Loading...
HomeMy WebLinkAboutAPA2565dTK 1425 .58 F472 no.2565d SUSITM 1I!J)1OILECDIC 'lOner DRAINAGE STRUCTUU AND WATERWAY DESIGN GUIDELINES Report by Rarza-Ebasco Suaitna Joint Venture Prepared for Alaaka Pover Authority Draft Report September 1984 0r- Oo LO LOr-, M M L r SUSITBA HYDROELEctRIC PROJECT DRAINAGE STRUCTURE AND WATERWAY DESIGN GUIDELINES Report by Harza-Ebasco Susitna Joint Venture Prepared for Alaska Power Authority Draft Report September 1984 Alaska Resources &Information Library Suite 111 3211 Providence Drive Anchorage,AK 99508-4614 TABLE OF COIITEJiTS SECTION/TITLE 1.0 INTRODUCTION 1.1 Setting 1.2 Scope 1.3 Project Description PAGE 1-1 1-1 1-1 1-2 1.3.1 1.3.2 General Watana Dam and Reservoir 1-2 1-3 1.3.2.1 1.3.2.2 1.3.2.3 1.3.2.4 Dam Site Transmission Facilities Access Plan Site Facilities 1-3 1-4 1-4 1-4 1.3.3 Devil Canyon Dam and Reservoir 1-4 1.3.3.1 1.3.3.2 1.3.3.3 1.3.3.4 Dam Site Transmission Facilities Access Plan Site Facilities 1-4 1-5 1-5 1-6 1.4 Stage 1 Pre-Project Field Investigations 1-6 1.4.1 1.4.2 Engineering Activities Environmental Science Activities 1-6 1-7 1.5 Stage II Project Construction 2.0 FLOW DETERMINATION 2.1 General 2.2 Gaged Watercourses 2.3 Ungaged Watercourses 1-8- 2-1 2-1 2-1 2-3 2.3.1 2.3.2 2.3.3 2.3.4 General Runoff Coefficient Draining Area Rainfall Intensity 2-3 2-4 2-5 2-i 2.4 Example Peak Discharge Determination 2-10 TABLE OF CONTEBTS (cont'd) SECTION/TITLE 3.0 HYDRAULIC DESIGN 3.1 Introduction 3.2 Fish Passage Problems PAGE 3-1 3-1 3-1 3.2.1 3.2.2 3.2.3 3.2.4 Excessive Water Velocity Inadequate Water Depth Excessive Hydraulic Jump Guidelines for Structures 3-2 3-2 3-4 3-4 3.3 Drainage Structure Design Criteria 3.4 Waterway Hydraulics 3-5 3-7 3.4.1 3.4.2 General Waterways 3-7 3-7 3.4.2.1 3.4.2.2 Permissible Non-erodible Velocity Method Tractive Force Method 3-12 3-15 3•4•3 Cu 1ve rt s 3-24 3.4.3.1 3.4.3.2 3.4.3.3 3.4.3.4 3.4.3.5 3.4.3.6 3.4.3.7 3.4.3.8 3.4.3.9 3.4.3.10 3.4.3.11 3.4.3.12 3.4.4 Bridges 3.4.4.1 3.4.4.2 3.4.4.3 3.4.4.4 Fish Passing Requirements Scope of Guidelines Culvert Hydraulics Culverts Flowing with Inlet Control Culverts Flowing with Outlet Control Computing Depth of Tailwater Velocity of Culvert Flow Inlets and Culvert Capacity Procedure for Selection of Culvert Size Inlet Control Nanographs Outlet Control Nanographs Performance Curves General Hydraulics of Constrictions in Watercourses Procedure for Design of Bridge Waterway Example 3-24 3-25 3-26 3-27 3-29 3-39 3-40 3-42 3-45 3-50 3-59 3-75 3-81 3-81 3-81 3-89 3-102 30221/TOC 840922 TABLE OF COJiTEliITS (conttd) SECTION/TITLE REFERENCES APPENDIX A PROJECT DRAWINGS APPENDIX B RAINFALL FREQUENCY DATA FOR ALASKA -iii- PAGE 4-1 A-I B-2 3022l!TOC 840922 No. 2.3.1 2.3.2 3.2.1 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 TABLES TITLE Page Values of Relative Imperviousness 2-5 Runoff Coefficients "C"2-6 Average Cross Sectional Velocities in Feet/Second Measured at the Outlet of the Culvert 3-3 Typical Channel Roughness Coefficients 3-10 Channel Roughness Determination 3-11 Recommended Permissible Velocities for Unlined Channels 3-13 Entrance Loss Coefficients 3-33 Key to Tables for Cland k Values for Each Constriction Type 3-87 -~v- No. 2.3.1 2.3.2 2.3.3 2.3.4 3.4.1 3.4.2 3.4.3 3.4.4 3.4.5 3.4.6 3.4.7 3.4.8 3.4.9 3.4.10 3.4.11 3.4.12 3.4.13 3.4.14 3.4.15 3.4.16 3.4.17 302211TOC 840922 FIGUUS TITLE Tc Nomograph for Small Watersheds Tc Nomograph for Large Watersheds Upland Method Velocity Determination Time of Concentration vs Intensity Waterway Cross Section Measurement Recommend Permissible Unit Tractive Force for Canals in Noncohesive Material Permissible Tractive Force for Coarse Noncohesive Material Angles of Repose of Noncohesive Material Tractive Force Ratio K vs Side Slope The Maximum Tractive Force on a Bed and Sides Inlet Control Outlet Control Culvert Hydraulics Diagram Culvert Outlet Diagram Culvert Outlet Submerged Hydraulic Performance Curves for 48-Inch C.M.Pipe Culvert with Projecting Inlet Definition Sketch of Flow through Constriction Constriction Types Type I Opening,Vertical Embankment Vertical Abutment Subrupts kW &k Curves for Vertical Embankment and Abutment of Type I Opening Type II Opening,Embankment Slope 1 to 1,Vertical Abutment -v- 2-8 2-8 2-9 2-11 3-8 3-19 3-20 3-21 3-22 3-23 3-28 3-30 3-35 3-38 3-39 3-77 3-82 3-83 3-92 3-94 30221/TOC 840922 No. 3.4.18 3.4.19 3.4.20 3.4.21 3.4.22 3.4.23 3.4.24 3.4.25 FIGURES (cout'd) TITLE Type II Opening Embankment and Abutment Slope 2 to 1 Vertical Abutment Type III Opening,Embankment and Abutment Slope 1 to 1 Type III Opening,Embankment and Abutment Slope 2 to 1 Type IV Opening,Embankment Slope 1 to 1,Vertical Abutment with Wing Walls Type IV Opening,Embankment Slope 2 to 1,Vertical Abutment with Wing Walls Types I-IV Openings,ke,k t and k j cures The Effect of Channel Roughness on the Backwater Ratio for Basic - Type Constrictions The Effect of Constriction on the Backwater Ratio -V:L- 3-95 3-96 3-97 3-98 3-99 3-100 3-101 3-101 DESIGN CHAR.TS CHART NO.TITLE 1 Headwater Depth for Box Culverts with Inlet Control 2 Headwater Depth for Concrete Pipe Culverts with Inlet Control 3 Headwater Depth for Oval Concrete Pipe Culverts with Long Axis Horizontal with Inlet Control 4 Headwater Depth for Oval Concrete Pipe Culverts with Long Axis Vertical with Inlet Control 5 Headwater Depth for C.M.Pipe Culverts with Inlet Control 6 Headwater Depth for C.M.Pipe Arch Culverts with Inlet Control 7 Headwater Depth for Circular Pipe Culverts with Bevelled Ring Inlet Control 8 Head for Concrete Box Culverts Flowing Full n=.012 9 Head for Concrete Pipe Culverts Flowing Full n=.012 10 Head for Oval Concrete Pipe Culverts Long Axis Horizontal or Vertical Flowing Full n=.Ol2 11 Head for Standard C.M.Pipe Culverts Flowing Full n=.024 12 Head for Standard C.M.Pipe Arch Flowing Full n=.024 13 Head for Structural Plate C.M.Pipe Culverts Flowing Full n=0.03028 to 0.0302 3-52 3-53 3-54 3-55 3-56 3-57 3-58 3-62 3-63 3-64 3-65 3-66 3-67 14 Head for Structural Plate C.M.Pipe Arch Culverts 18 in. Corner Radius Flowing Full n=0.0327 to 0.0306 3-68 3022l!TOC 840922 15 16 17 Q/B vs d c Critical Depth Circular Pipe Critical Depth Oval Concrete pipe Long Axis Horizontal -vu.- 3-69 3-70 3-71 3022l!TOC 840922 DESIGN CHARTS (cont'd) CHART NO.TITLE Page 18 Critical Depth Oval Concrete Pipe Long Axis Vertical 3-72 19 Critical Depth Standard C.M.Pipe-Arch 3-73 20 Critical Structural Plate C.M.Pipe-Arch 18 inch Corner Radius 3-74 -viii- DRAINAGE ST1WCTU'iE AID WAIEi.WAY DESIGN GUIDELINES 1.0 INTRODUCTION 1.1 SETTING This manual is intended to be used by design engineers during the preparation of contract plans and specifications for Alaska Power Authority projects.The guidelines ~n the manual incorporate State-of-the-Art Engineering Practices and procedures,and also incorporate Alaska Department of Fish and Game 1981 proposed habitat regulations where appropriate. Although the manual is organized in such a way that it is applicable to any Al as ka Power Authority project in ge ner aL,nevertheless it contains much detailed information which can be used directly ~n the preparation of contract documents for any specific project. 1.2 SCOPE The purpose of these best practices guidelines i s to establish the proper procedures for drainage structures and waterways required tor implementation of a major construction project using-the Susitna Project as an example. Drainage structures considered in these guidelines will consist of culverts, waterways,and the waterways beneath bridges which are required to implement temporary or permanent access to project features.The drainage structures and pertinent waterway work will be classi fied by the type of fish utilization that occurs in the watercourse where the project feature is proposed.These types are: Type A:Watercourse that i s used by anadromous f ish during any period of the year. 3022l/l 840922 1-1 Type B:Watercourse that is utilized by resident fish during any period of the year. Type C:Watercourse that has no history of being used by anadromous or re s ident fi sh , Waterway work for Type A and B watercourses will be limited to the necessary adjustments in the watercourse at the inlet and out let of the drainage structure to assure efficient hydraulic condi tions,fish movement,and to preclude deleterious sediment transport or deposition in or around the drainage structure.Waterway work for Type C watercourses can in some cases be more extensive in that a collector system may be required to channel surface runoff to the watercourse in question.A typical example of this is an interceptor ditch along a roadway or waterway work associated with diverting the watercourse during the construction of the drainage structure. The watercourse work will be divided into two distinct stages.Stage I will be the field investigations and design.During this stage,site specific investigation results and design criteria will be presented to secure the necessary permits from the Alaska Department of Fish and Game and any other permits ie.,CIRI,State of Federal.Stage II would be the construction of the drainage structure of waterway. 1.3 PROJECT DESCRIPTION (Example) 1.3.1 General The Susitna Hydroelectric Project,located on the Susitna River approximately 60 miles northeast of Anchorage,will consist of two dams and reservoirs and ancillary features necessary for field investigation,design, site access,construction,operation and transmission of energy to the 30221/1 840922 1-2 l centers of Anchorage and Fairbanks.The Federal Energy Regulatory Ccmmission License Application Project No.7114-000 as accepted July 29, 1983 included both Watana and Devil Canyon.Watana is located at river mile 184 on the Susitna River and 1S to be initiated first.Devil Canyon, located at r1ver mile 152 is scheduled to begin seven years after commencement of Watana Construction. 1 .3.2 Watana Dam and Reservoir 1.3.2.1 Dam Site The Watana Dam,Figure A-I Appendix A,will create a reservoir approximately 48 miles long,with a surface area of 38,000 acres, and a gross storage capacity of 9,500 acre-feet at Elevation 2185,the normal maximum operating level. The dam will contain a rolled embankment,earth and rock fill structure, with a central impervious core.The design crest elevation of the dam will be 2205,which results in a max unum height of 885 feet above the foundation and a crest length of 4,100 feet.During construction,the river will be diverted through two concrete-lined diversion tunnels,each 36 feet 1n diameter and 4,100 feet long,on the north bank of the river. The power intake will also be located on the north bank with a bi-level approach channel excavated in rock,serving it and the spillway.Turbine discharge will flow through six draft tube tunnels to surge chambers downstream from the powerhouse.The surge chambers will discharge to the river through two concrete-lined tailrace tunnels.The spillway located to the north of the power intake will consist of an upstream ogee control structure with three radial gates and an inclined concrete chute and flip bucket. Emergency release facilities will be located in one of the diversion tunnels to allow lowering of the reservoir over a period of time to permit emergency inspection or repair of impoundment structures. 30221/1 840922 1-3 1.3.2.2 Transmission Facilities.The project transmission facilities will deliver power fran the Susi tna River basin generating plants to the major load centers at Anchorage and Fairbnks in an economical and reliable manner. The facilities will consist of overhead transmission lines,underwater cables,switchyards,substations,a load dispatch center,and a communications system. 1.3.2.3 Access Plan.Access to the project site (See Figure A-3,Appendix A)will connect with the existing Alaska Railroad at Cantwell where a railhead and storage facility occupying 40 acres will be constructed. 1.3.2.4 Site Facilities.Included among the site facilities will be a combination camp and village that will be constructed and maintained at the project site.The camp/village will be a largely self-sufficient community housing 3300 people during construction of the project. Permanent facilities required will include a permanent town or community for approximately 130 staff members and their families. permanent facilities will include a maintenance building for use subsequent operation of the power plant. small Other during A plan showing the location of the campi vi llage and the permanent town 1.S shown on Figure A-I,Appendix A. 1.3.3 Devil Canyon Dam and Reservoir 1.3.3.1 Dam Site.The Devil Canyon dam and surrounding area in relation to main access facilities and camp facilities are shown on Figure A-4, Appendix A. The Devil Canyon Dam will form a reserV01.r approximately 26 miles long with a surface area of 7,800 acres and a gross storage capacity of 1,000,000 acre-feet at Elevation 1455,the normal maximum operating level. 30221/1 840922 1-4 The dam will be a thin-arch concrete structure with a crest elevation of 1463 (not including a three-foot parapet)which results 1n a maximum height of 646 feet.An earth-and rockfill saddle dam will provide closure to the south bank.The saddle dam will be a central core type earth and over fill similar in cross section to the Watana Dam. The dam will have a nominal crest elevation of 1469.The maximum height above foundation level of the dam is approximately 245 feet. During construction,the river will be diverted by means of a single 30-foot diameter concrete-lined diversion tunnel on the south bank of the river. A power intake on the north bank will consist of an approach channel excavated in rock leading to a reinforced concrete gate structure.The turbines will discharge to the river by means of a single 38-foot diameter trailrace tunnel leading from a surge chamber downstream from the powerhouse cavern. Outlet facilities consisting of seven individual outlet conduits will be located in the lower part of the main dam. The spillway will also be located on the north bank.As at Watana,this spillway will consist of an upstream ogee control structure with three radial gates and an inclined concrete chute and flip bucket. 1.3.3.2 Transmission Facilities. Transmission lines will be built between the Devil Canyon switchyard and the Gold Creek switching station. 1.3.3.3 Access Plan.Access to the Devil Canyon site (See Figure A-3, Appendix)will consist primarily of a rai lroad ex tension from the ex isting Alaska Railroad at Gold Creek to a railhead and storage facility adjacent to the Devil Canyon camp area. 30221/1 840922 1-5 1.3.3.4 Site Facilities.The construction of the Devil Canyon Dam will require various facilities to support the construction activities throughout the entire construction period. As described for Watana,a construction camp will be constructed and maintained at the project site.The camp/village will provide housing and living facilities for 1,800 people during construction.Electric power will be provided from Watana.A plan showing the location of the camp/village is shown on Figure A-4,Appendix A. 1.4 STAGE I PRE-PROJECT FIELD INVESTIGATIONS During the feasibility and licensing phase of the Susitna Project investigations in the areas described in section 1.3 "Project Description", will be necessary to design and construct the Project.This time frame is defined herein as Stage I and involves activities i n the engineering and environmental sciences.All such activities would be conducted under the applicable technical and regulatory permits required by Federal,State, and/or local authorities. 1.4.1 Engineering Activities The principal activity during this stage would be subsurface exploration for the major project features at Watana including improvements to the present camp site which could also include the development of a temporary airstrip. The geotechnical explorations will include damsite subsurface drilling, monitoring,dozer or backhoe excavation of inspection trenches,geophysical surveys and investigation of quarry materials and borrow materials.The above activities (except for quarry and borrow area development)can be accomplished with light equipment,helicopter transport or with special ground transport equipment.Whereas quarry and borrow_area development may require heavier equipment and access crossing natural waterways or earthwork which could impede drainage courses.In these instances drainage structures 30221/1 840922 1-6 will be designed and constructed using the criteria established Ln Section 2.0 and 3.0 of these guidelines. The temporary ai.r field will require the design and construction of a drainage collector system and perhaps drainage structures to insure that surface runoff will reach the existing drainage features.Criteria for this design is presented in sections 2.0 and 3.0. The preceeding is an estimate of what will be the Stage I engineering work requiring drainage and waterway design. 1.4.2 Environmental Study Activities Environmental science activities will consist of aquatic,terrestrial,and cultural resource field investigations. Environmental science activities involve most areas of the Susitna Project. The biological studies encompass both aquatic and terrestrial programs.The aquatic studies are concentrated on the mainstem Susitna River from the Oshetna River (the upstream boundary of the reservoir impoundment)to Cook Inlet.In addition,tributaries within this reach,lakes within the proposed impoundment areas and streams along the proposed access road are being studied.The primary terrestrial study area includes that portion of the Susitna Basin that lies within about 15 miles of the Susitna River from Gold Creek to the Oshetna River mouth.In addition,studies are being conducted within the Susitna River floodplain between Gold Creek and Cook Inlet.Cultural resource studies would be conducted primarily in the vicinity of the impoundment areas,along the access roads,railway and transmission line routes. These activities will not involve ground distrubance nor require culvert or bridges;hence waterways and drainage courses will not-be affected. 30221/1 840922 1-7 1.5 STAGE II PROJECT CONSTRUCTION The Alaska Power Authority and their engineering consultant will prepare engineering design memoranda,construction drawings and specifications for the features described in 1.3.2 Watana Dam and Reservoir.In project features requiring drainage structures or waterways,the technical criteria presented in these guidelines will be incorporated,and used in the design memoranda,and construction contract documents. 3022111 840922 1-8 2.0 FLOW DETEKKlHAIIOI 2.1 GENERAL In this section.the methodologies for determining the flow i.n a waterway for a specified recurrence frequency are discussed. 2.2 GAGED WATERCOURSES The U.S.Geological Survey,in cooperation with the Alaska Department of Transportation and Public Facilities and other State and Federal Agencies. maintains a network of stream gaging stations and crest gages throughout the State of Alaska.The data obtained from these programs is published in Water Resources Data for Alaska.Part 1.Surface Water Records.The U.S. Geological Survey has published computer print-outs of frequency-discharge curves for all stations with satisfactory length of record.Data obtained from the stream gaging program has been used to formulate·a report that presents regional flood frequency curves for most sites in Alaska.The publication contains Magni tude and Frequency of Floods in Alaska South of the Yukon River,Geological Survey Circular 493. In the case where a site 1.S being investigated on a waterway that has a gage and historical records of flow.the drainage area above the site will be compared with that above the gage to determine if there is compatibility 1.n the factors that affect runoff for the two areas.Factors that affect runoff can be grouped into two major categories;climatic.which for the purposes of these guidelines may have little or no incidence.and physio- graphic.Climatic factors mainly include the effects of rain.temperature. and evapotranspiration.all of which exhibit seasonal changes in accordance with the climatic environment.Physiographic factors may be further classified into two kinds:basin characteristics and channel characteristics.Basin characteristics include such factors as size,shape. 30221/2 840922 2-1 drainage area,permeability and capacity of groundwater reservoirs,presence of lakes and swamps,land use,etc.Channel characteristics are related 30221/2 840922 mostly to hydraulic properties of the channel which govern the movement and configuration of flood waves and develop the storage capacity.It should be noted that the above classification of factors are interdependent to a cer- tain extent.For clarity,the following is a list of the major factors: Meteorologic factors 1)Rainfall a)Intensity b)Duration c)Time distribution d)Areal distribution e)Frequency f)Geographic location 2)Snow 3)Temperature 4)Evapotranspiration Physiographic factors 1)Basin Characteristics a)Geometric factors i ,Drainage area 2.Shape 3.Slope 4.Stream density 5.Mean Elevation b)Physical factors 1.Land use or cover 2.Surface infiltration condition 3.Soil type 4.Geological condition,such as the permeability and capacity of groundwater reservoir 5.Topographical condition,such as the presence of lakes, swamps,and glaciers. 2-2 2)Channel characteristics a)Carrying capacity,considering size and shape of cross sec- tion,slope,and roughness b)Storage capacity If there is no significant difference i n these factors for both drainage areas above the site or above the existing gage,the flow at the site can be computed for the specified frequency by multiplying the gaged flow by the ratio of the squares of drainage areas. Qs =Qg (A )1/2s (A )1/2g Qs =Site flow Qg =Gage flow As =Site drainage area Ag =Gaged drainage area In cases where compatibility in the factors cannot be readily ascertained, the staff hydrologist should be consulted or the flow determination be made using the methodology for ungaged watercourses outlined in the succeeding paragraph. 2.3 UNGAGED WATERCOURSES 2.3.1 General The relation between rainfall and peak runoff has been represented by many empirical and semiempirical formulas.The rational formula which will be 30221/2 840922 used in these guidelines can be taken as representative of these formulas. The rational formula is: 2-3 Q =CIA where Q is the peak discharge in cubic feet per second (cf s ) , C a runoff coefficient dependent on the physiographic conditions of the drainage area, the average rainfall intensity (I)in inches per hour and A is the drainage area in acres. In using the rational formula it is assumed that the maximum rate of flow, due to a rainfall intensity over the drainage area,is produced by that rainfall intensity being maintained for a time equal to the period of con- centration of flow at the point under consideration (T c). The elements involved in runoff are far more complicated than the rational formula indicates.In larger drainage areas the temporary storage of storm water in overland travel toward stream channels and in these channels them- selves accounts for a considerable reduction in the peak discharge rate.It is for this reason the Alaska Department of Highways recommends that use of this method be restricted to drainage areas less than 200 acres unless no other method is available to estimate discharges. The remainder of this section will be dedicated to quantifying the para- meters used in the rational formula. 2.3.2 Runoff Coefficient The rational formula runoff coefficient (C)is the ratio of runoff to the average rate of rainfall at an average intensity when all the drainage area is contributing.Since this is the only manipulative parameter in the rational formula,judgement in its selection should reflect the physiogra- phic factors listed in paragraph 2.2. 30221/2 840922 2-4 Table 2.3.1 presents values of relative imperviousness for various surfaces. In Table 2.3.2 the runoff coefficient C can be determined by weighting physiographic factors (watershed characteristics)and summing them. Table 2.3.1 Values of Relative Imperviousness Type of Surface For.all watertight roof surfaces For asphalt runway pavements For concrete runway pavements For gravel or macadam pavements *For impervious soils (heavy) *For impervious soils,with turf *For slightly pervious soils *For slightly pervious soils,with turf *For moderately pervious soils *For moderately pervious soils,with turf *For slopes from 1%to 2% Factor C 0.75 to 0.95 0.80 to 0.95 0.70 to 0.90 0.35 to 0.70 0.40 to 0.65 0.30 to 0.55 0.15 to 0.40 0.10 to 0.30 0.05 to 0.20 0.00 to 0.10 To account for antecedent precipitation conditions,as reflected by the fre- quency of the selected rainfall intensity,a correction factor Ca should be multiplied with the runoff coefficient C.Values of Ca for various re- currence intervals are listed below: Recurrence Interval (Years) 2 to 10 25 50 100 .fa 1.0 1.1 1.2 1.25 30221/2 84U922 In no case should the product C x Ca exceed 1. 2.3.3 Drainage Area The drainage area,in acres,which contributes to the site for which the discharge is to be determined,can be calculated from~topographic map or 2-5 Thble 2.3.2 RUNOFF COEFFICIENTS "c" Runoff Producing Characteristics of Watershed With ODrresponding Weights Z, I G", Designation of Watershed Characteristics Relief Soil Vegetal cover Surface Storage Extreme 75 to 100% (40) St e ep,rugged terrain, with average slopes generally above 30%. (20) No effective soil cover; either rock or thin soil mantle of negligible in- filtration capacity. (20) No effective plant cov- er;bare or very sparse cover. (20) Negligible,surface de- pressions few and shal- low;drainageways steep and small;no ponds or marshes. High 50 to 75% (30) Hilly,with average slopes of 10 to 30%. (15) Slow to take up water; clay or other soil low infiltration capacity. (15) Poor to fair;clean- cultivated crops or poor natural cover; less than 10%of drainage area under good cover. (15) Low;well-defined sys- tem of small drainage- ways;no ponds or marshes. Normal 30 to 50% (20) Rolling,with average slopes of 5 to 10%. (10) Normal;deep permeable soils. (10) Fair to good;about 50%of drainage area in good grassland, woodland,or equiva- lent cover;not more than 50%of area in clean-cultivated crops. (10) Normal;considerable surface depression storage;drainage sys- tem similar to that of typical prairie lands; lakes,ponds,and marshes less than 2% of drainage area. Low 25 to 30% (10) Relatively flat land,with average slopes of 0 to 5%. (5 ) Hlgh;sands,loamy sands and other loose,open soils. (5) Good to excellent;about 90%of drainage area in good grassland,woodland, or equivalent cover. (5) High;surface depression storage high;drainage system not sharply defined; large floodplain storage or a large number of lakes, ponds,or marshes. from measurements taken in the field.If the former is used,a site visit should be programmed to gather information to be used in determining the runoff coefficient C and the parameters that will affect the value of the selected rainfall intensi ty ,Also,the si te visi t ,literature review and discussions with fisheries resource managers should be used to ascertain the type of water course.(see 1.2 Scope). 2.3.4 Rainfall Intensity Rainfall intensity,for the drainage area in question can be estimated for specific recurrence intervals (frequency)from the isohyetal maps 1n Appendix B.The average rainfall I used t n the rational formula depends upon size and shape of the drainage area,the land slope,type of surface, whether flow is overland or channelized as'well as the rainfall intensity. The former factors are instrumental in determining the time of concentration (T c)for the drainage area. The theory underlying the developnent of the rational formula 1S that the maximum discharge at any point in a drainage system occurs when: 1.The entire area tributary to the point 1S contributing to the flow. 2.The average rainf all intensi ty producing such flow is based upon the rainfall which can be expected to fall in the time req uired for water to flow from the most remote point of the area to the point being investigated.The "most remote point II is the point from which the time of flow is greatest.It may not be at the greatest linear distance from the point under investigation. Nanographs .for the determination of time of concentration Tc for small and large drainage areas are presented in Figures 2.3.1 and 2.3.2 respectively. These nomographs utilize the length of travel (L)in feet and the difference in elevation (H)in feet between the beginning and end point. 30221/2 840922 2-7 150 Tc,min 200 150 100 80 L,ft 10,000 60 50 40 5,000 30 c 25 ~O .2 20........"§ 2,000 -...C 15II 1,500 ve 0 U 10 1,000 '0 8-II E i=6 500 5 4 300 3 200 150 2 100 EXAMPLE HeiQht =100ft LenQth ~3,OOOft Time of concentration -14 Min 10 2 3 100 ................ ................E~PlE-...................--II> Note:~ Use nomograph Tc for natural .... basins with well defined chonnels,0 for overlond flow on bar.~ .arth,ond for mowed ora..road-~ side channels .... For overland flow,orau.d sur-5 foe ..,multiply Tc by 2__.5 5 For overland flow,cmrc'r.te or ~ ..-OiPhciit surfac..,multiply Tc ~ by 0.4 For concrete channels,multiply Tc by 0.2 '"o ~ c '0 CL. II '0 E II '" ,]:;o II>o .I:J-c Ba.ed an .tudy by P.Z.Kirpich, Civil £ngin-.ring,Vol.10,No.6,Jun.1940,p.~62 Fig.2.3.1 Tc Nomograph for Small Watersheds 10 40,000 10 8 30,000 6 4 20 20,000 3 30 2 Ul..40;:, 10,000 0s: 1.0 .s8,000 .8 o 60 I--__.6 806,000 ~- ----__f::~,"!,~e 100 =4,000 3 --.'3£=..i 3,000 .2 200 2,000 0.1 300 400 1,000 800 Example 600 L= 7,250 It 800600H=130ft then Tc = 0.57 hr 1,000 Fig.2.3.2 Tc Nomograph for Large Watersheds 2-8 The time of concentration of the preceeding nomographs may be calculated by the following equation: T ~.0078 (L )0.77cl'H/L"""' where Tc is in minutes.The Tc calculated by the preceeding methods assumes a natural drainage basin with well defined channels,for overland flow on bare earth,and for mowed grass road side channels.If the overland flow is on grassed surfaces multiply the Tc by 2.For overland flow on concrete or asphalt surfaces multiply Tc by 0.4.For concrete channels, multiply Tc by 0.2. Alternatively travel times for overland flow in watersheds with a variety of land covers can be calculated by the Uplands Method.(See Figure 2.3.3). The individual times are calculated from the velocity for each ground cover and the summation of the time giving the time of concentra- 40 30 20 i:•u..10•""9.s 8•7 j 6 en 5 4 3 2 1.0 0.5..Nc::i tion Tc' Figure 2.3.3 Upland Method Velocity Determination 2-9 With the time of concentration calculated and the rainfall intensity for the area selected (Appendix B)the average rainfall intensity for the drainage area may be determined using Figure 2.3.4.The curve for the selected one hour rainfall is followed to the right or left until reaching the calculated time of concentration and the average rainfall intensity (I)can be determined. 2.4 EXAMPLE PEAK DISCHARGE DETERMINATION As an example of the use of the Rational Method,a hypothetical drainage area and its characteristics are used. A drainage area of 40 acres with a distance from its most remote point being measured as 2500 feet of which 500 feet is overland flow in forests with heavy ground litter having an average slope of 5%. The remaining 2000 feet can be classified as in a natural basin with well defined channels with a drop in elevation of 150 feet. Watershed characteristics:Reference Table 2.3.2 Relief;Flat to rolling land average slope approximately 7 percent 0.15 Soil;Medium soil permeabilities 0.18 Vegetal cover;25%of the area under good cover 0.13 Surface Storage;Well defined system of drainage ways on 50%of area,negligible on remainder Sum C = 0.17 0.63 30221/2 840922 It is required to determine the runoff for recurrence periods of 2, 10 and 50 years for a location 100 miles north of Anchorage.Referring to Appendix 2-10 ,... ••0, '1 !T, 1.4 1·1 1.2 I .1 10 09 0.8 0.7 0.6 0.5 041 2 Iii' ';..... I .s::._; -0-<-:a ~-itlitttttitttiJtt- 2 oommm f)0- 1 9 b ~ll Jill If II EWtt#llll ._- .4 £J:::i::i::HttH .It I I I I II"'1'1"'"11 ,- Fig.2.3.4 "l B Figures B2, B4 and B6 we estimate 0.4,0.6 and 0.7 inches per hour respectively. Time of concentration Tc) Overland flow Figure 2.3.3 yields a velocity of 0.6 ft/sec. The Remaining route of 2000 feet and 150 feet of drop from Figure 2.3.1 give 9 minutes. Time of concentration =22.9 minutes500ftTc=9 +_ 0.6 ft/sec 60 sec Average Rainfall Intensity (I) Referring to Figure 2.3.4 with the given rainfall intensities the average rainfall intensities (I)can be derived as follows: Frequency One hour Rainfall Average Rainfall Intensity (1) 2 year 10 year 50 year 0.4 in. O.6 m , O. 7 m , 0.72 i n , 1.25 in. 1.48 i.n , Runoff Calculations Two year frequency Q =CIA =0.63 x 0.72 x 40 =18.14 ft 3jsec 30221/2 840922 2-12 Ten year freq uency Q =CIA =0.63 x 1.25 x 40 =31.50 ft 3/sec Fifty year frequency Q =C Ca*I A =0.63 x 1.2 x 1.48 x 40 =44.76 ft 3/sec *Antecedent precipitation correction factor see paragraph 2.3.2. 30221/2 840922 2-13 3.0 HYDRAULIC DESIGN 3.1 INTRODUCTION An effective drainage structure and waterway design process involves many factors.principal of which are hydraulic performance.structural adeq uacy and overall construction and maintenance costs.The design process will incl ude an assessment by a fisheries biologist to determine whether the water course is a fish stream.Type A or Type B.(see section 1.2-Scope). A fish stream is defined as any water flow that is accessible to fish and capable of supporting aquatic life.This would include.but is not limited to.all Alaska Department of Fish and Game designated streams and all their tributaries up to impassab le natural barriers.Type A freshwater systems above blockages may also support resident fish stocks.Evaluation and recommendations will be made by a fisheries biologist during site location to determine the presence of fish stocks. If the waterway is classified as either Type A or Type B the following cri- teria should be included in the design process. 3.2 FISH PASSAGE PROBLEMS The efficient passage of fish through a drainage structure req U1 res close attention to the resolution of three problems: 1.Excessive water velocity 2.Inadequate water depth 30221/3 840922 3-1 3.Excessive hydraulic jump 3.2.1 Excessive Water Velocity Excessive water velocities can block fish movement simply by exceeding the swimming ability of fish.Swimming ability varies with species,size and age of fish,and length of drainage structure (culvert).Studies of fish movement have provided the information presented on Table 3.2.1. Slope is the most important factor determining velocity in culverts.Slopes steeper than 0.5 percent (1/2 foot drop in 100 feet)generally create exces- sive velocities for fish passage. 3.2.2 Inadequate Water Depth Fish require sufficient water depth to attain maxunum swimming abilities. The depth required is directly related to fish size with larger fish requir- ing deeper water.When insufficient depths are encountered,fish are unable to produce full propulsion. Causes of inadequate depth.The two most frequently encountered reasons for insufficient water depth are steep slope and a wide,flat channel bottom (no low flow channel). a.All other factors being constant,the steeper the slope of a structure the shallower the water depth. b.All other factors being constant,the wider the structure bottom the shallower the water depth. 30221/3 840922 3-2 Table 3.2.1 AVERAGE CROSS SECTIONAL VELOCITIES IN FEET/SECOND MEASUREDl/ AT THE OUTLET OF THE CULVERT Length of Culvert in Feet Group I Upstream mi- grant salmon fry and fin- gerlings when ups team mi- gration takes place at mean annual flood Group II Adult and juvenile slow swimmers: grayling,longnose suckers,whitefish, burbot,sheefish, Northern pike, Dolly Varden/Arctic Char,upstream migrant salmon fry and fingerlings when migration not a~ mean annual flood Group III Adult mode- rate swim- mers:pink salmon,chum salmon,rain- bow trout, cutthroat trout Group IV Adult high performance swimmers: king salmon, coho salmon, sockeye sal- mon,steel- head 30221/2 840922 1/ 30 1.0 4.6 6.8 9.9 40 1.0 3.8 5.8 8.5 50 1.0 3.2 5.0 7.5 60 0.9 2.8 4.6 6.6 70 0.8 2.6 4.2 6.0 80 0.8 2.3 3.9 5.5 90 0.7 2.1 3.7 5.1 100 0.7 2.0 3.4 4.8 150 0.5 1.8 2.8 3.7 200 0.5 1.8 2.4 3.1 200 0.5 1.8 2.4 3.0 Title 5 Fish and Game Part 6 Protection of Fish and Game Habitat Chapter 95 -Alaska Department of Fish and Game 3-3 Minimum water depths required for instream movement of juveniles will vary with species and size of fish present.Generally,0.2 foot (2.4 inches)~s sufficient for passage.Minimum water depths for adult fish are:lJ King Salmon-0.8 feet Other salmon and trout over 20 inches-0.6 feet Trout under 20 inches-0.4 foot 3.2.3 Excessive Hydraulic Jump The two basic causes for a hydraulic jump at the downstream end of a structure are bed scour and slope of structure placement. a.Degradation of the streambed below the.structure can result in lowering the water surface below the downstream end of the structure.This occurs most frequently in steep gradient streams with erodible bottom materials.Degradation of a receiving waterway can create a hydraulic jump at a downstream end of the structure. tributary. b.Placement of a flat sloped structure on a steep sloped waterway builds in a jump. 3.2.4 Guidelines for Structures Location:The guidelines for locating structures for fish passage are also coincidental with those for hydraulic design. 1.There should not be a sudden increase i.n velocity immediately above, below,or at the crossing. 2.Structures should not be located on a sharp bend ~n the stream channel. 1/Lauman,J.E.Salmonid Passage at Stream -Road Crossings:A Report with Department Standards for Passage of Salmonids.1976 Department of Fish and Wildlife Portland Oregon. 30221/3 840922 3-4 3.Structures should be designed to fit the stream channel alignment. They should not necessitate a channel change to fit a particular cross ing design. 3.3 DRAINAGE STRUCTURE DESIGN CRITERIA All drainage structures in waterways an which fish are known to freq uent (Type A or B)shall be designed in accordance with the following criteria: Water- course Flood Type Frequency A B C 2 year 10 years 50 years* Maximum velocity per Table 3.2.1 group and twice the depth of flow per paragraph 3.2.2 No static head at culvert entrance Allowable pondage at site *In the case that the drainage structure is at a primary road or railway the flood frequency is to be 100 years. Drainage structures 1.n waterways where there are no anadromous fish will be designed for criteria Band C above.Drainage structures that are classified as temporary,meaning that they will be removed and the habitat rehabi l i tated wi thin a 10 year period wi 11 be designed for the preceedi ng criteria except that the flood frequency of criteria C will be 25 years. Drainage structures in fishery streams shall be placed with the waterway substrate in its invert.In the case of culverts,at least one fifth of the diameter of each round culvert and at least 6 inches of the height of each elliptical or arch type culvert is to be set below the stream bed at both the inlet and outlet of the culvert.The above is not applicable to bottom less arch type culverts.In the case of a rock substrate,a request for 30221/3 840922 3-5 variance should be submitted to the Alaska Department of Fish and Game (ADF&G)for approval. A drainage structure design data sheet,tabulating information for each site,prepared by a fisheries biologist and a design engineer will be sub- mitted to ADF&G for approval and approved prior to undertaking any construc- tion.(See end of 3.4.3.8,Inlets and Culvert Capacity.) The drainage structure design will require the following conditions to be adhered to during its construction. a.All bank cuts,slopes,fills and exposed earth work attributable to installation in a waterway must be stabilized to prevent erosion during and after construction. b.The width and depth of the temporary diverison channel must equal or exceed 7S percent of the width and the depth,respectively,of that portion of the waterway which is covered by ordinary high water at the diversion site,unless a lesser width or depth is specified by the ADF&G on the permit for activities undertaken during periods of lower flow; c.During excavation or construction,the temporary diversion channel must be isolated from water of the waterway,to be diverted,by natural plugs left ~n place at the upstream and downstream ends of the diversion channel. d.The diversion channel must be constructed so that the bed and banks will not significantly erode at expected flows. e.Diversion of water f low into the temporary diversion channel must be conducted by first removing the downstream plug then removing the up- stream plug,then closing the upstream end and then the downstream end, respectively,of the natural channel of the diverted waterway. 30221/3 840922 3-6 f.Rediversion of flow into the natural stream must be conducted by remov- ing the downstream plug from the natural channel and then the upstream plug,then closing the upstream end and then the downstream end,re- spectively,of the diversion channel. g.After use,the diversion channel and the natural waterway must be stabilized and rehabilitated as may be specified by permit conditions. 3.4 WATERWAY HYDRAULICS 3.4.1 General A field inspection is basic to the design of diversion channels,culverts, and bridge encroachment into waterways,all of which encompass the drainage structures to which these guidelines are addressed. For the design of drainage structures,the hydraulic condi tion of the prepared structure will be similar to the natural waterway upstream and downstream of the proposed structure site must be known.The parameters for a typical section will be measured in the field.During this inspection a check should be made of downstream controls.At times the tailwater is controlled by a downstream obstruction or by water stages in another waterway. 3.4.2 Waterways This section describes the techniques for investigation of the waterway on which a drainage structure is to be constructed and the construction activities for a new waterway such as a temporary diverison channel. Hydraulic investigation and design of waterways will be based upon Manning's formula for uniform flow unless existing site conditions indicate that flows will be non uniform.A full treatment of this subject may be found i.n 30221/3 840922 3-7 treatment of this subject may be found in Open-Channel Hydraulics by Ven Te Chow,Mc Graw Hill 1959. The Manning formula: v •1.49 R2/3 Sl/2 n Where:V is the mean velocity in fps; R is the hydraulic radius ft; S is the slope of the waterway,and n is the coefficient of roughness,specifically known as Manning's n The discharge in the waterway may be determined by multiplying by "A"the area of the water prism in the formula. a.Waterway Investigation A hydraulic rating curve of the waterway should be determined by measuring the waterway cross section between highwater marks on both sides of the waterway.If these marks are not visible a high water level should be esti- mated.Figure 3.4.1 is an example of a waterway cross section measurement. 8'/0'6'1"6'/2'5' Figure 3.4.1 Waterway Cross Section Measurement 3-8 30221/2 840922 From the cross section the area and wetted perimeter should be calculated for at least 3 levels,or more if the waterway is deep,including the maxi- mum level. From the measured slope of the waterway and a determination of waterway roughness n,the discharges for the selected levels (depth of flows)can be calculated using Manning's formula.The n values for typical channel condi- tions are presented in Table 3.4.1 and a method used by the U.S.Soil Con- servation Service for computing an n value taking into consideration factors that affect n is presented in Table 3.4.2. b.Waterway Design The required capacity of the waterway should be determined by the method indicated in Section 2.0-Flow Determination.If the waterway IS to be de- signed for fish passage,the group (Table 3.2.1)and the minimum depth of flow for instream movement (paragraph 3.2.2)snould be determined. 3-9 Table 3.4.1 Typical Channel Roughness Coefficientsl/ Value of n Channel Condition 0.016-0.017 0.020 0.0225 Smoothest natural earth channels,free from growth,with straigth alignment. Smooth natural earth channel,free from growth,little curva- ture. Small earth channels in good condition,or large earth chan- nels with some growth on banks or scattered cobbles in bed. 0.030 Earth channels with considerable growth. with good alignment,fairly constant section. channels,well maintained. Natural streams Large floodway 0.035 Earth channels considerably covered with small growth. Cleared but not continuously maintained floodways. 0.040-0.050 Mountain streams in clean loose cobbles. able section and some vegetation growing channels with thick aquatic growths. Rivers with in banks. vari- Earth 0.060-0.075 Rivers with fairly straight badly obstructed by small aquatic growth. alignment and cross section, trees,very little underbrush or 0.100 0.125 0.150-0.200 Rivers with irregular alignment and cross section,moderately obstructed by small trees and underbrush.Rivers with fairly regular alignment and cross section,heavily obstructed by small trees and underbrush. Rivers with irregular alignment and cross section,covered with growth of virgin timber and occasional dense patcnes of bushes and small trees,some logs and dead fallen reese Rivers with very irregular alignment and cross section,many roots,trees,bushes,large logs,and other drift on bottom, trees continually falling into channel due to bank caving. 30221/2 840922 1/Design of Small Dams,U.S.Bureau of Reclamation,1977. 3-10 Table 3.4.2 Channel Roughness Determinationl1 Steps 1.Assume basin n 2.Select modifying n for roughness or degree of irregularity 3.Select modifying n for variation in size and shape of cross section 4.Select modifying n for obstructions such as debris deposits,stumps,exposed and fallen logs 5.Select modifying n for vegetation 6.Select modifying n for meandering 7. Add items 1 through 6 Aids in Selecting Various n Values 1.Recommended basic in values Channels in earth------------O.OlO Channels in rock-------------0.015 Channels ln fine gravel------------0.014 Channels ln coarse gravel----------0.028 2.Recommended modifying n value for degree of irregularity Smooth-----------------------O.OOO Moderate---------------------------O.OlO Minor------------------------0.005 Severe-----------------------------0.020 3.Recommended modifying n value for changes in size and shape of cross &ection Gradual----------------------O.OOO Frequent------------------O.OlO to 0.015 Occasional-------------------0.005 4.Recommended modifying n value for obstruction such as debris,roots,etc. Negligible effect------------O.OOO Appreciable effect-----------------0.030 Minor effect-----------------O.OlO Severe effect----------------------0.060 5. Recommended modifying n values for vegetation Low effect----------0.005 to 0.010 High effect---------------0.025 to 0.050 Medium effect-------O.OlO to 0.025 Very high effect----------0.050 to 0.100 6. Recommended modifying n value for channel meander Ls=Straight length of reach ~=Meander length of reach Lm/Ls n 1.0-1.2 0.000 1.2-1.5 0.15 times n,s >1.5 0.30 times n s where ns=items 1+2+3+4+5 II Design of Small Dams, U.S.Bureau of Reclamation,1977. 30221/3 840922 3-11 30221/2 840922 The design of a stable channel 1S accomplished by trial and error.It is reasonable to expect a channel to suffer some damage during a 50-year flood event,but one would desire a stable channel for the la-year flood event. Therefore as a trial starting point,the channel section will be des igned for maximum discharge with a velocity approximately 20%higher than the velocity that would be permissible in the channel during the la-year flood event. Two methods will be presented for channel design;the Permissible Velocity Method and the Tractive Force Method.Examples of their use will also be presented. 3.4.2.1.Permissible Non-erodible Velocity Method The maximum permissible velocity,or non-erodible velocity is the greatest mean velocity that will not cause erosion of the channel body.In general, old and well-seasoned channels will stand much higher velocities than new ones,because the old channel bed is usually better stabilized,particular- ly with the deposition of colloidal matter.When other conditions are the same,a deeper channel will convey water at a higher mean velocity without erosion than a shallower one. Table 3.4.3.lists the maX1mum permissible velocity for cnannels with erod- ible linings based on uniform flow in continuously wet,aged channels. 3-12 30221/2 840922 Table 3.4.3* RECOMMENDED PERMISSIBLE VELOCITIES (ft./sec.)FOR UNLINED CHANNELS Type of Material for Excavated Section Clear Water Silt -Carrying Water Fine Sand (non colloidal)1.5 2.5 Sandy Loam (non colloidal)1.7 2.5 Silt Loam (non colloidal)2.0 3.0 Ordinary Firm Loam 2.5 3.5 Volcanic Ash 2.5 3.5 Fine Gravel 2.5 4.0 Stiff Clay (colloidal)3.7 5.0 Graded Material: Loam to Gravel 3.7 5.0 Silt to Gravel 4.0 5.5 Gravel 5.0 6.0 Coarse Gravel 5.5 6.5 Gravel to Cobbles «6")6.0 7.0 Gravel to Cobb les ()6")7.0 8.0 Shales and Hardpans 7.0 8.0 *State of California,Dept.of Public Works,Division of Highways, "Planning Manual of Instructions,Part 7,Design,"1963. Using permissible velocity as a criterion,the design procedure for an un- lined cnannel section,assumed to be trapezoidal,is as follows: 1.For the given kind of material forming the channel body,estimate the roughness coefficient n,side slope z,and the maximum per- missible velocity,V (Table 3.4.3). 2.Compute the hydraulic radius R by use of the Manning formula. 3.Compute the water area required by the given discharge and per- missible velocity,i.e.:A =Q/(1.2V). 4.Compute the wetted perimeter,P =A/R. 3-13 5.Solve simultaneously for band y (base and depth of flow). 6.With the given section,by iteration,calculate with varying depths of flow,the depth and velocity for the 10-year flood dis- charge.Check if velocity is equal or less than the permissible. If not,change slope if possible or lower velocity and repeat 1. 7.For fish streams,repeat 6 for the 2-year flood discharge to check if velocity is equal to or less than permissible fish pass- age velocity for the designated group (Table 3.2.1)and the depth of flow is at least 50%greater than that indicated in paragraph. 3.2.2 for the fish type.If the above are not met,a further channel revision may be required necessitating recalculation be- ginning with 1 or the incorporation of a low flow section in the invert of the channel. A calculation example follows in steps 1 through 6 Compute the bottom width and depth of flow of a trapezoid channel laid on a slope of .0016 and carrying a design discharge of 400 c f s , The channel a s to be excavated in earth containing non-colloidal gravelly silt. Solution: For the given conditions,the following are estimated:n =0.025,side slope z =2:1,and maximum permissible velocity =3.75 x 1.2 =4.5 fps. 1.Using the Manning Formula,solve for R 4.5 =1.49 R2/3 (.0016)1/2 0.025 R =2.60 ft Then A =400/4.5 =88.8 ft 2,and P =AIR =88.8/2.60 =34.2 30221/3 840922 3-14 2.A ~(b +zy)y =(b +2y)y =88.8 ft 2 and P =b +2 (1 +z2)1/2y =[b +2(5)1/2 y ]=34.2 ft. 3.Solving the two equations simultaneously: (b +2y) y =88.8 (b +4.47y)=34.2 88.8 - 2y 2 =34.2y -4.47 y2 2.47y2 -34.2y +88.8 =0 y =3.46 ft b =18.7 ft 3.4.2.2 Tractive Force Method The tractive force method takes into account physical factors of bed ma- terial,channel section,depth of flow and velocity.This method will be confined to non cohesive materials for which the permissible tractive force is related to particle size and shape,and sediment load in the water.The tractive force is the unit force tending to cause erosion of the material forming the channel.Figure 3.4.2 shows curves for recommended values of permissible unit tractive force for particles up to about 4 inches in diame- ter.For coarser material,the permissible tractive force in psf is eq ual to 0.4 times the diameter in inches as shown in Figure 3.4.3.The diameter is that of a particle of equivalent spherical volume.The curves in Figures 3.4.2 and 3.4.3 are based on particle sizes of which 25%by weight are larg- er. The limiting condi tion for permissible tractive force i s governed by the particles on the sides rather than those on the bottom of the channel.The resistance of the material on the sides is reduced by the sliding force down the sides due to gravity.The effect of side sLopes is expressed as factor K,which is the ratio of the tractive force required to initiate motion of a particle on the sloping sides to that on a level bottom.The equation is: ( 1 -sin2 0 1/2 K =sin 2 0 ) 30221/3 840922 3-15 30221/2 840922 o =side slope angle e =angle of repose of the material which varies with particle size and shape as shown in Figure 3.4.4. The solution of this equation is given in Figure 3.4.5. The formula for maximum tractive force is: TO =62.4 R8 8 =energy gradient ~n ft/ft (channel slope for uniform flow) R =hydraulic radius In a wide open channel,the hydraulic radius ~s approximately equal to the depth of flow y;hence,TO =62.4 y8. Channels in fine material less than 5 mm ~n diameter are designed by using the recommended values of tractive force ploted in Figure 3.4.2.In this case,"d"is the mean diameter for which 50%by weight are larger.The sliding effect of the particles down the channel sides due to their own weight is neglected. An example using values for;a 10-year flood design,a trapezoidal channel laid on a slope of .0016,and carrying a discharge of 400 cfs.The channel is to be excavated in earth containing noncolloidal coarse gravels and peb- bles,25%of which is 1.25 in or over in diameter.Manning's n =0.025. For trapezoidal channels,the maxamum unit tractive force on the sloping sides is usually less than that on the bottom (Figure 3.46);hence,the side force ~s the controlling value ~n the analysis.The design of the channel should therefore include:(a)the proportioning of the section dimensions for the maximum unit tractive force on the sides and (b)checking the proportioned dimensions for the maximum unit tractive force on the bottom. 3-16 a.Proportioning the Section Dimensions: 1.Assuming side slopes of 2: 1 and a b/y ratio =5,the maximum unit tractive force on the sloping sides (Figures 3.4.6)is .775 x 62.4 yS =.775 x 62.4 x .0016y =0.078y psf. 2.Considering a very rounded material 1.25 in.in diameter,the angle of repose (Figure 3.4.4)is 9 =33.5.With 9 =33.5 and SS =2.1,the permissible tractive force ratio on the sloping sides (Figure 3.4.5)is K =0.6.For a size of 1.25 in.,the permissible tractive force on a level bottom is T = 0.4 x 1.25 =0.5 psf (this can also be obtained from Figure 3.4.2)and the permissible tractive force on the sides is equal to 0.6 x 0.5 =0.3 psf. 3.For a state of impending motion of the particles on side slopes,.078y =0.3 or y =3.88 ft.Accordingly,the bottom width b = 5 x 3.85 =19.3 ft.For this trapezoidal section, A = 104 sq ft and R =2.85. 4.By the Manning equation Q =1.486 AR2/3S1/2 n =1.486 (104)(2.85)2/3 (.0016)1/2 = 491 cfs .025 Further computation will show that for a side slope of 2: 1 and b/y ratio of 4.1,b =15.8 ft.,Q = 425 cfs,which is close to the design discharge. 30221/2 840922 b.Checking the proportioned dimensions: With S8 =2:1 and b/y =4.1,the maximum unit tractive force on the channel bottom (Figure 3.4.6)is 0.97 x 62.4 x 3.85 x .0016 0.374 psf <0.5 psf (permissible tractive force on the bottom). 3-17 30221/2 840922 5. 6. Determining maximum flow conditions:with base width and side slopes determined,the depth of flow required for the maximum flow conditions can be determined using the Manning formula. For fish streams,repeat paragraph 5 for the 2-year flood discharge to check if velocity i s equal to or less than permissible fish passage velocity for the designated group (Table 3.2.1)and the depth of flow is at least 50%greater than that indicated in paragraph 3.2.2 for the fish type.If the above are not met,a further channel revision may be required,necessitating recalculation beginning with 1 or the incorporation of a low flow section in the invert of the channel. 3-18 2.0 4.0 OA 0002 .....t,. '7 7 / / / Hi9f\content of V ~I.lI.i ~Coarse noncahesive fine sed iment '"V material I '"~~,II .~~7 ~'":--"",/--/,./ \.....10--..-1\ \-........ "--Cleor water\ L Low content of fine .edlment I lj.4 0.6 081.0 2 4 6810 2 0 40 60 80 I OJ O.~ 002 0.1 0.08 0.06 0.Q04 0.003 0.01 0.008 0.006 1.0 0.8 0.6 •o..: I. e.. l. -oo..... N..:... ':•..e 0.2 Mean Diameter - mm. Figure 3.4.2 RECOMMEND PERMISSIBLE UNIT TRACTIVE FORCE FOR CANALS IN NONCOHESIVE MATERIAL 3-19 • • 4 2 N.:-~•..a 0.8 .s 8 O.i ! QI 0.4>.--c.J 0 '"~ ~..a ~0.2.-e '"4' 11. 0.1 0.08 0.06 0.04 '. V V / / / V / V V / / / V / / V 0.1 0.2 0.4 0.'0.8 I 2 4.e 10 Diameter In IneMI t 2!5'*a larger Figure 3.4.3 PERMISSIBLE TRACTIVE FORCE FOR COARSE NONCOHESIVE MATERIAL 3-20 42 "i 40-c: 0...38-'"0 J:: J::36-.-, lit 34 Qc» ""32CI'c» '0.30 ~ 0 Q,28~-0 26 •e;.24.i 22 20 Particle size in inches 0.2 0.4 o.sO.8 LO 2.0 3.0 4.0 1 I 't'«I I I11211'1'2. .,-,..-~ //~./~ ~//V~~ //V/ ~l/1///V ~~~If /// o~_c~IJ //~V VIeIfIf'1/~.if'1/ 0"oy 1/II~sbq;·~V IIoo~~/II..,0;b I~~~b~11.~c0 oJi I~"~~II~..~~...~~/ "..0 ~I A§j ~V t.s:I~I Figure 3.4.4 ANGLES OF REPOSE OF NONCOHESlVE MATERIAL 3-21 Repose Side Slopes j SIII.z , Based on 8qu~tlon K-1-SIII.~... 40- 11,44:1-I 35-• >-3 1112:1--I :;0> tt (") >-3 -.... H ti3 1 314:'-~ 0 I"Ij ---:'30 0 0 "'i: :;0 ~ (")I"Ij-2:1-I tx:I ....-I .... :;0 ~0 u ~- w >11 i 2 IM :.-I I I >-3 CD 25- MN0 W > N ~~021/2:'-... <1 Ln 00 0 00 .. H 8 3:1- t:1 tJ.:l N 00 jr-' 0 -~••As ~., "0 CI) 5' U.I 0.2 0.3 0.4·0..5 Q.6 0.7 o.a 0.9 .0 K =Permissible Tractive Farce on Side.in fraction of Volue for level Bottom for Nancaheslve Mote,••' 0'J_I LLI Ua:e LLI>-.... U <la::.... ~:::> ~-Xex :E <D 0 lJJ CD (f)LLI....0-(f)ozex..•~-.~~--.!•II ,If:0-;:~'i -,0e,If:0 --Q,,i -0 •.G ." I '0 II IIN.a --Qt I 0'I .1\~t--", t'lI- I 0--0 r{. \\ \\ \\ J \ ~\\""~:\/.~~\~.2 ::t '0IS'l'CI to\eIS'0-u~\ua: C/J \'Y1C/J \~~~\.,~ \;.:.~~r--.,'\'"co,I\CO»~~"'"",\~<,".,~1'-,,If:u--rt)~~~0 ..................... Z .....N I I"'~--N ..... ~i\.I-t-~~1---..,q .0)0'II)f'o:c&l "1 'If.ttl-O~0-:0-000000 S~.'Z9 .0 IW..8.U!(HnIOA 'XOW)"De'4S .AUDI.~ Figure 3.4.6 THE MAXIMUM TRACTIVE FORCE ON BED AND SIDES 3-23 30221/2 840922 3.4.3 Culverts 3.4.3.1 Fish Passing Requirements.The following presentation on culvert design is essentially a repitition of the Hydraulic Engineering Circular No.5 pepared by the Bureau of Public Roads,U.S.Department of Commerce. As such the design criteria established are for the design of highway culverts and includes no provisions of fish passage criteria.Therefore, this paragraph will ammend the following in the instances that the culvert is to be placed on a waterway that has been established to have resident fish or used by anadromous fish. In Sections 3.2,Fish Passage Problems and 3.3 Drainage Structure Design Criteria,the basic requirements were presented for the successful design of a culvert for passing fish.They were: 1.Velocity requirement per fish group (Specified in Table 3.2.1) 2.Place invert below waterway bed by at least 0.2 diameter 3.Maintain depth of flow requirement for fish type per paragraph 3.2.2 Inadequate Water Depth. It can be shown that concrete culvert characteristics with full flow,when the lower 20%of the diameter is filled with the streambed substrate,are modified as follows: Area reduced by 14.5% Hydraulic radius reduced by 11% Average roughness coefficient n increased by 30% 3-24 These changes in parameters will reduce the culvert capacity by about 39%. Therefore the selection of the culvert s i ze as presented in the following text will require a correction.This correction is achieved by increasing the design discharge (full pipe flow only)by 63%before starting the design procedure indicated in 3.4.3.11 Outlet Control Nomographs. For low flow design,as in the case of the 2 year flood,the culvert will flow partially full and the discharge depth for runoff discharge can be computed taking into consideration the culvert section with fill material using Manning's formula.The hydraulic radius is accounted for by weighting the perimeter with the n's of the culvert and the substrate material as per the following equation. P n 1.5)2/3s s n = "Important" Per the preceeding,culverts meeting the requirements prescribed herein should be designed for a maximum capacity equivalent to:1.63 x the cal- culated design discharge. 3.4.3.2 Scope of Guidelines.The following text contains a brief discus- sion of the hydraulics of conventional culverts and charts for selecting a culvert size for a given set of conditions.Instructions for using the charts are provided.Sane approx imations are made in the hydraulic design procedure for simplicity.These approximations are discussed at appropriate points throughout the text. 30221/3 840922 3-25 30221/2 840922 For this discussion,conventional culverts include those commonly installed, such as circular,arch and oval pipes,both metal and concrete box culverts. All such conventional culverts have a uniform barrel cross section through- out.The culvert inlet may consist of the culvert barrel projected from the roadway fill or mitered to the embankment slope.Sometimes inlets have headwalls,wingwalls and apron slabs,or standard end sections of concrete or metal.The more common types of conventional culverts are considered in these guidelines. 3.4.3.3 Culvert Hydraulics.Laboratory tes ts and field observations show two major types of culvert flow:(1)flow with nlet control and (2)flow with outlet control.For each type of control,different factors and formu- las are used to compute the hydraulic capacity of a culvert.Under inlet control,the cross-sectional area of the culvert barrel,the inlet geometry and the amount of headwater or ponding at the entrance are of primary impor- tance.Outlet control involves the additional consideration of the eleva- tion of the tailwater in the outlet channel and the slope,roughness and length of the culvert barrel. It is possible by involved hydraulic computations to determine the probable type of flow under wni.cn a culvert will operate for a given set of condi- tions.The need for making these computations may be avoided,however,by computing headwater depths from the charts in this circular for both inlet control and outlet control and then using the higher value to indicate the type of control and to determine the headwater depth.This method of de- termining the type of control is accurate except for a few cases where the headwater is approximately the same for both types of control. Both inlet control and outlet control types of flow are discussed briefly in the following paragraphs and procedures for the use of the charts are given. 3-26 30221/2 840922 3.4.3.4 Culverts Flowing With Inlet Control.Inlet control means that the discharge capacity of a culvert is controlled at the culvert entrance by the depth of headwater (HW)and the entrance geometry,including the barrel shape and cross-sectional area,and the type of inlet edge.Sketches of inlet-control flow for both unsubmerged and submerged projecting entrances are shown in sections A and B of Figure 3.4.7.Section C shows a mitered entrance flowing under a submerged condition witn inlet control. In inlet control the roughness and length of the culvert barrel and outlet conditions (including depth of tai Iwa t er )are not factors in determining culvert capacity.An increase in barrel slope reduces headwater to a small degree and any correction for slope can be neglected for conventional or commonly used culverts flowing with inlet control. In all culvert design,headwater or depth of ponding at the entrance to a culvert is an important factor in culvert capacity.The headwater depth (or headwater HW)is the vertical distance from the culvert invert at the entrance to the energy line of the headwater pool (depth +velocity head). Because of the low velocities in most entrance pools and the difficulty in determining the velocity head for all flows,the water surface and the ener- gy line at the entrance are assumed to be coincident,thus the headwater depths given by the inlet control charts in this circular can be higher than will occur in some installations.For the purposes of measuring headwater, the culvert invert at the entrance is the low point in the culvert opening at the beginning of the net cross-section of the culvert barrel.(Refer to p ar a gr a ph 3.4 •3 •1) • Headwater-discharge relationships for the various types of circular and pipe-arch culverts flowing with inlet control are based on laboratory re- search with models and verified in some instances by prototype tests.This 3-27 A HW ____...£!!![~,,~OC(--- PROJECTING EHO -UNSUe""ERGEO 8 -it'.••:--------""'~lR# t HW \ PROJECTING END -SUetoolERGEO c ------ 1'----.....-~~-­ HW JAITERED END -suetoolERGED --..,-./----~'io!.,~iZ;,~v!~'</B-- Figure 3.4.7 INLET CONTROL 3-28 research is reported in National Bureau of Standards Report No.44441/en- titled "Hydraulic Characteristics of Commonly Used Pipe Entrances",by John L.French and "Hydraulics of Conventional Highway Culverts",by H. G. BOs syZ/,Experimental data for box culverts with headwalls and wing- walls were obtained from an unpublished report of the U.S.Geological Survey. These research data were analyzed and nomographs for determining culvert capacity for inlet control were developed by the Division of Hydraulic Re- search,Bureau of Pub lic Roads.These nomographs,Charts 1 through 6, give headwater-discharge relationships for most conventional culverts flow- ing wi th inlet control through a range of headwater depths and discharges. Chart No. 7 is included to stress the importance of improving the inlets of culverts flowing with inlet control. 3.4.3.5 Culverts Flowing With Outlet Control.Culverts flowing with outlet control can flow with the culvert barrel full or part full for part of the barrel length or for all of it,(see Figure 3.4.8).If the entire cross section of the barrel ~s filled with water for the total length of the bar- rel,the culvert is said to be in full flow or flowing full,Sections A and B.Two other common types of outlet-control flow are shown in Sections C and D.The procedures given in this text provide methods for the accurate determination of headwater depth for the flow condi tions shown in Sections 1/Available from Division of Hydraulic Research,Bureau of Public Roads. 2/Presented at the Tenth National Conference,Hydraulics Division,ASCE., August 1961.Available on loan from Division of Hydraulic Research, Bureau of Public Roads. 30221/2 3-29 840922 .. 1 - HW WATER SURFACE A _~w.s. 8 1 HW I H <,w.s. '.....---- c f H -L..w.s .......------. o -----------~~--~~----.... OUTLET CONTROL Figure 3.4.8 3-30 A,Band C.The method given for the part full flow condition,Section D, gives a solution for headwater depth that decreases in accuracy as the headwater decreases. The head H (Section A)or energy required to pass a given quantity of water through a culvert flowing in outlet control with the barrel flowing full throughout its length is made up of three major.parts.These three parts are usually expressed in feet of water and include a velocity head ~,an entrance loss He'and a friction loss Hf•Tnis energy is obtained from ponding of water at the entrance and expressed in equation from (1) 30221/2 840922 The velocity head Hv equals V2/2g,where V is the mean or average velocity in the culvert barrel.(The mean velocity is the discharge Q,in cfs,di- vided by the cross-sectional area A,in square feet,of the barrel.). The entrance loss He depends upon the geometry of the inlet edge.This loss is expressed as a coeffcient k e times the barrel velocity head or He =k e V2/2g.The entrance loss coefficients k e for various types of entrances when the flow is in outlet control are given in Table 3.4.4. The friction loss Hf is the energy required to overcome the roughness of the culvert barrel.Hf can be expressed in several ways.Since most engineers are familiar with Manning's n the following expression is used: H = Rl.33 2g 3-31 Where: Where: n a Manning's roughness coefficient L =length of culvert barrel (ft) V =mean velocity of flow in culvert barrel (ft/sec) g =acceleration of gravity,32.2 (ft/sec 2) R =hydraulic radius or A/P (ft) A =area of flow for full cross-section (sq ft) P =wetted perimeter (ft) 30221/2 840922 Substituting in equation 1 and simplifying,we get for full flow 29n 2L v2 H =(1 +k e +------) RI.33 2g 3-32 Table 3.4.4 Entrance Loss Coefficients Coefficient ke to apply to velocity head V2/2g for determination of head loss at entrance to a structure,such as a culvert or conduit,operting full or partly full with control at the outlet. Entrance head loss He =k e V2 2g Coeffi- Type of Structure and Design of Entrance cient k e Pipe,Concrete Projecting from fill,socket end (groove-end)••••••••••••••0.2 Projecting from fill,sq cut end ••.••••••••••••••••••••••••0.5 Headwall or headwall and wingwalls Socket end of pipe (groove-end)........................0.2 Square-edge 0.5 Rounded (radius -1/12D)••••••••••••••••••••••••••••••0.2 Mitered to conform to fill slope •••••••••••••••••••••••••••0.7 *End-section conforming to fill slope •••.••••••••••••••••••0.5 Pipe,or Pipe-Arch,Corrugated Metal Projecting from fill (no headwall) Headwall or headwall and wingwalls 0.9 Square-edge'0.5 Mitered to conform to fill slope.••••••••••••••••.•••••.•••0.7 *End-section conforming to fill slope......................0.5 Box,Reinforced Concrete Headwall parallel to embankment (no wingwalls) Square-edged on 3 edges 0.5 Rounded on 3 edges to radius of 1/12 barrel dimension.0.2 Wingwalls at 30°to 75°to barrel Square-edged at crown.................................0.4 Crown edge rounded to radius of 1/12 barrel dimension.0.2 Wingwalls at 10°to 25°to barrel Square-edged at crown.................................0.5 Wingwalls parallel (extension of sides) Square-ed ged a t crown O. 7 30221/2 840922 *Note:"End-section conforming to fill slope",made of either metal or concrete,are the sections commonly available from manufacturers. From limited hydraulic tests,they are equivalent in operation to a headwall in both inlet and outlet control.Some end sections, incorporating a clo~aper in their design have a superior hy- draulic performance.These later sections can be designed using the information given in 3.4.3.8 Inlets and Culvert Capacity. 3-33 Figure 3".4.9 shows the terms of equation 2,the energy line,the hydraulic grade line and the headwater depth,HW.The energy line represents the to- tal energy at any point along the culvert barrel.The hydraulic grade line, sometimes called the pressure line,is defined by the elevations to which water would rise in small vertical pipes attached to the culvert wall along its length.The energy line and the pressure line are parallel over the length of the barrel except in the immediate vicinity of the inlet where the flow contracts and re-expands.The difference in elevation between these two lines is the velocity head,V2/2g. The expression for H 1S derived by equating the total energy upstream from the culvert entrance to the energy just inside the culvert outlet with con- sideration of all the major losses in energy.By referring to Figure 3.4.9 and using the culvert invert at the outlet as a datum,we get: 2g Where:dl and d2 =depths of flow as shown in Fig.3.4.9 =velocity hed in entrance poolVI 2g LSO =length of culvert times barrel slope Then: And: Vl 2 dl ++LSO - d2 =Hv +He +Hf2g vl2 H =dl ++LSO - d2 =Hv +He +Hf 2g From the development of this energy equation and Figure 3.4.9,head H 1S the difference between the elevations of the hydraulic grade line at he outlet and the energy line at the inlet.Since the velocity head in the 30221/2 840922 entrance pool is usually small under ponded condi tions,the water surface or headwater pool elevation can be assumed to equal the elevation of the 3-34 energy line.Thus headwater elevations and headwater depths,as computed by the methods given in this text,for outlet control,can be higher than might occur in some installations.Headwater depth is the vertical distance from the culvert invert at the entrance to the wate surface,assuming the water surface (hydraulic grade line)and the energy line to be coincident, d l +Y.l2 in Figure 3.4.9. 2g yl2 f 29 ~=".h-,'ll!..·s.r --.,....------/-----:--...--f'~:;..;;_-=-_--:;;;::--=-==.:7--~~-'-;------=--:P H HW d l =--',Hd2..!Ls. ~~2 DATUM +LSo Figure.3.4.9 CULVERT HYDRAULICS DIAGRAM Equation 2 can be solved for H readily by the use of the full-flow nomo- graphs,Charts 8 through 14.Each nomograph is drawn for a particular bar- rel shape and material and a single value of n as noted on the respective charts.these nomographs can be used for other values of n by modifying the culvert length for the use of the full-flow monographs as directed in 3.4.3.11 Outlet Control Nomographs. In culvert design,the depth of headwater HW or the elevation of the ponded water surface is usually desired.Finding the value of H from the nomo- graphs or by equation 2 is only part of the solution for this headwater depth or elevation.In this case of Figure 3.4.8 Section A or Figure 3.4.9 where the outlet is totally submerged,the headwat~pool elevation (assumed 3-35 30221/2 840922 to be the same elevation as the energy line)is found by adding H to the elevation of the tailwater.The headwater depth is the difference ~n eleva- tions of the pool surface and the culvert invert at the entrance. When the tailwater is below the crown of the culvert,the submerged condi- tion discussed above no longer exists and the determination of headwater is somewhat more difficult.In discussing outlet-control flow for this condi- tion,tailwater will be assumed to be so low that it has no effect on the culvert flow.(The effect of tailwater will be discussed later.)The com- mon types of flow for the low tailwater condition are shown in Sections B, C and D of Figure 3.4.8.Each of these flow conditions are dependent on the amount of discharge and the shape of the culvert cross-section.Each condi- tion will be discussed separately. Full flow at the outlet,Section B of Figure 3.4.8 will occur only with the higher rates of discharge.Charts 15 through 20 are provided to aid in de- termining this full flow condition.The curves shown on these charts give the depth of flow at the outlet control.This depth is called critical depth d c'When the discharge is sufficient to give a critical depth equal to the crown of the culvert barrel,full flow exists at the outlet as in Section B of Figure 3.4.8.The hydraulic grade line will pass through the crown of the culvert at the outlet for all discharges greater than the dis- charge causing critical depth to reach the crown of the culvert.Head H can be measured from the crown of the culvert in computing the water surface elevation of the headwater pool. When cri tical depth falls below the crown of the culvert at the outle t , the water surface drops as shown in either Sections C or D,depending again on the discharge.To accurately determine headwater for these conditions, computations for locating a backwater curve are usually required.These backwater computations are tedious and time consuming an they should be avoided if possible.Fortunately,headwater for the flow condition shown in Section C can be solved by using the nomographs and the instructions given in this text. 3-36 30221/2 840922 For the condition shown in Section C,the culvert must flow full for part of its length.The hydraul~c grade line for the portion of the length in full flow will pass through a point where the water breaks with the top of the culvert as represented by point A in Section C.Backwater computations show that the hydraulic grade line if extended as a straight line will cut the plane of the outle t cross section at a point above cri tical depth (water surface).This depth is at a height approximately equal to one haif the distance between critical depth and the crown of the culvert.The elevaton of this point can be used as an equivalent hydraulic grade line and H,as determined by equation 2 or the nomographs,can be added to this elevation to find the water surface elevation of the headwater pool. The full flow condition for part of the barrel length,Section C,will exist when the headwater depth HW,as computed from the above headwater pool ele- vation,is equal to or greater than the quantity: D +(l +k )y2e _ 2g Where Y is the mean velocity for the net cross section of the barrel;Ke, the entrance loss coefficient;and D,the inside height of the culvert.If the headwater is less than the above value,a free water surface,Figure 2D will extend through the culvert barrel. The part full flow condition of Section D must be solved by a backwwater computation if accurate headwater depths are desired.Detai Is for making this computation are not given in this text.Ins tead the solution used is the same as that given for the flow condition of Section C,with the reserv- ation that headwater depths become less accurate as the discharge for a par- ticular culvert decreases.Generally,for design purposes,this method is satisfactory for headwater depths above 0.75D,where D is the heignt of the culvert barrel.Culvert capacity charts found in Hydraulic Enginering Cir- cular No. 10 give a more accurate and easy solution .fo r this free surface flow condition. 3-37 Headwater depth HW can be expressed by a common equation for all outlet- control conditions,including all depths of tailwater.This is accomplished by designating the vertical dimension from the culvert invert at the outlet to the elevation from which II is measured as ho'The headwater dep t h HW elevation is: HW =H +h - LSo 0 All the terms in the equation are in feet.II is comptued by equation 2 or found from the full-flow nomographs.L is the length of culvert in feet and So the barrel slope in feet per feet.The distance ho is discussed in the following paragraphs for the various conditions of outlet-control flow. Headwater HW is the distance in feet from the invert of the culvert at the inlet to the water surface of the headwater pool. When the elevation of the water surfce in the outlet channel is equal to or above the elevation of the top of the culvert opening at the outlet,Section A, ho is equal to the tailwater depth.Tailwater depth 1W is the distance in feet from the culvert invert at the outlet to the water surface in the outlet channel.The relationship of HW to the other terms in equation 3 is illustrated in Figure 3.4.10. f-------=-------- HW J L ----------- Figure 3.4.10 CULVERT OUTLET SUBMERGED 3-38 If the tailwater elevation is below the top of the culvert opening at the outlet,Sections B, C and D of Figure 3.4.8,h o is more difficult to de- termine.The discharge,size and shape of culvert,and the TW must be con- sidered.In these cases,h is the greater of two values (1)TW depth asa defined above or (2)(de +D)e-2.The latter dimension is the distance to the equivalent hydraulic grade line discussed previously.In this frac- tion d c is the critical depth,as read from Charts 15 through 20 and D is the culvert height.The value of d can never exceed D,making the upperc limit of this fraction equal to D.Where TW is the greater of these two values,critical depth is submerged sufficiently to make TW effective in increasing the headwater.The sketch in Figure 3.4.11 shows the terms of equation 3 for this low tailwater condition.Figure 3.4.11 is drawn similar to Section C of Figure 3.4.8,but a change in discharge can change the water surface profile to that of Section B or D. LSo L-------- de +0--or2 Figure 3.4.11 CULVERT OUTLET LOW TAILWATER 3.4.3.6 Computing Depth of Tailwater.In culverts flowing with outlet con- trol,tailwater can be an important factor in computing both the headwater depth and the hydraulic capacity of a culvert.Thus,in many culvert de- signs,it becomes necessary to determine tailwater depth in the outlet chan- nel. 3-39 30221/2 840922 Much enginering judgment and experience is needed to evaluate possible tail- water conditions during floods.As has been mentioned previously,a field inspection should be made to check on downstream controls and to determine water stages.Often times tailwater is controlled by a downstream obstruc- tion or by water stages in another stream.Fortunately,most natural chan- nels are wide compared to the culvert and the depth of water in the natural channel is considerably less than critical depth,thus the tailwater ~s ~n­ effective and channel depth computations are not always warranted. An approximation of the depth of flow in a natural stream (outlet channel) can be made by using Manning's formula if the channel is reasonably uniform in cross section,slope and roughness.Values of n for natural streams for use in Manning's have been presented in Tables 3.4.1 and 3.4.2.If the water surface in the outlet channel is established by downstream controls, other means must be found to determine the tailwater elevation.Sometimes this necessitates a study of the stage-discharge relationship of another stream into which the stream in question flows or the utilization of data on reservoir elevations if one of the dams is involved. 3.4.3.7 Velocity of Culvert Flow.A culvert,because of its hydraulic cha- racteristics,increases the velocity of flow over that in the natural chan- nel.High velocities are most damaging just downstream from the culvert - outlet and the erosion potential at this point is a feature to be considered in culvert design. Energy dissipators for channel flow have been investigated in the laboratory and many have been constructed,especially in irrigation channels.Designs for highway use have been developed and constructed at culvert outlets.All energy dissipators add to the cost of a culvert,therefore,they should be used only to prevent or to correct a serious erosion problem (see Reference 5). 3-40 The judgment of engineers working in the particular area 1S required to determine the need for energy dissipators at culvert outlets.As an aid 1n evaluating this need,culvert outlet velocities should be computed.These computed velocities can be compared with outlet velocities of alternate culvert designs,existing culverts in the area,or the natural stream velocities.In many streams the maximum velocity t n the main channel is considerably higher than the mean velocity for the whole channel cross- section.Culvert outlet velocities should be compared with maximum stream velocities in determining the need for channel protection.A change in will of culvert does not change outlet velocities appreciably 1n most cases. Outlet velocities for culverts flowing with inlet control may be approxi- mated by computing the mean velocity for the culvert cross section using Manning's formula: v =1.49 R2/3 So1/2 n Since the depth of flow 1S not known,the use of tables or charts is recom- mended in solving this equation.ll .The outlet velocity as computed by this method will usually be high because the normal depth,assumed in using Manning's formula is seldom reached in the relatively short length of the average cu I vert.Also,the shape of the outle t channel,including aprons and wingwalls,have mucn to do with changing the velocity occuring at the end of the culvert barrel.Tailwater 1S not considered effective 1n reducing outlet velocities for most inlet control conditions. In outlet control,the average outlet velocity will be the discharge divided by the cros-sectional area of flow at the outlet.This flow area can be either that corresponding to critical depth,tailwater depth (if below the crown of the culvert)or the net cross section of the culvert barrel. 31 See References. 30221/2 3-41 840922 30221/2 840922 3.4.3.8 Inlets and Culvert Capacity.Inlet shape,edge geometry and skew of the entrance affects culvert capacity.Both the shape and edge geometry have been investigated by recent research but the effect of skew for various flow conditions has not been examined.Results show that the inlet edge geometry is particularly important to culvet performance in inlet-control flow.A comparison of several types of commonly used inlets can be made by referring to Charts 2 and 5.The type of inlet has some effect on capacity in outlet control but generally the edge geometry is less important than in inlet control. As shown by the inlet control nomograph on Chart 5,the capacity of a thin edge projecting metal pipe can be increased by incorporating the thin edge in a headwall.The capacity of the same thin edged pipe can be further in- creased if the entrance is rounded,bevelled or tapered by the addition of an attachment or the building of these shapes into a headwall.A sketch on the nomograph,Chart 7 shows the dimensions of two possible bevels.Al- though nomographs have not been prepared for other barrel shapes,the capa- city of box culverts can be increased at little cost by incorporating a bevel into the headwall.In computing headwater depths for outlet control, when the above bevel is used,ke equals 0.25 for corrugated me tal barrels and 0.2 for concrete barrels. 3-42 DRAINAGE STRUCTURE DESIGN DATA SHEET 1 Location:Township -------- Section Range Meridian -------- Project Feature:(Project access road,material site access road,etc.) Station: Type of Water Course User Fish Group (A &B Type Watercourse only) A I B II C III IV Drainage Area:acres years Gradient Q2:cfs Frequency of Qdesign: Watercourse Area for Q2: Watercourse depth of flow for Q2: Qdesign:cfs---------- ft/ft ft Classify channel substate: Channel configuration:Braided Other:(describe) Meandering Straigh t Culvert Type:Other Size: Slope: V,Q2: HW/D,Q2: ft/ft ft/sec %----------- Length: V,Qdesign: HW/D Qdesign: ft ft/sec % 30221/2 840922 Attested to by: Fisheries Biologist A849/DATA-SH.l 3-43 D~sign Engineer PROJECT:_ HVDRJLOGIC AKJ CHANNEL INFORMATIOO DESIGNER:_ DATE: SKETCH STATION:_ Q I ----~=---- TWI =----TW2 =--- EL. .r _L-----:--__"'-1--L ~~ ' so·tEL.__L .--I-ELo_7 ALLOWABLE OUTLET VEl.OCITY = TW_ HEADWATER COMPUTATION CULVERT DESCRIPTION (ENTRANCE TYPE a INLET CONf. .!:!.!et.HW D OUTLET CONTROL H d d .0 Ke c + HW-H ..."0 -LS o TW h o Llu HW 1->",I- .J- I-u ;:)0 0';: > COST COMMENTS 7{1-------I---4--+---1---4--4-4--1f---+---+---1--I--+--+-__I---+-------Ic l ~... SUMMARY a.RECOMMENDATIONS: Drainage Structure Design Data Sheet 2 3-44 3.4.3.9 Procedure for Selectin of Culvert Size Step 1:List design data.Drainage Structure Design Data Sheets 1 and 2 are provided for this. a.Design discharge Q,1n cfs.,for required periods (i.e.Q2S or QSO etc). b.Approximate length L of culvert,1n feet. c.Slope of culvert.(If grade 1S given 1n percent,convert to slope 1n ft.per ft.). d.Allowable headwater depth,in feet,which is the vertical distance from the culvert invert (flow line)at the entrance to the water surface elevation permissible in the headwater pool or approach channel upstream from the culvert. e.Mean and maX1mum flood velocities 1n natural stream. f.Type of culvert for first trial selection,including barrel material,barrel cross-sectional shape and entrance type. Step 2:Determine the first trial S1ze culvert. Since the procedure given 1S one of trial and error,the intitial trial size can be determined in several ways: 30221/2 840922 a.By arbitrary selection. 3-4S b.By using an approximating equation such as to =A from which the trial culvert dimensions are determined. c.By using inlet control nomographs (Charts 1-7)for the HWculverttypeselected.If this method ~s used,an D Z~ must be assumed,say D :1.5,and the given Q,a trial size ~s determined. If any trial s~ze ~s too large in dimension of limited height of embankment or availability of size,multiple culverts may be sued by dividing the discharge equally between the number of barrels used.Raising the embankment height or the use of pipe arch and box culverts with width greater than height should be considered. Final selection should be based on an economic analysis. Step 3:Find headwater depth for trial size culvert. a.Assuming INLET CONTROL (1)Using the trial size from step 2,find the headwater depth HW by use of the appropriate inlet control nomograph (Charts 1-7).Tailwater TW conditions are to be neglected in this determination.HW in this case ~s found by multiplying ~obtained from the nomographs by the height of culvert D. 30221/2 840922 (2)If HW ~s greater of less than allowable,try another trial size until HW is acceptable for inlet control before computing HW for outlet control. 3-46 b.ASSUMING OUTLET CONTROL (1)Approximate the depth of tailwater TW,in feet,above the invert at the outlet for the design flood condition in the outlet channel.(See general discussion on tailwater,3.4.3.6). (2)For tailwater TW elevation equal to or greater than the top of the culvert at the outlet set h o equal to TW and find HW by the following equation (equation 3). where HW =vertical distance ~n feet from culvert invert (flow line)at entrance to the pool surface. R =head loss in feet as determined from the appropriate nomograph (Charts 8-14). h =vertical distance in feet from culvert invert at outlet to the hydraulic grade line (In this case h o equals TW,measured in feet above the culbert invert). So =slope of barrel in ft./ft. L =culvert length in ft. (3)For tailwater TW elevations less than the top of the culvert at the outlet,find headwater RW by equation 3 as in b (2)above except that h =o 2 or TW,whichever 1S the greater. 30221/2 840922 3-47 30221/2 840922 where d c =critical depth in ft.(Charts 15 through 20 Note: d c cannot exceed D D =height of culvert opening in ft. Note:Headwater depth determined in b (3)becomes increasingly less accurate as the headwater computed by this method 2v-falls below the value D +(1 +K e)2g- .(See discussions under 3.4.3.5 Culvert Flowing Full with Outlet Control. c.Compare the headwaters found in Step 3a and Step 3b (Inlet Control and Outlet Control).The higher headwater governs and indicates the flow control existing under the given conditions for the trial si~e selected. d.If outlet control governs and the HW is higher than is acceptable,select a larger trial size and find HW as instructed under Step 3b.(Inlet control need not be checked, since the smaller size was satisfactory for this control as described under Step 3a). Step 4:Try a culvert of another type or shape and determine s~ze and HW by the above procedure. Step 5:Compute outlet velocities for s~ze and types to be considered ~n selection and determine need for channel protection. a.If outlet control governs in Step 3c above,outlet velocity equals to'where A=/Zo ~s the cross-sectional area of 3-48 30221/2 840922 flow 1n the culvert barrel at the outlet.If d c or TW 1S less than the height of the culvert barrel use Ao corresponding to d c or TW depth,whichever gives the greater area of flow.Ao should not exceed the total cross- sectional area A of the culvert barrel. b.If inlet control governs 1n step 3c,outlet velocity can be assumed to equal mean velocity in open-channel flow in the barrel as computed by Manning's equation for the rate of flow, barrel size,roughness and slope of culvert selected. Note:Charts and tables are helpful in computing outlet velocities.(See References) Step 6:Record final selection of culvert with size,type,required head- water,outlet velocity,and economic justification. 3-49 3.4.3.10 Inlet-Control Nomographs Charts 1 through 7 Instructions for Use 1.To determine Headwater (HW),given Q,and size and type of culvert. a.Connect with a straightedge the given culvert diameter or height (D) and the discharge Q,or ~for box culverts;mark ZW intersection of straightedge on ~scale marked (1). H~ b.If D scale marked (1)represents entrance type used,read Dn gz~ o scale (1).If another of the three entrance types listed on the nomograph is used,extend the point of intersection in (a) horizontally to scale (2)or (3)and read D. Compute HW by ZHZW multiplying D by D. 2.To determine discharge (Q)per barrel given HW,and s~ze and type of culvert. HWa.Compute o-for given conditions b.HWLocaten-0n scale for appropriate entrance type,If scale (2) 30221/2 840922 HW..(2)or (3)is used,extend o-po~nt hor~zontally to scale (1). HWc.Connect point on n-scale (1)as found ~n (b)above and the size of culvert on the left scale.Read Q or %on the discharge scale. HW d.If a-is read ~n (c)multiply by B (span of culvert)to find Q. 3-50 3.To determine culvert size,given Q,allowable HW and type of culvert. a.!£ii.Using a trial size,compute HWb.Locate n-0n scale for appropriate entrance type.If scale (2) or (3)is used,extend ~int horizontally to scale (1). c.Connect point on ~ale (1)as found in (b)above to given discharge and read diameter,height or size of culvert required for HW D value. d.If D is not originally assumed,repeat procedure with a new D. 30221/2 3-51 840922 FOR WITH CHART r 12 600 (I)(2)(3)II 500 EXAMPLE 8 9 10 10 400 5'12'eoa 0.75 ct.7 8 0/8 •15 ctt/fI.7 8679300,/ll.t -MW 60-'••t 5 6(t)1.7'3.5 5 8 200 (2)1.90 3.8 4 5 (3)2.05 4.1 4 4 7 3 3 3I-10060 0 QIl.80 2--......a::~2IIJ=.Q.60 2 S <II /1-Il.50 /'~1.5o I-~40 /IIJ 1.5IIJ:x:1.5IIJ "'/Il.CD Il. ~4 <,30 p-O2--.*",1-(/'I§:x:,,7 ~l- X 0 20/a:: 0 IIJ 1.0 CD ~I- 0 ZIl.1.0 100I-.9 3 /IIJ .."...~:x:l-I-:x:/'"".IRq_.O Q. ""a::10 F'lar.--...IIJ .8 .9 9 IIJ -:ct 0:x::x:-:o 8 a:: <II IIJ 8 ..J'-:Q .....7 -4-:Il.6 ~ 0 0-:5 .!:!.!.scs LE WINGWALL 4 .7 10IIJ~I-4 0 FLARE :x:.6 4a::(I)30·'0 1'- 3 (2)90·on4 15·.6 "6 (Jl O·(1II,nllon,-.5 2 ot l,di.l) .5 r."••Ical,(2)or (3)O',oj.e, "0'1'0".1'"fa leI',(I).,1\,,, 10111 ,'rolCaf'l'InClln.ct 1:1",rhrOUQn .4 o anCi Q Icot ••.Ot "W,tI,QS ill".t'OU4. .8 .4 4 .6 .5 .30 35 35 HEADWATER DEPTH 80X-CULVERTS I NLET CONTROL 3-52 1M 10,000 CHART 2 I"1,000 EXAMPLE (I)(3) 15.',000 0-41 I......(3.S ,.... 144 5,000 Q-120 aft L 132 4,000 y.-HW 5.,... 3,000 (II 1.5 I.' 120 4. 2,000 (II t.1 1.4 loe (31 t.1 1.1 4. '0 I_,...3. 9&1,000 3. 800 84 600 ,/'/ ·2.2:- 500 //72 400 2. en l.&.I 300 9"V %~~(,) 1.5 1.5 !en /en &0 II.200 / a:: z o l.&.I 1.5 !/ ....-l.&.I e 54 ~/2<....s a::/~100 l.&.I 48 !>./'a::80 ...I ./"<::) % (,)~2 ~60 I-a.~J \.0 II.en 50 ~ 0 0 HW ENTRANCE 0 a::40 o SCALE TYPE a::1.0 l.&.I 3& uJ I-30 .....9 .9 lIJ III Sq"art -.19'.lth C 2 33 h,a4.all 3t .9 <0 a 20 (2'G,oo••'''0 .,t"< 30 hea4 ••11 lIJ J:.E!a (3'G,oo...n4 .8 21 ptOl'Cli". 10 24 8 .7 .7 .7- 6 To u"Icol'(2'0'(3)pto,IC! 21 5 hot llOnl ally to scol'(I).tI.... 4 uti It,ol9h!i"clt",4 Ii",tMou9h o 0"4 Q Ical ...O'''''t It ~..6 3 II,,,.'tOU4..6 18 .6 2 1.0 .5 .5 .5 12 HEAQWATER SCALES 2 t13 REVISED MAY 1964 HEADWATER DEPTH FOR CONCRETE PIPE CULVERTS WITH INLET CONTROL 3-53 CHART 3 151 I If 3000 EXAMPLE SiI,;re"...1" Q.500 ctt (2) 13el I.,2000 (3) ..t:\1*'HW 0 (f ...)( I ) 40 121 a 71 (II Z.I 11.11. (2)Z.2 1.1 4.0 3.0 113 a12 (~)Z.~t.Z 3.0 "'0 i"f.,t 3~loeael ...---2.0 91 a 83 --2.0 fo...--- 91a 51 400 .->1.~""2.0--1.500Q 1.5 83a 53 --)---1.5...-200 :z: Z .... To u...eol.(Zl "'(~I tJ)...._•""it/t'11ft,ac:4-en i:I&.100 tlltevtft .,,_'0"'''I&.0 of ....011"'itc""9'0 ..I !80 ••iftf.,••ct Icof.(I ) . 1.0 1.0•tJ) >-F,_poi,,,011 ••'""(II :I 0 eo a38 2-60 ....j ..,"....0111111'It ac:.9 .9 I&.........."....011 •••".,ICO".....9 0 "50 (21 or (~l.t--ac:z•40 ,....53134 .8 ~ II):z::z: ac:0 30 t-Il) JC 49 a32 Q 4-.... Z 0 .1 .7•20 .7 4-45129 ac: II) HW/O .....-ENTRANCE ~.... N 42127 SCALE TYPE •.8 Cu;0 6 10 (I)Squo,."9'.""•.... 38124 8 n•••waU :z: (21 Groo...._..," 8 ...0 ...11 5 5 (3)(jto.....ncs 5 4 OtO,ICltll4 30119 3 .4 .4 4 2 8 1 S 0 1.0 _1 23114 HEADWATER DEPTH FOR OVAL CONCRETE PIPE CULVERTS LONG AXIS H'ORIZONTAL WITH INLET CONTROL IUll(AU OJ'IOIJIC.IC ~I JAN.1M3 3-54 \.0 14a23 CHART 4 '711 IS' '000 4000 EXAMPLE (2)1711136 (3) 3000 s"•.s.·I 10·6 Q.200 eft (I)6 5 11lL12\2000 ?HW 5 ('''')6 .. 12 lL 113 5 .. III 21 IS 0 (I)20 '00 368lL106..1000 (3)21 10 S 3_ 63 1'8 800 it 0 ito '••t 3 600 ./'-......2--258a91/"-500 ./"Q I/)400 ./"...2w53a83~...,~J:1.5-J:~1.5 C,)300 ./"!.---w 48a16 -ZOO !!i.5 !.---II: W ---I/)To w..ac.l.(21 0'lSI ~ea.43lL 68 ./"~4'...tttal9ftt "".0 i:./"C,).",........ft •.,.veh,••I/)..../"Z .f "10 .'u,d'ieft.',•2..-/10O II:1.0 1.0•»>(;to ,,,,,,,,c,Ic.l.(I).>~8.60 ,,_",to'Oft ,eel.II)W 0 -80 l- ~W .",.C,hOIl"""'"to !9 9 0 <:)60 .O....hOft Oft .,.".,Ie aMa::t2l 01(3)•50 8 pw34a53J: !!C,)40a::I/) JC 32.49 a 30 .1 1 Z HW!O ENTRANCE II:w•29a 45 SCAL.E TYPE l-ea.20 ceI/)~-6 .6_I.I,j (I)SCI"."let,.w.,ft Q N 27 I 42 h......u • \I)I.W 121 Grone .".w""J: 10 ".Od..... 24.38 8 (S)Gtoove ."..5 .5 'f"II'''''' 6 5.. 19.30 4 4 3 2 HEADWATER DEPTH FOR OVAL CONCRETE PIPE CULVERTS LONG AXIS VERTICAL WITH INLET CONTROL 3-55 CHART 5 <lOT '0,000 ( I) 'SI 8,000 EXAMPLE 6,000 0.36 i.chel (3.0 I.et)6. (2) 1~6 5,000 Q.I'eft (3) \44 4,000 5.6. I ttw'ttW 132 3,000 T (I.."6. 2 ~..:_-- (I)1.1 5.4 4.--- <,) 120 2,000 (21 2. I 1.3 5......4. c (31 2.2 6.6 108 ...Ia.3.4. ...I '011'1 hit C 96 a:\,000 3.:l...3-o 800:la:... 84 '"600 2. I 500 400 /'--..,. I 2.'272/'/(/'I I 300 <3 I.IJ j:::I (/'I /' 1.5 o ::: ~--l \0.~....<r../(,) 60 (/'I 1.5 1.5 ~~<r..;."y a: ,,/I.IJ §54 ~to-w to-W ~ a:\:l e:t I.IJ 48 a:0 >e:t ...l :::Z ::l /~1.0o:::I'; ~ 42 ./"0 ,.. c, 0 /w .10 . a::a .9 .§ I.IJ 36 HW ENTRANCEto-SCA ..E I.IJ 0 TYPE .... to-.~ ~33 e:t e:t :1)"tad_(UI ~.8 .8 0 a 30 121 -..it."c2 to c~nforrn e:t $ UJ atoIIQIU:r <.> Q 27 10 (3)P'OI'~"I'IQ a:.7 .7 c 8Q ;Z -24 .7::6 <II 5 To uti Ical,(2)or (31 CHOI'C: 2\4 hOllzon'aUy to leol,(I),thin 6 1&",'rait'".ncllnld lin,fhrQuqft .6 3 o .1nd Q ICOl.l,or r,.",..01 6 18 illus,rat.d. 2 l~ _.-'.'3-... .5 1.0 5 12 HEADWATER DEPTH FOR C.M.PIPE CULVERTS WITH INLET CONTROL 9URE Au OF Pvlll.IC ROAO'JAN 1963 3-56 CHART 6 .35 (I) .-4 (2)-jr------4'--'l3l r-s r 4 3-F-t 2 I-2 1.5 1.5 ~1.5 .AI ------ a 1.0 1.0~1.0:.i-.t ., 1M CIt .s.,ar:I-.•~•• lit ••2ar:I-.11M .1t- Z .7- %: t-a-••.11M Q ••ar: i Q«.51M .5 .52: I-••.4 .4 .35 .35 1-1-1rn HEADWATER DEPTH FOR C. M.PIPE-ARCH CULVERTS WITH I NLET CONTROL 1.0 •• I.", II· s.eee J '..·.,..10'·'·4,000 la'·4·."-S·5,000 EX.....PLE SI••:31'.u· Z,OOO O.to .f.•'1'-!d.I'-.· !U U'N_ I)'....,15 ...II'·S",1'·5·a~(II 1.10 1.0I;'1.000 (II 1.1t 1.1 100 131 1.11 ••2 .~,•••••"-S"100 wI)I.f ...,~SOO~...S"Z",S'·,"400en 1.300 1"0",S'-I" 200 1'-,·,4'-1·~ar:"~./,,/1M 72",4."C/)100 ,/a-li.a:~10 ,/ !",/II..5",40"+''70-10 "io~g 50 /'1M 1M ,/C/)5.",3.·i:'"40 ,/ar:,/..~./2:50 ,/z ~ ~50"'31"C/),/a-a io~ 1M ./'-?SCALE ENTR"'NCE N 43"'21"TV'I;;,/ /"III .......H ./10a./'III ..It......_f... I,),/•te Me,. Q /3.",2a·I."""'1"a:•c Q 5zc..4<It T...._I.Itl ..(SI "'1...2,""r s ....'.....11' ,••••,.(II,,... ........,11' I..UaM II ...tlt..... I)'"0 •••,••,..r ........ Z5",I'·I III...,.,... ••.S ..AOOfTIOMA1.!lUI NOT OIMDISlONm &filE L.IITID I"'A.AlCATQft'.CA1*.~ 3-57 CHART 7 .6 .1 .6 .1 A • 3.6 3.0 3.0 Q•2.0 : Z.O ;; /I: 1M...w 1.5:I 1,5 ca z : ~ Q" ""0 II: ""~..1.01.0 !cw:.9~-- •.8 ••t t •I.'••••n ... 0...1 o.4MJ 0.'"00"•....0.III 0.041 0.Itt • IIVILU.............u.JOO· ---l1."~'---~----o 2000 1000 100 600 500 400 300 '10I. 15. I." 131 120 101 9. 8. 11 In W:uz 60 ! S 54 ~ II:4'w ~ ;:) U...41 0 II: W ~36w :Ic 332i ~- 21 24 II II 15 It HEADWATER DEPTH FOR CIRCULAR PIPE CULVERTS WITH BEVELLED RING INLET CONTROL 3-58 3.4.3.11 Outlet -Control Nomographs Charts 8 through 14 Instruction for Use Outlet control nomographs solve equation 2,paragraph 3.4.3.5,for head H when the culvert barrel flows full for its entire length.They are also used to determine head H for some part-full flow conditions with outlet control.These nomographs do not give a complete solution for finding headwater HW,since they only give H in equation 3,HW =H+h o - LSo• (See discussion for 3.4.3.5 Culverts Flowing with Outlet Control). 1.To determine head H for a given culvert and discharge Q. a.Locate appropriate nomograph for type of culvert selected.Find k e for entrance type in Table 3.4.4. b.Begin nomograph solution by locating starting point on length scale.To locate the proper starting point on the length scales follow instructions below: (1)If the n value of the nomograph corresponds to that of the culvert being used,select the length curve for the proper k e and locate the starting point at the given culvert length.If a k e curve is not shown for the selected k e, see (2)below.If the n value for the culvert selected differs from that of the nomograph,see (3)below. (2)For the n of the nomograph and a k e intermediate between the scales given,connect the given length on adjacent scales by a straight line and select a point on this line spaced between the two charts in proportion to the k e values. 30221/2 3-59 840922 (3)For a di fferent roughness coefficient n l than that of the chart n,use the length scales shown with an adjusted length Ll•calculated by the formula See instruction 2 for n values. c.Using a straightedge,connect point on length scale to size of culvert barrel and mark the point of cr os s i ng on the "turning line."See instruction 3 below for size considerations for rectangular box culvert. d.pivot the straightedgeon this point on the turning line and connect given discharge rate.Read head in feet on the head (H)scale. For values beyond the limit of the chart scales,find H by solving eq uation 2. 2.Values of n for commonly used culvert materials. Concrete 30221/3 840922 Pipe 0.012 Boxes 0.012 3-60 30221/2 840922 Corrugated Metal Small Medium large Corrugations Corrugations Corrugations (2 2/3"x 1/2")(311 xI")(6"X 2") Unpaved 0.024 0.027 Varies* 25%paved 0.021 0.023 0.026 Fully paved 0.012 0.012 0.012 *Variation in n with diameter shown on charts.The various n values have been incorporated into the nomographs and no adjustment for culvert length is required as instructed in Ib (3). 3.To use the box culvert nomograph,chart 8,for full-flow for other than square boxes. a.Compute cross-sectional area of the rectanglar box. b.Connect proper point (see instruction 1)on length scale to barrel area ~/and mark point on turning line. c.pivot the straightedge on this point on the turning line and connect given discharge rate.Read head in feet on the head (H) scale. ~/The area scale on the nomograph is calculated for barrel cross-sections with span B twice the height D;its close correspondence with area of squart boxes assures it may be used for all sections intermediate between square and B =2D or B =1/2D.For other box proportions use equation 2 for more accurate results. 3-61 I ! ~ ~ i\,. o..o.. ...... "..t DISCHARGE tQ) IN CFS I vr I I I I""1 1 ' 1'1 '1"1 I I iii I','1'1"i i iil""1 i'111""1 iii 1'1'1'1"i'"Iillil i i "1""1'I ulGl.O N U'4IoUOGO GOo N C>I 4IoUOGO.-N "'.1 o 0 0\0 0 0 0 g g g g g s g s g s o 0 0 0ItDIMENSION OF SQUARE 80X IN FEET o ~t:0 N N 1)(U')(.uo GO "".oQ)()()(N )(11')()()()()()C __N\U.C>I UO.UO GO ...,.oQO .. I I I 1 I I I I I 1 I If\'1'1 I I I I Ii,I I Vii"'I,'I I Iii I I I I •UO\cJl •0 N C>I.UO GO •0~000000 0~"\"~REA Of RECTANGULAR 80X IN SQUARE FEET TUIU....,L.IIl---------- Iii I ,I 'iii J iii I ' I i I I I I I'" I I , ,'T'-'"T"• , I I"I I I'I • I ~0.GOUO.U'N bGt iJlUO:" F ,.- o % J>:u -I c» x ~•• "'•~r: ~ 'I i Io I IL~:a: s :1;1 ~~~I ~~nJIF...• < •r'"1r~ Ii' h i:::1:i il i etJt, IIIx• ~ .""....._""•••.0 .0_0'"~'" So "- +"t ~ ~..., ~ 't.'- 'b +' ~~ 'p~:.\ ""\ •HEAD (H)IN FEET \\ \\ \\\ \,..\ \i ~V. ..•'f-.\~o~ \\<"0 \ .t \0 w 'b \ 00 "0o \ oozo ::0 "1"1 ....-t:J: 01"11"1::J~ II -I»ZCD O°GlOoX" -"0l\leO::O....err< 1"1 ::0 -t (J) w I '"N CHART 9 '0'Qu"a.eroWft 'tot Il.Ibm."e4,com,,,t ....w by ""'fMOI dnCtlM.1ft '...d"I9ft ptoc.4ute 20 6 6 8 4 10 6 .5 -:i ··10 /g -+=1: SlOp.50-~ OuTL£T CUl.v£IIT FLOWII<G FVI.L ·MW.tot."0-\..50 ""-.-,0o~ ~ 5ue.,£/lG£O .,0 ,\.._110_ ---~~00." 2000 1000 800 120 600 106 500 96 400 64 JOO 72 66 200 60 U') U.54o ~U') uJ ::J: 0 '"-100 Z uJ ~;42 I.:la:8 - ~.;:)::J:J6 '"-60U')a:J3uJ Q 50 l-.....JO 40 :! <l 0 21 30 24 20 21 18 10 15 8 6 ,2 5 4 aUlllAU 01 _I.IC ~.os ,.1<.963 HEAD FOR CONCRETE -PIPE CULVERTS FLOWING FULL n :0.0 12 3-63 ... CHART 10 2000 '01'ClYlfe'era..."0'w."'.,...._COM,v'e H.by ........dHCltM4f ...'....".'9"","OC••..,. --- 4 8 9 10 t o.• 0.5 06 0.7 0.8 0.9 1.0 -%:-Q C "'"%: .'0 7 ~••Q~.,0 ~•·0.~ 510'.50- SUIM(ItGlO OuTLET CULV(liT FLOWING FVLL Jo4W."'.1\0-\.$0 ~3. 0"1""8'0'"Of'!..,.Icole 0" ot_.nd for IOft9 al.e l'lo'I,Oftfol .,,"oUO"O"Th"tfto",ld b. r~.".4 fot lon,:1111 ..."hcol ---------- 1000 800 151.97 800 138.87 500 121.71 400 113.72 10•••• 300 98.83 91.58 200 (I)83.53 lU (I)%:78.4.II.(,) (,)~ Z ~sa.43.--..i'!.l.9.0 --_lU &0-38 lU 100 !:!?--I:l Ill:--Ill:80 53134C•~;;%:Z(,)C(I) &0 CI.Q (I)45129-SO lU 42127N U; 40 38124 30 30 I \~ 20 23.14 10 20 8 HEAD FOR OVAL CONCRETE PIPE CULVERTS LONG AXIS HORIZONTAL OR VERTICAL FLOWING FULL IVII£AU OF "VILle "0.605 .4".19413 n •0.012 3-64 CHART II 2000 '0'0",11"ero..,""........,•••,c:oift ...',11'11 ty "",trloda ~"Cfl".IIfII 1M ca••,t"~OC'dwe SIO".50- SU."EI'GlD OUTl.ET CU\.VE I'T FLOWING FUl.l. HW.H+1\0-\,.5. 20 8 6 4 10 2 LO .4 i "0 !HW1000 800 600 120 500 108 400 96 300 84 200 12 U 60 III \I,.54o ~100 III \0.1 48:z: 0 80 <.,)-~ \0.1 42 <.:)60 ~ cz:50 0~36:z:-o 40 cz:III 33 Q Q.35 \0.1 ----~ 30 \0.1 304 'l.1:I ~..-f1Q 20 24 21 10 18 8 6 15 5 4 12 3 2 HEAD FOR STANDARD C.M.PIPE CULVERTS FLOWING FULL n·0.024 3-65 L CHART 12 6 Fo,oull,t crow"ItOt ",tlm,rqlct,comout.HW 'by 1'M'~d.dnCtlMd Ii1 1"4 4.I.q"1)(0c.du,1 -. 5 6 I- u.I 1 u.I I&.8 ~9 :r.:- 10 .- 7 1 8 -9 10 Slap.so .... SUIIII("GlO oun.er CUI.V£llr f\'ow.NG FUll w..-,.M~1\0-1-50 300 200 '"!... :It :It IE oJ:l.. 100 90 80 10 12"X ••" 60 6~"X 40" ~O J:o ~X36"a: c( In 40 • S,~~ I&.Q";7Q~(.,)--a::~0":'(31" ~30 I&. (5 0 .....43"X21"u.I u.I Cl In a:a:c(20 J:)( o ZIn 0 ~36"X 22" In u.I N In 10 29"XIe" 9 8 25"XI6" 1 6 5 4 IlUll(AU Of ~u8llC llOAO!l JAN 1963 HEAD FOR STANDARD C.M.Pt-PE-ARCH CULVERTS FLOWING FULL n =0.024 3-66 CHART 13 F.....'let cro_...t c....,.".w..,Ily ""ft.~._1_'"tftO ~proc_to 2 4 6 15 1 8 9 10 20 I:: I Q 4.... o+.'~",.p o.", q,g ~o ~f::'--;::OY,0 ... J... 5000 4000 3000 180 168 2000 154 144 I;f)....::132Q ~ 1000 ~120 I 114 800 Q 108 I;f)700 II:......102QI- 600 .... ~:I 96.. 0 !l00 Q 90 I.....oJ <:)400 ..84a::Z --..:I::78Q0 »>I;f)z Q 300 2 66 200 leo 100 30 Di.",.ft "0.0321 7'0.0320 10'0.0311 I"0.0302 40 50 HEAD FOR STRUCTURAL PLATE CORR.METAL PIPE CULVERTS FLOWiNG FULL n·0.0328 TO 0,0302 3-67 f '000 2000 CHART 14 .IT ~:-1=: Slope 50- SU8Mt:"G(O OUTLET CULYE"T FLOWI~G FULL HW_H""o"L.So '01 outl,t era ..""ot ,ubm"9Id,compute HW by meU'OCiI <t"CtlHd 1ft ,,,_cS"14ft procldu,. < 16.6 I 10.1 -to (C'1-:O~;,,0 G'-\ 1000 ->.'<Z I- 1~.3 I 9.2 LoJ (00 '" LoJ 2 I-o'~1.1. 800 lW =lW '9"~,\I 1.1.12.9 I 8.3 ,0 ~,,00 J: = I 0 600 J: ~:3lW (Il o ::I: 1.1.a: .</\~'\o !l00 ~I 1.4 I 1.2•=lW I CL \,..\1'Z.V ,,-00 \\.~4 0 400 a: I y/\'lW 1.1.9.5 I 6.4 ....0.,\ <:J 0 s a:-.y c \'\-~lW f)..,r-,.l"'\ J:300 ~10',}'I r 't 1\00 o a:8.~I Ex ...."LE ~\-\6 (Il 5.8 '. 0 -'"Q.280 C~Io4t 6 I J:'T <loOO -\\\z /,'r t.~•\.. f/l '!l00 j 8 200 .....1.0 I 5 IlW 9 ~ (Il 10 6 I I 46 Sir. 6.1 .4.6 0,032 '...•.1 I '.8 0.0321 z 11417.2 0.031 ,15::i 16.6110.1 0.0308 100 20 HEAD FOR STRUCTURAL PLATE CORRUGATED METAL 50 PIPE ARCH CULVERTS 18 IN.CORNER RADIUS FLOW-ING FULL n=0.0327 TO 0.0306 3-68 CHART 15 .~ ----- ~ :..---,I........ /"" .-.-V I ;- I ~....CRITICAL DEPTH -I ./_-l---!__!:I i/RECT~N6\JLAR StC7~ON /!I I I I I ..-t--l.._+-_.- i i I ' 4 .... u.3 z-u 2 '"0 o o 10 20 40 50 r--.-'."'---~---1 ,--------- :q!N C.F.S.!I !I I I 1 i i I 1 1 I ! \I i ;;I I / I Ii ,/!'. I :I !V II I I I ~'I I --!~.! :;I........I..........._- I I !I !I I i 1 !I I I I I !I II 1 I ! i I i i ~iI :I I I I1!I i !I I I I : I i !i I :! I !i I i I i ;i !! I I i I I Ii I i I I I I i i i :i I : i )I I ) 16 15 i !I i i 14 1 l-I I u., Z 10 u "0 9 e 7 6 e 3002150- I i I I ,:';! 150100 de C~NNOT EXCEED 0 4 --..""O-"""-~-.l.-.l."'--I--'---_-....__ 50 -NOTE· 8UA[AU OF PUBLIC qoAOS ......1963 3-69 CHART 16 2 ~I i-~" ......:~3,~ EXCEED TOP OF PI PE iA~de CANNOT ~~2,O II.~ 61,0'01 •• I 10 20 30 40 50 60 DISCHARGE - Q- CFS 70 80 90 100 i I I ~!I i I ! , I I IIi ,i ---I I i ~~: ,i i ~!I I, ~~l/~~I !~r IiI ~~V ~~I-+I ,~~-.g,y-7'1 i i !Ii, :/~i8'i I I I I I/h I de CANNOT EXCEED ToP OF PIPE id :Y~7'I I I I I I I I i-6'I i :!i I ~~,i ,,!i !I ! I "rI:,I i'OIA.I I !I 6 I- LIJ LIJ l.I. 'u 4 ~, 1: I- Q.3 LIJ Q ...J q: u 2 I-0 a:o 100 200 300 400 ~~0 600 DISCHhRGE'Q -CFS 700 800 900 8 7 I- I.IJ 6~, 1: ~.... •Q. I.IJo ...Jq: 1000 ::: I- er '.J 14,..----.....--------..,-----.,..-....--....------,--,---....---.,....-....----, 400030002000 DISCH ARGE·Q.CFS +--+-"""7""'~.--r-----"----l-~.-~---I--_-; i 'OCO 8 r--+---~-+--r-_t"7?"'b-'''::>_'"'--------+--- I 6 t---t--+-~>4'_-F--'-"l--.........--+--_+_-r--_+-..,.._-dc CANNOT EXCEE 0 TOP OF P.:..;IP~E'-i'--l I I I I 2 r---r-----_+-+---+-.........--!--!------+---- r-----------+-1-..,..---+..------- BUREAU OF PI.;8LIC ROADS JAN.i964 CRITICAL DE PTH CIRCULAR PIPE 3-70 CHART 17 18016014080100120 DISCHARGE-Q-CFS 604020 ~ ~~I ~P" ..". .-'~.,...,, ",V !, .A , #./",i I. ~/"I ~I ~~/I 1 ! A ~v , -+-~~V de CANNOT EXCEED TOP OF P1PE ! I'---+-- /-~~V I I I i ; .i//A ~68"143":I I- I ~'i "I :0.4"I I IIf!.....9'I !!38"129" iI! " 14'I !I_II I ! :!,I !I 3.0 3.4 1.0 2.0 ... L.IJ L.IJ "- I <,) "CI I %~°0 L.IJ '0 , i ! ! 400 500 600 OISCHARGE-Q - CFS 4 I ~~:..........VII r 'l"-- 5 1--l--+_.........-+_ol--+-+--+--+---:~~:;.~r-=~~::7""'~=t'-+_!~--"-~~~:I;Il--l----+-~_+-r__1___+___".6"""""""'--1r""____i~-+--_+-+1,--'--:---1'---- ' I I ~~:::"''''--L/!!I , I,~V---:I./~,--I I . I .#"~V-",V 'I I:i [i ..--,:_~~i I :dCICAN~(CE~D TrO~"'''1--- 3 ~V:'!1---:I::I !j'j10'1'"15;i97i '--;--I ~r-+--·/AV·I I I !1 I .;I 2 ~'2"x77 I,,., IOS"xq8'i !i !I I 91'1 5 01 I ,I I --l'-"---~-·· 76"1148"60"138'i I;· Bu REAU OF Pl.i3Li C ROAD S JAN 1964 CRITICAL DE PTH OVAL CONCRETE PIPE LONG AXlS HORrZONTAL 3-71 CHART 18 I I ~--I i I I i ~-rIiiIi~!-b::::=== !I !-'-:;;.-r-rr III--I ~~~-I iT I ~;i .J~~::/:~..--L. I i ::.,....--~-:'I-~~V "-i I -+-- i I I I I iI ~~-97'.151'I +-f _CAM"'~_~'C:~TO',0,Pi77'.12"t ! ~--68·.106·I53'.9"I -t.'-4S 0.76· I I 1 . 38'.60"I I I 1 1_-_+_~__ I I i i i i J.- ~ :::::::::::--i-~ ~~r::::~.....I ~~V"V .....!-i--' ---:%V V 1 I~1II I ~Y ""-,- ~i I I I i I ~~~43·.68"I I 1 I i IdeCANNOT EXCEED TOP OF PIPE.-Ae'i;,....,.I I ) 29'.45'! 24'.38"I H+-,4".23' ; 4 2 ....0t::0u.. I u ~, X.... Q. LLlo ..J <.to ~ ~10o 8 6 4 2 20 100 40 200 60 300 SO 100 120 OISCHARGE-Q-CFS 400 500 600 OISCHARGE-0-CFS 140 700 160 800 \80 900 200 iooc BUREAU OF PUBLIC ROADS JAN 1964 3-72 CRITICAL DEPTH OVAL CONCRETE PIPE LONG AXIS VERTICAL CHART 19 240220 50 200 .~--+--~ 180 ----4--------._---_-_ de CANNOT EXCEED TOP OF PIPE -,.-----,.--~ -----'------r--~~.--,-'-~---l i .i i .._..--------------------...~.. "'t'""--'----.----••- ---------.-------. 80 100 120 140 160 DISCHARGE-a -CFS 20 30 40 DISCHARGE-a-CFS '/;~-...;.....--..;.------------- .,-------......._--------..--~---+---~ ---';"-.-+------_.- ---.....--+0---- ,I --=----+-----,-_.-.-------.- 604020 _.._--------------'-'-..-,--- t-.L..-l.--+-l-+-->--+--+-f-+-+-+-1r-+-+-+-1""7~I!f--h""':;:---+---r-,-~.,. 2.0 1.8 l-1.6 loW loW U. I 1.4"'til" I 1: l-1.2a-w 0 ..J c(1.0o .... a::' ~0.8 0.6 04 0 34 32 3.0 ...2.8 w w 26u, ,;,,,2 4 1:22 I- a.20w 0 18 ..J c(16o I-14 a::o 1.2 1.0 0.8 0.6 0 BUREAU OF PUBl.IC ROADS JAN.1964 CRITICAL DEPTH STANDARD c.M.PIPE- ARCH 3-73 CHART 20 .......-;:;:"lA'"""" ,.".. ,...... ~~~.....I .JJ'~~V V ! ~~V l../ ,, /~'/./V I ~V '/./fI"~I /"./V V i I V /, ~V /V /'v:,/'I , V /.//,/ /V V -/I I i i/V!/V I I ,, /V!//de CANNOT EXCEED TOP OF PI PE !!! //'./.....r I I I , V//fr'!~o.S'-5"I I I/~~g-rl~':9:I I I.......-O"l}-I",....-~61_f·141-.! II f I I , : ...4 LIJ LIJ........ "a•:z::... ~3 Q ..J c( Q... a:: Q 2 I o 100 200 300 400 OISCHARG:::·Q·CFS 500 --r t---+.----'-+--4 , f . t---+--+--jJ¥--#.....,.--+-+--t--t--~---I I de CA'INOT EXCEED TOP OF PIPE ,:1 r--~~-------~--t-"""7"!--7"If-7+-~'----------- f--+----1---+---!--------...-,...-----+-~··-----~I-+, 9 a I I -! 7 6 16'·7".10'-1' 3 1---+---..,..:6JLi~JIf-15'·4',9''J="~i--"""'-'--r---+-~-----....--+--i.--i.---'--i---+--l 12"10",8'·4' 11',5',7'·3'~+-,-g.:rE:9'-6"'6'-5"!-+--+---l--+--+--t---t-----r-...-----'---r--+---+-......--t---+--i 2'-..u..'-I---l._1o--_--'----"__"""--.:...__~-'-.......---l_.:-.-.:...._J.,--l_~...J__J.,___:.___l o 200 400 600 800 ... LIJ LIJ.... '... "CI, J:... Q. LIJ Q 5 I-........-...-------::'""~""""lr_~'-J------+----~---~--.o..-_-___i ..J-< (,J t:41-........_-_-h'-,~.,..,...~-----......-+----.-....a:: (,J BUREAU 01:;:>U8,.C ROADS JAN.'964 CRITICAL DE PTH STRUCTURAL PLATE C,M.PIPE-ARCH IS INCH CORN!R RAOIUS 3-74 3.4.3.12 Performance Curves.The principal disadvantage in using nomographs for the selection of culvert sizes is that it requires the trial and err o r.,method described in the text.Some engineers who limi t their selection to a relatively small number of types of culverts would find it advantageous to prepare performance curves such as shown in Figure 3.4.12. These curves are applicable through a range of headwaters and discharges for a length and type of culvert.Usually charts with length intervals of 25 to 50 feet are satisfactory for design purposes. Figure 3.4.12 is plotted from the data shown in the following tabulations. These data were obtained from the nomographs contained in the text. (Computer programs are available from Public Roads for making these computatios).The first tabulation is for the inlet-control curve on Figure 3.4.12,and the second tabulation is for the outlet-control curves. Data for Inlet-Control Curve HW HW*~HWX 4 D (Read)D .5 21 c.f.s.2.0 ft. .6 29 2.4 .7 37 2.8 .8 46 3.2 .9 56 3.6 1.0 65 4.0 1.1 74 4.4 1.3 90 5.2 1.5 102 6.0 1.7 112 6.8 2.0 126 8.0 2.5 145 10.0 3.0 165 12.0 * From Chart 5 Projecting Inlet (3) 30221/3 840922 3-75 DATA FOR OUTLET-CONTROL CURVES Q d c d c+D H HW for Various So 2 (Assume)Chart 16 (Compute)Chart 11 %.5%1%1.5% 2.0% * 20 cfs 1.3 ft.2.6 ft..2 ft.2.8 ft.- 40 1.9 3.0 .8 3.8 2.8 1.8 .8 60 2.3 3.2 1.9 5.1 4.1 3.1 2.1 1.1 80 2.7 3.4 3.3 6.7 5.7 4.7 3.7 2.7 100 3.1 3.6 5.2 8.8 7.8 6.8 5.8 4.8 120 3.3 3.6 7.5 11.1 10.1 9.1 8.1 7.1 140 3.5 3.8 10.2 14.0 13.0 12.0 11.0 10.0 160 3.7 3.8 13.6 17 .4 16.4 15.4 14.4 13.4 30221/2 840922 2 *From Chart II -or by Equation 2. The curves plotted apply only to the type and length of culvert shown. Culverts placed on grades steeper than about 2.5 percent will operate on the inlet control curve for the headwater-discharge range of this plot.If a free outfall condition does not exist a correction for tailwater should be made an instructed in Step 3b,3.4.3.9 Procedure for Selection of Culvert Size. 3-76 HYDRAULIC PERFORMANCE CURVES FOR 48-INCH C.M.PIPE CULVERT WITH PROJECTING INLET ~.VIJI//If s «'I /'/3 O'il?0 J I /0"~olI/VIL~' /'1/VI /1 'I/;v I I '/i,/I 1, ,I;Iii !! I l,, ,- LIMIT V '/, .750:3':....~k e =0.9I""/r I /n =.024 I J LENGTH -:.200 ft. /--;NLET CONTROL I -OUTLET CONTROL I NO TAILWATER I, I 2i<)HW=O+(I+Ke}-L,29 9 2 o o 20 40 60 80 100 120 140 160 180 200 DISCHARGE (Q)CFS 12 10 " -~7 J:- Figure 3.4.l2 3-77 PROJECT:/42 £3 ._-DESIGNER:..I..o.~ DATE:2-/8-64- HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION :32./+14- EL.~A:vt~L ~-la,=/60 c.f.s ~Q ti O TW,=.$.0 ..l------- EL./ool TWL. Q2 =TWz =So·.o//. EL.;]tL ::-;;;0 , (a I :DESluH DISCHARGE.SAT QZ!I )MEAN STREAM VELOCITY =B!~°z =CHECIl DISCHARGE.SAT o~OR 0'00 MAX.STREAM VELOCITY=/O'/SIC. HEADWATER COM PuTA TlON <:t CULvERT z ....J INLET CONT.OUTLET CONTROL HW=H +ho -LSo oJ 'l ...!: DE S,.HIPTION Q SIZE ~x .J,",COST CO",,"ENTS..0 .!::!..!.~..:;).J IlHTRM'~E TYPE!HW :<e H de TW ho LSo HW s 0'" 0 2 u > 1---'---'._- Ic..,.,p (..',r)--N_........,..... ~-((/60 .$4"lSI.71:1 e s '."r-ry ....~ .-.. :5 &.:./,.,..,./,w.,.. "1 ..0 48 225 90 .S 85 3.7 3.8 38 /..0 //.//11 (~~ -'"-rrr -S4" .... 3.6 .II .3 4.//.0 7.B /1,(~",.I.,.,.y .,.til, '60 SJ /5"70 ..5 4.7 7.8 ,5 •'s••.•. (0 ,~"'----!-----I-- Co-:rtr-re C ...../..H ....it.y" ~.4'd'f~-#"'~//"-;..48 z 35"94 S 47 3. 7 38 .3 3.8 /.0 7S'94 /4;ic:.r.,..,S~.. ~----'~---- t... h'...v 0.< "/60 .:>(leO 7.Z ,...29 36 4/3 .1..//0 60 Jz./47 ~....~~";;D_....... --;:;",.c r"Ie--z;::-:r ~).-_.-i - ~N"""...: <ireQ"e ~"d ·1.0... 160 48 t q <78 ·z 10 3.7 3.8 3 ".8 /.0 '-B 78 /40.",~I -t ..,;,r'-----.--------------- I"---..--~- SUMMARY a RECOMMENDATIONS: -'-------_._..---_..._------------J 3-78 PROJECT:E /4--.2 (.5)DESIGNER:~P.e DATE:2-20·64 HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION:8+., EL.~ /~f / AHW=JLJ/ ~Q,-400 c../~Q so TW1 =6 S'-L_----.....-......--TW ."...s- O2 -TW2 =El./OI/SO""':'!:y;I. EL..u1 T- L;:~' (° I =Ot !>IGN DISCHARGE.SAY °2~)MEAN STREAM VELOCITY =S '(..s.c. °2 =CHEc.l(DISCHARGE:•SAY 0!l0 DR °100 MAX.STREAM VELOCITY =/J!'/.s.c H(ADWA TER COMPUTATION ~ CULI/ERT !........J ",'::INLET CONI OUTLET CONTROL HW=:H ...ho -LSo ...J ~DESCRIPTION 0 Silf ~z ...u COST CO......ENTS... 0.. dC+D ...:;,...J ttNIRAN(f IYPl)~HW t<~H de TW h o LS o HW ~0'">0 2 0 c .......""..(c,....)-N-./=9./As.s",.,. 4',S"d P,.•..,400 /s j#;-Dc 78"r...J,.·.44;""ac'~---...-----~-------~-r----,-- Hvv N,.,,,.. 400 84'118 83 r;..""90".--I ---1----_._-1------.-.--. .111;'rf ~...I."C.fc'c.x.«.....;.:",,"'a 90 .. /c:JS:79 ·2 /9 sz ~3 6.s 6.S 6.0 Z4-79 rry Z P'IPIJI"..iG ..o.e~-.~..--1--.•_----1-----1·-,-_.._~ s .....c 1"y,...c 1'i:oo ~./I' Z jO';o<!:-S Z-oo 54 /US'8.3 -1--"- - .---1--------_.z.:s i lice.r c:;Void "Z.G>O in-".Jd fo 9 z:;'54 4.0 4,S 6S 6,S 60 .59 '9 "0'~c..O.C:;.$•• <::__,,.6 '---.f-.-...--,.'f---_._-'\.~.,..--..c,.,C~P 14',(.e<-r c (..t.se (J~v,1 A &"..,a (I:-,r7)Zoo 60 "54 67 zs .Z 4.0 4S D·S 6.S'60 6.7 67 /0/C..,.b,,,_•.4'''1:10:<-0.<:~--..------1--.---_._. ."4 'I it'"1".,.bo's''''J /~c ..'~c:rc v ..I ..,...•r,,1 Q,,,J <:~ SUMMARY a RECOMMENDA 110NS' .. l - "------.._--------...- 3-79 PROJECT:r,s·z.DESIGNER:.I..",.H. DATE:z·Jl'.•~ HYDROLOGIC AND CHANNEL INFORMATION SKETCH STATION ::I'~"0 EL~ •..J=~".L ~l-°1 /z D et···Q,zs TWI =$.0 ,--L-___=Oz=TWz =EL901 So·~y.EL:J ,-TW~ L=~' ( 0 I •DtSIGN DISCH..RGE •S..Y Ou )MEAN STREAM VELOCITY:,~'!SIIe. 0 1 =CHECK DISCH....GE.S..Y 0 50 0fII 0 100 MAX.STREAM VELOCITY:/s Y.sec. CULVERT HEADWATER COM PUTATION ~~~:::l INLET CONT.OUTLET CONTROL HW=H +ho -LSo ..J 31 ....!:DESCRIPTION 0 SIZE iz ..JU COST CO ....ENTS~ogdC+D ...~;:IENTlIl ..NCE TYP!)HW Ke H dC TW hO LSO HW ~, D >, 2 u : eM'"(Ci...,)~"-N_",.~..i, """lwrwJ 1%0 :r."/.2$s.'-~:"-"y Nil , II ~~J N •."___ t,,1..0 .0 .91 4.9 .7 .l.s 3.0 4..0 3.0 ....0 leUJ JI 4.9 c:._.~.~ C_P Arc"1a ....~~.::4 .......-.,. ~.,I'r"";',"0 ~.H /'Z4 4.".7 '.4 2.4-3.0 3.0 $.0 "'.0 4.6 ,C.,/.......,. C.AC,.....lie"4'~l/ZO ..1.:13 4.9 .4 Z.e 3./3-S ".0 s.s 1•.0 ".9.50·'tN.\N.~''\:;;: C.A~-""0<1.'6u *.~~~<fr.1.-1 P,*v'./20 "8"/.S/4.8 .2 2.9 %·7 2.9 .5.0 .3.0 /•.0 "4.8 c_...h c,·..~~\I ,Z'" . /.//S.O /7 3./3.8 3.0 3.8 '0."So~_~,.t:I S10qj $'-1-.%~\0.. ~i~ SUMMAID'a BECO-MM€NDATIONS: IN-PLACE COST,AYIILABllITY,LOCATION,COVER REQUIREMENTS,ETC.,SHOULD BE tONSIDERED BY THE DESIGNER IN SELECTING CUl HRT.CM PIPE 'RCH CULVERTS OR ';ONCRETE OYAl PIPES MIGHT BE A SOLUTION WHEU COYER IS LIMITED. 3-80 30221/2 840922 3.4.4 Bridges 3.4.4.1 General.This paragraph will present the design criteria appli- cable to the locating of the bridge abutments and substructure,wnich constrict the waterway,to insure hydraulic conditions for safe a structure and the efficient passage of fish in watercourses that have been classified Type A or B. The criteria for fish presented in Table 3.2.1 and a depth of flow 50%greater than that specified in 3.2.2 Inadequate Water Depth shall be required during the two year flood. The criteria for design discharge determination shall be in accordance with the applicable portions of 3.3 Drainage Structure Design Criteria.The watercourse bed stability at the critical section should be investigated by either of the methods indicated in 3.4.2.1 Permissible Velocity Method or 3.4.2.2 Tractive Force Method. 3.4.4.2 Hydraulics of Constrictions 1n Watercourses.When an area con- striction is introduced to an otherwise uniform,friction-controlled flow in prismatic channel of mild slope a backwater profile is first developed upstream from the constriction.Please refer to Figure 3.4.13. 3-81 Section (0)-B «":.. ,Eddy zone '0..-' T <-1-" (1)b ~(3)Ccb (4) 1 __---1- ......-:::;:-Live streom bO\lndary ",- t ~ddY zone ...I- (u) Note:horizontal scale distorted Datum (0) ~ Backwater profile Normal profile ~i'lh I'h;...J,..--- .... "- he=hl .o(Y.=Y3 hon=htn r h4=h 3n Channel bottom (zero slope /. Datum- (e) n Figure 3.4.13.Definition of flow through constriction.(a)Plan; (b)elevation;(c)elevation,adapted to assunption of zero friction loss. 3-82 _lzF_ TYPE I Type I opening,vertical embankment,vertical abutment TYPE D Type II opening,embankment and abutment slope. ~@\ ______J---TYPE m ~-------- Type III opening,embankment and abutment slope/ Type IV opening,embankment slope and vertical abutment with wing walls. Figure 3.4.14 Constriction Types 3-83 The upstream end point of the backwater curve is assumed to be at section O. Near the constriction at section 1 the central body of water begins to accelerate.An adequate approximation for the location of Section 1 may be taken at a point one opening width b from the center of the opening. At the constriction,the flow a s rapidly varied,characterized by marked acceleration in directions both normal and parallel to the streamlines.The longitudinal water surface drops rapidly in this region.Within the con- striction,the live stream contracts to a width somewhat less than the nominal width of the opening,and the spaces between the live stream and the constriction boundaries are separation zones occupied by eddying water.As the water passes through the contraction,the contracted stream reaches a minimum width at Section 2,which corresponds to the vena contracta in an orifice flow.After the vena contracta,the live stream begins to expand until it reaches downstream Section 4,where the uniform-flow regime is reestablished in the full-width channel.Between Sections 3 and 4,the flow is gradually varied.Over the whole reach from Sections 0 to 4 encompassed by the backwater effect of the constriction,the total energy loss is the same as that for uniform flow. The equation for the discharge through the constricted Section 3 ~s 1 Eq. 1: Q =CA3 [2g ( h - h +f 1/2 30221/3 840922 A3 =area water prism at Section 3 VI =average water velocity at Section 1 hf =hydraulic friction loss between Sections 1 and 3 C =is an overall coefficient of discharge 3-84 Eq.2: The overall coefficient of discharge C is calculated by first determining the Ct ,the coefficient of discharge standard value whicn is a function of the physical type of abutment configuration along the flow lines of the constriction.The types are shown in Figure 3.4.14.The coefficient C'are dependent upon two factors;m the precent of channel contraction and L/b the ratio of the width of the abutment parallel to flow and the width of the constricted opening. The value of M may be calculated by: K m =[1 - K l +KC +K ]100% r c where K refers to the conveyance capacity Eq.3: K =1.486 r 2/3 n A 30221/2 840922 and subscripts L,rand c refer to the Sections at 1 to the right of,left of,and the constricted section. The overall coefficient of discharge C is now determined by adjusting C'for the effects of secondary variable by multiplying C'by the appropriate cor- rection factors k. A listing of these corrections follows: k F =a coefficient that adjusts C'for the influence of a nonstandard value of F k =a coefficient that adjusts C'for the influence of angularity of flow 3-85 k e =a coefficient that adjusts C'for the influence of angle of wing walls k e =a coefficient that adjusts C'for the influence of eccentricity of constriction kj =a coefficient that adjusts C'for the influence of piers and piles k r =a coefficient that adjusts C'for the influence caused by round- ing entrance corner of abutment for vertical-faced constrictions k t a coefficient that adjusts C'for the influence of submergence of bridge members k w =a coefficient that adjusts C'for the influence of length of wing walls k x a coefficient that adjusts C'for the influence of the ratio of distances x/b (See Fig.3.4.19c and Fig.3.4.20c) k y =a coefficient that adjusts for the influence of ratio of depth of water width to opening, y y a +b 2b The C'values and the correction factors can be obtained from the Figures 3.4.15 to 3.4.23 at the end of this Section. It is possible that certain combinations of the empirical coefficients applied to C'may appear to yield a value of C greater than 1.0. cases,however,a value of C =1.0 should be used. In such 30221/2 840922 Referring to Figure 3.4.13 in designing bridge opening for the maXimum dis- charge we are concerned with backwater profile or the surcharge above the normal profile and the depression in the normal profile at Section 3.The interest in the former is to see whether overtopping of the banks occurs and 3-86 TABLE 3.4.5 Key to Tables for C'and k Values for Each Constriction Type k k k~k k k k k k k Type C'F P e j r t w x y Type I 3.4.15 3.4.15B 3.4.16 3.4.23 3.4.23 3.4.15 3.4.23 3.4.15 A B D A C,D C B A,B&C Type II 3.4.17 3.4.17 3.4.23 3.4.23 3.4.23 3.4.18 8S=1: 1 A C A C,D B B Type II 3.4.18 3.4.18 3.4.23 3.4.23 3.4.23 3.4.18w I 8S=2: 1 A C A C,D B B ex> --.J Type III 3.4.19 3.4.19 3.4.23 3.4.23 3.4.23 3.4.19 88=1:1 A B A C,D B C Typed III 3.4.20 3.4.20 3.4.23 3.4.23 3.4.23 3.4.20 88=2:1 A B A C,D B C Type IV 3.4.21 3.4.21 3.4.21 3.4.23 3.4.23 3.4.23 8S=1: 1 A B C A C,D B Type IV 3.4.22 3.4.22 3.4.22 3.4.22 3.4.23 3.4.23 3.4.23 8S=2: 1 A C B 0 A C,D B SS =Sides lope the latter to determine water velocity at Section 3. obtain a relationship for h. By adjusting Eq.1 we Eq.4 h F =b (Q)2j'kl K3 +L the distance section 1 is upstream of the constriction,generally where hF is the friction loss between Sections land 3 and may be calcu- lated by: Eq.5 where;b equal to the breadth of the constriction L =the length of the constriction Kl &K3 =are the total conveyances of Sections 1 and 3 respectively In Figure 3.4.13 the increase hl*in water surface from the normal stage to the backwater stage at Section 1 is known as the backwater of the constric- tion.The distance h is the difference in water-surface elevation between Sections land 3.The ratio hl*/h is called the backwater ratio,which is known to be a function of the channel roughness,percentage of channel con- traction,and constriction geometry.A laboratory investigation (Reference 7)was made on the backwater effect due to vertical-faced constrictions with square-edged abutments.Data plotted in Figure 3.4.24 indicates the rela- tionship among backwater ratio,Manning's n ,and contraction ratio m,It can be seen that the channel roughness is relatively unimportant as a factor in determining the backwater ratio.In fact,the limit or change in the backwater ratio due to roughness is practically reached at an n of about 0.050.The previously cited laboratory investigation also reveals that the influence of cross-sectional shape on backwater ratio is included in the contraction ratio. 30221/2 840922 3-88 The backwater ratio in Figure 3.4.24 is for constriction of basic type,that is,for a vertical-faced constriction with square abutments.The backwater ratio for other types of constriction may be obtained by multiplying the backwater ratio by an adjustment factor k a•This factor has been found to be a function of the contraction ratio m and the ratio ct c .bas~c Cbasic and C are,respectively,the discharge coefficients for the basic type and for other types of constriction that can be determined by the method described in the preceding text. obtained directly from Figure 3.4.15 a and b. The value of Cbas i c can be Based on experimental data, 3.4.25. the relationship among k a,m,and clc .bas~c ~s shown Figure 3.4.4.3 Procedure for Design of Bridge Waterway.The first step is to list design data.Drainage Structure Design Data Sheet 1 is provided for this. a.Design discharge Q i n cfs,for required periods (i.e.Q50 or QIOO etc.) b.Establish constriction type,(I,II III or IV)breadth of constriction, length of constriction and the constriction centerline relative pr i.n-- cipal channel water prism.In watercourses with fish,Type A or B see 1.2 Scope,it is preferable that the abutments or piers fall outside of the two year flood channel.This will avoid the need to undertake an analysis for the two year flood. During the field investigation the watercourse should be surveyed at Section 1 (a distance upstream of the proposed constriction equal to the breadth of the constriction)and Section 3 (at the downstream end of the constriction), refer to 3.4.2 Waterways.The field investigation should also determine 30221/2 840922 Manning's n,the slope between Section 1 and 3,and the substrate classifi- cation for permissible velocities or tractive force calculations. 3-89 c.Determine a rating curve for the reach between Sections 1 and 3 using the average of the areas and hydraulic radii for several depths includ- ing the design flood depth. d.Calculate the conveyances K for Section 1 and the constricted channel at Section 3 and the ratio Lib (embankment and constriction breadths). e.Calculate m (channel con s t r ac t i.on )from conveyances K (Eq.2)with m and Lib go to figure for constriction type (Figures 3.4.14 to 3.4.22) to determine C'the coefficient of discharge (standard value). f.Determine if the constriction type or location require any modification to C'i v e ,c'x k , kF etc.=C. tion for modification factors. See Table 3.4.5 for figure loca- 3u221/2 840922 g.With nand m given enter Figure 3.4.24 to determine h1*1 h.(If the constriction under investigation is not Type I a C'and kF are deter- mined for the m,Lib and the Froude number in Figure 3.4.IS'a and b. The C'x kF C is used with C de termined f.In Figurebasicin 3.4.25 to obtain k a·k a times h1*1 h will give the corrected hl*1 h). h.Witn the value hl*1 n estimate h (Trial starts 0.9 x (VI ~)2~g A3 and calculate hl* 1.Calculate trial A3 using depth of flow calculated in c less ( h -hl*) which is Y3. J.Using Eq ,5 and 4 and correcting C value in Eq ,4 for Froude number kF calculate h,if value agrees with that assumed in h,the solution is reached.If not repeat h ,i and j with a new estimate of h. 3-90 30221/2 840922 k , When solution is reached check V3 velocity per tractive force or per- missible velocity criteria,if satisfactory or close to satisfactory a analysis at the 10 year flood may not be necessary. 1.For fish watercourses where the two year flood water prism is con- stricted,perform analysis a thru j to determine that velocity V3 does not exceed requirements stipulated in Table 3.2.1. 3-91 COMPUTATION OF PEAK DISCHARGE AT CONTRACTIONS --.-------,[Iz If---r- TYPE I 008030"0 50 SO 0 .Pltc'"of ~c,",,,oct .. A.Baa_curve (or ~oefflci_nt o:C diacharC_ 20 - "..."I I I Ir- _ ,"I...-l-I "'-lo-I ....."'-I t---~T-~--,.1---1--"r--I---1-.....l--l--l0-t:-"",r-:-l.:I-tJ +t'I -'~~...I--l--1"-q=-LCiiiI±"I--~-:-,'n"", lo----s_co ....itt ....+0 f·o ;I ;-.::Il !ll........ 1.J)zp' F·O.S ••I I --r-..0 j'O ,: :,;.,; 7 90 I 1.00 1i ~ !t 0.70 i c! -U 1.I ,,,,i....-i"' I .....-r I i ,I ......-f";I I I !:I !~,I I i 1 I I !~r-r I ,I I.,l-f+±...l.-l-,I I I ::I,I ,.---J-o+-,!I I I i I J...-j...-I ,i I I I ;:,;I I I,, I I I I I ,I , o oJO 02CI 0.30 0."0 0.50 0.60F.Fr............or •.,.9- A.llih 8.VariatiOD ol diacbarl(e coefficient wi.th Froude number 0.70 0.80 .20 =tc /'I''!lO.... I I '---+-"I<r :..-1 .-'-I I IS f-._L __~~I ,:I :....1-:I I ! '",=-,i I i I i~I : ".i I-'_f-o:!I i I :: -Q ,I I _I ,I I I.10 :,I ;I ! r/I I I I I I I ,:: ~I I I I ,.os i I I I , ~,,I ,I I7f I ,, 1\,1 o 0.0&0.04 0.Q6 0.01 0.10 0.12i'Aet"of cor"",0000clilll'1o widt'of 0"*"'''' C.Variatioo at diac:ha.rae coefficient With entrance round1nc 0.14 Figure 3.4.15.--Type 1 opening t vertical embankment t vertical abutment. 3-92 DlSCHAIlGE·COEFFIClENT CURVES oo.. o o... ci ,, 1 I ~ l- l-f\-...i; I'~l;V~/~. f '- E.\l- I !r- .1 !I I I, I ,, I ! ~9 , '....•..- T - 1 ! o 9:. .J- Ia I-, !!,.. ,., ,0a--::,,I 8 I ,-+-d,,, --,, I I I ,I .. ~,,:;,;,;, "',,I ,1,,, ~ri .v ,,~i,~I i\~~~1 "I ,Ii-I <,"\!, i-, i-;...;.--~+.1--"'-'\ :N ,Si-t .~e +--I I'-.J+--~, I " 0 Figure 3.4.16.--kw and kep curves for vertical ment of Type I opening see figure 3.4.23. and abut- ... ~.. o 5a~ g ~ ¥: embankment ,, I II 0 ..,I.. i :I :~H,.....1 ,:_+I ,1 I I i ! I "I, I I : 1 I I i I I i \, :: ~~I \\1 I \i-h~~\I I '\t ~/I I I 1 I i r,Io I I 1 1,1 , 1 !I 1 H I 1 I~L~,, !I-Il-, 1 i l I" 1 I "-i I '\.\,, ! I 1"\1\ !-:\ !!3 - 3-93 COMPUTATION OF PEAK DISCHARG£AT CONTRACTIONS 5 ,: I ,~--...-If,I I r-H-, I I : 90 '00so i !!I ~-L +t I :t I , ,( ;.t ! I .t-'I ;-1...... 'i i ~~~80 ro Itt.",rc••t·If eftGft""COftt,octl •• A.Baa.cut:ve (or coeCCiclent of discharge 20'a 1.00~iiifii:;;:r:r:'T'"""'~""'-'-"""irr--""""'~"""-:-""""'n-:-nITrrTrTTnTnTnlnrrl :.t O'80I---l--..,...++.........--1---+_-:==r-r--==:::::::::-f::::::::.l~o::::l::::~rr=H-++~~~~ 'il.. ~-0.20 0'"ol>o>o_. -...I I 0.1 I ~i-..i..r-......~-i-+-;I t ;I i~OTt -..r-~I I :-0.'-I ;~~-~r--lL....,........ -TO.01-r ,-f-.-:!!: I :!I ~-l.~-;--+-~I .05 :..---i t ..-.- I 0.03 I,i j I [,i I I ~....-+1 i .----:-:--':--n-I ,,I i I rt !I I I I I-.f I I !!I I I !I I I :. I I I'.,I 1.00 l<.y O.9 0 0.80 a 10 20 ~~~80 ro m -Perc.nt of eM"""contraction B.Varlatlon of discharge coetttctera with Ya")b r at io --zo- eo 90 100 0.9C H-t---r++-H-+-++-':"'"1.......-+-::?"""''-t-'--:--''--'!-::;:.-''f-+--t-----f--'----I o.so~-++++-+-!-+++-.;....:,.....l.--+O,.....=;-......-+-+..;....-f- 30 ~so 60 m.Pt!rctnt ot ,,,onntl controctioft C.'IIlriation ot discharge ccerftc ient wah antularity Figure 3.4.17.--Type II opening,embankment slope 1 to 1,ve rt ieal abutment.See figure 3.4.23. 3-94 DISCHARGE-COEFFICIENT CURVES TYPE II .....~-...,..1-I ,,,, i \-...0_'-r-I-l'"o!'-....I \ \ I I i I I I ..."-;...I i !I i : I I I !--;..."-'t.:I.O~I I I :I I I i I ,!"""'....;-.N--o.:..I I ,, i I i l'I ~""'"0.50 .............II ~I ·Ston_.._......ltl ...I ,i :-....-""'"I i !~.....I I ! I :,~~I I - Ef ~.0.20 •'1.00 I ,I I i"'o!--!""I.-.l.....[I I •-0·I I I Ii""....,, r -.-o0li--....._- ,...o.Z ,.0.7 !,I ,~I I ,. r-L ~.O I ·0 I I !+!H-<-~'s •I t i !-f- ~·t I I i I I I i , I ,,I I I i I ~1.00 i "_I.- 0.'0 I P C I ;;; ';0.10 i !...oo 'y 070 o 10 20 ~~~~ro 1ft.Pilre"t fJf eMMet COfttroctl .. A.Bu.curve for coefficient of discharie eo 90 '00 '0080 ~020 ....-. 30 40 30 ~70 III',..,_of _...."'1. B.VariatiOl1 of d1acharie coefficient ith Ya'Yb ratio 2i) 2010 -•....... 1 I C""~---..:~I i - i !i I i I i I I I I I I I I i I I I I i --;- I I :--....""':"4-I I ;I ........';~,i !I I i :;,I ,.O~I I i I i -....I I I I ,I :I I r I ~....I !,!,'1 0.03,:I , ,:I :,I I I I I I i ,-,I,!,I I I i I i I I i I I,I I I ,i ~....L.-...- j I i I :I I I I ,I I I I I r f I , I ,I !,I ,TI i I i , I ,I i I I ,i kyO.sO 0.10 o 1.00 eo7020~40 30 so ".-Pete"'"eM_""coettecU_ C.Variation of discharge coefficient ....,th ancularity ...0-, "0-I , I ~!/"'f~t t....-/. I !I I I I I I ,I I !I A !A I I !:2(/I I I !.:.....-'---1 :7 !!,,I I ,I i -:A I 1./1 ,,! I !I ,:!V I Y1 I I I I I I I ,I :I ~,A ,I I ....I -i I A I I I I I !:I :I I I i I !I I Y I ~~I t-i ~-l-;;-:- I I vr I---t-,.LI!'A-'"-I ------ ! .-~,I I 1-M [\-'-I .L---,I I !-! ! I I -......-,I I , ...;.-,!I ,I I , 0 10 1.00 0.10 0.70 030 Figure 3.4.18.--Type II opening,embankment and abutment slope 2 to 1, vertical abutment.See figure 3.4.23. 3-95 c.~~i.-...L.- ----------TYPE m ~1"'--- I I I I I I I !, 1 1 I i i ,I I .l I R , 1 ...--~.- --,-,,, i ;~-t·~~+H 70 so 90 100 ---!I i I--.--,....... 40 50 60 ",.Perc ...of eftc",",'GfI~octi ... A.aue curve for coefticient of diecharae i....I I"N.:..............!I 20 I i I I i I •I....,i........I I ,I I I "I 1"'-,.....I I I I...!I I -....:.I i I , 10 I so f..- f- I- i- ".-ri-~+- i 2l)30 40 50 60 ~.PI~t of ~"..COfttrlctio. B.Variation of diacharge coefficient WLth angularity ,I~- '-0'- I I 1 o 10 o.'0~~~~~~~~tdRt1;1L.-l""'1++'·1·+·'I Vf iLL l-L.LLL I t.,i- k.F rL i!f 1H1 IR++-r r*flilH _~._ oao8f J..1'iii I I +1-r 1\1-H--I-+:~+:;:-t.t...?_i"9-.t f I [I l',(..~~t,'r-t -I r t r r"','H--b-\..~.~l.f-tr I I t-r'rT;!1 r 0.-.-:-I 70 ..- r-f ~-1t:·- II i : 0.12 0.14 I i I I ,_!T-- 0.100.04 o.~o.~ t.II-of I '0 ....111 of '''''''' C.Variation of diecharge coelticient With .!..ratio b 0.01 1.10 1~!li, ....~~-f t l rtf 11 I I i I I i I I Hf-T-+++-H'++-~ I-+-- 100 ~o 1.20 Figure 3.4.19.--Type III opening,embankment and abutment slope 1 to 1. See figure 3.4.23. 3-96 DISCHARGE-COEFFICIENT CUR V ES o304050 m.~c."t 01 channel CQftfroclion A.Baa.curve Cor coefficient of discharge 2010 -,.....-,,,I ll+r-::k=c -II!Iix-I'o..';".1-1-l r~t1 I I I !I i I~'l-,~,I :i I I I !I~",~..[!"-., I I :,L'I ;~~-~-~-:--,~+--I-,...,~,:--.........,,,I ",".J.j ....,...",,1 I~.~,-...,--~-it---..-+-I ,I I ,....-....i-;"",r-<..'l"-.....:~I t---..L.-~H '".......'........,--.---.0<1 I ........;-;....;..--, .......'.......-.......---i ------I i t -H-t ,, '""".........----osc "l ,L'I ~~~-----L-o.4~...;.;'~.;.....-::;::I , I ,eOftdltiOftI I .i+---!--cl2J I i-S'.....d ttl ;I :;r--'-,,.0.2 '0 0.7 '-0·t r r : I !'I ;In,;!f 0 I ,,,1 I,-lOO i'O ~-.."---r-"-;,it-t.•I I I !,,,-- -1-.0 j'O I i i ;I !I :i -I ,,"..~I I !i f I !--,.-rTT r-tt I ,I I,, 0 60 70 80 90 10 1.00 o.s o I·0.90 "!..j,: c 10 80 ;;; 1; 1~0.7 ~ 7020304050eo 1ft.PwCllftt of d'IOI'tMt eontractl<ll B.Variation or discharge coefficient wtth angula.rlty 10 <t.n-- 1=60-';,1.'1;.""-.....--I ,./,/',/, !I >i ,,I I ,,....I !/"V,?rll ,...-;,.i.,:.A-:I !...-r ,./,,y ,1 ,!...:-~,L/(i t-----;--;---L......__.F...! I ,,,!L I ,;-I ;»«iiI :I ,!...-I,I ..r --:-:---1------- -1-.;~~i i-~i Hiit ./:\I ,..,f ; i !~-iI,,'!I ~,I f _. f 'i-r-i-H.....r I I !i r-I......_t~1 ,I ,I I I ,; 80 1,00 0.90 0.80 0.70 0 0.30O.O~010 0.15 020 0.2~1--Ratle 01 1 to WId'.(ff 0ttt'Ifti"" C..Variation ot di.charge coeffici.nt with .!-ratio b ~"ll I I I I ,,,!I -F!-1.1 I i :I ,,:, i ,i I !: I -"-+...L..i.l '-f-+f-l-!t l.~-~---~. I I-\~I !,i!! .~.±J:~+-,Loa .;...l !I ! to 1'0..~I II ,-.+-1._ I I ~o ~,'...............i !I i , -;.t-t-----I j--f I.... .!--;-!1 ! ....r-+t-+-I f I -:.-,, II 115 1.'0 I.O~ 1.00o Figure 3.4.20.--Type III opening,embankment and abutment slope 2 to 1. See figure 3.4.23. 3-97 _~..~~r'--_ 1001IO~~~~ro I'll-Plre ...t 01 ~COI'trOC'f'tcM A.Baa.curve for coefficient of diacharae 2010 IF -,-I ...-j;;;: ....- ..L I -.....i I I I I .........,..I I ..........,:---.I :-~I I I l.~"'"I "I ,.........I -+~-'---'-•' I : ~F".....!I Ii".....r-..l-~I i ~I lao'-H-r-;-"i . !~..tTl i-..J..~";;"'!--,-;....I !i ....i I :o.ao±kI,I ,~...~I I I i ! ,....."I r--i ,-·F I 0.iu.1 I 51_..,e.....lt_I ..........,~I ----t·O.!I.,.cr !~-~.'-~+-t,~1,,~'",0.5 ..rr ...---I i . ;;;h'0 '-30-I ,I I I ,I I i '" I i ,,,,----"""'1--.. 1 !,,!i !, ,.0.2 I.0.1 j to·I i i I I I I I I I I I I I I •• 1.00 i i :I I ,J 1.00 0.60 o . ~0.10. '"~ ..a;;.. ..o.to ! :. ;0.110:;; It..• .~ I I I '2 -._- .- --- w ~~~00 ",.Ptn:.-t of c.....cORtfoc::ti.,. B.Variation of discharge coefficient ....uh angul.ar1.ty I , i !4 ...J- 10 I : '-"""'i ! 1'1;I " ,y,,./ ,./I I ./I I I I I I ,1 I, I I !I :\ I.I~"",,,,,,,,,,,,,,,,,""""'.,...-r----"""--""'....,.----r----., ! 40'4!t ~cr ~~.61! 9 ......qle 01 .i""-01 C.Variation of dbch.arge coefficient with win&~....all angle See figure 3.4.23. Figure 3.4.21.--Type IV abutment with wing walls. opening,embankment slope 1 to 1,vertical 3-98 DISCHARCiE·COEri'ICU;hT CUR va ;.2Dd'~C-------- 100~~~~~ ........,c:...-~.. A.8&ae curve (or coefficient ot cit.ac.h&rp zo,0 O~~ ......1 ~.to... ,........1 ,i ,...............--..,I --I ,I., I i ,--,a !I ,~,-0.:!:,,......,.......:I -.i.,-:-St_..-...-,,",:,, t.0.1 ,.0.5 '-0·l"'-,,,---~I ,,I F·O.!lO •-so-I ~'I 'ala! ,,!·~.o I '0 ,-,..-- 1,-tOO I I ,,,,I !I I I I i ,, 1.0 ··j 0,10 i O.flO a I10 .. 0 ! ··~0.10 l.''" 1.00 O.SO ala ..'-I Y I I ,y L.-"I I I 2 ,~,I , I !I -'- , I :I I,I I I '~,I I-I,I :I :,1 ...,J-:,1I,I ,,1-,,,i v !I I -...------ r-l-r'I I I !1\r- !y I I ~,t-±-±~..:I I '-r I I ,I 10 zo ~~~c ••"'ruM fII ~~tr"'" B.Variaticm 01.d.1.Icharle coeltlcicnt witb ancular:l.ty 10 ee 0,81) ,I :, i ::I : i :.-.-- !I ---I,:---,I i.-H"'T !!I ,.....:I I , :,I i ,i I 1.10 ~~~~~~~ ,.'ro,,"""""'1.~ C.Vu1&t1clll 01 d.1acharp coefficient with 1"roude rw.m.ber k,.1.00 I I ,!I~,!I ~ !I ,I I ••01 ......-r--:;..........-:~~I --LlJ:L I , ,J.--I !,.....,.....i...... I ,100 XI' 1.10 c ......•,.l1li'__ D.Varw&!""01 dUcharCe coetflcleac ...1<.11 ...lD(•....u ""Cia: Figure 3.4.22.--Type IV opening,embankment slope 2 to 1,vertical abutment with wing walls.See figure 3.4.23. 3-99 COMPUTATION OF PE<AK DISCHARGE AT CONTRACTIONS L ~.P'"-.-..-- to,•1, los AwOf ....I>tt_-.n...131 I I ,I I l'i I I I : -t-'i ,N I !I I :-.....,i I I i ..........:I iII,1 I I I I l'I I+r-.1 :,:-.....I . I I !i I I N-I I I,I I I I i i I i : 1.00 0.80o O.O!!0.10 0.15 0.20 0.25 0.30 ~-arid"."lIfft"OlnCe ratio B.Variation of discharge coefficient with degree of submer-gence ot bndC. L~ ••~!1.0-V~·.. , V ! I 1.00 0.900 0.1 0.2 0.3 0.4 ••Eceenttlclty rGflo A.Vanation of discharge coefficient with eccentricity PILES ••• o • • A'j'i; _____.....i~"'-_ W 30 ~~~ro m-PerCI"t of d'lo"nef COfttroctiofi C.Variation of discharge coefficient Wlth area of brldge pile. 100 i ' 80 --- I I ! I ' l "-+---t-'H-i-~t--"- j ! l-~~!...i --r--, t f· f-'\ I ' I r I I I I I , -I-H-I 100 'II 'n''-,I-t+~ 100 -.+--,0"~ 0 ,~.A'.///1-;-.a »«///s 2 ./"-"'i/'0 ,. k·o 030 ./,'r -0.90J.:././.-:....2/'/',•...L-a £,.-,.-I ,, s- f LU++,1-:'1-.-n""0.80 ~PIERS -=J'~=:z:z::a A, ~ .0 I i I I I I i , !f !!!I I !nti.I I I !:I ::A"""!,i I ,I I I i i I ..--r- ~'O I I ..;......-,...-ri i ,i !i I :i 100 0.95 20 30 ~~~ro ~~ "uPtrc_011 cfto''''11 contraC1IO't D.Variation oflldischarge co.fficie~t with area.at bridge plera 100 Figure 3.4.23.--Types I-IV openings,k e,k t >and kj curves. 3-100 1.00 0.80 ~l~ ~0.60.. i•0.40g m 0.20 ----m-80-1 60-----I---~140----~-I ..--I--20-I--r-- ..-----'"JO I i---- 0.00o 0.010 0.020 0.030 0.040 0.050 0.060 0.070 MonninQls "nil Figure 3.4.24.The effect of channel roughness on the backwater ratio for basic-type constrictions. 1.21.1 C/Cbosic ~973 '"I"::::::--973--_973 \<,"'-,-~m:80 v '"~I--~~x \,.I :tt--'"r-\<,952-948- "",,-9 47 I v52_I-v52 !\952 r-,II \952 <,"'m:4~_N6 I I Legend _ ~o m:80 x m :60 ~•m:40- v m:20 9 m:as_ .1.'1m:2~I indicatedV27v I0·5 1.0 0.6 0.7 1.0 0.8 0.9 Figure 3.4.25.The effect of constriction on the backwater ratio. 3-101 SUBJECT /1IIAIlZAIIEWCO/2eo /(/4.Lvnc tid,.,RIve r Y SUS/TNA JO/NT VENTURE COMPUTED »5IR CHECKED C C. FilE NO./bS3-/03 DATE ~/2s:18'4 PAGE I--OF .2 PAGES -*/8/1 II II• J7 -;;;0.0 3S .5 =c:J,OO/::{ ch?/7/7€/CCJ~//o:s€c/t),eYr:2//e /s f"coJ;61es /cs..s r-/7a~C /J //7 d/;?/n€r€,1'" tt/Bler~O(/r'se ch SS/h~d;;-S 77/2~&rovj'?..IT' ~fI /'SC.p/e Oe-~/7n q /OOy,,-//00 d Qoo =~~20 ch CliO z:/200 Q-z =~50 o ;3h2.CJ Q-=-/20D QZZS-O Susitna Hydroelectric Project Culvert Design Data Sheet Location:Township ~;t;?;)1 Secti on _.lw::3:........=O::...-_ Range gee _ -:/}0 ~o (2/\If A /Meri dian (:)A..../U (V Project Feature:(project access road,material site access road,etc.) Station:/200 ~:sh.J-P7.o~j{;v€r Y J(.//2chor; Type Water Course 0 B C User Fish Group (8 &Conly) Drainage Area:&050 I ®III IV 0,()012 cfs--------Q2:2 ~Q cfs Qdesign: Frequency of Qdesign:~~years Watercourse Area for Q2:/08',0 .ft 2 Gradi ent ft/ft Watercourse depth of flow for Q2:2,IS ft Classify channel substate:~5/c?/J/hc2/l;/CJm 0 Ul1fo/IC;;e5, ;-:;;> 7rdt/fE/s h co,6,g,ks /~.55 /;4~/7 C'//7cAc s ============---01- _;0%-------- ________ft/sec Size: Channel configuration:Braided Meandering Gaig~ Other (describe)~~~~~~~=)7~t?------------ Other g/ld9~GUt'/);ce>'J,./c'/p/G!'" 2 ¥ t..1d/h .:);-c/;~nntP13&155 :1-{ :/ Length:50 /ft. 734 Culvert Type: Slope: Attested to by: ;??-~ Fisheries Biologist Design Engineer lfAIZA.f&UC8 SUBJECT~~::cr"sS~20£), FI .... roo/~53.-/tJ3 ~ __~tt: 11t:)#"'_1I( ,. Y DATe C'lzs/K4 SUSITNA JOINT VENTURE "'"' COMPUTeD 5"If CHeCKED C C PAGE .:3.-OF 7 PAGES £)~~/,?~ / ~ ,b~S"~d' C)'7 /7r'~ 2ZJ C~A.f";"It::.f/an (.,c.n-l~ 5.5 -::: 15".'/ wIll, 38' .6~~w~lffh ~O~ o;/$h~~.$ ~r/~?G GV~// A;;JV"~ ~ C~/?/r;1/.coJ'?crl/E~~ ~/€;­ $vj?,Pcrr /8;'/rh/4Ck 5EI d.:7S'h oCJ///J'J~ on 5Lc?1~.3 atJr//n~ p:7j1tE /. I I I I I I I I I 71 /. '"i'i '1/i~ Z$f-!.Qf.S"}) 10] ((17. Z$""'!!~$J)c7·~ 0. 0 '32 ~ . ;1 Li 01'/7. ZS" f/,9t10)J -7t 27 & .. L -::: :3 &. 7 S (S'~~ h~"",..~ 3. e,; /9 c..) ~ ;:: ~ 7S I b ~ 3B L-~ ~ /. 0 m := 1/ -~-) /~o .1. -:: [i -7 /2 7~ ]/()O~ {I J<;/ /()3 2Q~ • -=- 30.3% C / PI' //7~~~/;7nO/J h...--S.5¥.S".'! frc-? h9vr~.5 J~~/9 ;:J'7d3~~.20 -0.032 - UID-fMlCO SlJSlTNA JOINT VENTURE SUBJECT ~:r-C'135~~':2aO' U/05 u ,.u;:h~ ~ At::It!' yo Y COMPUTED S;:? CHECKED C~ FILE NO. /~5J-/03 DATE tg/Zs/9# PAGE £ OF J... PAGES s S := /:/ c ~ -:: {}.9Z$" '" " ~I/s~ CJ.!J2 3 /0,.5.$ r/.S:/ 55::2:/ C -::::: 0. 92 / ,RtrJ/t"~W />,?oq;;he:;J ~ot" ~c::/a"'s ro c"(SI£~I/ TiJ~h :3,~ s ~ N~. -4 N./-(. ~9 /VA'. -A~ N. 4. ~. ytf'S 0 ~~ 2J ~r /\(A -It Ax ,y~s ri,•. 3.iI.19 c ~ /)/~./J(A. 3.~.20c. J := /() /(/.s)J:: ~.l.. /..ly (3 8 ~/()')( /. 5)/0" =C/,03 ~ I',..o~ h,. 3· ~ 23 /cr /1'7::: 3CJ.9 ,).j.:: 0.03 ~ :: ..:3~9 ,A1f /n/t?/;Po/;:;/€d' /'rOI'Y? 05.:;. f'. /.5?C d"c/ 3.l/. ZOe. ,t;;,,... L~ ::. I f'" Y -.:.':3-7 S-0 ..I 0 rb .. 7ii" -=39­ 55:./.'/ '·$it S.5&2:1 ;'X /./7~ /.03 ~x 1./0 C C <:1./ A/I x' ~2:J (99!3}(;' ID)Ie -;;~CJ~4 >.1.0 t/s~t-:tJ c=~o MJAm~EIAS:C,O SUSITNA JOINT VENTURE SUBJECT S!r€:Ji"YJ c;.t:;ss/n?/2t%f FILE No.!.~S"3-/03 - t//S JvnCnt:>¥'};f)1/~r Y DATE &/2.s-/f14-A COMPUTED'S ,/f)CHECKED C C PAGE 5 OF 2..PAGES S/nc~LO~$~/C'ht;#7 /5 /J~/7f.P~T d6?~~rn?/;?~C'":2.nd~/rd i'Yl h~3,<1;/S 4 el8 h r:.I'Y1 ~:3 o.9 I %=/.C) A C"'~4 93<;- hd(.)eI~/1/0.-::q .._....;.3_C--:-:z-:-(J-=-~==. 4:;r;i -(('3 9Jtl.~(;o))/o)112.?(/0;' »o-3 ¥ 43 ~=0.:77S C C~/ -0.93<;-(0.:;;75)b.:J SIc:.-:::~r- ~0.9/5" ~o c:J.915- =/.09 ~x:0.77 h~iY)h?'3.L-/.24 wt'~A /')z;a0'32 f 1Y7::.30.9 9'f hIM h =0'~3 h*)h ~h CQ"r~c~d =44 (A.;;=:(J.L/9!d,77) ::Cl.377 <.. TrI .2 /L1 l]~.3 (}i~) :2 5 '3 -,9 (S,S<;(ff!)! 2 ('32,2- _0.&53 <.... r. ~I WZAJlEWiC;1) SUS/TNA JO/NT VENTURE SUBJECTSk£;l.n-?Cn!)$$/,,?1200 I Vb Jt../;?~"?d ~A';VIIG r Y COMPUTED 5&CHECKED cc FILE No.d53-/03 DATE '8/2s:/~'¢ PAGE ~OF -2 PAGES k~=C1.377 LJh ~0.377 (,c'S3) -CJ.2¥~ h ~7~-LJ J;,J-h/~-=-I t2 -CJ.65"3 1(/.2{JC ~-::9,5.:93 Q )'Z-2-hr -z:b~/i:.I ,t-L (9.)l/~K3 J.4 2.t,2.0 )'2-:::3 ~~3~2..0 ...,).;3 &,(__3 __ f~32d~(7127f6)7/z 7<6 a.o 6 g I-0.038 /;/:::0,/6 ~ £J ;,z:_V~'"-.!i '2--r h/ :2JC -:2J "Z.. (3~20 J _~3 ~,5"+9.593(1.$")"'f.593)_ ~7",<:.f (;,0) ~h ~a.S-~3 ~0.s s 3 /?Q~RJ/.5/:e-~5 h/L'f"J'hr /'lt2/JIr/;;;/LJ ~ -;;"121 I-J h ::,S2S (>hp~)r J;.;c:;,.377 (:S25/-.:a /3 8 f5"1-€"Pi)~1-:/0 /-~S290.138.:9·b73 Jj.J.,J 7(2 0 )~ i{3 <::.<;,-,...7~73(1..s))~&73 _'5 .s»~4./h~ 'r::-4.4 ~Y'.~ IJA -=C).52:S=<9K HAm a ;CO SUSITNA JOINT VENTURE SUBJECT d~~~L/'"CSSI1?/200/ V/:::1 JVJ17cho",,!va-r Y COMPUTED 5 if CHECKED C C. FILE No/~53 -/0.3 DATE B/2SL~¢' PAGE L OF 7 PAGES ~~~r/n7 ;to n;,~~:1.7',/3 /At;.~.7c~t.e/#!'h r ~/hc /:h f.=-CJ.3 n(tY.52~z:tJ.13S/ Y4/t,C/>~{2Vl11":l?~).;Jr .s;.C;?C'~J :J~2 0z: (3~,/f57.t?3/(;'sJ)~&73/ -7:3L1 /J/s~L C::1/t:"~/:;J*O~f .c:a ~ REFERENCES 1."Hydraulic Tables",Corps of Engineers,U.S.Army.For sale by Superintendent of Documents,Government Printing Office,Washington, D.C. 2."Hydraulic and Excavation Tables",U.S.Bureau of Reclamation.For sale by Superintendent of Documents,Government Printing Office, Washington,D.C. 3."Handbook of Hydraulics",by H.W.King,McGraw-dill Book Company,New York City. 4."Design Charts for Open-Channel Flow",U.S.Department of Commerce, Bureau of Public Roads.For sale by Superintendent of Documents, Government Printing Office,Washington,D.C. 30221/REF 840922 5. 6. 7. "Open-Channel Hydraulics",by Ven Te Chow,McGraw-rlill Book Company, New York City. U.S.Geological Survey,Circular No.284,1953 Computation of Peak Discharge at Contractions C.E.Kindwater,R.W.Carter,H.J.Tracy. Backwater Effects of Open Channel Constrictions,Transactions,ASCE, Vol.120,pp.993-1006,1955. 4-1 APPENDIX A PROJECT DRAWINGS A-l I I i ;~.~i\~~/)~(//~~~l~~ cxx:rO+L] I ! I I ooaKi l ) ( ~--,----- \ \ I.. ...II!i i I..I~l i ~,ii:Ii •z I;i I !~c~!c It..c ~~I r sf i U0(a::0\,'I!I i :J ""Z .I z II*I i ""~!~l.ll~i I !\I'!I(~~~~~>~xi~ ~~oUo~. "~~e '7i'o'UR.All (I ItCH ..101IItt..I:1) PROPOSED TRANSMISSION CORRIDOR 00 ALASKA POWER AUTHOflffY SU6lTNA HYIJIIOELECTRtC PROJECT o SCALf LEGEND --<!>--""tMM"t MV£O UNOMOl.D HI.,.... ---KCONCWft .....VED UNOIVKJIj)Hiett_V .----.KCOHCWn'eMYfL H........---....~ _·-ltrVI:ft -TRAH5Mt$SIOH COftRIDOO ~ •~ +."!c ~€!.'!Iol/~~.' ----~ -, .~./IIj ._._~_._""'_.. @ ) " ///1 ,./z . ('<01........000 FIGURe A3 l,./-) (-, ,J'....r ..... #'") ~0 l('::t f ...',J I /).pf" ,'(,J" J, \' I, "), ALASKA POWER AUTHORITY ~~~~~!NA ~~OR~?f·I.~:~T'.!~~j~~lfCT-==· WAf"N"O"M AND AEaEflYOfRi PROJECT PLAN WATANA a DEVIL CANYON DEVELOPMENTS 1\ I ./ .j \ rP°•I')'",I I <' ')\ "\)/5\')1 ,, \)~// /J (/ .'7().~~v~l)(!J<~[' .: ('",1.,/"~V'~.' "(I',J ..-.ft/\).u .._,r-, <.Il)\\'~"'.,7-~'"(",')"J'/":U--t'1~",.F'!""(/~;.<J~IL,i-~~"'"JJ ' f/ ' ,.~,.."/.1('SCAl.E 0 Z\\/.It·,.__.."<OOd 1 ,,"""'........, ~,I\I ( I \, l ) \ .00 0 j ")'.'\ I' t.,f(:)( i"Jii' -,,t Ii \ ~\~. 'I' \... It." \' \' t J c <.J( 1\J (,)': \'ttl II 1\ (,\ ,000 I \ ,)(J V '.1 .'II!"r I (,/) 1 ~./~'1\,-.fi:',,''/"(1,)./\'..".,),"I , I \j;'('"-'0 , , J )"1LEGEND '~~£"4"4 'P,"("'_'.__I'ttOPOSfO ftIOlO -'"'"'--'-.''<.-- I,,~'1,/''~~~•••••::.::.:'~",,'D''~,.'l'",_",,,'"._.__>.,'"In',,,=;;. (d ,.00 ,'!1\,')Ilf"':.__,=S'U$SK)ft UN( ,(,",I I ,',I '000"' " \'\,(\,)"i 1\I !l (\',\'I I D£N_ t (I I !"'"I.,I n,GH ...._'',",~_Ij)1/I,I ..",'>, f :''fl'I,,I ,t)',",;~~,:r.':''\"r',"',,I,/'II ''''',I',,00 0i.., \l j , , '( 0 'It':,400 ,'\I \I J I '.' \i'I""I"I""\I'! ''I·'I''l ,I I"I ,,""'.i I ",t ./'"'lit("I',,',',;V'jll/>~/'I,,'0 00 J \','\'I.!I. \\~".''I I .I"I \',\('I ''j',!J "I.),'L ,",I 1\,.,f ')'),'( ,I',/i',,,.•~"I'!-,<,"'" 'I,,/)/[')"-\'I..,I ::,1,\\.::,;)::/(~''I )!1f (,A\',J '--J II !'I If <...,?",~"'~.-'1 'I '"\II,L.')L ..,)-t·-},>~'.(."-":7 ~..-_'\/'\,? I '//(-f5!1<:; ,I,.:'\,\v.,<l-'' I 1\f I ''l',',)'-'\.}\. 'J V (/'1 \VI~I'000 (\"~\'" ' I '~'2 v,I f '/,)I ••",,000 '-)'.,I'""'.) '1 L ',-.,-, \L '<,''>?/(,'1',1 t,.>,\fle?\f." lJI,I \I;l I,t),,(J"S;'\\~'\. I '/,I.~!I YI",I,,'\'\l\l('~,.\,"I{to'~""'\'cj ,II'<l'."i ,.'-.1\',\t\I , I 0 v .,(I J",,''t; (I,'1"\ /"II.,'\1 '.)\' ')'('")",,('),.,""'.(<l:,.Jc ~'i 'i I \..s I,.'.~,'-;,;'<'~['\••~(,)/,i'{'~,,j,,I',,:(,'"'~;>)!"1 1 1' / (,?"'"rJ'I"~"',\' .,,.--'-'I "I,, ",',' /"",1\)/1 ,I 'Et:J(L_~.,~ \' )},':'')I , I }ooo ,, '((",,.0;'1,I 'I J I"('",',II.',1"1 )II,' ) ( 'I'I,,!.' " "0%1 !/!J',I''I \ ,i' II I \' 1"1\',':\(\ ,, n/I,, ;\ \i'l "0II'00 \\' t ,\'-', 1\ /I \/;1//\J \1 \',IIf''/ \ I ,'\' ( ,I S .l..I /(',I'Jl \'.(.\'J A,,t \'\I.\,,\l,(1 (I ( f 1 .J,, ) r" ( i \,1.,,,/' V' I'r:30 0 0 \ I I 'J \ J 1\\''(/,l D 'i,',ii'uI '.~','", \ j \),I ,\,l '\J )\\,()"(}"",l~nl .:1))"'j'(;V I';'-'))\{'{J \ \J f (\~,\(('I'1\,), "''/1 \\\\,/) J \ \ .'I \.",cPO \'' ') @ .'I"",( ,<,)1'1'II'~l , I,, 'ItI' \',"J''Ir , FI_EA4 ACct.••IIIOM(K_......n ACCC"M»J)"IMfOAAJIYJ CC*lTMlCllOIf JIIM:IAO "IIMANEM'1111 IIt040 UTlllOCMl RAILftOot,O HtOJ£CT lOUt«May WAYANA O...M AHD flE,EnYOI" DEVIL CANYON GENERAL PLAN SlJIillW.HYDROELECTRIC PROJECT ALA8KA POWER AUTHORITY o 1000 1000 fin ,(11tCtt·1000 run / /~ .> J 1000 ,..,0 -, I \\ ••UNA }~~~~tIr~ ) 'VlJr)l.'')~.'~-'\ ~(','\J~>-~'r, j ',','"\'<,~)~='I "f --/.,/1J~.r~,....i »>s \ .~,~. ,,'fY,""""....',j ~ICALIO 4.l ,,_.._..l~ /\----.... ~~I §I§I ~:~. 1 WI WI i \' I \\I \2100 \ -:)~I\ \"'\ \ TO WATAMA~ ~ Q ~ ..),,1N,.000 !UIUJlQQ. "~ Jl..~__ .lL1.ZlAJJIlQ ..lL~ APPENDIX B RAINFALL FREQUENCY DATA.FOR ALASKA B-1 -' /t...- ~ ; +T t t I 01su:: -+-~-f~"""""t.,.-r:::.:""'.....--Ifr'-f~~:H--------:3 -----". 0(...z :( 0: a: :l -----~-----;~ 0: 0( ~ < ~ ~-----'----~ ...l < .; "" I '--""'--'>,,---"---,--.--------+--=---.::::---:.~-_+__77_--''';''M~~-----!'~-," i I I \ T f I~II ; I ~i : I ~i-i--"::'~-r- I~~---j----- ]I--------i-- i!T"I Yi~-----..\ :I \ •!\ ~I t L - - -+- - - - - < ::.:: V'lL--+---< ...l < ! T ... CD .~ i~---,- I I I I i~ .-----,;- I II~ I ZI :: i ~------11 ~ i zI:IJ•---~i ~ 1 ,II:I OC I ~ 1 0 ,1 ~.---j~--------t--------1 --~i::~ '.I ~ _':..-- <:.:: VlL_-i-__< .... < ~L_+-__ EL--+----- II) co I I I I w I.cr--I";:,I I S:? i I ~ ,, -----,'-i~i I ~ ""I.I!-----, l~,~-----,: ~=.~ ~ T I~ " T , T i .. I I ~t ..:", .~ I ~ .., !';.. ..., ~, ~.~- !lI~. ·f ~-- "3.. ~- 0-: ! .. ~:y -: I v .. ~- Ir- ~;"'i--" ! -e ::.:: '"L---+----< .... < I \ =f..-,-----r',.---I :,, I i i I /III~; !1 ItI:I I i ::. ..., I cc: ~ ~----- / ) I;/ • I ! I / I:'J\::;. I~.I '1 < ~ ""~---:----<.... < , Ii t I I, I ~\ / I I.~ ;I / J"./r:!/~,.J i I .; I ./ '\; I , :'\:.i././ \ . \ \ I......, t ..... I .. •,;"I;_':1 i I a I~!l I v •t \ "'I ... c