10% 204,574.19$ Contingency:30%613,722.57$ Grand Total:3,199,200.96$ boiler_replacement_cost_estimate.xls Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 1 Attachment F - Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. 100% (Hydropower) Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other 9 Heating Boilers ii. Rated capacity of generators/boilers/other 5,733,700 BTU/Hour iii. Generator/boilers/other type N/A iv. Age of generators/boilers/other 15 Years v. Efficiency of generators/boilers/other 85% b) Annual O&M cost i. Annual O&M cost for labor $8,750 ii. Annual O&M cost for non-labor $3,750 c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] Other iii. Peak Load iv. Average Load v. Minimum Load vi. Efficiency vii. Future trends d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] 132,000 gallons (2007) ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 2 3. Proposed System Design a) Installed capacity b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $3,260 b) Development cost $53,000 c) Annual O&M cost of new system $7,000 d) Annual fuel cost N/A 5. Project Benefits a) Amount of fuel displaced for i. Electricity ii. Heat 132,000 Gallons (2007) iii. Transportation b) Price of displaced fuel $4.56 per Gallon (Price on 10/1/08) c) Other economic benefits Lower O&M cost for municipal buildings d) Amount of Alaska public benefits Lower cost to schools and public services (police, fire, hospital) 6. Power Purchase/Sales Price a) Price for power purchase/sale $.068 purchase $.07 sale 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio Save 48% over cost of diesel fuel Payback 8 Years Attachment G Alaska Energy Authority - Renewable Energy Fund BUDGET INFORMATION BUDGET SUMMARY: Milestone or Task Federal Funds State Funds Local Match Funds (Cash) Local Match Funds (In-Kind)Other Funds TOTALS 1 Utilities Study $27,000.00 $27,000.00 2 Conceptual Design $26,000.00 $26,000.00 3 Grant Administration $30,000.00 $30,000.00 4 Construction Management $40,000.00 $40,000.00 5 Engineering Design & Project Mgmt.$240,000.00 $240,000.00 6 Materials and Construction $3,020,000.00 $3,020,000.00 Milestone # or Task # BUDGET CATAGORIES:1 2 3 4 5 6 TOTALS Direct Labor and Benefits $30,000.00 $40,000.00 $70,000.00 Travel, Meals, or Per Diem $0.00 Equipment $0.00 Supplies $0.00 Contractual Services $27,000.00 $26,000.00 $53,000.00 Construction Services $240,000.00 $3,020,000.00 $3,260,000.00 Other Direct Costs $0.00 TOTAL DIRECT CHARGES $27,000.00 $26,000.00 $30,000.00 $40,000.00 $240,000.00 $3,020,000.00 $3,383,000.00 RFA AEA09-004 Budget Form