HomeMy WebLinkAboutAPA2012SUSITNA
HYDROELECTRIC PROJECT
FEDERAL ENERGY REGULATORY COMMISSION
PROJECT No.7114
FISCAL YEAR 1985
BUDGET BOOK
JUNE 1984
DOCUMENT NO.20 12
IALA$KAPOWER AUTHORITY ----'
1
CC08-3033
"ATN-83-0030
TYPE-6213
iK
lL\:/5
,59/
VL\'1/-
n D ;)l.0\L.t
SUSITNA HYDROELECTRIC PROJECT
"""I
ATTACHMENT C-1
TO
CONTRACT BETWEEN
ALASKA POWER AUTHORITY
AND
HARZA-EBASCO SUSITNA JOINT VENTURE
DETAILED SCOPE OF WORK
FISCAL YEAR 1985-
-
ARLIS
Alaska Resources
Library &InfonnatlOn ServIces
Anchorage,Alaska
---'~-'--------~"------------------'----.....,----------
,...,
C C08-3033
ATN-83-0030
TYPE-6213
ALASKA POWER AUTHORITY
SUSITNA HYDRELECTRIC PROJECT
HARZA-EBASCO SUSITNA JOINT VENTURE
FY 1985 BUDGET
This document presents fiscal year 1985 budget requirements for Harza-Ebasco
Susitna Joint Venture to perform the scope of work associated with
continuing the licensing and permitting of the Susitna Hydroelectric
project,and is intended,by reference,to be a part of Amendment No.7 to
the Professional Services Contract between Harza-Ebasco Susitna Joint
Venture and the Power Authority dated January 6,1983.
In general,the scope of work for FY85 includes:
-
1.Ongoing environmental studies which
license,and/or answer concerns
regulatory agencies.
are required to support the
of the state and federal
....
--
2.
3.
4.
Preparation of testimony for the Environmental and Need for Power
hearings.(Note:the budgets included for these activities are
based on judgment estimates and may require significant revision
as the hearing process and progress dictate).
Assistance to the Power Authority in preparation of power sales
agreements with the utilities who will ultimately purchase
Susitna's power generation.
Refinement of economic and operational studies to support the Need
for Power hearings.
5.Continuation of the process of settlement with state and federal
regulatory agencies.
6.Logistic support for the environmental field studies performed by
Harza-Ebasco,their subcontractors and ADF&G.
r
12361
840807
1
ARLIS
Alaska Resources
Library &IntbnnatlOn SetVJces
Anchor~e.Alaska
----+",.~------------------------------------------------....
Not included in this budget or scope of work is any activity associated with
project engineering or detailed design.
i~
r
i
6.
C COB-3033
ATN-83-0030
TYPE-62l3
Maintenance of an Anchorage based project office to provide
effective management of the total project efforts,administer the
subcontractors,coordinate efforts with the Power Authority and
work with the state and federal agencies.
.-
The work has been divided into tasks to facilitate management and control.
Table I which 1S included in this summary section,lists the tasks by
number,the name of each task and the total budget required for the task.
Table II also shows the tasks,and in addition provides the budget required
for each major spending category (i.e.,Services,Directs and Subcontracts).
Table III provides a comparison between the total ~udget request for FY8S as
prepared in November 1983 and the current requirements.Because of the
changed emphas is of the project,the two budgets are not truly comparable
and no at tempt has been made to rationalize the differences in detail.In
general,the environmental program and the Need for Power studies have been
expanded while the geotechnical and engineering-related efforts have been
eliminated.
The body of this document is comprised of the detailed work scope and budget
for each of the tasks.Each task is organized to include:
-
l.
2.
3.
4.
5.
12361
840807
Written scope of work
Summary budget required by month for each category of expenditure
plus the task budget total.
Task level recapitulation of serV1ces cost showing total salaries
paid,fringe benefits,overhead and fee.
Detailed budget required by month for each cost account,category
of expenditure and task budget total.
Functional organization chart showing primary responsibilities.
2
"~"'l--"--'~-'---"'I'i-----------------~----------------------------
.....
I
I,
.....
1
,....,
\
TASK
HO.
2
4
5
6
7
9
39
40
41
42
Table I
Alaska Power Authority
Susitna Hydroelectric Project
Harza-Ebasco Susitna Joint Venture
FYB5 BUDSET SlI"~ARY
DOLLARS (IN $1000)
Task Title
Project "anage.ent
Project Support Services
Procure.ent Support for ADF&G
Engineering Progral
Environaental Progral
Geotechnical Progra.
Licensing Support &Perlitting
Electrical Power Syste.Study
External Review Panel
Logistics
Need fDr Power Studies
Translission Facilities Siting'Licensing
Hydrologic &Hydraulic CEnvrn.ntl)Studies
DelDbilization Reserve
Harza~EbascD Total
Budget
Required
B78981
3728276
67500
314410
7313931
168186
119B570
29690
o
2157321
2391321
107437
1318230
o
19673B53
-----,---.......-----------------------------------
.-
-...............-,..----r-u
-----------------------------------
r
1
r
,j
r
r
J
Harza-EbasCD Total 17542 0397 23939 19074 4205
"""""!"~--'·-~'i""'i --------.-----------------------------
-
ALASKA POWER AUTHORITY
HARZA/EBASCO SUSITNA JOINT VENTURE
FISCAL YEAR 1985 CONTRACTOR SUMMARY REPORT
.....
-
.....
ITEM
DESCRIPT:rON
HARZA-EBASCO INTERIM II:
Se,'"vi c:es
Oi r-ects
Subcontractor Handling Fees
Sub-Total Harza-Ebasco
SUBCONTRACTS INTERIM II:
CIRI/FMAA
Acres American,Inc.
F.Orth
EDAW,INC
Dankin
SIC-Resources Program Approach
CR-Technical Review Panel
ERTEC-Cultural Resources Program Approach
RM-Bell Consultation
R8"M
AEI
W.Trfhey
Woodward Clyde and Associates
I_GI_
Ll (:If A --Pal mer
U of A -Fairbanks
F(.A.~::reig
:s •~~€1?5Se 1
FERC Hearing Preparation -Unident.Subcontractor
Air Logistics,Inc •
Alaska Air Guides
Battelle-Northwest
!3H CI awk
U of A -ISER
General Electric
D':''lrnes e...Moor-e
P.WfElir
Direct Testimony -Unident.Subcontractor
PI'"of •Tyrell
Hamblin-Reservior Temp/lce Consultant
FY 85
APPROVED
BUDGET
84c~40'79
296051(7
161514
1 :1.586:1.12
1389:385
175000
212967
166~51 0
30·000
210000
40000
50000
20000
979216
<;105550
656091
665459
455000
3~'5000
63000
152000
20000
20000
E3!333'75
~~~;~f.J 8 El
1~~4000
165000
1470C)O
::"j2500
:L 12000
110000
:~OOOO
10000
15000
_..._,------------,--_._----------------------------
ALASkA POWER AUTHORITY
HARZA/EBASCO SUSITNA JOINT VENTURE
FISCAL YEAR 1985 CONTRACTOR SUMMARY REPORT
ITEM
DESCRIPTION
Calkins-Instrearn Ice Consultant
Glacial Data Reduction'
Streamflow Forecasting
Sediment Consultant
Sub-Total Subcontracts
FY E35
APPROVED
BUDGE~T
25000
25000
50000
50000
8087741----_.._-----"---'-'-
TOTAL FISCAL 1 ci85 APPROVED BUDGET 196T,:58:75::::'
******************************************************************CONTRACT SUMMARY
ORIGINAL CONTRACT
TOTAL INTERIM II AMEND.1-4
TOTAL INTERIM II AMEND.5
TOTAL INTERIM II AMEND.6
TOTAL INTERIM II AMEND.7
TOTAL HARZA-EBASCO
691161
cn:08S:39
16620000
7484484
15271194
4937567El*
========:.'=
*Not To Exceed Carries $815,000 Reserve for Demobilization
-"""'--=I'"II!!/:ihiiiPi ."1""1 --------------------
....Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
PROJECT TOTALS
-
-
SERVICES
DIRECTS
SUBCONTRACTS
PROJECT TOTAL
8464079
296051'3
824'3255
1'3673853
1
~J 1 I 1 J 1 1 ]I 1 1
.
i .
08/08/84
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labm'Costs
PROJECT SUMMARY:SALARY BREAKDOWN
Budgeted Salaries Fri Ylge Overhead Fee Total
Hout's Benefits _.
Dedicated Staff 120697 2470744.21 839572.38 1622064.71 469128.36 5401509.67
Home Office Staff 59092 1204605.33 409423.84 1181891.70 266648.55 3062569.44
TOTAL STAFF 179789 3675349.54 J248996.23 2803956.42 735776.92 8464079.11
I•
j 1 -1 1 1 -1 1 --1 ----1 J J 1 ---I
Alaaka Joint Venture
Power Management
Authority Convnlttee
Project Director
W.E.Larson
I
'nternal Review
Board
~a
Manager -Administration Manager -Licensing !!:o
and Control N""'"
I.L.VanPatten L.A.PoMvka ~o
0::J
Project Contrill Adminlstrallon Contracts Engineering Licensing Support Environmental Need For Power
Manager Manger Manager Operallons &Permitting Program Manager
Manager Manager Manager
W.H.Pelligrew P.T.Lambert I.L.Van Pallen C.D.Craddock L.A.Polivka J.H.Twall G.V.Voland
Accounting Purchasing Contract Geotechnical Federal,State &AquaUc Ecology .Project Economics
Cost I Schedule Document Control Administration Programs Local Permits Social Sciences &Financing
Control Word Processing Transmission SeWement Process Terrestrial Ecology Utility Studies
Office Oper alion
System FERC Responses Fuel Pricing
Support HydrauMcs &
Hydrology Thermal Alternatives
HARZA-EBASCO SUSITNA JOINT VENTURE
ORGANIZAlION-PHASE I SERVICES-LICENSING
July I,1964 .
1 I )J ]-j J --1 --J )I j -)]D -1
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 12
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * *** * * * * ********* * • * * •*** *** •* ** • •** * * * • • **• • **** • • •*•****** *****•*• • • • • • • • • •
FISCAL YEAR 1985 PROJECT TOTALS ,.-
2105075 2166980 20e4867 1619113 1653490 1696467 1674612 1475612 1403e4e 1197441 1386598 le71l1356 19673853 .
**** • **•**** * ******* * * *** * * **** • * * * * * * * *** * * * * *** * * * * * • • * ** * * * • * * * * • * • • • * * • • **
.......-'........-.~~.
J+~
-.
C C08-3033
ATN-83-0030
TYPE-62l3
TASK 1
PROJECT MANAGEMENT
Task 1 consists of level of effort activities associated with the highest
level of project team managers.These managers direct the efforts required
to complete the FERC licensing process for the Susitna Hydroelectric Project
within the established budget and schedule consistent with established
technical standards.
Management efforts are divided into categories including overall project
management,licensing management,administration and control management.
environmental program management,engineering operations management,and
contract compliance.All of these project management activities will take
place in the Anchorage office.
Services
01-ClIO-01 Management and Coordination of Total Project
To direct the accomplishment of the environmental,regulatory,and engineer-
ing tasks required to obtain the FERC license and the Federal,State,and
loc~ll permits required for the Susitna Project,three senior level managers
will be utilized,namely the Project Director,the Licensing Manager,and
the Administration and Control Manager.
The Project Director is responsible for all services performed and will
pro'iTide the principal contact between the Power Authority and the Cont-
ractor.
The Project Director will:
o
12361/1
840807
Direct all activities of the Joint Venture.This will be done
primarily thru his 2 principal subordinates,the Licensing Manager
and the Administration and Control Manager
1
C C08-3033
ATN-83-0030
TYPE-6213
o Maintain close liaison with the Power Authority
o Review and sign all communications with the Power Authority -
o Initiate Internal Review Board participation in project work as
required to support the FERC license application
o Generally guide and direct the development of detailed procedures
to be used in the execution of project work
The Licensing Manager will be responsible for all of the Contractor's activ-
ities related to obtaining the necessary licenses and permits for the initi-
ation of construction of the Susitna Project,including providing support
for the FERC license application;obtaining Federal,State,and local
permits;and directing any engineering operations necessary for such activ-
ities.The Licensing manager will also be the·principal point of contact
between the Power Authority's legal counsel and the Contractor.
The Licensing Manager will direct the activities of:
o The Environmental Program Manager (Task 4)
-
o The Engineering Operations Manager (Task 3)
o The Need for Power Manager (Task 40)
In addition,the Licensing Manager will perform the duties of the Licensing
Support and Permitting Manager for Task 6.
The Project Administration and Control Manager will be responsible for all
of the Contractor's activities related to contract administration,cost and
schedule control,accounting,and office management.
12361/1
840807
2
.....
C COS-3033
ATN-83-0030
TYPE-6213
The Project Administration and Control Manager will manage Tasks 2 and 39.
Principal responsibilities include:
o Non-technical administration of subcontracts
o Administration and accounting in the Anchorage offices
o Project team budget,cost,and schedule control functions
-o Preparation of project status reports
o Site logistics
o Maintenance of the document control systems
o Project procurement
o Administration of the Anchorage office including management of all
project support personnel
-
....,
In clddition,the Project Administration and Control Manager will perform the
duties of the Contract Manager under Task 2.
01-010-02 Management and Coordination of Environmental and Licensing
The Environmental Program Manager will implement the work plan described in
Task 4 and 42 and direct all environmental programs needed for project
licensing.
The Environmental Program Manager will be the principal Contractor contact
with Power Authority environmental staff on technical issues and will assist
as needed with settlement of environmental issues •
ThE!Environmental Program Manager will also manage:
12361/1
840807
3
C C08-3033
ATN-83-0030
TYPE-6213
o Planning and executing all environmental programs necessary to
supply data which supports the FERC licensing process
o Resolving environmental issues that may impede project licensing
and permitting
."""'.
-o Preparing periodic progress reports on the status of all enV1ron-
mental program activities
o Preparing all technical environmental documents developed by the
Contractor and its subcontractors
01-010-03 Management and Coordination of Engineering
The Engineering Operations Manager Report will function on a part time basis
to oversee Tasks 3,5,7,and 41.Efforts wi 11 also consist of obtaining
necessary engineering data,primarily from the home offices of specialty
individuals,to respond to FERC requests.
The Engineering Operations Manager Report will also function within the
above named tasks to perform specific engineeering assignments required for
FERC.The Engineering Operations Manager will be the principal contact with
the Contractor's Internal Review Board.
01-010-06 Liaison and Support
The home offices of the Joint Venture partners will supply short term tech-
nica 1 support and other specialized support services (drafting,computer,
etc.).Most of these support efforts have been included in the individual
tasks in which they will be required.Coordination of activities through
liaison between the Anchorage office and the home offices,however,will be
a management responsibility and is included in this task.Also included in
-
-
12361/1
840807
4
-
"..,
C COB-3033
ATN-83-0030
TYPE-6213
this task is an allowance for the Project Director to ut ilize home office
personnel to support special efforts.
Directs
01-020-01 Travel and Living Expenses
This budget item includes the cost of airfare and expenses for lodging,
meals,etc.while traveling on project business and per diem expenses for
temporary assignments.The estimated number of trips is shown below:
Estimated Estimated
Between Number Duration Each
Anchorage and Bellevue 10 5
Anchorage and New York 4 5
Anchorage and Chicago 10 5
Anchorage and Washington D.C.6 5
Anchorage and Juneau 4 2
01-020-02 Relocation
Thi:;item covers the relocation of permanent personnel (longer than a one
year assignment)to the project.Costs include shipment of household
effects and one vehicle,cost associated wi th di sposal/rental of previous
residence,etc.
12361/1
840807
5
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 01 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
****•********************************•**********•*• •*******•*•*•*• • • • •*• •*****•
TOTAL LABOR ~
65047 75454 59182 66720 610\17 56183 58682 58081 75287 63062 58490 687111 766306
**************•********************************************* * •*•* * * * • • * **•**•**
TOTAL 01 RECTS
4800 332110 388011 4000 41100 4000 4000 400/1 4000 4000 0\000 3875 112675
* • •* •* * * * * * * * * • * • • * * • * * * ***** •*• •**** • •****• •*• • • •*• • • • • • •* • • • • • * • • • • • • •** * • ***
TASK 01 TOTALS
69847 108654 97982 70720 65417 60183 62682 62081 79287 67/162 62490 72576 878981
**************************** * * * **** *** * ***** *** ***** *** ** ***** * ***** • •** * **** • •
I'1 ~I .1 J I I i },].J
I ]i ''I i -I >,
fi I J 1 1 1 I >J J ;
08/08/8~
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 19B5:Labor Costs
TASK 01 SALARY BREAKDOWN
Budgeted 5aIat-ies Fringe Overhead Fee Total
Hours Benefi ts
_.-
Dedicated Staff 7260 298454.36 101450.38 195979.17 5E.590.10 652474.03
HoMe Office Staff 1664 44536.24 1513E..98 44163.54 9995.52 113832.28
TOTAL STAFF B924 342990.60 116587.36 240142.71 66585.62 766306.31
TASK 01
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
878981
TOTAL SERVICES 766306 '"'"
01-010-01 MNGMT &CO-ORO.OF TOTAL PROJ 506281
01-010-02 MNGMT &CO-ORO.OF ENVIRON &-LICENSING 149269
01-010-03 MNGMT &CO-ORO.OF ENGINEERING 58680
01-0113-06 CONTRACT COMPLIANCE &OTHER H.O.SUPPORT 52076 766306
"""
TOTAL DIRECTS 112675 -131-020-1211 TRAVEL AND LIVING EXPENSES 52275
01-1212121-02 RELOCATION 60400 112675
-
-
1 1 -1 1 I 1 1 I 1 )1 }J !
RUN DATE 08/03/84 ALASKA POWER AUTHORITY PAGE
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 01 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTRL
* **** * * * * * *** **** ************* * ******* * *** * ****** * * * * ** ** * **** *** * * * * * * * * * * ****
LABOR 010
01-010-01 MNGMT &CO-ORO.OF TOTAL PROJ
47015 53742 3802E.45008 37136 38081 38081 36369 50451 41350 36778 44244 506281
0l-1li10 -02 MNGMT &CO-ORO.OF ENVIRON &LICENSING
8817 12497 11941 12497 150&&8887 11386 12497 15621 12497 12497 15066 1492&9
01-010-03 MNGMT &CO-ORO.OF ENGINEERING
4890 4890 4890 4890 4890 4890 4890 4890 4890 4890 4890 4890 58&80
01-010-0E.CONTRACT COMPLIANCE &OTHER H.D.SUPPORT
4325 4325 4325 4325 4325 4325 4325 4325 4325 4325 4325 4501 52076
LABOR 010 TOTALS
65047 75454 59182 6&720 61417 56183 58682 58081 75287 63062 58490 68701 76630&
**** * * **** * ** * * * ** ****** * * * * * * * *** * * * * ** ** * *** *********** *******.*** **** * * ** ***
DIRECTS
01-020-01 TRAVEL AND LIVING EXPENSES
4800 5800 581210 4000 4000 4000 4000 4000 4000 4000 4000 3875 52275
01-020-02 RELOCATION
0 27400 33000 0 0 0 0 0 0 0 0 0 &0400
TOTAL DIRECTS
4800 33200 38800 4000 4000 4000 4000 4000 4000 4000 4000 3875 112&75
* * * * *** * * * * * * * * ** * * * * * * * *** * ******* *** ** *** * ** ** ** * *** * *** * * *** * * * * * ** * * *** ***
TASK 01 TOTALS
69847 108654 97982 70720 65417 60183 62&82 62081 79287 &70&2 62490 72576 878981
* *** * * * * ********* **** **** ** * * **** *** * *** * ** * ******* *********** * *** ** ****** * * ***
Alaska
Power
Authority
Project Director
W.E.Larson
Office
Personnel
Responsibilities
Bellevue
S.Simmons
Home Office
Liaison
Chicago
E.Gruninger
W.Tolentino
Home Office
Liaison
G~aphics
,Anchorage
L.A.Polivka
I.L.Van Patten
J.H.Thrall
C.D.Cra ddock
Manager -Licensing
Manager -
Administration
&Control
Environmental Program
Manager
Engineering Operations
Manager
Chicago-New York
A.Zagars
D.Kleiner
J.Ehasz
G.Kanakaris
Internal Review
Board
July 1,1984 TASK 1 -PROJECT MANAGEMENT
J 1 j I ,I J .~J J J J J I I
-
,...
l~
C C08-3033
ATN-83-0030
TYPE-6213
TASK 2
PROJECT SUPPORT SERVICES
INTRODUCTION
Project support services consist of activities that can be categorized
into Administrative Services,Project Control,and Contract
Administration.The Task 2 services budget is limited to personnel in
these departments and support from home offices.In addition,direct
costs which are general in nature and are used by all HE staff are
included in Task 2.Support services from subcontractors are limited
to drafting for Task 2 needs and an allowance is included as a support
for special presentat ions.The primary dut ies are categorized into
items including general administration and clerical support,
acc:ounting,contract administ;ration,purchasing,cost and schedule
control,document control,and quality control.
SERVICES
02'·011-01 General Administration and Clerical Support
ThE!Administrative Manager is responsible for office administration,
document control and communications,quality control,purchasing,and
word processing.The General Administration group includes the Office
Supervisor,Document Control Supervisor,Word Processing Supervisor,
Purchasing Agent,and clerical support staff.
02-011-02 Accounting
Th.e Accounting staff will maintain accounting records and make
payments.Their responsibilities include audits of subcontractors'and
12361/2 1
C C08-3033
ATN-83-0030
TYPE-6213
Contractor's invoices to verify contract compliance and adherence to
accounting practices as they may affect project invoicing to the Power
Authority.The scope of services is to:
o Provide timely investment of project and Power Authority
funds,
o Process invoices from subcontractors,consultants,vendors
and joint venture partners,
o Maintain general ledger books of accounts,
-
o
o
Prepare Contractor's invoices,
Perform bank reconciliations,
o Assist in reconciliation of billings to cost reports,
o Perform periodic audits of subcontract invoices,
o Establish and maintain capital asset inventory 1n accordance
with Power Authority procedures,and
o
12361/2
840807
Provide project cost data as a part of the accounting
statements.
2
-
..-
C COB-3033
ATN-B3-0030
TYFE-6213
02-011-03 Contract Administration
The Contract Administration function will be located in Anchorage to
administer subcontracts.Duties include pre-award and post-award
controls.In both phases,staff members are assigned to handle
contract administration services in support of the Technical Manager.
Dur ing pre-award,the Contract Administrator prepares and is sues bid
packages,receives and commercially evaluates bids,and provides input
for the letter of recommendation.The Contract Manager performs the
technical overview and is responsible for schedule and cost compliance.
The Contract Administrator supports the Contract Manager post-award by
responding to correspondence dealing with commercial matters,assessing
of invoices and claims,as well as implementing contract closeout
procedures and audits.The final approval of invoices and signatory
authority rests with the Administration and Control Manager and the
Project Director of the Harza-Ebasco Susitna Joint Venture
respectively.
The scope of these services is to:
o Prepare Contract terms and conditions in accordance with the
needs of the particular contract,while adhering to the
established HESJV procedures and the requirements of the
Power Authority,
o Place advertisements of upcoming subcontract proposals in
newspapers,
12361/2 3
C COB-3033
ATN-83-0030
TYPE-6213
o Prepare,assemble,and issue bid packages,
o Receive and commercially evaluate subcontract proposals,-
o Prepare recommendation letters,
o Upon receiving comments from the Power Authority;conduct
negotiations in the best interests of the Power Authority,
o Prepare and issue contracts,
o Prepare and issue change orders,
o Administer on-go1ng contracts,
o Assess claims,and
o Support ADF&G 1n leases and other services.
02-011-04 Purchasing
The Purchasing Department procures supplies,materials,and equipment
for Anchorage office operations and,when required,the camp.
The scope of services 1S to:
o Establish and maintain purchase requisition and order logs,
o Solicit bids,receive bids,and evaluate proposals,
-
-
-
12361/2
840807
4
C C08-3033
ATN-83-0030
TYPE-6213
o Expedite items to meet delivery requirements,and
o Prepare and maintain material received reports.
02-011-05 Document Control
The Document Control Department provides the project with a computer-
ized information management system.This Department also maintains the
following:
o The tracking of FERC requests for supplemental in format ion
for which responces are being prepared,
o The tracking of past responces tb FERC requests for
supplemental information and agency comments to provide a
basis for preparing timely responses to questions raised by
intervenors,
o The logging/tracking of project related documents and
-
-
o
o
12361/2
document distribution schedules,
The tracking of actions required by Harza-Ebasco in response
to external requests or needs,
The tracking of actions required from external sources to
provide timely information to Harza-Ebasco operations,
5
o
C C08-3033
ATN-83-0030
TYPE-6213
The tracking of commitments made by Harza-Ebasco 1n the
responses to agency comments,and
-
,~
o The logging/tracking of all correspondence related to the
project.
02-012-01 Project Control Management
The Project Control Manager (PCM)directs the Cost/Schedule Engineers
and reviews all work projects before publication.In addition,the PCM
tracks all Project Change Requests,Changed Work Authorizations and the
status of Management Reserve funds.Special projects and presentation
materials are prepared by the PCM with assistance of the Cost/Schedule
staff •
02-012-02 Cost/Schedule Control
The Cost/Schedule Engineer I s responsibilities are:to monitor actual
cost and the consistency of the remaining project activities with the
schedule of the remaining work,develop work schedules in conjunction
with the task leaders,monitor progress against the budget and sche-
dule,and analyze both cost and schedule variances.
Directs
02-020-01 Temporary Services
-
This item covers expenses of temporary help
(secretaries,word processors,clerks,etc.).
for clerical services
In addition,this item
12361/2
840807
6
"""
,~
C C08-3033
ATN-83-0030
TYPE-6213
cov€:rs hiring of short tenn staff to handle peak loads,especially in
wordl processing,or for intennediate absences of pennanent staff
(illness,vacation,etc.).
02-020-02 Phone/Communications
This item includes operating costs of the Anchorage office
tele:phone system,the charges related to the Watana Camp telephones,
charges which are project related from the Home Offices,and the costs
of operating the telecopy and telex machines.
02-020-03 Office Rent
This item covers the costs for leasing office space at 711 H Street and
amortized leasehold improvements.
02-020-04 Furniture Rent/Purchase
In order to meet immediate minimum requinnents;desks,bookcases,
tables,chairs,etc.are rented over short periods from loca I
suppliers.Upon verification of availability of surplus inventory from
the Power Authority,decisions to purchase additional furniture (and
reduce rental furniture)are made.
02-020-05 Supplies
This item covers all office supplies,including reproduction center
papE~r and supplies,word process1ng supplies,drafting supplies,
computer supplies,and general office supplies.
7-------------------------
C C08-3033
ATN-83-0030
TYPE-6213
02-020-06 Postage,Air Express,Freight
~,
This item includes all postage,overnight express packages,parcel
post,and other shipment costs for correspondence,documents,and other
materials.
02-020-07 Photocopy/Prints
This item includes photocopying and printing for Task 2 at commercial
print shops.
02-020-08 Vehicle Expense -This item includes the cost of leasing vehicles for Harza-Ebasco
Susitna Joint Venture,plus gas,oil,servicing,and repairs.
02-020-09 Insurance
This item includes general liabi lity insurance,errors and omissions
insurance,vehicle insurance,and personal property insurance on behalf
of Harza-Ebasco in accordance with contract terms with the Power
Authority.-
02-020-12 Equipment Procurement -Word Processing
Additional work stations and other peripheral equipment.
02-020-14 Reproduction Equipment Rental &Maintenance
This item includes one Xeros Model 9500,one Xerox Model 1075,one
Xerox Model 3450,and another copier to be selected.The 9500 copier
-
-
12361/2
840807
8
C C08-3033
ATN-83-0030
TYPE-6213
02-020-20 Travel &Living Expenses
This item covers the air fare and per diems of temporary staff assigned
to Anchorage,per diems of permanent staff travelling on business
outelide of Anchorage,and per diems for home visits.
Estimated Estimated
Between Number Duration Each
New York and Anchorage 4 10
Chic:ago and Anchorage 4 10
Chicago and Anchorage '3 5
Chic:ago and Anchorage 2 30
Seatt Ie and Anchorage 4 12
Seattle and Anchorage 3 30
02-020-22 Computer
Includes the cost to lease Project/2 schedule processor software for
ninE!months and for procurement of hardware and software to computerize
the accounting work efforts.In addition,miscellaneous upgrades and
-
replacements for the existing microcomputers is included.
02-020-34 Special Presentation Materials
Thiel item includes an allowance for the cost of materials for presenta-
tions which are requested by the Power Authority.At this time,none
are scheduled.
12361/2 9
C C08-3033
ATN-83-0030
TYPE-6213
02-020-22 Computer
Includes the cost to lease Project/2 schedule processor software for
nine months and for procurement of hardware and software to computerize
the accounting work efforts.In addition.miscellaneous upgrades and
replacements for the existing microcomputers is included.
02-020-34 Special Presentation Materials
This item includes an allowance for the cost of materials for presenta-
tions which are requested by the Power Authority.At this time,none
are scheduled.
02-020-36 Warehouse Lease &Improvements
This item covers the costs for the warehouse being leased to store the
core samples form Watana and other Susitna related Power Authority
property.In addition.an estimate of $20,000 is included to erect
storage shelving,fencing and partitions as required in the warehouse.
02-020-41 Harris Computer Communications
This item covers the purchase of document control equipment and related
supplies to support the Project's Document Control functions.
02-020-42 Harris Computer Charges
This item covers the monthly charges for use of the Harris computer -
principally for Document Control and the tracking of commitments to
FERC.
-
.",
~.
-
~.
!
12361/2
840807
10
-
C C08-3033
ATN-83-0030
TYPE-6213
02-0:20-43 Document Control Equipment &Supplies
This item covers the purchase of document control equipment and related
supplies to support the Project's Document Control functions.
02-0:W-44 Micro Filming Equipment &Supplies
This item covers the purchase of microfilming equipment and other
related supply items to support the micro filming function.
Subcontractors
02-103-01 CIRI/FMAA -Drafting
Drafting support serV1ces for budget and cost control presentations,
forms,flow charts,etc.
02-103-02 CIRI/FMAA -Special Presentation Drafting
This item is an allowance for drafting services provided to the Power
Authority for specific,special request items.
02-105-01 Subcontractor Handling Fee
A haI1ldling fee equal to 2 percent of the subcontractor costs.
12361/2
840807
11
-----_......_-------.....,----,_.-'--------'------------------------------
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 2
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EPASCO SUSITNA JOINT VENTURE
TASK 02 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
****•******•*****•***************************************************** *** •****
TOTAL LABOR .
~
155594 222081 198589 186822 217160 153880 151233 165843 217099 186822 186822 212919 2254864
**********• ***** ***************** * * ****• ***** ********************* •** * •***** * **
TOTAL DIRECTS
124660 195960 194860 133560 98760 179960 92510 89510 105912 95510 114910 96441 1522552
******** • **************** * ************************************* ** **************
TOTAL SUBCONTRACTORS
1020 2040 1020 2040 1020 2040 1120 2040 1020 2040 1020 2040 18360
***•********** * ***** * ***** ******* * ************** *** ****** * ******•** * * * **** * * * * *
TASK 02 TOTALS
281274 420081 394469 322422 31G940 335880 244763 257393 324031 284372 302752 311399 3795776
• * *** * * * * * ** •* * * * * * * *** ***** * **** * * * * * * * * ****** ********• * * * ** ***** ** * **** * * * * * *
..J J .1 J I .]J j c]J J ]I !_J
1
08/08/84
I 1 1 ~..)J I I 1 1
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TASK 02 SALARY BREAKDOWN
BUdgeted Salaries Fringe Overhead Fee Total
Hours Benefits
-
Dedicated Staff E.0888 92646E..18 314183.14 608115.24 176414.41 2025839.63
Home Office Staff 3945 89113.65 30491.85 88962.15 19856.85 229024.50
TOTAL STAFF 64833 1016119.83 345275.59 691131.39 196271.32 2254864.13
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
TASK 02
TOTAL SERVICES
3795776
2254864
-
02-011-01
02-011-02
02-011-03
02-011-04
02-011-05
GENERAL ADMINISTRATION AND CLERICAL SUPPORT
ACCOUNTING
CONTRACT ADMINISTRATION
PURCHASING
DOCUMENT CONTROL
556791
288094
35812104
79176
22839121 1510455
"""
-
02-012-01 PROJECT CONTROL MANAGEMENT
02-012-02 COST SCHEDULE CONTROL
TOTAL DIRECTS
166517
577892 744409
1522552
'"""
02-020-01
02-020-02
02-020-03
02-020-04
02-020-05
02-020-06
02-020-07
02-020-08
02-020-09
02-020-12
02-020-14
02-020-16
02-020-17
02-020-20
02-020-22
02-020-26
02-020-33
02-020-34
02-020-36
02-020-41
02-02121-42
02-020-43
02-020-44
TEMPORARY SERVICES
PHONE/COMMUNICATIONS
OFFICE RENT
FURNITURE RENT /PURCHASE
SUPPLIES
POSTRGE,AIREXPRESS,FRIEGHT
PHOTOCOPY/PRINTS
VEHICLE EXPENSE
INSURANCE
EQUIPMENT PROCUREMENT-WORD PROCESSING
REPRODUCTION EQUIPMENT RENTAL AND MAINTENANCE
OFFICE EQUIPMENT PROCUREMENT &MAINTENANCE
PERSONNEL RELOCATION
TRAVEL AND LIVING EXPENSES
COMPUTER
ADF&G WAREHOUSE RENT
ADF&G LINE 500
SPECIAL PRESENTATIONS MATERIALS
WAREHOUSE LEASE AND IMPROVEMENTS
HARRIS COMPUTER COMMUNICATIONS
HARRIS COMPUTER CHARGES
DOCUMENT CONTROL EQUIPMENT AND SUPPLIES
MICRO FILMING EQUIPMENT &SUPPLIES
4812100
126000
303032
14400
1021211210
74400
35000
7621210
11012100
20000
961300
12000
93400
50000
20000
46500
30000
12000
48120
48012112\
48000
12000
96500 1 C"-~'-IC:-C"-',,;c-C-..J..Jc.
TOTAL SUBCONTRACTORS 18360
-
02-1iZ14-01
02-1iZ14-02
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
CIRI/FMAA-DRAFTING
CIRI/FMAA-SPECIAL PRESENTATION DRAFTING
12000
6000 18000
-
02-105-01 SUBCONTRACTOR HANDLING FEE 360 360
RUN DATE 08/03/84 ALASKA POWER AUTHORITV
SUSITNA HYDROELECTRIC PROJECT
FISCAL VEAR 1385 BUDGET FOR HARZA-EOASCO SUSITNA JOINT VENTURE
PAGE
"""•*"•"""""* *"""•••••" * " " " " *••"•""•"• """""" " " """""""""""•"" • •"••"• " • ""•
Gf.NERAL ADMINISTRATION AND CLERICAl SUPPORT
42709 57011 44720 43601 ~2373
JANUARV FEBRUARVTASK02
" """." "LABOR 011
02-011-01
JUL\,AUGUST SEPTE~BER OCTOBER NOVEMBER DECEMBER
39348 39348 43601
~ARCH
~450~
APRIL
43601
MAY
43601
JUNE
52373
TOTAl
5~e.791
02-011-02 ACCOUNTING
21038 26521 25784 21858 25649 24799 20113 21858 31207 21858 21858 25491 288094
02-011-03 CONTRACT AD~INISTRATION
21'.903 41'.398 .33669 26458 31936 24106 24106 26458 33112 26458 26458 31936 358004
02-011-04 PURCHASING
5983 7827
02-011-05 DOCUMENT CONTROL
13533 17748
5983
20472
6262
21137
7549
24586
5705
12867
5705
12867
6262
14198
7827
24687
6262
21137
6262
21137
7549
2~021
79176
228390
LABOR 011 TOTALS
110232 155505 130628 119316 142093 106825 102139 112377 151338 119316 119316 141370 151045:5
• " """"••""•"•"•"••• • " •""•"""""••*•"""""""""""""""•""*"""" """"•""••"""•""""""""
LABOR 012
02-012-01 PROJECT CONTROL ~ANAGEMENT
13042 170f.l 13042
02-012-02 COST SCHEDULE CONTROl
32320 49515 54919
13649
538~7
16455
58&12
12436
34619
12436
366~8
13649
39817
17061
48700
13649
53857
13649
53857
10388
61161
166517
577892
LABOR 012 TOTALS
4:5362 66576 67961 67506 7~0e.7 4705~49094 53466 65761 67506 67506 71549 744409
•"" "•""""" " " ""•"""""•""""""••""•"""""""""""" """""""""""""""""""""""""""•"""""*
01 REeTS
02-020-01
02-12120-02
TEMPORARY SERVICES
4000 4000
PHONE/CO~MUNICATIONS
10500 10500
4000
10500
4000
10500
4000
10500
4000
10500
4000
10500
4000
10500
4000
10500
4000
10500
4000
10500
4000
10500
4801110
126000
02-020-03 OFFICE RENT
25250 25250 25250 25250 25250 25250 25250 25250 25252 25250 25250 25280 303032
02-020-04 FURNITURE RENT 1 PURCHASE
1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 1200 14400
I J ]J J -"11"":-_----'1 I I !J _I •
ALAS~A POWER AUTHORITV
SUSITNA HVDROELECTRIC PROJECT
FISCAL VEAR 198~BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
j
I
I J
RUN DATE 06/03/84
j 1 J -J 1 J i I I
PAGE 3
1 1 ]
10200085008500850085008500850085008500850085008500
TASK 02 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRil MAV JL~TOTAL
••*••***********•••••••• •*•••••**•**•• •*••••****•••••••••••••••••••*••* *•• *••*•
DIRECTS
02-020-05 SUPPLIES
8500
02-020-0b POSTAGE,AIREXPRESS,fRIEGHT
6200 6200 6200 6200 6200 6200 £200 6200 6200 6200 6200 6200 74400
02-020-07 PHOTOCOPV/PRINTS
3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 3000 36000
02-020-08 VEHICLE EXPENSE
6350 6350 6350 6350 6350 6350 6350 6350 6358 6350 6350 6350 76200
02-020-09 INSURANCE
10000 o o o o 80000 o o o o 20000 o 110000
02-020-12 EQUIPMENT PROCUREMENT-WORD PROCESSING
o 0 10000 0 o o o o 10000 o o o 20000
02-020-14 REPRODUCTION EQUIPMENT RENTAL AND MAINTENANCE
8000 8000 8000 8000 8000 8000 8000,8000 8000 8000 8000 8000 %000
02-020-16 OFfiCE EQUIPMENT PROCUREMENT &MRINTENANCE
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 12000
02-020-17 PERSONNEL RELOCATION
o 33000 27400 33000 o o o o o o III o 93400
02-020-20 TRAVEL AND LIVING EXPENSES
10900 4200 2700 1800 o 2700 3000 o 6400 6000 5400 .6908 50008
02-020-22 COMPUTER
8000 8000 4000 o o o o o o o o III 20000
02-020-26 ADFIG WAREHOUSE RENT
7750 7750 7150'7150 7750 7750 8 o o o o o 46500
02-020-33 ADF&G LINE 500
o 15000 15000 o o o o o o o o o 30000
02-020-34 SPECIAL PRESENTATIONS MATERIALS
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 12000
02-020-36 WRREHOUSE LEASE AND IMPROVEMENTS
4010 4010 4010 4010 4010 4010 4010 4010 4010 4010 4010 4010 48120
02-020-41 HARRIS COMPUTER COMMUNiCATIONS
4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 4000 48000
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUD6ET FOR HAR1A-EBASCO SUSITNA JOINT VENTuRE
PAGE 'I
TASK 02 JULY AU6uST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAV JUNE TOTAL
* *** ******* * * ****~*•••••••*••* *•*••**•* ••* ••*•***• • •****************** • * * * * * ***
DIRECTS
02-020-42 HARRIS COMPUTER CHARGES
4000 4000 4000 4000 400'"4000 4000 4000 ~000 4000 4000 4..48000
02-020-43 DOCUMENT CONTROL EQUIPMENT AND SUPPLIES
10&0 1000 1000 1000
02-020-44 MICRO FILMING EQUIPMENT &SUPPLIES
o 40000 40000 3000
1000
3000
1000
1500
1000
1500
1000
1500
1000
1500
1000
1500
100.
1500
1111
1500
12000
91>500
TOTAL DIRECTS
124660 195960 194860 133560 98760 179960 92510 89:;;10 105':112 9:i5UI 11491.96448 1522552
*************•****** ***** * ************* • **********• • • •••**••*•***•••••*••~•*•*
SUBCONTRACTOR 104
02-104-01 CIRI/FMAA-DRAFTIN6
1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 1000 12000
02-104-02 CIRI/FMAA-SPECIAL PRESENTATION DRAFTING
o 1000 °1000 o 1000 o 1000 o 1000 III 1000 1>001l1
SUBCONTRACTOR 104 TOTALS
1000 2&00 1000 2000 1000 2000 1000 2000 1000 2000 1000 2000 18000
************•**•********• • • *•***•***••*••******************** * **•* • * ** * * * * * ***
SUBCONTRACTOR 105
02-105-01 SUBCONTRACTOR HANDLING FEE
20 40 20 40 2"40 20 40 20 40 20 40 360
SUBCONTRACTOR 105 TOTALS
20 40 20 40 20 40 20 40 20 40 20 40 360
* ****** ***********•*****************• •*••• • • • ••* • *•*••**••****•****** * • * * • ** •*
TASK 12 TOTALS
281274 420081 3'.14463 322422 316940 33:;;880 244763 257393 324031 284372 302752 311399 3795776
***••••**•**•*•******* * *** *** ****•••*•*••••**•••••••• •*•••* *•*••••*••**••*•••* •
I j I f I J I J .J I 1 'I
I
1 I ')J j 1 J J 1 -1 --I }1 1 s
Administrative
Manager
P.T.lambert
.r I 1 ,I
Anchorage Anchorage Anchorage Anchorage Chicago
Olllce Word Document Purchasing Home Office
Management Processing Control Support
C.Gruver C.St.louis D.Calesen D.McClenaghan
D.Appel H.Gayton -V.HI.M.Mcintosh
A.King D.lavae B.Thra.(P.T,)W.Tolentino
R.Fuqua (n P.Bishop G.Taylor (P.T.)
T.Smith
L.love
l.Roberts
•Expediting •Word Processing •Correspondence •PW'chase Requisitions •Computer Support
•Secretarial Services Control &Tracking •PW'chase Orders •Draltlng Support
•Maintenance of •Document Reproduction.
•BiddingDistribution&TrackingoUice&equipment
•Action/Commitment •Bid EvalUation•Office Security Tracking •Receiving Reports•Consumable SuppleE •FERC Convnltment
Tracking
•Telecommunications
TASK 2A'-ADMINISTRATIVE MANAGEMENT
~
-l»o
X
~mz
-l
o-o
(,I)
::a::m
In
-l
Personnel
Subcontractors
Technical
Responsibilities
July 1,1984
A.Velazquez
Pillsbury,Madlson &Sutro
External Review Board
Air Logistics
Alaska Air Guides
CIR/lMoolin
F.Moolin &Assoc.
Acres American
Battelle
Dames &Moore
General Electric
Paul Weir
Sherman H.Clark Assoc.
Dr.T.Tyrrell
U of A -JSER
D.Calkins
Paul Hamblin
Administer Subcontracts
Administer Leases
H.A.Dare
Contracts Manager
S.Paske
AEIDC
Dr.B.Kessell
Dr.A.Dekin
EDAW,Inc.
E.Woody Trihey &Assoc.
Frank Orth &Assoc.
LGL Alaska Research
Dr.Milo Bell
R.A.Krieg
R &M Consultants
U of A -Museum
U of A -Wildlife
Woodward Clyde Assoc.
Denali Drilling
Interstate Exploration
MSI
Administer Subcontracts
TASK 2B -CONTRACT ADMINISTRATION
TASK 39 -LOGISTICS
G..Hizey
Air Loglstl cs
Alaska Air Guides
CIRIlMoolin J.V.
Manage Watana
Camp Logistics
Manage Aircraft
Logistics
Manage all HIE
and Subcontractor
Inventory
~J ~.1 _J .1 J ...1 I J
J 1 I ].J ....,!J 1 -1 1 .))I
1
r
Anchorage
Cost/Scheduling
M.Schwan
B.Mcintosh
D.Zee
Scheduler (N.H-l
_Compilation of Budgets &
Actual Cost
•Analysis of Spending Trends
-Manpower &Cost Forecasting
•Maintenance of Project
Schedule including
subcontractors work
•Cash flow forecasting
•Changed Work Authorization
Control
I Project Contiol Managei I
W.H.Pettigrew
BeUevue
Cost/Scheduling
M.Varrone (P.T')
-Coordination with New York
&Bellevue offices
•Special Projects &
Presenta tions as requ.ired
1
Anchorage
Accounting
D.Hathaway
J.Colbert
M.Gattagher
E.McGraw
-Accounts Payable to Joint
Venture partners,
subcontractors and vendors
-Invoicing Alaska Power
Authority
-Preparing Financial
Statements
Maintenance of accounting
records
•Auditing of invoices reCeived
to assure appropria te
documentation and payment
app roval is received
July 1,1984 TASK 2C -COST AND SCHEDULING CONTROL
C C08-3033
ATN-83-0030
TYPE-62l3
TASK 3
ENGINEERING
The work program for Fy85 stresses only activities necessary to
support the Federal Energy Regulatory Commission (FERC)licensing
prOCE?;Ss.In some cases,activities are a continuation from FY84.
Services
03-010-06 Geotechnical Data Review
Information gathered from reV1ew of previous geotechnical studies,
underground exploiations,laboratory testing,geophysical studies,
instrumentation readings,field mapping programs etc.,will be
collected and evaluated on a continuing basis.This data bank will
allow designers and reV1ewers to plan and evaluate forthcoming
exploration programs.along with establishing the criteria and
parameters necessary for detailed design.
Geotechnical data summaries will be available to the FERC staff prior
to the hearings on Dam Safety.
03-010-07 Support for Input to Testimony
Provide engineering input to counsel,the pre-hearing process,
....
disc:overy requests and the direct filed testimony prepared by a
subcontractor forthe Dam Safety Hearings.
During the reV1ew of the DEIS and preparation of the FEIS,the process
will require responses to engineering related matters .
12361/3
840807
1
___ww_~...~_
C C08-3033
ATN-83-0030
TYPE-6213
03-010-09 Support for Need for Power,Dam Safety and
Environmental Hearings
This activity provides the expected support requirement for the FERC
process activities relating to the hearings which will be needed in
FY85.
To date the level of effort for assessing the feasibility design of
Devil Canyon has been less than that expended for Watana.In support
of the Dam Safety Hearing Process,Devil Canyon Dam design will be
reviewed.
03-010-15 Best Management Practices Manuals Review
This activity provides a review of the Best Management Practices
Manuals to ensure constructabi1ity and reasonability of practices be
encurred on a subcontractor.
03-010-16 1984 Geotechnical Report Review
Draft copies of the report will be furnished to the Internal Review
Board for review and comment.
03-010-17 Draft EIS and Final EIS Review
Assistance in providing reV1ew and comment on the technical aspects of
the DEIS and FEIS are covered by this activity.
Directs
03-020-02 Travel and Living Expenses
Travel and living expenses to coordinate and oversee activities in the
-
-
-
12361/3
840807
2
C COB-3033
ATN-83-0030
TYPE-6213
Chicago and Bellevue offices associated with the above work.The
travE~l estimate consists of the following:
..-
.-
I
Between
Anchorage and Washington DC
Anchorage and Chicago
Chic,ago and Anchorage
Chic,ago and Anchorage
Anchorage and Bellevue
Subcontractors
Estimated
Number
1
2
2
2
2
Estimated
Duration Each
3
5
10
6
20
.-
I"""
!
i'lJJ/lPl1l
03-143-01 Acres American Inc -Discovery Activites Dam Safety
Hearings
Contribute to preparation of responses to requests for information
during the discovery period.
03-143-02 Acres American -Preparation of Direct Testimony,Dam
Saf€!ty Hearings
Prepare direct testimony for Dam Safety Administrative Hearings.
03-1l43-03 Acres American -Administrative Hearing
Attendance at hearing and presentation of testimony.
03-133-03 Subcontractor Handling Fee
A handling fee equal to 2 percent of subcontract costs.
12361/3 3
840807
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 3
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1965 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 03 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * • • • • * • • • •
TOTAL LABOR ~
39151 39456 30703 14721 12390 7640 7640 23893 12301 8863 8863 11689 217310
• * * * * * * * * * * * * * * **.* **.* * * * * * * * * * * * * * **** * * * * * **.* * * * * * * * * * * * • * * * * * *••*•••*••••*
TOTAL DI RECTS
1900 2200 1800 2300 1800 4000 0 0 0 0 3300 3300 20600
* * * * * * * * * • * * * * * * * * * * * * * * *** ** ** * * * * * * *** * * * * * * *** * * *** **** ** * * ** * • ** * • * •* •* * * * *
TOTAL SUBCONTRACTORS
0 0 0 0 0 20400 30600 25500 0 0 0 0 76500
** * ** * * * * * * * * * * * *** * *** * * * * * * ***** * *** * * * * * ** *** **** * * * ** ** •** ** * *** •* • •** * * * **
TASK lII3 TOTALS
41051 41656 32503 17021 14190 32040 3824111 49393 12301 8863 12163 14989 314't10
* * * * •** * * *** * * *** * * * * * * * * * * * * ** ** * *** * **** * * • * ** * * * ** * ** • *** •*** ** * • • • •** *** * * *
I I J J J J J J J J ]
]]
08/08/84
]J -;1 1 1 1 D J 1 j 1 1 ]J
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TASK 03 SALARY BREAKDOWN
Budgeted Salaries Fringe Overhead Fee Total
Hours Benefi ts
.--,-
Dedicated Staff 1510 52759.74 17938.91 34639.62 10034.34 115372.64
Home Office Staff 1372 39928.18 13573.46 39594.86 8841.36 101937.86
TOTAL STAFF 2882 92687.92 31512.37 74234.48 18875.70 217310.50
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary -
TASK 03
TOTl=lL SERVICES
03-010-06
03-010-07
03-010-09
03-010-15
03-010-16
03-010-17
GEOTECHNICAL DATA REVIEW
SUPPORT FOR INPUT TO TESTIMONY
SUPPORT FOR NEED FOR POWER HEARING,DAM SAFETY
BEST MANAGEMENT PRACTICES MANUALS REVIEW
1984 GEOTECHNICAL REPORT REVIEW
DRAFT EIS AND FINAL EIS REVIEW
18336
43701
48133
40253
35868
31019
314410
217310
217310
TOTRL DIRECTS
03-020-02 TRAVEL AND LIVING EXPENSES
TOTAL SUBCONTRACTORS
03-133-01 SUBCONTRACTOR HANDLING FEE
20600
1500
20600
20601Z1
76500
1500
03-143-IZll
03-143-02
03-143-03
ACRES,DISCOVERY ACTIVITIES DAM SAFETY HEARINGS
ACRES,PREPARATION OF DIRECT TESTIMONY DAM SAFETY
ACRES,ADMINISTRATIVE HEARINGS
10000
45000
20000 75000
"""
1 1 ]1 J I 1 1 ]-J J 1 j
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 5
18336152815281528152815281528152815281528
TASI{03 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
••••••••••*••••••••••••••*•••••*•••••••*••*•••••••••*******•* ************ ***•**
LABOR 010
03~010-06 GEOTECHNICAL DATA REVIEW
1528 1528 1528
03-010-07 SUPPORT FOR INPUT TO TESTIMONY
3132 6189 3132 3591 5730 2674 2674 3591 76 3591 3591 5730 43701
03-010-09 SUPPORT FOR NEED FOR
1451 4584
POWER HEARING,DAM SAFETY
3591 3744 4431 3438 3438 840 10697 3744 3744 4431 48133
03-010-15 BEST MANAGEMENT PRACTICES MANUALS REVIEW
3786 17098 14468 4200 701 o o o o o III o 40253
03-010-16 1984 GEOTECHNICAL REPORT REVIEW
17934 0 0 o o o o 17934 o o o o 35868
03-010-17 DRAFT EIS AND FINAL EIS REVIEW
11320 10057 7984 1658 o o o o o o o o 31019
LABOR 010 TOTALS
39151 39456 30703 14721 12390 7fA0 7640 23893 12301 8863 8863 11689 217310
*** ***********************•***•*•*•* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
DIRECTS
03-020-02 TRAVEL AND LIVING EXPENSES
1900 2200 1800 2300 1800 4000 o III o o 3300 3300 20600
TOTAL DIRECTS
1900 2200 1800 2300 1800 4000 o o o o 3300 3300 20600
*•*****•*•*•*••*••••**•••••••••*••••**••••••••••••••••••••••••*••••••••* *•••*•
SUBCONTRACTOR 133
03-133-01 SUBCONTRACTOR HANDLING FEE
o 0 0 o o 400 600 500 o III o o 1500
SUBCONTRACTOR 133 TOTALS
o o o o o 400 600 500 o III o o 1500
•***•••****••**•••••*••*••••••*••••••••••••••••*••*•*••••••••••*•••••••*•••*•*
SUBCONTRACTOR 143
03-143-01 ACRES,DISCOVERY ACTIVITIES DAM SAFETY HEARINGS
o 000 o 10000 o o o o o o 10000
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 6
TASK 03 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * ***** *** * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * ***** ******* * * ** ** * * * * *
SUBCONTRACTOR 143
03-143-02 ACRES,PREPARATION OF DIRECT TESTIMONY DAM SAFETY
III III 0 III 0 0 20000 25000 0 III 0 0 45000
03-143-03 ACRES,ADMINISTRATIVE HEARINGS
0 0 0 0 0 10000 10000 0 0 0 0 0 20000
SUBCONTRACTOR 143 TOTALS
0 0 0 0 0 20000 30000 25000 0 0 0 0 75000
* * ** * * ** ***** ** ** * * * * * * *** * * * ** **** * ****** ** * * * ** * ** *** *** * * ** **** * ** * ** * *** * *
TASK 03 TOTALS
41051 41656 32503 17021 14190 32040 38240 49393 12301 8863 12163 14989 314410
* * * * * * * * * **** * * * * ***** * * * * * * *** * * ** * ** *** ** **** * * *** * **** ** * * *** ****** ** * * *** * *
)J J J !-_._].J I J !J
1 1 1 ]~-]J 1 1 J J -J 1 J
Office
Personnel
Subcontr actors
Technical Responsibilities
July 1,1984
Anchorage
C.Craddock
M.Bruen
A.Stukey
D.Yacko
CIRI/Moolin
Site Investigations
Instrumenta tion
Monitoring
Engineering Operations
Manager
C.D.Craddock
Atlanta/Bellevue
w.Rom
J.Szablya
Transmission Line
Systems
TASKS 3,5,7,41 -ENGINEERING
C C08-3033
ATN-83-0030
TYPE-6213
ALASKA POWER AUTHORITY
SUSITNA HYDRELECTRIC PROJECT
HARZA-EBASCO SUSITNA JOINT VENTURE
FY 1985 BUDGET
This document presents fiscal year 1985 budget requirements for Harza-Ebasco
Susitna Joint Venture to perform the scope of work associated with
continuing the licensing and permitting of the Susitna Hydroelectric
project,and is intended,by reference,to be a part of Amendment No.7 to
the Professional Services Contract between Harza-Ebasco Susitna Joint
Venture and the Power Authority dated January 6,1983.
In general,the scope of work for Fy85 includes:
"1I
1.Ongoing environmental studies which
license,and/or answer concerns
regulatory agencies.
are required to support the
of the state and federal -
2.Preparation of testimony for the Environmental and Need for Power
hearings.(Note:the budgets included for these activities are
based on judgment estimates and may require significant revision
as the hearing process and progress dictate).
.....
3.Assistance to the Power Authority in preparation of power sales
agreements with the utilities who will ultimately purchase
Susitna's power generation.
4.Refinement of economic and operational studies to support the Need
for Power hearings.
5.Continuation of the process of settlement with state and federal
regulatory agencies.-
6.
12361
840807
Logistic support for the environmental field studies performed by
Harza-Ebasco,their subcontractors and ADF&G.
1
....
-
,F-
C C08-3033
ATN-83-0030
TYPE-6213
TASK 4
ENVIRONMENTAL
The work plan for FY85 includes a much greater level of detail than in prior
years.It 1S consistent with the plans established with the Power
Authority.The account numbers correspond to the task numbers presented in
the FY85 Detailed Plan of Study.The services provided by H-E are presented
in three major sub groups:Social Sciences,Terrestrial and Aquatic.
Services
Social Science Program:
04-011-04 SSP-Administration and Contract Management
This effort will consist of general administrative activities such as weekly
staff meetings,progress report preparation,budget revisions and refore-
casting,and the nontechnical aspects of contract management as well as
contract preparation,preparation of amendments and CWA's,reviewing invoic-
es and progress reports,and tracking expenditures relative to budgets.
This activity will be conducted by Harza-Ebasco.
04-011-05 SSP-FERC Supplemental Information Requests
The Social Science Program will continue to prepare written responses to
FERC supplemental information requests.This will include both responses to
new requests made by FERC 1n FY 1985 as well as responses which were to be
supplied to FERC based on information submitted to FERC in FY 1984.Harza-
Ebasco will be responsible for preparing each response.Frank Orth &
Associates and EDAW,Inc.will provide input to Harza-Ebasco as requested.
12361/4
840807
1
C C08-3033
ATN-83-0030
TYPE-6213
04-011-08 SSP-DEIS/FEIS Review Memorandums
The Power Authority must review and comment on the DEIS and FEIS and on
comments on these documents to ensure that all analyses and conclusions are
based on accurate information,to provide clarification(s),and to provide
alternative interpretations where appropriate.Social Science Program
activities that will lead to the completion of this task will involve the
following activities:correcting inaccuracies,and preparing additional
information (which will strengthen some conclusions,differ from others,and
provide clarification for others).Additionally,comments prepared by other
agencies and the public will be reviewed to identify those comments and
conclusions with which a substantial difference of opinion remains.These
reviews will provide a basis for identifying specific conclusions which may
need resolution through the settlement and hearing processes.This cost
account assumes that comments on the DEIS are due July 25,1984 and comments
on the FEIS are due on January 25,1985.Harza-Ebasco will be responsible
for providing reV1ew comments to the Power Authority.Frank Orth &
Associates and EDAW,Inc.will provide input to Harza-Ebasco as requested.
04-011-09 SSP-Settlement Process Input
The Social Science Program will provide ongoing input into the settlement
process by reviewing agency concerns,consolidating them into concise
issues,and participation in internal and agency meetings and preparation of
issues papers aimed at resolving issues.This cost account covers only
those settlement process efforts requiring less than a person-week each
month for preparation.This activity will be conducted by Harza-Ebasco with
support from Frank Orth &Associates and EDAW,Inc.as required.
04-011-10 SSP-General Licensing Support
Numerous miscellaneous activities will be required to fully
requirements of the Power Authority and FERC for completing the
meet the
licensing
12361/4
840807
2
.-
--
-I
.....
C C08-3033
ATN-83-0030
TYPE-6213
process smoothly.These activities will be supportive of the other main
actyities of the Social Science Program.
04-011-11 SSP-Workshops
An important aspect of the settlement process ~s the dissemination of
information to familiarize agency personnel with Social Science Program
study methodologies,analyses,and results for FY 1985 work and to outline
proposed work activities and methodologies for FY 1986.This cost account
assumes that a two-day Social Science Program workshop will be held in April
1985 that focuses on providing agencies with the information identified
aboye.Harza-Ebasco will be responsible for organizing and conducting the
workshop.Frank Orth &Associates and EDWA,Inc.will provide input as
required.
04-011-13 SSP-Hearing Preparation
Steps in the hearings process that will require participation by members of
the Social Science Program include the discovery process,filing of direct
testimony,filing of rebuttal testimony,possible filing of surrebuttal
testimony and cross examination of witnesses.Although most of these steps
will not occur ~n FY85,it ~s necessary to begin preparation for
accomplishing these steps.A major element of the environmental hearings
proc~ess will focus on the impacts of the Susitna Hydroelectric Project on
cultural resources,socioeconomic and recreational resources and the
potential effectiveness of planned mitigation measures.Information may
need to be condensed and sunnnarized into formats appropriate to support the
hearings process scheduled to begin December 28,1984.The primary
activities which will occur during Fy85 include the selection of persons who
will testify on behalf of the Power Authority,consultation with Power'
Authority Licensing Counsel,responses to discovery requests from FERC and
intervenors,and the initiation of preparation of written direct testimony.
12361/4
840807
3
C C08-3033
ATN-83-0030
TYPE-6213
Specific deliverables to result from the activities of this task include:
(1)designation of expert witnesses to testify on terrestrial resources on
behalf of the Power Authority;(2)position papers by expert witnesses
defining areas to be discussed and input required from other participants;
(3)responses to discovery requests;and (4)draft outline of direct
testimony from each expert witness.In addition,the designated expert
witnesses will participate 1.U activities leading to deliverables of other
terrestrial study tasks and will initiate preparation of their direct
testimony to be filed on September 25,1985.Representatives from Frank
Orth and Associates and EDAW,Inc.wi 11 participate in this task at the
request of Harza-Ebasco.
04-011-14 SSP-Program Coordination
This cost account covers coordinating the activities of Social Science
Program subcontractors and Harza-Ebasco Social Science Program subtask
leaders.It also includes the efforts required to ensure cross-discipline
coordination with the Aquatic and Terrestrial Programs and with Harza-Ebasco
hydrologic,engineering,and logistical personnel.Harza-Ebasco will be
responsible for organizing and conducting all coordination meetings.Frank
Orth &Associates and EDAW,Inc.will participate as necessary.
04-011-15 SSP-Public Access Report Input
This task will evaluate the effects of alternative public access policies on
cultural,socioeconomic,recreation,aesthetic,and land use resources.
This will include assessments of public use of the access roads,the rail
spur,reservoirs,airstrips,and transmission line rights-of-way.Access to
other locations,such as to Portage Creek and across the dam to the south
shore will also be evaluated.Harza-Ebasco Social Science Program personnel
will be responsible for preparing appropriate sections of this report.
EDAW,Inc.will provide input as necessary.
~I
-
-
12361/4
840807
4
..-
-
C C08-3033
ATN-83-0030
TYPE-6213
04-0ll-16 SSP-Access Road Location Report Input
ThiB task involves the rev~ew and finalization of the Social Science Program
sections of the draft access road report begun in FY84.The University of
AlaBka Museum,Frank Orth and Associates,and EDAW,Inc.will provide input
as necessary.
04-0ll-l7 SSP-Construction Location Report Input
This task wi 11 provide cultural resources,recreation,aes.thetic,and land
use input into a report which will examine the proposed siting of the Watana
and Devil Canyon construction camps and the implications of alternative
sitingCs)within the project area.Social Science Program subtask leaders
will be responsible for providing appropriate input to this report.EDAW,
Inc.will provide assistance to Harza-Ebasco as necessary.
04-011-18 SSP-Instream Flow Comparisons Report Input
The Aquatics Program will be conducting research ~n order to.prepare an
Instream Flow Comparisons Report.Information on potential changes in water
quality,temperature and ice,and other physical processes will be supplied
to the Social Science Program.The Social Science Program;.to the extent
possible will provide information on the current and projected river use by
area and the significance of that use.
04-011-19 SSP-Detailed Plan of Study Development and Updating
This effort includes the finalization and updating of the Social Science
Program Detailed Plan of Study for FY 1985 and the development of Detailed
Plan of Study for FY 1986.Each document will provide the rationale and
objectiveCs)for each work activity as well as a description of the study
area,methodology,data management,and deliverables.Harza-Ebasco will be
12361/4
840807
5
C C08-3033
ATN-83-0030
TYPE-6213
responsible for preparing and updating the Social Science Program Detailing
Plans of Study.Frank Orth &Associates and EDAW.Inc.will provide input
as required.
04-011-20 CR-Workshop
A significance criteria workshop wi 11 be he ld in October 1984 which wi 11
include a presentation of the framework developed for evaluating the
significance of cultural resources ~n the study area.Materials describing
the framework will be distributed to participants prior to the workshop so
that a productive round-table discussion can occur.A special effort will
be made to solicit the comments of Native Americans and the Alaska
archeological community.Harza-Ebasco will take the lead ~n organizing and
conducting the workshop.The University of Alaska Museum wi 11 prepare a
document summarizing the methodology used to develop the significance
framework and wi 11 participate in the workshop·as requ~sted by the Power
~'''"Authority.
04-011-21 CR-QA Program
Harza-Ebasco will review the procedures/quality control manual prepared by
the University of Alaska Museum as part of the Q-A Program undertaken ~n FY
1984.In addi t ion,Harza -Ebasco wi 11 recommened procedures to the Power
Authority for conducting periodic field and laboratory records and audits·
and field inspections as part the of Q-A Program.
04-011-22 CR-Report Review
In this task,Harza-Ebasco will provide technical review of all reports
prepared by the University of Alaska Museum and submitted to the Power
Authority.Harza-Ebasco will provide all review comments in writing to the
Power Authority.
-
-
12361/4
840807
6
--
-
--
C C08-3033
ATN-83-0030
TYPE-6213
04-011-23 CR-Program-Approach
The cultural resources program will continue to be reevaluated in light of
current procedures and schedules and the ro Ie of the Advisory Council on
Historic Preservation,the State Historic Preservation Officer,and the
University of Alaska Museum.This reevaluation will provide the overall
strategy toward developing an appropriate mitigation plan.Harza-Ebasco
will conduct the reevaluation in conjunction with the Power Authority and
appropriate agencies.In addition,Dr.Albert A.Dekin and a -Cultural
Resources Program Technical Reivew Board will partipate at the request of
Harza-Ebasco.
04-011-24 CR-Impact Assessment and Mitigation Planning
Harza-Ebasco will evaluate how and to what degree all identified cultrual
resource sites and/or districts within the area affected by the Project
(which have been detennined to be eligible for the National Register of
Historic Places)will be affected by the Project.In the absense of formal
detenninations of National Register eligibility,assessments of impacts will
be made for all sites which are considered significant under the criteria
established through significance studies.For all National Register
eligible (or significant)sites or 'districts which will be impacted by the
Project,recommendations wi 11 be made for means of avoiding or miniminizing
those impacts ident ified as adverse.
04-·011-30 SE-Winter River Users Analysis
This task will utilize a multi-method,triangulated approach to the descrip-
tion of winter rl.ver use on the Susitna River.Because winter use is
thought to be of relatively low intensity and to occur over a large
geographic area,efforts to survey winter users would not be cost effective.
ThE~refore,the approach taken in this task will include interviews with
12361/4
840807
7
C C08-3033
ATN-83-0030
TYPE-6213
lodge operators,trappers,guides operating ~n the study area,and
knowledgeable area residents.In addition,observational data from winter
fly-overs and other fieldwork will be utilized.To this end,an outline of
information needs regarding winter river use will be prepared,along with an
interview guide formulating the questions that could be asked or the
observations that could be made to obtain this information.These materials
will be circulated to those conducting the various field efforts that would
bring them into contact with the persons or situations that could provide
this information.Given the disbursed character of the data collection
effort,a special procedure for compiling,verifying,and synthesizing the
information will be designed and implemented.In addition,special care
will be taken to review the-draft report with persons knowledgeable about
the region and winter activities.Harza-Ebasco will be responsible for
completing this task.
04-011-31 SE-Worker Characteristics Analysis
During FY85,data from a hand-out survey of workers at both staging sites on
the Intertie Project and at Terror Lake will be coded and analyzed.A
report will be prepared in draft and final form for each of these surveys.
In addition,contact will be made with project managers/logistics personnel
and researchers in Canada and in other parts of Alaska to obtain any other
available information about worker characteristics at remote,northern
sites.If other ongoing projects are identified,an attempt will be made to
administer a hand-out survey to the work force.A white paper identifying
changes to the model used for forecasting socioeconomic impacts suggested by
the surveys and estimating the consequences of those changes will be
prepared.A white paper summarizing the information obtained from the
surveys and other research will also be prepared.Harza-Ebasco will be
responsible for overall direction on this task,for review of the draft and
final worker survey reports and the white paper on implications for the
model,and for preparation of the draft and final white paper on worker
-
-
12361/4
840807
8
-
-
C C08-3033
ATN-83-0030
TYPE-6213
characteristics.Frank Orth and Associates,Inc.will be responsible for
the coding,analysis,and write-up of the worker surveys,for preparation of
the white paper on model implications,and for review of the white paper on
worker characteristics.
04-011-35 SE-Adjacent Landowners Analysis
In this task,information about the land settlement process in the study
area and the development plans of landowners will be collected and analyzed
to update and expand the assessment of project impacts.Data collection
will involve discussions with the ADNR and with each of the major
landholders in the study area.The focus of the informat ion-gathering
effo~t will be on developing a current,accurate description of
landownership status,a profile of landowne.rs 1n the study area,and a
des(:ription of landowners'plans and opinions.This task will require
carE~ful coordination with the Land Use and Recreation subtasks and with
othE~r projec t-related efforts dealing wi th land or ownership issues.Harza-
Ebasco will be responsible for completing all aspects of this task.Frank
Orth and Associates,Inc.will provide assistance 10 identifying and
spel:ifying model modifications and will review the memorandum on modeling.
04-011-36 SE-Remote Parcel Owners Analysis
Ownl~rs of remote parcels in the study area constitute a population group
that may be affected by the Project in unique ways.In addition,decisions
by remote-parcel owners have the potential to alter baseline conditions in
the study area in a manner that could affect the consequences of the
project.To date,although the ADNR maintains a list of remote parcel
own,~rs,little is known about their current use of the remote parcels,about
their plans for future use of their land,or about their expectations
reg,arding project effects.Because the development of remote parcels could
12361/4
840807
9
C C08-3033
ATN-83-0030
TYPE-6213
have widespread impacts on fish and wildlife and on hunting and fishing in
the study area,it is particularly important to establish better information
about current conditions and potential future development and to determine
whether some form of a monitoring program regarding remote parcels should be
-
recommended.The purpose of this monitoring program would be to provide a
firmer basis for evaluating the relationship between project impacts,
development of remote parcels and the impacts of remote-parcel development.
H~za-Ebasco will be responsible for this task.
04-011-38 SE-Land Use and Housing Constraints
This study entails the gathering of secondary data concerning land use and
the availability of land for residential development,and the capacity
builders to expand housing supply in local impact-area communities.
conjunction with the Land Use Subtask,land use information would
obtained from the ADNR for the communities located ~n the unorganized
borough and from local organizations in the various communities.Of -
particular interest is the Community of Cantwell,Inc.and the Cantwell
Village Corporation.An.analysis of the ability of the housing market to
respond to anticipated increases in demand would be made by examining
secondary data on housing starts and by conducting key informant interviews
with local and regional housing developers.If appropriate,capacity
constraints would be incorporated into the socioeconomic model and the model
run to determine the consequences that various assumptions regarding land
and housing constraints would have on the population impacts of the Project.
Harza-Ebasco would have responsibility for overseeing this task,for
collecting the information concerning land use and builders constraints and
for reviewing the mode 1 runs.Frank Orth and Associates,Inc.would have
responsibility for participating in the development of the detailed plan of
study,for specifying the format of the data necessary to the model and for
modifying the model and making the sensitivity runs.
12361/4
840807
10
-
C C08-3033
ATN-83-0030
TYPE-6213
04-011-39 SE-Air Taxi Operators Analysis
Information about air taxi operations in the study area will be obtained
frotll a number of the study tasks being conduc ted in FY85.In particular,
the river user survey will provide detailed,quantitative information about
float plane activity on the Susitna during the open-water season.The
surveys of guides,lodge operators,households and businesses 1n local
impacted communities,and the resource user survey will all include
questions regarding air taxi operations.The winter river use study will
also collect information about airplane use of the river during the winter.
The purpose of this task is to integrate the information obtained from these
othl~r studies and supplement it with additional information from available
secondary sources and interviews with air taxi operators.Harza-Ebasco will
be responsible for this task.
04-011-40 Refinement of Impacts on Communities
The first step in this task will be to review the methods used previously to
collect information on the local impact communities to identify the need for
revision and expansion,and to delineate "the information needed from this
task by other FY85 activities.Based on this review,a detailed plan of
study will be developed for the task and for each of the principal compon-
ents:the household survey,the business survey,the public sector survey,
and the refineI1lent of social effects.The household and business surveys
will be conducted by personal interviews with a representative sample of
households and business owners/managers 1n each community.The public
sector survey will be conducted by personal or telephone interviews with
public officials.The information needed to refine the description of the
existing environment and the analysis of social effects will be obtained
through a combination of personal and telephone interviews,secondary data,
and observations in the community.In each instance,previous information
and agency COIIUllents will be reviewed and utilized to delineate specific
12361/4
840807
11
C COS-3033
ATN-S3-0030
TYPE-6213
information needs for each component,to develop or reV1se field instruments
(questionnaires,interview guides,and data sheets)that wi 11 yield this
information,to field test these instruments as appropriate,and to assign
procedures for developing a sampling frame and drawing a sample of
respondents that will yield precise and statistically valid results.This
will involve resolution of a number of issues regarding community boundar-
ies,vacant housing,and the definition and identification of local
businesses.Once the field instruments and sampling procedures have been
reviewed,revised quality assurance procedures will be established and a
field team will be trained.Field work will be completed and the results
reviewed for completeness and accuracy.As the field work is progressing,
completed questionnaires and interview forms will be coded and entered into
computer data files.The data will be cleaned,the analytic procedures
finalized,and as data become available,the analysis will proceed.Because
the FY85 effort for the household,business,and public sector surveys
represents a second round of research in the communities of Talkeetna,
Trapper Creek,and Cantwell,special attention will be given in the analysis
to comparison with FY84 results.For each community in the study,one
report presenting the survey results will be .prepared.A separate report
summarizing the results of the social effects study will also be prepared.
This report will address all six study communities.Included in each report
will be a section comparing the characteristics of the community in FY85 to
assumptions used in the ISER and Susitna socioeconomic models.Harza-Ebasco
will have overall responsibility for this task.Frank Orth and Associates
will assist in the development of the plan of study and the revision of the
questionnaires,the analysis of the data,and the preparation of the draft
and final reports.
04-011-44 SE-Mitigation Plan Update
During FY85 ,many activities will be undertaken to improve the ability to
delineate specific mitigation measures and to assess their likely effective-
--
-
12361/4
840807
12 -
-
.-
-
.....
.-
C C08-3033
ATN-83-0030
TYPE-6213
ness.The first step in this task will be to review the License Application
and the FY84 Mitigation Plan Update and develop an outline of 1)priority
mitigation issues (Le.what impacts need most attention);2)information
requirements,and 3)information sources.This will be followed by the
dev4~lopment of a detailed work plan describing the flow of the data collec-
\
tiOIl and analysis to be conducted.It is anticipated that additional infor-
mation will be available during FY85 concerning the attitudes and concerns
of various special populations as well as residents of the local -impact
are.a.This will allow more specific discussion of the complex trade-offs
involved in the Mitigation Plan.In addition,as mitigation alternatives
are further refined,it will be possible to develop substantially more
specific information about the mechanisms,programs,and agencies available
for providing the recommended mitigative actions and to delineate and
evaluate a comprehensive plan.Specific attention will be paid to the
trade-offs that are involved in project design and mitigation alternatives.
Measures that reduce one type of socioeconomic impact-may aggravate another.
Reduced socioeconomic impacts may increase impact on the natural
environment.Once a reasonably satisfactory plan for the socioeconomic
component has been developed,the team will be in the position to
participate in trade-off evaluations with representatives of the other
components.The analysis will result in the preparation of a draft and
final Mitigation Plan Update Report.Harza-Ebasco will have primary
responsibility for this task and will take the lead for organizing the work
and for preparing the reports.Frank Orth and Associates will participate
in the development of the detailed plan of study,in the delineation of
information needs,in the analysis of the consequences of various mitigation
me~lsures,and in reviewing the draft report.
04-'011-51 SE-Permanent Village Evaluation Report
-
A variety
locating,
12361/4
840807
of issues must be considered ~n
lod ging,and support ing operations
13
evaluating alternatives for
workers.The prob lem to be
~---'''---,----------_._----------------------------------
C C08-3033
ATN-83-0030
TYPE-6213
addressed requires careful delineation of the major trade-off ~ssues
associated with the location,lodging,and support of the operations work
force followed by compilation and analysis of information that will clarify
the nature of the trade-offs associated with the various alternatives.It
is anticipated that the first step in the process will be to delineate the
alternatives to be considered and the major trade-off issues to be
addressed.The alternatives will then be further refined to provide a
limited set of alternatives upon which to base the trade-off evaluation.
Information from various secondary services will then be compiled and
a~alyzed,including computer runs to explore the implications of various
alternatives,to provide a basis for a draft report outlining the trade-off
issues involved with each alternative.This draft will be reviewed with
other members of the Harza-Ebasco team and the Power Authority.
Modifications suggested by this review will be analyzed and the draft report
revised to final form.Responsibility for developing the detailed plan of
work,coordinating the analysis,and overseeing the preparation of the draft
and final reports will rest with Harza-Ebasco.Frank Orth and Assocaites,
Inc.will participate in the analytic process,providing suggestions about
alternatives and running the socioeconomic model to examine the population,
housing and facilities/services/fiscal consequences of each.Frank Orth and
Associates,Inc.will also participate in review of the draft report.EDAW,
Inc.will provide relevant input regarding recreation and aesthetics.
04-011-52 SE-Worker Transportation Alternatives Report
Based on work conducted in FY84 and previously,members of the Harza-Ebasco
socioeconomic team and Frank Orth and Associates would work together to
develop a set of transportation alternatives for analysis.The alternatives
delineated wou ld take into account likely effects on worker location and
family accomplishments,union requirements and constraints,project
operating/construction requirements,transportation costs to the worker and
to the Project as well as other factors identified as important trade-off
-
-
-
-
12361/4
840807
14
"'""'
C C08-3033
ATN-83-0030
TYPE-6213
considerations.Once the alternatives are delineated,the socioeconomic
modE~l will be run to develop estimates of worker location and population
impacts and an analysis will be made of the implications of the alternative
for union agreements,worker compensation or project cost for transporta-
tion,and project logistics.This task will interface with Task 1"04-011-53,
an analysis of worker shift and rotation schedules.An important function
of this analysis will be 1)to determine the least cost mode,2)to
det,armine the least socioeconomic impact mode,3)to identify Fatal flaws or
serious problems with any of the proposed alternatives,and 4)to develop
information about the most promising alternatives that would support more
detailed analysis of their effects on the study area.Harza-Ebasco would
have overall responsibility for this task,overseeing the development of the
detailed work plan,coordinating the analysis,and report preparation.
Frank Orth and Associates would participate in the delineation of
alternatives for examination,would run the socioeconomic model to estimate
the worker location and population effects of each alternative,and would
review the draft report.
04-·011-53 SE-Worker Shift and Rotation Schedule Report
Fealsible alternatives for worker shift and rotation schedules during
construction and operation will be delineated in this task.In addition,
information about each alternative (which will be necessary to analyze its
implicat ions for transportat ion al ternatives,worker residence,traffice
impacts,and costs)will be compiled and presented in a format useable for
persons conducting the analysis.A report will be prepared that describes
thE~alternatives,presents the data,and summarizes and issues/constraints
aS80ciated with each alterntiave.Harza-Ebasco will be responsible for
directing and managing this task and preparing the draft and final report.
Frank Orth and Associates will participate in the delineation of
alternatives for examination,will run the socioeconomic model to estimate
12361/4
840807
15
ATN-83-0030
TYPE-6213
the worker location and population effects of each alternative,and will
review the draft report.
04-011-54 SE-Lodge Operators Analysis
The principal activity in this task will be a survey of lodge operators
serv~ng the study area.This will require compilation of a directory of all
lodges and lodge operators,preparation of an interview guide,and
implementation of personal (face-to-face)interviews with all lodge
operators operating in the study area.The interview would cover the
following topics:demographic and household characteristics;description of
lodge facilities and activities;number and characteristics of clients;
business/economic linkages (eg.to guides,a~r taxi operators,taxidermists,
etc.);resource use in the study area by lodge operator and household;
resou.rce use in the study area by others;and attitudes and expectations
about the future.Harza-Ebasco would be responsible for completing this
task.
04-011-55 SE-Guide Analysis
This task will involve a survey of big game and river guides working in the
study area.The first step in completing this task will be to compile a
directory of the guides serving the area.The next step will be to review
existing information (for example,the recent ADF&G survey)and prepare and
pre-test an interview guide to be administered to the guides.Personal
interviews will then be conducted,the data coded,and analyses prepared.
The outcome of the task would be a report documenting the findings and
presenting data that would be incorporated in the refinement of project
impacts and projections.In addition,the information from this task would
be incorporated into a section of the white paper discussing the potential
for and consequences of project impacts.Harza-Ebasco would be responsible
for all aspects of this task.
....
-
12361/4
840807
16
....
....
C COB-3033
ATN-83-0030
TYPE-6213
04-Cill-57 SE-Trappers Analysis
This:task constitutes a joint effort of the socioeconomic and terrestrial
components and is designed to provide information about both furbearers and
trappers.Work initiated in FY 1984 has developed pril iminary informat ion
abotJlt trapping in the impoundment area and a pre1 iminary draft of a survey
instrument.In FY85,three phases of effort will be conducted.During the
summer,a literature review and informal interviews will be conducted to
more~clearly delineate the information needs of the study.The study will
involve the use of key informants using a Snowball sampling technique
supplemented by secondary data to develop a list of all households actively
eng~Lged in trapping in the study area.In the fall of FY85,a presentat ion
will be made to the Alaskan Trappers Association,and a first round of
intE!rviews with trappers will be conducted.Members of these households
will then be contacted and interviewed to obtain information about expected
trapping activities and harvest,household composition and characteristics,
othE~r resource use,and attitudes and expectations about the future.
Respondents will be asked to keep records concerning trapping effort and
suceess during the trapping season.A second round of interviews,using a
revised questionnaire/interview guide will be conducted at the completion of
the trapping season in the spring of 1985.The results of this research
will be analyzed and a draft and final report prepared.A section for the
white paper on special populations will be prepared.Harza-Ebasco will be
responsible for overall supervision of this task and for development of the
survey instrument and interviewer instructions/training for the
socioeconomic component of the information needs.A Harza-Ebasco team
member will participate in the presentation to the Alaska Trappers
Association and will assist in the fieldwork,data analysis and report
preparation.Harza-Ebasco will be responsible for reviewing and approving
all project documents.Phil Gipson (U of A)will subcontract with Harza-
Ebasco and will be responsible for the information concerning furbearers,
12361/4
840807
17
C COB-3033
ATN-83-0030
TYPE-6213
for field logistics,for data analysis,and for preparing the sections of
the report dealing with furbearers and trapping success.
04-011-58 SE-Boat Operations Analysis
This task will supplement information being obtained from the River User
Survey with additional information about boat operators.Based on
information from the River User Survey and other sources,a directory of
persons operating boats on the Susitna for commercial/business purposes will
be prepared.A sample of these persons will be interviewed to review the
results of the River User Survey and obtain additional information about the
characteristics and importance of boat operations on the Susitna River.
These personal interviews will be used to develop a profile of commer-
cial/business boat operations and to obtain in format ion about boat
operator's attitudes and expectations for the future.The interview format
will contain both structured and unstructured components.Data from the
interviews will be analyzed and the information combined with that from the
River User Survey,other secondary sources.and other components.This
information will be used to refine the assessment of project impacts on boat
operators and businesses.Based on this report.a section for the white
paper on special populations will be prepared.Harza-Ebasco will be
responsible for all aspects of this task.
04-011-59 SE-Sport Hunters and Fishermen Analysis
This task wi 11 entail a number of coordinat ive and analytic steps.The
first step is to work with members of the terrestrial and aquatics group to
develop the analytic framework,problem statement.information needs and
sources.and detailed study plan.This process is similar to,and tied
with,the identification of mitigation options and refinement of the
mitigation plan.
~
i
12361/4
840807
18
-
C C08-3033
ATN-83-0030
TYPE-62l3
In ,addition to the information available from secondary sources and other
project work conducted in Fy84 ,this task will utilize results and data from
the 1)River User Survey,2)the Trappers Survey,3)the Lodge Operators
Survey,4)the Community Surveys,5)the Sus itna Area Resident Resource
User Survey,6)the Guide Survey and,7)the Winter River User Assessment.
These efforts should provide adequate information about fishing and
fishermen,but it wi 11 probably not provide adequate in format ion about all
sport hunting or hunters.Consequently,one component of this task will be
to utilize available secondary data (for example from ADF&G,the Alaska
Public Survey,etc.)to ensure that the hunting and fishing activities,
intE~rests,and perspectives of urban Alaskan residents are appropriately
addressed.Harza-Ebasco will have overall responsibility for coordinating
the work on this task and for preparing the white papers.Other team
members (terrestrial and aquatics)will provide input to the an1alysis.
04-1011-61 Recreation Impact Refinement
Refinement of the impacts on recreation resources will focus on obtaining
information related to four recreational ac tivit ies:hunting,fishing,
boating,and non-consumptive activities.
Hunting -Discussions with Terrestrial Program representatives and ADF&G
staff will be held to define hunting characteristics specific to the area,
and to collect available information related to the numbers and distribution
of hunters and harvest data as specific 1n the project area.Hunting
information will also be obtained from the lodge and guide surveys to be
conducted during the 1984 field season.Demand projections will focus on
the potential use of project road,railroad,air,and reservoir access by
hunters.Particular attention will be paid to the potential for increased
boat access and resultant effects due to hunting pressure north and south of
the Susitna River.The potential effects of linking access modes,such as
the access roads and reservoirs will also be explored.A simi1iar case
12361/4
840807
19
C C08-3033
ATN-83-0030
TYPE-6213
comparison,if available and feasible,will be made to help determine the
potential with-project demand.Meetings will be held with representatives
of the Terrestrial Program to coordinate use and resource data in order to
assess the overall impact the Project may have on hunting.
Fishing -Existing use of project area streams and lakes will be obtained
through discussion with ADF&G staff and through the lodge,guide,and
general use surveys to be conducted during the 1984 field season.Location,
frequency,and distribution of use will be identified and described.Demand
projections will focus on the potential use of project road,railroad,air,
and reservoir access and quantified by each mode of access.Assessment of
fishing demand will be closely associated with data collected for the non-
consumptive activities.Assessment of overall effects of the Project on
fishing will be closely coordinated with the Aquatic Program and its
information on fishery resources.
Boating -Existing boating use will be obtained for areas above and below
Portage Creek.Boating use below Portage Creek will be obtained through the
Sus itna'River use survey.Future demand for downstream boating wi 11 be
determined based on the use data collected on the river.Meetings will be
conducted with Aquatic,Navigation,and Socioeconomic representatives to
determine the overall significance the proposed project flow regime would
have on boating activities and related resources attractions.Existing
boating use upstream of Portage Creek will be determined through the guide
and lodge operators surveys and discussions with boating groups.Evaluation
of with-project demand in the reservoir areas will be closely coordinated
with the evaluation of hunting demand and fishery mitigation studies.
Assessment of the impacts to boating will include an evaluation of the
potential for white-water boating in area tributaries and an assessment of
the potential for white-water boating below Watana Dam in the event that
Devil Canyon is delayed or not constructed.
-
-
-
12361/4
840807
20
.....
-
C C08-3033
ATN-83-0030
TYPE-62l3
Non--Consumptive Activities -Analysis of non-consumptive activities will
focus on hiking,camping,berry gathering,and ATV use.Particular emphasis
will be placed on use and demand for camping.Existing and future use pro-
jec~:ions will be defined by comparing activity use levels at recreation
sitEls in the area that have characteristics and conditions similar to the
project area.This information will be obtained through discussions with
district park managers and through surveys of selected sites.Additional
information will be obtained through the guide and lodge operators surveys
planned for the 1984 field season under the Socioeconomics subtask.Data
gather.ed from the survey and other methods will be used to project future
demand.This information,in addition to related resource information
obt,:tined from other ·Program task studies,will be used to assess the
significance of the project on these general recreation activities.Results
of the evaluation will be used to refine the recreation plan.Harza-Ebascop
will be responsible for providing voerall direction and mangement of this
task.EDAW,Inc.will review draft survey insruments,collect secondary
data necessary for refining impacts,refine the impacts,and prepare the
draft and final refinement report.
04-011-62 RE-Tourism Potential of Project Facilities
This task will estimate the potential of the Susitna Project to meet or
generate tourist demand for visitation of the project facilities.The
methodolgy will include:interviewing Alaska tour operators;collecting
tourism profiles and tourist counts for adjacent and comparable projects;
conducting a secondary source review of existing tourism projections for
South-Central Alaska;es timat ing the potential capture rate of the proposed
project's recreat ion features;recommending changes in projec t use
projections and proposed features for input into the revised Recreation
Plam;and preparing a report summarizing the findings and recommendations of
this work.Harza-Ebasco will provide overall direction and management of
this task,including the.work and preparing the draft and final reports.
12361/4
840807
21
----".._-----------------------------------------------
C C08-3033
ATN-83-0030
TYPE-6213
04-011-63 RE-Recreation Plan Refinement
Refinement of the Recreation Plan will involve coordinating the results of
the Recreation Subtask with the results of the Socioeconomic,Aesthetic,and
Land Use subtasks and the Terrestrial and Aquatic programs.Meetings will
be held with agency representatives to discuss the results of the impact
refinement studies (#04-011-61)and how they may affect the Recreation Plan.
Discussions with Native groups will also be held to determine the actual
demand and/or need for linkages to Native landholdings and overall compat-
ibility with regional recreation opportunities and goals.Harza-Ebasco will
be responsible for directing and managing the work to be completed in this
task.EDAW,Inc.will conduct the necessary work to refine the Recreation
Plan and will prepare the draft and final refinement reports.
04-011-64 LU-Operating and Management Agreements
This task will include the identification of current land ownership status
and the land requirements of each recreation facility proposed ~n the
License Application.Discussionbs will be held (in conjunction with the
Power Authority)with landowners,and land managers to determine what steps
will be required in order to obtain the land and/or easements.During the
refinement of the REcreation Plan,operating and management needs ad costs
will be updated.This information wi 11 then be discussed with appropriate
entities,including ADF&G,ADNR,BLM,Mat-Su Borough,and Native
corporations.This task will be conducted by Harza-Ebasco.
04-011-65 RE-Recreation Opportunities for On-Site Workers
Information from the permanent village evaluation (#04-011-51),worker shift
and rotation schedule (#04-011-53),and worker transportation al ternatives
UI04-011-52)tasks in the Socioeconomic Subtask will be used to determine
the leisure time available for project workers.This information will be
used to determine the day-use zone for on-site workers as well as potential
...
....
-.
-
-
--
12361/4
840807
22
i~
.....
C C08-3033
ATN-83-0030
TYPE-62l3
overnight sites within the project area.(Estimates of participation'in
recreational ac tivities wi 11 be made based in part on in format ion obtaned
through the Terror Lake Construction Worker Survey conducted during FY 1984).
OnCE!the extent and distribution of worker demand is estimated,discussions
will be held with Aquatic and Terrestrial program representatives to
detE!rmine the potential input of on-site worker rereation activities on area
resources.An evaluation will be made of facilities that would meet the
demands of those workers relative to selected town and camp sites.Harza-
Ebasco will provide overall direction and management of this task.EDAW,
Inc"will conduct the work necessary to complete the analysis and will
prepare the draft and final reports.
04-011-66 RE-Non-Consumptive Activities Survey
Information related to camping and other general recreation activities such
as hiking,ATV use,berry picking and winter sports specific to the project
vicinity is not well documented.Existing use estimates on these activities
WerE!based on general information.With development of access related to
the Project,the potential may exist for use of these activities to increase
significantly over existing conditions.In order to evaluate the effects
thi:;increase may have,more information on these activities at sites in the
project vicinity needs to be obtained.This information will be obtained
through surveys of area recreation sites that have similar characteristics
to the project area.Results of the surveys will be used to refine the
recreation impacts and update the recreation plan as well as other program
mitigation plans.The surveys will be coordination and conducted by Harza-
Ebasco during the 1984 fie ld season.
04-011-71 AE-Aesthetic Impacts Refinement
-
Information on aesthetic impacts
proposed mitigation programs for
will be refined
other disciplines
to take into account
and Power Authority
12361/4
840807
23
----,"'-------------------------------------------------
C C08-3033
ATN-83-0030
TYPE-6213
polcies.Taking into consideration proposed project roads,recreation
facilities,and off-site public areas,major viewpoints of project
facilities will be determined and viewsheds will be ploted and confirmed ~n
the field.In addition,estimates will be made of the possible numbers of
viewers and the duration of view at each viewpoint.Furthermore,designated
scenic quality mapping zones will be verified and refined 1n the field.
Additionally,estimates will be made of the significance of the visual
impact of each project feature taking into consideration associated
landscape character types,aesthetic value and absorption capabilities,view-
sheds and number of v~ewers.The results of this work will be documented in
a refinement report.Harza-Ebasco will provide overall direction and
management of this task.EDAW,Inc.will take the lead in conducting the
work necessary to complete this task,including the preparation of the draft
and final report.
04-011-72 AE-Feasibility of Aesthetic Mitigation Measures
Members of the Aesthetic Subtask will participate with Harza-Ebasco design
engineers and other project staff in an interdisciplinary review team to
consider the feasibility of aesthetic mitigation measures outlined in the
License Application.Members of the Aesthetic Subtask will prsent
recommendations to the team and will prepare a revised list of aesthetic
mitigation measures determined to be feasible.Issues to be covered
include:recommendations for creative design alternatives and adjustments,
resiting studies,construction techniques and restrictions,and
rehabilitation techniques.Determinations of feasibility will be made as to
whether each mitigation measure ~s or is not a feasible alternative or
technique or whether additional planning and engineering design would be
required to determine its feasibility.The design engineers would be
responsible for deveoping alternative design concepts that responded to the
proposed aesthetic mitigation recommendations.the contents of the Aesthetic
Mitigation Selection Report would be the responsibility of members of the
"'"
12361/4
840807
24
C COB-3033
ATN-B3-0030
TYPE-6213
Aesthetics Subtask.Harza-Ebasco will provide overall direction and
man<9lgement of this task.EDAW,Inc.wi 11 provide assistance in preparing
information for presentation to the interdisciplinary review team and the
draft and final report.
04-011-73 AE-Draft Aesthetics Mitigation Plan
A Draft Aesthetics Mitigation Plan will be prepared based on the results of
the aesthetics impact refinement (#04-011-71)and the feasibility of
aesthetic mitigation measures (4104-011-72)tasks.The plan will include
operational policies,construction and rehabilitation techniques,design
changes,and the identification of alternative designs and siting studies to
be c:ompleted.Harza-Ebasco will provide overall direction and management of
this task.EDAW,Inc.will prepare the draft and final reports.
04-011-B1 LU-Other Project Development Plans
Work conducted within this task will include two primary components.First,
most:of the key information for the assessment will be obtained through
personal contacts with landowners and managing agencies.Second,an
analysis of this information and existing data on potential development
activity will be conducted and a report on anticipated development in the
project area will be written.The primary agency/landowner contacts will be
with BLM,ADNR,the Mat-SU Borough,and Native corporations.With regard to
BLM lands,the emphasis will be on updating the status of BLM planning and
man<lgement for the Denali Planning Block.Contacts with DNR will have a
dual focus on the agency I s land disposal program and its planning
activities.The key planning effort to be mnitored will be the cooperative
Susitna ARea Plan,involving primarily DNR and the Mat-Su Borough.Native
Corporations will be consulted to determine which lands in the project area
they intend to develop,what activities are proposed for each area,and the
projected schedule of development.The ADNR Division of Parks and private
12361/4
840807
25
C C08-3D33
ATN-83-0D30
TYPE-62l3
The ADNR Division of Parks and private lodge operators will also be
contacted concern1ng their future plans.The report assessing development
plans will include,to the extent possible,independent Harza-Ebasco
judgment of the likelihood of development activities on other lands in the
project area.This work will be conducted by Harza-Ebasco.
04-011-82 LU-Project and Land Management Decisions
This task will largely involve building upon the results of the work
activity concerning development plans (#04-011-81).All completed plans and
current planning activities will be reviewed to identify potential points of
conflict with proposed elements of the Project.Given the acreages involved
and knowledge of current planning efforts,BLM management and the state/
local Susitna Are.a Plan will receive the greatest attention.Potential
conflicts will be identified and discussed with the approp.riate agency,and
a range of options for conflict resolution will be developed.The options
identified could involve plan adjustments to acknowledge and accommodate the
effects of the Project,or refinements of elements of the Project to attain
consistency with plans.This task will be conducted by Harza-Ebasco.
A report will be prepared to describe potential land management conflicts,.
identify possible options for conflict resolution,and recommend the best
option for each case.
04-011-83 LU-Habitat Mitigation Lands
This task will require integrating the results of Terrestrial Program's
detailed assessment of candidate compensation lands with land use studies
conducted to date.Land recommended for selection as compensation lands
will be analyzed against existing and planned land use to determine the land
use impacts of those selections.The Susitna Area Plan and BLM planning and
management activities will also be reviewed to identify potential conflicts
-
-
12361/4
840807
26
with the land selection recommendations.
Har:~a-Ebasco•
04-011-95 SE-Specialty Businesses Analysis
C C08-3033
ATN-83-0030
TYPE-6213
This work will be conducted by
-
This task will serve as a coordinator for the various research activities
addressing specialty businesses and particular population groups during FY
1985,and will be responsible for compiling and analyzing information on any
such groups not addressed more specifically elsewhere.For such groups,the
focus of the effort will be on delineating the magnitude and economic impor-
tanc:e of the specialty businesses,the general characteristics of those
engaged in such businesses and assessing the potential consequences of the
Project for the businesses and the people engaged in them.A major element
of the task will be the coordination of information from various other
subtasks and the integration of the sections for the white paper prepared as
part of each task that will be addressing special populations.This will
involve the development of a white paper outline,coordination with those
working on other tasks,and assistance in the preparation and review of the
white paper itself.Harza-Ebasco will have responsibility for this task.
04-011-96 SE-Economic Implications of Project Flows
The first s"tep in this task would be to determine the frequency of high
rivl~r flows.Depending upon the severity of anticipated high flows,the
frequency could be estimated for five-,ten-,twenty-,fifty-,or one-
hundred-year intervals.For example,if on the basis of preliminary
inv1estigation it was found that a high,damaging flow at Talkeetna could
occur as frequently as every five years,then it would be appropriate to
initiate the assessment of potential flood damages on the basis of five-year,
high-flow frequencies.If it were found that high water with the Susitna
Project ~n place would cause damage at intervals as short as every five
12361/4
840807
27
C C08-3033
ATN-83-0030
TYPE-6213
years,the Project would turn toward developing a plan for relocating homes,
businesses,and other local facilities to higher ground.If it were found
that the frequency of damaging high flows was closer to twenty years and
that the damage would not be excessive,then the project would turn more
toward assessing the level of damages that would likely occur at frequencies
of twenty years and more.Given the case where damages would occur
relatively frequently,the Project would necessarily have to address
relocation,assuming that there would be no other feasible method for
providing flood protection.As assessment of the community's topography
would be conducted to determine the relocation needs and alternatives,and
the relocation would be casted out.The objective of the relocation would
generally be to produce a plan that would protect the community from at
least a one-hundred-year flood,the generally accepted level of protection.
The more likely situation would be occasional high flows that would cause
damages but not warrant substantial relocation.To assess damages,high
water frequencies and levels would be assessed,and the approximate extent
of damages at different frequency levels would be analyzed.If the present
worth of the forcasted damages exceeded the cost of relocation,then some
relocation would be justified.
In either case,it would be important to determine whether high water was
attributable to the Susitna Project or not.While the state might choose to
incur the costs for flood damages or prevention thereof,it would be impor-
tant,from the standpoint of the Project's economics and opinion to demon-
strate the extent to which a flooding problem should be attributed to the
Project.Harza-Ebasco will be responsible for conducting this task.
04-011-97 SE-Alaska Hiring Policies
The first step in this task will be to delineate the pertinent legislation
regarding employment in Alaska and to establish its current status.The
second step will be to compile available information and to assess the
-~
.....
-
12361/4
840807
28
.....
C C08-3D33
ATN-83-DD30
TYPE-62l3
impl.ications of this legislation on worker characteristics,settlement
patterns,and speculative in-migration.If necessary,adjustments will be
made in the socioeconomic model to reflect these implications.Based on this
anaJLysis,a memorandum will be prepared summarizing the findings.Harza-
Ebasco will be responsible for this task.
04-011-98 SE-Report Review
In this task,Harza'-Ebasco will provide technical rev~ew of all reports and
fimll computer output prepared by Frank Orth &Associates.Specifically,
this will include the socioeconomiv projection revisions,the socioeconomic
impact projections summary,the traffic analysis,the railhead analysis,and
the socioeconomic model refinement.
04-0ll-99 SE-Special Populations Analysis
Since most of the information to be presented in the white paper will be
obtained and analyzed by other FY85 tasks,the major effort in this task
will be to delineate and communicate the objectives,outline,format,and
ti~~table of the white paper and to oversee the production and mitigation of
the various white paper sections that will be prepared as the final deliver-
ablE!~n the other tasks.This will require careful specification of the
type of information to be included in each section,the degree of detail and
length of each section,coordination of information among those preparing
various sections of the report,and review of section outlines and drafts.
OnC4~the draft sections have been prepared,and reviewed by the various team
members knowledgeable about each of the special populations,the linkages
betlW'een the various populations will be re-examined.Appropriate revisions
will be made and the draft white paper revised and prepared for review
outs ide the study team.Comments from this review wi 11 be evaluated and
incorporated into the white paper as appropriate.Harza-Ebasco will be
responsible for the entire task.
12361/4
840,807
29
C C08-3033
ATN-83-0030
TYPE-6213
Terrestrial Program:
04-013-02 Plan of Study Development and Updating
This effort includes the finalization and updating of the detailed plan of
study for FY85.In addition it includes the development of the detailed
plan of study for FY86.The detailed plan of study provides the background
and objectives,description of the study area~methodology,data management,
and reports for each task being performed in a given fiscal year.It also
provides information on long-term plans and quality assurance.This is a H-
E task with input from subcontractors,primarily LGL.
04-013-08 Responses to FERC Supplemental Information Requests
This effort involves the preparation of responses to FERC requests for
supplemental information.Responses to previous requests as well as a
limited amount of new requests is included.This is a H-E activity.
04-013-09 Terrestrial Workshops
An important aspect of the settlement process is the dissemination of infor-
mation to familiarize agency personnel with project study methodologies,
analyses and results.This process will also faci litate feedback from the
agencies which will assist the resolution of impact issues and mitigation
plans.The primary means of providing for this information transfer will be
through a series of five workshops during 1984 and early 1985.
Appropriate members of the Terrestrial Study Team will coordinate and parti-
cipate in these workshops and coordination meetings depending on the parti-
cular topics to be covered.Deliverables will consist of prepared workshop
materials and presentations and workshop summaries.
-
-
-
12361/4
840807
30
C C08-3033
ATN-83-0030
TYPE-62l3
Fivl~specific terrestrial workshops are planned for FY84 and FY85.The
tentative schedule for workshops during the remainder of FY84 and FY85 1S as
follows:
Workshop 1:
Workshop 2:
Workshop 3:
Workshop 4:
Workshop 5:
Workshop
FY85 Terrestrial Program
Scoping Workshop
Impact Assessment and Mitigation
Plan Refinement Workshop
Impact Assessment and Mitigation
Plan Refinement Workshop
Terrestrial Program
Update Workshop
Mitigation Plan Workshop
Date
April 10 ,1984
June 27,1984
September 28,1984
December 12,1984
April 30,1985
04-1013-10 Mitigation Plan Refinement
This task represents the refinement of botanical and
gation plans through the specific identification of
tion procedures including schedules and probable
technical rationale.
The following reports will be prepared:
wildlife resource miti-
objectives,implementa-
costs,and supporting
1.FY85 Mitigation Plan Refinement Report -this report will provide
a detailed description of each aspect of the mitigation plan
including a description of options where appropriate.
12361/4
840807
31
2.
ATN-83-0030
TYPE-6213
Recommended Mitigation Plan -this document will be prepared by
Harza-Ebasco based on subcontractor input and will recommend a
detailed and specific mitigation plan,based on consideration of
all reasonable options,that is consistent with plans proposed by
the Aquatic and Social Science Programs and project construction
and operation plans.
-
"""
The first report will be prepared by LGL with input from H-E,as well as
other subcontractors.H-E will also provide technical review.The second
report will be prepared by H-E with subcontractor input.
04-013-11 Impact/Mitigation Planning Tracking System
A "bookkeeping"system is being maintained and applied to the terrestrial
biology program,so that the current status of impact assessment;mitigation
planning and resolution of each impact 1ssue can be tracked and easily
determined as the program progresses.This process was initiated during
FY84 with the preparation of an Impact Assessment and Mit igation Planning
Summary for Wildlife and Botanical Resources.This document is a matrix
which summarizes impact assessment and mitigation planning as it evolved
through the spring of 1984.The matrix is organized so that the development
of impact assessment and mitigation planning can be followed horizontally
across each page.
Two revisions will be made to the Impact Assessment and Mitigation Planning
Summary to document refinements accomplished during the FY8S program.
Refinements contained in various FY8S project reports,including the impact
assessment and mitigation planning refinement reports,will be shown in the
successive revisions.In particular,it 1S expected that the "Proposed
Mitigation Measures"column will show considerable refinement during FY8S.
-
.....
-
,....,
12361/4
840807
32
'1m...._
-
-
C C08-3D33
ATN-83-0030
TYPE-6213
04-013-14 Furbearer and Trapper Surveys
This cost account includes beaver field studies,beaver population model
refinement,a survey of Middle Susitna Basin trappers and other fur bearer
field studies.
Beaver field studies include cache surveys,life history studies and
overwinter/breakup survival study.The objective of the cache surveys is to
obtain accurate counts of beaver caches in each type of aquatic haibtat that
will be influenced by the Project.Counts will be made from a helicopter
during September and/or early October.Emphasis will continue to be placed
on the region between Devil Canyon and Talkeetna.Cache counts will be made
on key tributary streams,such as Deadman and Portage creeks,and 1n
representative segments of the Susitna River downstream from Talkeetna.A
survey for caches will also be made along the Susitna River in the proposed
impoundment zones to verify that few resident beaver are present in these
areas.
The objectives of the beaver life history studies are to:
1.
2.
Relate number of beavers 1n a colony to S1ze of the cache esta-
blished by that colony.
Evaluate how cache formation relates to water level,water
temperature,ice formation,vegetation availability and growth
changes,day length,ambient temperatures and other environmental
factors.
3.Determine home range sizes of beavers in study colonies.
4.Determine foraging areas and vegetation harvested.
-12361/4
840807
33
·~~;...;-_-..---,,---_·-o~o _
C C08-3033
ATN-83-0030
TYPE-6213
5.Relate vegetation harvested to cache composition.
Representative beaver colonies will be selected for study 1.n each of the
seven aquatic habitat types except Type 6,Tributary Mouth Habitat,because
this type does not appear to be used as overwintering habitat by beavers.
Beavers will be studied by direct observation and with the aid of radio-
telemetry.Vegetation and caches will be surveyed directly by the study
team.
Twelve colonies will be selected,ranging in size from two or three individ-
uals to 10 or more.Direct observations will be made to count the beavers
present.Caches constructed by these colonies will be measured and photo-
graphed.A correlation analysis will then be constructed to relate size of
cache to number of beavers in the colony.
Adult,yearling and juvenile beavers will be live-trapped and radio-tagged
in two colonies to determine home range size,foraging area and relation-
ships between plants harves ted and plants stored in caches.Radio-tagged
·beavers will be located periodically through winter and the following spring
to determine winter movements,overwinter survival and dispersal.Environ-
mental conditions including day length,ambient and water temperatures,1.ce
conditions and vegetation characteristics will be assessed throughout the
study period.
The objectives of the beaver overwinter/breakup survival study are to deter-
mine the survival rate of beavers through the winter season and to assess
the effects of breakup on their continued survival.Beaver colony overwin-
tering sites between Talkeetna and Devil Canyon will be visited prior to and
following breakup.Physical features of successful and failed sites will be
identified,measured and compared.
~-
"""
....
-
.....
12361/4
840807
34
C C08-3033
ATN-83-0030
TYPE-6213
Beaver population model refinement will be conducted to enhance beaver
impact assessment and mitigation plan refinement.The model will be updated
using information gathered from the literature,from project vegetation and
hydrologic studies and from beaver field studies.
The objectives of the trapper survey are to:
1.Estimate the numbers and locations of furbearers harvested in the
upper Susitna drainage.
2.Record furbearer observations made by trappers.
3.Provide information on economic value of pelts harvested and
efforts expended on trapping for use in socioeconomic studies.
Trappers opera~ing in the upper Susitna reg~on will be visited by personnel
of the furbearer study team and interviewed in person.Questions concerning
sigbtings of furbearers,extent of trapping efforts,etc.,will be presented
to each participant.Trappers not available for personal interview will be
interviewed by telephone if possible.
Other furbearer field studies will include furbearer distribution surveys,
ot ter and mink autumn concentration surveys and fox den surveys.The
objectives of the furbearer distribution surveys are to:
1.Determine the distribution and relative abundance of furbearers
downstream from Devil Canyon to Talkeetna.
2.Monitor annual furbearer population changes ~n the impoundment
zones and in the downstream area.
12361/4
840807
35
C C08-3033
ATN-83-0030
TYPE-6213
3.Identify furbearer habitat relationships.
The study team will conduct aerial transect surveys for sign of furbearers
in snow in early winter (late October -early November)along the Sus itna
River between the Tyone River and Talkeetna.Data will be computer coded
and analyzed.Furbearer distribution,habitat preference,relative abun-
dance and population trends will be calculated.
There are 14,six-mile long transects at intervals of six miles from Portage
Creek to the Tyone River.A similar transect system is envisioned for the
lower r1ver,with similar transect design from Portage Creek to Talkeetna.
To determine accuracy of track identification,ground truth checks will be
conducted.Checks for furbearer sign on sandbars and mudbanks during summer
will be used to verify that furbearers are present along the river
throughout the year.
Objectives of the otter and mink autumn concentration surveys are to:
1.Determine if there is an annual autumn concentration of otters and
mink along the Susitna River in the proposed impoundment zones.
.....
2.Determine if track counts made 1n separate years indicate relative
abundance.
Sample points established 1n 1980 will be surveyed in early November 1984.
A similar survey design will be developed for representative downstream
sections of the river.Data collected will be analyzed to determine the
distribution and intensity of suspected movements.
The objectives of the fox den surveys are to:
1.Survey existing dens to determine annual use.
12361/4
840807
•
36 -
C C08-3033
ATN-83-0030
TYPE-6213
2.Locate other traditional dens.
3.Compare past and present usage to determine relative abundance and
trends.
Dens known or suspected to have been active l.n the past will be visited
in early May to determine present use.An effort will be made to locate
pre\1ious ly undi scovered dens.Present and pas t usage wi 11 be compared to
det,~rmine population trends and breeding success.
Field work,data analysis and report preparation for furbearer and trapper
surveys will be conducted by the U.of A.at Fairbanks under the direction
of Dr.Phil Gipson.H-E will provide input,technical review and logistical
and other support.
04-013-15 Settlement Process Input
The Terrestrial Program will provide on-going input into the settlement
prol:ess by reviewing agency concerns,consolidating them into concise
issues,participation in internal and agency meetings and preparation of
issue papers aimed at resolving issues.This cost account covers only those
settlement process efforts requiring less than a man-week for preparation.
Larger anticipated efforts that support settlement are budgeted separate ly.
This activity is conducted by H-E with support from subcontractors.
04-013-16 DEIS/FEIS Review
The Power Authority must reVl.ew and comment on the DElS and FElS and on
co~nents on these documents to ensure that all analyses and conclusions are
basl~d on accurate information,to provide clarifications and to provide
altf~rnative interpretations where appropriate.
.....12361/4
840B07
37
1..0 I..oUO-.)U.).)
ATN-83-0030
TYPE-6213
Terrestrial Program activities that will lead to completion of this task
will involve several elements.These elements will consist of correcting
inaccuracies and preparing additional information which will strengthen some
conclusions,differ from others and provide clarification for others.
Additionally,comments prepared by other agencies and the public will be
reviewed to identify those comments and conclusions with which a substantial
difference of opinion remains.These reviews will provide a basis for
identifying specific conclusions which may need resolution through the
settlement and hearings processes.This cost account assumes that comments
on the DEIS are due July 25,1984,and comments on the FEIS are due on
January 25,1985.
04-013-20 H-E Support of ADF&G Big Game Studies
The Alaska Department of Fish and Game (ADF&G)will be conducting field
studies of moose,(both upstream in the vicinity of the impoundments and
downstream of the impoundments),caribou,brown and black bear and wolves.
These studies will include the continuation of an intensive moose calf
mortality study,initiated in FY84 ,severe winter studies (should a severe
winter occur),and field testing of moose carrying capacity model,as well
as the continuation of habitat use and distribution monitoring and annual
censuses.H-E will provide technical review,coordination with other
activities and logistical and other reports.
04-013-30 Moose Browse Inventory
The objective of this task is to provide accurate and precise estimates of
standing crop biomass of winter forage for moose in the middle Susitna
Basin.Sampling efforts will be prioritized based on available vegetation
maps,vegetation types known to contain important winter browse species,
aerial extent of important vegetation types,cost-benefit ratio of sampling
intensity to statistical accuracy and logistic feasibility.A biometrician
-
"'"'
12361/4
840807
38
C C08-3033
ATN-83-0030
TYPE-6213
will work closely with the project leader and work crews to assure the
statistical validity of the sampling effort.
Sampling efforts will be undertaken during July and August of the summers of
198,+(FY85)and 1985 (FY86).Preliminary vegetation maps of selected areas
in the middle Basin will be used to stratify the samples during 1984.At
-
-
randomly located sites wi thin vegetat ion types strat ified by elevat ion,
slope and/or aspect,approximately twenty 1-m2 quadrats will be cl ipped.
Current annual woody growth of browse species important in winter moose
diets will be clipped and bagged by species.Samples will be oven-dried and
weighed to determine the weight of browse available per unit area by vegeta-
tion type.
Results from summer 1984 field studies will be presented in draft and final
repl:)rts.Reports will include documentation of browse quantity for sampled
vegl~tation types and recommendations for summer 1985.site stratification
basled on digitized vegetation maps.Recommendations for sampling intensity
during summer 1985 to achieve the desired statistical accuracy will be
addressed.The final report will also recommend final stratification plans
for elevation,slope and aspect modifiers to mapped vegetation types.
Data collection,analysis and report writing will be conducted by ADF&G with
participation and substantial input from LGL.H-E will provide technical
rev1ew,coordination with other activities and logistical and other
support.
04-013-31 Vegetation Mapping and Digitizing
The objective of this task is to prepare a detailed and accurate 1:63,360
scale photobase map of vegetation on about 2,000 sq.mi.in the project area
along with a concise and explicit user guide.
12361/4
840807
39
ATN-83-0030
TYPE-6213
Available 1:24,000 true color and 1:60,000 CIR aerial photography in combin-
ation with other photography will be utilized.Mapping procedure will
include stereoscopic interpretation of vegetation,delineation of vegetation
type boundary lines and labeling of the resulting polygons.
Mapping of vegetation will employ the classification system of Viereck et
al.(1982).The entire area within the delineated boundary will be mapped,
including waterbodies,unvegetated terrain and disturbed areas.All vege-
tation types will be mapped to at least Classification Level III.Forest,
tall shrub and low shrub communities will be mapped to Classification Level
IV.For open forest,woodland forest,tall shrub and low shrub the percent
cover of willow,shrub birch and alder wl11 be indicated.
Following production of the preliminary mapping based on photointerpre-
tation,field studies will be conducted to eliminate ambiguity and to
provide greater detail and accuracy of vegetation coverage.It is expected
that ground-truth data wi 11 provide categorical detai 1 beyond the limita-
tions of the photography.
Digitization of the final map product (along with pertinent physical para-
meters)will be conducted to facilitate its use for browse inventory plan-
ning,habitat utilization analyses,and other applications.
R.A.Kreig and Associates will conduct this task.
cal review,coordination with other activities
support.
04-013-32 Impact Assessment Refinement
H-E will provide techni-
and logistical and other
This task represents the refinement of botanical and wi ldl ife resource
impact assessments through incorporation of new information collected and
12361/4 40
840807 -
-
C COB-3033
ATN-B3-0030
TYPE-6213
new analyses conducted since the license application.Emphasis will be
placed on area~of agency concern and specifically at resolving issues.
The following reports will be prepared:
.-
1.
2.
3.
Final Wildlife Habitat/Instream Flow Relationships Report -this
report will update and refine our assessment of the effects of
altered flows downstream of the Project on wildlife and wildlife
habitat and will provide input to the Aquatic Program's Instream
Flow Relationships Report.
Economic and Environmental Comparisons Report input -this input
will provide an assessment of the effects of alternative instream
flow regimes on wildlife and wildlife habitat.
FYB5 Impact Assessment Refinement Report -this report will repre-
sent a compilation of impact assessment updates and refinements
based on recently collected data and analyses directed at resolv-
ing issues •
The first and third reports will be prepared by LGL with input from H-E,as
well as other subcontractors.H-E will also proivde technical review.The
second report will be prepared by H-E with input from LGL and other subcon-
tra.ctors.
04-'013-33 Wetlands Mapping
Project area wetlands mapping will be conducted as part of the National
Wetlands Inventory in a cooperative effort between the U.S.Fish and Wild-
life Service CUSFWS)and the Power Authority.Data will be collected and 13
wetland maps at a scale of 1:63,360 will be produced.
12361/4
840807
41
C C08-3033
ATN-83-0030
TYPE-6213
Mapping is to be performed through stereoscopic interpretation of high alti-
tude color infrared aerial photographs with detailed -ground sampling.
Wetlands will be classified according to the u.s.Fish and Wildlife
Service I s "Classificat ion of Wet lands and Deepwater Habitats of the U.S.II
(Cowardin et al.1979).A minimum mapping polygon size of 2 to 4 acres for
wetlands will be utilized.
USFWS will conduct the mapping and H-E will provide technical review,coor-
dination with other activities and logistical and other support.
04-013-34 General Administration and Contract Management
This effort consists of general administrative activities such as weekly
staff meetings,progress report preparation,budget revisions and
reforecasting,and the nontechnical aspects of contract management.This
latter task includes contract preparation,preparation of amendments and
CWA IS,reviewing invoices and progress reports and tracking expenditures
relative to budgets.This activity is conducted by H-E.
04-013-35 Terrestrial Program Coordination
This cost account covers coordinating the activities of terrestrial
subcontractors and H-E terrestrial staff.It includes the efforts required
to ensure cross-discipline coordination with the Aquatic and Social Science
Programs and with H-E Engineering and Logistics Tasks.It also includes the
preparation for a participation in monthly Terrestrial Program progress and
coordination meetings.
04-013-36 FERC Hearings Preparation
-
A major element of the
impacts of the Susitna
12361/4
840807
environmental hearings process will focus on the
Hydroelectric Project on wi ldlife and botanical
42
C C08-3033
ATN-83-0030
TYPE-6213
resources and the potential effectiveness of planned mitigation measures.
Information may need to be condensed and summarized into formats appropriate
to support the hearings process scheduled to begin December 28,1984.Steps
1n the hearings process that will require participation by members of the
Terrestrial Study Team include the discovery process,filing of direct
testimony,filing of rebuttal testimony,possible filing of surrebuttal
testimony and cross examination of witnesses.Although most of these steps
will not occur in FY85,it is necessary to begin preparation for accomplish-
ing these steps.
The primary activities which will occur during FY85 include the selection of
persons who will testify on behalf of the Power Authority,consultation with
Power Authority Licensing Counsel,responses to discovery requests from FERC
and intervenors and the initiation of preparation of written direct testi-
mony.Specific deliverables to result from the activities of this task
include:
1.Designation of expert witnesses to testify on terrestrial resour-
ces on behalf of the Power Authority.
2.position papers by expert witnesses defining areas to be discussed
and input required from other participants.
3.Responses to discovery requests.
4.Draft outline of direct testimony from each expert witness.
In addition,the designated expert witnesses will participate 1n activities
lea.ding to deliverables of other terrestrial study tasks and will initiate
preparation of their direct testimony to be filed on September 25,1985.
12361/4
840807
___.am".raI.'~_
43
C C08-3033
ATN-83-0030
TYPE-6213
04-013-37 Permanent Village Evaluation Report Input
This task will provide botanical and wildlife resources input into a report
which will examine the implications of locating the permanent village out-
side of the project area.This is a H-E activity.
04-013-39 Camp and Village Location Report Input
This task will provide botanical and wildlife resources input into a report
which will examine the proposed siting of the Watana construction camp and
village and the implications of alternative sitings within the project area.
This is a H-E activity.
04-013-40 Worker Transporation and Policy Reports
This task will provide botanical and wildlife resources input into reports
which will examine the implications of various worker transportation alter-
natives (including car,bus and air transport)and various worker shift and
rotation schedules.This is a H-E activity.
04-013-41 Access Road Location Report
This task involves the review and finalization of the botanical and wildlife
resources sections of the draft Access Road Report.It is a H-E task.
Aquatic Program:
04-013-42 Candidate Mitigation Lands Assessment
The objective of this task is to provide specific recommendations to the
Power Authority concerning tracts of land to be considered for wildlife
habitat compensation,with technical documentation supporting the recommen-
~,
R?Jlll.
-
-
12361/4
840807
44
-
--
C C08-3033
ATN-83-0030
TYPE-6213
dations.Studies conducted·within this task will have two components:(1)a
detcliled office analysis,including an examination of all available infonna-
tion and extended discussions with project wildlife and habitat specialists;
and (2)an aerial reconnaissance of candidate lands identified as a result
of the preceding study component.
The identification of lands with characteristics optimal for habitat compen-
satlLon will require the synthesis of results from ongoing impact assessment
and mitigation planning refinement efforts.Wildlife species for which
habitat compensation will be an appropriate and effective means of impact
mitigation will be identified and the supporting technical rationale clearly
documented.Habitat attribute criteria will be developed for the species of
concern,so that physical and biological requirements of lands to be select-
ed for habitat compensation can be defined and the criteria systematically
applied.
The results of the FY84 habitat enhancement procedures review and follow-up
Fy85 studies will be studied and applied to exi~ting habitat characteristics
of lands under consideration based on the FY84 Candidate Lands Survey.
Enhancement procedures will be reviewed with respect to the kinds of habitat
with which they are most effective,logistic requirements for implementa-
tion,and tradeoffs among various target species requiring habitat compensa-
tion.Potential adverse effects of habitat enhancement procedures on target
and non-target species will be identified.Applicable criteria for habitat
enhancement procedures will be developed as a result of this review.
Candidate lands will be selected through the systematic merging of habitat
attribute criteria for target wildlife species,applicable criteria for
habitat enhancement procedures and consideration of present and intended
future land use patterns.The latter will be necessary to help assure that
habitat compensation efforts and expenditures for habitat enhancement are
not offset by future incompatible activities on or near selected lands.
12361/4
840807
45
C COS-3033
ATN-S3-0030
TYPE-6213
When office activities have proceeded as far as possible in defining optimal
candidate lands,a reconnaissance will be flown to view and photograph the
lands in question.The results of the aerial reconnaissance will be used to
refine the earlier office work to the point where specific tracts of land
can be defined on maps and prioritized for selection.A detailed report
with accompanying maps will be prepared.The report will provide definitive
recommendations for the selection of specifically identified compensation
lands and document the supporting technical rationale.LGL will prepare the
report with input from H-E and other subcontractors.H-E will also provide
technical review.
04-013-43 Habitat Enhancement Studies
The objective of this task is to identify factors determining differential
use by moose of areas cleared through burning,logging or other means in the
Susitna Basin.
There are two categories of factors that must be considered:1)Those which
affect the vegetative response (qualitative as well as quantitative).These
include site characteristics such as existing vegetation,soils,topography,
etc.;2)Those factors which affect the moose population's ability to take
advantage of increased forage quantity or quality.These include geographic
and climatic factors that affect availability of forage,non-nutritional
factors that limit the rate of increase of the existing population,movement
patterns of the existing population that might prevent or delay use of new
areas of higher forage production and factors that might create secondary
problems such as attracting moose to areas of high human/moose conflict.
The first step in the evaluation of enhancement procedure was a review of
literature and other available information conducted in FYS4,on the respon-
se of vegetation to mechanical disturbance and burning.The second phase
will be an examination of existing disturbed sites in an effort to identify
-
-.
-
12361/4
840807
46
"""
.~
C C08-3033
ATN-83-0030
TYPE-6213
and assess the factors that influence their usefulness to moose.Sites
-which are believed to be used lightly by moose as well as those used heavily
by moose will be examined.
The initial review of sites will be made based on available information.
This will be followed by preliminary field evaluations of moose use and
veg4~tation characteristics.More detailed quantitative studies of selected
sitl::!s may be recommended.
A report will be prepared documenting the results of the evaluation.H-E
will conduct the evaluation with input from LgL and ADF&G •
04-013-44 Downstream Riparian Studies
The objectives of this task are to:(1)obtain a more complete and accurate
und,::!rstandingof vegetation dynamics and its relationship with flow and ice
dyn,amics in the downstream floodplain,and (2)refine our assessment of
do~~stream linpacts.Objective 1 will be at least partially satisfied
through the conduct of field sampling at the vegetation sites in the down-
stream floodplain sampled in 1981.This sampling at the same locations with
3 years in between will significantly enhance our unde~standing of vegeta-
tion dynamics.Additionally,field observations,examination of aerial
photographs taken between 1981 and 1984,and data from ice observation and
flow studies conducted during that period will provide information on the
relationships between vegetation dynamics and ice and flow dynamics.
Objective 2 will be addressed through the conduct of limited office analyses
that will be based on the results of field studies,the Wildlife Habitat/-
Instream Flow Relationships Report and flow and ice analyses.Results will
be incorporated into the Economic and Environmental Comparisons Report.
More extensive office analyses or additional field studies may be recommend-
12361/4
840807
47
C C08-3033
ATN-83-0030
TYPE-6213
ed by the Wildlife Habitat/lnstream Flow Relationships Report or subsequent
studies,but these are beyond the scope of this task.
The U of A -Palmer will conduct the vegetation field studies with input
from H-E and other subcontractors and technical rev~ew by H-E.H-E will
conduct the office analyses with substantial input from LGL.
04-013-45 Raptor Studies
This cost account includes a bald eagle food habits study,a lower Susitna
River bald eagle nest survey and the monitoring of peregrine falcon nest
sites.
Objectives of the food habits are to:
1.To collect and identify prey remains at active bald eagle nesting
locations in the middle basin of the Susitna River.
2.To observe flight directions taken by one pa~r of foraging bald
eagles nesting in the middle basin of the Susitna River.
Each nesting location will be visited three times;once during mid-to-late
June after any young present are capable of thermoregulat ion;once during
July;and once during late August or September after young have fledged.
During the first two visits,prey remains will be collected from beneath the
nesting sites and perches.During the third visit,prey remains will be
collected from the nests and from the ground beneath the nests and perches.
Three nests will be accessed with the aid of climbing spurs and safety
lines.The single cliff-nest will be accessed by standard rappelling
techniques.Entries and exits from nests will be performed in a manner
which will avoid damaging the nests.Prey remains will be dried,sorted and
~,
~:
12361/4
840807
48
C C08-3033
ATN-83-0030
TYPE-6213
identified using representative study collections at the University of
Ala:;ka Museum.
One pair of adult bald eagles nesting in the Susitna River valley of the
middle basin will be watched continuously for about 48 hours pr10r to the
initial visit in June to collect prey remains.The observers will attempt
to document the directions and total times taken by the eagles during their
hunting forays.Similar watches will be conducted at the selected nest in
July and August.
The objective of the lower river nest survey is to recheck and verify the
physical locations of all reported bald eagle nests in the Susitna River
floodplain between the mouth of the Indian River and Cook Inlet.
The reported locations of bald eagle nests will be verified by an aerial
survey,and addit ional nest locations wi 11 be recorded.The aerial survey
will be conducted prior to leaf-out by an experienced raptor biologist using
either a helicopter or fixed-wing aircraft.
The objective of the peregrine falcon nest monitoring 1S to monitor the
activity status of three peregrine falcon nest sites near the proposed
transmission corridor centerline in the vicinity of Nenana.
An experienced raptor biologist accompanied by a second biologist will spend
one day observing the nests 111 question.The trip will be made in June
1985,during the nesting period and prior to fledging.The sites will be
reached via the Tanana River by travel in a Zodiac boat from Nenana.The
three nest sites and surrounding habitat will be photographed and on-site
notes will be taken concerning the active or inactive status of the nests.
This task will be conducted only if one or more of the nest sites is found
to be active in June 1984.
123161/4
840807
49
C C08-3033
ATN-83-0030
TYPE-6213
Field work,data analysis and report preparation for rapt or studies will be
conducted by LGL.H-E will provide input,technical review and logistical
and other support.
04-013-46 Swan/Eagle T-Line Nest Surveys
The objectives of this task are to:
1)To determine nest sites and concentrated use areas of all trum-
peter swans along the proposed transmission corridor.
2)To confirm the locations of previously recorded bald eagle nests
near the proposed transmission corridor and to identify and locate
geographically any new or Rreviously unreported nest sites.
3)To determine the activity status of bald eagle nests along the
proposed transmission corridor.
Aerial surveys of trumpeter swan breeding habitat (as determined from the
1980 USFWS swan census)and bald eagle nest sites along the proposed trans-
mission corridors will be conducted in May 1985 prior to tree leaf-out.
Observers will record locations of swan nests and groups of non-breeders on
topographic maps.Bald eagle nests sites will be similarly recorded and
their activity status checked.Distances from the transmission corridor and
detailed maps of swan and eagle nest sites,swan use areas and swan brood
habitat will be compiled and will incorporate 1985 USFWS survey results for
trumpeter swans.
The surveys wi 11 be conducted by LGL with input,technical review and
logistical and other support from H-E.
.....,
12361/4
840807
50
.....
C C08-3033
ATN-83-0030
TYPE-6213
04-013-47 Winter Bird Surveys
The objective of these surveys is to estimate the numbers of birds
using the impoundment zones in winter (November -March)and to identi-
fy habitats of highest value to birds.A series of transect surveys
for bird population estimation will be conducted in all major habitat
types within the impoundment zones.Survey routes will be plotted on
vegetation maps of the study area and bird sighting information cata-
loged by habitat type to determine habitat preferences of resident
birds.In addition,numbers and estimated ages of ptarmigan tracks and
notes on food preferences of ptarmigan will be recorded on all surveys
as an index of ptarmigan abundance and nabitat use.
The report of survey results will include recommendations on habitat
types of greatest value to resident birds to provide guidance in miti-
gation planning for compensation lands •
LGL will conduct the surveys with substantial input from Dr.Brina Kessel at
U of A Fairbanks and from H-E.H-E will also provide technical review and
logistical and other support.
04-013-48 Input To Fish and wildlife User Survey
This task will provide botanical and wildlife resources input into the de-
sign and analysis of survey efforts,conducted primarily by the Social
Sciences Program,that are designed to provide site-specific information on
pro1ject area hunters,trappers and other resource users.This is primarily
a EI-E activity.
12361/4
840807
51
C C08-3033
ATN-83-0030
TYPE-62l3
04-013-49 Input to Social Sciences Mitigation Planning
There is a need for consiaerable input from the Terrestrial Program to the
Social Sciences Mitigation plans as well as the Project Recreation Plan.
This task allows for that input on both a technical and policy basis.It is
primarily a H-E task but will receive input from subcontractors.
04-014-01 Administrative Assistance
-
Assumes one full
redraft of EIS;
presentation of
requests.
time equivalent to assist in coordinating connnents on
coordinating expert witness logistics preparation and
testimony coordination of reponses to discovery
04-016-01 DEIS/FEIS Review
Activities will involve three elements.The first element will consist of
preparing additional information which will strengthen some conclusions
reached in the DEIS.The second element will consist of preparing
information and substantiation for analyses which differ from those reached
in the DEIS.Toe third element will consist of information,analyses and
conclusions for topics not discussed in the DEIS which would alter other
conclusions of the DEIS.
Preparation of a list of conclusions reached by the FERC in the FEIS with
which the Power Authority does not agree.Additionally,comments prepared
by other commenting agencies will be reviewed to identify those conclusions
with which a substantial difference of opinion remains.This review will
provide a basis for identifying specific conclusions which may need
resolution through the settlement and hearings processes.
'"'"
'"""
-
12361/4
840807
52
-
C C08-3033
ATN-83-0030
TYPE-62l3
To meet the first objective the deliverables are:
1.Memoranda identifying conclusions reached 1n the DEIS.
2.Memoranda containing necessary additional information for each
conclusion.
3.Memorandum of Power Authorit~comments on the DEIS.
Deliverables to accomplish the second objective include:
1.Memoranda identifying conclusions reached in the FEIS.
2.Memoranda describing conclusions for which there is substantial
disagreement among licensing participants.
04-016-02 Agency Workshops/Settlement Process
An important aspect of the settlement process 1S dissemination of
information to familiarize resource agency personnel with project study
methodologies,analyses and results directed toward resolution of primary
impact issues.The primary method for providing this information will be a
ser1es of agency workshops in which specific topics will be discussed.
Appropriate members of the Aquatic
preparation for or actually take part
particular topics to be covered.
Study Team will participate in
in specific workshops depending on
The Power Authority will meet with resource agencies to attempt to reach
settlement on various issues and negotiate a project flow regime.Aquatic
Teallll members will provide various information,analyses,documents and other
support as requested by the Power Authority.
12361/4
840807
53
.•m'·
C C08-3033
ATN-83-0030
TYPE-6213
Deliverables will consist of prepared materials and/or presentations as
requested to support the settlement process.
04-016-03 General Aquatic Program Activities Coordination
This task requ1res effort from all members of the Aquatic Study Team.
H-E has an over-all coordinating function that includes monitoring all
activities 1n the aquatic studies to insure that team members are able
to accomplish their tasks and that sufficient progress is·being made
toward over-all study goals.Each team member is responsible for
maintaining an appropriate level of communication and coordination with
other team members who share common,integrated or related tasks.
Program coordination will be achieved by var10US means including:
1.Joint preparation of study plans.
2.Weekly team meetings.
3.Team-wide dissemination of information reports,correspondence and
memos.
4.Frequent meetings and data and information exchange among team
members with related tasks.
There are no other specific deli verables for this task.However,
memoranda describing the results of or need for coordination will be
prepared when appropriate to affect necessary changes 1n planned
activities,schedules,etc.
12361/4
840807
54
04--016-04 Instream Flow Relationships
C C08-3033
ATN-83-0030
TYPE-62l3
The Instream Flow Relationships Report will describe the relationships
between mainstem flow and fish habitat.
It will be derived primarily from information contained 1n a ser1es of
technical reports.These reports are:
1.Fish Resources and Habitat of the Susitna Basin -this report will
be a consolidation of the information on the aquatic resources of
the Susitna Basin that is currently dispersed throughout numerous
reports,memoranda and workshop minutes.It will be based on
information and data that is available through June 1984.This
report may be updated as additional information becomes
available.
2.Watershed Processes Report this report will describe the
physical processes that occur within the -Basin.It will be
focused primarily on preproject to with-project changes 1n
streamflow,channel stability and groundwater upwelling.
3.Water Quality/Limnology Report -this report will consolidate much
of the existing information on water quality 1n the Basin and
focus on preproject versus with-project changes.Some additional
modelling and field studies (primarily concerning turbidi ty and
suspended sediments)will be incorporated into this report to
refine information from previous studies.
4.Reservoir and Instream Temperature -this report will present
ins tream temperature forecas ts for a range of operational and
climatological conditions and a preliminary commentary of their
effects on fish habitats and ice processes.During the first half
12361/4
840807
55
C C08-3033
ATN-83-0030
TYPE-6213
of FY8S review comments will be addressed,the discussion of with-
project instream temperature effects on fish will be enhanced and
interpretive discussions of instream temperature effects on 1ce
processes and ice effects on aquatic habitat will be added to the
review draft.An initial report will be avail.able by the end of
FY84.An updated version will be made in FY8S that will
incorporate additional modelling refinements based on 1984
temperature data.
5.Aquatic Habitat Report -this report will describe the response of
aquatic habitat surface areas to mainstem discharges.The river
reach to be analyzed first in FY8S will be from Talkeetna to Devil
Canyon.Efforts on the lower river are continuing and will be
described in the Lower River Study Plan.
Compositing follows compilation of site-specific habitat
relationships and proceeds to completion of flow relationships
hydrographs (FRH)which incorporate relevant information on
instream flow habitat relationships and species distribution,
abundance and timing.Compositing is a highly analytic step
requiring familiarity with detailed Susitna field and refined
data,assessment design and quantification techniques.A general
compositing process has been established,however,the detailed
rationale and analytic techniques must be developed as part of
this task.
Three drafts of the Relationships Report will be issued in an effort to
transfer available analyses and information into the licensing and
settlement processes.Work that had commenced 1n the latter quarter of
FY84 will continue into the first half of FY85.
12361/4
840807
56
-
C C08-3033
ATN-83-0030
TYPE-62l3
A preliminary draft of the Relationships Report will be issued in time
to contribute to the preparation of the FEIS.However,the major
contribution that can be made during the first quarter of FY85 to the
FEIS by the Relationships Studies will be derived from the topic area
reports.An interim draft of the Relationships Report,envisioned as
being a considerable enhancement over the preliminary draft,will be
issued by November 30,1984,to assist with clarifying contradictory
statements that might appear ~n the FEIS.The final draft of the
Relationships Report is not expected to contain much new information
other than the turbidity and ice effects on llabitat.It will be
upgraded by responding to comments made on the interim draft and by
incorporating more descriptive analyses,graphics and narratives to
improve its clarity.
Technical Report Series Deliverables:
REPORT
Fish Resources and Habitat
Watershed processes
Water Quality
Reservoir and Instream Temp
Response of Habitat to Flow
Flow Relationships Hydrographs
Relationships Report:
Preliminary Draft
Interim Draft
Final Draft
DRAFT
8/31/84
8/31/84
FY84
8/31/84
8/31/84
1/4/85
8/31/84
11/31/84
3/31/85
FINAL
8/31/84
3/31/85
10/31/84
12361/4
840807
57
C C08-3033
ATN-83-0030
TYPE-6213
04-016-05 Economic and Environmental Comparisons
Several alternative weekly flow regimes will be defined and compared.
The·flow regime will range from the optimum environmental (aquatic
habitat)to the optimum economic regimes and will include natural flows
and flows presented in the License Application.Other alternative
regimes will be selected based on the needs of navigation,recreation,
riparian habitats and water quality.
A project optimization procedure will be used to evaluate alternative
flow reg1mes.This is a computer based,iterative process that will be
used to narrow alternatives to a small set of regimes that best provide
for the needs of both energy and power generation and the var10US
downstream uses of the river.Emphasis during the Project optimization
-
-
-process will be placed on comparisons of Project econom1CS and fish
habitat.At several steps in the procedure the effects of the flow
regimes on physical parameters such as water temperature,water
quality and ice processes as well as impacts of these physical changes
on other instream relationships and uses will be evaluated.These in-
process evaluations are necessary to establish boundaries for the next
iterations.
Minimum and maX1mum environmental flows will be established and input
to the weekly reservoir operations model to produce a time series of
expected flows and energies (based on a 33 year record of historic
flows)for four energy demand levels.This will be required to examine
the influence of increasing energy demand levels that will occur during
the life of the project.Composited habitat relationships will be used
to forecast relative fish habitat for the 33 years of record.The
resulting time series will be presented as habitat duration curves.
.....
12361/4
840807
58
C CD8-3D33
ATN-83-0030
TYPE-6213
The resultant flow regimes will be analyzed to determine effects (both
positive and negative)on each instream flow use.Mitigation..
opportunities and associated costs will be examined for those instream
flow uses that are adversely affected.The affect of each flow regime
on project benefits and costs will be determined for comparison with
the corresponding environmental effects.
04-016-06 Recommended Flow Report
Provide support and consultation to the Power Authority to develop and
document a recommended flow regime from the regimes presented in the
Economic and Environmental Comparisons Report.
Summary of the impacts associated with this reg~me will also be
presented.
The report developed under this task will be used as the primary
document for the flow negotiation process.It will be presented in
draft form to the various utilities and resource agencies.Depending
on the outcome of this review,the report will either be:1)
finalized,if no significant comments are received,or 2)a second
draft will be prepared (based on comments received)in anticipation of
actual instream flow negotiations.
A working report that will be developed in draft form.The final form
will depend on results of the review process.
04-016-07 Aquatic Impact Assessment
The Susitna aquatic investigations program includes the following
steps:field data collection and analysis,development of habitat
relationships,development of composite flow relationships hydrographs
12361/4
840807
59
----------------------------
and flow optimization.
C COB-3033
ATN-B3-0030
TYPE-62l3
After the tradeoffs between habitat/fish
populations and power generation have been examined ~n the comparisons
process,a reconnnended operating regime will be developed and
negotiated.It
related effects
is
on
expected that this regime will have some flow-
fishery resources which must be quantified and
described in order to plan specific measures to mitigate these effects.
This task will quantify the impacts of the negotiated operating regime.
Impact analyses of alternative flow regimes will be presented in the
Economic and Environmental Comparisons Report and the Recommended Flow
Regimes Report.This impact assessment will be more detailed and
comprehensive.
A report detailing expected impacts of a negotiated flow regime on
aquatic habitat.The schedule will depend on the progress of
negotiations.Although this task will begin ~n FYB5,it may not be
Wli):
completed until FY86.
04-016-08 Flow Negotiations
The Power Authority will enter negotiations with var~ous resource
agencies to finalize a Project flow schedule.Participation and
assistance will be needed from various aquatic study team members (and
members from other disciplines)during these negotiations in order that
technical assistance be provided to the Power Authority.The coordin-
ator for assuring that this assistance ~s provided will be H-E.All
members of the Aquatic Study Team may be needed to assist the Power
Authority in preparing for the actual negotiations.
The overall deliverable is a negotiated flow schedule for Project
construction and operation.This will be a memorandum of understanding
between the Power Authority and the various resource agencies.More
12361/4
840B07
60
C C08-3033
ATN-83-0030
TYPE-6213
immediate deliverables will include memoranda,analyses and other
documents as requested by the Power Authority.
04-'016-09 FERC Hearings Preparation
Steps in the hearing process that will require participation by members
of the Aquatic Study Team include the discovery process,fil ing of
direct testimony,filing of rebuttal testimony,possible filing of
surrebuttal testimony and cross examination of witnesses.Although
most of these steps will not occur in FY86,it is necessary to begin
preparation for accomplishing these steps.This is due to the large
volume of data and analyses pertaining to the aquatic resources which
must be summarized and developed into an appropriate form for
hearings.
The .primary activities which will occur during FY85 include the
selection of persons who will testify on behalf of the Power Authority,
consultation with Power Authority Licensing Counsel,responses to
discovery requests from FERC and intervenors and preparation of written
direct testimony.
Specific deliverables to result from the activities of this task
include:
1.position papers by expert witnesses defining areas to be discussed
and input required from other participants.
"...,
2.
12361/4
840807
Responses to discovery requests.
61
C C08-3033
ATN-83-0030
TYPE-62l3
3.Draft outline of direct testimony from each expert witness.
In addition,the designated expert witnesses will participate 1n
activities leading to deliverables of other aquatic study tasks.
The schedule for accomplishing this task will be coupled with the
schedule set by FERC for the environmental hearing process.
04-016-10 Mitigation/Enhancement Planning
A mitigation report is being developed that will identify mitigation
opportunities associated with anticipated Project conditions.The
report will further develop the mitigation plan identified in the FERC
license application and explore additional mitigation alternatives
compatible with Project mitigation policy.
A draft report will be produced by the end of the first quarter of
FY85.The report will identify potential areas and methods for habitat
modification based on existing information through FY 1984 field
efforts.
It is anticipated that Project conditions may improve habitat
downstream from Devil Canyon.If habitat improves,.there may be an
opportunity to enhance salmon runs into the Devil Canyon to Talkeetna
reach.The anticipated habitat conditions under Project operation,
based on existing information,will be evaluated for their potential to
support enhancement.Specific locations and methods will be identified
where possible.An enhancement evaluation will be included as a
section of the mitigation report.
A mitigation report series will be prepared for the Devil Canyon to
Talkeetna reach.It is anticipated that the report series will consist
....
'"""
....
12361/4
840807
62
-
C C08-3033
ATN-83-0030
TYPE-6213
of interim reports in 1984 and 1985,with updating based on new
informat.ion and agency policy decisions.
Report Schedule
First Interim Mitigation Report
Second Interim Mitigation Report
04-016-11 Comprehensive Fish Report
Draft
8/31/84
8/31/85
Final
10/31/84
10/31/85
.....
The license application consolidated existing knowledge on the aquatic
resources of the Susitna River Basin that was available at that time.
Since the application was submitted numerous other studies have been
completed or are ongoing.Many of these studies were not interrelated
when the final reports were finished.Much of the existing information
is now spread out over dozens of volumes of text,reports,workshop
minutes and memoranda.Work under this task will be directed at
examining this information,deriving key information and presenting a
condensation of this material in one document.There will also be an
examination of information from areas outside the Susitna Basin that
might be pertinent to a better understanding and perspective on the
habitat relationships that have been found in the Susitna Basin.This
report will supplement and expand the Fish Resources and Habitat Report
prepared as part of the Instream Flow Relationships Report Series.
The main deliverable will be the final comprehensive report.
04-016-12 Middle River Habitat Analysis
The successful completion of this task will provide a quantitative
assessment of potential effects that might accrue to existing side-
channel and mainstem habitats as a result of flow and temperature
regulation of the Susitna River.
12361/4
840807
63
C C08-3033
ATN-83-0030
TYPE-6213
The objective is to quantify the potential of with-project streamf10ws
for improving existing spawning and rearing conditions at mainstem and
side channel locations between Talkeetna and Devil Canyon.
Site Selection:Aerial photographs taken during FY84 (12,000 ds at
Gold Creek)will be systematically reviewed for the purpose of
selecting eight to ten candidate study sites that appear to have
channel structure and hydraulic conditions that might provide spawning
and rearing habitat when mainstem flows are between 8,000 and 14,000
cfs.A brief narrative will be prepared by July 31,1984,regarding
the rationale supporting the selection of each candidate study site for
review by Project personnel.Four or five study sites will be selected
prior to the third week of July and site specific field work will
commence in early August.
TheSusitna River discharge needed to maintain flow at each study site,
as well as the relationship between the mainstem flow at Gold Creek and
that at the study site,will be determined from correlation analyses
between the average daily flow at Gold Creek and corresponding
miscellaneous streamflow measurements at the respective study sites.
Although emphasis will be placed on evaluating with-project rearing
potential,habitat utilization curves for chinook,chum and pink salmon
spawning (available in Alaskan literature and Project reports)will be
used in concert with the calibrated IFG-2 hydraulic models to forecast
flow versus weighted usable area indices for natural and with-project
streamflows.Evaluations will also be made of streambed scour,
dewatering and freezing for natural and with-project stream flow
conditions at each site.The results of these comparative evaluations
will be used in a structured,limited factor approach to interpret the
weighted usable area indices and discuss the relative difference
between existing and with~project mainstem spawning potential.
-
....
-
-
12361/4
840807
64
--
C C08-3033
ATN-83-0030
TYPE-6213
A draft technical report will be prepared which describes the effects
of various levels of Susitna River discharge on mainstem habitat
potential.A draft report documenting the model calibration procedures
will also be prepared.Final reports will be completed in FY86.
04-016-13 Adult Salmon Spawning Surveys
Routine escapement surveys of streams.sloughs.side channels and the
main channel Susitna River will be performed in 1984 to meet the study
objective.The surveys will be performed on the ground except for
selected tributaries and the main channel which will be surveyed by
helicopter.Surveys will be performed by the following schedule:
Sloughs
Tributaries
Mainstem and Side Channel
Weekly.August 15 -October 7.1984
Weekly.July 21 -October 7.1984
Weekly.September 1 -October .7.1984
.....
Slough.side channel,tributary and mainstem habitats associated with
the lower Susitna River will be surveyed weekly from the air.from
August 15 to October 7.Areas where adult fish are observed will be
ground truthed to determine if the area is an actual spawning location
and the extent of its use •
ADF&G SuHydro will conduct the study.HE will review the report and
provide comments and recommendation at various stages of the study.
04-016-14 Lower River Resident and Juvenile Anadromous Fish Studies
To assess the effects of these changes in flow regime on the habitat of
resident and juvenile anadromous fish.it is necessary to determine
distribution of the species over different seasons and to develop the
predictive capability to estimate changes in available rearing habitat
12.361/4
840807
65
C C08-3033
ATN-83-0030
TYPE-62l3
as a function of mainstem discharge to assess the effects of changes in
-flow regime on the habitats of resident and juvenile anadromous fish.
This study will address only the open water season because ice
com~ounds a quantitative assessment of the rearing habitat.
Studies conducted by ADF&G SuHydro (1981-82)1n this reach of river
have provided limited insight into distribution of the species and
responses of habitat in the backwater zones near slough and tributary
mouths to mainstem stage changes.The distribution information has
.provided some insight into the year round distribution of coho and
chinook salmon but has provided limited information on pink,chum.and
sockeye salmon juveniles.
Analysis of the response of habitat to mainstem discharge of the
Susitna River by examination of the distribution of juvenile anadromous
fish in backwater zones and the incremental watering and dewatering of
these areas provided a general insight as to how the different species
present would respond to changing stages of the mainstem Susitna.
However,during this analysis,we observed that the cover value of the
habitat in these backwater areas and 1n free flowing areas often
changed disproportionately to changes in measured surfac~area.This
observation suggested that monitoring cover response to mainstem
discharge would be of importance.Studies conducted in the middle
river used habitat models based on cover in addition to hydraulic
analysis of areas of use.This methodology will also be used in the
lower river studies.
The studies will be planned,based on available information,to examine
the habitat availability in different reaches and morphological
components of the lower Susitna River for juvenile salmon as well as
selected resident species.This habitat availability study will
utilize both the Sunshine USGS gaging station at the Park I s Highway
-
-
12361/4
840807
66
.....
.....
C C08-3033
ATN-83-0030
.TYPE-6213
bridge and site specific discharge to provide incremental assessment of
habitat availability as a function of discharge at each study site.
Selected areas,based on the fish distributional information and on the
morphological and reach mapping performed by R&M during 1983,will be
studied for seasonal distribution of fish and the response of physical
habitat parameters to mainstem discharge.Approximately 15 different
sites will be selected for study using the approach mentioned above for
sites where water quality and/or cover are the dominant variables
influencing habitat quality.Other sites where the dominant hydraulic
variables of the habitat are influenced by water depth and velocity are
discussed in Task 36.Habitat criteria developed for the upper reach
will be supplemented with additional information for this lower reach
to simulate the habitat response of fish to mainstem discharge changes •
Distributional data over the seasons will be used to estimate the
relative seasonal importance of rearing habitat for the different
species.This information will be supplemented by the outmigrant trap
studies.
ADF&G SuHydro will conduct the study.HE will review the report and
provide comments and recommendation at various stages of the study.
Draft Report on resident and juvenile anadromous habitat studies of the
lower rl.ver.
04-016-15 Main Channel Salmon Escapement Monitoring
Escapements in the lower reach have been monitored from 1981 through
1983 into the Yentna River at RM 28 and in the Susitna River main
channel at RM 80.The results document annual escapement numbers,
timing distribution and migrational behavior of sockeye,pink,chum and
12361/4
840807
67
salmon escapements to RM 80 are available for 1982 and 1983.
This task will quantify the numbers of sockeye,pink,chum and coho
salmon that reach RM 20,enter the Yentna River (RM 28),reach RM 80
and reach RM 120 of the Susitna River.This task will also determine
their migrational timing and behavior.The same basic data will be
collected for chinook salmon escapement 1n the Susitna River main
channel at RM 80.
coho salmon at these locations.
C C08-3033
ATN-83-0030
TYPE-62l3
Similar information on the chinook -
-
u
This information will be obtained by implementing a tagging operation
at RM 20,using sonar counters and fishwheels in the Yentna River and
operating tagging sites at RM 80 and RM 120.
ADF&G SuHydro will conduct the study.HE will review the report and
provide comments and recommendation at various stages of the study.
A report will be produced that specifically answers the study
objective.The Draft Report will be issued December 21,1984 and the
Final,February 21,1985.
~I
04-016-16 Outmigration Studies
Studies by ADF&G SuHydro of outmigrants from the middle r1ver were
begun in 1982 and were expanded in 1983.This data set has provided
valuable information as to the success of the previous summers'
spawning runs,the effects of discharge on redistribution of rearing
juveniles and has provided population and survival estimates (when
coupled with adult escapement data).Extrapolation of this data set
over a longer period of time and at several key sites will provide a
comparative index of the production of individual sloughs.
-
12361/4
840807
68 -
-
-
.....
C C08-3033
ATN-83-0030
TYPE-6213
A mark and recapture study of outmigrant juveniles will be conducted to
repeat a 1983 study.The juveniles are marked with coded wire tags
(CWT)at selected sites and recaptured at a downstream smolt trap at
Talkeetna Station.Emphasis will be placed on increased tagging of
chum salmon juveniles.
Other data collected during operation of the outmigrant traps will
include catch per unit effort and data on daily river stage.turbidity.
temperature and other habitat parameters.
The relative production of sockeye and chum salmon in four side sloughs
will be estimated by weir counts and recovery of marked fish.Sites
near the mouths of sloughs 8A.9,11 &21 will be weired with small
mesh seines for three consecutive days.Fish collected on each day
will be marked with a unique dye mark and released.Recaptures on all
days will be recorded.This information will be analyzed to estimate
emergence and outmigration rates from the sites.These results will be
compared with habitat information and results of the egg incubation
studies at each site.These comparisons should help determine the
applicability of the results of Vibert incubation box studies to
explaining overall production limits in sloughs.
Several outmigrant traps will be established near the mouth of Portage
Creek during the summer of 1984.Chinook and coho collected at these
sites will be fin clipped and released approximately four miles up-
stream.Recaptured outmigrants will be measured for length and the
mark recorded.These unique data will be used to estimate outmigration
rates.
The timing and rearing of juvenile salmon species has not been
established in the lower river.The importance to assess the potential
i~
12361/4
840,607
69
C C08-3033
ATN-83-0030
TYPE-6213
habitat effects of Project flow regulation of habitats associated with
the mainstem lower Susitna need to be established.
Monitoring of outmigrant timing and condition will be conducted at a
site below the confluence of the Susitna and Yentna Rivers.This
outmigrant trap will provide an estimate of the timing,size and
relative numbers of juvenile salmon that are leaving the fresh water
system.Chinook movement into the mainstem environments will be
estimated at temporary outmigrant traps established and operated
intermi ttently on the Deshka River.The movement of chum,slough
sockeye and chinook into the lower river will be evaluated by use of
the data obtained from the Talkeetna station trap and intermittent
sampling of the Talkeetna River.
The study will conducted by ADF&G SuHydro.HE will review reports and
provide comments at various stages of the study.
04-016-17 Streamflow and Flood Frequency Studies
The objective of this study is to define natural and with-project flow
duration and flood frequency curves for key locations in the Lower
River.The discharges for a given duration or frequency derived from
these curves will be used in other studies to evaluate project impacts
due to changes in flow regimes.
Daily streamflow are available from nine USGS gaging stations in the
Susitna River Basin.With project discharge will be estimated using
studies of reservoir operations carried out by Harza-Ebasco.Monthly
and weekly streamflow data and flow duration and flood frequency curves
will be developed both for natural and with-project conditions for the
Susitna River near Sunshine and at Susitna Station stream gaging
....,
I
-
-
-
....
-
12361/4
840807
70 -
-
C C08-3033
ATN-83-0030
TYPE-6213
stations.The natural flows of these stations will be modified based
on reservoir releases to develop data for with-project conditions.
A report will be prepared which documents the results of the study.
04-016-18 Suspended Sediment -Turbidity Studies
The primary objective is to relate predicted with-project suspended
sediment concentrations and characteristics to their potential
turbidity related biological effects downstream from the Project
reservoirs.
Studies and data existing prior to May 1984 will be used to produce a
draft report of expected biological impacts to the Middle Susitna River
reach to be included in the IFRS report on Water Quality/Limnology.
Future studies,including DYRESM model predictions,will be used to
refine the knowledge presented in the IFRS reports.
Analyses and assessments of pre-and with-projec t suspended sediments
and turbidity and predictions of potential water quality changes during
winter periods will include the lower river reach.Predictions of
with-project turbidity will provide information·for other studies
related to potential impacts on the biological food web.
Data needed for predicting biological effects include:
.-
1.
12361/4
840807
Temporal quantification (at least monthly means and ranges for
data)of suspended sediment concentrations and their cumulative
size distribution analysis for Project reservoir discnarges (these
data will come from reservoir operations simulations);
71
C C08-3033
ATN-83-0030
TYPE-6213
2.Computation of a relationship between with-project turbidity in
nephelometric turbidity units (NTU)and suspended sediment
quantities and characteristics;
-
3.Computation of the area of
selected habitats which may
populations.
substrate per
support viable
unit discharge ~n
benthic periphyton .....
Analyses and discussions will summarize the most probable effects of
with-project suspended sediment and turbidity conditions on the
mainstem Susitna River in terms of benthic productivity and salmonid
incubation and rearing.
position paper(s)on the with-project suspended sediment issues.
04-016-20 Load Following Alternative
Power studies are currently assessing load following at Watana
powerhouse as an alternative to base loading during the years that
Watana will operate alone.If this alternative has economic benefits
relative to base loading ~the downstream environmental impacts caused
by load following will need to be assessed.Environmentally acceptable
maximum daily flow changes and maximum hourly flow changes (ramping
rates)will need to be established for various periods of the year.
Activities will include:
.....
1.
12361/4
840807
Examine naturally occurring rates of flow and stage change at Gold
Creek in the range of with-project flow (i.e.5,000 to 20~000 cfs)
for the available USGS gage traces from the Gold Creek gage.
72
-
C C08-3033
ATN-83-0030
TYPE-6213
2.Observe rates of change of stage during 1984 storm events at
several locations in the mainstem.
3.Perform a literature reV1ew and an evaluation of the downstream
effects on aquatic resources from water surface fluctuations
caused by hydroelectric generation.The transferability of the
operating experiences from Pacific Northwest hydro projects to the
Susitna project will be examined.Results from the literature
reV1ew would provide the biological perspecitve necessary to
evaluate effects of varying stage changes and to recommend interim
operating criteria for load following at Watana·dam.
4.Perform dynamic routings of var10US load following alternatives
using the model DMBRK.Using recommendations for interim
operating criteria obtained in Task 4A and other alternatives,
dynamically route Watana discharges downstream.Evaluate the
environmental effects of these load following alternatives.
Data required for successful completion of this task include:
1.Several continuous stage recorders will be required -for the
successful completion of Item 2.
2.Hourly discharge data will be required from the hourly load
program for item 4.
Items 1 &2 Technical memorandum on natural stage discharge
fluctuation and on 1984 stage changes.
Item 3 -Report on findings of literature review and interim operations
criteria.
12361/4
840807
73
C C08-3033
ATN-83-0030
TYPE-62l3
04-016-21 Lower River Morphological Assessment
The objective is to document and assess the effects of different flow
rates on the morphology of the Susitna River between Talkeetna and Cook
Inlet.The study will provide the information necessary to forecast
changes in wetted surface areas in the mainstem and side-channels due
to Project operation.
Photography (scale:III =2000 1
)of the lower Susitna River was obtained
in 1983 for flow rates at Sunshine of 56,500;37,500;22,000 and 13,600
cfs.Additional sets of photography at flow rates of about 75,000 cfs
(with-project 5-year £lood)and 95,000 ds (pre-project 2-year £lood)
are needed.This photography will define wetted areas at flood levels
which control channel morphology.Wetted areas will be digitized and
summed to charactertze flow related changes in the lower river.
A preliminary determination of important aquatic habitat sites in the
lower river will be made.The location of these areas will be
identified on blue line prints of the lower river and a brief narrative
prepared describing the rationale for their selection.The blue line
prints and rationale will be discussed with other members of the
aquatic study team and a concensus sought regarding the number of
priority of areas to be analyzed.Photo enlargements of these areas
will be obtained through R&M for the 1983 lower river photography.
Helicopter over flights will be made at approximately the same mainstem
discharges (Sunshine)that the 1983 photography was obtained.During
the helicopter overflights habitat types will be identified using the
same (or a slightly modified)definition of habitat types used in the
middle river and their locations delineated on blue line prints.The
wetted surface areas of these locations wili be digitized for entry
into the computerized data base developed by EWT&A during 1983.
-
-
-.
12361/4
840807
74 -
C C08-3033
ATN-83-0030
TYPE-6213
,....
Analysis of the response of habitat surface areas to changes in
mainstem flow at Sunshine will be completed.
A technical report will be prepared to present the findings of analysis
of streamflow effects on habitat surface areas in the lower r1ver.The
report will be integrated with findings from lower river sediment
studies to estimate effects of aggradation below the Chulitna River
Confluence.
04-016-23 Lower River Ice Observations
The objectives of this study will be to obtain a better understanding
of lower river 1ce processes.Specific study objectives will be to:
1.Refine the estimate of when ice cover progression at the
Susitna-Chulitna confluence begins.
2.Estimate the magnitude of staging with-project on the lower
river.
3.Document the impact of mainstem freeze-up on existing and
potential side channel and slough habitats.·
4.Make field observations of significant hydraulic parameters
related to ice cover progression on the lower river.
Ice process observations were carried out on the lower river during
this past winter.Observations of ice generation in the Chulitna and
Talkeetna Rivers have been carried out for several years.Estimates
of ice production in the middle reach of the Susitna River will be
available from the ice process modeling studies carried out in FY84 and
ongoing in FY85.
12361/4
840B07
75
____;'1l'i'I,_~~,~-----
C C08-3033
ATN-83-0030
TYPE-6213
This study will be conducted using field observations and hydraulic
computations.
Data to be collected 1n the field include:
-
1.River channel cross sections at six locations 1n the Lower River
chosen to be representative of their respective reaches.
2.Observations of staging and ice thicknesses at these cross
sections during open water season,freeze-up and 1ce cover periods
on the Lower River.
-
-
3.Observations of staging at selected habitat locations 1n the Lower
River during the freeze-up and ice cove~period.
4.Observations of the progression of the ice cover periods on the
Lower River.
5.
6.
Observations of frazil ice generation in the Yentna,Chulitna and
Talkeetna Rivers.
Observations of break-up in the Lower River including maX1mum
water levels resulting from ice jams.
7.Observations of ice bridge formation at the mouth of the Susitna
River at Cook Inlet.
Analyses of the data will include:
1.Analysis of factors leading of formation of an 1ce bridge at the
mouth of the Susitna River at Cook Inlet.
-
-
12361/4
840807
76
2.
3.
C C08-3033
ATN-83-0030
TYPE-62l3
Analysis of the natural volume of ice in the Lower River.
Estimation of the volume of 1ce required to cover the Lower River
with-project.
4.Estimation of the with-project staging at the S1X cross sections •
..-,5.Estimation of the time required to form an 1ce cover on the Lower
River,with-project.
Two reports will be prepared.The first will document field
observations.The second will document the analytical results.
04-1)16-24 Lower River Sediment Aggradation
The objectives of these studies are to evaluate sedimentation processes
in various sections of the lower river and to identify the potential
impacts.The study area will include the reach of the river between
Susitna Station and the Chulitna -Susitna confluence.
Two years of data are currently available from the USGS at four
locations near the confluence area.Suspended sediment data are also
available from the USGS at the Gold Creek and Susitna Station gaging
stations.
The stations where the data are being collected for the evaluation of
project impacts in the Lower reach,include:
1.
2.
12361/4
840807
Susitna River near Talkeetna,
Chulitna River near Talkeetna,
77
C C08-3D33
ATN-83-0030
TYPE-6213
3.Susitna River below the confluence of the Susitna and Chulitna
Rivers (new station established in 1983),and
4.Susitna River at Sunshine.
The sediment data collected at these stations include suspended and
bedload discharges.To evaluate project impacts downstream from
Sunshine,suspended and bedload discharge measurements also will be
required on the Susitna River at Susitna Station and Yentna River near
Susitna Station.USGS is currently collecting suspended sediment data
on the Susitna River at Susitna Station.
The current sediment sampling program at USGS will be continued for
FY85 and they will initiate suspended and bedload discharge measure-
ments on the Susitna River at Susitna Station and on the Yentna River.
Bed material samples will be collected at selected locations in the
lower reach in the mainstem.The sampling will be done twice,once
during high flow season and second time prior to freeze-up of the
river.
The lower reach will be sub-divided into 8 to 10 sub-reaches depending
upon locations of sloughs and major tributaries to estimate potential
aggradation/degradation.Computations of total sediment load transport
(bedload plus suspended)will be made at the stream gaging locations.
Aggradation/degradation in each sub-reach will be computed using
empirical relationships.The streamflow and flood peaks data required
for these computations will be obtained from "Streamflow and Flood
Frequency Studies"discussed earlier.
As part of
discharge to
12361/4
840807
the evaluation of sediment processes,
stream velocities and depths are
78
relationships of
necessary.This
-
C C08-3033
ATN-83-0030
TYPE-6213
information will be derived from staff gage readings obtained by ADF&G
as part of their lower r1ver Resident and Anadromous Fish Program
utilizing surveyed cross sections of the lower river and a mathematical
model of the reach between the Sunshine Bridge and the Chulitna -
Susitna confluence.This hydraulic study will a~so provide necessary
information to Lower River Ice and Temperature Studies.
This study will have two components;field observations and data
collection,and office analysis.The field work will include:
1.Selection of river cross sections at locations most
significant for ice and sedimentation studies;
at the selected r1ver cross
locations where stage-discharge
2.
3.
4.
Installation of staff gages
sections and also at other
relationships are required;
Surveying of river cross sections;
A field program to observe staff gages and to measure
mainstem and side channels velocities for a selected range of
discharges at Sunshine gage.
-
The office analyses will include:
1.Calibration of HEC-2 for the reach between the confluence of
the Chulitna and Susitna Rivers and Sunshine gage using
surveyed river cross sections and river stages observed for a
range of dishcarges;
12361/4
840807
79
C C08-3033
ATN-83-0030
TYPE-6213
2.Computations of water surface profiles for 8 to 10 selected
discnarges for the above reach which can be used to support
sediment,ice and temperture studies;
-.
3.
4.
Preparation of relationships betweens discharge,stage,depth
and velocity and water surface profiles at significant
locations,1n the reach upstream of the Parks Highway
Bridge;
Computations of relationships between discharge,stage,depth
and velocity for the reach downstream of Parks Highway Bridge
using steady,uniform flow assumptions.
-
-
Two reports will be prepared.The first will summarize the results of
water surface profile and stage-discharge relationsnip work.Tne
second will summarize the results of the aggradation studies.
04-016-25 Assessment of the Available Food Source in Turbid Susitna River
Habitats for Rearing Juvenile Chinook Salmon
Project related changes in the habitat conditions associated with the
development of the Susitna Hydroelectric Project may have impacts on
the density and timing of emergence of the invertebrate communities
presently utilized as a food source by rear1ng juvenile chinook salmon.
With-project changes in these invertebrate communities could have
secondary impacts on the condition and survival of juvenile chinook
salmon.Examination of these invertebrate communities would serve as a
basis for predicting the rearing capabilities of potentially affected
habitats under with-project conditions.
Previous investigations by the ADF&G SuHydro have shown that juvenile
chinook salmon are most often found in turbid water habitats in or near
12361/4
840807
80
,.....
.....
C C08-3033
ATN-83-0030
TYPE.-6213
the mainstem (ADF&G t 1983).In habitats where the turbid mainstem
flow comes together with the flow from clearwater tributaries and/or
sloughs t chinook salmon juveniles are most often found in the turbid
water environment (RJ 1984 report).Other ADF&G SuHydro (1982)studies
examined the food habits of rearing juvenile salmon t including chinook t
in regard to percent stomach composition,species electivity,etc.
However,it is unclear whether juvenile chinook salmon that utilize
turbid water mainstem affected macrohabitats are dependent on
invertebrate organisms which are present in these areas for their food
source or which are produced elsewhere.
The invertebrate food sources presently available to juvenile chinook
salmon in these areas may be affected by physical and chemical changes
associated with Project operation.There is a need to provide
quantification of the response of the invertebrate community and the
food habitats of juvenile·chinook salmon to potential changes in the
habitats they presently utilize.This information will serve to relate
changes in the condition and survival of these fish to changes in
physical and chemical habitat parmeters.
Previous investigations by ADF&G SUHydro have provided a good data base
on the abundance and distribution of chinook salmon juveniles within
the middle r1ver reach and a preliminary evaluation of their food
habits.In addition,IFG-4 modeling of selected side channels within
this reach has provided velocity,depth,cover and substrate data along
specified transects within these sites.Locations of study sites will
be selected to utilize established transects of IFG-4 modeling sites
within this reach.Other sites may be established in other areas that
have been found to contain large numbers of chinook juveniles.
Habitat data to be collected along transects at each study site will
include:point specific water depths t velocities,substrates,and
12361/4
840807
81
ATN-83-0030
TYPE-62l3
general water quality.Drift invertebrate samples will be collected
and analyzed along transects to quantify the availability of food
sources with changes in discharge.Stomach analysis will also be
performed on a limited number of chinook salmon to correlate the
available food source with that being utilized by fish.Comparisons
will be made of the available invertebrate drift between the various
habitats to determine the dominant available food source at each site.
An indication of the effects of possible with-project changes in
habitat conditions on the available food source will be made utilizing
flow,temperature and fish data.
ADF&G SuHydro will conduct the study.HE will rev~ew the report and
provide comments and recommendation at various stages of the study.
04-016-26 Preparation of a Written Report for the FY84 Incubation
Study
The objective of this Task conducted by ADF&G SuHydro u to complete
the analysis of incubation-related data (intragravel water quality t
embryo survival and substrate composition)collected from August t 1983
to May t 1984 and prepare a report synthesizing this information and
previous data with information available in published literature.
Four types of data will be analyzed:intragravel and surface water
quality data,surface and intragravel temperature data,development and
survival of embryos and substrate composition.The report will include
a discussion of the analyzed data and a section comparing the results
of this study to results of similar studies.
There are three primary sources of data that will be used for report
preparation:1)data collected during the FY82 -FY84 field studies t
-
-
~,
12361/4
840807
82
p-
I
C C08-3033
ATN-83-0030
TYPE-6213
2)a report by Wangaard and Burger (1983)and 3)other published
literature.
HE will review the report and provide comments.
04-016-27 Middle River -Main Channel Escapement Monitoring at
Talkeetna Station (RM 103)
Based on results of field studies conducted by ADF&G SUHydro during
1981,1982 and 1983,it has been determined that the RM 103 area of the
middle river is a site of significant milling by chinook,sockeye,
pink,chum and coho salmon.Continued escapement monitoring,through a
complete escapement cycle,would provide refined estimates of natural
variability in salmon use of the middle river reach and milling at RM
103.This task will directly aid resource managers in establishing
baseline data for potential project monitoring and will support the
settlement and hearing processes.
Four fishwheels will be operated by ADF&G SuHydro at RM 103 from June 7
to September 9,to record daily catches and tag and release all
intercepted adult salmon.The catch data will define species timing
distribution and migrational behavior.The tagging operation will
provide escapement estimates for each species.
04-1)16-28 Lower River Tributary Access Analysis
The objective of this study is to determine whether or not alteration
of discharge by the proposed Project will result in reductions of
mainstem water surface elevations of sufficient magnitude in the lower
river that access by adult salmon into tributary streams would become
unacceptably restricted without mitigative actions.
12361/4
840807
83
C C08-3033
ATN-83-0030
TYPE-6213
Tributary mouths that might warrant investigation will be identified
during July.Photographic enlargements of each tributary mouth area
will be obtained from the available lower river photography.
Streamflow records will be reviewed to identify mainstem and tributary
flows.
A visual interpretation of the photography will be completed.If
exposed streambed gravels or shallow riffles are not visible,it will
be assumed that depth of flow at the tributary mouth for the flow
condition photographed is not shallow enough to impair access.The
tributary mouth will be visited at a low flow period (probably
September)and representative depth measurements obtained.The
,location of these depth measurements will be noted on a copy of the
tributary mouth photograph.At the time of this site visit,a visual
assessment of channel stability will also be made.Sufficient
photographic evidence (channel structure and steambed particle size)
will be obtained for documentation.
A first level of analysis will be undertaken.If exposed streambed
gravels or shallow riffles appear to be present,a study site will be
established on the lower 0.25 miles of the tributary and cross sections
and thalweg profiles surveyed.Staff gage readings will be obtained in
the mainstem or side channel above and below the tributary mouth and at
three cross sections along the thalweg profile.An analysis of these
data will demonstrate the effects of mainstem discharge on depth of
flow in the tributary.
A higher level of analysis will be applied if it is determined after
viewing the available photography and making a site visit,that the
tributary mouth area might be unstable due to sand/gravel deposition or
the side channel into which the tributary discharged might dewater
upstream of the tributary due to with-project reductions in mainstem
-
12361/4
840807
84
......
-
C C08-3033
ATN-83-0030
TYPE-6213
flow.These analyses are not described in detail because of the
unlikelihood they will be required.Field data collection beyond that
necessary for the first level of analysis would principally consist of
streamflow and bedload material measurements.
04-016-29 Evaluation of Middle River Mainstem and Tributary Spawning
Habitat Relationships
During the open water field season,ADF&G SuHydro survey crews will
locate mainstem,side channel and tributary salmon spawning areas in
the middle r1ver reach.These spawning areas will be stratified by
sub-reach.Representative areas will be selected and temperature
recording devices situated to monitor intragravel and surface water
temperatures.In addition,porosity samples will be collected at each
of the selected sites.During the ice covered period,open leads in
the middle reach of the Susitna River will be identified and
categorized as velocity or warm water upwelling leads.The middle
reach will again be stratified by sub-reach and accessibility for
purposes of selecting representative warm water upwelling leads,which
may be potential salmon spawning areas,to measure intragravel and
surface water temperatures and substrate composition.
The deliverable product will be 1n the form of a final report and will
include:
1.Analysis of the intragravel and surface water temperature
relationships between mainstem,side channel and tributary salmon
spawning areas.
2.Substrate composition analysis of mainstem,side channel and
tributary salmon spawning areas.
12361/4
840807
85
-----,,--------"----------------
C C08-3033
ATN-83-0030
TYPE-62l3
3.An index of the warm water upwelling leads with intragravel and
surface water temperatures and porosity samples collected at
representative sites.
4.Provide a summary of the pre-FY8S temperature information
collected in mainstem,side channel and tributary salmon spawning
areas.
04-016-30 Slough Groundwater and Water Balance Studies
Aquifer testing at existing wells at Slough 9 will be conducted to
obtain data on hydraulic conductivity and storage coefficient.
Potential tests include constant-head tests,constant-rate pumping
tests and constant rate injection tests.
Water levels in existing deep wells and in selected shallow wells will
be monitored at Slough 9,along with open-water stages on the mainstem,
side-channels and sloughs.Using the results from the aquifer testing
and water level monitoring,estimates will be made at the theoretical
temporal variations of groundwater flow into Slough 9.The estimates
will be verified by conducting a water balance study of Slough 9.
Precipitation will be measured at the Sherman Station,with
accumulating precipitation cans located at other portions of the basin
in order to determine the spatial distribution of precipitation,
including orographic effects.Evaporation will be estimated from data
gathered at Watana Camp.Streamflow will be continuously monitored in
the slough and in the tributary which enters Slough 9 approximately
halfway upstream from the mouth.Frequent discharge measurements will
be made to establish reliable rating curves.
Up to 10 seepage meters will be installed in both Slough 9 and Slough
11 to determine the relationship between seepage rate and mainstem
.....
.....
12361/4
840807
86 -
--
C C08-3033
ATN-83-0030
TYPE-62l3
discharge at Gold Creek.Approximately 20 readings will be made at
each seepage meter.All visible upwelling locations will be mapped.
04-016-31 Development of Long-Term Monitoring Plan
Preproject studies have been designed to predict potential impacts due
to Project construction and operation and to describe means with which
to avoid or minimize these impacts.To assure the mitigation plans
incorporated into the license are achieving their intended goal s,a
long-term monitoring program must be developed and initiated.
Efforts under this task will concentrate on developing a detailed.-
planning document that can be presented to the various resource
agencies.This document will describe the potential impacts to be,-monitored,the methods and parameters to be monitored,the limits of
-
-
-
.....
concern,potential measures to rectify the impact and an alternative
schedule for compl"etion of certain elements of the monitoring program
if no impacts are detected.
The Power Authority,with the assistance of Harza-Ebasco,organizations
in the aquatic study team and individuals from other disciplines,will
develop a working document that will be presented to the var10US
resource agencies for review and comment.If needed,a meeting will be
held to resolve any areas of disagreement.The document will then be
finalized and submitted for incorporation into the license.
Harza-Ebasco will coordinate the planning efforts for the Power
Authority •
A draft monitoring program document will be the first deliverable
developed.Responses to agency comments on the draft will be the
second deliverable.
12361/4
8401307
87
C C08-3033
ATN-83-0030
TYPE-62l3
The third deliverable will be the finalized document that will be
incorporated into the license.
04-016-32 Lower Susitna Stream Temperature Analys~s
This task is intended to provide estimates of with-project instream
temperatures and their effects on Susitna fishery resources in order to
provide a tool useful in optimizing reservoir operations.mi tigat ion
planning and to aid the settlement process.
If biologically significant instream temperature differences between
pre-and with-project conditions are predicted for the Susitna River
below the Chulitna and Talkeetna confluences,a lower river instream
temperature analysis will be required.This analysis will involve
setting up a data base to use the instream temperature model (SNTEMP)
for prediction of weekly average water temperatures.The instream
temperature estimates produced by this task will be integrated with
estimates of flow effects and slough habitat changes to quantify
fisheries impacts by species and life stage.The predicted stream
temperature and heat transfer relationships will also be useful for
improving estimates of the lower river ice processes.
The data requirements of the stream temperature model are of three
types:structural,hydrologic and meteorologic.Most of the
structural data can be developed from topographic maps and
reconnaissance field work.The exception is stream width data.
Representative stream transects will be surveyed for a range of flow
events.
"""
-
-
Required hydrologic
tributary flows and
and temperatures.
12361/4
840807
data include mainstem flows and temperatures,
temperatures,and estimates of distributed flows
Mainstem flow data are necessary for simulating
88
..
-
-
-
C C08-3033
ATN-83-0030
TYPE-6213
mainstem temperatures and estimating distributed flows.Mainstem
temperatures are required to validate the stream temperature
predictions.Tributary flows and temperatures are necessary for
validation studies and to provide estimates of tributary influences on
the mainstem for with-project simulations.
Mainstem temperature recorders will be installed above the confluences
of large tributaries and at the end-of-simulation point.Mainstem
flows can be estimated from historical data and flows observed during
the stream width data collection.
Tributary temperatures should be collected for all major tributaries.
A major tributary can be defined as one which contributes at least 5%
of the mainstem flow under any condition,pre-or with-project.
Tributary flow data will be collected on these major tributaries.
Distributed flows and temperatures will be estimated using the
techniques developed from the upper river SNTEMP study and from the
mainstem and tributary data collection.
Necessary meteorologic data include a~r temperature,wind speed,
humidity,and solar radiation data.As with the upper r~ver SNTEMP
simulations,the data collected at the NWS station at Talkeetna will be
adjusted to represent local conditions.A meteorological collection
station located in a representative lower river location might be
recommended to verify the appropriatness of using adjusted Talkeetna
data to represent lower river conditions.
Much of the data required for lower river temperature analysis will be
available through the work necessary to complete other tasks.
12361/4
840807
89
____~l3llI'~_
C C08-3033
ATN-83-0030
TYPE-6213
1.Model validation report.
2.Report documenting with-project
fisheries resource analysis.
simulations and associated -
04-016-34 Winter Studies of Resident and Juvenile Anadromous Fishes
Data on the distribution of overwintering juvenile salmon and resident
species are small when compared to data available for the open water
season.Many of the problems in understanding overwintering habitat
are caused by very difficult sampling conditions that prevail during
the winter months.Sampling techniques are often limited to baited
gear because of the ice cover and the prevalence of slush ice under the
cover.The decreased activity of fish associated with colder
temperatures often lower the effectiveness of this type of sampling
equipment.Although catch data over a wide variety of habitats has
been accumulated during previous winter periods,the lack of trends and
small numbers of fish collected do not provide strong conclusions as to
the importance of different types of mainstem habitat.Relatively low
catch rates of chinook and coho salmon have occurred at many sites
associated with the mainstem that have some thermal influence from
ground water sources.The distribution of fisn appears to be rather
broad but not associated with mainstem flows.This suggests that the
near zero degree (centigrade)water does not provide suitable
conditions for overwintering,probably because of continual formation
of anchor ice and unstable flows as ice processes continue to develop
throughout the winter.Ground water sources in the side sloughs and
tributary mouth areas appear to be of maj or importance but there is
limited data to support this statement.
Radio telemetry data for burbot and primarily for rainbow tagged in the
upper river suggest these species will often be found in areas of
higher conductivity and warmer temperatures.This suggests they may
-
12361/4
840807
90
-
-
C COB-3033
ATN-B3-0030
TYPE-62l3
seek ground water sources in the winter.These areas are usually in
deeper and faster water than the areas where chinook and coho juveniles
are thought to overwinter.Fall movements suggest that essentially all
of these species that rear in clear water tributaries enter the
mainstem Susitna to overwinter.Currently)we have a very small number
of data points to support these conclusions.
Further studies on distribution of rearing salmon and resident species
will be conducted to evaluate the effects of with-project discharges on
overwintering habitat.This study will obtain more information on
winter utilization of sloughs using temporary beach seine wiers ~cross
the mouths of sloughs that do not have mainstem water breaching their
upper heads.This data collection effort will be .associated with the
coded wire tagging program planned for spring)1984.
Outmigrant trapping proposed for Portage Creek will provide the needed
information to assess the outmigration of chinook and coho into the
mainstem Susitna.From this information and the outmigration observed
from the sloughs)the overwintering habitat importance will be
inferred.
The microhabitat utilized within sloughs and the response of juveniles
to habitat discharge changes will be estimated by intensive winter
studies on one slougn/side channel complex.Juvenile chinook and coho
salmon collected in the slough 9 complex of the upper river will be
marked with a series of fin clip combinations.These fish will be
collected by beach seines,minnow traps and'electrofishing equipment.
A wier will be installed under the ice near the mouth of the slough to
capture fish moving in or out.These fish will also be marked and
checked for marks.
-12361/4
840807
91
C C08-3033
ATN-83-0030
TYPE-6213
Discharge will be monitored throughout the slough during the entire
winter period and habitat conditions,including temperature,dissolved
oxygen,conductivity,cover,substrate,depth,and water velocity,will
be recorded at all collection sites.
These data will be used to describe the responses of juvenile salmon to
discharge changes and the utilization of micro-habitat within the
slough complex.
Further information will be obtained on rainbow trout overwintering
habitat by use of radio telemetry.Habitat requirements and winter
distribution will be established by relocation of radio tagged fish and
measurement of habitat conditions at the relocation sites.
ADF&G SuHydro will conduct the study.HE will review the report and
provide comments and recommendation at various stages of the study.
04-016-35 Slough Access Criteria
The access and passage criteria developed during ITB3 and FY84 were
evolutionary steps in the understanding and quantification of
conditions needed for access and passage of salmon into slough and side
channel spawning areas.This process has produced the present product
of an access/passage criteria curve which will be presented in the FY84
report.This curve was produced as a result of review of field data
and observations collected over the past two field seasons and
professional judgement.Field data are necessary to verify these
access and passage criteria.
Side channel and slough sites 1n the middle river where access and
passage problems have been documented will be selected as study sites.
Observations of fish passage activity will be made at each site noting
-
-
-
~l
12361/4
840807
92 -
C C08-3033
ATN-83-0030
TYPE-6213
..-
1
-
--
whether successful passage,successful passage with difficulty and
exposure,or unsuccessful passage occurs.Measurements of length and
depth of the access/passage reach at each site will be collected.
These data will be used to verify the access/passage criteria curve
developed during FY84.·
Refined access/passage criteria curves for chum salmon.Refined
estimates of mainstem discharge required for access and passage
for all sites where passage and access have been evaluated previously
in the middle river.
04-016-36 Lower River Rearing Habitat Investigations
Modeling
IFG Hydraulic
-
Two approaches have been used to quantify the responses of rearing
habitat to changes in discharge.The two approaches differ in their
applications.The first approach is applied to sites where the
dominant hydraulic variables of the habitat are influenced by water
quality and/or cover.The other is applied to sites where water depth
and velocity are the dominant hydraulic variables of the habitat.This
task emphasizes the second approach.
IFG hydraulic models of water velocity,water depth,substrate and
cover will be developed for a maximum of six selected sites at which
the dominant hydraulic variables of the habitat are influenced by water
depth and velocity.These hydraulic models,which will be developed by
ADF&G SuHydro staff with the assistance of a hydraulic engineer,will
be meshed with rearing habitat utilization data to relate changes in
rearing habitat with changes in discharge (WUA or equivalent).
Water depth and velocity,substrate,and cover data will be obtained
along selected representative transects under.a variety of discharge
12361/4
840807
93
____'r;_·~~~,_-----~-----------
C C08-3D33
ATN-83-003D
TYPE-6213
conditions.These data will be input to IFG hydraulic models and used
to calibrate the model to predict changes in hydraulic conditions as a
function of change in discharge.Study site selection will be based on
degree of habitat utilization and extent of habitat dewatering expected
with project flows based on lower river morphological assessments (R&M,
1984).
Final products will include calibrated IFG hydraulic models for use in
juvenile anadromous fish studies to estimate the response of rearing
habitat to changes in mainstem discharge.
04-016-37 Preliminary Mitigation Studies for the Devil Canyon to Talkeetna
Reach
The objectives are:
-
-
1.
2.
To identify potential sites for habitat modification 1n the Devil
Canyon to Talkeetna Reach.
To evaluate the feasibility of various habitat enhancement
techniques.
The task will consist of field surveys and studies to identify
potential mainstem,side channel,and slough areas for habitat
modification.Habitat characteristics demonstrated to be important
components of presently util ized habitats such as depth,temperature,
substrate and presence of upwelling will be used to develop evaluation
criteria.
After candidate locations are identified,an analysis will be performed
to evaluate the conditions likely to exist under Project operation and
identify methods to promote use of these areas by spawning or rearing
12361/4
840807
94
-
-
-
C C08-3033
ATN-83-0030
TYPE-6213
salmon.Side and upland slough sites exist within the Devil Canyon to
Talkeetna reach that exhibit some characteristics expected under
Project operation.These slough sites will be used as models of
Project conditions and examined to evaluate modifications that would
promote their use as habitat.Efforts in FY85 will be restricted to
physical and/or biological monitoring of habitat conditions.Project
conditions to be evaluated include wetted areas with improper sub-
strate,areas of suitable substrate with insufficient flow and suitable
spawning habitat that is inaccessible because of low mainstem water
levels.
Candidate areas 1n the mainstem and side channels will be surveyed in
fall as flows drop to levels that approximate anticipated Project
flows.A physical assessment of habitat will be performed to evaluate
their potential suitability as habitat under Project conditions.Key
parameters include temperature,substrate,depth,velocity and presence
or absence of upwelling.
The results of the FY85 field investigations and habitat analysis will
be presented in the ADF&G SuHydro 1984 field season report ser1es.
This analysis will be used by WCC to evaluate the feasibility of the
proposed habitat modifications as effective mitigations and will be
included in the Second Interim Mitigation Report.
04-016-38 Impact Assessment of Construction-Related
Transmission Line and Access Road
Activities:
..-
-
An impact assessment report will be prepared to address impacts
associated with construction activities.Specific areas to be covered
include construction of the dams,floodplain gravel mining,
construction of the camps and permanent village,diversion tunnel,
access roads and transmission lines.The report will refine and
12361/4
840807
95
C COB-3033
ATN-B3--0030
TYPE-6213
quantify the assessment provided in the FERC license application based
on current construction planning and available Project information.
A construction impact assessment report will be produced.
04-016-39 Mitigation Planning for Construction Activities
Activities anticipated to produce aquatic impacts include construction
of the access roads,transmission lines,floodplain gravel pits~camps,
permanent village and other project facilities.The mitigation
planning effort will identify appropriate mitigation,such as siting,
scheduling and designs,that will avoid or minimize impacts for the
construction activities and facilities.The mitigation plan will be
included in the construction impact assessment report.
-
A detailed construction mitigation plan will be developed.
will be organized by activity or facility.
04-016-40 Impoundment Resident Fish Mitigation Planning
The plan -
~-
Available information on resident fishes in the impoundment area will
be summarized to update the assessment in the FERC license application.
Mitigation options will be refined to further assess their
applicability as compensatory measures.The options considered will be
submi t ted for agency review and policy dec is ion.Emphas is wi 11 be
placed on those options that appear to have the highest probability of
success.
A report will be prepared describing the impoundment area resident fish
populations,the anticipated loss of habitats and expected consequences
to fish populations,and the options considered as compensation.A
12361/4
840807
96
-
C C08-3033
ATN-83-0030
TYPE-6213
preferred project mitigation alternative will be presented.The report
will be attached to the report described in Task 38.
04-016-41 Baseline Water Quantity and Quality Monitoring at Tsusena and
Deadman Creeks
A water monitoring plan will be developed to produce the information
necessary to document water quality and quantity parameters in
sufficient detail to assist in facilities designs and to acquire
appropriate permits.The plan will be based on a thorough review of
permit and design information requirements and produce data sufficient
to:
Tsusena Creek water source is.....1.determine whether the
adequate to produce
treatment)•
proposed
sufficient potable water supply (with
.-
-
2•produce design criteria for a potable water supply treatment
facility using Tsusena Creek water.
3.provide estimates of the quantity and quality of waste effluents
discharged from the potable water treatment facility.
4.estimate the waste assimilative capacity of Deadman Creek and the
with-project effects on water quality.
5.produce design criteria for a wastewater treatment facility
discharging effluent to Deadman Creek.
A report summarizing necessary monitoring programs for Tsusena and
Deadman Creeks which will outline:
12361/4
840807
97
C C08-3033
ATN-83-0030
TYPE-6213
1.monitoring schedules.
2.sampling locations.
3.type of samples collected.
4.quantity of samples collected.
5.cost estimates of monitoring program.
04-016-45 Primary Productivity Studies Within the Susitna River,Other
Glacial Streams and Some Non-Glacial Streams
Appropriate substrates (either natural or artificial)from var10US
habitats of the Susitna and other rivers will be analyzed for indices
of autochthanous primary productivity (e.g.,chlorophyll "a "per unit
of standing crop organic carbon).Additional physical measurements
such as water depth,turbidity,suspended sediment,discharge,
temperature,Secchi disc or other photic zone indicators will be made
in each sampling site.Physical characteristics will be analyzed to
investigate the relationships between benthic primary productivity and
habitat physical parameters.
Comparative data from various Susitna River habitats and from other
south-central Alaskan rivers will be useful in forecasting with-project
impacts to the downstream biological food web,including resident and
anadromous fishes.
04-016-47 Middle River Tributary Stability Study
The objectives of this study are to quantify the extent of potential
aggradation in the mainstem near the mouths of Indian River and Portage
-
-
,""",
12361/4
840807
98
C C08-3033
ATN-83-0030
TYPE-62l3-
Creek,and to determine whether this aggradation will result 1n impacts
to habitat access.
The following elements will be part of this study:
1.Suspended sediment,bedload and bed materials measurements by the
USGS on Indian River and Portage Creek.
2.
3.
4.
Surveying cross sections on the tributaries near the mouths and on
the mainstem just upstream and downstream of mouth.
Periodic discharge measurements and continuous stage recording on
the tributaries.
Analyses to estimate bedload transporatable by tributaires and to
quantify aggradation or degradation of material at tributary
mouths.
-
-I
5.Estimation of impact of aggradation or degradation on tributary
access.
Currently available data and results of analyses of these data have
been compiled into a report entitled Susitna Hydroelectric Project -
Reservoir and River Sedimentation.There are currently no data on
suspended sediment and bedload discharge from the tributaries.ADF&G
recorded water stage during 1983 on the tributaries.R&M made
discharge measurements on these tributaries and some bed material
sampling has been made.However,the data available is not sufficient
to support a quantitative analysis of sedimentation in the
tributaries.
12361/4
840807
99
...........__'r'!IlJI·~~"""'1'rw=------
C COB-3033
ATN-B3-0030
TYPE-62l3
A report documenting the results of the analyses will be provided.
04-016-55 Navigation Studies
The regulation of discharge in the Susitna River due to the proposed
Susitna Project may cause problems with the navigability of the Susitna
River principally by sportspersons.This study will evaluate various
reaches of the Susitna River in terms of this navigability.
Preliminary results of a recreational user survey will be used to
identify specific reaches of the Susitna River for evaluation of the
navigability vs discharge relationship.Where appropriate stage
discharge relationships will be developed and integrated with local
knowledge of the river channel and surveyed cross sections to evaluate
the potential effect of with altered flow regime on navigation use.
04-016-56 General License Support
Numerous miscellaneous activities will be required to fully meet the
requirements of the Power Authority and FERC for completing the
Licensing Process smoothly.These activities will be supportive of the
other main activities of the Aquatic Program.
04-016-57 Issue Papers/Settlement Process
The settlement of agency issues is a prime goal of the FY85 studies.To
facili tate the settlement process H-E will prepare several technical
documents to support the negotiation and settlement process.The
documents will include a brief statement of the status of each issue.
Internal planning memoranda for resolving each issue.and a series of
technical papers which summarize the available information pertaining
to each issue.
-
12361/4
840807
100
-
-
..-
.....
-
C C08-3033
ATN-83-0030
TYPE-62l3
04-016-58 Monthly Progress Reports
The monthly progress reports will describe the status of each study
program based on the previous month's activities.These reports will
include many or all of the following:activities completed,problems
and solutions,personnel considerations,program modifications,status
of budget and schedule,and upcoming activities.
04-016-60 General Administration and Contract Management
This task is designed to provide support to the Aquatic Program 1n the
form of general administrative activities such as weekly staff
meetings,budget review,revisions and unforecast ing,technical
progress review of HE staff and subcontractor activities.The task
includes preparation of contract documents,necessary amendments to the
contracts and supporting documentation.Also included in this task are
the preparation of change work authorization requests reV1ew of
subcontractor invoices and progress reports and monitoring of
subcontractor budget expenditures.This task will be conducted by HE
aquatic program staff.
04-016-61 General Plan of Study/Workscope Preparation
The General Plan of Study for fiscal year 1984 will describe the
specific study objectives and work tasks,detailed study methodology
including sampling and analysis procedures,data management and report
formats,quality assurance procedures,data management and report
deliverables for each study element.The various tasks described in
the study plan will address specific elements necessary for completion
of analyses for several aspects of the FERC Licensing procedure.These
aspects include input to the DElS,(FERC Node 2435),input to the FElS
12361/4
840807
101
evaluation of existing and
which may be used in the
and permanent village siting
complete evaluation of the
and selected sites for the
C C08-3033
ATN-83-0030
TYPE-6213
(FERC Node 2800),the Set t lement process (FERC Node 6920)and the
Heari~gs Process (FERC Node 6310).
Workscopes for continuing and additional studies for the subcontractors
will be developed.The workscopes will reflect specific issues
pertraining to the analysis of effects of the Susitna Project.The
workscopes will be developed in consultation with appropriate resource
agencies as part of the general licensing process.
04-016-63 Access Road Location Report Input
During FY85,the evaluation of the access road location will be
finalized.Additional evaluation,based on data collected in 1983.
will enable refinement of the evauation.Teh activities in this task
will provide for the revision of the access road report and inclussion
of the additional information.The task will be·accomplished by HE
staff.
04-016-64 Camp and Permanent Village Location Report Input
This activity will provide for the
potentially affected aquatic resources
evaluation of the construction camp
studies.The study will enable a
enviornmental effects of the possible
construction camp and permanent village.
04-016-65 Transmission Line Location Report Input
During FY85.the Transmission Line report will be revised and refined.
This task will provide for refinement of the existing evaluations bsed
on additional aquatic resources information obtained since the previous
-
-
-
-
12361/4
840807
102 -
-report was completed.
staff •
C C08-3033
ATN-83-0030
TYPE-6213
This wi 11 be conducted by HE aquatic program
04-016-66 Multilevel Outlet Design Alternatives Evaluation
Results of the reservoir and instream temperature and ~ce studies
conducted to date and the concurrent evaluation of altered temperatures
on fish populations has indicated a potential benefit to existing fish
populations if it were possible to release 4°c water from the Watana
Reservoir during the winter months.An engineering study to evaluate
the feasibility of providing a low level part 1n the operational
multilevel outlet structure will be conducted.As part of this
.....
-
-,
,~
feasibility study,the potential benefits to the aquatic resources will
be evaluated.
Dirl:~cts
04-020-01 Travel &Living Expense
Air travel and the associated expenses for staff who will be required to
suppo~t the task activities •
Estimated Estimated
Between Number Duration Each
Anchorage and Bellevue 24 7
Anchorage and Bellevue 5 14
Anchorage and Bellevue 12 3
Anchorage and Bellevue 13 5
Anchorage and Chicago 5 14
New York and Anchorage 8 7
Anchorage and Washington,D.C.8 10
-1~361/4
840807
103
____.m __'_..~~_
C C08-3033
ATN-83-0030
TYPE-62l3
04-020-04 Printing
This item will include production of copies of all Environmental study
documents from Harza-Ebasco or of the subcontractors.These documents will
be for distribution to intervenors,lawyers,agencies,the client,and
subcontractors as required.
04-020-05 Computer
This item will include computer useage cost for analyses related to the
social sciences.
04-020-07 Relocation
Cost to relocate personnel to Anchorage for performance of this task.
.....
-
""'"
-
-
""'"
12361/4
840807
104
,,,,..
....
C C08-3033
ATN-83-0030
TYPE-6213
Subcontractors
Similar to services,subcontractors are divided into three prime subtasks;
Social Sciences,Aquatic and Terrestrial
FRANK ORTH AND ASSOCIATES,INC.
04-1113-01 FERC Supplemental Information Requests
Refer to description of Cost Account 04-011-05
04-1113-02 Settlement Process Input
Refer to description of Cost Account 04-011-09
04-Jl13-03 DEIS Review Memorandum
Refer to description of Cost Account 04-011-08
04-1113-04 Workscope and Detailed Plan of Study
Refer to description of Cost Account 04-011-19
04-113-05 Intertie and Terror Lake Worker Survey Report
Refer to description of Cost Account 04-011-31
04-113-07 Socioeconomic Mitigation Plan Update
Refer to description of Cost Account 04-011-44
04-1113-08 Socioeconomic Impact Projections Summary
Refer to description of Cost Account 04-011-98
04-1113-09 Household and Business Surveys
Refer to description of Cost Account 04-011-40
12361/4
840B07
105
FRANK ORTH AND ASSOCIATES,INC.(Cont'd)
04-113-20 Hearings Preparation
Refer to description of Cost Account 04-011-13
04-113-21 Program Coordination
Refer to description of Cost Account 04-011-14
04-113-22 FEIS Review Memorandum
Refer to description of Cost Account 04-011-08
04-113-23 Access Road Location Report Input
Refer to description of Cost Account 04-011-15
04-113-24 Permanent Village Evaluation Report
Refer to description of Cost Account 04-011-51
04-113-26 Worker Transportation Alternatives Report
Refer to description of Cost Account 04-011-52
04-113-27 Worker Shift and Rotation Schedule Report
Refer to description of Cost Account 04-011-53
04-113-29 Traffic Analysis
Refer to description of Cost Account 04-011-98
04-113-30 Railhead Analysis
Refer to description of Cost Account 04-011-98
04-113-31 Model Refinement
C COB-3033
ATN-83-0030
TYPE-6213
1f@lU1,
-
-.
-
-
12361/4
840807
106
-
-
Refer to description of Cost Account 04-011-23
04-113-32 Land Use and Housing Constraints
Refer to description of Cost Account 04-011-38
CCOB-3033
ATN-83-0030
TYPE-6213
1236Jl/4
840807
107
04-113-28 Public Sector Survey
Refer to description of Cost Account 04-011-40
04-113-33 Project Management
Refer to description of Cost Account 04-011-04
C C08-3033
ATN-83-0030
TYPE-6213 -
-.
.....
-.
-.
12361/4
840807
108
.....
C C08-3033
ATN-83-0030
TYPE-6213
EDAW,INC.
04-123-01 RE!AE-FERC Supplemental Information Requests
Refer to description of Cost Account 04-011-05
04-123-02 RE/AE-DEIS Review Memorandum
Refer to description of Cost Account 04-011-08
04-123-05 RE-Workscope and Detailed Plan of Study
Refer to description of Cost Account 04-011-19
04-123-06 RE-Sett1ement Process Input
Refer to description of Cost Account 04-011-09
04-123-08 RE-Hearings Preparation
Refer to description of Cost Account 04-011-13
04-123-15 RE-Program Coordination
Refer to description of Cost Account 04-011-14
04-123-16 RE-Public Access Report Input
Refer to description of Cost Account 04-011-15
04-123-17 RE-Access Road Location Report Input
Refer to description of Cost Account 04-011-16
04-123-18 RE-Camp Location Report Input
Refer to description of Cost Account 04-011-17
04-123-19 RE-Recreation Impacts Refinement
Refer to description of Cost Account 04-011-61
12361/4
840807
109_......--,,~--,-~-----------,--------------,-------------------
EDAW,INC.(Cont'd)
04-123-21 RE-Recreation Plan Refinement
Refe~to description of Cost Account 04-011-63
04-123-22 RE-Permanent Village Evaluation Report
Refer to description of Cost Account 04-011-51
04-123-23 RE-Recreation opportunities for On-Site Workers
Refer to description of Cost Account 04-011-65
04-123-50 AE-Workscope and Detailed Plan of Study
Refer to description of Cost Account 04-011-19
04-123-51 AE-Settlement Process Input
Refer to description of Cost Account 04-011-09
04-123-53 AE-Hearings Preparation
Refer to description of Cost Account 04-011-13
04-123-54 AE-Program Coordination
Refer to description of Cost Account 04-011-14
04-123-55 AE-Access Road Location Report Input
Refer to description of Cost Account 04-011-16
04-123-57 AE-Aesthetic Impacts Refinement
Refer to description of Cost Account 04-011-71
04-123-58 AE-Feasibility of Aesthetic Mitigation Measures
Refer to description of Cost Account 04-011-72
C C08-3033
ATN-83-0030
TYPE-6213
-
.....
-
12361/4
840807
110
.-,
,~
C COB-3033
ATN-B3-0030
TY.PE-6213
EDAW,INC.(Cont'd)
04-123-59 AE-Draft Aesthetic Mitigation Plan
Refer to description of Cost Account 04-011-73
04-123-60 AE-Permanent Village'Evaluation Report
Refer to description of Cost Account 04-011-51
04-123-61 AE-Camp Location Report Input
Refer to description of Cost Account 04-011-17
SUBTOTAL EDAW,INC:$IB5,859
12361/4
840807
III
____w..J~~_.------------------_
C C08-3033
ATN-83-0030
TYPE-6213
ALBERT A.DEKIN CONSULTING SERVICES
04-133-01 Cultural Resources Program Approach
Refer to description of Cost Account 04-011-23
SUBTOTAL ALBERT A.DEKIN:$30)000
UNIDENTIFIED SUBCONTRACTOR FOR RESOURCE USERS SURVEY
04-153-01 Unidentified Subcontractor -Resource Users Survey
Refer to description of Cost Account 04-011-56
SUBTOTAL UNIDENTIFIED SUBCONTRACTOR -RESOURCE USERS SURVEY
CULTURAL RESOURCES PROGRAM TECHNICAL REVIEW BOARD
04-173-01 Technical Review
Refer to description of Cost Account 04-011-23
SUBTOTAL CULTURAL RESOURCES PROGRAM REVIEW BOARD:$40,000
CULTURAL RESOURCES PROGRAM APPROACH
04-183-01 Unidentified Subcontractor -Program Approach
Refer to description of Cost Account 04-011-23
SUBTOTAL CULTURAL RESOURCES PROGRAM APPROACH:$50)000
,~
-
-
-
12361/4
840807
112
C COB-3033
ATN-83-0030
TYPE-6213-
-
LGL
04-303-02 Plan of Study Development and Updating
Refer to description of Cost Account 04-013-02.
04-303-09 Terrestrial Workshops
Refer to description of Cost Account 04-013-09.
04-303-10 Mitigation Plan Refinment
Refer to description of Cost Account 04-013-10.
04-303-11 Impact/Mitigation Planning Tracking System
Refer to description of Cost Account 04-013-11.
04-303-16 DEIS/FEIS Review
Refer to description of Cost Account 04-013-16.
04-3103-30 Moose Browse Inventory
Refer to description of Cost Account 04-013-30.
04-3103-32 Impact Assessment Refinement
Refer to description of Cost Account 04-013-32.
04-3103-36 FERC Hearings Preparation
Refer to description of Cost Account 04-013-36.
04-3103-42 Candidate Mitigation Lands Assessment
Refer to description of Cost Account 04-013-42.
....
04-303-43 Habi"tat Enhancement Studies
Refer to description of Cost Account 04-013-43 •
12361/4
840807
113
~~U_~~iiiiiliM'i ~I""""~=~--
LGL (Cont'd)
04-303-44 Downstream Riparian Studies
Refer to description of Cost Account 04-013-44.
04-303-45 Raptor Studies
Refer to description of Cost Account 04-013-45.
04-303-46 Swan/Eagle T-Line Nest Surveys
Refer to description of Cost Account 04-013-46.
04-303-47 Winter Bird Surveys
Refer to description of Cost Account 04-013-47.
C C08-3033
ATN-83-0030
TYPE-6213 -
-
-
12361/4
840807
114
-
--
..-
C C08-3033
ATN-83-0030
TYPE-6213
U of A -Palmer
04-313-09 Terrestrial Workshops
Refer to description of Cost Account 04-013-09.
04-313-36 FERC Hearing Preparation
Refer to description of Cost Account 04-013-36.
04-313-44 Downstream Riparian Studies
Refer to description of Cost Account 04-013-44 •
12361/4
840807
us
............-........,..-..--._------...".----------------------------------
U of A -Alaska Cooperative
wildlife Res.Unit (Dr.Gipson)
04-323-09 Terrestrial Workshops
Refer to description of Cost Account 04-013-09.
04-323-10 Mitigation Plan Refinment
Refer to description of Cost Account 04-013-10.
04-323-14 Purbearer and Trapper Studies
Refer to description of Cost Account 04-013-14.
04-323-32 Impact Assessment Refinment
Refer to description of Cost Account 04-013-32.
04-323-36 PERC Hearing Preparation
Refer to description of Cost Account 04-013-36.
04-323-44 Downstream Riparian Studies
Refer to description of Cost Account 04-013-44.
C C08-3033
ATN-83-0030
TYPE-6213
'"""
-
,;
12361/4
840807
116
-
"...
R.A.Kreig &Associates
04-333-09 Terrestrial Workshops
Refer to description of Cost Account 04-013-09.
04-333-31 Vegetation Mapping and Digitizing
Refer to description of Cost Account 04-013-31.
C COS-3033
ATN-83-0030
TYPE-6213
12361/4
840807
117
U of A -Alaska Cooperative
Wildlife Res.Unit (Dr.Kessel)
04-343-09 Terrestrial Workshops
Refer to description of Cost Account 04-013-09.
04-343-10 Mitigation Plan Refinement
Refer to description of Cost Account 04-013-10.
04-343-32 Impact Assessment Refinment
Refer to description of Cost Account 04-013-32.
04-343-36 FERC Hear~ng Preparation
Refer to description of Cost Account 04-013-36.
04-343-47 Winter Bird Surveys
Refer to description of Cost Account 04-013-47.
C C08-3033
ATN-83-0030
TYPE-6213
-
-
-
12361/4
840807
118
....
!
.....
R &M 'CONSULTANTS,INC.
04-263-01 RM DEIS/FEIS Review
Refer to Description of Cost Account 04-016-01
04-263-02 RM Agency Workshops
Refer to Cost Account 04-016-02
04-263-03 RM General Aquatic Program Coordination
Refer to Description of Cost Account 04-016-03
04-263-04 RM Instream Flow Studies
Refer to Description of Cost Account 04-016-04
04-263-05 RM Instream Flow Studies
Refer to ijescription of Cost Account 04-016-04
04-263-09 RM FERC Hearings Preparation
Refer to Description of Cost Account 04-016-09
04-263-12 RM Middle River HabitatAna1ysis
Refer to Description of Cost Account 04-016-12
04-263-18 RM Suspended Sediment/Tributary
Refer to Description of Cost Account 04-016-18
C C08-3033
ATN-83-0030
TYPE-6213
12361/4
840807
119
R &M CONSULTANTS,INC.(Cont'd)
04-263-19 RM Hydrologica1/Meterological Data
Refer to Description of Cost Account 04-016-19
04-263-21 RM Lower River Morphological Assessment
Refer to Description of Cost Account 04-016-21
04-263-22 RM Middle River Habitat Map
Refer to Description of Cost Account 04-016-22
04-263-23 RM Lower River Ice Observations
Refer to Description of Cost Account 04-016-23
04-263-24 RM Lower River Sediment Aggradation
Refer to Description of Cost Account 04-016-24
04-263-28 RM Lower River Tributary Access
Refer to Description of Cost Account 04-016-28
04-263-30 RM Slough Groundwater
Refer to Description of Cost Account 04-016-30
04-263-43 RM Glacier Studies
Refer to Description of Cost Account 04-016-43
04-263-55 RM Navigation Studies
Refer to Description of Cost Account 04-016-55
C C08-3033
ATN-83-0030
TYPE-6213
"""
-
"3
12361/4
840807
120
.....
..-
R &M CONSULTANTS,INC.(Cont'd)
04-263-56 RM General Licensing Consultation
Refer to Description of Cost Account 04-016-56
04-263-60 RM Contract Management Administration
Refer to Description of Cost Account 04-016-60
04-263-61 RM Upper Basin Winter Precipitation
Refer to Description of Cost Account 04-016-08
04-263-62 RM -MaClaren and Tyone Weather Stations
Refer to description of Cost Account 04-016-08
C C08-3033
ATN-83-0030
TYPE-6213
12361/4
840807
121
AEIDC
04-273-02 AEI -Agency Workshops/Settlement
Refer to Description of Cost Account 04-016-02
04-273-03 AEI -General Aquatic Program Coordination
Refer to Description of Cost Account 04-016-03
04-273-04 AEI -Instream Flow Studies
Refer to Description of Cost Account 04-016-04
04-273-05 AEI -Environmental and Economic Comparisons
Refer to Description of Cost Account 04-016-05
04-273-06 AEI -Recommended Flow Report
Refer to Description of Cost Account 04-016-06
04-273-07 AEI -Aquatic Impact Assessment
Refer to Description of Cost Account 04-016-07
04-273-09 AEI -FERC Hearings Preparation
Refer to Description of Cost Account 04-016-09
04-273-32 AEI -Lower River Temperature Analysis
Refer to Description of Cost Account 04-016-32
04-273-56 General Licensing Consultation
Refer to Description of Cost Account 04-016-56
04-273-60 AEI -Contract Management Administration
Refer to Description of Cost Account 04-016-60
l;l;UO-.jU.:U
ATN-83-0030
TYPE-6213
12361/4
840807
&.$$4
122
-.
C C08-3033
ATN-83-0030
TYPE-6213
E.W.TRIHEY AND ASSOCIATES
04-283-02 WT -Agency-Workshops/-Sett1ement
Refer to Description of Cost Account 04-016-02
04-2.83-03 WT -General Aquatic Program Coordination
Refer to Description of Cost Account 04-016-03
04-283-04 WT -Instream Flow Studies
Refer to Description of Cost Account 04-016-04
04-283-09 WT -FERC Hearings Preparation
Refer to Description of Cost Account 04-016-09
04-283-12 WT -Middle River Habitat Analysis
Refer to Description of Cost Account 04-016-12
04-283-14 ADF&G Consultation
Refer to Description of Cost Account 04-016-14
04-283-21 WT -Lower River Morphological Assessment
Refer to Description of Cost Account 04-016-21
,04-283-22 WT -Middle River Habitat Map
Refer to Description of Cost Account 04-016-22
04-283-28 WT -Lower River Tributary Access
Refer to Description of Cost Account 04-016-28
12361/4
840807
123
--_._-...,"'~-----,--------""""'---------_._------------------
E.W.TRIHEY AND ASSOCIATES (Cont'd)
04-283-36 WT -Lower River Rearing (IFG)
Refer to Description of Cost Account 04-016-36
04-283-56 WT -General Licensing Consultation
Refer to Description of Cost Account 04-016-56
04-283-60 WT -Contract Management/Administration
Refer to Description of Cost Account 04-016-60
ATN-83-0030
TYPE-6213
~-
""'"
mJj.
-
-
-
12361/4
840807
124
....
-
WOODWARD CLYDE CONSULTANTS
04-293-02 WC -Agency Workshops/Settlement
Refe!r to Description of Cost Account 04-016-02
04-293-03 WC -General Aquatic Program
Refer to Description of Cost Account 04-016-03
04-293-04 WC -Instream Flow Studies
Refer to Description of Cost Account 04-016-04
04-293-09 WC -FERC Hearings Preparation,
Refer to Description of Cost Account 04-016-09
04-293-10 WC -Mitigation/Enhancement Planning
Refer to Description of Cost Account 04-016-10
04-293-11 WC -Comprehensive Fish Report
Refer to Description of Cost Account 04-016-11
.04-293-37 WC -Mitigation Demonstration
Refer to Description of Cost Account 04-016-37
04-293-39 WC -Construction Mitigation
Refer to Description of Cost Account 04-016-39
94-293-40 WC -Impoundment Mitigation
Refer to Description of Cost Account 04-016-40
C C08-3033
ATN-83-0030
TYPE-6213
1236t!4
840807
125
ATN-83-0030
TYPE-6213
04-293-56 WC -General Licensing Consultation
Refer to Description of Cost Ac~ount 04-016-56
04-293-60 WC -Contract Adminstration and Management
Refer to Description of Cost Account 04-016-60
CIRI/MOOLIN
04-354-01 CIRI/Moolin -Task 4 Drafting
Drafting support when,and as,required by the Environmental staff will
be provided by CIRI/Moolin.
-
-
12361/4
840807
126
C C08-3033
ATN-83-0030
TYPE-6213
unidentified Consultants
04-363-50 unidentified Licensing Support
04-353-36 FERC Hearing Preparation
Refer to description of Cost Account 04-013-36.
04-400-01 Subcontractor Handling Fee
A ha.ndling fee equal to 2 percent of the subcontractor costs.
--
-
12361/4
840807
127
.,.,..---~"-,---------------""""'---~-----------------------
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 4
SUSITNA HYDROELECTRIC PROJECT
FISCAl YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
••••••• • ••••••••••••••••••••••• ••••••••••••••••••••••••••••••••••••••••••••••••
TOTAL LABOR t
169878 al3386 283931 203899 209987 166107 156912 167130 210005 178195 16'3301 186'371 2235702
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••*•••••
TOTAL DIRECTS
54751 21751 21751 16951 48351 16951 20951 16951 16'351 24952 16'351 16953 2'3'1215
••••••• ••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••*•
TOTAL SUBCONTRACTORS
468976 455723 553770 466608 432627 398549 440607 352226 339951 317728 299097 258152 '178'101'1
•• •••*•••••*•••••••••••••••••••••••••••••••••••••••••••••••••*•••••••••••••••••
TASK 0lt TOTALS
69361lJ5 690860 779452 687458 690965 581607 618470 536387 566907 520875 lt853lt'3 lt62076 7313931
•••••••••••••••*•••• •••••••••••••••••••••••••••••••••••••••••••••••••••••••••*•
.1 j I .1 J I J
j J J i J i 1 ]J )1 i i 1 }1 I 'i
08/08/84
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TRSK 04 SALARV BREAKDOWN
Budgeted Salaries Fril'lge Overhead Fee Total
Hours Benefits
--.-
Dedicated Sta ff 35503 816812.58 277545.35 536239.17 154764.15 1785361.25
Home Office Staff 10366 182070.03 61906.09 167989.25 38375.06 450340.43
TOTAL STAFF 45869 998882.61 339451.44 704228.42 193139.21 2235701.68
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1'385:Cost SUMmary
TASK 04
TOTAL SERVICES
7313931
2235702
-
04-~11-04
04-011-05
04-011-08
04-011-0'3
04-011-10
04-011-11
04-011-13
04-011-14
04-011-15
04-011-16
04-0.11-17
04-011-18
04-011-19
04-011-2121
04-011-21
04-011-22
04-011-23
04-011-24
04-011-30
04-011-31
04-011-35
04-011-36
04-011-38
04-1011-39
04-011-40
04-011-44
04-011-51
04-011-52
04-011-53
04-011-54
04-011-55
04-011-57
04-011-58
04-011-5'3
04-011-61
04-011-62
04-011-63
04-011-64
04-011-6.5
104-011-66
0.4-011-71
04-011-72
SSP-ADMINISTRATION &CONTR.MANAGEMENT
SSP-FERC SUPPLEMENTAL INFORMATION REQUESTS
SSP-DEIS/FEIS REVIEW MEMORANDUMS
SSP-SETTLEMENT PROCESS INPUT
SSP-GENERAL LICENSING SUPPORT
SSP-WORKSHOP
SSP-HEARINGS PREPARATION
SSP-PROGRAM COORDINATION
SSP-PUBLIC ACCESS REPORT INPUT
SSP-ACCESS ROAD LOCATION INPUT
SSP-CONSTRUCTION LOCATION REPORT INPUT
SSP-INSTREAM FLOW COMPARISONS REPORT INPUT
SSP-DTLD PLAN OF STUDY DEVELOPMENT &UPDATING
CR-WORKSHOP
CR-QA PROGRAM
CR-REPORT REVIEW
CR-PROGRAM APPROACH
CR-IMPACT ASSESSMENT AND MITIGATION PLANNING
SE-WINTER RIVER USERS ANALYSIS
SE-WORKER CHARACTERISTICS ANALYSIS
SE-ADJACENT LANDOWNERS ANALYSIS
SE-REMOTE PARCEL OWNERS ANALYSIS
SE-LAND USE AND HOUSING CONSTRAINTS
SE-AIR TAXI OPERATORS ANALYSIS
SE-REFINEt>1ENT OF IMPACT ON COMMUNITIES
SE-MITIGATION PLAN UPDATE
SE-PERMANENT VILLAGE EVALUATION REPORT
SE-WORKER TRANSPORTATION ALTERNATIVES REPORT
SE-WORKER SHIFT AND ROTATION SCHEDULE REPORT
SE-LODGE OPERATORS ANALYSIS
SE-GUIDE ANALYSIS
SE-TRAPPERS ANALYSIS
BE-BOAT OPERATIONS ANALYSIS
SE-SPORT HUNTERS AND FISHERMEN RNALYSIS
RE-RECREATION IMPACT REFINEMENT
RE-TOURISM POTENTIAL OF PROJECT FACILITIES
RE-RECREATION PLAN REFINEMENT
RE-OPERATING &MGMT AGREEMENTS
RE-RECREATION OPPORTUNITIES FOR ON-SITE WORKERS
RE-NON-CONSUMPTIVE ACTIVITIES SURVEY
AE-AESTHETIC IMPACTS REFINEMENT
AE-FEASIBILITY OF AESTHETIC MITIGATION MEASURES
49543
10865
34953
36562
47041
11030
60774
35074
6818
7099
3669
4154
24019
4156
2077
17464
6642
42493
12173
2054
9131
7114
4869
14025
147317
10005
10386
10387
935'3
7114
7366
8522
7975
'3789
8801
3230
4845
3632
2421
30714
2422
2016
-
-
....
.....
......
eI4-Q)11-73
04-12111-81
04-Q\11-82
04-QI11-83
04-Q\11-95
04-i2i11-96
04-12111-97
'lI4-i2i11-98
04-12111-99
04-~113-02
04-1Z113-08
04-0113-09
04-lZi13-10
04-013-11
04-0'13-14
04-013-15
04-013-16
04-013-2121
04-013-30
04-013-31
04-013-32
04-013-33
04-013-34
04-013-35
04-013-36
04-013-37
04-013-39
iZl4-013-40
04-013-41
04-013-42
04-013-43
0.4-013-44
04-013-45
04-013-46
04-013-47
04-013-48
04-013-49
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
AE-DRAFT AESTHETICS MITIGATION PLAN
LU-OTHER PROJECT DEVELOPMENT PLANS
LU-PROJECT AND LAND MANAGEMENT DECISIONS
LU-HABITAT MITIGATION LANDS
SE-SPECIALTY BUSINESS ANALYSIS
SE-ECONOMIC IMPLICATIONS OF PROJECT FLOWS
SE-ALASKA HIRING POLICIES
REPORT REVIEW
SPECIAL POPULATION ANALYSIS
PLAN OF STUDY DEVELOPMENT AND UPDATING
RESPONSES TO FERC SUPPL INFO REQUESTS
TERRESTRIAL WORKSHOPS
MITIGATION PLAN REFINEMENT
IMPACT/MITIGATION PLANNING TRACKING SYSTEM
FURBEARER &TRAPPER STUDIES
SETTLEMENT PROCESS INPUT
DEIS/FEIS REVIEW
ADF&G BIG GAME STUDIES
MOOSE BROWSE INVENTORY
VEGETATION MAPPING AND DIGITIZING
IMPACT ASSESSMENT REFINEMENT
WETLANDS MAPPING
GENERAL ADMINISTRATION AND CONTRACT MANAGEMENT
TERRESTRIAL PROGRAM COORDINATION
FERC HEARINGS PREPARATION
PERMANENT VILLAGE EVAL REPORT INPUT
CAMP/VILLAGE LOCATION REPORT INPUT
WORKER TRANSPORTATION/POLICY REPORT INPUT
ACCESS ROAD LOCATION REPORT
CANDIDATE MITIGATION LANDS ASSESSMENT
HABITAT ENHANCEMENT STUDIES
DOWNSTREAM RIPARIAN STUDIES
RAPTOR STUDIES
SWAN/EAGLE TRANSMISSION LINE NEST SURVEYS
WINTER BIRD SURVEYS
INPUT TO F&W USER SURVEYS
INPUT TO SOC SCI MITIG PLANNING
2422
4128
2752
1376
25794
7856
212154
63841
2121057
21458
2'370
9309
12144
5570
8471
20987
18349
6841
8438
8063
8897
2273
56641
14964
3516'3
3510
3096
2205
3594
4997
9221
10485
4142
1924
3550
6030
9093
870380
302391
-
04-014-01 ADMINISTRATIVE ASSISTANCE
04-016-01 .DEIS/FEIS REVIEW
131064
1897
13101:.4
04-016-02
04-016-03
iZI4-12l16-04
04-016-05
04-016-06
04-016-07
iZI4-12l16-08
04-016-09
04-12116-1121
04-016-11
1214-016-12
04-016-13
1214-12116-14
04-016-15
04-12116-16
04-016-17
04-Q)16-18
04-016-2121
04-12116-21
04-016-23
04-12116-24
0L~-016-25
1214-016-26
04-12116-27
QJ4-016-28
04-016-29
1214-12116-3121
04-016-31
04-12116-32
04-016-34
1214-016-35
04-016-36
04-016-37
04-016-38
04-016-39
04-016-40
04-016-41
04-016-45
04-016-47
04-016-55
04-016-56
04-016-57
04-016-58
04-016-60
04-015-61
0L~-016-63
04-016-64
04-016-65
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
AGENCY WORKSHOPS/SETLEMENT PROCESS
GENERAL AQUATIC PROGRAM COORDINATION
INSTREAM FLOW RELATIONSHIPS
ENVIRONMENTAL AND ECONOMIC COMPARISONS
RECOMMENDED FLOW REPORT
AQUATIC IMPACT ASSESSMENT
FLOW NEGOTIATIONS
FERC HEARINGS PREPARATION
MITIGATION/ENHANCEMENT PLANNING
COMPREHENSIVE FISH REPORT
MIDRIVER HABITAT ANALYSIS
SALMON SPAWNING SURVEYS
LOWER RIVER RESIDENT AND JUVENILE STUDY
SALMON ESCAPEMENT
OUTMIGRATION STUDIES
STREAM FLOW &FLOOD FREQUENCY
SUSPENDED SEDIMENT/TURBIDITY
LOAD FOLLOWING
LOWER RIVER MORPHOLOGY ASSESSMENT
LOWER RIVER ICE OBSERVATIONS
LOWER RIVER SEDIMENT AGGRADATION
FOOD RESOURCES FOR CHINOOKS
EGG INCUBATION
MIDRIVER ESCAPEMENT-TALKEETNA
LOWER RIVER TRIBUTARY ACCESS
MIDDLE RIVER MAINSTREAM SPAWNING
SLOUGH GROUNDWATER
LONG TERM MONITORING
LOWER RIVER TEMPERATURE ANALYSIS
WINTER R.J.STUDY
SLOUGH ACCESS CRITERIA
LOWER RIVER REARING IFG
MITIGATION STUDIES <DVL CNYN TO TALK)
CONSTRUCTION IMPACT ASSESSMENT
CONSTRUCTION IMPACT MITIGATION
IMPOUNDMENT MITIGATION
WATER QUALITY-TSUSENA/DEADMAN CREEKS
PRIMARY PRODUCTIVITY STUDIES
MIDDLE RIVER TRIBUTARY STABILITY ANALYSIS
NAVIGATION STUDIES
GENERAL LICENSE SUPPORT
ISSUE PAPERS/SETTLEMENT PROCESS
MONTHLY PROGRESS REPORTS
GENERAL ADMINISTRATION AND CONTRACT MANAGEMENT
PLAN OF STUDY/WORKSCOPE PREPARATION
ACCESS ROAD LOCATION REPORT INPUT
CAMP AND PERMANENT VILLAGE LOCATION REPORT INPUT
TRANSMISSION LINE LOCATION REPORT INPUT
51113
·39522
136255
5181219
951213
19718
12572
87389
5428
29601
412168
3936
6920
5314
5774
2364
21852
7486
461213
711121
3551
1838
1838
1869
7850
8659
8330
13266
12433
1121336
6878
10382
16126
5023
'3366
12377
5526
5972
8688
22340
12674
136947
3252
512114
56114
115'37
6662
9969
-
~laska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:C.:)st Summat'y
04-eI16-65 EVALUATION OF MULTILEVEL OUTLET ALTERNATIVES
TOTAL DIRECTS
2755 931867
294215
04-~20-01
04-1l1120-04
04-020-05
04-0:20-05
04-020-07
TRAVEL AND LIVING EXPENSES
PRINTING
CCOMPUTER
MISCELLANEOUS
RELOCATION
143815
6013130
12000
1800121
5121400 294215
,~TOTAL SUBCONTRACTORS 4784014
.-
04-113-01
04-113-02
04-113-03
1214-113-134
04-113-.1215
04-113-07
04-113-08
1214-113-09
04-113-20
IZI4-113-21
04-113-22
04-113-23
04-113-24
04-113-26
04-113-27
04-113-28
04-113-29
04-113-30
04-113-31
04-113-32
04-113-33
FERC SUPPLEMENTAL INFORMATION REQUESTS
SETTLEMENT PROCESS INPUT
DEIS REVIEW MEMORANDUM
WORKSCOPE AND DETAILED PLAN OF STUDY
INTERTIE WORKER SURVEY REPORT
SOCIOECONOMIC MITIGATION PLAN UPDATE
SOCIOECONOMIC IMPACT PROJECTIONS SUMMARY
FO&A-HOUSEHOLD AND BUSINESS SURVEYS
HEARINGS PREPARATION
PROGRAM COORDINATION
FEIS MEMORANDUM
ACCESS ROAD LOCATION REPORT INPUT
PERMANENT VILLAGE EVALUATION REPORT
WORKER TRANSPORTATION ALTERNATIVES REPORT
WORKER SHIFT AND ROTATION SCHEDULE REPORT
PUBLIC SECTOR SURVEY
RAILHEAD ANALYSIS
MODEL REFINEMENT
LAND USE AND HOUSING CONSTRAINTS
PROJECT MANAGEMENT
2433
72'35
2070
4172
12500
7146
5519
33032
18079
24961
2070
3530
5161
5982
5886
8498
8658
5475
19024
4891
25385 212967
-04-123-01 RE/AE-FERC SUPPLEMENTAL INFORMATION REQUESTS 1920
04-123-1212 RE/AE-DEIS REVIEW MEMORANDUM 1821
04-123-05 RE-WORKSCOPE AND DETAILED PLAN OF STUDY 2384
04-1 ;23-0&RE-SETTLEMENT PROCESS INPUT 4111.....04-123-08 RE-HEARINGS PREPARATION 15339
04-1i23-15 RE-PROGRAM COORDINATION 18151
04-123-16 RE-PUBLIC ACCESS REPORT INPUT 6950....04-1i23-17 RE-ACCESS ROAD LOCATION REPORT INPUT 3383
04-123-18
04-123-1'3
04-123-21
04-123-22
04-123-23
04-123-50
04-123-51
04-123-53
04-123-54
04-123-55
04-123-57
04-123-58
04-123-5'3
04-123-60
04-123-51
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1'385:Cost Summary
RE-CAMP LOCATION REPORT INPUT
HE-RECREATION IMPACTS REFINEMENT
RE-RECREATION PLAN REFINEMENT
RE-PERMANENT VILLAGE EVALUATION REPORT
RE-RECREATION OPPORTUNITIES FOR ON-SITE WORKERS
AE-WORKSCOPE AND DETAILED PLAN OF STUDY
AE-SETTLEMENT PROCESS INPUT
AE-HEARINGS PREPARATION
AE-PROGRAM COORDINATION
AE-ACCESS ROAD LOCATION REPORT INPUT
AE-AESTHETICS IMPACTS REFINEMENT
AE-FEASIBILITY OF AESTHETIC MITIGATION MEASURES
AE-DRAFT AESTHETIC MITIGATION PLAN
AE-PERM.VILLAGE EVALUATION REPORT
AE-CAMP LOCATION REPORT INPUT
3862
12302
10150
3'386
4725
2474
4050
838'3
14337
34'3'3
10673
7152
6387
3782
16473 165310
04-133-01 DEKIN-CULTURAL RESORCES PROGRAM APPROACH
04-153-01 UNIDENTIFIED SIC-RESOURCE USERS SURVEY
04-173-01 CR TECHNICAL REVIEW PANEL
04-183-01 ERTEC-CULTURAL RESOURCES PROGRAM APPROACH
04-253-01 RM-M.BELL -CONSULTATION
30000
210000
40000
50000
20000
3121000
210000
40000
50000
20001Z1
-
~I
-
-
04-263-01
04-263-02
04-263-03
04-263-04
0L~-263-05
04-263-0'3
04-263-12
04-263-18
04-263-19
04-263-21
RM-DEIS/FEIS REVIEW
RM-AGENCY WORKSHOPS
RM-GENERAL AQUATIC PROGRAM COORDINATION
RM-INSTREAM FLOW STUDIES (ICE)
RM-INSTREAM FLOW STUDIES (WATERSHED)
RM-FERC HEARINGS PREPARATION
RM-MIDDLE RIVER HABITAT ANALYSIS
RM-SUSPENDED SEDIMENT/TURBIDITY
RM-HYDROLOGICAL/METEOROLOGICAL DATA
RM-LOWER RIVER MORPHOLOGY ASSESSMENT
o
14850
44341
25225
223'30
20076
17457
123231
178702
87266
r-
04-~~63-22
04-~~53-23
04-~~63-24
04-E53-28
04-E63-30
04-,~S3-43
04-~~63-55
04-;:~63-55
04-,~53-60
134-,:63-61
04-,:63-62
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
RM-MIDDLE RIVER HABITAT MAP
RM-LOWER RIVER ICE OBSERVATIONS
RM-LOWER RIVER SEDIMENT AGGRADATION
RM-LOWER RIVER TRIBUTARY ACCESS
SLOUGH GROUNDWATER
RM-GLACIER STUDIES
RM-NAVIGATION FIELD STUDIES
RM-GENERAL LICENSING CONSULTATION
RM-CONTRACT MANAGEMENT/ADMINISTRATION
RM-UPPER BASIN WINTER PRECIPITATION
RM-MACLAREN AND TYONE WEATHER STATIONS
20228
53265
60778
23312
74386
16276
46359
19773
12407
53559
46335 '370216
04-;::73-02 AEI-AGENCY WORKSHOPS/SETTLEMENT 50643
04-;::73-03 AEI-GENERAL AQUATIC PROGRAMS COORDINATION 22004
04-;::73-04 AEI-INSTREAM FLOW RELATIONSHIPS 250160
pRiiJ 04-;::73-05 AEI-ENVIRONMENTAL AND ECONOMIC COMPARISONS 144738
04-2:73-06 AEI-INSTREAM FLOW RELATIONSHIPS (P&2)27824
04-;::73-07 AEI-AQUATIC IMPACT ASSESSMENT 97046
04-2:73-09 AEI-FERC HEARINGS PREPARATION 12152-04-2:73-32 AE!-LOWER RIVER,TEMPERATURE ANALYSIS 207582
04-273-56 GENERAL LICENSING CONSULTATION 11098
04-273-60 AEI-CONTRACT MANAGEMENT/ADMINISTRATION 82303 905550
~
.-04-283-02
04-283-03
04-283-04
04-283-09
04-283-12
04-283-14
04-283-21
04-283-22
04-283-28
04-283-36
04-283-56
04-263-60
WT-AGENCY WORKSHOPS/SETTLEMENT
WT-GENERAL AQUATIC PROGRESS COORDINATION
WT-INSTREAM FLOW RELATIONSHIPS REPORT
WT-FERC HEARINGS PREPARTION
WT-MIDDLE RIVER HABITAT ANALYSIS
ADF&G CONSULTATION
WT-LOWER RIVER MORPHOLOGY ASSESSMENT
WT-MIDDLE RIVER HABITAT MAP
WT-LOWER RIVER TRIBUTARY ACCESS
WT-LOWER RIVER REARING{IFG)
GENERAL LICENSING SUPPORT
WT-CONTRACT MANAGEMENT/ADMINISTRATION
19883
25871
168926
11034
217906
56258
16826
58508
11138
29486
29242
11013 656091
.-
04-293-02 WC-AGENCY WORKSHOPS/SETTLEMENT
04-293-03 WC-GENERAL AQUATIC PROGRESS COORDINATION
04-293-04 WC-INSTREAM FLOW RELATIONSHIPS
0.4-293-09 WC-FERC HEARINGS PREPARATION
04-293-10 WC-MITIGATION/ENHANCEMENT PLANNING
04-293-11 WC-COMPREHENSIVE FISH REPORT
23450
28060
233174
181M2
208183
181020
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
04-293-37 WC-MITIGATION DEMONSTRATION
04-293-39 WC-CONSTRUCTION MITIGATION
04-293-40 WC-IMPOUNDMENT MITIGATION
04-293-56 GENERAL LICENSING SUPPORT
04-293-60 WC-CONTRACT MANAGEMENT/ADMINISTRATION
23254
65365
11553
15724
20634 665459
-
-
04-303-02 PLAN OF STUDY DEVELOPMENT AND UPDATING 5000
04-303-09 TERRESTRIAL WORKSHOPS 15000 ~
04-303-10 MITIGATION PLAN REFINEMENT 120000
04-303-11 'IMPACT/MITIGATION PLANNING TRACKING SYSTEM 15000
04-303-16 DEIS/FEIS REWIEW 1000121
04-303-30 MOOSE BROWSE INVENTORY 70000
04-303-32 IMPACT ASSESSMENT REFINEMENT 110000
04-303-36 FERC HEARING PREPARATION 20000
04-303-42 CANDIDATE MITIGATION LANDS ASSESSMENT 2000tZ1
134-303-43 HABITAT ENHANCEMENT STUDIES 1501210
04-303-44 DOWNSTREAM RIPARIAN STUDIES 10000
04-303-45 RAPTOR STUDIES 2500121
04-303-46 SWAN/EAGLE T-LINE NEST SURVEYS 5000
04-303-47 WINTER BIRD SURVEYS 15000 455000
.....
04-313-09 TERRESTRIAL WORKSHOPS 2000
04-313-36 FERC HEARING PREPARATION 300121 """04-313-44 DOWNSTREAM RIPARIAN STUDIES 30000 35000
04-323-09 TERRESTRIAL WORKSHOPS 3000
04-323-10 MITIGATION PLAN REFINEMENT 212100 ~
1214-323-14 FURBEARER AND TRAPPER STUDIES 5001210
04-323-32 IMPACT ASSESSMENT REFINEMENT 312100
04-323-36 FERC HEARINGS PREPARATION 300121
0.4-323-44 DOWNSTREAM RIPARIAN STUDIES 2000 63000
""'!I
04-333-1219 iERRESTRIAL WORKSHOPS 200121
04-333-31 VEGETATION MAPPING AND DIGITIZ ING 1512100121 15201210 -
04-343-09 TERRESTRIAL WORKSHOPS
04-343-10 MITIGATION PLAN REFINEMENT
04-343-32 IMPACT ASSESSMENT REFINEMENT
200121
5000
8000
--
......
"...
04-~343-36
04-:~43-47
lZl4-353-36
04-,354-01
Alaska Power Authority
Harza-Ebasco,Susitna Joint Venture
Fiscal Year 1985:Cost Summary
FERC HEARING PREPARATION
WINTER BIRD SURVEYS
FERC HEARING PREPARATION
CIRIfMOOLIN-DRAFTING
SUBCONTRACTOR HANDLING FEE
2500
2500
20000
18624
937'37
20000
20000
18624
937'37
RUN DATE ~8/~3/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1385 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 7
4954329812127782981212778298121318961211211218995
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
••* *** *•* * *•*** * * * *** * *** * * **•* * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
LABOR 12111
04-011-04 SSP-ADMINISTRATION &-CONTR.MANAGEMENT
35%4422 4422 4422
1214-12111-1215 SSP-FERC SUPPLEMENTAL INFORMATION REQUESTS
33~1126 141211 81213 1401 81213 667 803 1401 o 667 81213 1121865
1214-12111-1218 SSP-DEIS/FEIS REVIEW MEMORANDUMS
141213121 8283 321212 121 121 121 812156 1376 121 121 121 121 34953
1214-12111-1213 SSP-SETTLEMENT PROCESS INPUT
2279 4933 4815 4933 ·3336 2576 2279 21211210 2279 2442 2415 2275 36562
1214-12111-1121 SSP-GENERAL LICENSING SUPPORT
3847 439G 3798 4719 4444 3482 31211213 512147 258121 3531 3798 4396 47041
1214-12111-11 SSP-WORKSHOP
121 121 1375 1768 121 o 121 121 3218 4669 III o 11030
1214-12111-13 SSP-HEARINGS PREPARATION
121 121 121 121 121 121 5699 10869 12263 1121377 9992 11574 6121774
1214-12111-14 SSP-PROGRAM COORDINATION
3335 312161 2921 3061 2921 312161 251121 312161 251121 265121 2921 312161 3512174
1214-12111-15 SSP-PUBLIC ACCESS REPORT INPUT
121 0 0 1211 11215121 1474 1345 1738 o 121 121 121 6818
1214-011-16 SSP-ACCESS ROAD LOCATION INPUT
121 0 121 121 121 646 646 81217 121 688 2500 1812 7099
1214-12111-17 SSP-CONSTRUCTION LOCATION REPORT INPUT
121 121 785 785 121 121 646 81217 646 o o 121 3669
1214-12111-18 SSP-INSTREAM FLOW COMPARISONS REPORT INPUT
121 969 121 0 121 121 323 1431 1431 121 o 121 4154
1214-12111-19 SSP-DTLD PLAN OF STUDY DEVELOPMENT &-UPDATING
145121 332 1127 392 1127 392 81214 599 4372 5400 2943 512121 2412119
1214-12111-2121 CR-WORKSHOP
121 121 212178 212178 121 121 121 121 121 121 121 o 4156
1214-12111-21 CR-QA PROGRAM
831 831 415 121 121 121 121 121 121 121 121 o 2077
1214-12111-22 CR-REPORT REVIEW
IlEA 1164 1164 1164 1164 2'312 2912 1164 1164 1164 1164 1164 17464
J I I _J cl I J J J i J 11;fJ J l
I 1 -1 1 ])1 I 1 1 '~
J 1 1 J j ]
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 8
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
************************************************* * ******* **** ******************
LABOR 011
04-011-23 CR-PROGRAM APPROACH
415 415 415 415 415 415 415 415 415 415 1246 1246 6642
04-011-24 CR-IMPACT ASSESSMENT AND MITIGATION PLANNING
o 0 0 4156 6649 4156 1662 4156 6753 3948 4779 6234 42493
04-011-30 SE-WINTER RIVER USERS ANALYSIS
o 0 0 o 1217 o 1156 1217 2496 1826 1826 2435 12173
04-011-31 SE-WORKER CHARACTERISTICS ANALYSIS
o 0 0 1~7 1027 o o o o o o o 2054
04-011-35 SE-ADJACENT LANDOWNERS ANALYSIS
001/1
04-011-36 SE-REMOTE PARCEL OWNERS ANALYSIS
1636 1826 1826
o
1826
608
o
3957
o
4566
o
o
o
o
o
o
o
o
o
o
o
9131
7114
04~011-38 SE-LAND USE AND HOUSING CONSTRAINTS
01/10 0
04-011-39 SE-AIR TAXI OPERATORS ANALYSIS
755 249£2435 3470
04-011-40 SE-REFINEMENT OF IMPACT ON COMMUNITIES
4593 10833 42276 44245
2435
3287
23218
1217
o
17709
1217
1582
4443
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
4869
14025
147317
04-011-44 SE-MITIGATION PLAN UPDATE
000 o o o o 2435 2244 2244 1027 2055 10005
04-011-51 SE-PERMANENT VILLAGE EVALUATION REPORT
1/1 0 0 0
04-011-52 SE-WORKER TRANSPORTATION ALTERNATIVES REPORT
000 0
04-011-53 SE-WORK~R SHIFT AND ROTATION SCHEDULE REPORT
o 0 0 0
o
o
o
o
o
o
1027
o
o
3462
4490
2435
3462
3462
3462
2435
2435
3462
o
o
o
o
o
o
10386
10387
9359
04-011-54 SE-LODGE OPERATORS ANALYSIS
1636 1826 1826 1826 o o o o o o o o 7114
04-011-55 SE-GUIDE ANALYSIS
1888 2191
04-011-57 SE-TRAPPERS ANALYSIS
o 0
1461
o
913
o
913
o
o
o
o
o
o
o
o
o
o
,0
o
3652
o
4870
7366
8522
RUN DATE 1218/1213/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE '3
7975oooooo1826182&121
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * *** * * * * ** *** * * * * * * * * ** **** * * * * * * * *** * * * * * * * * * * ** ** * *** * * * * ** * * * ** * * * * * * * * * * *
LABOR 011
04-12111-58 SE-BOAT OPERATIONS ANALYSIS
1888 2435 0
04-12111--59 SE-SPORT HUNTERS AND FISHERMEN ANALYSIS
1510 1461 14&1 14&1 14&1 2435 121 121 121 o o 121 9789
04-12111-61 RE-RECREATION IMPACT REFINEMENT
1211 1292 81217 1211 212119 1292 64&323 121 o o o 8801
1214-12111-62 RE-TOURISM POTENTIAL OF PROJECT FACILITIES
323 %9 1938 121 121 o 121 121 o o 121 o 3230
04-011-63 RE-RECREATION PLAN REFINEMENT
00121 o 121 121 o 121 81217 1292 1777 %9 4845
04-12111-&4 RE-OPERATING &MGMT AGREEMENTS
000 121 o o o o 807 403 403 2019 3632
1214-011-65 RE-RECREATION OPPORTUNITIES FOR ON-SITE WORKERS
121 0 0 0 1211 807 41213 o o o o o 2421
04-011-66 RE-NON-CONSUMPTIVE ACTIVITIES SURVEY
921213 8939 8939 1211 1211 1211 o o 121 121 o o 30714
04-011-71 AE-AESTHETIC IMPACTS REFINEMENT
o 646 807 %9 121 121 o o o o o o 2422
04-011-72 AE-FEASIBILITY OF AESTHETIC MITIGATION MEASURES
o 121 0 0 ill o 41213 41213 403 o o 807 212116
1214-011-73 AE-DRAFT AESTHETICS MITIGATION PLAN
o 0 0 o o o o o 121 &05 1817 o 2422
04-011-81 LU-OTHER PROJECT DEVELOPMENT PLANS
121 121 121 o 121 1376 137&1376 o o o o 4128
04-011-82 LU-PROJECT AND LAND MANAGEMENT DECISIONS
121 0 0 0 121 1376 688 &88 o o o o 2752
04-011-83 LU-HABITAT MITIGATION LANDS
01210 121 o o 137&121 o 121 o o 137&
04-011-95 SE-SPECIALTY BUSINESS ANALYSIS
000 o 121 o o 4870 7&59 &633 5415 1217 25794
04-011-96 SE-ECONOMIC IMPLICATIONS OF PROJECT FLOWS
121 121 121 0 121 121 o 121 o 3928 3928 o 785&
f I J ,j ]J J j I 1 I ~,
i -J -J I 1 1 I 1 -1
J 1 J
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1~85 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 10
2054oooooooooo
SE --ALASKR HI RING POll CI ES
1027 1027
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * *** * * * ** *** * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * *** * * * * * * * * * ***
LABOR 011
~4-011-97
04-011-98 REPORT REVIEW
5826 10512 7327 8142 10923 8347 5676 1233 1078 1027 1644 2106 63841
04-011-~9 SPECIAL POPULATION ANALYSIS
000 o o o o o 8923 5780 4563 791 20057
LABOR 011 TOTALS
63434 76451 99021 96208 8285~67470 58715 60185 76613 70334 61255 57835 870380
** * * * * * *** * *** * * ** ******* * * * ** ** * * * * ** * * * * * * * * * * * * * * * * * * * * * * * *** *** *** ***** * * *
LABOR 013
04-013-02 PLAN OF STUDY DEVELOPMENT AND UPDATING
2056 1833 1051 759 1158 75~75~1855 2690 2562 2887 3089 21458
04-013-08 RESPONSES TO FERC SUPPL INFO REQUESTS
181 415 181 314 181 314 181 314 181 314 80 314 2970
04-013--09 TERRESTRIAL WORKSHOPS
o 526 2480 o 1053 2362 o o 526 2362 o o 9309
04-013-10 MITIGATION PLRN REFINEMENT
000 o 162 o 364 2327 3273 2908 2381 729 12144
04-013-11 IMPACT/MITIGATION PLANNING TRACKING SYSTEM
598 364 396 364 598 364 598 364 598 364 598 364 5570
04-013-14 FURBEARER &TRAPPER STUDIES
801 598 963 5~8 729 598 729 598 729 598 567 963 8471
04-013-15 SETTLEMENT PROCESS INPUT
1573 1775 1573 1775 1775 1775 1775 1775 1775 1573 1775 2068 20987
04-013-16 DEIS/FEIS REVIEW
3000 4073 577 234 %3 3307 3834 1835 526 o o o 18349
04-013-20 ADF&G BIG GAME STUDIES
3%3%3%598 598 396 396 396 598 396 656 1619 6841
04-013-30 MOOSE BROWSE INVENTORY
1255 1255 720 963 598 598 598 598 1255 598 o o 8438
04-013-31 VEGETATION MAPPING AND DIGITIZING
436 890 598 890 963 963 598 598 445 598 364 720 8063
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA~EBASCO SUSrTNA JOINT VENTURE
PAGE 11
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * *** * * * * * *** **** * * * * * * * * * *** * **** * * * * * *** *** * * * * * * * * * * * * * * * * * * * *** * * * *** * ***
LABOR 013
04-013-32 IMPACT ASSESSMENT REFINEMENT
1718 1274 881 1734 2692 598 0 III 111 0 111 0 8897
0/,-013-33 WETI-ANDS MAPPING
80 234 80 526 80 234 181 597 o 80 III 181 2273
04-013-34 GENERAL ADMINISTRATION AND CONTRACT MANAGEMENT
424/1 6247 4000 5079 6884 3243 3190 3608 5607 3680 4668 6191 56641
04-013-35 TERRESTRIAL PROGRAM COORDINATION
1247 1247 1247
04-013--36 FERC HEARINGS PREPARATION
415 598 415
1247
890
1247
1598
1247
2578
1247
3651
1247
3732
1247
5360
1247
4014
1247
5311
1247
6607
14964
351E.9
04-013-37 PERMANENT VILLAGE EVAL REPORT INPUT
III 415 597 597
04-013-39 CAMP/VILLAGE LOCATION REPORT INPUT
234 1431 1431 0
04-013-40 WORKER TRANSPORTATION/POLICY REPORT INPUT
III 0 415 597
415
o
778
o
o
415
597
o
o
889
o
o
o
o
o
o
o
o
o
o
o
o
o
o
3510
3096
2205
04-013~41 ACCESS ROAD LOCATION REPORT
III 1255 963 1376 III o o o o o o o 3594
04-013-42 CANDIDATE MITIGATION LANDS ASSESSMENT
835 1761 997 234 234 234 234 234 234 o o o 4997
04-013-43 HABITAT ENHANCEMENT STUDIES
1032 1885 1431
04-013-44 DOWNSTREAM RIPARIAN STUDIES
1362 1848 1362
1885
1362
1356
1184
399
598
411
598
o
598
411
598
111
177
411
399
o
399
9221
10485
04-013-45 RAPTOR STUDIES
890 0 o o o o o o 598 598 801 1255 4142
04-013-46 SWAN/EAGLE TRANSMISSION LINE NEST SURVEYS
000 0 o o o o o 436 598 890 1924
04-013-47 WINTER BIRD SURVEYS
396 162 3%162 598 162 396 162 3%162 396 162 3550
04-013-48 INPUT TO F&W USER SURVEYS
890 890 890 832 890 234 234 234 234 234 234 234 6030
I J cJ J J J I J J J
J ~I I 1 1 ,1 1 1 )1 1 1 ~1
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 12
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
909359859889012551~551093728890598
INPUT TO SOC SCI MITIG PLANNING
3%3%3%
* * * * * * * * * * * * * * * * * * * * ***** * ********* * *** ************* ** * ** * *** * **** * * ** ** * * ** ** *
LABOR 013
04-013-49
LABOR 013 TOTALS
24035 31768 24436 23614 275;::4 22106 21664 23216 28536 23791 p971 27630 302391
***** ** * ** * **** * ** * * ****** **** ****** * * * *** **** * *** ** ** ** * ***** * * * * * ** **** ** ** *
LABOR 014
04-014-01 ADMINISTRATIVE ASSISTANCE
10213 12924 9879 10339 12464 9420 9421£1 10339 12924 10339 10339 12464 131064
LABOR 014 TOTALS
10213 12924 9879 10339 12464 9420 9420 10339 12924 10339 10339 12464 131064
* * * * *** * * *** **** ***** ** * *** * ** **** ** ** *** * ** * * *** * ****** ** * ** *** ** * * *** * ******
LABOR 016
04-016-01 DEIS/FEIS REVIEW
813 0 o o o o 1084 o 1£1 o o o 1897
04-016-02 AGENCY WORKSHOPS/SETLEMENT PROCESS
6'304 4649 4649 4649 4649 975 3835 3835 3835 3835 4649 4649 51113
04-016·~03 GENERAL AQUATIC PROGRAM COORDINATION
2508 3661 2440 3186 5491 3796 2712 3796 2712 2712 2712 3796 39522
04-016-04 INSTREAM FLOW RELATIONSHIPS
13429 22745 18583 13082 15818 9502 7154 8275 9780 5145 5829 6913 136255
04-016-05 ENVIRONMENTAL AND ECONOMIC COMPARISONS
220 2575 2355 4554 3989 7297 6856 7888 6028 3975 3036 3036 51809
04-016-06 RECOMMENDED FLOW REPORT
o 0 0 o o o o o 1267 2851 2851 2534 9503
04-016-07 AQUATIC IMPACT ASSESSMENT
o 0 0 835 1463 1691 2066 3837 3010 2£55 1955 2206 19718
04-016-08 FLOW NEGOTIATIONS
835 835 1252 835 1252 782 835 1043 1252 1043 1043 15E,5 12572
04-016-09 FERC HEARINGS PREPARATION
5364 4821 4821 4477 4484 6012 (,666 %77 9621 7813 10192 13441 87389
RUN DRTE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNR JOINT VENTURE
PAGE 13
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * ***** * * *** ******* * * * *** * * * * **** *** *** * * * * * * * * ******** * * * * * *** * * * ***** ***
~ABOR 016
04-016-10 MITIGATION/ENHANCEMENT PLANNING
137 587 687
04-016-11 COMPREHENSIVE FISH REPORT
2261 1103 1103
04-016-12 MIDRIVER HABITAT ANALYSIS
o 288 288
04-01E.-13 SRLMON SPAWNING SURVEYS
950 689 919
687
2206
o
III
8 ·:>~,-u
2482
576
o
o
3236
288
1378
825
3236
o
o
o
112130
360
o
o
3236
360
o
1237
3236
o
121
206
3236
720
o
137
3236
1188
o
5428
2%01
4068
3936
04-016-·14 LOWER RIVER RESIDENT AND JUVENILE STUDY
950 1148 1148 III 1378 III o o o 1148 1148 o 6920
04-016-15 SALMON ESCAPEMENT
950 919
04-016--16 OUTMIGRATION STUDIES
950 919
919
919
o
III
III
o
o
o
o
o
o
o
1378
o
1148
1148
o
1838
o
o
5314
5774
04-015-17 STREAM FLOW &FLOOD FREQUENCY
o 394 0
04-016-18 SUSPENDED SEDIMENT/TURBIDITY
o 2052 1800
394
3240
o
3£4121
394
1440
o
1440
394
1440
o
1800
394
1800
o
1800
394
1800
2364
21852
04-016-20 LOAD FOLLOWING
Ib10 2244 1267 1267 III o o 343 o o 343 412 7486
04-016-21 LOWER RIVER MORPHOI.OGY ASSESSMENT
1237 687 687 550
04-016-23 LOWER RIVER ICE OBSERVATIONS
204 197 197 1184
275
1382
137
197
137
1184
o
197
550
197
o
197
o
1974
343
III
4603
7110
04-016~24 LOWER RIVER SEDIMENT AGGRADATION
III 197 III
04-016--25 FOOD RESOURCES FOR CHINOOKS
III 0 0
o
919
III
919.
1184
o
592
o
592
o
592
o
394
III
o
o
o
o
3551
1838
04-016-26 EGG INCUBATION
o 0 III 919 919 o III o o o o o 1838
04-016-27 MIDRIVER ESCAPEMENT-TALKEETNA
950 0 III III o o 919 o o o o o 186'3
~J J J I ..1 I J J J I I J J
j 1 i I J 1 B
RUN DRTE 08/03/84 ALASKR POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 14
7850o1970987987493illill1378o
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
******* * * * * *** ***** * * * * * * **** * *** * * * * * ***** * * * * * *** ****** *** * *** ***** * * * *** * ***
LABOR 016
04-016-28 LOWER RIVER TRIBUTARY ACCESS
o 1116 919
04-016-29 MIDDLE RIVER MAINSTREAM SPAWNING
1425 1378 1378 1378 574 ill o 1378 ill o o 1148 8659
04-016-30 SLOUGH GROUNDWATER
1224 1184 987 1974 o III o o ill o 1974 987 8330
04-016-31 LONG TERM MONITORING
o 0 o 3446 3848 2297 1378 o 2297 o o o 13266
04-016-32 LOWER RIVER TEMPERATURE ANALYSIS
o 0 1184 1184 1184 1184 1184 1184 1184 987 1184 1974 12433
04-016-34 WINTER R.J.STUDY
o 0 0 o o 2297 2297 2297 2297 1148 o ill 10336
04-016-35 SLOUGH ACCESS CRITERIA
2041 2369 987 o o 1481 o o o o o ill 6878
04-016-36 LOWER RIVER REARING IFG
1425 1378 1378 o o o 2297 o ill 1148 1378 1378 10382
04-016-37 MITIGATION STUDIES IDVL CNYN TO TALK)
1425 2297 2297 1378 o o ill 1838 o 2297 2297 2297 16126
04-016-38 CONSTRUCTION IMPACT ASSESSMENT
1224 1431 1184 987 III o ill o 197 o o o 5023
04-016-39 CONSTRUCTION IMPACT MITIGATION
1224 1184 987 987 839 1184 o o o o 987 1974 9366
04-016-40 IMPOUNDMENT MITIGATION
1224 1184 987 987 o ill o 2073 1974 987 987 1974 12377
04-016-41 WATER QUALITY-TSUSENA/DEAOMAN CREEKS
o 789 789 0 987 o 987 987 987 o ill o 5526
04-016-45 PRIMARY PRODUCTIVITY STUDIES
o ill ill III o ill o o 1378 o 2297 2297 5972
04-016-47 MIDDLE RIVER TRIBUTARY STABILITY ANALYSIS
1633 1974 1184 1184 1184 493 o o 1036 o o o 8688
04-016-55 NAVIGATION STUDIES
2916 3491 887 1140 3744 2027 1267 1717 III 1717 1717 1717 22340
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 15
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
******************** * * * * * * * *** * * * * ***** * * * * * * ******** **** *** ** * * ***************
LABOR 016
04-016-51'.GENERAL LICENSE SUPPORT
1084 0 1423
04-016--57 ISSUE PAPERS/SETTLEMENT PROCESS
9806 16800 8897
04-016-58 MONTHLY PROGRESS REPORTS
271 271 271
17G2
13093
271
1351'.
lGG89
271
1017
11375
271
o
9001
271
o
7014
271
2508
14%4
271
1084
6257
271
1084
7804
271
1356
15247
271
12674
136947
3252
04-011'.-60 GENERAL ADMINISTRATION AND CONTRACT MANAGEMENT
1084 1220 271 271 271 271 271 271 271 271 271 271 5014
04-016-1'.1 PLAN OF STUDY/WORKSCOPE PREPARATION
3918 2044 0
04-011'.-63 ACCESS ROAD LOCATION REPORT INPUT
III 0 0
o
271
o
1974
2931
1481
4202
1752
8199
987
12014
987
10911
1974
4799
1184
7096
987
5(;114
11597
04-016-64 CAMP AND PERMANENT VILLAGE LOCATION REPORT INPUT
o 0 0 0 1184 o 1184 987 1481 987 o 839 6662
04-016-65 TRANSMISSION LINE LOCATION REPORT INPUT
000 III
04-016-1'.6 EVALUATION OF MULTILEVEL OUTLET ALTERNATIVES
o 1323 551 441
1974
441"
493
121
1481
o
987
o
1481
o
1974
o
o
o
1579
o
9%9
2756
LABOR 016 TOTALS
72196 92243 70595 73738 8704121 67111 67113 73390 91932 73731 73736 89042 931867
************************************* * ** ******** ****** * ** *********************
DIRECTS
04-020-01 TRAVEL AND LIVING EXPENSES
14251 14251 14251 9451 13451 9451 13451 9451 9451 17452 9451 9453 143815
04-020-04 PR I NT!NG
5000
04-12120-05 CCOMPUTER
1000
5000
1000
500121
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
5000
1000
60000
12000
1214-020-06 MISCELLANEOUS
1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 1500 18000
04-020-07 RELOCATION
33000 III o o 27400 o o o o o o o 60400
J J I .J ]J I I J I
i 1 1 I 1 J ])1 I 1 ]I
RUN DATE 1218/1213/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTUREI
TASK 1214 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY
PAGE 16
JUNE TOTAL
* * * ** * **** * * * * * * * * * * *** * * * * * * * * * * * * **l * * * * * *** * * *** ****** * * * * * * ***** * * * * * * * * * * *
TOTAL DI REeTS
54751 21751 21751 16951 48351 16951 2121951 16951 16951 24952 16951 16953 294215
* * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * ***** *** * * *** * * * * *** * * *
SUBCONTRACTOR 113
04-113-1211 .FERC SUI=-PLEMENTAL INFORMATION REQUESTS
239 186 186 237 185 185 237 186 186 236 185 185 2433
1214-113-1212 SETTLEMENT PROCESS INPUT
364 364 365
1214-113-1213 DEIS REVIEW MEMORANDUM
121 21217121 ill
365
121
364
121
366
121
364
o
365
o
3E.5
121
3283
o
366
121
-364
o
7295
207121
1214-113-1214 WORKSCOPE AND DETAILED PLAN OF STUDY
121 121 0 121
04-113-1215 INTERTIE WORKER SURVEy REPORT
2141 3639 2782 2141
04-113-1217 SOCIOECONOMIC MITIGATION PLAN UPDATE
121 121 0 121
1214-113-08 SOCIOECONOMIC IMPACT PROJECTIONS SUMMARY
o 121 121 121
04-113-1219 FO&A-HOUSEHOLD AND BUSINESS SURVEYS
112155 121 112155 896121
121
1284
121
121
13177
121
513
121
o
8785
o
121
o
121
121
1841
121
121
311
o
1227
121
386121
3271
121
121
o
1946
1523
o
111214
121
1340
514
121
o
o
121
121
121
4172
125121121
7146
5619
3312132
1214-113-2121 HEARINGS PREPARATION
121 121
1214-113-21 PROGRAM COORDINATION
I/)121 121 o 3013 3013 312114 312114 312114 312111 1812179
2211 221217 221217 221218 2207 221217 2207 221217 1692 2092 1724 1792 24%1
1214-113-22 FEIS MEMORANDUM
121 121 121 121 121 121 2070 121 o 121 o 121 21217121
1214-113-23 ACCESS ROAD LOCATION REPORT INPUT
121 121 121
1214-113-24 PERMANENT VILLAGE EVALUATION REPORT
0121121
121
o
o
o
o
121
121
o
121
398121
121
2181
1432
o
2198
o
o
121
363121
6161
04-113-26 WORKER TRANSPORTATION ALTERNATIVES REPORT
I/)000 o o o o 4331 1651 o o 5982
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 17
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* • * * * • * • • * * • * * * * * * * * * * * * * * *** *** **** * **** * * * * * * * * * * ****** * * * * *** * ******** * * * * **
SUBCONTRACTOR 113
04-113-27 WORKER SHIFT AND ROTATION SCHEDULE REPORT
o 0 ill ill ill 0 0 0 3815 2071 0 0 5886
04-113-28 PUBLIC SECTOR SURVEY
290 192 5553 1209 %4 290 o o o ill ill o 849B
04-113-29
257 1031 2062 2062 2062 1031 153 ill o o o o 8658
04-113-30 RAILHEAD ANALYSIS
276.2916
04-113-31 MODEL REFINEMENT
1234 2365
1515
o
512
o
256
2365
o
2365
o
2365
ill
3600
o
23&5
ill
2365
o
ill
ill
o
5475
19024
04-113-32 LAND USE AND HOUSING CONSTRAINTS
280 0 ill 2698 1124 563 113 113 ~o ill o 4891
04-113-33 PROJECT MANAGEMENT
2120 2115
SUBCONTRACTOR 113 TOTALS
10467 17085
2115
17840
2115
22507
2115
26103
2115
18420
2115
12637
2115
17731
2115
28422
2115
21728
2115
12560
2115
74&7
25385
212967
* * * * * *** * *** * * * * * * *** * * * ***** * * * ** ** ***** * * * * * * ** ** ***** * * * *** *.****** *** * * * * * *
SUBCONTRACTOR 123
04-123-01 RE/AE-FERC SUPPLEMENTAL INFORMATION REQUESTS
o 0 0 355 713 852 o o o o ill o 1920
04-123-02 RE/AE-DEIS REVIEW MEMORANDUM
o 0 769 1052 o o o ill o o ill ill 1821
04-123--05 RE-WORKSCOPE AND DETAILED PLAN OF STUDY
o ill 0 0 III o o 5%596 5%596 o 2384
04-123-06 RE-SETTLEMENT PROCESS INPUT
o ill 0
04-123-08 RE-HEARINGS PREPARATION
o ill ill
04-123-15 RE-PROGRAM COORDINATION
1497 1497 1545
04-123-16 RE-PUBLIC ACCESS REPORT INPUT
o 0 ill
J J
o
o
1497
o
I
374
o
1497
1540
I
379
o
1497
1803
379
2559
1543
1803
379
2556
1543
1814
I
379
2556
1543
III
1842
2556
1497
III
379
255&
1497
ill
I J
o
2556
1498
ill
J
4111
15339
18151
6%0
I
RUN DRTE 08/03/84
1 J 1
ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCRL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
j 1
PAGE 18
j
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * * * * * * * * * * **** ** *** * * * * * * * * * * * * * * * * * * *** * * **** ** * * * * * * * * * ***** *SUBCONTRACTOR 123
04-123-17 RE-ACCESS ROAD LOCATION REPORT INPUT
o 0 0 0 0'0 619 61'3 619 763 763 0 3383
04-123-18 RE-CAMP LOCATION REPORT INPUT
1049 1049 715
04-123-19 RE-RECREATION IMPACTS REFINEMENT
o 0 0
04-123-21 RE-RECREATION PLAN REFINEMENT
2537 2537 2537
1049
o
2539
o
o
o
o
1786
o
o
2629
ill
o
2629
o
o
2629
o
o
2629
o
o
o
o
o
o
o
3862
12302
10150
04-123-22 RE-PERMANENT VILLAGE EVALUATION REPORT
o 717 717 717 717 369 373 376 o o o o 3986
04-123-23 RE-RECREATION OPPORTUNITIES FOR ON-SITE WORKERS
o 0 0 0 0 930 930 930 930 1005 ill o 4725
04-123-5121 AE-WORKSCOPE AND DETAILED PLAN OF STUDY
o III 0 III o o o 821 o o 821 832 2474
04-123-51 AE-SETTLEMENT PROCESS INPUT
o 0 0
04-123-53 AE-HEARINGS PREPARATION
o ill 0
04-123-54 AE-PROGRAM COORDINATION
1194 1194 1194
370
o
1195
365
o
1195
365
o
1195
365
o
1195
365
1677
1195
365
1678
1195
1482
1678
1195
373
1E.78
1195
o
1678
1195
4050
8389
14337
04-123-55 AE-ACCESS ROAD LOCRTION REPORT INPUT
o 0 III III o 111 339 940 960 1260 o o 3499
04-123-57 AE-AESTHETICS IMPACTS REFINEMENT
1524 1524 1524 1524 1524 o 1524 1529 o o o o 10673
04-123-58 AE-FEASIBILITY OF AESTHETIC MITIGATION MEASURES
764 847 847 0 III 847 1262 1291 1294 o o o 7152
04-123-59 AE-DRAFT AESTHETIC MITIGATION PLAN
o 769 770 0
04-123-60 AE-PERM.VILLAGE EVALUATION REPORT
1029 818 1029 906
o
o
o
o
820
o
820
o
748
o
1230
o
1230
111
111
III
6387
3782
04-123-61 AE-CAMP LOCATION REPORT INPUT
1751 1306 1306 1306 1306 1306 1306 1306 1306 1306 1308 1660 1EA73
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 19
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
** * **** * ***** * * * * * * * * * * *** * * * * ******** *** * * * * * **** * * * * * * * * ** ** * * * * * * * * * * * * * * ***
SUBCONTRACTOR 123 TOTALS
11345 12258 12953 12510 9231 11329 17646 21381:,15798 19039 123%9419 155310
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** *** * * * * * * * * * * * * * * * * * *** * * * ****** * * * * * * * **** * *
SUBCONTRACTOR 133
04-133-01 DEKIN-CULTURAL RESORCES PROGRAM APPROACH
o 0 10000 10000 10000 o o o o o o o 30000
SUBCONTRACTOR 133 TOTALS
o o 10000 10000 10000 o o o o o o o 30000
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * *** *** * * * * * * * * * *** * * * * * * * * *** * *** * * * *
SUBCONTRACTOR 153
04-153-01 UNIDENTIFIED SIC-RESOURCE USERS SURVEY
o 0 60000 E.0000 30000 30000 30000 o o o o o 210000
SUBCONTRACTOR 153 TOTALS
o o 50000 60000 30000 30000 30000 o o o o o 210000
* * * * * * * * * * * * * * * *** * *** * * * * * * * * * * ***** * * * * * **,** * ** **** * * * * * * * * * * *** *** * * * * * * * * *
SUBCONTRACTOR 173
04-173-01 CR TECHNICAL REVIEW PANEL
o 0 o o o 20000 2001010 o o o o 10 40000
SUBCONTRACTOR 173 TOTALS
o o o o o 20000 20000 ill o o o o 40000
* *** * * * * * * * *** * * * * * * * * * * * * * * * * * * * * **** * * * * * * * *** * * * * *** * * * * * * * * * * * * * * * * * * * * * * *
SUBCONTRACTOR 183
04-183-01 ERTEC-CULTURAL RESOURCES PROGRAM APPROACH
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 500 50000
SUBCONTRACTOR 183 TOTALS
4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 4500 500 50000
* * * * * * * * * * * * * * * * * * * * * * * * *** *** * *** * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * **** * * * * * * * *
SUBCONTRACTOR 253
04-253-01 RM-M.BELL -CONSULTATION
2000 2000 2000 2000 2000 o o 2000 2000 2000 2000 2000 2,~IOi<JQJ
I I ,__J J .!l J -)
1 )i 1 1 -]1 1 1 1 J
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
** * * * * * * * * * * *** * * * * * * * * * * * * * *** * * * * * * * * * * * * * ***** * * * *** * * * * * *** * *** * *** * * *** * * *
I
I
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 2!1l
SUBCONTRACTOR 253 TOTALS
2000 2000 2000 2000 2000 o o 2000 2000 2000 2000 2000 20000
* * * * *•* * * * * * * **** * ** ** * * ** **** * * * *** * * * * * ***** *•** * * **** * * *** * * * * * * * * * *•* * * * **
SUBCONTRACTOR 2&3
04-2£3-01 RM-DEIS/FEis REVIEW
o 0
04-2&3-02 RM-AGENCY WORKSHOPS
1350 0
o
1350
o
1350
o
1350
o
1350
o
1350
o
1350
o
1350
o
1350
o
13513
til
1350
til
148::;0
04-2&3-03 RM-GENERAL AQUATIC PROGRAM COORDINATION
1410 1410 1410 1410
04-263-04 RM-INSTREAM FLOW STUDIES (ICE)
6074 8140 4203 4374
04-263-05 RM-INSTREAM FLOW STUDIES (WATERSHED)
2399 2400 0 0
04-2&3-09 RM-FERC HEARINGS PREPARATION
o 000
04-2&3-12 RM-MIDDLE RIVER HABITAT ANALYSIS
4929 8350 4178 0
1410
2434
o
o
o
1410
o
7523
o
o
4515
o
7523
3194
o
74&4
o
o
3194
o
74&4
o
2545
3422
o
74&4
o
o
3422
o
74&4
o
til
3422
til
1510
o
o
3422
o
44341
25225
22390
2007&
17457
04-263-18 RM-SUSPENDED SEDIMENT/TURBIDITY
33587 2&504 21563 15517 13940 5492 &£28 o o o o o 123231
04-2&3-19 RM-HYDROLOGICAL/METEOROLOGICAL DATA
27914 23312 12379 8733
04-263-21 RM-LOWER RIVER MORPHOLOGY ASSESSMENT
10765 13056 16812 14997
04-2&3-22 RM-MIDDLE RIVER HABITAT MAP
&018 3341 2656 5842
04-2&3-23 RM-LOWER RIVER ICE OBSERVATIONS
o 0 3515 10932
04-2&3-24 RM-LOWER RIVER SEDIMENT AGGRADATION
2100 2483 53124 c 1987
04-263-28 RM-LOWER RIVER TRIBUTARY ACCESS
3784 1958 &1&7 1189
10775
87&&
E:371
12&7&
1084
2390
103':'13
7414
o
&035
o
&047
19552
11449
o
8522
o
o
21905
o
o
5933
o
1777
10270
4007
ill
o
o
o
9585
o
til
3877
til
o
11950
til
o
104&1
o
o
11934
o
o
1314
o
o
178702
872&6
20228
63255
&0778
23312
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 21
74386III121ooo2601o81271166517261
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TqTAL
*************** * * * * ***** * *** * ****** ******* * * * * **** * **** * •****** **** ************
SUBCONTRACTOR 263
04-263-30 SLOUGH GROUNDWATER
10238 24494
04-263-43 RM-GLACIER STUDIES
754 0 3159 o 3328 431111 3403 o 1331 o o o 16276
04-263-55 RM-NAVIGATION FIELD STUDIES
8667 3552 7784 7931 3450 6015 6714 ill 2246 o III o 45353
04-263-56 RM-GENERAL LICENSING CONSULTATION
3280 1321 1321 1321 1321 1321 3280 1321 1321 1322 1322 13i='2 j '3773
04-263-60 RM-CONTRACT MANAGEMENT/ADMINISTRATION
1III 34 111134 1034 1034 1034 1034 1034 1034 I1tl34 1034 1034 1033 12407
04-263-61 RM-UPPER BASIN WINTER PRECIPITATION
22002 7541 2259 2260 2259 2260 3684 2259 2260 2259 2260 2256 5355'3
04-263-62 RM-MACLAREN AND TYONE WEATHER STATIONS
17208 5817 2081 ;::081 2081 2081 3353 21tl81 3293 2081 2089 2083 46335
SUBCONTRACTOR 263 TOTALS
163513 134713 162255 92623 78796 62676 86802 48318 40543 32394 41352 26230 970216
**** **** **** * * ************* * ******* *********** * *** * ** ** * ** ********* * * * ** * *****
SUBCONTRACTOR 273
04-273-1ll2 AEI-AGENCY WORKSHOPS/SETTLEMENT
10176 8584 7150 2240 1436 4392 4750 4392 5468 805 81115 445 50643
04-273-03 AEI-GENERAL AQUATIC PROGRAMS COORDINATION
2355 3209 1908 2230 2297 445 1340 1018 2259 1463 2230 1250 22004
04-273-04 AEI-INSTREAM FLOW RELATIONSHIPS
40743 49445 26441 24486 29470 15833 17648 11860 11633 7798 721219 7594 250160
04-273-05 AEI-ENVIRONMENTAL AND ECONOMIC COMPARISONS
6418 9071 12817 16730 18076 20140 181%I 5661tl 11961 8993 3518 3158 14473.8
04-273-06 AEI-INSTREAM FLOW RELATIONSHIPS (P&2)
1381 4337 5288 7054 8601 1153 ill o o o o o 278,:::4
04-273-07 AEI-AQUATIC IMPACT ASSESSMENT
1076 1968 1968 5402 3439 4879 8587 14474 14022 17E.0i?13956 9673 '3704£
04-273-09 AEI-FERC HEARINGS PREPARATION
000 o o o 805 2529 2371 2701 2082 1££.4 12152
,f I 1 I J I I !I t I I J
1 1 1 3 1 i j 1 1 '~r --B .--1 i I
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 22
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
*****************************************************•*****4 *4 4 *4 **4 4 **•*****•*
SUBCONTRACTOR 273
04-273-32 AEI-LOWER RIVER TEMPERATURE ANALYSIS
3627 5243 4180 9918 11920 15201 18849 24915 24738 26596 30782 31613 207582
04-273-56 GENERAL LICENSING CONSULTATION
892 892 1089 892 892 892 892 892 1089 892 892 892 l.,z3B
04-273-60 AEI-CONTRACT MANAGEMENT/ADMINISTRATION
7444 7923 5208 5029 5782 3958 5555 6068 5961 11204 11348 .5823 823213
SUBCONTRACTOR 273 TOTALS
74112 90672 66049 73981 82913 66903 76622 81808 79502 78054 72822 62.112 31l15551l1
**********•*******••**********4 **********************~**•***** *•* **•** * * * *****
SUBCONTRACTOR 283
04-283-02 WT-AGENCY WORKSHOPS/SETTLEMENT
2754 1042 6711 1042 1042 1042 1042 1042 1042 1042 1041 1041 19883
04-283-03 WT-GENERAL AQUATIC PROGRESS COORDINATION
1042 1042 1042 1041
04-283-04 WT-INSTREAM FLOW RELATIONSHIPS REPORT
22390 23909 13937 17569
1042
197%
1042
15395
2594
17372
38%
19830
38%
16586
40%
2182
40'36
o
1042
12\
25871
168926
04-283"09 WT-FERC HEARINGS PREPARTION
III III 0
04-283-12 WT-MIDDLE RIVER HABITAT ANALYSIS
29462 18881 20789
o
15899
III
13429
o
10715
1839
15697
1839
14038
1839
18380
1839
19673
1839
21230
1839
19713
11034
217906
04-283-14 ADF&G CONSULTATION
4323 4937 3833 4877 3710 4362 43E.2 4262 4363 4954 5546 672.9 56258
04-283-21 WT-LOWER RIVER MORPHDLOGY ASSESSMENT
903 1313 2527 2322
04-283-22 WT-MIDDLE RIVER HABITAT MAP
3767 3211 3868 3868
04-283-28 WT-LOWER RIVER TRIBUTARY ACCESS
3492 2792 592 59;:'
2092
3863
1835
·2843
3800
o
1%7
6222
o
552
4835
III
1203
5392
1835
1104
72.97
o
o
6477
o
o
5908
o
16826
58508
11138
04-283-36 WT-LOWER RIVER REARING<IFG)
1302 3228 1926
04-283-56 GENERAL LICENSING SUPPORT
1401 2715 2358
2577
2000
1514
2000
4603
2117
2252
1642
2252
1642
2352
2000
2026
3789
3328
3789
2025
3789
29486
29242
RUN DATE 138/03/84 ALASKA POWER AUTHORITY PAGE 23
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 EUDGET FOR HARZA-EEASCO SUSITNA JOINT VENTURE
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * *** * * * * * * * * * * * * * * * * * * * * * *** * *** ******** * * * * * * * * * * * * * *** *** * * * *** * * * * * * * * * * **
SUBCONTRACTOR 283
0'1-283-60 WT-CONTRACT MANAGEMENT/ADMINISTRATION
1751 1751 751 751 751 751 751 751 751 751 751 752 Il1ll13
SUBCONTRACTOR 283 TOTALS
72587 64821 58334 52538 51134 46670 55740 54939 59539 48753 48097 42839 655091
* * * * * * * * * **** * *** **** * * * * * * •*** ** * *~* ***** *** **** * **** * * * * ****** * *** * * *** *****
SUBCONTRACTOR 293
04-293-02 We-AGENCY WORKSHOPS/SETTLEMENT
1426 1780 2503 2967 1780 1780 1869 18b9 1869 1859 1869 1859 23450
04-293-03 WC-GENERAL AQUATIC PROGRESS COORDINATION
1053 1242 1242 1242 1242 1242 3037 4090 40913 3987 4289 1304 281/160
134-293-04 WC-INSTREAM FLOW RELATIONSHIPS
19258 20329 23105 23195 25723 26005 21E.10 17381 18135 17937 10242 10242 233174
04-293-09 WC-FERC HEARINGS PREPARATION
0 0 III 0 0 0 3007 3007 3007 3007 3007 3007 1804;?
0"-293-10 WC-MITIGATION/ENHANCEMENT PLANNING
21577 24213 33723 21Zl91ll6 10682 9848 7892 9010 16117 19393 17926 16896 208183
04-293-11 WC-COMPREHENSIVE FISH REPORT
1715 2958 4189 3482 ·-·r:-7C 2385 755 0 0 0 0 0 180;;:0CO..J ......J
0',-293-37 WC-MITIGATION DEMONSTRATION
3180 3180 3180 2471 111 0 ill 0 0 0 4552 E.591 23254
04-293-39 WC-CONSTRUCTION MITIGATION
III 0 III III 7842 8025 9217 9608 9427 6963 9944 4338 55355
04-293-40 WC-IMPOUNDMENT MITIGATION
III III 0 0 1527 1914 2457 2996 2559 0 0 0 11553
04-293-56 GENERAL LICENSING SUPPORT
1303 1303 1303 1303 1303 1303 1368 1368 1358 1055 1368 1368 15724
04-293-60 WC-CONTRACT MANAGEMENT /ADM INI STRAT ION
1582 1682 1582 1682 1582 1682 1757 1757 1757 1757 1757 1757 20534
t J .J I I r .J ~])I ]t ••J
'J t 1 1 I J "~l "J 1 1 1 I J 1
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
sUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 24
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * ** * * * * * ***** * * *** * * * * * * ***** * ** *** * * * * * * * * * * * ***** * * * * ****** * * * * ** ******** ***
SUBCONTRACTOR 293 TOTALS
51205 5(;687 70928 57248 54415 54185 52959 51085 58330 55979 54954 47472 (;55459
*** *** * * **** ** * *** * * ***** ** ** ** ** * * * * * *********** *** *** *** **** * * * ********* ****
SUBCONTRACTOR 403
04-303-02 PLAN OF STUDY DEVELOPMENT AND UPDATING
000 0 o o o o 2500 500 1000 le,00 5000
04-303-09 TERRESTRIAL WORKSHOPS
o 0 5000 o 1000 41300 o o o 5000 o o 15000
04-303-10 MITIGATION PLAN REFINEMENT
2000 31300 5000 50130 20000 301300 30000 10000 5000 5000 2500 2500 12121000
04-3133-11 IMPACT/MITIGATION PLANNING TRACKING SYSTEM
20130 1000 1000 1000 2000 1000 1000 1000 1000 1000 1000 2000 15000
04-303-15 DEIS/FEIS REWIEW
3000 0 o o o 5000 20013 o o 121 o o 10000
04-303-30 MOOSE BROWSE INVENTORY
12000 12000 5000
04-303-32 IMPACT ASSESSMENT REFINEMENT
10000 10000 20000
5000
20000
4000
12000
4000
6000
5000
5000
10000
11000
2000
3500
1000
3500
2000
5500
8000
2500
70000
110001?1
04-303-36 FERC HEARING PREPARATION
o 0 o o o o o 2000 3000 4000 50130 5000 20000
04-303-42 CANDIDATE MITIGATION LANDS ASSESSMENT
1000 4000 2000 1000 1000 3000 5000 2000 o o o o 20000
134-303-43 HABITAT ENHANCEMENT STUDIES
1000 3000 4000
04-3133-44 DOWNSTREAM RIPARIAN STUDIES
2000 3000 2000
5000
o
2000
o
o
o
o
o
o
o
o
o
ill
o
o
1000
o
2000
15000
10000
04-303-45 RAPTOR STUDIES
2000 1000 1000 3000 3000 2000 o o o o 5000 8000 25000
04-303-46 SWAN/EAGLE T-LINE NEST SURVEYS
III 0 0 o o o o o o o 3000 2000 5000
04-303-47 WINTER BIRD SURVEYS
o 0 o o 3000 1000 2000 1000 2000 401210 2000 o 15000
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 25
TASK 04 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
****************************** ****************** ** * * ***************************
SUBCONTRACTOR '3133 TOTALS
3501313 370013 450013 40000 48000 55000 52000 37000 19000 24000 28000 34000 455000
********** * *** *************** * ******* * ****** * ***** * * ********* *** * * * * * * ********
SUBGONTRACTOR 313
04-313-139 TERRESTRIAL WORKSHOPS
o 0
04-313-35 FERC HEARING PREPARATION
o 0
1000
o
o
o
o
o
500
o
o
o
o
o
o
o
500
1000
ill
1000
o
1000
2000
3000
04-313-44 DOWNSTREAM RIPARIAN STUDIES
5000 5000 513130 50013 30013 2000 2000 o o o 10130 2000 30000
SUBCONTRACTOR 313 TOTALS
5000 50130 501313 5000 31300 2500 2000 o o 1500 2000 3000 350013
** ********* * ********** ************** * * ******************* **** **** * * * * * ********
SUBCONTRACTOR 323
04-323~\Z19 TERRESTRIAL WORKSHOPS
o 0 113013 o o 101313 o o o 1000 o o 3000
04-323-10 MITIGATION PLAN REFINEMENT
000
04-323-14 FURBEARER AND TRAPPER STUDIES
5000 3000 50013
04-·323-32 IMPACT ASSESSMENT REFINEMENT
500 5013 5013
o
51300
1000
500
41300
500
5013
2000
o
5013
10013
o
500
21300
o
o
5000
o
ill
5000
o
13
5000
o
o
5000
o
2000
50000
3000
134-323-35 FERC HEARINGS PREPARATION
o 0 o o o o o o o 1000 1000 1000 3000
04-323-44 DOWNSTREAM RIPARIAN STUDIES
5013 51313 500 o o o o o o o o 500 2000
SUBCONTRACTOR 323 TOTALS
7000 4000 7000 50130 5000 3500 15013 2500 5000 7000 7000 7500 53000
**** * * * ****** * *************************** *** ******** ********* *** * * * ***********
SUBCONTRACTOR 333
I "j i I I ~._J J I J
RUN DRTE 0B/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 19B5 BUDGET FOR HARZA--EBASCO 5USITNA JOINT VENTURE
PAGE 25
mSK 04 JULY RUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
2000oo500ooo500oo1000
* * * ********* * * * * * * *** * * * * * * * ******** * ******* ** ** *** *** * * * * * * * * * * * * * * * * * * * * * * * * *
SUBCONTRACTOR 333
04-333-09 TERRESTRIAL WORKSHOPS
III 0
04-333-31 VEGETATION MAPPING AND DIGITIZING
20000 15000 15000 15000 15000 10000 15000 20000 15000 10000 o o 150000
SUBCONTRACTOR 333 TOTALS
20000 15000 15000 15000 15000 10500 15000 20000 15000 10500 o o 152000
* * * * * * ******************** ****************************** ******** * ****** * * * * * * *
SUBCONTRACTOR 343
04-343-09 TERRESTRIAL WORKSHOPS
o 0 1000 o o 500 o o o 500 o o 2000
04-343-10 MITIGATION PLAN REFINEMENT
000 500 500 1000 2000 500 500 o o o 5000
04-343-32 IMPACT ASSESSMENT REFINEMENT
1500 1500 1500 1500 1000 500 500 o o o o o 8000
04-343-35 FERC HEARING PREPARATION
o 0 o o o o ill o o 500 1000 1000 2500
04-343-47 WINTER BIRD SURVEYS
ill 0 o o 1000 o 500 o 500 500 o o 2500
SUBCONTRACTOR 343 TOTALS
1500 1500 2500 2000 2500 2000 3000 500 1000 1500 1000 1000 20000
* *** * * * * * *** * * * * * * *** * * *** ******* * *** ** ** *** * * * * * * * * * * * * *** *** * * *** *** * * * * ****
SUBCONTRACTOR 353
04-353-35 FERC HERRING PREPARATION
o 0 o o o o o 2000 2000 3000 5000 B000 20000
SUBCONTRACTOR 353 TOTALS
o o o o o o o 2000 2000 3000 5000 B000 20000
* * * * ***** * * * * * * * * * * * * *** * ***** * * * * *** * * * * * * * *** * * * * * * * *** * * * * ***** * * * *** * * * ***
SUBCONTRACTOR 354
04-354-01 CIRI/MOOLIN-DRRFTING
1552 1552 1552 111:'-=-,-·...J..JC 1552 1552 1552 1552 1552 1552 1552 1552 IB524
J .1 I J t ~J j J I )J !
J 1 )J J I J ])I 1 I 1 J
I I·
I Manager I
J.H.Thrall
Anchorage I I
Bellevue I I
New York I I
Chicago I I
Subcontractors
Staft Stall Stall Staff
Studies I Pam Bergmann .. .Frank Orttl &Associates
D.Owens I I
K.Branch I I
J.Klein I I I I
EDAW,Inc.
Of.A.DeklnR.Suttle W.Hutchinson
ERTECS.Vasllere C.Lawson
Terrestrial I R.Fairbanks .LGL Alaska Research
I I I I
R.Lindsay U 0'A -PalmerC.ElIIolI
U 0'A -FairbanksA.Rivkin E.Dudley R.A.Kreig &Associates
Aquatic I L.Gilbertson
AEIDC
I I
E.Woody Trlhey &Assoc.
J.Blzer I I
D.Marlin I I I I Woodward Clyde Assoc.
D.Beyer R &M Coosultants
T.Stuart Dr.Milo Bell
1,1984 TASK 4 -ENVIRONMENTAL PROGRAMS
-
,.-
C CDB-3D33
ATN-B3-D030
TYPE-6213
TASK 5
GEOTECHNICAL EXPLORATION
There are no plans for any funding in FY85 for a Geotechnical Fie ld
Exploration Program.
Services
05-0l0-0B Report Preparation
Complete the 1984 Watana Field Explorations and summary report.
05-010-11 Watana Observation Device Monitoring
Prepare observation device data graphs.
05-010-12 Observation Device Reading
Read and test groundwater and temperature at the Watana site.
05-010-13 Compilation of Geotechnical Field Data
Implementation of field and laboratory methods to obtain basic data
including the monitoring of the subsurface site conditions.Geologic
-
data on groundwater and temperature will be summarized and furnished to the
FERC staff prior to the Dam safety hearings.
Directs
05-020~03 Printing and Miscellaneous
Printing and miscellaneous expenses associated wi th the 1984 Fie ld
Exploration Report.
12361/5
840807
1
----,~--,-----------,----------------------------------
C C08-3033
ATN-83-0030
TYPE-6213
05-020-04 Travel and Lining Expenses
Expenses for personnel involved in final preparation of the 1984
Geotechnical Exploration Report.
Subcontractors
05-184-01 CIRI/FMAA Task 5 -Drafting
Drafting support for the Geotechnical Report preparation will be
provided by CIRI/FMAA.
05-133-01 Subcontractor Handling Fee
A Handling Fee equal to two percent of the subcontracts cost.
05-173-01 Watana Observation Device Reading
R&M to provide assistence for the transfer of all data collected
previously to 1983.
-
""",
~.
~,
12361/5
840807
2
1 >I J I I J i 1 )i I ]I I 1 1 I
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 5
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 05 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARV MARCH APRIL MAV JUNE TOT~L
*******************************************************************************.TOTAL LABOR ~
24234 7029 8337 8725 10518 7949 7948 8725 10907 8725 8726 10520 122343
************************************************************** * * * * * * * * * * * * * * * * *
TOTAL DIRECTS
13400 1000 2000 0 500 0 0 0 0 0 0 0 lG900
* * ***************** ************* ***********************************************
TOTAL SUBCONTRACTORS
21838 14 3500 14 644 14 644 14 G44 14 644 959 28943
*******************************************************************************
TASK 05 TOTALS
59472 8043 13837 8739 11GG2 79G3 8592 8739 11551 8739 9370 11479 lG818G
*******************************************************************************
08/08/84
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TASK 05 SALARY BREAKDOWN
Budgeted Salaries Fringe Overhead Fee Total
Hom's Benefits
--
Dedicated Staff 2196 48685.32 16535.88 31951.80 9223.20 106396.20
Home Office Staff 344 6228.02 2116.15 6174.69 1427.98 15946.85
TOTAL STAFF 2540 54913.34 18652.03 38126.49 10651.18 122343.15
J I .J J J ,]J J I .1 I
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
TASK 05
TOTAL SERVICES
168186
122343
05-iZ11 iZI-0B
05-010-11
05-010-12
05-1ZI1iZ1-13
REPORT PREPARATION
WATANA OBSERVATION DEVICE MONITORING
WATANA OBSERVATION DEVICE READING
COMPILATION OF GEOTECHNICAL FIELD DATA
24234
28744
19387
49978 122343
-
TOTAL DIRECTS
05-1~2iZ1-03 PRINTING AND MISCELLANEOUS
05-12120-04 TRAVEL AND LIVING EXPENSES
TOTAL SUBCONTRACTORS
05-133-01 SUBCONTRACTOR HANDLING FEE
05-:l73-01 WRTANA OBSERVATION DEVICE READING
135-:L 84-01 CIR1/MOOLI N-D RAFT!NG
125iZ10
4400
348
9000
19595
1690iZ1
16900
28943
348
9iZ100
19595
---_."..~-,-------------------------------------
RUN DRTE 08/03/84 RLASKR POWER AUTHORITY
SUSITNR HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZR-EBASCO SUSITNA JOINT VENTURE
PRGE 28
24234ooooooooIIIo
REPORT PREPRRATION
24234 0
TRSK 05 JULY RUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MRRCH RPRIL MRY JUNE TOTAL
•* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **** * * * * * * * * * * * * * * * * *•* * * * * * *•**** *•* * * * * *•* * * *
LRBOR 010
05-010-08
05-010-11 WRTANR OBSERVRTION DEVICE MONITORING
o 1939 2908 2908 2908 2908 2908 2569 2424 2424 2424 2424 28744
05-010-12 WRTRNR OBSERVATION DEVICE RERDING
o 0 2666 3054 1599 1599 1308 2278 4266 2084 533 o 19387
05-010-13 COMPILRTION OF GEOTECHNICRL FIELD DRTR
o 5090 2763 2763 6011 3442 3732 3878 4217 4217 5769 8096 49978
LRBOR 010 TOTALS
24234 7029 8337 8725 10518 7949 7948 8725 10907 8725 8726 10520 122343
** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * *
DIRECTS
05-020-03 PRINTING RND MISCELLANEOUS
10000 0 2000 o 500 o o o o o o o 12500
05-020-04 TRRVEL RND LIVING EXPENSES
3400 1000 0 o III o o o o o o o 4400
TOTAL DIRECTS
13400 1000 2000 o 500 o o o o o o III 16900
* * * * * * * * * * * * * *•* * * * * * * * * * * * * * * * * * * * *** * * * *** * * * * * * * *** * * * * * * * * * * * * * * * * *•* * * * **
SUBCONTRRCTOR 133
05-133-01 SUBCONTRRCTOR HRNDLING FEE
1~14 n 14 14 14 14 14 14 14 14 14 348
SUBCONTRRCTOR 133 TOTRLS
138 14 70 14 14 14 14 14 14 14 14 14 348
*** * * * * * * * * * * * * * * * * * *** * ** ** * * ****** * * * ***** * *** * * * * * *** ** * * * * * * * * * * * * * * * * * * * *
SUBCONTRRCTOR 173
05-173-01 WRTRNR OBSERVRTION DEVICE READING
6200 0 2800 III o o o o o o o o 9000
c)J I J J J J J t J J J J J
1 i I ;-I J i 1 ~l 1 -)i 1
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 2'3
TASK 05 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * **<* * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * ***
SUBCONTRACTOR 173 TOTALS
f,200 o 2800 o o o o o o o o ill '3000
* * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * *** * * * * *** * * * * * * * * * * *** * * * * * * * * * * * * * * * * * *
SUBCONTRACTOR 184
05-184-01 CIRI/MOOLIN-DRAFTING
15500 0 630 0 630 0 630 0 f,30 0 630 '345 135'35
SUBCONTRACTOR 184 TOTALS
15500 0 630 0 630 0 630 0 530 0 630 '345 1'3595
* * * * * *** * * * * * * * * * * * * * * * * * * *** * * * * * * *** * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
TASK 05 TOTALS
59472 8043 13837 873'3 11662 7963 85'32 873'3 11551 8739 9370 1147'3 15818f,
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
Office
Personnel
Subcontractors
Technical Responsibilities
July 1,1984
Anchorage
C.Craddock
M.Bruen
A.Stukey
D.Yacko
CIRI/Moolin
Site Investigations
Instrumentation
Monitoring
Engineering Operations
Manager
C.D.Craddock
Atlanta/Bellevue
w.Rom
J.Szablya
Transmission line
Systems
TASKS 3,5,7,41 -ENGINEERING
.1 1 J .1 J I !J J J 1 J .1 •
C COB-3033
ATN-B3-0030
TYPE-6213
TASK 6
FERC LICENSING,SETTLEMENT,&PERMITTING
The prime responsibilities of this task are to coordinate support
activities for the FERC licensing process,the settlement process,and
the various permits required for the project.Task 6 will maintain a
coordinating.a supporting.and a monitoring role.The level of effort
activities and the deliverables are described below.
Services
06-010-03 EIS Support
Sections of the DEIS will be assigned to the appropriate contractor or
subcontractor personnel for review and comment.Scheduling.review,
editing.and production of comments will coordinated,and the approved
comn~nts filed with FERC by Task 6 personnel.
Preparation of responses to agency and public comments on the DEIS will
be coordinated and responses provided to the commenting parties and to
FERC for use in the FEIS.Liaison with counsel will be maintained and
responses to any additional FERC information requests will be
coordinated.
12361/6 1
~G"*,--...~b/,,,aI.J7:.-_
C.C08-3033
ATN-83-0030
TYPE-6213
06-010-04 Supplemental Information Request Tracking
Task 6 personnel will provide technical support for a computerized
tracking system for FERC and other agency requests for supplemental
information.The tracking system will also include information items
to be sent to FERC which were referenced in previous responses to
information requests.
06-010-05 Permit Support
Close coordination with the permitting subcontractor and with Con-
tractor technical personnel will be maintained to ensure timely
acquisition of permits and other authorizations necessary for project
activities.A 4-5 month summer total suspended particulates (TSP)air
quality monitoring program will be carried out at the present Watana
camp site.
06-010-07 Settlement Support
The Contractor will coordinate its personnel and other support as
required for the issue settlement process.Included will be contribu-
tions to agency coordination guidelines,identification and preparation
of issues lists,issue analyses,preparation of draft letters to
agencies,coordination during preparation of study plans for resolving
1ssues,coordination of issues tracking reports,dissemination of
reports and other technical material to agencies,and coordination of
responses to agency comments.
....
-
....
12361/6
840807
2
-
....
C COB-3033
ATN-83-0030
TYPE-6213
06-010-08 Need for Power Hearings Support
Task 6 personnel will provide assistance 1.n the gathering of reports
and other documents required for the Need for Power Hearings.
06-010-09 Environment/Dam Safety Hearings Support
These hearings wi 11 address matters of engineering and safety of
project structures and operation,and any environmental matters still
in.dispute.Coordination of Contractor effort and assistance to expert
witnesses and Power Authority Counsel will be provided during all
phases of these hearings,including the pre-hearing conference,
discovery and supplemental discovery periods,preparation of direct
testimony,and preparation of expert witnesses for cross-examination.
06-()l0-10 Best Management Practices Manuals
The Contractor will provide overV1.ew and coordination for five Best
Management Practices Manuals/Plans to be prepared by a subcontractor.
DirE~cts
06-020-01 Printing
Printing costs for reproduction of materials for responses to FERC
supplemental information requests,for materials to support settlement,
and for BMP manuals,are estimated to be as shown.
312361/6___...,,,_B401~j0'-l7 ~_
C COB-3033
ATN-83-0030
TYPE-6213
06-020-02 Travel and Living Expenses
Travel to Anchorage and living expenses for home office support,and
Anchorage personnel travel and expenses for License/Permit Tracking and
Settlement meetings are estimated to be as shown.
Between
Anchorage and Washington,D.C.
Anchorage and Juneau
Anchorage and Fairbanks
06-020-04 Relocation
Estimated
Number
4
2
2
Estimated
Duration Each
4
2
2
Costs associated with relocation of Chicago home office personnel to
work in Anchorage.
06-020-05 Miscellaneous
Miscellaneous direct costs,including summer TSP monitori.ng program
analysis and supplies,are estimated to be as shown.
06-020-06 Workshop Directs
Direct costs for settlement process workshops,which will include room
rental,etc.for fourteen workshops,is estimated to be as shown.
Subcontracts
12361/6
840B07
4
06-134-01 Subcontractor Handling Fee
C C08-3033
ATN-83-0030
TYPE-6213
"""
,."..
-
A handling fee equal to 2 percent of subcontract cost.
06-135-01 Field Permit Application Preparation,Processing and
Monitoring
CIRI/Moolin and Associates (CIRI/FMAA)will assist the Contractor ~n
identifying data needed for field program permit applications,
reviewing work plans needed for these permit applications,processing
and submitting the applications to the appropriate agencies,monitoring
field work to insure compliance with permit stipulations,and preparing
input for the permit tracking system.
06-·135-02 Long Lead Time Permit Applications
CIR.I/FMAA will prepare applications for long lead time permits as
appropriate.Such items may include COE 404 applications,ADF&G Title
16 permit applications,and ADEC PSD application.
06-·135-03 Best Management Practice Manuals
CIRI/FMAA will prepare the following five Best Management Practices
Manuals/Plans in accordance with the investigation memoranda approved
in FY84 by the Power Authority:
o Contingency Plan for oil and Hazardous Material Spills
o Fuel and Hazardous Materials Management Manual
12]61/6
__-.84,;..;;Cl80L
5
C C08-3033
ATN-83-0030
TYPE-6213
o Erosion and Sedimentation Control Manual
"""I
I
...
o
o
Rehabilitation and Revegetation Manual
Liquid and Solid Waste Management Manual
06-135-04 Special Task:Air Quality Monitoring
Continuation of the Air Quality monitoring program begun 1n Fy84
through October 1984 by CIRI/FMAA.
06-135-05 CIRI/FMAA -Drafting
Drafting support for the licensing and permitting efforts,including
the BMP manuals,will be provided by CIRI/FMAA.
.....
-
-
-
12361/6
840807
6
I !]i I )I 1 I )1 1 i 1 1 I ]1 ]
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 6
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK !!If,JULV AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* *** ***** ***** * * *** * * * * * **** * * * * * * * * * * * * * * * * * * * * * * **** * * * * * * ***** * * *** **** * * * **
TOTAL LABOR
55168 53728 40814 44451 51608 37149 36469 40739 49217 40739 39883 48258 538223
* * * * * * * * * * * **** * * * * * * * * * * * * * * * * * * *** *** * * * * * * * * * * * * * * * * * * * * * ****~*** * * ** * * * * ***
TOTAL DIRECTS
29400 12500 12300 13000 11300 10300 7300 7300 7300 7300 7300 7300 132600
* * * * * * * * *** * * * * * **** * *** * * * * * * * * * * *** * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *****
TOTAL SUBCONTRACTORS
96'302 74562 72828 73032 71196 55608 25354 24882 9647 7504 7504 8728 527747
* * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * ** ** * * * * * * ** * * * ** ** * * *** * **
TASK 06 TOTALS
181470 140790 125942 130483 134104 103057 69123 72921 66164 55543 54687 64286 1198570
* * * * *** * *** * * * * ***** * * * * * * * * * * * *** * * * * * * * ***** * ******** * •******** * * * *****•*•* * *
08/08/84
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985=Labor Costs
TASK 06 SALARV BREAKDOWN
BUdgeted Salaries Fringe Overhead Fee TotAl
Hours Benefits --_.
Dedicated Staff 7812 178782.46 60746.03 117399.22 33900.51 390828.22
Home Office Staff 3356 57699.88 19602.48 57230.60 12861.44 147394.40
TOTAL STAFF 11168 236482.34 80348.51 174629.82 46761.95 538222.62
I J ;1 I .1 I J I I
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
TASK 06
TOTAL SERVICES
119857121
538223
06-12110-03
06-ili10-04
06-12110-05
06-lli10-07
06-1Zl10-08
06-ia10-09
06-12110-10
EIS SUPPORT
SUPPLEMENTAL INFO REQUEST TRACKING
PERMIT SUPPORT
SETTLEMENT SUPPORT
NEED FOR POWER HEARINGS SUPPORT
ENVIRONMENTAL/SAFETY HEARINGS SUPPORT
BEST MANAGEMENT PRACTICES MANUALS
50611
27025
10435121
267141
4608
66464
18024 538223
.....TOTAL DIRECTS 132600
06-ia20-01
06-(~20-02
06-i~20-04
06-(~20-05
06-(~20-06
PRINTING
TRAVEL &.LIVING
RELOCATION
MISCELLANEOUS
WORKSHOP DIRECTS
36000
48000
1740121
17200
14000 13260121
TOTAL SUBCONTRACTORS 527747
06-134-01
06-1l35-01
06-135-02
06-Jl35-03
06-:l35-04
06-l35-05
SUBCONTRACTOR HANDLING FEE
CIRI/FMAA-FlD PRMT APPL PREP,PROCESS AND MONITOR
CIRI/FMRA-LONG LEAD TIME PERMIT APPLICATIONS
CIRI/FMAA-BMP MANUALS
CIRI/FMAA SPECIAL TASK:AIR QUALITY MONITORING
CIRI/MOOLIN-DRAFTING
10346
85801
135038
240418
1200121
44144
10346
517401
--_'_"'P--'~---_'_---------------------------
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 30
5051 ;ooooooo1179595317958
EIS SUPPORT
9041 12285
TASK 06 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * ** ** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ** * ** * * * * * * * ** ** * ********* * * *
LABOR 010
06-010-03
06-010-04 SUPPLEMENTAL INFO REQUEST TRACKING
15500 1486 630 1486 &30 1485 630 148&630 1486 630 945 27Qlc~5
06-010-05 PERMIT SUPPORT
839E.10E.21 83%8732 10285 8061 7177 7848 9737 7848 7848 9401 104350
06-010-07 SETTLEMENT SUPPORT
19227 25332 20825 21598 25893 15891 19955 21598 26332 21698 21E.98 25893 257141
05-010-08 NEED FOR POWER HEARINGS SUPPORT
000 o o 1536 153E.1536 (/)o o o 4508
06-010-0g ENVIRONMENTAL/SAFETY HEARINGS SUPPORT
o 0 0 0 o 7171 7171 8171 12518 9707 9707 12019 55464
06-010-10 BEST MANAGEMENT PRACTICES MANUALS
3004 3004 3004 3004 3004 3004 o o o o o o 18024
LABOR 010 TOTALS
551E.B 53728 40814 44451 51608 37149 36469 40739 49217 40739 39883 48258 538223
* * * * * * **** * * * * * * * ** ***** * * * * * * ********* * ** * *** **** ***** * *** * ** * *********** * ** *
DIRECTS
06-020-01 PRINTING
5000 5000 5000 5000 5000 5000 1000 1000 1000 1000 1000 1000 3E.000
06-020-02 TRAVEL &LIVING
6100 3200 3000 4700 4000 3000 4000 4000 4000 4000 4000 4000 48000
06-020-04 RELOCATION
15200 200 200 200 200 200 200 200 200 200 200 200 17400
0E.-020-05 MISCELLANEOUS
2100 2100 2100 2100 1100 1100 l11il0 1100 1100 1100 1100 1100 17200
05-020-05 WORKSHOP DIRECTS
1000 2000 2000 1000 1000 1000 1000-1000 1000 1000 1000 1000 14000
I !J I J J j j )J J ,
j J I i 1 I 1 1 1 J )1 »J -I
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 31
TASK 06 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAl..
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **** * * * * * * * * * * * * * * * * * * * * * * * * * *4 **** **
TOTAL DIRECTS
29400 12500 12300 13000 11300 10300 7300 7300 7300 7300 7300 7300 132600
** ** *** * * * * * * ** *** ** * ** * ** ***** * **** ***** *** ** ****** * * *** * * *** * * * *** * * * * ******
SUBCONTRACTOR 134
0b-134-01 SUBCONTRACTOR HANDLING FEE
1900 1462 1428 1432 13%.1090 497 487 189 147 147 171 10346
SUBCONTRACTOR 134 TOTALS
1900 1462 1428 1432 13%1090 497 487 189 147 147 171 10346
***** * * * * **** * * ** * ** * *** **** * ** * **** ** * * * **** * ** * * *** * * * * * * * * *** * * * * *** *******.
SUBCONTRACTOR 135
06-135-01 CIRI/FMAA-FLD PRMT APPL PREP,PROCESS AND MONITOR
6500 8000 6300 6500 7700
06-135-02 CIRI/FMAA-LONG LEAD TIME PERMIT APPLICATIONS
17000 17000 17000 17000 17000
7000
17000
7000
17000
7500
16038
8601
o
6500
o
6500
o
7700
o
85801
135038
06-135-03 CIRI/FMAA-BMP MANUALS
42500 42500 42500 42500 42500 27918 o o o o o ill 240418
06-135-04 CIRI/FMAA SPECIAL TASK:AIR QUALITY MONITORING
3000 3000 3000 3000 121 o o o ill o ill o 12el00
06-135-05 CIRI/MOOLIN-DRAFTING
26002 2600
SUBCONTRACTOR 135 TOTALS
95002 73100
2600
71400
2600
71600
2600
69800
2600
54518
857
24857
857
24395
857
9458
857
7357
857
7357
857
8557
44144
517401
* ***** ** * * ** * * * * * * * ** ****** * * * *** * * * *** * * **** * * *********** * * *** * * *** * * ** ******
TASK 06 TOTALS
181470 140790 125942 130483 134104 103057 59123 72921 66164 55543 54687 64286 1198570
** * * **** * ** ***** ******* ***** ** **** * * * ************ * * *** * * *** * * * * * * * * * *** *** * ****
Office
Personnel
Subcontractors
.Technical Responsibilities
July 1,1984
Anchorage
J.Robinson
A.Gordon
R.Drews
P.Eggleston
CIRI/Moolin
(J.Marx)
Field Permits
Permit Tracking
FERC Support
Issues Settlement
Air Quality Program
Management
Manager
L.A.Polivka
Bellevue
J.Wilder
P.Hummel
Air Quality
Monitoring Program
Technical Support
TASK 8 -LICENSING SUPPORT AND PERMITTING
I J J c~.Ccc,.•j .J B J I :1 I I
C C08-3033
ATN-83-0030
.TYPE-6213
TASK 7
ELECTRIC POWER SYSTEM STUDY
The purpose of Tas_k 7 in FY85 is to respond to reques ts to support the
FERC License Application in relation with the electric power system
configuration during the Need-for-Power Hearing of the FERC licensing
proc1ess.Also,Task 7 shall providE:!a feasibi lity and cost study
conc1erning the util hat ion of the intertie transmission line for
construction power.
Services
07-010-01 System Studies and Economic Comparison
A study will be made to determine the feasibility and cost of utilizing
the Intertie as a ,source of construction power.
Directs
07-020-01 Travel and Living Expenses
This item includes the air fare and per diem associated with traveling
to Anchorage.It is based on the following trip assumptions:
,~
Between
Anc:horage and Belleuve
07-020-04 Printing
Estimated
Number
1
Estimated
Duration Each
5 days
.The cost of reproducing the construction power report and reproduction
of documents to support Need for Power responses.
07-020-05 Computer
The cost of utilizing computer services to aid in the above items.
123>61/7
840807
1
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 7
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 07 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
**** *** * * * * * * * *** * ******* *** * *** * * * * * * * * ******* *** *****************************
TOTAL LABOR .~
0 7385 11'.248 0 0 0 0 0 0 0 0 0 23633
*************************************** ****************************************
TOTAL DIRECTS
0 2000 4057 0 0 0 0 0 0 0 0 0 6057
*******************************************************************************
TASK 07 TOTALS
0 9385 20305 0 0 0 0 0 0 0 0 0 29690
********* **************** ******************************************************
I I I I I )I r !,I I J )I
1 J )1 I ]]1 1 .~I 1 1 i
08/08/84
Alaska Power Authority
Harza-Ebasco SusitnaJoint Venture
Fiscal Year 1985:Labor Costs
TASK 07 SALARV BREAKDOWN
Budgeted Salaries Fringe Overhead Fee Tot~l
Hours Benefits
Dedic~ted Staff 0 0.00 0.00 0.00 0.00 0.00
Home Office Staff 368 9256.16 3147.52 9179.20 2050.24 23633.12
TOTAL STAFF 368 9256.16 3147.52 9179.20 2050.24 23633.12
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
TASK 0.7 29590 -
TOTAL DIRECTS
TOTAL SERVICES
0.7-010-01 SYSTEM STUDIES AND ECONOMIC COMPARISON
07-020-01
07-020-04
0.7-020-1215
TRAVEL AND LIVING EXPENSES
PRINTING
COMPUTER TIME
~
23633
23633 23533
~
6057
1157
81210
4100 512157 -
J 1 1 0-1 -]1 1 ]1 --j j )
RUN DATE 08/03/84 ALASKA POWER AUTHORITY PAGE 3,~
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 07 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * ***** * * * *** * * * * * * * * * * * *** *** * * * * * * * * *** * * * * * * * * *
LABOR 010
07-llI10-01 SYSTEM STUDIES AND ECONOMIC COMPARISON
0 7385 11',248 0 0 0 0 0 0 0 0 0 23633
LABOR 010 TOTALS
0 7385 11',248 0 0 0 0 0 0 0 0 0 23633
* * * * * * * * * * * * * *** * * * * *** * * * * * * * * *** ** * ** * *** ** * * * * ** ** * * * * * * * * * **** * * * * * * *** ***
DIRECTS
07-020-01 TRAVEL AND LIVING EXPENSES
0 0 1157 0 0 0 0 0 0 0 0 0 1157
07-020-04 PRINTING
0 III 800 0 III 0 0 0 0 0 0 0 800
07-020-05 COMPUTER TIME
0 2000 2100 III III III 0 0 III III 0 III 4100
TOTAL DIRECTS
0 2000 4057 0 III 0 0 0 0 III 0 0 5057
* * * * * * * * * * * * * * * * * * * * * *** * **** * * * * * * * * * * * *** * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * ***
TASK 07 TOTALS
111 9385 20305 0 0 ill III .0 0 III 0 0 2359il1
*** * *** * * *** * * * *** **** * * * * *** *.****** * **** * ** * * * ***** * * *** ********* * ** *** * *** ***
Office
Personnel
Subcontr actors
Technical Responsibilities
July 1,1984
Anchorage
C.Craddock
M.Bruen
A.Stukey
D.Yacko
CIRIIMoolin
Site Investigations
Instrumentation
Monitoring
Engineering Operations
Manager
C.D.Craddock
Atlanta/Bellevue
W.Rom
J.Szablya
Transmission Line
Systems
TASKS 3,5,7,41 -ENGINEERING
I J J J I ]I I j
-
C C08-3033
ATN-83-0030
TYPE-6213
TASK 39
LOGISTICS
Task 39 involves logistical support for the Susitna proje-ct.The
support contributions include all aviation and lodging in support of
field activities.
For FY85 base budgeting,it is assumed
closed on October 1st for the winter,
tha t the fie ld camp wi 11 be
and that Talkeetna wi 11 be
-
utilized as an operations base until camp reopening April 1st.
Services
39-010-01 Logistical Services
Coordination of Logistics
DirE~ct Costs
39-020-02 Jet Fuel Purchase out of Camp
Jet fuel purchased away from the camp refers to refueling of heli-
copters at places other than the Watana Camp fuel dump.The limited
fuel capacity of the helicopters requires them to take on fuel l.n
Talkeetna,Cantwell,and other locations when their missions have taken
them-out of range of Watana Camp or when operating from Talkeetna with
the camp closed.
12361/39
S4QiW,
1
C C08-3033
ATN-83-0030
TYPE-6213
39-020-03 Extraordinary Aircraft Support
Extraordinary air support is the chartering of aircraft other than
those currently subcontracted when an unusual or infrequently used type
of aircraft is required.
39-020-04 Talkeetna Lodging
Talkeetna lodging includes the costs associated-with room and board 1n
motels in Talkeetna when Watana Camp is closed.
39-020-08 Camp Fuel Aircraft
Purchasing and transportation of fuel to storage bladders at Watana
camp.
39-020-09 Relocations
Relocation of permanent personnel (longer than a one year assignment)
to the project.Costs include shipment of household effects and one
vehicle,costs associated with disposal/rental of previous residence,
etc.
Subcontracts
-
-
-
"""
-
39-143-02 -39-143-27 Helicopter Air Logistics
Furnish rotary wing support for field activities.
l236l/39
840807
2
C C08-3033
ATN-83-0030
TYPE-6213
-
39-153-02 -39-153-27 Alaska Air Guides -Fixed Wing
Provide fixed wing support for commut ig to si te and aerial
obsE!rvation.
39-193-01 Subcontractor Handling Fee
,.,..
.A handling fee equal to 2 percent of subcontractor costs.
39-203-02 -39-203-41 CIRI/Moolin Camp Operation
CIRI-Moolin is responsible for housekeeping,
maintenance support for Watana camp.
Special projects to be performed include:
39-203-28 Cargo Pad
food service,and
A cargo pad sufficiently large to service the Bell 205 series of heli-
copter is needed.Without this pad,all sling loads must be made up in
the mud or snow and the rigger is placed in a dangerous position
because of unsure footing.
39-203-29 Communication Equipment
The G.E."Lunchbox"radios have been in constant use since their pur-
chaise from Alyeska Surplus Management in 1980.They have now had so
many charges that they no longer can be relied upon to function.While
it is possible to purchase battery cells for 'replacement,they also are
used and are not guaranteed.Battery cells cost $250-$300 each.
12361/39
___"",,,,._~807
3
C C08-3033
ATN-83-0030
TYPE-6213
Many of the Field Observation Programs depend on radios for emergency,
as well as operation contact and at the present time the radios are
unreliable to the extent that one cannot determine whether a radio is
good for 10 hours or 10 minutes.A 5 watt,hand held radio can be
purchased new for $850.00 complete with case and charger.Ten are
required for most programs.
39-203-30 Dishwasher
An approved dishwasher and ancillary sanitary equipment for the camp
kitchen has been needed for several years.
The present machinery does not meet the sanitary requirements of DEC
and requires all dishwashing be done by hand.This is labor intensive
and expensive.In addition,the improved system will allow us to use
our trays,for the greater convenience of the guests.
39-203-31 Fuel Bladders
The present bladders,have for the most part,been on site for four
years and were surplus Alaska Pipeline Service Co.material.Two
bladders require replacement this year,one for 25,000 gallons and the
other for 50,000 gallons.This must be done before the next fuel
haul.
39-203-32 Sanitary Landfill
Sanitary Landfill
A sanitary landfill for the disposal of sewage sludge and non
putrescible solid waste is a requirement of the Department of Environ-
mental Conservation,for Watana Camp.At present,we are on limited
.....
..,..
-
-
-12361/39
840807
4
C C08-3033
ATN-83-0030
TYPE-6213
permit which allows us to package waste and fly it into Talkeetna for
disposal.The DEC has allowed us to postpone our construction of this
facility until we receive our FY 1985 budget.The use of Talkeetna IS
facilities are denied us after this time as their facility is actually
to small for their own requirements.A landfill of this size should
serve the camp for three years.
39-.203-33 All Terrain Vehicle
An all terrain,eight wheel vehicle can be permitted by BLM to carry
refuse to the sanitary landfill as it renders minimal damage to the
tundra.This vehicle will also be used for waterline maintenance and
borehole readings.
39-.203-34 Water Filters
A water filter system incorporating 5 micron filters and charcoal ~s
needed to trap giardia cysts and eliminate much of the iodine taste
fr~n the drinking and cooking water.
39-203-35 Clean up after Denali Demobilization
General Clean up and land restoration as a result of the winter Denali
demobilization.
12361/39
840807
5
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 8
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HAR2A-EBASCO SUSITNA JOINT VENTURE
TASK 39 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL•••••••••••••••••••••• •••••••••••••••• ••••••••••••••••••••••• ••••••••••••••••••
TOTAL LABOR ~
10108 14008 10708 11206 13510 10210.10210 11206 14008 11206 11206 135111 141696
•••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••••
TOTAL DI RECTS
5000 32410 3000 7680 7540 8220 9600 1620 9900 9640 13681111 lr.5411 2479411
••••••••••••••••••••••••••• •••••••••••••••••••••••••••••••••••••••••••**•*•••*•
TOTAL SUBCONTRACTORS
388484 371433 261508 91615 81848 63395 10326 64311 90173 70198 768116 131588 1767685
•••••••••••••• ••••••••••••••••••••• ••••••••••••••••••••••••••••*••*•••••••*••••
TASK 39 TOTALS
404192 411841 275216 110501 108898 81825 90136 83131 114081 91044 224812 155638 2157321
••••••••••••••••••• •••••••••••••••••••••**•••••••••••••••*••••••***••••••••••••
i
J I ],I I I )J J I ~,I J I I
08/08/84
I I i J J -1 J i 1
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TASK 39 SALARV BREAKDOWN
Budgeted Salat'ies Fringe Overhead Fee Total
Haut"s Benefits
.-
Dedicated Staff 2276 64814.80 22037.48 42549.65 12293.64 141695.58
Home Office Staff 0 0.00 0.00 0.00 0.00 0.00
TOTAL STAFF 2276 64814.80 22037.48 42549.65 12293.64 141695.58
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
TASK 39 2157321
TOTAL SERVICES 141696 ~
39-01iZ1-01 HARZA/EBASCO LOGISTICAL SERVICES 141696 141696
"""1
TOTAL DIRECTS 24794iZ1
39-1320-02 JET FUEL PURCHASED OUT OF CAMP 58000
39-020-03 EXTRAORDINARY AIRCRAFT SUPPORT 101300
39-020-04 TALKETNA LODGING-AIR QUALITY MONITORING 27540
39-020-08 CAMP FUEL AIRLIFT 125000
39-020-09 RELOCATION 27400 247940
TOTAL SUBCONTRACTORS 1767685 "'1"\1
39-143-02
39-143-03
39-143-05
39-143-06
39-143-07
39-143-08
39-143-09
39-143-10
39-143-12
39-143-14
39-143-17
39-143-20
39-143-21
39-143-22
39-143-24
39-143-25
39-143-26
39-143-27.
HELICOPTER AIR LOG.-H/E STAFF SUPERVISION
HELICOPTER AIR LOG.-LGL
HELICOPTER AIR LOG.-U OF A FAIRBANKS(AAES)
HELICOPTER AIR LOG.-R.A.KREIG &ASSOCIATES
HELICOPTER AIR LOG.-ADF&G TERRESTRIAL
HELICOPTER'AIR LOG.-UNIV.OF ALASKA MUSEUM
HELICOPTER AIR LOG.-AEIDC
HELICOPTER AIR LOG.-R&M AQUATIC
HELICOPTER AIR LOG.-E.W.TRIHEY
HELICOPTER AIR LOG.-ADF&G AQUATIC
HELICOPTER AIR LOG.-HARZA/EBASCO INSTRUMENTATION
HELICOPTER AIR LOG.-HYDROLOGY IHYDRAULICS
HELICOPTER AIR LOG.-T LINE OVERFLIGHTS
HELICOPTER AIR LOG.-WOODWARD CLYDE
HELICOPTER AIR LOG.-USFW
HELICOPTER AIR LOG.-EDAW
HELICOPTER AIR LOG.-PERMITTING
HELICOPTER AIR LOG.-AIR QUALITY MONITORING
87129
16662
27803
13722
76915
41090
11222
102822
14614
312372
27017
13614
664
15921
2142
109573
938
9155
-
-
883375
39-153-02 ALASKA AIR GUIDES-HARZA/EBASCO SUPERVISION
39-153-03 ALASKA AIR GUIDES-LGL
39-153-04 ALASKA AIR GUIDES-U OF A PALMER (AAES)
39-153-05 ALASKA AIR GUIDES-UNIV.OF ALASKA FAIRBANKS
39-153-05 ALASKA'AIR GUIDES-R.A.KREIG &ASSOCIATES
12078
2574
1584
198
1188
....'
Alaska Power Ruthority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
39-153-07 ALASKA AIR GUIDES-ADF&G TERRESTRIAL
39-153-08 ALASKA AIR GUIDES-R&M AQUATIC
39-153-09 ALASKA AIR GUIDES-AEIDe
39-153-17 ALASKA AIR GUIDES-HARZA/EBASCO INSTRUMENTATION
39-153-22 ALASK8 AIR GUIDES-WOODWARD CLYDE
39-153-24 ALASKA AIR GUIDES-USFW
39-153-25 ALASKA AIR GUIDES-PERMITTING
39-153-27 ALASKA AIR GUIDES-AIR QUALITY MONITORING
39-193-01 SUBCONTRACTOR HANDLING FEE
1584
1188
1188
2376
30
396
594
8910
34657
33888
34657
39-:203-02
39-203-03
39-203-05
39-:203-05
39-203-07
39-:203-08
39-203-11
39-203-12
39-203-17
39-.203-20
39-203-22
39-203-24
39-203-26
3'3-203-27
39-203-28
39-203-29
39-203-30
3'3-203-31
39-202-32
39-203-33
39-203-34
39-203-35
39-203':"'38
3'3-2iZl3-39
39-203-40
3'3-203-41
CIRI/FMAA CAMP LODGING FOR H/E
CIRI/FMAA CAMP LODGING FOR LGL
CIRI/FMAA CAMP LODGING FOR UA FBNKS(TERRESTRIAL
CIRI/FMAA CAMP LODGING FOR KREIG &ASSOC.
CIRI/FMAA CAMP LODGING FOR ADF&G(TERRESTRIAL)
CIRI/FMAA CAMP LODGING'FOR R&M AQUATIC
CIRI/FMAA CAMP LODGING FOR UA MUSEUM
CIRI/FMAA CAMP LODGING FOR EDAW
CIRI/FMAA CAMP LODGING FOR H/E INSTRUMENTATION
CIRI/FMAA CAMP LODGING FOR HYDRAULICS
CIRI/FMAA CAMP LODGING FOR WOODWARD CLYDE
CIRI/FMAA CAMP ,LODGING FOR USFW
CIRI/FMAA CAMP LODGING FOR PERMITTING
CIRI/FMAA CAMP LODGING FOR AIR QUAL.MONITORING
CIRI/FMAA-SP.PROJ.-CARGO PAD
CIRIIFMAA-SP.PROJ.-CDMII1UNICATION EQUIPMENT
CIRI/FMAA-SP.PROJ.-CAMP DISHWASHER
CIRI/FMAA-SP.PROJ.-FUEL BLADDERS
CIRI/FMAA-SP.PROJ.-SANITARY LANDFILL
CIRI/FMAA-SP.PROJ.-ALL TERRAIN VEHICLE
CIRI/FMAA-SP.PROJ.-WATER FILTERS
CIRI/FMAA-CLEAN UP AFTER DENALI DRILLING DEMOB
CIRI/MOOLIN-HOME OFFICE MANAGEMENT
CIRI/MDOLIN-WATANA CAMP MANAGEMENT
CIRI/MOOLIN-TALKEETNA FIELD MANAGEMENT
CIRI/MOOLIN-CAMP CLOSE &REOPEN
792121
5720
2640
495121
5105121
6710
16104iZJ
3300
132121121
330
154121
440
220
44121
31121121
8500
85121121
55250
19080
69121121
5700
1800
180254
142953
62218
521211210 815765
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR,1g85 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 33
***** ** ***** * ***** * * * *
TASK 3g JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH
************************* ******************* *************
LABOR 0113
39-010-01 HARZA/EBASCO LOGISTICAL SERVICES
107138 14008 10708 11206 13510 10;::113 113210 11206 14008
APRIL
11206
MAY
11206
JUNE
13510
TOTAL
141696
LABOR 010 TOTALS
113708 14008 10708 11206 13510 10210 10210 11206 14008 11206 11206 13510 141£9E
*** * * *** *********** *************** * * * * * ***** ****** ******** *** **** ** *** ** * *****
DIRECTS
39-020-02 JET FUEL PURCHASED OUT OF CAMP
3000 3000 2000
39-020-03 EXTRAORDINARY AIRCRAFT SUPPORT
2000 2000 1000
5000
1000
3000
1000
6000
o
6000
o
6000
o
6000
o
6000
1000
6000
1000
6000
1000
58000
1000121
39-020-04 TALKETNA LODGING-AIR QUALITY MONITORING
o 0 0 240 o o o o o 240 o 111 480
39-0213-04 TALKEETNA LODGING-ADF&G
o 0
39-1320-04 TALKEETNA LODGING-AEIDC
o 0
o
o
o
o
o
180
1200
o
300
o
300
180
300
o
o
o
300
o
o
111
2400
360
3g-020-04 TALKEETNA LODGING-HARZA/EBASCO
13 0 0 300 840 180 780 300 780 1020 1440 1380 7020
3g-020-1/I4 TALKEETNA LODGING-LGL
o 0 o o 360 o 3613 o 360 120 120 (/I 1320
39-020-04 TALKEETNA LODGING-PERMITTING
000 120 o o (/I o o o o (/I 120
39-020-04 TALKEETNA LODGING-R&M
o 0 o 600 600 600 600 840 600 720 1140 720 6420
39-020-04 TALKEETNA LODGING-R&M(INSTRUMENTATIONl
o 000 1200 o 1200 o 1200 o 1200 1200 6000
3g-020-04 TALKEETNA LODGING-UAFBNKSIFUR)
000
39-0213-04 TALKEETNA LODGING-UAFBNKS(BIRDl
o 0 0
300
o
240
120
240
o
240
120
o
o
420
120
540
o
600
o
240
o
2820
360
39-020-04 TALKEETNA LODGING-WWC
o 0 o 120 (/I o ill (/I 120 o o o 240
J 1 I l 1 J J J I ]I J J I
--1 1 1 I I 1 J 1 ]j ).~1
I
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCo.SUSITNA JOINT VENTURE
PAGE 34
TASK 39 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL t~AY JUNE TOTAL
125000o125000oooooooo
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
DIRECTS
39-020-08 CAMP FUEL AIRLIFT
o 0
39-020-09 RELOCATION
o 27400 o o o 111 o .0 o o o o 27400
TOTAL DIRECTS
5000 32400 3000 7680 7540 8220 9600 7620 9900 9640 136800 10540 247940
* * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * *** * * * *
SUBCONTRACTOR 143
39-143-02 HELICOPTER AIR LoG.-H/E STAFF SUPERVISION
7711 8340 5238 2451 11060 5806 9413 5674 8494 6664 5808 10470 87129
39-143-03 HELICOPTER AIR LOG.-LGL
1713 1497 1637 o 3277 o 2789 o 2517 1904 1328 o 1666.';:
39-143-05 HELICOPTER AIR LoG.-U OF A FAIRBANKS(AAES)
1285 428 0 0 0 o o o o o 332 654 2699
39-143-05 HELICOPTER AIR LoG.-U OF A FAIRBANKS FURBEARING
2142 855 2619 1362 4096 1659 o 1621 2202 3094 2655 654 22959
39-143-05 HELICOPTER Ar'R LoG.-U OF A FAIRBANKS(BIRDSl
o 0 0 0 819 o 697 o 629 o o o 2145
39-143-06 HELICOPTER AIR LoG.-R.A.KREIG &ASSOCIATES
4284 5346 4092 0 0 o o o o o o o 13722
39-143-07 HELICOPTER AIR LoG.-ADF&G TERRESTRIAL
25702 21384 1637 681 2048 2074 3486 2028 12584 1190 829 3272 76915
39-143-08 HELICOPTER AIR LOG.-UNIV.OF ALASKA MUSEUM
1991 9 19888 0 111 0 o o o o o o o 39807
39-143-08 HELICOPTER AIR LoG.-UNIV.OF ALASKA MUSEUM(SPL
111 1283 111 0 0 111 111 o o o o o 1283
39-143-09 HELICOPTER AIR LoG.-AEIDC
1713 2138 491 o 2458 o 1046.2432 944 o o o 11222
39-143-10 HELICOPTER AIR LOG.-R&M AQUATIC
6640 9409 8512 8850 6%4 7880 2440 3242 2202 5236 3984 5562 70921
39-143-10 HELICOPTER AIR LoG.-R&M AQUATIC(SPECIAL HELIC)
111 2138 3110 408 4506 4562 3835 4458 3460 2618 1825 981 31901
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 35
TASK 39 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * *** * * ***** *********************** * * **************** **************** ****
SUBCONTRACTOR 143
39-143-12 HELICOPTER AIR LOG.-E.W.TRIHEY
3641 2138 5075 1770 0 0 1046 III 944 0 0 0 14614
39-143-14 HELICOPTER AIR LOG.-ADF&G AQUATIC
38981 48757 44853 22192 11880 17834 13248 17428 19820 23321 2821!25847 312372
39-143-17 HELICOPTER AIR LOG.-HARZA/EBASCO INSTRUMENTATION
1071 0 2456 0 6145 o 5229 o 4719 o 2489 4908 27017
39-143-20 HELICOPTER AIR LOG.-HYDROLOGY
857 855 655
IHYDRAULICS
545 3277 o o 3242 1258 952 664 1309 13614
39-143-21 HELICOPTER AIR LOG.-T LINE OVERFLIGHTS
o 000
39-143-22 HELICOPTER AIR LOG.-WOODWARD CLYDE
2142 4277 2619 1089
o
3277
o
o
o
o
o
o
o
2517
o
o
664
o
o
o
664
159;:'1
39-143-24 HELICOPTER AIR LOG.-USFW
2142 0 0
39-143-25 HELICOPTER AIR LOG.-EDAW
32555 32504 24883
39-143-26 HELICOPTER AIR LOG.-PERMITTING
o 428 0
o
o
272
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
238
o
o
o
o
19631
o
2142
109573
938
39-143-27 HELICOPTER AIR LOG.-AIR QUALITY MONITORING
2142 2994 1637 1906 o o o o o 476 o o 9155
SUBCONTRACTOR 143 TOTALS
154640 164659 109514 41526 59807 39815 43229 40125 62290 45693 48789 73288 883375
********* * * ******* ******************************* * * * * *********** * * * * *** ****** *
SUBCONTRACTOR 153
39-153--02 ALASKA AIR GUIDES-HARZA/EBASCO SUPERVISION
1386 792 990 792 1386 396 9'30 79;?-1386 792 1386 990 12078
3'3-153-03 ALASKA AIR GUIDES-LGL
594 792 594 o 198 III 0·o 198 o 19B 111 2574
39-153-04 ALASKA AIR GUIDES-U OF A PALMERIAAESl
594 396 0 0
39-153-05 ALASKA AIR GUIDES-UNIV.OF ALASKA FAIRBANKS
111 000
o
o
o
o
o
198
o
o
o
o
o
o
396
o
198
o
1584
198
J J _J 1 J I J I J I I J J
)1 ]]I 1 -I 1 I -~I 01 1
RUN DATE 08/03/84 ALASKA pmJER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCo SUSITNA JOINT VENTURE
PAGE 36
TASK 39 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **
SUBCONTRACTOR 153
39-153-06 ALASKA AIR GUIDES-R.A.KREIG &ASSOCIATES
3%39&396 ill ill ill ill ill 0 0 0 0 1188
39-153-07 ALASKA AIR GUIDES-ADF&G TERRESTRIAL
n2 n2 0 ill
39-153-08 ALASKA AIR GUIDES-R&M AQUATIC
ill 0 ill 1188
o
o
III
o
o
ill
o
o
o
o
o
o
ill
o
III
ill
1584
1188
39-153-09 ALASKA AIR GUIDES-AEIDC
396 198 198 ill 19B o o 198 o o III ill 1188
39-153-17 ALASKA AIR GUIDES-HARZA/EBASCO INSTRUMENTATION
o ill 3%0 3%ill 396 o 396 o 3%3%2376
39-153-22 ALASKA AIR GUIDES-WOODWARD CLYDE
ill 8 2 2 &6 o ill ill 6 o o 30
39-153-24 ALASKA AIR GUIDES-USFW
396 0 ill o ill o ill o ill ill o ill 396
39-153~2&ALASKA AIR GUIDES-PERMITTING
ill 198 198 ill o ill o o ill 198 o ill 594
33-153-27 ALASKA AIR GUIDES-AIR QUALITY MONITORING
1980 2376 1980 2376 o ill o o o 198 o o 8910
SUBCONTRACTOR 153 TOTALS
6534 5348 4754 4358 2184 402 1584 390 1980 1194 237&1584 33888
* * * * * * * * * *** * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **0** * *
SUBCONTRACTOR 133
39-133-01"SUBCONTRACTOR HANDLING FEE
7617 7283 5127 1796 1722 1243 1378 1261 1768 1376 1506 2580 34657
SUBCONTRACTOR 193 TOTALS
7&17 7283 5127 1796 1722 1243 1378 1261 1768 1376 1506 2580 34657
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * *
SUBCONTRACTOR 203
39-203-02 CIRIIFMAA CAMP LODGING FOR HIE
2750 2750 2420 III o 111 ill III III o 111 ill 7920
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 37
TASK 39 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL.
********** ************* *** *** * ***** * * * ******* * * * *********** * * ********* *********
SUBCONTRACTOR 203
33-203-03 CIRI/FMAA CAMP LODGING FOR LGL
2860 2420 440 0 0 0 0 III 0 0 0 0 5"120
39-203-05 CIRI/FMAA CAMP LODGING FOR UA FBNKS(TERRESTRIAL
1320 440 BB0 III 0 o o o o III o III 264'1)
39-203-06 CIRI/FMAA CAMP LODGING FOR KREIG &ASSOC.
1980 1430 1540 0
39-203-07 CIRI/FMAA CAMP LODGING FOR ADF&G(TERRESTRIAL)
34100 26400 550 0
39-203-08 CIRI/FMAA CAMP LODGING FOR R&M AQUATIC
1100 3740 1870 0
39-203-11 CIRI/FMAA CAMP LODGING FOR UA MUSEUM
79200 81840 0 0
39-203-12 CIRI/FMAA CAMP LODGING FOR EDAW
1100 1100 1100 0
\!I
o
o
III
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
III
o
o
o
o
o
o
III
III
III
o
o
o
o
o
o
III
III
o
o
o
4950
61050
6710
161040
3300
39-203-17 CIRI/FMAA CAMP LODGING FOR H/E INSTRUMENTATION
o 0 2200 0 2200 o 2200 o 2200 III 2200 2200 13200
39-203-20 CIRI/FMAA CAMP LODGING FOR HYDRAULICS
110 110 110 0
39-203-22 CIRI/FMAA CAMP LODGING FOR WOODWARD CLYDE
660 440 440 0
39-203-24 CIRI/FMAA CAMP LODGING FOR USFW
440 0 0 0
39-203-26 CIRI/FMAA CAMP LODGING FOR PERMITTING
o 220 0 0
o
III
o
o
III
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
330
1540
440
220
39-203-27 CIRI/FMAA CAMP LODGING FOR AIR QUAL.MONITORING
o 440 0 0 0 o o o o III o o 440
39-203-28 CIRI/FMAA-SP.PROJ.-CARGO PAD
o 0 3100 o o o o o o III o III 3100
39-203-29 CIRI/FMAA-SP.PROJ.-COMMUNICATION EQUIPMENT
8500 0 0 0 o o III o o o o o 8500
39-203-30 CIRI/FMAA-SP.PROJ.-CAMP DISHWASHER
8500 0 III o o o o o III o III o 8500
1 ~1 J ..~I )I I
j J )1 1 I 1 1
RUN DATE 08/03/84 ALASKA POWER AUTHORITY PAGE 38
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCo SUSITNA JOINT VENTURE
TASK 39 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
***********************************,*************************** ******~**** ******
SUBCONTRACTOR 203
39~203-31 CIRI/FMAA-SP.PRoJ.-FUEL BLADDERS
0 0 55250 0 0 0 0 0 0 0 0 0 55250
39-203-32 CIRI/FMAA-SP.PRoJ.-SANITARY LANDFILL
0 9540 9540 0 0 0 0 0 0 0 0 0 19080
39-203-33 CIRI/FMAA-SP.PRoJ.-ALL TERRAIN VEHICLE
5900 0 0 0 0 0 ill ill III 0 0 0 E,'3ill0
39-203-34 CIRI/FMAA-SP.PRoJ.-WATER FILTERS
5700 0 0 0 0 0 0 0 0 0 III 0 5700
39-203-35 CIRI/FMAA-CLEAN UP AFTER DENALI DRILLING DEMOB
1800 0 0 0 0 0 0 0 0 0 0 0 1800
39-203-38 CIRI/MooLIN-HOME OFFICE MANAGEMENT
15022 15022 15022 15022 1512'22 15022 15022 15022 15022 15022 15022 15022 180254
39-203-39 CIRI/MOOLIN-WATANA CAMP MANAGEMENT
47551 47551 47551 0 ill ill ill 0 0 0 0 0 142953
39-203-40 CIRI/MOOLIN-TALKEETNA FIELD MANAGEMENT
0 0 0 6913 6913 6913 5913 6913 5913 6913 6913 5914 62218
39-203-41 CIRI/MOOLIN-CAMP CLOSE &REOPEN
ill 0 0 22000 0 ill 0 0 0 0 0 30000 52000
SUBCONTRACTOR 203 TOTALS
21'3593 193543 142113 43935 24135 21935 24135 21935 24135 21935 24135 54135 615765
************ ********************* * ********************'************************
TASK 39 TOTALS
404192 417841 275216 110501 106698 81825 90135 63137 114081 91044 224812 155638 2157321
******* ****************** * *************************** ***************•****•*****
Personnel I A.Velazquez
Subcontractors I PillsburY,Madlson &Sutro
External Review Board
Air Logistics
Alaska Air Guides
CIRI/Moolin
F.Moolin &Assoc.
Acres American
Battelle
Dames &Moore
General Electric
Paul Weir
Sherman H.Clark Assoc.
Dr.T.Tyrrell
U of A -JSER
D.Calkins
Paul Hamblin
Technical
Responsibilities I Administer Subcontracts
Administer Leases
H.A.Dare
Contracts Manager
S.Paske
AEIDC
Dr.B.Kessell
Dr.A.Dekin
EDAW,Inc.
E.Woody Trlhey &Assoc.
Frank Orth &Assoc.
LGL Alaska Research
Dr.Milo Bell
R.A.Krieg
.R &M Consultants
U of A ~Museum
U of A -Wildlife
Woodward Clyde Assoc.
Denali Drilling
Interstate Exploration
MSI
Administer Subcontracts
TASK 2B -CONTRACT ADMINISTRATION
TASK 39 -LOGISTICS
G..Hlzey
Air Logistics
Alaska Air Guides
CIRI/Moolin J.V.
Manage Watana
Camp Logistics
M~nage Aircraft
Logistics
Manage all HIE
and Subcontractor
Inventory
July 1,1984
I .J J j J oJ __I J .I .!I .!J .t I J
C COB-3033
ATN-B3-0030
TYPE-6213
TASK 40
NEED FOR POWER STUDIES
The objectives of this task l.n FYB5 will be to support the economic and
financial conclusions of the License Application and subsequent studies
before the FERC,to assist the Power Authority 1n negotiations with
utilities anhd to prepare studies to support Project financing and the
marketing of Project power.All work is to be performed under schedules
set by FERC.
The FY85 budget has been established on the basis of accomplishing the
following major objectives:
1.Finalize the preparation of comments and narrative discussion of
the DEIS including supporting studies.
-
2.Prepare additional studies required to support direct testimony
based on issues raised in the DEIS.
3.Finalizing direct testimony prepared l.n Fy84 for Administrative
Hearings including the results of the additional studies.
4.Assist counsel in witness preparat ion and assembly of supporting
material for witnesses.
5.Participate 1n Administrative Hearings.
6.Assist counsel in discovery and 1n preparing briefs including
preparation of additional analyses if required.
12361/40A
840807
-~----------------,
1
C C08-3033
ATN-83-0030
TYPE-6213
7.Prepare utilities expansion plans for the Railbelt utilities which
will identify their most likely course of action and associated
energy costs in the period prior to Project operation.
8.Assist the Power Authority 1n power sales negotiations with
utilities and prepare supporting studies.
-
-9.
10.
Assist the Power Authority in finalizing a financing and marketing
plan for project power including the preparation of supporting
studies.
Prepare project operation and dispatch studies to support hearings
and utility negotiations.
11.Prepare econom1C studies to assist in settlement program.
Services
40-010-04 Discovery Activities -Need for Power
This work is related to the Need for Power Hearings Process.The work will
consist of collecting,compiling and disseminating informat10n and preparing
responses requested by the FERC staff,intervenors,and other agencies and
individuals;preparing questions on testimony and requesting discovery data
of FERC and opponents;receiving,analyzing and indexing discovery
information from FERC and opponents;advising counsel,general coordination
and filing.This estimate is preliminary because the extent of requests
cannot be anticipated.
40-010-05 Pre-Hearing Studies and Direct Testimpny
This task encompasses the work required to finish preparation and support
direct testimony.Preparation of draft testimony,except for coal witnesses
-
12361/40A
840807
2
C CD8-3D33
ATN-83-0030
TYPE-6213
was completed in FY84.Work in FY85 will include revision and review of the
draft testimony to take into account points raised in the DEIS and also the
completion of coal price testimony.The identification and execution of
additional studies which will be required to support testimony in light of
the DEIS is included in this Task.The preparation of witnesses is also
included in this task.While the work in this task encompasses the NFP
testimony and this testimony is also intended to be used for the environ-
mental hearings with minor revisions.
....
The testimony is anticipated to cover
project operation,capacity and energy
and financial requirements •
economics,
production,
fuel price
generation
forecasts,
expansion,
-
-
Extended discussion and contacts with the following witnesses 1S
expE!cted:Acres,S.H.Clark,Dames &Moore,Battelle,P.Weir Co.,and
ISER.
40-010-06 Discovery Activities -Environmental Hearings
Thi:3 item is related to the Environmental Hearings.The work will consist
of collecting,compiling,and disseminating information;expanding
disl:ussions of testimony items,reviewing and preparing questions on
testimony of others,indexing and filing.Although NFP and Environmental
Hearings might be combined,this has been retianed as a separate task for
the present because of timing differences of the discovery periods.
This estimate is preliminary because the extent of requests cannot be
anticipated.
12361/40A
840807
3
,---_._------------------------------------------------
C C08-3033
ATN-83-0030
TYPE-6213
40-010-13 Presentation of Testimony -Need for Power
This task ~s part of the Need ·for Power Hearings.It consists of the
presentation of direct and subsequent rebuttal testimony and conferences
with counsel concerning cross-examination of witnesses for APA~FERC,
and the intervenors.Approximately 10 witnesses and coordinators from the
Joint Venture will participate.
This estimate is based on a three-week hearing period according to the
April 1984 "Bear Book"schedule transposed 0 the basis of the hearing
order being issued December 28,1984.
40-010-14 Initial,Reply &Exception Briefs -
Need for Power
This item is part of the Need for Power Hearing Process.The effort
consists of assisting counsel ~n the preparation of briefs ~the revieW'
of opponents briefs,and the preparation of recommendations to the
Power Authority and counsel.The extent of the work is not definable
now,but time scheduled by FERC is short.
40-010-26 Financial and Market Support
The effort consists of assisting the Power Authority 10 marketing
Susitna power to Railbelt Utilities resulting ~n power sales
agreements.Work wi 11 include presentation of Susitna power -and energy
capabilities for integration into each of the utility systems and
allocation of power among the utilities under normal and adverse
streamflow conditions.This task will also include the preparat ion of
studies,similar to those performed for the Economic and Financial
-
-
l2361/40A
840807
4
.....
.....
-
C C08-3033
ATN-83-0030
TYPE-6213
Update,which will be used to support presentations to the State
financial institutions and the FERC with respect to project financing.
40-010-27 Comment on DEIS and Provide Input to FEIS
Thi1;item provides input to the Environmental·Impact Statements.The
effort consists of reviewing the DEIS to ensure that data and analysis
are complete and accurate.For those items which are not complete,or at
the request ofFERC,additional information will be provided for the FEIS •
In addition,comments will be prepared on certain subject areas where the
assumptions,analyses and/or conclusions do not agree with those of the
Power Authority as expressed in the License Application.
The work wi 11 cover
sys tem opera t ion.
economic analyses.
ec onomic condi t ions,oi 1 and
the project and alternatives.
fue 1 price forecas ts,
flow re leases and
Major effort 1S expected by Joint Venture
discussions and contacts with Acres,S.H.Clark,
P.Weir Co.,and ISER.
40-010-29 Project Operation and Dispatch
personnel from
Dames &Moore,
extended
Bat telle,
The studies will provide basic information for discussion of project
operation with Railbelt Utilities.to identify effect on power
generation of instream flow requirements,and to support preparat ion of
direct testimony for the Environmental Hearings.Studies will be
performed for base load,load fo Howing,and peaking operation.Both
Watana alone and Watana with Devil Canyon will be analyzed.Reservoir
rule curves and reserV01r operating guides will be developed for a
range of operating conditions.Hourly operation will be performed to
l236l/40A
8401807
5
C C08-3033
ATN-83-0030
TYPE-6213
provide data balancing environmental quality with economic
Provision for additional units also will be studied.
These studies are a continuation of the studies beguin in FY84.
40-010-30 Settlement Process -Economic Data Input
The work will involve specialized economic studies to provide
resolving outstanding ~ssues.Meetings and conferences will
among agencies,the public and intervenors.
40-010-33 Utility Expansion Planning
return.
data for
be held
-
~,
This effort ~s related to the
Settlement Process (40-010-30)and
Environmental Hearings.
Marke t ing Support
the preparat ion of
(40-010-26),the
testimony for the
The program consists of using utility planning information including
forecasts,retirement schedules,reliability criteria,etc.,to develop
expansion plans for each utility.It is anticipated that the expansion
planning will be performed us~ng the EGEAS or similar model.The
results will be used to establish the cost of power on the bases of
four independent utilities operating ~n the Rai1be1t in the period
prior to the operation of the Project and immediately after the date of
scheduled initial project operation if the project is not built.The
rental cost of the EGEAS or similar model computer program ~s not
included in the estimate as it ~s intended to be provided by the Power
Authority.
Direct
40-020-01 Air Travel and Per Diem
12361/40A
840807
6 -
.-.
C C08-3033
ATN-83-0030
TYPE-6213
These costs are comprised of the following items:
-
Estimated
Between Number
Chicago and Washington,D.G.20
Chicago and Anchorage 17
Seattle and Washington,D.C.13
Seattle and Anchorage 5
Seattle and Chicago 10
Estimated
Duration Each
4
5
2
5
3
i~
-
-
40-020-03 Computer
Modf~ls runs for economic and project operation studies.Also includes 1st
year software charges for EGEAS model.
40-1[)20-04 Printing
Printing costs for four reports on project operation and one report on
utility planning.All testimony will be reproduced by counsel.
40-020-09 GE,OGP Model Operation
Computer model utilization cost.
Subcontractor
40--103-04 Acres,Discovery Activities -Need for Power Hearings
12361/40A
840807
7
C C08-3033
ATN-83-0030
TYPE-6213
Contribute to preparation of responses to requests for information during
the Discovery period.
40-103-05 Acres,Prehearing Studies and Preparation of Testimony
Prepare direct testimony for Need for Power Administrative Hearings.
40-103-06 Acres,Discovery Activities -Environmental Hearings
Contribute to preparation of responses to requests for information during
the Discovery period.
40-103-13 Acres,Presentation of Testimony -Need for Power Hearings
Attendance at hearing and presentation of testimony
40-103-27 Acres,Comment on DEIS and Provide Input to FEIS
Provide input to EIS process.
40-113-04 Battelle,Discovery Activities -Need for Power Hearings
Contribute to preparation of responses to requests for information during
the Discovery period.
40-113-05 Battelle,Prehearing Studies and Preparation of Testimony
Prepare direct testimony for Need for Power Administrative Hearings
.....
-
-
12361/40A
840807
8
.-
C COB-3033
A'l'N-B3-0030
TYPE-6213
40-113-06 Battelle,Discovery Activities -Environmental Hearings
Contribute to preparation of responses to requests for information during
the Discovery period.
40-113-13 Battelle,Presentation of Testimony -Need for Power Hearings
AttEmdance at Hearing and presentation of testimony
40-Jl13-27 Battelle,Comment on DEIS and Provide Input to FEIS
Provide input to EIS process.
40-123-04 Sherman H.Clark,Discovery Activities -Need for Power
Hearings
Contribute to preparation of response to requests for information during the
Dis1covery period.
40-123-05 Sherman H.Clark,Prehearing Studies and Preparation
of Testimony -Need for Power Hearings
Prepare direct testimony for Need for Power Administrative Hearings.
40-123-06 Sherman H.Clark,Discovery Activities -Environmental
Hearings
Contribute to preparation of response to requests for information during the
Discovery period.
40-123-13 Sherman H.Clark,Presentation of Testimony -Need for
Power Hearings
12361/40A
840B07
9
_____0'._
C C08-3033
ATN-83-0030
TYPE-6213
Attendance at Hearing and presentation of testimony
40-123-27 Sherman H.Clark,Comment on DEIS and Provide Input
to FEIS
Provide input to EIS Process
40-133-01 ISER,Economic &Financial Update
Refinement of MAP Model to take into account suggestions by DOR on corporate
income tax and to respond to other comments received on the model.
40-133-04 ISER,Discovery Activities -Need for Power Hearings
Contribute to preparation of response to requests for information during
the Discovery period.
40-133-05 ISER,Prehearing Studies &Preparation of Direct Testimony
Prepare direct testimony for Need for Power Administrative Hearings.
40-133-06 ISER,Discovery Activities -Environmental Hearings
Contribute to preparation of responses to requests for information
during the Discovery period.
40-133-13 ISER,Presentation of Testimony -Need for Power Hearings
Attendance at Hearing and presentation of testimony
....
12361/40A
840807
10
~I
-
.-
,-
I
C C08-3033
ATN"';'83-0030
TYPE-62l3
40-133-27 ISER,Comment on DEIS and Provide Input to FEIS
Provide input to EIS process.
40-143-05 General Electric,Prehearing Studies and Preparation of
Direct Testimony
Prepare direct testimony for Need for Power Administrative Hearing.
40-143-13 General Electric,Presentation of Testimony -
Need for Power Hearings
Attemdance at Hearing and presentation of testimony.
40-153-04 Dames &Moore,Discovery Activities -Need for Power Hearings
Contribute to preparation of responses to requests for infonna'tion during
the Discovery period.
40-J.53-05 Dames &Moore,P,rehearing Studies and Preparation of Testimony
Prepare direct testimony for Need for Power Administrative Hearings.
40-][53-06 Dames &Moore,Discovery Activities -Environmental Hearings
Contribute to preparation of responses to requests for infonnation during
the Discovery period.
40-153-13 Dames &Moore,Presentation of Testimony -
Need for Power Hearings
l236l/40A
840807
11
C C08:"3033
ATN-83-0030
TYPE-6213
Attendance at Hearing and presentation of testimony.
40-153-27 Dames &Moore,Comment on DElS and Input to FElS
Provide input to EIS Process.
40-173-04 Paul Weir Company,Discovery Activities -Need for Power Hearings
Contribute to preparation of resposnes to requests for information during
the Discovery period.
40-173-05 Paul Weir Company,Prehearing Studies and Preparation of
Testimony
Prepare direct testimony for Administrative Hearings.
40-173-06 Paul Weir Company,Discovery Activities -Environmental Hearings
Contribute to preparation of responses to requests for information during
the Discovery period.
40-173-13 Paul Weir Company,Presentation of Testimony -Need for
Power Hearings
Attendance at Hearing and preparation of testimony.
40-173-17 Paul Weir Company,Comment on DEIS and Input to FEIS
Provide input to Ers process.
40-203-05 Unassigned Prehearing Studies and Preparation of
"'"
.....
-
-
...
12361/40A
840807
12
.....
C C08-3033
ATN-83-0030
TYPE-6213
Testimony Subcontract
Prepare testimony for Need for Power Administrative Hearings.
40-213-05 Professor Tyrrell Prehearing Studies and Preparation
Testimony
Prepare testimony for Need for Power Administrative Hearings.
40-223-01 Subcontractor Handling Fee
Handling fee equal to 2%of subcontract cost.
12361/40A
840807
13
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 9
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 40 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • •*• • • • • • • • • • • • • • • • • • • • • • • •~• • • • • • • • • • ••• • • •
TOTAL LABOR •113823 150022 119096 131278 141456 132435 99852 96110 59621 52650 53400 57068 1206811
• • • • • •*• • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • • ••• • ••• • • • •••
TOTAL DIRECTS
70100.12400 33800 17400 14900 16500 30500 37500 35900 11500 21300 5000 306800
• •••• •• •• ••• • ••••• ••••• •••• ••••• • • ••• •••••••••• ••• • • • • • •••• •••••• • • •• ••••••• •••
TOTAL SUBCONTRACTORS
68340 30600 5100 0 20400 221850 281520 168300 10200 0 71400 0 877710
•••••••••• • • • • ••••• • • •• • • •• •• ••• ••••••• • ••• • • • • • • • • • • ••• •••••• • •• • •••••• • ••••••
TASK 40 TOTALS
252263 193022 157996 148678 176756 370785 411872 301910 105721 64150 146100 62068 2391321
• ••••• •• •••••• • • •• • •••••• ••• ••••••• • • • • • • ••••••••• •• • ••••• • •••• • •• • ••••••• • • •••
J J I ••J I J .J I ~J .J
-1
08/08/84
1 -I 1 J 1 t )I )]1 J
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Vear 1985:Labor Costs
TASK 40 SALARV BREAKDOWN
Budgeted Salaries Fringe Overhead Fee Total
HOIJrs Benefits
..-
Dedicated Staff 1066 30892.68 10500.10 20285.98 5852.34 67531.10
Home Office Staff 21269 445851.89 151525.23 442076.12 99826.74 1139279.98
TOTAL STAFF 22335 476744.57 162025.33 462362.10 105679.08 1206811.08
Alaska Power Authority
Harza-Ebasco Susit~a Joint Venture
Fiscal Year 1985:Cost Summary
TASK 40
-
2391321 ~
TOTHL SERVICES 1206811
AID,
40-1310-04 DISCOVERY ACTIVITIES-NEED FOR POWER HRGS.69686
410-010-05 PRE-HEARING STUDIES AND PREPARATION OF TESTIMONY 403984
40-010-06 DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARINGS 34211 -4lZi-01iZl-13 PRES.OF TESTIMONY-NEED FOR POWER HEARINGS 6575'3
40-010-14 INITIAL,REPLY &EXCEPTION BRIEFS-NEED FOR POWER 19533
40-010-26 FINANCIAL &MARKETING SUPPORT 81161
40-1010-27 COMMENTS ON DEIS.AND PROVIDE INPUT TO FEIS 85111 -.
l~0-010-29 PROJECT OPERATION AND DISPATCH 325924
Lt 0-010-30 SETTLEMENT PROCESS-ECONOMIC DATA INPUT 25169
40-01121-33 UTILITY EXPANSION PLANNING 96273 1206811 """
TOTAL SUBCONTRACTORS
TOTAL DIRECTS
40-020-01
4iZl-020-03
41Z!-02!Z1-04
40-020-05
40-103-04
40-103-05
40-103-06
40-103-13
40-103-27
40-113-04
40-113-1Zi5
40-113-06
40-113-13
40-113-27
TRAVEL AND LIVING EXPENSES
COMPUTER
PRINTING
GE -OGP COMPUTER MODEL
ACRES,DISCoVERY ACTIVITIES-NEED FOR POWER
ACRES,PREHEARING STUDIES &PREP.OF TESTIMONY
ACRES,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARING
ACRES,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
ACRES,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
.BP,TTELLE,DISCOVERY ACTIVITIES-NEED FOR POWER
BATTELLE,PERHRG.STUDIES &PREP.OF TESTIMONY
BATTELLE,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEAR
BATTELLE-PRES.OF TESTIMONY-NEED FOR POWER HRGS.
BATTELLE,COMNT ON DElS AND PROVIDE INPUT TO FEI
306800
84800
135000 ~,
12000
75000 306800
IlIOI'l
877710 -
10000
45000
10000 ,"""
20000
15000 100000 -
241Zi00 -,45000
1Ql000
40000
15000 134000
48-123-04 SH CLARK,DISCOVERY ACTIVITIES-NEED FOR POWER
40-123-05 SH CLARK,PREHRG.STUDIES &PREP.OF TESTIMONY
20000
60000
-
.,~
40-123-06
40-123-13
40-1.23-27
40-133-01
40-133-04
40-133-05
40-133-06
40-l33-13
4!Z1-l33-27
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
SH CLARK,DISCOVERY ACTIVITIES-ENVIRONMENTAL HRGS
SH CLARK-PRES.OF TESTIMONY-NEED FOR POWER HRGS.
SH CLARK,COMNT ON DEIS AND PROVIDE INPUT TO FEIS
ISER-ECONOMIC &FINANCIAL UPDATE
ISER,DISCOVERY ACTIVITIES-NEED FOR POWER
ISER,PREHEARING STUDIES &PREP.OF TESTIMONY
ISER!DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARINGS
ISER,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
ISER,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
2001210
51211211210
15!Z11210
52000
101211210
4501210
1012100
150121121
150121121
1651211210
14701210
40-143-05 GE,PREHEARING STUDIES &PREP.OF TESTIMONY
40-1.43-13 GE,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
40-143-27 GE,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
40-1 53-!ZI4 D&M,DISCOVERY ACTIVITIES-NEED FOR POWER
4iZH.53-05 D&/Yi,PREHEARING STUDIES &PREP.OF TESTIMONY
40-:l53-!ZI6 D&M,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARINGS
40-1.53-13 D&iYI,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
40-153-27 D&M,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
701210
40500
51210121
112100121
54000
1121000
23!Z100
1500121
5251210
11201210
40-l73-04
40-:L73-05
40-:l73-06
40-173-13
40-:l73-27
P.WEIR,DISCOVERY ACTIVITIES-NEED FOR POWER
P.WEIR,PREHRG.STUDIES &PREP.OF TESTIMONY
P.WEIR,DISCOVERY ACTIVITIES-ENVIRONMENTAL HRGS
P.WEIR,PRES.OF TESTIMONY-NEED FOR POWER HRGS.
P.WEIR,COMMENT ON DElS AND PROVIDE INPUT TO FEIS
112101210
4501210
1012100
3012100
15000 11121000
40-j~03-05 PRESENTLY UNIDENTIFIED SIC FOR DIRECT TESTIMONY
4eH~13-e5 PROF.TYRELL-PREHRG.STUDIES &PREP.OF TSTMY
4121-;::23-01·SUBCONTRACTOR HANDLING FEE
3000121
11210121121
1721121
10000
172LiZl
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 39
TASK 40 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
6%8E.ooooo69686oo
**.** ** * * * *** * *** *** ****** *** * * * * * ****** ****** *** ** *** * * * * **** *** *** * *** ***** ***
LABOR 010
40-010-04 DISCOVERY ACTIVITIES-NEED FOR POWER HRGS.
o III 0 0
40-010-05 PRE-HEARING STUDIES AND PREPARATION OF TESTIMONY
39811 69451 59236 57853 68439 59675 17115 6931 7287 5703 5703 6780 403984
40-010-06 DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARINGS
000 III o o o III o 10587 10587 13037 34211
40-010-13 PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
o 0 III 0 o o o 65759 o o o ill 65759
40-010-14 INITIAL,REPLY &EXCEPTION BRIEFS-NEED FOR POWER
00000 o o o 10587 o 8946 ill 19533
40-010-26 FINANCIAL &MARKETING SUPPORT
o 14050 14548 13769 12692 26102 o o o o o ill 81161
40-010-27 COMMENTS ON DEIS AND PROVIDE INPUT TO FEIS
54496 20389 5113 5113 o o o o o o o o 85111
40-010-29 PROJECT OPERATION AND DISPATCH
18463 32950 27492 31373 33643 23495 10778 20815 33336 28164 28164 37251 325924
40-010-30 SETTLEMENT PROCESS-ECONOMIC DATA INPUT
000 0 2456 1228 2273 2605 .8411 8196 '0 ill 25169
40-010-33 UTILITY EXPANSION PLANNING
1053 13182 12707 23170 24226 21935 o o o o o o %273
LABOR 010 TOTALS
113823 150022 119096 131278 141456 132435 99852 96110 59621 52650 53400 57068 1206811
* * * * * * * * **** ****** ****** ** ***** * * ** * *** **** ** ** ** *** ** ***** *** * *** **** * * ******
DIRECTS
40-020-01 TRAVEL AND LIVING EXPENSES
25100 2400 3800 4900 2900 6500 8000 12500 13400 1500 1300 2500 84800
40-020-03 COMPUTER
III 10000 113000 10000 10000 10000 20000.2501210 20000 10000 10000 III 135000
40-020-04 PRINTING
o o o 2500 2000 o 2500 o 2500 o o 2500 12000
40-020-05 GE -OGP COMPUTER MODEL
45000 0 20000 o o o o o o III 10000 III 75000
I J !I J J I J J .I •J .J .1 J J .~
1 1 J I 1 1 -1 1 1 J 1 1 I
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 40
TASK 40 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * *** * * * * * *** **** * ***
TOTAL DIRECTS
70100 12400 33800 17400 14900 lE.500 30500 37500 35900 11500 21300 51211210 306800
* *** * * * * **** **** * * * * * * * ***** * *** ** * ** *** * * ** ** * * * * * *** * * * *** * *** * * * * * *********
SUBCONTRACTOR 103
40-103-04 ACRES,OISCOVERY ACTIVITIES-NEED FOR POWER
o 0 0 0 0
40-103-05 ACRES,PREHEARING STUDIES &PREP.OF TESTIMONY
00000
40-103-0&ACRES,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARING
00000
40-103-13 ACRES,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
o 0 0 0 0
40-103-27 ACRES,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
10000 5000 0 0 0
10000
o
o
10001ll
o
o
2011100
o
10000
o
o
25000
o
o
o
o
o
o
o
o
o
o
o
o
o
o
o
10000
o
o
o
o
o
o
o
10000
45000
1001210
20000
15000
SUBCONTRACTOR 103 TOTALS
10000 5000 o o III 20000 30000 25000 o o 10000 o 100000
* * ***** * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * *** ** ** * * * * **** * * * * * * * * **** ** * * *** * * * * *
SUBCONTRACTOR 113
40-113-04 BATTELLE,DISCOVERY ACTIVITIES-NEED FOR POWER
000 0
40-113-05 BATTELLE,PERHRG.STUDIES &PREP.OF TESTIMONY
o 01210
o
o
24000
o
o
2012100
o
25000
o
o
o
o
o
o
0.
o
24000
4501210
40-113-12IE.BATTELLE,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEAR
o 0 0 0 0
40-113-13 BATTELLE-PRES.OF TESTIMONY-NEED FOR POWER HRGS.
00000
40-113-27 BATTELLE,COMNT ON DEIS AND PROVIDE INPUT TO FEI
10121121121 501210 0 0 121
o
2000121
o
121
20000
o
o
o
o
o
o
o
o
121
o
10000
121
o
o
o
121
10000
400121121
1501210
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 41
TASK 40 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * *** * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
SUBCONTRACTOR 113 TOTALS
10000 5000 o o o 44000 40000 25000 o o 10000 til 134000
* * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * **** *** ** * **
SUBCONTRACTOR 123
40-123-04 SH CLARK,DISCOVERY ACTIVITIES-NEED FOR POWER
o 000
40-123-05 SH CLARK,PREHRG.STUDIES &PREP.OF TESTIMONY
o 0 0 0
o
o
20000
o
o
30000
o
30000
o
o
o
o
o
III
o
o
20000
60000
40-123-06 SH CLARK,DISCOVERY ACTIVITIES-ENVIRONMENTAL HRGS
o 0 0 0 0
40-123-13 SH CLARK-PRES.OF TESTIMONY-NEED FOR POWER HRGS.
o 000 0
40-123-27 SH CLARK,COMNT ON DEIS AND PROVIDE INPUT TO FEIS
10000 5000 0 0 0
o
25000
o
o
25000
o
o
o
o
o
o
o
o
o
o
20000
o
o
o
o
o
20000
50000
15000
SUBCONTRACTOR 123 TOTALS
10000 5~00 o o o 45000 55000 30000 o o 20000 o 165000
* * * * * * * * * * * * * * * *** * * * * * * * ***** * * *** * * ********* * * * * * * * * * * * *** * * * * * * * * * * * * * * * * **
SUBCONTRACTOR 133
40-133-01 ISER-ECONOMIC &FINANCIAL UPDATE
7il100 121 50il10 o o 10000 10000 10000 10000 o III o 52000
40-133-04 ISER,DISCOVERY ACTIVITIES-NEED FOR POWER
00000
40-133-05 ISER,PREHEARING STUDIES &PREP.OF TESTIMONY
.000 0 0
40-133-06 ISER,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARINGS
00000
40-133-13 ISER,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
o 0 0 0 0
40-133-27 ISER,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
10000 5000 0 0 0
10000
o
o
8000
o
o
20000
o
7il100
o
o
25000
ill
o
o
o
o
o
o
o
o
o
o
o
o
o
o
10000
o
o
o
o
o
o
o
10000
45000
10000
15000
15000
J _J J I J ].1 J J J !~]
]]j 1 i I )1 1 -1 I
RUN DATE 08/03/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
PAGE 42
TASK 40 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * *** *** * * * * * * *•* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * ***
SUBCONTRACTOR 133 TOTALS
17000 5000 5000 o o 28000 37000 35000 10000 o 10000 o 147000
* * * * * * * * * * * *** * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * *
SUBCONTRACTOR 143
40-143-05 GE,PREHEARING STUDIES &PREP.OF TESTIMONY
o I/)000
40-143-13 GE,PRES.OF TESTIMONY-NEED FDR POWER HEARINGS
o 0 0 I/)20000
7000
20500
o
o
o
o
o
o
o
o
o
o
o
o
7000
40500
40-143-27 GE,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
o 001/)I/)5000 o o o o o o 5000
SUBCONTRACTOR 143 TOTALS
I/)o o o 20000 32500 I/)o o o o o 52500
* * * * * * * * * **** * * * * * * * * * * * * * * * * * * * * * * * * * ***** * * * * * * * * * * * * *** * * * * * *** * * * * *** * * * **
SUBCONTRACTOR 153
40-153-04 D&M,DISCOVERY ACTIVITIES-NEED FOR POWER
01/)000
40-153-05 D&M,PREHEARING STUDIES &PREP.OF TESTIMONY
00000
40-153-06 D&M,DISCOVERY ACTIVITIES-ENVIRONMENTAL HEARINGS
o 0 0 0 0
40-153-13 D&M,PRES.OF TESTIMONY-NEED FOR POWER HEARINGS
o 0 000
10000
III
o
13000
o
29000
o
10000
o
25000
o
o
o
'0
o
o
o
o
o
o
I/)
o
10000
o
I/)
o
o
o
10000
54000
10000
23000
40-153-27 D&M,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
10000 5000 0 0 o I/)o o o o o o 15000
SUBCONTRACTOR 153 TOTALS
10000 5000 o o o 23000 39000 25000 o o 10000 o 112000
* * *** * * * * * * * * **** * * ****~* * * * * *** * * * * * * * * * **~* * * * * * * *** * * * * * * * * * * * * * * * * * * * * *** *
SUBCONTRACTOR 173
40-173-04 P.WEIR,DISCOVERY ACTIVITIES-NEED FOR POWER
o 0 0 0 o 10000 o o o o o o 10000
RUN DATE 1218/1213/84 ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1385 BUDGET FOR HARZA-EBASCO SUSITNR JOINT VENTURE
PRGE 43
TASK 4121 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
******* * * *** * **** * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * ***** * * ****** ****** * * * *
SUBCONTRACTOR 173
4121-173-05 P.WEIR,PREHRG.STUDIES &PREP.OF TESTIMONY
o 0 0 121 0 ill 2001210 25000 0 III 0 III 45000
40-173-05 P.WEIR,DISCOVERY ACTIVITIES-ENVIRONMENTAL HRGS
o 0 0 0 o o o o o o 10000 ill 112112100
40-173-13 P.WEIR,PRES.OF TESTIMONY-NEED FOR POWER HRGS.
o 0 0 0 0
40-173-27 P.WEIR,COMMENT ON DEIS AND PROVIDE INPUT TO FEIS
1130013 51300 0 0 0
150130
o
15000
o
o
o
o
o
o
o
o
o
o
o
31l10@121
151l1Q10
SUBCONTRACTOR 173 TOTALS
10000 5000 o o o 250013 35000 25000 o o 10000 o 110000
* * * * *** * * **** * **** * * *** * * * * * * * * **** ** ** ******* * ***** * * * * *** * *** * * * * * * * * * * * * ***
SUBCONTRACTOR 203
4121-203-05 PRESENTLY UNIDENTIFIED SIC FOR DIRECT TESTIMONY
000 0 ill o 30000 o o o ill o 30000
SUBCONTRACTOR 203 TOTALS
o o o o o o 30000 o o o o o 30000
* * * ****.** * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * *** * * ** ** * **** * * **** * *** ** *** **
SUBCONTRACTOR 213
40-213-05 PROF.TYRELL-PREHRG.STUDIES &PREP.OF TSTMY
o 000 o o 10000 ill o o o o 10000
SUBCONTRRCTOR 213 TOTALS
o o o o o o 10000 o o o o o 10000
* ** *** ********* ********** ***** *** * ************ * * * * * * * * *** * * *** * * **** * *** * * * * * *
SUBCONTRACTOR 223
4121-223-01 SUBCONTRACTOR HANDLING FEE
1340 600 100 o 400 4350 5520 3300 200 o 1400 o 17210
SUBCONTRACTOR 223 TOTALS
1340 60121 100 o 400 43513 5520 3300 21210 o 1400 o 17210
* * * * * * * * *** * * * *** * * ***** **** ***** * * * * * * * * **** ****** ***** ****** * ****** ******* * *
,I I J J J .1 I J j J I
J 1 1 I 1 j I ·1 I 1 )i 1 ...~.~
RUN DATE 08/03/84 ALASKA POWER AUTHORITY PAGE 44
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARUl-EBASCO SUSITNA JOINT VENTURE
TASK 40 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
** ***** **** * ***** ******** ***** *** * ************* *** * * * * **** *** * *** ********** ****
TASK 40 TOTALS
252263 193022 157996 148678 176756 370785 411872 301910 105721 64150 146100 62~68 2391321
** *** *** *************** ****** ** * *** * * ** * * ** *** *********** ******* * * * * ***•*** *•**
OFFICE
PERSONNEL
SUBCONTRACTORS
TECHNICAL
RESPONSIBILITIES
July 1,1984
MANAGER ADVISOR
G.Volland A.Allen
I I
BELLEVUE CHICAGO ANCHORAGE
D.Tillman E.Carter W.Dyok
D.Augustine J.Feinstein
C.Berry N.Pansic
E.Hall R.Swarner
W.Hutchinson B.Trouille
R.Keegan Y.Wu
N.Lesnick D.Southern
R.Schnorr
BATTELLE ACRES AMERICAN
S.H.CLARK GENERAL
ASSOCIATES ELECTRIC
DAMES II MOOR E
ISER
PAUL WEIR
COMPANY
Oil Price.Operation Studies Manqement
Fuel.Hydro Projects Coordination
Thermal Pl.nts OGP Model T••4 Coordlhlltion
MAP Model Project Economics Utility Contacts
RED ~odel Fln.ncing
Gener.1 Economics
TASK 40 -NEED FOR POWER
I J ;,I .-I ......1 "I
-
-
C C08-3033
ATN-83-0030
TYPE-6213
TASK 41
TRANSMISSION FACILITIES SITING &LICENSING
The purpose of Task 41 in FY85 is limited to the support of the FERC
hearing process and the securing of power sales agreements.
Services
41-010-01 Prepare Cost Estimates for Alternatives
Prepare estimates on transmission system alternatives.
41-010-02 Report on Transmission System Alternatives
Define and report on transmission system alternatives.
41-010-08 Support FERC Requests for Information
Prepare wri tten responses to FERC supplemental information reques ts.
This will include both responses made by FERC in FY 1985 as well as
responses which were supplied to FERC based on information submitted to
FERG in FY 1984 •.
41-010-16 Provide Input to Brief Process
Provide input when requested to pre hearing activities such as
preparation of direct testimony.
12361/41
840807
1
------------,------------------------
C CD8-3D33
ATN-83-0030
TYPE-6213
Directs
-
41-020-01 Travel and Living Expense
Includes two trips of one week duration associated with the above
effort.
Between
Atlanta and Anchorage
41-020-04 Printing
Estimated
Number
2
Estimated
Duration Each
7 days
...
Drawings and report reproductions required for the task activities.
-
....
-
12361/41
840807
2
-1 1 I "J J !1 ~~I ~l I J I -))i I H
RUN DATE 08/09/84 ALASKA POWER AUTHORITY PAGE 10
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 41 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
****t ****************************************************** * **** * * * * * * *******••
TOTAL LABOR ~
3704 4802 8404 3252 6509 5242 9783 3481 8232 9524 3252 3252 69437
*** ***** * * ******** * * * * **** *** ******************************** * * * * * * * *•** * *•* ***
TOTAL.DI RECTS
3000 3500 3000 3500 3000 3500 2500 3500 3000 3500 3000 3000 38000
* * *** *** * * * * * ***** * * * *** * ***** *************** ************* * * * * * * * * * * * * ***** * ***
TASK 41 TOTALS
f.704 8302 11404 6752 9509 8742 12283 6981 11232 13024 6252 6252 107437
*** * * ***** * * **** **********•*** •************* ************** * * *** * * * * * * * * * * * **•* *
1
08/08/84
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TASK 41 SALARY BREAKDOWN
Budgeted Salaries Fringe Overhead fee Total
Hours Benefits
--
Dedicated Staff 0 0.00 0.00 0.00 0.00 0.00
HoMe Office Staff 95'3 27161.68 '3232.30 26'335.80 6107.53 6'3437.32
TOTAL STAFF '359 27161.68 9232.30 26935.80 6107.53 69437.32
I I ..~~J 1 ~
.....
.-
~!i!1lj
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 198~:Cost SUMmary
TASK 41
TOTALSERV!CES .
107437
69437
-41-01iZJ-01
41-iZl10-iZJ2
41-010-08
41-010-16
PREPARE COST ESTIMATES FOR ALTERNATIVES
REPORT ON TRANSMISSION SYSTEM ALTERNATIVES
SUPPORT FERC REQUESTS FOR INFORMATION
'PROVIDE INPUT TO BRIEF PROCESS
64614
4823
121
o 69437
-
TOTAL DIRECTS
41-0:2121-01 TRAVEL AND LIVING EXPENSES
41-020-iZJ4 PRINTING
3000121
8000
38000
38000
------------------------------------
RUN DATE ~8/~3/84 ALASKA POWER AUTHORITY PAGE 45
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-E8ASCO SUSITNA JOINT VENTURE
TASK 41 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
* * * * * * * * *** ******* * * * * * * * * * * * * * *** * * * * ******* * * * * * * * * * * * * * * * * * * * * * * * * * * * *** ****
LABOR ~10
4H~10-01 PREPARE COST ESTIMATES FOR ALTERNATIVES
2326 3252 6509 3252 6509 5242 9783 3481 8232 9524 7'::)C":)3252 64614oJ....,:JL...
41-010-02 REPORT ON TRANSMISSION SYSTEM ALTERNATIVES
1318 1550 1895 0 0 0 0 0 0 0 0 0 4823
41-010-08 SUPPORT FERC REQUESTS FOR INFORMATION
0 0 0 0 0 ~0 ~~0 0 0 0
41-010-16 PROVIDE INPUT TO BRIEF PROCESS
0 0 0 0 0 0 0 0 0 0 0 0 ~
LABOR 010 TOTALS
3704 4802 8404 3252 5509 5242 9783 3481 8232 9524 3252 3252 69437
* *** * * * * * * * * * * * * * * * * *** * * * * * *** * * * * * * * * * * *** * * * *** * * *** * * * * * * * * * * * *** * ********
DIRECTS
41-~20-01 TRAVEL AND LIVING EXPENSES
2500 2500 2500 2500 2500 2500 2500 250~2500 2500 2500 250121 3~~0~
41-020-04 PRINTING
500 1000 500 1000 500 H'I00 0 1000 500 1000 500 50121 8000
TOTAL 01 RECTS
3000 3500 31Zl00 3500 3000 3500 251Zl0 3500 3000 3500 3000 3000 38000
* * * * * * * * * ***** **** * * * * * * *** * * * * * * * * * * * * * * * * * **** * *** * * * * * * * * * * **** * * * *** *** ***
TASK 41 TOTALS
6704 8302 11404 &752 9509 8742 12283 6981 11232 13024 6252 E.252 107437
***** * *** * **** * * ****** * *** * * * * * * * * * * * *** * * * * * *** * * * * *** * * *** * * *** * * * * * * ***** * * *
'I !J .1 J )...1 i J .1 ,I
-,I -j -J -I I 1 1 )i
Office
Personnel
Subcontractors
Technical Responsibilities
July 1,1984
Anchorage
C.Craddock
M.Bruen
A.Stukey
D.Yacko
CIRI/Moolin
Site Investigations
Instrumentation
Monitoring
Engineering Operations "
Manager
C.D.Craddock
Atlanta/Bellevue
W.Rom
J.Szablya
Transmission Une
Systems
TASKS 3,5,7,41 -ENGINEERING
C C08-3033
ATN-83-0030
TYPE-6213
-
TASK 42
HYDROLOGIC AND HYDRAULIC STUDIES
-
-
Task 42 will include the hydrologic and hydraulic analyses required to
support assessments of project impacts on the aquatic ecosystem.
AssE~ssments of project impacts on the aquatic ecosytem will be required
for the preparation of the Environmental Impact Assessment and for the
negotiated settlement of the licensing process.
Services
42-010-01 Supervision &Coordination
Task 42 coordinators wi 11 work with personnel of the Aquatic Terres-
trial and Socioeconomic Study Teams to ensure that hydrologic and
hydraulic studies provide the necessary information for the FEIS.
supplemental reque sts for information.and the set tlement process.
They also will provide technical review for work by Aquatic Study sub-
contractors and for hydrologic and hydraulic studies by Task 42 person-
nel.The coordination function also ensures that hydrologic and
hydraulic studies will be accomplished in a timely and efficient man-
ner.This item includes budget for the above management and coordina-
tion functions.In addition it provides budget for the general level-
of-effort for this task including:participation in coordination meet-
ings of the aquatic studies team.participation in meetings and work-
shops with concerned state and federal agencies.preparation of invest-
igation memoranda and work scopes.preparation of budgets.compilation
of progress and status reports.computer support and word proces sing
services 1n the home offices for reports and memoranda prepared for all
subtasks of Task 42.Mr.E.J.Gemperline has the primary responsibi-
12361/42
840807
1
'o m_
C C08-3033
ATN-83":'0030
TYPE-6213
lity for coordination and supervision of Task 42.He will be assisted
by Dr.B.H.Wang and Mr.Wayne Dyok,as necessary.
42-010-02 Reservoir Operation and Stream Hydraulics Study
This subtask includes three studies:
1.Reservoir operation study
2.Stream water surface profiles (steady state)
3.Water level fluctuations due to load following operation.
In conjunction with Task 40,Need-for-Power studies the reservoir
operation study will be conducted to determine downstream releases
based on forecasted power requirements,project operation rules and
downstream requirements.Results of the study will be used as input to
reserV01r temperature and 1ce studies,instream hydraulic studies,
instream temperature and ice studies and river sediment studies.
Results from these studies will be required 1n the the FEIS and the
settlement process.The scope of work will include provision of
reservoir releases and water levels on a weekly average basis.
The objective of the stream water surface profiles study will be to
develop stage-discharge relationships and discharge velocity relation-
ships at locations downstream of the Chulitna-Susitna confluence where
such relationships are needed for ice,sediment and temperature stud-
1es.The scope of work includes mathematical modeling of the reach
between the Sus itna-Chulitna confluence and the Sunshine Bridge.A
report containing results of the study will be prepared.
The objective of the study of water level fluctuations 1S to estimate
the time variation in water levels in the Middle and Lower Reaches
resulting from load following operation of Watana Powerhouse.This
,~
..
-
-
12361/42
840807
2
C C08-3033
ATN-83-0030
TYPE-6213
analysis will be carried out for release patterns suggested by the
Needi-for-Power (Task 40)and Environmental (Task 4)Study Groups to
allow evaluation of environmental impacts.
Rive:r stage fluctuations due to project operation will be determined
uS111lg the dynamic wave routing model (DAMBRK)developed by Dr.D.L.
Freald of the National Weather Service.The dynamic wave routing will
be c:arried out in two sub-reaches t first from Devil Canyon to the con-
fluence of the Susitna and Chulitna rivers and then from the confluence
to Sunshine Station.The results of the analysis of the Middle Reach
will provide the upstream boundary condit ions for the Lower Reach.The
initial conditions t downstream boundary conditions,and cross sectional
and channel roughness data will be taken from previous steady state
hydraulic studies.Upstream boundary conditions will be represented by
the selected reservoir release pattern.
For reservoir releases less than 3,000 cfs the Muskingum method will be
used instead of dynamic flood routing.This is because the DAMBRK
mode!l does not provide accurate results for flows less than this.The
routing by the Muskingum method in the Lower Reach will be carried out
by dividing the river reach between Devil Canyon and Sunshine Station
into several subreaches.Previous routing studies for the Middle Reach
are described in "S us itna Hydroelectric Project River Stage
F1uc:tuations Resulting from Alternative Operation,Watana Development"
February,1984.
42-010-04 Reservoir Temperature/Ice/Turbidity Study
The reservoir temperature/ice/turbidity study wi 11 be made with the
DYRESM model and will be used to examine the effects of the Watana and
Devi 1 Canyon Reservoirs on downstream water temperatures and water
temperatures in the reservoir area.This information will be needed
-
12361/42
840807_____'.__0_
3
C COB-3033
ATN-B3-0030
TYPE-6213
for the examination of project impacts on the fisheries resources.
Additionally,the reservoir temperature model will be expanded to
include a turbidity/suspended sediment model.This will provide esti-
mates of suspended sediment in the water released from the Watana and
Devil Canyon reservoirs for use in the evaluation of enhancement of the
mainstem as a habitat for chinook salmon.
The reservoir temperature/ice/turbidity model will be run as part of
the negotiated settlement process.Suggested reservoir operations will
be modeled in the reservoir operation study.The results will be input
to the reservoir temperature/ice/turbidity study.The output of this
study will provide input into the stream temperature and instream ice
studies.A report will be prepared which documents results of the
study.
42-010-09 Instream Ice Studies
The instream ice study will be used to assess potential project effects
on the fishery resource due to ice cover formation and breakup.The
instream ice studies can be broken down into:
1.Studies of the reach downstream of the Susitna-Chulitna con-
fluence
2.Studies of the reach upstream of the Susitna-Chulitna con-
fluence
The objectives of the study of Lower Reach ice processes will be to:
1.Make field observations of significant hydraulic parameters
related to ice cover progression on the Lower Reach.
12361/42 4
840807
-
-
(Il""'Ili'.
C C08-3033
ATN-83-0030
TYPE-6213
2.Refine the estimate of when the ice cover progression at the
Susitna -Chulitna confluence begins.
3.Estimate the magnitude of staging with-project on the Lower
River,
Empirical formulae will be applied to S1X cross sections representative
of reaches of the Lower River to estimate ice cover thickness and water
surface staging.Observations of thickness and staging during the 1984
free!ze-up will provide data which can be used to refine the empirical
fornLulae.Results of the analyses will be used to refine the estimate
of the time required for ice cover progression to Talkeetna.Results
will be analyzed by the aquatic study team to determine whether ice-
rel~Lted impacts to the Lower Reach habitats may be significant.
A re!port will be prepared and should be available by June 30,1985.
The study of 1ce processes in the Middle Reach wi 11 have two compon-
ents:
2.review of exper1ence 1n operating hydroelectric facilities in
northern climates in relation to effects on downstream ice
-
1.Operation of the instream ice model in support of environ-
mental impact analyses and the negotiated settlement process,
and
processes.
Throughout the negotiated settlement process reservoir operating poli-
cies will be suggested.The reservoir operation,reservoir temperature
and instream temperature models will be operated to provide the stream
flows and temperatures which will be input to the instream ice model.
12361/42
840807
5
C C08-3033
ATN-83-0030
TYPE-6213
The instream ice model will then be operated to provide estimates of
ice-related staging,ice thickness and ice cover progression for use ~n
impact analyses.Additional operation of the ice model may be required
if ice studies of the Lower Reach result in significant changes to
estimates of progression of the ice front to the Chu1itna-Susitna con-
fluence.
A review of experience in operating hydroelectric faci1ites in northern
climates will be carried out to
1.Support the use of a mathematical model for estimating ~ce
related impacts,
-
-
2.
3.
develop measures for estimating ice-related impacts resulting
from fluctuating flows under an ice cover,and
evaluate experience in operating load following plants in
northern climates in winter in order to develop methods for.
minimizing potential impacts.
The results of the rev~ew of experience wi 11 be used to modify the
instream ice model,where appropriate,and to suggest possible winter
operating regimes for the project.The results of the analyses will be
documented in a report.
42-010-12 Slough -Groundwater Study
The purpose of this study wi 11 be to confirm the nature of aquifer
materials in the vicinities of the slough and to quantify the degree
hydraulic connection between the river and the groundwater aquifer.
This knowledge could help to refine present estimates of the rates at
12361/42
840807
6
C C08-3033
ATN-83-0030 .
TYPE-6213
which changes in mainstem hydraulic or thermal condi tions propagate
through the ground to the sloughs.
ComJPutations wi 11 be made to analyze:
1.The resul tsof aquifer testing at Slough 9,
2.additional seepage meter data to be collected at selected
sloughs,and
-:
3.tributary runoff and groundwater underflow components of flow
in Slough 9.
r
-
-
The results of the analyses will be compiled 1n a report.
42-010-17 General FERC Process Support
ThiB task includes responding to FERC requests for supplemental
information,Agency requests,review of the Draft Environmental Impact
Statement and review of the Final Environmental Impact Statement.
42-010-21 Lower River Hydrologic Study
The most basic physical change 1n the Lower River resulting from
SusiLtna Project operation will be in streamflow.Altered streamflow
and reduced peak flood discharges may impact Lower River morphology,
riparian vegetation,inmigrating salmon and stream navigability.The
purpose of this task 1S to define natural and with project flow
duration and flood frequency relationships for key locations in the
LOWE~r River.This information wi 11 be used in evaluating impacts on
the aquatic environment.
12361/42
840807
7
C C08-3033
ATN-83-0030
TYPE-6213
Studies undertaken in FY84 will define the flow duration and flood
frequency relationships for Case C.As other project operation
scenarios are defined the flow duration and flood frequency curves will
be reviewed and refined.This item provides budget for limited review
and refinement of flow duration.and flood frequency curves and
revision ofa report.
42-010-22 Sedimentation Study at Sunshine Gage
The purpose of this task is to estimate with project suspended sediment
concentrations at the Sunshine stream gaging station.This information
will be used to estimate turbidity levels in the Lower River.Juvenile
and resident salmonids utilizing riverine habitats will be affected by
the level of turbidity in the river,and fish populations may be adver-
sely affected if the turbidity levels are too high.
This task was begun 1n Fy84 and a draft report was prepared.This item
includes budget for finalization of that report.
42-010-23 Lower River Sediment Study
The objective of this study is to evaluate sedimentation processes in
the Lower Reach of the Susitna River.The study reach is from Sunshine
gage upstream to the Chulitna-Susitna confluence.The study will be
carried out in two parts.In the firs t part of.the study empirica 1
formulae will be used to evaluate aggradation and degradation.Results
of this analysis should be availab Ie by December,1984.The second
part of the study will include development and application of a methe-
matical model to evaluate sediment processes in the reach between
Sunshine gage and the Susitna-Chulitna confluence.An expert consult-
ant will be retained who will provide a mathematical model and advise
in its use.Cross sectional surveys of the Lower Reach upstream of
....
-
-
-
-
"""I
-
12361/42
840807
8 .....
..-
C C08-3033
ATN-83-0030
TYPE-6213
Sunshine Bridge wi 11 be obtained for use 1.n the analysis.A draft
report of preliminary results will be provided by June 30,1985.
42-010-24 FERC Hearing Process
This task includes participation of five key personnel in the FERC
Hearing Process for the period March,1985 through June,1985.This
includes participation in the pre-hearing conference,preparation of
discovery requests,preparation of information requested by interven-
ors,and preparation of testimony.
42-010-25 Stream Channel Stability Analyses
The objective of this study will be to:
1.Define sedimentation process at selected locations 1.n the
mainstem,side channel and sloughs under natural conditions,
2.estimate potential degradation/aggradation under with-project
conditions at the entrances and in the selected side channels
and sloughs,and in the mainstem at selected locations;and
3.estimate discharge rates required to flush out fine sediment
likely to be deposited in the side channels and sloughs.
The analyses will be performed for the selected side channels and
sloughs and for selected locations in the mainstem to:
1.Evaluate sedimentation processes,that is,scouring and
deposition,under the natural flow regime,
12361/42
840807
9
C C08-3033
ATN-83-0030
TYPE-6213
2.determine discharge rates at which the mainstem flows are
likely to overtop the entrances at the heads of sloughs and
side channels under natural and with-project conditions,
3.estimate discharge rates for the sloughs and side channels at
which their beds will be unstable and also the rates to flush
out fine sediment deposits;and
4.estimate potential aggradation near the entrances of the
sloughs and side channels under with-project conditions.
Directs
42-020-01 Travel and Temporary Living Expenses
Hydrologic and hydraulic studies will be carried out in the home
offices,primarily in Chicago.This wi 11 require trips between the
home offices and Anchorage for coordination and data gathering
purposes.Additiona lly,trips will be required for participation in
the FERC hearing process,and for reviewing experience in winter
operation of hydroelectric projects in northern climates.The
following trips between the home office and Anchorage have been
budgeted:
'"'"I
Estimated Estimated
Between Number Duration Each
Chicago and Anchorage 26 7
Denver and Anchorage 3 7
Anchorage and Chicago 4 7
Chicago and Montreal 2 6 ""'1
12361/42
840807
10
-
Chicago and Vancouver
Anchorage and Washington,D.C.
Chicago and Washington,D.C.
42-020-02 Relocation
2
2
4
C C08-3033
ATN-83-0030
TYPE-6213
6
7
6
The cost associated with demobilizing one family from Anchorage to
Chicago and the monthly costs of property management and storage.
42-020-03 Computer Charges
The hydrologic and
include operation
computers.
hydraulic
of several
(environmental related)studies will
mathematical models using electronic
.....
-
-
As part of the negotiated settlement process the reservoir operation
studies will be carried out on a weekly basis for input to reservoir
temperature studies.
The reservoir temperature model (DYRESM)will also be run as part of
the negotiated settlement process.Production runs wi 11 be made as
necessary to provide information required for settlement.
The instream ice model will also be run during the settlement process.
Productions runs of this model will be for the same conditions as the
reservoir temperature model.
Steady state water surface profiles in the reach of the river between
the Chulitna-Susitna confluence and the Sunshine Bridge will be
computed using the u.s.Army Corps of Engineers program HEC-2.
12361/42
840807
11
C C08-3033
ATN-83-0030
TYPE-62l3
Water level fluctuations resulting from load following operation of
Watana dam will be computed using the National Weather Service Model
DAMBRK.
Streambed aggradation or degradation in the reach between the Susitna-
Chulitna confluence and the Sunshine bridge will be computed using a
state-of-the art model such as the u.S.Army Corps of Engineers model
HEC-6 or models developed by Simons and Lei,Inc.,H.W.Sten,or J.F.
Kennedy.
42-020-06 Miscellaneous
This item will cover such things as report printing film,aerial photos
(from USGS EROS data center)and other items which are necessary but
not covered under specific budgets.
Subcontracts
42-103-01 Reservoir Temperature/Ice Consultant
Dr.Paul Hamblin of the Canadian Center for Inland Waters will be
retained to provide consultation on the model for reservoir thermal
behavior and to provide the turbidity subroutine.The model will be
used in studies providing input to the FEIS and settlement process.
42-113-01 Instream Ice Process Study
Mr.Darryl Calkins of the U.S.Army Corps of Engineers,Cold Regions
Research and Engineering Laboratory will be retained to provide
consultation on the model of instream ice processes.The model will be
used in studies providing input to the FEIS and the settlement
process.
-
""'"
-.
-
12361/42
840807
12 -
-
.....
-
.....
C COB-3033
ATN-83-0030
TYPE-6213
42-183-01 Sediment Consultant
An l'!xpert consultant wi 11 be retained to provide a state-of-the-art
model for streambed sediment processes and to advise in its use.
42-163-01 Glacier Data Reduction
Dr.Will Harrison will be retained to reduce field data on glaciers
collected in 1982-1983 and to provide an interpretive report •
42-173-01 Streamflow Forecasting
An e~pert in streamflow forecasting will be retained to advise on the
possibility of developing long term and short term streamflow
forecasting models and to begin development·if the resul t is favorable.
The ~pert will be expected to work with R&M consultants and Dr.
Harrison to determine how best to utilize glacier data and the type of
meteorological,hydrological,and glaciological data collection
programs necessary.
42-143-01 Subcontractor Handling Fee
A handling fee equal to 2 percent of subcontract costs.
04-016-43 Glacier Studies
The glaciated portions of the Susitna River Basin upstream of Gold
Creek playa significant role in the hydrology of the area.The
drainage area upstream of the Denali and MacLaren gages comprises
19.9 percent of the basin above Gold Creek,yet contributes 39
percent of the average annual flow (License Application p.E-2-
12).
12361/42
840807
13
C C08-3033
ATN-83-0030
TYPE-6213
Glaciers act as reservoirs collecting snow and ice in the winter
and releasing melt water to the stream in the summer.The rate at
which glaciers store water,melt and contribute to streamflow
depends on the climate.Periodic changes in climate may have
significant effects on glacier wasting and,thus,on inflow to the
project.
Although there is no reliable mechanism for predicting glacier
wasting during project life,due to the importance of the
glaciated region to Susitna River streamflow it may be beneficial
to conduct a monitoring program.The purpose of this program
would be to determine the current physical glacier charateristics
and periodic changes in relation to climate.Records of this type
might provide insights into glacier performance and data which
would be useful for project operation.
The objective of this task would be the preparation of a plan for
glacial monitoring which would specify how such a program would
benefit project operation.A base line monitoring program would
be initiated if review of the monitoring program plan was
favorable.
Work would consist of three items:
-
1.Preparation of a plan for glacier monitoring including an
assessment of its usefulness for project operation,
2.Review of the plan,and
3.Confirmation of the base line monitoring program already in
place.
12361/42 14
840807 -I
,~
There would be two deliverables:
C COB-3033
ATN-B3-0030
TYPE-6213
1.A report on the proposed glacial monitoring program.
i.A report of the data collected during FYB5.
-
....
12361/42-..,...__.u_~~
15
RUN DAlE 08/09/84 ALASKA POWER AUTHORITY PAGE 11
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 42 JULV AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
I * * * * * * *1*** * * * * *•* * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *•••*••••• *••
TOTAL LABOR ..
84347 97496 82813 74293 82999 72341 7£.405 62564 78089 58409 57263 60735 887154
* *•••* *•••* *•* * * *•••*•*•* *•••* * *•* *••*•* * * * * * * * * * * * ••• ••••••••••• ••••••• ••• ••• •
TOTAL 01 RECTS
23200 23200 25300 24400 24400 24400 24400 16540 16540 12100 12100 35600 26218111
••• ••••••• I •• • • • • • • • • • • • • • • • • • • • • * • • • * • • • • • • • • * • * • • • • • • • * • • • • • • • • • • • • ••• • • • • • • •
TOTAL SUBCONTRACTORS
7650 7650 7f.48 17£.46 17f.50 17644 17646 17646 17338
13260 Ue60 13258 168e96
• • * * * * * * * * * * * * * * * * * * * * * * * * • * * * • * * * * * * * * * * * * * * • * * * • * * * *•* * * * * * * * * * * * * • *••• •••• ••
lAS!(4e TOTAlS
115197 128346 115761 116339 125049 114385 118451 96750 111967 83769 8e6e3 109593 1318230
I •• • • ••••• • • • • *•* • • * * • * • * * * * * *•• • ••* *•••*••••••••* • ••*•••• *••••••*•••• •••*•••••
0.1 I _J J J
{
i
08/08/84
1 1 1 1 I J 1 -1 J --''1 ..'1 1 1
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Labor Costs
TASK 42 SALARY BREAKDOWN
Budgeted Salaries Fringe Overhead Fee Tot~l
Hours Benefits
-~
Dedicated Staff 2186 53076.08 18034.50 34844.84 10055.60 116011.02
Home Office Staff 15449 302159.59 102691.78 299585.49 67305.83 771742.69
TOTAL STAFF 17635 355235.67 120726.28 334430.33 77361.43 887753.71
Alaska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
TASK 42
TOTAL SERVICES
131823121 I!I!Il
887754
42-010-01
42-010-02
42-1211121-1214
42-010-1219
42-1211121-12
42-010-17
42-010-21
42-010-22
42-010-23
42-01121-24
42-01121-25
SUPERV.&.COORD.
RESERVIOR OPERATION &STREAM HYDRAULIC STUDIES
RESERVIOR TEMPERATURE STUDIES
INSTREAM ICE STUDIES
SLOUGH -GROUNDWATER STUDY
GENERAL FERC PROCESS SUPPORT
LOWER RIVER HYDROLOGIC STUDY
SEDIMENTATION STUDY AT SUNSHINE GAGE
LOWER RIVER SEDIMENT STUDY
FERC HEARING PROCESS
STREAM CHANNEL STABILITY ANALYSIS
155057
10121117
11121943
167995
5912121
49512
13909
15561
64431
112775
18334
-
887754
TOTAL DIRECTS 262180
~
42-020-01 TRAVEL AND LIVING EXPENSES 6960121
42-020-02 RELOCATION 25300
42-020-03 COMPUTER CHARGES 16248121
42-020-06 MISCELLANEOUS 480121 252180
-TOTAL SUBCONTRACTORS 168296
42-103-01 RESERVIOR TEMP/ICE CONSULTANT 15000 1501210
42-113-01 INSTREAM ICE CONSULTANT
42-143-01 SUBCONTRACTOR HANDLING FEE
42-163-01 GLAICER DATA REDUCTION
42-173-01 STREAMFLOW FORCASTING
25000
3296
2500121
50000
250121t21
3296
251210121
50000
-
r
r
I
F""'"
I
....
~laska Power Authority
Harza-Ebasco Susitna Joint Venture
Fiscal Year 1985:Cost Summary
42-183-01 SEDIMENT CONSULTANT 50000
-----~-'.;~-......._-----------,---------------------------------
RUN DRTE 08/03/84 RLRSKR POWER RUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCRL YEAR 1985 BUDGET FOR HRRZR-EBASCO SUSITNR JOINT VENTURE
PRGE 46
16505711455133251332516659133251247512475162341332512900
SUPERV.&COORD.
12900 16659
TASK 42 JULY RUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JRNUARY FEBRUARY MRRCH RPRIL MAY JUNE TOTRL
* * * * * * * * * * * * ** * ** * * * * * * * *** * ***** * * * * * * * *** * *~* *** ** ** * * * *** * ** * *** *** *** * * * * * *
LABOR 010
42-010-01
42-010-02 RESERVIOR OPERRTION &STRERM HYDRRULIC STUDIES
4264 5143 4264 8779 10425 8056 8056 9230 11915 9230 9230 11525 100117
42-010-04 RESERVIOR TEMPERATURE STUDIES
15259 17527 15259 15701 17509 14853 14835 o o I/)o o 110943
42-010-09 INSTRERM ICE STUDIES
19275 24449 18974 19564 21672 21061 20178 18634 4188 o o o 167995
42-010-12 SLOUGH -GROUNDWRTER STUDY
7259 8522 7259 7259 8522 7259 7259 7259 8522 o o o 69120
42-010-17 GENERRL FERC PROCESS SUPPORT
6189 6189 6189 6189 6189 6189 6189 6189 o o o o 49512
42-010-21 LOWER RIVER HYDROLOGIC STUDY
4290 5329 4290 0 I/)o o o 1/1 I/)o o 13909
42-010-22 SEDIMENTATION STUDY RT SUNSHINE GAGE
5187 5187 5187 0 o o o o 1/1 o o o 15561
42-010-23 LOWER RIVER SEDIMENT STUDY
3476 2448 2448 3476 2448 2448 7413 7927 8482 7927 7413 8525 64431
42-010-24 FERC HEARING PROCESS
o 0 o o o o o o 28323 27927 27295 29230 112775
42-010-25 STRERM CHRNNEL STRBILITY RNALYSIS
6248 6043 6043 o o o o o o o o o 18334
LABOR 010 TOTRLS
84347 974%82813 74293 82999 72341 76405 62564 78089 58409 57263 60735 887754
*** ** ** * * * * * * * * * * **** * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * **** ** ******** * * * * ** * *** * *
DIRECTS
42-020-01 TRRVEL RND LIVING EXPENSES
5800 5800 5800 5800 5800 5800 5800 5800 5800 5800 5800 5800 6%00
42-020-02 RELOCRTION
150 150 150 150 150 150 150 150 150 150 150 23650 25300
42-020-03 COMPUTER CHARGES
16850 16850 18950 18050 18050 18050 18050 10190 10190 5750 5750 .5750 162480
I ,I )_I "!
RUN DATE 08/03/84
1 )
ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
j
I
TASK 42 JULY AUGUST SEPTEMBER OCTOBER
)1
NOVEMBER
J
DECEMBER
1
JANUARY
i ]
FEBRUARY MARCH
1
APRIL
1
MAY
J 1
PAGE 47
JUNE
1
TOTAL
1
* * * * * * * * * * * * * * * * * * * * * * * * * * * ** ** * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * *** * * * * * * * * * *** * *
DIRECTS
42-020-06 MISCELLANEOUS
400 400 400 400 400 400 40121 40121 40121 400 4121121 40ili 4800
TOTAL DIRECTS
2321210 23200 2530121 2440121 2441210 244121121 24400 16540 16540 1210121 1211210 35600 252180
* * * * * * * * * * * * * * * * * * * * * * * * ****** * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * ****
SUBCONTRACTOR 103
42-11213--01 RESERVIOR TEMP/ICE
1250 1250
CONSULTANT
125121 1250 125121 1250 125121 1250 1250 1250 1250 1250 15000
SUBCONTRACTOR "103 TOTALS
1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1250 1500121
*** * *** * * * * * *** * *** * * * * * *** * * * * * * * **** * * *** * * *** * * * * ***** * * * * * * * * * * * **,** * * * * * *
SUBCONTRACTOR 113
42-113-01 INSTREAM ICE CONSULTANT
2083 2083 2083 2083 2087 2083 2083 2083 2083 2083 2083 2083 25000
SUBCONTRACTOR 113 TOTALS
2083 2083 2083 2083 2087 2083 2083 2083 2083 2083 2083 2083 25000
*** * * * * * * * *** *** * *** * *** * *** *** * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * *** * *****
SUBCONTRACTOR 143
42-143-01 SUBCONTRACTOR HANDLING FEE
150 150 149 346 346 345 345 345 339 260 260 25'3 32'35
SUBCONTRACTOR 143 TOTALS
150 150 14'3 346 345 345 346 345 339 260 260 259 3296
* * * *** * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * *** * * *** *** * * ***** * * * * * * *** * * * *** * * *** * *
SUBCONTRACTOR 163
42-163-01 GLAICER DATA REDUCTION
o 0 o 4200 4200 4200 4200 4200 4000 o o o 25000
RUN DATE 08/03/84 ALASKA POWER AUTHORITY PAGE 48
SUSITNA HYDROELECTRIC PROJECT
FISCAL YEAR 1985 BUDGET FOR HARZA-EBASCO SUSITNA JOINT VENTURE
TASK 42 JULY AUGUST SEPTEMBER OCTOBER NOVEMBER DECEMBER JANUARY FEBRUARY MARCH APRIL MAY JUNE TOTAL
**** *** * * ** ** * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * *** * **~*•
SUBCONTRACTOR 163 TOTALS
0 0 0 421210 4200 4200 4200 4,;:1210 4000 0 0 III 25000
* * * * * * * * * * * * * * * * * * * **** * * * * * * * * * * * * * * ******* **** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
SUBCONTRACTOR 173
42-173-01 STREAMFLOW FORCASTING
0 0 121 561210 5600 5600 5600 560121 5500 5500 55121121 5500 5001210
SUBCONTRACTOR 173 TOTALS
0 0 0 5600 5600 5E.00 5600 5600 5500 5500 550121 5500 50000
* * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * *** * * * *** * *
SUBCONTRACTOR 183
42~183-01 SEDIMENT CONSULTANT
4167 41f.7 4166 4167 4161 4166 4167 4167 4166 4167 4167 4166 50000
SUBCONTRACTOR 183 TOTALS
4167 4157 4166 4157 4167 4155 4167 4167 4166 4167 4167 416E.50000
* * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
TASK 42 TOTALS
115197 128346 115761 115339 125049 114385 118451 95750 111957 837£9 82623 109593 1318230
* * * * * ***** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *** * * * * * * * * * * * * * * * * * * * * * * * * * * * * * * *
1 J -J -1 ..J .'.1 ,,].1 ••.1
I
I
·1 1 j I I 1 1 1
Task Manager
E.J.Gemperline
1 ]---15 j 1
Office I Chicago I I
Chicago Chicago ~Y9r
H.Coleman I I
C.Y.Wei K.Jawed D.Beaver
Personnel I N.Paschke I I
M.Rogers J.H.C.Lin I I
P.White
J.H.C.Lin S.C.L.Ylu
C.Burke
I I
Subcontractors D.Calkins P.Hamblin
Technical River Ice Studies Reservoir Hydrologic &Reservoir Geo-Hydrologic
Responsibilities Temperature Studies Operation Studies Studies
July 1,1984 TASK 42 -HYDRAULIC AND.HYDROLOGIC STUDIES