Title:
Wetlands mapping - 2012
SuWa 106
Author(s) – Personal:
Author(s) – Corporate:
Alaska Energy Authority
AEA-identified category, if specified:
2012 Environmental Study Plans
AEA-identified series, if specified:
Series (ARLIS-assigned report number):
Susitna-Watana Hydroelectric Project document number 106
Existing numbers on document:
Published by:
[Anchorage, Alaska : Alaska Energy Authority, 2012]
Date published:
May 18, 2012
Published for:
Date or date range of report:
Volume and/or Part numbers:
Final or Draft status, as indicated:
Document type:
Pagination:
10 p.
Related work(s):
Pages added/changed by ARLIS:
Notes:
All reports in the Susitna-Watana Hydroelectric Project Document series include an ARLIS-
produced cover page and an ARLIS-assigned number for uniformity and citability. All reports
are posted online at http://www.arlis.org/resources/susitna-watana/
Susitna-Watana Hydroelectric Project
(FERC No. 14241)
Wetlands Mapping - 2012
Alaska Energy Authority
May 2012
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 1
WETLANDS MAPPING STUDY PLAN—2012
INTRODUCTION
The Alaska Energy Authority (AEA) is preparing a License Application that will be submitted to the
Federal Energy Regulatory Commission (FERC) for the Susitna-Watana Hydroelectric Project (Project)
using the Integrated Licensing Process (ILP). The Project is located on the Susitna River in the south-
central region of Alaska. The Susitna River drains the Talkeetna Mountains and portions of the Alaska
Range (Clearwater Mountains) and flows for approximately 300 miles before emptying into upper Cook
Inlet. The Project’s dam site would be located at River Mile (RM) 184, and a reservoir would be created
upstream of the dam. One or two power transmission lines and an access road also would be constructed.
The results of Wetlands Mapping Study will provide baseline information needed to support the FERC’s
National Environmental Policy Act (NEPA) analysis for the Project license.
Construction and operation of the Susitna-Watana Hydroelectric Project as described in the Pre-
application Document (PAD; AEA 2011) would affect wetlands both upstream and downstream from the
proposed dam site, and along access and transmission line routes. However, fill in wetlands would only
occur upstream of the dam site and along the access and transmission line routes, hence the mapping of
wetlands is being proposed only for those areas. The downstream effects of the proposed Project on
riparian habitats in the Susitna River will be addressed in the Riparian Study (see Riparian Study Plan—
2012). This study plan outlines the objectives and methods for characterizing the existing wetlands in the
Project area. The study efforts in 2012 will be the first year of a multi-year study, which will include field
data collection activities and mapping in 2012, 2013, and 2014.
STUDY OBJECTIVES
The overall (multi-year) objectives of the Wetlands Mapping Study are to:
Identify and map wetlands in the Project area based upon recent aerial imagery;
Quantify the potential direct, indirect, and cumulative impacts to wetlands and wetland functions
from Project construction, operations, and maintenance activities;
Develop potential protection, mitigation, and enhancement (PME) measures to address Project-
related impacts to wetlands and wetland functions; and
Develop and implement the 2013–2014 Wetlands Mapping Study Plan.
A complete assessment of the Project area wetlands and wetland functions will be completed as the
Project area is refined (e.g., preferred alternative access and transmission corridors). The interim study
objective for 2012 is to begin work on a wetland map for the Project area using existing and recent aerial
imagery and field verification (ground-truth) data to be collected in summer 2012.
STUDY AREA
The study area for the mapping of wetlands will be formally defined in consultation with management
agency personnel over the course of developing the 2013–2014 study plan. A working study area for the
2012 season, however, includes all areas that could be directly altered or disturbed by Project construction
and operations (reservoir impoundment zone, dam and powerhouse and supporting facilities, access route
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 2
and transmission-line corridors, and materials sites) and a 2-mile buffer surrounding these areas
(Figure 1).
The alteration of wetland habitats downstream of the dam (due to changes in hydrologic flow and ice
processes in the Susitna River) will be addressed in the Riparian Study. In that study, we are not
proposing to map wetlands separately, primarily because fill of wetlands would not occur downstream
from the proposed dam and therefore wetlands mapping information would not be needed for the
Project’s Section 404 wetlands permit application. In the Riparian Study, we will be mapping
successional vegetation and wildlife habitats (which include wetlands), and we will collaborate with other
researchers conducting several different studies of riverine physical processes, most notably instream
flow and ice processes, to map and predict the changes in riparian habitats from construction of the
proposed dam (see Riparian Study Plan—2012).
EXISTING INFORMATION
Wetlands were mapped for the Alaska Power Authority’s (APA) Susitna Hydroelectric Project (SHP) in
the 1980s through a cooperative agreement between U.S. Fish and Wildlife Service (USFWS) and the
APA to produce a preliminary wetland map for the SHP area at a scale of 1:63,360. These data, described
in USFWS (1984), are now a part of the National Wetlands Inventory (NWI) database; however, they are
currently unavailable to the public in digital format. The NWI maps of the SHP area were based on the
vegetation mapping completed by McKendrick et al. (1982), with some additional modification using
stereoscopic photo-interpretation. The original Alaska Vegetation Classification (AVC) (Viereck and
Dyrness 1980) vegetation classes were cross-referenced and converted into wetland classes using the
classification scheme of Cowardin et al. (1979). Mapping was not finalized by the original report
publication date (USFWS 1984), but a preliminary table of wetland classes and acreages expected to be
affected by SHP components was developed from that report (see AEA 2011). NWI data for the current
Project area has recently been digitized, but to date, the data has not been released by the USFWS for
public use. Complete digital NWI data for the current Project area is expected to be available by middle
or late 2012.
Current, high-resolution orthophoto imagery is available for some portions of the mapping study area, but
not all. To support field studies in 2012, AEA plans to purchase additional moderate-resolution imagery,
which will cover the entire mapping study area. New high-resolution aerial photography or satellite
imagery for the Project area is expected to be acquired in summer 2012; that imagery (needed to support
fine-scale, on-screen mapping work) likely will be available in late 2012.
METHODS
In general, the wetlands mapping for the Project area will follow the protocols for preparing wetland
maps that have been developed by the USFWS NWI program (National Wetlands Inventory Center 1995,
Dahl et al. 2009), but the classification of wetlands will incorporate elements of three different wetland
classification systems: NWI, hydrogeomorphic (HGM) classes, and a regional classification developed
for the Cook Inlet basin (see below). Wetland types will be defined based on a number of landscape,
geomorphic, hydrological, and biological variables and will be classified as fine-scale wetland ecosystems
(wetland ecotypes).
In addition to the wetlands mapping needed for a Section 404 wetland permit application, a wetland
functional assessment for the mapped wetland ecotypes will be prepared. The specific set of wetland
functions and the data elements needed to evaluate those wetland functions have not yet been determined,
but will be defined in consultation with management agencies over the next several weeks. These
discussions are on-going and are expected to be completed before the 2012 field season starts. The set of
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 3
wetland functions to be assessed will be tailored to those expected to be of most importance in remote
regions of Alaska in which landscape disturbances are few. The wetland functional assessment will be
based on based on hydrogeomorphic (HGM) principles. Although draft HGM guidebooks have been
prepared for the Cook Inlet Basin (Hall et al. 2003) and Interior Alaska (Alaska Department of
Environmental Conservation and USACE 1999), the models are confined to a small set of HGM classes
and are regionally specific; thus, they are unlikely to be applicable to the Susitna Basin, which lies in the
transition zone between Interior Alaska and Cook Inlet and includes montane environments. As a result,
we will use the rapid assessment procedure developed by Magee and Hollands (1998) as the basis for
assessing wetland functions, but the procedure (and parameters measured) will be modified as needed to
evaluate wetland functions unique to the project area.
At a minimum, the 2012 study will include the following study components:
Compile available digital wetland mapping layers to help facilitate the development of wetland
delineations based on current aerial imagery.
Incorporate data from the Vegetation and Wildlife Habitat Mapping Study and available data on
natural fire patterns along the reservoir reach of the Susitna River.
If possible, identify wetland delineation field sites and data from the 1980s studies for potential
resampling.
Preselect field sampling locations and conduct field wetland delineation and functional assessment
surveys.
Conduct initial mapping of wetland types in the areas sampled during field surveys in summer 2012.
Report on the progress and initial results of the study in the Technical Memorandum (see Products
below).
TASK 1: COMPILE AND REVIEW EXISTING INFORMATION TO DEVELOP MAPPING
MATERIALS
A number of wetland and vegetation mapping resources for the project area were identified as part of the
preparation of the PAD (AEA 2011). Of particular value is the availability of digital NWI wetlands
mapping for the study area. Although this mapping is more than 20 years old, it still will be a useful
resource for planning the 2012 field effort. Other data sources that will be used (where available) include
soil surveys, digital elevation data, the National Hydrography Dataset (USGS 1999), and any map
products that may have been produced for other studies in the region. These data will be compiled and
reviewed and, where possible, included as a map layer in ArcGIS to assist the current mapping effort.
Available, high-resolution aerial imagery for the mapping study area will be acquired and evaluated for
quality and geodetic control. As noted above, for those portions of the study area that are not covered by
the high-resolution aerial imagery, moderate-scale imagery will be purchased to support the field effort in
summer 2012. New high-resolution aerial photography or satellite imagery for the Project area is
expected to be acquired in summer 2012, which then will be used to map wetlands in those areas not
covered by existing high-resolution imagery.
TASK 2: COMPLETE PRELIMINARY MAPPING
Prior to the 2012 field season, we will initiate preliminary mapping of wetland and upland boundaries
using ArcGIS 10.0. On-screen digitizing will be conducted in those areas where NWI mapping is lacking
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 4
and suitable aerial imagery is available. The magnitude and scale of the mapping effort will depend on the
quality of the imagery and the extent of NWI mapping. The goal of this preliminary mapping is to map a
reasonable set of characteristic wetland ecotypes that occur in the mapping study area so as to guide the
field wetland-determination and ground-verification surveys (see below).
Classification and mapping of the Project area will follow the protocols for preparing wetland maps that
have been developed by the USFWS National Wetland Inventory (NWI) program (National Wetlands
Inventory Center 1995, Dahl et al. 2009). These protocols describe requirements for boundary
delineation, polygon size, classification, and NWI annotation. The minimum mapping polygon size for
most upland and wetland habitats will be 0.5 acres, with smaller polygons (0.1 acre) delineated for water
bodies and other wetlands of ecological importance. Wetland and upland boundaries will be delineated
based on color signature, plant canopy, and surface relief, along with hydrological indicators such as
drainage patterns and surface water connections. As noted above, the classification of wetlands will
incorporate elements of three different wetland classification systems: NWI, hydrogeomorphic (HGM)
classes, and a regional classification for the Cook Inlet basin (see below). Wetlands also will be classified
into Viereck Level IV vegetation types (where possible) using The Alaska Vegetation Classification
(Viereck et al. 1992), which includes canopy classes for shrub, dwarf tree, and tree lifeforms.
TASK 3: COMPLETE FIELD WETLAND DETERMINATIONS AND VERIFICATIONS
The wetland field surveys will be organized to collect data from as many wetland ecotypes as possible in
a way that maximizes safety and efficiency. The preliminary mapping effort described above will be used
to preselect sampling transects and wetland-determination plots, although additional plots may be
established in the field when additional field data are needed for a given area or a particular wetland
ecotype. Field plots will be sampled along transects that will be located within major physiographic types,
including riverine, lacustrine, lowland, and upland areas. If possible, plots for which vegetation data were
collected in the 1980s will be resampled (these data will be valuable for assessing the extent to which
landscape characteristics have changed in the intervening 25 years).
Wetland determinations will be made using the standard three-parameter approach described in the 1987
Corps of Engineers Wetlands Delineation Manual (Environment Laboratory) and Regional Supplement to
the Corps of Engineers Wetland Delineation Manual: Alaska Region (Version 2.0) (USACE 2007). Field
surveys will be conducted between 15 June and 15 September, which is well within the median dates of
the onset of vegetation green-up in spring and vegetation senescence in fall, which are summarized in the
2007 Regional Supplement for the Project area. To be classified as a wetland, a site must be dominated by
hydrophytic plants, have hydric soils, and show evidence of a wetland hydrologic regime. At each
wetland determination plot, percent areal cover of plant species within each stratum (herb, shrub, and
tree) will be visually estimated, generally within a 10-m (30-ft) radius of relatively homogeneous
vegetation as specified in the 1987 Manual. The size and dimensions of the plots may be modified,
however, depending on the site characteristics of the plant community (e.g., narrower plots in riparian
fringe habitats). Additional documentation at each plot will include observations of wildlife use (stick
nests, dens) and other site characteristics that reflect habitat quality and wetland function. Additional
vegetation structure information for both vascular and nonvascular plants will be recorded to assist in
evaluating use of the wetland ecotypes birds and mammals.
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 5
In addition to wetland determination plots, we will establish ground-verification plots for improving the
accuracy of the overall mapping effort. At these plots, the dominant plant species will be recorded, and
wetland ecotype and Viereck Level IV vegetation classes (Viereck et al. 1992) will be assigned. These
verification assessments will be performed in areas where the wetland or upland status has been well
documented in determination plots elsewhere, and will be used to improve map accuracy by increasing
the number of documented wetland ecotypes tagged to particular aerial photosignatures.
A mobile Trimble® Nomad™ series GIS unit will be used to record the wetlands data (using the WetForm
database), record GPS location (as back-up to handheld GPS receivers), and provide field access to aerial
imagery and the preliminary mapping performed prior to the field survey. WetForm is a proprietary
relational database used to enter wetlands site data in the field, and it facilitates the preparation of
electronic copies of the USACE 2007 Regional Supplement dataform for each wetland determination
plot.
TASK 4: POST-FIELD MAPPING OF WETLANDS
After the field season, we will revise the preliminary wetlands map to reflect the site characteristics of
wetland ecotypes verified in the field. This on-screen mapping in GIS will be an on-going process that
likely will not be completed for the full mapping study area until 2014.
As noted above, wetland ecotypes will be defined based on a number of landscape, geomorphic,
hydrological, and biological variables. For each map polygon delineating a wetland ecotype, attribute
codes will be recorded in GIS so as to categorize the mapped wetlands according to three wetland
classification systems: the Classification of Wetlands and Deepwater Habitats of the United States
(Cowardin et al. 1979), HGM class (Smith et al. 1995), and the wetland classification system developed
by the Kenai Watershed Council specifically for lowlands in the Cook Inlet region
(http://cookinletwetlands.info/). The latter system, developed by Mike Gracz, improves on the Cowardin
system by incorporating region-specific landscape, geomorphic, and wetland function features into the
classification. In the mapping of wetlands for the Project, wetland ecotypes will be defined specifically
for the Susitna basin using methods consistent with the Cook Inlet lowlands wetland classification
system. Wetlands also will be classified into Viereck Level IV vegetation types (where possible) using
The Alaska Vegetation Classification (Viereck et al. 1992), which includes canopy classes for shrub,
dwarf tree, and tree lifeforms.
Once substantial progress has been made on the wetlands mapping for 2012, we will prepare a
preliminary wetlands map for the Technical Memorandum, in which the results of the 2012 mapping
study will be described (see below).
REPORTING
The primary deliverables to be prepared in 2012 include (1) this study plan describing the work to be
performed in 2012, (2) the Proposed and Revised Study Plans for work in 2013–2014, (3) copies of field
data and GIS map products, and (4) a Technical Memorandum describing the progress and results of the
2012 Wetlands Mapping Study (see Products below).
In the Technical Memorandum, we will summarize the results of the 2012 Wetlands Mapping Study. The
report will include descriptions of the wetland ecotypes identified; a summary table (acreages) of the
wetland ecotypes and upland areas represented in the 2012 wetlands mapping effort; a description of the
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 6
vegetation, hydrology, and soils of the preliminary wetland functional groups identified; the model to be
used for the functional assessment; and recommendations for the 2013 field survey effort. The report also
will include field wetland dataforms, and field plot photos including site, ground, and soil photographs.
A digital copy of the preliminary wetlands mapping will be provided as a separate deliverable in ArcGIS
format, and will include supporting metadata documentation.
LOGISTICAL SUPPORT AND HEALTH AND SAFETY
The field survey will be coordinated with the Vegetation and Wildlife Habitat Mapping Study using the
following schedule, transportation, and personnel:
Two (2-person) field crews will perform each field survey;
Two 12-day field surveys (24 days total, including travel time) will be conducted starting
approximately 15 June 2012 and ending 15 August 2012; and
Field logistics will require a 4-passenger helicopter with approximately 4 hours of flight time
required each day.
A Health, Safety, and Environmental Plan will be prepared prior to the field effort that will include:
Project Safety Risk Assessment and Plan: This consists of a matrix that describes specific
potential hazard/risk categories; the methods to be used to minimize risks; and responses to
hazards.
Field Communication Plan: This plan identifies the field personnel, the physical location of the
field party, and contact information (telephone, fax, email, satellite phone, cell phone, or radio).
Emergency Contact form and Emergency Medical form: All field personnel complete (or update)
these forms prior to beginning field work.
All field personnel will have, at a minimum, CPR and Basic First Aid training prior to commencing
fieldwork. Discussions regarding safety concerns raised by field personnel will be documented on a
Safety Concerns or Minor Safety Incident Report. Should a minor safety incident occur, an ABR Safety
Concerns or Minor Safety Incident Report will be filled out by the staff member(s) involved in the
incident and reviewed by the Field Project Leader (FPL) and Project Manager (PM). After returning from
the field, all forms will be submitted to the ABR Safety Group for review and a copy will be stored in the
project’s safety folder. A post-field safety review will be conducted to review all safety concerns or minor
incidents, identify any problems areas where safety training or planning can be improved, and those
resolutions will be communicated to the PI/FPL and the staff involved in the incident.
A major safety incident (defined as an accident that required removal of the staff member from the field,
hospitalization, or other responses that would initiate an OSHA or Workman’s Compensation report) will
be reported immediately to their PM/FPL and Tom DeLong, ABR’s Office/Contracts Manager. A
detailed report on the safety incident, the response, and any actions required will be prepared by the PM
and submitted to the ABR Safety Group for review. As with the minor incident reports, this report will be
reviewed during the post-field audit and any appropriate changes in planning, training, or response will be
undertaken and documented with a follow-up addendum to the original report.
NEXUS BETWEEN PROJECT AND RESOURCE TO BE STUDIED AND HOW THE RESULTS
WILL BE USED
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 7
Project construction, facilities, and operation and maintenance may affect wetlands upstream from the
dam site, and along access and transmission line routes. The construction and operation of the Susitna-
Watana Hydroelectric Project is expected to affect wetland resources in the following ways:
• Direct wetland loss from fill placement for constructing roads, power plants, and other Project
infrastructure;
• Conversion of palustrine wetland systems to a lacustrine system by damming the Susitna River to
create a reservoir;
• Loss of wetland function, including changes in wetland canopy structure, soil biological productivity,
water storage, and flood control; and
• Indirect impacts from erosion, dust, permafrost degradation, landslides, and off-road vehicle use.
A thorough understanding of how Project activities are expected to affect wetland resources in the study
area will be critical for developing best management practices, rehabilitation options for promoting
recovery of wetlands exposed to short term impacts, and compensatory mitigation for permanent wetland
losses. Upon completion of the Wetlands Mapping Study for the Project (expected in 2014), protection,
mitigation, and enhancement (PME) measures will be developed in consultation with the USACE through
the FERC ILP process to address the adverse Project-induced impacts on wetlands identified in the PAD
(AEA 2011). As noted above, in areas downstream of the proposed dam the alteration of successional
riparian vegetation and wildlife habitats (which include wetlands) will be addressed in the Riparian Study
(see Riparian Study Plan—2012).
PRODUCTS
Study products to be delivered in 2012 will include:
Development of final 2012 Wetlands Mapping Study Plan. The study plan for work in 2012 will be
finalized through consultation with AEA, the Botanical Resources Program Lead, the USACE and other
resource agencies and licensing participants. USACE must approve the proposed wetland classification
functional assessment methods prior to initiation of field data collection. The Study Project Manager for
the Wetlands Mapping Study will participate in the Technical Working Group meetings as the technical
lead for this study and will prepare materials and revise the study plan accordingly.
2013–2014 Wetlands Mapping Study Plan. The 2013–2014 study plan will be developed with input
received during the Technical Working Group Meetings through the formal FERC ILP study plan
process. The Study Project Manager for the Wetlands Mapping Study will participate in the Technical
Working Group and assist the Botanical Resources Program Lead in developing the draft and final
Proposed Study Plans and draft and final Revised Study Plans.
Draft Technical Memoranda. A draft technical memorandum will be prepared in mid-summer 2012
summarizing the progress of the 2012 field studies and mapping work.
Geospatially-referenced ground-verification data. A geospatially-referenced relational database of
historic data and data collected during 2012 field season, including representative photographs of wetland
ecotypes will be prepared. This database will form the basis for additional data collection efforts in 2013
and 2014. Naming conventions of files and data fields, spatial resolution, map projections, and metadata
descriptions will meet the data standards to be established for the Project.
Wetland map in ArcGIS software. The preliminary wetland map will be developed and delivered
according to the schedule indicated below. The wetland map will continue to be developed during the
2013 and 2014 so as to cover the full mapping study area. Naming conventions of files and data fields,
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 8
spatial resolution, map projections, and metadata descriptions will meet the data standards to be
established for the Project.
Final Technical Memorandum. A final technical memorandum summarizing the 2012 study results will
be prepared in winter 2012. In the memorandum, the status of the study will be assessed and any technical
problems that have occurred will be identified, thereby allowing for refinement of the study methods in
2013–2014.
SCHEDULE
This is a multi-year study. The following schedule is for the 2012 scope of work. The schedule for the
2013–2014 components will be developed with the AEA during the 2013–2014 study planning process.
Final 2012 Wetlands Mapping Study Plan — May 18, 2012
Draft 2013–2014 Wetlands Mapping Proposed Study Plan — May 28, 2012
Final 2013–2014 Wetlands Mapping Proposed Study Plan — June 30, 2012
Draft Technical Memorandum — July 31, 2012
Draft 2013–2014 Wetlands Mapping Revised Study Plan — September 15, 2012
Final 2013–2014 Wetlands Mapping Revised Study Plan — October 31, 2012
Geospatially-referenced relational database of field data — November 30, 2012
Draft wetlands map in ArcGIS software — November 30, 2012
Final Technical Memorandum — November 30, 2012
Draft 2013–2014 Wetlands Mapping Study Plan (based on FERC approval) – December 2012
REFERENCES
Alaska Department of Environmental Conservation/U. S. Army Corps of Engineers Waterways
Experiment Station Technical Report Number: WRP-DE-____1999. Operational draft guidebook for
reference based assessment of the functions of precipitation-driven wetlands on discontinuous
permafrost in Interior Alaska. Anchorage, AK.
Alaska Energy Authority (AEA). 2011. Pre-Application Document: Susitna-Watana Hydroelectric Project
FERC Project No. 14241. December 2011. Prepared for the Federal Energy Regulatory Commission
by the Alaska Energy Authority, Anchorage, Alaska.
Cowardin, L. M., V. Carter, F. C. Golet, and E. T. LaRoe. 1979. Classification of wetlands and deepwater
habitats of the United States. Northern Prairie Publication 0421, U.S. Department of the Interior, Fish
and Wildlife Service, Washington, DC. 131 pp.
Dahl, T. E., J. Dick, J. Swords, and B. O. Wilen. 2009. Data collection requirements and procedures for
mapping wetland, deepwater and related habitats of the united states. Division of Habitat and
Resource Conservation, National Standards and Support Team, Madison, WI. 85 p.
(http://www.fws.gov/wetlands/_documents/gNSDI/DataCollectionRequirementsProcedures.pdf)
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 W etlands Mapping Study—May 18, 2012 9
Environmental Laboratory. 1987. Corps of Engineers Wetlands Delineation Manual. Technical Report Y-
87-1. Vicksburg, MS: U.S. Army Engineer Waterways Experiment Station.
(http://el.erdc.usace.army.mil/wetlands/pdfs/wlman87.pdf)
Hall, J. V., J. E. Powell, S. Carrack, T. Rockwell, G. Hollands, T. Walter, and J. White. 2003. Wetland
functional assessment guidebook, operational draft guidebook for assessing the functions of slope/flat
wetland complexes in the Cook Inlet Basin Ecoregion Alaska, using the HGM approach. ADEC and/
USACE Waterways Experiment Station Technical Report: WRP-DE-__. 160 pp.
National Wetlands Inventory Center. 1995. Photointerpretation conventions for the National Wetlands
Inventory, USFWS. St. Petersburg, FL. 60 pp.
Magee, D. W., and G. G Hollands, 1998. A rapid procedure for assessing wetland functional capacity
based on hydrogeomorphic (HGM) classification. Bedford, NH.
McKendrick, J. D., W. Collins, D. Helm, J. McMullen, and J. Koranda. 1982. Susitna Hydroelectric
Project environmental studies, Phase I final report, Subtask 7.12—Plant ecology studies. Report
prepared by University of Alaska, Agricultural Experiment Station, Palmer, for Alaska Power
Authority, Anchorage. 124 pp. + appendix. [APA Doc. No. 1321]
Smith, R. D., A. Ammann, C. Bartoldus, and M. M. Brinson. 1995. An approach for assessing wetland
functions using hydrogeomorphic classification, reference wetlands, and functional indices. Technical
Report WRP–DE–9, U.S. Corps of Engineers, Army Engineer Waterways Experiment Station,
Vicksburg, MS.
USACE (U.S. Army Corps of Engineers). 2007. Regional supplement to the corps of Engineers Wetland
Delineation Manual: Alaska Region (Version 2.0). ERDC/EL TR-07-24. September 2007. Wetlands
Regulatory Assistance Program. U.S. Army Engineer Research and Development Center, Vicksburg,
MS. 130 pp.
USFWS (U.S. Fish and Wildlife Service). 1984. Wetlands mapping [no title page]. Report section
prepared for Harza–Ebasco Susitna Joint Venture, Anchorage. 29 pp. [APA Doc. No. 2376].
U. S. Geological Survey in cooperation with the U.S. Environmental Protection Agency. 1999. National
Hydrography Dataset—Medium resolution. Reston, Virginia. U.S. Geological Survey. Online
Linkage: http://nhd.usgs.gov. Accessed 15 June 2006.
Viereck, L. A., and C. T. Dyrness. 1980. A preliminary classification for the vegetation of Alaska.
General Technical Report PNW-106, Portland, OR. U.S. Forest Service, Pacific Northwest Forest and
Range Experiment Station, 38 pp.
Viereck, L. A., C. T. Dyrness, A. R. Batten, and K. J. Wenzlick. 1992. The Alaska vegetation
classification. Gen. Tech. Rep. PNW-GTR-286. Portland, OR: U.S. Department of Agriculture,
Forest Service, Pacific Northwest Research Station. 278 pp.
Susitna-Watana Hydroelectric Project FERC #14241 Alaska Energy Authority
2012 Wetland Mapping Study—May 18, 2012 10