HomeMy WebLinkAboutAPA4155pt4. .
1)
I ..
by
Mona Jamison, Attorney
Montana Department of Health and
Environmental Sciences
TECHNICAL REPORT NO. 4
conducted by
Water Resources Division
Montana Department of Natural Resources and Conservation
32 South Ewing
Helena, Montana 59601
Bob Anderson, Project Manager
Shari Meats, Editor
for the
Old West Regional Commission
228 Hedden Empire Building
Billings, Montana 5g101
Kenneth A. Blackburn, Project Coordinator
April 1978
1730 K Street, N. W.
Suite 426
The Old West Regional Commission is a Federal-State
partnership designed to solve regional economic
problems and stimulate orderly economic growth in
the states of Montana, Nebraska, North Dakota,
South Dakota and Wyoming. Established in 1972
under the Public Works and Economic Development
Act of 1965, it is one of seven identical commissions
throughout the country engaged in formulating and
carrying oui coordinated action plans for regional
economic development.
COMMISSION MEMBERS
State Cochairman
Gov. Thomas L. Judge of Montana
Alternate: Dean Hart
Federal Cochairman
George D. McCarthy
State Members
Gov. Edgar J. Herschler of Wyoming
Alternate: Steve F. Freudenthal
Gov. J. James Exon of Nebraska
Alternate: Jon H. Oberg
Gov. Arthur A. Link of North Dakota
Alternate: Woody Gagnon
Gov. Richard F. Kneip of South Dakota
Alternate: Theodore R. Muenster
COf-IMI SS I ON OFFICES
201 Main Street
Suite D
Washington, D. C. 20006
202/967-3491
Rapid City, South Dakota 57701
605/348-6310
Suite 228
Heddon-Empire Building
Bi 11 ings, Montana 5910"
406/657-6665
i i
)
I ,
I
I
' r
I
FOREWORD
The Old West Regional Commission wishes to express its appreciation for
this report to the Montana Department of Natural Resources and Conservation,
and more specifically to those Department staff members who participated
directly in the project and in preparation of various reports, to Dr. Kenneth A.
Blackburn of the Commission staff who coordinated the project, and to the
subcontractors who also participated. The YelJowstone Impact Study was one
of the first major projects funded by the Commission that was directed at
investigating the potential environmental impacts relating to energy develop-
ment. The Commission is pleased to have been a part of this important research.
George D. McCarthy
Federal Cochairman
LIST OF ABBREVIATIONS.
PREFACE. . .
INTRODUCTION
ISSUE NO. 1:
contained in
of water?
What are the ramifications of the nondegradation policy
the Montana Water Pollution Control Act on large withdrawals
Analysis ..... .
Nondegradation
Summary . . . . . .
Recommendation ...
ISSUE NO. 2: Can dewatering be effectively controlled under the Montana
Water Pollution Control Act?
Analysis. . . .
Summary . . . . . . . .
Recommendation .....
ISSUE NO. 3: Can the State of Montana, through the Montana Pollutant
Discharge Elimination System, prohibit the discharge of saline or other
low-quality waters by requiring a zero-discharge limitation on point-
source dischargers, and impose a temporal rate of discharge?
Analysis ....
Summary . . . . .
Recommendation ..
ISSUE NO. 4: Does the State of Montana have the authority to control
the construction and maintenance of ash and sludge ponds associated with
large coal conversion facilities?
Analysis. . . . .
Summary . . . . . . .
Recommendation. . . .
ISSUE NO. 5: Do Montana's regulations address the impact of air
pollutant emissions on the Yellowstone River basin watershed?
Analysis. . . .
Summary ....
Recommendation.
iv
Page
vi
1
7
9
9
11
13
14
15
15
20
20
23
23
28
29
31
31
34
35
37
37
37
38
I
._
ISSUE NO. 6: Do Montana's regulations adequately address the problem
of irrigation return flow? 39
Analysis. . . . 39
Summary . . . . 40
Recommendation. 40
ISSUE NO. 7: Does Montana have sufficient regulatory authority to control
nonpoint sources of water pollution? . . . . . . . . 41
The FWPCA: Nonpoint Sources of Water Polution. 41
Analysis. . 44
Summary . . . . . . . . . . . . . . 46
Recommendation. . . . . . . . . . . . . . . . . 4 7
ISSUE NO. 8: Does the State of Montana have sufficient control over the
introduction of dissolved and .suspended solids into surface waters and
groundwater aquifers? . . . . . . . . . . 49
Analysis of Water Quality Regulations . . 49
Summary . . . . . . . . . . . . . . . . . 55
Recommendation. . . . . . . . . . . . . . . . . 55
Analysis of Reclamation and Mining Regulations. 56
~uinna ry . . . . . . . . . . . . . . . . . . . 59
Recommendation. . • . . . . . . . . . . . . . 60
ISSUE~No. 9: Does The Natural Streambed and Land Preservation Act of
1975 affect water quality control efforts? 61
Analysis. . . . 61
Summary . . . . . . . 63
Recommendation. . . . 64
ISSUE NO. 10: Can water quality problems associated with impoundment or
other developments which alter the hydrograph be controlled under the
existing water quality rules? 65
Analysis. . . . . 65
Summary . . . . . 68
Recommendation. . 68
ISSUE NO. 11: What are the enforcement remedies provided by the MWPCA,
and are they effective? 71
Analysis. . . . 71
Summary . . . . 76
Recommendation. 76
CONCLUSION 77
LITERATURE CITED 79
v
ARM
BHES
BLC
BNRC
DHES
DNRC
DSL
FWPCAA
MPDES
MWPCA
NPDES
Reclamation Act
Streambed Act
SUMS A
Administrative Rules of Montana
Board of Health and Environmental Sciences
Board of Land Commissioners
Board of Natural Resources and Conservation
Department of Health and Environmental Sciences
Department of Natural Resources and Conservation
Department of State Lands
Federal Water Pollution Control Act Amendments
of 1972 {33 U.S. C. 1251 et seq., Supp. 1973)
Montana Pollutant Discharge Elimination System
Montana Water Pollution Control Act (Section
69-48D1 et seq., R.C.M. 1947)
National Pollutant Discharge Elimination System
The Strip and Underground Mine Reclamation Act
(Section 50-1034 et seq., R.C.M. 1947)
The Natural Streambed and Land Preservation Act
of 1975 (Section 26-1510 et se9., R.C.M. 1947)
The Strip and Underground Mine S1ting Act
(Section 50-1601 et seq., R.C.M. 1947)
vi
I
THE RIVER
The Yellowstone River Basin of southeastern f1ontana, northern Hyoming,
and western North Dakota encompasses approximately 180,000 km2 (71,000 square
miles), 92,200 (35,600) of them in Montana. Montana's portion of the basin
comprises 24 percent of the state's land; where the river crosses the
border into florth Dakota, it carries about 8. 8 million acre-feet of water per
year, 21 percent of the state's average annual outflow. The mainstem of the
Yello~tstone rises in northwestern Hyoming and flows generally northeast to its
confluence with the Missouri River just east of the Montana-North Dakota
border; the river flows through Montana for about 550 of its 680 mi 1 es. The
major tributaries, the Boulder, Stillwater, Clarks Fork, Bighorn, Tongue, and
Powder rivers, all flow in a northerly direction as shown in figure 1. The
western part of the basin is part of the middle Rocky Mountains physiographic
province; the eastern section is located in the northern Great Plains (Rocky
Mountain Association of Geologists 1972).
THE CONFLICT
Historically, agriculture has been Montana's most important industry. In
1975, over 40 percent of the primary employment in Montana was provided by
agriculture (Montana Department of Community Affairs 1976). In 1973, a good
year for agriculture, the earnings of labor and proprietors involved in
agricultural production in the.fourteen counties that approximate the
Yellowstone Basin were over $141 million, as opposed to $13 million for
mining and $55 million for manufacturing. Cash receipts for Montana's
agricultural products more than doubled from 1968 to 1973. Since that year,
receipts have declined because of unfavorable market conditions; some
improvement may be in sight, however. In 1970, over 75 percent of the
Yellowstone Basin's land was in agricultural use (State Conservation Needs
Committee 1970). Irrigated agriculture is the basin's largest water use.
consuming annually about 1.5 million acre-feet (af) of water (Montana DNRC
1977).
There is another industry in the Yellowstone Basin which, though it con-
sumes little water now, may require more in the future, and that is the coal
development industry. In 1971, the North Central Power Study (North Central
Power Study Coordinating Committee 1971) identified 42 potential power plant
sites in the five-state (Montana, North and South Dakota, Uyoming, and
Colorado) northern Great Plains region, 21 of them in Montana. These plants,
all to be fired by northern Great Plains coal, ~muld generate 200,000 megawatts
(mw) of electricity, consume 3.4 mill ion acre-feet per year (mmaf/y) of water,
and result in a large population increase. Administrative, economic, legal,
1
and technological considerations have kept most of these conversion facilities,
identified in the i·lorth Central Po~1er Study as necessary for 1980, on the
drawing board or in the courtroom. There is now no chance of their being
completed by that date or even soon after, which will delay and diminish the
economic benefits some basin residents had expected as a result of coal
development. On the other hand, contracts have been signed for the mining
of large amounts of Montana coal, and applications have been approved not
only for new and expanded coal mines but also for Colstrip Units 3 and 4,
twin 700-mw, coal-fired, electric generating plants.
In 1975, over 22 million tons of coal were mined in the state, up from
14 million in 1974, ll million in 1973, and 1 million in 1969. By 1980, even
if no new contracts are entered, Montana's annual coal production will exceed
40 million tons. Coal reserves, estimated at over 50 billion economically
strippable tons (~lantana Energy Advisory Council 1976), pose no serious con-
straint to the levels of development projected by this study, which range
from 186.7 to 462.8 million tons stripped in the basin annually by the year
2000. Strip mining itself involves little use of water. How important the
energy industry becomes as a water user in the basin will depend on: 1) how
much of the coal mined in Montana is exported, and by what means, and 2) by
what process and to what end product the remainder is converted within the
state. If conversion follows the patterns projected in this study, the energy
industry will use from 48,350 to 326,740 af of water annually by the year 2000.
A third consumptive use of water, municipal use, is also bound to
increase as the basin population increases in response to increased employment
opportunities in agriculture and the energy industry.
Can the Yellowstone River satisfy all of these demands for her water?
Perhaps in the mainstem. But the tributary basins, especially the Bighorn,
Tongue, and Powder, have much smaller flows, and it is in those basins that
much of the increased agricultural and industrial water demand is expected.
Some impacts could occur even in the mainstem. What would happen to
water quality after massive depletions? How would a change in water quality
affect existing and future agricultural ,industrial, and municipal users?
What would happen to fish, furbearers, and migratory waterf01·1l that are
dependent on a certain 1 evel of instream flow? Would the river be as
attractive a place for recreation after dewatering?
One of the first manifestations of ~1ontana's growing concern for water
in the Yellowstone Basin and elsewhere in the state was the passage of
significant legislation. The ~later Use Act of 1973, which, among other
things, mandates the adjudication of all existing water rights and makes
possible the reservation of water for future beneficial use, was followed
by the l~ater Moratorium Act of 1974, ~1hich delayed action on major
applications for Yello~1stone Basin water for three years. The moratorium,
by any standard a bold action, was prompted by a steadily increasing rush of
applications and filings for water (mostly for industrial use) which, in two
tributary basins to the Yellowstone, exceeded supply. The DNRC's intention
during the moratorium was to study the basin's water and related land
resources, as well as existing and future need for the basin's water, so that
2
YEllowsTONE RIVER BASIN
'
0 10 20 40 60 80 100 Miles
u-JHt---:j I I I I
0 10 20 40 60 80 100 l<ilomelers
wu---1 I I I I
I MUSSELSHELL
'
WHEATLAND
GOLDEN\
' MEAGHER
I
' -------~-J VALLEY
I ~----~-
N
\
' l
I
YELLOWSTONE
RIVER BASIN
GARFIELD
'y--
1 I
) I
I
------l
'\T R E A Sr"U"'R""'E~-....:..,~~---,r"'""'-r-'
~
McCONE
I
(
PRAIRIE
-~
' l
-----,
I
DAWSON
L -_i.l -/'"""-1.-.J YELLOWSTONE '
_j CARBON
' _ _j
I
------'1 _....;;>.. __ - --t,---'--
y E L L 0 W S T 0 N E ')
NATIONAL PARK L
L--~ ° COLSTRIP '-;_-{ .
' ---------. I
--------1 ••• II'
~-:..
" INDIAN
BIG HORN
RESERVATION
WYOMING
'
POWDER I
ASHLAND
I
... __ _j
I ----r' I
! l ----~
\ Tongue River ~ Reservoir
I
I
---1 ~
' ~ l :I:
l
GLENDIVE)
I tl
> ~
0
~
J
)
>
l
the state would be able to proceed wisely with the allocation of that water.
The study which resulted in this series of reports was one of the fruits of
that intention. Several other Yellowstone water studies were undertaken
during the moratorium at the state and federal levels. Early in 1977, the
45th f•lontana Legislature extended the moratorium to allo~t more time to con-
sider reservations of water for future use in the basin.
THE STUDY
The Yellowstone Impact Study, conducted by the Water Resources Division
of the Montana Department of Natural Resources and Conservation and financed
by the Old West Regional Commission, was designed to evaluate the potential
physical, biological, and water use impacts of water withdrawals and water
development on the middle and lower reaches of the Yellowstone River Basin in
Montana. The study's plan of operation was to project three possible levels
of future agricultural, industrial, and municipal development in the Yellow-
stone Basin and the streamflow depletions associated with that development.
Impacts on river morphology and water quality were then assessed, and,
finally, the impacts of altered streamflow, morphology, and water quality on
such factors as migratory birds, furbearers, recreation, and existing water
users were analyzed.
The study began in the fall of 1974. By its conclusion in December of
1976, the information generated by the study had already been used for a
number of moratorium-related projects--the EIS on reservations of \~ater in
the Yellowstone Basin, for example (Montana DNRC 1976). The study resulted
in a final report summarizing all aspects of the study and in eleven
specialized technical reports:
Report No. 1
Report No. 2
Report No, 3
Report No. 4
Report No. 5
Report flo. 6
Report No. 7
Future Development Project.1ons and Hydrologic Modeling in
the Yellowstone River Basin, Montana.
The Effect of Altered Streamflow on the Hydrology and
Geomorphology of the Yellowstone River Basin, lolontana.
The Effect of Altered Streamflow on the l~ater Quality of
the Yellowstone River Basin, Montana.
The Adequacy of t~ontana' s Regula tory Framework for Water
Quality Control
Aquatic Invertebrates of the Yellowstone River Basin,
~1ontana.
The Effect of Altered Streamflow on Furbearing r~ammals of
the Yellowstone River Basin, Montana.
The Effect of Altered Streamflow on Migratory Birds of the
Yellowstone River Basin, Montana.
5
Report No. 8
Report ilo. 9
Report No. 10
Report No. 11
The Effect of Altered Streamflow on Fish of the
Ye 11 0\~stone and Tongue Rivers, Hontana.
The Effect of Altered Streamflo~l on Existing t•1unicipal
and Agricultural Users of the Yellowstone River Basin,
Montana.
The Effect of Altered Streamflow on Hater-Based Recreation
in the Yellowstone River Basin, Montana.
The Economics of Altered Streamflow in the Yellowstone
River Basin, Montana.
ACKNOWLEDGMENTS
This report was reviewed by and guidance received from John C. Orth,
Director of the Montana Department of Natural Resources and Conservation;
Ted J. Doney, Deputy Director of the DNRC; Orrin Ferris, Administrator of
the DNRC's Water Resources Division; Carole Massman, of the DNRC's Special
Staff; and David Lambert, Supervisor of the DNRC's Communications Section.
Other DNRC personnel providing assistance were Janet Cawlfield, Violet
Garner, and Barbara Williams, typists. The cover was designed and executed
by D. C. Howard.
The author expresses appreciation to G. Steven Brown and Mike Salvagni,
who provided input to the development of the issues; to Don Willems, who
answered many inquiries regarding the implementation of the Water Pollution
Control Act; to Professor Swenson of the University of Utah College of Law,
who provided assistance in legal interpretations; and to Maureen Stohl,
Marjorie Chebul, and Linda Bjerke, typists-at the DHES who typed original
drafts of this report.
AUTHOR'S NOTE
My biggest thank-you goes to my husband, Van. He inspired my becoming.
He encouraged my acceptance of this project and strengthened my spirit during
its completion.
6
·;
The purpose of this report was to assess the adequacy of Montana's
existing water quality control laws. This is accomplished by determining
the specific ramifications of policies such as the Montana Water Pollution
Control Act, the Montana Pollutant Discharge Elimination System, and the
Natural Streambed and Land Preservation Act. Montana's ability to effect-
ively control specific water quality problems through the authority mandated
by these and other regulations is addressed.
Each of the following 11 issues has an analysis, summary and recommen-
dation on water quality problems such as large withdrawals of water, point
and nonpoint sources of pollution, air pollutant emissions, irrigation re-
turn flow, the introduction of dissolved and suspended solids into surface
waters, and impoundments. The last issue discusses the effectiveness of
enforcement remedies.
7
What are the ramifications of the nondegradation policy contained in
the Montana Water Pollution Control Act on large withdrawals of water and
flow reservation to preserve and protect water quality?
ANALYSIS
The legislature defines pollution as the:
Contamination, or other alteration of the physical, chemical,
or biological properties of any state waters, which exceeds
that permitted by Montana water quality standards, including,
but not limited to, standards relating to change in tempera-
ture, taste, color, turbidity, or odor; or the discharge, seep-
age, drainage, infiltration or flow of any liquid, gaseous,
solid, radioactive, or other substance into any state water
which will or is likely to create a nuisance or render the
waters harmful, detrimental, or injurious to public health,
recreation, safety, welfare, livestock, wild animals, birds,
fish, or other wildlife. A discharge, seepage, drainage, in-
filtration or flow which is authorized under the pollution
discharge permit rules of the board is not "pollution" under
this chapter [Sec. 69-4802(5), R.C.M. 1947).
Legally, therefore, water pollution is the alteration of various water
properties. Po 11 uti on occurs when these alterations exceed tho.se permitted
by the water quality standards adopted by the BHES, and when discharges of
substances into state waters adversely affect various uses or exceed author-
ized limits as set forth in MPDES permits.
Water quality standards set forth in ARM 16-2.14(10)-S14480 are rules
which have been promulgated by the BHES pursuant to the MWPCA which comply
with the requirements of the FWPCAA. Water quality standards have been
adopted" ... to establish maximum allowable changes in water quality and
establish limits for pollutants which affect prescribed beneficial uses of
state waters" [ARM 16-2.14(10)-S14480(1)].
A water quality standard is composed of many elements. Initially, state
waters are given water use classifications; then water use descriptions
enumerating uses to be made of the various state waters are assigned to the
classifications. Next, specific water quality criteria are established to
protect the designated water uses. The final component of a water quality
standard incorporates the general water quality criteria which are applicable
to all state waters except where the specific water quality criteria are
designated more applicable to a specific water use classification [ARM 16-2.14
(10)-S14480(2)(a)J. The classifications assigned to various state waters are,
therefore, indicative of their intended uses.
9
Pollution must occur in order for state waters to be protected by state
law. The MWPCA defines state waters as:
any body of water, irrigation system, or drainage system
either surface or underground; however, this subsection
does not apply to irrigation waters where the waters are
used up within the irrigation system and the waters are
not returned to any other state waters [Sec. 6g-4802(9),
R.C.~1. 1947).
As defined by the MWPCA, very few, if any, bodies of water existing in the
state would fall outside this definition. Thus, any pollution occurring in
state waters falls within the jurisdiction of the MWPCA. Whether the depart-
ment, however, can exercise authority over all incidents of pollution involves
complex legal questions concerning the authority of the state on Indian reser-
vations and the right of the state to regulate federal activities.
As articulated in the policy statement of the water quality standards
rule, the standards quantify the maximum degree of degradation permissible
within each classification. The water quality standards rule explicitly
provides that:
specific water quality criteria, along with criteria in
section (6) protect the beneficial uses set forth in the
water-use descriptions for the following classifications
of water [ARM 16-2.14(10)-S14480(5)(a)].
Therefore, the principal inquiry becomes whether an apparent unsuitability of
a reach of stream for its designated uses is sufficient evidence of water
quality degradation. For example, one may question whether the disruption
of fish and aquatic life is sufficient evidence of water quality degradation.
The water use classifications applicable to the Yellowstone River as set
forth in ARM 16-2.14(10)-S14480(4) and the water use descriptions relating to
fish and aquatic life relevant to each classification as set forth in ARM 16-2.14
(10)-S14480(5) are enumerated in table 1. Since the criteria for each water use
description are designed to guarantee the suitability of the water for its desig-
nated uses, an inability to maintain the various uses would indicate that the
criteria have not been maintained or met. Thus, an apparent unsuitability of a
reach of stream for its designated uses would indicate water quality degradation.
For example, the Yellowstone River from the Yellowstone Park boundary to
the Laurel water supply intake has been classified as B-D . Specific water
quality criteria applicable to B-D classification have b~en adopted and de-
signed to protect and maintain the 1suitability of the water for growth and propa-
gation of salmonid fishes and associated aquatic life [ARM 16-2.14(10)-S14480(5)
(d)(iii)]. Should the absence of growth and propagation of salmonid fishes and
associated aquatic life become apparent within this B-D reach of the Yellowstone
River, it would be reasonable to maintain that the specfHc water quality criteria
are not being met, and that water quality degradation has occurred within this
reach of stream. Thus, disruption of fish and aquatic life, using the applicable
criteria, would provide substantial evidence of water quality degradation within
this B-D 1 reach of the Yellowstone River.
10
TABLE 1. Water use classifications applicable to the Yellowstone River.
Classification Water Use Description
A -Open -o1 water quality is to be maintained suitable
for ... growth and propagation of salmonid fishes
and associated aquatic life ...
B - D 1 The quality is to be maintained suitable for .
growth and propagation of salmonid fishes and
associated aquatic life
The quality is to be maintained suitable for .. ;
growth and marginal propagation of salmonid fishes
and associated aquatic life
The quality is to be maintained suitable for ..
growth and propagation of nonsalmonid fishes and
associated aquatic life ...
NONDEGRADATION
The opening policy statement of the MWPCA declares as a goal the conser-
vation of water through the protection, maintenance, and improvement of its
quality [Sec. 69-4B01(1)(a)~ R.C.M. 1947]. This statement implies a policy of
nondegradation. Although the legislature has not directly defined nondegrada-
tion, it has done so indirectly throu9h the provisions which delegate duties to
the BHES. In Section 69-4808.2(1)(c}(ii), R.C.M. 1947, the legislature pro-
vides that:
The board shall require that any state waters, whose existing
guality is higher than the established water guality standards,
be maintained at that high guality unless it has been affirma-
tively demonstrated to the board that a change is justifiable
as a result of necessary economic or social development and will
not preclude present and anticipated use of these waters.
[Emphasis provided]
Moreover, the nondegradation policy has been adopted as a rule by the BHES in
ARM 16-2.14(10)-S14480(6}, which states:
General Water ualit Criteria
The egree of waste treatment required to restore and
maintain the standards is to be determined by the de-
partment and is to be based on the following:
(1) The state's policy on nondegradation of ex-
isting high water quality as described in
Section 4g-4808.2, R.C.M. 1947.
Thus, state waters in which the existing quality surpasses that required by an
applicable water quality standard cannot be degraded down to the applicable
11
water quality standard, and, in fact, must be maintained at that high level.
Furthermore, the BHES has been expressly directed not to lower any previously
adopted water quality standard except:
... upon a finding that a particular state water has been
classified under a standard or classification of water quality
that is higher than the actual water quality that existed at
the time of classification and only if the action is taken
pursuant to 69-4814 [Sec. 69-4808.2(1)(c)(i), R.C.M. 1947).
Therefore, an applicable water quality standard serves not as a justification
for degradation of existing high water quality, but as a minimum water quality
standard to be maintained or achieved where it has not previously been attain-
ed.
In addition, the legislature has delegated to the BHES a statutory duty to
regulate new and increased sources of water pollution. The statute provides
that:
The board shall require any industrial, public, or private
project or development, which would constitute a new source
of pollution or an increased source of pollution to high
quality waters, referred to in subsection (1)(c)(ii), to
provide the degree of waste treatment necessary to maintain
that existing high water quality [Sec 69-4808.2(1)(c)(iii),
R.C.M. 1947).
Thus, it can be demonstrated that a nondegradation policy is mandated by the
MWPCA and affirmed by the BHES.
The nondegradation policy is enforceable in its present statutory form,
although the Board's adoption of rules and standards would promote more effective
implementation of this policy. Section 69-4808.2(1)(g), R.C.M. 1947, expressly
states that the BHES shall: " ... adopt rules for the administration of this
chapter." Accordingly, in order for the DHES to effectively fulfill its duties
under the MWPCA, particularly those pertaining to enforcement, the BHES must adopt
rules implementing the nondegradation policy contained in the MWPCA.
The Strip and Underground Mine Reclamation Act (Sec. 50-1034 et se~., R.C.M.
1947; hereinafter referred to as the Reclamation Act), and the Strip an Under-
ground Mine Siting Act (Sec. 50-1601 ~ .• R.C.M. 1947; hereinafter referred
to as SUMSA), administered by the DSL, incTude water quality control in reclam-
ation activities [Sec. 50-1036(14) and Sec. 50-1602, R.C.M. 1947, respectively].
As required by statute, rules have been adopted to implement both acts.
The water quality segments of the rules adopted to implement the Reclamation
Act and SUMSA proclaim a policy of nondegradation of waters. Specifically, the
rules provide the following:
Non-degradation of waters. Waters within the public domain
of the state that possess a higher quality than that estab-
lished on the effective date of established standards shall
be maintained at their present high quality consistent with
the powers granted to the board. Such high quality waters
shall not be lowered in quality unless and until it is
affirmatively demonstrated to the board through public
12
hearing, that such a change is justifiable as a result of
necessary economic or social development and that the
change will not adversely affect the present and future
uses of such waters ... [ARM 26-2.10(10)-S10330(1)(a)].
Nondegradation of waters. Waters within the public domain
that possess a quality higher than established standards
shall be maintained at their present high quality consistent
with the powers granted to the board [ARM 26-2.10(18)-
S10400(G.)(3. )(a.)].
Thus, if the introduction of pollutants into surface waters decreases the
existing high quality of a particular body of water, the nondegradation policy
has been violated. If such a situation occurs, the DSL is authorized to exer-
cise its enforcement powers against the liable operator [Sec. 50-1038(1) and
Sec. 50-1605(1), R.C.M. 1947].
In order for an operator to legally allow the introduction of pollutants
into high quality surface waters, he must affirmatively exhibit to the BLC
that such degradation is economically or socially necessary and that such
introduction will not adversely affect the beneficial uses of the surface
waters.
Since the DHES has explicit statutory jurisdiction over water quality and
its enforcement, it is possible that the DSL reclamation and mining rules con-
cerning water quality are outside the scope of the Reclamation Act and SUMSA,
and are therefore unauthorized. The issue of potentially conflicting and over-
lapping jurisdiction between DHES and DSL, if ever raised, would ultimately be
resolved by the Montana Supreme Court.
SUMMARY
The MWPCA defines pollution as anything causing alterations in state
waters which exceed those permitted by the water quality standards, discharges
of various substances into state waters which render the waters unsuitable for
various beneficial uses, and discharges which exceed those permitted by an
MPDES permit. The MWPCA furthermore prohibits such pollution and the placement
of wastes in locations where they are likely to pollute state waters. State
waters has been defined by the MWPCA as any body of water within the state,
either surface or underground.
The water quality standards adopted by the BHES specify the maximum degree
of water quality degradation allowed to exist within each water use classifi-
cation. Various water uses are subsequently designated to the classifications.
Specific water quality criteria are then established to protect the designated
water uses assigned to the various water use classifications. Thus, an apparent
unsuitability of a particular reach of stream for its designated uses indicates
water quality degradation.
The legislature has established a nondegradation policy in the MWPCA, and
such a policy has also been adopted as a rule by the BHES. The nondegradation
policy requires that existing high water quality within a particular reach
13
of stream be maintained at that high level. A water quality standard, therefore,
defines a minimum level of water quality to be maintained or achieved and not as
a justification for degradation of state waters. Although the DHES is required
to enforce the nondegradation policy set forth in the MWPCA, it may allow degra-
dation of existing high water quality if it is demonstrated to the BHES that
such degradation is economically or socially justifiable.
The Reclamation Act and SUMSA, administered by the DSL, also concern water
quality control. A nondegradation policy, similar to the one contained in the
MI·/PCA, has also been required of operators in the rules adopted to implement
both acts.
Jurisdictional conflicts over nondegradation may exist between the DHES and
the DSL. The judicial system could ultimately resolve this issue.
RECOMMENDATION
It is recommended that the BHES adopt rules implementing the nondegradation
policy mandated by the MWPCA, including standards to be applied in determining
whether economic or social development will be allowed to degrade existing high
quality state waters. These rules would provide the DHES with a concrete frame-
work upon which to enforce the policy.
The BLC, for purposes of implementing the Reclamation Act and SUMSA, should
also adopt standards to determine if specific economic or social considerations
will permit a violation of the nondegradation policy to occur. The BLC could
adopt its own standards or, in order to minimize potential legal conflicts,
adopt by rule the nondegradation standards promulgated by the BHES.
14
Can dewatering be effectively controlled under the Montana Water Pollution
Control Act?
ANALYSIS
Pollution can be attributed to point-source discharges, nonpoint sources,
or dewatering. Point-source discharges are effectively controlled by the
Montana Pollutant Discharge Elimination System (MPDES) created by the t1WPCA.
Increases in nonpoint sources of pollution will be minimized by the implemen-
tation of the statewide 208 plan. Both the MPDES permit system and the 208
plan are under the jurisdiction of the DHES. Dewatering, however, is not
addressed in the MWPCA. Therefore, the DHES has no authority to directly con-
trol water quality degradation caused by dewatering. Pollution caused by de-
watering, however, can be significant.
A dewatered stream has been defined as a "perennial or intermittent stream
whose water has been removed for one or more beneficia 1 uses" [ARM 16-2 .14( 10)-
S14480(3)J. Dewatering is a process which lowers the water level of a stream
and which can cause numerous and substantial deleterious effects on water
qua 1 ity. Some of these are documented as fo 11 ows:
... possible results of dewatering, [include) reducing
the stream's ability to transport and assimilate waste,
decreasing the sediment carrying capacity, lowering the
water level of the stream, and possibly increasing the
water temperature . . . [~iontana DNRC 1975) .
These problems may constitute pollution if dewatering of the Yellowstone River
causes chan~es in any of the specific water quality criteria cited in ARM 16-2.14
(10)-514480{5): average number of organisms in the coliform group, dissolved
oxygen concentration, total dissolved solids, sulfates, variation of hydrogen ion
concentration (pH), turbidity, temperature, concentration of sediment, settleable
solids, residues, toxic and other deleterious substances, and true color.
The DHES has authority to "prevent, abate, and control the pollution of
state waters" [Sec. 69-4820.1 (1 )(a), R.C.M. 1947). However, the scope of the
DHES's authority in pollution control and enforcement is limited to discharges
of pollutants into state waters and alterations of conditions in state waters
which exceed those permitted by the water quality standards. The authority of
the DHES under the MWPCA does not extend to the actual withdrawal of water from
state waters.
Although dewatering may violate water quality standards, the DHES has no
control over the amount of water withdrawn for beneficial uses. None of the
acts under the jurisdiction of the DHES, or any of the rules adopted by the BHES,
address regulation or control of water use rights.
15
The Montana Water Use Act (Sec. 80-865 et seq., R.C.M. 1947) determines
a person's right to appropriate water and establishes the procedure to be
followed in acquiring and perfecting a water right. The policies and purposes
of this Act are stated in Section 89-866, R.C.M. 1947, which provides the
following:
(1) Pursuant to article IX of the Montana constitution, the
legislature declares that any use of water is a public
use and that the waters within the state are the property
of the state for the use of its people and are subject to
appropriation for beneficial uses as provided in this act.
(2) A purpose of this act is to implement article IX, section
3(4) of the Montana constitution, which requires that the
legislature provide for the administration, control, and
regulation of water rights and establish a system of
centralized records of all water rights ....
(3) It is the policy of this state and a purpose of this act
to encourage the wise use of the state's water resources
by making them available for appropriation consistent with
this act, and to provide for the wise utilization, develop-
ment, and conservation of the waters of the state for the
maximum benefit of its people with the least possible degre-
dation of the natural aquatic ecosystems ... [Sec. 89-866,
R.C.M. 1947]. [Emphasis provided)
The BNRC has the authority to "adopt rules necessary to implement and carry
out the purposes and provisions of this act" [Sec. 89-869(2), R.C.M. 1947).
The DNRC has the duty to enforce and administer the Montana Water Use Act
and its rules [Sec. 69-868(1)(a), R.C.M. 1947).
The DNRC also has the duty to:
prescribe procedures, forms, and requirements for appli-
cations, permits, certificates, declarations, and proceed-
ings under this act, ... [Sec. 89-868(l)(b), R.C.M. 1947).
After these technicalities and procedures have been established, the DNRC--
not the DHES--must grant permits to appropriate water and construct withdrawal
works. The Montana Water Use Act states that:
. . . a person may not appropriate water or commence
construction of diversion, impoundment, withdrawal,
or distribution works therefor except by apllying for
and receiving a permit from the department Sec. 89-880
(2), R.C.M. 19471. [Emphasis provided)
The DNRC is required to issue a permit if certain conditions are met by
the applicant. The criteria are set forth in Section 89-885, R.C.M. 1947,
which states:
16
J
'I
The department shall issue a permit if:
(1) there are unappropriated waters in the source of
supply:
(a)
(b)
(c)
at times when the water can be put to the use
proposed by the applicant;
in the amount the applicant seeks to appropriate;
and
throughout the period during which the applicant
seeks to appropriate, the amount requested is
available;
(2) the rights of a prior appropriator will not be adversely
affected;
(3) the proposed means of diversion or construction are
adequate;
(4) the proposed use of water is a beneficial use;
(5) the proposed use will not interfere unreasonably
with other planned uses or developments for which
a permit has been issued or for which water has
been reserved;
(6) an applicant for an appropriation of 10,000 acre-
feet a year or more or 15 cubic feet per second or
more proves by clear and convincing evidence that
the rights of a prior appropriator will not be ad-
versely affected.
An interpretation of this section indicates that the duty to grant permits may
be nondiscretionary if the criteria are successfully met.
One can argue, however, that a number of mechanisms exist by which the
DNRC could justify denying water permits. The rights of a prior appropriator,
as set forth in Section 89-885(2), reasonably include water quality. There-
fore, if a prior appropriator's water quality will be degraded by the granting
of a permit to an applicant, it could be argued that the DNRC is authorized to
deny his permit. Since the DNRC has not denied permits on the basis of water
quality degradation occurring at the expense of existing appropriators, the
DNRC's actions indicate that it has adopted the position that the word "ri9hts"
includes only water quantity. The ~1ontana Environmental Policy Act (MEPA) may
also give the DNRC authority to deny a permit to an applicant. If the MEPA pro-
cess establishes that adverse environmental impacts will occur should a permit
1However, in response to the author, the DNRC takes the position that in
some cases water quality can be an attribute or element of a water right, and
in such cases it may deny a permit if the water quality element of an existing
water right would be adversely affected. It has not done so to date.
17
be granted, the DNRC could justifiably deny a permit. Currently, no permits
have been denied on the basis of resulting adverse environmental impacts.
The water-permitting procedure therefore remains nondiscretionary. It is
through the ''Reservation of Waters'' provision of the Montana Water Use Act
[Sec. 89-890, R.C.M. 1947] that the DHES may become instrumental in controlling
pollution caused by various activities such as dewatering. The actual authority
to grant reservation of waters, however, lies with the BNRC. As a state agency,
the DHES is permitted to apply to the BNRC to reserve waters [Sec. 89-890(1),
R.C.M. 1947]. Pursuant to statute, the DHES may apply to reserve waters:
... for existing or future beneficial uses, or to maintain
a minimum flow, level, or quality of water throughout the
year or at such periods or for such length of time as the
board designates [Sec. 89-890(1), R.C.M. 1947].
In order for the BNRC to adopt an order reserving water for the DHES, the
DHES must first satisfactorily establish:
(a) the purpose of the reservation;
(b) the need for the reservation;
(c) the amount of water necessary for the purpose of
the reservation;
(d) that the reservation is in the public interest
[Sec. 89-890(3), R.C.M. 1947].
Therefore, it is encumbent upon the DHES to establish the above requirements
to the satisfaction of the BNRC before an order reserving water for the DHES
can be issued. The DHES has the express authority to:
(d) Collect and furnish information relating to
the prevention and control of water pollution;
(e) Conduct or encourage necessary research and
demonstrations concerning water pollution;
[Sec. 69-4809.1(1), R.C.M. 1947].
Thus, the BHES is statutorily authorized to fulfill the reservation essentials
set forth in Section 89-890(2) of the Montana Water Use Act. Through its re-
search authority, the DHES can establish its need to reserve waters for the main-
tenance of water quality. For example, the DHES can establish that dewatering
degrades water quality by increasing stream concentrations of total dissolved
solids (TDS) and that certain minimum flows are required in order to prevent this
pollution.
Pursuant to Section 89-890(4), R.C.M. 1947, the DNRC is authorized to
" ... reject an application and refuse a permit for the appropriation of re-
served waters, ... " only after the DHES has satisfactorily met the above
enumerated criteria, and has been granted a water reservation by the BNRC.
18
Although this procedure seems rather circuitous as a means of preventing
water pollution caused by dewatering, the MWPCA and the Montana Water Use Act
presently preclude the DHES from taking any other course. In the final
analysis, however, only the BNRC can prevent pollution caused by dewatering
since it is the body authorized to grant water reservation.
An exception to the seemingly mandatory duty of the DNRC to issue water
appropriation permits can be found in the Montana Water Use Act. This ex-
ception specifically pertains to the Yellowstone River Basin (Sec. 89-8-103
et seg., R.C.M. 1947} and is often referred to as the "Yellowstone Moratorium."
Section 89-8-103, R.C.M. 1947, of the Moratorium states that because the number
of applications for water appropriation from the Yellowstone River Basin
threatens the "depletion of Montana's water resources to the significant detri-
ment of existing and projected agricultural, municipal, recreation~] and other
uses, and of wildlife and aquatic habitat,'' and that because the legislature
further finds that ''these appropriations foreclose the options ... for other
future beneficial purposes," the legislature declares:
... that it is the policy of this state that before these
proposed appropriations are acted upon existing rights to
water in the Yellowstone basin must be accurately determined
for their protection, and that reservations of water within
the basin must be established as rapidly as possible for the
preservation and protection of existing and future beneficial
uses.
Section 8g-8-105, R.C.M. 1947, mandates the DNRC to suspend applications
to appropriate surface water in the Yellowstone River basin which exceed 14,000
af or 20 cfs. This section of the 11ontana Hater Use Act states the following:
( 1) The~ department may not grant or otherwise take any
acfion on an application until one of the following
first occurs:
(a) The board of natural resources and conservation
makes a final determination on the applications
for reservations of water in the basin filed
before January 1, 1977, in accordance with
89-890;
(b) A final determination of existing rights has
been made in the source of supply in accordance
with the Montana Water Use Act; or
(c) January 1, 1978; however, if a court stays or
enjoins the continuance of proceedings on any
pending application for reservation of water in
the basin filed before January 1, 1977, and such
stay or injunction prevents the board from making
a final determination on such application before
January 1, 1978, the court shall extend this date
by the length of delay incurred. The court may
not extend this date beyond January 15, 1979.
19
Permits may be granted, therefore, in the Yellowstone River Basin after
January 1, 1978, or upon a final adjudication of existing rights in the basin,
or upon a decision by the BNRC on the reservation applications, whichever
occurs first, unless the Moratorium is extended by court order. (Subsequent
to the writing of this report, the Moratorium was extended by court order in
December 1977 until mid-summer 1978.)
Since the MWPCA does not authorize the DHES to regulate water quality
degradation caused by dewatering, the DHES has filed an application for
reservation of water in the Yellowstone River. The basis of the DHES's
request is to ensure that water quality in the Yellowstone River is not
degraded. If the BNRC grants the DHES's reservation request, water quality
in the Yellowstone River will be maintained.
SUMMARY
A dewatered stream is one in which the water has been removed for one
or more beneficial uses. The process of dewatering lowers the water level
of the stream and may ultimately result in its degradation.
The DNRC exercises jurisdiction over water appropriations and with-
drawals. Since the DHES has no jurisdiction in the water appropriation pro-
cess, it is not directly authorized to regulate water quality degradation
caused by dewatering. The DHES, however, is authorized to apply for flow
reservations. Accordingly, the DHES has applied for a reservation on the
Yellowstone River to maintain the minimum flow necessary to guarantee the
maintenance of the water quality standards.
The flow reservation process provides the DHES with an indirect method
of controlling water quality degradation caused by dewatering. The BNRC
grants or denies applications for reservations of waters. Thus, the DHES's
control over water quality degradation caused by dewatering is inadequate
since the reservation process does not guarantee that the flow reservations
applied for will be granted.
RECOMMENDATION
It is incongruous that two different state agencies preside over water
quality and water appropriations. The DHES's jurisdiction encompasses
water quality and that of the DNRC encompasses water withdrawals. Neither
agency has the authority to involve itself with the other's jurisdiction.
Legislative action is necessary to involve the DNRC in water quality
as it relates specifically to water withdrawals, or the DHES in water
appropriations as it relates specifically to water quality. Perhaps a
procedure similar to the certification process used in the Major Facility
Siting Act {Sec. 70-801 et seq., R.C.M. 19471 could be legislatively estab-
lished in which applications for withdrawals considered by the DNRC could
also be evaluated for effects on water quality by the DHES.
20
I
~
Another alternative is to consolidate jurisdiction over water quality
and withdrawals under one department. The implementation of either alternative
would greatly enhance the control and maintenance of water quality in the
State of Montana.
It is strongly urged
in the Yellowstone River.
quality of the Yellowstone
ficial uses.
that the BNRC grant the DHES's reservation request
If the DHES flow reservation is granted, the water
River will remain suitable for prescribed bene-
21
' .
I
~
'
I
.)
Can the State of Montana, through the Montana Pollutant Discharge
Elimination System, prohibit the discharge of ~aline or other low-quality
waters by requiring a zero-discharge limitation on point-source discharges,
and impose a temporal rate of discharge?
ANALYSIS
Section 402(b) of the FWPCAA enables states to administer their own
permit systems under certain conditions. Accordingly, the State of Montana
has established the ~1PDES pursuant to Section 402(b) of the FWPCAA and
Section 69-4801 et seg., .R.C.M. 1947 in ARM 16-2.14(10)-Sl4460(1).
The purpose of the MPDES rule is to implement a uniform system for
issuing permits for point-sou~ce discharges [ARM 16-2.14(10)-Sl4460(l)l.
An MPDES permit is:
any permit or equivalent document or requirements issued
by the department to regulate the discharge of pollutants
from point sources into state waters [ARM 16-2.14(10)-Sl4460(2)].
A discharge into state waters may constitute pollution, but if it is authorized
in an MPDES permit, it will not be considered pollution under the MWPCA
[Sec. 69-4802(5), R.C.M. 1947]. In order for an owner or operator to main-
tain or acquire rights to discharge pollutants into state waters without
violating the law, he must secure an MPDES permit from the DHES. The permit
system, therefore, is the primary regulatory tool used in the enforcement of
the effluent and water quality standards.
The FWPCAA establishes two levels of effluent standards that existing
point-source dischargers must mirimally meet. The effluent standards are
basically technologically oriented, aside from the standards specifically
applicable to toxic pollutants. Effluent limitations for point sources
"require the application of the best practicable control technology currently
available" by July 1, 1977 [Sec. 30l(b)(l)(A)l. The second level of effluent
standards mandates that "effluent 1 imitations for categories and classes of
point sources ... require application of the best available technology
economically achievable for such category or class ... " by July 1, 1983
[Sec. 301 (b)(2)(A)l.
"Effluent standards" as defined by ARM l6-2.14(10)-Sl4460(2) means:
any restriction or prohibition on quantities, rates and
concentrations of chemical, physical, biological and other
constituents which are discharged from point sources into
state waters.
23
"Applicable water quality standards" has been defined by ARM l6-2.14(10)-
Sl4460(2) to mean:
that portion of the state's water quality standards,
MAC l6-2.14(10)-Sl4480 promulgated by the department and
approved by the regional administrator, which apply water-
use classifications and descriptions and general and
specific water quality criteria to the state waters
receiving the discharge of pollutants.
"Standards of performance" as defined by ARM l6-2.14(10)-Sl4460{2) means:
a standard adopted by the department for the control of
the discharge of pollutants which reflects the greatest
degree of effluent reduction achievable through application
of the best available demonstrated control technology,
processes, operating methods or other alternatives,
including, where applicable, a standard permitting no
discharge of pollutants.
The DHES is statutorily vested with the authority to impose effluent
limitations applicable to a discharger in his MPDES permit. The MWPCA states
in Section 69-4809.l{l)(c) that:
The department shall clearly specify in any permit any
limitations imposed as to the volume, strength, and other
significant char~rteristics of the waste to be discharged.
All issued MPDES permits, as required by ARM l6-2.14(10)-Sl4460{7)(a),
must contain the following general condition:
( i )
(ii) The discharge of pollutants to state waters more
frequently than or at a level in excess of that
identified and authorized by an MPDES permit shall
constitute a violation of the conditions of the permit.
( i i i )
This rule provides that discharges exceeding permitted levels or occurring
more often than authorized constitute violations of the MPDES permit.
Thus, MPDES conditions pertaining to discharge restrictions, prohibi-
tions, and frequency must be adhered to by the permittee. Should the
permittee violate any of the limitations or conditions designated in his
MPDES permit, he will be held in violation of the MWPCA [Sec. 69-4806(3),
R.C.M. 1947) and subject to its enforcement remedies [Sec. 69-4809. l(l)(g),
R.C.M. 1947].
The function of an MPDES permit is to explicitly enumerate the
discharger's obligations under the MliJPCA. t1ore specifically, the permit:
24
I ,
will serve the role of translating the ... effluent
standards into limitations tailored to the discharger's
particular operation. In addition, water quality
requirements do not readily translate into effluent
limitations for particular dischargers; the permit
will serve the role of performing this translation.
Finally, the permits will serve to define the schedule
[Anderson 197 4, p. 7281 •
Before the DHES renders its tentative determination regarding issuance
or denial of an MPDES permit, it must first determine whether the applicant
will comply with:
(i) Effluent standards, effluent limitations, standards
of performance for new sources of pollutants, toxic
effluent standards and prohibitions, and pretreatment
standards
(ii) Water quality standards established pursuant to
Section 69-4808.2, R.C.M. 1947
(iii) -(v) ...
(vi) Prohibition of any discharge which is in conflict with
a plan or amendment thereto approved pursuant to Section
208(b) of the act
(vii) Any additional requirements that the department
determines are necessary to carry out the provisions
of Section 69-4801 et seq., R.C.M. 1947 [ARM 16-2.14(10)-
S 14460 ( 5 )(a ) 1 .
Moreover, all MPDES permits issued must contain special conditions guaranteeing
compliance with the requirements set forth in ARM 16-2.14(10)-Sl4460(5)(a)(i)
through (5)(a)(vii) [see ARM 16-2.14(10)-Sl4460(7)1.
MPDES permits must also contain special conditions which authorize the
discharge of pollutants into state waters [A~1 16-2.14(10)-Sl4460(7)(b)(i)1
and the "prohibition of certain discharges without prior approval from the
department'' [Arm 16-2.14(10)-Sl4460(7)(b)(iv)1. The MPDES permit must also
designate special conditions pertaining to:
Effluent standards and, if necessary, compliance schedules
on each authorized discharge of pollutants into state
waters [ARM 16-2.24(10)-Sl4460(7)(b)(ii)1.
Thus, if dischargers are unable to comply with the effluent limitations,
the DHES must establish compliance schedules indicating the dates by which
compliance with the limitations will be required.
A permit can be issued by the DHES only when it has determined that the
applicant owner or operator will be able to comply with the applicable water
quality standards [ARM 16-2.14(10)-Sl4460(7)1. Should a water quality
assessment indicate that any additional discharges would violate the
applicable water quality standards, the DHES would be compelled to impose
effluent limitations upon the source which would guarantee compliance with
water quality standards, including, if necessary, a "zero-discharge" limitation.
25
The relationship between effluent and water quality standards is
articulated by Anderson (1974, p. 694):
The basic scheme of the FWPCA is to require all dischargers
to meet uniform technology-based effluent standards as
a m1n1mum. However, each body of water also has water
quality standards, and a discharger may be required to
achieve a greater reduction in his effluent than the
applicable effluent standard would require if such a
reduction is necessary to meet the water quality standards
applicable to the body of water that receives his effluent.
The water quality rules explicitly bind the discharge to quantitative
and qualitative discharge limits. Specifically:
Permittees having authorized discharges of pollutants into
state waters shall be required to take necessary steps
to meet the most stringent schedule of compliance con-
tained in applicable effluent standards, water quality
standards,and legal requirements developed pursuant to
section 5 [ARM 16-2.14(10)-Sl4460(7)(b)(ii )(aa)].
The term "applicable effluent standards," which defines limitations on
discharges, means:
All state effluent standards to which a discharge of
pollutants is subject under this rule and including, but
not limited to, effluent limitations, standards of
performance, toxic effluent standards and prohibitions,
and pretreatment standards. The minimum state applicable
effluent standards will be those standards adopted bf the
U.S. Environmental Protection A enc [ARM 16-2.14(10-
Sl4460 2 ]. [Emphasis provided]
Effluent standards promulgated by the EPA are published in the Code of
Federal Regulations (CFR). These effluent standards establish the minimum
effluent standards that can be enforced by the State of Montana.
If the DHES determines, however, that the effluent standards adopted
by the EPA will not guarantee compliance with the applicable Montana water
quality standards, the DHES is authorized to impose limitations on dis-
chargers that will guarantee water quality maintenance [ARM 16-2.14(10)-
Sl4460(5)(a)J. In many cases, therefore, effluent limitations imposed on
dischargers will be more stringent than those adopted by the EPA.
It is also conceivable that an effluent limitation developed to meet
water quality standards will require a zero-discharge. The water quality
standards, therefore, may dictate the imposition of zero-discharges on
point sources in certain situations.
The FWPCAA also supports the imposition of zero-discharges on point
sources. Before the discharge-permit program can be transferred to a
state, a state must establish to the satisfaction of the EPA administration
26
,
that it has the authority to issue permits which guarantee compliance with
applicable water quality standards [Sec. 420(b), FWPCAA]. Furthermore, a state
must establish that it has the authority to impose effluent limitations on
point-source discharges that contribute to water quality maintenance where
the discharge would otherwise interefere with water quality maintenance
[Sec. 402(b), FWPCAAI.
The importance of water quality maintenance in the development of
t~PDES permit limitations is further emphasized by ARM 16-2.14(10)-Sl4460(7)(a)iii).
This rule provides that:
An MPDES permit may be modified, suspended, or revoked
in whole or in part during its term under provisions of
Section 69-4807.1, R.C.M. 1947 for cause, including but
not limited to, any of the following:
(aa) Violation of any conditions of the permit
(a b)
(ac) A change in any condition that requires either
a temporary or permanent reduction or elimination
of the authorized discharge
Pursuant to this rule, the DHES would be authorized to require the elimination
of a discharge which was previously restricted if changed conditions indicated
that permanent elimination were necessary. However, the DHES can admini-
stratively modify, suspend, or revoke a discharger's per~it should any
effluent limitation or condition established to assure compliance be violated.
As demonstrated by the Hoerner-Waldorf Corporation permit (No. MT-0000035),
issued on December 2, 1974, the DHES may modify a permit if it deems such
action necessary in order to guarantee compliance with the water quality
standards. The permit provides the following:
OTHER REQUIREMENTS
Violation of Water Quality Standards
If river data resulting from the water quality monitoring
program show violation of established water quality
standards, including the introduction of taste and odor
problems, this permit may be modified to specify additional
control measures to ensure compliance with water quality
standards.
Therefore, water quality standards may function as an additional
effluent limitation in certain circumstances. Even if the effluent limita-
tions imposed upon a source can be met, the applicable water quality standards
may operate to severely restrict or prohibit point-source discharges.
In addition, the water quality standards rule specifically provides
that the DHES's determination regarding the degree of waste treatment
required of an owner or operator to maintain the water quality standards
be based on the state's policy of nondegradation of existing high water
quality [ARM 16-2.14(10)-Sl4480(6)(a)(i)]. The degree of waste treatment
required must protect and maintain the already existing high water quality.
27
There is a way, however, to circumvent mandatory compliance to the
nondegradation policy. According to Section 69-4808.2(l)(c)(ii), R.C.M.
1947, an owner or operator may demonstrate to the BHES that (1) the degradation
of existing high water quality is socially or economically justifiable, and
(2) that the proposed degradation will not preclude present and future
beneficial use of the waters in question. If the discharger cannot satisfy
these requirements, the discharge of saline water or other pollutants into
state waters can be prohibited. The justification for such a prohibition
would be the nondegradation policy.
Just as the state can quantitatively and qualitatively limit discharges,
it is also authorized to impose temporal or seasonal limitations on dis-
charges [Sec. 69-4809.l(l)(c), R.C.M. 1947, and ARM 16-2.14(10)-Sl4460(5)(a)].
If the imposition of temporal restrictions will guarantee compliance with the
effluent and water quality standards, the DHES has the authority to require
a permittee to store his waste during part of the year and release it only
during high-flow or other approved times. The MPDES permit issued to the
Hoernor-Waldorf Corporation (Permit No. MT-0000035) on December 2, 1974,
illustrates the operation of these rules. The permit states the following:
Immediate Effluent Limitations
Such discharges shall be limited by the permittee
as specified belo~1:
Discharges 001, 002, and 003 (direct discharges). There
shall be no discharge from these outfalls except during
the spring high-flow period. Discharges shall not
commence until written permission is given by the
department. Discharge shall be terminated when requested
orally or in writing by the department.
Specific discharge requirements following the granting
of permission to discharge are as follows:
1. 96-hour TL 50 --The combined rate of direct discharge
shall not exceed the following formula:
As illustrated, through the implementation of the MWPCA and the rules, the
DHES is authorized to impose a temporal or seasonal discharge requirement on
any permittee, including, but not limited to owners or operators of power,
gasification, and liquefaction plants. These regulations enable the DHES
to limit the impact and degree of contamination on state waters.
SUMMARY
Before an owner or operator may discharge into state waters, he is
required by the MWPCA and the MPDES rule to secure an MPDES permit from the
DHES, making the MPDES system the primary enforcement tool of the DHES in
regulating point-source discharges of pollutants into state waters. Dis-
charges authorized by an MPDES permit do not constitute pollution under the
~P~. .
28
I
I
I
~
An MPDES permit specifies a discharger's obligations under the MWPCA
and sets effluent limitations for an individual discharger. The DHES has
several methods to ensure compliance with the MWPCA: i·t may prohibit
point-source discharges altogether, it may impose temporal or seasonal
discharges upon permittees, or it may·require temporary or permanent reductions
or eliminations of previously authorized discharges if existing water quality
conditions warrant such a change.
Maintenance and achievement of water quality standards offer the
strongest justifications for imposing "zero-discharge" limitations on
various pollutants. Thus, water quality standards can function as effluent
standards in some circumstances.
The nondegradation policy also justifies imposing a zero-discharge
limitation upon a permittee. An owner will be permitted to discharge in
violation of the nondegradation policy only if he demonstrates to the BHES
that such degradation is socially or economically justifiable.
RECOMMENDATION
As recommended in Issue No. l, the BHES should adopt rules implementing
the nondegradation policy contained in the MWPCA. Specifically, these rules
should enumerate the standards to be used by the BHES in determining
when economic or social development will justify degradation of existing
high water quality.
29
Does the State of Montana have the authority to control the construction
and maintenance of ash and sludge ponds associated with large coal conversion
facilities?
ANALYSIS
The State of Montana has the authority to control the construction and
maintenance of ash and sludge ponds associated with large coal conversion
facilities. The DHES, BHES, and BI~RC exercise jurisdiction in this area. An
understanding of each agency's jurisdiction pertaining to the construction
and maintenance of ash and sludge ponds will better describe the State of
Montana's authority in this area.
The following statutory provisions and administrative rules are useful
in understanding the DHES's and BHES's roles in this matter. Section
6g-4802(8), R.C.M. 1947, and ARM 16-2rl4(10)-Sl4460(2) define "disposal
system" as: 1
.. a system for disposing of sewage, industrial, or other
wastes and includes sewerage systems and treatment works.
The term "sewerage system" is similarly defined by both the MWPCA and the
HPDES rule to mean:
... any device for collecting or conducting sewage,
industrial wastes, or other wastes to an ultimate disposal
point [Sec. 69-4802(6), R.C.M. 1947, and ARM l6-2.14(10)-
Sl4460(2)].
"Industrial waste" is defined in Section 69-4802(2), R.C.M. 1947, as meaning:
. . any waste substance from the process of business
or industry, or from the development of any natural resource
together with any sewage that may be present; ...
In addition, ARM l6-2.14(10)-Sl4460(2) provides that "industrial waste" and
"other wastes," as defined in Section 69-4802, R.C.M. 1947, be interpreted
as having the same meaning as pollutant.
According to the above definitions, the ponds used to dispose of
industrial wastes consisting of ash and sludge are disposal systems. There-
fore, in whatever manner the MWPCA and the rules direct themselves to the
issue of disposal systems, they similarly address themselves to sludge and
ash ponds.
31
Under the MPWCA, the BHES has been delegated the duty to:
adopt rules governing application for permits to discharge
sewage, industrial wastes, or other wastes into state waters
including rules requiring the filing of plans and
specifications relating to the construction, modification·,
or operation of disposal systems [Sec. 69-4808.2(l)(d),
R.C.M. 1947].
Pursuant to this section, the BHES is required to adopt rules for the filing
of disposal system plans, which are to include rules relating to the
construction, maintenance, and operation of disposal systems. Nothing in
this provision gives the BHES control, h0wever, over the actual construction
of disposal systems. The DHES has been delegated the duty to:
Examine plans and other information needed to determine
whether a permit should be issued or suggest changes
in plans as a condition to the issuance of a permit
[Sec. 69-4809.1(1 )(b), R.C.M. 19471.
This provision permits the DHES to make suggestions and recommendations
pertaining to the plans submitted by an MPDES permit applicant. Plans and
other information may be interpreted to include disposal system plans. This
statutory provision does not give the DHES the actual authority to control
the construction or maintenance of a disposal unit, or the power to require
that the applicant choose one disposal system design over another. The
DHES's role is limited to making suggestions. As the section indicates,
adoption of the suggestions offered by the DHES may be required before an
applicant is issued an MPDES permit. Therefore, these suggestions exert
authoritative influence over MPDES applicants.
It may be reasoned that this provision allows the DHES to suggest
changes which constitute actual construction design plans. Such an argument
could be proposed only if Section 69-4809.l(l)(b), R.C.M. 1947, were very
broadly interpreted. When read in conjunction with other provisions of the
MWPCA, such an interpretation appears to be overly broad. Moreover, a broad
interpretation would give the DHES the burden of determining which disposal
system achieves maximum "no-seepage" efficiency and would ultimately require
the DHES to design various operational systems for energy facilities. In
addition, the DHES's enforcement powers under the MWPCA would be severely
restricted as the DHES would become primarily liable for the particular
disposal system constructed. Such authority is clearly outside the scope
of the DHES's statutory duties as set forth in Section 69-4809.1, R.C.M. 1947.
An interpretation more consistent with the total character of the
MWPCA is that the DHES must offer suggestions which assure compliance with
other provisions of the MWPCA and the MPDES permit rules as set forth in
ARM 16-2.14(10)-Sl4460(4), adopted by the BHES pursuant to Section
69-4808.2(l)(d), R.C.M. 1947.
For example, ARM 16-2.14(10)-Sl4460(4)(h) lists the minimum require-
ments to be included in all reports submitted to the DHES by an MPDES
applicant. If the submitted plans do not contain the requirements specified
32
'
and mandated by the rule, the DHES would be authorized to deny an MPDES permit
to the applicant.
Construction plans are addressed in ARM 16-2.14(10)-Sl4460(4)(i). This
rule states that:
Construction plans and specifications should cover the
sewerage system and all unit operations associated with
the treatment works and disposal system, including
appurtenant items such as flow measuring devices and
river outlet structure.
If the DHES's review of the applicant's plans reveals that the construction
plans and specifications do not include the material required by this rule,
the DHES would be authorized to point out such deficiences and suggest that
until such plan deficiencies were remedied, an MPDES permit would not be
issued. The DHES, however, is not authorized by this rule to require a
specific type of disposal system.
It should be noted that the DHES's statutory authority to make
suggestions and recommendations regarding an applicant's plans [Sec.
69-4809. l(l)(b), R.C.M. 1g47J is separate from its authority to require
an applicant to construct no-seepage ash and sludge ponds. The authority to
demand requirements other than those specifically enumerated in the rules is
apparently conferred upon the DHES in ARM 16-2.14(10)-Sl4460(5)(a)(vii) and
confirmed in ARM 16-2.14(10)-Sl4460(7), which states the following:
(5) Processing procedure for MPDES permit applications
(6)
(a) Upon receipt of a completed MPDES permit application
and requested supplemental information, the
department shall make a tentative determination
with respect to issuance or denial of an MPDES permit.
The tentative determination shall be made based
on apparent compliance or noncompliance with all
of the following whenever applicable:
(i) -(vi) ...
(vii) Any additional requirements that the
department determines are necessary to carry
out the provisions of Section 69-4801 et seg.,
R.C.M. 1947.
(7) Conditions and terms of MPDES permits
All issued MPDES permits shall contain special
conditions which will assure compliance with the
requirements discussed in subsections (5)(a)(i)
through (5)(a)(vii). [Emphasis provided)
If the DHES determines that no-seepage ponds are necessary to effectively
implement the MWPCA, it may require their construction and maintenance. The
33
burden of performance, or the burden of demonstrating that the ponds are
seepage-proof, is carried by the applicant. If the applicant adequately
demonstrates that seepage will not occur, the DHES may tentatively determine
to issue the applicant an MPDES permit. Pursuant to this rule, the DHES has
not designed a no-seepage pond, but has demanded such from the applicant.
Recognition should be taken of the fact that the BNRC has the express
authority to control the construction and maintenance of ash and sludge ponds
and other facilities associated with large coal conversion facilities.
Specifically, the Major Facility Siting Act [Sec. 70-801 et seg., R.C.M.
1947] provides that:
within ninety (90) days after the last day of the
hearing, the board shall make complete findings,
·issue an opinion, and render a decision upon the
record, either granting or denying the application
as filed, or granti~g it upon such terms, conditions,
or modifications of the construction, operation
or maintenance of the facility as the board considers
appropriate [Sec. 70-810(1 }, R.C.M. 1947]. [Emphasis
provided]
Under this section, the BNRC is given extremely broad powers regarding the
~ranting of certificates of environmental compatibility and public need
(hereinafter referred to as certificates). This section clearly indicates
that the BNRC may condition the granting of a certificate upon whatever
terms, conditions, or modifications that it deems necessary. A reasonable
interpretation of "terms, conditions, or modifications of the construction,
operation, or maintenance of the facility" implies that the BNRC has the
power to specifically design parts of coal conversion facilities, including,
but not limited to, ash and sludge ponds. Unlike the power given to the
DHES and BHES, the BNRC is not limited to merely adopting rules for the
filing of plans or requiring that certain operational limitations be
imposed. The BNRC possesses a clear statutory mandate to grant certificates
upon whatever conditions, terms, or modifications it deems necessary. The
major distinction between the authority of the DHES, BHES, and BNRC is
that while the first two may require a specific type of facility to be
constructed, such as a no-seepage pond, the latter has authority to estab-
lish construction and design specifications in the certificate it grants
to an applicant.
SUMMARY
A reasonable interpretation of the MWPCA indicates that the BHES and
DHES do not possess the authority to control the actual construction and
maintenance of disposal systems. They do, however, have the authority to
adopt rules regarding the filing of plans, make suggestions pertaining to
construction, and to require certain operational limitations.
Specifically, the BHES has the duty to adopt rules governing
applications for MPDES permits, including rules pertaining to the filing of
plans and specifications related to the construction of disposal systems.
34
'\
Nothing in the pertinent ARM rule authorizes the BHES to adopt rules regarding
actual construction or maintenance of disposal systems.
The DHES has been delegated the duty to make suggestions exerting
authoritative influence over the contents of the plans submitted by MPDES
permit applicants. These suggestions should be intended only to place the
discharger in compliance with the MWPCA and rules adopted by the BHES. The
DHES, by regulation, has also been given the power to require what is
necessary of a permittee. Thus, while the DHES is authorized to request
the construction of a no-seepage pond, and make suggestions regarding plan
contents, it is not authorized to design the no-seepage pond.
The BNRC, however, has express authority to control the construction
anc'. maintenance of ash and sludge ponds along with other facilities
associated with large coal conversion facilities. The BNRC may condition a
certificate of environmental compatibility and public need upon whatever
terms, conditions, or modifications it deems necessary for the construction,
operation, or maintenance.of a facility. Hhile the DHES and BHES are limited
to an advisory role regarding the construction and maintenance of ash and
sludge ponds, the BNRC is not so limited. Thus, whereas the DHES may
require a no-seepage pond to be constructed, the BNRC may actually set
forth the design specifications it requires.
RECOMMENDATIONS
If the State of Montana, through the DHES or BHES, desires to control
the actual construction of ash and sludge ponds, the MHPCA should be amended
to provide the DHES with such authority.
It is recommended that the DHES and BHES not pursue a statutory
amendment providing for "design" authority as its passage would make them,
and not the permittee, primarily liable for disposal system deficiencies.
Furthermore, the BNRC is expressly given the power to design various
energy-related facilities. An amendment conferring such authority on the
DHES would unnecessarily duplicate the authority already conferred upon
the BNRC and would possibly create jurisdictional conflicts.
35
Do Montana's regulations address the impact of air pollutant emissions
on the Yellowstone River basin watershed?
ANALYSIS
The most significant rules promulgated by the BHES pursuant to the
MWPCA involve water quality standards and the Montana Pollutant Discharge
Elimination System [ARM 16-2.14(10)-Sl4480 and ARM 16-2.14(10)-Sl4460,
respectively]. Neither of these rules addresses water pollution caused
by indirect sources such as stack emissions.
A relationship between air and water pollution has, however, been
established. Rainfall carries various pollutants into streams, rivers,
lakes, and other bodies of water which support human needs and activities
(Wilbur lg69, p. 245). The DHES recognizes that energy development creates
and increases indirect sources of water pollution (Montana DNRC 1975, p. 90).
Although insufficient data have been accumulated concerning the specific
effects of such sources on water quality, various general effects of certain
sources are known. For example, the following has been acknowledged:
Drift from wet cooling devices containing dissolved and
suspended salts will adversely affect plants, animals,
and water quality within a few hundred feet of the
cooling facility.
Also unknown is the fate of trace elements in coal; part
remain in the ashes (where they may contaminate local
ground water); the rest leave via the stack and are
dispersed (Montana DNRC 1975, p. 90).
Air pollutant emissions are directly addressed in the Montana Clean
Air Act [Sec. 69-3904, et seq., R.C.M. 19471 and the Federal Clean Air Act
Amendments of 1970 [42 U.S.C. 1857, et seq.]. As the MWPCA does not address
itself to the impact of air pollutant emissions on water quality, the DHES
has no enforcement authority in that area. The Montana Clean Air Act and the
federal clean Air Act amendments of 1970 should be analyzed if air pollutant
emissions cause or increase water quality degradation. An analysis of both
acts will enumerate the standards and controls placed on air pollutant
emissions, whether they originate from energy-related facilities or other
sources.
SUMMARY
The MPDES and water quality standards rules do not address water
pollution caused by indirect sources. Air pollutant emissions, however,
37
are addressed in the Montana Clean Air Act and the Federal Clean Air Act
Amendments of 1970, which enumerate the standards and controls placed on
air pollutant emissions originating from energy-related facilities and
other sources. Both clean air acts should be consulted if air pollutant
emissions contribute to or cause water quality degradation.
RECOMMENDATION
It is recommended that control of indirect sources of water pollution
continue to remain within the exclusive jurisdiction of the Montana Clean
·Air Act and the Federal Clean Air Act Amendments of 1970.
3B
Do Montana's regulations adequately address the problem of irrigation
return flow?
ANALYSIS
The MPDES regulates discharges originating from point sources,
including, but not limited to, irrigation return flow, sewerage systems,
treatment works, disposal systems, animal confinement facilities, and
industries [ARM 16-2.14(10)-514460(4)1. The problem of irrigation return
flow originating from point sources is specifically covered in the MPDES
rule. JIR.1 16-2.14(10)-514460(4) states the following:
Application for an MPDES permit
(a)-(c).
(d) MPDES requirements shall apply to those discharges
of irrigation return flow under NPDES requirements
as described in regulations in or subsequent revisions
to the Federal Register, July 5, 1973, Vol. 38, No. 128,
Part II I.
In order to ascertain the point-source discharges of irrigation return flow
that are subject to MPDES control, an examination of NPDES requirements as
set forth in federal regulations is mandatory. Other than this particular
reference to NPDES requirements, the MPDES rule does not offer any additional
control specifics relating to point-source discharges of irrigation return
flow.
Regulations have been promulgated by the EPA which require the
application of the NPDES permit program to various agricultural activities.
These regulations were adopted pursuant to the court order issued in the
case of NRDC v. Train, 396 F. Supp. 1393, 7 ERC 1881 (D.D.C. 1975).
The regulations clarify the jurisdictional scope of the NPDES and
thus, the t1PDES, as they specifically relate to the discharge of pollutants
from agricultural activities. The EPA clarifies the scope of the permit
systems by defining "which sources of pollutants are point sources, and
thus subject to the NPDES permit program" (41 Fed. Reg. 28493).
Accordingly, "agricultural point source" has been defined as:
any discernible, confined, and discrete conveyance from
which any irrigation return flow is discharged into
navigable waters [41 Fed. Reg. 28496].
39
"Irrigation return flow" has been defined as:
surface water, other than navigable waters, containing
pollutants which result from the controlled application
of water by any person to land used primarily for crops,
forage growth, or nursery operations [41 Fed. Reg. 38496].
In addition, 'Surface waters" has been defined as:
water that flows exclusively across the s•Jrface of the
land from the point of application to the point of
discharge [41 Fed. Reg. 28496].
Sources in Montana which qualify as agricultural point sources will
be subject to an areawide general permit system which will soon be finalized
by the EPA and pub 1 i shed. Pursuant to ARt·1 15-2 .14( 1 0) -Sl4460, the genera 1
permit system for agricultural point sources to be established by the
EPA and applicable to the NPDES, will also apply to the MPDES. In Montana,
"agricultural point sources" would basically be limited to waters that
move across the surface of the land and are discharged through discernible,
discrete conveyances into state waters.
If a discharge from agricultural land, however, does not qualify as
an "agricultural point source," it would be considered a nonpoint source,
and not subject to the areawide general permit system to be developed.
SUMMARY
The MPDES regulates discharges, including irrigation return flow,
originating from point sources. By reference, the pertinent ARM rule
adopts NPDES requirements as set forth in the Code of Federal Regulations;
these requirements indicate the type of controls agricultural point
sources must adhere to.
The EPA has recently published regulations which require the
application of the NPDES permit program, and thus the MPDES permit program,
to various agricultural point sources. Agricultural point sources 1n
Montana would be limited to waters that travel across land surfaces and
are discharged through discernible conveyances into state waters. Dis-
charges from agricultural land which do not qualify as agricultural point
sources are considered nonpoint sources, and are therefore not regulated
by the MPDES permit system.
RECOt1MENDATION
It is recommended that the DHES, as soon as practicable, implement the
"agricultural point-source" permit requirements that will soon be finalized
by the EPA and published in the Code of Federal Regulations. A failure to
expeditiously act may jeopardize the continuance of Montana's MPDES permit
program.
40
Does Montana have sufficient regulatory authority to control nonpoint
sources of water pollution?
THE FWPCAA: NONPOINT SOURCES OF WATER POLLUTION
The National Pollutant Discharge Elimination System (NPDES) is the
national system developed for the issuance of permits under Section 402 of
the FWPCAA and includes any state or interstate program approved by the
administrator of the EPA in whole or in part, pursuant to Section 402(b)
of the FWPCAA [40 C.F.R. 124. l(g)(l975)1. Section 402(b) of the FWPCAA
transfers jurisdiction of the FWPCAA from the EPA to states choosing to
administer their own pennit programs. In order for a state to excerise
this prerogative, it must demonstrate that it possesses the statutory
authority necessary to administer and enforce such a program, and that
its program meets certain other additional requirements [Sec. 402(b)].
The FWPCAA prohibits the discharge of any pollutant unless such
discharge complies with the permit requirements of the FWPCAA [Sec. 30l(a)].
The NPDES authorized the issuance of permits "for the discharge of any
pollutant" [Sec. 402(a)(l)]. The term "discharge of pollutant" is defined
by the HIPCAA as the discharge of pollutants from point sources [Sec. 502(12)].
Thus, the FWPCAA restricts the application of its pennit system to point-
source discharges of pollutants only.
Although pollution originating from nonpoint sources is outside the
bounds of the NPDES, the FWPCAA explicitly deals with nonpoint sources of
pollution. Section 208 is the provision which requires states to formulate
regulatory programs which control nonpoint sources of pollution. Gnerally,
Section 208 conveys to various agencies the authority to establish area~1ide
treatment management plans. Pursuant to Section 208, these areawide waste
treatment management plans should address both point and nonpoint sources
of poll uti on.
Pursuant to the FWPCAA, the states retain, under certain conditions,
the primary responsibility of controlling water pollution [Sec. lOl(b)].
One condition imposed upon the states is that they must submit a continuing
planning process as mandated by Section 303(3) of the FWPCAA. The continuing
planning process must incorporate all the elements "of any applicable area-
wide waste management plans under Section 208, and applicable basin plans
under Section 209 of the Act'' [Sec. 303(e)(e)(b)].
The EPA has adopted rules pertaining to 208 plans and requirements.
These rules are published in 40 Federal Register 55334 (1975), parts 130 and 131
respectively entitled "Policies and Proc-edures for Continuing Planning
Process" and "Preparation of Water Quality Management Plans."
41
The preamble to these proposed regulations provides that:
These amended regulations describe the necessary elements
of, and provide procedures for review, revision, and
approval of a state's continuing planning process. In
addition, these regulations now provide the mechanism for
states to satisfy the statewide requirements of Section
208 (40 Fed. Reg. 55335).
Compliance with these regulations assures compliance with the requirements
of both Sections 303(e) and 208.
Policies and procedures to be embodied within the state's continuing
planning process are set forth in 40 Federal Register 55337 (Pt. 130). This
part provides that:
the broad goals of the continuing planning process are to
assure that the necessary institutional arrangements and
management programs are established to make and implement
coordinated decisions designed to achieve water quality
goals and standards; to develop a statewide (state and
areawide) water quality assessment; and to establish water
quality goals and state water quality standards which take
into account overall state and local policies and programs,
including those for management of land and other natural
resources; and to develop the strategic guidance for pre-
paring the annual state program plan required under
Section 106 of the Act.
The regulations further provide that the state and the EPA administrator shall
agree to a schedule and the level of detail to be incorporated in a state's
water quality management program (40 Fed. Reg. 55338). Such agreement:
shall provide a sequence for phasing of planning, at the
appropriate level of detail and in sufficient time to meet
the 1983 national water quality goal specified in
Section 10l(a)(2) of the Act ... (40 Fed. Reg. 55338).
The regulations include nonpoint-source management within their mandate,
and require that nonpoint-source management planning be effectuated so that
the 1983 goal of swimmable waters and protected aquatic life be achieved.
The regulations require that a state comply with the continuing
planning process requirements if it desires to acquire or retain jurisdiction
over its permit system. On point, 40 Federal Register 55342 provides that:
state participation in the National Pollutant Discharge
Elimination System pursuant to Section 402(b) of the Act
shall not be approved for any state which does not have a
continuing planning process approved by the Regional
Administrator pursuant to Part 130.41.
42
Consequently, NPDES participation can be denied to a state if it does not have
an approved continuing planning process. Most important, federal control
over nonpoint sources is exerted by this regulation since the continuing
planning process in Section 303(e) must in~lude the Section 208 waste
treatment management plan [Sec. 303(e)(3)(B)J, which in turn must include a
nonpoint-source management plan [Sec. 208(b)(2)(F-K)J,
Since the State of Montana has developed the MPDES pursuant to Section
402(b) of the FWPCA, 40 Federal Register 55342 is particularly pertinent.
This rule provides that:
approval of state participation in the National Pollutant
Discharge Elimination System pursuant to Section 402{b) of
the Act may be withdrawn in accordance with the provisions
of Section 402{c)(3) of the Act and Section 124-93 of this
chapter from any state if approval of the continuing
planning process is withdrawn pursuant to Section 130.42.
Therefore, in order for a state to retain jurisdiction over its permit
system, its water quality management plan must comply with the planning
process requirements; the continuing planning process must include waste
treatment management plans which must in turn include a nonpoint-source
management plan.
The federal regulations specifically deal with the preparation of a
state water quality management program which serves as a:
management document which identifies the water quality problems
of a particular approved state planning area or designated
areawide planning area and sets forth an effective management
program to alleviate those problems and to achieve and
preserve water quality for all intended uses ... [40 Fed.
Reg. 553441 .
A state's 1~ater quality management plan is required to identify point and
nonpoint sources of pollution and provide for orderly water quality
management [40 Fed. Reg. 553441. The state water quality management plan
to be submitted by November l, 1978, for pre-adoption review by the
administrator, must include "an assessment of water quality problems caused
by nonpoint sources of pollutants" [40 Fed. Reg. 55345). This federal
requirement, along with the MWPCA and the rules adopted pursuant thereto,
compel the State of Montana to develop a comprehensive program addressing
nonpoint sources of pollution.
Specifically, the elements of the state water quality management plan
must include:
... a description of the type of problem, an identification
of the waters affected ... an evaluation of the seriousness
of the effects on those waters, and an identification of
nonpoint sources (by category as defined in Sec. l3l.ll(j))
contributing to the problem (40 Fed. Reg. 55345).
43
Pursuant to 40 Federal Register 55346 [Pt. 13l.ll(j)], the state must then
identify and evaluate for each category of nonpoint-source pollutants, the
measures necessary to achieve the desired level of control through applica-
tion of best management practices. The regulation further requires that
the evaluation include:
an assessment of non-point source control measures
applied thus far, the period of time required to
achieve the desired control ... the proposed regu-
latory programs to achieve the controls ... the
management agencies needed to achieve the controls
... and the costs by agency and activity, presented
by 5-year increments, to achieve the desired controls,
and a description of the proposed actions necessary
to achieve such controls.
Forty Federal Register 55346 [Pt. 13l.ll(j)(3)] then proceeds to enumerate the
various nonpoint sources which must be included in this assessment and evalua-
tion. These categories include, but are not limited to, nonpoint sources
related to agriculture, silviculture, mining, construction, subsurface disposal
activities, salt water infusion, and hydrologic modification.
ANALYSIS
The Montana Pollutant Discharge Elimination System (MPDES) has been
defined as:
the system developed by the State of Montana for issuing
permits for the discharge of pollutants from point
sources into state waters [ARM 16-2.14(10)-Sl4460(2)].
The MPDES was adopted pursuant to Section 402(b) of the FWPCAA and Section
69-4801, et seg., R.C.M. 1947 [ARM 16-2.14(10)-Sl4460(1 )I, and provides the
basic tool by which the state can regulate the discharge of pollutants into
state waters. An analysis of the MPDES rule shows that nonpoint-source
pollution is not encompassed within the confines of the state's permit
system; the rule's purpose being to implement a system for issuing permits
for point-source discharges [ARM 16-2.14(10)-Sl4460(1 )I. For additional
clarification, ARM 16-2.14(10)-Sl4460(2) has defined ''discharge of pollutant''
as "any addition of any pollutant to state waters from any point source."
Specifically, point source is defined in ARM 16-2.14(10)-Sl4460(2) as:
any discernible, confined or discrete conveyance, including
but not limited to, any pipe, ditch, channel, tunnel, conduit,
well, discrete fissure, container, rolling stock, or vessel
or other floating craft, from which pollutants are or may
be discharged. In this rule, the term "point source" also
includes animal confinement facilities.
Diffuse or nondiscernible sources of pollution are not considered point sources
by this ru 1 e.
44
Although nonpoint-source pollution is outside the scope of the MPDES,
the MWPCA and the water quality standards rule address the issue of
nonpoint-source pollution. These legal provisions provide the authority
by which the State of Montana can control pollution originating from
nonpoint sources. The declared policy of the State of Montana regarding
water pollution is to:
provide a comprehensive program for the prevention,
abatement, and control of water pollution [Sec.
69-480l(l)(b), R.C.M. 1947].
A distinction is not drawn between point source and nonpoint sources of
pollution. Therefore, a nonpoint-source regulatory program is clearly
mandated by this policy declaration.
"Pollution" has been defined by the MWPCA as:
contamination, or other alteration of the physical,
chemical, or biological properties of any state waters,
which exceeds that permitted by Montana water quality
standards, ... or the discharge, seepage, drainage,
infiltration or flow of any liquid, gaseous, solid,
radioactive, or other substance into any state water which
will or is likely to create a nuisance or render the waters
harmful, detrimental, or injurious . [Sec. 69-4802(5),
R.C.M. 1947].
Again, no distinction is drawn between point and nonpoint sources of
pollution. Wastes originating from nonpoint sources can be as causative of
pollution as wastes discharged from point sources. The only qualifying
limitations placed on a source is that it alter or contaminate state waters
beyond the levels permitted by water quality standards or render the waters
unsuitable for beneficial use.
Additional authority to control nonpoint sources of pollution can also
be found in the water quality standards rule. By regulation, the BHES has
conferred upon the DHES the authority to eliminate or minimize pollution
resulting from nonpoint sources. ARM l6-2.14(10)-Sl4480(6)(0) states that:
Pollution resulting from storm drainage, storm sewer
discharges, and non-point sources, including irrigation
practices, road building, construction, logging
practices, overgrazing and other practices, are to be
eliminated or minimized as ordered by the department.
Authority to adopt a nonpoint-source program, therefore, is firmly
established by both statute and regulation.
Pursuant to its federal mandate, the State of Montana, through the
DHES, has developed a statewide 208 plan to regulate nonpoint-source
pollution. The DHES has adopted objectives for its statewide 208 plan
which are set forth in Montana's Statewide 208 Planning: Final Work Plan
Summary (Summary), which includes the following:
45
(1) Development of a water qua 1 i ty management plan to a chi eve
the 1983 goals of protection and propagation of fish and
wildlife, and full body contact recreation in all waters
insofar as socially, economically, and environmentally
possible
(2) Determination of effluent limitations needed to meet
applicable water quality standards
(3) Development of a plan with recommended abatement measure
and proposed funding methods for solutions
(4) Evaluation of existing regulatory programs, and, if necessary,
development of new programs to prevent and control point and
nonpoint sources of pollution
The DHES has determined that 208 emphasis should be on nonpoint
source problems such as dewatering, salinity, and sediment because they.are
the greatest obstacles to attaining the 1983 federal goal of swimmable
waters. Since these problems are primarily associated with agricultural
activities, development of an agricultural nonpoint-source management
program has the highest priority under the statewide 208 plan.
As stated previously, federal requirements for 208 plans necessitate
the development and implementation of regulatory programs for all nonpoint
sources of pollution. For each nonpoint-source problem, 208 plans are
required to define and implement best management practices. Best management
practices specifically refers to a practice or combination of practices
determined to be the most effective, practicable means of preventing or
reducing nonpoint-source problems to levels compatible with the 1983
federal water quality goals.
Total elimination of all nonpoint-source pollution through the
application of best management practices is unrealistic. The most that
can be hoped for is a slight reduction of existing nonpoint-source
pollution and minimization of increases. As stated in the summary, segments
of streams with low flows, which do or may deplete water quality, will be
identified. The summary has recommended flow reservations as a method of
protecting water quality in these streams.
SUMMARY
Section 208 of the FWPCAA requires states to develop a 208 plan which
must include areawide waste treatment management plans for nonpoint sources
of pollution. It is the policy of the State of Montana to provide compre-
hensive programs for the prevention, abatement, and control of water pollution.
This policy does not differentiate between point and nonpoint sources of
pollution. Therefore, the nonpoint-source program required by Section 208
of the FWPCAA is statutorily justified as a comprehensive program for the
prevention, abatement, and control of water pollution in Montana.
46
The statewide 208 plan strives for the development of water quality
management plans, determination of effluent limitations, and development
of new programs to prevent and control point and nonpoint-source pollution.
For each nonpoint-source problem, 208 plans will define and implement best
management practices. The best management practices developed will reduce
and minimize increases in nonpoint-source pollution.
All nonpoint-source pollution problems will not be eliminated by the
implementation of the statewide 208 plan and its best management practices.
Where low flows may affect water quality maintenance, the Statewide 208
Planning: Final Work Plan Summary recommends that flow reservations
be adopted.
RECOMMENDATION
In order that increases in nonpoint-source pollution be minimized
and possible reduction achieved, it is recommended that the statewide
208 plan be implemented as soon as practicable. Since the statewide 208
plan and its best management practices will not eliminate all nonpoint-
source pollution, it is recommended that the BNRC grant the flow reservation
applied for by the DHES on the Yellowstone River.
47
Does the State of Montana have sufficient control over the introduction
of dissolved and suspended solids into surface waters and groundwater aquifers?
WATER QUALITY REGULATIONS ANALYSIS
Pursuant to its duties as set forth in Section 69-4808.2{1), R.C.M. 1947,
the BHES has adopted water quality standards. The water quality standards
apply to state waters [ARM 16-2.14(10)-Sl4480{1)]. The definition of state
waters as set forth in ARM 16-2.14(10)-Sl4480(3) denotes the jurisdictional
scope of the water quality standards. As defined by the rule, "state waters"
means:
any body of water, irrigation system or drainage system,
either surface or underground. This section shall not
apply to irrigation waters where the waters are used up
within the irrigation system and said waters are not
returned to any other state waters. The term "state
waters'' as used in this rule does not include underground
water. [Emphasis provided]
An examination of the definition reveals that groundwater is specifically ex-
cluded from the concept of state waters. As a result of this exclusion, the
water quality standards which have been adopted pursuant to the MWPCA are in-
applicable to groundwater. Furthermore, the BHES has not exercised its power
under the MWPCA to promulgate specific groundwater quality standards. Inasmuch
as groundwater quality rules do not exist, regulatory standards have not been
imposed on the introduction of dissolved solids and otherpollutants into ground-
water aquifers.
The MWPCA, however, establishes a statutory basis on which the State of
Montana can regulate the quality of groundwater. Pollution as defined by the
MWPCA includes:
... the discharge, seepage, drainage, infiltration or
flow of any liquid, gaseous, solid, radioactive, or other
substance into any state water which will or is likely to
create a nuisance or render the waters harmful, detrimen-
tal, or injurious to public health, recreation, safety,
welfare, livestock, wild animals, birds, fish, or other
wildlife ... [Sec. 69-4802{5), R.C.M. 1947].
Because "state waters" includes groundwater [Sec. 69-4802(9), R.C.M. 1947],
pollution cannot be limited to surface waters under the MWPCA. Thus, should
a discharge, seepage, drainage, infiltration, or flow of a substance into
groundwater deleteriously affect its beneficial uses, pollution of ground-
water could be established and held unlawful under Section 69-4806{1), R.C.M.
1947.
49
Although groundwater is excluded from the definition of state waters and
is free from water quality control under the water quality standards ·rule of
the ~1WPCA, surface waters are explicitly included in the definition. There-
fore, the water quality standards which have been adopted to "establish max-
imum allowable changes in water quality and establish limits for pollutants
which affect prescribed beneficial uses" expressly apply to surface waters
[ARM l6-2.14(10)-Sl4480(l )I.
The water quality standards are composed of water use classifications,
water use descriptions, and specific and general water quality criteria
[(ARM 16-2. l4(10)-Sl4480(2)1. The general water quality criteria enumerated
in the rule apply to all state waters except where the rule indicates that
the specific water quality criteria should be applied [ARM 16-2. l4(10)-Sl4480
(2)(a)l. The specific and general water quality criteria which are set forth
in the rule have been developed to protect the designated beneficial water
uses assigned to the various water use classifications [ARM l6-2.14(10)-Sl4480
( 5 l I .
A survey of the water quality standards clarifies the manner in which
the introduction of suspended and dissolved solids into surface waters is
addressed. The specific and general water quality criteria adopted describe
water quality properties and conditions, including, but not limited to, tur-
bidity, concentrations of total dissolved solids, sediment, settleable solids,
sulfates, toxic, and other deleterious substances. In order to achieve a
better understanding of the specific and general water quality criteria adopted,
the following definitions have been set forth. "Sediment" means:
solid material settled from suspension in a liquid; mineral
or organic solid material that is being transported or has
been moved from its site of origin by air, water or ice
and has come to rest on the earth's surface, either above
or below sea level; or inorganic or organic particles
originating from weathering, chemical precipitation or
biological activity [ARM 16-2. l4(10)-Sl4480(3)1.
''Settleable solids'' means:
inorganic or organic particles that are being trans-
ported or have been transported by water from the site
or sites of origin and are settled or are capable of
being settled from suspension [ARM 16-2. 14(10)-Sl4480
( 3 l I .
And, "turbidity" has been defined by the rule as:
a condition in water or wastewater caused by the
presence of suspended matter resulting in the scat-
tering and absorption of light rays [ARM 16-2. 14(10)-
Sl4480(3)1.
As previously stated, each water use classification contains specific
water quality criteria which have been designated to protect the classifica-
tion's designated uses. The specific water quality criteria adopted concern
50
sediment and settleable solids. The pertinent criteria provide that:
(af) no increases above naturally occurring concen-
trations of sediment, settleable solids or res-
idues, which adversely affect the uses indicated,
are allowed [ARM l6-2.14(10)-Sl4480(5)(b)(ii);
(S)(c)(ii); (5)(d)(ii); (S)(e)(ii); (S)(f)(ii);
(5 ) ( g ) ( i i ) ; ( 5 )(h) ( i i ) I .
Pursuant to this rule, an increase in sediment is disallowed if it exceeds the
concentrations naturally occurring within a stretch of stream, and if at the
same time it adversely affects the beneficial uses described. The standard of
''naturally occurring" has been defined as:
conditions or material present from runoff or percolation
over which man has no control or from developed land where
all reasonable land, soil and water conservation practices
have been applied. Conditions resulting from dams in
existence as of July l, 1971 are natural [ARM 16.2.14(10)-
S 14480 ( 3) I .
The term "natural" as used in the MWPCA has the same meaning as "naturally
occurring" which is employed in the rule [Sec. 69-4801 (2), R.C.M. 1947).
Once rules have been established to determine the parameters of "all reasonable
land, soil, and water conservation practices," the standard of "naturally
occurring" will become more precisely defined and capab 1 e of more effective
application.
When the concentration of sediment exceeds that concentration naturally
occurring in a stretch of stream, and such concentration adversely affects the
water uses described, the applicable water quality standard has been violated.
There is no standard for total suspended solids in the water quality
standards rule. There is a standard for turbidity. Since there is a relation-
ship between turbidity and concentrations of suspended solids (Wilbur 1969,
p. 264), suspended solids do not escape regulation. Since the water quality
standards apply to surface waters only, however, the criteria pertaining to
turbidity do not apply to groundwater.
The specific water quality criteria established within each classification
pertaining to turbidity are more differentiated than the criteria relating to
sediment and settleable solids. Two of the classifications contain specific
water quality criteria requiring that:
(ad) no increase above naturallr occurrin9 .turbidity
is allowed [ARM 16-2.14(10)-Sl4480(5)(b)(ii);
(S)(c)(ii )I.
Other specific water quality criteria require that:
(ad) The maximum allowable increase above naturally
occurring turbidity is 5 Jickson.Candle Units
except as is permitted in the general water
quality criteria [ARM 16-2.14(10)-Sl4480(5)(d)
(ii); (5)(g)(ii)l.
51
A number of the other specific water quality criteria require that:
(ad) The maximum allowable increase above naturally
occurring turbidity is 10 Jackson Candle Units,
except as is permitted in the general water
quality criteria [ARM 16-2.14(10)-Sl4480(5)(e)
( i i ) ; ( 5 )(f)( i i ) ; (5 )(h) (i i ) I .
Turbidity, sediment, and settleable solids are collectively described in
ARM 16-2.14(10)-Sl4480(5)(d)(ii)(ad). This criterion states that:
Naturally occurring turbidity, naturally occurring water
temperatures, and naturally occurring concentrations of
sediments, settleable solids or residues are not to be
increased in quantity to amounts which adversely affect
the use indicated.
Thus, once rules are adopted which more thoroughly define "naturally occurring,"
any increase in turbidity over and above that permitted within the water qual-
ity criteria will constitute a water quality violation.
As noted, exceptions are contained in the specific water quality criteria
for allowable increases in turbidity. The criteria state that increases in
turbidity above that naturally occurring, or above 5 or 10 Jackson Candle Units
are permitted if allowed by the general water quality criteria. The exception
relating to allowable additional increases in turbidity concerns short-term
activities. ARM l6-2.14(10)-Sl4480(6)(g) provides that:
No wastes are to be discharged and no activities conducted
which, either alone or in combination with other wastes
or activities, will cause turbidities to exceed those
allowed by specific water quality criteria; provided,
short-term activities necessary to accommodate essential
dredging, channel or bank alterations, stream diversions
or other construction where turbidities in excess of the
criteria are unavoidable, may be authorized by the depart-
ment under conditions as it may prescribe. [Emphasis
provided.)
Therefore, if the DHES determines that a particular short-term activity results
in an increase in turbidity which will exceed that allowed by the various spe-
cific water quality criteria, such additional increase may be authorized. By
using this particular general water quality criterion, only short-term activi-
ties resulting in a temporary additional increase in turbidity will be author-
ized. The extent to which a particular activity is short-term and involves
essential "dredging, channel or bank alterations, stream diversions, or other
construction" will determine the extent to which the designated increases in
turbidity may be exceeded.
Whereas the specific and general water quality criteria explicitly set
forth allowable concentrations of sediment, settleable solids, and allowable
increases in turbidity, the criterion pertaining to dissolved solids is set
forth in the U.S. Public Health Service Drinking Water Standards and incor-
porated by reference into the water quality standards rule. One of the specific
52
water quality criterion provides that:
(ag) No increases of toxic or other deleterious
substances, pesticides and organic and in-
organic materials, including heavy metals,
above naturally occurring concentrations,
are allowed [ARM 16-2.l4(10)-Sl4480(5)(b)(ii)].
ARM 16-2.14(10)-Sl4480(5)(c)(ii) states that:
(ag) Concentrations of toxic or other deleterious
substances, pesticides and organic and in-
organic materials including heavy metals,
after treatment for domestic use, are not to
exceed the recommended limits established in
the 1962 U.S. Public Health Service Drinking
Water Standards or subsequent editions; an
increase of more than 10 percent of the con-
centration present in the receiving water is
not allowed; maximum allowable concentrations
are to be less than acute or chronic problem
levels as revealed by bioassay or other methods.
Three of the specific water quality criteria require that:
(ag) Concentrations of toxic or other deleterious
substances, pesticides and organic and in-
organic materials including heavy metals,
after treatment for domestic use, are not to
exceed the recommended limits contained in
the 1962 U.S. Public Health Service Drinking
Water Standards or subsequent editions; also,·
maximum allowable concentrations are to be
less than acute or chronic problem levels as
revealed by bioassay or other methods [ARM
16-2.14(10)-Sl4480(5)(d)(ii); (5)(3)(ii);
(5)(f)(ii)].
The U.S. Public Health Service Drinking Water Standards establish a limit
of 500 mg/1 for total dissolved solids. An analysis of the water quality stan-
dards rule adopting the U.S. Public Health Service Drinking Water Standards
compels use of the 500 mg/1 "after-treatment" standard as an instream standard.
ARM 16-2.14(10)-Sl4480(5)(g)(ii) and (5)(h)(ii) state that:
(ag) Concentrations of toxic or other deleterious
substances, pesticides and organic and inorganic
materials, including heavy metals, are not to
exceed levels known or demonstrated to be of
public health significance; also maximum allow-
able concentrations are to be less than acute
or chronic problem levels as revealed by bio-
assay or other methods.
53
And finally, ARN l6-2.14(10)-Sl4480(d)(ii )(ag) provides that:
Concentrations of toxic or other deleterious substances,
pesticides and organic and inorganic materials including
heavy metals, are to be less than those demonstrated to
be deleterious to livestock or plants or their subse-
quent consumption by humans or to adversely affect other
indicated uses.
These criteria indicate the concentrations of various substances and materials
permitted within the various classifications of state waters. Since the water
quality standards apply to state waters, groundwater excluded, these concentra-
tion limitations apply only to surface waters. They are not applicable to
groundwater aquifers.
In summary, the water quality standards appear adequate to effectively
control the introduction of suspended and dissolved solids into surface waters.
Should the designated and allowed concentrations exceed those allowed by the
specific water quality criteria, pollution could be established and the DHES
would be authorized to exercise its enforcement prerogatives as enumerated in
the MWPCA.
It must be recognized that the BNRC exercises indirect regulatory control
over the quality of groundwater. The BNRC is authorized by the Montana Water
Use Act to adopt rules to:
... regulate the construction, use, and sealing of
wells to prevent the waste, contamination, or pollution
of ground water [Sec. 89-869(2), R.C.M. 1947].
This section expressly confers upon the BNRC the authority to regulate the
"construction, use, and sealing of wells." The degree to which the rules
adopted adequately address the "construction, use, and sealing of wells" is
the degree to which the rules control pollution of groundwater. The BNRC
has not adopted such rules at this time.
Furthermore, the groundwater laws, under the jurisdiction of the DNRC,
also addresses the pollution of groundwater. This law provides that:
... both flowing and nonflowing wells shall be so
constructed and maintained as to prevent the waste,
contamination or pollution of ground waters through
leaky casings, pipes, fittings, valves, or pumps
either above or below the land surface ... [Sec.
89-2926, R.C.M. 1947].
This section prohibits the pollution of groundwaters caused by faulty well
construction. Although this statute does not directly control the pollution
of groundwaters or set forth groundwater quality standards, it does positively
contribute to the regulation of groundwaters through statutory standards appli-
cable to the construction, use, and maintenance of wells.
54
SUMMARY
Water quality standards have been adopted by the BHES pursuant to the
MWPCA. These standards apply to state waters. State waters as defined by
the water quality standards rule includes s•Jrface waters but excludes ground-
water. Thus, the water quality standards do.not regulate the introduction of
dissolved or suspended solids into groundwater aquifers. In this respect, the
water quality standards are inadequate. It should be noted, however, that
groundwater quality standards are being developed.
The water quality standards rule expressly and adequately regulates the
quality of surface waters. By regulating turbidity, the water quality stan-
dards rule effectively regulates suspended solids. The standard for total
dissolved solids is set forth in the U.S. Public Health Service Drinking Water
Standards, and adopted by reference into the water quality standards rule.
Total suspended and dissolved solids, therefore, are sufficiently regulated.
Although groundwater quality standards have not been adopted by the BHES,
the MWPCA establishes a statutory basis by which the quality of groundwater
can be regulated. State waters under the MWPCA includes groundwater. There-
fore, since pollution has been defined by the MWPCA as a discharge, seepage,
drainage, infiltration, or flow into state waters, a discharge, seepage,
drainage, infiltration, or flow of pollutants into groundwater may be held
unlawful.
The BNRC exercises indirect control over pollution of groundwater inasmuch
as it is authorized by statute to adopt rules regulating the construction, use,
and sealing of wells to prevent the pollution of groundwater. The DNRC, by
virtue of another statute, also indirectly contributes to groundwater quality
maintenance through regulation over well construction and maintenance.
RECOMMENDATION
Although a statutory standard exists by which to regulate the quality of
groundwater, a comprehensive regulatory scheme would guarantee more effective
quality control over groundwater. At present, the water quality standards
fail to address groundwater degradation and quality control. Although the
introduction of dissolved solids into surface waters is regulated by the water
quality standards, the introduction of dissolved solids into groundwater
aquifers is neither considered nor controlled by the standards. Therefore,
the presence of dissolved solids in groundwater aquifers is entirely ignored
by the water quality standards.
Groundwater quality standards must be promulgated if the quality of ground-
water is to be adequately protected. The formulation of such a regulatory
scheme is defensible under the MWPCA since it is the policy of the State of
Montana to conserve water by protecting, maintaining, and improving its quality
for various beneficial uses, and to provide a comprehensive program for the
prevention, abatement, and control of water pollution [Sec. 69-4801(1}, R.C.M.
1947). Furthermore, Section 69-4804 explicitly provides that:
55
This chapter applies to drainage or seepage from all
sources including that from artificial, privately owned
ponds or 1 a goons if such drain age or seepage may reach
other state waters in a condition which may pollute the
other state waters.
Since Section 69-4808.2(1), R.C.M. 1947, expressly directs the BHES to adopt
water quality standards, a statutory justification for the adoption of ground-
water quality standards can be established.
When groundwater quality standards are established and the definition of
"state waters" under ARM 16-2.14(10)-514480(3) is changed to include ground-
water, an additional basis on which to allege pollution of groundwater will be
established.
When groundwater quality standards are adopted by the BHES, pursuant to
its duty to "adopt rules for the administration of this chapter" [Sec. 69-4808.2
(1 )(g), R.C.M. 1947), the water quality regulations will then be sufficient to
control the introduction of dissolved solids and other pollutants into ground-
water aquifers. Until the adoption of groundwater quality standards, the water
quality regulations, as they now stand, are only sufficient to control the
introduction of suspended and dissolved solids into surface waters.
Rules should also be adopted to determine what constitues "all reasonable
land, soil, and water conservation practices." When rules are adopted, the
standard of "naturally occurring" will become more definitive and easier to
apply. The formal adoption of such rules would eliminate potential objections
made by alleged polluters that this standard, standing alone, is arbitrary and
vague. "Naturally occurring," as it is now defined and used in the specific
water quality criteria can impede the effective administration and enforcement
of the MWPCA and the rules adopted to implement the act.
RECLAMATION AND MINING REGULATIONS ANALYSIS
One of the declared policies of the State of Montana under the Montana
Strip and Underground Mine Reclamation Act (Sec. 50-1034, et seq, R.C.M. 1947,
hereinafter referred to as the Reclamation Act) is to "demand effective
reclamation of all lands disturbed by the taking of natural resources" [Sec.
50-1034(2), R.C.M. 1947]. Reclamation is defined by the Reclamation Act as:
backfilling, subsidence stabilization, water control,
grading, highwall reduction, topsoiling, planting,
revegetation, and other work to restore an area of land
affected by strip mining or underground mining under
a plan approved by the department [Sec. 50-1036(14),
R.C.M. 1947].
Pursuant to thjs defi.nition, reclamation of strip or underground mining lands
must provide for water quality control. The regulations adopted to implement
the Reclamation Act address to varying degrees the introduction of suspended
and dissolved solids into surface waters and groundwater aquifers.
56
"Department" as referred to in the Reclamation Act means the Department of
State Lands (DSL), which has the authority to.supervise, administer, and en-
force the Reclamation Act [Sec. 50-1038(1), R.C;M. 1947]. The Board, as re-
ferred to in the Reclamation Act, means the Board of Land Commissioners (BLC),
which has been given the authority to adopt rules implementing the Reclamation
Act [Sec. 50-1037(3), R.C.M. 1947].
ARM 26-2.10(10)-Sl0330 specifically concerns water quality. This rule and
its subsections comprise the major segment of the. Reclamation Act regulations
which deal with water pollution. The rule requires that all operators comply
with:
... the following requirements and with all applicable
water quality standards established under Montana law
and the rules adopted pursuant thereto [ARM 26-2.10(10)-
Sl0330(1 )1.
"Operator" as defined by the Reclamation Act is:
a person engaged in strip mining or underground mining
who removes or intends to remove more than ten thousand
(10,000) cubic yards of mineral or overburden [Sec. 50-
1036(7), R.C.M. 1947].
As required by ARM 26-2.10(10)-Sl0330, an operator must defer to the water
quality standards adopted to implement the MWPCA. The reclamation rule com-
pels an operator to comply with the MWPCA and the rules adopted pursuant thereto
in order for him to comply with the Reclamation Act and rules. In light of
this particular reclamation rule, the previous water quality rule analysis
dealing with the introduction of dissolved and suspended solids into surface
waters and groundwater aquifers is incorporated into the present discussion.
The water quality section of the reclamation rule adopts a policy of non-
degradation of waters [ARM 26-2.10(10)-Sl0330(l)(a)]. Activities which degrade
existing high water quality will be held unlawful unless the BLC determines
that degradation is economically and socially justifiable. For further dis-
cussion, refer to the nondegradation analysis contained in Issue No. 1.
The issue of treatment facilities as relating to sediment control is also
directly address.ed in the water quality segment of the reclamation rule. The
rule provides that:
Treatment facilities in sufficient size and number
consisting of but not limited to collection basins,
water retarding structures and siltation dams shall
be constructed with prior approval of the Department.
All such facilities shall be constructed at or above
the points of discharge into receiving streams for
the purpose of treating acid or toxic water and for
the settling of sediment prior to discharge into the
receiving stream [ARM 26-2.10(10)-Sl0330(l)(b)(i)].
57
Pursuant to this rule, waters containing sediment and settleable solids cannot
be discharged into the receiving stream until the settleable solids have set-
tled. When the collected water meets the applicable water quality standards,
then the collected water can be discharged. Through the implementation of
this rule, the concentration of sediment in the receiving stream should not
be significantly altered by this controlled discharge. This rule should guar-
antee that the waters polluted by the mining operation will not enter surface
waters outside the mining operation's confines. This particular rule provides
one of the most effective means for controlling the introduction of suspended
solids into surface streams that can be found in any of the water quality or
reclamation regulations.
Turbidity is also addressed in the reclamation rules. ARM 26-2.10(10)-
Sl0330{l)(b){viii) provides that:
The maximum total allowable increase to naturally
occurring stream turbidit¥ is ten (10) Jackson Candle
Units except that four {4) hours following a major
precipitation event, the discharge shall not contain
suspended sediments in excess of five hundred {500)
Jackson Candle Units above normal and not over one
hundred (100) Jackson Candle Units above normal
twenty-four (24) hours thereafter .... If the
above standards in (vii) and (viii) are in conflict
with Federal and/or other Montana state agencies,
the more stringent regulations will apply.
Again, deference is given to the rules implementing the MWPCA, but in this case,
only on the condition that those rules regarding allowable increases in turbi-
dity are more stringent than the reclamation rules regarding such increases.
For example, the Yellowstone River drainage from the Yellowstone Park
boundary to the Laurel water supply intake is classified as B-D1 under the
water quality standards rule [ARM l6-2.14(10)-Sl4480{4)]. The specific water
quality criteria in the B-D1 classification states that:
The maximum allowable increase above naturally occur-
ring turbidity is 5 Jackson Candle Units except as is
permitted in the general water quality criteria [ARM
16-2.14{10)-Sl4480(5)(d)(ii){ad)].
Since the reclamation regulation provides for a maximum total allowable increase
of 10 Jackson Candle Units above the levels naturally occurring, the more strin-
gent 5 Jackson Candle Units increase required by the water quality regulations
would be applicable to this B-0 1 stretch of the Yellowstone River. The converse
would also be true. If the allowable increase in turbidity in the reclamation
regulation is more stringent than that permitted by the water quality regul-
ations, then the more stringent reclamation regulation increase would be en-
forced.
The Strip and Underground Mine Act [Sec. 50-1601, et seq., R.C.M. 1g47],
hereinafter referred to as SUMSA, states that it is the policy of the State of
Montana to:
58
I
•
I
I
I
,.
I
... provide adequate remedies for the protection of
the environmental life support system from degradation
and provide adequate remedies to prevent unreasonable
depletion and degradation of natural resources [Sec.
50-1602(1), R.C.M. 1947].
Pursuant to its authority, as set forth in Section 50-1604, R.C.M. 1947, the
BLC has adopted regulations to accomplish and implement the purposes of SUMSA.
The regulations implementing SUMSA are embodied in ARM 26-2.10(18)-Sl0380.
The segment of this regulation which specifically addresses water quality is
set forth in ARM 26-2.10(18)-Sl0400(f)(3). Inasmuch as this particular water
quality rule almost identically reflects the wording of ARM 26-2.10(10)-Sl0330,
which implements the Reclamation Act, a separate analysis of this rule is not
necessary. Therefore, the previous discussion pertaining to the introduction
of suspended and dissolved solids into surface water and groundwater aquifers
under ARM 26-2. 10(10)-Sl0330 of the Reclamation Act, is pertinent and appli-
cable to this comparable SUMSA regulation.
SUMMARY
As required by the Reclamation Act, reclamation of strip and underground
mining lands must provide for water quality control. SUMSA provides that it
is Montana policy to protect the environment and prevent unreasonable deple-
tion and degradation of the state's natural resources. The regulations which
have been adopted to implement these acts concern and regulate the introduction
of suspended and dissolved solids into surface waters and groundwater aquifers.
Specifically, reclamation and SUMSA regulations require persons engaged
in strip or underground mining who remove more than 10 ,000 cubic yards of
mineral or overburden to comply with the water quality standards established
under the MWPCA. Therefore, for an operator to remain in compliance with the
Reclamation Act and SUMSA, he must comply with the rules adopted to implement
the MWPCA. Thus, by deference, the water quality standards rule is indirectly
incorporated into both acts.
The reclamation and SUMSA rules also adopt a policy of nondegradation of
state waters. Should an activity occur which causes existing high water qual-
ity to be degraded, the DSL is authorized to take enforcement action against
the responsible operator. Activities which degrade high water quality may be
authorized only if the BLC determines that such degradation is economically
or socially necessary.
The water quality segment of both rules also requires the construction of
and regulates sediment treatment facilities. They specify that waters con-
taining sediment and settleable solids cannot be discharged into a receiving
body of water until the particles have settled. The successful implementation
of this controlled discharge guarantees that sediment concentrations in re-
ceiving streams will not be altered. This particular rule provides one of the
most effective means by which to control the introduction of suspended and
dissolved solids into surface streams.
59
Turbidity is also addressed in both rules. Deference is given to the
water quality standards adopted by the MWPCA. If the water quality standards
regulate increases in turbidity more stringently than the reclamation and
SUMSA rules, the water quality standards will be enforced. The converse is
also true.
Both the Reclamation Act and SUMSA defer to the water quality standards
adopted pursuant to the MWPCA; their adequacy is measured by the adequacy of
the water quality standards. Therefore, both these acts adequately address
the introduction of dissolved and suspended solids into surface waters. These
regulations do not, however, adequately address the introduction of dissolved
solids into groundwater aquifers.
RECOMMENDATION
The regulations implementing the Reclamation Act and SUMSA defer to the
water quality standards of the MWPCA as the minimum water quality levels to
be achieved by operators. For this reason the need to adopt groundwater qual-
ity standards under the MWPCA becomes exceedingly important. Therefore, it
is emphatically recommended that the BHES proceed to adopt groundwater quality
standards.
60
I
I
~
f
Does The Natural Streambed and Land Preservation Act of 1975 affect water
quality control efforts?
ANALYSIS
The Natural Streambed and Land Preservation Act of 1975 [Sec. 26-1510,
et seg., R.C.M. 1947, hereinafter referred to as the Streambed Act) states
as its goals the protection and preservation of Montana's rivers and streams.
The policy declaration of the Streambed Act states that it is the:
policy of the state of Montana that its natural rivers
and streams and the lands and property immediately
adjacent to them within the state are to be protected
and preserved to be available in their natural, or
existing state, and to prohibit unauthorized projects
and in so doing to keep soil erosion and sedimentation
to a minimum, except as may be necessary and appropriate
after due consideration of all factors involved
[Sec. 26-1511, R.C.M. 1947].
As illustrated by the policy statement, proposed projects must be authorized
before they are commenced so that soil erosion and sedimentation will be
minimized. Furthermore, "No work on a project under this act may take
place without the written consent of the supervisors" [Sec. 26-1514(9),
R.C.M. 1947). The procedure to acquire the requisite authorization is set
forth in Sections 26-1513 and 26-1514, R.C.M. 1947.
The projects within the scope of the Streambed Act are those which
cause a:
physical alteration or modification of a stream in
the state of Montana which results in a change in the
state of the stream in contravention of section 26-1511
[Sec. 26-1512(5), R.C.M. 1947).
The particular projects which have been established as causing undesirable
stream alterations and modifications are enumerated in ARM 36-2.2(2)-S250.
The BNRC is the administrative body which has been delegated the duty
to adopt statewide rules implementing the Streambed Act. The pertinent
statutory provision provides that:
By July 1, 1975, the board of natural resources and
conservation after consultation with the association
of conservation districts shall adopt rules setting
minimum standards and guidelines for the purposes
of this act [Sec. 1520(1), R.C.M. 1947).
61
•
Pursuant to this statutory directive, the BNRC has adopted state m1n1mum
standards and guidelines implementing the Streambed Act. These standards
and guidelines are set forth in ARM 36-2.2(2)cS210 through S260.
The Streambed Act also directs the supervisors of each conservation
district, or grazing district, or even the county where a conservation
district or grazing district has no jurisdiction, to adopt minimum standards
and guidelines which meet or exceed those adopted by the BNRC. Section 26-1520(2),
R.C.M. 1g47, provides that:
By January 1, 1976, the supervisors of each district
shall adopt by resolution after a public hearing rules
setting standards and guidelines for projects, and
exclusions, within their districts which shall meet or
exceed the minimum standards set by the board under
subsection (1) of this section.
Thus, rules adopted by the supervisors of each conservation district must
minimally require compliance with the standards and guidelines adopted by
the BNRC as set forth in ARM 36-2.2(2)-S210 through S260.
The statewide minimum standards and guidelines adopted by the BNRC
[ARM 36-2.2(2)-S210 through 260] address various water quality problems which
the DHES's water quality standards rule also specifically addresses
[ARM 16-2.14(10)-Sl4480]. Before the supervisors of a conservation district
approve a proposed project, they must initially determine that reasonable
efforts will be made by the applicant to:
(c) Insure that the project will pass anticipated water
flows without creating harmful erosion problems
upstream or downstream;
(d) Minimize effects on fish and aquatic habitat;
(e) Minimize turbidity or other water pollution
problems by the materials used or removal of
ground cover; ... [ARt1 36-2.2(2)-S240].
The standards cited require minimization of certain water quality problems.
However, they do not mandate compliance with the water quality standards
which have been adopted by the BHES.
The minimum standard enunciated in the Streambed Act rule requires that
turbidity resulting from projects be minimized. The water quality
standards specifically designate the increases in turbidity that will be
permitted within the various stream classifications. These increases must
not be exceeded if a person is to remain in compliance with the MWPCA.
Therefore, it is possible that an applicant under the Streambed Act who has
taken affirmative steps to minimize turbidity will cause a disallowed increase
in turbidity to occur. The DHES could then take enforcement action against
an applicant for water quality violations.
Under the Streambed Act rule no project may be approved unless reason-
able efforts will be made by the applicant to minimize the potential effects
on fish and aquatic habitat resulting from the project. This regulation,
similar to the one regarding turbidity, requires reasonable efforts at
62
' l
I
minimization. The standard does not strive to guarantee compliance with the
water quality standards in effect. Therefore, while positive steps are
taken by an applicant to minimize adverse effects on fish and aquatic habitat,
a water quality standard may be violated with the resulting effect that fish
and aquatic habitat within a reach of stream are no longer protected. Again,
an applicant could be subject to enforcement actions authorized by the MWPCA
for water quality violations.
The Streambed Act and the rules adopted pursuant thereto are oriented
towards pre-pollution control. As stated in the policy declaration, projects
must be authorized before commenced. The goal of this mandatory project
authorization is the minimization of certain water quality problems. The
major benefit of the Streambed Act is the operation of this minimization
guarantee. The Streambed Act and the rules adopted to implement the Act do
not seek to achieve water quality standard compliance. Therefore, a
''successful minimization'' of turbidity and of adverse effects on fish and
aquatic life may still constitute pollution under the MWPCA.
Special consideration must be afforded ARM 16-2.14(10)-Sl4480(6)(g).
Under this particular water quality standards rule subsection, certain
unlawful increases in turbidity may be authorized by DHES. The activity
or project involved must be short-term, and increases in turbidity over the
levels permitted must be unavoidable. The pertinent rule states:
No wastes are to be discharged and no activities conducted
which, either alone or in combination with other wastes
or activities, will cause turbidities to exceed those
allowed by specific water quality criteria; provided,
short-term activities necessary to accommodate essential
dredging, channel or bank alterations, stream diversions
or other construction where turbidities in excess of
the criteria are unavoidable, may be authorized by the
department under conditions as it may prescribe.
Pursuant to this rule, it is possible that given certain procedures, a
project which has been approved by the supervisors of a conservation district
could also be authorized by the DHES even though the project causes
otherwise unlawful increases in turbidity.
Currently, the Streambed Act and the rules adopted pursuant thereto
positively serve water quality control efforts because they seek to minimize
certain water quality problems. Without the Streambed Act and statewide
minimum standards and guidelines, water quality problems resulting from
various projects would be of greater magnitude.
SUMMARY
A goal of the Streambed Act is the protection and preservation of
Montana's rivers and streams. To accomplish this goal, proposed projects
must be authorized by the supervisors of the local conservation district
before they are begun, so that erosion and sedimentation will be minimized.
Projects which physically alter or modify streams in Montana come within the
purview of the Streambed Act.
63
The BNRC has been designated the rule-making body possessing the statutory
obligation to adopt statewide rules and standards implementing the Streambed
Act. The supervisors of each conservation district have been required by
the Streambed Act to adopt standards and guidelines for their districts
which minimally meet those adopted by the BNRC.
The statewide minimum standards adopted by the BNRC concern various
water quality issues. For example, turbidity, fish and aquatic habitat,
and erosion are specifically regulated in the statewide minimum standards.
The standards require minimization of certain water quality problems.
They do not, however, require compliance with the water quality standards
adopted by the BHES. The ultimate accomplishment of the Streambed Act,
therefore, is the minimization of potential water quality problems. This
is a benefit which must not be overlooked. It should be emphasized,
however, that successful minimization of various water quality problems
may still constitute pollution under the MWPCA.
RECOMMENDATION
The incongruity of having a particular project approved by the board
of supervisors of a conservation district and concurrently subject to
remedial action by the DHES is apparent. It is recommended that the
following action be taken to alleviate this potential conflict.
A variance system should be formally established by the DHES. This
variance system would enable an individual whose project has been approved
under the Streambed Act to secure a guarantee from the DHES that should
the project cause water quality violations, the project under certain
conditions would not be held in violation of the MWPCA. A reasonable
interpretation of ARM 16-2. 14(10)-Sl4480(6)(g) authorizes the DHES to
establish such a variance system.
This recommendation obviously proposes the establishment of a coordinated
referral system between the district supervisors and the Department of Fish
and Game, both members of the "team" under the Streambed Act [Sec. 26-1512(8),
R.C.M. 1947], and the DHES. Therefore, the DHES should actively pursue the
establishment of a coordinated referral system contemplated by this
reco111nendation.
The implementation of this recommendation will assure an individual
engaged in an approved project under the Streambed Act that the commencement
or continuation of his project will not subject him to remedial action by
the DHES under the MWPCA.
64
Can water quality problems associated with impoundment or other
developments which alter the hydrograph be controlled under the existing
water quality rules?
ANALYSIS
The ~illPCA and the rules promulgated pursuant thereto do not address
the issue of hydrographs or the issue of alterations in a hydrograph.
According to the Glossary a hydrograph is "a graph showing, for a given
point on a stream or conduit, the discharge, stage, velocity, available
power, or other property of water with r'espect to time." An alteration in
a hydrograph does not constitute water quality degradation under the MWPCA.
If the normal hydrograph in a particular river is altered, the alteration
itself does not constitute a violation of the MWPCA or the rules. Activities
associated with water quality degradation, including activities which may
alter the hydrograph, are considered in the rules.
Impoundments which may alter a hydrograph are generally addressed in
ARM 16-2.14(10)-Sl4480(6)(i) which states:
For operations of existing water impoundments that
cause conditions harmful to prescribed beneficial uses
of state waters, it is to be demonstrated to the satisfaction
of the department that continued operations will be done
in the best practicable manner to minimize harmful
effects and will not violate state laws or department rules.
New water impoundments shall be designed to provide temperature
variations in discharging water that maintain or enhance
the existing propagating fishery and associated aquatic
life. As a guide, the following temperature variations
are recommended: Continuously less than 4QOF during
the months of January and February, and continuously
greater than 44oF during the months of June through
September.
This rule compels existing water impoundment operations to comply with
state laws and DHES rules. Besides compliance with state laws and DHES
rules, an additional requirement is imposed upon new water impoundment
operations. Newer impoundment operations are also required to seasonally
regulate the temperature of the water discharged. A review of this rule,
however, clearly indicates that the issue of impoundment or other similar
development, as relating to hydrographs or alterations thereof, is not
considered.
As the rule mandates, both new and existing impoundment operations
must comply with state laws and department rules. Therefore, a person
desiring to appropriate water or commence construction of an impoundment
65
must secure a permit from the DNRC authorizing such request [Sec. 89-880(2),
R.C.M. 1947]. The DNRC will issue a permit to the applicant if:
.•. ( 1 )
(2)
(3)
(4)
(5)
(6)
there are unappropriated waters in the source
of supply:
(_a) at times when the water can be put to the
use proposed by the applicant;
(b) in the amount the applicant seeks to appropriate;
and
(c) throughout the period during which the
applicant seeks to appropriate, the amount
requested is available;
the rights of a prior appropriator will not be
adversely affected;
the proposed means of diversion or construction
are adequate;
the proposed use of water is a beneficial use;
the proposed use will not interfere unreasonably
with other planned uses or developments for which
a permit has been issued or for which water has been
reserved;
an applicant for an appropriation of 10,000 acre-feet
a year or more or 15 cubic feet per second or more
proves by clear and convincing evidence that the rights
of a prior appropriator will not be adversely affected
[Sec. 89-885, R.C.M. 1947].
An examination of this law indicates that the issuance or denial of a permit
to appropriate is probably not based on the potential pollution that may be
caused by the operation of the impoundment.
In light of ARM 16-2.14(10)-Sl4480(6)(i), impoundment operations must
comply with the MWPCA and the rules adopted pursuant thereto. An examination
of the MWPCA shows how it affects water quality degradation associated with
various activities, including those which may not alter the hydrograph.
The policies of the State of Montana under the MWPCA are to conserve
water by protecting, maintaining, and improving its quality for various
beneficial uses, and to provide programs which prevent, abate, and control
water pollution [Sec. 69-4801 (1), R.C.M. 1947].
The defining characteristics of pollution thus becomes exceedingly
important if one is to determine whether an alteration in a hydrograph is
indicative of water quality degradation. Pollution is defined by the
MWPCA as:
contamination, or other alteration of the physical,
chemical, or biological properties of any state
waters, which exceeds that permitted by Montana
water quality standards, including, but not limited
to, standards relating to change in temperature,
taste, color, turbidity, or odor; ... [Sec.
69-4802(5), R.C.M. 1947].
66
The substance of this definition concerns situations which indicate water
pollution. The definition does not attempt to enumerate activities whi.ch
may potentially produce degradation. Rather, the definition stresses the
effects of an activity rather than the activity itself. Pursuant to this
definition; an impoundment does not cause pollution by altering a hydrograph
but only by causing an alteration of the physical, chemical, or biological
properties of state waters beyond that permitted by the Montana water
quality standards.
Section 69-4806(1), R.C.M. 1947, makes it unlawful to:
... cause pollution as defined in section 69-4802(5),
R,C.M. 1947, of any state waters ...
Therefore, pollution caused by an impoundment's operation is unlawful under
the MWPCA. When pollution does occur, the violator is subsequently subject
to the enforcement remedies set forth in the MWPCA.
The primary issue thus becomes whether the impoundment or any other
development which might have altered the hydrograph has violated a Montana
water quality standard. The policy declaration of the water quality
standards rule states that:
The following standards are adopted to establish
maximum allowable changes in water quality and
establish limits for pollutants which affect
prescribed beneficial uses of state waters
[ARM 16-2.14(10)-514480(1 )].
A water quality standard is composed of various elements. Each body
of water is given a water use classification, a water use description,
and specific and general water quality criteria [ARM 16-2.14(10)-514480(2)].
More precisely, the specific and general water quality criteria are designed
to protect the water use descriptions designated under each classification
[ARM 16-2. 14(10)-514480(5)].
The specific water quality criteria enumerated in the rule and
established to protect the various water uses described include: turbidity,
temperature, sulfates, concentration of sediment, settleable solids, total
dissolved solids, residues, and true color [ARM 16-2.14(10)-514480(5)].
If an activity causes any of the above criteria to exceed the level permitted
by the applicable water quality standard in effect for a particular reach of
a river, pollution can be established. For example, if an impoundment
causes a river's concentration of total dissolved solids to exceed the
concentration permitted by the water quality standard applicable to that
particular reach of river, its designated uses are no longer protected, and
pollution has occurred.
Regardless of the factors creating the alteration of the physical,
chemical, or biological properties characterizing a body of water,
alterations exceeding the allowed levels constitute pollution. It is
immaterial that the cause of the alteration or contamination is an impound-
ment. The violation of a water quality· standard and the effect of the
activity establishes the pollution, not the existence of the activity itself.
67
Pollution can be established only if an impoundment or some other development
causes a violati_on of a water quality standar:-d.
SUMMARY
The MWPCA and the rules promulgated to implement the act do not address
the issue of hydrographs or alterations in hydrographs. Although an alteration
in a hydrograph may denote water quality degradation, an alteration in a
hydrograph standing alone does not in itself constitute water quality de-
gradation.
Impoundments which may alter a hydrograph are covered in the water
quality standards rule. A review of the pertinent rule, however, indicates
that impoundments or other developments as they specifically relate to
hydrographs or their alterations are not considered. Impoundment operations
must comply with the MI~PCA and the rules adopted to implement the act. The
rules indicate ho~1 water quality degradation associated with various
activities, including those which alter hydrographs, is addressed.
The definition of pollution as given in the MWPCA stresses various
conditions which may indicate pollution rather than pollution-causing
activities. In light of this definition, an impoundment does not cause
pollution if it merely alters a hydrograph, but only if it causes a water
quality standard to be exceeded.
Thus, in light of the MWPCA and the rules which have been promulgated
thereto, it is immaterial that a hydrograph has been altered by an impound-
ment or any other development. If the impoundment has caused a water quality
standard to be violated, pollution can be established.
The r4WPCA makes it un 1 awfu 1
[Sec. 69-4806(1), R.C.M. 1947].
authorized by the MWPCA to:
RECOMMENDATION
to cause pollution as defined in-the act
When pollution does occur, the DHES is
Take such actions as are authorized or required under
section 69-4820.1 to ensure that the terms and conditions
of issued permits are complied with and to insure that
violations of this chapter are appropriately prosecuted
[Sec. 69-4809.l(l)(g), R.C.M. 1947].
Section 69-4809. l(l)(g), R.C.M. 1947, indicates that the DHES may initiate
enforcement actions against a violator of the MWPCA. If the operation of
an impoundment has caused a water quality standard to be exceeded, the
DHES can pursue enforcement remedies. Usually, enforcement follows water
qua 1 i ty degradation.
Emergency procedures, however, are established in Section 69-4824,
R.C.M. 1947, whereby the DHES "shall order the person to stop, avoid, or
moderate the act so that the substantial injury will not occur." The DHES
is authorized under this section to issue an emergency order when it
68
" .. finds that a person is committing or is about to commit an act in viola-
tion of this chapter ... '' Thus, Section 69-4824, R.C.M. 1947, empowers the
DHES to deter a pollution-causing activity before it occurs, but the act must
be capable of causing " ... substantial pollution the harmful effects of
which will not be remedied immediately after the commission or cessation of
the act ... ''
It is not advisable, however, for the DHES to issue an emergency order--
for example, requiring a person to stop the construction of an impoundment.
Such an action could result in political repercussions, such as the substantial
modification or repeal of the MWPCA.
Since this outcome would be undesirable, the implementation of the recom-
mendation set forth in Issue No. 1 is reemphasized. A certification process
should be established whereby withdrawal applications considered by the DNRC
could also be evaluated by the DHES in terms of potential water quality
degradation. The other alternative as discussed in Issue No. 1 is to con-
solidate jurisdiction of water quality and water withdrawal under one department.
As recommended in Issue No. 1, it is urged that the BNRC grant the DHES's
reservation request for the Yellowstone River. Such action by the BNRC would
effectively serve to prevent pollution before it occurs, whether the pollution
is caused by an impoundment or other development.
69
What are the enforcement remedies provided by the MWPCA, and are they
effective?
ANALYSIS
Success of a "regulatory" act is measured by the effectiveness of its
enforcement provisions. The MWPCA sets forth various enforcement procedures
which may be pursued by the DHES. A review of the MWPCA indicates that
the DHES may proceed either administratively or judicially. The MWPCA
specifies the various remedies that should be initiated in certain
situations. Where discretion is permitted, however, the type and
seriousness of a violation will determine the enforcement action to be taken.
An administrative remedy includes all responses made by and available
to a regulatory agency which seek compliance with its requirements. A
judicial remedy is one which endeavors to resolve cases and controversies
in court. The following discussion will pertain to the various enforcement
remedies, both administrative and judicial, available to the DHES.
Pursuant to Section 69-4809.l(l)(f), R.C.M. 1947, the DHES has been
directed to:
Issue orders to any person to clean up any material
which he or his employee, agent, or subcontractor has
accidentally or purposely dumped, spilled, or otherwise
deposited in or near state waters and which may pollute
them; ...
This section clearly confers upon the DHES the authority to issue orders
to persons whose actions have polluted or may pollute state waters.
Section 69-4820.1, R.C.M. 1947, enumerates the type of order and the
precise conditions under which an order may be issued. Pursuant to
Section 69-4820.1(1), R.C.M. 1947, the DHES may take appropriate enforcement
action to:
(a) prevent, abate, and control the pollution of state waters;
(b) prevent, abate, and control any violation of a condition
or limitation imposed by a permit issued under
69-4809. 1 ( 1 ) (a) ,
(c) prevent, abate, and control any violation of rules
relating to pretreatment standards [Sec. 69-4820.1(1),
R.C.M. 1947].
Thus, when the DHES determines that pollution of state waters, violations of
limitations set forth in MPDES permits, or violations of pretreatment
standards have occurred or are likely to occur, it is authorized to begin
71
enforcement action. Since this section sanctions appropriate enforcement
action, either administrative or judicial remedies may be pursued. The
nature of the violation in question will determine the enforcement action
to be undertaken.
The various elements in a compliance order are set forth in Section
69~4820. 1(2), R.C.M. 1947. This section provides that:
In furtherance of subsection (1), a person violating
a condition, limitation, standard, or other require-
ment established pursuant to this chapter may be
served with a compliance order issued by the
department. The order must specify the condition,
limitation, standard, or other requirement violated
and must set a time for compliance ...
This section also directs the DHES to evaluate the seriousness of the
violation and the good faith efforts made by the violator to comply with the
DHES's requirements when it establishes a compliance schedule.
The DHES is authorized under Section 69-4820.1(3), R.C.M. 1g47, to:
commence a civil action seeking appropriate relief,
including a permanent or temporary injunction, for
a violation which would be subject to a compliance
order under subsection (2).
Pursuant to this section, the DHES is permitted to seek an inju·nction if a
particular violation would be subject to a compliance order under Subsection
2 of Section 69-4820.1, R.C.M. 1947. Thus, the DHES may commence civil
action seeking injunctive relief if the violator has or is likely to pollute
state waters, violate a condition contained within the MPDES permit, or
violate a pretreatment standard. The petition seeking injunctive relief
must be filed in the district court of the county where the defendant is
located, resides, or is doing business.
Although the DHES is authorized to proceed either administratively or
judicially under Section 69-4820.1, R.C.M. 1947, it may choose only one of
these particular enforcement remedies. If the DHES determines to seek an
injunction it will be denied the right to simultaneously proceed admini-
stratively. Conversely, if the DHES decides to proceed administratively,
it will be denied the right to simultaneously proceed judicially. Once
administrative remedies are exhausted, however, judicial action may be taken.
The DHES is also authorized under Section 69-4820.1(4), R.C.M. 1947, to
seek civil penalties. Penalty provisions are set forth in Section 69-4823,
R.C.M. 1947. This section provides that:
A person who violates this chapter or rule, permit, effluent
standard, or order issued under the provisions of this act
shall be subject to a civil penalty not to exceed ten
thousand dollars ($10,000). Each day of violation constitutes
a separate violation.
72
I
(
' ,.
Thus, if a person violates the MWPCA, a rule promulgated to implement the act,
a condition or limitation contained within an MPDES permit, or a compliance
order issued pursuant to the act, he will be subject to a daily civil penalty
not to exceedten thousand dollars (.$10,000).
A violator will also be subject to a twenty-five thousand dollar ($25,000)
daily civil penalty in addition to imprisonment for not more than one year,
or both, if he willfully or negligently violates Section 69-4806, R.C.M.
1947, or any pretreatment standard established pursuant to the MWPCA
[Section 69-4823(2), R.C.M. 1947]. Subsequent convictions under this sub-
section will subject a violator to a daily fine of not more than fifty
thousand dollars ($50,000) or imprisonment for not more than two years, or
both. It is reasonable to assume that the economic burdens resulting from
the imposition of a civil penalty along with imprisonment will compel many
potential violators to comply with the MWPCA.
It should be noted that the MWPCA specifically provides that the DHES's
securing of a civil penalty "does not bar enforcement of this chapter or
of rules or orders issued under it by injunction or other appropriate
remedy" [Section 69-4823 (3), R.C.M. 1947]. Thus, a judicial action by the
DHES seeking a civil penalty does not preclude it from petitioning for
injunctive relief.
The MWPCA specifically provides that a purpose of the act is to:
provide additional and cumulative remedies to prevent,
abate, and control the pollution of state waters. This
chapter does not abridge or alter rights of action or
remedies in equity or under the common law or statutory
law, criminal or civil, nor does this chapter or an
act done under it estop the state or a municipality
or person as owners of water rights or otherwise in
the exercise of their rights in equity or under the
common law or statutory law to suppress nuisances or
to abate pollution [Section 69-4823(4), R.C.M. 1947].
This section provides that the DHES is not limited by the specific enforcement
remedies set forth in the MWPCA. For example, Section 69-4820.1(3), R.C.M.
1947, provides the DHES with specific grounds on which to seek a permanent
or temporary injunction. Pursuant to Section 69-4823(4), R.C.M. 1947,
however, the grounds for injunction afforded the DHES under Section 69-4820.1(3),
R.C.M. 1947, are not the only ones on which the DHES may rely. Thus, the
DHES may proceed to secure an injunction under the MWPCA's injunctive grant
or pursuant to statutory grounds providing for injunctive relief.
Section 93-4204, R.C.M. 1947, sets forth statutory grounds on which an
injunction may be granted. Briefly, provisions of this section provide that
an injunction may be granted when it appears by the complaint that the
plaintiff is entitled to the relief demanded and that the continuance or
commission of an act would produce irreparable injury to the plaintiff.
Additional injunctive powers are also conferred upon the DHES in
Section 69-4825, R.C.M. 1947. Thus, if the DHES determines that injunctive
73
relief is the appropriate remedy, it is authorized to petition for an injunction
pursuant to Section 69-4820.1 (3), R.C.M. 1947, Section 93-4204, R.C.M. 1947,
~r Section 69-4825, R~C~M. 1947.
Another administrative remedy that the DHES may pursue upon knowledge of
a violation is to serve a notice of violation on an alledged violator. Section
69-4820(1), R.C.M. 1947, provides that:
The notice shall state the provision alleged to be violated,
the facts alleged to constitute the violation, the nature
of the corrective action which the department requires, and
the time within which the action is to be taken.
The notice of violation authorized to be issued under this section is
distinguishable from the compliance order authorized to be issued under
Section 69-4820.1(2), R.C.M. 1947. Whereas a notice of violation must
set forth the corrective action that the DHES requires a violator to take,
a compliance order need not set forth any corrective action.
Another distinction is that the section authorizing notices of violation
confers upon the DHES the authority to require an alleged violator to
appear before the SHES to answer the charges made against him as set forth
in the notice. When the DHES issues a compliance order, however, it cannot
require an alleged violator to appear before the BHES for a public hearing.
Furthermore, an alleged violator who has received a notice of violation
may request the BHES to conduct a hearing if the DHES does not. This right,
however, is not conferred upon a violator who has been issued a compliance
order.
Under the notice of violation section, the BHES may issue an appropriate
order for the prevention, abatement, or control of pollution after a hearing
has been held or upon the failure of an alleged violator to request a hearing
[Section 69-4820(5), R.C.M. 1947].
The MWPCA provides an administrative procedure which allows the DHES to.
halt actions which will cause substantial injury to state waters.
Section 69-4824, R.C.M. 1947, sets forth the procedure to be ·followed by the
DHES in emergency situations. This section provides that:
If the department finds that a person is committing or is
about to commit an act in violation of this chapter or an
order or rule issued under it which, if it occurs or con-
tinues, will cause substantial pollution the harmful
effects of which will not be remedied immediately after the
commission or cessation of the act, the department shall
order the_ person to stop, avoid, or moderate the act
so that the substantial injury will not occur. The
order shall be effective immediately upon receipt by
the person to whom it is directed, unless the department
provides otherwise
This section clearly permits the DHES to demand the immediate cessation of
any act which will substantially affect the quality of state waters. Therefore,
the extent to which an emergency order is effective immediately upon receipt
by the person to whom it is directed is the extent to which it resembles a
74
\
I'
I·
' I
I
court-issued injunction. This section is an extremely valuable administrative
enforcement tool. Like an injunction, it provides the DHES with a means of
preventing a pollution-causing act before it occurs.
Another enforcement remedy conferred upon the DHES is the authority to
suspend or revoke an MPDES permit if it believes that the permittee has
violated the MWPCA. If the DHES determines that a point-source violation is
likely to continue and cause lasting pollution, the DHES may order the
suspension or revocation of the MPDES permit to take effect immediately
[Section 69-4807. 1(2), R.C.M. 1947]. The possible suspension or revocation
of a person's MPDES permit offers the best enforcement tool available to the
DHES in preventing and controlling the discharge of pollutants into state
waters.
Pursuant to its statutory duty to adopt rules [Section 69-4808.2(l)(e),
R.C.M. 1947], the BHES has adopted rules which concern the suspension,
modification, and revocation of permits. ARM l6-2.14(10)-Sl4460(7)(a)(iii)
states the conditions justifying the modification, suspension, or revocation
of an MPDES permit:
An MPDES permit may be modified, suspended, or revoked in
whole or in part during its term under provisions of Section
69-4807.1, R.C.M. 1947, for cause, including but not limited
to, any of the following:
(a a)
(a b)
(ac)
(ad)
Violation of any conditions of the permit
Obtaining an MPDES permit by misrepresentation or
failure to disclose fully all relevant facts
A change in any condition that requires either a
temporary or permanent reduction or elimination
of the authorized discharge
A failure or refusal by the permittee to comply
with the requirements of Section 69-4809.2,
R.C.M. 1g47 [Emphasis provided]
An examination of this rules indicates that the DHES is given extremely
broad authority on which to base the modification, suspension, or revocation
of an MPDES permit. A permittee's knowledge of this power ac~s as an induce-
ment to comply with the MWPCA, the rules promulgated to implement the act,
and the conditions and limitations set forth in his MPDES permit.
It is unlawful under Section 69-4806(2), R:C.M. 1947, to discharge
pollutants into state waters without an MPDES permit; therefore, an unauthorized
discharge will subject an individual to whatever appropriate enforcement
action the DHES determines to pursue, including, but not limited to,
revocation of his MPDES permit. Moreover, if an individual continues to
discharge pollutants after his MPDES permit has been revoked, he may also
subject himself to additional enforcement action.
The enforcement alternatives set forth in the MWPCA do not lend them-
selves as readily to nonpoint sources of pollution as they do to point sources.
The very nature of nonpoint-source pollution and the evident problem of
tracing a nonpoint source of pollution to an individual makes application
75
of the enforcement remedies very difficult. Even the successful implementation
of best management practices (see Issue 7) will not provide for the elimination
of nonpoint-source pollution.
Pollution caused by dewatering is also fairly immune from application of
the enforcement remedies authorized by the MWPCA. Since it is usually the
cumulative effect of many withdrawals that cause pollution, and not just
one individual approprition, enforcement action against an individual
appropriator would be non-productive.
SUMMARY
The enforcement remedies enumerated in the MWPCA, in addition to those
provided in the common law and by statute, provide the DHES with a full and
fairly effective gamut of enforcement remedies for controlling point-source
pollution. Therefore, there is no reason why pollution or the threat of
pollution from point sources cannot be adequately remedied or prevented.
The enforcement remedies available, however, for control of pollution
caused by nonpoint sources and dewatering are inadequate.
RECOMMENDATION
It is recommended that jurisdiction over the water appropriation pro-
cess and water quality maintenance be combined into one department or a
referral system established between the DNRC and the DHES so that pollution
caused by dewatering will be properly and adequately controlled.
Due to the inadequacy of the enforcement remedies available for con-
trolling pollution caused by nonpoint sources and dewatering, it is once
more urged that the BNRC grant the reservation of Yellowstone River waters
applied for by the DHES.
76
I
I·
I
I·
I
!
I
I
1-
,
I
I'
I
I.
In order to avoid repetition, the recommendations enunciated following
the various issue-analyses will not be reiterated. However, the author
takes the opportunity to re-emphasize the importance of implementing the
recommendation proposed in Issue 1. Should this particular recommendation
be implemented, water quality in the Yellowstone River will be adequately
protected from degradation.
77
I
I
I·
I I'
I'
i'
I·
I
Anderson, F. 1974. Federal Environmental Law. West Publishing Company.
St. Paul, Minnesota.
Montana Department of Community Affairs. 1976 (December). Economic conditions
in Montana: a report to the Governor. Research and Information Systems
Division, Helena. 35 pp.
Montana Department of Health and Environmental Sciences.
Bureau. Montana's Statewide 208 Planning To Achieve
Waters: Final Work Plan Summary. Helena, Montana.
1977. Water Quality
and Preserve Clean
Montana Department of Natural Resources and Conservation. 1975. A study to
evaluate potential physical, biological, and water use impacts of water
withdrawals and water development on the middle and lower portions of the
Yellowstone River drainage in Montana. Annual Report to the Old West
Regional Commission. August l. Helena.
1976. Yellowstone River Basin: draft environmental impact statement
for water reservation applications. Two volumes. water resources division,
Helena. 412 pp.
1977. Yellowstone River Basin final EIS for water reservation appli-
cations. Water resources division. 194 pp.
Montana Energy Advisory Council. 1976 (June). Montana energy position: a
Montana Energy Advisory Council staff report, by Theodore H. Clack, Jr.
Helen a. 56 pp.
North Central Power Study
central power study:
Coordinating Committee. 1971 (October). North
report of phase I. Volume I. Bureau of Reclamation,
Billings. 80 pp.
Rocky Mountain Association of Geologists. 1972.
Mountain Region: United States of America.
Geologic atlas of the Rocky
Denver. 331 pp.
State Conservation Needs Committee. 1970. Montana soil and water conservation
needs inventory. Soil Conservation Service, Bozeman. 172 pp.
Water and Waste Water Central Engineering, Joint Editorial Board representing
the Emerican Public Health Association, American Society of Civil
Engineers, American Water Works Association, and Water Pollution
Control Federation. 1969. Glossary.
Wilbur, C. G. 1971. The biological aspects of water pollution. Charles
C. Thomas, Springfield, Illinois.
79