Loading...
HomeMy WebLinkAboutAPA2777- .-, - - n< \4;1.5 ~,(,S "3 ,A 23 nD.~-=fH ALASKA POWER AUTHORITY BEST MANAGEMENT PRACTICES MANUAL EROSION AND SEDIMENTATION CONTROL February 1985 Prepared by Frank Moolin &Associates,Ire. -under contract to Harza-Ebasco Susitna Joint Venture ARLIS Alaska Resources Library &Information Services Anchorage.Alaska ""'" .... PREFACE This manual is one of a series of Rbest management practices"manual to be used in the design,.construction,and maintenance of Alaska Power Authority projects. It represents a coordinated effort involving federal,.state and local government agencies,and special interest groups. The Alaska Power Authority intends that applicable gUidelines and state-of-the- art techniques contained in the manuals will be incorporated where appropriate into the contractual documents for projects constructed,maintained,or operated .-bY'or under the direction of the Alaska Power Authority. TABLE OF CONTENTS PAGE - r r r r r PREFACE CHAPTER 1 -INTRODUCTION CHAPTER 2 -GENERAL GUIDELINES 2.1 PLANNING 2.2 DESIGN 2.3 CONSTRUCTION 2.4 MAINTENANCE CHAPTER 3 -SPECIFIC TECHNIQUES 3.1 EARTHWORK 3.1.1 Clearing and Grubbing 3.1.2 Surface Preparation 3.1.3 Borrow and Disposal Practices 3.1.3.1 Operations Plans 3.1.3.2 All Borrow Sources 3.1.3.3 Upland Sites 3.1.3.4 Floodplain Sites 3.2 DRAINAGE STRUCTURES 3.2.1 Culverts 3.2.1.1 Non-Fish Streams 3.2.1.2 Fish Streams 3.2.2 Low-Water Crossings 3.2.3 Grading and Cross Drains 3.2.4 Vegetated Channels 3.2.5 Ditch Checks,Check Dams 3.2.6 Mechanical Channel Liners 3.2.7 Outlet Protection 3.2.8 Inlet Protection 3.3 ICING CONTROL 3.3.1 Stacked Culverts and Subsurface Drains 3.3.2 Culvert Thawing 3.3.3 Channel Maintenance 3.4 STREAM PROTECTION 1 3 3 6 11 16 19 19 19 20 21 21 22 23 23 39 39 40 40 42 44 46 48 51 53 56 57 57 59 59 62 3.4.1 3.4.2 3.4.3 3.4.4 Protection During Crossing and Construction 62 Bank Stabilization -Revetments 63 Bank Stabilization -Deflectors &Jetties 65 Bank Stabilization -Vegetative ~IE;66 Alaska Resources Library &Information Services Anchorage.Alaska - - - TABLE OF CONTENTS (continued) 3.5 SEDIMENT RETENTION 3.5.1 Settling Ponds 3.5.2 Buffer Strips,Barriers 3.5.3 Trap and Filters for Inlets 3.5.4 Silt Curtains 3.6 SLOPE STABILIZATION PAGE 66 66 71 71 73 73 3.6.1 General Techniques for Non-Pennafrost Areas 73 3.6.2 Temporary Downdrains 75 3.6.3 Permanent Downdrains 76 3.6.4 Diversions and Benches 79 3.6.5 Level Spreaders and Interception Dikes 81 ..... r I r F I 3.7 THERMAL EROSION CONTROL 3.7.1 Prevention/Treatment of Disturbed Surfaces 3.7.2 Cut Slope Stabilization 3.8 REVEGETATION 3.8.1 Soil Constraints 3.8.2 Site Preparation 3.8.3 Seeding 3.8.3.1 Timing 3.8.3.2 Application Methods 3.8.3.3 Recommended Seeds and Mixtures 3.8.4 Fertilization 3.8.5 Mulches 3.8.6 Woody Plants 3.9 RECLAMATION 3.10 INSPECTION AND MONITORING CHil1.PTER 4 -AUTHORITIES AND AGENCIES REFERENCES ·83 83 84 85 87 87 89 89 89 90 99 99 100 101 102 103 - - - -. I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 LIST OF TABLES Guidelines for Borrow Operations in Braided Rivers Guidelines for Borrow Operations in Split Channel Rivers Guidelines for Borrow Operations in Meandering, Sinuous,and Straight Rivers Minimum Flood-Flow Buffer Widths Approximate Maximum Channel Depths -Gravel Bars Adjacent to High-Water and Abandoned Channels Approximate Maximum Channel Depths -Gravel Bars Adjacent to Active Channels Species~Velocities,and Soils for Vegetated Channels Soil Groups in Al aska Cook Inlet-Susitna Area Seeding Recommendations Interior Area Seeding Recommendations Southeast Area Seeding Recommendations Southwest Area Seeding Recommendations Western Area Seeding Recommendations Arctic and Alpine Areas Seeding Recommendations PAGE 25 26 27 33 .35 36 47 88 93 94 95 96 97 98 - - -. FIGURE 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 LIST OF FIGURES Schematic Diagram of a Low-Flow Buffer Schematic Diagram of a Flood-Flow Buffer Low-Water Crossing Cross Drains Ditch Checks,Check Dams Mechanical Channel Liners Outlet Protection Stacked Culverts and Subsurface Drains Frost Belts Gravel Washing Settling Pond Layout Sediment Barriers Temporary Downdrains Pennanent Downdrains Diversions and Benches Level Spreaders and Interceptor Dikes Treatments for Cut Slopes Geographic Areas by Vegetative Type PAGE 30 31 43 45 49 52 54 58 60 70 72 77 78 80 82 86 92 - """ - - - CHAPTER 1 -INTRODUCTION This manual has been prepared by the Alaska Power Authority as one of a series of best management practices manuals for projects constructed or operated by the Power Authority in Alaska.The guidelines and techniques presented in this manual for control and prevention of erosion and sedimentation represent a compil ation of information contained in numerous publ ished sources and the direct recommendations of public agencies and special interest groups.Whil e the information presented will be used in preparing contractual documents for projects,it is not all inclusive.Rather,it concentrates on commonly accepted practices.Nor are all the techniques appropriate for a particular site. Therefore,this manual should be used only as a guide to select appropriate site-specific procedures.It is intended to create an awareness of the ways and means to minimize e.ffects of construction on the natural environment,to identi- fy potential environmental hazards that must be considered,and to suggest methods that can be employed to avoid or minimize environmental disturbances. Federa l,state,and local 1aw impose specific requirements on parti cul ar Power Authority construction projects or activities.This manual is not a substitute for case-by-case identification and compliance with all laws and regulations applicable to the construction and operation of Power Authority projects. Prior to the start of construction of a project component,the contractor will prepare a detailed plan of operations.This plan will be reviewed by the eng;neering consultants,who,in turn,wi 11 recommend action to the Power Authority.The plan prepared by the contractor will conform with the guidelines -1- - - I""" I r r I r I presented in this manual and with any appropriate land or water use authoriza- tion stipulations or conditions. Summary guidelines addressing general situations and conditions are contained in Chapter 2 of this manual.Chapter 3 discusses alternative techniques for specific phases of a project to implement the summary gUidelines listed in Chapter 2.Regulatory authorities and agencies involved in controlling erosion and sedimentation are listed in Chapter 4. -2- ..... - CHAPTER 2 -SUMMARY GUIDELINES Any planned action should be conducted with forethought toward minimizing any damage which may result.This chapter summarizes general guidelines for reduc- ing erosion,minimizing sedimentation,and lessening water quality impacts.It is organized according to the phases of project development:planning,design, construction,and maintenance.Alternative techniques to implement these general guidelines are presented in Chapter 3. 2.1 PLANNING The planning process entails several important elements,including initial site selection,reconnaissance studies,economic evaluations,and review of applicable legal and permitting requirements.This development phase offers the greatest opportunity to explore and anticipate erosion related problems and take initial action to avoid or minimize their occurrence. Following are general guidelines pertaining to the planning phase: Site Selection - o Utilize a planning team comprised of multidisciplinary special- ists experienced in Alaska .conditions. o Fully consider land use management probl ems and assess impacted resources. -3- - - o Maintain an open dialogue among government and private managers, engineers,environmental specialists,and planners,as well as solicit public input. - - o o o o Assemble available data concerning water quality,soils,topogra- phy,climate and biology to determine erosion potential and other related problems. Consolidate related facilities to minimize environmental damage. Utilize existing rights-of-way whenever feasible. Identify criteria needed for selection of acceptable sites and routes. Avoid,when feasible,siting fac;liti~s in areas of unstable permafrost soils,seepage zones,landslide areas,dissected terrain,ponds,natural channels,wetlands,and critical habitat. ..... a Minimize cut and fill approaches to streams and encroachment on streams • Reconnaissance o Minimize surface disturbances when conducting reconnaissance activities. -4- .- - ..... o o o o Reconnaissance surveys shall include preliminary aerial photogra- phy and map studies followed by extensive ground-truthing pro- grams. Collect sufficient data on surface and subsurface soils,geology, vegetative type and cover,fish and wildlife,climate and topo- graphy not only to be incorporated into conceptual engineering design requirements,but also to estimate erosion potential and risk,and requirements for restoration. Areas disturbed by reconnaissance activities shall be treated to prevent degradation. Clearing for ground surveys shall be kept to a minimum. Economic Evaluation ,.... - o o Erosion protection should be cost justified with alternate sites, routes and configurations. Erosion and sedimentation control techniques should be considered as capital costs.Projected maintenance costs of these items should be evaluated. Review of Project Permit Reguirements o Identify project goals and describe proposed construction and -5- other activities to implement goals. o Determine project impact on environment. o Identify statutes,regulations and aencies which regulate either the proposed activity or its impacts.In particular,determine whether existing Power Authority permits control the activities or impacts involved. o Compare burdens imposed by regulations and/or permits for pro- posed activities and alternatives (incl uding costs associ ated with modifying activities to reduce or eliminate requirements). - - o Develop and implement permitting strategy to obtain timely issuance of permits. 2.2 DESIGN Many problems involving erosion during and after construction can be mitigated by proper design.Even with the design,however,some erosion can be expected.Provi si ons shaul d be made to accommodate unforeseen circumstances and provide for adequate protection.General guidelines pertaining to the design phase are summarized as follows: Configuration o When feasible,locate facilities on well drained upland areas and away from stream courses and wetland areas. -6- o Avoid seepage areas and geologic features which may result in instability. o Make cuts as steep as possible to minimize surface area.In erodible soils,incorporate slope stabilization measures. o o o o Fills or embankments should be well compacted and built in lifts. Desi gn s lopes fl atter than the angl e of repose for greater stability. Design to reduce the amount of c1earingrequired for cuts and fi 11 s. Design to prevent accumulatfon of water on surfaces of temporary or completed work areas. Whenever feasible,maintain buffer strips of undisturbed land and vegetation in areas adjacent to streams,1akes over 5 acres in size,critical areas,and borrow sites.Consult resource agency land use plans for suggested buffer widths.Unless agreed to otherwise by the landowner,managing or licensing agency,or when no guidance exists,buffer strips should be 500 feet wide. Drainage Design o Maintain natural drainage patterns where possible. -7- o Design to provide interception and removal of runoff waters. Incorporate temporary measures to protect disturbed areas. o Give ample consideration to determining the design flood when designing culvert installations.Provide for clean-out or use debris collectors to prevent clogging. o Provide sufficient cross-drainage to prevent excess accumulation on uphill sides of temporary or permanent work areas. -. - - o o On low-use access routes,use water bars and low-water crossings for reduced maintenance.Consider fish passage requirements through the use of such techniques as low-flow channels. Provide adequate protection for inlets and outlets of drainage structures. o Approach stream crossings at right angl es,and when feasibl e leave a buffer strip along the stream bank until actual construc- tion of the structure is ready to begin. o In permafrost areas or erodible natural soils,avoid concentrated discharges from drainage structures.Attempt to convert to sheet flow to prevent ground erosion. o Consider bridges where fish passage is critical and where spawn- ing and rearing habitat occurs.Provide clearance for debris and -8- - -o to avoid icing,and stabilize banks. In areas where the facility will be endangered,provide a means to remove or control groundwater and seepage waters to prevent "aufeis"buildup. o Consult applicable federal and state agencies for fish require- ments and other habitat features. Permafrost Design o Whenever possible,use overlay construction as opposed to cut and fill. o When practicable,use insulation beneath fills to reduce the amount of fill material. o When using overlay,avoid stripping of the organic layer. o Consider winter construction to avoid melting and thermal degra- dation. o o Provide for stabilization of cut slopes. Avoid induced drainage or standing water over permafrost areas which can result in rapid thermal degradation. -9- Erosion Control Design o Based on design and construction requirements,incorporate temporary erosion control procedures into design provisions. o Give special attention to immediate control of surface runoff waters. - o \~here feasible,revegetate or otherwise stabilize erodible areas which are to be left uncompleted for the following season. o Consider work schedules and local climatological events to insure adequate erosion protection is provided. ..... o o Take advantage of natural erosion control features such as vegetative and brush buffer strips. Provide for adequate right-of-way to perform erosion-related work. - Design Documentation o Specifications shall clearly detail measures to prevent erosion. o Insure correlation between plans,specifications and design documents. -10- o Insofar as possible,incorporate all temporary and permanent erosion control measures into the final design and bid documents. o Allow flexibility to resident engineers and contractors to improve upon design or methods. o Provide contingency to allow for unforeseen circumstances. o Contract scheduling shall specify the appropriate time to perform all seasonally-effected work,to result in minimal impact. 2.3 CONSTRUCTION The construction force shoul d follow procedures to prevent erosion.The following guidelines pertain to the construction phase: General o A preconstruction conference shall educate and coordinate all involved parties towards the goals of erosion control and pro- tection of water quality,permit requirements and stipulations, and inspections. o Equipment operators and other personnel shall clearly understand and participate in safe and proper practices. -11- o The Power Authority's environmental inspector shall be given sufficient authority to be effective. flearing and Grubbing o Protect establ ished monuments and clearly mark work area boun- daries on the ground prior to initiating clearing or other ground disturbance operations. o All trees,snags and other wood material cut in connection with clearing operations shall be felled within the clearing bounda- ries. o Avoid destroying the organic mat in permafrost areas.Immedi ate treatment shall follow any disturbances. - o Keep clearing and grubbing operations closely in line with subsequent activities.Avoid clearing beyond the present sea- son's schedule. o Dispose of clearing debris in accepted manners.Utilize avail- able materials for brush barriers and ditch checks. o Whenever feasible,uti 1ize non-mechanical means when clearing in permafrost locations,wetlands and in areas such as along tops of cut banks. -12- f"" I Earthwork o Dependent upon load-bearing capacity specifications,chipped wood,limbs,and other organic detritus may be mixed with mineral materials in road fill embankments.Compact fills in lifts to reduce infiltration and settliFig.Avoid placing fill in areas covered by snow or ice. - o o o Provi de temporary protecti on such as berms to the tops of erodi- ble cut and fill slopes. Dispose of waste spoils in approved areas away from water courses. Preferred methods include disposal in any future impoundment area of a reservoir,or retention for rehabilitation of material sites or for solid waste disposal site maintenance. Dependent upon material quality and availability,borrow areas should be located in upland areas. -o Provide for perimeter dikes,ditches and sediment removal at borrow sites. o Apply measures to control surface runoff waters throughout construction areas. -13- - - ~- - Borrow and Disposal Areas a Design for phased development whenever feasible. a Conserve stripped topsoil for respreading over completed areas. a Provide perimeter dikes,diversions and other techniques to prevent sediment movement from excavated areas into streams and drainages. .... I""" I o o o Qrainage o o Incorporate sediment removal techniques into disposal site plans. Prepare comprehensive operations pl ans which outl ine excavation and disposal techniques,applicable erosion procedures,and final restoration measures. Stabilize all slopes and embankments.Grade to stable slope angles. Keep sediment and debri s out of all structures.Stabi 1i ze at inlets and outlets. Consider using low-water crossings for both temporary and perma- nent cross-drains on low-traffic volume access routes,particu- larly those that do not cross fish streams. -14- - o Exercise care and comply with permit stipulations when rerouting streams during bridge and culvert installation.Provide a non-erosive temporary channel or sediment removal measure such as silt curtains. - - o Avoid sedimentation of water courses when removing temporary structures. Erosion Control and Revegetation/Reclamation o Schedule final reclamation activities to closely follow final construction. a Utilize temporary techniques to protect slopes until final treatment. o Conserve stripped topsoil for respreading over completed areas. o Surfaces left exposed for extended periods shall be temporarily revegetated with fast-growing native species in areas subject to erosion or where siltation will be a problem.Encourage reinva- sion by native species from surrounding undisturbed areas. a Establish permanent erosion control items.Give consideration to critical areas and erodible soils.Maintain appropriate erosion control materials on site. -15- - o Abandon,block,and restore unused roads,borrow and disposal sites and other low-use areas.Stabilize cross-drains by either removal or adequate inlet and outlet protection~ o Inspect abandoned facilities periodically to correct any erosion problems. 2.4 MAINTENANCE Proper maintenance is essential to ensure that some erosion control struc,;. tllJres function effectively.General guidelines for maintenance activities are as foll ows: Glenera 1 o Provide a planned,regularly scheduled maintenance program incorporating inspection and expeditious repair. o Develop dialogue between maintenance and design personnel. Drainage Systems ,..,. o o Inspect all drainage structures prior to wet seasons or before winter.Clean out debris and sediment. Remove transportable debri s upstream and downstream of drainage structures. -16- o Clean out ditches,sediment basins and other sediment retention structures periodically.Dispose of sediments according to approved plan design and specifications. ..... - Surface Maintenance o Treat washouts and gullies on sTopes by filling,mulching and revegetation . o Avoid damaging treated areas with mechanized maintenance equip- ment. o Direct special attention to frozen cuts until stabilized. o Keep non-paved surfaces crowned or sloped.Avoid wi ndrows along edges to provide lateral drainage. o Water and fertilize revegetated areas to promote growth. a Dust control chemicals should be used carefully and only lrlitl1 accepted techniques according to local,state and federal regu- lations. Winter Maintenance - o Prior to breakup,remove or level snow berms along road edges to prevent accumulation of meltwaters. -17- - o o Use salts and other chemicals prudently,especially near any streams containing aquatic 1 ife.Comply with applicabl e regu- lations. Attempt to divert aufeis-forming flows away from driving sur- faces.Where possible,thaw culverts susceptible to erosion from ice-buildup. -18- - - .- CHAPTER 3 -SPECIFIC TECHNIQUES This chapter presents descriptions of specific techniques to implement the guidel ines 1 isted in Chapter 2.In most instances,site-specific conditions will dictate the feasibility of a particular technique or the need to modify it. Nn attempt has been made to represent all possible techniques,nor should the te.chniques as described in this manual be considered as design standards or contract specifications. 3.1 EARTHWORK 3.1.1 Clearing and Grubbing Clearing and grubbing activities involve removal of vegetation and timber. Any clearing operation must be restricted to areas marked on the ground at the work site prior to beginning construction.All trees,snags and other y,rood material cut in connection with clearing operations must be felled \'jlithin the clearing boundaries.To minimize and protect erodible surfaces, clearing should be scheduled to closely precede excavation and construction a.ctivities in any given area.All vegetation which does not interfere with construction activities should be left.Whenever feasible,hand clearing, instead of mechanical equipment,shall be used to clear permafrost areas (for summer construction),wetlands,and at the top of cut banks.Buffer strips of existing vegetation at approaches to stream crossings should be maintained until actual construction.Instream equipment operation in alnadromous fish streams should be kept to an absolute minimum and as -19- - ..... permitted by the Alaska Department of Fish and Game.If felled trees or other debris unavoidably enter a stream,they must be removed within 48 hours. Clearing and grubbing materials can be buried,burned,chipped or sold as appropriate. 3.1.2 Surface Preparation A variety of techniques can be used to stabil ize disturbed surface areas, promote seed germination,increase soil moisture retention,reduce movement of seed and fertilizer,and increase runoff infiltration. All disturbed areas,even those which will not be revegetated,should be scarified to a depth of 12 inches to increase aeration and moisture infil- tration and to control runoff."Cat-tracking",which consi sts of running tracked vehicles up and down slopes to create mini-benches,can be effec- tive on slopes up to 2:1.Dics and harrows can also be used for scarifi- cation.Another technique for improving infiltration is to cut or serrate slopes into mini-benches along the contours. The configuration of a fill area is critical to providing surface drainage and minimizing runoff of eroded soils.For example,in roadbed construc- tion,the final lift of each day's work should be crowned and drum rolled to direct surface runoff to ditches,berms,or other stabilized areas.A surface dressing of aggregate can also minimize surface erosion. -20- ~- - F"" I - If the surface is to remain unused for extended periods,temporary cover may be required to stabilize soil from wind and winter erosion.This can be achieved by applying aggregate cover or soil binders,or by establishing temporary vegetation. 3.1.3 Borrow and Disposal Practices Careful site planning of borrow and disposal areas is required to prevent or minimize sedimentation.Each site will impose its own 1 imitations, ~rhich should be considered to facilitate economical and effective con- struction techniques. 3.1.3.1 Operations Plans A,detailed plan of operations will be required for each borrow site.The plan should include: -21- - ...... I o Oust control procedures o Final reclamation measures 3.1.3.2 All Borrow Sources Whenever possible~borrow sites should be located in upland areas rather tlhan in floodplains where they may degrade water quality and sensitive habitat. An sites should be surveyed and their boundaries clearly marked.Pre- construction elevation controls will facilitate restoration efforts upon site closure.It is particularly important that sites planned to be open during winter be surveyed during the.summer months and that boundary markings be established so they they can be found during heavy snow cover. The 1 imits of the area worked within a site should avoid a straight 1 ine configuration and should be shaped to blend with natural physical features. When possible.borrow sites should be worked in phases to minimize the amount of disturbed areas.As one segment is completed.it may besta- bilized while the next segment is developed.Progressive upslope or upstream work will allow use of preceding work sections for settling ponds (see Section 3.5.1). If operations require washing of heavy equipment.a specially designated area must be provided to facilitate treatment of the wash water.For large operations,treatment may require construction of a catch basin. -22- - i'J"'"'I, - -I 3.1.3.3 Upland Sites Borrow areas should be located away from heavy groundwater seepage path- ways.Surface runoff upslope of the pit should be diverted with dikes to ditches.The floor of the pit should be sloped to facilitate drainage and any surface runoff from the pit should pass through settling ponds before entering a waterbody.Small volumes of discharges from settling ponds can be diverted to overland flow if ground conditions allow the water to percolate at a rate which will not cause rills or gullies. Spoil or waste material removed during site opening should be disposed of in an approved manner or stockpiled. Borrow area slopes should not adjoin steep slopes except for those slopes composed of rock.Excavated faces of rock quarries may be left vertical, but no face should be more than 30 feet high without an intermediate bench 10 feet wide. All completed borrow sites should be sloped to stable angles.Further reclamation,such as revegetation,will be performed in accordance with stipulations of the regulatory agency or landowner.Respreading topsoil removed during initial site opening will assist in reclamation efforts. 3.1.3.4 Floodplain Sites Site Planning Borrow sites within a floodplain should be developed so that disturbance of -23- .... the following features is minimized: o Fish spawning and overwintering habitats o Vegetated banks and associated riparian zones - o Springs o Active channels in small rivers .Projects requiring large borrow quantities (approximately 65~000 cubic yards or more)should consider 1)scraping of unvegetated,mid-channel bars a'nd lateral bars in braided rivers and medium and large split-channel rivers,and 2)pit excavation in terraces or inactive floodplains.Pro- j1ects requiring less than 65,000 cubic yards should consider 1)scraping wnvegetated mid-channel and lateral bars in braided rivers and large and mledium split-channel rivers,2)scrapi,ng point bars of large and medium meandering rivers,and 3)scraping in terraces or inactive floodplains. Specific guidelines for borrow operations in rivers of different size l )and configuration,and for different deposit locations in each size and confi- guration are presented in Tables 1 through 3. D,esign of specific work area boundaries should incorporate the following factors: 1)Small river - a river with a drainage area less than 40 square miles and a mean annual flow channel top width of less than 50 feet. Medium river - a river with a drainage area greater than 40 square miles but less than 380 square miles and a mean annual flow channel top width greater than 50 feet but less than 300 feet. large rivers - a river with a drainage area greater than 380 square miles and a mean annual channel top width greater than 300 feet. -24- TABLE 1 GUIDELINES FOR BORROW OPERATIONS IN BRAIDED RIVERS ,... River Site Associated size location channel Type of deposit l::or-..... l::R:S (IJ r-or-r-l::(IJ "R:S c-l::l::~~l:: r-".....R:S l::R:S ~Q)R:S ~ c-O (IJ oJ::R:S .0 (IJ "r-l:: "0 l::t)oJ::"l::111 R:S 0 r-l::t)~.....l::10 or-.0 0 'i-10 ~R:S QJ R:S Q) r-oJ::QJ "~co l::QJ e ""'i-QJ t)+.l QJ 10 l::e Q)CIJ >Q)10 l::co r-IO QJ of..)of..)e QJ or-t)QJ 3:0 R:S oJ::(IJ "R:S 10.....~QJ >of..)10 >,"of..)~t)"'r-of..)of..) r-'r-C'l or-t)~or-oJ::l::l::(IJ ,or-111 CIJ QJ R:S "~of..)10 ~of..)C'l R:S "'r-of..)"tJ)of..)C'l C'leQJR:S U l::QJ t)'r-.0 QJ 0 R:S or-l::~(IJ QJ t/):r:...J et:-l-et::::I:et:ce 0......J :r:-0 ::>::>Comments X X X X X X 1o Crave1 may be available by scraping or dredgingo X X X X X X X 2o Gravel available by scraping. X X X X X·X X X X 3.Gravel available by scraping. X X X X X X X X X 4.Generally should not be mined. X X X X X X X X X 5.Banks should not be minedo X X X X X X X X 6.Grav~l available by scraping. X X X X X X X X X 7.Gravel avail ab1 e by scraping. X X X X X X X X X X X 8.Crave1 available by scraping or pit miningo Comments Comment 1.Glenera11y,the bed of an active channel should not be disturbed.If bed deposits are the only ......available source,.the side channel (s)should be mined rather than the main channel.Select side channel (s)that carr'y less thilln approximately one third of the total flow·during the mining p~riod;block off upstream ends and minEl by scraping operations.If the main channel must be mined,dredging may be an apprOllriate method. Comment 2.G.'ave1 is available by scraping gravel deposits to near the low summer flow or no lower than the ,....,water level present during the mining operation.Maintain appropriate buffers. Comment 3.C"ave1 is available by scraping such that the configuration of the channel is not greatly changed and there is nota high probability of channel diversion through the mined area. ,....Comment 4.VEigetated i sl ands shou1 d generall y be exc1 uded.Exposed deposits should be considered before vege- tatEld island deposits.If deposits in feasible alternative locations are not sufficient,and vegetated islands are abundant in the particular reach in question,up to about 10 to 20 percent of this habitat may be removed _from about a given 3-mi1e length of the floodplain. Comm~.Vegetated river banks of both active and high-water channels should not be disturbed. Comn~.G,'avel is available by scraping within the channel;but the general configuration of the channel should be maintained. -Comment 7.Gravel may be available by scraping in these locations,but the general configuration of the channel should be maintained. Comm~.Generally,pits should only be considered when more than 65,000 cubic yards are required. Sour'ce:U.So Fish and Wildlife Service (1980) TABLE 2 GUIDELINES FOR BORROW OPERATIONS IN SPLIT CHANNEL RIVERS - - - River Site Associated size location channel Type of deposit c..........c ~QJ -.....-C QJ "C ~0-C C ~~c....."C .....~c ~~QJ ~~ 0-0 QJ .s:::.~.a QJ "C .....C "C 0 C U .s:::."C c tI)~ 0 .....c u ~-c ~......a . 0 t!-~~~QJ ~~......s:::.QJ "C ~c:J c QJ'"C "C t!-QJ U .j.,,)QJ ~c E QJ QJ >QJ ~C c:J .....~QJ .j.,,)+" E QJ .....U QJ :::0 ~.s:::.QJI "C ~~.....::;:,QJ >.j.J ~>I "C .j.,,)~U "C ......j.,,).j.J..........C'l .....U ~......s:::.c c QJ I .,...tI)QJ QJ ~"C ~.j.J ~~+"C)~"C ......j.J "C IIlI +"C'l C'l E QJ ~U C QJ U .,...a QJ 0 ~.....c ::;:,QJ QJ V'):::::.....l e(.....l-e(::::J:e(c:J a.......l :::::.....0 ::::-::::-Comments X X X X X 1•Gravel may be avail able by scraping or dredging. X X X X X X X 2.Gravel available by scraping X X X X X X X X X 3.Some gravel may be avail abl e by scraping or pit. X X X X X X X X X 4.Generally should not be mined. X X X X X X X X X 5.Banks should not be mined. X X X X X X X X X X 6.Gravel available by scraping. X X X X X X X X X X 7.Should not be mined. X X X X X X X X X X X 8.Generally avoid,but much available. X X X X X X X X X X X X X X 9.Gravel avail abl e by scrape or pit. X X X X X X X X X X X 10.Gravel available by scraping. Comment 1.Generally the bed of the active channel should not be disturbed.If bed deposits are the only available source,the side channel (s)should be mined rather than the main channel.If the site contains a side channel that carries less than approximately one third of the total flow during the mining period this channel can be blocked at its upstream end and mined by scraping.If channels approximately this size are not available-then either the side or main channel can be mined using dredging. Comment 2.Gravel is available by scraping deposits to near the low summer flow,or no lower than the water level present during the mining operation.Maintain appropriate buffers. -.Comment 3.Gravel is available if suitable buffers are maintained to protect against channel diversion. Comment 4.Exposed deposits should be considered before vegetatl~d island deposits.If deposits in feasible alternative locations are not sufficient,and vegetated islands are abundant in the river system in question, r'"about 10 t02C percent of this habitat may be removed from about a 3-mile reach of floodplain. Comment 5.Vegetated river banks of both active and high-water channels should not be disturbed. Comment 6.Gravel is available by scraping in the high-water channel,but precautions must be taken to avoid channel diversion. Comment 7.Mining is not recommended in or near the active channel of small split channel rivers because there is not must material available. Comment 8.There generally is not much material avail able in these deposits and they should be avoided.If --only a small amount (13,000 cubic yards)of gravel is needed,these deposits may be considered for scraping. Comment 9.Pits should be considered when more than 65,000 cubic yards. Comment 10.Some gravel is available by scraping,but the general configuration of the channel should be main- ,....tained. Source:U.S.Fish and Wildlife Service (1980) TABLE 3 GUIDELINES FOR BORROW OPERATIONS IN MEANDERING,SINUOUS,AND STRAIGHT RIVERS - River Site Associated size location channel Type of deposit ~....r- ~ttS OJ ............~0)"'C ttS 0-~~s-s-~...."'C ....ttS ~ttS s-O)ttS .:::.!. 0-0 OJ .s::ttS .Q 0)"'C ....~ "'C 0 ~u .s::"'C ~1Il ttS 0 -~u s-....~ttS ......0 0 ~ttl s-ttS 0)ttS OJ.....s::OJ "'C s-..0 ~~E "'C "'C ~OJ U 01->OJ ttS ~0)OJ >OJ ttS ~.Q ....ttS OJ 01->01-> E OJ ....U OJ 3 0 ttS .s::<ll "'C ttS ttS....::::5 OJ >01->ttS >I "'C 01->s-U "'C ....01->01-> r-....Ol ....U s-.....c ~~0)I ....1Il OJ OJ ~"'C s-ol->ttS s-ol->t:)1 ttS "'C ....01->"'C 1Il 4->Ol Ol OJ 1tI U ~<ll U ......0 OJ 0 ttS ....~::::5 OJ OJ V)%....J <t .....l-<t ::c:<t co c.......J %.....0 :>:>Comments X X X X X 1•Some gravel may be available by dredging. X X X X X X X 2.Gravel avail able by scraping. X X X X X X X X X 3.Some gravel may be available. X X X X X X X X X 4.Not recommended in these systems. X X X X X X X X X 5.Banks should not be mined. X X X X X X X X X X 6.Gravel available by scraping. X X X X X X X X X X X X 7.Should not be mined. X X X X X X X X X X 8.Generally aVOid,but much available. X X X X X X X X X X X X X X 9.Gravel available by pit or scrape. Comment 1.Generally the bed of an active channel should not be disturbed.If bed deposits are the only avail- able source,the gravel should be taken by dredging only under strict work plans and stipulations • .....Comment 2.Gravel is available by scraping deposits to near the low summer flow or no lower than the water level present during the mining operation.Maintain appropriate buffers. Comment 3.Gravel is available if suitable buffers are maintained to protect against channel diversion. ~Comment 4.Vegetated islands should not be disturbed. Comment 5.Vegetated river banks of both active and high-water chalnnels should not be disturbed. Comment 6.Gravel is available by scraping in the high_ater chcrnnel,but precautions must be taken to avoid channel diversion. """l'Comment 7.Mi ni ng in the acti veor hi gh-water channel s of these small rivers is not recommended because there is not much material available. Comment 8.There generally is not much gravel available in these deposits and they should be avoided.If only a small amount (13,000 cubic yards)is needed,scraping may be considered. Comment 9.Pits should be considered when more than 65,000 cubic yards are required. Source:U.S.Fish and Wildlife Service (1980) - - o o o o o o Site configurations should be shaped to blend with natural physical features Slopes and contours resembl ing those of natural bars should be maintained when scraping point bars of meandering and sinuous systems Natural gravel bar shapes should be maintained when scraping mid-channel and lateral bars of bll'aided systems Pits should be excavated to provide irregular shore1 ines wi th curved configurations,islands,spits,and diverse shorel ine depths When vegetated areas cannot be avoided,it is usual1ydesirab1e to locate material sources in large stands of homogeneous mature vegetated areas The site should be located on the same side of the floodplain as the material use point tom;nimi;~e the need for crossing active channels. - Site Preparation Design of floodplain access should avoid vegetated habitats.If it is necessary to traverse vegetated areas,ice roads should be used for winter operations and gravel should be spread over the organic layer for summer operations.Floodplain access should occur at the inside of a meander to avoid trafficking incised banks at outside meanders.Crossing of other incised floodplain banks should also be avoided.If incised banks must be crossed,a removeable fill ramp should be constructed instead of cutting or -28- ...... notching the bank.If active channels must be crossed,crossing should be via temporary bridges,low-water crossings,or properly cu1verted access roads. Any vegetation and organic overburden cleared during site preparation should be removed from the active floodplain and eithe!r stockpiled for restoration activi- ties or disposed of in an approved manner. Buffer areas of undisturbed ground surface are required for most floodplain borrow sites to maintain the integrity of active channel s.Where natural buffers do not exist or are too low to be effective,man-made buffers in the form of river-training structures and bank protection devices may be necessary. low-flow buffers are recommended for scrapirtg operations on unvegetated gravel bars adjacent to active channels.A low-flow buffer is a strip of undisturbed ground surface extending up the bank and beneath the water surface from the water1s low summer flow level (Figure I).The upper limit ofa low-flow buffer is that point on the bank that is the lesser of the following:1)having an elevation that is 0.5 meters (1.6 feet)above the low summer flow surface elevation,or 2}having a horizontal distance to the low summer flow water's edge wh i ch is equa 1 to one-half the norma 1 top wi dth at channe l-fu11 flow conditions.The lower limit is that point on the bed that has a horizontal distance to the water1s edge which is 10 percent of the top width of the low summer flow channel. Flood-flow buffers should be used for scraping or pit-mining operations that are separated from active channels (Figure 2).The purpose of this -29- Lo'w Summer Flow Water's Edge Lower Buffer Boundary - .... O.5W w •••.QJt~!l!l ~1.•f.y.IJ••~!!£l~••••••••52 ••• •5m 'il low Summer Flow Stage w ALASKA POWER AUTHORITY SCHEMATIC DIAGRAM OF A LOW-FLOW BUFFER FIGURE 1 .- - ALASKA PO WER AUTHORITY SCHEMATIC D'A FLOOD IAGRAM OF -FLOW BUFFER FIGURE 2 ""." I undi sturbed,often vegetated t area is to prevent the active channel from diverting through the material site. In scraping removal operations t the site shoul d be protected by a flood- flow buffer for at least 5 to 8 years to allow re-establishment of vegeta- tion.The height of the buffer should be at least as high as the water level during a 5-year flood.Table 4 Hsts minimum flood-flow buffer widths for different sites.The width can be reduced to half the recom- mended minimum at the downstream end of the scraped site. For pi t removal operations,the si te s hou 1d be protected by a fl ood-fl ow buffer for at least 20 years to provide long-term protection of this newly created habitat.The elevation of the buffer should be at least as high as the water level during a 20-year flood.Minimum flood-flow buffer widths for pit operations are listed on Table 4.The width can be reduced to 20 percent of the recommended minimum at the downstream end of the pit. Temporary dikes should be constructed around borrow sites that would be inundated during operation.Dikes should be impermeable,high enough to prevent overtopping t and protected from ernsion.They are often construc- ted of stone and/or earth.Side slopes should be stable and riprapped (generally,a 2:1 slope is recommended).The dikes should be constructed to minimize disturbance to low-flow channels and avoid fish entrapment. Borrow Operation -Scraped Sites Gravel bars adjacent to high-water and abandoned channels can be scraped to -32- TABLE 4 MINIMUM FLOOD-FLOW BUFFER WIDTHS - Scraping Operations River Size Small Medium Large Pit Operations River Size Small Medium Large Source:U.S.Fish and Wildlife Service (1980)· -33- Minimum Width (ft) 50 115 165 Minimum Width (ft) 250 500 800 -. a specified level at the edge of the channel and should be sloped toward the channel to provide proper drainage.An average maximum depth (the distance between the average thalweg profile line and the channel-full stage at a point along the channel)should be maintained in the channel to provide for flow containment during periods of high flow within the chan- nel.Approximate values of maximum depth that should be maintained for three ranges of channel-full width ~re listed on Table 5. Gravel bars·adjacent to active channels can be scraped to a specified minimum level and should be sloped toward the channel to provide proper drainage.The recommended lowest elevation of gravel removal is controlled by the greatest of the following three elevations: F"", - - o o o The upper elevation of the low-flow buffer The elevation corresponding to 6 inches above the average water level expected during the gravel removal operation The elevation that will maintain a specified average maximum depth in the active channel (approximate values of maximum depth for three ranges of channel-full width are listed on Table 6) Scraping in high-water and abandoned channels should follow the alignment of the channel.Side slopes should be stabilized for flow conditions during a 2-year recurrence interval (annual)flood.The channel-full top width should not be increased.Longitudinal slope into the material site at the upstream end should not exceed 10 times the average slope of the -34- - TABLE 5 APPROXIMATE MAXIMUM CHANNEL DEPTHS GRAVEL BARS ADJACENT TO HIGH-WATER AND ABANDONED CHANNELS Braided Configuration Approximate maximum depth (in) Channel-full width (ft) o -15 15 -100 100 or greater High-water channel s. 12 20 30 Abandoned channels 2 6 20 .-Split,Meandering,Sinuous,and Straight Configurations Approximate maximum depth (in) - Channel-full width (ft) o-15 15 -100 100 or greater High-water channel~ 15 24 40 Abandoned channels 6 12 24 -Source:U.s.Fish and Wildlife Service (1980) -35- - TABLE 6 APPROXIMATE MAXIMUM CHANNEL DEPTHS GRAVEL BARS ADJACENT TO ACTIVE CHANNELS Braided Configurati.Q.!l - - - Channel-full width (ft) a -15 15 -100 100 or greater Approximate maximum depth (in) 12 20 39 F"" I Split,Meandering,Sinuous,and Straight Configurations ,...., - .,.... Channel-full width (ft) o-15 15 -100 100 or greater -36- Approximate maximum depth (in) 20 39 51 - ..... .- - .-. channel.longitudinal slope out of the material site at the downstream end should permit channel drainage during a flow recession to prevent against fish entrapment. Scraping in active side channels that have been diked and dewatered should follow the alignment of the channel and be confined between the low-flow buffers.Slopes of the material site should be stabilized for flows having a 5-year recurrence interval.Existing pool-riffle sequences should be retained.If water is present in an active channel scheduled for winter scraping,the site should not be operated. Horrow Operation -Excavated Sites When appropriate,pits should be long and narrow in shape,be aligned parallel to the river,and provide an irregular configuration.At least 30 to 50 percent of the shoreline should have a gradual slope. Borrow pits connected to a river and those planned for restoration as fish management areas shoul d have a mean depth of at 1east 8 feet to ensure winter survival of fish.Those pits connected to a river should include an outlet channel for a path of low resistance when the pit is inundated.All outlet channels should be located on the downstream end of the pit and connect to a scour area of an active channel.While outlet channels should be angled downstream,they should not be of straight line configurations. Channels should be deep enough to allow fish passage during low flow conditions.Outlet channels should be constructed at the end of site closure to minimize siltation in the river • -37- - Borrow Operation -Dredged Sites Active channels scheduled for winter dredging that contain flowing water should not be disturbed as these areas may provide overwintering habitat for fish.Depth of excavation in an active channel during any season shaul d be confi ned to the wi dth of the surrmer low flow channel mi nus the low-flow buffer.The length of excavation in a pool of the active main channel should be confined to the length of the pool.Length of excavation in a riffle should not exceed the average lengths of the pools within 3 miles up and downstream of the site.Slopes of the active channel site should be designed to remain stable during 5:-year flood flows. Borrow Site Restoration Floodplain borrow sites should be returned,as closely as is possible,to natural conditions immediately following completion of operations.The work area should be sloped and contoured to minimize ponding and to blend with surrounding features.Access roads,culverts,and bridges should be removed.All cut slopes should be stabilized to prevent thermal,fluvial, and wind erosion.Water in the settling ponds should be released by pumping or lowering dikes.Silt from settling ponds may be 1)left in place in inactive floodplains and terrace locations (dikes should be lowered to the level of the impounded silt),2)used in revegetation activities (see Section 3.8),or 3)removed to an approved disposal area. At side-channel sites which were diked to allow scraping in a dry condition,the downstream di ke shoul d be removed and the upstream di ke should be lowered to correspond to the river stage of a 1.25-year flood to -38- - "'"' -. - .... - prevent large quantities of sediment from being washed from the site into the river at low flow conditions.Outlet channels from pits should be constructed during the final phases of site closure. 3.2 DRAINAGE STRUCTURES The follo\'/ing paragraphs di scuss al ternative techniques to facH itate drainage and their respective advantages and limitations.Detailed design guidelines,particularly for culverts and bridges,are·presented in a report prepared for the Power Authori ty by the Harza-Ebasco Sus itna Joint Venture entitled nDrainage Structure and Waterway Design Guidelines". 3.2.1 Culverts Culverts are used to provide streamflow and fish passage where continuous access across a stream is required"and where flow,gradient and/or length of span do not mandate bridging.Crossings should be 90 degrees to the direction of stream flow.In permafrost areas,culverts should be designed to prevent ponding. Culvert installation should occur nin the dry"whenever possible.Stream diversion or fluming may be possible in special situations.The use of a temporary dam and pumps to route water around a cul vert site often is a practical method for small streams.If culvert installation occurs in flowing water,the upstream end should be sandbagged or back.filled first to immediately direct flow through the culvert.Culvert installation should not occur during frozen conditions unless channel alignment,thalweg slope, -39- - -. ..... 3.2.1.1 Non-Fish Streams The culvert should match the gradient of the natural channel and the depth of headwater at design flow (QSO)should be no greater than Ii times the culvert diameter.If the grade is steep or the culvert outlet is above the streambed,energy dissipators (see Section 3.2.7)may be required • 3.2.1.2 Fish Streams Velocity of water within a culvert is one of the primary considerations in ensuring that culvert design is adequate to permit upstream movement of fish.The velocity criteria applied to any installation must generally be adequate to protect the weakest swimming upstream migrant at the time that migration occurs.The culvert velocity through which a fish can success- fully swim is dependent on the length of time that the swimming speed must be sustained and,therefore,dependent on cul vert length.Where the velocity criteria cannot be met,reducing the width of the road or pad at the crossing to shorten the length of the culvert may achieve compliance. The slope of the culvert may match the natural river or streambed slope up to a slope of 0.5 percent,provided that the velocity criteria can be attained.Culverts may be installed in a natural streambed having a slope greater than 0.5 percent,provided that the culvert can reasonably be -40- - - installed to maintain the appropriate velocity without danger of excessive erosion and perching. The design flow for purposes of fish passage design must be at least the mean annual flood (Q2.33).Headwater depth must be less than or equal to culvert diameter at the intake for the design flow (Q2.33). At least one-fifth of the diameter of a round pipe culvert at the outlet end must be set below the lowest elevation of the natural stream bottom. At least 6 inches of all pipe-arch culverts should be similarly set.Depth of burial of the inlet for circular or pipe-arch culverts will depend on the slope of the culvert relative to the streambed slope.The use of oversized~deeply buried culverts should be considered in situations where stream gradients make culvert velocity criteria difficult to meet or Where unusually low velocities are required. Where alignment and other conditions allow,stream crossings should be located in reaches of lower gradient.Culverts can then be placed as near horizontal as possible,allowing lower in-pipe velocities.All bank cuts, slopes,fi lls and exposed earth work attributable to cul vert install ation must be stabilized to prevent erosion during construction and the culvert1s operational life.Inlets and outlets must be stabilized with riprap or other appropriate method.Hand labor should be utilized to the greatest practical extent when armoring culvert inlet and outlet areas. -41- 3.2.2 low-Water Crossings Low-water crossings (Figure 3)may be used to provide passage of stream flow on roads or workpads having low traffic volumes.They are not suit- able for use on high-flow streams t deeply incised streams t and areas of heavy traffic.While low-water crossings are inexpensive to install,they frequently result in more maintenance costs than initial installation costs for temporary bridges.Periodic (perhaps frequent)grading,fish blockage t sedimentation t traffic lane failure,and icing are common problems. The intent of the low-water crossing is to match the natural geometry as closely as possibl e.Therefore,they are only appl icabl e where stream banks are low and approach grades are fl at.The depth of the crossing should be comparable to that in the stream.Low-water crossings in streams having intermittent or seasonably low flow should be trapezoidal.On fish streams,a minimum water depth of 4 inches must be maintained.Average water velocity within the crossing should not exceed the average velocity in adjoining stream sections.The banks and bed of the excavated crossing should be protected with rock armor sized according to the maximum flow velocity and the anticipated traffic loading.Where applicable,the streambed should be sealed to prevent dewatering through excessive subsurface flow by employing sufficiently fine material or an impervious membrane. When constructing a low-water crossing,water flow through the disturbed streambed should be minimized.Stream diversion or fluming may be possible.The use of a temporary dam and pumps to route water around the -42- - FLOW " PLAN ":.,a G11;0 (.0 ~• i1',.01 I 00 I I 0 ~Ol I ~~I 0 I (J '-'e ~? r- I PROFILE .- ALASKA POWER AUTHORITY LOW-WATER CROSSING FIGURE 3. ..... - - ~, crossing site is a practical method for small streams.Temporary dams should be composed of sandbags,fill contained in visqueen,or other non-erodible materials.Bypass pumps should be adequate to avoid buildup of water behind the darn and to assure sufficient flow downstream.Pump discharge points should be naturally or artifical1y armored to dissipate energy and prevent erosion. 3.2.3 Grading and Cross Drains Temporary and other unpaved roads,'especially in areas of steep slopes and highly erodible soils,must be provided with adequate drainag.e to prevent gullying.Careful grading,using dips and pools in the grade,will break up surface flows on or parallel toa road.A cross fa 11 of 3 percent is recommended.Berms and tracks which prevent croSs drainage should be graded out.Snow berms should be removed before breakup to permit lateral drainage. Cross drains,such as box or pole culverts (illustrated on Figure 4),can be installed across the surface of temporary roads to collect surface runoff.Round culverts can be used to intercept flow in ditches upstream of a bridge or culvert crossing,carry it across the road,and discharge it on the downstream side of the crossing to prevent erosion. The distance between dips or crossdrains should usually be less than 100 feet for slopes over 5 percent.In silt soil areas,intervals should usually be as noted below. -44- 1"Pipe ;'1'·'••••.•"~}'\I t ~.-.-;..:.~.:-:1/:'"~#..-•.:-I'.:'--.lit...:....-.......: •.......-...... . •••:,.\I 4"I"\~too_: I ••,..1 ••3"X 8'1/is'=_. iII,-"..J -.~-1'-11 • •;:.~.TL"L :3"x 12" ::.~.,.:~:1/.....:~.::-•.;11 BOX CULVERT 8"Dia. POLE CUL VERT Spikes .........DOWNGRADE .....-..'..'.:-. ...... I, I,, --I I r-r I Riprap CROSS DRAIN CULVERT ALASKA POWER AUTHORITY CROSS DRAINS FIGURE 4 - - Slope (%) 10 8 6 4 2 3.2.4 Vegetated Channels Cross Drain I nterva1 (feet) 55 65 70 80 95 - -. Vegetation can be used to protect man-made 0'"natural channel s from erosion where soil conditions,flow velocities,and slope will allow adequate stabilization with grass.While grass lined channels are the least expen- sive method to carry surface runoff flow,they require careful design and good maintenance to prevent gully erosion. Generally,grass channels are not suitable for flows greater than 5 to 6 feet per second or gradients more than 10 percent.Nettings (Section 3.2.6),ditch checks (Section 3.2.5),or other techniques can be used in the channels to decrease flows or reduce gradients.Table 7 shows allow- able velocities for various species of grass in erodible and erosion res i stant so il s• While expensive,sodding may be required where rapid cover and protection are necessary.Overlapping sod strips parcillel to the water flow can be used in relatively flat ditches that carry large volumes of water.Shin- gling,where grass strips are laid perpendicular to the flow,can be used -46- I~ ....,' TABLE 7 SPECIES,VELOCITIES,AND SOILS FOR VEGETATED CHANNELS -47- ..- ...... - on short grades that are steeper than 10 percent.In both methods,staking the overlapped portions will increase effectiveness . Channel sections may be V-shaped,trapezoidal,or parabol ic.Parabolic cross sections have proven to be the most satisfactory.Trapezoidal sections tend to revert to a parabolic shape.Due to flow velocity distri- bution,V-shaped channels should not be used if channel side slopes would exceed 6:1. Provision should be made to divert flows during construction of the channel and to avoid excessive compaction of soils.A tile drain placed offset from the center of the channel by at least one-quarter of the channel width will assist in turf maintenance.Regular mowing and a yearly application of fertilizer will increase the effectiveness of the grass channel. 3.2.5 Ditch Checks,Check Dams Ditch checks and check dams (Figure 5)are temporary structures used during construction to protect natural channels from construction-induced sedimen- tation,or to protect man-made ditches until permanent liners,such as vegetation,can be established.They are aha used in steep channels as a gradient break to reduce slope.These inexpensive structures,which can be built with scrap or native materials,are used to reduce flow velocities, trap eroded sediments,and prevent gullying of the channel.They may require periodic clean-out or replacement due to accumulation of silt which will reduce flow pereol ation through the structure and may cause water to overtop channel banks. -48- STRAW BALE CHECKS VIEW FROM DOWNSTREAM -o-C/l QI <3 I I Rip-Rap Apron to Prevent Formation of Scour Hole I I I:t 4' ~I I I ....f:!l J E::J III I_~I J E:J I STRA W BALE CHECK FOR CHANNELS OVER 9 FEET WIDE STRA W BALE CHECKS FOR SMALL CHANNELS WIRE FENCE CHECK WITH STRAW OR BRUSH BUNDLES WIRED J. TO FENCE·,FLOW - - I J c .,"\I I I .Rip-Rap Apron to Prevent I I Formation of Scour Hole Wire Upstream I 1 I of Posts I .'FLOW ISTRAW BALES~.3.I :'..•.WIRED TO FENCE4/1 x 4".,....Cc::::r t::::J I Posts -......a -til.lll 4'Min. §:_2.5.Z!fiI_ !!!!E lilt ]II!~..iliE 3IR 3iiiir ...---...~.-.-..-,..--&I cccccc Use Rip-Rap on Downstream Side WOODEN STAKES ,4/'Dia.Poles ~ i BRUSH BETWEEN TWO ROWS OF STAKES 4"Dia.Stakes on 2'Centers ~.\,~~",. lJ \'~ Use Rip-Rap Apron ALASKA POWER AUTHORITY DITCH CHECKS AND CHECK DAMS FIGURE a - ".,.. - Straw bale checks in channels over 9 feet wide consist of bales staked with two 2!-foot wooden or metal stakes and tied with nylon cord or wire.A riprap apron is placed downstream of the bales for a minimum of 4 feet and at the edges of the bales to bring the structure to the crest of the .channel.On channels less than 9 feet wide,small checks consisting of two bales may be used without riprap.They should be spaced approximately 50 feet apart. A wire fence/straw bale check consists ofa 3-foot cyclone fence nailed to the upstream side of 4-inch diameter wooden stakes which are driven across the width of the channel.Straw bales are wired together and to the upstream side of the fence.A riprap apron is placed downstream for a minimum of 4 feet. On sites with large quantites of brushwood,bundles approximately 2 feet in diameter can be substituted for straw bales.The bundles should be tied with #9 wire,laid in staggered formation upstream of the fence,and wired together and to the fence. Two rows of 4-inch diameter stakes with brush packed between them is another inexpensive check.The brush should be secured by criss-crossing #9 wire between the stakes. A semi -permeab 1e check may be constructed elf rock.01 ameters of 9 inches are sufficient for velocities of up to 8 feet per second.One-hundred pound sand bags may be used as a check in areas where rock 1s not available.A riprap apron should extend at least 4 feet downstream. -50- - ~ I I 3.2.6 Mechanical Channel Liners Methanical channel liners are used where runoff quantities,velocities,and soil conditions require greater protection than can be afforded by vegeta- tive means.They may often be used temporarily when vegetative liners are becoming establ ished or permanently in conjunction with vegetative 1iners to slow velocity and increase infiltration.The initial costs may be higher than vegetative channel liners but,with proper design and con- struction,mechanical channel liners have long life effectiveness.Some will require maintenance due to scour. Nettings made of biodegradable materi al s are often used to stabil ize newly vegetated channel s.Theyal so offer some protection on their own and are effective for medium velocities up to 6 feet per second.In large channels,where several widths of netting are required,strips of netting should overlap 2 inches at all edges and should be stabilized with hairpin- shaped wire staples.The top end of the netting shoul d be buried in a 4-inch trench.Equipment should roll the c:hannel to assure that the net makes contact with the soil. A fiberglass mat (Figure 6)embedded in a l--foot deep trench perpendicular to a drainage swale can function as a spreader to avoid the formation of gullies,allow subsurface flow without migration of sediments,and aid in establishing vegetation.Once the mat is installed in the trench and secured with staples,the trench is backfilled and compacted.Another mat or netting is centered on top of the vertical strip to form a cap extending -51- FIBERGLASS MAT SECTION A-A STONE CENTER DRAINS .- WATERWAY WITH STONE CENTER DRAIN "Y"SECTION SHADED Design Depth4~-----~-~ Gra'al B.ddl~I':' WATERWAY WITH STONE CENTER DRAIN ROUNDED SECTION SHAPED BY BULLDOZER 4"'2'~ Gravel Bedding BRUSH SPILLWAY (PERSPECTIVE 8&SECTION) Sod Crest' 10'Min.I,.., Tamped Fill :.:.[;":;;;:,.';,;1' ~~~I , Original Stream Bed Straw or ulch DROP STRUCTURES DRY ROCK SPILL WA Y Sod Crest ':::4-'Tamped Fill... .'.,..•:...:,;.r-0riginal Stream Bed 'qIIj~r.>-;12"Min. ALASKA POWER AUTHORITY MECHANICAL CHANNEL LINERS FIGURE. ,~ ...... -, """ !foot beyond the lateral limit of the design flow.This technique is not appropriate for permafrost soils. Stone center drains (Figure 6),consisting of a gravel bedding and packed stone in the center of a grassed swale,are used in drainage channels that experience prolonged flow and wetness.Acceptable flow velocities and gradients are determined by standard riprap specifications. Methods of stabil izing banks in waterways that experience high velocity floW's include 1atticework concrete blocks (gaps in the blocks are back- filled with soil,compacted and seeded with grass),gabions (enclosed wire bask.ets filled with riprap),paving,sacked sand,and concrete filled mattresses. Drop structures (Figure 6)and check dams are used to counteract gully erosion by reducing the channel gradient and are preferred over impermeable concrete or asphalt linings when physical conditions are too severe for the establishment of a vegetative cover.Materials can consist of timber, rock,gabions,concrete,brush or sod.Energy dissipators in drop spill- ways will collect silt and debris and require cleaning. 3.2.7 Outlet Protection A variety of techniques (Figure 7)can be used to slow the velocity of flow at drainage structure outlets.The choice of protection depends on 1)soil and topography,2)anticipated flows,and 3)height of fill or outlet. None of these techniques discussed below should be used where fish passage -53- RIPRAP APRON FOR SHALLOW FILLS - DOWNDRAIN AND ROCK DISSIPATOR .DOWNDRAIN AND SEDIMENT BASIN PLUNGE POOLS CANTILEVERED CULVERT CULVERT WITH CUT-OFF WALL - - STILLING BASIN 'WITH BAFFLES TO DISSIP ATE ENERG ~f[:AT BASE OF ::CONCRETE CHUT SPILLWAY} LOG CRIB FILLED WITH ROCK ALASKA POWER AUTHORITY OUTLET PROTECTION FIGURE 1 - .-. - is required.Structures which impound water should not be used in permafrost soils. Outlet protection for culverts in shallow fills can be accomplished with protective aprons of dumped rock,hand-placed riprap or rock-filled gabions.The width of the apron shaul d be three times as wi de as the culvert.Height should be to or above design high water.Depending on soil conditions,filter layers may be required under the apron. Flows from culverts in high fills can be directed through a downdrain to a rock dissipator or to a sediment basin. Plunge pools should be used only for free outfall.An armor layer,perhaps underlain by filter layers,is required for the base of the pool to prevent the flow from undermining the toe of the embankment.While aesthetically undesirable,the end section of the culvert can be cantilivered and supported with wood or concrete.A second method is to support the end of the culvert with a cut-off wall that extends into the ground below the. anticipated depth of scour • Stilling basins with energy dissipators can be used at the outlets of chutes,spillways,flumes,or downdrains.The outlet should be shaped to conform to the receiving channel. log';'rock cribs can be used for free outfalls and at downdrains.If soil conditions permit,the cribs can disperse the discharge to overland flow. -55- - 3.2.8 Inlet Protection Inlet protection consists of a variety of structures located upstream from a culvert.The devices protect the culvert from debris accumulation that may cause flooding and erosion.Regular removal of debris is required to allow full culvert capacity during high flow.These devices should not be used on fish streams. o Debris Deflectors--usua lly "V"shaped structures pl aced upstream from the culvert to prevent the major portion of the debris from entering the culvert.The apex of the "V"is upstream. o Debris Racks--rails placed across the stream channel to collect debris before it reaches the cul vert entrance.Usually vertical and at right angles to the streamflow. o Debris Risers--closed-type structures,usually of metal piping, placed directly over the culvert inlet in log-cabin fashion to prevent inflow of coarse bed load and light floating debris. o DebriS Crib--open crib-type structures placed vertically over the culvert inlet in log-cabin fashion. o Debris Fins--walls built upstream of the culvert and aligned with the direction of flow to direct debris through the culvert. -56- ..... ..... - .... ..... o Debris Dams and Basins--structures pl aced across well-defined channels to form basins which impede the stream flow and provide storage space for deposition of debris. 3.3 ICING CONTROL 3.3.1 Stacked Culverts and Subsurface Drains Stacked culverts (Figure 8}provide a relief route for meltwater at an ice-dammed culvert,thus eliminating the need to thaw the culvert at breakup.The drainageway requires a de!ep fill section and enough storage area for ice accumulation during \'linter,without plugging the upper culvert.Offsetting the upper culvert reduces the amount ·of fill required.Offset culverts also provide for fish passage in streams which experience wide fluctuations in flow • Subsurface drains {Figure 8}are used where topography is steep to allow diversion of subsurface stream flow and exit downstream of the structure to be protected.The subdrain is for low flow only and should not be used to repl ace the conventi onal drainage structure.Perforated pipes are pl aced upstream of the icing area and in a trench across the stream to intercept sub-bed flow and allow filtration of low stream flow.Within the stream channel,the trench should be backfilled with coarse material to allow infiltration.Outside the channel banks,insulation should be placed over the subdrain to prevent freezing.Subdrain outlets must be designed so they will not freeze or so they can be periodically thawed. -57- - - Natural Ground ~ Area of Known Icing Embankment // Anticipated Icing Level STACKED CULVERTS SUBSURFACE DRAIN ALASKA POWER AUTHORITY STACKED CULVERTS AND SUBSURF ACE DRAINS FIGURE 8 ~ i - - - - """ Subsurface drains also can be used to reduce artesian head at the roadside beneath seasonal ice.For a subdrain to function effectively,surface flows must be intercepted at the source (since the icing layer is imper- meable)and the drain must be buried below maximum freezing depth.Outlets arle downslope from the road embankment. 3.3.2 Culvert Thawing Culvert thawing may be required to maintain winter flow or provide passage of spring meltwater. Tha\'l cables are electrical heat cables used to maintain an open passageway through a culvert.An electrical resistance-type cable is either buried be~low or suspended inside the culvert. Steam thawing is suitable for ice-blocked culverts that are accessible to a tl'UC!<mounted boiler.Thawing can be done by probe or by permanent piping. 3.3.3 Channel Maintenance TI:!chniques to maintain winter flow through a channel or to induce icing at sl:>me location that will not require maintenance include frost belts, air-ice covers,and ice fences. Frost belts (Figure 9)are constructed by excavating a ditch in the ice 10 to 12 feet wide to the streambed.The ditch progresses downward as the ice --59- River Ice PARTIALLY-COMPLETED FROST DAM - - PERMAFROST OPERATING FROST DAM PERMAFROST ALASKA POWER AUTHORITY FROST BELTS FIGURE 9 - - t", - below the ditch thickens.A drainage ditch may be required to remove acc;umu1 ated water downstream.Frost bel ts must extend well beyond the stl'°eam edges.Extension ditches on the banks may be excavated before frE~eze-up at the selected site,which should be between 600 and 900 feet from the structure.Additional dams should be at least 60 feet apart. Frost bel ts are best constructed where stream ice usually freezes sol id to the bed,as in shallows or near rapids. Air-ice covers are created by temporarily damming the stream early in the winter and allowing the water to back up through the culvert.The dam is placed a short distance downstream from the culvert and should retain a degree of permeabili ty.After the ice cover freezes to a depth of 5 to 6 inches,the dam is removed.With free flow restored,the water level drops so that an 8 to 15 inch air gap remains.The intervening layer of air usually will insulate the flowing water sufficiently to prevent freezing. Insulation,such as snow,peat,brush or other available materials,may be a~/plied to the ice layer and removed in the spring.Where a broad channel is encountered,additional support for the ice cover may be prOVided in the form of short wooden or concrete posts acting as columns.Temporary check dams may be reqUired at large icing sites. A wide variety of materials can be used to form a fence upstream from a culvert or bridge to store ice accumulation.Upstream storage area must be large enough for a winter's accumulation of ice.If avenues open below the flence for water to pass upward through the ice,the fence will be ineffec- tive. -61- - -, - r ,...,' - ,..,.. 3.4 STREAM PROTECTION 3.4.1 Protection During Crossing and Construction Whlen construction activity repeatedly crosses active streams,particularly fish streams,or when construction is immediately adjacent to streams, stream protection from erosion and turbidity is required. Seasonal timing of construction may reduce the impact of construction. Where construction schedules or habitat sensitivity create conflicts, techniques for stream protection should be employed.Periodic inspection for erosion or sedimentation may be required. CClnstruction dikes and cofferdams can be used to separate the waterbody fY'om the construction area.Construction dikes are placed on the stream slide of a construction area.Placement of these structures must not constrict the channel to avoid increasing velocities that could cause channel erosion and obstruct fish passage.Cofferdams completely enclose an instream work area while permitting flow to continue through the channel.While cofferdams cause minimal disturbance to the channel,they are usually expensive to build. Stream channel diversions should be avoided whenever possible.Temporary diversion channels must be capable of carrying flows anticipated to occur during the construction period.The average water velocity within the channel should not exceed the average velocity in the natural stream.The bed of the diversion channel must be stable at expected flows.During -62- - - - construction and excavation,the channel should be isolated from the stream to be diverted by natural plugs left in place at the upstream and d01r'mstream ends.Diversion of water flow into the temporary channel is accomplished by first removing the downstream pl ug,then removing the upstream plug,then closing the upstream end and then the downstream end of the natural channel of the diverted stream.Abandoned diversi on channel s must be backfilled or plugged and stabilized. During ditching operations across small streams,it is often practical to pipe (flume)stream water over the ditch while excavation is in progress. With this procedure,a culvert or other pipe is installed in the stream pr'ior to ditching with all stream flow directed through the flume.The diitch is then excavated underneath the flume and the structure to be pl aced in the ditch is installed.'After installation,the stream channel is rf~stored prior to removing the flume. T1emporary culverts can be installed under temporary roads and work pads to clontain stream flow and allow fish passage.low-water crossings {Section 3.2.2}may be a practical method for small streams. 3.4.2 Bank Stabilization -Revetments Mechanical streambank stabilization is for the prevention of erosion at critical areas where velocities are too great for vegetative stabil ization. Materials consist of riprap,concrete,grouted stone,gabion baskets,and bagged concrete.Genera 11 y,most fa i 1ures occur at the toe,where scour c:an undermine the lining. -63- - "..,. - - Planning for permanent bank stabilization must consider the following: o Controlling the grades of the banks either by natural or artificial means,before permanent stabilization is feasible o Debris or obstructions that may deflect flow toward the bank o The greatest depth of scour """' - o a Additional stabilization measures,i.e.vegetative cover on the top of slope banks The physical and biological impact the modifications will have on the stream - - - These permanent techniques have high costs.Construction may require hand labor and may be particUlarly difficult in deep water.Maintenance may b~=come expensive for obstruction inspection and clearing. Tlhe smooth lining of rigid concrete revetments will accelerate the velocity of stream flow that may induce scour·downstream.Rigid revetments require good access and dewateri ng of the streambed for construction.To prevent settling and cracking,they should be used only on well compacted soils. The revetment lining should extend beyond the top of the bank where it is stabil i zed with vegetative.The toe shaul d be extended to the maximum scour depth anticipated and be protected with riprap.Each concrete joint requires reinforcement to prevent leaking and undermining. -64- - ..... i Concrete-filled nylon blankets are revetments consisting of nylon fabric shleets that are stitched together as a quilt,fixed in place,and filled with concrete.These blankets are capable of withstanding small movements and are 1ess susceptibl e to undercutting than rigid concrete revetments. Installation requires dewatering of the channel.This technique is not recommended for slopes steeper than 1:1. Dumped stone fonns a flexible lining that slumps into scour holes.The rough surface of the stone dissipates the stream's energy,thus minimizing sc:ouring problems at the ends of a revetment or lining.Linings and re!vetments of hand-pl aced riprap genera11y consist of IOO-pound stones pl aced in a single 1ayer.Any shifting of the stone exposes bare soil and is therefore,more subj ect to damage than dumped stone.Grouted stone rE~vetments are sometimes used when large stones are unavailable to stabi- Hze dumped stone linings.This technique will reduce the roughness of the l"ining and increase flow velocity which may enlarge any holes or flaws in the grouting and lead to failure. lrJlhen large stone for a dumped stone or riprap lining is unavailable,wire ba.skets or wire mattresses filled with smaller stone may be acceptable. G,abions are easy to install with minimum instream disturbance.Gabion baskets may be placed on steeper streambanks than gabian mattresses. Gabion mattresses may be placed in deep water by sliding them off a raft . 3.4.3 Bank Stabilization -Deflectors and Jetties Deflectors and jetties are placed on the outside bends of streams to -65- .~. - - ~; i - deflect stream flow away from an eroding bank or to prevent meandering and encourage the stream to increase channel capacity by scouring its bed rather than by lateral cutting.Jetties and deflectors should not be used where the stream cannot compensate for restriction in channel width or in fish spawning areas.Because jetties produce excessive eddying,they should not be used in very sinuous channels. 3.4.4 Bank Stabilization ~Vegetative Vegetative bank stabilization is applicable for small streams and low gr'adient streambanks to prevent or control erosion and sedimentation. Little maintenance is required especially after the first few years when vE!getation is well established.If soils and flow dictate,vegetative bank stabilization can be supplemented with mechanical techniques.Vegetation shoul d be incorporated behind revetments,jetties,gabi ons,etc.on the bcmks behind the design flow. 3.5 SEDIMENT RETENTION 3.5.1 Settling Ponds S,ettling ponds are used in non-permafrost areas for retaining runoff waters tiD remove sediments generated from construction and borrow activities. They can range from large pennanent-type basins to temporary measures such as ditch checks.Generally,a settling pond consists of a dike,a pit,and an outlet for clean water.The effectiveness of a settling pond depends upon: -66- - o o o o o o o Surface area of the pond Rate of flow through the pond Grain size distribution of the incoming sediment Specific gravity and shape of incoming solids Water temperature Turbulence within the pond as a result of wind or rainfall Entrance and exit effects r - - To the extent possible,settling ponds should not be located in streambeds 01'floodplains.The ideal site is on or underlain by a thick layer of fclirly impervious soil. Sl!ttling ponds must be sized so that the effluent is in conformance with A'laska Water Quality Standards.Removal of suspended soi ls particl es liirger than 0.02 millimeters is usually necessary to consistently meet this limitation.The maximum surface overflow rate (the flow rate through the plDnd,divided by the surface of the pond)to permit sedimentation of 0.02-millimeter particles is 3,700 gallons per minute per acre (0.011 ft/minute).Ponds should be constructed with a length that is at least tlrlice the width.A length-to-width ratio of 5:1 or greater is desirable. Depth ?f a pond,while not a factor in settling efficiency,must be considered for sediment storage.Use of flocculants to enhance the settling process to subject to approval from regulatory agencies. Containment dikes for settling ponds should usually not exceed 10 feet in height.They should have a crest width of at least 12 feet and upstream a.nd downstream slopes of 2:1 or flatter.The core of the dike must be -67- .- ..... - impermeable and should extend through surficial pervious foundation soils into underlying bedrock or other impervious soils. Outlets should be constructed to limit the level of the water surface to at least 1 foot below the top of the dike.Outlet structures may be constructed as overflow spillways or culvert pipes with risers.At least one overflow or riser should be provided for each 150 feet of pond width to limit nonuniform flow velocities through the pond. Erosion protection on the downstream slope of the containment dike and at the toe of the overflow should consist of a minimum 2-foot thickness of arlgular rock,averaging 8 inches in diameter.The crest of the overflow should be protected with at least a I-foot thickness of 4-inch angular rock.The width of the overflow should be at least 1 foot for each 400 gclllons per minute of f1 ow through the pond . R"iser outlet pipes should have a diameter of at least 18 inches.At least 1 inch of pipe diameter should be provided for each 100 gallons per minute of flow through the pond.Several cutoff collars should be installed around the portion of the pipe that passes through the containment dike to prevent erosion of fill materials by seepage along the pipe.Collars may consist of sheet metal,polyethylene sheeting or other impervious materials and should extend at least 2 feet beyond the pipe.An apron of large rock should be placed at the pipe outlet to prevent erosion at the toe of the dike. Settl ing ponds used in borrow operations to contain water from gravel -68- .,." - - washing (Figure 10)may be more effective if sluiced material is discharged to a meandering tailrace that leads to the pond.Construction of a small pr'esettl ing pond at the pond entrance wi 11 reduce inflow velocities and result in additional deposition of coarse sediment before it reaches the pond.The surface area of the presettling pond shoul d be about 1 square foot for each gallon per minute of flow through the pond.Frequent removal of coarse sediments from presettling ponds may be necessary. R€!use of process water 'can reduce the quantity of water to be treated. Normally,presettling of the sluice discharge would be desirable to remove C(larse sediments before the water is recirculated back to the sluice. C"lleaning of settling ponds should be accomplished when the pond is filled wHh sufficient sediment to lower the quality of water discharged below acceptable standards.Monitoring pond effluent with an Imhoff cone is the usual method to determine if the pond is becoming ineffective.Gleaning can be performed with a dragl ine.Removed sediment should be transported to an approved waste area. If clearing is impractical,or if the pond is to be abandoned,it should be d'rained and covered with granul ar material.Draining can be accompl ished by breaking the containment dike,prOVided that a lower containment dike of p,ermeabl e material is constructed downstream of the pond outl et to prevent accumulated sediments from entering a stream. -69- Emergency Overflow Riser Type-~~~~~~"""'" Outlet Structures Emergency Overflow e'r ~-~~ ~ \,\M.eandering \ \ \Trailface ~ Containment Dike --_.Ii.\... Easily Adjustable Bypass Gate Presettling Pond ----~~ Area of Breaching Containment __~~~~--~ Dam for Pond Dewatering -~ ~ I ALASKA POWER AUTHORITY GRAVEL WASHING SETTLING POND LAYOUT FIGURE 10 ".... ..- .... ~. - I""'" i I~ 3.5.2 Buffer Strips,Barriers Buffer zones of undisturbed ground and vegetation,and man-made barriers, aIre techniques to retard runoff,increase infiltration,and contain slediments eroded from construction areas . Man-made barriers constructed at the toe of a slope are shown on Figure 11. Some maintenance is required to remove accumulated sediments,especially if these techniques are intended to be permanent. 3.5.3 Traps and Filters for Inlets Traps and filters are normally applied as temporary measures during con- struction to prevent eroded sediments and debris from entering natural or constructed drainages.Vegetative or mechanical techniques are used depending on the size of the structure,the anticipated flows and sediment quantities,the maintenance requirements,as well as cost. Examples of these techniques are discussed in Sections 3.2.5 and 3.2.8. -71- Dispose of Slash and Brush Along Toe of Hill Cut I)r FiJI Slope ""'" I~••OUNDS OR DEPRESSIONS BRUSH BARRIERS Scari!fy Surface. Fertilize and PI~lce Sod Ditch Of S .... SOD STRIPS h~ ~'V SEDIMENT FENCES STRAW-BALI!BARRIERS - ALASKA POWER AUTHORITY - SEDIMENT BARRIERS FIGURE 11 r ~I 3.5.4 Silt Curtains Silt curtains are temporary measures used to intercept sediment from ccmstruction activities adjacent to waterbodies.They are installed in the wtllterbody.The intent of the curtain is to prevent muddied water caused by construction activity from spreadi ng over the entire body of water.They are not affective for streams where turbulent flow will prevent settling, dE!ep lakes,or where there is wind induced mixing. The curtain can be constructed of heavy plastic,canvas,or other suitable material that is of sufficient strength and density to withstand wave action and infiltration of fine-grained material.The curtain is generally fastened to the shore at both ends and fitted with anchors and flotation d.~vices so that is remains in a vertical position. 3.6 SLOPE STABILIZATION 3.6.1 General Techniques for Non-permafrost Areas Listed below are vegetative and mechanical techniques available to provide temporary or permanent stabilization of slopes.The selection of the appropriate technique is determined by the soils,ground water,and precipi- tation.In soils where a saturated condition results in liquification or slumping,preferred methods could include paving slopes or ditches and constructing diversion ditches for maximum non-erodible velocities.If soils are not saturated and slumping ;s not anticipated,methods should be selected to maximize infiltration. -73- """ o o Serrated Cuts--reduce the velocity of runoff and collect sediment.They are not recommended for saturated slopes where sloughing may occur.Serrated cuts are appropriate in fragmented rock or shale materials. Pavement or Riprap--appropriate in high risk slopes of saturated soils where immediate protection is required.Pavement and rip- rap are expensive and may be difficult to install and maintain. o Diversion Ditch--appropriate for cut slopes in erodible soils where there is sufficient slope to prevent ponding and satura- tion.These ditches divert runoff through·stable channels and outlets. o Benches or Fill Benns--reduce the angle of the slope to slow runoff and facilitate seeding and other maintenance programs. o Slope Drains--prevent gullying erosion by carrying runoff down the slope in a drain.Energy dissipators may be required at the outlet. o Diversion Berms--made of stable non-erodible material placed temporarily or permanently at a slope crest to divert runoff away from the face of the slope. o Sodding--immediate,permanent and expensive cover for critical cut or fill slopes. -74- o Seeding and Mulch--provide a permanent or a temporary cover on cut or fill slopes (see Section 3.8). ..... -. o Temporary Cover--netting,plastic sheeting,or other material used on steep cut or fill slopes for stabilization until perma- nent measures can be taken.Plastic sheeting may be difficult to secure. 3.6.2 Temporary Oowndrains T1emporary downdrains can be effective methods during construction to safely C!Dnvey runoff from one elevation to another until permanent stabil ization is established.These downdrains can be used on cut or fill slopes or as a channel gradient break to reduce velocities.Temporary downdrains can be extended as construction of the slope progres.ses,and can serve as an inlet to channels or as a transition from grassed to cpen waterways. These structures usually require a diversion and a collection system to intercept and direct runoff to the downdrain.Energy dissipators are usually required at the outlet of the downdrain. Each structure should be periodically inspected and any damage repaired immediately.Inlets should be examined for undermined slopes.If snow removal equipment is used,care must be taken to prevent damage to the buried structure.When the temporary downdrains are removed,the slopes should be restabilized. -75- - - - Sl~ctional downdrains (Figure 12)are normally constructed of one-half to olne-third of round culvert sections which are secured together and fastened tiD the slope to prevent leaking and erosion underneath the downdrain. Slectional downdra ins can eas;ly be extended as slope construction progresses. Paved ch"utes (Figure 12)are generally constructed of asphalt.They are most successful on cut slopes.An asphalt apron should extend at least 3 feet beyond the toe of the slope.The inlet should be designed and con- structed to prevent runoff piping underneath the chute. A flexible downdrain (Figure 12)consists of a flexible conduit (i.e.heavy fabric)that is anchored to prevent movement.They are especially appropriate for benched or terraced slopes.Fahri c conduits are not f'ecommended for winter use as freezing could damage the fabric and result in leaking. 3:.6.3 Permanent Downdrains Permanent downdra ins (Fi gure 13)are used to transport runoff down cut and fill slopes,as inlet or transition structures to transport water from a c:hannel at a higher elevation to a lower one,and to provide non-erosive 9radient breaks to reduce channel velocities.They are usually used when flows are continuous or runoff quantities dictate a permanent level of protection.Corrugated pipe,bituminous concrete,or cement are often the materials used for permanent downdrains.The cross section can be trape- :i:oidal,parabolic or U-shaped.Energy dissipators are usually required at -76- PERSPECTIVE VIEW OF FLEXIBLE DOWNDRAIN FLOWING FULL Ruri-Oft Tabs &Anchor Pins for Securing Pipe in Position at 20"Centers ,- c Run-Off:cc~m~~~~~ "ERSPECTIVE VIEW OF TEMPORARY ........ PAVED ASPHALT DROP CHUTE ..-, SECTIONAL DOWNDRAIN ALASKA"POWER AUTHORITY TEMPORARY DOWNDRAINS FIGURE 12 - - - - - SECTION A-A Typical Concrete Chute or Flume ALASKA POWER AUTHORITY PERMANENT.DOWNDAAINS FIGURE 13 - - t1'1le outlets.Inlets and outlets of downdrains should be checked for undermining and erosion.Accumulated debris should be removed. 3.6.4 Diversions and Benches Diive.rsions and benches (Figure 14)are intended to divert runoff water and s~~diments away from critical areas and convey them to a stable outlet. They maybe a temporary measure to protect exposed construction sites or a pHrt of a permanent stabilization plan.Diversions and benches,such as those listed below,can break up concentrations and velocities of water on long,gentle slopes or divert runoff from steep,erodible areas. -- o o o Diversion Channel--a channel with a confining berm downslope constructed laterally across sloping areas.Runoff is conveyed laterally at slow velocity to protected area or outlet channel. Diversion Levees--compacted earth ridges placed laterally along the top of steep slopes or cut sections.Often constructed with a diversion ditch upslope to convey runoff to a downdrain or stable outlet. Benches--flat areas built along the contours of a slope and parallel to one another.If wide enough,equipment access may be provided.Benches are built with a natural or reverse fall, often with a swale at the lowest point. -79- - PERSPECTIVE DIVERSION CHANNEL - - Swale or DitchJ Swale or Ditch\:.-,,-!-\~~-"" DIVERSION LEVEES BENCH TERRACES (REVERSE FALL) BENCH TERRACES (NATURAL FALL) r ALASKA POWER AUTHORITY DIVERSIONS AND BENCHES FIGURE 14 - - - - - - DE~sign is usually based on a 10-year frequency storm.If overflow would be a hazard to water resources or structures,a design frequency of 50 years milY be needed.location and spacing of diversions will depend on slope soils and estimated runoff.Channel gradients are usually 0.5 to 1.0 percent but can be greater in resistant soils.The diversion outlets can bl~vegetated cnannels,natural waterways,level spreaders,etc.If flows are carrying sediment eroded from the si te,sediment retention techniques (Section 3.5)may be required. Miaintenance requirements include removal of sediment in the channel and the establishment of any vegetation used for stabilization and erosion control. 3.6.5 level Spreaders and Interceptor Dikes l,evel spreaders and interceptor dikes (Figure 15)intercept runoff flow and convert it to sheet flow with non-erodible velocities over stable areas. Spreaders are used to disperse sheet flow onto undisturbed,vegetated areas where much of the flow will infiltrate the ground.Soils must be well drained and stable;this technique is not appropriate for permafrost areas. Care must be taken to ensure that the outlet 1ip is level.length of the spreader can be determined from the inflow (0)in cubic feet per second (cfs)as shown below. Design Q (cfs)Length (ft) less than 10 15 10-20 20 20-30 26 30-40 36 40-50 44 -81- - LEVEL SPREADER - - - - ,...,. ....., SECTION SECTION ~~ 6 Foot Minimum 2 To 1 Or Flatter INTERCEPTOR DIKE _STABILIZE OUTLET SLOPE ALASKA POWER AUTHORITY LEVEL SPREADERS AND INTERCEPTOR DIKES FIGURE 15 - Interceptor dikes,or water bars,are used to divert flow from roadways or work pads,particularly on long steep grades.The spacing of the dikes is glenerallyas follows: Grade (%) less than 5 5-10 more than 10 3.7 THERMAL EROSION CONTROL Spacing (ft) 300 200 150 - - 3.7.1 Prevention/Treatment of Disturbed Surfaces Prevention and/or treatment of disturbed surfaces is required in areas of poorly drained permafrost,or wherever disturbances of the active layer could result in melting of underlying ice-rich soils and cause ponding, gully erosion,and other self-aggravating conditions.Disturbed areas should be inspected periodically and treatment of damaged areas should commence immediately after discovery.Treatment also requires periodic inspection until the area is completely stabilized.As access to the disturbed area may be limited and a large amount of hand labor may be required,prevention of damage is a more economical approach in permafrost areas.Prevention measures include: o Overlay construction,rather than cut and fill o Use of insulation beneath fills -83- -o Maintaining the organic layer;conventional wheeled or tracked vehicles should not be used o Winter construction Ditch checks and water bars can be used to convey melt and runoff waters away from a disturbed area or to control the water within the area. Revegetation of a disturbed area,once establ ished,will insulate the underlying soils and help retard melting.Seeding and fertilizing should be done immediately by hand or aerial application to prevent additional dlisturbance.Sodding and transplanting trees or brush may be favorable in some areas for quick cover and erosion control.In small areas where rapid thawing may be occurring due to removal of the active layer,materials such alS straw,excelsior blankets,slash,and styrofoam can be used for insula- tion • - - .- o Avoiding induced drainage or standing water and concentrated discharges from drainage structures 3.7.2 Cut Slope Stabilization The general practice for frozen cuts is to ,make a fairly steep slope (1.5:1 to 1:4)and allow the slope to self-stabilize.While this technique will ,·esult in thawing of ice-rich soils,release of melt waters,and some degree of sloughing,the cut will eventually return to a stable condition. In implementing this technique,the vegetated mat should not be damaged and should overhang or drape the cut for insulation.Trees in back of the cut -84- - - - .... - slhould be cleared by hand to prevent them from tearing the mat as the bank rletreats due to melting.Ditch checks or sediment filters should be "installed to trap sediment eroded from the cut.If it appears that a cut will not self-stabilize t the slope should be treated with either a filter buttress or insulation (Figure 16). A filter buttress is constructed by re-dressing the slope and placing free-draining gravel fil ter material.The filter material can be pl aced at an angle steeper than natural repose to eventually settle to a stable r1epose.Sediment filters should be placed along the toe to contain silts from melt flows.The buttress can be dressed with topsoil and revegetated. Insulation is installed by dressing the slope to 2:lt overlaying it with 12 inches of free-draining sand or gravel t and placing urea foam insulation. The insulation can be covered with topsoil and revegetated . 3.8 REVEGETATION Revegetation of sites disturbed by development activities can provide an effective erosion control mechanism.Whenever possible t reestablishment of native vegetation should be promoted rather than introducing non-native species which may be less hardy and more expensive to maintain.In addi- tion t areas which do not have potential for erosion problems necessitating vegetative cover should be left to revegetate naturally after receiving site preparation. -85- - - - -. Sand &Gravel Filter-...r;..-t Insulation FIL TER BUTTRESS INSULATION TREATMENT ALASKA POWER AUTHORITY TREATMENTS FOR CUT SLOPES FIGURE 18 - ...... ..... """ 3.8.1 Soil Constraints Soil texture is an extremely important factor in the restablishment of vl~getation in disturbed areas.Each of the six soil groups identified in Alaska have unique properties which restrict root development and will influence a revegetation program.Table 8 ill ustrates the properties in each of the six soil groups and suggests the type of plant species suitable f()r each soil group.Soil information for specific sites may be available in soil survey reports published by the u.S.Department of Agriculture (IUSDAL Soil Conservation Service. 3.8.2 Site Preparation Proper seedbed preparation is essential to encourage revegetation through planting or natural reinvasion.Whenever possible,surface materials removed during construction should be segregated,stockpiled and reapplied. In arctic and alpine areas,the largest component of soil nutrients is in the surface organi c 1ayer.If these nutrients are not retrieved after stripping by replacing the surface materials,large amounts of nutrients are lost which can necessitate use of additional fertilizer. Restoration grading should avoid creating overly smooth surfaces and surface mater;a 1s shou 1d not be replaced over a Rha rdpa nn of compacted material.All disturbed areas should be scarified to a depth of 12 inches to increase aeration and moisture infiltration and to control runoff. -87- TA8LE 8 sorLS GROUPS I~ALASKA 1 Croup 1 -son.with Few or Ho ll..itlltion. Hajor Soil Lim;tat ions None Drainage Cl aS5 Well and moderately well drai ned. Depth (inche.) More than 20 ... USDA Texture Silt loam"Hne sandy loam,.sandy 10.... Available Water Holding: Capacity (inchesl 5 to 8 Moderately pef"lfte-able" Substratum Porous gravel, moderately fine textured sed;- ments t bedrock or rock fill A wide range of cl'imati-eally ada~ted pl ant species are suited to these 5011s if soil nutrients are adequate or fertilized for establishment. Croup 2 -Sons "Ith _rate limitation.Due taL-Water Holding Capacity - "'jar Soil Ll.mltatioftS Drainage Cll$. We1t drained-. Up to 20\aTop .. Depth (Inche.l HI to 20 USDA Te,xt-ur-e Silt loam.fine sandy loam,sandy loam. Available Water Hal ding Cap.clty (Inchea) 3 to 5 Maderately p"r.....ble. - Sub.tr.t....V..ry gravelly sand,.shattered roc-k t b:e:dr.ocf( Group 3 -Salls with Sa""""ll"ltGtionl _ta Ve.,.low lIater Holding CapacitY or Steep Slope. "ajar Soil I..f..;tatio-na Drougtltiness or high ero$;on haz.rd. Drainage Class We 11 and exces- sively drained. Depth (Inchea] tess than 10, or steep and deep or shallow. USDA Texture Silt loam,.sandy loam,sand. A"afl.bl e W.t..r Hal dIng Capacft)'.[Inches) Less than -3,. or excessive runoff • Substratum Gravel,.sand, bedrock ... Drought tolerant plants ttlat form a-dense root mass are -optimal for I"'evegetatl"q disturbed sites in Group 3 soils. 9I'l!VI!..-Soils "itll H'od....e~lillritations Due to Exces.Holstllt'..- Hejar SofT limitations- Dra;nage CTa.a Somnhat poorly drai ned or poorly drained~ Depth (inches) USDA Texture Silty clay 10.... silt loam,.sandy loam,fine s-andy loam. Avaiilable lletor Holding Capac;ty (f nchesl Hore than 5.H.y be waterlogged f-ar short peri-ods. Only plants tolerant of -cooT,. ad.pted to Croup 1 soi Is can be mol 51:cor.ditiol'1S are adaptable to these 1.Indra;nad 50il s. suitable to Croup -4 soils when the surface remains drained. Pl.nts Group S -SoHs with So........lllOitationl Due to Exc....Moi.ture Haitlr Soil Limitations Wetness {high ..ahr table] Drainage Class- Poorly dra;ned.. Depth (Inches) More than 20 .. H.y h.ve up to 16 of peat on surface. USDA Texture Very "ide range. Available Water HoT di nq Capacity (fnches) Usual I y "aterloqged water'tabl e wi thin Z feet ,of su-rface. Plant choices in this group are limited due to the difficulty condititlns.Selected plants :should be adapted to cold,wet soils. drained soi I Major Soi I Limftations 'Drainage C1 ass Depth (Inchea) USDA Texture Water Hal ding capacity (i nchesl Wetness {water tabl e at surface J. Very poorly drained.More than 16...Peat drained. Substratum Very n,de range Waterlog-ged. The choice of plants is limited. avoided whenever -possible. Damage to the existing vegetation over these soils should be 1 Source:Rural Development Council,1983. - 1""" I r I Scarification will result in cooler,looser,more moist soil for seed germination and will increase seed-to-soil contact. 3.8.3 Seeding 3.8.3.1 Timing Seeding should be done as early in the growing season as possible.Avail- able moisture is the limiting factor necessitating early planting because many areas dry rapidly following spring melting and summer precipitation ;s low.Early planting also facilitates earlil:!r germination and growth which results in less winterkill than later sowing.Optimum seeding dates for most areas of Alaska are from May 15 to June 15,depending on temperature and soil moisture. 3.8.3.2 Application Methods There are several seeding methods available depending upon the size,slope, and accessibil ity of the area to be seeded.On large areas to be planted with grass for erosion control,unseeded stY'ips or areas should be dispersed among the seeded areas to allow for reinvasiion and restabl ishment of native species. Drill seeding,which results in uniform seed distribution and placement at the proper depth,is the most successful me~thod for achieving a productive density rate.However,it has disadvantages for use in widespread revege- tation programs.It is not applicable to rocky areas and must be limited -89- "i""I r r 1 - - - to use on areas having a slope of less than 3:1.It is also expensive and slow. Broadcast seeding is faster and less expensive than drill seeding,but is less effective and requires more seed.The seed should be covered by harrowing,packing,dragging,or mulching.Aerial broadcasting is advanta- geous for large or inaccessible areas.Low lrlind speeds (below 2 mph)and a uniform height are necessary to achieve an even distribution of seed. Hydroseeding is a good technique,particularly for steep slopes where drilling is not feasible and aerial seeding is not necessary.A water source is necessary for mixing the slurry of 100 to 150 pounds or less of seed with 100 gallons of water.Hydroseeding may be followed by mulching to prevent seed runoff and retain moisture,but the operations should be done separately to ensure·sufficient contact between the seed and soil to enable germination. 3.8.3.3 Recommended Seeds and Mixtures The most successful revegetation programs iare designed around the use of native grasses,preferably the same species as those adjacent to the site. Barring this,species should be from similar latitudes and,at worst,those adapted to similar weather conditions.One of the greatest advantages of the use of native plants is that once they areestabl ished they can grow vigorously and persist without the management and maintenance so necessary for cultivars. -90- rI, - r ! ! Traditionally,annual ryegrass (Hal ium mu1tiflorum)has been used as a temporary measure for erosion control.Its very fast growth rate,exten- sive root system,high seedling vigor,and good acidity tolerance are particularly suited for this purpose.While~annual ryegrass may provide a good initial cover for erosion control,it is not a permanent solution to erosion problems.It is an annual plant and will not persist in areas where it is seeded even though abundant seed may be produced.In addition, it discourages the establishment of native species which would provide long-term cover for site stability and requires reseeding and fertilization maintenance treatments to perpetuate its cover.Where annual rye is used, small areas within the site should be left bare to allow for the reinvasion of native plants which can eventually take over the function of erosion control and obviate the need for indefinite maintenance of non-native grasses. In general,grass seed mixes are preferable to monocultures because they provide different species for microsite differences in soil,moisture,and fertility.However,mixes can result in competition between species which may result in less cover,particularly if high seeding rates are used or if annuals and perennials are mixed. Using the geographic regions as determined by type of vegetation (depicted on Figure 17)and the soil groups listed in Table 8,alternative seeds and mixtures are presented on Tables 9 through 14.Excluded are recommenda- tions for Soil Group 6 in the Cook In1et-Susitna,Interior,Southwest,and -91- r ! r •ARCTIC &ALPINE AREA COOK INLET-SUSITNA AREA D INTERIOR AREA SOUTHEAST .AREA SOUTHWEST AREA •WESTERN AREA Q -100 200 300 MILES ALASKA POWER AUTHORITY GEOGRAPHIC AREAS BY VEGETATIVE TYPE FIGURE 17 TABLE 9 COOK INLET -SUSITNA AREASEEDINGRECoMMENDATIONS Soil Groups land 2 Pure Live Seed Mixtures and Species Vari ety Name Drill Seeding Broadcast in order of in order of Seeding Rates Seeding Rates Preference Preference lb.per acre lb.per acre l-Red Fescue Arctared or 5 10 Boreal 5 10 Alsike or White Dutch Cover 1 2 Annual Ryegrass 2 4 2.Kentucky Bluegrass Nugget.4 15 Merion or Park 4 15 Alsike or White Dutch Cover 1 2 Annual Ryegrass 2 4 3.Red Fescue Arctared or 5 10 Boreal 5 10 4.Hard Fescue Ourar 5 10 5.Kentucky Bluegrass Nugget.5 10 Merion or Park 5 10 6;Smootf1Brome Polar or 10 20 ~Mancflar 8 16 7.Polargrass Alyeska 10 15 8.Bluejoint Reedgrass Sourdough 4 8 Soil Group 3 Mixtures and Species in order of Preference* Variety Name in order of Preference Pure t ive Seed Drill Seeding Broadcast Seeding R:ates Seeding Rates lb.per a.cre lb.per acre 1.Red Fescue Arctared White Dutch Clover or Sweet Clover Annual RYeeJrass 2.Hard Fescue Durar Annual Ryegrass 3.Streambank Wheatgras!Sodar 5 1 2 5 2 6 10 2 4 10 4 12 ,.Watering.is generally required at least for establishment and preferably for the first 2 years. Sen Group 4 Mixtures and Species in order of Preference* Variety Name in order of Preference Pure Live Seed Drill Seeding Broadcast Seeding R:ates Seeding Rates lb.per a.cre lb.per acre 1.Creeping Foxtail 4 8 2.Meadow Foxtail 4 8 3.Red Fescue Arctared or -5 10 Boreal 5 10 4.Reed Canarygrass Frontier 10 20 5.Polargrass Alyeska 10 15 6.Bluejoint Reedgrass Sourdough 4 8 NOTE:If land ha~been drained.use recommendations for Group 1. ,.Alsike clover at 1 lb./acre drilled or 2 lbs./acre broadcast may be added to any of the following. Soil Group 5 Mixtures and Species in order of Preference Variety Name in order of Preference Pure live Seed Drill See!ding Broadcast Seeding Rates Seeding Rates 1b.per a.cre 1b.per acre 1.Polargrass Alsike Clover 2.Bluejoint Reedgrass Alsike Clover Alyeska Sourdough 10 1 4 1 15 2 8 2 10 10 20 16 15 15 15 8 Broadcast Seeding Rates lb.per acre Pure Li ve Seed 5 10 8 4 4 4 4 Drill Seeding Seeding Rates lb.eT'acre TABLE 10 INTERIOR AREA SEEDHlG RECOMMENDATIONS~ Soil Group 1 Variety Name in order of Preference Re Fescue rctare or Boreal Polar or Manchar Park or Merion Polargrass Alyeska Bluejoint Reedgrass Sourdough Smooth Brame Kentucky Bluegrass Mixtures and Species in order of Preference 2. 3. 4. 5. .... ! Soil Group 2 B S 20 16 10 8 5 5 8 4 2.5 10 8 5 4 2.5 2.5 4 Pure Live Seed Drill Seeding Broadcast Seedinl~Rates Seeding Rates lb.e!r acre lb.er acre Variety Name in order of Preference Po ar or Manchar Durar Polar or Manchar Polar or Manchar Arctared or Boreal SourdoughBluejointReedgrass Red Fescue Hard Fescue Smooth Brome Smooth Brame 4. 2. 3. SoOOr Polar or Manchar Soil Group 3* 10 8 5 10 10 12 20 16 Seed Broadcast Seeding Rates lb.per acre 4 2.5 5 5 Pure Live Drill Seeding Seeding Rates lb.pSr acre Variety Name in order of Preference Polar or Manchar Durar Durar Arctared L Smooth Brame Mi xtures.and Sped es in order of Preference** Hard Fescue 2.Hard Fescue 3.Red Fescue 4.Streambank Wheatgrass 5.Smooth Brome - .... I NOTE:If the soils of this group are irrigated.us;e seeding recommendations for Soil Group 1. *Watering is generally required at least for establishment and preferably for 2 years • **YeT1ow or white sweet clover may be added at a nte not to exceed 2 lbsfacre drilled or 4 lbs.facre broadcast. Soil Group 4 8 8 6 6 10 10 2 5 5 20 16 15 8 Seed Broadcast Seeding Rates lb.per acre II /I 1l.5 1.5"..1 ".1 :[ :~.5 :1.5 10 8 10I' Pure Live Drill Seeding Seedi ng Ra tes lb.pE!r acre Mixtures and Species Variety Name in order of in order of Preference Preference 1.Creeping Foxtail Garrison 2.Creeping foxtail Garrison KentUcky Bluegrass Park or Merion 3.Red Fescue Arctared or Boreal 4.Timothy Engmo Red Fescue Arctared or Boreal 5.Smooth Brome Polar or Manchar 6.Polargrass Alyeska ~7.Bluejoint Reedgrass Sourdough 8 2 6 6 15 8 Seed Broadcast Seeding Rates lb.per acre 4 1 1.5 1.5 10 4 Pure live Drill Seeding Seeding Rates lb.per acre son Group 5 Variety Name- in order of Preference Garrlson Engmo Park or Merion Polargrass Alyeska Bluejoint Reedgrass Sourdough Mixtures and Species in order of Preference 3. 4. 1.Creep,ng Foxta 11 2.Timoth'l Kentucky Bluegrass - NOTE:The permafrost conditions common to these soils will recede to greater depth after clearing of the native vegetation but usually will return to its original depth if grass is grown continuously for 5 years or more. TABLE 11 SOUTHEAST AREA SEEDING RECOMMENDATIONS So11Groupsl,2 and 3 -Mixtures and Species in order of Preference Variety Hame in order of Preference Pure Live Seed Orin Seeding Broadcast Seeding Rates Seeding Rates lb.per acre lb.per acre Arctared or Boreal 1.Red Fescue White Dutch or Alsike Clover Annual Ryegrass 2.Kentucky Bluegrass Nugget,Park or Merion White Dutch or Alsike Clover Annual Ryegrass 3.Meadow foxtail or COlllllOn Creeping Foxtail Garrison 4.Bluejoint Reedgrass Sourdough White Dutch or Alsilce Clover AnnUll Ryegrass 5 10 5 10 1 2 2.5 5 4 15 1 2 2.5 5 4 8 4 8 4 8 1 1 2 I"5.:) Pure Live Seed Drill Sl!eding Broadcast Seeding Rates Seeding Rates lb.per acre lb.per acre - Mixtures and Species Variety Name in order of in order of Preference Preference 1.Meadow Foxtail or COll'lllon Creeping Foxtail Garrison 2.Red Fescue Arctared or 80real 3.Reed Canarygrass Frontier 4.Bluejoint Reedgrass Sourdough 5 5 4 10 4 10 10 15 10 8 ,A> - Soil Groups 5 and 6 When drained refer to Soil Group 1 Undrained refer to Soi 1 Group 4 tABtE 12 SOUTHWEST.AREA SEEDING RECOMMENDATIONS Soil Groups 1 and 2-i -Mixtures and Species in order of Preference Variety Hame in order of Preference Pure Live Seed Orin Seeding Broadcast Seeding Rates Seeding Rates lb.per acre lb.per acre Soil Group 3 1.Red Fescue Arctared or Boreal Alsike Clover 2.Creeping Foxtail Garrison Al si Ite Clover 3.Kentucky Bluegrass Nugget.Park or Merion Alsike Clover 4.Bering Hairgrass Norcoast Alsike Clover S.Bluejoint Reedgrass Sourdough -Mixtures and Species in order of Preference Variety Name in order of Preference 5 10 5 10 1 2 4 8 1 2 4 15 4 15 10 15 1 2 4 8 Pure Live Seed Drill SE!eding Broadcast Seeding Rates Seeding Rates lb.per acre lb.per acre 1.Hard Fescue Dural" White Dutch'Clover 2.Red Fescue Aretared or Borea~ White Dutch Clover 5 1 S 5 1 10 2 10 10 2 son Group.4 .- Mixtures and Species in order of Preference* Variety Hame in order of Preference Pure Live Seed Drill SE!eding Broadcast Seeding Rates'Seeding Rates lb.per acre lb.per acre 8 8 10 10 2 IS 2 8 2 IS 2 8 2 4 4 5 5 1 4 1 4 .1 10 1 4 1 COllll1On Garrison Arctared or Boreal Rorcoast Nugget~Park or Merion Engmo Alsfke Clover Kentucky Bluegrass Alsike Clover Tfmothy Alsike Clover Bering Hairgrass Alsike Clover 81uejoint Reedgrass Sourdough Alsike Clover Meadow Foxtall or Creeping Foxtail Red·Fescue 1. 2. 3. 4. S. 6. *NOTE:These recommendations are for undrained soil..For drained soil recommendations refer to Group 1 soils. 5011 Group 5-Mixtures and Species in order of Preference VarietyHame in order of Preference Pure Li ve Seed Drill S~!eding Broadcast Seeding·Rates Seeding Rates lb.per acre lb.per acre 1. 2. 3. 4. Meadow Foxtail or Creeping Foxtail Bering Hairgrass Alsike Clover Bluejoint Reedgrass Alsike Clover Reed canarygrass Alsike Clover C011lDon Garrison Norcoast. Sourdough 4 4 10 1 4 1 10 1 8 8 15 2 8 2 20 2 TABLE 13 WESTERN AREA SEEDING RECoMMENDATIONS So11 Groups 1 and 2 Mixtures and Species in order of Preference* Variety Name in order of Preference Pure Live Seed Drill Seeding Broadcast Seeding Rates Seeding Rates lb.per <lcre lb.per acre Bluejoint Reedgrass Sourdough 1- 2. 3. 4. 5. 6.,-. Red Fescue Meadow Foxtail Creeping Foxtail Bering Kairgrass Potargrass Arctared CORDllon Garrison Norcoast Alyeska 5 4 4 10 10 4 10 8 8 15 15 8 NOTE:The above recOIIIIendations are based on judgemel~t and.not on actua 1 tti a1s in the area.*Alsfke clover should be added to any of the fonowil~g at a rate not to exceed 1 lb/acre drilled or 2 lbs/acre broadcast. $011 Group 3 -Mixtures and Species in order of Preference Variety Name in order of Preference Pure Live Seed Drill Se1eding Broadcast Seeding IRates Seeding Rates lb.per i!Cre lb.per acre _. r 1.Red Fescue Als.ike Clover 2.Hard Fescue Ahike Clover 3.Meadow Foxtail Alsifce Clover Aretared or Boreal Dura.r C01IIIlOn 5 5 1 5 1 4 1 10 i.o 2 10 2 8 2 NOTE:The above recOllllle1'ldations are based on judgement and not on actual trials in the area. Soil Groups 4 and 5 Pure Live Seed Mixtures and Species Variety Name Drill Seeding Broadcast in order of in order of Seeding Rates Seeding Rates Preference Preference lb.per acre lb.per acre 1.Meadow Foxta it C01llllOn 4 8 AlsitceClover 1 2 2.Creeping Foxtail Garrison 4 8 Alsike Clover 1 2 3.Bering Hairgrass Norcoast 10 15 Alsike Clover 1 2 4.Polargrass Alyeslca 10 15 Alsilce Clover 1 2 5.Bluejoint Reedgrass Sourdough 4 8 Alsike Clover 1 2 Mixtures and Species Variety Name Drill Seeding Broadcast in order!of in order of Seeding R,ates Seeding Rates Preference*Preference 1b.per a<cre lb.per acre 1.Glaucous Bluegrass*Tundra 10 15 Polargrass Alyeska 7 10 Alsike Clover 1 ·2 2.Red Fescue Arctared 10 20 Alsike Clover 1 2 3.Bering Hairgrass Norcoast 10 15 Alsike Clover 1 2 4.Bluejoint Reedgrass*Sourdough 4 8 Alsike Clover 1 2 - TABLE 14 ARCTIC AND ALPINE AREASSEEDINGRECOMMENDATIONs Soil Groups 1 and 2 'Pure Live Seed NOTE:Disturbed sites may be revegetated by sodding or spreading freshly cut native cottongrass~sedges,or other native tundra from adjacent areas, packing and fertiliZing according to soil tests. *This grass is to be used only in upland sites in the Arctic area. -This gra.S5 is to be used only in the Alpine area. Soil Group 3 Arctared Tundra Variety Name in order of Preference Mixtures and Species in order of Preference* 1.41 aucous 81 uegra5s· Alsike Clover 2.Red Fescue Alsike Clover 15 2 15 2 20 2 8 2 Broadcast Seeding Rates lb.per acre Pure Live Seed 10 1 10 1 10 1 4 1 Drill Set:ding Seed i ng R:a tes lb.per acre Alyeska Arctared No rcoas t Variety Name in order of Preference Mixtures and Species in order of Preference* NOTE:Disturbed sites may be revegetated by sodding 01'1'spreading freshly cut native cottongrass,sedges,or other n,atiYe tundra from adjacent areas, packing and fertiliZing according to soil tests. *This grass is to be used only in the Alpine area. Soil Group 4 1.Beri.ng Rairgrass Alsike Clover 2.Polargrass Alsike Clover 3.Red Fescue Alsike Clover 4.81uejoint Reedgrass*Sourdough Alsilce Clover 15 2 15 2 8 2 Broadcast Seeding Rates lb.per acre Pure Live Seed 10 1 10. 1 4 1 Drill Seeding Seeding Flates 1b.per alcre ~orcoast Alyeslca Variety Name in order of Preference Mixtures and Species in order of Preference* NOTE:Disturbed sites may be revegetated by sodding or spreading freshly cut native cottongrass,sedges,or other native tU~ldra from adjacent areas. packing and fertilizing according to soil tests:. *Tbis grass is to be used only in the Alpine area. Son Group 5 1.Bering Hairgrass Alsike Clover 2.Polargrass Alsike Clover 4.Bluejoint Reedgrass*Sourdough Alsike Clover NOTE:Disturbed sites may be revegetated by sodding (Ir spreading freshly cut native cottongrass,sedges.or other native tundra from adjacent areas, packing and fertilizing according to soil test~;. *This grass is to be used only in the Alpine area. -! - Western regions where seed recommendations are not yet available.Seed sources for large revegetation programs should be developed several years in advance of project construction. 3.8.4 Fertilization Fertilizers basically consist of nitrogen,phosphorous,and potassium (N-P-K).While fertilization is normally imperative for plant establishment at disturbed sites,specialized fertilizers with micronutrients are not necessary as part of an Al aska revegetation program.Use of a standard - N-P-K fertilizer (e.g.8-32-16,14-30-14)is usually sufficient and yields a considerable cost savings to revegetation programs compared to use of fertilizers containing micronutrients. A standard N-P-K fertilizer should be applied to all disturbed sites.On sites which receive general site preparation but no seeding,appl ;cation should be at a rate of 300 to 500 lbs{acre.For seeded areas,application rates should be 450·to 600 lbs{acre.Fertilization should include periphe- ral areas of undisturbed natural vegetation to stimulate seed production and dispersal. Fertilizer treatments should be applied in the early spring.Maintenance treatments should be applied in the second year after planting. 3.8.5 Mulches The use of mul ches has advantages and di sadvantages.Mul ches moderate -99- rr- I - temperature extremes,conserve moisture,protect surface soi 1s from ero- sion,improve conditions for germination,and can be used to improve soil quality.The use of organic mulch (e.g.straw,woodchips),however,can result in depletion of available nutrients~,particularly nitrogen,which becomes tied up in the decomposition process.Mulches may also inhibit germination or result in premature germination after early rains and seedling mortality.In general,the indisc:riminant use of mulch is not recommended for environmental conditions where nutrients are limited and decomposition is a slow process. 3.8.6 Woody Plants While extensive use of woody plants for revegetation is not expected at Power Authority project sites,they may be appropriate in areas of disturbed riparian habitat where annual flooding does not occur.Stem cuttings can be used to propogate many of the deciduous tree and shrub species in Alaska.Willow and poplar arle particularly widespread and frequent invaders of disturbed areas. Cuttings,approximately 8 to 10 inches long,should be conected when plants are dormant,preferably March or early April.They should be stored at freezing temperatures in plastic bags wi th a wet paper towel wrapped around the bases to prevent drying.Cuttings should be planted as early in the growing season as possible by pushing them into the ground.Approxi- mately 2 to 3 inches of the cutting should be left exposed above ground. -100- 3.9 RECLAMATION Reclamation of disturbed sites should be ul1ldertaken whenever the intended use is complete and for those areas which will remain unused for extended periods. o Slopes,borrow areas,and waste al'eas should be graded to stable conditions and provided with permanent drainage o Open culverts and culverts in natural drainages should be removed o Fill material in streams should be removed down to the origina1 stream contour o Roadways should be shaped to drain by crowning or outsloping and water bars,checks or drainage str'uctures should be installed o Abandoned roads should be removed or put to bed (i.e.stabilized, scarified and fertilized in place) o o Disturbed areas should be treated for revegetation or reinvasion by native species Access blocks such as berms or ditches should be installed to prevent access and damage to stabilized areas. -101- - .- 3.10 INSPECTION AND MONITORING An environmenta 1 i os pector wi1l be ass i gned to Power Authori ty proj ects • This individual will be thoroughly familiar with the various portions of the work and with the environmental requirements as they relate to con- struction operations.Before any activity is begun,the inspector will review the work requirements,make a physical survey of the area,and verify that construction boundaries are clearly marked.The inspector will review the contractor's proposed methods and procedures wi-th special attention to environmental protection.The inspector will then monitor the actual construction activities to ensure that environmental requirements are met.Special attention will be given to equipment movements,excava- tion,cl earing and grubbing,embankments,quarry and borrow operations, ditching,stream diversions,stockpiling,access roads,drainage and revegetation • Monitoring will be required for some projects to provide documentation that water quality standards are met.The location of upstream and downstream sampling stations will be pre-determined through consultation with the applicable regulatory agency.Considerations include the hydrology of the stream,the allowable mixing zone,and effec:ts of upstream feeder streams. -102- -CHAPTER 4 -AUTHORITIES AND AGENCIES Any component of a project may require one or more permits from federal,state, or local authorities.The following list of federal and state permits empha- sizes those most frequently required from thle standpoint of erosion and sedimentation control.Legal requirements appl'icable to individual projects should be thoroughly examined on a case-by-case basis. Federal U.S.Corps of Engineers Section 404 permit -required for dredge and fill operations in navigable waters and wetlands Section 10 permit -required for obstructions,alterations or improvements in navigable waters Bureau of Land Management Pl an of operations for mineral operations and land use leases,permits, easements u.S.Coast Guard Section 9 permit -for construction,modification or removal of a bridge or causeway in navigable water U.S.Environmental Protection Agency National Pollutant Discharge Elimination System (NPDES permit)-required for point source discharges -103- u.s.Fish and Wildlife Service Special use permits for activities on lands under its jurisdiction u.S.Forest Service Special use permits for activities on lands ILlnder its jurisdiction State of Alaska Office of Management and Budget Coastal zone management consistency determination Department of Environmental Conservation Section 401 certification (water gUidelines)-required for activities subject to federal permits and licenses Wastewater discharge permit Water quality standards Department of Fish and Game Anadromous fish protection permit Habitat protection permits Department of Natural Resources land use permit Permit to construct or modify a dam Water rights permit Material purchase Right of way ~Easements -104- REFERENCES Alaska Department of Environmental Conservation,1979.Transportation corridors water quality management study. Alaska Department of Environmental Conservation,1980.Transportation and water quality. Alaska Department of Environmental Conservation,1983.Placer mining settling pond design handbook. Bell,F.G.,1975.Methods of treatment of unstable ground.Newnes- Batterworths,London. Brian,Curran,H.J.and H.M.Etter,1976.Environmental design for northern road developments.Environmenta 1 Protecti on Environment Canada. Service, Brown,J.andR.L.Berg (eds.),1980.Environmental engineering and ecol ogicalbaseline investigations along tlhe Yukon River -Prudhoe Bay haul road:Cold Regions Research and EngineE!ring laboratory. Dabbs,D.l.,We Frieson,and S.Mitchell,1974.Pipeline revegetation. Prepared by Northern Engineering Services Company limited for Alaskan Arctic Gas Study Company. Down,C.E.and J.Stocks,1977.Environmental impact of mining.Halsted Press,N.Y. Harza-Ebasco Susitna Joint Venture,1984.Drainage structure and waterway design guidelines.Prepared for Alaska Powel"Authority. Kubanis,S.A.,1982.Revegetation techniques in arctic and subarctic I regions.Office of the Federal InspectOl",Alaska Natural Gas Trans- portation System. lotspeich,F.B.and A.E.Helmers,1974.Environmental guidelines for development roads in the subarctic.U.S.Environmental Protection Agency. Murfitt,A.W.,W.B.McMullen,and J.F.McPhail,1975.Design and construction of roads on muskeg in arctic and subarctic regions.16th Annual Muskeg Research Conference. Rural Development Council,1983.A revegetation guide for Alaska. U.S.Environmental Protection Agency,1975.l099in9 roads and protection of water quality. U.S.Environmental Protection Agency,1975.Methods of quickly vegetating soils of low productivity,construction activities. r- I ...... I I -I I u.s.Fish and Wildlife Service,1980.Gravel re~moval guidelines manual for arctic and subarctic floodplains. U.S.Forest Service,1979.Roadway drainage guide for installing culverts to accommodate fish. Vee,C.S.and T.O.Roelofs,1980.Planning fOrE!st roads to protect salmonid habitat.USDA Forest Service General Technical Report PNW-109 . Younkin,W.E.,1976.Revegetation studies in the northern Mackenzie Valley region.Prepared by Northern Engineering Services Company Limited for Canadian Arctic Gas Study Limited.