Loading...
HomeMy WebLinkAboutAPA483ALASKA POWER AUTHORlTY SUSlf NA HYDROELECTRIC PROJECT ATTACHMENT D: SUSlTNA d1VF.R MILE lMDEX MOUTH TO SUSITNA GLACIER DECEMBER "8981 Prepared by: R&M CONSULTANTS, INC. 5024 Cordova Street An~horage, Aiaska 99502 Prepared for: ACRES AMERICAN INCORPORATED 1000 Liberty Bank Building Main at Court Buffalo, New Ycrk 14202 Telephone (71 6) 853-7525 ALASKA POWER AUTHORITY SUSlf NA HYDROELECTRIC PROJECT TASK 2 - SURVEYS AND SITE FACILITIES HYDROGRAPHIC SGRVEYS TABLE OF CONTENT 1 - INTRODUCTION 1.4 Objectives 1.2. Report Contents PAGE 2- SUMMARY 2-'I 3 - SCOPE OF WORK 3.1 Background 3,2 Field Method 3,2,1 Control NeB;wo~k 3.2.2 Procedure for Field Survey 3.2.3 Bed Material Analysis 3.3 Results ATTACHMENT A - Correspondence and minutes from meetings related to Subtask 2."8@ ATTACHMENT B - Plots and summarized field notes for cross sections from Deadman Creek to Tal keetna. ATTACHMENT C - Plots and summarized field notes for partial cross-sections betsw Tal keema. ATTACHMENT D - Susitna River Mila Index. 3,1 Susitna River Profile Data Summary 3,2 Description of grid photagraph locatians for bed material analysis 3,s Susitna River bed material distribution analysis Number Title 3,1 Maps shawing river cross -section locaticns between Deadmen Cpeek and TaIkeetna 3-1 6 3*2 Lcngitudinal river profile Prom Devil Canyon to Ta l kestna 3-20 3%3 Sample of bed material analysis date sheets 3=21 FOLDER - River Cross Section Location Map ATTACHMENT D SUSITNA RIVER MILE INDEX SUSOTNA RIVER MILE INDEX LlST OF FiGkJRES index Map Miles 1 ta 11 Miles 7 to 21 Miles 22 ta 31 Miles 32 to 42 Miles 35 to 45 Miles 46 ta 58 Miles 56 to 68 Miles 69 80 Miles 78 to 9% Miles 92 to 182 Miles 101 to 111 Miles 112 to 721 Miles 122 ta 133 Miles 123 to 134 Miles 135 to ?4 Miles MQS to 355 Miles 353 to 164 Miles 164 to 177 Miles "$73 $0 18% Miles 786 ta 196 Miles 193 204 Miles 205 to 215 Miles 2"8 60 225 Miles 226 to 248 Miles 235 to 250 Miles 251 264 Miles 260 $0 273 Miis% 273 W 278 Milea 279 ta 285 Miles 28% 08 293 Miles 291 to 298 Milas 299 to 302 Miles 303 t8 314 Milas 313 to 338 SOURCES OF ONFOWMATiQN River Miles were established by means of measurement along the principal channel thalweg, as identified on maps and photsgraphs sf varying scales as follows: 0 Wivsr Mile 1-98. 1" "= 10011' blueline copies of reproducible phctag~aphs, Sheets 18/37 thrsugh 37/37, by Narth Pacific Aerial Surveys for R&M Consultants and Acsss Amssss8can, a River Miie 96-152. 1" = 50QVblueline copies of reproducible photographs, Sheets 1/37 through 17/37 by North Pacific Aerial Surveys for R&M Consultants and ACP~S American. 8 River Mi 755-"tl$ 2nd 1888.248. la' = 220069$8uslisr.3as copies 0% topographic maps, Sheets A-G, by R&N Consultants and Acees American for Alaska Power Authority. o Ri%/er Mila 182-188. 1" = 10001 blueline copies of photog rammetric topographic maps, Sheets 2/19 and 411 9, by Nofl-th Pacific Aerial Surveys, from photography dated 7:"169=800 8 River Mile 248-320. 1 :63,360 photocopies cF 15' quadrangle maps from the U.S. Geological Surgey, as included herein, [ [i 4 1: 250,800 QUADRANGLE NAME [El 1: 63,360 QUADRANGLE NAME