HomeMy WebLinkAboutSuWa22Alaska Resources Library & Information Services
Susitna-Watana Hydroelectric Project Document
ARLIS Uniform Cover Page
Title:
Susitna-Watana Hydroelectric Project, FERC Project no. 14241-000
SuWa 22
Author(s) – Personal:
Wayne Dyok
Author(s) – Corporate:
Alaska Energy Authority
AEA-identified category, if specified:
January 31, 2013 Filing
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 22
Existing numbers on document:
Published by:
[Anchorage, Alaska : Alaska Energy Authority, 2013]
Date published:
January 31, 2013
Published for: Date or date range of report:
Volume and/or Part numbers:
Cover letter
Final or Draft status, as indicated:
Document type:
Pagination:
3 p.
Related work(s):
Attachments A-E (SuWa 23 -27)
Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
1
January 31,2013
Ms. Kimberly Bose
Secretary
Federal Energy Regulatory Commission
888 First Street, NE
Washington, DC 20426
Re: Susitna-Watana Hydroelectric Project, FERC Project No. 14241-000
Dear Secretary Bose:
By letter dated January 17, 2013, Staff of the Federal Energy Regulatory
Commission (Commission) issued a modified schedule for its April 1, 2013 study plan
determination (SPD)for 13 of the individual studies contained in the Alaska Energy
Authority’s (AEA) Revised Study Plan (RSP) for the Susitna-Watana Hydroelectric
Project, FERC Project No. 14241.1 Among other milestones, Staff’s modified schedule
required AEA to file specified information related to these 13 individual studies by
January 31, 2013, and to convene public meetings on February 14-15, 2013, to discuss
these materials with federal and state resource agencies and other licensing participants.
In accordance with Staff’s modified schedule, the purposes of this filing are to: (1)
submit all information specified by Staff for filing by January 31; and (2) provide details
of the public meetings to be held in Anchorage, Alaska, on February 14-15, 2013.
Description of Attached Information
Commission Staff’s January 17 modified schedule required AEA to file the
following information by January 31, 2013:
results of 2012 open-water flow routing model and habitat mapping; draft
implementation plans for the Fish Distribution and Abundance in the
Upper Susitna River (study 9.5), the Fish Distribution and Abundance in
the Lower and Middle Susitna River (study 9.6), and River Productivity
1 See Letter from Jeff C. Wright, Federal Energy Regulatory Commission, to Wayne Dyok, Alaska
Energy Authority, Attachment A, Project No. 14241-000 (issued Jan. 17, 2013)[hereinafter, Schedule
Modification Letter]. The 13 individual studies scheduled for Staff’s April 1 SPD consist of the following:
(1) Baseline Water Quality (RSP 5.5); (2) Water Quality Modeling Study (RSP 5.6); (3) Mercury
Assessment and Potential for Bioaccumulation Study (RSP 5.7); (4) Geomorphology Study (RSP 6.5); (5)
Fluvial Geomorphology Modeling Below Watana Dam Study (RSP 6.6); (6) Groundwater Study (RSP 7.5);
(7) Ice Processes in the Susitna River Study (RSP 7.6); (8) Fish and Aquatics Instream Flow Study (RSP
8.5); (9) Riparian Instream Flow Study (RSP 8.6); (10) Study of Fish Distribution and Abundance in the
Upper Susitna River (RSP 9.5); (11) Study of Fish Distribution and Abundance in the Middle and Lower
Susitna River (RSP 9.6); (12) River Productivity Study (RSP 9.8); and (13) Characterization and Mapping
of Aquatic Habitats (RSP 9.9).
2
(study 9.8) studies; all proposed focus areas; and a description of habitat
units within the focus areas for all aquatic studies to be implemented in the
middle Susitna River.2
In response to Staff’s request, and in furtherance of its efforts to finalize study reports
associated with its 2012 early licensing studies, AEA has prepared several study reports
and technical memoranda containing all the requested information. The information
requested by Commission Staff appears in the attachments as follows:
Requested Information Attachment
Results of 2012 Open-Water Flow Routing Attachment A, Open Water HEC-RAS
Flow Routing Model (January 2013)
Results of 2012 Habitat Mapping Attachment B, Middle Susitna River
Segment Remote Line Habitat Mapping
Technical Memo (January 2013)
Draft Implementation Plan for Study of
Fish Distribution and Abundance in the
Upper Susitna River (RSP 9.5)
Attachment C, Draft Susitna River Fish
Distribution and Abundance
Implementation Plan (January 2013)
Draft Implementation Plan for Study of
Fish Distribution and Abundance in the
Middle and Lower Susitna River (RSP 9.6)
Attachment C, Draft Susitna River Fish
Distribution and Abundance
Implementation Plan (January 2013)
Draft Implementation Plan for River
Productivity Study (RSP 9.8)
Attachment D, Draft Susitna River
Productivity Study Implementation Plan
(January 2013)
Proposed Focus Areas Attachment E, Selection of Focus Areas
and Study Sites in the Middle and Lower
Susitna River for Instream Flow and Joint
Resource Studies –2013 and 2014
(January 2013)
Description of Habitat Units within Focus
Areas for All Aquatic Studies to Be
Implemented in the Middle Susitna River
Attachment E, Selection of Focus Areas
and Study Sites in the Middle and Lower
Susitna River for Instream Flow and Joint
Resource Studies –2013 and 2014
(January 2013)
Details of Public Meetings
Commission Staff’s modified schedule directed AEA to hold meetings on
February 14-15, 2013, “to discuss the study results, proposed implementation plans, and
selected focus areas in the middle and lower Susitna River.”3 These Technical
Workgroup (TWG) meetings, which are open to federal and state resource agencies, other
licensing participants, and interested members of the public, will begin each day at 8:30
a.m. (Alaska Standard Time), and will be held in the Public Conference Room of the Z.J.
2 Schedule Modification Letter, Attachment A.
3 Id.
3
Loussac Public Library, located at 3600 Denali Street, Anchorage, Alaska. Additional
information regarding these TWG meetings—including instructions for participating
online and via teleconference for those unable to attend in person—appear at AEA’s
licensing website, http://www.susitna-watanahydro.org/meetings/. More detailed
information regarding these TWG meetings, including a draft agenda, will be posted to
the website in the coming days.
AEA looks forward to discussing these materials in the upcoming TWG meetings.
These discussions will inform and assist AEA in its development of the final
implementation plans for the Study of Fish Distribution and Abundance in the Upper
Susitna River (RSP 9.5), Study of Fish Distribution and Abundance in the Middle and
Lower Susitna River (RSP 9.6), and River Productivity Study (RSP 9.8). As provided in
Commission Staff’s modified schedule, AEA will file these final implementation plans
with the Commission by March 1, 2013.
AEA acknowledges and greatly appreciates the participation and commitment to
this licensing process of Commission Staff, federal and state resource agencies, and other
licensing participants. AEA is particularly appreciative of all participants’ efforts to date
to work efficiently and collaboratively in developing a robust study plan that can be
approved by Commission Staff in accordance with the modified schedule and
implemented beginning with the 2013 field season.
If you have questions concerning this submission please contact me at
wdyok@aidea.org or (907) 771-3955.
Sincerely,
Wayne Dyok
Project Manager
Alaska Energy Authority
Attachments
cc: Distribution List (w/o Attachments)