Loading...
HomeMy WebLinkAboutCostworksheet Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 1 Application Cost Worksheet Please note that some fields might not be applicable for all technologies or all project phases. Level of information detail varies according to phase requirements. 1. Renewable Energy Source The Applicant should demonstrate that the renewable energy resource is available on a sustainable basis. Annual average resource availability. The project will produce 90% of all Gustavus electric requirements. This Hydroelectric output is based on hydrologic analysis of the stream and projected electric usage. Unit depends on project type (e.g. windspeed, hydropower output, biomasss fuel) 2. Existing Energy Generation a) Basic configuration (if system is part of the railbelt grid, leave this section blank) i. Number of generators/boilers/other Three ii. Rated capacity of generators/boilers/other (2) 375 kW; (1) 100kW iii. Generator/boilers/other type John Deere diesels iv. Age of generators/boilers/other 1 year v. Efficiency of generators/boilers/other 14.1 kWhrs/gal. b) Annual O&M cost i. Annual O&M cost for labor $34,000 ii. Annual O&M cost for non-labor $21,000 c) Annual electricity production and fuel usage (fill in as applicable) i. Electricity [kWh] 1,822,252 kWhr Sept. 1, 2007 to Aug. 31,2008) ii. Fuel usage (if system is part of the Railbelt grid, leave this section blank Diesel [gal] 128,949 gal. Other iii. Peak Load 340 kW iv. Average Load 250 kW v. Minimum Load 200 kW vi. Efficiency 14.1 kWhr/gal; 11.1% line loss vii. Future trends Loads are expected to increase when hydroelectric comes on line. d) Annual heating fuel usage (fill in as applicable) i. Diesel [gal or MMBtu] ii. Electricity [kWh] iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 2 v. Wood [cords, green tons, dry tons] vi. Other 3. Proposed System Design a) Installed capacity 800 kW b) Annual renewable electricity generation i. Diesel [gal or MMBtu] ii. Electricity [kWh] 1,700,000 kWhr first year; increasing each year iii. Propane [gal or MMBtu] iv. Coal [tons or MMBtu] v. Wood [cords, green tons, dry tons] vi. Other 4. Project Cost a) Total capital cost of new system $8,615,000 b) Development cost $1,563,000 c) Annual O&M cost of new system $55,000 d) Annual fuel cost $0.00 5. Project Benefits a) Amount of fuel displaced for i. Electricity 117,000 gal diesel initially, increasing thereafter. ii. Heat iii. Transportation Unknown, but there is expected to be conversion to electric vehicles. b) Price of displaced fuel Now $4.84/Gal; Ave $3.51 past 12 months c) Other economic benefits d) Amount of Alaska public benefits 100% of the benefits go to the public ratepayers of the utility, per tariffs with the Regulatory Commission of Alaska. (RCA) 6. Power Purchase/Sales Price a) Price for power purchase/sale Price for power regulated by the RCA. Per GEC’s tariff, the Cost of Power Adjustment filed Quarterly will lower the rate immediately by $.3314/kWhr. This grant will Renewable Energy Fund RFA AEA 09-004 Application Cost Worksheet Page 3 keep the rates from rising $.027/kwhr to repay a portion of the capital cost. Any revenue requirement analysis has to be approved by the RCA. 7. Project Analysis a) Basic Economic Analysis Project benefit/cost ratio 2.2:1 (see application) Payback 13.7 yrs (see application)