HomeMy WebLinkAboutAPA1388-I
I
·I
I ALASKA POWER AUTHORITY
I SUSITNA HYDROELECTRIC PROJECT
I
I
I
•• REPORT ON ACRES INTERNAL
REVIEW BOARD MEETING NO. 3.,
I NIAGARA FALLSJ CANADA
I
I
I FEBRUARY 10~ 1981
I
• I
I ACRES AMERICAN INCORPORATED
1000 Liberty Bank Building
I Main at.Court
Buffalo, New York 1420Z
Telephone (716) 853-7525
I
I;
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
ALASKA POWER AUTHORITY
SUSITNA HYDROELECTRIC PROJECT
REPORT ON ACRES INTERNAL
REVIEW BOARD MEETING NO •. 3
TABLE OF CONTENTS
Agenda
List of Attendees
1 . Genera 1 Remarks by D. MacDona 1 d/ J .. Lawrence
2. Project Development Selection: J .. Hayden
3. Seismology: V. Singh
4. Geotechnical Fie~ld Program: V. Singh
5. General Arrangements: R. Ibbotson
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
~~----~----·----------........... ...
.AGENDA
1 -0900 -General Remarks
2 -915 -Project Development Selection -Brief Introduction
3 -1000 -Seismology -Recommended Design Parameters
(a) Acres 1 Specialist Consultants Panel Meeting -
October 20-24, 1980
(b) Meeting with M. Copen -Oecember 8 and 11, 1980
(c) Woodwa.rd-Clyde Report -January 1981
(d) APA Consulting Board Meeting -January 22-24, 1981
(e) Meeting with L. Sykes -January 29, 1981
4 ~ 1130 -Geotechnita1 Field Program -1981
1230 -LUNCH
5 -1300 -General Arrangements
(a) , l~atana
(b) Devil Canyon
6 -1400 -Main Dams
(a) Watana
(b) Devil Canyon
7 -1530 -Construction Schedules
(a) Winter Work
(b) Rates of Placing, Excavation, Concreting, etc.
8 -1600 -Future Review Subjects
1630 -ADJOURNMENT
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
LIST OF ATTENDEES:
Internal Consultants Panel
Dr. D. MacDonald (Chainnan)
A. Tawil
Dr. A. Burgess
I. McCaig
J. MacPherson
G. Thompson
Acres Project Team
J. D. Lawrence
Dr·. J. W. Hayden
V .. Singh
R. Henschel
R. Ibbotson
D. Meilhede
H. Eichenbaum
L. Duncan
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
1 . .General Remarks by D. MacDo'.la 1 d/ J. Lawrence
-Brief review of AAI scope for Phase I -FERC license application
·~ Possible Phase II involvement, "fast tracku approach if APA decides
to start construction in 1985 -on line 1993. Project designed to
meet wide range of power demands
-Project has very high profi 1 e both pub 1 i ely and \'li thin the · engineering
community. Environmentally sensitive 11 seismically active area.
Variety of boards and consultant revir~w panels to insure technical
quality.
Acres subcontractors ~ stattis and scopes described.
-APA -Consultants Review Board, Acres External Board
*Need to set up schedule of meetings for Acres External Board from
now until March 1982.
-Points to be covered by Internal Review Board -those most pressing
to Project Group at time of meeting. Keep panel membership flexible
to meet Project needs, and to cover all aspects and disciplines as
work develops, can vary as subject before board changes.
2. Proje~t Development Selection: J. Hayden
-Brief Introduction -Project location and description of sites--
Devil Canyon is break point for salmon runs; dams located upstream
to eliminate problems~
-Review: Task 6 Objectives, previous studies~ identified 12 potential
sites; Acres started with these~ re-evaluated all ·separately~nd tn
conjunction with environmental screening; many eliminated on environ-
mental aspects, others by economics; arrived at four· 11 best" sites:
Devil Canyon, Watana, High Devil Canyon and Vee; Devil Canyon/Watana
and High Devil Canyon/Vee form best combinations; further evaluation
of economics, power generation capacity, 1 ayouts of those t\•.Jo schemes -
(briefly reviewed preliminary layouts of engineering of 4 sites)
Watana Site first to be built -therefore spent more time on preliminary
design; Watana-840' dam·-developed new cross-section 2~5:1 U/ss
2:1 downstream slopes; cofferdam outside main clamshell; looked at
staged construction, economically not feasible; concrete arch s-tructure -
cost too high, no further evaluation
Also considered tunnel schemes -only one scheme cost effective,
150' rereg. dam and 15 mile tunnel to Portage Creek (lose· about 20%
energy, higher cost than Devil Canyon scheme); worked up preliminary
layouts of dam and tunnel.
Took all schemes and performed economic (cost vs power generation
analys.is) Watana/Devil Canyon has best ratio; tunnel scheme is most
costly ..
I
I
I
I
I
I•
I
I
I
I
I
I
I
I
I
I
I
I
••
Next looked at load growth and system comparison analysis (hydro, coal,
gas turbine) and how they are fit together -preliminary economic
evaluation of all schemes and alternative systems -Watana/Devil Canyon
apoear to be most cost effective (full height Watana and fast track)
3. Seismology: V. Singh
-Project extremely sensitive to seismic considerations. wee performing
studies for Acres.
-Review of seismic sett·ing of site. Denali/Totschunda Fault System,
Castle Mountain Fault and Benioff zone are controlling features.
-Brief review of WCC activities during 1980. Includes installation
and operation of microseismic monitoring network, review of all the
known faults and lineaments, field reconnaissance with sub.s.eouent
identification of significant features "for future study in 1981.
(Tptal of 13 features - 9 at Devil Canyon~ 4 at Watana)
-Reviewed data obtained from microseismic network. Several clusters
of epicenters. wee analysis shown no relationship of epicenters to
known features·. Planning installation ·of permanent netwol~k.
-Looked at response spectrum plots at Watana and Devil Canyon over
known sources. Both sites are on high part of curves (i.e. high
accelerations).
-Brief review of WCC proposed program for 1981. (Included seismology,
geology and earthquak~ engineering activities)~
Important points discus~ed by panel: .
a) possible connection ~f Broxon Gulch and Talkeetna thrust faults.
If connected then tnere is direct tie to Denali Fault which is
known to be active. Raises concern about activity of Talkeetna
fault and also affects magnitude of earthquakes which occur.
b) For 1981 program -(Watana)
-have to prove age of displacements along Talkeetna fault
-prove/disprove Susitna feature
-investigate KD3-7 (down river channel)
-'Fingerbuster• feature should also be included in studies
c) Panel considered three features which could have major effect on
sites. D2nali Fault (8.5M), Castlemountain Fault (7.5M), and
Benioff zone (8.5M). Prime concern is Benioff zone (~4g). Feeling
time magnitudes over conservative and could be refined downward.
Accept known active features and look at those features whidi ~~,.e
not well defined as to activity and which are close to sites. For
preliminarY-/design only consider the three known features~
d) Reservo"l ... induced sei smi city fs 1 ike ly to occur but t'li 11 have 1 ower
magnitude than design eartilquake.
e) Need to address the question of a floating earthquake more fully
and assign a magnitude to it. Dr. Lynn Sykes has suggested a
method to do this. Involves a review and evaluation of historical
earthquakes within Talkee~tna terrain and a probabilistic approach
to occurrence at the site.
f) Need to refine magnitude of earthquake assor.iated with Benioff zone.
Data from microseismic network shows decoup'ting zone to be located
about 30 to 40 km. southeast of sites. Therefore, any major earthquake
should be located even further southeast (<40 km) where plates are
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
still coupled. Expect smaller earthquakes associated with subducting
plate directly under site. Evaluate attenuation to sites.
g) Response spectra curves and attenuation models for both sites need .
to be defined.
h) Dam design considerations:
-For Watana, can design for known features, and also for cases
where Talkeetna or Susitna features prove active. However if
KD3-7 is active, then may have seri·ous problem, because of surface
rupture potential. ,
-For concrete arch at Devil Canyon the magnitude of the earthquake
and accelerations don't seem to have much effect on seismicity.
Need to do analysis and generate stress levels in dam.
4. Geotechnical Field Program: V. Singh
-Brief review of 1980 program activities and findings at Watana site.
-Outlined proposed 1981 program a-t Watana and reviewed recommendations
of APA's consultants panel for additional work.
-Review of 1980 program activities and fi-ndings at Devil Canyon site.
-Outlined proposed 1981 program at Devil Canyon.
-Important points discussed by panel
a) Feeling that proposed 1981 program at Watana is.very minimal program
and doesn't address APA pan~l concerns. (Two holes in powerhouse
area, two holes in relict channel and possibly an adit.)
b) Discussion on relict channel area
-Preliminary cross sections and flow nets show a gradient of about
1:10 on 1:12 which is very high if you don't know infilling
materials. Need to refine model further.
Remedial work is not required to prevent leakage unless piping
occurs. May use blankets downstream or upstream.
-Concern about excavating area D as it may aggravate the situation
due to low saddle in that area.
-Not necessary to investigate channel at this stage. If a
problem arises, then it can be addressed. Allow adequate
contingency for this situation
c) General conclusion that two additional holes in the relict chnnnel
area at this time will not provide much usable information.
Recommend that additional seismic lines be used to better define the
geometry of the channel and further analyses (flow nets) of
performances to get handle on potential problems of leakage and
piping. In future (after 1982) a more comprehensive program \'Jill have
to be developed to fully investigate relict channel.
d) Discussion on additional holes in powerhouse area
-Additional information is desirable. Don't feel that adi·t is
required at this stage, although adits have been used on other
projects during feasibility studies.
-APA panel has recommended work, up to Acres to cost it out and
decide necessity of the work.
e) General conclusion that at least one additional hole in the powerhouse
would be useful. · Second hole depending on what results of first
hole are.
I
I·
I
I
I
I
••
I
I
I
I
I
I
I
I
I
I
I
I
f) Discussion on proposed 1981 program at Devfl Canyon.
~ Feel that three oroposed.holes ar·e bare min·!mum for FERC
license application.
-If Devil Canyon site is proven not to be feasible and a one dam
scheme is then selected, Watana is not the best economic choice.
High Devil Canyon is most_cost effective single scheme. Therefore,
feasibility of Devi1 Canyon should be verified at the same time
as Watana.
-Not likely that APA would only go for licensing of one site (Watana)
and not the other (Devil Canyon) at this time.
g) Conclud~d that nothing be taken out of program at Devil Canyon
and that it be left in for licensing.
5~ General Arrangements: R. Ibbotson
-Reviewed various layouts for development of the Watana site.. These all
included an earth-rockfill dam and underground powerhouse but the
centerline location; powerhouse location; time, number and location of
spillways; embankment slopes, etc. were varied.
-Comments of panel on Watana schemes
a) .Spillway design ·
-should not use unlined spillway, even for 1:10,000 year use, due
to-potential scour problem and associated repair costs.
-must consider nitrogen saturation problem -use staircase or surface
discharge
b) Fingerbuster Shear Zone
-Controls dam centerline location to some extent (don't want to
construct dam across it) Need to do enough drilling to define it.
-What's wrong with building across shear zone if we don't expect
any movement? Should only require excavation and treatment -
Problem of seepage through shear zone
c) Powerhouse Location
--1 ike powerhouse on right abutment between fins and fi ngerbuster,
on left abutment it·is getting close to fingerbuster shear.
-some concern with right abutment location from possible shears,
low velocity zone (slide block?) and no borings.
d) Possibility of needing low level outlet for dewatering in emergency
-possibility of using diversion tunnels, but flow would be about
90,000 cfs to allow drawdown in 4-5 monthso Would sacrifice
tunnels
-will have to che~k on laws to see if any requirement
-preference for using separately designed structure to handle this
-Corps of Engineers looked at using diversion tunnels with blastable
plugs for emergency drawdown.
-need multi-level intake to control water temperature downstream
for salmon spawning
-Review several possible layouts for arch dam at Devil Canyon.
Preferred scheme has service spillway on right abutment with
emergency spillway on left abutment at end of saddle dam.
-Preliminary design analyses have satisfied most conditions except
for extreme drawdown. Results in tension cracks above water level
due to thermal stresses. Copen says it has to be allowed ·for.
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
I
-No seismic ·input tc analysis yet. Will be next step. Fee1 that
most problems can be eliminated by prestressing.
-Comments by panel on Devil Canyon schemes.
a) Look at earthfill dam
-have to use earthfi11 if potential for surface rupture
-generally no disagreement with constructing arch at this site.
Cost is about the same for both schemes.
Some reservations about high earthfill structure in narrow
gorge in regards to cracking and settlement.
-Have to identify material sources. Arqillite may not make
good rockfill, might have to consider river alluvium.
b) Some concern about cose where extreme drawdown and tension
cracking due to thermal stresses ar'e coincident with earthquake.
Not sure what will happen. Copen stated that probability of this
case is extremely low and he is therefore not too concerr~d. Needs
further review.
c) Discussion on construction schedule of Arch vs Earthfill
-.Fill dam takes longer~ but powerhouse is controlling feature
-Some concern about rates of placement of fill at Watana as to
overall schedule. General opinion that experience from other
dams would indicate that quarrying operations can be designed
to meet quantities and required schedule.